ELECTRONIC PACKET JANUARY 9, 2017 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Tuesday, January 3, 2017

Size: px
Start display at page:

Download "ELECTRONIC PACKET JANUARY 9, 2017 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Tuesday, January 3, 2017"

Transcription

1 ELECTRONIC PACKET JANUARY 9, 2017 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING RELEASED: Tuesday, January 3, 2017

2

3

4

5

6

7 Item 6 COMMISSION FILE NO: DATE INTRODUCED: January 9, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Policy, Finance, and Personnel Committee RELATING TO: Agreement with the United States Army Corps of Engineers for the Upper Underwood Creek, Contract W21007E01 SUMMARY: The Commission is requested to authorize the Executive Director to execute a feasibility cost sharing agreement (FCSA) with the United States Army Corps of Engineers (USACE) for the Upper Underwood Creek, Contract W21007E01, in a total amount not to exceed $262,500. The Menomonee River Watercourse Management Plan includes a recommendation to perform up to 7,000 feet of concrete channel lining removal and rehabilitation of Underwood Creek and 5,700 feet of concrete channel lining removal and rehabilitation of South Branch of Underwood Creek. The Plan s limits are North Mayfair Road upstream to the Milwaukee/Waukesha County line for Underwood Creek and approximately West Bluemound Road upstream to West Schlinger Avenue for the South Branch of Underwood Creek. The concrete channel lining is a District asset that was installed in the 1960 s. The lining is significantly degraded and reaching the end of its useful life. USACE, in cooperation with the District, is proposing to perform a feasibility study of 12,400 lineal feet of Underwood Creek and South Branch of Underwood Creek from North Mayfair Road to West Schlinger Avenue. This feasibility study requires a 35% proportionate share from the non-federal sponsor (in this case, the District). The feasibility study will recommend a final alternative to perform the above work and will issue a determination as to whether there is a Federal interest in the project. If it does, the project would qualify for USACE sponsorship and funding (with a District cost share), and USACE would then proceed with design and construction. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER PFP_W21007E01_Upper_Underwood_Crk_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

8 SUMMARY (Cont d) Agreement with the United States Army Corps of Engineers for the Upper Underwood Creek, Contract W21007E01 The FCSA is the first step in this partnership opportunity. It sets forth terms and conditions, including how costs will be shared between USACE and the District. The FCSA only commits the District to a cost share for the feasibility study; a future agreement would be needed to commit the District to funding for the design and construction. USACE has requested that the District obtain authorization to enter into the FCSA by February The proposed FCSA is funded by USACE in accordance with Section 506 of the Water Resources Development Act of Under the proposed agreement, USACE will fund 100% of the first $100,000 and 65% of the cost thereafter, while the District will fund the remaining 35% of the study costs above $100,000. The District s share will not exceed $262,500 and may be in the form of cash or in-kind contributions. In addition, the District will: Participate on the project coordination team, which oversees all aspects of the feasibility study, including providing comment and review of the study and related documents. Collect field data (e.g. survey, soil borings, wetland delineation). Assess the potential for contamination at the site. Provide comments on all project documents. USACE will: Participate on the project coordination team. Manage the project feasibility study in consultation with the District. Select and manage the consultants that USACE deems necessary. Provide the District the opportunity to provide comment and feedback. Provide progress reports to the District. In February 2016, the Commission approved executing a proposed FCSA for this same project in an amount not to exceed $200,000. USACE delayed entering into the proposed FCSA, and no agreement between USACE and the District was executed. USACE updated its project cost estimates, which resulted in a need to increase the District cost share to a total of $262,500. This authorization will replace the February 2016 authorization. 2

9 RESOLUTION Agreement with the United States Army Corps of Engineers for the Upper Underwood Creek, Contract W21007E01 RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized to execute a feasibility cost sharing agreement with the United States Army Corps of Engineers for the Upper Underwood Creek, Contract W21007E01, in a total amount not to exceed $262,500. 3

10 Capital Budget Fiscal Note Total Project Cost RELATING TO: Agreement with the United States Army Corps of Engineers for the Upper Underwood Creek, Contract W21007E01 Capital Project Number(s) Impact of Requested Action on Total Project Cost: W21007-Underwood Creek Reach 2 Increase Decrease New Project X No Change Total Project Cost Analysis Project Costs Adopted 2017 Total Project Cost $16,114,430 Previously Approved Changes $0 Approved Total Project Cost $16,114,430 Requested Total Project Cost n/a Requested (Increase)/Decrease $0 Action to be taken to Long-Range Financing Plan to address Total Project Cost change Transfer from Allowance for Cost and Schedule Changes Transfer from another project (specify in comments) Delay Project(s) (specify in comments) Delete Project(s) (specify in comments) Other Transfer to Allowance for Cost and Schedule Changes Comments This feasibility study requires a 35% proportionate share from the District and will recommend a final alternative of work to be performed and a determination as to whether there is a Federal interest in this project. Budget Review by: Date: Theresa Zwieg 12/12/2016

11 Item 7 COMMISSION FILE NO: DATE INTRODUCED: January 9, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Policy, Finance, and Personnel Committee RELATING TO: Approval of the Updated Kinnickinnic River Watercourse Management Plan SUMMARY: The Commission is requested to approve the updated Kinnickinnic River Watercourse Management Plan (KKRWMP) as described below. According to MMSD Commission Policy , Watercourse Policy, the District may fund structural and nonstructural flood risk reduction measures where the District has assumed watercourse jurisdiction for flood management purposes. The KKRWMP currently identifies 448 structures located in the one percent annual probability floodplain (floodplain) along the District s jurisdictional watercourses within the Kinnickinnic (KK) River watershed. The KKRWMP currently consists of 10 different capital projects necessary to reduce the flood risk to the structures located in the floodplain and to meet overall plan objectives. In about 2009, the District began working on various initiatives toward resolving flooding on the KK River. In 2015, floodplain maps were updated, as existing floodplain maps were at least 20 to 30 years old. These updated floodplain maps now reflect changes in the watershed, modeling improvements, and, most significantly, increases in precipitation. With the updated floodplain map and other changes, there are now 221 new structures in the floodplain. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER KKRWMP Project Map and Structures Map PFP_Kinnickinnic_River_Mgmt_Plan_Update_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

12 SUMMARY (Cont d) Approval of the Updated Kinnickinnic River Watercourse Management Plan Based upon the revised floodplain maps, public and stakeholder input, and engineering analysis and planning work detailed in a draft report developed under contract with GRAEF (Report titled Kinnickinnic River Watershed Flood Management Plan ), staff is now proposing to update the KKRWMP. In addition, the requested update reflects changes that have occurred outside of the GRAEF report. The updated plan has the following objectives: Reduce flood risk, Address public safety, Improve in-stream aquatic habitat, Improve stream channel aesthetics, and Leverage community objectives. Following are the proposed changes. KK River Estuary In December 2016, the Commission approved taking jurisdiction of the KK River Estuary. The KKRWMP is updated to include 27 flood prone structures within the KK River Estuary. These structures are all located in the City of Milwaukee. In 2017, staff will begin to develop alternatives and preliminary recommendations to reduce the flood risk to these structures. KK River Mainstem The KKRWMP currently identifies 282 flood prone structures on the KK River Mainstem. The proposed change amends the KKRWMP to add 48 additional flood prone residential structures, for a total of 330 flood prone structures on the KK River Mainstem in the City of Milwaukee. Currently, the KK River Reach 2 project consists of replacing the concrete channel lining from S. 6 th Street to S. 27 th Street with a more naturalized stream design, widening the stream from a top of bank width of 60 feet to approximately 200 feet, acquiring 83 structures between S. 6 th Street and S. 16 th Street to allow for the wider stream, and replacing five vehicular and four pedestrian bridges. There is no change for this stream reach. This update adds voluntary property acquisition or floodproofing of seven residential structures currently in the floodplain (within Reach 2). 2

13 SUMMARY (Cont d) Approval of the Updated Kinnickinnic River Watercourse Management Plan Currently, the KK River Reach 3 project consists of replacing the concrete channel lining between S. 27 th Street into Jackson Park with a naturalized stream design. The update adds two new elements: Increase the flow capacity of the KK River Parkway Bridge. Voluntary acquisition or floodproofing of three residential structures currently in the floodplain. The KK River Reach 4 project currently does not have specific recommendations. The update changes the name of the project from KK River Reach 4 to Jackson Park. The Jackson Park project scope now consists of: Lowering a portion of Jackson Park to provide flood storage; Removing 700 feet of concrete lined channel and 700 feet of corrugated metal culvert and replacing them with a naturalized channel; and Increasing flow capacity of the S. 43 rd Street Bridge. Lyons Park Creek The KKRWMP currently identifies 33 flood prone structures on Lyons Park Creek, all in the City of Milwaukee. The update adds 33 residential structures to the floodplain, for a total of 66 flood prone structures. The Lyons Park Creek project does not currently have a recommended project scope within the KKRWMP. The update proposes to increase the flow capacity of culverts located at the following four locations: W. Cleveland Avenue, W. Stack Drive, S. 57 th Street, and a culvert that extends from W. Bennett Avenue to W. Lakefield Drive. The update also adds replacing 3,000 feet of concrete channel lining with a naturalized channel from S. 57 th Street to the confluence with the KK River, north of W. Cleveland Avenue. 43 rd Street Ditch There are currently no flood prone structures identified on the 43 rd Street Ditch. The update adds nine flood prone commercial structures adjacent to the 43 rd Street Ditch in the Village of West Milwaukee. 3

14 SUMMARY (Cont d) Approval of the Updated Kinnickinnic River Watercourse Management Plan The current KKRWMP does not identify a project on the 43 rd Street Ditch. The update proposes a new 43 rd Street Ditch project to reduce the risk of flooding to commercial structures along S. 43 rd Street and roadway flooding at the intersection of S. 43 rd Street and W. Lincoln Avenue. The proposed project consists of increasing culvert capacity at S. 43 rd Street, W. Lincoln Avenue, and under the Union Pacific Railroad. The project also includes removing 600 feet of concrete-lined channel located between the two sets of culverts and creating a naturalized channel. Wilson Park Creek The KKRWMP currently identifies 130 flood prone structures on Wilson Park Creek in the City of Milwaukee. The update adds 144 residential and commercial structures to the floodplain, for a total of 274 flood prone structures. Currently, the Wilson Park Creek Reach 3 project consists of replacing the concrete channel lining with a naturalized channel from S. 6 th Street to W. Layton Avenue, increasing the size of undersized culverts at S. 5 th Street, and constructing a detention basin on land adjacent to the Central Steel & Wire facility. The update further proposes to: Increase the size of culverts at S. 6 th Street (Wilson Park Creek Reach 3). Perform voluntary acquisition or floodproofing of eight residential and commercial structures (Wilson Park Creek Reach 3). Create a new Wilson Park project, which consists of: o Lowering a portion of Wilson Park to provide flood storage. o Performing voluntary acquisition or floodproofing of two commercial structures currently in the floodplain. Add a new Wilson Park Creek Reach 4 project, which consists of replacing 3,900 feet of District-owned concrete-lined channel with a more naturalized channel design within the property limits of the General Mitchell International Airport between S. Howell Avenue and the Canadian Pacific Railroad. Villa Mann Creek There are currently no flood prone structures identified on Villa Mann Creek in the KKRWMP. The update adds nine flood prone residential and commercial structures on Villa Mann Tributary in the Cities of Greenfield and Milwaukee. The current KKRWMP does not identify an active or planned project on the Villa Mann Creek. The update adds a new Villa Mann Tributary Culvert Improvement project. The project scope consists of increasing the flow capacity of the culverts that extend from S. 27 th Street to the confluence with the Villa Mann Mainstem. 4

