1 External Resettlement Monitoring Report Semi annual Report Mission 3 Octocber, 2013 VIE: STRENGTHENING WATER MANAGEMENT AND IRRIGATION SYSTEMS REHABILITATION PROJECT Subproject: Nhat Trai pumping station in Bac Ninh province Prepared by: The Local Implementation consultant (LIC) Hà Long Investment and Consulting JSC ( Halcom) for the Central Project Office (CPO) Under Ministry of Agriculture and Rural Development (MARD) and the Asian Development Bank (ADB).

2 CURRENCY EQUIVALENTS (As of 31 th December 2012 at Vietcombank) Currency unit vnd VND 1.00 = $ $1.00 = VND 20,815 WEIGHTS AND MEASURES m (Meter) Is the base unit of length m2 (Square meter) A system of units used to measure areas m3 (Volume) A system of units used to measure the spaces, that an object or substance occupies. kg (Kilogram) A decimal unit of weight based on the gram

3 ABBREVIATIONS ADB AH AP BHH CPMO CPO CPC DARD DOLISA DRC DMS DONRE DPC EA EMA IOL LURC MOLISA MONRE MARD PPC PMU RF RP SES Asian Development Bank Affected household Affected person Bac Hung Hai Central Project Management Office Central Project Office Commune Peoples Committee Department of Agriculture and Rural Development Department of Labor, Invalids and Social Assistance District Compensation, Assistance, resettlement Committee Detailed Measurement Survey Department of Natural Resources and Environment District Peoples Committee Executing Agency External Monitoring Agency Inventory of Losses Land Use Rights Certificate Ministry of Labor, Invalids and Social Assistance Ministry of Natural Resources and Environment Ministry of Agriculture and Rural Development Provincial Peoples Committee Project management unit Resettlement Framework Resettlement Plan Socio-Economic Survey

4 VND VWU WRU Vietnamese dong Viet Nam Women s Union Water Resources University This resettlement monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

5 CONTENTS ABBREVIATIONS...3 I. INTRODUCTION...6 I.1. Overview of Project...6 II.2. Findings in Monitoring mission II. MONITORING METHODS AND ARRANGEMENT...8 III. MONITORING RESULTS...9 III.1. In-door works....9 III.2. Dissemination of information...10 III.3. Inventory of loss...11 III.4. Compensation plans...12 III.5. Resettlement for relocated households...16 III.6. Income and living restoration...16 III.7. Complaints and grievance redress...16 IV. CONCLUSION AND RECOMMENDATIONS...17 IV.1. Conclusion...17 IV.2 Recommendations...17 V. Appendix: Photograph of Doan Thuong pump station September

6 I. INTRODUCTION I.1. Overview of Project 1. Based on the Decision No. 1399/QD-BNN-TCTL on June 14, 2012 of MARD on the approval of Nhat Trai Pumping Station Sub-Project in Luong Tai district, Bac Ninh province in "Strengthening irrigation management and improvement of irrigation system" project funded by ADB and AFD (ADB5). Nhat Trai Pumping Station is designed together with Vang II and Van Thai A pumping stations for drainage for ha of Gia Thuan subregion in Bac Ninh province as well as to improve the ecological environment in the project area. Pumping station is designed with the flow of 30 m 3 /s. In addition, the sub-project also includes items such as discharge tank, discharge sewer through dike, channel and two-storey administration house. In addition, the sub-project build on the transferring channel to the Station with the length of 1.683m and a number of other internal items. 2. According data provided by PMU in September 2013, the construction of Nhat Trai pumping station affect 03 communes: Lai Ha, Minh Tan, Trung Xa. Total number of affected households is 299 households with affected people. There were 80 severely affected households (losing from and more than 10% of land/assets), 07 poor households. Summary of project affected households and severely affected households in each commune of the project as follows: Table 1: Number of affected households No. Communes Number of Number of Number of Number of Number of affected severely slightly vulnerable poor households affected affected households households households households 1 Trung Xa Lai Ha Minh Tan Total Source: PMU s data - September/ Impact on land: According to statistics for the RP approved by ADB, the subproject of Nhat Trai pumping station will require land acquisition of m2 including m2 of tranferring land into residential land; m2 of agricultural land; m2 of traffic and irrigration land. Detail of impact will be described as follows: 6

7 Table 2: Land impact Impact type Trung Xa Minh Tan Total Unit: m2 Agricultural land managed by households Agricultural land managed by the commune Transferring land into residential land Traffic and Irrigration land Total Source: DCARC s data - 10/ Temporarily affected land during construction: The construction will impact on m2 of agricultural land and m2 of traffic and irrigration land. 5. Impact on assets and crops: - 05 households will have houses, kitchen and warehouses affected with the total area of 160m2. - Some structures will be affected such as water tanks, wells, cement yard, walls etc. - Affected crops are mainly carrots ( m2), affected plantings are mainly banana, bamboo, eucalyptus with a total of 1571 trees etc. II.2 Findings in Monitoring mision 2 6. Until March, 2013; 100% affected households in the first phase received the compensation. The PMU and the DCARC conducted the resettlement process as outlined in the resettlement plan and the Government's Decree 69/2009/ND-CP without any complaint and grievance. 7. The stage of information dissemination and inventory has the participation and representation of the APs and stakeholders. The internal monitoring of the first quarter of 2013 was undertaken by PMU according to CPO s form. The internal report has been prepared with full information, which reflects the resettlement implementation progress as well as problems to be solved. Data is stored at the DCARC s and the PMU s offices in document and the database on the computer to serve management and reporting. 8. Compensation payment to affected people in phase 2 has not been implemented because 7

