4

5

6

7

8

9 COMMISSION MEETING May 22, 2017 OPERATIONS AND MAINTENANCE REPORT FOR APRIL 2017 PAT OBENAUF & SCOTT ROYER PowerPoint presentation from Patrick Obenauf, Manager of Contract Compliance, and Scott Royer, General Manager, Veolia Water Milwaukee, LLC

10 Item 1 COMMISSION FILE NO: DATE INTRODUCED: May 8, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Operations Committee RELATING TO: Award of Contract J04040C01, Jones Island Dewatering and Drying Building Freight and Passenger Elevators Modernization, and Approve Changes in Total Project Costs SUMMARY: The Commission is requested to award and to direct the Executive Director to execute on behalf of the District Contract J04040C01, Jones Island Dewatering and Drying (D&D) Building Freight and Passenger Elevators Modernization, to Mid-American Elevator Company, Inc., (Mid- American) in the amount of $2,198,856. Mid-American was the only responsible, responsive bidder and the only bid received. Further, the Commission is requested to increase the total project cost for Project J04040, Jones Island Dewatering and Drying Building Freight and Passenger Elevators Modernization, by $70,301 for an amended total project cost of $2,680,732, and to make a corresponding change to the total project cost for Project M99001, Allowance for Cost and Schedule Changes. The D&D Building located at the Jones Island Water Reclamation Facility has been in service since The movement of people, both the public and plant staff, equipment, and materials is vital to the continued operation of the D&D Building. There are two elevators that service the D&D Building. Elevator No. 1 is a passenger elevator while Elevator No. 2 is the freight elevator, but can also accommodate large groups of passengers during tours of the facility. Both elevators and their associated equipment are original to the building. Currently, both elevators require frequent servicing to maintain safe operation. Elevator interruption causes production downtime and can be a safety hazard. In addition, people occasionally become detained in a stopped elevator. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER OP_Award_J04040C01_D&D_Freight_Passenger_Elevator_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

11 SUMMARY (Cont d) Award of Contract J04040C01, Jones Island Dewatering and Drying Building Freight and Passenger Elevators Modernization, and Approve Changes in Total Project Costs This contract consists of modernizing Elevator No. 1 and Elevator No. 2 in the D&D Building. The purpose of modernizing the two existing elevators is to extend the service life of each elevator and to ensure continued safe operation for both the public and plant staff. This contract includes the following for both elevators: Replacing and upgrading traction machines and hoist motors. Replacing and upgrading elevator controls with digital closed loop microprocessors. Refurbishing elevator cars. Performing mechanical and electrical upgrades to elevator shafts and machine rooms. Miscellaneous architectural upgrades. The duration of this contract is 14 months. The low bid received by the District is more than budgeted, and staff requests to increase the total project cost accordingly. Consistent with the Agreement for Management, Operations, and Maintenance Services between the District and Veolia Water Milwaukee, LLC, (VWM) VWM will make a $20,000 contribution to the District for this project. 2

12 RESOLUTION Award of Contract J04040C01, Jones Island Dewatering and Drying Building Freight and Passenger Elevators Modernization, and Approve Changes in Total Project Costs RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that Contract J04040C01, Jones Island Dewatering and Drying Building Freight and Passenger Elevators Modernization, is awarded to Mid-American Elevator Company, Inc., in the amount of $2,198,856, and that the Executive Director is directed to execute a contract on behalf of the District. FURTHER RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the total project cost for Project J04040, Jones Island Dewatering and Drying Building Freight and Passenger Elevators Modernization, is increased by $70,301 for an amended total project cost of $2,680,732, and that a corresponding change is made to the total project cost for Project M99001, Allowance for Cost and Schedule Changes. 3

13 Capital Budget Fiscal Note Total Project Cost RELATING TO: Award of Contract J04040C01, Jones Island Dewatering and Drying Building Freight and Passenger Elevators Modernization, and Approve Changes in Total Project Costs Capital Project Number(s) J04040-D&D Freight & Passenger Elevator Rehab Impact of Requested Action on Total Project Cost: X Increase Decrease New Project No Change Total Project Cost Analysis Project Costs Adopted 2017 Total Project Cost $2,610,431 Previously Approved Changes $0 Approved Total Project Cost $2,610,431 Requested Total Project Cost $2,680,732 Requested (Increase)/Decrease ($70,301) Action to be taken to Long-Range Financing Plan to address Total Project Cost change X Transfer from Allowance for Cost and Schedule Changes Transfer from another project (specify in comments) Delay Project(s) (specify in comments) Delete Project(s) (specify in comments) Other Transfer to Allowance for Cost and Schedule Changes Comments The low bid received by the District is more than budgeted, and staff requests to increase the total project cost accordingly. Consistent with the Agreement for Management, Operations, and Maintenance Services between the District and Veolia Water Milwaukee, LLC, (VWM) VWM will make a $20,000 contribution to the District for this project. Budget Review by: Date: Theresa Zwieg 4/11/2017

14 Bid & S/W/MBE Information Award of Contract J04040C01, Jones Island Dewatering and Drying Building Freight and Passenger Elevators Modernization, and Approve Changes in Total Project Costs Cost Center: 41 Bid Opening Date: March 24, 2017 Total S/W/MBE Local No. of Bids No. of Responsive Bids Bids (listed low to high) (Name/City/State/Zip) Price Responsive/ Non-Responsive/ Not Reviewed % Subcontractor % S/W/MBE Mid-American Elevator Co. Chicago, IL $2,198, Responsive 5.5% 5.5% Low Bid Information Subcontractor MBE/WBE/SBE/VBE Firms MBE: Allcon Construction LLC Butler, WI WBE: Belonger Corporation Inc. West Bend, WI SBE: Type of Work % Amount Electrical 2.7% $59, HVAC 2.8% $62, VBE: 04/28/17 J04040C01-1 -

15 Non- MBE/WBE/SBE/VBE Subcontractors Type of Work % Amount NA List reason(s) if no MBE/WBE/SBE Involvement: As this is a highly specialized project requiring specialized skillsets, the bid responsiveness was very low. Extraordinary outreach attempts were made to obtain increased participation but the result was still quite low, resulting in one bidder. Local Workforce Participation Requirement: A. Sanitary Sewer Service Area Employment: 45% B. Target Area Employment: 20% Apprentice Utilization As Bid: 2 Bids Non-Responsive: Comments: S/W/MBE Planholders: Allcon Construction LLC, Belonger Corporation, Inc. Media Ads: Yes No Name of Publication: Daily Reporter 04/28/17 J04040C01-2 -

16 Information for Low Bid (Over $10,000) Company Name: Mid-American Elevator Contact Person: Patrick Stacy Phone: EEO DATA: a) Total Number of Employees: 130 Total Percentage Total Percentage b) Minorities % c) Female % Hispanic 5 3.8% Hispanic 0 0.0% African American 5 3.8% African American 1 0.8% Native American 0 0.0% Native American 0 0.0% Asian 1 0.8% Asian 0 0.0% d) Labor Market Availability: Minorities: 16.2% Females: 48% 04/28/17 J04040C01-3 -

17 Item 2 COMMISSION FILE NO: DATE INTRODUCED: May 8, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Operations Committee RELATING TO: Award of Contract J04051C01, Jones Island Water Reclamation Facility Main Recycle Air Belt Feed Screw Replacement Project, and Approve Changes in Total Project Costs SUMMARY: The Commission is requested to award and to direct the Executive Director to execute on behalf of the District Contract J04051C01, Jones Island Water Reclamation Facility Main Recycle Air Belt Feed Screw Replacement Project, to J.F. Ahern in the amount of $335,000. J.F. Ahern was the lowest responsible, responsive bidder among three bids received. Further, the Commission is requested to decrease the total project cost for Project J04051, Jones Island Water Reclamation Facility Main Recycle Air Belt Feed Screw Replacement Project, by $112,325 for an amended total project cost of $670,103 and to make a corresponding change to the total project cost for Project M99001, Allowance for Cost and Schedule Changes. The Jones Island Water Reclamation Facility Dewatering and Drying (D&D) Facility has been in service since The D&D Facility converts sludge to Milorganite product. The Milorganite production process includes 12 rotary sludge dryers used to heat-dry dewatered biosolids producing Milorganite. The dried biosolids are transported from the dryers to other processes within the D&D Facility using various conveyors. Conveyors throughout the D&D Facility are experiencing various degrees of wear, which leads to breakdown of the equipment. This condition results in inefficient and unreliable biosolids conveyance equipment and reduced Milorganite production. To ensure that the D&D Facility continues to process biosolids and create Milorganite, the District has been developing and implementing multiple projects to replace these conveyors. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER OP_Aw_J04051_JIWRF_Main_AirBelt_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

18 SUMMARY (Cont d) Award of Contract J04051C01, Jones Island Water Reclamation Facility Main Recycle Air Belt Feed Screw Replacement Project, and Approve Changes in Total Project Costs The Main Recycle Air Belt Feed Screw Conveyors transport material from the Recycle Product Bin to the Main Recycle Air Belt. One screw conveyer services the north side of the building, one the south side, and the third is redundant and can service both sides of the building. The existing conveyors were installed in 1999, show extensive wear, and need replacing. The scope of this contract includes removing and replacing all three Main Recycle Air Belt Feed Screw Conveyors. The new conveyors will be equipped with deflagration (explosion relief) venting. Additionally, the project will replace the dust collection connections, motors, and zero speed switches. The duration of the contract is 353 days. The low bid received by the District is less than budgeted, and staff requests to decrease the total project cost accordingly. Consistent with the Agreement for Management, Operations, and Maintenance Services between the District and Veolia Water Milwaukee, LLC, (VWM), VWM will make a $30,000 contribution to the District for this project. 2

19 RESOLUTION Award of Contract J04051C01, Jones Island Water Reclamation Facility Main Recycle Air Belt Feed Screw Replacement Project, and Approve Changes in Total Project Costs RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that Contract J04051C01, Jones Island Water Reclamation Facility Main Recycle Air Belt Feed Screw Replacement Project, is awarded to J.F. Ahern in the amount of $335,000, and that the Executive Director is directed to execute a contract on behalf of the District. FURTHER RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the total project cost for Project J04051, Jones Island Water Reclamation Facility Main Recycle Air Belt Feed Screw Replacement Project, is decreased by $112,325 for an amended total project cost of $670,103, and that a corresponding change is made to the total project cost for Project M99001, Allowance for Cost and Schedule Changes. 3