15 SUMMARY (Cont d) Approval of the Updated Kinnickinnic River Watercourse Management Plan The KK River Reach 2, KK River Reach 3, Jackson Park, and Wilson Park projects include the design and construction of park improvements to compensate Milwaukee County for impacts to park assets and the parkland as a result of the District s proposed work within the park areas. The park improvements included in the project will be defined in future memorandums of understanding between Milwaukee County and the District. The following table summarizes the changes to the plan: Total # structures in the floodplain (without District improvements) # structures no longer in the floodplain # structures remaining in the floodplain Existing Updated KKRWMP KKRWMP Projects Completed 1 3 Projects Underway 6 5 Future Projects 3 6 The attached maps show existing and updates to the general locations of structures in the floodplains and projects that are part of the KKRWMP. 5

16 RESOLUTION Approval of the Updated Kinnickinnic River Watercourse Management Plan RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the updated Kinnickinnic River Watercourse Management Plan as described in the foregoing Commission document is approved and that the Executive Director is authorized to implement the updated plan, subject to Milwaukee Metropolitan Sewerage Commission budget approval. 6

17 KINNICKINNIC RIVER WATERCOURSE MANAGEMENT PLAN UPDATE: PROJECTS PROJECT COMPLETED PROJECT UNDERWAY KK RIVER ARMY CORPS SECTION 14 PROJECT 43RD STREET DITCH JACKSON PARK KK RIVER REACH 2 KK RIVER FLOOD MANAGEMENT: S. 6TH ST TO S. CHASE AVE UPDATED PROJECT UNDERWAY UPDATED FUTURE PROJECT KINNICKINNIC RIVER WATERSHED BOUNDARY 1% ANNUAL PROBABILITY FLOODPLAIN KK RIVER FLOOD MANAGEMENT: LYONS PARK CREEK PROJECT KK RIVER REACH 3 WILSON PARK CREEK REACH 2 KK RIVER SEDIMENT TRANSPORT STUDY - WATERSHED WILSON PARK KK RIVER FLOOD MANAGEMENT: VILLA MANN CREEK PROJECT VILLA MANN TRIBUTARY CULVERT IMPROVEMENT WILSON PARK CREEK REACH 3 WILSON PARK CREEK REACH 4 E Miles Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), MapmyIndia, OpenStreetMap contributors, and the GIS User Community

18 KINNICKINNIC RIVER WATERCOURSE MANAGEMENT PLAN UPDATE: STRUCTURES KK RIVER FLOOD MANAGEMENT: LYONS PARK CREEK PROJECT (UNDERWAY) (REMAINING STRUCTURES: 33) (ADDITIONAL STRUCTURES: 33) 43RD STREET DITCH (FUTURE) (ADDITIONAL STRUCTURES: 9)!< JACKSON PARK (UNDERWAY) (REMAINING STRUCTURES: 2) (ADDITIONAL STRUCTURES: 6)!< KK RIVER REACH 3 (FUTURE) (ADDITIONAL STRUCTURES: 36)!< KK RIVER REACH 2 (UNDERWAY) (REDUCTION IN FLOODPLAIN STRUCTURES: 48) (REMAINING STRUCTURES: 238) (ADDITIONAL STRUCTURES: 6) KK RIVER I94 - BECHER (FUTURE) (ADDITIONAL STRUCTURES: 27) REDUCTION IN FLOODPLAIN STRUCTURES STRUCTURE REMAINING ADDITIONAL STRUCTURE NEWLY IDENTIFIED KINNICKINNIC RIVER WATERSHED BOUNDARY 1% ANNUAL PROBABILITY FLOODPLAIN KK RIVER FLOOD MANAGEMENT: VILLA MANN CREEK PROJECT (COMPLETED) (REDUCTION IN FLOODPLAIN STRUCTURES: 3)!< WILSON PARK CREEK REACH 2 (FUTURE) (REMAINING STRUCTURES: 107) (ADDITIONAL STRUCTURES: 103)!< WILSON PARK (FUTURE) VILLA MANN TRIBUTARY CULVERT IMPROVEMENT (FUTURE) (ADDITIONAL STRUCTURES: 9)!< WILSON PARK CREEK REACH 3 (UNDERWAY) (REMAINING STRUCTURES: 23) (ADDITIONAL STRUCTURES: 41) E Miles Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), MapmyIndia, OpenStreetMap contributors, and the GIS User Community

19 Item 8 COMMISSION FILE NO: DATE INTRODUCED: January 9, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Policy, Finance, and Personnel Committee RELATING TO: Declaration of the Public Necessity and Approval of the Revised Acquisition Plat (Relocation Order) for the Kinnickinnic River Reach 2, Project W40002 SUMMARY: The Commission is requested to approve the revised acquisition plat for the Kinnickinnic River Reach 2, Project W40002, and to authorize the Executive Director to approve future minor changes to the identified parcels and the addition of new parcels where they have a minor impact on the overall project and land rights acquisition process. The initial acquisition plat for the project was approved by the Commission on October 26, 2009, and revised on December 14, The approval of the revised acquisition plat also authorizes the Executive Director to execute easements, permits, licenses, purchase agreements, intergovernmental cooperation agreements, and any other related real estate documents with property owners and governmental agencies that have real estate that is affected by the project. Upon approval and within 20 days, the revised acquisition plat (relocation order) will be filed with the Milwaukee County Clerk s Office as required by law, thereby allowing acquisition matters to proceed. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER Acquisition Plat PFP_AcqPlat_KKReach2_W40002_legislative_file COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

20 SUMMARY (Cont d) Declaration of the Public Necessity and Approval of the Revised Acquisition Plat (Relocation Order) for the Kinnickinnic River Reach 2, Project W40002 An update to the Kinnickinnic River Watercourse Management Plan (KKRWMP) is also currently being considered by the Commission. As recommended in the updated KKRWMP, the District is expanding the Kinnickinnic River channel between 6th and 16th Streets to create additional flood flow capacity and to allow for the replacement of the existing concrete-lined channel with a more naturalized stream design. The expanded channel will reduce flood risk to over 300 residential structures identified within the one percent annual probability floodplain in the project area. The District will expand the top of bank width of the stream from 60 feet to 200 feet. Parcel #96 is owned by the Milwaukee Public Schools (MPS), via the City of Milwaukee, and is currently operated as Modrzejewski Park. The MPS Park area (approximately 20,000 square feet) identified within the plat is included within the proposed project limits of the stream. The only improvement within this area that will be affected by this action is a deteriorated asphalt cover confined within a chain link fence. District staff has had preliminary discussions with MPS. In addition, the District will need to relocate a City of Milwaukee combined sewer within the identified park area to accommodate the expanded channel. Previous spending authority is sufficient to acquire the requested property rights. 2

21 RESOLUTION Declaration of the Public Necessity and Approval of the Revised Acquisition Plat (Relocation Order) for the Kinnickinnic River Reach 2, Project W40002 RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that: 1. The revised acquisition plat (relocation order) as attached hereto and that identifies Parcel 96 is approved; 2. The Executive Director is authorized to approve future changes to the identified parcels and the addition of new parcels where they have a minor impact on the overall project and the land rights acquisition process; and 3. The Executive Director may accept and execute on behalf of the Commission all project related easement documents, memorandums of understanding, intergovernmental cooperation agreements, jurisdictional offers, awards of compensation damages, leases, purchase agreements, deeds of conveyance, permits, licenses, or any other related real estate documents. 3

22

23

24

25

26

27

28 SOUTH 16TH STREET WEST HARRISON AVENUE N 28 SOUTH 15TH PLACE SOUTH 15TH STREET SOUTH 14TH STREET LEGEND MILWAUKEE COUNTY OWNED LANDS THAT ARE ENCUMBERED BY MMSD MMSD OWNED LANDS PRIVATELY OWNED LANDS REUSE OF DOCUMENTS VERIFY SCALES PM MILWAUKEE METROPOLITAN SEWERAGE DISTRICT THIS DOCUMENT AND THE IDEAS AND BAR IS ONE INCH ON P. ELLIOTT DESIGNS INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF THE MILWAUKEE METROPOLITAN SEWERAGE DISTRICT. ORIGINAL DRAWING 0" 1" IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY. DRFT R. CHAVEZ CHK D. TALARCZYK ADDED PARCEL 96 RC DN ADDED PARCELS 40 TO 95 KM PK ADDED PARCELS C TO F KM PS REV. NO. DATE REVISION DESCRIPTION BY APVD PARTNERS FOR A CLEANER ENVIRONMENT MILWAUKEE METROPOLITAN SEWERAGE DISTRICT (MMSD) KINNICKINNIC RIVER FLOOD MANAGEMENT-MAINSTEM WORK SOUTH 6TH STREET TO SOUTH 16TH STREET PROJECT MMSD COMMISSION APPROVED REVISIONS MMSD COMMISSION APPROVED MMSD COMMISSION APPROVED DRAWING NO.: SHEET: DATE: CONTRACT: MMSD FILE: ACP-07 7 JANUARY 2017 W40002 ACP07.dwg

29 SOUTH 16TH STREET WEST HARRISON AVENUE N 28 SOUTH 15TH PLACE SOUTH 15TH STREET SOUTH 14TH STREET LEGEND MILWAUKEE COUNTY OWNED LANDS THAT ARE ENCUMBERED BY MMSD MMSD OWNED LANDS PRIVATELY OWNED LANDS REUSE OF DOCUMENTS VERIFY SCALES PM MILWAUKEE METROPOLITAN SEWERAGE DISTRICT THIS DOCUMENT AND THE IDEAS AND BAR IS ONE INCH ON P. ELLIOTT DESIGNS INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF THE MILWAUKEE METROPOLITAN SEWERAGE DISTRICT. ORIGINAL DRAWING 0" 1" IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY. DRFT R. CHAVEZ CHK D. TALARCZYK ADDED PARCEL 96 RC DN ADDED PARCELS 40 TO 95 KM PK ADDED PARCELS C TO F KM PS REV. NO. DATE REVISION DESCRIPTION BY APVD PARTNERS FOR A CLEANER ENVIRONMENT MILWAUKEE METROPOLITAN SEWERAGE DISTRICT (MMSD) KINNICKINNIC RIVER FLOOD MANAGEMENT-MAINSTEM WORK SOUTH 6TH STREET TO SOUTH 16TH STREET PROJECT MMSD COMMISSION APPROVED REVISIONS MMSD COMMISSION APPROVED MMSD COMMISSION APPROVED DRAWING NO.: SHEET: DATE: CONTRACT: MMSD FILE: ACP-08 8 JANUARY 2017 W40002 ACP08.dwg

