LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

Size: px
Start display at page:

Download "LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT"

Transcription

1 LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Bryan Nicholas, Associate Planner DATE: September 27, 2018 TITLE: Review and action of a Subdivision Permit and Plat for Grizzly Cliffs, 2 nd Filing, located in Tracts 3 & 4, Grizzly Cliffs, 1 st Filing, a portion of the NW1/4, Section 19, T.13N., R69W., and in a portion of the E1/2, Section 24, T.13N., R.70W., of the 6 th P.M., Laramie County, WY. EXECUTIVE SUMMARY Steil Surveying Services, on behalf of Leon M. Grube and Robin Grube of 2221 ½ Seymour Ave, Cheyenne, WY has submitted an application for a Subdivision Permit and Plat for Grizzly Cliffs, 2 nd Filing, located on Jenny Lynn Road, north of Willadsen Estates. The application has been submitted for the purpose of the property to create five single-family residential lots, by vacating and re-platting Tracts 3 & 4 of Grizzly Cliffs 1 st Filing and using a portion of an adjacent un-platted property. BACKGROUND Assessed as Residential Vacant Land, there is currently no development, water, or septic on the subject properties. Jenny Lynn Road, an 80-foot right-of-way, was dedicated to the public through the Willadsen Estates Subdivision plat, recorded January 15, 2002 (Bk. 8, Pg. 10). The proposed Tracts 4 & 5 will have access off Jenny Lynn Road by 40 ingress/egress easements. There are multiple existing utility easements within this proposed subdivision, as noted on the plat. Pertinent Regulations Section (a-e) of the Laramie County Land Use Regulations governing the criteria for a subdivision permit and plat Archer Pkwy Cheyenne, WY Phone (307) Fax (307) Page 1 of 3

2 DISCUSSION This proposed subdivision lies within the Agricultural & Range Land (AGR) land use designation of the Laramie County Comprehensive Plan. Areas in this category are generally located on the outlying portions of the county with public utilities being absent, and limited road access. This land use category discourages freestanding residential uses not associated with agricultural purposes, with agricultural, livestock, and associated residences as the primary uses. Although this proposed subdivision would create freestanding single-family residences, the Comprehensive Plan does support expansion of existing development identified as rural centers. This area is specifically discussed upon, stating: the Harriman Road area in Southwestern Laramie County may be appropriate for additional residential uses and/or neighborhood services, keeping in mind that access to water may be difficult and expensive. Per the Comprehensive Plan, this subdivision would need to address certain issues such as water availability, public land access, cultural preservation, roads, and connectivity; while ensuring that view sheds, and wildlife are minimally impacted. The boundary of PlanCheyenne and the Zoned Boundary do not reach this property, and thus do not have any bearing on the discussion of this proposed subdivision. This proposed plat would vacate existing Tracts 3 and 4, thus creating a total of seven lots instead of nine between the first filing and this proposed filing. Per Section (c)(vi), subdivisions of five (5) or fewer divisions of land are exempt from a Department of Environmental Quality Chapter 23 Review pursuant to W.S Public notice was published and neighbor notice letters were sent by certified mail per Section Staff received no comments from adjacent landowners. A revised plat was submitted to the Planning Staff on August 21, 2018, a copy of which is attached. RECOMMENDATION and FINDINGS Based on evidence provided, staff recommends the Laramie County Planning Commission find that: a. This application meets the criteria for a subdivision permit and plat pursuant to section (a-e) of the Laramie County Land Use Regulations. and that the Planning Commission recommend approval of the Subdivision Permit and Plat for Grizzly Cliffs, 2 nd Filing, to the Laramie County Board of Commissioners with the following conditions: 1. All County Engineer comments shall be addressed prior to the public hearing before 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307) Page 2 of 3

3 the Board. 2. All pertinent easements shall be shown on the plat prior to the public hearing before the Board. 3. All Clerical issues shall be addressed prior to recordation of the plat. 4. A drainage easement along Jenny Lynn Road shall be shown on the plat prior the public hearing before the Board. 5. A note stating, any further subdivision of the lands contained within this replat will be subject to a Subdivision Application pursuant to Wyoming Department of Environmental Equality (WYDEQ) Chapter 23 rules, requirements, and regulations, shall be shown on the plat prior to the public hearing before the Board. PROPOSED MOTION I move to recommend approval of the Subdivision Permit and Plat for Grizzly Cliffs, 2 nd Filing to the Laramie County Board of Commissioners with conditions 1-5, and adopt the findings of fact a of the staff report. ATTACHMENTS Attachment 1: Location Map Attachment 2: Aerial Map Attachment 3: Comprehensive Plan Map Attachment 4: Agency Review Comments Attachment 5: Draft Resolution Attachment 6: Plat Revised August 21, Archer Pkwy Cheyenne, WY Phone (307) Fax (307) Page 3 of 3

4 I-80 I-80 I-80 I-80 I-80 SERVICE RD I-80 I-80 Laramie County, Wyoming Grizzy Cliffs 2nd Filing Subdivision Permit & Plat PZ Location Map LYNN JENNY LYNN RD RD JENNY LYNN RD JAYMERS LN Legend JENNY Driveway LOUISE LN COUGAR LN Assessment Boundary ROAD 205 Approximate Plat Boundary Printed on August 22, ,900 Cheyenne/Laramie County GIS Cooperative Program Feet This map is made possible through the Cheyenne and Laramie County Cooperative GIS Program (CLCCGIS). The data contained herein was collected for its use and is for display and planning purposes only. The CLCCGIS will not be held liable as to the validity, correctness, accuracy, completeness, and/or reliability of the data. The CLCCGIS furthermore assumes no liability associated with the use or misuse of this information.

