1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Bank s approval Date of the procurement Plan Original: August 19, 2016; Updated Procurement Plan, April Date of General Procurement Notice: Dec 24, Period covered by this procurement plan: The procurement period of project covered from August 2016 December 2017 II. Goods and Works and non-consulting services. 1. Review Threshold: Procurement Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method 1. ICB Goods and Non-Consulting Services 2. NCB - Goods and Non-Consulting Services 3. Shopping - Goods and Non-Consulting Review Threshold US$ Above or equal to US$ 2,000,000 Below US$ 2,000,000 Below US$ 100,000 Comments All None None Services 4. ICB (Works) Above US$ 10 million All 5. NCB (Works) Below US$ 10 million None 6. Shopping (Works) Below US$ 100,000 None 2. Prequalification. Bidders for shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: 4. Reference to (if any) Project Operational/Procurement Manual: N/A at this stage 5. Any Other Special Procurement Arrangements: 5 ICB works packages are eligible to be financed under retroactive financing 6. the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement)

2 Ref. No. Description the ICB (Works) the ICB (Goods) the NCB (Works) the ICB (Non- Consultant Services) the Shopping (Goods) Cost US$ million Packages Domest ic Prefere nce (yes/no) Review by Bank ( / ) No No 19 3 No No No Comments III. of Consultants 1. Review Threshold: decisions subject to Review by Bank as stated in Appendix 1 to the Guidelines and Employment of Consultants: Method Review Threshold Comments 1. Competitive Methods (Firms) QCBS Above US$ 1,000,000 All 1. Competitive Methods (Firms) QCBS 300,000 - < 1,000,000 None 1. Competitive Methods (Firms) Below US$ 300,000 None CQS/FBS/LCS 2. Single Source (Firms) All All 3. Individual Above or equal to US$ All 200, Individual Below US$ 200,000 None 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines Any Other Special Arrangements: 5 QCBS works packages are eligible to be financed under retroactive financing

3 4. Consultancy Assignments with Methods and Time Schedule Ref. No. Description of Assignment number of contracts that will be let under QCBS number of contracts that will be let under other methods number of contracts that will be let under ICS Cost US$ million Packages Review by Bank ( / ) CQS Comments

4 Page 1 PROCUREMENT PLAN Angola : Second Water Sector Institutional Project General Information Country: Angola Banks Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P GPN Date: Project Name: Second Water Sector Institutional Project Loan / Credit No: Executing Agency(ies): National Directorate of Water WORKS Procurement Prequalification (Y/N) Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1W3/MALANJE/DNA/16 / Design and construction of network and home connections in Malanje Water Supply Production and Request for Bids Open - International 13,800,00 8,096, Signed W3/DUNDO/DNA/16 / Design and construction of network and home connections in Dundo Water Supply Production and Request for Bids Open - International 16,050,00 12,836, Signed W3/HUAMBO/DNA/16 / Design and construction of network and home connection for peri-urban areas in Huambo Water Supply Production and Request for Bids Open - International 23,000,00 12,859, Signed W3/LUENA/DNA/16 / Design and construction of network and home connections in Luena Water Supply Production and Request for Bids Open - International 17,250,00 9,849, Signed W3/UIGE/DNA/16 / Design and construction of network and home connections in Uige Water Supply Production and Request for Bids Open - International 11,500,00 10,368, Signed W3/NAMIBE/DNA/16 / Design and construction of network and home connections in Namibe Water Supply Production and Request for Bids Open - International 16,500,00 Pending W3/KUITO/DNA/16 / Design and construction of network and home connections in Kuito Water Supply Production and Request for Bids Open - National 5,000,00 4,071, Signed W3/NDALATANDO/DNA/16 / Design and construction for refurbishment of the WTW, construction of distribution centers and 1.6 km trunk mains for Ndalatando Water Supply Production and Request for Bids Open - International 10,500,00 Canceled W3-B/HUAMBO/DAS/17 / Construction of Network and Home Connections for the City of Huambo-Lot 2 Water Supply Production and Direct Direct 5,757, ,731, Signed W3/KUITO/DNA/17 / Supply and installation of valves and fittings for Kuito Water Supply System Water Supply Production and Direct Direct 400,00 Canceled W3/NDALATANDO/DNA/17 / Supply and installation of bulk meters and valves for Ndalatando water supply system Water Supply Production and Request for Bids Open - National 400,00 Canceled W3-R/DAS/17 / Repairs to the in the City of Ndalatando Water Supply Production and Request for Bids Open - National 770,00 Pending W3/LUBANGO/DNA/16 / Design and Construction of reservoirs in Lubango Water Supply Production and Request for Bids Open - National 9,300,00 Pending W3/LUBANGO/DNA/18 / Design and Construction of Network and Household Connections in Lubango Water Supply Production and Request for Bids Open - National 3,500,00 Pending W3/MALANJE/DNA/18 / Repair works to connections in Malanje Water Supply Production and Request for Bids Open - National 2,500,00 Pending W3/CUITO/DNA/18 / Design and Construction of Network and Household Connections in Cuito- Phase 2 Water Supply Production and Request for Bids Open - National 3,500,00 Pending W3/NDALATANDO/DNA/16 / Design and construction of a new water source, WTW, pumping station, raw water pipeline, distribution centers and trunk mains for Ndalatando Water Supply Production and Request for Bids Open - International Y 30,000,00 Canceled W3/LUBANGO/DNA/18 / Construction of Water Production Boreholes in Lubango Water Supply Production and Request for Bids Open - National 700,00 Pending W3/LUBANGO/DNA/16 / Design and construction of boreholes in Lubango Water Supply Production and Request for Bids Open - National 8,000,00 Pending