30 WEST HARRISON AVENUE C D N SOUTH 14TH STREET SOUTH 13TH STREET SOUTH 12TH STREET SOUTH 11TH STREET LEGEND MILWAUKEE COUNTY OWNED LANDS THAT ARE ENCUMBERED BY MMSD MMSD OWNED LANDS PRIVATELY OWNED LANDS MMSD KK RIVER EASEMENT REUSE OF DOCUMENTS VERIFY SCALES PM MILWAUKEE METROPOLITAN SEWERAGE DISTRICT THIS DOCUMENT AND THE IDEAS AND BAR IS ONE INCH ON P. ELLIOTT DESIGNS INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF THE MILWAUKEE METROPOLITAN SEWERAGE DISTRICT. ORIGINAL DRAWING 0" 1" IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY. DRFT R. CHAVEZ CHK D. TALARCZYK ADDED PARCEL 96 RC DN ADDED PARCELS 40 TO 95 KM PK ADDED PARCELS C TO F KM PS REV. NO. DATE REVISION DESCRIPTION BY APVD PARTNERS FOR A CLEANER ENVIRONMENT MILWAUKEE METROPOLITAN SEWERAGE DISTRICT (MMSD) KINNICKINNIC RIVER FLOOD MANAGEMENT-MAINSTEM WORK SOUTH 6TH STREET TO SOUTH 16TH STREET PROJECT MMSD COMMISSION APPROVED REVISIONS MMSD COMMISSION APPROVED MMSD COMMISSION APPROVED DRAWING NO.: SHEET: DATE: CONTRACT: MMSD FILE: ACP-09 9 JANUARY 2017 W40002 ACP09.dwg

31 WEST HARRISON AVENUE C D SOUTH 14TH STREET SOUTH 13TH STREET SOUTH 12TH STREET SOUTH 11TH STREET N LEGEND MILWAUKEE COUNTY OWNED LANDS THAT ARE ENCUMBERED BY MMSD MMSD OWNED LANDS PRIVATELY OWNED LANDS MMSD KK RIVER EASEMENT REUSE OF DOCUMENTS VERIFY SCALES PM MILWAUKEE METROPOLITAN SEWERAGE DISTRICT THIS DOCUMENT AND THE IDEAS AND BAR IS ONE INCH ON P. ELLIOTT DESIGNS INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF THE MILWAUKEE METROPOLITAN SEWERAGE DISTRICT. ORIGINAL DRAWING 0" 1" IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY. DRFT R. CHAVEZ CHK D. TALARCZYK ADDED PARCEL 96 RC DN ADDED PARCELS 40 TO 95 KM PK ADDED PARCELS C TO F KM PS REV. NO. DATE REVISION DESCRIPTION BY APVD PARTNERS FOR A CLEANER ENVIRONMENT MILWAUKEE METROPOLITAN SEWERAGE DISTRICT (MMSD) KINNICKINNIC RIVER FLOOD MANAGEMENT-MAINSTEM WORK SOUTH 6TH STREET TO SOUTH 16TH STREET PROJECT MMSD COMMISSION APPROVED REVISIONS MMSD COMMISSION APPROVED MMSD COMMISSION APPROVED DRAWING NO.: SHEET: DATE: CONTRACT: MMSD FILE: ACP JANUARY 2017 W40002 ACP10.dwg

32 SOUTH 9TH STREET 31 WEST HARRISON AVENUE E LEGEND SOUTH 11TH STREET N SOUTH 10TH STREET SOUTH 9TH PLACE MILWAUKEE COUNTY OWNED LANDS THAT ARE ENCUMBERED BY MMSD MMSD OWNED LANDS PRIVATELY OWNED LANDS MMSD KK RIVER EASEMENT REUSE OF DOCUMENTS VERIFY SCALES PM MILWAUKEE METROPOLITAN SEWERAGE DISTRICT THIS DOCUMENT AND THE IDEAS AND BAR IS ONE INCH ON P. ELLIOTT DESIGNS INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF THE MILWAUKEE METROPOLITAN SEWERAGE DISTRICT. ORIGINAL DRAWING 0" 1" IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY. DRFT R. CHAVEZ CHK D. TALARCZYK ADDED PARCEL 96 RC DN ADDED PARCELS 40 TO 95 KM PK ADDED PARCELS C TO F KM PS REV. NO. DATE REVISION DESCRIPTION BY APVD PARTNERS FOR A CLEANER ENVIRONMENT MILWAUKEE METROPOLITAN SEWERAGE DISTRICT (MMSD) KINNICKINNIC RIVER FLOOD MANAGEMENT-MAINSTEM WORK SOUTH 6TH STREET TO SOUTH 16TH STREET PROJECT MMSD COMMISSION APPROVED REVISIONS MMSD COMMISSION APPROVED MMSD COMMISSION APPROVED DRAWING NO.: SHEET: DATE: CONTRACT: MMSD FILE: ACP JANUARY 2017 W40002 ACP11.dwg

33 SOUTH 9TH STREET 31 WEST HARRISON AVENUE E SOUTH 11TH STREET N SOUTH 10TH STREET SOUTH 9TH PLACE LEGEND MILWAUKEE COUNTY OWNED LANDS THAT ARE ENCUMBERED BY MMSD MMSD OWNED LANDS 81 PRIVATELY OWNED LANDS MMSD KK RIVER EASEMENT REUSE OF DOCUMENTS VERIFY SCALES PM MILWAUKEE METROPOLITAN SEWERAGE DISTRICT THIS DOCUMENT AND THE IDEAS AND BAR IS ONE INCH ON P. ELLIOTT DESIGNS INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF THE MILWAUKEE METROPOLITAN SEWERAGE DISTRICT. ORIGINAL DRAWING 0" 1" IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY. DRFT R. CHAVEZ CHK D. TALARCZYK ADDED PARCEL 96 RC DN ADDED PARCELS 40 TO 95 KM PK ADDED PARCELS C TO F KM PS REV. NO. DATE REVISION DESCRIPTION BY APVD PARTNERS FOR A CLEANER ENVIRONMENT MILWAUKEE METROPOLITAN SEWERAGE DISTRICT (MMSD) KINNICKINNIC RIVER FLOOD MANAGEMENT-MAINSTEM WORK SOUTH 6TH STREET TO SOUTH 16TH STREET PROJECT MMSD COMMISSION APPROVED REVISIONS MMSD COMMISSION APPROVED MMSD COMMISSION APPROVED DRAWING NO.: SHEET: DATE: CONTRACT: MMSD FILE: ACP JANUARY 2017 W40002 ACP12.dwg

34 WEST HARRISON AVENUE 15 E F SOUTH 6TH STREET N A B SOUTH 9TH STREET SOUTH 8TH STREET SOUTH 7TH STREET LEGEND MILWAUKEE COUNTY OWNED LANDS THAT ARE ENCUMBERED BY MMSD MMSD OWNED LANDS PRIVATELY OWNED LANDS LANDS PREVIOUSLY APPROVED ON ACQUISITION PLAT W /20/2009 WEST CLEVELAND AVENUE REUSE OF DOCUMENTS VERIFY SCALES PM MILWAUKEE METROPOLITAN SEWERAGE DISTRICT THIS DOCUMENT AND THE IDEAS AND BAR IS ONE INCH ON P. ELLIOTT DESIGNS INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF THE MILWAUKEE METROPOLITAN SEWERAGE DISTRICT. ORIGINAL DRAWING 0" 1" IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY. DRFT R. CHAVEZ CHK D. TALARCZYK ADDED PARCEL 96 RC DN ADDED PARCELS 40 TO 95 KM PK ADDED PARCELS C TO F KM PS REV. NO. DATE REVISION DESCRIPTION BY APVD PARTNERS FOR A CLEANER ENVIRONMENT MILWAUKEE METROPOLITAN SEWERAGE DISTRICT (MMSD) KINNICKINNIC RIVER FLOOD MANAGEMENT-MAINSTEM WORK SOUTH 6TH STREET TO SOUTH 16TH STREET PROJECT MMSD COMMISSION APPROVED REVISIONS MMSD COMMISSION APPROVED MMSD COMMISSION APPROVED DRAWING NO.: SHEET: DATE: CONTRACT: MMSD FILE: ACP JANUARY 2017 W40002 ACP13.dwg

35 WEST HARRISON AVENUE 15 E F SOUTH 6TH STREET N A B SOUTH 9TH STREET SOUTH 8TH STREET SOUTH 7TH STREET LEGEND MILWAUKEE COUNTY OWNED LANDS THAT ARE ENCUMBERED BY MMSD MMSD OWNED LANDS PRIVATELY OWNED LANDS LANDS PREVIOUSLY APPROVED ON ACQUISITION PLAT W /20/2009 WEST CLEVELAND AVENUE REUSE OF DOCUMENTS VERIFY SCALES PM MILWAUKEE METROPOLITAN SEWERAGE DISTRICT THIS DOCUMENT AND THE IDEAS AND BAR IS ONE INCH ON P. ELLIOTT DESIGNS INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF THE MILWAUKEE METROPOLITAN SEWERAGE DISTRICT. ORIGINAL DRAWING 0" 1" IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY. DRFT R. CHAVEZ CHK D. TALARCZYK ADDED PARCEL 96 RC DN ADDED PARCELS 40 TO 95 KM PK ADDED PARCELS C TO F KM PS REV. NO. DATE REVISION DESCRIPTION BY APVD PARTNERS FOR A CLEANER ENVIRONMENT MILWAUKEE METROPOLITAN SEWERAGE DISTRICT (MMSD) KINNICKINNIC RIVER FLOOD MANAGEMENT-MAINSTEM WORK SOUTH 6TH STREET TO SOUTH 16TH STREET PROJECT MMSD COMMISSION APPROVED REVISIONS MMSD COMMISSION APPROVED MMSD COMMISSION APPROVED DRAWING NO.: SHEET: DATE: CONTRACT: MMSD FILE: ACP JANUARY 2017 W40002 ACP14.dwg

36 Item 9 COMMISSION FILE NO: DATE INTRODUCED: January 9, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Policy, Finance, and Personnel Committee RELATING TO: Approval of Contract P-2695, Greenseams Program Implementation for the Year 2017 SUMMARY: The Commission is requested to authorize and to direct the Executive Director to negotiate and execute Contract P-2695 with the Conservation Fund. The Greenseams Program Implementation contract is for an amount not to exceed $343,044 for one year. The contract is being negotiated with the consultant and is requested for Commission approval. The duration of the contract is one year, beginning January 1, 2017, with an estimated completion date of December 31, The Conservation Fund has managed and overseen MMSD s Greenseams Program since 2001, when it was selected through a competitive request for proposal process. This agreement represents a $62,815 decrease from the 2016 contract budget. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER PFP_Greenseams_TCF_Contract_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

37 BACKGROUND Approval of Contract P-2695, Greenseams Program Implementation for the Year 2017 MMSD has been implementing the Greenseams Program since This innovative program was designed to accomplish environmentally responsible flood management by permanently preserving critical floodplain areas. Undeveloped, permanently vegetated lands reduce future flooding risks by storing and draining water into the ground naturally. Greenseams also helps protect MMSD s structural flood management projects infrastructure investments worth hundreds of millions of dollars. The Greenseams Program makes voluntary purchases of undeveloped, privately owned properties in areas expected to experience major growth in the next 20 years. These sites contain water absorbing hydric soils typically found along streams, shorelines, and wetlands. To date, Greenseams has purchased 104 parcels totaling approximately 3,383 acres and restored 761 acres of land within its project boundary. Many of these purchases have been made in partnership with organizations such as the Wisconsin Department of Natural Resources Knowles Nelson Stewardship Fund, Wisconsin Coastal Management Program, United States Fish and Wildlife Foundation, Fund for Lake Michigan, local land trusts, and local municipalities. Since 2001, the Greenseams Program has leveraged $10.3 million in grant funding. 2