20 Capital Budget Fiscal Note Total Project Cost RELATING TO: Award of Contract J04051C01, Jones Island Water Reclamation Facility Main Recycle Air Belt Feed Screw Replacement Project, and Approve Changes in Total Project Costs Capital Project Number(s) J04051-MRAB Feed Screw Replacements Impact of Requested Action on Total Project Cost: Increase X Decrease New Project No Change Total Project Cost Analysis Project Costs Adopted 2017 Total Project Cost $782,428 Previously Approved Changes $0 Approved Total Project Cost $782,428 Requested Total Project Cost $670,103 Requested (Increase)/Decrease $112,325 Action to be taken to Long-Range Financing Plan to address Total Project Cost change Transfer from Allowance for Cost and Schedule Changes Transfer from another project (specify in comments) Delay Project(s) (specify in comments) Delete Project(s) (specify in comments) Other X Transfer to Allowance for Cost and Schedule Changes Comments The low bid received by the District is less than budgeted and staff requests to decrease the total project cost accordingly. Consistent with the Agreement for Management, Operations, and Maintenance Services between the District and Veolia Water Milwaukee, LLC, (VWM), VWM will make a $30,000 contribution to the District for this project. Budget Review by: Date: Theresa Zwieg 4/12/2017

21 Bid & S/W/MBE Information Award of Contract J04051C01, Jones Island Water Reclamation Facility Main Recycle Air Belt Feed Screw Replacement Project, and Approve Changes in Total Project Costs Cost Center: 41 Bid Opening Date: March 30, 2017 Total S/W/MBE Local No. of Bids No. of Responsive Bids Bids (listed low to high) (Name/City/State/Zip) J.F. Ahern Co. Fond du Lac, WI Price Erecting Co. Inc (MBE) Milwaukee, WI Marshall Erecting Milwaukee, WI Price Responsive/ Non-Responsive/ Not Reviewed % Subcontractor % S/W/MBE $335, Responsive 6.1% 3.008% $342, Responsive 77.9% 30.6% $344, Responsive 0.0% 2.0% Low Bid Information Subcontractor MBE/WBE/SBE/VBE Firms MBE: Sanchez Coating & Env. Wausau, WI WBE: Type of Work % Amount Painting 0.4% $1, SBE: VBE: Mill Equipment Co., Inc. Burlington, WI 53105SBE: Installation 2.6% $9, /10/17 J04051C01-1 -

22 Non- MBE/WBE/SBE/VBE Subcontractors Type of Work % Amount Pieper Electric Electrical 3.1% $10, New Berlin, WI List reason(s) if low MBE/WBE/SBE Involvement: More than $250,000 of the total bid is tied to the procurement of equipment, and there is a lack of SWMBE firms willing to bid on electrical services. Note that if the second lowest bidder was not itself a SWMBE firm, the participation submitted in their bid would be less than 1%. Local Workforce Participation Requirement: A. Sanitary Sewer Service Area Employment: 45% B. Target Area Employment: 20% Apprentice Utilization As Bid: 0 Bids Non-Responsive: Comments: S/W/MBE Planholders: Mill Equipment Co. Inc., Thomas A. Mason Co. Inc., Price Erecting Co., Inc. Media Ads: Yes No Name of Publication: Daily Reporter 05/10/17 J04051C01-2 -

23 Information for Low Bid (Over $10,000) Company Name: J.F. Ahern Contact Person: Ashley Kahlhamer Phone: EEO DATA: a) Total Number of Employees: 1347 Total Percentage Total Percentage b) Minorities % c) Female % Hispanic % Hispanic 2 0.2% African American % African American 1 0.1% Native American 8 0.6% Native American 1 0.1% Asian 3 0.2% Asian 0 0.0% d) Labor Market Availability: Minorities: 16.2% Females: 48% 05/10/17 J04051C01-3 -

24 Item 3 COMMISSION FILE NO: DATE INTRODUCED: May 8, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Operations Committee RELATING TO: Modification Number Two, Contract S04025C01, South Shore Water Reclamation Facility Hot Water Boiler Control Systems Improvements, Restore the Executive Director s Original Delegated Authority, and Approve Changes in Total Project Cost SUMMARY: The Commission is requested to authorize the Executive Director to execute Modification Number Two to Contract S04025C01, South Shore Water Reclamation Facility (SSWRF) Hot Water Boiler Control Systems Improvements, with Next Electric, Inc., (Next) in an amount not to exceed $3,018 and to restore the Executive Director s authority for approving future modifications. Further, the Commission is requested to increase the total project cost for Project S04025, SSWRF Hot Water Boiler Control Systems Improvements, by $52,898 for an amended total project cost of $650,922 and to make a corresponding change to the total project cost for Project M99001, Allowance for Cost and Schedule Changes. The Commission awarded Contract S04025C01 in July The purpose of the contract is to upgrade components of Boilers No. 3 and No. 4 to improve system reliability and efficiency. The original contract scope of work includes removing and replacing the following components for each boiler: Boiler burner and blower Natural gas fuel train Digester gas fuel train Boiler instrumentation Local control systems ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER OP_S04025C01_Mod1_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

25 SUMMARY (Cont d) Modification Number Two, Contract S04025C01, South Shore Water Reclamation Facility Hot Water Boiler Control Systems Improvements, Restore the Executive Director s Original Delegated Authority, and Approve Changes in Total Project Cost When the contractor started work to replace the boiler burner, it was discovered that the firebox was flooded with water. The firebox must be dry to properly operate the burner and boiler. Installing the new burner equipment under the existing conditions would also void the new burner manufacturer s warranty. Further inspection revealed that the boiler tubes were leaking and needed a full replacement (several hundred tubes). Staff requested and received a cost estimate from Next to replace all tubes. Next s proposed cost to replace the tubes on Boiler No. 4, $52,898, was comparable to a 2016 competitively bid contract to replace the tubes in Boiler No. 3. This cost consists of $49,880 to a subcontractor that would perform the tube replacement (PBBS Equipment Corporation, Menomonee Falls) plus a $3,018 contractor markup for Next. Staff authorized Next to proceed with the boiler tube replacement work without the $3,018 contractor markup. This allowed the necessary boiler replacement to proceed without any delays. This proposed amendment allows the District to compensate Next for contractor markup on the subcontract. Contact SUMMARY OF CONTRACT COST CHANGES Amount Percentage Increase Authorized By Original $ 366,500 - Commission Modification No. 1 $ 49, % Director of Technical Services Modification No. 2 $ 3, % Requested of the Commission Total Modifications $ 52, % Total Contract $ 419,398 The Commission has delegated to the Executive Director the authority to make cumulative construction contract modifications of $50,000 for contracts less than $500,000 as approved by the Commission. To date, the Executive Director has $120 authority remaining. The request to restore the Executive Director s authority is based on potential future modifications. If issues arise that necessitate additional contract modifications beyond the $120, the contractor could have to stop work while staff requests the necessary authority from the Commission. This could result in contractor claims and additional costs to the District. 2

26 SUMMARY (Cont d) Modification Number Two, Contract S04025C01, South Shore Water Reclamation Facility Hot Water Boiler Control Systems Improvements, Restore the Executive Director s Original Delegated Authority, and Approve Changes in Total Project Cost The request to increase the total project cost by $52,898 is due to the two contract modifications increasing costs beyond that budgeted. 3

27 RESOLUTION Modification Number Two, Contract S04025C01, South Shore Water Reclamation Facility Hot Water Boiler Control Systems Improvements, Restore the Executive Director s Original Delegated Authority, and Approve Changes in Total Project Cost RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized to execute Modification Number Two to Contract S04025C01, South Shore Water Reclamation Facility Hot Water Boiler Control Systems Improvements, with Next Electric, Inc., in an amount not to exceed $3,018 and that the Executive Director s original delegated authority is restored. FURTHER RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the total project cost for Project S04025, South Shore Water Reclamation Facility Hot Water Boiler Control Systems Improvements, is increased by $52,898 for an amended total project cost of $650,922 and that a corresponding change is made to the total project cost for Project M99001, Allowance for Cost and Schedule Changes. 4

28 Capital Budget Fiscal Note Total Project Cost RELATING TO: Modification Number Two, Contract S04025C01, South Shore Water Reclamation Facility Hot Water Boiler Control Systems Improvements, Restore the Executive Director s Original Delegated Authority, and Approve Changes in Total Project Cost Capital Project Number(s) S04025-HW Boiler Control Systems Improvements Impact of Requested Action on Total Project Cost: X Increase Decrease New Project No Change Total Project Cost Analysis Project Costs Adopted 2017 Total Project Cost $598,024 Previously Approved Changes $0 Approved Total Project Cost $598,024 Requested Total Project Cost $650,922 Requested (Increase)/Decrease ($52,898) Action to be taken to Long-Range Financing Plan to address Total Project Cost change X Transfer from Allowance for Cost and Schedule Changes Transfer from another project (specify in comments) Delay Project(s) (specify in comments) Delete Project(s) (specify in comments) Other Transfer to Allowance for Cost and Schedule Changes Comments Upon the beginning of work to replace the boiler burner additional, unbudgeted work was discovered as needed. The requested increase to total project cost is to cover these unanticipated expenditures. Budget Review by: Date: Theresa Zwieg 4/11/2017

29 COMMISSION FILE NO: DATE INTRODUCED: May 8, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Operations Committee Item 4 REVISED RELATING TO: Approval of 2017 Green Infrastructure Partnership Program Projects W96001P22, W96001P24, W96001P25, W96001P29, and W96001P31 SUMMARY: The Commission is requested to authorize the Executive Director to approve five projects, W96001P22, W96001P24, W96001P25, W96001P29, and W96001P31, under the 2017 Green Infrastructure Partnership Program (GIPP) in a total amount not to exceed $1,215,191. The 2017 GIPP funding was allocated in the approved 2017 Capital and Operations and Maintenance budgets. Nine additional project awards, W96001P21, W96001P23, W96001P26, W96001P27, W96001P28, W96001P30, W96001P32, W96001P33, and M03090P07, are within the Executive Director s authority and therefore are not requested for approval. They are included in this document as reference only. The primary goals of this program are to support the District s 2035 Vision, implement the Regional Green Infrastructure Plan, and continue progress toward the goal of providing 740 million gallons of stormwater capture capacity in any given storm by Additionally, this program helps to form mutually beneficial partnerships to generate quantitative data on the effectiveness of green infrastructure (GI) in managing stormwater runoff in the District s service area and qualitative data on the implementation and feasibility of various GI practices. The District received 20 proposals from private property owners, municipalities, and developers in response to the District s notice and application. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER OP_2017_Green_Infrastructure_Partnership_Program_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

