Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

Size: px
Start display at page:

Download "Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project"

Transcription

1 Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project I. Introduction The overall length of the road network in Albania totals about 15,000 km. The network comprises 3,412 km of national roads administered by the Ministry of Public Works, Transport and Telecommunications (MPWTT) and directly managed by the General Roads Department (GRD), and about 12,000 km of local roads. The local road network consists of: (i) 4,411 km of regional roads, which provide rural links of regional importance and are administered and maintained by the regional road departments under the regional councils; (ii) 4,980 km of communal roads, including private access roads, which provide rural links of communal importance and are administered and maintained by commune road departments; and (iii) 2,500 km of urban or municipal roads, which are administered and maintained by the Municipal road departments. All these Local Governments fall under the Ministry of Interior. The priority given to the expansion of the road network in recent years has resulted in inadequate emphasis on maintenance and the neglect of the local road network. The problems facing the local road network are significant, as little of the network is paved, and a recent survey on a sample of the network, found that about 90 per cent is in a poor or very poor condition 1. The decentralization to local governments of the responsibility for managing regional, commune and municipal roads has compounded the problems of inadequate maintenance. Local revenue sources, such as vehicle registration charges, have proved insufficient, and managerial capacity is weak. Only about 40 percent of what is needed in maintenance expenditures is actually expended on the local road network at present, reflecting the scale of the current unfunded mandate created through decentralization. The weak management and planning, generally undertaken without any consideration of the broader regional planning dimension also undermines the efficiency of spending in other sectors 2 ; improving roads potentially realizes savings in education and health budgets through facility centralization. And yet the contribution of an efficient and effective local road network is known and the links to economic development and poverty alleviation are established. Over 1 Butler, Robert (2007) Management and Financing of Local Roads in Albania - A study undertaken for the World Bank 2 World Bank (2006) Public Expenditure and Institutional Review

2 half (57 percent) of the Albanian population lives in rural areas, and over one-third (35 percent) of the rural population is estimated to live in poverty. 3 A qualitative survey of both poverty, and its causes, noted that, after employment and income, the majority of respondents considered infrastructure problems to be the main factors affecting their low standard of living. Rural inhabitants have also acknowledged that poor road access makes it difficult to reach markets, contributes to migration to urban areas, and inhibits the delivery of health and education services 4. Forty-nine (49) percent of rural producers stated that a lack of adequate transportation, primarily good roads, was their biggest marketing problem 5. More recent studies elsewhere have supported these findings and also report positive differences in school enrolment and frequency in use of health services, between areas with and without all-weather roads. 6 The potential contribution of improved local roads in Albania is significant and has been recognized by the authorities. The Albanian authorities recognize the seriousness of these issues, and the importance of the sector to poverty alleviation and economic development. In 2006, the authorities established a task force, headed by the Minister of Public Works, Transport and Telecommunications, to act as a steering committee 7 for a program to asphalt a significant proportion of the network 8 and improve the management and financing of the network. They have requested the assistance of the World Bank, via a Project Preparation Facility, to procure a consultants to prepare a strategy for the rehabilitation of priority sections of the district and local road network and establish a stylized Road Management System in the Client s offices (Phase 1), and prepare, together with the local community representatives and the Client, the detailed engineering design and tender documentation for the defined program (Phase 2). The program would then be implemented in the prospective Local Roads Project, to be financed by the Government the World Bank, and other interested donors. The overall purpose of the project is to improve the living conditions in the rural areas of the country though the improvement of secondary and local roads. The idea of the project is to improve the transport conditions in the rural areas of the country in order to ease the linkages with the markets, health and education services as well as contribute to the economic development through employment and creation of opportunities to develop the rural economy (agriculture and services related). The main activities of the project will be: 1. Update the list of current district and local road network in terms of a functional classification. 3 World Bank (2003) 4 World Bank (2002b) 5 World Bank (2002b,) p.27 6 World Bank (2006) 7 The implementing agency for the assignment and the subsequent project will be the Albania Development Fund (hereafter referred to as the Client), under the guidance of the Steering Committee established in the MPWTT. 8 Prime Ministerial Order no 224, issued on September 19 th 2006.

3 2. Undertake a full inventory of the active network of district on communal network of roads. 3. A review of current management capacity of the District and Commune local road networks 4. Identify priority capital investments through participatory consultation to be funded by the project 5. Preparation of detailed standard designs for the roads segments to be rehabilitated 6. The preparation of the tender and safeguard documentation for the defined program. 7. Procurement and financing of the civil works and 8. Capacity development of communes to manage private sector contractors The primary results of the project are expected to include: Generation of employment in the rural areas Develop agriculture and other rural economy through improved, faster links with markets Increased access to education for the rural population Increased access to health services for the rural population Trained regional and communal staff on identification and prioritization of investments Trained regional and communal staff on management of the maintenance The policy framework The purpose of the Resettlement Policy Framework (RPF) is to clarify land acquisition and resettlement principles, organizational arrangements, and design criteria to be applied to secondary and local road investments included under the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project. For those sub-projects (specific Road Sections) financed by the Bank, specific resettlement plans consistent with the principles included in this RPF will be submitted to the Bank for approval when specific information about any resettlement or land expropriation becomes available. (i) Components for which land acquisition and resettlement are required The main components of the projects that are expected to involve expropriations of some type are the construction/rehabilitation of the secondary and local roads throughout the country. However, as the exact details or locations of these works is not known yet any specific land acquisition/ resettlement plans that will be required cannot be prepared prior

