1 LARAMIE COUNTY PLANNING & DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Nancy M. Trimble, Associate Planner DATE: December 14, 2017 TITLE: Review and action of a Subdivision Permit and Plat for Clear Creek Subdivision, 1 st Filing, located in portions of Sections 10, 11, 14, 15, and 16, T.13N., R.67W., of the 6 th P.M., Laramie County, WY. EXECUTIVE SUMMARY AVI, PC, on behalf of the City of Cheyenne, Clear Creek Land Company LLC and Swan Ranch LLC, has submitted a Subdivision Permit and Plat application for approval of Clear Creek Subdivision, 1st Filing, located west of Interstate 25, south of Otto Road. The application has been submitted for the purpose of platting multiple parcels into two lots. BACKGROUND The subject property contains approximately 380 acres, with the FEMA 100-year floodplain running through a significant portion of the area. The subdivision is occurring within a mile of the City and requires Governing Body review (W.S (b) and approval. This plat has been submitted to the City and is processing concurrently with the County. Pertinent Regulations Section (a-e) of the Laramie County Land Use Regulations governing the criteria for a subdivision permit and plat. Section of the Laramie County Land Use Regulations governing the A2 Agricultural zone district Archer Pkwy Cheyenne, WY Phone (307) Fax (307) Page 1 of 3

2 DISCUSSION The Laramie County Comprehensive Plan identifies the area as Urban Rural Interface (URI), which is intended to accommodate a mix of more intensive land uses than other areas. PlanCheyenne contemplates Industrial as the future land use in portions of the west area of the subdivision, and Agriculture/Rural in portions of the east and north area. The remainder of the subdivision is designated as Open Space and Parks, which covers the floodplain area located on the property. The property is zoned A2 with a minimum lot size requirement of 20 acres. This zone district allows for agriculture and associated operations, and uses including single-family residential, duplexes, bed & breakfasts, child care centers, primary/secondary schools, animals hospitals/clinics and stables/arenas/kennels, churches and other places of worship, and cemeteries. The subdivision proposes to combine seven (7) parcels owned by the City of Cheyenne, one (1) parcel owned by Clear Creek Land Company, and approximately 40 acres of a 1,920 acre parcel owned by Swan Ranch LLC into one lot to be known as Lot 1, Block 1. As indicated on the plat, the 40-acre parcel (labelled as Parcel E ) is to be gifted to the City of Cheyenne, resulting in the entirety of Lot 1, Block 1 being owned by the City of Cheyenne. Proposed Lot 2, Block 1, located in the northeasterly area of the subdivision, will consist of about two acres also derived from the 1,920 acre parcel, and shall be owned by Clear Creek Land Company. A development sign was posted, adjacent property owners were notified via certified mail, and a public hearing notice was published in the newspaper. No comments were received from the public. Staff received agency comments confirming the application is in process with the City, and required mapping and clerical revisions to the plat. Information has been requested regarding the intended use of Lot 2, Block 1, as the lot size does not meet the minimum requirements of the A2 zone district, and the plat does not indicate access provided for this lot. As of the date this staff report was writtten, no additional information or updates have been received by the Planning Office. The attached resolution shall serve as the Subdivision Permit upon approval by the Board. Staff finds the proposal to be in general conformance with the plans and policies of Laramie County. RECOMMENDATION and FINDINGS Based on evidence provided, staff recommends the Planning Commission find that: 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307) Page 2 of 3

3 a. This application meets the criteria for a subdivision permit and plat pursuant to section (a-e) of the Laramie County Land Use Regulations. b. This application is generally in conformance with the A2 Agricultural zone district. and that the Planning Commission recommend approval of the Subdivision Permit and Plat for Clear Creek Subdivision, 1 st Filing, located in portions of Sections 10, 11, 14, 15, and 16, T.13N., R.67W., of the 6th P.M., Laramie County, WY, to the Laramie County Board of Commissioners with the following condition: 1. A revised plat addressing agency concerns shall be submitted and approved by the commenting agencies prior to plat recordation. PROPOSED MOTION I move to recommend approval of the Subdivision Permit and Plat for Clear Creek Subdivision, 1st Filing, to the Laramie County Board of Commissioners with condition 1, and adopt the findings of facts a and b of the staff report. ATTACHMENTS Attachment 1: Location Map Attachment 2: Aerial Map Attachment 3: Comprehensive Plan Map Attachment 4: PlanCheyenne Map Attachment 5: Zoning Map Attachment 6: Agency Review Comments Report Attachment 7: Draft Resolution Attachment 8: Plat 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307) Page 3 of 3

4 4 HORIZON DR 9 OTTO RD ERIE LN W COLLEGE DR 1 W 5TH ST SWAN RANCH RD SOUTHWEST DR 12 Laramie County, Wyoming CLEAR CREEK SUBDIVISION 1ST FILING SUBDIVISION PERMIT AND PLAT Legend PZ Location Map Property Lines Current Flood Hazards NAME Subject Property FEMA FLOODWAY FEMA 100YR FLOODPLAIN FEMA 500YR FLOODPLAIN CITY/CNTY 100YR FLOODPLAIN BERWICK DR W WALLICK RD CLEAR CREEK PKWY D R GRANITE PEAK QUARTZ DR Printed on Nov 07, ,900 Feet This map is made possible through the Cheyenne and Laramie County Cooperative GIS Program (CLCCGIS). The data contained herein was collected for its use and is for display and planning purposes only. The CLCCGIS will not be held liable as to the validity, correctness, accuracy, completeness, and/or reliability of the data. The CLCCGIS furthermore assumes no liability associated with the use or misuse of this information.

5 HORIZON DR OTTO RD COUNTY BERWICK DR W WALLICK RD CHEYENNE ERIE LN CLEAR CREEK PKWY W COLLEGE DR D R GRANITE PEAK QUARTZ DR EVELYN ST SWAN RANCH RD SOUTHWEST DR United States Department of Agriculture Laramie County, Wyoming CLEAR CREEK SUBDIVISION 1ST FILING SUBDIVISION PERMIT AND PLAT Legend PZ Aerial Map Property Lines Current Flood Hazards NAME FEMA FLOODWAY FEMA 100YR FLOODPLAIN FEMA 500YR FLOODPLAIN CITY/CNTY 100YR FLOODPLAIN Cities & Towns TOWN ALBIN BURNS CHEYENNE PINE BLUFFS Subject Property Printed on Nov 08, ,900 Feet This map is made possible through the Cheyenne and Laramie County Cooperative GIS Program (CLCCGIS). The data contained herein was collected for its use and is for display and planning purposes only. The CLCCGIS will not be held liable as to the validity, correctness, accuracy, completeness, and/or reliability of the data. The CLCCGIS furthermore assumes no liability associated with the use or misuse of this information.