30 SUMMARY (Cont d) Approval of 2017 Green Infrastructure Partnership Program Projects W96001P22, W96001P24, W96001P25, W96001P29, and W96001P31 The following projects and partners are recommended for funding and are requested for Commission approval: Project Name Applicant Award $ Project Number Greenprint for Milwaukee Milwaukee County War Shoreline Phase I Memorial, Inc. $366,966 W96001P25 Coakley Site Renovation Project Coakley Brothers Moving and Brothers Business Interiors $330,541 W96001P29 Schlitz Audubon Stormwater Wetland & Habitat Restoration Schlitz Audubon Nature Center $189,280 W96001P22 WasserGärten at The 42 SSL Milwaukee, LLC $166,436 W96001P31 Community-Based Park Reconstruction, MKE Plays City of Milwaukee, MKE Plays $161,968 W96001P24 Total $1,215,191 These projects are summarized below. Greenprint for Milwaukee Shoreline Phase 1, submitted by Milwaukee County War Memorial (W96001P25) Greenprint for Milwaukee Shoreline Phase 1 is the on-the-ground first phase of a larger comprehensive plan to renovate 2.8 miles of Milwaukee s shoreline from Michigan Avenue north through Veteran s Park into McKinley Marina Park using sustainable design elements. The project will capture stormwater before it enters Lake Michigan, naturalizing the shoreline by including native landscaping, natural buffers, and habitat enhancement, while moving parking away from the shoreline itself. Location: 750 N. Lincoln Memorial Drive, Milwaukee, WI Gallons Captured: 152,598 GI Strategies: Native Landscaping, Porous Pavement, and Bioswales 2

31 SUMMARY (Cont d) Approval of 2017 Green Infrastructure Partnership Program Projects W96001P22, W96001P24, W96001P25, W96001P29, and W96001P31 Coakley Site Renovation Project, submitted by Coakley Brothers Moving and Brothers Business Interiors (W96001P29) The Coakley Site Renovation Project incorporates a wide variety of GI strategies to mitigate stormwater runoff on a site at the south end of the 6 th Street Viaduct. The project will include a blue roof on the seven-story tower building that will include smart controls to catch and harvest stormwater. Location: 400 S. 5 th Street, Milwaukee, WI Gallons Captured: 163,193 GI Strategies: Native Landscaping, Porous Pavement, Cisterns, Stormwater Trees, Bioswales, Rain Gardens, and Blue Roof with Smart Drain Technology Schlitz Audubon Stormwater Wetland & Habitat Restoration, submitted by Schlitz Audubon Nature Center (W96001P22) The Schlitz Audubon Stormwater Wetland & Habitat Restoration Project is part of a multiphase project that will create new wetlands and enhance and restore existing wetlands to slow, store, and filter stormwater on Schlitz Audubon Nature Center s coastal Lake Michigan wildlife sanctuary. Location: 1111 E. Brown Deer Road, Milwaukee, WI Gallons Captured: 2,898,011 GI Strategies: Constructed Wetlands, Native Landscaping, and Stormwater Trees WasserGärten at The 42, submitted by SSL Milwaukee LLC (W96001P31) This project is in the Brewery District at the former Pabst Brewery Complex and will occupy the site previously housing Pabst s distribution/shipping center building. The development will house the new offices of Milwaukee Brewing. The project will create usable rooftop space using smart control technology with a blue roof. Location: 1131 N. 8 th Street, Milwaukee, WI Gallons Captured: 57,931 GI Strategies: Native Landscaping, Porous Pavement, Cisterns, Green Roof, and Blue Roof with Smart Drain Technology 3

32 SUMMARY (Cont d) Approval of 2017 Green Infrastructure Partnership Program Projects W96001P22, W96001P24, W96001P25, W96001P29, and W96001P31 Community-Based Park Reconstruction, MKE Plays, submitted by City of Milwaukee, MKE Plays (W96001P24) This project will renovate a playground area located at Witkowiak Park on Milwaukee s near south side. The project will mitigate stormwater runoff through the renovation of a playground area incorporating GI strategies such as permeable synthetic turf designed to provide benefits similar to porous pavement. Location: 1648 S. 4 th Street, Milwaukee, WI Gallons Captured: 70,060 GI Strategies: Porous Pavement, Stormwater Trees, Rain Gardens, and Permeable Synthetic Turf The following projects and partners are included for reference only. They are within the Executive Director s authority and are not requested for Commission approval: Project Name Applicant Award $ Innovation Park Stormwater/Green Infrastructure Demonstration Site Porous Pavement Addition, Underground Storage (Cistern) Installation and Rain Garden Expansion at MillerCoors LLCS Milwaukee Brewery Northwest Side Community Development Corporation 4 Project Number $134,500 W96001P23* MillerCoors Milwaukee Brewery $120,375 W96001P32* Westlawn Gardens Phase 2 Housing Authority of the City of Milwaukee $100,000 W96001P26* Burnham Playfield Project Milwaukee Public Schools Department of Recreation and Community $98,480 W96001P28* ALBA School Playground Project Milwaukee Public Schools $82,225 W96001P33* 2100 Urban Residence The 2100 LLC $51,143 W96001P30* Adams Garden Park Sharon Adams $40,950 W96001P21* Arts at Large Historic Building Renovation with Green Infrastructure Arts at Large $25,000 W96001P27* Big Red Church Green Roof Calvary Presbyterian Church $6,000 M03090P07* *Approval not requested. Total $658,673 These projects are summarized below.

33 SUMMARY (Cont d) Approval of 2017 Green Infrastructure Partnership Program Projects W96001P22, W96001P24, W96001P25, W96001P29, and W96001P31 Innovation Park Stormwater/Green Infrastructure Demonstration Site, submitted by Northwest Side Community Development Corporation (W96001P23) This project will capture stormwater using a variety of GI types on the location of a former industrial property within the 30 th Street Corridor. The project includes planting up to 1,000 stormwater trees intended to perform phytoremediation of petroleum in the soil as well as mitigation of stormwater runoff. Location: N. 31 st Street, Milwaukee, WI Gallons Captured: 56,100 GI Strategies: Native Landscaping, Porous Pavement, Cisterns, Stormwater Trees, and Bioswales Porous Pavement Addition, Underground Storage (cistern) Installation, and Rain Garden Expansion at MillerCoors LLC Milwaukee Brewery, submitted by MillerCoors Milwaukee Brewery (W96001P32) This project creates additional parking needed to accommodate increased brewery production at the MillerCoors Milwaukee Brewery. Several buildings will be removed to create additional parking, with GI strategies used to capture rainwater from these areas. The project also includes an expansion of an existing rain garden. Location: 4001 W. Bluemound Road, Milwaukee, WI Gallons Captured: 252,390 GI Strategies: Porous Pavement, Cisterns, and Rain Gardens Westlawn Gardens Phase 2, submitted by Housing Authority of the City of Milwaukee (W96001P26) This phase of a much larger overall project consists of the installation of an underground detention chamber installed under an existing asphalt playground at Browning Elementary School. Upon completion of the remaining phases, this site will incorporate four stormwater detention chambers with a combined capacity of 1,874,970 gallons. Location: 5440 N. 64 th Street, Milwaukee, WI Gallons Captured: 869,221 GI Strategies: Cisterns 5

34 SUMMARY (Cont d) Approval of 2017 Green Infrastructure Partnership Program Projects W96001P22, W96001P24, W96001P25, W96001P29, and W96001P31 Burnham Playfield Project, submitted by Milwaukee Public Schools Department of Recreation and Community (W96001P28) This project is a renovation of the Burnham Playfield located in the center of Milwaukee s Layton Boulevard West neighborhood incorporating GI. Burnham Park is the only significant green space in a 165-block radius, serving as the neighborhood park for nearly 7,000 children living in the area. Location: 1755 S. 32 nd Street, Milwaukee, WI Gallons Captured: 84,000 GI Strategies: Porous Pavement, Stormwater Trees, Bioswales, and Rain Gardens ALBA School Playground Project, submitted by Milwaukee Public Schools (W96001P33) ALBA, a Milwaukee Public School, is a bilingual Spanish/English elementary school with a fine arts focus in the center of Milwaukee s Layton Boulevard West neighborhood. This is the first phase of a project to renovate the school s playground while incorporating GI strategies. A future phase will include installation of a permeable synthetic turf playfield. Location:1712 S. 32 nd Street, Milwaukee, WI Gallons Captured: 46,525 GI Strategies: Porous Pavement, Stormwater Trees, Bioswales, and Rain Gardens 2100 Urban Residence, submitted by The 2100 LLC (W96001P30) The 2100 Urban Residence project is a multi-family development located in Wauwatosa s Redevelopment District Number 1. The project employs a wide variety of GI strategies for on-site stormwater runoff mitigation. Location: 2100 N. Mayfair Road, Wauwatosa, WI Gallons Captured: 20,070 GI Strategies: Native Landscaping, Porous Pavement, Rain Gardens, and Green Roof 6

35 SUMMARY (Cont d) Approval of 2017 Green Infrastructure Partnership Program Projects W96001P22, W96001P24, W96001P25, W96001P29, and W96001P31 Adams Garden Park, submitted by Sharon Adams (W96001P21) This project will capture stormwater on eight sites located within two blocks, connected by paths and landmark signage, to create an urban garden center showcasing and selling plants, landscapes, and small-scale GI designed for urban dwellers. Location: Multiple parcels near N. 17 th Street and W. Lloyd Street, Milwaukee, WI Gallons Captured: 21,855 GI Strategies: Native Landscaping, Rain Barrels, Cisterns, Stormwater Trees, Bioswales, and Rain Gardens Arts At Large Historic Building Renovation with Green Infrastructure, submitted by Arts at Large (W96001P27) This project is part of an overall restoration of a three-story 1890 Patrick Cudahy building located at the southernmost end of historic 5 th Street in Walker s Point, Milwaukee. The rooftop of the building will include public event space that incorporates a rooftop garden and green roof. Location: 1100 S. 5 th Street, Milwaukee, WI Gallons Captured: 2,260 GI Strategies: Green Roof Big Red Church Green Roof, submitted by Calvary Presbyterian Church (M03090P07) (Operations and Maintenance Project) The Big Red Church Green Roof is one component of a larger $1.3 million exterior and interior renovation project that incorporates several sustainable or green elements to reflect the church s commitment to preserving the environment. The green roof will be installed on a 1957 addition of the church. This is the sole Operations and Maintenance Budget-funded project recommended for award. Location: 935 W. Wisconsin Avenue, Milwaukee, WI Gallons Captured: 1,200 GI Strategies: Green Roof 7