4 to appraisal. It is expected that most of the civil works to be financed by the project will be entirely within the current public right of way, in those exceptional cases where this is not the case and expropriation is required, a site specific RAP will be prepared in a manner consistent with the tenets of this Resettlement Policy Framework. Any land acquisition and resettlement caused by the activities supported under the Project will be carried out following well-established procedures specified in Albanian laws and policies relating to land purchase and expropriation that comply with World Bank Operational Policy (OP) 4.12 and Bank Procedures (BP) These procedures are further specified in the following sections, which also provide detailed instructions regarding documentation and impact assessments. (ii) Principles and objectives governing resettlement preparation and implementation The premise governing the RPF is that involuntary resettlement and/or loss of land may cause hardship and impoverishment., Therefore, (i) any involuntary resettlement and/or loss of land will be avoided or minimized, particularly by implementing suitable alternative designs, sub-project locations, etc.; and (ii) where it is not feasible to avoid resettlement or loss of land, the affected persons will be meaningfully consulted when preparing the resettlement/compensation plan, and assisted in their efforts to improve or restore their livelihoods and standards of living to the levels prevailing prior to implementing the sub-project. (iii) Legal framework reviewing the fit between Albanian laws and regulations and Bank policy requirements, and measures proposed to bridge any gaps between them Law 8561, dated , On Expropriations and Temporary Takings of Private Property for a Public Interest and four Council of Ministers Decisions 9 define the procedures for expropriation of immovable property in Albania. The expropriation of private properties is done only for reasons of public interest and with fair compensation. Expropriation is completed by a Decision of the Council of Ministers based on the proposal of the Minister heading the Ministry wishing to expropriate the property, who is designated as the competent official under the Law. In general, expropriations may be done for public projects and investments, for the protection of archaeological, historical or cultural monuments and for the protection of public health and security. Law 8561 requires that procedures for direct notification of the intent to expropriate shall begin no more than ten (10) days after the relevant Ministry submits the expropriation request to the Council of Ministers. In addition, it is mandatory for the plan to expropriate the property to be published in a national newspaper for a period of one (1) week during this ten-day period. 9 Decision 126, dated , On the Composition and Work Procedures of the Special Committee for Expropriations; Decision 127, dated , On the Content and Procedures for Applications and Notification of Expropriation; Decision 138, dated , On Technical Criteria of Valuation and Computation for Expropriation; Decision 147, dated , On the Rules and Manner of Functioning of the Special Committee on Expropriation.

5 The valuation of property is determined by a Valuation Commission that bases the calculation on the average of purchases and sales registered in the Immovable Property Registration System over the last 3-months. For expropriation of property with corresponding cash compensation, the World Bank Guideline OP 4.12 states that payment of cash compensation for lost assets is appropriate, where active markets for land, housing, and labor exist, there is sufficient supply of land and housing, and the affected persons are able to use such markets. In Albania, there are no major legal impediments to the land market that prevent affected persons from purchasing alternative land with the compensation received from the government as a result of the expropriation process. Furthermore, Albania has an increasingly active market in immovable property. A review of recent purchases 10 indicates that current compensation at market value corresponds to the Bank standard of full replacement cost. Notification of the final Decision of the Council of Ministers on expropriation is made directly to the owner(s) of the expropriated property, who have the right to appeal in court within thirty (30) days of receiving notice of the decision. However, the appeal may only be about the amount of compensation specified in the decision, and not about the decision to expropriate. Also, in the event of an appeal the implementation of the decision and the respective procedure for re-registration of the expropriated property will continue as decided. In addition to the Ministry or Ministries involved in an expropriation, there are other institutions that will have relevant information and must be consulted in the process. One of the main institutions is the IPRS. The IPRS administers all spatial and legal ownership data related to immovable property. In addition to ownership information, other real rights are registered in the IPRS as well. For example, mortgages, liens, leases and easements are registered for each property. Also, when the property that is to be expropriated is located in a Cadastral zone that has completed the process of First 11 Registration and the data have been transferred to the IPRS, it holds the records of legal ownership; and the process of expropriation can proceed in a relatively straight forward manner. When a cadastral zone has not completed First Registration, the expropriating entity has to rely on documents issued by the Local Land Commissions. While World Bank OP 4.12 embodies the principle that a lack of legal land title does not disqualify affected people from resettlement assistance, under relevant Albanian legislation, discrepancies with this principle arise. Specifically, according to the 1998 Urban Planning Law, buildings without construction/building permits are considered illegal and can be demolished without having to follow the formal expropriation process and without having to pay compensation. Therefore, within the scope of the Project: Based on transaction information gathered by the Immovable Property Registration System for the years see 2.6