38 KEY ISSUES Approval of Contract P-2695, Greenseams Program Implementation for the Year 2017 Project Description The Conservation Fund, a national land trust, has been implementing the District s Greenseams Program since 2001, when it was selected through a competitive request for proposal process. Greenseams supports environmentally sustainable flood management by preserving undeveloped floodplain areas, along with linear corridors of open space that allow streams, rivers, and the associated wetlands and floodplains to function as naturally as possible while accommodating stormwater and floodwater flows. In addition, properties that contain a minimum of five acres of stormwater trees are eligible for acquisition. Conserving such properties is complementary to constructing stormwater storage or detention measures and has the added benefit of providing public open space, which contributes to an improved quality of life. The Greenseams Program helps the District satisfy the annual requirement contained in its current operating permit for stormwater management utilizing green infrastructure through the purchase and protection of hydric soils in wetlands and natural areas. Scope of Services Under this contract, the Conservation Fund continues to act as the District s program manager for the Greenseams Program. The District has ultimate oversight and decision making authority over this service, except with respect to the consultant s right to enter into contracts for sale of real estate in its own name and acquire property interests in its own name. The Conservation Fund will continue to provide the following consulting services through the contract: Project management, Implementation planning, including real estate services, and Land management services for acquired properties. 3

39 RESOLUTION Approval of Contract P-2695, Greenseams Program Implementation for the Year 2017 RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized and directed to negotiate and execute Contract P-2695, Greenseams Program Implementation for January 1, 2017 through December 31, 2017, with the Conservation Fund in an amount not to exceed $343,044. 4

40 Capital Budget Fiscal Note Total Project Cost RELATING TO: Approval of Contract P-2695, Greenseams Program Implementation for the Year 2017 Capital Project Number(s) Impact of Requested Action on Total Project Cost: W97002 Increase Decrease New Project X No Change Total Project Cost Analysis Project Costs Adopted 2017 Total Project Cost * Previously Approved Changes $0 Approved Total Project Cost * Requested Total Project Cost n/a Requested (Increase)/Decrease $0 Action to be taken to Long-Range Financing Plan to address Total Project Cost change Transfer from Allowance for Cost and Schedule Changes Transfer from another project (specify in comments) Delay Project(s) (specify in comments) Delete Project(s) (specify in comments) Other Transfer to Allowance for Cost and Schedule Changes Comments *The Greenseams program does not have a total project cost because it is a capital program. The 2017 Capital Budget includes $1.2 million for 2017, and the long-range financing plan includes $7.2 million. The adopted 2017 Capital Budget and the long-range financing plan have sufficient funding for the current request of $343,044. Budget Review by: Date: Christine Durkin 11/3/2016

41 Proposal & S/W/MBE Summary Information Approval of Contract P-2695, Greenseams Program Implementation for the Year 2017 Cost Center: 74 Proposal Receipt Date: October 1, 2016 Total S/W/MBE Local No. of Firms Solicited No. of Proposals No. of Acceptable Proposals Proposals (listed by rank) (Name/City/State/Zip) The Conservation Fund Arlington, VA Negotiated Price [Submitted Price] $343, [$343,044.00] Acceptable/ Conditionally Acceptable/ Unacceptable % Sub- Contractor % S/W/MBE Acceptable 46.0% 41.0% Compensation packages for proposals rated Conditionally Acceptable and Unacceptable are not opened. 12/27/16 P

42 Low Bid Information Subcontractor MBE/WBE/SBE/VBE Firms MBE: MWH Law Group LLP Milwaukee, WI Type of Work % Amount Outside Legal Counsel 13.0% $45, M Squared Engineering, LLC Cedarburg, WI Surveys 3.0% $11, WBE: LF Green Development, LLC Milwaukee, WI Phase 1 Environmental 5.0% $18, SBE: Chaput Land Surveys Milwaukee, WI Surveys 3.0% $11, CHM, Inc. Thiensville, WI Restoration 4.0% $15, EC3 Environmental Consulting Group, Inc. Madison, WI Restoration 4.0% $15, PARE Consultants Reedsburg, WI Appraisals 3.6% $12, Stone Appraisals Cottage Grove, WI Appraisals 3.6% $12, Non- MBE/WBE/SBE/VBE Subcontractors Type of Work % Amount Land Title Services Wauwatosa, WI Title Company 0.3% $1, Matrix Title Company West Bend, WI Title Company 0.3% $1, Royalty Title Corp. Wauwatosa, WI Title Company 0.3% $1, Sigma Development, Inc. Milwaukee, WI Surveys 3.0% $11, List reason(s) if no MBE/WBE/SBE involvement: n/a Local Office Preference: No Proposal Comments: 12/27/16 P

43 S/W/MBE Solicited: Chaput Land Surveys, CHM, EC3 Environmental Consulting Group, LF Green Development, M Squared Engineering, LLC, MWH Law Group, PARE Consultants, Stone Appraisals Media Ads: Yes No Name of Publication: n/a Per Procurement, non-competitive professional services contracts not advertised. Information for Recommended Proposal (Over $10,000) Company Name: The Conservation Fund Contact Person: Dave Grusznski Phone: EEO DATA: a) Total Number of Employees: 177 Total Percentage Total Percentage b) Minorities % c) Female % Hispanic 2 1.0% Hispanic 2.0 1% African American % African American % Native American 0 0.0% Native American 0.0 0% Asian 3 2.0% Asian 1.0 1% d) Labor Market Availability: Minorities: 20% Females: 48% 12/27/16 P

44 Item 10 COMMISSION FILE NO: DATE INTRODUCED: January 9, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Policy, Finance, and Personnel Committee RELATING TO: Approval of Contract P-2698, Working Soils Program Implementation for the Year 2017 SUMMARY: The Commission is requested to authorize and to direct the Executive Director to negotiate and execute Contract P-2698, Working Soils Program Implementation, with the Conservation Fund. The Working Soils Program Implementation contract is for an amount not to exceed $170,000 for one year. The contract is being negotiated with the consultant and is requested for Commission approval. The duration of the contract is one year, beginning January 1, 2017, with an estimated completion date of December 31, The District has a longstanding, successful working relationship with the Conservation Fund; therefore, the Working Soils Program has continued with the Conservation Fund on a sole source procurement basis. The Conservation Fund has managed and overseen MMSD s Greenseams Program since 2001 when it was selected through a competitive request for proposal process. This agreement represents an increase of $75,000 from the 2016 Working Soils contract value due to redistribution of the Conservation Fund s staff assignments and time allocation resources across two separate program contracts for Working Soils and Greenseams. The net increase in 2017 total contract values for the Conservation Fund s Greenseams and Working Soils implementation contracts is $12,185. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER PFP_WorkingSoils_TCF_Contract_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

45 BACKGROUND Approval of Contract P-2698, Working Soils Program Implementation for the Year 2017 MMSD has been implementing the Greenseams program since This innovative program was designed to accomplish environmentally responsible flood management by permanently preserving critical floodplain areas. Undeveloped vegetated lands reduce future flooding risks by storing and draining water into the ground naturally and helping to preserve the capacity of downstream flood management facilities. Like Greenseams, the Working Soils program acquires voluntary, permanent easements on undeveloped, privately owned properties in areas expected to experience major growth in the next 20 years. Working Soils easements provide protection on privately owned farmland and do not accommodate public access to private working lands, whereas Greenseams properties are typically purchased outright and allow for public access for recreation. Like Greenseams, Working Soils easements protect land with water-absorbing hydric soils typically found along streams, shorelines, and wetlands. The Greenseams and Working Soils programs help protect MMSD s structural flood management projects infrastructure investments worth hundreds of millions of dollars. The Working Soils program has leveraged $1 million in grant funding toward the purchase of easements. 2

46 KEY ISSUES Approval of Contract P-2698, Working Soils Program Implementation for the Year 2017 Project Description The Conservation Fund, a national land trust, has been implementing the District s Greenseams program since 2001 when it was selected through a competitive request for proposals process. Greenseams and Working Soils support environmentally sustainable flood management by preserving undeveloped floodplain areas along with linear corridors of open space that allow streams, rivers, and the associated wetlands and floodplains to function as naturally as possible while accommodating stormwater and floodwater flows. In addition, properties that contain a minimum of five acres of stormwater trees are eligible for acquisition. Conserving such properties is complementary to constructing stormwater storage and detention measures, and has the added benefit of providing public open space that contributes to an improved quality of life. The Working Soils program helps the District satisfy the annual requirement in its current discharge permit for stormwater management using green infrastructure through the purchase and protection of hydric soils in wetlands and natural areas. Scope of Services Under this contract, the Conservation Fund acts as the District s program manager for the Working Soils program. The District has ultimate oversight and decision making authority over this service, except with respect to the consultant s right to enter into contracts for sale of real estate in its own name and acquire property interests in its own name. The Conservation Fund will continue to provide the following consulting services through the contract: Project management, Implementation planning, including real estate services, and Land management services for acquired easements. The Working Soils 2017 program implementation contract value has increased by $75,000 from the 2016 Working Soils contract (whereas the 2017 Greenseams program implementation contract has decreased by $62,815). This redistribution of contract resources accurately represents the Conservation Fund s staff assignments and time allocation between the two programs, Working Soils and Greenseams. The net increase in 2017 total contract value for the Conservation Fund s Greenseams and Working Soils implementation contracts is $12,185. 3

47 RESOLUTION Approval of Contract P-2698, Working Soils Program Implementation for the Year 2017 RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized and directed to execute Contract P-2698, Working Soils Program Implementation for January 1, 2017 through December 31, 2017, with the Conservation Fund in an amount not to exceed $170,000. 4

48 Capital Budget Fiscal Note Total Project Cost RELATING TO: Approval of Contract P-2698, Working Soils Program Implementation for the Year 2017 Capital Project Number(s) Impact of Requested Action on Total Project Cost: W97003 Increase Decrease New Project X No Change Total Project Cost Analysis Project Costs Adopted 2017 Total Project Cost * Previously Approved Changes $0 Approved Total Project Cost * Requested Total Project Cost n/a Requested (Increase)/Decrease $0 Action to be taken to Long-Range Financing Plan to address Total Project Cost change Transfer from Allowance for Cost and Schedule Changes Transfer from another project (specify in comments) Delay Project(s) (specify in comments) Delete Project(s) (specify in comments) Other Transfer to Allowance for Cost and Schedule Changes Comments *The Working Soils program does not have a total project cost because it is a capital program. The 2017 Capital Budget includes $365,505 for 2017, and the long-range financing plan includes $3,201,585. The Adopted 2017 Capital Budget and the long-range financing plan have sufficient funding for the current request of 170,000. Budget Review by: Date: Christine Durkin 11/7/2016