8 there are still some pending issues (1) ditch irrigation system manufacturers serving the area across the river (about 7,000 m2), (2) determine specific location for a bridge to the cemetery, (3) solutions for the local pump station when under project impact, (4) some AHs requested to check again their area of land devided by Board of Land Consolidation. 9. The compensation plans for 82 affected households in Minh Tan commune is being recalculated. The province is conducting land valuation for the affected households. 10. IMO will monitor the payment of phase 2&3 and reflect findings in the next monitoring report 11. After the second monitoring phase, the Consultant made some recommendations as follows: To start the construction of the subproject as proposed schedule, the PMU and DCARC need to accelerate the progress to settle all remaining issues and complete the compensation payment in April Through consultation and interviews with AHs, IMO saw some remaining issues need to be settled as following: - Some HHs with their total area of unacquired land of 7000m2 will face difficulty when continue their cultivation due to lack of water sources. - The specific location of the bridge is under selection process. The location must be suitable for both communes of Nhat Trai and Nhi Trai. So far, the agreement with HHs has not been reached. - Solution for the local pump station when it is affected by the project; - Some AHs requested to check again their area of land devided by Board of Land Consolidation. PMU representative said that: PMU and DCARC agreed to assign for local authority to replan the ditch irrigation system of the area so as to make it more convenient for cultivation. II. MONITORING METHODS AND ARRANGEMENT II.1. Methodology 12. Consultants have used a combination of different methods to monitor for both qualitative and quantitative information. The main methods included focus group discussions, questionnaire survey, literature review and interviews. In addition, consultants also combine 8

9 observations to learn more about the living conditions of the affected households and the actual field progress. 13. The preparation for the monitoring stage was conducted in the weeks from 03/09/2013 to 08/09/2013. In the Consultant s office, the experts of the monitoring team prepared the monitoring tools reviewed the remaining issues of the subproject from the previous mission and prepared the monitoring tools for the monintoring mission 3, including guidance for in-depth interviews and group discussions, research of URP documents related to the project compensation. The field monitoring in three provinces of Hung Yen, Bac Ninh and Hai Duong is started from 9/92013 to 16/9/ On 12/9/2013, consultants worked with PMU of ADB5 subprojects in Bac Ninh province; update information from the monintoring mission 2 (if any), find and collect data of arising issues (if any), solutions for the monitoring mission 3. Consultants conducted field consultations, indepth interviews with AHs from 3 communes in the project area; observerd and visited the site of construction. 15. On 13/9/2013, after completing the site monitoring, the monitoring team worked with the PMU of ADB5 subprojects in Bac Ninh province for the discussion of the monitoring contents. 16. According to information obtained from the PMU of ADB5 and Luong Tai DCARC. The compensation is divided into three phases. In which, all 165 households in the first phase in Trung Xa and Minh Tan communes received compensation and until now, there is no complaints and grievances. 100% of AHs(94) of Trung Xa commune were compensatedin the second phase.. The third phase included 40 AHs (82 land lots). PPC of Bac Ninh issued a Decision No. 775/QD-UBND dated 4/7/2013 on approving the land prices to make it households. and as a basis for establishing compensation estimation for affected 17. Based on this situation, the Consultant conducted field monitoring and public consultation with representatives of the households in the first, second and third phases. Consultants conducted public consultations with 25 representatives of affected households. In which, 7 HHs are from the first phase; 13 from the second phase. ; Consultants conducted indepth interviews with representatives of 05 affected households from the third phase.. III. MONITORING RESULTS III.1. In-door works. 18. The DMS has been completed for affected households in 03 phases. The survey households all agree with inventory data completed by the DCARC. The DMS record 9

10 was signed by the affected household. 19. PMU in collaboration with Luong Tai DCARC conducted compensation for households in the first and second phases. Overall, the compensation process was conducted according to the stages prescribed in Decree 69/2009/CP and approved RP as well as provincial regulations. 20. The DMS records and approved compensation plan, list and decision on land acquisition and land acquisition decision for each individual were fully stored in PMU s and CDARC s offices. The inventory records of assets and land status had full signatures of the participants and representatives of affected households. 21. Compensation for affected households (259 AHs) in the first and second phases were completed. All 259 affected households have received compensation money and signed on the paylist. There is no complaints and grievances. 22. Compensation for the third phase included 40 households/82 landlots in Minh Tan commune. DMS for these HHs were completed. At the IMO mission 3, PPC of Bac Ninh issued Decision No.775/QD-UBND on applying residential land price for these HHs. PMU in collaboration with DCARC are preparing to publicize the Compensation Plan. PMU of Bac Ninh province is expected to complete all procedures so as to make compensation payment in October 2013; the construction will be started in the end of Internal report on new form issued by the CPO was prepared by PMU and submitted to CPO in the first quarter of This new form of report presents the details of the household, which is summarized in general data and schedule as well as the emerging issues and recommendations. According to PMU expectation, internal report will be submitted to CPO the second time by PMU after completing the compensation payment for AHs from the third phase(expected to be in October/2013). III.2. Dissemination of information 24. Project disclosure as well as its stages of resettlement and compensation and compensation plan was conducted by the PMU and Luong Tai DCARC. As a result of public consultation and survey questionnaire, 25/25 of the affected households said they were informed about the Project and understood the project policies. 25. Survey results about the participation of HHs into the project activities showed that HHs were informed in advance and engaged in activities related to DMS. Regarding to the selection of compesation options, 4/25 slightly AHs on their agricultural land said they did not care about this, because their affected area is really inconsiderable. 10

11 26. Compensation Plan for AHs in the first and second phases were posted publicly at the CPC headquarter. After the publicity, 100% of households has reviewed and signed on the minutes of the compensation calculation. 27. Conclusion: the dissemination of the project information to AHs were conducted following the regulations of the Government and ADB. AHs were aware of the project information, policies as well as their benefits. They actively participated and created favourable conditions for the project implementation. III.3. Inventory of loss 28. The inventory of affected land and assets has been completed for the affected households of the first, second and third phases. At the public consultation meetings and deep interviews, the affected households said they agreed with the inventory data conducted by the CARC. They did not have any inquiries, complaints and lawsuits against the inventory results. Inventory records were certified by affected households. Survey results also showed that 25/25 of households said DMS was correct. 29. AHs HHs were informed in advance and engaged in activities related to DMS. The result of AHs participation is described in the following table: Table 3: Affected households participation in project activities No. Content Yes Answer No 1. Participate in project disclosure and public consultation Informed DMS time Participated in DMS Is the DMS accurate? Reviewed and signed on the DMS form Discussed about the compensation plans Reviewed the calculation record At the public consultation, people expressed their agreement with the DMS result. Communal officials informed us the DMS time. I participated in the DMS team. I reviewed the result and signed the minute of confirmation. I saw the DMS result was correct, (said a AHs of Trung Xa commune.) 11