6 1. All sub-project proponents, LGUs and Regions will be encouraged to avoid using sites that are occupied by large illegal settlements or sites that have multiple or competing claims to land. 2. If a sub-project requires the acquisition of land that is occupied by individual encroachers/ squatters who do not have formal legal rights to land, yet have a claim on the land or assets thereon, the affected people will be provided compensation for the value of the property or assets lost, and, in the case of resettlement, assistance as deemed necessary to restore their living standards to levels prevailing prior to the project.(see Sec (ii) above). (iv) Likely categories of affected persons, eligibility criteria for defining the various categories, and compensation package Lack of title/ permits: Where it occurs, expropriation could involve the loss of, land, shelter or other sources of income. Since not all sub-projects and any consequent impacts, are known at project preparation stage, this RPF includes consideration of possible adverse impacts from loss of shelter and relocation, as well as loss of assets and/or income (livelihood). As indicated in (iii) above, the criteria for eligibility to receive compensation will include those people who are occupying or using the affected land, but may not carry documentation indicating formal or recognizable legal rights to the land or permits for buildings. Loss of Income: If less than 10-20% of an individual s land holding is adversely affected by the land acquisition process for a particular sub-project no significant loss of income is expected and impacts can be generally considered to be minor. In these cases, compensation will be provided as detailed in the following table. However, if affected people suffer loss of income through loss of more than 20% of their land holding, income reduction is likely and income restoration assistance will be provided if required. This will take the form of Rehabilitation Assistance meaning assistance comprising job placement, job training, or other forms of support to enable displaced persons, who have lost their source of livelihood as a result of the displacement, to improve or at least restore their income levels and standard of living to pre-project levels. Loss of Structures: It is not expected that there will be any residential or other structures that will need to be acquired in the project site. However, in the event that there are structures (barns, kiosks, small commercial buildings etc.,) that will need to be demolished, depreciation will not be used while calculating the compensation payable for affected structures, and affected people will be able to replace their structures with the compensated amount. The following Entitlement Matrix summarizes the categories of impact that will likely to result from the Project as well as the corresponding mitigation measures:

7 ASSET ACQUIRED LAND TYPE OF IMPACT Less than 80% of total land holding affected, The remaining land remains economically viable More than 80% of land holding affected and remaining land is not viable ENTITLED PERSON User of land without title COMPENSATION ENTITLEMENT Cash compensation for affected land equivalent to the market value of the property sufficient to replace the lost assets and cover transaction costs. Cash compensation for the assets plus Rehabilitation Assistance comprising job placement, or job training Rehabilitation Assistance in rental/lease of alternative land/property to re-establish use such as grazing BUILDINGS STANDING CROPS TREES TEMPORARY ACQUISITION Entire/ partial structure affected Crops affected by land acquisition or temporary acquisition Trees lost Temporary acquisition Cash compensation for entire or partially affected structure and other fixed assets without depreciation Right to salvage materials without deduction from compensation Rehabilitation assistance if required (assistance with job placement, skills training) Cash compensation equivalent to the market value for the affected crops Cash compensation based on type, age and productive value of affected trees Replacement of assets affected (e.g. boundary wall demolished, trees removed) (v) Mechanisms for consultations In addition to documenting the expropriation procedures indicated above, once the tentative arrangement of the civil works is identified, each sub-project proponent, (Communes or Regions) will hold public consultations to discuss the expropriation and its implications. All those whose ownership or occupation of land that will be affected by the expropriation will be invited to these consultations, in which they will be offered choices about their options and rights pertaining to compensation, and resettlement if required, and provided with technically and economically feasible alternatives. Their views will be sought and the content and results of the consultations will be recorded in minutes that will be maintained in the sub-project files and made available to the ADF and the Bank.

8 (vi) Description of the implementation process The implementation of expropriation activities will be linked to the implementation of the sub-projects, to ensure that loss of assets and/or and displacement does not occur before the necessary mitigation measures and resources are in place. In particular, land and related assets will be taken only after compensation has been paid. (vii) Arrangements for funding resettlement The overall responsibility for resettlement and expropriation for the Project is under the Council of Ministers. The subproject proponents under the active support of ADF, will determine if a site-specific RAP needs to be developed, and if so, will develop the RAP as per policies and procedures set out under The financial responsibility for the expropriation procedures, including the compensation to be paid, resettlement costs, etc., lies with the Ministry of Finance (MoF), working with the expropriating LGU. The Council of Ministers is responsible for issuing the expropriation decision and authorizing the funds required. The ADF in cooperation with the Ministry of Finance, is therefore responsible for ensuring that the responsible Ministry submits the expropriation dossier required by the Law On Expropriation to the Council of Ministers and following up and ensuring conclusion of the compensation procedures by the LGUs,. The land acquisition transfer must be fully completed, and payment made, before any Works can be executed on the expropriated property. (viii) Responsible Institutions and/or Agencies The following agencies and institution are responsible for the coordination and delivery of each activity in the land entitlement policy: Immovable Property Registration Office for each District in the Project area,, under the authority of the Central Registration Office, which are responsible for identifying and verifying property boundaries and ownership Land Administration and Protection Offices (formerly Cadastre Offices) under the Qark, which will clarify land allotment certificates for agricultural land that has not been formally registered and transferred to the Immovable Property Registration Offices. The Communes, Qarks and the Municipalities -, will be responsible for the coordination of the implementing procedures and execution of the compensation. (ix) Grievance Redress mechanisms The Expropriation Law provides for an appeals process against the proposed award for compensation. In addition, the Urban Planning and Construction Police laws allow for administrative appeals against a decision for demolitions of illegal construction. Further appeals can be made to the district courts. The Office of the Ombudsman in Tirana