49 Proposal & S/W/MBE Summary Information Approval of Contract P-2698, Working Soils Program Implementation for the Year 2017 Cost Center: 74 Proposal Receipt Date: October 1, 2016 Total S/W/MBE Local No. of Firms Solicited No. of Proposals No. of Acceptable Proposals Proposals (listed by rank) (Name/City/State/Zip) The Conservation Fund Arlington, VA Negotiated Price [Submitted Price] $170, [$170,000.00] Acceptable/ Conditionally Acceptable/ Unacceptable % Sub- Contractor % S/W/MBE Acceptable 27% 24% Compensation packages for proposals rated Conditionally Acceptable and Unacceptable are not opened. 12/27/16 P

50 Low Bid Information Type of Work Subcontractor MBE/WBE/SBE/VBE Firms % Amount MBE: M Squared Engineering, LLC Cedarburg, WI Surveys 2.4% $4, WBE: LF Green Development, LLC Milwaukee, WI Phase 1 Environmental 4.7% $8, SBE: Chaput Land Surveys Milwaukee, WI Surveys 2.4% $4, PARE Consultants Reedsburg, WI Appraisals 7.4% $12, Stone Appraisals Cottage Grove, WI Appraisals 7.4% $12, Non- MBE/WBE/SBE/VBE Subcontractors Type of Work % Amount Land Title Services Wauwatosa, WI Title Company 0.3% $ Matrix Title Company West Bend, WI Title Company 0.3% $ Royalty Title Corp. Wauwatosa, WI Title Company 0.3% $ Sigma Development, Inc. Milwaukee, WI Surveys 2.4% $4, List reason(s) if no MBE/WBE/SBE involvement: n/a Local Office Preference: No Proposal Comments: S/W/MBE Solicited: Chaput Land Surveys, LF Green Development, M Squared Engineering, LLC, PARE Consultants, Stone Appraisals Media Ads: Yes No Name of Publication: 12/27/16 P n/a Per Procurement, non-competitive professional services contracts not advertised.

51 Information for Recommended Proposal (Over $10,000) Company Name: The Conservation Fund Contact Person: Dave Grusznski Phone: EEO DATA: a) Total Number of Employees: 177 Total Percentage Total Percentage b) Minorities % c) Female % Hispanic 2 1.0% Hispanic 2 1.0% African American % African American % Native American 0 0.0% Native American 0 0.0% Asian 3 2.0% Asian 1 1.0% d) Labor Market Availability: Minorities: 20% Females: 48% 12/27/16 P

52 Item 11 COMMISSION FILE NO: DATE INTRODUCED: January 9, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Policy, Finance, and Personnel Committee RELATING TO: Authorizing the Executive Director to Procure Online Advertising for the Marketing of Milorganite SUMMARY: The Commission is requested to authorize the Executive Director to expend an amount not to exceed $200,000 with Google for Milorganite online advertising through The 2017 Milorganite advertising plan includes strategies to increase the engagement of lawn and garden audiences through its website and YouTube channel. The goal is to target individuals who utilize internet key word searches for lawn and garden products, buying the ability to bring the brand to the top of the search results. Google charges a per-click fee once the consumer chooses to view the Milorganite website or to view a video. The per-click fee amount is based on an agreed upon sum established through potential advertisers bidding on a specific time-frame and geographical market. While Google is not the only search engine that provides the paid search service (Yahoo, Microsoft Bing, etc.), it is considered the lead search engine, currently holding 64% of online search traffic. The dollar amount requested for this expenditure is consistent with the 2017 budget allocation for Milorganite marketing expenses. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER PFP_Milorganite_Online_Advertising_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

53 BACKGROUND Authorizing the Executive Director to Procure Online Advertising for the Marketing of Milorganite The District s Milorganite website is part of an integrated marketing strategy (print, radio, social media, point of purchase materials, etc.) aimed at educating and inspiring consumers interested in lawn and garden topics. Viewers are finding value in Milorganite s message, as demonstrated in over 468,000 unique visits and over 1,300,000 page views for 2016 (a 42% and 37% increase respectively over 2015). While organic searches comprise a large percentage of the site s web traffic, a paid search strategy is also useful in competing against brands that may have greater consumer awareness. Google and YouTube advertising helps to deliver the Milorganite message to reach a national audience that is specifically searching for relevant lawn and garden information. The online search demographic skews more diverse (younger, educated, and affluent) than typical media aimed at lawn and garden customers. Milorganite sets a specific cost per-click bid as well as daily and overall campaign budgets. Online Advertising Target: Funds will be expended as follows: Seasonality spring, summer, fall Geographically southern, northern, growth markets (west) Key words related lawn and garden terms Video promote Milorganite videos on YouTube and Google networks Targeted viewing devices desktop, mobile/tablet Results from previous years have shown a marked increase of Milorganite website traffic and use of online content, with the following results attributed to the paid search campaign. 2

54 BACKGROUND (Cont d) Authorizing the Executive Director to Procure Online Advertising for the Marketing of Milorganite Campaign Results: Google TM Paid Search & YouTube Video 2016* Description Ad Impressions 3,185,308 4,193,386 4,524,743 2,680,409 How often ad appears search results Website Clicks 76,568 65,545 71,369 55,422 Click ad and taken to website Website Page Visits Average # pages visited per guest Time on Website 1:24 minutes 1:36 minutes 1:36 minutes 1:33 minutes Average website time on site per guest Cost Per Click $1.94 $2.10 $1.93 $1.80 Average cost per ad clicked Click-through rate (CTR) 2.9% 2.5% 1.7% 2.1% # of clicks divided by impressions Video Views 194, ,628 18,844 Total video views Video CTR 17.4% 9.3% 6.4% # of views divided by impressions Video Cost Per View $0.14 $0.18 $0.30 Average cost per video view Investment $176,664 $164,464 $144,342 $99,562 Total campaign spend *Estimates Dec 2016 In addition, by directly working with Google to manage its campaigns and analytics, the District can save an estimated 15 to 20% ($30,000) of fees typically charged by advertising agencies. 3

55 RESOLUTION Authorizing the Executive Director to Procure Online Advertising for the Marketing of Milorganite RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized to expend an amount not to exceed $200,000 with Google for Milorganite online advertising through

56 O&M Budget Fiscal Note RELATING TO: Authorizing the Executive Director to Procure Online Advertising for the Marketing of Milorganite Cost Center: Line Item: MKT 636 Line Item Impact 2017 Original Budget Carryovers or Transfers Adjusted Budget Estimated Annual Expenditure including Request Anticipated Year End Balance Actual Year to Date Expenditures Through 12/12/16 $403,000 $0 $403,000 $403,000 $0 $396,831 For unfavorable Year End Balance, identify funding source: Absorbed within the Division Other Division Unallocated Reserve Anticipated Expenditure Timing Current Year (2017) Subsequent Total Cost Requested Expenditures $200,000 $0 $200,000 Anticipated Savings/Revenues $0 $0 $0 Net Fiscal Impact $200,000 $0 $200,000 Comments: The Milorganite website has seen increased use and traffic over the past few years. To further encourage this use, the District desires to work directly with Google to target individuals who utilize internet key word searches for lawn and garden products, buying the ability to bring the brand to the top of the search results. Budget Review by: Date Theresa Zwieg 12/12/2016

57 Non-Competitive Procurement & S/W/MBE Summary Information Authorizing the Executive Director to Procure Online Advertising for the Marketing of Milorganite Cost Center: MKT Proposal Receipt Date: December 9, 2016 Total S/W/MBE Local No. of Firms Solicited No. of Proposals No. of Acceptable Proposals Proposals (listed by rank) (Name/City/State/Zip) Google, Inc. Mountain View, CA Negotiated Price [Submitted Price] Acceptable/ Conditionally Acceptable/ Unacceptable % Sub- Contractor % S/W/MBE $200, Acceptable 0.0% 0.0% 12/27/16 1

58 List reason(s) if no MBE/WBE/SBE involvement: This is a non-competitive procurement with no opportunities for subcontracting. Local Office Preference: n/a Proposal Comments: n/a S/W/MBE Solicited: n/a Media Ads: Yes No Name of Publication: n/a 12/27/16 2

59 Information for Recommended Proposal (Over $10,000) Company Name: Google, Inc. Contact Person: Jes Kane EEO DATA: a) Total Number of Employees: 46,760 Total Percentage Total Percentage b) Minorities 20, % c) Female 13, % Hispanic 2, % Hispanic % African American 1, % African American % Native American % Native American % Asian 15, % Asian 5, % d) Labor Market Availability: Minorities: 20% Females: 48% 12/27/16 3

60 Item 12 COMMISSION FILE NO: DATE INTRODUCED: January 9, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Policy, Finance, & Personnel Committee RELATING TO: Approval of Job Content Value and Job Title SUMMARY: Policy, Finance, and Personnel Committee approval is required for changes in job content values and job titles as a result of changes in position responsibilities, organizational changes affecting job duties, or to establish a job content value for newly created positions. Based on the District s process of evaluating positions, the Job Content Committee convened to evaluate all District positions as a part of a comprehensive compensation study. Using established methodology and lead by the Carlson-Dettmann consultant, the following changes are recommended to job content value (points and pay grade) and job title: Current Title Water Resources Program Supervisor Recommended Title Current points/grade Recommended points/grade Water Resources Program Manager 709/13 763/14 ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER PFP_JobContentValue_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

61 KEY ISSUES Approval of Job Content Value and Job Title The job content value and job title recommended are based upon an objective review of positions by the District s Job Content Evaluation Committee utilizing the Carlson- Dettmann rating system. The Committee evaluates positions using a point factor system that assigns points in the categories of Formal Preparation and Experience, Decision Making, Thinking Challenges and Problem Solving, Interactions and Communications and Work Environment. Water Resources Program Supervisor Recently, the Water Quality Program Manager accepted a position within MMSD s Planning, Research, and Sustainability Division, creating a managerial vacancy in the Water Quality Program s Field Monitoring department. In an effort to create efficiencies within the systems and field monitoring areas, field monitoring staff and responsibilities were transferred to the Water Resources Program Supervisor position. The position is now responsible for managing the resources associated with systems and field monitoring and related programs to meet District and regulatory needs. A review of the position has determined an increase in the Formal Preparation and Experience and Decision Making factors. The position is now rated at 763 points, pay grade 14. In addition, it is recommended that the title is changed to Water Resources Program Manager. 2

62 RESOLUTION Approval of Job Content Value and Job Title RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the following job content value, pay grade, and job title are approved: Current Title Recommended Title Recommended points/grade Water Resources Program Supervisor Water Resources Program Manager 763/14 3

63 O&M Budget Fiscal Note RELATING TO: Approval of Job Content Value and Job Title Cost Center: Line Item: IWC 511 Line Item Impact 2017 Original Budget Carryovers or Transfers Adjusted Budget Estimated Annual Expenditure including Request Anticipated Year End Balance Actual Year to Date Expenditures Through $2,721,208 $0 $2,721,208 $2,627,322 $93,886 $0 For unfavorable Year End Balance, identify funding source: Absorbed within the Division Other Division Unallocated Reserve Anticipated Expenditure Timing Current Year (2017) Subsequent Total Cost Requested Expenditures $4,616 $0 $4,616 Anticipated Savings/Revenues $0 $0 $0 Net Fiscal Impact $4,616 $0 $4,616 Comments: As the Water Resources Program Manager absorbs the workload of the Water Resources Program Supervisor, it is anticipated that the cost center will have a year-end favorable variance for salaries. Budget Review by: Date Christine Durkin 12/15/2016