36 BACKGROUND Approval of 2017 Green Infrastructure Partnership Program Projects W96001P22, W96001P24, W96001P25, W96001P29, and W96001P31 This program provides funding support for a series of GI projects to demonstrate the importance of GI as a sustainable practice in managing the volume, rate, and quality of stormwater runoff. These projects may also catalyze more widespread GI strategies that can benefit the operation of municipal storm and sanitary sewers and the MMSD system. They may also provide potential added benefits to the award partners including: Energy savings. Reduction of the urban heat island effect. Improved aesthetics. Improved air quality. Improved water quality. Partners were selected based on: The visibility of the projects and their benefits to the public (public accessibility). Partner match, commitment to outreach, and job training. Demonstration of a long-term commitment to the projects (maintenance). The partners chosen through the request for proposal and evaluation process will share funding responsibility (cost share) with the District. The partner share includes costs associated with the design and construction, monetary contributions, and long-term commitments to maintain the projects. The District s 2020 Facilities Plan recommended stormwater management demonstration projects to determine best practices that the District could recommend. The GIPP allows for a wide array of GI practices to be used to manage stormwater. Projects are evaluated from a qualitative standpoint post-construction, and that information is reported in District publications. Six of the 14 projects have an enhanced ability to attract attention from a larger regional audience and may catalyze the acceptance and widespread use of GI; therefore, these projects are considered Signature Projects. Receiving Signature Project status means that the project may receive up to a 50% match of total eligible project costs from the District. Projects may exceed 50% of total match funding for municipal proposers using Green Solutions program funds. Projects qualifying for funding from the capital budget must have a minimum award amount of $25,000 or more, and the District maintains a permanent easement on the project for 10 years or more. 8

37 RESOLUTION Approval of 2017 Green Infrastructure Partnership Program Projects W96001P22, W96001P24, W96001P25, W96001P29, and W96001P31 RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized to approve five projects, W96001P22, W96001P24, W96001P25, W96001P29, and W96001P31, and that the Executive Director is directed to execute contracts and agreements for the projects in a total amount not to exceed $1,215,191. 9

38 Capital Budget Fiscal Note Total Project Cost RELATING TO: Approval of 2017 Green Infrastructure Partnership Program Projects W96001P22, W96001P24, W96001P25, W96001P29, and W96001P31 Capital Project Number(s) Impact of Requested Action on Total Project Cost: W96001 Increase Decrease New Project X No Change Total Project Cost Analysis Project Costs Adopted 2017 Total Project Cost $8,890,494 Previously Approved Changes $0 Approved Total Project Cost $8,890,494 Requested Total Project Cost n/a Requested (Increase)/Decrease $0 Action to be taken to Long-Range Financing Plan to address Total Project Cost change Transfer from Allowance for Cost and Schedule Changes Transfer from another project (specify in comments) Delay Project(s) (specify in comments) Delete Project(s) (specify in comments) Other Transfer to Allowance for Cost and Schedule Changes Comments Budget Review by: Date: Christine Durkin 4/7/2017

39 Item 5 COMMISSION FILE NO: DATE INTRODUCED: May 8, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Operations Committee RELATING TO: Amendment Number Six, Contract M03043P01, MMSD Energy and Greenhouse Gas Emissions Data Management Project, and Restore the Executive Director s Original Delegated Authority SUMMARY: The Commission is requested to authorize the Executive Director to execute Amendment Number Six to Contract M03043P01, MMSD Energy and Greenhouse Gas (GHG) Emissions Data Management Project, with CH2M HILL, Inc., (CH2M) in an amount not to exceed $185,070 and to restore the Executive Director s original delegated authority for potential future amendments. The Commission authorized award of Contract M03043P01 to CH2M in June The purpose of this project is to identify opportunities to increase energy efficiency and the generation of renewable energy, reduce GHG emissions, and comply with future potential emission reporting requirements. The District will be able to track the success of energy projects and produce documentation that energy projects are reducing the District s reliance on fossil fuels and production of GHG s to meet the 2035 Vision. Amendment Number Six to the District s Contract No. M03043P01 is requested to extend the contract completion date to December 31, 2018, and to increase the total contract cost. The increased contract cost of this amendment covers CH2M s scope of work to complete the implementation of the energy and GHG data management system. This system is called Scope 5. A summary of the remaining and necessary scope of work to complete the project is as follows: Evaluating the accuracy and completion of the Hach Water Information Management System (Hach WIMS) data for 2015 and Evaluating and implementing automated data connections among Scope 5 and Hach WIMS and We Energies. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER OP_Amdt6_M03043P01_Energy GHG Data Management_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

40 SUMMARY (Cont d) Amendment Number Six, Contract M03043P01, MMSD Energy and Greenhouse Gas Emissions Data Management Project, and Restore the Executive Director s Original Delegated Authority Populating Scope 5 with data from Hach WIMS for 2015 and Documenting final data management processes. Finalizing implementation of the scenario planning tool. Finalizing reporting operating procedures for energy and carbon goals (2035 Vision). Finalizing training materials and providing training for District staff. Completing the final project report and presentations. The scope of work also includes a contingency task to provide on-call support to assist District staff in ongoing data management tasks for up to December 2018, if necessary. The project has a target completion date of December 31, SUMMARY OF PRIOR CONTRACT COST CHANGES CONTRACT AMOUNT PERCENTAGE INCREASE OVER ORIGINAL CONTRACT AUTHORIZED BY Original $ 424,856 Commission Amendment No. 1* $ 0 0.0% Division Director Amendment No. 2* $ 0 0.0% Division Director Amendment No. 3* $ 0 0.0% Division Director Amendment No. 4 $ 40, % Executive Director Amendment No. 5* $ 0 0.0% Division Director Amendment No. 6 $ 185, % Request of Commission Total Amendments $ 225, % TOTAL $ 649,926 *Time extension only. 2

41 BACKGROUND Amendment Number Six, Contract M03043P01, MMSD Energy and Greenhouse Gas Emissions Data Management Project, and Restore the Executive Director s Original Delegated Authority This project was initiated for several purposes to provide efficiencies and new capabilities in energy and GHG data tracking and forecasting. As the project proceeded, it was apparent that the communication between the District s data management system of record, Hach WIMS, and Scope 5 would require additional work on the part of the consultant team and the owner of the Scope 5 product. At the project outset, the goal of a future energy and GHG data management system would support all areas of energy and GHG management, including, but not limited to: Developing energy budgets and forecasts. Analyzing trends and variances in energy consumption and emissions. Assessing contract performance and analyzing how flow, biochemical oxygen demand, and total suspended solids affect energy consumption and emissions. Providing data for air emission monitoring and reporting. Tracking progress against the District s 2035 Vision for energy and carbon emissions. Enabling the District to assess and manage energy consumption to reduce current tariff rates. Generating revenue from the sale of renewable energy credits, if they become available in the future. Managing multi-site utility information. Accurately forecasting the benefits of proposed energy efficiency projects and determining actual results after implementation. The additional work entailed in this amendment is necessary to reach the ultimate goals of this project. If history is any guide, it is possible that additional needs will be identified as the work to provide Scope 5 with full functionality is underway; therefore, restoring the Executive Director s authority is also requested in this action. 3

42 RESOLUTION Amendment Number Six, Contract M03043P01, MMSD Energy and Greenhouse Gas Emissions Data Management Project, and Restore the Executive Director s Original Delegated Authority RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized to execute Amendment Number Six to Contract M03043P01, MMSD Energy and Greenhouse Gas Emissions Data Management Project, with CH2M HILL, Inc., in an amount not to exceed $185,070, and that the Executive Director s original delegated authority is restored. 4

43 Capital Budget Fiscal Note Total Project Cost RELATING TO: Amendment Number Six, Contract M03043P01, MMSD Energy and Greenhouse Gas Emissions Data Management Project, and Restore the Executive Director s Original Delegated Authority Capital Project Number(s) Impact of Requested Action on Total Project Cost: M03043 Increase Decrease New Project X No Change Total Project Cost Analysis Project Costs Adopted 2017 Total Project Cost $1,618,308 Previously Approved Changes $0 Approved Total Project Cost $1,618,308 Requested Total Project Cost $1,618,308 Requested (Increase)/Decrease $0 Action to be taken to Long-Range Financing Plan to address Total Project Cost change Transfer from Allowance for Cost and Schedule Changes Transfer from another project (specify in comments) Delay Project(s) (specify in comments) Delete Project(s) (specify in comments) Other Transfer to Allowance for Cost and Schedule Changes Comments Budget Review by: Date: Christine Durkin 4/13/2017

44 Item 7 COMMISSION FILE NO: DATE INTRODUCED: May 8, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Policy, Finance, and Personnel Committee RELATING TO: Authorizing Application for a Wisconsin Department of Natural Resources Urban Nonpoint Source and Storm Water Program Planning Grant on Behalf of the Southeastern Wisconsin Watersheds Trust, Inc. SUMMARY: The Commission is requested to authorize the Executive Director to submit the Respect Our Waters Nonpoint Source Educational Campaign for Greater Milwaukee Watersheds" grant application on behalf of the Southeastern Wisconsin Watersheds Trust, Inc., (Sweet Water) to the Wisconsin Department of Natural Resources (WDNR) and to act as Sweet Water s fiscal agent. The grant application is for the purposes of public education and outreach on stormwater impacts. WDNR is making available planning grant funds that can be used for public education and awareness. The WDNR Urban Nonpoint Source and Storm Water Program Planning Grants are offered to Wisconsin counties, cities, towns, and villages as a competitive grant process to improve urban water quality by limiting or ending sources of urban nonpoint source pollution, also known as stormwater pollution. Among the eligible activities allowed by the grant are, (p)ublic participation, education, and outreach activities. The Urban Nonpoint Source and Storm Water Program Planning Grant funding is available to government entities, but not directly to nongovernmental organizations, such as Sweet Water. As such, the District would act as a fiscal agent for Sweet Water in submitting the grant application. WDNR requires that the fiscal agent, the District, provide a resolution authorizing this arrangement as a condition of the grant application process. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER PFP_2017SWWT_DNR_Grant_Approval_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