9 receives complaints from citizens against government actions that affect their rights. ADF staff will also play a role in resolving grievances. In addition to the formal procedures, grievances related to land acquisition impacts should be pursued at the municipality/ commune level with facilitation by ADF staff together with design consultants in order to find technical solutions that avoid or further minimize the need for land acquisition. Solutions to grievances related to compensation amounts, delays in compensation payments should be pursued directly by the designated authorities in liaison with ADF staff. ADF will maintain a record of grievances received, and the result of attempts to resolve them. This information will be entered into the Management Information System (MIS) and be included in the regular progress reporting. (x) Process for preparing and approving resettlement plans and arrangements for monitoring The design consultant must report to ADF about the existence of ownership problems. For the intended civil works, where resettlement action plans will be needed, the expropriation authority assisted by ADF will prepare a Resettlement Plan for any expropriation required, and execute it prior to commencing physical works on the expropriated property. The Plan will include details about steps already taken, such as notification or consultation with owners, and a description of the land acquisition process. It should also include the following: an estimate of the amount of land that will be acquired, baseline census and socio-economic survey information for the affected persons; the specific compensation rates and standards; entitlements that are to be provided, related to impacts identified through the census or survey; description(s) of the land to be provided and/or the resettlement sites; the implementation schedule for the compensation/resettlement activities; and a detailed cost estimate. This will be reviewed by the ADF and submitted to the Bank for review and no objection before it is sent to the Council of Ministers for its decision. The ADF, and Bank supervision missions, will monitor the implementation and resettlement plans and their outcomes.

REPUBLIC OF MACEDONIA

REPUBLIC OF MACEDONIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Municipal Services Improvement Project (MSIP) LAND ACQUISITION

More information

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT Village Roads Component on the GAUNGXI ROADS DEVELOPMENT II PROJECT in THE PEOPLE S REPUBLIC OF CHINA (PRC) Guangxi Comnications Department Nanning, PRC This report was prepared by the Borrower and is

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LAO PDR: AGRICULTURAL DEVELOPMENT PROGRAM RP-59 POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT

More information

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS MINISTRY OF EDUCATION GOVERNMENT OF NEPAL August 2011 2 A. Introduction 1.

More information

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION

More information

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Summary of Land Acquisition Policy Framework JAMAICA: JM Hurricane Dean ERL Project RP607

More information

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Vision Contribute to overall development of the nation and its citizens by creating conducive

More information

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PIP annex 9 - C of GEF Hai Basin Integrated Water and Environment Management Project

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP275 Socialist Republic of Vietnam Ministry of Transport and National Traffic Safety

More information

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency

More information

Resettlement Policy Framework

Resettlement Policy Framework Republic of Turkey Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework Background 1. The Second Renewable Energy and Energy Efficiency Project will fund private sector investments

More information

RESETTLEMENT POLICY FRAMEWORK (RPF)

RESETTLEMENT POLICY FRAMEWORK (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JANUARY 2013 Republic of Mozambique Mozambique Climate Resilience: Transforming Hydro-Meteorological

More information

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy

More information

FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATIONS OR WILLING BUYER/WILLING SELLER PROCESSES

FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATIONS OR WILLING BUYER/WILLING SELLER PROCESSES Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SCHOOL SECTOR REFORM PROGRAM (SSRP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY

More information

ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY

ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Background ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY Abbreviated Resettlement

More information

Scheme of Service. for. Housing Officers

Scheme of Service. for. Housing Officers REPUBLIC OF KENYA Scheme of Service for Housing Officers APPROVED BY THE PUBLIC SERVICE COMMISSION AND ISSUED BY THE PERMANENT SECRETARY MINISTRY OF STATE FOR PUBLIC SERVICE OFFICE OF THE PRIME MINISTER

More information

JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK

JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK I. Introduction The Jamaica Social Investment Fund (JSIF) was established in 1996 under the Government of Jamaica s National

More information

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) ARRANGEMENT OF REGULATIONS Regulations 1. Claims for compensation 2. Assessment of compensation 3. Compensation principles

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name Land Registry and Cadastre Modernization Project Region EUROPE AND CENTRAL ASIA Sector Central government administration

More information

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Project preparation under the PDF-B grant RP337

More information

ALBANIA - VLORA BYPASS RESETTLEMENT ACTION PLAN REPORT

ALBANIA - VLORA BYPASS RESETTLEMENT ACTION PLAN REPORT ALBANIA - VLORA BYPASS RESETTLEMENT ACTION PLAN REPORT February 2013 TABLE OF CONTENTS Page 1. INTRODUCTION AND SCOPE OF THE DOCUMENT 1 2. PROJECT DESCRIPTION 2 3. POLICY AND REGULATORY BACKGROUND 4 3.1.

More information

Resettlement Compensation Framework Railway Corridor VIII - Eastern section

Resettlement Compensation Framework Railway Corridor VIII - Eastern section Republic of Macedonia February 2012 Resettlement Compensation Framework Railway Corridor VIII - Eastern section Contract No: C21196/EBSF-2010-07-101 Macedonian Railways: Feasibility Study for Corridor

More information

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework 1. BACKGROUND Dhaka Water Supply and Sanitation Project Resettlement Policy Framework The Dhaka Water and Sewerage Authority (DWASA) currently supplies water to about 70% of the population of the Dhaka

More information

Mini-Thesis Siam University (International Master of Business Administration), Bangkok, Thailand 2015 CHAPTER IV

Mini-Thesis Siam University (International Master of Business Administration), Bangkok, Thailand 2015 CHAPTER IV CHAPTER IV 4. Land Issues: 4.1 Land Ownership: In Vietnam, land cannot be owned either by individuals or by entities, whether they are Vietnamese or foreign. The Constitution provides that land is owned