6 HORIZON DR OTTO RD COUNTY URI ERIE LN EVELYN ST SWAN RANCH RD SOUTHWEST DR Laramie County, Wyoming CLEAR CREEK SUBDIVISION 1ST FILING SUBDIVISION PERMIT AND PLAT PZ Comprehensive Plan Map Legend Subject Property BERWICK DR W WALLICK RD CHEYENNE CLEAR CREEK PKWY W COLLEGE DR D R GRANITE PEAK QUARTZ DR United States Department of Agriculture Property Lines Future Land Use Districts OTHER Urban-Rural Interface (URI) Rural Metro (RM) Rural Ag Interface (RAI) Ag & Range Land (AGR) Cities & Towns TOWN ALBIN BURNS CHEYENNE PINE BLUFFS Printed on Nov 07, ,900 Feet This map is made possible through the Cheyenne and Laramie County Cooperative GIS Program (CLCCGIS). The data contained herein was collected for its use and is for display and planning purposes only. The CLCCGIS will not be held liable as to the validity, correctness, accuracy, completeness, and/or reliability of the data. The CLCCGIS furthermore assumes no liability associated with the use or misuse of this information.

7 HORIZON DR PUB OTTO RD Row OS AR ERIE LN RECIR MU-C MU-R W 5TH ST SWAN RANCH RD SOUTHWEST DR Laramie County, Wyoming CLEAR CREEK SUBDIVISION 1ST FILING SUBDIVISION PERMIT AND PLAT Legend PZ PlanCheyenne Map Subject Property IND BERWICK DR W WALLICK RD MU-E GANNETT PEAK DR CLEAR CREEK PKWY ETCHEPA LAZY Y DR CB UR United States Department of Agriculture Property Lines PlanCheyenne (2014) NEW_FLUP Agriculture/Rural Rural Residential Urban Transition Residential Urban Residential Mixed-use Residential MU-E Industrial Mixed-use Commercial Community Business Central Business District Public and Quasi-Public PUB-FED Open Space and Parks ROW Printed on Nov 07, ,900 Feet This map is made possible through the Cheyenne and Laramie County Cooperative GIS Program (CLCCGIS). The data contained herein was collected for its use and is for display and planning purposes only. The CLCCGIS will not be held liable as to the validity, correctness, accuracy, completeness, and/or reliability of the data. The CLCCGIS furthermore assumes no liability associated with the use or misuse of this information.

8 PLANNED UNIT HEAVY INDUSTRIAL AGRICULTURAL OTTO RD PLANNED UNIT BERWICK DR AGRICULTURAL AND RURAL RESIDENTIAL W WALLICK RD CLEAR CREEK PKWY ERIE LN COMMUNITY BUSINESS EVELYN AGRICULTURAL RESIDENTIAL LIGHT INDUSTRIAL PLANNED UNIT LIGHT INDUSTRIAL PLANNED UNIT ST MIXED USE - COUNTY PLANNED UNIT PLANNED UNIT LOW DENSITY RESIDENTIAL PUBLIC COMMUNITY BUSINESS PLANNED UNIT MEDIUM DENSITY RESIDENTIAL AGRICULTURAL AND RURAL RESIDENTIAL AGRICULTURAL COMMUNITY BUSINESS United States Department of Agriculture Laramie County, Wyoming CLEAR CREEK SUBDIVISION 1ST FILING SUBDIVISION PERMIT AND PLAT Legend PZ Zoning Map Property Lines All Other Values Archer Special Use District (ASU) Agricultural (A-2) Agricultural and Rural Residental (A-1) Agricultural Residentail (AR) Low Density Residential - Established (LR-1) Low Density Residential - Developing (LR-2) MR Medium Density Residential - Established (MR-1) Medium Density Residential - Developing (MR-2) High Density Residential - Established (HR-1) High Density Residentiial - Developing (HR-2) MU Mixed Use with Residential Emphasis (MUR) Mixed Use with Business Emphasis (MUB) Neighborhood Business Community Business (CB) Light Industrial (LI) Heavy Industrial (HI) Public (P) Planned Unit Development (PUD) Military (M) Subject Property Printed on Nov 07, ,900 Feet This map is made possible through the Cheyenne and Laramie County Cooperative GIS Program (CLCCGIS). The data contained herein was collected for its use and is for display and planning purposes only. The CLCCGIS will not be held liable as to the validity, correctness, accuracy, completeness, and/or reliability of the data. The CLCCGIS furthermore assumes no liability associated with the use or misuse of this information.

9 PZ CLEAR CREEK SUBDIVISION, 1 ST FILING Sub Pmt/Plat Board of Public Utilities: Linda Gunter COMMENTS ATTACHED 11/16/2017 Need to show all existing Easements on Plat Cheyenne MPO: Nancy Olson COMMENTS ATTACHED 11/17/2017 As per the Amended and restated Development Agreement (August 29, 2013) between the City and Granite Peak/Clear Creek Land, a right of way will need to be platted in the future in the vicinity of Berwick Dr. on the Long Range transportation Plan, in PlanCheyenne. This is in the PlanCheyenne County Version Transportation Plan, page 115 TABLE 7: COST ESTIMATES AND 2040 FISCALLY CONSTRAINED ROADWAY PLAN INCLUSION # 10a Berwick Dr., Wallick Rd. to New minor arterial with UP RR/Otto Rd. overpass 1.99 miles. Cheyenne Development Services: Lisa Pafford COMMENTS ATTACHED 11/20/2017 This subdivision is occurring within a mile of the City and requires Governing Body review (W.S (b) and approval. This plat has been submitted to the City and is processing concurrently with the County. County Assessor: Clarice Blanton COMMENTS ATTACHED 11/13/2017 Note To Assessor is verbose. A general note such as Ownership by this plat is hereby established in Lot 1, Block 1, to the City of Cheyenne would suffice. Remove Douglas Samuelson s name from Dedication. It need only appear under the signature line. Parcel E is not clearly defined. Is it a separate parcel? If so, then Lot 1 needs to be broken into different lots. If it is not separate, but a part of Lot 1 there is no need to reference it at all. The Ownership statement takes care of any land contained in the boundary of Lot 1. County Engineer: Scott Larson COMMENTS ATTACHED 11/27/2017 Engineer Review 1. I concur with the waiver of a Traffic Study and Drainage Study at this time. A detailed Traffic Study and Drainage Study will be required with a Site Plan application for any of the lots within this platted area. Surveyor Review 1. Plats require that dedication and acknowledgment statements must be executed by all owners of legal and equitable interests in the property being subdivided/developed. Both Dedication Statements indicate - PLAT OF CLEAR CREEK ADDITION, 1ST FILING. The Title Block indicates - CLEAR CREEK SUBDIVISION, 1ST FILING. The wording of both Dedications seems a little unwieldy and difficult to follow. Maybe