5 Page 2 8W3A/NDALATANDO/DNA/18 / Design and construction of a new water source, WTW, pumping station, raw water pipeline, distribution centers and trunk mains for Ndalatando Water Supply Production and Request for Proposals Open - International Multi Stage Y 50,000,00 Pending GOODS Procurement Prequalification (Y/N) Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1G4/DNA/16 / Education and laboratory equipment for Onga Zanga training center Request for Bids Open - National 1,800,00 Pending G4/DNA/16 / Computers and IT equipments for IRSEA and DNA Water Supply Production and Request for Quotations Limited 100,00 Pending G4/DNA/16 / Furniture shopping Request for Quotations Limited 100,00 Pending G4/DNA/16 / of a Financial Management System (Primavera software) Request for Quotations Limited 70,00 Canceled G1/CITIES/DNA/18 / Water meters, pipes valves and fittings for six cities Request for Bids Open - National 800,00 Pending /G1/CITIES/DNA/18 / Workshop and maintenance equipment Request for Bids Open - National 250,00 Pending G1/CITIES/DNA/18 / Workstations and printers for Utilities in Huila, Malanje and Cuanza Norte Request for Bids Open - National 300,00 Pending NON CONSULTING SERVICES Procurement Prequalification (Y/N) Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1NC1/LUENA/DNA/16 / Management Contract for Luena Request for Bids Open - International 4,800,00 Pending NC1/CUITO/DNA/18 / Management Services Contract for Cuito Request for Bids Open - International Y 4,500,00 Pending NC1/HUAMBO/DNA/18 / Management Services Contract for Huambo Request for Bids Open - International Y 4,500,00 Pending NC1/UIGE/DNA/18 / Management Services Contract for Uige Request for Bids Open - International Pending Y 4,500, NC1/MALANJE/DNA/18 / Management Services Contract for Malanje Request for Bids Open - International Y 4,500,00 Pending NC1/NDALATANDO/DNA/18 / Management Services Contract for Ndalatando Request for Bids Open - International Y 4,500,00 Pending CS1/DAS/18 / Operation and Management of Kuito and Kunje Water Direct Direct 1,135, Pending 93CS1/DAS/18 / Operation and Management of Huambo Water Direct Direct 1,091, Pending 20CS1/DAS/18 / Operation and Management of Malanje Water Direct Direct 835, Pending 94CS1/DAS/18 / Operation and Management of Uige Water Direct Direct 934, Pending 59CS1/DAS/15 / Operation and Management of Lubango Water Direct Direct 2,235, Pending CONSULTING FIRMS Contract Type Status Combined Evaluation Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1CS3/DNA/16 / Design checking for Peirurban areas of Malanje Water Supply Production and Based Open - International 3,000,00 1,934, Signed

6 Page 3 2CS3/DNA/16 / Design checking for Dundo Water Supply Production and Based Open - International 3,200,00 2,328, Signed CS3/DNA/16 / Design checking for Huambo (1st phase) Water Supply Production and Based Open - International 3,000,00 2,074, Signed CS3/DNA/16 / Design checking for Luena Water Supply Production and Based Open - International 3,000,00 1,680, Signed CS3/DNA/16 / Design checking for Uige Water Supply Production and Based Open - International 2,700,00 2,194, Signed CS3/DNA/16 / Design checking for Namibe Water Supply Production and Based Open - International 2,900,00 Under CS3/DNA/16 / Design checking for Kuito (1st phase) Water Supply Production and Based Open - International 2,400,00 994,22 Signed CS3/NDALATANDO/DNA/16 / Design checking and works supervision for the construction of a new water source and pipeline in Ndalatando Water Supply Production and Based Pending Open - International 3,300, CS3/NDALATANDO/DNA/16 / Design checking and works supervision for the refurbishment of the treatment plant and construction of distribution centers in Ndalatando Water Supply Production and Based Open - International 2,400,00 Pending CS3/LUBANGO/DNA/16 / Design checking and works Supervision of Construction of reservoirs in Lubango Water Supply Production and Based Open - International 1,500,00 Under CS2/INRH/DNA/16 / TA to develop Integrated Basin Management Plan for River Basins in Benguela Water Resource Management Based Open - International 2,200,00 Canceled CS2/INRH/DNA/16 / TA to develop Integrated Basin Management Plan for Keve e Longa Basins Water Resource Management Based Open - International 2,200,00 Canceled CS4/NAMIBE/DNA/16 / Salt water intrusion study at Namibe Based Open - International 500,00 Canceled CS1/IRSEA/DNA/16 / TA Water and Electricity Regulator (IRSEA) Based Under Open - International 6,300, CS1/DNA/17 / External Audit Least Cost Open - International 130,00 Under CS4/DNA/17 / Project Internal Audit Under Least Cost Open - International 250, CS1/DNA/17 / AUDIT OF FINANCIAL STATEMENTS FOR SIX BENEFICIARY WATER SUPPLY AND SANITATION UTILITIES Under Least Cost Open - International 200, CS2/TA/INRH/17 / Technical Assistance to INRH (National Water Resource Management Water Resources Institute) Based Open - International 3,000,00 Under Review CS3/KUITO/DNA/18 / Design checking and works Supervision of Network and Home Connections for Kuito (2nd phase) Water Supply Production and Based Open - International 1,000,00 Pending CS3/LUBANGO/DNA/18 / Design checking and works Supervision of Network and Home Connections for Lubango (1st phase) Water Supply Production and Based Open - International 1,000,00 Pending CS3/UIGE/DNA/18 / Environmental and Social Impact Assessment for Uige Water Water Supply Production and Based Pending Open - National 200, CS3/MALANJE/DNA/18 / Design Checking and Supervision of Repairs to Household Connections at Malanje Water Supply Production and Based Open - International 1,000,00 Pending CS3/LUBANGO/DNA/18 / Hydrogeological survey and prospection of new production boreholes in Lubango Based Pending Open - International 4,800,

