1 KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan LARP IMPLEMENTATION REPORT For Regional Roads Development Project West Kalimantan (Sambas & Singkawang District) November, 2014

2 TABLE OF CONTENTS Page 1. Project Background 1 2. Purposes of Report 1 3. Number of Affected Assets 2 4. Entitlement Matrix 5 5. Implementation Progress 6 6. Corrective Action Plan and Follow Up Action 10 LIST OF TABLES Table 1: Subproject Road in Sambas District 1 Table 2: Affected Persons 2 Table 3: Cost Estimation for Affected Land 3 Table 4: Cost Estimation for Structure and Fixed Assets 4 Table 5: Summary of LARP Cost Estimation 4 Table 6: Entitlement Matrix 5 LIST OF APPENDIXES Appendix 1: Decree of Sambas Regent No. 268 Year 2011 Appendix 1 Appendix 2: Data of APs based on verification Appendix 2 Appendix 3: Budget Allocation of Singkawang City on 2014 Appendix 3

3 PACKAGE 30-RCP 02: TEBAS-SINGKAWANG (SECTION-1 & 2) AND GALING- TANJUNG HARAPAN PACKAGE 30-RCP 03): SP TANJUNG-GALING (SECTION-1 & 2) AND ARUK-SP. 3 TANJUNG SAMBAS AND SINGKAWANG DISTRICT - WEST KALIMANTAN PROVINCE I. PROJECT BACKGROUND 1. The Regional Road Development Project (RRDP) in Sambas District, West Kalimantan has five subproject roads which three of them i.e. Singkawang Tebas ( ), SP3 Tj. Harapan SP3 Galing ( ), and SP3 Tanjung SP3 Aruk ( ) which will have resettlement impacts. The sub projects will pass through 2 sub districts and 2 villages within Singkawang District, i.e. Singkawang Tengah with Jawa village; Singkawang Utara with Sei Wie village. Whereas 3 sub districts with 12 villages within Sambas District consist of Pemangkat, Semparuk and Sajingan Besar, with the villages are: Pemangkat Kota, Penjajap Harapan, Prapakan, Tebas, Semparuk, Segedong, Singaraja, Tanjung Harapan, Galing, Senatap and Kaliau. The Description of subproject roads is shown in the Table The draft Land Acquisition and Resettlement Plan (LARP) for Sambas was agreed between the Government of Indonesia and ADB in July 2010 that has been updated in October 2011 due to additional road lengths as per DGH design, and in November 2012 following detailed inventory and measurement done by Team of Inventory and Negotiation for Delivering Compensation of Provincial and National Development Road of Sambas District for 2011 Fiscal Year (Tim Pendataan dan Negosiasi untuk Pemberian Uang Santunan Pembangunan Jalan Propinsi dan Jalan Nasional, Kabupaten Sambas Tahun Anggaran 2011). As stated in the previous LARP, scopes of updating are including updated number of Affected Households related to detail inventory of losses done by Land Acquisition Committee, updated width of affected asset, updated unit rate for calculation of replacement asset following new standard/new market price and implementation of LARP. The entitlement may be revised, as needed, to better respond to the need of the APs, but the standards set in the previous LARP cannot be lowered when the LARP is finalized. Sambas and Singkawang District 3

4 No. Package No. Link No. Table 1: Subproject Road in Sambas District West Kalimantan Total Length (km) Design Length (km) Existing Width (m) Design Width (m) Resettlement Impacts (Yes/No) 1 30-RCP SINGKAWANG-TEBAS Yes 2 (CW-06) TEBAS SAMBAS (Bypass) No RCP 02 (CW-07) SP3 TJ. HARAPAN SP3 BANTARAN SP3 BANTARAN SP3 GALING SP3 GALING SP3 TANJUNG (section 01) SP3 GALING SP3 TANJUNG (section 02) SP3 TANJUNG SP3 ARUK Yes Yes No 3. The Resettlement Plan prepared for Sambas District was based on initial design with total corridor-of-impact (COI) 14 meters has been used as basis for estimating the scope of resettlement impacts. The LARP is based on inventory by Team of Inventory and Negotiation for Delivering Compensation of Provincial and National Development Road of Sambas District using a corridor of impact (COI) of 14 meters. During the preparation of this document, numbers of meetings were held with potentially affected households and other stakeholders to determine potential impacts on land, non-land assets, and income of households living along the subproject roads. 4. The implementation report made for find out how far the action plan in the LARP document has been implemented in the field, and identifies constraint and problems that faced during the implementation process, as well as progress of land acquisition and resettlement or update of compensation payment. II. PURPOSES OF REPORT 5. The report was prepared to find out how far action plan in the LARP document has implemented in the field, and also identify constraint and problems that faced during the implementation process. III. NUMBER OF AFFECTED PERSONS 6. The first inventory of asset was carried out on 11 to 25 February 2010, additional inventory on February 2011, and on August 2011 with Corridor-of-Impact (COI) used for the project is 14 meters total. Estimated 284 affected persons (APs) have been identified. 7. The estimated area of land to be acquired is 4, square meter. With the exception of 39 households who are within the ROW, the 245 APs have certificated and non-certificate land. Non-certificate land (SKT/Girik) is issued by head of sub-district or head of village, and falls under customary right. These 245 APs are entitled to payment for land while the 39 Sambas and Singkawang District 4

5 households are not entitled to payment for land but are entitled to cash assistance for their affected structures (fence and shops) at replacement cost. 8. There are total of 133 businesses/shops affected at along three links. Some main structures of the 120 shop/business are partially affected. The remaining 13 shop only the terraces affected, thus there will be no relocation of shops. In addition, there is health center clinic in Harapan Village (Singkawang Tebas) which is only fence and will be partially affected. Other structures affected are concrete and wooden fences and also terraces which owned by 76 households. Sub-projects Link Table 2: Affected Persons No. of APs (HHs + Institutions) With certificate/ Non-Certificate Land Land to be No. of APs Acquired (m 2 ) Within the ROW Tebas-Singkawang (*) 4, (**) Galing-Tj. Harapan 3 3 (**) Aruk-SP 3 Tanjung (**) Total APs ,711,75 39 (*) Total 224 HHs + 1 health centre clinic + 1 school + 1 institution + 1 Bank of Kalimantan Barat. (**) HHs (households) 9. The unit rates below are based on information gathered from the field at the time of LARP preparation. The rates have been used for cost estimation only and will be adjusted following the conduct of replacement cost survey during the finalization of the LARP. 10. The unit rates were derived from the sub-district and households in the area. The local banks do not have information on the market value of land. Please note that these are cost estimation only and will be adjusted to reflect current market prices at the time of payment. 11. The width of affected land was measured during inventory of losses on February 2010 and February However, inventory carried out by the Team of Inventory and Negotiation Sambas District only measured affected asset, not the affected land. As informed by Public Work Agency of Sambas District, and head of Pemangkat Kota and Prapakan village that the land within ROW has already acquired by Government of Sambas. No Village Singkawang-Tebas Table 3: Cost Estimation for Affected Land No of AHs Land (m 2 ) Initial Affected % affected Market Price/m 2 Total Compensation 1 Jawa 14 5, % 312,000, ,000 2 Sei Wie 1 2, % 40,000,000 3 Pemangkat Kota 58 30,782 1, % 100, ,400,000 Sambas and Singkawang District 5