45 SUMMARY (Cont d) Authorizing Application for a Wisconsin Department of Natural Resources Urban Non- Point Source and Storm Water Program Planning Grant on Behalf of the Southeastern Wisconsin Watersheds Trust, Inc. Sweet Water s "Respect Our Waters" project proposes multimedia messaging combined with educational materials distributed through hands-on workshops and tabling at community events. These efforts are designed to raise awareness of individual behavior that contributes to nonpoint source pollution and to educate people on how to change these behaviors to better protect the waterways. The project area is the Menomonee River Watershed, Milwaukee River Watershed - East and West Branch, Milwaukee River - North Branch, Milwaukee River - South Branch and Milwaukee Estuary, Cedar Creek, Kinnickinnic River Watershed, and Oak Creek Watershed. The timeline of the project is January 2018 through December 2019 with a total budget of $185,000. The amount requested from WDNR in the grant application is $85,000, and the match amount is $100,000. As an eligible entity, the District can apply for this grant, and Sweet Water can perform the public education activities outlined in the proposal scope and strategy, working on behalf of its municipal partners. The cost share (match amount) required by WDNR would be provided by Sweet Water using both its own resources through Sweet Water s fundraising efforts and with funding offered by municipal partners working with Sweet Water. Should Sweet Water be unable to provide the required cost share, the District will not accept the grant. 2

46 RESOLUTION Authorizing Application for a Wisconsin Department of Natural Resources Urban Non- Point Source and Storm Water Program Planning Grant on Behalf of the Southeastern Wisconsin Watersheds Trust, Inc. RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized to submit the Respect Our Waters Nonpoint Source Educational Campaign for Greater Milwaukee Watersheds" grant application on behalf of the Southeastern Wisconsin Watersheds Trust, Inc., to the Wisconsin Department of Natural Resources, and to act as the fiscal agent for the Southeastern Wisconsin Watersheds, Inc. 3

47 Item 8 COMMISSION FILE NO: DATE INTRODUCED: May 8, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Policy, Finance, and Personnel Committee RELATING TO: Revision to Commission Policy , Commission Chairpersonships SUMMARY: Staff requests that the Commission revise Commission Policy , Commission Chairpersonships. The Commission Chairperson is elected annually by the Commission. Current policy indicates that barring compelling circumstances, a Commission Chairperson shall not serve two terms consecutively. In recent years, the Commission Chair has routinely been reelected to a consecutive term. Staff requests modify the policy to allow Commission Chairpersons to serve two consecutive terms without requiring a finding of compelling circumstances. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER Revised Commission Policy PFP_Commission_Chair_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

48 RESOLUTION Revision to Commission Policy , Commission Chairpersonships RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the attached Commission Policy , Commission Chairpersonships, as revised, is adopted. 2

49 Commission Policy Subject: Commission Chairpersonships Index: Page: 1 of 1 Authority Statute: Date Issued: 6/26/80 Resolution: , D(3)o; ; ; 17- Date Revised: 7/22/02 9/26/16 5/22/17 The election of a Commission Chairperson and Vice-Chairperson for the Commission shall be conducted annually for a one-year term commencing January 1 or until the Chairpersonship is filled. Chairpersons may serve multiple terms but, absent compelling circumstances, will may not serve anyno more than two terms consecutively. The Commission will hold an open public election. The Commission Chairperson will annually appoint Commission committee members and name the Chairperson for each of the Commission committees to serve for a calendar year - or until filled - commencing January 1st of each year. Each Committee Chairperson shall be a Commission member. The Commission Chairperson shall also serve as public representative for the Commission in its role as a District policy body, and will be the major interface between the Commission and the Executive Director and other positions reporting to the Commission. The Commission Chairperson shall establish, subject to Commission approval, the regular Commission meeting calendar. The Commission Chairperson may appoint, subject to committee and Commission approval, one public member of that committee and, subject to Commission approval, all public members of technical subcommittees. In the absence of both the Commission Chairperson and the Commission Vice-Chairperson at a Commission meeting, the Chairperson of the Policy, Finance, and Personnel Committee shall preside over the meeting. Should the Chairperson of the Policy, Finance, and Personnel Committee also be absent or unavailable, the Chairperson of the Operations Committee shall preside. In the absence of the Commission Chairperson, the Commission Vice-Chairperson is authorized to sign documents on behalf of the Commission Chairperson. Should both the Chairperson and the Vice- Chairperson be out of town or otherwise incapacitated to sign documents, the Chairperson of the Policy, Finance, and Personnel Committee may sign such documents. Should the Policy, Finance, and Personnel Committee Chairperson also be unavailable, the Operations Committee Chairperson may sign documents under these circumstances.

ELECTRONIC PACKET JANUARY 9, 2017 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Tuesday, January 3, 2017

ELECTRONIC PACKET JANUARY 9, 2017 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Tuesday, January 3, 2017 ELECTRONIC PACKET JANUARY 9, 2017 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING RELEASED: Tuesday, January 3, 2017 Item 6 COMMISSION FILE NO: 17-010-1 DATE INTRODUCED: January 9, 2017 INTRODUCED

More information

ELECTRONIC PACKET. February 11, 2019 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Monday, February 4, 2019

ELECTRONIC PACKET. February 11, 2019 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Monday, February 4, 2019 ELECTRONIC PACKET February 11, 2019 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING RELEASED: Monday, February 4, 2019 Item 7 COMMISSION FILE NO: 19-023-2 DATE INTRODUCED: February 11, 2019 INTRODUCED

More information

ELECTRONIC PACKET. March 26, 2018 Commission Meeting. RELEASED: Monday, March 19, 2018

ELECTRONIC PACKET. March 26, 2018 Commission Meeting. RELEASED: Monday, March 19, 2018 ELECTRONIC PACKET March 26, 2018 Commission Meeting RELEASED: Monday, March 19, 2018 COMMISSION MEETING March 26, 2018 OPERATIONS AND MAINTENANCE REPORT FOR FEBRUARY 2018 PAT OBENAUF & SCOTT ROYER

More information

ELECTRONIC PACKET. January 23, 2017 Commission Meeting. RELEASED: Tuesday, January 17, 2017

ELECTRONIC PACKET. January 23, 2017 Commission Meeting. RELEASED: Tuesday, January 17, 2017 ELECTRONIC PACKET January 23, 2017 Commission Meeting RELEASED: Tuesday, January 17, 2017 COMMISSION MEETING January 23, 2017 OPERATIONS AND MAINTENANCE REPORT FOR DECEMBER 2016 PAT OBENAUF

More information

Standard Operating Procedure: Implementation of the Inspection and Maintenance Program Under the Long Creek Watershed Management Plan

Standard Operating Procedure: Implementation of the Inspection and Maintenance Program Under the Long Creek Watershed Management Plan Standard Operating Procedure: Implementation of the Inspection and Maintenance Program Under the Long Creek Watershed Management Plan 1. PURPOSE: The Long Creek Watershed Management District ( LCWMD )

More information

Ingham County Land Bank Fast Track Authority RESIDENTIAL REAL ESTATE PROFESSIONALS

Ingham County Land Bank Fast Track Authority RESIDENTIAL REAL ESTATE PROFESSIONALS 3024 Turner Street, Lansing MI 48906 517.267.5221 www.inghamlandbank.org Ingham County Land Bank Fast Track Authority REQUEST FOR QUALIFICATIONS FOR RESIDENTIAL REAL ESTATE PROFESSIONALS RFQ # Real Estate

More information

WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2003

WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2003 Louisville and Jefferson County Metropolitan Sewer District WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2003 A. WASTEWATER SERVICE CHARGES Applicable to all bills rendered.

More information

Community Development Department

Community Development Department Community Development Department SUBJECT: Consideration of a Resolution and recommendation to enter into an Easement Agreement with Glenview School District 34 for the Stormwater Detention Project at the

More information

STORMWATER MANAGEMENT SYSTEM AND FACILITIES

STORMWATER MANAGEMENT SYSTEM AND FACILITIES 152.01 Purpose 152.09 Nonresidential Unit 152.02 Findings 152.10 Rate Determinations; Compliance with Bond 152.03 Scope and Responsibility for Stormwater Utility Covenants 152.04 Definitions 152.11 Billing,

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 17, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 17, 2017 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 17, 2017 DATE: June 9, 2017 SUBJECT: Request to authorize advertisement of public hearings by the Planning Commission and County Board

More information

SCOPE OF WORK DEVELOPMENT OF A SOCIO-ECONOMIC IMPACT ANALYSIS FOR THE PRELIMINARY REGIONAL HOUSING PLAN FOR THE SOUTHEASTERN WISCONSIN REGION

SCOPE OF WORK DEVELOPMENT OF A SOCIO-ECONOMIC IMPACT ANALYSIS FOR THE PRELIMINARY REGIONAL HOUSING PLAN FOR THE SOUTHEASTERN WISCONSIN REGION RHP SEI SCOPE OF WORK (00203617-4).DOC KRY/NMA/BRM 5/24/12; 5/4/12 SCOPE OF WORK DEVELOPMENT OF A SOCIO-ECONOMIC IMPACT ANALYSIS FOR THE PRELIMINARY REGIONAL HOUSING PLAN FOR THE SOUTHEASTERN WISCONSIN

More information

Chapter 10: Implementation

Chapter 10: Implementation Chapter 10: Introduction Once the Comprehensive Plan has been adopted by the City of Oakdale, the City can begin to implement the goals and strategies to make this vision a reality. This chapter will set

More information

MITIGATION POLICY FOR DISTRICT-PROTECTED LANDS

MITIGATION POLICY FOR DISTRICT-PROTECTED LANDS MITIGATION POLICY FOR DISTRICT-PROTECTED LANDS Approved by the District Board of Directors on July 18, 2017 The following Mitigation Policy is intended to inform the evaluation of environmental mitigation-related

More information

WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2005

WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2005 Louisville and Jefferson County Metropolitan Sewer District WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2005 A. WASTEWATER SERVICE CHARGES Applicable to all bills rendered.