7 Page 4 60CS1/DNA/18 / Review of the Legal and Institutional Frameworks of the Angola Water Sector Based Under Open - International 663, CS4/DNA/18 / Updates of Sanitation Master Plans in three Cities - Batch 1 Based Pending Open - International 600, INDIVIDUAL CONSULTANTS Contract Type Status Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 11CS4/DNA/16 / Hydrogeology specialist Direct 400,00 Canceled CS4/DNA/17 / Senior FCMU Coordinator Open 700,00 802, Signed CS4/DNA/17 / Senior Financial Management Specialist Water Supply Institutional Open 700,00 809, Signed CS4/DNA/17 / Financial Management Specialist-DNA Open 700,00 303, Signed CS4/DNA/17 / Senior Procurement Specialist Open 700,00 803, Signed CS4/DNA/17 / Senior Procurement Specialist Open 500,00 645, Signed CS4/DNA/17 / Senior Procurement Specialist-DNA Open 700,00 405, Signed CS4/DNA/17 / Water Utility Management Specialist Open 700,00 683, Signed CS4/DNA/17 / Procurement officer (1) Open 250,00 211, Signed CS4/DNA/17 / Procurement Officer (2) Open 250,00 211, Signed CS4/DNA/17 / Design/Environmental Expert to DNA/FCMU Open 385,00 Under CS4/DNA/17 / Senior Design Engineer Open 500,00 516, Signed CS4/DNA/17 / Senior Environmental Specialist Open 500,00 Under CS4/DNA/17 / Technical Assistance to support DNA/FCMU Open 350,00 338, Signed CS4/DNA/17 / Project Accountant Open 320,00 Under CS4/DNA/17 / Financial Assistant (1) Open 170,00 67, Signed CS4/DNA/17 / Financial Assistant (2) Open 170,00 67, Signed CS4/DNA/17 / MIS Consultant Open 60,00 Pending CS4/DNA/17 / Consultant to the of the Primavera Accounting System Direct 45,00 Under CS4/DNA/17 / Monitoring Evaluation Specialist Water Supply Production and Open 250,00 Pending CS4/DNA/17 / Supervision Engineer Water Supply Production and Open 700,00 Under CS4/DNA/17 / Senior Environmental Specialist Water Supply Production and Open 500,00 Pending CS4/DNA/17 / Stakeholder Engagement e Social Specialist Water Supply Production and Open 700,00 Under CS4/DNA/17 / Information Technology Open 200,00 Under

8 Page 5 43CS1/IRSEA/18 / SHORT TERM TECHNICAL ASSISTANCE TO IRSEA Open 80,00 Under ACS4/DNA/18 / Hydrogeology specialist Direct 180,00 Under CS4/DNA/18 / Consultant to prepare the TORs for the Updates of the Master Plans in 9 Cities Open 80,00 Pending CS2/DAS/18 / Short Term Technical Assistance to INRH Water Resource Management Direct 100,00 Pending CS3/DAS/18 / DESIGN CHECKING AND WORK SUPERVISION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF HUAMBO - LOT 2 Water Supply Production and Direct Direct 850,00 Pending

Procurement Plan. Prior Review Threshold (US$) 1. ICB and LIB (Goods) USD 3,000,000 All 2. NCB (Goods and Nonconsultant prior review by the bank

Procurement Plan. Prior Review Threshold (US$) 1. ICB and LIB (Goods) USD 3,000,000 All 2. NCB (Goods and Nonconsultant prior review by the bank Public Disclosure Authorized I. General Procurement Plan Public Disclosure Authorized 1. Project information: Country: Mozambique Borrower: Government of Mozambique Project Name: Mining and Gas Technical

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 1. Bank s approval Date of the procurement Plan Original:

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 1. Bank s approval Date of the procurement Plan Original:

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 1. Bank s approval Date of the procurement Plan Original:

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

Sample Procurement Plan

Sample Procurement Plan Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 1. Bank s approval Date of the procurement Plan Original:

More information

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan Mozambique: P125120 - Greater Maputo Water Supply Expansi Project 1. Bank s approval Date

More information

2. Project Implementation Agency: National Bureau of Statistics. 3. Date of the Procurement Plan Approval: June 12, 2018

2. Project Implementation Agency: National Bureau of Statistics. 3. Date of the Procurement Plan Approval: June 12, 2018 Public Disclosure Authorized Plan 1. Project Information Country: United Republic of Tanzania Project Name: Development Support for Tanzania Statistics / Support to Strengthen Statistics in Tanzania Project

More information

Procurement Plan Governance and Policy Project for Federally Administered Tribal Areas (P156412)

Procurement Plan Governance and Policy Project for Federally Administered Tribal Areas (P156412) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan Governance and Policy Project for Federally Administered Tribal Areas (P156412) I. General 1. Bank s approval

More information

Procurement Plan. I. General

Procurement Plan. I. General Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan 2. Date of General Notice:

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 2. Bank s approval Date of the procurement Plan Original:

More information

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project information: Country: Afghanistan PROCUREMENT PLAN (Textual Part) Project name:

More information

YESSO 18 Months Procurement

YESSO 18 Months Procurement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General YESSO 18 Mths Procurement 2. Bank s approval Date of the procurement Plan

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT PLAN (Textual Part) Project information: Democratic Republic Democratic of

More information

Prior Review Thresholds

Prior Review Thresholds Public Disclosure Authorized Prior Review Thresholds I. Goods and Works and n-csulting services. Prior Review Threshold: Decisis subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines

More information

I. General. II. Goods and Works and non-consulting services. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

I. General. II. Goods and Works and non-consulting services. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Procurement Plan (Text Part) Bangladesh Weather and Climate Regional Project (BWCSRP) Agency: Bangladesh Meteorological Department (BMD) Bangladesh Water Development Board

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT PLAN (Textual Part) Project information: Democratic Republic Democratic of

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT PLAN (Textual Part) Project information: Democratic Republic Democratic of

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project informati: [country] [Project name] [P-number] Project Implementati agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: To Be Initiated.