5 Laramie County, Wyoming Grizzy Cliffs 2nd Filing JENNY LYNN RD Subdivision Permit & Plat PZ Aerial Map JENNY LYNN RD Legend 586 JENNY LYNN RD 587 CHIMNEY ROCK LOOP Addresses Driveway Assessment Boundary JENNY LYNN RD 503 CHIMNEY ROCK LOOP Approximate Plat Boundary 575 JENNY LYNN RD 510 CHIMNEY ROCK LOOP CHIMNEY ROCK LOOP Cheyenne/Laramie County GIS Cooperative Program This map is made possible through the Cheyenne and Laramie County Cooperative GIS Program (CLCCGIS). The data contained herein was collected for its use and is for display and planning purposes only. The CLCCGIS will not be held liable as to the validity, correctness, accuracy, completeness, and/or reliability of the data. The CLCCGIS furthermore assumes no liability associated with the use or misuse of this information. LOUISE LN Printed on August 22, Feet

6 Future Land Use Districts OTHER Urban-Rural Interface (URI) Rural Metro (RM) Rural Ag Interface (RAI) Ag & Range Land (AGR) Laramie County, Wyoming Grizzy Cliffs 2nd Filing Subdivision Permit & Plat JENNY LYNN RD PZ Comprehensive Plan AGR JENNY LYNN RD JAYMERS LN Legend Streets Classification Interstate JENNY LYNN RD Arterial Collector Local Platted, Not Built Private Rail Road LOUISE LN Subject Property Printed on August 22, ,000 Feet This map is made possible through the Cheyenne and Laramie County Cooperative GIS Program (CLCCGIS). The data contained herein was collected for its use and is for display and planning purposes only. The CLCCGIS will not be held liable as to the validity, correctness, accuracy, completeness, and/or reliability of the data. The CLCCGIS furthermore assumes no liability associated with the use or misuse of this information.

7 PZ GRIZZLY CLIFFS, 2 ND FILING SUBDIVISION PERMIT County Engineer: Scott Larson COMMENTS ATTACHED 09/10/2018 Engineer Review 1. I cannot find the 40 easement that is referenced in Note 5.d. on the plat drawing. 2. I concur with the request for a waiver of a detailed Traffic Study and Drainage Study since this development will have an insignificant impact on either. Surveyor Review 1. Lots 1 and 2 of Grizzly Cliffs 1st Filing appear to be mislabeled. 2. Two items in the Curve Table -- Boundary: The record data given for C1 differs more than 100 feet and 20 in chord bearing from the measured data, is this correct? Also, the record data given for C2 and C3 are identical, so one of them is likely incorrect. Environmental Health Department: Roy Kroeger COMMENTS ATTACHED 09/07/2018 Laramie County Small Wastewater System Regulations This development needs to complete a DEQ Subdivision review and provide a copy of the report to Environmental Health through the Laramie County Commission. A small wastewater system permit shall be obtained for each lot prior to the start of construction. A perc test and site hole will be required on each lot prior to the issuance of the small wastewater system permit. A copy of the signed final plat shall be submitted to Environmental Health prior to the issuance of any small wastewater systems permit. Some lots have steep slopes and large easements in which the small wastewater system can not be located in or on. Careful planning and possible consultations may be needed with system location. Wyoming Game & Fish: Meghan Lockwood COMMENTS ATTACHED 09/10/2018 The staff of the Wyoming Game and Fish Department (Department) has reviewed the proposed Grizzly Cliffs 2nd Filing - Subdivision Permit and Plat (PZ ) located in Laramie County. We offer the following comments for your consideration. Terrestrial Considerations: The proposed subdivision is outside of big game crucial ranges; however pronghorn, elk and deer are often present in the area. To best mitigate negative impacts to the wildlife and the community we recommend the following: Habitat Alteration: Development should be minimized or avoided in mountain shrub communities, aspen stands and any other important plant communities. Burning or cutting may revitalize old,

8 decadent stands of aspen. Standing dead trees and dead and downed plant material should be left to provide important habitat for small wildlife species and to replenish soil nutrients through decomposition. No filling, excavating, dredging, mining, drilling, or removing of topsoil, sand, gravel, rock, or other minerals should be done except when associated with approved development plans. Non-native Plants: Introduction of non-native shrubs and trees should be restricted to those species that are the least palatable to browsing wildlife animals and pose little risk of spreading to adjacent areas (e.g., Russian olive should never be planted). The developer should consult with our local wildlife biologist when planning landscaping for the subdivision. Bird Nesting/Perching Habitat: Nesting and perching areas for raptors and some cavity nesting birds should be maintained and human disturbance minimized during incubation and rearing time frames. Developments should be located to protect unique physical or vegetative features that provides important nesting habitat. Home construction should be discouraged in these areas. Damage/Feeding: When applicable, the subdivision covenants should explain to prospective purchasers that wildlife inhabits, winters and/or migrates through the area. It is very likely that wildlife may damage ornamental shrubs, trees, homes and fences. The land purchaser accepts this risk factor. We will not accept compensation claims for damages caused by wildlife to ornamentals, homes and fences. Supplemental feeding of ungulates or carnivores should not be allowed. Pets: Domestic pets, especially dogs and cats, should be restrained and prevented from roaming at large. Unrestrained pets can harass and kill small and large birds and mammals. Roads: Construct the minimum standard and number of roads needed to serve the subdivision. Roads should be constructed to avoid watercourses, wetlands and other important wildlife habitats. Habitat Enhancement: Enhancements can improve the existing wildlife habitat and provide enjoyment for wildlife enthusiasts within the subdivision. Enhancements should be planned thoroughly and thoughtfully prior to any construction. The developer and/or homeowners association should review the plan before approval. We will assist developers or homeowners in designing habitat enhancements. Off-road Vehicles: Restricted use of off-road vehicles should be written into the covenant. Off-road vehicles