6 4 Harapan Private 53 12, % 58,755,000 Institution % 2,100,000 5 Penjajap 39 8, % 48,625,000 6 Prapakan 4 1, % 100,000 5,800,000 7 Semparuk 15 3, % 18,275,000 8 Singaraja 11 2, % 14,500,000 9 Segedong 34 54,548 1, % 100,105,000 Sp.3 Tj.Harapan Galing 10 Tj.Harapan % 8,000, , Galing % 5,000,000 Sp.3 Tanjung Aruk 12 Kaliau 12 7, % 50,000 8,790,000 TOTAL ,664 4,711,75 3,61% 770,350, For affected buildings and other affected properties (fences, terrace, structure foundation, roof etc) estimate for compensation was given based on calculation using actual current market prices of materials and actual cost of labor for dismantling and rebuilding. The rates were derived from Public Work Agency of Sambas District These rates are used as basis for private businesses or construction suppliers to issue their market prices. There is no depreciation applied for the structures or deduction for salvageable materials. At the time of LARP preparation the district has not established 2010 rates, therefore budgeting purposes, 2009 rates will be used. The additional assets that identified in 2011 still use 2009 rates for budget purposes. However, during LARP finalization, the rates will be adjusted to reflect current market prices at the time of compensation. NO. Table 4: Cost Estimation for Structures and Fixed Assets TYPE OF STRUCTURE AFFECTED (m 2 ) UNIT PRICE (IDR) TOTAL COMPENSATION (IDR) 1 Permanent Structure 48 2, 440, ,120,000 2 Semi Permanent Structure ,720, ,450,000 3 Temporary Structure 1, ,000 1,018,316,250 4 Wall Fence , ,488,600 5 Wooden Fence ,000 12,500,000 6 Permanent Terrace ,040, ,916,000 7 Semi Permanent Terrace , ,964,000 8 Temporary Terrace ,000 46,410,000 TOTAL 2,340,164,850 Sambas and Singkawang District 6

7 13. There are 133 businesses that will be partially affected. It is estimated that the business/shops will be disrupted during restoration. Average net income of shop is IDR 50,000/day, thus cost estimates for assistance\temporary loss of income is IDR 31,500, There are 27 elderly households and 9 households of vulnerable households that headed by women. The district committee will give particular assistance during restoration of their affected properties, such as easy access to get materials and labor, if needed. The project staff and external monitor will ensure that all of the vulnerable households will get all of information easily and receive all of their compensation prior to clearance of land. 15. For protecting ROW land, the prohibition sign for using acquired land will be installed in several strategic points alongside the road link. Estimated cost for one prohibition sign is about IDR 500,000 and will be installed ±10 units. Total cost estimation is IDR 5,000, In summary, cost estimates for resettlement is IDR 4,215,393,563 as shown at Table 5 below. It includes cost for engaging an external monitor, contingency and administration cost. The administration cost of 15% is applied for budget purposes only. 17. Based on the Decree of Bupati Sambas No. 270 B/2011 the LG of Sambas change name of affected persons and allocation budget of uang santunan decrease become IDR 597,600,000 for replacement affected structure only. Whereas the replacement cost estimation budget need IDR 3,259,514,850 for replacement affected land and structure. A meeting between DGH and Sambas District has been carried out to address this issue. Table 5: Summary of LARP Cost Estimation ITEM QUANTITY COST ESTIMATES (IDR) Affected Land 4, m ,000 Affected Structures and fixed assets various Loss of income Compensation 126 shop owners 31,500,000 Installation of ROW signs 10 units 5,000,000 Certification cost 225 certificates 112,500,000 Sub-Total Contingency (10%) Admin Cost (15%) External Monitoring Team LS 141,000,000 Total LARP Cost Estimates IV. ENTITLEMENT MATRIX 18. The entitlements below are based on potential resettlement impacts and corresponding compensation and assistance to the APs, regardless of tenure status. Entitlements adopted are based on central and local decisions, ADB-funded project in Indonesia and as per policy principles of ADB Safeguard Policy Statement. It should be noted that actual impacts can only be determined based on census and detailed measurement survey. The entitlement matrix of this LARP may be revised to reflect the relevant changes but the standards set in the LARP entitlement matrix cannot be lowered when the resettlement plan is finalized. Sambas and Singkawang District 7

8 19. Initially compensation payment of assets in Sambas District only based on the uang santunan, which means it doesn t meet with the entitlement matrix. Therefore during mission on December 2013, ADB requested some agreement of Sambas District and Provincial Government of West Kalimantan to comply with standards set in the LARP entitlement matrix. LG of Sambas commits to complete payment process of land acquisition and resettlement based on replacement cost, with target of completion is within next six months or will be completed on July However, the plan cannot be implemented, after a series of meetings with LG Sambas and west Kalimantan provincial government, it will be attempted to fulfill them through correspondence assistance from the Directorate General of Highways. Table 6: Entitlement Matrix TYPE OF LOSS/IMPACTS Loss of Land Impacts on Shops and Fixed Assets ELIGIBLE PERSONS Owners with certificate/noncertificate land 1 Owners with certificate/noncertificate land Owners inside the ROW ENTITLEMENTS Compensation in cash at replacement based on current market value which is derived from recent land sales in the area. Affected households will be exempt from paying transaction costs (administration cost/taxes). The local government will pay for the land certification cost. (IDR 500,000/certificate) Cash compensation based on replacement cost which is equivalent to current market value of structures and labour without application of depreciation and without deduction for salvageable materials. Owners will be allowed to take salvageable materials. As for the utilities such as water and electricity, owners will be compensated based on cost of removal and installation of said utilities. Any utilities (eg. water meters or water pipes) that will be fully damaged and can no longer be re-installed will be compensated at replacement cost. Cash assistance based on replacement cost which is equivalent to current market value of structures and labour without application of depreciation. Owners will be allowed to take salvageable materials. As for the utilities such as water and electricity, owners will be compensated based on cost of removal and installation of said utilities. Any utilities (eg. water meters or water pipes) that will be fully damaged and can no longer be re-installed will be compensated at replacement cost. Temporary disruption of Shop owners It is estimated that 120 shops may require 2 5 days to be repaired. 1 Non-certificate land (SKT/Girik) is issued by Head of Sub District or Head of Village. It falls under "customary right. It is common practice that during land acquisition process, "non-certification land" is upgraded as "certification land", and certification cost will be shouldered by the Government. Sambas and Singkawang District 8