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: To Be Initiated. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Bank s approval Date of the procurement Plan Original:

More information

WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months)

WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months) WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen mths) I. General The following procurement plan has been developed for project implementati during the first eighteen

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: Democratic Republic Democratic of Congo, Quality Improvement Project, P157922 Project agency: Ministry of Primary, Secondary and Professional Date of

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: Republic of Congo Education Sector Support Project P152910 Project agency: [insert legal name] Date of the Plan: [insert date] Period covered by this

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: [Mali] [Improving Mali s Statistical System] [P-160977] Project agency: [INSTAT] Date of the Plan: [My-12-2017] Period covered by this Plan: [July 207

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT PLAN (Textual Part) Project informati: Republic of Liberia Liberia Land Administrati

More information

Procurement Method. Preparatio n of TORs/invi tation

Procurement Method. Preparatio n of TORs/invi tation losure Authorized Procurement plan for BETA Project, Kosovo Revised 1/11/2010 Description Type Number of slices/ items/ subpackages Procurement Method I. BUSINESS SERVICES INTEGRATION Preparatio n of TORs/invi

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: Senegal Gas Project Negotiations & Inst Capacity (P160652) Project agency: GES Petrogez Date of the Plan: October 15, 2017 Period covered by this Plan:

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project informati: Country: Bangladesh PROCUREMENT PLAN (Textual Part) Project name:

More information

Project: Rwanda Stunting Prevention and Reduction Project: P

Project: Rwanda Stunting Prevention and Reduction Project: P Public Disclosure Authorized Procurement Plan Project: Rwanda Stunting Preventi and Reducti Project: P 164845. Project Implementati agency: Rwanda Biomedical Centre (RBC) Date of General Procurement Notice

More information

3 and above Less than 3 Less than 1 Recommended to advertise for 7 days for RFQ above 0.5

3 and above Less than 3 Less than 1 Recommended to advertise for 7 days for RFQ above 0.5 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Natial Electrificati Project (P152936) Detailed Plan I. General 1. Project informati:

More information

Contract Completed Contract Signed Procurement Ongoing

Contract Completed Contract Signed Procurement Ongoing losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Contract Completed Contract Signed Procurement Ongoing Ref. No. Contract Description 1. Civil 2

More information

Second Land and Real Estate Registration Project. between KYRGYZ REPUBLIC. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Second Land and Real Estate Registration Project. between KYRGYZ REPUBLIC. and INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H380 KG Public Disclosure Authorized Financing Agreement Second Land and Real Estate Registration Project between Public Disclosure Authorized KYRGYZ

More information

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods I. General Procurement Plan 1. Project Informati Country: Tanzania Project Name: Secd Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Implementati Agency: Ministry of Water and Irrigati

More information

REPORT 2014/050 INTERNAL AUDIT DIVISION. Audit of United Nations Human Settlements Programme operations in Sri Lanka

REPORT 2014/050 INTERNAL AUDIT DIVISION. Audit of United Nations Human Settlements Programme operations in Sri Lanka INTERNAL AUDIT DIVISION REPORT 2014/050 Audit of United Nations Human Settlements Programme operations in Sri Lanka Overall results relating to the effective and efficient implementation of the UN-Habitat

More information

Tel: (617) Fax: (617) OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2

Tel: (617) Fax: (617) OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2 MITT ROMNEY GOVERNOR KERRY HEALEY LIEUTENANT GOVERNOR The Commonwealth of Massachusetts Executive Office for Administration and Finance Division of Capital Asset Management One Ashburton Place Boston,

More information

Common Audit Findings Related to Purchasing and How to Avoid Them

Common Audit Findings Related to Purchasing and How to Avoid Them Common Audit Findings Related to Purchasing and How to Avoid Them Jennifer L. Smith, CPA, Senior Manager 1 Audit Reports and Types of Audit Findings Report on Internal Control over Financial Reporting

More information

CONTRACTOR EMPLOYER

CONTRACTOR EMPLOYER INVITATION FOR BIDS 1. Mangalore SEZ Limited (MSEZL) is jointly promoted by Oil & Natural Gas Corporation Ltd. (ONGC), Infrastructure Leasing & Financial Services Ltd., Karnataka Industrial Areas Development

More information

Public Disclosure Authorized

Public Disclosure Authorized PROCUREMENT PLAN Project informati: Zambia: Mining and Envirment remediati and improvement Project [P154683] Project Implementati agency: Ministry of Mines and Mineral Development Date of the Plan: February

More information

Surplus Property Disposal Guidelines

Surplus Property Disposal Guidelines Surplus Property Disposal Guidelines I. Purpose To provide end-of-life guidelines for the disposal or destruction of the technology assets of the University II. Policy The purpose of the Surplus PC Criteria

More information

BYLAW 5781 ****************

BYLAW 5781 **************** BYLAW 5781 **************** A BYLAW OF THE CITY OF LETHBRIDGE PROVIDING FOR THE IMPOSITION OF AN OFF-SITE LEVY IN RESPECT OF LAND TO BE DEVELOPED OR SUBDIVIDED FOR THE YEARS 2013, 2014, 2015 and 2016 ************************************************************

More information

UTTAR PRADESH JAL NIGAM

UTTAR PRADESH JAL NIGAM UTTAR PRADESH JAL NIGAM INVITATION FOR BID (IFB) NATIONAL GANGA RIVER BASIN PROJECT (INDIA) (WORLD BANK FUNDED) Invitation for Bid International Competitive Bidding Loan No. 8065-IN, Credit No. 4955-IN

More information

SBD 6.2 DECLARATION CERTIFICATE FOR LOCAL PRODUCTION AND CONTENT FOR DESIGNATED SECTORS

SBD 6.2 DECLARATION CERTIFICATE FOR LOCAL PRODUCTION AND CONTENT FOR DESIGNATED SECTORS SBD 6.2 DECLARATION CERTIFICATE FOR LOCAL PRODUCTION AND CONTENT FOR DESIGNATED SECTORS This Standard Bidding Document (SBD) must form part of all bids invited. It contains general information and serves

More information

Intent: To establish a policy and guidelines for all procurement activities in the city. SECTION I: Purpose of Purchasing Policies...