9 include all-wheel drives, motorcycles, all-terrain vehicles, and snowmobiles. Corridors: Developers should preserve wildlife corridors by maintaining areas of undeveloped open or wooded habitat and reducing the density of dwellings or through cluster development with undeveloped land between clusters. Corridors will help wildlife move through or around developments, provide protection for sensitive areas, and reduce many land use conflicts. Aquatic Considerations: To minimize impacts to the aquatic resources of nearby waterways, we recommend the following: * Accepted best management practices be implemented to ensure that all sediments and other pollutants are contained within the boundaries of the work area. Disturbed areas that are contributing sediment to surface waters as a result of project activities should be promptly re-vegetated to maintain water quality. * Equipment should be serviced and fueled away from streams and riparian areas. Equipment staging areas should be at least 500 feet from riparian areas. Thank you for the opportunity to comment. Lee Knox, the Laramie District Wildlife Biologist, is available at if you have any questions or would like help with habitat improvements. If you have any aquatic questions or concerns please contact Rick Huber, Habitat Protection Biologist, at Sincerely, Angi Bruce Habitat Protection Supervisor AB/mc/ml cc: U.S. Fish and Wildlife Service Lee Knox, Wyoming Game and Fish Department Embere Hall, Wyoming Game and Fish Department Bobby Compton, Wyoming Game and Fish Department Chris Wichmann, Wyoming Department of Agriculture, Cheyenne Black Hills Energy: Dustin McKen COMMENTS ATTACHED 09/07/2018 CLFP owns an electric line/easement which isn t shown on the plat. Also, for utility services in the future, lot line easements will need to be added to service future customers.

10 Planners: Bryan Nicholas COMMENTS ATTACHED 09/10/ Applicant is required to meet all applicable requirements per Section (e)(i-xiv). 2.The Fire District providing fire protection is stated as FD #2, this needs to be corrected to FD # A Wyoming P.L.S. Stamp needs to be included on the plat. 4. A drainage easement was required along Jenny Lynn Road on an adjacent subdivision recently approved by the Board, the application is advised to consider doing the same. Building Dept.: Antony Pomerleau COMMENTS ATTACHED 09/07/2018 BUILDING PERMITS REQUIRED AGENCIES WITH NO COMMENTS: Planners/GIS County Real Estate Office County Public Works Department Laramie Co School Dist. No. 1 AGENCIES WITH NO RESPONSE: County County Attorney County Treasurer County Conservation District Wyoming DEQ US Post Office Combined Communications Center Emergency Management Fire District No. 10 Sheriff s Office High West Energy Rockies Express Pipeline

11 RESOLUTION NO. A RESOLUTION TO APPROVE A SUBDIVISION PERMIT AND PLAT FOR GRIZZLY CLIFFS, 2 ND FILING, LOCATED IN TRACTS 3 & 4, GRIZZLY CLIFFS, 1 ST FILING, A PORTION OF THE NW1/4, SECTION 19, T.13N., R.69W., AND IN A PORTION OF THE E1/2, SECTION 24, T.13N., R.70W., OF THE 6TH P.M., LARAMIE COUNTY, WY. WHEREAS, Wyoming State Statutes to ; to authorize Laramie County, in promoting the public health, safety, morals and general welfare of the county, to regulate the use of land through zoning in unincorporated Laramie County; and WHEREAS, the Laramie County Board of Commissioners adopted the Laramie County Land Use Regulations; and WHEREAS, the proposed subdivision and plat is in accordance with section (a-e) of the Laramie County Land Use Regulations; and WHEREAS, this resolution is the subdivision permit for Grizzly Cliffs, 2 nd Filing. NOW THEREFORE BE IT RESOLVED BY THE GOVERNING BODY OF LARAMIE COUNTY, WYOMING, as follows: The Laramie County Board of Commissioners finds that: a. This application is in conformance with section (a-e) of the Laramie County Land Use Regulations. and the Board approves the Subdivision Permit and Plat for Grizzly Cliffs, 2 nd Filing, with the following conditions: 1. All County Engineer comments shall be addressed prior to the public hearing before the Board. 2. All pertinent easements shall be shown on the plat prior to the public hearing before the Board. 3. All Clerical issues shall be addressed prior to recordation of the plat. 4. A drainage easement along Jenny Lynn Road shall be shown on the plat prior the public hearing before the Board. 5. A note stating, any further subdivision of the lands contained within this replat will be subject to a Subdivision Application pursuant to Wyoming Department of Environmental Equality (WYDEQ) Chapter 23 rules, requirements, and regulations, shall be shown on the plat prior to the public hearing before the Board. PRESENTED, READ AND ADOPTED THIS DAY OF, LARAMIE COUNTY BOARD OF COMMISSIONERS ATTEST: K.N. Buck Holmes, Chairman Debra K. Lee, Laramie County Clerk Reviewed and approved as to form: Mark T. Voss, Laramie County Attorney 1

12

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Bryan Nicholas, Associate Planner DATE: October 16, 2018 TITLE: Review and

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Bryan Nicholas, Associate Planner DATE: April 11, 2019 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Marissa Pomerleau, Planning Technician DATE: March 28, 2019 TITLE: Review and

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Brad Emmons, Planning Director DATE: May 15, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Seth Frentheway, Associate Planner DATE: November 8, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Nancy M. Trimble, Associate Planner DATE: July 13, 2017 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Jean Vetter, Senior Planner DATE: January 26, 2017 TITLE: Review and action of

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Bryan Nicholas, Associate Planner DATE: February 14, 2019 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Brett Walker, Planner DATE: January 25, 2018 TITLE: Review and action of a Subdivision

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Nancy M. Trimble, Associate Planner DATE: November 9, 2017 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Bryan Nicholas, Associate Planner DATE: May 15, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Seth Frentheway, Associate Planner DATE: August 23, 2018 TITLE: Review and recommendations

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Nancy M. Trimble, Associate Planner DATE: November 9, 2017 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Nancy Trimble, Associate Planner DATE: July 13, 2017 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Nancy M. Trimble, Associate Planner DATE: December 5, 2017 TITLE: Review and