ELECTRONIC PACKET. January 23, 2017 Commission Meeting. RELEASED: Tuesday, January 17, 2017

ELECTRONIC PACKET. January 23, 2017 Commission Meeting. RELEASED: Tuesday, January 17, 2017 ELECTRONIC PACKET January 23, 2017 Commission Meeting RELEASED: Tuesday, January 17, 2017 COMMISSION MEETING January 23, 2017 OPERATIONS AND MAINTENANCE REPORT FOR DECEMBER 2016 PAT OBENAUF

More information

ELECTRONIC PACKET. February 11, 2019 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Monday, February 4, 2019

ELECTRONIC PACKET. February 11, 2019 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Monday, February 4, 2019 ELECTRONIC PACKET February 11, 2019 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING RELEASED: Monday, February 4, 2019 Item 7 COMMISSION FILE NO: 19-023-2 DATE INTRODUCED: February 11, 2019 INTRODUCED

More information

ELECTRONIC PACKET. March 26, 2018 Commission Meeting. RELEASED: Monday, March 19, 2018

ELECTRONIC PACKET. March 26, 2018 Commission Meeting. RELEASED: Monday, March 19, 2018 ELECTRONIC PACKET March 26, 2018 Commission Meeting RELEASED: Monday, March 19, 2018 COMMISSION MEETING March 26, 2018 OPERATIONS AND MAINTENANCE REPORT FOR FEBRUARY 2018 PAT OBENAUF & SCOTT ROYER

More information

ELECTRONIC PACKET. May 22, 2017 Commission Meeting. RELEASED: Monday, May 15, 2017

ELECTRONIC PACKET. May 22, 2017 Commission Meeting. RELEASED: Monday, May 15, 2017 ELECTRONIC PACKET May 22, 2017 Commission Meeting RELEASED: Monday, May 15, 2017 COMMISSION MEETING May 22, 2017 OPERATIONS AND MAINTENANCE REPORT FOR APRIL 2017 PAT OBENAUF & SCOTT ROYER 17-004-01

More information

CHECKLIST FOR DEVELOPMENT REVIEW

CHECKLIST FOR DEVELOPMENT REVIEW CHECKLIST FOR DEVELOPMENT REVIEW Petitions and related documents and plans for land development or other proposals regulated by Title 16 of the Municipal Code (Development Ordinance) and Title 17 of the

More information

City of Owasso Public Work Department STATUS REPORT November 7, 2017

City of Owasso Public Work Department STATUS REPORT November 7, 2017 City of Owasso Public Work Department STATUS REPORT November 7, 2017 E 76 St N Widening (from U.S. Hwy169 to N 129 E Avenue) HDH - In 2010, federal funding was awarded for the engineering, right-ofway

More information

August 13, 2015 WALK-IN BOARD MATTER #3. Consideration of a Proposal to Exchange State Trust Land in Sheridan County

August 13, 2015 WALK-IN BOARD MATTER #3. Consideration of a Proposal to Exchange State Trust Land in Sheridan County August 13, 2015 WALK-IN BOARD MATTER #3 ACTION: AUTHORITY: Consideration of a Proposal to Exchange State Trust Land in Sheridan County W.S. 36-1-110,-111; Board of Land Commissioners Rules and Regulations,

More information

STORMWATER MANAGEMENT SYSTEM AND FACILITIES

STORMWATER MANAGEMENT SYSTEM AND FACILITIES 152.01 Purpose 152.09 Nonresidential Unit 152.02 Findings 152.10 Rate Determinations; Compliance with Bond 152.03 Scope and Responsibility for Stormwater Utility Covenants 152.04 Definitions 152.11 Billing,

More information

City of Owasso Public Work Department STATUS REPORT February 6, 2018

City of Owasso Public Work Department STATUS REPORT February 6, 2018 City of Owasso Public Work Department STATUS REPORT February 6, 2018 E 76 St N Widening (from U.S. Hwy169 to N 129 E Avenue) HDH - In 2010, federal funding was awarded for the engineering, right-ofway

More information

Appendix B Real Estate Plan

Appendix B Real Estate Plan Appendix B Real Estate Plan B-1 REAL ESTATE PLAN Prepared for U.S. Army Corps of Engineers Southwestern Division Little Rock District As of May 1, 2013 Prepared by Ronald Bridges Real Estate Division ANY

More information

City of Owasso Public Work Department STATUS REPORT January 2, 2018

City of Owasso Public Work Department STATUS REPORT January 2, 2018 City of Owasso Public Work Department STATUS REPORT January 2, 2018 E 76 St N Widening (from U.S. Hwy169 to N 129 E Avenue) HDH - In 2010, federal funding was awarded for the engineering, right-ofway and

More information

APPENDIX H REAL ESTATE REQUIREMENTS

APPENDIX H REAL ESTATE REQUIREMENTS Malden River Ecosystem Restoration Detailed Project Report APPENDIX H REAL ESTATE REQUIREMENTS April 2007 Malden River Ecosystem Restoration Real Estate Report 1. PURPOSE: The Detailed Project Report

More information

LANDS COMMITTEE MEETING AGENDA OPEN TO THE PUBLIC

LANDS COMMITTEE MEETING AGENDA OPEN TO THE PUBLIC LANDS COMMITTEE MEETING AGENDA OPEN TO THE PUBLIC August 14, 2018 Following Board Meeting District Headquarters Live Oak, Florida 1. Call to Order / Committee Roll Call 2. Public Comment General Discussion

More information

City of Edwardsville, Kansas Special Benefit District Policy

City of Edwardsville, Kansas Special Benefit District Policy City of Edwardsville, Kansas Special Benefit District Policy Date Adopted: September 12, 2011 Section 1. Objective The objective is to establish a policy to finance public streets, sanitary sewers, water

More information

OFFERING MEMORANDUM 2 TENANT BUILDING Old Hickory Jackson, TN EHREN JACOBS. Asking Price $455,000

OFFERING MEMORANDUM 2 TENANT BUILDING Old Hickory Jackson, TN EHREN JACOBS. Asking Price $455,000 OFFERING MEMORANDUM 2 TENANT BUILDING 1011 Old Hickory Jackson, TN 38305-2678 EHREN JACOBS Asking Price $455,000 1 EXCLUSIVELY LISTED BY EHREN JACOBS REALTOR CELL: (310) 920-8996 EMAIL: jacobs.ehren@gmail.com

More information

DESCRIPTION OF THE DISTRICT

DESCRIPTION OF THE DISTRICT DESCRIPTION OF THE DISTRICT The project plan for City of Wausau, Tax Increment District #11 has been prepared in compliance with Wisconsin Statutes Chapter 66.1105(4). The plan establishes the need for

More information

Residential Minor Subdivision Review Checklist

Residential Minor Subdivision Review Checklist Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals) E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals) 1. Name(s): 2. Address: 3. Telephone Number(s): 4. E-mail: 5. Owner Name(s) (if

More information

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

BRIDGETON SUBDIVISION APPLICATION CHECKLIST APPLICATION NAME AND # CHECKLIST COMPLETED BY: DATE: Signature and printed name BRIDGETON SUBDIVISION APPLICATION CHECKLIST TO SUBDIVISION APPLICANTS: The attached checklist is to assist you in the submission

More information

RULES AND REGULATIONS FOR ADMINISTRATION OF AREA DRAINAGE PLANS

RULES AND REGULATIONS FOR ADMINISTRATION OF AREA DRAINAGE PLANS RIVERSIDE COUNTY RULES AND REGULATIONS FOR ADMINISTRATION OF AREA DRAINAGE PLANS ADOPTED JUNE 10, 1980 BY RESOLUTION NO. 80-244 AMENDMENTS RESOLUTION NO. May 26, 1981 81-148 Nov. 9, 1982 82-320 July 3,

More information

Residential Major Subdivision Review Checklist

Residential Major Subdivision Review Checklist Residential Major Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

SACRAMENTO COUNTY WATER AGENCY ORDINANCE NO. WA0-0089

SACRAMENTO COUNTY WATER AGENCY ORDINANCE NO. WA0-0089 SACRAMENTO COUNTY WATER AGENCY ORDINANCE NO. WA0-0089 AN ORDINANCE OF THE SACRAMENTO COUNTY WATER AGENCY CODE RELATING TO THE NORTH VINEYARD STATION SUPPLEMENTAL DRAINAGE FEE The Board of Directors of

More information

June 1, 2017 BOARD MATTER H - 1 FINAL CONSIDERATION OF STATE TRUST LAND EXCHANGE

June 1, 2017 BOARD MATTER H - 1 FINAL CONSIDERATION OF STATE TRUST LAND EXCHANGE June 1, 2017 BOARD MATTER H - 1 ACTION: AUTHORITY: FINAL CONSIDERATION OF STATE TRUST LAND EXCHANGE W.S. 36-1-107, 36-1-110, and 36-1-111; Board of Land Commissioners Rules and Regulations, Chapter 26,

More information

Appendix G. Non-Federal Letters of Support and Draft Real Estate Plan

Appendix G. Non-Federal Letters of Support and Draft Real Estate Plan Appendix G Non-Federal Letters of Support and Draft Real Estate Plan REAL ESTATE PLAN UPPER DELAWARE RIVER WATERSHED FEASABILITY STUDY LIVINGSTON MANOR, NEW YORK 1. GENERAL 2. REAL ESTATE REQUIREMENTS

More information

47.9 acres + Amenities Lower Rocky River Road, Cabarrus County NC

47.9 acres + Amenities Lower Rocky River Road, Cabarrus County NC 47.9 acres + Amenities Lower Rocky River Road, Cabarrus County NC INFORMATION PACKAGE Exclusive Listing Agency Franklin Buddy Hege, CCIM Gibson Smith Realty Co. 1100 Kenilworth Ave., Suite 200 Charlotte,

More information

Condominium Unit Requirements.