Intent: To establish a policy and guidelines for all procurement activities in the city. SECTION I: Purpose of Purchasing Policies... Policy Number: Appendix C Subject: Revised: 03/26/2012 Issued: 02/10/97 Page: 1 of 10 Intent: To establish a policy and guidelines for all procurement activities in the city. Applies to: All City Employees

More information

LOCKHEED MARTIN CORPORATION PRIME SUPPLEMENTAL FLOWDOWN DOCUMENT (PSFD) ADDITIONAL TERMS AND CONDITIONS FOR SUBCONTRACTS/PURCHASE ORDERS UNDER

LOCKHEED MARTIN CORPORATION PRIME SUPPLEMENTAL FLOWDOWN DOCUMENT (PSFD) ADDITIONAL TERMS AND CONDITIONS FOR SUBCONTRACTS/PURCHASE ORDERS UNDER LOCKHEED MARTIN CORPORATION PRIME SUPPLEMENTAL FLOWDOWN DOCUMENT (PSFD) ADDITIONAL TERMS AND CONDITIONS FOR SUBCONTRACTS/PURCHASE ORDERS UNDER JSF LRIP 3 CONTRACT NUMBER N00019-08-C-0028 Generated using

More information

EMERGING ALTERNATE DELIVERY LEASE LEASEBACK FOR COMMUNITY COLLEGES CCFC 21 ST ANNUAL CONFERENCE SEPT 9 TH, TUESDAY 10:25 AM 11:40 AM WORKSHOP #1 (CC

EMERGING ALTERNATE DELIVERY LEASE LEASEBACK FOR COMMUNITY COLLEGES CCFC 21 ST ANNUAL CONFERENCE SEPT 9 TH, TUESDAY 10:25 AM 11:40 AM WORKSHOP #1 (CC EMERGING ALTERNATE DELIVERY LEASE LEASEBACK FOR COMMUNITY COLLEGES CCFC 21 ST ANNUAL CONFERENCE SEPT 9 TH, TUESDAY 10:25 AM 11:40 AM WORKSHOP #1 (CC ROOM 202) agenda LEGAL PERSPECTIVE & FRAMEWORK OWNERS

More information

PROPERTY DISPOSITION GUIDELINES OF STATE OF NEW YORK MORTGAGE AGENCY, ESTABLISHING STANDARDS FOR THE DISPOSITION AND REPORTING OF PROPERTY

PROPERTY DISPOSITION GUIDELINES OF STATE OF NEW YORK MORTGAGE AGENCY, ESTABLISHING STANDARDS FOR THE DISPOSITION AND REPORTING OF PROPERTY -1- PROPERTY DISPOSITION GUIDELINES OF STATE OF NEW YORK MORTGAGE AGENCY, ESTABLISHING STANDARDS FOR THE DISPOSITION AND REPORTING OF PROPERTY (effective as of October 16, 2008, revised as of April 8,

More information

Town of Waldoboro ADMINISTRATIVE POLICY

Town of Waldoboro ADMINISTRATIVE POLICY Town of Waldoboro ADMINISTRATIVE POLICY Effective Date: December 1, 2010 Regulation No: 2010 001 Revision Date: None Supersedes: None Approved By: Board of Selectmen Subject: SECTION I. PURPOSE This policy

More information

PURCHASING and ACQUISITION

PURCHASING and ACQUISITION Student Alternatives Program, Inc. CH POLICIES PERTAINING TO BUSINESS AND SUPPORT SERVICES PURCHASING and ACQUISITION 1. Guiding Principles (a) The superintendent or designee in consultation with charter

More information

REPUBLIC OF MACEDONIA

REPUBLIC OF MACEDONIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Municipal Services Improvement Project (MSIP) LAND ACQUISITION

More information

Consulted With Individual/Body Date Head of Finance Financial

Consulted With Individual/Body Date Head of Finance Financial Equipment Disposal Policy Developed in response to: Policy Register No: 12037 Status: Public Internal Audit Report for Fixed Assets Contributes to CQC Regulation 17 Consulted With Individual/Body Date

More information

PROCUREMENT CODE: What Districts Need to Know

PROCUREMENT CODE: What Districts Need to Know PROCUREMENT CODE: What Districts Need to Know Cuddy & McCarthy, LLP R. Daniel Castille, dcastille@cuddymccarthy.com Andrea Salazar, asalazar@cuddymccarthy.com (505) 988-4476 Purpose of the Procurement

More information

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Summary of Land Acquisition Policy Framework JAMAICA: JM Hurricane Dean ERL Project RP607

More information

Plan of Survey (Feature Plans)

Plan of Survey (Feature Plans) October 4, 2014 Plan of Survey (Feature Plans) NOTE: This document is a Controller of Surveys Policy manual to be used as a general guideline for the preparation and examination of plans. Reference should

More information

TEXAS GENERAL LAND OFFICE PROCUREMENT GUIDANCE FOR RECIPIENTS AND SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES)

TEXAS GENERAL LAND OFFICE PROCUREMENT GUIDANCE FOR RECIPIENTS AND SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES) TEXAS GENERAL LAND OFFICE COMMUNITY DEVELOPMENT & REVITALIZATION PROCUREMENT GUIDANCE FOR RECIPIENTS AND SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES) This checklist will assist the Texas General