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Bryan Nicholas, Associate Planner DATE: November 9, 2017 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Bryan Nicholas, Associate Planner DATE: October 2, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Brett Walker, Planner DATE: January 25, 2018 TITLE: Review and action of a Variance

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Nancy Trimble, Associate Planner DATE: July 18, 2017 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY ANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Seth Frentheway, Associate Planner DATE: June 19 th, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Brad Emmons, Planning Director DATE: March 22, 2018 TITLE: Review and recommendations

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Seth Frentheway, Associate Planner DATE: August 23, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Nancy M. Trimble, Associate Planner DATE: December 14, 2017 TITLE: Review and action of a

More information

CHAPTER 3 PRELIMINARY PLAT

CHAPTER 3 PRELIMINARY PLAT 10-3-1 10-3-3 SECTION: CHAPTER 3 PRELIMINARY PLAT 10-3-1: Consultation 10-3-2: Filing 10-3-3: Requirements 10-3-4: Approval 10-3-5: Time Limitation 10-3-6: Grading Limitation 10-3-1: CONSULTATION: Each

More information

MINERAL COUNTY PLANNING STAFF FINDINGS OF FACT Proposed Elk Run at St. Regis. February 12, 2017

MINERAL COUNTY PLANNING STAFF FINDINGS OF FACT Proposed Elk Run at St. Regis. February 12, 2017 MINERAL COUNTY PLANNING STAFF FINDINGS OF FACT Proposed The proposed is a five-lot subdivision and is located approximately one mile east of St. Regis on Old Highway 10 East. The property is located in

More information

Rezoning Staff Report St. Croix County Community Development Committee Gerald & Joan Mellgren Hearing Date: July 16, 2015

Rezoning Staff Report St. Croix County Community Development Committee Gerald & Joan Mellgren Hearing Date: July 16, 2015 Rezoning Staff Report St. Croix County Community Development Committee Gerald & Joan Mellgren Hearing Date: Property Owners: Gerald & Joan Mellgren Agent: William Mellgren Site Address: 97 230 th Street

More information

For Office Use Only. Permit No. Fee: $ $ per proposed lot (AN ADDITIONAL 10% CODE COMPLIANCE FEE WILL BE CHARGED)

For Office Use Only. Permit No. Fee: $ $ per proposed lot (AN ADDITIONAL 10% CODE COMPLIANCE FEE WILL BE CHARGED) For Office Use Only Permit No. Fee: $1600 + $560.00 per proposed lot (AN ADDITIONAL 10% CODE COMPLIANCE FEE WILL BE CHARGED) LAND PARTITION FOREST (Conditional Use) Crook County Planning Department 300

More information

Conservation Design Subdivisions

Conservation Design Subdivisions Conservation Design Subdivisions An excerpt from the Rules and Regulations Governing Division of Land in Sheridan County, Wyoming, November 5, 2010 Sheridan County Public Works Department 224 S. Main Street

More information

Sample Baseline Documentation Report (BDR) Annotated Template for Environmentally Important Land

Sample Baseline Documentation Report (BDR) Annotated Template for Environmentally Important Land Sample Baseline Documentation Report (BDR) Annotated Template for Environmentally Important Land The baseline documentation report (BDR) provides a snap shot of the biophysical condition of a property

More information

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10 Guide to Replats Introduction Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures and expectations

More information

Instructions for Residential Building Permit Application

Instructions for Residential Building Permit Application Instructions for Residential Building Permit Application Sublette County, Wyoming Processing Procedure: Paperwork Use this application for residential homes and accessory structures. A Sufficient Building

More information

Napa County Planning Commission Board Agenda Letter

Napa County Planning Commission Board Agenda Letter Agenda Date: 9/20/2017 Agenda Placement: 8C Napa County Planning Commission Board Agenda Letter TO: FROM: Napa County Planning Commission Charlene Gallina for David Morrison - Director Planning, Building

More information

Deb Grube Walworth County Land Use and Resource Management

Deb Grube Walworth County Land Use and Resource Management Deb Grube dgrube@co.walworth.wi.us 262-741-7907 Walworth County Land Use and Resource Management www.co.walworth.wi.us County Zoning Contacts: Deb Grube (262) 741-7907 Board of Adjustment, Mobile Towers

More information

MONTEREY COUNTY STANDARD SUBDIVISION COMMITTEE

MONTEREY COUNTY STANDARD SUBDIVISION COMMITTEE MONTEREY COUNTY STANDARD SUBDIVISION COMMITTEE Meeting: May 11, 2006 Agenda Item: 1 Project Description: Standard Subdivision Amendment of recorded Markham Ranch Subdivision Map to relocate building envelope

More information

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist Prior to filing any application for SUBDIVISION approval, the applicant shall request in writing that the zoning administrator schedule a pre-submission conference. APPLICATION TO THE PLANNING BOARD TOWN

More information

4. If any perennial surface water passes through or along the property lines of the acreage, a minimum of 200 feet or frontage should be required.