9 TYPE OF LOSS/IMPACTS business relocation during Impacts on Crops and Trees Loss of, or damage to Public Facilities Higher risks of hardship due to project impacts due to impacts on house and shops Impacts Construction during ELIGIBLE PERSONS Owners regardless of tenure status Local government. Vulnerable households To be determined during construction ENTITLEMENTS Average net income of shop per day is IDR 50,000 multiplied by the number of days of disruption (IDR 250,000/shop owner) Trees and crops will be based on replacement cost which is equivalent to age, type, and productive value. Households will be given timely notice in order for them to harvest their crops. To be restored and relocated in accessible areas or Cash compensation based on current market value of facilities (including removal and transfer) to replace affected assets. Those who will require relocation of shops or fixed structures will be provided easier access to materials and provision of labour, as needed. Assistance may be in cash or in kind. The needs of vulnerable groups will be assessed during LARP finalization. Contractors will be responsible for paying rental in cash for land outside the ROW which will be no less than the net income that would have been derived from the affected property during disruption. Restoration of land will done immediately after use. Non-land assets within the residual area of the ROW will be replaced through in-kind support while those outside of the ROW that are adversely impacted by construction activities will be compensated in-kind or cash at replacement cost by the civil works contractor. *) Of the 254 households with land and non-land certificate, 62 households have affected land without structures/fixed assets ( = 192 HHs). **) 3 HHs inside of ROW have affected structures. V. IMPLEMENTATION PROGRESS a. Establishment of Land Acquisition and Resettlement Team 21. Refers to Head of National Land Board s Regulation No.3/2007 regarding Implementation Guidelines for President Regulation No. 36/2005 and 65/2006, the Land Acquisition and Resettlement is carried out by the Land Acquisition Committee (LAC) that established by the Bupati. The Office of the Bupati will provide the main workforce in the preparation and implementation of the LARP. The Bupati will have the following functions: (i) organize the committee for resettlement by way of a Decree; (ii) issue a local regulation on the unit costs of affected assets based on replacement cost and/or market rates; (iii) issue a local regulation with regard to assistance to informal settlers on ROW or state land; (iv) manage and disburse funds for compensation, assistance and administration costs; and (v) assist in the expeditious and judicious resolution of complaints of DPs. The office of the Bupati will work closely with the PMU staff. Sambas and Singkawang District 9

10 22. As per Indonesian Government regulations on Land acquisition for the Development of Public Purposes, land acquisition was implemented by the Land Acquisition Committee (LAC) (Panitia Pengadaan Tanah Untuk Kepentingan Umum) chaired by the Bupati of Sambas District. The Head of Bappeda served as a vice chairman with 9 members from relevant institutions including Chief of Sub District and Head of. The main tasks of the LAC at the Sambas District level are to collect land property data in the affected area, conduct public meetings with local residents and the affected people, negotiate and pay compensation, and address any disputes that may arise during Project implementation. b. Socialization 23. Socialization is carried out based on the Regent's Decree on the Formation Team Socialization in February 2010 (SK Bupati Sambas). Socialization was done throughout discussion between community and the Land Acquisition Committee (LAC). In addition, dissemination leaflet of land acquisition for RRDP was conducted as well, on the socialization in Sambas District. Socialization to the APs has been done through a series of consultation meetings with the relevant local government agencies were held in February and March 2010, to gain an understanding of the land acquisition process. c. Measurement and Inventory of Losses 24. Inventory of losses survey (IOL) was conducted in combination with the socio-economic survey (SES) and covered all the affected households in the sub-project area. Replacement cost survey (RCS) was also conducted by collecting information from both secondary sources and primary sources. The methodology includes direct interviews with people in the affected area, information from local authority, and relevant national and local regulations. 25. Inventory and measurement activities was done by a team of Data Collection and Negotiations for Awarding Compensation of Provincial Roads and National Roads Improvement in Sambas District, together with or witnessed by the PAPs. The results of measurement and inventory activities will be announced at the Village Hall and/or at the local/sub-district to be clarified by the PAPs on the width and type of asset that get compensation. At this time the community may delivers a complaint to the Land Acquisition Committee either directly or in writing. Then the result of the clarification was announced back at the Village Hall and the local or sub-district or answered directly by the implementation team to the PAPs who complain. d. Compensation Payment 26. Compensation value or the assets value of PAPs is determined by the Regent's Decision based on the assessment of the Data Collection and Negotiations Team for Awarding Compensation of Provincial and National Roads Improvement. Negotiation in section of Singkawang Tebas (Section 2) has been performed, the results of have been reported in September Furthermore, the results of these negotiations are set as the santunan by the Regent of Sambas. 27. Activities of compensation payment to PAPs constitute payment to the PAPs according to the value of assets that are made directly to the eligible PAPs whose name appears in the list of results of negotiation. Compensation Values are given according to the results of negotiations without any cuts. The amount of compensation in Sambas district for land acquisition for Regional Road Development Program (RRDP) established firstly through decree number 268 in 2011, renewed with the Sambas Regency Decree number 270 B in Sambas and Singkawang District 10