More information

REQUEST FOR PROPOSALS LIHTC PROPERTY MANAGEMENT CONSULTING MAKAH TRIBAL HOUSING DEPARTMENT

REQUEST FOR PROPOSALS LIHTC PROPERTY MANAGEMENT CONSULTING MAKAH TRIBAL HOUSING DEPARTMENT REQUEST FOR PROPOSALS LIHTC PROPERTY MANAGEMENT CONSULTING MAKAH TRIBAL HOUSING DEPARTMENT The Makah Tribal Housing Department (MTHD) is pleased to invite you to submit your firm s qualifications and proposal

More information

M.G.L. c. 30B Bidding Basics

M.G.L. c. 30B Bidding Basics M.G.L. c. 30B Bidding Basics Office of the Inspector General Commonwealth of Massachusetts Massachusetts Treasurers and Collectors Association August 14, 2012 1 M.G.L. c. 30B: Applicability Cities Towns

More information

REQUEST FOR PROPOSALS (A )

REQUEST FOR PROPOSALS (A ) CITY OF TUSCALOOSA ) STATE OF ALABAMA ) REQUEST FOR PROPOSALS (A18-1471) TO: FROM: RE: Qualified Firms The City of Tuscaloosa, Alabama Request for Proposals for Development of Analysis of Impediment to

More information

ENQUIRY DOCUMENT NO IMC/ CGD/LAND/2018/02 Date:

ENQUIRY DOCUMENT NO IMC/ CGD/LAND/2018/02 Date: To, Dear Sir/Ma am, M/s IMC Ltd., Solapur invites sealed bids UNDER TWO BID SYSTEM for the item(s) in complete accordance with the Bid Documents/ Attachments. The salient terms and conditions of the bid

More information

Okinawa Institute of Science and Technology School Corporation Contract Management Stipulations

Okinawa Institute of Science and Technology School Corporation Contract Management Stipulations Okinawa Institute of Science and Technology School Corporation Contract Management Stipulations Table of Contents Article 1... 3 Article 2... 3 Article 3... 3 Article 4... 4 Article 5... 5 Article 6...

More information

Central Kentucky Educational Cooperative

Central Kentucky Educational Cooperative Central Kentucky Educational Cooperative Name of Co-operative PROCUREMENT PLAN CHILD NUTRITION PROGRAM This procurement plan contained on the following pages 1 through 10 will be implemented on _April

More information

Agenda Item 11. Fixed price contract : A contract that provides a price for each procurement item obtained under the contract.

Agenda Item 11. Fixed price contract : A contract that provides a price for each procurement item obtained under the contract. Agenda Item 11 Fixed price contract : A contract that provides a price for each procurement item obtained under the contract. Definite quantity contract a fixed price contract that provides for the supply

More information

ARTICLE I 1. STATEMENT OF PURPOSE AND APPLICABILITY

ARTICLE I 1. STATEMENT OF PURPOSE AND APPLICABILITY -1- PROPERTY DISPOSITION GUIDELINES OF THE NEW YORK STATE HOUSING FINANCE AGENCY, ESTABLISHING STANDARDS FOR THE DISPOSITION AND REPORTING OF PROPERTY OF THE NEW YORK STATE HOUSING FINANCE AGENCY, AND

More information

TRIBAL CODE CHAPTER 13 PROCUREMENT AND PROPERTY MANAGEMENT

TRIBAL CODE CHAPTER 13 PROCUREMENT AND PROPERTY MANAGEMENT TRIBAL CODE CHAPTER 13 PROCUREMENT AND PROPERTY MANAGEMENT CONTENTS: 13.101 Definitions. 13.102 Compliance. 13.103 Financial Reporting and Recordkeeping. 13.104 Maintenance of Property. 13.105 Disposition

More information

Prepared by Office of Procurement and Real Property Management. This replaces Administrative Procedure No. A8.215 dated November 2012 A8.

Prepared by Office of Procurement and Real Property Management. This replaces Administrative Procedure No. A8.215 dated November 2012 A8. Prepared by Office of Procurement and Real Property Management. This replaces Administrative Procedure No. A8.215 dated November 2012 A8.215 A8.215 Definitions A8.200 Procurement October 2013 The words

More information

RECORDKEEPING PROCESS. All ACEDP grantees are required to develop a recordkeeping system that is comprehensive, well-organized and easy to review.

RECORDKEEPING PROCESS. All ACEDP grantees are required to develop a recordkeeping system that is comprehensive, well-organized and easy to review. RECORDKEEPING PROCESS I. INTRODUCTION All ACEDP grantees are required to develop a recordkeeping system that is comprehensive, well-organized and easy to review. The recordkeeping system below provides

More information

FINAL REPORT OF THE PROCUREMENT SYSTEM REVIEW METROPOLITAN COUNCIL ST. PAUL, MINNEAPOLIS

FINAL REPORT OF THE PROCUREMENT SYSTEM REVIEW METROPOLITAN COUNCIL ST. PAUL, MINNEAPOLIS FINAL REPORT OF THE PROCUREMENT SYSTEM REVIEW OF METROPOLITAN COUNCIL ST. PAUL, MINNEAPOLIS JANUARY 2018 Conducted by a Procurement Management Review Team from Milligan & Company, LLC Philadelphia, PA

More information

OVERVIEW OF HOUSING DEVELOPMENT CORPORATION, LONDON (HDC)

OVERVIEW OF HOUSING DEVELOPMENT CORPORATION, LONDON (HDC) OVERVIEW OF HOUSING DEVELOPMENT CORPORATION, LONDON (HDC) Information for Persons Interested in Applying to Serve on the HDC Board of Directors STEPHEN GIUSTIZIA EXECUTIVE LEAD SGIUSTIZIA@HDCLONDON.CA

More information

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2015 S 2 SENATE BILL 554 Education/Higher Education Committee Substitute Adopted 6/24/16