More information

Fixed Asset Management

Fixed Asset Management Fixed Asset Management Policy/Procedure This policy applies to faculty and staff with responsibility for purchasing, maintaining or disposing of Fixed Assets, including Department Chairs, Department Heads,

More information

ADDENDUM NO. 1 January 26, 2018 JOB ORDER CONTRACT FLEET AND FACILTY MANAGEMENT

ADDENDUM NO. 1 January 26, 2018 JOB ORDER CONTRACT FLEET AND FACILTY MANAGEMENT ADDENDUM NO. 1 January 26, 2018 JOB ORDER CONTRACT FLEET AND FACILTY MANAGEMENT SPECIFICATION NO: 152948N REPAIR AND REHABILITATION OF CITY FACILITIES MADISON STREET AND NORTH OF MADISON STREET For Which

More information

The City of Dayton has received questions relating to our RFP No JL.

The City of Dayton has received questions relating to our RFP No JL. TO: Proposers on RFP No.16071JL FROM: City of Dayton, Ohio Division of Purchasing SUBJECT: ADDENDUM 2 - Questions and Answers for above RFP The City of Dayton has received questions relating to our RFP

More information

Marin County Agricultural Land Conservation Program March 1, 2014

Marin County Agricultural Land Conservation Program March 1, 2014 Marin County Agricultural Land Conservation Program March 1, 2014 I. Purpose of this Document This document describes the Marin County Agricultural Land Conservation Program (County Program). The Marin

More information

Residential Major Subdivision Review Checklist

Residential Major Subdivision Review Checklist Residential Major Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

SCHOOL BOARD ACTION REPORT

SCHOOL BOARD ACTION REPORT SCHOOL BOARD ACTION REPORT DATE: May 31, 2018 FROM: Dr. Larry Nyland, Superintendent LEAD STAFF: Dr. Lester Herndon, Associate Superintendent, Facilities and Operations (206) 252-0644, ltherndon@seattleschools.org

More information

JURISDICTIONAL RUNOFF MANAGEMENT PROGRAM ENFORCEMENT RESPONSE PLAN

JURISDICTIONAL RUNOFF MANAGEMENT PROGRAM ENFORCEMENT RESPONSE PLAN CITY OF ESCONDIDO JURISDICTIONAL RUNOFF MANAGEMENT PROGRAM ENFORCEMENT RESPONSE PLAN June 2015 Utilities Department Environmental Programs Division 201 N. Broadway Escondido, CA 92025 760-839-4668 TABLE

More information

WASHTENAW COUNTY BROWNFIELD REDEVELOPMENT AUTHORITY ACT 381 WORK PLAN TO CONDUCT ELIGIBLE DEQ RESPONSE AND/OR MSF NON-ENVIRONMENTAL ACTIVITIES

WASHTENAW COUNTY BROWNFIELD REDEVELOPMENT AUTHORITY ACT 381 WORK PLAN TO CONDUCT ELIGIBLE DEQ RESPONSE AND/OR MSF NON-ENVIRONMENTAL ACTIVITIES WASHTENAW COUNTY BROWNFIELD REDEVELOPMENT AUTHORITY ACT 381 WORK PLAN TO CONDUCT ELIGIBLE DEQ RESPONSE AND/OR MSF NON-ENVIRONMENTAL ACTIVITIES 400 NORTH RIVER STREET THE HISTORIC THOMPSON BLOCK REDEVELOPMENT

More information

REQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA

REQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA REQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA Project Description The County of Wise, Virginia has been awarded CDBG

More information

REQUEST FOR PROPOSAL/QUALIFICATIONS ENGINEERING SERVICES TOWNSHIP ENGINEER

REQUEST FOR PROPOSAL/QUALIFICATIONS ENGINEERING SERVICES TOWNSHIP ENGINEER REQUEST FOR PROPOSAL/QUALIFICATIONS ENGINEERING SERVICES TOWNSHIP ENGINEER Issued by the Township of Exeter Date Issued: November 19, 2015 Responses Due by: December 4, 2015 REQUEST FOR PROPOSAL & QUALIFICATIONS

More information

Chesapeake Bay Preservation Area (CBPA) Map Update. Presentation to the County Board July 15, 2017

Chesapeake Bay Preservation Area (CBPA) Map Update. Presentation to the County Board July 15, 2017 Chesapeake Bay Preservation Area (CBPA) Map Update Presentation to the County Board July 15, 2017 Chesapeake Bay Program Comprehensive Plan Chesapeake Bay Preservation Ordinance (1992) (Chapter 61, Arlington

More information

REQUEST FOR PROPOSALS LIHTC PROPERTY MANAGEMENT CONSULTING MAKAH TRIBAL HOUSING DEPARTMENT

REQUEST FOR PROPOSALS LIHTC PROPERTY MANAGEMENT CONSULTING MAKAH TRIBAL HOUSING DEPARTMENT REQUEST FOR PROPOSALS LIHTC PROPERTY MANAGEMENT CONSULTING MAKAH TRIBAL HOUSING DEPARTMENT The Makah Tribal Housing Department (MTHD) is pleased to invite you to submit your firm s qualifications and proposal

More information

City Council Committee Meeting

City Council Committee Meeting Study for Flood Management and Water Quality Funding City Council Committee Meeting January 8, 2019 1 Council Committee Meeting 1. Welcome and Study Update 2. Review Final Extent and Level of Service Options

More information

Louisville and Jefferson County Metropolitan Sewer District WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2013

Louisville and Jefferson County Metropolitan Sewer District WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2013 Louisville and Jefferson County Metropolitan Sewer District WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2013 A. WASTEWATER SERVICE CHARGES The Wastewater Service Charge

More information

REQUEST FOR PROPOSAL FOR ENGINEERING DESIGN SERVICES. Channel Reconstruction at Short Hills Garden Apartments Site Millburn, New Jersey

REQUEST FOR PROPOSAL FOR ENGINEERING DESIGN SERVICES. Channel Reconstruction at Short Hills Garden Apartments Site Millburn, New Jersey REQUEST FOR PROPOSAL FOR ENGINEERING DESIGN SERVICES Channel Reconstruction at Short Hills Garden Apartments Site Millburn, New Jersey Diane Thall-Eglow, Mayor Issue Date: March 21, 2019 Jackie Benjamin

More information

CHECKLIST FOR DEVELOPMENT REVIEW

CHECKLIST FOR DEVELOPMENT REVIEW CHECKLIST FOR DEVELOPMENT REVIEW Petitions and related documents and plans for land development or other proposals regulated by Title 16 of the Municipal Code (Development Ordinance) and Title 17 of the

More information

Residential Minor Subdivision Review Checklist

Residential Minor Subdivision Review Checklist Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

City of Boerne, Texas Incentives Policy

City of Boerne, Texas Incentives Policy City of Boerne, Texas Incentives Policy WHEREAS, upon full review and consideration of this Policy, the City Council of the City of Boerne is of the opinion that this Policy will assist in implementing

More information

Item 7.1, June 29, 2004 ACQUISITION OF THE GLOBAL PHOTON PROPERTY FOR THE GUADALUPE RIVER PARK

Item 7.1, June 29, 2004 ACQUISITION OF THE GLOBAL PHOTON PROPERTY FOR THE GUADALUPE RIVER PARK Item 7.1, June 29, 2004 SUBJECT: ACQUISITION OF THE GLOBAL PHOTON PROPERTY FOR THE GUADALUPE RIVER PARK RECOMMENDATION (a) (b) It is recommended that the City Council and Redevelopment Agency Board approve

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2009-12 AUTHORIZATION FOR THE PRESIDENT & CEO TO EXECUTE AND DELIVER CONTRACTS FOR THE DEVELOPMENT, CONSTRUCTION, DESIGN, AND VEHICLE SUPPLY WITH PARSONS TRANSPORTATION GROUP INC. ("PARSONS")

More information

Community Based Public Private Partnership (CBP3) Great Lakes & St Lawrence Cities Initiatives

Community Based Public Private Partnership (CBP3) Great Lakes & St Lawrence Cities Initiatives Community Based Public Private Partnership (CBP3) Great Lakes & St Lawrence Cities Initiatives COMMON REASONS FOR PARTNERING Purpose Create long-term value by solving the essential problems you can t solve

More information

VIRGINIA CENTRAL REGION ITS ARCHITECTURE MAINTENANCE PLAN

VIRGINIA CENTRAL REGION ITS ARCHITECTURE MAINTENANCE PLAN VIRGINIA CENTRAL REGION ITS ARCHITECTURE MAINTENANCE PLAN Prepared for: Prepared by: June 30, 2009 Table of Contents 1 INTRODUCTION... 1 2 ARCHITECTURE MAINTENANCE DECISIONS... 1 2.1 Architecture Maintainer...

More information

Housing Program Application (HOME & HTF) County of Bucks, Pennsylvania Housing Services

Housing Program Application (HOME & HTF) County of Bucks, Pennsylvania Housing Services Housing Program Application (HOME & HTF) County of Bucks, Pennsylvania Housing Services Since 1989, Housing Services has been the comprehensive provider of funding for community development, housing and

More information

TOWNSHIP SERVICES POLICY PREPARED BY: ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER

TOWNSHIP SERVICES POLICY PREPARED BY: ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER TOWNSHIP SERVICES POLICY PREPARED BY: ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER ISSUED JUNE 8, 2011 Summit County Engineer Policy for Township Services The Summit County Engineer endeavors to provide

More information

DESCRIPTION OF THE DISTRICT

DESCRIPTION OF THE DISTRICT DESCRIPTION OF THE DISTRICT The project plan for City of Wausau, Tax Increment District #11 has been prepared in compliance with Wisconsin Statutes Chapter 66.1105(4). The plan establishes the need for

More information

MIDWAY CITY Municipal Code

MIDWAY CITY Municipal Code MIDWAY CITY Municipal Code TITLE 9 ANNEXATION CHAPTER 9.01 PURPOSE CHAPTER 9.02 GENERAL REQUIREMENTS CHAPTER 9.03 PROPERTY OWNER INITIATION OF ANNEXATION CHAPTER 9.04 PROCEDURES FOR CONSIDERATION OF PETITION

More information

City of O Fallon Project Management

City of O Fallon Project Management City of O Fallon Project Management Request for Qualifications 2018 Storm Water Improvements Projects Design December 2017 RFQ# 18-008 REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES In compliance

More information

Request to Advertise: Chesapeake Bay Preservation Area (CBPA) Map Update. June 20, 2017

Request to Advertise: Chesapeake Bay Preservation Area (CBPA) Map Update. June 20, 2017 Request to Advertise: Chesapeake Bay Preservation Area (CBPA) Map Update June 20, 2017 Outline Context Past County Board actions Why update the CBPA Map? What and Why - Resource Protection Areas Property