11 Therefore, the compensation amount was based on the Sambas Regent Decree No. 270 B/2011. Through interviews with the Land Acquisition Committee, compensation payment activities have completed in the year 2011 and results have been reported in January However, the results of which payment has been carried out, there are several records required clarification, namely: i) there are differences in the names of APs that are listed in the document LARP with a Sambas Regency Decree, so it is necessary measures to perform validation; ii) Compensation Uang Santunan only for buildings and plants; iii) some LARP program has not been implemented as assistance to APs that loss of income and support for vulnerable groups. 29. On the basis of the above conditions, the necessary corrective actions to be consistent with the ADB provisions and as contained in the document LARP. e. Income Restoration 30. Income Restoration Program (IRP) is focused to help the severely affected AHs i.e. households who lose 10% or more of their productive lands; the household affected by the entire loss of houses or by the entire loss of kiosks, and vulnerable AHs such as the poor, improve their situation. Women will participate during the detailed measurement survey, consultation meetings, and payment delivery. The Project will ensure active participation of women during the design, implementation and monitoring, on the community development programs. Resettlement monitoring will be disaggregated by gender. 31. The Local Government of Sambas District has not discussed about allocated budget for livelihood restoration assistance to affected households. The programs are geared to restore, if not improve, the socio-economic conditions of affected households, including vulnerable households. f. Grievance and Complaints 32. Grievance mechanism and complaints redress have been informed to the AHs during socialization, and described detail in the Project Information Pamphlet that has distributed to affected households. There no grievance and complaints received by the LAC or Project, which means no grievance and complaint regarding land acquisition process or amount of compensation or any complaints and grievance could be solved in the field level. g. Internal Monitoring 33. Project Management Unit will prepare quarterly reports and submits to DGH starting from the commencement of LARP implementation. This report is part of the quarterly report which includes update on resettlement in its regular progress reports to ADB. 34. The internal monitoring and supervision will look into the following concerns: a. Compensation and other entitlements are provided as per agreed Final LARP, with no discrimination according to gender, vulnerability, or any other factor; b. Income restoration measures are designed and implemented including modifications in the programs and provision of additional cash and in-kind assistance to the participating affected households as and when necessary; c. Public information, public consultation and grievance redress procedures are followed as described in the agreed Final LARP; Sambas and Singkawang District 11

12 d. The transition between relocation or site clearing and commencement of civil works is smooth and that sites are not handed over for civil works until the affected households have been satisfactorily compensated, assisted and relocated. h. External Monitoring 35. The scope of work of the external monitoring is to provide an independent periodic review and assessment of (i) the achievement of settlement purposes; (ii) changes in income, livelihoods and standards of living; (iii) restoration and / or improvement of the economic and social base of the affected communities; (iv) the effectiveness and sustainability of rights; and (v) the need for further mitigation measures. The activity External monitoring and evaluation activities for LARP in Sambas and Singkawang District has been done in 2013 and uploaded on the ADB website. In 2014 being carried out by consultants hired by the Directorate General of Highways as the Executing Agency. 36. In order to compliance monitoring during resettlement implementation, the main activities of the external monitor will revolve around the following: (i) review existing baseline data and gather additional socio-economic information, as necessary, on sample affected households; (ii) monitor preparation and implementation of the LARP; (iii) identify any discrepancy between policy requirements and actual implementation of resettlement; (iv) monitor the resolution of complaints and grievances of affected households; (v) provide recommendations for improving resettlement preparation and implementation; and (vi) review compliance with regard to use funds for land acquisition and resettlement. VI. CORRECTIVE ACTION PLAN and FOLLOW UP ACTION 37. Based on the results of the verification as to the difference in the name of the village and AHs conducted jointly with the Government Parties and Parties Sambas District Project on November 4 to 10, The number of AHs and land area shall be compensated is as follows: No. District No. Of AHs Land Affected Area (m2) 1. Singkawang Sambas Total The following actions should be taken to make Land Acquisition and Resettlement Plan in Sambas and Singkawang District compliant with the Project Resettlement Policy. Sambas District NO OUTSTANDING ISSUES TIME FRAME RESULTS FOLLOW UP ACTIONS 1. Differences of AHs name and type of assets The final data regarding number of assets and name of the AHs was determined based on validation to site The final data will be used as the basis for implementing improvements to compliance with the provisions in the LARP Sambas and Singkawang District 12

13 NO OUTSTANDING ISSUES TIME FRAME RESULTS together with the officer of Public Work Agency and related Village. FOLLOW UP ACTIONS document 2. Compensation loss land of 2015 In accordance with ADB's policies and contained in documents LARP that the land had to be paid compensation Once has received fund assistance from West Kalimantan Provincial Government, the compensation payments should be adjusted by updating the data of AHs. Sambas district government will request financial assistance to the provincial government of West Kalimantan to meet these provisions. 3. Allowances of lost revenue No revenue loss allowances in the budget of Sambas. Once has received fund assistance from Provincial Government, Sambas District should pay allowance revenue loss to the APs. This assistance includes also proposed to receive funding from the province of West Kalimantan. 4. Assistance vulnerable groups. to 2015 APs that require relocation/fixed of shops/ structures should be provided easier access to materials and provision of labour, as needed. Assistance may be in cash or in kind. It was discussed with LG of Sambas. This assistance includes also proposed to receive funding or from the province of West Kalimantan. Singkawang City NO OUTSTANDING ISSUES TIME FRAME RESULTS FOLLOW UP ACTIONS 1. Compensation of Buildings and Plants affected December 2014 The current negotiations are being conducted with APs, while the compensation fund for buildings and plants are available for Compensation loss land of 2015 In accordance with ADB's policies and contained in documents LARP that the land had to be paid compensation Once has received fund assistance from West Kalimantan Provincial Government, the compensation payments should be adjusted by updating the data of APs. Singkawang city government will request funding from the Sambas and Singkawang District 13

14 NO OUTSTANDING ISSUES TIME FRAME RESULTS FOLLOW UP ACTIONS provincial government of West Kalimantan 3. Allowances of lost revenue No revenue loss allowances in the budget of Sambas. Once has received fund assistance from Provincial Government, Singkawang City should pay allowance revenue loss to the AHs. This assistance includes also proposed to receive funding from the province of West Kalimantan 39. The LG of Sambas and Singkawang was expected provide fund for giving allowance of lost revenue some affected shops/kiosks. The average net income of shop per day is IDR 50,000; therefore Sambas Government should multiply the shop/kiosk affected, by the number of days of disruption which is approximately 5 days, thus amount of allowance about IDR 250,000/shop. 40. Estimated costs necessary to implement the program set forth in the table above is IDR. 8,000,000,000,- 41. In order to accelerate implementation of corrective action, was suggested to keep coordination among Directorate General of Highway and Local Government of Sambas and Singkawang District, especially regarding completion of replacement cost of affected assets, delivering allowance of lost revenue and assistance to vulnerable groups. Sambas and Singkawang District 14

15 APPENDICES Sambas and Singkawang District 15

DRAFT EXECUTIVE SUMMARY

DRAFT EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT EXECUTIVE SUMMARY IPUH - BANTAL (LINK 015.1) KABUPATEN MUKO-MUKO YEAR 2010 EXECUTIVE