4. If any perennial surface water passes through or along the property lines of the acreage, a minimum of 200 feet or frontage should be required. b. Provide adequate acreage for appropriate productive use of rural residential land, such as small numbers of livestock, large gardens, etc. 3. Minimum of 200 feet of frontage on an improved county or

More information

IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS

IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS IV-A. General Minor subdivisions create five or fewer lots from a tract of record, each lot of which has legal and physical access. If the tract of record proposed

More information

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL SECTION 22.01 PURPOSE ARTICLE XXII PROCEDURES The purpose of this Article is to establish uniform requirements of procedure for all developments in the Township. Certain specific types of minor development

More information

BY BOARD OF COUNTY COMMISSIONERS AN ACT TO BE ENTITLED

BY BOARD OF COUNTY COMMISSIONERS AN ACT TO BE ENTITLED BY BOARD OF COUNTY COMMISSIONERS ORDINANCE NO. AN ACT TO BE ENTITLED AN ORDINANCE AMENDING THE PASCO COUNTY LAND DEVELOPMENT CODE, ARTICLE 700, BY REPEALING EXISTING SECTION 702, ENVIRONMENTALLY SENSITIVE

More information

Guide to Minor Developments

Guide to Minor Developments Guide to Minor Developments Introduction The Douglas County (DCD) is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in

More information

Chapter 210 CONDITIONAL USES

Chapter 210 CONDITIONAL USES Chapter 210 CONDITIONAL USES 210.01 Purpose 210.02 Authorization 210.03 Process Type 210.04 Determination of Major or Minor Conditional Use Review 210.05 Approval Criteria 210.06 Conditions of Approval

More information

ORDINANCE NO. BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF CHEYENNE, WYOMING: That the City of Cheyenne hereby finds as follows:

ORDINANCE NO. BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF CHEYENNE, WYOMING: That the City of Cheyenne hereby finds as follows: ORDINANCE NO. ENTITLED: AN ORDINANCE ANNEXING TO THE CITY OF CHEYENNE, WYOMING, A PARCEL OF LAND SITUATED IN THE NORTH 102 FEET OF TRACTS 323 AND 324, SUNNYSIDE ADDITION, 7TH FILING, LARAMIE COUNTY, WYOMING

More information

1105 SUBDIVISIONS, PARTITIONS, REPLATS, CONDOMINIUM PLATS, AND VACATIONS OF RECORDED PLATS

1105 SUBDIVISIONS, PARTITIONS, REPLATS, CONDOMINIUM PLATS, AND VACATIONS OF RECORDED PLATS 1105 SUBDIVISIONS, PARTITIONS, REPLATS, CONDOMINIUM PLATS, AND VACATIONS OF RECORDED PLATS 1105.01 PURPOSE AND APPLICABILITY Section 1105 is adopted to provide standards, criteria, and procedures under

More information

Guide to Combined Preliminary and Final Plats

Guide to Combined Preliminary and Final Plats Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested

More information

RENITA HURDSMAN BEAR RIVER STATE PARK LAND EXCHANGE PROPOSAL

RENITA HURDSMAN BEAR RIVER STATE PARK LAND EXCHANGE PROPOSAL DETAILED ANALYSIS RENITA HURDSMAN BEAR RIVER STATE PARK LAND EXCHANGE PROPOSAL June 1, 2006 Prepared by the Office of State Lands and Investments Herschler Building, 3W 122 West 25 th Street Cheyenne,

More information

PLANNING & DEVELOPMENT

PLANNING & DEVELOPMENT PLANNING & DEVELOPMENT STAFF REPORT Rezoning PETITION: APPLICANT: PROPERTY OWNER: TYPE OF REQUEST: SIZE OF TRACT: LOCATION: (#17-22) Rezone from A-PUD (Agri-Business Planned Unit Development) to A-PUD

More information

Guide to Preliminary Plans

Guide to Preliminary Plans Guide to Preliminary Plans Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures

More information

Amendment to the Zoning and Subdivision Ordinances; Consider Repeal Cluster Development Standards

Amendment to the Zoning and Subdivision Ordinances; Consider Repeal Cluster Development Standards 2 Board of Supervisors Meg Bohmke, Chairman Gary F. Snellings, Vice Chairman Jack R. Cavalier Thomas C. Coen L. Mark Dudenhefer Wendy E. Maurer Cindy C. Shelton February 28, 2018 Thomas C. Foley County

More information

Lincoln County Planning Department 512 California Ave. Libby, MT

Lincoln County Planning Department 512 California Ave. Libby, MT Lincoln County Planning Department 512 California Ave. Libby, MT. 59923 Deb Blystone; Planning Manager P: (406) 283.2464 F: (406) 293-8577 Lisa Oedewaldt; Planner P: (406) 293-6295 F: (406) 293-2515 C:

More information

DOUGLAS COUNTY ZONING RESOLUTION Section 4 LRR - Large Rural Residential District 3/10/99. -Section Contents-

DOUGLAS COUNTY ZONING RESOLUTION Section 4 LRR - Large Rural Residential District 3/10/99. -Section Contents- SECTION 4 LRR LARGE RURAL RESIDENTIAL DISTRICT -Section Contents- 401 Intent... 4-2 402 Principal Uses... 4-2 403 Accessory Uses... 4-3 404 Uses Permitted by Special Review... 4-4 405 Land Dedication...

More information

The Ranches Sketch Plan

The Ranches Sketch Plan The Ranches Sketch Plan APPLICATION: RURAL LAND USE PROCESS (AKA CLUSTER DEVELOPMENT) HEARING DATES: Planning Commission: 12 July 2017 at 6:30 pm Board of County Commissioners: TBD APPLICANT: REQUEST:

More information

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY COUNTY COMMISSIONERS Cathy Wolfe District One Diane Oberquell District Two Robert N. Macleod District Three HEARING EXAMINER BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY In the Matter of the Application

More information

RECITALS. B. WHEREAS, Ranch, its successors and assigns, are referred to in the Easement as the Grantor ; and

RECITALS. B. WHEREAS, Ranch, its successors and assigns, are referred to in the Easement as the Grantor ; and Basic Components of Management Plans Associated with Conservation Easement Acquisitions Where A Land Trust Or other third party Is the Grantee April 17, 2012 Key: Text in normal font, without highlight,

More information

BOARD OF COUNTY COMMISSIONERS ARCHULETA COUNTY, COLORADO RESOLUTION 2018-

BOARD OF COUNTY COMMISSIONERS ARCHULETA COUNTY, COLORADO RESOLUTION 2018- BOARD OF COUNTY COMMISSIONERS ARCHULETA COUNTY, COLORADO RESOLUTION 2018- ARCHULETA COUNTY IMPROPERLY DIVIDED PARCELS EXEMPTION INTERIM RESOLUTION - A RESOLUTION ADDRESSING PARCELS UNDER THE SIZE OF 35