12 31. Conclusion: The DMS of land and assets of HHs was conducted publicly and in a transparent manner under the regulations stated in Decree 69/CP and RP. III.4. Compensation plans III.4.1. Legal framework and compensation baseline 32. The legal framework and the main basis for compensation is the Policy Framework of the Resettlement Plan the ADB approved. The Policy Framework is developed based on the legislation of the Government of Viet Nam and the ADB's policy relating to the involuntary land acquisition and resettlement as well the solutions for the differences between both of them. 33. Besides, the compensation progress will applied some decisions as follows: Decision No. 155/2011/QD-UBND on Dec 22, 2011 of the Bac Ninh PPC on the regulation of land prices in the province in Decision No. 171/2009/QD-UBND on Dec 18, 2009 of Bac Ninh PPC on issuing a Regulation of the implementation content of some Decrees of the Government on compensation, assistance and resettlement when the State recovers land in Bac Ninh province and Decision No. 157/2011/QD-UBND on Dec 27, 2011 on amending Clause 1, Article 10 of the Regulation issued together with the above Decision 171/2009/QD-UBND. Decision No. 157/2010/QD-UBND on Dec 17, 2010 of Bac Ninh PPC on the decision on unit price for specified crops and aquaculture when the State recovers land. Decision No. 652/QD-UBND on May 28, 2012 on the promulgation of unit price for houses and structures regarding resettlement and compensation activities in Bac Ninh province. III.4.2. Compensation Prices 34. The unit price applied for compensation and assistance (phase 2) and the unit price in accordance with conversion price survey in RP are summarized in the following table: Table 4: Unit prices for compensation and the unit price in accordance with replacement price survey in RP No. Items Unit prices for compensation (VND/m2) Unit prices in accordance with replacement price survey (VND/m2) 12

13 No. Items Unit prices for compensation (VND/m2) Unit prices in accordance with replacement price survey (VND/m2) 1 Permanent agricultural land acquisition 2 Compensation for crops on acquired land during construction time N/A 3 Agricultural land of the commune Plantings (VND/unit) (Source: IMO s mission 2 report 3/2013) 35. The compensation unit prices applied for HHs in the third phase are summarized in the following table: Table 5. Unit prices for compensation and the unit price in accordance with replacement price survey in RP No. Items Unit price for compensation (VNĐ/m2) Unit price in accordance with replacement unit price survey in RP (VNĐ/m2) 1 Land for growing other annual trees Land for aqua raising Rural residential land crops In comparision with the price unit of the PPC for the AHs in the third phase, the 13

14 compensation price for crops and trees which DCARC of Luong Tai are submitting to DPC for approval is appropriate to the RP. And the unit price applied for HHs in the third phase by Bac Ninh PPC was established following the current prices of various types of land. 37. Through consultation with the local governments (representatives of the CPC, staff of DCARC, PMU), the applied price unit is suitable with the local replacement cost. The interviewed AHs agreed with the compensation pice which had complied with the local price. In a public consultation, a resident of HHs from the third phase of Minh Tan commune said We see the applied compensation is suitable with the current market price. Satisfied compensation helps us have enough money to repair our houses and develop our family economy. My family agreed and had no complaints about the compensation price. (said a of AH in Minh Tan commune.) III.4.3. Assistances 38. Allowances for severely affected households did not established in the compensation plan for affected households in the first phase because there was no severely affected household 39. Allowances for affected households in the second and third phases are summarized in the following table: Table 6. Summarise of allowances for the first and second phases No. Subjects Application I HHs with high risk of poor/difficulties due to losing land and assests Special assistances will be provided for HHs of social policies and HHs with sepcial difficulties under the regulations (30kg of rice/a month for every person x 6 months). II III Vulnerable households (HHs headed by women,...) Livelihood stabilization Assistances equivalent of 30kg of rice /a person x 24 months 30kg of rice/a person x 6 months for HHs aquired from 10 30% of their agricultural land; 30kg of rice/a person x 9 months for HHs aquired from 30 70% of their agricultural land; (Source: Data provided by PMU July/2013) 14

15 40. The consulted HHs in the second phase said they received the project assistances. I saw all the compensation amount for my family in the compensation calculation table. I saw the compensation for land, trees and other assistances. I am satisfied with the compensation. The more compensation the project made, the better AHs feel, (said a woman of AH in Minh Tan commune.) 41. Conclusion: Assistances applied in the Compensation, Assistance and Resettlement Plan are suitable with policies stated in RP of the project. III.4.4. Compensation plan approval Compensation cost 42. Compensation for affected households at the first phase is approved through Decision No. 2514/QD-UBND on Dec 25, According to this decision, (1) land acquisition area is m2, (2) compensation area for land is m2, (3) compensation fund and assistance is VND. 43. Compensation for affected households in the second phase was approved in Decision No QD-Committee on Dec 28, 2012 of Luong Tai District PC. According to this decision, (1) land acquisition area is m2, (2) land compensation and assistance fund is m2, (3) compensation fund and assistance is 9,218, VND. 44. Compensation Plan for affected households in the third phase: At the monitoring mission 3(september/2013), the Compensation, Assistance and Resettlement Plan was being completed by DCARC and prepared to be publicized. III.4.5. Compensation payment 45. Phase 1: The compensation payments were conducted for affected households in the first phase, to compensate for phase 1 households. Through public consultation, 100% of households received cash compensation and handed over the site to the PMU; 100% of households is satisfied with compensation plans and recommends that the project should be quickly implemented to ensure its schedule and the mitigation of negative impacts on the lives of people like dust, noise etc. 46. Phase 2: Compensation payment were made to 94 affected households in Trung Xa commune. AHs agreed with PMU on the issues: (i) adding some welfare works such as: Irrigation systems for production over the area across the river (7.000m2); (ii) Identify comprehensive position for the bridge to the cemetery: the project is planned to build the bridge with 3m width and 39m length with about 5 billion fund. However, people believe that the bride location is not reasonable; (iii) Plan for dealing with the local pumping station when under project impact; (iv) Some AHs requested to check again their area of land devided by Board of Land Consolidation in