10 something like this would clarify the intent and flow better: KNOW ALL MEN BY THESE PRESENTS THAT SWAN RANCH LLC AND CLEAR CREEK LAND CO., LLC (or respectively THE CITY OF CHEYENNE), BY AND THROUGH THEIR UNDERSIGNED DULY AUTHORIZED REPRESENTATIVE DOUGLAS D. SAMUELSON, MANAGER OF SWAN RANCH LLC AND CLEAR CREEK LAND CO., LLC, THE OWNERS IN FEE SIMPLE OF A PORTION OF THE LANDS EMBRACED IN THIS PLAT OF CLEAR CREEK SUBDIVISION, 1ST FILING, DO HEREBY DECLARE THIS PLAT. These can be lengthy and difficult to compose and make sense, this is just an idea, food for thought. 2. For subdivisions within one (1) mile of the city limits of Cheyenne, survey tie(s) by bearing/azimuth and the distance to two (2) of the City of the City of Cheyenne s Horizontal Control Network monuments shall be accurately described on the plat. In addition, for the purposes of enhancing the City and County GIS Program framework, all public land survey corners on or within the subdivision boundary shall have field observation coordinates provided on the plat. These coordinates shall reference Wyoming State Plane Coordinate System, East Zone, U.S. Survey foot, NAD 1983(CORS96). The coordinates shall be observed and verified at the time of the plat survey. Some of the City of Cheyenne s Horizontal Control Network survey ties are shown in very small text, difficult to read and clearly distinguish the details. There is one Section Corner within the subdivision and two adjacent 1/4 Corners shown as found without coordinates provided. 3. Plats require that if any lot, block, boundary or right-of-way from a previously recorded plat is being vacated by this plat a notation shall be provided, describing the area or boundaries to be vacated under a section titled Statement to Vacate. An executed Petition to Vacate signed by all affected owners is required as part of the application packet. A blanket vacation description is provided, however, it seems like it would be a good idea to provide a little more information regarding the name of the previously recorded plat being vacated along with a little more information regarding what exactly is being vacated. It does state tract lines, are there any streets or easements being vacated? 4. Plat layouts shall include boundary lines with bearings/azimuths and distances and the location of all recorded rights-of-way intersecting the boundary of the subdivision. In the northeast corner of the subdivision there is course label (N E FEET from the legal description) that is difficult to read due to overlapping utility labeling. 5. Plat layouts shall include where applicable, curve data showing the radius, central angle, arc length, chord bearing/azimuth and distance and any notation of non-tangent curves. The location of points of curvatures and intersections shall be shown. With respect to the access easements shown approximately in the middle of the western half of the subdivision, the line and curve numbering as labeled is small and difficult to read, making it challenging to coordinate the Line and Curve Tables with the drawing. 6. Plat layouts shall include the location and dimensions, with boundary ties, for all existing and proposed utility, drainage, access, or other easements. There are several existing utility and access easements shown on the plat that have no boundary ties. 7. Plat layouts shall include the area of each lot or tract in square feet and/or acres. According to the LEGAL DESCRIPTION and the plat the total area of the subdivision is

11 acres. Parcel E contains acres (with Parcel E noted to be gifted to the City of Cheyenne along with Lot 1, Block 1). If Parcel E is gifted to the City, doesn t that split Lot 1, Block 1 into two parcels.? What if the plans for deeding explained in the NOTE TO ASSESSOR change in the future? A little more information or clearer explanation of the intent of the parcel creation in the NOTE TO ASSESOR would be helpful. 8. Plat layouts require such additional information as may be required to adequately describe proposed utility systems, street improvements and easements or reservations contemplated within the area to be subdivided. What is the current legal standing of the FUTURE ROAD RESERVATION as platted? What is its purpose, when is it proposed to happen and exactly where would it be located within the subdivision? 9. Plat layouts require any recorded easements or restrictions applicable to the subdivision shall be noted by reference to Register s book and page number. The County will not be involved in the enforcement of deed restriction or covenant instruments. There are several easements shown on the plat with incomplete Book and Page number references. County Public Works Department: David Bumann COMMENTS ATTACHED 11/22/2017 See county engineer s comments Environmental Health Department: Roy Kroeger COMMENTS ATTACHED 11/20/2017 Laramie County Small Wastewater System Regulations 201 Area Facility Management Plan The property is in the 201 Area and should utilize the City of Cheyenne s Public Water and Sewer System as proposed. Planner: Nancy Trimble COMMENTS ATTACHED 10/27/2017 1) No access has been provided on the plat for Lot 2, Block 1, thereby rendering the lot land-locked. 2) It is unclear as to the intent of this subdivision since a project narrative letter not submitted to the County with the application. 3) Any proposed development in, or crossing of, the floodplain shall require submittal of a Floodplain Development Permit application to the County Planning Office. Agencies responding with No Comment: County Real Estate Office, WYDOT, Fire District No. 1, Sheriff s Office, Cheyenne Light Fuel & Power. Agencies not responding: County Treasurer, Department of Energy (WAPA), Combined Communications Center, Emergency Management, CenturyLink.