More information

19.12 CLUSTER RESIDENTIAL DISTRICT

19.12 CLUSTER RESIDENTIAL DISTRICT Chapter 19.12 CLUSTER RESIDENTIAL DISTRICT (Adopted 12/22/2003; Ordinance #0061970). Amended 7/3/17, Ordinance #079100. Section 19.12.010 - Declaration of Intent. The Cluster Residential District provides

More information

Umatilla County Department of Land Use Planning

Umatilla County Department of Land Use Planning Umatilla County Department of Land Use Planning 216 SE 4 th ST, Pendleton, OR 97801, (541) 278-6252 PROCESSING TYPE I & III APPLICATIONS Land Division, Type I - IV Supplemental Application & Information

More information

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS - Larimer County Planning Dept. Procedural Guide for 1041 PERMITS PLEASE NOTE: A PRE-APPLICATION CONFERENCE IS REQUIRED PRIOR TO SUBMITTING THIS APPLICATION. PURPOSE: State Statutes allow local governments

More information

FOREST DWELLING PERMIT APPLICATION. Other: APPLICANT: Name: Mailing address: Phone No.: Office Home. Name: Mailing Address: Phone No.

FOREST DWELLING PERMIT APPLICATION. Other: APPLICANT: Name: Mailing address: Phone No.: Office Home. Name: Mailing Address: Phone No. FOREST DWELLING PERMIT APPLICATION TYPE: Lot of Record Template Large/Multi Tract Other: APPLICANT: Name: Mailing address: City State Zip Code Phone No.: Office Home Are you the property owner? owner's

More information

MIDWAY CITY Municipal Code

MIDWAY CITY Municipal Code MIDWAY CITY Municipal Code TITLE 9 ANNEXATION CHAPTER 9.01 PURPOSE CHAPTER 9.02 GENERAL REQUIREMENTS CHAPTER 9.03 PROPERTY OWNER INITIATION OF ANNEXATION CHAPTER 9.04 PROCEDURES FOR CONSIDERATION OF PETITION

More information

City of Fort Lupton Amended Plat Process

City of Fort Lupton Amended Plat Process City of Fort Lupton Amended Plat Process Purpose The Amended Plat process is an administrative process to amend a recorded Plat. An Amended Subdivision is an administrative revision to a recorded Subdivision

More information

Letter of Intent May 2017 (Revised November 2017)

Letter of Intent May 2017 (Revised November 2017) THE BEACH AT WOODMOOR LETTER OF INTENT MAY 2017 (REVISED NOVEMBER 2017) OWNER/APPLICANT: CONSULTANT: Lake Woodmoor Holdings LLC N.E.S. Inc. 1755 Telstar Drive, Suite 211 619 North Cascade Avenue Colorado

More information

CONSERVATION EASEMENT GRANT AND AGREEMENT. ( the "Grantor") - and - Strathcona County ( the "Grantee")

CONSERVATION EASEMENT GRANT AND AGREEMENT. ( the Grantor) - and - Strathcona County ( the Grantee) CONSERVATION EASEMENT GRANT AND AGREEMENT BETWEEN: ( the "Grantor" - and - Strathcona County ( the "Grantee" (the Grantor and the County sometimes referred to jointly as the "Parties" IN CONSIDERATION

More information

2030 General Plan. December 6, 7 pm

2030 General Plan. December 6, 7 pm 2030 General Plan GPAC Meeting #9 GPAC Meeting #9 December 6, 7 pm City Council Input on Working Draft Land Use Map Council discussed GPAC & PC versions of the working draft land use map 11/28 Council

More information

Minutes of the Proceedings Laramie County Planning Commission Prepared by the Laramie County Planning & Development Office Laramie County Wyoming

Minutes of the Proceedings Laramie County Planning Commission Prepared by the Laramie County Planning & Development Office Laramie County Wyoming Minutes of the Proceedings Laramie County Planning Commission Prepared by the Laramie County Planning & Development Office Laramie County Wyoming Thursday, January 12, 2012 120112 00 The Laramie County

More information

MODEL DEED RESTRICTION FOR THE PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-3 (PASPGP-3) DECLARATION OF RESTRICTIVE COVENANTS FOR CONSERVATION

MODEL DEED RESTRICTION FOR THE PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-3 (PASPGP-3) DECLARATION OF RESTRICTIVE COVENANTS FOR CONSERVATION MODEL DEED RESTRICTION FOR THE PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-3 (PASPGP-3) DECLARATION OF RESTRICTIVE COVENANTS FOR CONSERVATION THIS DECLARATION OF RESTRICTIVE COVENANTS FOR CONSERVATION

More information

Land Use. Existing Land Use

Land Use. Existing Land Use 8 Land Use 8.1 Land Use Chapter Purpose and Contents This element includes a brief summary of existing land use conditions and trends followed by a series of goals, objectives, and recommendations to guide

More information

LLC & MLLC Property Bismark Meadows Bonner County, Idaho

LLC & MLLC Property Bismark Meadows Bonner County, Idaho Vital Ground Property Management Plan LLC & MLLC Property Bismark Meadows Bonner County, Idaho December 10, 2009 (updated 2/12/13) Ryan Lutey The Vital Ground Foundation Building T-2, Fort Missoula Road

More information

LABEL PLEASE NOTE: ALL APPLICATIONS AND SITE PLANS MUST BE COMPLETED IN BLACK OR BLUE INK ONLY Intake by:

LABEL PLEASE NOTE: ALL APPLICATIONS AND SITE PLANS MUST BE COMPLETED IN BLACK OR BLUE INK ONLY Intake by: STAFF USE ONLY Thurston County Resource Stewardship 2000 Lakeridge Dr. S.W. Olympia, WA 98502 (360)786-5490 / (360)754-2939 (Fax) TDD Line (360) 754-2933 Email: permit@co.thurston.wa.us Supplemental Application

More information

Wildlife Habitat Conservation and Management Program

Wildlife Habitat Conservation and Management Program EXHIBIT 1 PC-2015-4106 ODFW Guide Wildlife Habitat Conservation and Management Program Manual for Counties and Cities Oregon Department of Fish and Wildlife March 2006 Table of Contents 1. Introduction

More information

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 4 Preliminary Plan 10/13/2015

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 4 Preliminary Plan 10/13/2015 ARTICLE 4 PRELIMINARY PLAN 401 Intent An in-depth analysis of the proposed subdivision, including a review of the design considering the ability to obtain water and sanitation, identified geologic hazards,

More information

MINOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE

MINOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE MINOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE Clear Creek County Planning Department P.O. Box 2000 Georgetown, Colorado 80444 (303) 679-2436 phone (303) 569-1103 fax 1 PURPOSE To establish criteria and

More information

A. Preserve natural resources as identified in the Comprehensive Plan.

A. Preserve natural resources as identified in the Comprehensive Plan. 1370.08 Conservation Residential Overlay District. Subd. 1 Findings. The City finds that the lands and resources within the Conservation Residential Overlay District are a unique and valuable resource

More information

SUBURBAN AND URBAN RESIDENTIAL LAND USE

SUBURBAN AND URBAN RESIDENTIAL LAND USE SUBURBAN AND URBAN RESIDENTIAL LAND USE GOAL 1 DISCOURAGE URBAN AND SUBURBAN DEVELOPMENT OUTSIDE INCORPORATED AREAS IN WHITMAN COUNTY, EXCEPT WITHIN DESIGNATED UNINCORPORATED COMMUNITIES, AND THOSE AREAS

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 10-11-12 Subdivision Review Waiver SRW 2011001: Big Woods Road Richard Weaver, Acting

More information

AGENDA ITEM 3. R Meeting May 14, 2014 AGENDA ITEM

AGENDA ITEM 3. R Meeting May 14, 2014 AGENDA ITEM R-14-75 Meeting 14-12 May 14, 2014 AGENDA ITEM AGENDA ITEM 3 Approval of Grant of Access Easement and Quitclaim Deed between James F. Wickett et al. (San Mateo County Assessor s Parcel Numbers 081-120-060

More information

March 26, Sutter County Planning Commission

March 26, Sutter County Planning Commission March 26, 2003 To: Re: Sutter County Planning Commission Agenda Item #12: Public hearing on Rezoning #03-04 to change the zoning classification of two parcels totaling 324+ acres from the AG (General Agricultural)

More information

TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST

TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST Schedule A - General Requirements 1. Where the application involves only a variance one (1) original and nineteen (19) copies of the appropriate

More information

B. Subarea Provisions, including the Design Elements and Area of Special Concern and Potential Park/Open Space/Recreation Requirements;

B. Subarea Provisions, including the Design Elements and Area of Special Concern and Potential Park/Open Space/Recreation Requirements; ARTICLE III: LAND USE DISTRICTS III-1 300 INTRODUCTION Article III of the Washington County Community Development Code consists of the primary and overlay districts which apply to the unincorporated areas

More information

YELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT

YELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT YELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT The City-County Planning staff has prepared the Findings of Fact for the Aspen Ridge Subdivision, 2 nd Filing. These findings are based on the preliminary

More information

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS 105.11. Permit requirements. 105.12. Waiver of permit requirements. Title 25 Environmental Protection Part I. Department of Environmental Protection Subpart C. Protection of Natural Resources Article I.

More information

Finnerty, Shawn & Lori Water Front Setback

Finnerty, Shawn & Lori Water Front Setback BONNER COUNTY PLANNING DEPARTMENT PLANNING AND ZONING COMMISSION STAFF REPORT FOR NOVEMBER 2, 2017 Project Name: Finnerty, Shawn & Lori Water Front Setback File Number, Type: FILE #V492-17, Variance Request

More information

SINGLE-FAMILY WETLAND CERTIFICATION PROCESS

SINGLE-FAMILY WETLAND CERTIFICATION PROCESS SINGLE-FAMILY WETLAND CERTIFICATION PROCESS Listed below is a step-by-step process for expediting wetland reviews for single-family development. It is called the Single-Family Certification Process. It

More information

Kitsap County Department of Community Development. Administrative Staff Report

Kitsap County Department of Community Development. Administrative Staff Report Kitsap County Department of Community Development Administrative Staff Report Report Date: Application Complete Date: March 15, 2018 Application Submittal Date: March 12, 2018 Project Name: Nikki Lee Salon

More information

Cover Letter with Narrative Statement

Cover Letter with Narrative Statement Cover Letter with Narrative Statement March 31, 2017 rev July 27, 2017 RE: Rushton Pointe Residential Planned Unit Development Application for Public Hearing for RPUD Rezone PL2015 000 0306 Mr. Eric Johnson,

More information

STAFF REPORT. Permit Number: Porter. Kitsap County Board of Commissioners; Kitsap County Planning Commission

STAFF REPORT. Permit Number: Porter. Kitsap County Board of Commissioners; Kitsap County Planning Commission STAFF REPORT Permit Number: 15 00461 Porter DATE: November 9, 2015 TO: FROM: Kitsap County Board of Commissioners; Kitsap County Planning Commission Katrina Knutson, AICP, Senior Planner, DCD and Jeff

More information

b) Tangerine Corridor Overlay District 1) Tangerine Corridor District Regulations

b) Tangerine Corridor Overlay District 1) Tangerine Corridor District Regulations Attachment 1 Tangerine Road Corridor Overlay District Section 27.10.D.3.f.vi.b Initiation of Code Amendment September 2, 2014, Planning and Zoning Commission b) Tangerine Corridor Overlay District 1) Tangerine