16 47. My family received the compensation money from the project. I think the payment is undertaken accurately. PMU considered and settled satisfactorily our proposals. I hope the project will be implemented soon bringing benefit to the local production, ( said a man in Trung Xa commune.) 48. Stage 3: Total of 42 HHs with 82 affected land lots in Minh Tan commune are under the process of completing Compensation, Assistance and Resettlement Plan. PMU is expected to make compensation payment in October/2013. III.5. Resettlement for relocated households 49. There are no relocated households in all records of 03 phases. III.6. Income and living restoration HHs received the compensation money. However, the project has not carried out the site clearance so far. HHs are still cultivating temporarily on the affected land. 51. According to the monitoring result, the project has not had any negative impact on the income and livelihood of AHs so far. AHs on agricultural land are still cultivating and harvesting on the affected area. 52. The early compensation helps AHs actively have plan to spend the money effectively like investing into their own business to develop family economy; paying for children education; paying for the family healthcare, etc. 53. Answering the interviews, 100% of interviewed HHs said that the project had no negative impact on their income. III.7. Complaints and grievance redress 54. According to the information obtained from the PPMU, the District Compensation, Assistance and resettlement Committee and the CPC, during the implementation, there are no written complaints from the affected households. 55. AHs proposed some following issues: (i) adding some welfare works such as: Irrigation systems for production over the area across the river (7.000m2); (ii) Identify comprehensive position for the bridge to the cemetery: the project is planned to build the bridge with 3m width and 39m length with about 5 billion fund. However, people believe that the bride location is not reasonable; (iii) Plan for dealing with the local pumping station when under project impact; (iv) Some AHs requested to check again their area of land devided by Board of Land Consolidation in 2010 These issues were condisered and settled appropriately by PMU and involved agencies. 56. Regarding some questions on the inventory of crops and plants from households, the 16

17 Mission Team timely explained to them. All affected households the Monitoring Team interviewed and collected information do not have any questions and complaints whatsoever. IV. CONCLUSION AND RECOMMENDATIONS IV.1. Conclusion 57. Until September, 2013; 100% affected households in the first and second phases received the compensation money. The PMU and The DCARC conducted the resettlement process as outlined in the resettlement plan and the Government's Decree 69/2009/ND-CP without any complaint and grievance. 58. The stage of information dissemination and inventory has the participation and representation of the APs and stakeholders. Data is stored at the DCARC s and the PMU s offices in document and the database on the computer to serve management and reporting. 59. During the time of establishing Compensation, Assistance and Resettlement Plan for AHs in the third phase, PMU, DCARC of Luong Tai and other stakeholders identified the owners of 82 affected landlots in Minh Tan commune. Hence, there are 40 AHs with the total of 82 affected landlots. The compensation plan for these HHs are being completed following the new unit price issued by PPC. 60. PMU will submit the second internal report to CPO after completing the third payment(expected in October/2013). 61. IMO will monitor the payment of phase 3 and reflect findings in the next monitoring report. IV.2 Recommendations 62. For the launching on project's progress, PMU and DCARC need to address existing and completed compensation payments in November, Keeping the dissemination of information to AHs; It is needed to have timely explaination to complaints of the local people. 17

18 V. Appendix: Photograph of Nhat Trai pump station September

Viet Nam: Secondary Cities Development Project - Buon Ma Thuot Subproject

Viet Nam: Secondary Cities Development Project - Buon Ma Thuot Subproject Resettlement Monitoring Report Semi-Annual Report January 2017 Viet Nam: Secondary Cities Development Project - Buon Ma Thuot Subproject Prepared by Nguyen Van Trung, External Resettlement Monitoring Consultant,

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Lines

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Lines Social Monitoring Report Quarter Report April June 2015 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Lines Prepared by the Southern Vietnam Power Projects

More information

Viet Nam: Central Region Rural Water Supply and Sanitation Sector Project

Viet Nam: Central Region Rural Water Supply and Sanitation Sector Project Resettlement Plan July 215 Viet Nam: Central Region Rural Water Supply and Sanitation Sector Project WATER SUPPLY AND SANITATION OF TIEN LOC COMMUNE HAU LOC DISTRICT, THANH HOA PROVINCE Prepared by National

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized HAI PHONG DEPARTMENT OF TRANSPORT RP1035 V. 3 PROJECT MANAGEMENT UNIT OF REGIONAL TRANSPORT

More information

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT Village Roads Component on the GAUNGXI ROADS DEVELOPMENT II PROJECT in THE PEOPLE S REPUBLIC OF CHINA (PRC) Guangxi Comnications Department Nanning, PRC This report was prepared by the Borrower and is

More information

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION

More information

VIE: Yen Vien-Lao Cai Railway Upgrading Project

VIE: Yen Vien-Lao Cai Railway Upgrading Project Social Monitoring Report Semi-Annual Report June 2014 VIE: Yen Vien-Lao Cai Railway Upgrading Project External Monitoring Report on RP Implementation Lao Cai Province Prepared by Railway Projects Management

More information

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Ho Chi Minh City)

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Ho Chi Minh City) Social Monitoring Report 3 rd Monitoring Report January 2015 VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Ho Chi Minh City) Prepared by the Central

More information

DRAFT EXECUTIVE SUMMARY

DRAFT EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT EXECUTIVE SUMMARY IPUH - BANTAL (LINK 015.1) KABUPATEN MUKO-MUKO YEAR 2010 EXECUTIVE

More information

Viet Nam: Central Region Small and Medium Towns Development Project Khanh Hoa Province

Viet Nam: Central Region Small and Medium Towns Development Project Khanh Hoa Province Resettlement Planning Document Resettlement Plan Document Stage: Draft for Consultation Project Number: 30286 June 2006 Viet Nam: Central Region Small and Medium Towns Development Project Khanh Hoa Province

More information

DA NANG QUANG NGAI EXPRESSWAY PROJECT

DA NANG QUANG NGAI EXPRESSWAY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Transport Vietnam Expressway Corporation DA NANG QUANG NGAI EXPRESSWAY PROJECT

More information

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4 Vietnam: Transmission

More information

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PIP annex 9 - C of GEF Hai Basin Integrated Water and Environment Management Project