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2015 S 2 SENATE BILL 554 Education/Higher Education Committee Substitute Adopted 6/24/16 GENERAL ASSEMBLY OF NORTH CAROLINA SESSION S SENATE BILL Education/Higher Education Committee Substitute Adopted // Short Title: School Building Leases. (Public) Sponsors: Referred to: March 0, 1 0 1 A

More information

STATE OF MINNESOTA OFFICE OF THE STATE AUDITOR

STATE OF MINNESOTA OFFICE OF THE STATE AUDITOR REBECCA OTTO STATE AUDITOR STATE OF MINNESOTA OFFICE OF THE STATE AUDITOR SUITE 500 525 PARK STREET SAINT PAUL, MN 55103-2139 (651) 296-2551 (Voice) (651) 296-4755 (Fax) state.auditor@osa.state.mn.us (E-mail)

More information

WEST BENGAL RENEWABLE ENERGY DEVELOPMENT AGENCY

WEST BENGAL RENEWABLE ENERGY DEVELOPMENT AGENCY WEST BENGAL RENEWABLE ENERGY DEVELOPMENT AGENCY Tender Document For Design & engineering, manufacture / procurement, testing, supply, installation and commissioning ETC based Solar Water Heating Systems

More information

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6306-MD. Public Disclosure Authorized

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6306-MD. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS Financing Agreement (Land Registration and Property Valuation Project) CREDIT NUMBER 6306-MD Public Disclosure Authorized between

More information

ANNUAL INVENTORY AND PROPERTY DISPOSITION REPORT For the Period Commencing February 2, 2014 and Ending February 1, 2015

ANNUAL INVENTORY AND PROPERTY DISPOSITION REPORT For the Period Commencing February 2, 2014 and Ending February 1, 2015 New York State Housing Finance Agency, State of New York Mortgage Agency and State of New York Municipal Bond Bank Agency ANNUAL INVENTORY AND PROPERTY DISPOSITION REPORT For the Period Commencing February

More information

CONTRACTING - BID LAWS

CONTRACTING - BID LAWS LEGAL COMPLIANCE AUDIT GUIDE Introduction A municipality entering into an agreement for the sale or purchase of supplies, materials, equipment or the rental thereof, or the construction, alteration, repair

More information

12. STAFF REPORT ACTION REQUIRED SUMMARY. Date: September 21, Toronto Public Library Board. To: City Librarian. From:

12. STAFF REPORT ACTION REQUIRED SUMMARY. Date: September 21, Toronto Public Library Board. To: City Librarian. From: STAFF REPORT ACTION REQUIRED 12. Property Redevelopment Feasibility Date: September 21, 2015 To: From: Toronto Public Library Board City Librarian SUMMARY At the meeting on May 25 2015, the Toronto Public

More information

County Tax Sale PLEASE MARK YOUR ENVELOPE "SEALED BID # RETURN ONE (1) ORIGINAL AND THREE (3) COPIES TO:

County Tax Sale PLEASE MARK YOUR ENVELOPE SEALED BID # RETURN ONE (1) ORIGINAL AND THREE (3) COPIES TO: REQUEST FOR BID No. 201303-216 TANEY COUNTY MISSOURI Purchasing Department 132 David Street / P. O. Box 1630 Forsyth, Missouri 65653 Attn: Ron Erickson, Director of Purchasing Phone: 417-546-7281 / FAX:

More information

Sewer Repair Application for 2019

Sewer Repair Application for 2019 Sewer Repair Application for 2019 Residential Wastewater Disposal Improvements for Septic Tank and Individual Treatment Plant Systems Grant Funding Disclosures: This grant is provided by the Community

More information

BIDDING INSTRUCTIONS FOR SALE

BIDDING INSTRUCTIONS FOR SALE MUNICIPALITY OF ANCHORAGE Real Estate Department BIDDING INSTRUCTIONS FOR SALE Site: 22351 Judd Drive, Chugiak, Alaska Address: 22351 Judd Drive, Chugiak, Alaska Legal Description: Tract C, Knik View Estates

More information

AN-C57 MODIFICATIONS TO GENERAL TERMS AND CONDITIONS GOVERNMENT PRIME CONTRACT F D-0006

AN-C57 MODIFICATIONS TO GENERAL TERMS AND CONDITIONS GOVERNMENT PRIME CONTRACT F D-0006 MODIFICATIONS TO GENERAL TERMS AND CONDITIONS GOVERNMENT CONTRACT REQUIREMENTS GOVERNMENT PRIME CONTRACT F42610-99-D-0006 If Form GP1 is applicable to this procurement, this Attachment constitutes the

More information

Okinawa Institute of Science and Technology School Corporation Contract Management Stipulations

Okinawa Institute of Science and Technology School Corporation Contract Management Stipulations Okinawa Institute of Science and Technology School Corporation Contract Management Stipulations Table of Contents Article 1 (Purposes)... 3 Article 2 (Parties That May Not Be Allowed to Participate in

More information

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES TABLE OF CONTENTS

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES TABLE OF CONTENTS TABLE OF CONTENTS CHAPTER Puc 1900 RATE CASE EXPENSES PART Puc 1901 PURPOSE Section Puc 1901.01 Purpose PART Puc 1902 APPLICATION OF RULES Section Puc 1902.01 Application of Rules PART Puc 1903 DEFINITIONS

More information

Implementation of a PPP Transaction in the Rural Water Sector in Uganda. IFC - PPP Transaction Advisory Dakar, June 4, 2012

Implementation of a PPP Transaction in the Rural Water Sector in Uganda. IFC - PPP Transaction Advisory Dakar, June 4, 2012 Implementation of a PPP Transaction in the Rural Water Sector in Uganda IFC - PPP Transaction Advisory Dakar, June 4, 2012 Outline What is a small scale PPP and What are the Main characteristics? Main