More information

Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT POLICY FRAMEWORK FOR

Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT POLICY FRAMEWORK FOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP47 Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT

More information

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose Expropriation Context Following from the goal of the National Land Policy, to promote and ensure a secure land tenure system that is transparent, effective, non-discriminative, equitable and just ; it

More information

Dhaka Water Supply and Sanitation Project

Dhaka Water Supply and Sanitation Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VOL. 1 Dhaka Water Supply and Sanitation Project Resettlement Policy Framework Dhaka

More information

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6306-MD. Public Disclosure Authorized

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6306-MD. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS Financing Agreement (Land Registration and Property Valuation Project) CREDIT NUMBER 6306-MD Public Disclosure Authorized between

More information

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action

More information

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors. SUMMARY LAND ACQUISITION PLAN Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the RURAL ROADS SECTOR I PROJECT in INDIA Ministry of Rural Development

More information

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK BACKGROUND MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK The objective of the above project is to support municipal development in a sustainable manner. To this end, the project will a) support

More information

BIOMASS-BASED DISTRICT HEATING PROJECT

BIOMASS-BASED DISTRICT HEATING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Biomass-Based District Heating Project BIOMASS-BASED DISTRICT HEATING PROJECT Construction

More information

RESETTLEMENT POLICY FRAMEWORK FOR KENYA POWER PROJECTS

RESETTLEMENT POLICY FRAMEWORK FOR KENYA POWER PROJECTS RESETTLEMENT POLICY FRAMEWORK FOR KENYA POWER PROJECTS REVISED SEPTEMBER - 2012 i EXECUTIVE SUMMARY The Kenya power and Lighting Company Ltd (KPLC) falls under the Ministry of Energy (MoE). KPLC, which

More information

LAND REFORM IN MALAWI

LAND REFORM IN MALAWI LAND REFORM IN MALAWI Presented at the Annual Meeting for FIG Commission 7 In Pretoria, South Africa, Held From 4 th 8 th November, 2002 by Daniel O. C. Gondwe 1.0 BACKGROUND Malawi is a landlocked country

More information

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Involuntary Resettlement Safeguards Objectives: To avoid resettlement wherever possible;

More information

RENEWABLE ENERGY INTEGRATION PROJECT

RENEWABLE ENERGY INTEGRATION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT TURKISH ELECTRICITY TRANSMISSION COMPANY TEIAS RP1530 RENEWABLE ENERGY INTEGRATION

More information

Second Land and Real Estate Registration Project. between KYRGYZ REPUBLIC. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Second Land and Real Estate Registration Project. between KYRGYZ REPUBLIC. and INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H380 KG Public Disclosure Authorized Financing Agreement Second Land and Real Estate Registration Project between Public Disclosure Authorized KYRGYZ

More information

ISLAMIC REPUBLIC OF AFGHANISTAN. Ministry of Rural Rehabilitation and Development (MRRD) And. Independent Directorate of Local Governance (IDLG)

ISLAMIC REPUBLIC OF AFGHANISTAN. Ministry of Rural Rehabilitation and Development (MRRD) And. Independent Directorate of Local Governance (IDLG) Public Disclosure Authorized SFG2396 Public Disclosure Authorized Public Disclosure Authorized ISLAMIC REPUBLIC OF AFGHANISTAN Ministry of Rural Rehabilitation and Development (MRRD) And Independent Directorate

More information

RESSETTLEMENT POLICY FRAMEWORK

RESSETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Department of Water Resources and Land Improvement of the Kyrgyz Republic Project Implementation

More information

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND (DRAFT) Public Disclosure Authorized RP337 v2 LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND Public Disclosure Authorized Public

More information

Real Estate Acquisitions Audit (Green Line LRT Stage 1)

Real Estate Acquisitions Audit (Green Line LRT Stage 1) Real Estate Acquisitions Audit (Green Line LRT Stage 1) October 10, 2018 ISC: Unrestricted THIS PAGE LEFT INTENTIONALLY BLANK ISC: Unrestricted Table of Contents Executive Summary... 5 1.0 Background...

More information

THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT

THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT July 2009 1 CONTENTS CHAPTER 1 PRELIMINARY... 3 Title, extent and commencement...

More information

KENYA ELECTRICITY EXPANSION PROJECT (EASP)- RURAL ELECTRIFICATION AUTHORITY (REA) COMPONENT

KENYA ELECTRICITY EXPANSION PROJECT (EASP)- RURAL ELECTRIFICATION AUTHORITY (REA) COMPONENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized KENYA ELECTRICITY EXPANSION PROJECT (EASP)- RURAL ELECTRIFICATION AUTHORITY (REA) COMPONENT

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Ministry of Agriculture and Environmental Protection Directorate for Water Management 11070 Belgrade, Blvd. Umetnosti 2a ELEKTROPRIVREDA SRBIJE FLOODS EMERGENCY AND RECOVERY PROJECT (FERP) RESETTLEMENT

More information

Serbia Corridor X Highway Project E-75 and E-80. Resettlement Policy Framework. Final Version June 4, 2009

Serbia Corridor X Highway Project E-75 and E-80. Resettlement Policy Framework. Final Version June 4, 2009 Public Disclosure Authorized Serbia Corridor X Highway Project E-75 and E-80 Resettlement Policy Framework RP789 rev Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