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP275 Socialist Republic of Vietnam Ministry of Transport and National Traffic Safety

More information

SUB-PROJECT: OVERHEAD LINE BAY EXTENSION AT 500kV QUANG NINH SUBSTATION AND 500kV HIEP HOA SUBSTATION

SUB-PROJECT: OVERHEAD LINE BAY EXTENSION AT 500kV QUANG NINH SUBSTATION AND 500kV HIEP HOA SUBSTATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL POWER TRANSMISSION CORPORATION CENTRAL VIETNAM POWER PROJECT MANAGEMENT BOARD RESETTLEMENT PLAN (RP) SUB-PROJECT:

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LAO PDR: AGRICULTURAL DEVELOPMENT PROGRAM RP-59 POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT

More information

NATIONAL POWER TRANSMISSION CORPORATION SOUTHERN POWER PROJECT MANAGEMENT BOARD RESETTLEMENT PLAN (RP) SUBPROJECT:

NATIONAL POWER TRANSMISSION CORPORATION SOUTHERN POWER PROJECT MANAGEMENT BOARD RESETTLEMENT PLAN (RP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL POWER TRANSMISSION CORPORATION SOUTHERN POWER PROJECT MANAGEMENT BOARD -------------------------------

More information

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2 Resettlement Plan March 2018 Indonesia: Neighborhood Upgrading and Shelter Project Phase 2 Prepared by the City of Kendari and Directorate General of Human Settlements, Ministry of Public Works and Housing

More information

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN Project Number: 42039-035 August 2012 Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program PLEIKU-MY PHUOC-CAU

More information

RESETTLEMENT POLICY FRAMEWORK (RPF)

RESETTLEMENT POLICY FRAMEWORK (RPF) SOCIALIST REPUBLIC OF VIET NAM MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT ============================================= MEKONG DELTA INTEGRATED CLIMATE RESILIENCE AND SUSTAINABLE LIVELIHOODS PROJECT

More information

REPUBLIC OF MACEDONIA

REPUBLIC OF MACEDONIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Municipal Services Improvement Project (MSIP) LAND ACQUISITION

More information

Social Due Diligence Report

Social Due Diligence Report Social Due Diligence Report Can Giuoc District Province of Long An September 2013 VIE: GMS Ben Luc - Long Thanh Expressway Project Prepared by Vietnam Expressway Corporation for the Asian Development Bank.

More information

VIET NAM: CENTRAL MEKONG DELTA REGION CONNECTIVITY PROJECT DUE DILIGENCE REPORT FOR USE OF ADB FUNDS FOR LAND ACQUISITION AND RESETTLEMENT

VIET NAM: CENTRAL MEKONG DELTA REGION CONNECTIVITY PROJECT DUE DILIGENCE REPORT FOR USE OF ADB FUNDS FOR LAND ACQUISITION AND RESETTLEMENT VIET NAM: CENTRAL MEKONG DELTA REGION CONNECTIVITY PROJECT DUE DILIGENCE REPORT FOR USE OF ADB FUNDS FOR LAND ACQUISITION AND RESETTLEMENT February 2013 A. Introduction 1. Under the ADB Policy on Cost

More information

VOLUME 3 RESETTLEMENT PLAN PHU THO PROVINCE VIETNAM ADDITIONAL FINANCING TO RURAL ENERGY 2 PROJECT VOL. 4 ELECTRICITY OF VIETNAM POWER COMPANY NO1

VOLUME 3 RESETTLEMENT PLAN PHU THO PROVINCE VIETNAM ADDITIONAL FINANCING TO RURAL ENERGY 2 PROJECT VOL. 4 ELECTRICITY OF VIETNAM POWER COMPANY NO1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ELECTRICITY OF VIETNAM POWER COMPANY NO1 POWER CONSTRUCTION CONSULTING CENTER NO1 VOL.

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM HO CHI MINH CITY PEOPLE S COMMITTEE INVESTMENT MANAGEMENT

More information

Social Safeguards Due Diligence Report

Social Safeguards Due Diligence Report Social Safeguards Due Diligence Report June 2018 IND: Bihar State Highways III Project Establishment of Bihar Road Research Institute Prepared by Bihar State Roads Development Corporation Limited, Government

More information

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose Expropriation Context Following from the goal of the National Land Policy, to promote and ensure a secure land tenure system that is transparent, effective, non-discriminative, equitable and just ; it

More information

Resettlement and Ethnic Minority Development Plan

Resettlement and Ethnic Minority Development Plan Resettlement and Ethnic Minority Development Plan November 2015 VIE:The Second Northern Greater Mekong Subregion Transport Network Improvement Project NH217 Improvement, Thanh Hoa Province Ba Thuoc Section

More information

PRC: Fujian Soil Conservation and Rural Development II Project

PRC: Fujian Soil Conservation and Rural Development II Project Resettlement Monitoring Report Project Number: 33439-013 July 2012 PRC: Fujian Soil Conservation and Rural Development II Project Prepared by Research Institute of Agricultural Economy, Fujian Academy

More information

DECREE GENERAL PROVISIONS

DECREE GENERAL PROVISIONS THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness --------------- No: 44/2014/ND-CP Hanoi, May 15, 2014 DECREE REGULATIONS ON LAND PRICES Pursuant to Law on Government

More information

KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan 12110

KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan 12110 KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan 12110 LARP IMPLEMENTATION REPORT For Regional Roads Development Project West Kalimantan

More information

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Project preparation under the PDF-B grant RP337

More information

SUB-PROJECT. BINH SON 110kV SUBSTATION AND TEE-OFF RESETTLEMENT PLAN

SUB-PROJECT. BINH SON 110kV SUBSTATION AND TEE-OFF RESETTLEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ELECTRICITY VIETNAM SOUTHERN POWER CORPORATION ---------------------------------------------------

More information

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project)

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project) Resettlement Plan October 2014 GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project) Prepared by United Water Supply Company of Georgia LLC of the Ministry

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document June 2012 Pakistan: Sindh Cities Improvement Investment Program (SCIP) Prepared by North Sindh Urban Services Corporation Limited for the Asian Development Bank. PFR-2 Annex-11

More information

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND (DRAFT) Public Disclosure Authorized RP337 v2 LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND Public Disclosure Authorized Public

More information

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Land Acquisition

More information

Port Moresby Power Grid Development Project.