12 RESOLUTION NO. A RESOLUTION TO APPROVE A SUBDIVISION PERMIT AND PLAT FOR CLEAR CREEK SUBDIVISION, 1 ST FILING, LOCATED IN PORTIONS OF SECTIONS 10, 11, 14, 15, AND 16, T.13N., R.67W., OF THE 6TH P.M., LARAMIE COUNTY, WY WHEREAS, Wyoming State Statutes to ; to authorize Laramie County, in promoting the public health, safety, morals and general welfare of the county, to regulate the use of land through zoning in unincorporated Laramie County; and WHEREAS, the Laramie County Board of Commissioners adopted the Laramie County Land Use Regulations; and WHEREAS, the proposed subdivision and plat is in accordance with section (a-e) of the Laramie County Land Use Regulations; and WHEREAS, the proposed subdivision is generally in conformance with the plans and policies of the A2 - Agricultural zone district; and WHEREAS, this resolution is the subdivision permit for Clear Creek Subdivision, 1st Filing. NOW THEREFORE BE IT RESOLVED BY THE GOVERNING BODY OF LARAMIE COUNTY, WYOMING, as follows: The Laramie County Board of Commissioners finds that: a. This application is in conformance with section (a-e) of the Laramie County Land Use Regulations. b. This application is in conformance with A2 - Agricultural zone district. And the Board approves the Subdivision Permit and Plat for Clear Creek Subdivision, 1st Filing with the following condition: 1. A revised plat addressing agency concerns shall be submitted and approved by the commenting agencies prior to plat recordation. PRESENTED, READ AND ADOPTED THIS DAY OF, LARAMIE COUNTY BOARD OF COMMISSIONERS ATTEST: Troy Thompson, Chairman Debra K. Lee, Laramie County Clerk Reviewed and approved as to form: Mark T. Voss, Laramie County Attorney

13

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Nancy M. Trimble, Associate Planner DATE: November 9, 2017 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Nancy M. Trimble, Associate Planner DATE: December 5, 2017 TITLE: Review and

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Nancy M. Trimble, Associate Planner DATE: November 9, 2017 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Bryan Nicholas, Associate Planner DATE: February 14, 2019 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Nancy Trimble, Associate Planner DATE: July 13, 2017 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Bryan Nicholas, Associate Planner DATE: November 9, 2017 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY ANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Seth Frentheway, Associate Planner DATE: June 19 th, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Nancy M. Trimble, Associate Planner DATE: July 13, 2017 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Bryan Nicholas, Associate Planner DATE: May 15, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Brad Emmons, Planning Director DATE: May 15, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Bryan Nicholas, Associate Planner DATE: April 11, 2019 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Bryan Nicholas, Associate Planner DATE: October 2, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Marissa Pomerleau, Planning Technician DATE: March 28, 2019 TITLE: Review and

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Brett Walker, Planner DATE: January 25, 2018 TITLE: Review and action of a Subdivision

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Nancy Trimble, Associate Planner DATE: July 18, 2017 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Jean Vetter, Senior Planner DATE: January 26, 2017 TITLE: Review and action of

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Brad Emmons, Planning Director DATE: March 22, 2018 TITLE: Review and recommendations

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Seth Frentheway, Associate Planner DATE: November 8, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Brett Walker, Planner DATE: January 25, 2018 TITLE: Review and action of a Variance

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Seth Frentheway, Associate Planner DATE: August 23, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Seth Frentheway, Associate Planner DATE: August 23, 2018 TITLE: Review and recommendations

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Bryan Nicholas, Associate Planner DATE: September 27, 2018 TITLE: Review and action

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Bryan Nicholas, Associate Planner DATE: October 16, 2018 TITLE: Review and

More information

ORDINANCE NO. BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF CHEYENNE, WYOMING:

ORDINANCE NO. BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF CHEYENNE, WYOMING: ORDINANCE NO. ENTITLED: AN ORDINANCE PURSUANT TO SECTION 2.2.1, ZONING MAP AMENDMENT, 2.2.2, PLANNED DEVELOPMENT REGULATING PLAN OR DEVELOPMENT MASTER PLAN, SECTION 5.1.2, ZONING DISTRICTS ESTABLISHED,

More information

ORDINANCE NO. BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF CHEYENNE, WYOMING: That the City of Cheyenne hereby finds as follows:

ORDINANCE NO. BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF CHEYENNE, WYOMING: That the City of Cheyenne hereby finds as follows: ORDINANCE NO. ENTITLED: AN ORDINANCE ANNEXING TO THE CITY OF CHEYENNE, WYOMING, A PARCEL OF LAND SITUATED IN THE NORTH 102 FEET OF TRACTS 323 AND 324, SUNNYSIDE ADDITION, 7TH FILING, LARAMIE COUNTY, WYOMING

More information

MINOR PLAT FILING APPLICATION

MINOR PLAT FILING APPLICATION FILING APPLICATION Date of PC Meeting: Date of BCC Meeting: Fee Paid: 1. APPLICANT: DAYTIME PHONE: MAILING ADDRESS: LANDOWNER: DAYTIME PHONE: MAILING ADDRESS: AUTHORIZED AGENT: MAILING ADDRESS: RELATIONSHIP

More information

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS Lawrence-Douglas County MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS Preliminary Plats The applicant shall schedule a Pre-Application meeting with Planning Staff at least seven (7) working days prior

More information

City of Clever Planning & Zoning Department P.O. Box 52 Clever, MO QUALIFICATIONS FOR MINOR SUBDIVISIONS

City of Clever Planning & Zoning Department P.O. Box 52 Clever, MO QUALIFICATIONS FOR MINOR SUBDIVISIONS QUALIFICATIONS FOR MINOR SUBDIVISIONS All subdivision of land not otherwise classified as a major subdivision shall be classified as a minor subdivision and shall be subject to the procedures adopted by

More information

To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal agreements.