More information

This is a New Findings of Adequacy for a Recorded Plat (Plat Book 179, Page 131) LAND USE Vacant Effective Plan: Pompano Beach

This is a New Findings of Adequacy for a Recorded Plat (Plat Book 179, Page 131) LAND USE Vacant Effective Plan: Pompano Beach Page 1 of 11 Board of County Commissioners, Broward County, Florida Environmental Protection and Growth Management Department Planning and Development Management Division DEVELOPMENT REVIEW REPORT PROJECT

More information

BOUNDARY LINE ADJUSTMENT

BOUNDARY LINE ADJUSTMENT DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 Fax: 360.379.4451 Web: www.co.jefferson.wa.us/communitydevelopment E-mail: dcd@co.jefferson.wa.us BOUNDARY

More information

Kitsap County Department of Community Development. Staff Report and Administrative Decision

Kitsap County Department of Community Development. Staff Report and Administrative Decision Kitsap County Department of Community Development Report Date: Staff Report and Administrative Decision Application Complete Date: March 19, 2018 Application Submittal Date: March 19, 2018 To: Seth Hanson,

More information

CHARTER TOWNSHIP OF CALEDONIA COUNTY OF KENT, MICHIGAN. at the Township and Village Hall, 8196 Broadmoor Avenue, Caledonia, Michigan on the

CHARTER TOWNSHIP OF CALEDONIA COUNTY OF KENT, MICHIGAN. at the Township and Village Hall, 8196 Broadmoor Avenue, Caledonia, Michigan on the First Reading CHARTER TOWNSHIP OF CALEDONIA COUNTY OF KENT, MICHIGAN At a regular meeting of the Township Board of the Charter Township of Caledonia, held at the Township and Village Hall, 8196 Broadmoor

More information

R E S O L U T I O N. a. Remove Table B from the plan.

R E S O L U T I O N. a. Remove Table B from the plan. R E S O L U T I O N WHEREAS, Werrlein Property is the owner of a 0.3902-acre parcel of land in the 5th Election District of Prince George s County, Maryland, being zoned One-Family Detached Residential

More information

Taos County Planning Department COMMERCIAL/ADMINISTRATIVE/SPECIAL USE APPLICATION

Taos County Planning Department COMMERCIAL/ADMINISTRATIVE/SPECIAL USE APPLICATION PERMIT FEE: $250.00 Taos County Planning Department COMMERCIAL/ADMINISTRATIVE/SPECIAL USE APPLICATION Application No. FOR OFFICIAL USE ONLY SELECT THE USE TYPE OF COMMERCIAL ZONING CLEARANCE FOR REVIEW

More information

Rural Municipality of Kellross No Official Community Plan. Bylaw No

Rural Municipality of Kellross No Official Community Plan. Bylaw No Rural Municipality of Kellross No. 247 Official Community Plan Bylaw No. 2009-03 2 BYLAW NO. 2009-03 THE RURAL MUNICIPALITY OF KELLROSS NO. 247 LEROSS, SASKATCHEWAN A Bylaw of the Rural Municipality of

More information

STAFF REPORT. Permit History:

STAFF REPORT. Permit History: STAFF REPORT Application: Request to rezone property from General Agriculture (AG) to Suburban Residential (a) (R-2a) Applicant: Perry Puncochar Agenda Item: 4(g) Background Information: Proposal: The

More information

Wood River Land Trust Staff Report

Wood River Land Trust Staff Report Wood River Land Trust Staff Report Date: July 9, 2014 To: Board of Directors From: Staff, Keri York Regarding: MacConnell Agricultural Lands Easement Action Item Action Item: The item for consideration

More information

ATTACHMENT A: FINDINGS

ATTACHMENT A: FINDINGS ATTACHMENT A: FINDINGS 1.0 CEQA FINDINGS 1.1 ENVIRONMENTAL IMPACT REPORTS Findings pursuant to public resources code Section 21081 and the California Environmental Quality Act Guidelines Sections 15090

More information

STAFF REPORT. Permit Number: Garland. Kitsap County Board of Commissioners; Kitsap County Planning Commission

STAFF REPORT. Permit Number: Garland. Kitsap County Board of Commissioners; Kitsap County Planning Commission STAFF REPORT Permit Number: 15 00686 Garland DATE: February 25, 2016 TO: FROM: Kitsap County Board of Commissioners; Kitsap County Planning Commission Katrina Knutson, AICP, Senior Planner, DCD and Jeff

More information

THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by ("Covenantor"). RECITALS

THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by (Covenantor). RECITALS Model for Use with Permits Without Mitigation Plans STATE OF COUNTY OF DECLARATION OF RESTRICTIVE COVENANTS THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by ("Covenantor"). RECITALS

More information

NOTICE OF DECISION. FILE #: PLASTS DECISION DATE: November 2, 2017 APPEAL DEADLINE: November 14, 2017

NOTICE OF DECISION. FILE #: PLASTS DECISION DATE: November 2, 2017 APPEAL DEADLINE: November 14, 2017 Wasco County Planning Department Service, Sustainability & Solutions 2705 East Second St. The Dalles, OR 97058 (541) 506-2560 wcplanning@co.wasco.or.us www.co.wasco.or.us/planning NOTICE OF DECISION FILE

More information

Type II Replacement Dwelling (EFC) Packet updated 07/07/16

Type II Replacement Dwelling (EFC) Packet updated 07/07/16 WASHINGTON COUNTY Dept. of Land Use & Transportation Planning and Development Services Current Planning 155 N. 1 st Avenue, #350-13 Hillsboro, OR 97124 Ph. (503) 846-8761 Fax (503) 846-2908 http://www.co.washington.or.us

More information