Port Moresby Power Grid Development Project. Social Monitoring Report Semi-annual Report March 2017 Port Moresby Power Grid Development Project. Reporting period: July to December 2016. Prepared by PNG Power Limited for the Asian Development Bank.

More information

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS MINISTRY OF EDUCATION GOVERNMENT OF NEPAL August 2011 2 A. Introduction 1.

More information

RESETTLEMENT POLICY FRAMEWORK (RPF)

RESETTLEMENT POLICY FRAMEWORK (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JANUARY 2013 Republic of Mozambique Mozambique Climate Resilience: Transforming Hydro-Meteorological

More information

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Summary of Land Acquisition Policy Framework JAMAICA: JM Hurricane Dean ERL Project RP607

More information

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project Land Acquisition/Resettlement Framework Project Number: 46453 March 2014 Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project Prepared by the Ministry of Finance and

More information

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors. SUMMARY LAND ACQUISITION PLAN Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the RURAL ROADS SECTOR I PROJECT in INDIA Ministry of Rural Development

More information

SOCIALIST REPUBLIC OF VIET NAM ELECTRICITY OF VIET NAM POWER ENGINEERING CONSULTING COMPANY I. Project: Project: Project: 51.

SOCIALIST REPUBLIC OF VIET NAM ELECTRICITY OF VIET NAM POWER ENGINEERING CONSULTING COMPANY I. Project: Project: Project: 51. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PECC I RP82 V. 7 SOCIALIST REPUBLIC OF VIET NAM ELECTRICITY OF VIET NAM POWER ENGINEERING

More information

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION RP762 v30 1. Information About Project Name &Location of Subproject Project Sponsor Project Cost Installed Generation

More information

PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program

PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Resettlement Due Diligence Report Project Number: 50050 September 2016 PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Prepared by the Guangxi Zhuang Autonomous Region Government

More information

Land Acquisition and Compensation Plan. Lao PDR: Small Towns Water Supply and Sanitation Sector Project

Land Acquisition and Compensation Plan. Lao PDR: Small Towns Water Supply and Sanitation Sector Project Land Acquisition and Compensation Plan Lao PDR: Small Towns Water Supply and Sanitation Sector Project Songkhone July 2008 Prepared by: Lao Ministry of Public Works and Transport The Land Acquisition and

More information

AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals

AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals Due Diligence Report April 2013 AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals Prepared by for the Ministry of Finance and the Asian

More information

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK BACKGROUND MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK The objective of the above project is to support municipal development in a sustainable manner. To this end, the project will a) support

More information

NORTH-SOUTH ROAD CORRIDOR INVESTMENT PROGRAM TRANCHE 3 (Talin-Lanjik and Lanjik-Gyumri), SUBSECTION 2

NORTH-SOUTH ROAD CORRIDOR INVESTMENT PROGRAM TRANCHE 3 (Talin-Lanjik and Lanjik-Gyumri), SUBSECTION 2 ECONOMIC DEVELOPMENT AND RESEARCH CENTER NORTH-SOUTH ROAD CORRIDOR INVESTMENT PROGRAM TRANCHE 3 (Talin-Lanjik and Lanjik-Gyumri), SUBSECTION 2 IMPLEMENTATION OF LAND ACQUISITION AND RESETTLEMENT PLAN COMPLIANCE

More information

People s Republic of China: Gansu Tianshui Urban Infrastructure Development Project

People s Republic of China: Gansu Tianshui Urban Infrastructure Development Project Resettlement Plan July 2013 People s Republic of China: Gansu Tianshui Urban Infrastructure Development Project Prepared by Tianshui Urban Construction Investment Group Co. Ltd. for the Asian Development

More information

Vietnam Land Administration - the Past, Recent and for the Future

Vietnam Land Administration - the Past, Recent and for the Future Mr. Ton Gia Huyen, Former Director General of General Department of Land Administration and Mrs. Tran Thi Minh Ha, Director of International Relation Department, Ministry of Natural Resources and Environment,

More information

India: Madhya Pradesh Irrigation Efficiency Improvement Project. Subproject: Pipeline Distribution System for 500 Hectares of Command Area

India: Madhya Pradesh Irrigation Efficiency Improvement Project. Subproject: Pipeline Distribution System for 500 Hectares of Command Area Madhya Pradesh Irrigation Efficiency Improvement Project (RRP IND 45371) Resettlement Plan/Land Acquisition Plan (This document is prepared in accordance to the ADB Resettlement Plan Requirement as described

More information

Surabaya River Improvement Project (II-1)

Surabaya River Improvement Project (II-1) Indonesia 1. Project Profile and Japan s ODA Loan (1) Background Surabaya River Improvement Project (II1) Report Date: June 2 Field Survey: February 2 When this project was planned in 199, the city of

More information

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency

More information

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Vision Contribute to overall development of the nation and its citizens by creating conducive

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document Land Acquisition and Resettlement Plan (LARP) for Mirishkor Subproject Document Stage: Final Project Number: UZB: 2208 July 2009 UZB: Kashkadarya and Navoi Rural Water Supply

More information

LAND POLICY - THE TURN POINT TO THE RENOVATION IN VIETNAM

LAND POLICY - THE TURN POINT TO THE RENOVATION IN VIETNAM LAND POLICY - THE TURN POINT TO THE RENOVATION IN VIETNAM Prof. Dr.Sc. Dang Hung Vo M.Sc. Do Duc Doi Ministry of Natural Resources & Environment I. GENERAL OVERVIEW Before 1986, when Vietnam s economy

More information

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PT PLN (Persero) INDONESIA POWER SECOND TRANSMISSION DEVELOPMENT PROJECT (IPTD-2) RP1232

More information

Land Acquisition and Resettlement Plan Corrective Action Plan

Land Acquisition and Resettlement Plan Corrective Action Plan Land Acquisition and Resettlement Plan Corrective Action Plan Faizabad Baharak Road Project Prepared in February 2018 Grant 0261/0262-AFG: Transport Network Development Investment Program Tranche 1 Prepared