More information

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT Village Roads Component on the GAUNGXI ROADS DEVELOPMENT II PROJECT in THE PEOPLE S REPUBLIC OF CHINA (PRC) Guangxi Comnications Department Nanning, PRC This report was prepared by the Borrower and is

More information

Social Monitoring Report

Social Monitoring Report Social Monitoring Report Quarterly Internal Monitoring Report Land Acquisition and Resettlement Plan (LARP) Implementation June August 2014 INO: Loan 2817: Regional Road Development Project I Prepared

More information

INO: Regional Roads Development Project (RRDP)

INO: Regional Roads Development Project (RRDP) Quarterly LARP Monitoring Report (September-November 2014) Project Number : Loan 2817-INO INO: Regional Roads Development Project (RRDP) Prepared by Directorate General of Highways for the Asian Development

More information

INO: Regional Roads Development Project (RRDP)

INO: Regional Roads Development Project (RRDP) Quarterly LARP Monitoring Report (March-May 2015) Project Number : Loan 2817-INO INO: Regional Roads Development Project (RRDP) Prepared by Directorate General of Highways for the Asian Development Bank

More information

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2 Resettlement Plan March 2018 Indonesia: Neighborhood Upgrading and Shelter Project Phase 2 Prepared by the City of Kendari and Directorate General of Human Settlements, Ministry of Public Works and Housing

More information

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PIP annex 9 - C of GEF Hai Basin Integrated Water and Environment Management Project

More information

Quarterly LARP Monitoring Report (Sept - Nov 2015) Project Number : Loan 2817-INO

Quarterly LARP Monitoring Report (Sept - Nov 2015) Project Number : Loan 2817-INO Quarterly LARP Monitoring Report (Sept - Nov 2015) Project Number : Loan 2817-INO INO: Regional Roads Development Project (RRDP) Prepared by Directorate General of Highways for the Asian Development Bank

More information

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors. SUMMARY LAND ACQUISITION PLAN Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the RURAL ROADS SECTOR I PROJECT in INDIA Ministry of Rural Development

More information

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PT PLN (Persero) INDONESIA POWER SECOND TRANSMISSION DEVELOPMENT PROJECT (IPTD-2) RP1232

More information

INO: Regional Roads Development Project

INO: Regional Roads Development Project Land Acquisition and Resettlement Plan October 2011 INO: Regional Roads Development Project Central Java (Puring-Petanahan Segment of Tambakmulyo-Wawar Road Section) Prepared by Directorate General of

More information

INO: Regional Roads Development Project

INO: Regional Roads Development Project Land Acquisition and Resettlement Plan October 2011 INO: Regional Roads Development Project East Java (Jolosutro Sendangbiru Road Section) Prepared by Directorate General of Highways, Ministry of Public

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LAO PDR: AGRICULTURAL DEVELOPMENT PROGRAM RP-59 POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT

More information

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document June 2012 Pakistan: Sindh Cities Improvement Investment Program (SCIP) Prepared by North Sindh Urban Services Corporation Limited for the Asian Development Bank. PFR-2 Annex-11

More information

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS MINISTRY OF EDUCATION GOVERNMENT OF NEPAL August 2011 2 A. Introduction 1.

More information

REPUBLIC OF MACEDONIA

REPUBLIC OF MACEDONIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Municipal Services Improvement Project (MSIP) LAND ACQUISITION

More information

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project I. Introduction The overall length of the road network in Albania totals

More information

Indonesia: Metropolitan Sanitation Management Investment Project

Indonesia: Metropolitan Sanitation Management Investment Project Resettlement Plan June 2013 Indonesia: Metropolitan Sanitation Management Investment Project Land Acquisition and Resettlement Plan PEKANBARU CITY OFF-SITE WASTEWATER COLLECTION SYSTEM AND TREATMENT (FINAL)

More information

INO: Regional Roads Development Project (RRDP)

INO: Regional Roads Development Project (RRDP) Quarterly LARP Monitoring Report (December 2014 - February 2015) Project Number : Loan 2817-INO INO: Regional Roads Development Project (RRDP) Prepared by Directorate General of Highways for the Asian

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP275 Socialist Republic of Vietnam Ministry of Transport and National Traffic Safety

More information

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Land Acquisition

More information

RESETTLEMENT POLICY FRAMEWORK (RPF)

RESETTLEMENT POLICY FRAMEWORK (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JANUARY 2013 Republic of Mozambique Mozambique Climate Resilience: Transforming Hydro-Meteorological

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Regional Development and Infrastructure of Georgia Roads Department of Georgia

More information

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Vision Contribute to overall development of the nation and its citizens by creating conducive

More information

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Project preparation under the PDF-B grant RP337

More information

REPORT 2014/050 INTERNAL AUDIT DIVISION. Audit of United Nations Human Settlements Programme operations in Sri Lanka

REPORT 2014/050 INTERNAL AUDIT DIVISION. Audit of United Nations Human Settlements Programme operations in Sri Lanka INTERNAL AUDIT DIVISION REPORT 2014/050 Audit of United Nations Human Settlements Programme operations in Sri Lanka Overall results relating to the effective and efficient implementation of the UN-Habitat

More information

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4 Vietnam: Transmission

More information

LAND ACQUISITION AND COMPENSATION

LAND ACQUISITION AND COMPENSATION LAND ACQUISITION AND COMPENSATION 7 Land owner receiving compensation payment, Azerbaijan Village based negotiations, Turkey RAP Monitoring with RUDF, Lot C, Turkey 7 7 LAND ACQUISITION AND COMPENSATION

More information

Indonesia: Metropolitan Sanitation Management Investment Project

Indonesia: Metropolitan Sanitation Management Investment Project Resettlement Plan June 2013 Indonesia: Metropolitan Sanitation Management Investment Project Land Acquisition and Resettlement Plan CIMAHI CITY OFF-SITE WASTEWATER COLLECTION SYSTEM AND TREATMENT Prepared

More information

KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA JalanPattimura No. 20, KebayoranBaru, Jakarta Selatan 12110

KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA JalanPattimura No. 20, KebayoranBaru, Jakarta Selatan 12110 KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA JalanPattimura No. 20, KebayoranBaru, Jakarta Selatan 12110 QUARTERLY REPORT LARP Implementation On Regional Roads Development Project (RRDP) March-May,

More information

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency

More information

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Summary of Land Acquisition Policy Framework JAMAICA: JM Hurricane Dean ERL Project RP607