More information

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PT PLN (Persero) INDONESIA POWER SECOND TRANSMISSION DEVELOPMENT PROJECT (IPTD-2) RP1232

More information

REPORT 2014/050 INTERNAL AUDIT DIVISION. Audit of United Nations Human Settlements Programme operations in Sri Lanka

REPORT 2014/050 INTERNAL AUDIT DIVISION. Audit of United Nations Human Settlements Programme operations in Sri Lanka INTERNAL AUDIT DIVISION REPORT 2014/050 Audit of United Nations Human Settlements Programme operations in Sri Lanka Overall results relating to the effective and efficient implementation of the UN-Habitat

More information

12 El Saleh Ayoub St., Zamalek, Cairo, Egypt Tel: Fax:

12 El Saleh Ayoub St., Zamalek, Cairo, Egypt Tel: Fax: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SUBMITTED TO: PORT CITIES DEVELOPMENT PROGRAM Port Cities Development Program () 12 El

More information

KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT

KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT SFG1940 REV KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT RESETTLEMENT POLICY FRAMEWORK JUNE 2016 Public Disclosure Authorized Public Disclosure

More information

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP)

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) Resettlement Action Plan Update Report for the ARUSHA

More information

Azerbaijan Second National Water Supply and Sanitation Project (SNWSSP) Resettlement Policy Framework (RPF) Land Acquisition

Azerbaijan Second National Water Supply and Sanitation Project (SNWSSP) Resettlement Policy Framework (RPF) Land Acquisition Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Azerbaijan Second National Water Supply and Sanitation Project (SNWSSP) Resettlement

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

MITIGATION POLICY FOR DISTRICT-PROTECTED LANDS

MITIGATION POLICY FOR DISTRICT-PROTECTED LANDS MITIGATION POLICY FOR DISTRICT-PROTECTED LANDS Approved by the District Board of Directors on July 18, 2017 The following Mitigation Policy is intended to inform the evaluation of environmental mitigation-related

More information

Legal Analysis of Memorandum of Understanding between the Government of Timor Leste and GTLeste Biotech. Legal issues concerning land and evictions

Legal Analysis of Memorandum of Understanding between the Government of Timor Leste and GTLeste Biotech. Legal issues concerning land and evictions Legal Analysis of Memorandum of Understanding between the Government of Timor Leste and GTLeste Biotech Legal issues concerning land and evictions A Memorandum of Understanding (MOU) was signed between

More information

SFG kv İzmir Substation Abbreviated Resettlement Action Plan (ARAP) Turkish Electricity Transmission Company. Public Disclosure Authorized

SFG kv İzmir Substation Abbreviated Resettlement Action Plan (ARAP) Turkish Electricity Transmission Company. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Turkish Electricity Transmission Company 380 kv İzmir Substation Abbreviated Resettlement

More information

Government of the Kingdom of Swaziland MINISTRY OF HOUSING AND URBAN DEVELOPMENT MINISTRY OF TINKHUNDLA ADMINISTRATION AND DEVELOPMENT

Government of the Kingdom of Swaziland MINISTRY OF HOUSING AND URBAN DEVELOPMENT MINISTRY OF TINKHUNDLA ADMINISTRATION AND DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Government of the Kingdom of Swaziland MINISTRY OF HOUSING AND URBAN DEVELOPMENT MINISTRY

More information

Government Emergency Ordinance No. 54/2006 on the regime of the concession contracts for public assets ( GEO No. 54/2006 );

Government Emergency Ordinance No. 54/2006 on the regime of the concession contracts for public assets ( GEO No. 54/2006 ); 219 Chapter 16 PPP & Concessions 1. General Public-private partnership ( PPP ) refers to forms of cooperation between public authorities and the world of business which aim to ensure the design, funding,

More information

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis: Code No: 1.9 Social Screening and Impact Assessment for Sub Projects A. Sub Project Description: Proposed Activity Walkability and Parking Improvements Lotus Road Implementing Agency: Colombo Municipal

More information

LAND ACQUISITION AND RESETTLEMENT ACTION PLAN FOR THE REGIONAL SANITARY LANDFILL & WASTE TRANSFER STATION SOUTHERN COASTAL REGION

LAND ACQUISITION AND RESETTLEMENT ACTION PLAN FOR THE REGIONAL SANITARY LANDFILL & WASTE TRANSFER STATION SOUTHERN COASTAL REGION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ALBANIA INTEGR ATED COASTAL ZONE MAN AGEMENT AND CLEAN -UP LAND ACQUISITION AND RESETTLEMENT

More information

18 Sale and Other Disposition of Regional Lands Policy

18 Sale and Other Disposition of Regional Lands Policy Clause 18 in Report No. 7 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 19, 2018. 18 Sale and Other Disposition

More information

Cambodia Health Equity and Quality Improvement Project (H-EQIP) (P157291) Resettlement Policy Framework (RPF) (DRAFT)

Cambodia Health Equity and Quality Improvement Project (H-EQIP) (P157291) Resettlement Policy Framework (RPF) (DRAFT) Cambodia Health Equity and Quality Improvement Project (H-EQIP) (P157291) Resettlement Policy Framework (RPF) (DRAFT) Date: December 2, 2015 Contents 1. Introduction... 1 2. Project Description... 2 Project

More information

South African Council for Town and Regional Planners

South African Council for Town and Regional Planners TARIFF OF FEES South African Council for Town and Regional Planners PLEASE NOTE : THE TARIFF OF FEES WAS APPROVED BY THE COUNCIL CHAPTER 10 : TARIFF OF FEES 10.1 INTRODUCTION 10.1.1 General This tariff