More information

RURAL DISTRIBUTION PROJECT

RURAL DISTRIBUTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ELECTRICITY OF VlET NAM POWER COMPANY 3 VOL 33 RURAL DISTRIBUTION PROJECT COMPONENT PROJECT

More information

MINISTRY OF HEALTH CAN THO PROVINCIAL HEALTH DEPARTMENT CAN THO PROVINCE. Resettlement Action Plan (RAP) DRAFT JANUARY 2002 CAN THO JANUARY 2002

MINISTRY OF HEALTH CAN THO PROVINCIAL HEALTH DEPARTMENT CAN THO PROVINCE. Resettlement Action Plan (RAP) DRAFT JANUARY 2002 CAN THO JANUARY 2002 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF HEALTH CAN THO PROVINCIAL HEALTH DEPARTMENT VETNAM: REGIONAL BLOOD TRANSFUSION

More information

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis: Code No: 1.9 Social Screening and Impact Assessment for Sub Projects A. Sub Project Description: Proposed Activity Walkability and Parking Improvements Lotus Road Implementing Agency: Colombo Municipal

More information

Draft Land Acquisition and Resettlement Framework. Cambodia: National Solar Park Project

Draft Land Acquisition and Resettlement Framework. Cambodia: National Solar Park Project National Solar Park Project (RRP CAM 51182) Draft Land Acquisition and Resettlement Framework September 2018 Cambodia: National Solar Park Project Prepared by the Electricité Du Cambodge for the Asian

More information

DECREE GENERAL PROVISIONS DETAILED REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT UPON LAND EXPROPRIATION BY THE STATE

DECREE GENERAL PROVISIONS DETAILED REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT UPON LAND EXPROPRIATION BY THE STATE THE GOVERNMENT -------- SOCIALIST REPUBLIC OF VIETNAM Independence Freedom - Happiness ---------------- No.: 47/2014/NĐ-CP Hanoi, May 15, 2014 DECREE REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Resettlement Due Diligence Report Project Number: 46391-001 March 2017 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh City Power Corporation for the Asian

More information

PAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing

PAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing

More information

Chapter 24 Saskatchewan Housing Corporation Housing Maintenance 1.0 MAIN POINTS

Chapter 24 Saskatchewan Housing Corporation Housing Maintenance 1.0 MAIN POINTS Chapter 24 Chapter 24 Saskatchewan Housing Corporation Housing Maintenance 1.0 MAIN POINTS The Saskatchewan Housing Corporation s maintenance of the 18,300 housing units it owns is essential to preserve

More information

Due Diligence Report on Social Safeguards. IND: Rural Connectivity Investment Program Projects I and II

Due Diligence Report on Social Safeguards. IND: Rural Connectivity Investment Program Projects I and II Due Diligence Report on Social Safeguards December 2015 IND: Rural Connectivity Investment Program Projects I and II Rural Road Network Management Unit in Midnapur, West Bengal Prepared by Ministry of

More information

Indonesia: Metropolitan Sanitation Management Investment Project

Indonesia: Metropolitan Sanitation Management Investment Project Resettlement Plan June 2013 Indonesia: Metropolitan Sanitation Management Investment Project Land Acquisition and Resettlement Plan PEKANBARU CITY OFF-SITE WASTEWATER COLLECTION SYSTEM AND TREATMENT (FINAL)

More information

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project I. Introduction The overall length of the road network in Albania totals

More information

Draft Land Acquisition and Resettlement Plan (LARP) TAJ: CAREC Corridors 2, 5 and 6 (Dushanbe-Kurgonteppa) Road Project

Draft Land Acquisition and Resettlement Plan (LARP) TAJ: CAREC Corridors 2, 5 and 6 (Dushanbe-Kurgonteppa) Road Project Draft Land Acquisition and Resettlement Plan (LARP) Project Number: 49042-004 August 2016 TAJ: CAREC Corridors 2, 5 and 6 (Dushanbe-Kurgonteppa) Road Project Prepared by the Ministry of Transport. This

More information

Land Use Rights Transfer and Cooperation Agreements Due Diligence Report. PRC: Fujian Farmland Sustainable Utilization and Demonstration Project

Land Use Rights Transfer and Cooperation Agreements Due Diligence Report. PRC: Fujian Farmland Sustainable Utilization and Demonstration Project Land Use Rights Transfer and Cooperation Agreements Due Diligence Report Project Number: 47071-001 March 2016 PRC: Fujian Farmland Sustainable Utilization and Demonstration Project Prepared by the Fujian

More information

LAND ACQUISITION FRAMEWORK

LAND ACQUISITION FRAMEWORK LAND ACQUISITION FRAMEWORK (This framework was prepared in accordance to the ADB requirements for preparing Resettlement Framework as described in the ADB Safeguards Policy Statement, 2009) Project Number:

More information

TONGA: Nuku alofa Urban Development Sector Project. Core Subproject 1 (Water Supply)

TONGA: Nuku alofa Urban Development Sector Project. Core Subproject 1 (Water Supply) Nuku'alofa Urban Development Sector Project (RRP TON 42394-22) Resettlement Plan TONGA: Nuku alofa Urban Development Sector Project Core Subproject 1 (Water Supply) Prepared by Planning and Urban Management

More information

ARM: Proposed Armenia Georgia Border Regional Road (M6 Vanadzor Bagratashen) Improvement Project

ARM: Proposed Armenia Georgia Border Regional Road (M6 Vanadzor Bagratashen) Improvement Project Resettlement Plan Land Acquisition and Resettlement Plan July 2016 ARM: Proposed Armenia Georgia Border Regional Road (M6 Vanadzor Bagratashen) Improvement Project Prepared by the Ministry of Transport

More information

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) ARRANGEMENT OF REGULATIONS Regulations 1. Claims for compensation 2. Assessment of compensation 3. Compensation principles

More information

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action

More information

Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal

Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal Tanahu Hydropower Project (RRP NEP 43281) Resettlement Framework October 2012 NEP: TANAHU HYDROPOWER PROJECT Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal

More information

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in the Lok Sabha by the Minister for Rural