Condominium Unit Requirements. ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

Capital Improvement Program

Capital Improvement Program METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY POLICY AND PROCEDURES FOR RIGHT OF WAY ACQUISITION 1.0 PURPOSE AND DEFINITIONS Capital Improvement Program The purpose of this Policy is to establish procedures

More information

CHAPTER 3 PRELIMINARY PLAT

CHAPTER 3 PRELIMINARY PLAT 10-3-1 10-3-3 SECTION: CHAPTER 3 PRELIMINARY PLAT 10-3-1: Consultation 10-3-2: Filing 10-3-3: Requirements 10-3-4: Approval 10-3-5: Time Limitation 10-3-6: Grading Limitation 10-3-1: CONSULTATION: Each

More information

APPLICATION REVIEW CHECKLISTS

APPLICATION REVIEW CHECKLISTS APPLICATION REVIEW CHECKLISTS The following must be submitted with and are part of each application. No application is complete until all required documentation has been submitted to the Community Development

More information

SUBDIVISION REGULATIONS

SUBDIVISION REGULATIONS CHAPTER 14 SUBDIVISION REGULATIONS 14-100 Provisions 14-200 Preliminary Plat 14-300 Final Plat 14-400 Replat 14-500 Minor Subdivision 14-600 Administrative Replat 14-700 Vacation of Roadways, Public Easements,

More information

JANUARY 2016 MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK APPENDIX E

JANUARY 2016 MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK APPENDIX E U.S. Army Corps of Engineers New York District MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK JANUARY 2016 APPENDIX E REAL ESTATE

More information

VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL

VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL SECTION I. OVERVIEW AND GENERAL INSTRUCTIONS INTRODUCTION A stormwater

More information

ARTICLE 13 CONDOMINIUM REGULATIONS

ARTICLE 13 CONDOMINIUM REGULATIONS ARTICLE 13 CONDOMINIUM REGULATIONS Section 13.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

RESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension

RESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension RESOLUTION NO. R2018-07 To Acquire Real Property Interests Required for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 03/08/2018

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Public Notice U.S. Army Corps Permit Application No: SWG-2016-00384 Of Engineers Date Issued: 27 December 2018 Galveston District Comments Due: 29 January 2019 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

More information

Dane County Planning & Development Land Division Review

Dane County Planning & Development Land Division Review Dane County Planning & Development Land Division Review Date: June 26, 2012 To: Zoning & Land Regulation Committee From: Daniel Everson, Land Division Review Re: Revere Trails (preliminary plat) Town of

More information

Federal Mandates and Willing Sellers: Real Estate Acquisition for the Missouri River Recovery Program

Federal Mandates and Willing Sellers: Real Estate Acquisition for the Missouri River Recovery Program Federal Mandates and Willing Sellers: Real Estate Acquisition for the Missouri River Recovery Program Brad Thompson, Chief, Civil Works Branch U.S. Corps of Engineers, Omaha District US Army Corps of Engineers

More information

S Legend. Urban Municipality. Township label. Section label. Cadastral Surface Parcel. To wn sh ip. River Lot. Section.

S Legend. Urban Municipality. Township label. Section label. Cadastral Surface Parcel. To wn sh ip. River Lot. Section. S-12-20-5-2 Legend Urban Municipality Township label Section label Cadastral Surface Parcel To wn sh ip River Lot Section Quarter Section Date: February 14, 2017 Scale 1:18,056 μ Sources: Esri, HERE, DeLorme,

More information

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY Adopted January 3, 2012 PURPOSE: The purpose of the policy statement is to clarify the policies and procedures of the City of Fort

More information

Conservation Easement Stewardship

Conservation Easement Stewardship Conservation Easements are effective tools to preserve significant natural, historical or cultural resources. Conservation Easement Stewardship Level of Service Standards March 2013 The mission of the

More information

Township of Collier 2418 Hilltop Road Presto, PA 15142

Township of Collier 2418 Hilltop Road Presto, PA 15142 Township of Collier 2418 Hilltop Road Presto, PA 15142 Fees: Major: 2 checks $600 + $50 per lot & $1700 Escrow) APPLICATION FOR SUBDIVISION major FINAL only Plans must be folded Rolled plans will not be

More information

REVIEWED BY: Administrator Counsel Program Mgr. (Name): Board Committee Engineer Other

REVIEWED BY: Administrator Counsel Program Mgr. (Name): Board Committee Engineer Other Minnehaha Creek Watershed District REQUEST FOR BOARD ACTION MEETING DATE: July 28, 2016 TITLE: Authorization to execute a cooperative agreement with Park Nicollet Health Services for the construction of

More information

STONEY CREEK SHOPPING PLAZA

STONEY CREEK SHOPPING PLAZA PREMIUM REDEVELOPMENT LCBO ANCHORED PLAZA SHADOW ANCHORED BY FORTINOS, REXALL & DOLLARAMA FOR MORE INFORMATION: Matthew Pieszchala Sales Representative 416 495 6278 matthew.pieszchala@cbre.com UNITS RANGING

More information

Census Tract Data Analysis

Census Tract Data Analysis Data Analysis Study Area: s within the City of Evansville, Indiana Prepared For Mr. Kelley Coures City of Evansville Department of Metropolitan Development 1 NW MLK Jr. Boulevard Evansville, Indiana 47708

More information

Responsibilities of the Grant Recipient LAND AND WATER CONSERVATION FUND PROGRAM

Responsibilities of the Grant Recipient LAND AND WATER CONSERVATION FUND PROGRAM Responsibilities of the Grant Recipient LAND AND WATER CONSERVATION FUND PROGRAM STATE OF NEW HAMPSHIRE Department of Resources and Economic Development DIVISION of PARKS and RECREATION State of New Hampshire

More information

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012 Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012 IMPORTANT NOTE: This document was created to accompany the City of Fort Collins

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 17, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 17, 2017 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 17, 2017 DATE: June 9, 2017 SUBJECT: Request to authorize advertisement of public hearings by the Planning Commission and County Board

More information

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL SECTION 22.01 PURPOSE ARTICLE XXII PROCEDURES The purpose of this Article is to establish uniform requirements of procedure for all developments in the Township. Certain specific types of minor development

More information

Land Use Application

Land Use Application Land Use Application Check all permits you are applying for in the boxes provided. Submit this application form, the applicable materials listed in the corresponding permit application packet(s) and application

More information

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1 Proposed Name of Subdivision: City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1 FOR PRELIMINARY SUBDIVISION APPROVAL This application must be filled out legibly, in

More information

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO ATTENTION OF: CECW-PM (10-1-7a) THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report

More information

Planning Commission Preliminary Plan LRC Subdivision Montville Township

Planning Commission Preliminary Plan LRC Subdivision Montville Township Planning Commission Preliminary Plan LRC Subdivision Montville Township Meeting: February 1, 2017 App. No.: 002-2017-PP Owner: Faith & Hope Land Dev. Co. Applicant: Montville Investors LLC Engineer: Weber

More information

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW Application Number: Date Plat Submitted: Name of Subdivision: Name of Owner: Owner Address: (Street or P.O. Box) Telephone #: (City) (State) (Zip) E-mail:

More information

[First Reprint] SENATE, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED SEPTEMBER 17, 2018

[First Reprint] SENATE, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED SEPTEMBER 17, 2018 [First Reprint] SENATE, No. 0 STATE OF NEW JERSEY th LEGISLATURE INTRODUCED SEPTEMBER, 0 Sponsored by: Senator BOB SMITH District (Middlesex and Somerset) Senator CHRISTOPHER "KIP" BATEMAN District (Hunterdon,

More information

Subject: Ashville Park Cost Participation Term Sheet and Briefing

Subject: Ashville Park Cost Participation Term Sheet and Briefing OFFICE OF THE CITY MANAGER (757) 385-4242 April 27, 2018 MUNICIPAL CENTER BUILDING 1, ROOM 234 VVIRGINIA BEACH, VA 23456-9001 The Honorable Mayor William D. Sessoms, Jr. Members of City Council Subject:

More information

City of Yelm. Community Development Department BOUNDARY LINE ADJUSTMENT OR LARGE LOT SUBDIVISION

City of Yelm. Community Development Department BOUNDARY LINE ADJUSTMENT OR LARGE LOT SUBDIVISION City of Yelm Community Development Department BOUNDARY LINE ADJUSTMENT OR LARGE LOT SUBDIVISION Fee Date Received By File No. FEES: Boundary Line Adjustment $100.00 LARGE LOT SUBDIVISION $250.00, + $10.00/lot

More information

Open Space Model Ordinance

Open Space Model Ordinance Open Space Model Ordinance Section I. Background Open space development has numerous environmental and community benefits, including: 1) Reduces the impervious cover in a development. Impervious cover

More information

COASTAL CONSERVANCY. Staff Recommendation January 18, Carmel River Parkway Acquisitions. File No Project Manager: Trish Chapman

COASTAL CONSERVANCY. Staff Recommendation January 18, Carmel River Parkway Acquisitions. File No Project Manager: Trish Chapman COASTAL CONSERVANCY Staff Recommendation January 18, 2006 Carmel River Parkway Acquisitions File No. 06-104 Project Manager: Trish Chapman RECOMMENDED ACTION: Authorization to disburse up to $3,500,000

More information

Community Development Department

Community Development Department Community Development Department SUBJECT: Consideration of a Resolution and recommendation to enter into an Easement Agreement with Glenview School District 34 for the Stormwater Detention Project at the

More information

Appendix H: Real Estate Plan

Appendix H: Real Estate Plan APPENDIX H Spring Creek North Ecosystem Restoration Feasibility Study Appendix H: Real Estate Plan New York District U.S. Army Corps of Engineers October 2016 Revised: 13 April 2017 Spring Creek North

More information

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST TOWNSHIP OF EGG HARBOR PLANNING BOARD/ZONING BOARD OF ADJUSTMENT 3515 BARGAINTOWN ROAD EGG HARBOR TOWNSHIP, NJ 08234 MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST The following checklist is designed to

More information

S U B D I V I S I O N AGREEMENT

S U B D I V I S I O N AGREEMENT S U B D I V I S I O N AGREEMENT THIS AGREEMENT made this 17th day of January, 2006, by and between Peachtree Properties, L.L.C., (hereinafter referred to as "Developer"); SANITARY AND IMPROVEMENT DISTRICT

More information

LABEL PLEASE NOTE: ALL APPLICATIONS AND SITE PLANS MUST BE COMPLETED IN BLACK OR BLUE INK ONLY Intake by:

LABEL PLEASE NOTE: ALL APPLICATIONS AND SITE PLANS MUST BE COMPLETED IN BLACK OR BLUE INK ONLY Intake by: STAFF USE ONLY Thurston County Resource Stewardship 2000 Lakeridge Dr. S.W. Olympia, WA 98502 (360)786-5490 / (360)754-2939 (Fax) TDD Line (360) 754-2933 Email: permit@co.thurston.wa.us Supplemental Application

More information

ESTES VALLEY STORMWATER MANAGEMENT PROGRAM

ESTES VALLEY STORMWATER MANAGEMENT PROGRAM ESTES VALLEY STORMWATER MANAGEMENT PROGRAM Phase I. Stormwater Master Plan Phase II. Stormwater Utility Feasibility Study Board of Realtors Meeting May 3, 2018 Stormwater Master Plan Summary Stormwater

More information

Guide to Combined Preliminary and Final Plats

Guide to Combined Preliminary and Final Plats Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested

More information

Chapter 405 SUBDIVISION OF LAND. [HISTORY: Adopted by the Town Board of the Town of Middle Inlet Amendments noted where applicable.