More information

Town Centre Community Improvement Plan

Town Centre Community Improvement Plan 2012 Town Centre Community Improvement Plan City of Greater Sudbury Growth and Development Department 1.0 PLAN BACKGROUND 1.1 Introduction The following Community Improvement Plan (CIP) has been prepared

More information

H. UNIVERSITY PROCUREMENT CODE

H. UNIVERSITY PROCUREMENT CODE Page 1 H. UNIVERSITY PROCUREMENT CODE 3-801 General A. Applicability 1. This Article H ( University Procurement Code ) shall consist of rules prescribing procurement policies and procedures for the Arizona

More information

City of Brandon Brownfield Strategy

City of Brandon Brownfield Strategy City of Brandon Brownfield Strategy 2017 Executive Summary A brownfield is a property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of a hazardous

More information

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington Issue Date: March 2, 2018 Prepared By: Rural Municipality of Wellington Wellington, PEI

More information

South Park County Sanitation District

South Park County Sanitation District For accessibility assistance with this document, please contact Sonoma County Water Agency Community and Government Affairs department at (707)526-5370, Fax to (707)544-6123 or through the California Relay

More information

VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL

VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL SECTION I. OVERVIEW AND GENERAL INSTRUCTIONS INTRODUCTION A stormwater

More information

EXHIBIT A. City of Corpus Christi Annexation Guidelines

EXHIBIT A. City of Corpus Christi Annexation Guidelines City of Corpus Christi Annexation Guidelines Purpose: The purpose of this document is to describe the City of Corpus Christi s Annexation Guidelines. The Annexation Guidelines provide the guidance and

More information

HERSHEY COMMUNITY CENTER

HERSHEY COMMUNITY CENTER HERSHEY COMMUNITY CENTER 1 Frequently asked questions 5 Learn more about the new Hershey Community Center process 8 Understand the proposed Community Center solution 10 Read about how the Derry Township

More information

Introduction to INRMP Implementation Options

Introduction to INRMP Implementation Options El Dorado County Integrated Natural Resources Management Plan Introduction to INRMP Implementation Options 1 Our approach to the options evaluation is based on the INRMP components as they are currently

More information

TOTTENHAM SECONDARY PLAN

TOTTENHAM SECONDARY PLAN TOTTENHAM SECONDARY PLAN AMENDMENT NO. 11 TO THE OFFICIAL PLAN OF THE TOWN OF NEW TECUMSETH The following text and schedules to the Official Plan of the Town of New Tecumseth constitute Amendment No. 11

More information

Shawnee Landing TIF Project. City of Shawnee, Kansas. Need For Assistance Analysis

Shawnee Landing TIF Project. City of Shawnee, Kansas. Need For Assistance Analysis Shawnee Landing TIF Project City of Shawnee, Kansas Need For Assistance Analysis December 17, 2014 Table of Contents 1 EXECUTIVE SUMMARY... 1 2 PURPOSE... 2 3 THE PROJECT... 3 4 ASSISTANCE REQUEST... 7

More information

SOUTH VILLAGE TAX INCREMENT FINANCING DISTRICT (TIF) COMMERCIAL REHABILITATION PROGRAM GUIDELINES & APPLICATION

SOUTH VILLAGE TAX INCREMENT FINANCING DISTRICT (TIF) COMMERCIAL REHABILITATION PROGRAM GUIDELINES & APPLICATION SOUTH VILLAGE TAX INCREMENT FINANCING DISTRICT (TIF) COMMERCIAL REHABILITATION PROGRAM GUIDELINES & APPLICATION Program Overview: The South Village Tax Increment Financing District (TIF) Commercial Rehabilitation

More information

002 - Assessor GENERAL GOVERNMENT SERVICES ASSESSOR Assessor. At a Glance:

002 - Assessor GENERAL GOVERNMENT SERVICES ASSESSOR Assessor. At a Glance: GENERAL GOVERNMENT SERVICES 002 - ASSESSOR Operational Summary Mission: To serve the citizens of Orange County by valuing all legally assessable property with uniformity and impartiality, producing property

More information

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY Adopted January 3, 2012 PURPOSE: The purpose of the policy statement is to clarify the policies and procedures of the City of Fort

More information

Edith A. Schneider Trust. Rezoning from F & B3 to E-1

Edith A. Schneider Trust. Rezoning from F & B3 to E-1 Edith A. Schneider Trust Rezoning from F & B3 to E-1 Edith A. Schneider Trust Regional Planning Commission: N/A Zoning Board of Appeals: Approve Proposed Zoning Ordinance Amendments The proposed changes

More information

OFFICE OF PROPERTY ASSESSMENT FISCAL YEAR 2017 BUDGET TESTIMONY April 6, 2016 INTRODUCTION

OFFICE OF PROPERTY ASSESSMENT FISCAL YEAR 2017 BUDGET TESTIMONY April 6, 2016 INTRODUCTION OFFICE OF PROPERTY ASSESSMENT FISCAL YEAR 2017 BUDGET TESTIMONY April 6, 2016 INTRODUCTION Good morning, President Clarke and Members of City Council. I am Michael Piper, Chief Assessment Officer. Joining

More information

SIMPLIFIED APPROACH PERMIT PROCEDURES

SIMPLIFIED APPROACH PERMIT PROCEDURES SIMPLIFIED APPROACH PERMIT PROCEDURES UPPER ALLEN TOWNSHIP Community Development Department 100 Gettysburg Pike, Mechanicsburg, PA 17055 Phone: 717-766-0756 Fax: 717-796-983 Office Hours: M-F 8:00 AM 4:30

More information

Arlington County, Virginia. Internal Audit of the Real Estate Assessment Appeals Process Calendar Year Ended December 31, 2014

Arlington County, Virginia. Internal Audit of the Real Estate Assessment Appeals Process Calendar Year Ended December 31, 2014 Arlington County, Virginia Internal Audit of the Real Estate Assessment Appeals Process Calendar Year Ended December 31, 2014 Table of Contents Transmittal Letter... 1 Executive Summary... 2-9 Background...

More information

Community Development Department

Community Development Department Community Development Department SUBJECT: Consideration of a Resolution and a recommendation to (1) award a bid to DiMeo Brothers, Inc., of Elk Grove Village, Illinois, for the Happy Hollow & Rebecca Improvement

More information

Barbara County Housing Element. Table 5.1 Proposed Draft Housing Element Goals, Policies and Programs

Barbara County Housing Element. Table 5.1 Proposed Draft Housing Element Goals, Policies and Programs Table 5.1 Proposed Draft Housing Element Goals, Policies and Programs Goal 1: Enhance the Diversity, Quantity, and Quality of the Housing Supply Policy 1.1: Promote new housing opportunities adjacent to

More information

A STUDY OF TRANSFER OF DEVELOPMENT RIGHTS (TDR) IN THURSTON COUNTY, WASHINGTON

A STUDY OF TRANSFER OF DEVELOPMENT RIGHTS (TDR) IN THURSTON COUNTY, WASHINGTON A STUDY OF TRANSFER OF DEVELOPMENT RIGHTS (TDR) IN THURSTON COUNTY, WASHINGTON Prepared June 2010 by Evergreen College students Jenna Fissenden and Steven Michener with guidance from staff members within

More information

County of Sonoma Agenda Item Summary Report

County of Sonoma Agenda Item Summary Report Revision No. 20170501-1 County of Sonoma Agenda Item Summary Report Agenda Item Number: 33 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA

More information

True Vine Development

True Vine Development True Vine Development Thank you for your interest! This is my personal invitation to meet over coffee, lunch, or place of business to learn more about your idea and how I can help. It will help me understand

More information

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW MARCH, 2018

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW MARCH, 2018 CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW MARCH, 2018 Fenton Township continues to receive inquiries regarding the relatively high sewer use fees that Township residents have been paying

More information

Office of the County Auditor. Broward County Property Appraiser Report on Transition Review Services

Office of the County Auditor. Broward County Property Appraiser Report on Transition Review Services Office of the County Auditor Broward County Property Appraiser Report on Transition Review Services January 14, 2005 Table of Contents BACKGROUND AND SCOPE...3 FINDINGS AND RECOMMENDATIONS...3 1. Financial

More information

BUILDINGS, LAND AND LAND IMPROVEMENTS

BUILDINGS, LAND AND LAND IMPROVEMENTS Approved: Effective: February 19, 2014 Office: Office of Comptroller, General Accounting Topic No. 350-090-315-g Department of Transportation BUILDINGS, LAND AND LAND IMPROVEMENTS PURPOSE: To define requirements

More information

Conservation Easement Stewardship

Conservation Easement Stewardship Conservation Easements are effective tools to preserve significant natural, historical or cultural resources. Conservation Easement Stewardship Level of Service Standards March 2013 The mission of the

More information

REQUEST FOR DEVELOPMENT SERVICES, PLANNING AND ENGINEERING COMMITTEE ACTION

REQUEST FOR DEVELOPMENT SERVICES, PLANNING AND ENGINEERING COMMITTEE ACTION File Number: 2018-0282 Orig. Department: File Name: BACKGROUND: BUDGET IMPACT: Village Clerk REQUESTED ACTION: Approval of the March 19, 2018 Development Services, Planning and Engineering Committee Minutes

More information

Administrative Plat Application Form

Administrative Plat Application Form 1 Administrative Plat Application Form This form shall be submitted with each application for an administrative plat. CONTACT INFORMATION Applicant Architect (if different) Property Owner (if different)

More information

PROPERTY management. Case Studies

PROPERTY management. Case Studies PROPERTY management Case Studies SIERRA REAL ESTATE CASE STUDIES REINVIGORATING 648 BROADWAY Property 648 Broadway Commercial building 50,000 SF 10 floors Owner-managed for over 25 years Sierra Real Estate

More information

VILLAGE BOARD MEETING STAFF REPORT

VILLAGE BOARD MEETING STAFF REPORT Meeting: Village Board Meeting Date: 10/24/16 Agenda Item: 6h Mission Statement To provide our residents with a safe, friendly, attractive and active community by aggressively pursuing innovative ways