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Section I - Basic Information Date Prepared/Updated:

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM HO CHI MINH CITY PEOPLE S COMMITTEE INVESTMENT MANAGEMENT

More information

COMPONENT 2 - TSKB DRAFT

COMPONENT 2 - TSKB DRAFT 2015 Resettlement Policy Framework for the Turkey Geothermal Development Project COMPONENT 2 - TSKB DRAFT Contents 1. Project Description & Background... 2 2. Principles & Objectives... 3 3. Process for

More information

Resettlement Policy Framework for the Turkey Geothermal Development Project

Resettlement Policy Framework for the Turkey Geothermal Development Project SFG1378 V3 Public Disclosure Authorized 2016 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Resettlement Policy Framework for the Turkey Geothermal Development Project

More information

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4 Vietnam: Transmission

More information

Proposal to Restructure

Proposal to Restructure ~ Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date: November 10,2008 Country: Ukraine Project Name: Rural Land Titling and Cadastre

More information

Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand

Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand TS03H_ REAL ESTATE ECONOMICS & EXPROPRIATION SOLUTIONS TO LAND POLICY PROBLEMS- Paper 8312 Compensation Assessment for

More information

Decree on State Land Lease or Concession

Decree on State Land Lease or Concession Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity ~~~~~~~~~~~~~ Prime Minister s Office No. 135/PM VCC, Date 25/05/2009 Decree on State Land Lease or Concession - Pursuant

More information

MARKETILED SMALLHOLDER

MARKETILED SMALLHOLDER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNMENT OF THE REPUBLIC OF MOZAMBIQUE MINISTRY OF PLANNING AND DEVELOPMENT RP428 MARKETILED

More information

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project Land Acquisition and Resettlement Framework Date: May 2016 Status: Update FIJI: Transport Infrastructure Investment Sector Project CURRENCY EQUIVALENTS (as of August 2014) Fiji Dollar (FJD) FJD 1.00 =

More information

COUNTY GOVERNMENT OF LAMU Department of Land, Physical Planning, Infrastructure & Urban Development

COUNTY GOVERNMENT OF LAMU Department of Land, Physical Planning, Infrastructure & Urban Development 1 COUNTY GOVERNMENT OF LAMU Department of Land, Physical Planning, Infrastructure & Urban Development TERMS OF REFERENCE FOR OUTSOURCING OF CONSULTANCY SERVICES FOR SURVEY & REGULARIZATION OF KATSAIKAIKAIRU

More information

Resettlement Policy Framework for the Turkey Geothermal Development Project

Resettlement Policy Framework for the Turkey Geothermal Development Project 2016 Resettlement Policy Framework for the Turkey Geothermal Development Project COMPONENT 2 FINANCIAL INTERMEDIARIES (TSKB) FINAL 1 Contents 1. Project Description &Background...3 2. Principles & Objectives...4

More information

Chittagong Water Supply Improvement and Sanitation Project. Resettlement Policy Framework

Chittagong Water Supply Improvement and Sanitation Project. Resettlement Policy Framework Chittagong Water Supply Improvement and Sanitation Project Resettlement Policy Framework Chittagong Water Supply & Sanitation Authority Government of Bangladesh February 2010 Table of Contents 1. BACKGROUND

More information

Standard for the acquisition of land under the Public Works Act 1981 LINZS15005

Standard for the acquisition of land under the Public Works Act 1981 LINZS15005 Standard for the acquisition of land under the Public Works Act 1981 LINZS15005 Version date: 20 February 2014 Table of contents Terms and definitions... 5 Foreword... 6 Introduction... 6 Purpose... 6

More information

Koridori Srbije Corridor X Highway Project Land Acquisition and Resettlement Framework LARF

Koridori Srbije Corridor X Highway Project Land Acquisition and Resettlement Framework LARF Land Acquisition and Resettlement Framework LARF Issue 1 June 2018 PREPARED BY Contents List of Abbreviations 2 Glossary 3 1 Introduction 7 1.1 Principles and Objectives 12 2 Gaps Between RS Legislation

More information

Resettlement Policy Framework (RPF) for the Sustainable Rural Water and Sanitation Project

Resettlement Policy Framework (RPF) for the Sustainable Rural Water and Sanitation Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Resettlement Policy Framework (RPF) for the Sustainable Rural Water and Sanitation Project

More information

DECREE GENERAL PROVISIONS DETAILED REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT UPON LAND EXPROPRIATION BY THE STATE

DECREE GENERAL PROVISIONS DETAILED REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT UPON LAND EXPROPRIATION BY THE STATE THE GOVERNMENT -------- SOCIALIST REPUBLIC OF VIETNAM Independence Freedom - Happiness ---------------- No.: 47/2014/NĐ-CP Hanoi, May 15, 2014 DECREE REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT

More information

INVENTORY POLICY For Real Property

INVENTORY POLICY For Real Property INVENTORY POLICY For Real Property (Broader Public Sector Entities) Page 1-12 CONTENTS 1. TITLE... 3 2. OVERVIEW... 3 3. PURPOSE... 3 4. POLICY STATEMENT... 3 5. APPLICATION... 7 6. EVALUATION AND REVIEW...