More information

South Java Flood Control Sector Project Component F ADB LOAN 1479-INO COMPENSATION POLICY FRAMEWORK AND PROCEDURAL GUIDELINES (CPFPG)

South Java Flood Control Sector Project Component F ADB LOAN 1479-INO COMPENSATION POLICY FRAMEWORK AND PROCEDURAL GUIDELINES (CPFPG) Ministry of Home Affairs Directorate General of Regional Development Guidance South Java Flood Control Sector Project Component F ADB LOAN 1479-INO COMPENSATION POLICY FRAMEWORK AND PROCEDURAL GUIDELINES

More information

Viet Nam: Secondary Cities Development Project - Buon Ma Thuot Subproject

Viet Nam: Secondary Cities Development Project - Buon Ma Thuot Subproject Resettlement Monitoring Report Semi-Annual Report January 2017 Viet Nam: Secondary Cities Development Project - Buon Ma Thuot Subproject Prepared by Nguyen Van Trung, External Resettlement Monitoring Consultant,

More information

Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program

Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program Resettlement Framework Project Number: 42414 April 2010 Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program ABBREVIATIONS ADB Asian Development Bank

More information

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy

More information

PAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing

PAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing

More information

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND (DRAFT) Public Disclosure Authorized RP337 v2 LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND Public Disclosure Authorized Public

More information

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project)

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project) Resettlement Plan October 2014 GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project) Prepared by United Water Supply Company of Georgia LLC of the Ministry

More information

ARM: Proposed Armenia Georgia Border Regional Road (M6 Vanadzor Bagratashen) Improvement Project

ARM: Proposed Armenia Georgia Border Regional Road (M6 Vanadzor Bagratashen) Improvement Project Resettlement Plan Land Acquisition and Resettlement Plan July 2016 ARM: Proposed Armenia Georgia Border Regional Road (M6 Vanadzor Bagratashen) Improvement Project Prepared by the Ministry of Transport

More information

Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT POLICY FRAMEWORK FOR

Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT POLICY FRAMEWORK FOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP47 Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT

More information

Draft Land Acquisition and Resettlement Framework. Cambodia: National Solar Park Project

Draft Land Acquisition and Resettlement Framework. Cambodia: National Solar Park Project National Solar Park Project (RRP CAM 51182) Draft Land Acquisition and Resettlement Framework September 2018 Cambodia: National Solar Park Project Prepared by the Electricité Du Cambodge for the Asian

More information

PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program

PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program Resettlement Framework July 2017 PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program Prepared by the National Highway Authority, Pakistan

More information

Subproject: Nhat Trai pumping station in Bac Ninh province

Subproject: Nhat Trai pumping station in Bac Ninh province External Resettlement Monitoring Report Semi annual Report Mission 3 Octocber, 2013 VIE: STRENGTHENING WATER MANAGEMENT AND IRRIGATION SYSTEMS REHABILITATION PROJECT Subproject: Nhat Trai pumping station

More information

Land Acquisition and Resettlement Plan Corrective Action Plan

Land Acquisition and Resettlement Plan Corrective Action Plan Land Acquisition and Resettlement Plan Corrective Action Plan Faizabad Baharak Road Project Prepared in February 2018 Grant 0261/0262-AFG: Transport Network Development Investment Program Tranche 1 Prepared

More information

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project Land Acquisition/Resettlement Framework Project Number: 46453 March 2014 Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project Prepared by the Ministry of Finance and

More information

FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATIONS OR WILLING BUYER/WILLING SELLER PROCESSES

FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATIONS OR WILLING BUYER/WILLING SELLER PROCESSES Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SCHOOL SECTOR REFORM PROGRAM (SSRP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY

More information

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project Land Acquisition and Resettlement Framework Date: May 2016 Status: Update FIJI: Transport Infrastructure Investment Sector Project CURRENCY EQUIVALENTS (as of August 2014) Fiji Dollar (FJD) FJD 1.00 =

More information

YEREVAN MUNICIPALITY

YEREVAN MUNICIPALITY THE REPUBLIC OF ARMENIA YEREVAN MUNICIPALITY CONSTRUCTION OF ROAD LINKS OF YEREVAN WESTERN RING ROAD MFF Sustainable Urban Development Investment Program, Tranche 1 LAND ACQUISITION AND RESETTLEMENT PLAN

More information

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose Expropriation Context Following from the goal of the National Land Policy, to promote and ensure a secure land tenure system that is transparent, effective, non-discriminative, equitable and just ; it

More information

MINISTRY OF SUSTAINABLE RESOURCE MANAGEMENT

MINISTRY OF SUSTAINABLE RESOURCE MANAGEMENT The mission of the Ministry of Sustainable Resource Management is to provide provincial leadership, through policies, planning and resource information, to support sustainable economic development of the

More information

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) ARRANGEMENT OF REGULATIONS Regulations 1. Claims for compensation 2. Assessment of compensation 3. Compensation principles

More information

Mongolia: Western Regional Road Corridor Investment Program

Mongolia: Western Regional Road Corridor Investment Program Western Regional Road Corridor Investment Program (RRP MON 41193) Resettlement Framework September 2011 Mongolia: Western Regional Road Corridor Investment Program Prepared by the Ministry of Roads, Transportation,

More information

DA NANG QUANG NGAI EXPRESSWAY PROJECT

DA NANG QUANG NGAI EXPRESSWAY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Transport Vietnam Expressway Corporation DA NANG QUANG NGAI EXPRESSWAY PROJECT

More information

UZB: Kashkadarya Regional Road Project

UZB: Kashkadarya Regional Road Project Resettlement Framework Project No.: 50063 September 2016 UZB: Kashkadarya Regional Road Project Prepared by the Road Fund under the Ministry of Finance of the Republic of Uzbekistan for the Asian Development

More information

PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program

PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program Resettlement Plan July 217 PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program Ratodero Shikarpur Section II Prepared by the National

More information

Scheme of Service. for. Housing Officers

Scheme of Service. for. Housing Officers REPUBLIC OF KENYA Scheme of Service for Housing Officers APPROVED BY THE PUBLIC SERVICE COMMISSION AND ISSUED BY THE PERMANENT SECRETARY MINISTRY OF STATE FOR PUBLIC SERVICE OFFICE OF THE PRIME MINISTER

More information

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2 Resettlement Plan September 2018 Indonesia: Neighborhood Upgrading and Shelter Project Phase 2 Prepared by the City of Bima and Directorate General of Human Settlements, Ministry of Public Works and Housing