More information

What is the Omni-Circular Final Guidance on the Uniform Administrative Requirements, Cost Principals and Audit Requirements for Federal Awards

What is the Omni-Circular Final Guidance on the Uniform Administrative Requirements, Cost Principals and Audit Requirements for Federal Awards What is the Omni-Circular Final Guidance on the Uniform Administrative Requirements, Cost Principals and Audit Requirements for Federal Awards What are the Goals? Streamline guidance Reduce administrative

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name Land Registry and Cadastre Modernization Project Region EUROPE AND CENTRAL ASIA Sector Central government administration

More information

Notification of Policy. Rawdon Young, SEI Appraisal Program Manager

Notification of Policy. Rawdon Young, SEI Appraisal Program Manager SEI SM Appraisal Program Communication Issuance Date: October 24, 2008 May 20, 2009 Revised Communication Type: Communication ID: Title: References: Implementation Date: Source: Action Identified: Distribution:

More information

City of Columbia ENgiNEEriNg regulations Part 8: sanitary sewer main EXtENsioN table of CoNtENts Paragraph Description Page No.

City of Columbia ENgiNEEriNg regulations Part 8: sanitary sewer main EXtENsioN table of CoNtENts Paragraph Description Page No. City of Columbia Engineering Regulations PART 8: SANITARY SEWER MAIN EXTENSION Table of Contents Paragraph Description Page No. 8.1 General 8-1 8.2 Sanitary Sewer Main Extension Agreement 8-1 8.3 Procedures

More information

RIGHT OF WAY AND UTILITIES DIVISION RIGHT OF WAY ACQUISITION AND ASSOCIATED SERVICES. (Internet Posting)

RIGHT OF WAY AND UTILITIES DIVISION RIGHT OF WAY ACQUISITION AND ASSOCIATED SERVICES. (Internet Posting) 11/2015 RIGHT OF WAY AND UTILITIES DIVISION RIGHT OF WAY ACQUISITION AND ASSOCIATED SERVICES CONSULTANT PREQUALIFICATION QUESTIONNAIRE (Internet Posting) ACQUISITION OF RIGHT OF WAY AND ASSOCIATED SERVICES

More information

PROCUREMENT PLAN (P162086)

PROCUREMENT PLAN (P162086) PROCUREMENT PLAN (P162086) Project informati: India, Jharkhand Jharkhand Power System Improvement Project Project Implementati agency: JHARKHAND URJA SANCHARAN NIGAM LIMITED (JUSNL) and JHARKHAND BIJLI

More information

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action

More information

KUVENDI KOMUNAL-DEÇAN CONTRACT NOTICE. According to Article 40 of Law No. 04/L-042 on Public Procurement of the Republic of Kosovo,

KUVENDI KOMUNAL-DEÇAN CONTRACT NOTICE. According to Article 40 of Law No. 04/L-042 on Public Procurement of the Republic of Kosovo, KUVENDI KOMUNAL-DEÇAN CONTRACT NOTICE WORKS SUPPLIES SERVICES According to Article 40 of Law No. 04/L-042 on Public Procurement of the Republic of Kosovo, amended and supplemented with the law No. 04/L-237,

More information

The American University in Cairo. Financial Policies and Procedures

The American University in Cairo. Financial Policies and Procedures The American University in Cairo Financial Policies and Procedures Policy : Capitalization & Depreciation Policy Effective Date : April 1, 2011 Date Revised : December 2016 Prepared by Related Policies

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominican Republic Water Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 18 ARCHIVED on 30-Jun-2017 ISR28927 Implementing Agencies:

More information

Recurrent research and knowledge exchange funding: technical guidance

Recurrent research and knowledge exchange funding: technical guidance 2018-19 Recurrent research and knowledge exchange funding: technical guidance Research England 2018 Contents Page Purpose of this document 3 Section one Further information and requests for changes The

More information

EAST BATON ROUGE REDEVELOPMENT AUTHORITY ADMINISTRATIVE POLICY PROCUREMENT CONTRACTING AND DBE POLICY FOR FEDERALLY FUNDED PROJECTS.

EAST BATON ROUGE REDEVELOPMENT AUTHORITY ADMINISTRATIVE POLICY PROCUREMENT CONTRACTING AND DBE POLICY FOR FEDERALLY FUNDED PROJECTS. EAST BATON ROUGE REDEVELOPMENT AUTHORITY ADMINISTRATIVE POLICY PROCUREMENT CONTRACTING AND DBE POLICY FOR FEDERALLY FUNDED PROJECTS February 5, 2013 East Baton Rouge Redevelopment Authority 801 North Blvd,

More information

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing Involuntary Resettlement Due Diligence Report Loan 2860 (SF) July 2015 ARM: Water Supply and Sanitation Sector Project Additional Financing Prepared by the Armenian Water and Sewerage Closed Joint Stock

More information

Public Private Partnerships in Urban Regeneration

Public Private Partnerships in Urban Regeneration Public Private Partnerships in Urban Regeneration Best Practice from the UK The Role of Design and Masterplanning in Housing Market Renewal Prof. C.H. Bovis Framework Policy 2003 2015 Sustainable Communities

More information

: 156 m to 177 m above Mean Sea Level

: 156 m to 177 m above Mean Sea Level MAITHON POWER LIMITED INVITATION TO BID (ITB) INTERNATIONAL COMPETITIVE BIDDING (ICB) WAGON TIPPLER, SIDE ARM CHARGER, APRON FEEDER WITH ACCESSORIES PACKAGE FOR THE PULVERISED COAL FIRED POWER PLANT OF

More information

The World Bank Support to the Afghanistan Independent Land Authority (P156225)

The World Bank Support to the Afghanistan Independent Land Authority (P156225) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SUPPORT TO THE AFGHANISTAN INDEPENDENT LAND AUTHORITY APPROVED ON JUNE