More information

LAO: Small Towns Water Supply and Sanitation Sector Project

LAO: Small Towns Water Supply and Sanitation Sector Project Resettlement Plan June 2016 LAO: Small Towns Water Supply and Sanitation Sector Project Prepared by Department of Water Supply Ministry of Public Works and Transport for the Asian Development Bank. This

More information

The Drainage Control Regulations

The Drainage Control Regulations 1 The Drainage Control Regulations Repealed by Saskatchewan Regulations 89/2015 (effective October 16, 2015) Formerly Chapter D-33.1 Reg 1 (effective August 18, 1981) as amended by Saskatchewan Regulations

More information

Indonesia: Metropolitan Sanitation Management Investment Project

Indonesia: Metropolitan Sanitation Management Investment Project Resettlement Plan June 2013 Indonesia: Metropolitan Sanitation Management Investment Project Land Acquisition and Resettlement Plan CIMAHI CITY OFF-SITE WASTEWATER COLLECTION SYSTEM AND TREATMENT Prepared

More information

TONGA: Nuku alofa Urban Development Sector Project

TONGA: Nuku alofa Urban Development Sector Project Nuku'alofa Urban Development Sector Project (RRP TON 42394-22) Resettlement Framework TONGA: Nuku alofa Urban Development Sector Project Prepared by Planning and Urban Management Department, Ministry of

More information

Recent development in land consolidation in Macedonia and land valuation issues

Recent development in land consolidation in Macedonia and land valuation issues Recent development in land consolidation in Macedonia and land valuation issues EMERALD(2008-2009)-Encouraging Macedonia s Endeavours to Rural Land Development and STIMERALD(2010-2012) Origin of Emerald

More information

LAND CONVERSION DURING THE

LAND CONVERSION DURING THE LAND CONVERSION DURING THE URBANIZATION PROCESS IN VIET NAM: CURRENT STATUS, PROBLEMS AND SOLUTIONS Tran Kim Chung, Vice-President, CIEM, Vietnam Tran Tien Dung, Researcher, CIEM, Vietnam (CIEM: Central

More information

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing Involuntary Resettlement Due Diligence Report Loan 2860 (SF) July 2015 ARM: Water Supply and Sanitation Sector Project Additional Financing Prepared by the Armenian Water and Sewerage Closed Joint Stock

More information

nhatrangrenting.com SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness Page 1 of 9

nhatrangrenting.com SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness Page 1 of 9 BRANCH OF CONSTRUCTION PRIVATE ENTERPRISE NO. 1 DIEN BIEN PROVINCE MUONG THANH KHANH HOA HOTEL No:. / HDMBCH-MTKH SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness APARTMENT SALE AND PURCHASE

More information

Resettlement Plan. BHU: SASEC Road Connectivity Project. Phuentsholing Bypass Road. March 2014

Resettlement Plan. BHU: SASEC Road Connectivity Project. Phuentsholing Bypass Road. March 2014 Resettlement Plan March 2014 BHU: SASEC Road Connectivity Project Phuentsholing Bypass Road Prepared by the Phuentsholing Thromde for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 12 March 2014)

More information

COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation

COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN CMM and CBM Production for Power Generation Shanxi Jincheng Coal Mining Group Co., Ltd. September 2004 THIS IS NOT AN ADB BOARD

More information

GI support for land consolidation

GI support for land consolidation Problems GI support for land consolidation Bela MARKUS University of West Hungary College of Geoinformatics Technology??? Legislation Organization Financial Awareness Ill-structured process 2 Past Present

More information

LAND ACQUISITION AND COMPENSATION

LAND ACQUISITION AND COMPENSATION LAND ACQUISITION AND COMPENSATION 7 Land owner receiving compensation payment, Azerbaijan Village based negotiations, Turkey RAP Monitoring with RUDF, Lot C, Turkey 7 7 LAND ACQUISITION AND COMPENSATION

More information

DECREE PROVIDING FOR IMPLEMENTATION OF LAW ON LAND. The Government. Pursuant to the Law on Land dated 26 November 2003;

DECREE PROVIDING FOR IMPLEMENTATION OF LAW ON LAND. The Government. Pursuant to the Law on Land dated 26 November 2003; GOVERNMENT No. 181-2004-ND-CP SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness ------******------ Hanoi, 29 October 2004 DECREE PROVIDING FOR IMPLEMENTATION OF LAW ON LAND The Government

More information

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011 The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in Lok Sabha on September 7, 2011. On December 17, 2012, during the winter session of Parliament, the government circulated

More information

UZB: Kashkadarya Regional Road Project

UZB: Kashkadarya Regional Road Project Resettlement Framework Project No.: 50063 September 2016 UZB: Kashkadarya Regional Road Project Prepared by the Road Fund under the Ministry of Finance of the Republic of Uzbekistan for the Asian Development

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Regional Development and Infrastructure of Georgia Roads Department of Georgia

More information

I U B Reddy The World Bank New Delhi, India

I U B Reddy The World Bank New Delhi, India IAIA15 India s New Land Acquisition Act Right To Fair Compensation and Transparency in Land Acquisition and Rehabilitation and Resettlement Act, 2013 I U B Reddy The World Bank New Delhi, India Challenging

More information

Dhaka Water Supply and Sanitation Project

Dhaka Water Supply and Sanitation Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VOL. 1 Dhaka Water Supply and Sanitation Project Resettlement Policy Framework Dhaka

More information

RESETTLEMENT FRAMEWORK. Transport Sector Development Project (RRP SOL 41171)

RESETTLEMENT FRAMEWORK. Transport Sector Development Project (RRP SOL 41171) RESETTLEMENT FRAMEWORK Transport Sector Development Project (RRP SOL 41171) ii ABBREVIATIONS ADB Asian Development Bank CDO Community Development Officer CLAC Customary Land Appeal Court CLO Community

More information

THE GOVERNMENT. THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness. No. 84/2007/NĐ-CP. Hanoi, May 25, 2007

THE GOVERNMENT. THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness. No. 84/2007/NĐ-CP. Hanoi, May 25, 2007 THE GOVERNMENT THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 84/2007/NĐ-CP Hanoi, May 25, 2007 DECREE On supplementary regulations for issuance of Certificate of land use right,

More information