Chapter 405 SUBDIVISION OF LAND. [HISTORY: Adopted by the Town Board of the Town of Middle Inlet Amendments noted where applicable. Chapter 405 SUBDIVISION OF LAND [HISTORY: Adopted by the Town Board of the Town of Middle Inlet 6-9-2005. Amendments noted where applicable.] Citations See Ch. 14. Planning Commission See Ch. 106. Driveways

More information

Preliminary Plat Information & Application Packet

Preliminary Plat Information & Application Packet Introduction Preliminary Plat Information & Application Packet This information packet was created to assist anyone who is considering applying for a preliminary plat of subdivision that is not a part

More information

PLAN COMMISSION APPLICATION CITY OF MIDDLETON 7426 HUBBARD AVE. MIDDLETON, WI (608) FAX (608)

PLAN COMMISSION APPLICATION CITY OF MIDDLETON 7426 HUBBARD AVE. MIDDLETON, WI (608) FAX (608) PLAN COMMISSION APPLICATION CITY OF MIDDLETON 7426 HUBBARD AVE. MIDDLETON, WI. 53562 (608) 821-8370 FAX (608) 827-1080 Plan Commission usually meets the 2 nd and 4 th Tuesdays of each month at 7 p.m. in

More information

Individual Well Individual Septic. Community Well 19. What is the proposed method of sewage disposal? Public. None

Individual Well Individual Septic. Community Well 19. What is the proposed method of sewage disposal? Public. None Please Answer the Following Questions: (attach sheet if needed). What type of facility is being proposed? Campground Recreational Vehicle (RV) Park Both 2. What is the total acreage of the proposed facility?

More information

City of Fort Lupton Amended Plat Process

City of Fort Lupton Amended Plat Process City of Fort Lupton Amended Plat Process Purpose The Amended Plat process is an administrative process to amend a recorded Plat. An Amended Subdivision is an administrative revision to a recorded Subdivision

More information

Emergency Watershed Program Sandy Recovery Activities and Flood Plain Easement Program

Emergency Watershed Program Sandy Recovery Activities and Flood Plain Easement Program Emergency Watershed Program Sandy Recovery Activities and Flood Plain Easement Program Greg Westfall, Resource Conservationist USDA-Natural Resources Conservation Service (NRCS) Set up by Congress to respond

More information

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation 5.0 Introduction This chapter summarizes the County s rules and regulations regarding floodplain management and development. The requirements presented in this chapter should be used by the design engineer

More information

A Guide to Good Applications

A Guide to Good Applications A Guide to Good Applications February 11 th, 2019 Instructor Terence McMullen, Deputy Director FUNDING CYCLE 2019-20 CDBG Allocation for Montgomery County: (approx.)$1.3m available Proposals encouraged

More information

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

TOWN OF WHITBY REPORT RECOMMENDATION REPORT TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Planning and Development Committee REPORT NO: PL 4-08 DATE OF MEETING: January 21, 2008 FILE NO(S): MI-01-07 (SW- 2002-03) PREPARED BY: Planning Department

More information

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST This CHECKLIST has been adopted in accordance with Section 25:807 of the Land Development Ordinance of the Township of Bordentown and will

More information

ARTICLE FIVE FINAL DRAFT

ARTICLE FIVE FINAL DRAFT ARTICLE FIVE 021218 FINAL DRAFT Sec. 503.6 Open Space Preservation Option Open Space Preservation Option Open Space Preservation developments may be approved in the AR, R-1, R-2 and R-3 zoning districts,

More information

APPENDIX B. SUBMISSION REQUIREMENTS

APPENDIX B. SUBMISSION REQUIREMENTS Master Major Site Minor Site Landscape Section B.1 Table of /Plat Requirements Proposed or approved name of development, project, subdivision, and/or phase. Location, including township, county, and state.

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review PUBLIC WORKS - COMMUNITY DEVELOPMENT 333 Broadalbin Street SW, PO Box 490, Albany, Oregon 97321-0144 BUILDING 541-917-7553 PLANNING 541-917-7550 Floodplain Development Land Use Review Application Information

More information

Town of Surf City. City Council Presentation April 2, 2013 PETER A. RAVELLA, PRINCIPAL PAR CONSULTING, LLC

Town of Surf City. City Council Presentation April 2, 2013 PETER A. RAVELLA, PRINCIPAL PAR CONSULTING, LLC Town of Surf City City Council Presentation April 2, 2013 PETER A. RAVELLA, PRINCIPAL CONSULTING, LLC I. Review Workshop schedule & Input SC-NTB Federal Project Plan 1550 Funding Contributors You re Not

More information

AGENDA ITEM Public Utilities Commission City and County of San Francisco

AGENDA ITEM Public Utilities Commission City and County of San Francisco WATER WASTEWATER POWER AGENDA ITEM Public Utilities Commission City and County of San Francisco MEETING DATE May 11, 2010 Approve Project - Mitigated Negative Declaration: Regular Calendar Bureau Manager:

More information

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Title: Date Adopted: Effective Date: Non-Maintained Public Right of Way Improvement Program August 21, 2018 August 21, 2018 It shall be the policy of the

More information

Metro. Board Report. File #: , File Type: Policy Agenda Number: 60.

Metro. Board Report. File #: , File Type: Policy Agenda Number: 60. Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #: 2018-0331, File Type: Policy Agenda Number: 60. REGULAR BOARD

More information

JOINT PUBLIC NOTICE PUBLIC NOTICE

JOINT PUBLIC NOTICE PUBLIC NOTICE Albuquerque District JOINT PUBLIC NOTICE PUBLIC NOTICE Application Number: SPA-2012-00299-ABQ Date: October 20, 2014 Comments Due: November 20, 2014 SUBJECT: The U.S. Army Corps of Engineers, Albuquerque

More information

Article III. Erosion and Sedimentation Control

Article III. Erosion and Sedimentation Control Article III. Erosion and Sedimentation Control Section 9.6 Erosion and Sedimentation Control Plan Requirements Section 9.6.1 Plan Submission A plan shall be prepared for all land-disturbing activities

More information

Georgia Conservation Tax Credit Program Frequently Asked Questions

Georgia Conservation Tax Credit Program Frequently Asked Questions Georgia Conservation Tax Credit Program Frequently Asked Questions What are the minimum requirements for eligibility under the Georgia Conservation Tax Credit Program (GCTCP)? Individual and corporate

More information

REQUEST FOR COUNCIL ACTION

REQUEST FOR COUNCIL ACTION COUNCIL AGENDA ITEM L-7 COUNCIL MEETING OF 11/19/13 REQUEST FOR COUNCIL ACTION SUBJECT: Resolution No. 7347 determining that pursuant to Section 15162 of the State s Guidelines implementing the California

More information

Initial Subdivision Applications Shall Include the Following:

Initial Subdivision Applications Shall Include the Following: Initial Subdivision Applications Shall Include the Following: 1) Subdivision Application Form: completely filled out (12 copies) 2) Plat: The Plat must adhere to the requirements set forth in the Town

More information

Evaluating and Processing Road and Utility Easement Proposals on Corps Lands and Flowage Easements

Evaluating and Processing Road and Utility Easement Proposals on Corps Lands and Flowage Easements Evaluating and Processing Road and Utility Easement Proposals on Corps Lands and Flowage Easements Don Wiese Natural Resources Manager Fort Worth District September 13, 2017 US Army Corps of Engineers

More information

Nutrient Offset Program & Buffer Mitigation Program Authorities for MBI Updated 09/15/2015 All Basins ATTACHMENT A Authorities pertaining to the Nevil

Nutrient Offset Program & Buffer Mitigation Program Authorities for MBI Updated 09/15/2015 All Basins ATTACHMENT A Authorities pertaining to the Nevil Nutrient Offset Program & Buffer Mitigation Program Authorities for MBI Updated 09/15/2015 All Basins ATTACHMENT A Authorities pertaining to the Neville Farms Mitigation Banking Instrument General Statutes:

More information

SW :9,028. Scale. Legend. Building. Corral. Dam. Dugout. Gate. Graveyard. Power. Pump. Spring. Trough. Well. Windmill. Fence.

SW :9,028. Scale. Legend. Building. Corral. Dam. Dugout. Gate. Graveyard. Power. Pump. Spring. Trough. Well. Windmill. Fence. SW-03-19-14-2 Legend Building Corral Dam Dugout Gate Graveyard Power Pump Spring Trough Well Windmill Fence Trail Waterline Field Hay Plots Pasture Boundary - SPP Pasture Boundary - AESB Date: January

More information

TRUSTEE RESPONSIBILITIES ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING

TRUSTEE RESPONSIBILITIES ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING TRUSTEE RESPONSIBILITIES ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING CHAPTER 468 OF THE CODE OF IOWA Drainage Districts are governed under this chapter of the Code of Iowa. PETITION Triggers

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 DATE: December 3, 2012 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Manager

More information

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER RESOURCES ABANDONED MINE LANDS RECLAMATION PROGRAM

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER RESOURCES ABANDONED MINE LANDS RECLAMATION PROGRAM RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER RESOURCES 0400-44-01 ABANDONED MINE LANDS RECLAMATION PROGRAM TABLE OF CONTENTS 0400-44-01-.01 Scope 0400-44-01-.09 Methods

More information

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION Date Received: Fee Paid (amount): Applicant: Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION Subdivision Name/Title: This application must be received at the Town Office by close of business on the

More information

Planned Residential Development ( PRD ) Application

Planned Residential Development ( PRD ) Application FOR PLANNING USE ONLY Application # PRD Application Fee $ Receipt No. Filing Date Completeness Date Planned Residential Development ( PRD ) Application A. PROJECT INFORMATION 1. Project Name: 2. Address

More information

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation 5.0 Introduction This chapter summarizes the Town s rules and regulations regarding floodplain management and development. The requirements presented in this chapter should be used by the design engineer

More information

PLANNING BOARD APPLICATION FORM TOWNSHIP OF BETHLEHEM 405 MINE ROAD ASBURY, NEW JERSEY Date of Application: Township Application Number:

PLANNING BOARD APPLICATION FORM TOWNSHIP OF BETHLEHEM 405 MINE ROAD ASBURY, NEW JERSEY Date of Application: Township Application Number: Township of Bethlehem Page 1 of 8 PLANNING BOARD APPLICATION FORM TOWNSHIP OF BETHLEHEM 405 MINE ROAD ASBURY, NEW JERSEY 08802 Date of Application: Township Application Number: Jurisdiction: Planning Board

More information

CITY OF NORTH PORT Neighborhood Development Services Planning Division Final Plat/Re-Plat Packet

CITY OF NORTH PORT Neighborhood Development Services Planning Division Final Plat/Re-Plat Packet CITY OF NORTH PORT Neighborhood Development Services Planning Division Planninginfo@cityofnorthport.com Final Plat/Re-Plat Packet The following items are to be included in the submission: Final Plat/Re-Plat

More information

HUNTING BAYOU FLOOD RISK MANAGEMENT, HARRIS COUNTY, TEXAS DRAFT GENERAL REEVALUATION REPORT AND INTEGRATED ENVIRONMENTAL ASSESSMENT

HUNTING BAYOU FLOOD RISK MANAGEMENT, HARRIS COUNTY, TEXAS DRAFT GENERAL REEVALUATION REPORT AND INTEGRATED ENVIRONMENTAL ASSESSMENT HUNTING BAYOU FLOOD RISK MANAGEMENT, HARRIS COUNTY, TEXAS DRAFT GENERAL REEVALUATION REPORT AND INTEGRATED ENVIRONMENTAL ASSESSMENT APPENDIX 6 REAL ESTATE PLAN June 2014 HARRIS COUNTY FLOOD CONTROL DISTRICT

More information

CONDOMINIUM REGULATIONS

CONDOMINIUM REGULATIONS ARTICLE 37 CONDOMINIUM REGULATIONS SECTION 37.01. Purpose The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information