To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal agreements. ARTICLE 5 FINAL PLAT 501 Intent DOUGLAS COUNTY SUBDIVISION RESOLUTION To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal

More information

FINAL PLAT APPLICATION

FINAL PLAT APPLICATION FINAL PLAT APPLICATION (Page 1 of 3) LEGAL OWNER(s): NAME: STREET ADDRESS OWNER(s): CITY, STATE, ZIP CODE: PHONE NUMBER: BILLING ADDRESS: NAME OF ENGINEER/SURVEYOR: Engineer/Surveyor Address, Phone: PROPERTY

More information

City of Fort Lupton Amended Plat Process

City of Fort Lupton Amended Plat Process City of Fort Lupton Amended Plat Process Purpose The Amended Plat process is an administrative process to amend a recorded Plat. An Amended Subdivision is an administrative revision to a recorded Subdivision

More information

Minutes of the Proceedings Laramie County Planning Commission Prepared by the Laramie County Planning & Development Office Laramie County Wyoming

Minutes of the Proceedings Laramie County Planning Commission Prepared by the Laramie County Planning & Development Office Laramie County Wyoming Minutes of the Proceedings Laramie County Planning Commission Prepared by the Laramie County Planning & Development Office Laramie County Wyoming Thursday, January 12, 2012 120112 00 The Laramie County

More information

RULES OF THE GEORGIA STATE BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS CHAPTER APPLICATIONS TABLE OF CONTENTS

RULES OF THE GEORGIA STATE BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS CHAPTER APPLICATIONS TABLE OF CONTENTS RULES OF THE GEORGIA STATE BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS CHAPTER 180-7 APPLICATIONS TABLE OF CONTENTS 180-7-.07 Maps and Plats. All maps, plats and similar documents

More information

STAFF REPORT - SUMMATION. Saddle Ridge, 7 th Filing. Preliminary Plat Process CASE NUMBER: UDC SUBDIVISION CODE: SDRA-P

STAFF REPORT - SUMMATION. Saddle Ridge, 7 th Filing. Preliminary Plat Process CASE NUMBER: UDC SUBDIVISION CODE: SDRA-P STAFF REPORT - SUMMATION Saddle Ridge, 7 th Filing Preliminary Plat Process CASE NUMBER: UDC-15-00351 SUBDIVISION CODE: SDRA-P PREPARED BY: MEETING DATES: Josh Tetzlaff July 6, 2015 Planning Commission

More information

Preliminary Plat/Final Plat Application

Preliminary Plat/Final Plat Application Melissa Municipal Center 3411 Barker Avenue Melissa, Texas 75454 Phone: (972) 838-2036 Applicant: Date: Address: Phone: Contact: Fax: E-mail: Propose Addition Name: Acres: Existing Zoning: Propose Zoning:

More information

The Laramie County Land Use Regulations

The Laramie County Land Use Regulations LARAMIE COUNTY, WYOMING Formatted The Laramie County Land Use Regulations Title 2 County-Wide Land use Regulations 5/24/2018 pg. Adopted February 15, 2011 Table of Contents Title 2 County Wide Land Use

More information

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10 Guide to Replats Introduction Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures and expectations

More information

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS Final Plats The applicant shall schedule a Pre-Application meeting with Planning Staff at least seven (7) working days prior to submittal of the application.

More information

A Final Plat will be reviewed concurrently with any other development review application(s) that is required.

A Final Plat will be reviewed concurrently with any other development review application(s) that is required. RELATED FACTS TO KNOW: Adams County Recording Requirements, Annexation, Common Wall Subdivision, Development Plan (PUD Development Permit), Fees, Helpful Contact Information, Lot Line Adjustment, Neighborhood

More information

Final Plat Approval of a Minor Subdivision Application Packet

Final Plat Approval of a Minor Subdivision Application Packet Final Plat Approval of a Minor Subdivision Application Packet 1. Application Packet. Be sure to complete and submit all the required materials that are a part of this Application Packet. Failure to do

More information

APPENDIX C: PLAT SPECIFICATIONS AND CERTIFICATES

APPENDIX C: PLAT SPECIFICATIONS AND CERTIFICATES APPENDIX C: PLAT SPECIFICATIONS AND CERTIFICATES A. Drawing. All plats for recording must be submitted on photographically reproducible and dimensionally stable polyester sheets such as Mylar, Cronar or

More information

Submittal Requirements: Subdivision Plat (Final)

Submittal Requirements: Subdivision Plat (Final) s Planning and Zoning Submittal Requirements: Subdivision Plat (Final) 1. Application form, APO fees, and filing fee. Transportation Development Review Fee please contact Engineering at (970) 221-6605

More information

Guide to Combined Preliminary and Final Plats

Guide to Combined Preliminary and Final Plats Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested

More information

CITY OF FAYETTEVILLE, ARKANSAS FINAL PLAT FOR STAFF USE ONLY FINAL PLAT FEE: $ $ Date Application Submitted: Date Accepted as Complete:

CITY OF FAYETTEVILLE, ARKANSAS FINAL PLAT FOR STAFF USE ONLY FINAL PLAT FEE: $ $ Date Application Submitted: Date Accepted as Complete: CITY OF FAYETTEVILLE, ARKANSAS FINAL PLAT FOR STAFF USE ONLY FINAL PLAT FEE: $200.00-$800.00 Date Application Submitted: Date Accepted as Complete: Project Number: Public Hearing S-T-R: PP#: Zone: Please

More information

The Filing Fee for a Minor Plat is $ PLUS $20.00 per lot created

The Filing Fee for a Minor Plat is $ PLUS $20.00 per lot created DEPARTMENT OF COMMUNITY DEVELOPMENT MINOR PLAT PROCEDURE The Filing Fee for a Minor Plat is $250.00 PLUS $20.00 per lot created Description: The purpose of a Minor Plat is to allow property to be platted

More information

MINOR SUBDIVISION PLAT CHECKLIST

MINOR SUBDIVISION PLAT CHECKLIST MINOR SUBDIVISION PLAT CHECKLIST Project Name: Tax ID #: Project Number: Date: _ Reviewed By: Telephone: NOTES: All lots on septic systems must comply with the Fulton County Health Department requirements

More information

BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF CHEYENNE, WYOMING: FIRST READING: SECOND READING: 3RD AND FINAL READING:

BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF CHEYENNE, WYOMING: FIRST READING: SECOND READING: 3RD AND FINAL READING: ORDINANCE NO. ENTITLED: AN ORDINANCE PURSUANT TO SECTION 2.2.1 ZONING MAP AMENDMENTS, SECTION 5.1.2 ZONING DISTRICTS ESTABLISHED, AND SECTION 5.1.3 OFFICIAL ZONING MAP, OF THE UNIFIED DEVELOPMENT CODE,

More information

2401 S. E. Monterey Road, Stuart, FL Plat Application Martin County Growth Management Department

2401 S. E. Monterey Road, Stuart, FL Plat Application Martin County Growth Management Department Martin County, Florida Growth Management Department DEVELOPMENT REVIEW DIVISION PLAT APPLICATION A. Identification of the applicant or agent: Applicant (property owner): Address: Telephone: Applicant's

More information

Final Plat Approval of a Major Subdivision Application Packet

Final Plat Approval of a Major Subdivision Application Packet Final Plat Approval of a Major Subdivision Application Packet 1. Application Packet. Be sure to complete and submit all the required materials that are a part of this Application Packet. Failure to do

More information

SUBDIVISION APPLICATION

SUBDIVISION APPLICATION SUBDIVISION APPLICATION Preliminary Plat Minor Plat Final Plat Amended Plat Applicant Name: Owner (if different from applicant) Name: Company: Company: Address: Address: City, State, Zip City, State, Zip

More information

STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY IN DARKE COUNTY, OHIO

STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY IN DARKE COUNTY, OHIO STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY IN DARKE COUNTY, OHIO As directed by Section 319.203 of the Ohio Revised Code which states The County Auditor and the County Engineer shall adopt standards

More information

Guide to Minor Developments

Guide to Minor Developments Guide to Minor Developments Introduction The Douglas County (DCD) is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in

More information

Planning. the propertyy. Texas Local. Government. Code. size of 2,0000 RSF-2-PUD. Road within the Wharf at a. Citizen. 0 Letter of. 1.

Planning. the propertyy. Texas Local. Government. Code. size of 2,0000 RSF-2-PUD. Road within the Wharf at a. Citizen. 0 Letter of. 1. Planning & Zoning Commissionn Replat Phase I of the Wharf at Clear Lake, Dock 18, Slips 1 and 2 Planning & Development Department February 15, 20166 Request Replat approximately 0.0209 acres of a previouslyy

More information

Easements, Establishments, Abandonments and Vacations

Easements, Establishments, Abandonments and Vacations Easements, Establishments, Abandonments and Vacations A highway easement conveys, in perpetuity, the right to construct and maintain a highway facility on the land of the fee holder. (Property owner) The

More information

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

ARTICLE 900 PLAT AND PLAN REQUIREMENTS ARTICLE 900 PLAT AND PLAN REQUIREMENTS SEC. 900.1 ITEMS TO BE SHOWN ON PLAT OR PLAN General (1) Property lines of all property owners adjacent to the exterior boundaries of the project shall be located

More information

INSTRUCTIONS FINAL PLAT APPROVAL APPLICATION

INSTRUCTIONS FINAL PLAT APPROVAL APPLICATION INSTRUCTIONS FINAL PLAT APPROVAL APPLICATION 1. The applicant/agent shall fill out the attached application. The attached application form must be completely filled in before it can be filed. Portions

More information

MINOR SUBDIVISION PLAT

MINOR SUBDIVISION PLAT MINOR SUBDIVISION PLAT Community Development Department 8101 Ralston Road Arvada, Colorado 80002 MINOR SUBDIVISION PLAT Subdivisions consisting of five (5) or fewer lots are eligible for the minor subdivision

More information

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (FINAL PLAT)

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (FINAL PLAT) 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR MAJOR SUBDIVISION APPROVAL (FINAL PLAT) *** IMPORTANT INFORMATION ~ Please read

More information

MINOR SUBDIVISION PLAT

MINOR SUBDIVISION PLAT MINOR SUBDIVISION PLAT Community Development Department 8101 Ralston Road Arvada, Colorado 80002 September 2015 MINOR SUBDIVISION PLAT Subdivisions consisting of five (5) or fewer lots are eligible for

More information

STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY

STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY Hancock County, Ohio Charity A. Rauschenberg, Hancock County Auditor Steven C. Wilson, Hancock County Engineer Revised: March 1, 2007 TRANSFER AND CONVEYANCE

More information

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248) Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248)-858-1447 Fax (248)-858-7466 Requirements Needed for Final Plat Approval No. General Requirements. 1 Routing

More information

WESTON COUNTY FINAL PLAT APPLICATION

WESTON COUNTY FINAL PLAT APPLICATION WESTON COUNTY FINAL PLAT APPLICATION Property Owner: Mailing Address of owner: Telephone Number(s) of owner: Property Owner: Mailing Address of owner: Telephone Number(s) of owner: (If subdivider/applicant

More information

FINAL PLAN CHECKLIST

FINAL PLAN CHECKLIST FINAL PLAN CHECKLIST Subdivision Name: Subdivision Number: Project Number: REVIEW CRITERIA Plans: A final plan shall be on a 24 x 36 sheet at a scale that is no smaller than 1 = 40 and shall contain all

More information

LAND USE PERMIT APPLICATION

LAND USE PERMIT APPLICATION LAND USE PERMIT APPLICATION Date Application No. TYPE OF PERMIT Subdivision Short Plat Conditional Use Binding Site Plan Final Plat Final Short Plat Variance Final Binding Site Plan Plat Amendment Short

More information

Final Plat Mapping Requirements

Final Plat Mapping Requirements CURRENT PLANNING DIVISION 410 E. 5 th Street Loveland, CO 80537 970-962-2523 eplan-planning@cityofloveland.org cityofloveland.org/dc Final Plat Mapping Requirements All Final plats shall comply with the

More information

Guide to Preliminary Plans

Guide to Preliminary Plans Guide to Preliminary Plans Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures

More information

Planning Commission Application Summary

Planning Commission Application Summary Planning Commission Application Summary Project Name: Academy Office Park Plat Amendment Request Address: 339 West 13490 South Current Zoning: CSD-DPMU Hearing Date: August 11, 2016 Summary of Request

More information

CITY OF NORTH PORT Neighborhood Development Services Planning Division Final Plat/Re-Plat Packet