More information

I. STATEMENT BY GENERAL COUNSEL APPROVAL OF THE AGENDA

I. STATEMENT BY GENERAL COUNSEL APPROVAL OF THE AGENDA HOUSING AUTHORITY OF NEW ORLEANS BOARD OF COMMISSIONERS ANNUAL MEETING BOARD OF COMMISSIONERS PRESIDENT ALICE RIENER COMMISSIONERS ISABEL BARRIOS TONI HACKETT ANTRUM SHARON JASPER DEBRA JOSEPH CASIUS PEALER

More information

Post Construction Stakeholder Involvement Charles Brown Town of Cary. TOWN Of CARY

Post Construction Stakeholder Involvement Charles Brown Town of Cary. TOWN Of CARY Post Construction Stakeholder Involvement Charles Brown Town of Cary Issues to Address Who are the stakeholders Why the need for continuous stakeholder involvement Construction to Post Construction Process

More information

Request for Proposals HQS Inspection Services May 21,

Request for Proposals HQS Inspection Services May 21, MAILING ADDRESS: Arlington Housing Authority 4 Winslow Street Arlington, MA 02474 ATTENTION: John J. Griffin Executive Director REQUEST FOR PROPOSALS Inspectional Services for Housing Choice Voucher Program

More information

LITHUANIAN HOUSING MODERNIZATION PROGRAM. valius serbenta housing energy efficiency agency

LITHUANIAN HOUSING MODERNIZATION PROGRAM. valius serbenta housing energy efficiency agency LITHUANIAN HOUSING MODERNIZATION PROGRAM valius serbenta housing energy efficiency agency v.serbenta@betalt.lt 29 June, 2016 Lithuanian key statistics situated in Northen Europe average temperature are

More information

Major Impact Review for Solar Energy System, Large River Frontage Road, New Castle - Garfield County File Number MIPA

Major Impact Review for Solar Energy System, Large River Frontage Road, New Castle - Garfield County File Number MIPA March 23, 2016 Clean Energy Collective c/o Richard Miller 361 Centennial Parkway, Third Floor Louisville, CO 80027 Reference: Major Impact Review for Solar Energy System, Large 35960 River Frontage Road,

More information

Silver Line Acceptance

Silver Line Acceptance Finance & Administration Committee Action Item III-A June 12, 2014 Silver Line Acceptance Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

LORAIN COUNTY GENERAL HEALTH DISTRICT SEWAGE TREATMENT SYSTEM RULES

LORAIN COUNTY GENERAL HEALTH DISTRICT SEWAGE TREATMENT SYSTEM RULES LORAIN COUNTY GENERAL HEALTH DISTRICT SEWAGE TREATMENT SYSTEM RULES SUPPLEMENT TO THE OHIO DEPARTMENT OF HEALTH SEWAGE TREATMENT SYSTEM RULES OHIO ADMINISTRATIVE CODE CHAPTER 3701-29 2015 Effective: May

More information

Real Estate Acquisitions Audit (Green Line LRT Stage 1)

Real Estate Acquisitions Audit (Green Line LRT Stage 1) Real Estate Acquisitions Audit (Green Line LRT Stage 1) October 10, 2018 ISC: Unrestricted THIS PAGE LEFT INTENTIONALLY BLANK ISC: Unrestricted Table of Contents Executive Summary... 5 1.0 Background...

More information

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record. 200 W. Oak Street, 3rd Floor Fort Collins, CO 80521 (970) 498-7683 / larimer.org/planning SITE PLAN REVIEW ADMINISTRATIVE REVIEW The submittal requirements listed in this packet are intended to collect

More information

NC General Statutes - Chapter 153A Article 15 1

NC General Statutes - Chapter 153A Article 15 1 Article 15. Public Enterprises. Part 1. General Provisions. 153A-274. Public enterprise defined. As used in this Article, "public enterprise" includes: (1) Water supply and distribution systems. (2) Wastewater

More information

RECITALS STATEMENT OF AGREEMENT. Draft: November 30, 2018

RECITALS STATEMENT OF AGREEMENT. Draft: November 30, 2018 MEMORANDUM OF AGREEMENT TO FACILITATE THE EXPANSION, RENOVATION, AND EFFICIENT AND SAFE OPERATION OF THE ALBEMARLE CIRCUIT COURT, THE ALBEMARLE GENERAL DISTRICT COURT, AND THE CHARLOTTESVILLE GENERAL DISTRICT

More information

ACCOUNTING FOR CAPITAL ASSETS. Presented by: Joel Knopp, CPA Shareholder

ACCOUNTING FOR CAPITAL ASSETS. Presented by: Joel Knopp, CPA Shareholder ACCOUNTING FOR CAPITAL ASSETS Presented by: Joel Knopp, CPA Shareholder Agenda Definition Reporting Capital Assets Questions from Implementation Guides Modified Approach Interest Capitalization Intangibles

More information

Revenue Summary Chart - Sewer Service Fees

Revenue Summary Chart - Sewer Service Fees ATTACHMENT NO. 3 Revenue Summary Chart - Sewer Service Fees FY 16-17 Sanitation Zone or FY 15-16 FY 16-17 FY 16-17 Rate Rate Revenue Incr. County Sanitation Rate Per Rate Per Projected Dollar Percent due

More information

23 TOTAL ACRES IN CHICAGO, IL REDEVELOPMENT OPPORTUNITY OF 18 ACRES IN THE NORTH BRANCH INDUSTRIAL CORRIDOR AND 5 ACRES IN THE ENGLEWOOD NEIGHBORHOOD

23 TOTAL ACRES IN CHICAGO, IL REDEVELOPMENT OPPORTUNITY OF 18 ACRES IN THE NORTH BRANCH INDUSTRIAL CORRIDOR AND 5 ACRES IN THE ENGLEWOOD NEIGHBORHOOD Rahm Emanuel Mayor 23 TOTAL ACRES IN CHICAGO, IL REDEVELOPMENT OPPORTUNITY OF 18 ACRES IN THE NORTH BRANCH INDUSTRIAL CORRIDOR AND 5 ACRES IN THE ENGLEWOOD NEIGHBORHOOD OFFERING HIGHLIGHTS Cushman & Wakefield

More information

Request for Proposals for the Development of the Downtown Vision

Request for Proposals for the Development of the Downtown Vision Request for Proposals for the Development of the Downtown Vision Issued by: The City of Kenosha, Wisconsin Date of Issuance: September 19, 2018 Proposal Due Date: 4pm, Friday, November 2, 2018 Delivered

More information

CAPITAL IMPROVEMENT PLAN POLICY/PROCEDURE Approved by the Town Council at the Town Council Meeting

CAPITAL IMPROVEMENT PLAN POLICY/PROCEDURE Approved by the Town Council at the Town Council Meeting CAPITAL IMPROVEMENT PLAN POLICY/PROCEDURE Approved by the Town Council at the 10-20-15 Town Council Meeting A Capital Improvement Plan (CIP) is a valuable and critical planning tool that is used to manage

More information

SANTA MONICA RENT CONTROL BOARD STAFF REPORT

SANTA MONICA RENT CONTROL BOARD STAFF REPORT SANTA MONICA RENT CONTROL BOARD STAFF REPORT TO: FROM: Santa Monica Rent Control Board Commissioners Garrett Wong, Sustainability Analyst, Office of Sustainability and the Environment FOR MEETING OF: August

More information

Orange Water and Sewer Authority Water and Sewer System Development Fee Study

Orange Water and Sewer Authority Water and Sewer System Development Fee Study Orange Water and Sewer Authority Water and Sewer System Development Fee Study March 6, 2018 March 6, 2018 Mr. Stephen Winters Director of Finance and Customer Service 400 Jones Ferry Road Carrboro, NC

More information

SCHEDULE OF RATES, RENTALS & CHARGES

SCHEDULE OF RATES, RENTALS & CHARGES Louisville & Jefferson County Metropolitan Sewer District SCHEDULE OF RATES, RENTALS & CHARGES EFFECTIVE: AUGUST 1, 2016 1.0 WASTEWATER SERVICE CHARGES The Wastewater Service Charge is a fixed service

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 DATE: November 23, 2009 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior

More information

ARTICLE 24 SITE PLAN REVIEW

ARTICLE 24 SITE PLAN REVIEW ARTICLE 24 SITE PLAN REVIEW 24.1 PURPOSE: The intent of these Ordinance provisions is to provide for consultation and cooperation between the land developer and the Township Planning Commission in order

More information

Housing Commission Report

Housing Commission Report Housing Commission Report To: From: Subject: Housing Commission Meeting: July 21, 2016 Agenda Item: 4-B Chair and Housing Commission Barbara Collins, Housing Manager Draft Request for Proposals for Mountain

More information

Metropolitan Milwaukee Office Market Report Third Quarter 2015

Metropolitan Milwaukee Office Market Report Third Quarter 2015 Metropolitan Milwaukee Office Market Report Third Quarter 2015 RETAIL OFFICE INDUSTRIAL LAND INVESTMENT NAI MLG COMMERCIAL 414 347 9400 757 N BROADWAY, SUITE 700, MILWAUKEE, WI 53202 MLGCOMMERCIAL.COM

More information

Resource Protection Area Map Update - Frequently Asked Questions

Resource Protection Area Map Update - Frequently Asked Questions DEPARTMENT OF ENVIRONMENTAL SERVICES Office of Sustainability and Environmental Management 2100 Clarendon Boulevard, Suite 705, Arlington, VA 22201 TEL 703-228-4488 FAX 703-228-7134 TTY 703-228-4611 www.arlingtonva.us

More information

PART ONE - GENERAL INFORMATION

PART ONE - GENERAL INFORMATION Corrected Date: Page 7 Date of Submittal Changed to Coincide with Submittal Date on Page 5 PART ONE - GENERAL INFORMATION A. INTRODUCTION B. Background Miami Shores Village is soliciting responses to this

More information

SUBURBAN AND URBAN RESIDENTIAL LAND USE

SUBURBAN AND URBAN RESIDENTIAL LAND USE SUBURBAN AND URBAN RESIDENTIAL LAND USE GOAL 1 DISCOURAGE URBAN AND SUBURBAN DEVELOPMENT OUTSIDE INCORPORATED AREAS IN WHITMAN COUNTY, EXCEPT WITHIN DESIGNATED UNINCORPORATED COMMUNITIES, AND THOSE AREAS

More information

ADOPT A RESOLUTION REGARDING

ADOPT A RESOLUTION REGARDING G-6 STAFF REPORT MEETING DATE: September 12, 2017 TO: FROM: City Council Regan M. Candelario, City Manager Maureen Chapman, Interim Finance Manager 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX

More information