More information

The Federal Democratic Republic of Ethiopia MINISTRY OF WORKS AND URBAN DEVELOPMENT

The Federal Democratic Republic of Ethiopia MINISTRY OF WORKS AND URBAN DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Federal Democratic Republic of Ethiopia MINISTRY OF WORKS AND URBAN DEVELOPMENT RESETTLEMENT

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document June 2012 Pakistan: Sindh Cities Improvement Investment Program (SCIP) Prepared by North Sindh Urban Services Corporation Limited for the Asian Development Bank. PFR-2 Annex-11

More information

Community Occupancy Guidelines

Community Occupancy Guidelines Community Occupancy Guidelines Auckland Council July 2012 Find out more: phone 09 301 0101 or visit www.aucklandcouncil.govt.nz Contents Introduction 4 Scope 5 In scope 5 Out of scope 5 Criteria 6 Eligibility

More information

ABSTRACT Land Administration System in Lithuania

ABSTRACT Land Administration System in Lithuania ABSTRACT Land Administration System in Lithuania 1. General introduction to the Lithuanian Land Administration System and State Enterprise Centre of Registers ( shortly SECR) Lithuania has established

More information

ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING. Section 26 of the Constitution enshrines the right to housing as follows:

ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING. Section 26 of the Constitution enshrines the right to housing as follows: 1 ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING Constitution Section 26 of the Constitution enshrines the right to housing as follows: Everyone has the right to have access to adequate housing The

More information

How Swaziland Is Upgrading Its Slums

How Swaziland Is Upgrading Its Slums Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized How Swaziland Is Upgrading Its Slums CIVIS chose to profile this example from Swaziland

More information

Right-of-Way Acquisition and

Right-of-Way Acquisition and Request for Proposals On Call Right-of-Way Acquisition and Appraisal Services Requested by: CityofElCentro Department of Public Works 307 W. Brighton Avenue El Centra, Ca. 92243 Phone: (760) 337-4505 Fax:(760)337-3172

More information

SOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT

SOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Armenia SOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT RESETTLEMENT POLICY

More information

Landowner's rights. When the Crown requires your land for a public work. April 2010

Landowner's rights. When the Crown requires your land for a public work. April 2010 Landowner's rights When the Crown requires your land for a public work April 2010 Image Goes HERE Landowner's rights when the Crown requires your land for a public work Land Information New Zealand April

More information

NORTHWEST TERRITORIES HOUSING CORPORATION

NORTHWEST TERRITORIES HOUSING CORPORATION NORTHWEST TERRITORIES HOUSING CORPORATION OVERVIEW MISSION The mission of the Northwest Territories Housing Corporation (NWTHC) is to ensure, where appropriate and necessary, that there is a sufficient

More information

RESETTLEMENT MANAGEMENT FRAMEWORK

RESETTLEMENT MANAGEMENT FRAMEWORK RP539 V6 RESETTLEMENT MANAGEMENT FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Rural Energy Agency Ministry of Energy and

More information

HOUSING ELEMENT OF THE CITY OF PEMBROKE PINES COMPREHENSIVE PLAN ADOPTION DOCUMENT

HOUSING ELEMENT OF THE CITY OF PEMBROKE PINES COMPREHENSIVE PLAN ADOPTION DOCUMENT HOUSING ELEMENT OF THE CITY OF PEMBROKE PINES COMPREHENSIVE PLAN RULES 9J-5.010, FAC City of Pembroke Pines, Florida ADOPTION DOCUMENT HOUSING ELEMENT HOUSING ELEMENT ADOPTION DOCUMENT VI. GOALS, OBJECTIVES

More information

INDEX. of subrecipients, VIII -2 records, VI-1, 4, 13. OMB Circular A-122, VIII- 3 certification: I-28

INDEX. of subrecipients, VIII -2 records, VI-1, 4, 13. OMB Circular A-122, VIII- 3 certification: I-28 INDEX A B Barney Frank Amendment, IV-7 accounts beneficiary characteristics (form), VI-1, 2, 19 escrow, II-2,4,7-11, 16,20 bidder s instructions, I-12 interest-bearing, II-7, 0 compliance notion, I-12

More information

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Land Acquisition

More information

CITY OF SEASIDE. Infrastructure and Fixed Asset Capitalization and Inventory Control Policy PURPOSE

CITY OF SEASIDE. Infrastructure and Fixed Asset Capitalization and Inventory Control Policy PURPOSE PURPOSE The purpose of this policy is to ensure adequate control, appropriate use of, and proper reporting of the City s infrastructure assets and fixed assets. This policy and the related procedures are

More information

Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal

Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal Tanahu Hydropower Project (RRP NEP 43281) Resettlement Framework October 2012 NEP: TANAHU HYDROPOWER PROJECT Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal

More information

New Developments in the Hellenic Cadastre

New Developments in the Hellenic Cadastre New Developments in the Hellenic Cadastre Prof. M. Kavouras Vice-president Ktimatologio S.A. (Hellenic Cadastre) The Hellenic Cadastre Background The Hellenic National Cadastre Organizational and institutional

More information

Consultation on Disposition of Surplus School Property Fall 2015 (vrr2)

Consultation on Disposition of Surplus School Property Fall 2015 (vrr2) Consultation on Disposition of Surplus School Property Fall 2015 (vrr2) Introduction The Ministry of Education is reviewing Ontario Regulation 444/98 Disposition of Surplus Real Property (O. Reg. 444/98),

More information

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in the Lok Sabha by the Minister for Rural