More information

Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal

Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal Tanahu Hydropower Project (RRP NEP 43281) Resettlement Framework October 2012 NEP: TANAHU HYDROPOWER PROJECT Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal

More information

Draft Land Acquisition and Resettlement Plan (LARP) TAJ: CAREC Corridors 2, 5 and 6 (Dushanbe-Kurgonteppa) Road Project

Draft Land Acquisition and Resettlement Plan (LARP) TAJ: CAREC Corridors 2, 5 and 6 (Dushanbe-Kurgonteppa) Road Project Draft Land Acquisition and Resettlement Plan (LARP) Project Number: 49042-004 August 2016 TAJ: CAREC Corridors 2, 5 and 6 (Dushanbe-Kurgonteppa) Road Project Prepared by the Ministry of Transport. This

More information

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Involuntary Resettlement Safeguards Objectives: To avoid resettlement wherever possible;

More information

PAK: Punjab Intermediate Cities Improvement Investment Project

PAK: Punjab Intermediate Cities Improvement Investment Project Punjab Intermediate Cities Improvement Investment Project (RRP PAK 46526) Resettlement Framework April 2017 PAK: Punjab Intermediate Cities Improvement Investment Project Prepared by Local Government and

More information

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis: Code No: 1.9 Social Screening and Impact Assessment for Sub Projects A. Sub Project Description: Proposed Activity Walkability and Parking Improvements Lotus Road Implementing Agency: Colombo Municipal

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Lines

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Lines Social Monitoring Report Quarter Report April June 2015 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Lines Prepared by the Southern Vietnam Power Projects

More information

PAK: National Trade Corridor Highway Investment Program (NTCHIP)

PAK: National Trade Corridor Highway Investment Program (NTCHIP) Land Acquisition and Resettlement (E-35, Hassanabdal Havelian Expressway) September 2015 PAK: National Trade Corridor Highway Investment Program (NTCHIP) Prepared by National Highways Authority for the

More information

CHAPTER I INTRODUCTION. expansion as a whole, but also balanced economic and social development

CHAPTER I INTRODUCTION. expansion as a whole, but also balanced economic and social development CHAPTER I INTRODUCTION The region-based national development not only requires economic expansion as a whole, but also balanced economic and social development throughout the country. Furthermore, it is

More information

ARM: Sustainable Urban Development Investment Program Tranche 2

ARM: Sustainable Urban Development Investment Program Tranche 2 Resettlement Plan May 2015 ARM: Sustainable Urban Development Investment Program Tranche 2 Argavand - Shirak Road Link Prepared by Yerevan Municipality for the Asian Development Bank. This is an updated

More information

Republic of Azerbaijan: Water Supply and Sanitation Investment Program (Tranche 2)

Republic of Azerbaijan: Water Supply and Sanitation Investment Program (Tranche 2) Appendix 5 Resettlement Planning Document Land Acquisition and Resettlement Plan for Subprojects Under Tranche 2 (Goychay, Nakhcivan, Beylagan, and Agdash) Document Stage: Final November 11, 2011 Republic

More information

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework 1. BACKGROUND Dhaka Water Supply and Sanitation Project Resettlement Policy Framework The Dhaka Water and Sewerage Authority (DWASA) currently supplies water to about 70% of the population of the Dhaka

More information

EUROPEAN UNION ACCOUNTING RULE 7 PROPERTY, PLANT & EQUIPMENT

EUROPEAN UNION ACCOUNTING RULE 7 PROPERTY, PLANT & EQUIPMENT EUROPEAN UNION ACCOUNTING RULE 7 PROPERTY, PLANT & EQUIPMENT Page 2 of 10 I N D E X 1. Objective... 3 2. Scope... 3 3. Definitions... 3 4. Recognition... 4 4.1 General recognition principle... 4 4.2 Initial

More information

LAND ACQUISITION FRAMEWORK

LAND ACQUISITION FRAMEWORK LAND ACQUISITION FRAMEWORK (This framework was prepared in accordance to the ADB requirements for preparing Resettlement Framework as described in the ADB Safeguards Policy Statement, 2009) Project Number:

More information

RESETTLEMENT FRAMEWORK. Transport Sector Development Project (RRP SOL 41171)

RESETTLEMENT FRAMEWORK. Transport Sector Development Project (RRP SOL 41171) RESETTLEMENT FRAMEWORK Transport Sector Development Project (RRP SOL 41171) ii ABBREVIATIONS ADB Asian Development Bank CDO Community Development Officer CLAC Customary Land Appeal Court CLO Community

More information

LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT. ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II

LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT. ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT SUBPROJECT 1, ARMAVIR ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II Project Number: L2860-ICB-1-01 Prepared by the Project Management

More information

Republic of Indonesia: Community-Focused Investments to Address Deforestation and Forest Degradation Project

Republic of Indonesia: Community-Focused Investments to Address Deforestation and Forest Degradation Project Resettlement Framework Project Number: 47084 September 2016 Republic of Indonesia: Community-Focused Investments to Address Deforestation and Forest Degradation Project Prepared by the Ministry of Environment

More information

MOTION NO. M Property Exchange Agreement with the University of Washington for the Northgate Link Extension

MOTION NO. M Property Exchange Agreement with the University of Washington for the Northgate Link Extension MOTION NO. M2012-93 Property Exchange Agreement with the University of Washington for the Northgate Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Board 12/20/12 Final Action Ahmad

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document Land Acquisition and Resettlement Plan (LARP) for Mirishkor Subproject Document Stage: Final Project Number: UZB: 2208 July 2009 UZB: Kashkadarya and Navoi Rural Water Supply

More information

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION RP762 v30 1. Information About Project Name &Location of Subproject Project Sponsor Project Cost Installed Generation

More information

Summary: Resettlement Action Plan for the Thwake Multi- Purpose Dam-Kenya

Summary: Resettlement Action Plan for the Thwake Multi- Purpose Dam-Kenya Summary: Resettlement Action Plan for the Thwake Multi- Purpose Dam-Kenya 1. Introduction and Background The proposed Thwake water supply and sanitation Dam is a project conceived and intended to be constructed

More information

NORTH-SOUTH ROAD CORRIDOR INVESTMENT PROGRAM TRANCHE 3 (Talin-Lanjik and Lanjik-Gyumri), SUBSECTION 2