CITY OF NORTH PORT Neighborhood Development Services Planning Division Final Plat/Re-Plat Packet CITY OF NORTH PORT Neighborhood Development Services Planning Division Planninginfo@cityofnorthport.com Final Plat/Re-Plat Packet The following items are to be included in the submission: Final Plat/Re-Plat

More information

ARTICLE 6 MINOR DEVELOPMENT FINAL PLAT Single-Family Residential

ARTICLE 6 MINOR DEVELOPMENT FINAL PLAT Single-Family Residential ARTICLE 6 MINOR DEVELOPMENT FINAL PLAT Single-Family Residential 601 Intent The intent of the minor development is to provide a streamlined review process for the creation of ten or fewer single-family

More information

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached: Staff Report: Completed by Jeff Palmer Director of Planning & Zoning Date: November 7, 2018, Updated November 20, 2018 Applicant: Greg Smith, Oberer Land Developer agent for Ronald Montgomery ET AL Property

More information

Final Subdivision Plat

Final Subdivision Plat Final Subdivision Plat Application Packet Public Works Department New Development Division 175 East 200 North St. George, UT 84770 Office (435) 627-4120 Dear Applicant, This packet has been prepared to

More information

MINOR PLAT. The following documents are provided as required by the City of Conroe for use in the above titled platting submittals:

MINOR PLAT. The following documents are provided as required by the City of Conroe for use in the above titled platting submittals: Public Works - Engineering Division CITY OF CONROE MINOR PLAT The following documents are provided as required by the City of Conroe for use in the above titled platting submittals: Submittal Questionnaire

More information

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached: Staff Report: Completed by Jeff Palmer Director of Planning & Zoning Date: November 7, 2018 Applicant: Greg Smith, Oberer Land Developer agent for Ronald Montgomery ET AL Property Identification: Frontage

More information

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 7 Replat 10/13/2015

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 7 Replat 10/13/2015 ARTICLE 7 REPLAT 701 Intent To provide a review process for the replatting of an existing subdivision plat or superblock final plat. The process shall vary according to the nature of the proposed amendment,

More information

Article 6: Planned Unit Developments

Article 6: Planned Unit Developments LUDC 2013 GARFIELD COUNTY, COLORADO Article 6: Planned Unit Developments ARTICLE 6 PLANNED UNIT DEVELOPMENTS TABLE OF CONTENTS DIVISION 1. GENERAL.... 1 6-101. GENERAL PROVISIONS.... 1 A. Purpose....

More information

PRELIMINARY PLAT Checklist

PRELIMINARY PLAT Checklist PRELIMINARY PLAT Checklist 3715 Bridgeport Way W University Place, WA 98466 PH: (253) 566-5656 FAX: (253) 460-2541 This is a checklist of materials required for a Preliminary Plat. This checklist is provided

More information

Innsbruck Val Moritz AFP of Lot 46, Lot 47, & Amended Lot 48 Block 17 Amended Final Plat Adjustment of Interior Lot Lines

Innsbruck Val Moritz AFP of Lot 46, Lot 47, & Amended Lot 48 Block 17 Amended Final Plat Adjustment of Interior Lot Lines Innsbruck Val Moritz AFP of Lot 46, Lot 47, & Amended Lot 48 Block 17 Amended Final Plat Adjustment of Interior Lot Lines APPLICATION: AMENDED FINAL PLAT HEARING DATES: Planning Commission: 8 November

More information

TRANSFER AND CONVEYANCE STANDARDS OF THE PICKAWAY COUNTY AUDITOR AND THE PICKAWAY COUNTY ENGINEER

TRANSFER AND CONVEYANCE STANDARDS OF THE PICKAWAY COUNTY AUDITOR AND THE PICKAWAY COUNTY ENGINEER TRANSFER AND CONVEYANCE STANDARDS OF THE PICKAWAY COUNTY AUDITOR AND THE PICKAWAY COUNTY ENGINEER Melissa A. Betz, Auditor Robert E. Parker, P.E., P.S., Engineer AS ADOPTED UNDER OHIO REVISED CODE SECTION

More information

FINAL PLAT. Community Development Department 8101 Ralston Road Arvada, Colorado 80002

FINAL PLAT. Community Development Department 8101 Ralston Road Arvada, Colorado 80002 FINAL PLAT Community Development Department 8101 Ralston Road Arvada, Colorado 80002 September 2015 FINAL SUBDIVISION PLAT Final Subdivision Plat Review Applications for a Final Plat shall be submitted

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application

More information

Administrative Plat Submittal Checklist (Minor, Development)

Administrative Plat Submittal Checklist (Minor, Development) Planning & Community Development Department 550 Landa Street New Braunfels, Texas 78130 (830) 221-4050 www.nbtexas.org CC/Cash/Check No.: Amount Recd. $ Receipt No.: Case No.: Submittal date office use

More information

DAWSON COUNTY MINOR PLAT REVIEW CHECKLIST $50.00 FEE PER PLAT REVIEW, $5.00 FEE FOR SCAN & CD FOR RECORDING

DAWSON COUNTY MINOR PLAT REVIEW CHECKLIST $50.00 FEE PER PLAT REVIEW, $5.00 FEE FOR SCAN & CD FOR RECORDING DAWSON COUNTY MINOR PLAT REVIEW CHECKLIST $50.00 FEE PER PLAT REVIEW, $5.00 FEE FOR SCAN & CD FOR RECORDING NAME ON PLAT: CONTACT/PHONE #: NAMED STREET/ADDRESS: LAND LOT: DISTRICT: SECTION: ZONING: SETBACKS:

More information

Township of Collier 2418 Hilltop Road Presto, PA 15142

Township of Collier 2418 Hilltop Road Presto, PA 15142 Township of Collier 2418 Hilltop Road Presto, PA 15142 Fees: Major: 2 checks $600 + $50 per lot & $1700 Escrow) APPLICATION FOR SUBDIVISION major FINAL only Plans must be folded Rolled plans will not be

More information

Whitney Ranch, 1 st Filing Annexation UDC P a g e 1

Whitney Ranch, 1 st Filing Annexation UDC P a g e 1 STAFF REPORT - SUMMATION Whitney Ranch, 1 st Filing Annexation CASE NUMBER: UDC-17-00689 SUBDIVISION CODE: HIH 01 PREPARED BY: Eric Hammer PROPOSED CODE: WTRH 01 MEETING DATES: January 2, 2018 Planning