NORTH-SOUTH ROAD CORRIDOR INVESTMENT PROGRAM TRANCHE 3 (Talin-Lanjik and Lanjik-Gyumri), SUBSECTION 2 ECONOMIC DEVELOPMENT AND RESEARCH CENTER NORTH-SOUTH ROAD CORRIDOR INVESTMENT PROGRAM TRANCHE 3 (Talin-Lanjik and Lanjik-Gyumri), SUBSECTION 2 IMPLEMENTATION OF LAND ACQUISITION AND RESETTLEMENT PLAN COMPLIANCE

More information

Upgrading and Construction of Chumateleti-Khevi Section of the E-60 Highway

Upgrading and Construction of Chumateleti-Khevi Section of the E-60 Highway mail33 Ministry of Regional Development and Infrastructure of Georgia Roads Department of Georgia Resettlement Policy Framework EAST-WEST HIGHWAY CORRIDOR IMPROVEMENT PROJECT AF Upgrading and Construction

More information

Syr Darya Control and North Aral Sea Project Phase 2 (SYNAS-2) Land Acquisition Framework

Syr Darya Control and North Aral Sea Project Phase 2 (SYNAS-2) Land Acquisition Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Syr Darya Control and North Aral Sea Project Phase 2 (SYNAS-2) Land Acquisition Framework

More information

COMPONENT 2 - TSKB DRAFT

COMPONENT 2 - TSKB DRAFT 2015 Resettlement Policy Framework for the Turkey Geothermal Development Project COMPONENT 2 - TSKB DRAFT Contents 1. Project Description & Background... 2 2. Principles & Objectives... 3 3. Process for

More information

RESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension

RESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension RESOLUTION NO. R2018-07 To Acquire Real Property Interests Required for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 03/08/2018

More information

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action

More information

Port Moresby Power Grid Development Project.

Port Moresby Power Grid Development Project. Social Monitoring Report Semi-annual Report March 2017 Port Moresby Power Grid Development Project. Reporting period: July to December 2016. Prepared by PNG Power Limited for the Asian Development Bank.

More information

Indonesia: Metropolitan Sanitation Management Investment Project

Indonesia: Metropolitan Sanitation Management Investment Project Land Acquisition and Resettlement Plan Indonesia: Metropolitan Sanitation Management Investment Project May 2017 Prepared by the Directorate General of Human Settlements, under the Ministry of Public Works

More information

TAJ: CAREC Corridors 2, 5, and 6 (Dushanbe Kurgonteppa) Road Project Additional Financing

TAJ: CAREC Corridors 2, 5, and 6 (Dushanbe Kurgonteppa) Road Project Additional Financing Additional Financing of Central Asia Regional Economic Cooperation Corridors 2, 5, and 6 (Dushanbe Kurgonteppa) Road Project (RRP TAJ 49042) Resettlement Plan Project Number: 49042-005 (DRAFT) October

More information

Mongolia: Ulaanbaatar Urban Services and Ger Areas Development Investment Program

Mongolia: Ulaanbaatar Urban Services and Ger Areas Development Investment Program Resettlement Framework August 2013 Mongolia: Ulaanbaatar Urban Services and Ger Areas Development Investment Program Prepared by {complete and accurate name of government agency or private sector project

More information

Annex 4 Land Acquisition and Resettlement Policy Framework INDONESIA: DAM OPERATIONAL IMPROVEMENT AND SAFETY PROJECT - 2 (DOISP AF)

Annex 4 Land Acquisition and Resettlement Policy Framework INDONESIA: DAM OPERATIONAL IMPROVEMENT AND SAFETY PROJECT - 2 (DOISP AF) Public Disclosure Authorized Annex 4 Land Acquisition and Resettlement Policy Framework INDONESIA: DAM OPERATIONAL IMPROVEMENT AND SAFETY PROJECT - 2 (DOISP AF) SFG2777 REV LAND ACQUISITION AND RESETTLEMENT

More information

Dhaka Water Supply and Sanitation Project

Dhaka Water Supply and Sanitation Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VOL. 1 Dhaka Water Supply and Sanitation Project Resettlement Policy Framework Dhaka

More information

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP)

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) Resettlement Action Plan Update Report for the ARUSHA

More information

Due Diligence Report (Social): Kupang Peaker 2 Core Subproject

Due Diligence Report (Social): Kupang Peaker 2 Core Subproject Sustainable Energy Access in Eastern Indonesia Power Generation Sector Project (RRP INO 49203) Due Diligence Report (Social): Kupang Peaker 2 Core Subproject Document stage: Draft Project number: 49203-002

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM HO CHI MINH CITY PEOPLE S COMMITTEE INVESTMENT MANAGEMENT

More information

BIOMASS-BASED DISTRICT HEATING PROJECT

BIOMASS-BASED DISTRICT HEATING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Biomass-Based District Heating Project BIOMASS-BASED DISTRICT HEATING PROJECT Construction

More information

Accounting. Overview of the New Revenue Recognition Standard. Fort Worth Chapter TSCPA Free CPE Day

Accounting. Overview of the New Revenue Recognition Standard. Fort Worth Chapter TSCPA Free CPE Day Accounting Update - 2015 Overview of the New Revenue Recognition Standard 1 Fort Worth Chapter TSCPA Free CPE Day 2015 1 ASC Topic 606, Revenue from Contracts with Customers Issued in May 2014 Supersedes

More information

COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation

COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN CMM and CBM Production for Power Generation Shanxi Jincheng Coal Mining Group Co., Ltd. September 2004 THIS IS NOT AN ADB BOARD

More information

India: Madhya Pradesh Irrigation Efficiency Improvement Project. Subproject: Pipeline Distribution System for 500 Hectares of Command Area

India: Madhya Pradesh Irrigation Efficiency Improvement Project. Subproject: Pipeline Distribution System for 500 Hectares of Command Area Madhya Pradesh Irrigation Efficiency Improvement Project (RRP IND 45371) Resettlement Plan/Land Acquisition Plan (This document is prepared in accordance to the ADB Resettlement Plan Requirement as described

More information

Chittagong Water Supply Improvement and Sanitation Project. Resettlement Policy Framework

Chittagong Water Supply Improvement and Sanitation Project. Resettlement Policy Framework Chittagong Water Supply Improvement and Sanitation Project Resettlement Policy Framework Chittagong Water Supply & Sanitation Authority Government of Bangladesh February 2010 Table of Contents 1. BACKGROUND

More information

LAND ACQUISITION AND COMPENSATION

LAND ACQUISITION AND COMPENSATION LAND ACQUISITION AND COMPENSATION 7 Community meeting in Muzdurlar village, Goranboy district, Azerbaijan RAP meetings with local community, Turkey 7 7 LAND ACQUISITION AND COMPENSATION The land acquisition

More information