More information

SUBDIVISION APPLICATION: RECOMBINATION PLAT or EXEMPT PLAT

SUBDIVISION APPLICATION: RECOMBINATION PLAT or EXEMPT PLAT SUBDIVISION APPLICATION: RECOMBINATION PLAT or EXEMPT PLAT Pursuant to Article 7, Section 155.706 of the Unified Development Code, an owner of land within the jurisdiction of the Town (or a duly authorized

More information

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20 185 Attachment 20 APPENDIX S Plat No. Date of Submission Twp. Fee $ Dauphin Co. Fee $ TOWNSHIP OF DERRY SUBDIVISION OR LAND DEVELOPMENT PLAN SUBMISSION APPLICATION This block for Twp. use only 1. Title

More information

Certified Survey Review Instructions

Certified Survey Review Instructions DEARBORN COUNTY PLAN COMMISSION County Administration Building, 165 Mary St., Lawrenceburg, IN 47025 Phone (812) 537-8821 Fax (812) 532-2029 Website: www.dearborncounty.org/planning Certified Survey Review

More information

Minutes of the Proceedings Laramie County Planning Commission Prepared by the Laramie County Planning & Development Office Laramie County Wyoming

Minutes of the Proceedings Laramie County Planning Commission Prepared by the Laramie County Planning & Development Office Laramie County Wyoming Minutes of the Proceedings Laramie County Planning Commission Prepared by the Laramie County Planning & Development Office Laramie County Wyoming Thursday, April 10, 2014 140410 00 The Laramie County Planning

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Board of Commissioners Brett Walker, Planner DATE: April 3, 2018 TITLE: Review and action of a PUD

More information

LOCATION MAP: AERIAL PHOTOGRAPH, 2015:

LOCATION MAP: AERIAL PHOTOGRAPH, 2015: LOCATION MAP: AERIAL PHOTOGRAPH, 2015: ORDINANCE NO. AN ORDINANCE OF THE CITY OF BRYAN, TEXAS, AMENDING CHAPTER 130, ZONING, OF THE CITY OF BRYAN CODE OF ORDINANCES, BY CHANGING THE ZONING CLASSIFICATION

More information

APPENDIX B TOWN OF LITTLE COMPTON, RHODE ISLAND INSTRUCTIONS AND CHECKLIST FOR MINOR SUBDIVISION

APPENDIX B TOWN OF LITTLE COMPTON, RHODE ISLAND INSTRUCTIONS AND CHECKLIST FOR MINOR SUBDIVISION APPENDIX B TOWN OF LITTLE COMPTON, RHODE ISLAND INSTRUCTIONS AND CHECKLIST FOR MINOR SUBDIVISION These Instructions and Checklist apply to Minor Subdivisions a residential subdivision resulting in five

More information

APPLICATION FOR PRELIMINARY PLAT CERRO GORDO COUNTY, IOWA

APPLICATION FOR PRELIMINARY PLAT CERRO GORDO COUNTY, IOWA APPLICATION FOR PRELIMINARY PLAT CERRO GORDO COUNTY, IOWA Before subdividing any tract of land and previous to the filing of an Application for conditional approval of the Preliminary Plat, the subdivider

More information

CASE NO.: PLT CASE NAME: BLACKSTONE RANCH, FILING 3

CASE NO.: PLT CASE NAME: BLACKSTONE RANCH, FILING 3 Exhibit 1 - Staff Report COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT TABLE OF CONTENTS CASE NO.: PLT2017-00002 CASE NAME: BLACKSTONE RANCH, FILING 3 EXHIBIT 1 PC Staff Report EXHIBIT 2- Maps 2.1 Aerial

More information

Administrative Application Duplex Subdivisions

Administrative Application Duplex Subdivisions Department of Community Development 75 South Frontage Road Vail, CO 81657 Tel: 970-479-2128 www.vailgov.com Development Review Coordinator Administrative Application Duplex Subdivisions General Information:

More information

SUBDIVISION APPLICATION

SUBDIVISION APPLICATION SUBDIVISION APPLICATION City of Horn Lake Planning Department 3101 Goodman Road, W Horn Lake, MS 38637 662-342-3559 Fax: 662-342-3485 Applications due the 1st working day of the month. Submit application

More information

DAUPHIN CREEK ESTATES SUBDIVISION

DAUPHIN CREEK ESTATES SUBDIVISION # 12 SUB-000076-2017 DAUPHIN CREEK ESTATES SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer):

More information

MINOR SUBDIVISION INFORMATION

MINOR SUBDIVISION INFORMATION A. POINTS OF CONTACT: MINOR SUBDIVISION INFORMATION Surveyor: Address: Phone #: Fax # E-Mail Address: Representative (If different from applicant): Address: Phone #: Fax # E-Mail Address: B. GENERAL INFORMATION:

More information

Group Sewer Only** 80 Ft Frontage* 20,000 Sq. Ft. (.46 acre) Minimum** 120 Ft Frontage* 20,000 Sq. Ft. (.46acre) Minimum** 150 Ft Frontage*

Group Sewer Only** 80 Ft Frontage* 20,000 Sq. Ft. (.46 acre) Minimum** 120 Ft Frontage* 20,000 Sq. Ft. (.46acre) Minimum** 150 Ft Frontage* Residential Lots Minimum Chart The minimum lot size of any minor subdivision where there is no public sewers shall be as shown below or as required by township zoning and/or the Tuscarawas General Health

More information

CITY OF DECATUR, TEXAS

CITY OF DECATUR, TEXAS Final Plat or Amending Plat / Replat Checklist A submittal of a complete application will facilitate a timely review. Failure of the applicant to provide required information or obtain a waiver from the

More information

Plats and subdivisions; mapping requirements. (a) Size Requirements. All land plats presented to the register of deeds for recording in the

Plats and subdivisions; mapping requirements. (a) Size Requirements. All land plats presented to the register of deeds for recording in the 47-30. Plats and subdivisions; mapping requirements. (a) Size Requirements. All land plats presented to the register of deeds for recording in the registry of a county in North Carolina after September

More information