AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals

Size: px
Start display at page:

Download "AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals"

Transcription

1 Due Diligence Report April 2013 AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals Prepared by for the Ministry of Finance and the Asian Development Bank.

2 Islamic Republic of WATER RESOURCES DEVELOPMENT INVESTMENT PROGRAMME TRANCHE 1 ADB Grant AFG NORTHERN BASINS DEVELOPMENT AND FLOOD MANAGEMENT PROGRAMME Due Diligence Report for Construction of NBD Main Canal Structures Contract no. MEW/1277/ICB April 2013

3 Islamic Republic of Tranche 1 C1: Northern Basin Development Page i

4 Islamic Republic of Tranche 1 C1: Northern Basin Development TABLE OF CONTENTS Page Table of Contents... Abbreviations... Glossary... Executive Summary... i ii iii iv 1. Introduction Background Rationale and Status of the Report Sub-Project Physical Works Field Surveys and Findings Approach Impact and Mitigation Measures Impact Mitigation Measures Compensation Conclusion... 4 List of Figure Figure 1: NBD Location Map... 1 List of Tables Table 1: Distribution of 250 Main Structures... 2 Table 2: Summary of Impact... 3 Annex Annex 1: Questionnaire Annex 2: location and selected photographs of area maps Page i

5 Islamic Republic of Tranche 1 C1: Northern Basin Development ABBREVIATIONS ADB : Asian Development Bank DDR : Due Diligence Report FFA : Framework Financing Agreement GoA : Government of IR : Involuntary Resettlement LAR : Land Acquisition and Resettlement (impacts) LARP : Land Acquisition and Resettlement Plan MAIL : Ministry of Agriculture, Irrigation and Livestock MEW : MFF : Multitranche Financing Facility MEW :, NBD : Northern Basins Development NVDA : Nangarhar Valley Development Authority PIO : Program Implementation Office RBA : River Basin Agency SIM S.p.A : Società Italiana Monitoraggio (Italy) WRDIP : WUA : Water Users Association Page ii

6 Islamic Republic of Tranche 1 C1: Northern Basin Development GLOSSARY Affected Household/Family: All members of a household residing under one roof and operating as a single economic unit; who are adversely affected by the Project or any of its components. It may consist of a single nuclear family or an extended family group. Affected Person (AP) : All the people (or household) affected by the Project through land acquisition, relocation, or loss of income; and include any person, household [sometimes referred to as project affected family (AF)], firms, or public or private institutions. APs, therefore, include (i) persons whose agricultural land or other productive assets such as trees or crops are affected; (ii) persons whose businesses are affected and who might experience loss of income due to the Project impact; (iii) persons who lose work/employment as a result of Project impact; and (iv) people who lose access to community resources/property as a result of the Project. Category C : A proposed project is classified as category C if it has no involuntary resettlement impacts. Displaced Persons : People who are physically displaced (relocation, loss of residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. Jerib : Traditional unit of land measurement in. One Jerib is equal to 2000 square meter of land. 5 Jeribs make 1 hectare. Jirga : Pashto language meaning a community development council or assembly. Land Acquisition: The process whereby a person is compelled by a public agency to alienate all or part of the land s/he owns or possesses, to the ownership and possession of that agency, for public purposes, in return for fair compensation. Rehabilitation : Compensatory measures provided under the Policy Framework on involuntary resettlement other than payment of the replacement cost of acquired assets. Relocation : Displacement or physical moving of the APs from the affected area to a new area/site and rebuilding homes, infrastructure, provision of assets, including productive land/employment and re-establishing income, livelihoods, living and social systems. Shura: Local institution which represent the seniors of a rural community. They are mostly the decision makers at village level. There are two types of Shura - NSP/MRRD established shuras and tribal shuras. NSP shuras or CDCs are responsible mostly for developmental work while the tribal shuras are responsible for conflict resolutions, jirgas etc. Currently both shuras function for both responsibilities and are represented by the same group of people. Vulnerable : Who might suffer disproportionately or face the risk of being marginalized from the effects of resettlement and includes : (i) female-headed households with dependents; (ii) disabled household heads; (iii) poor households that fall on or below the poverty line (within the meaning given previously); (iv) landless; (v) elderly households with no means of support; (vi) households without security of tenure; (vii) households of indigenous population or ethnic minority; and (viii) marginal farmers (with landholdings of five acres or less). Page iii

7 Islamic Republic of Tranche 1 C1: Northern Basin Development EXECUTIVE SUMMARY 1. The Government of (GoA) entered into a Framework Financing Agreement (FFA) with Asian Development Bank (ADB) under the tranche 1 of Multitranche Financing Facility (MFF) to finance the Water Resources Development Investment Program (WRDIP). 2. The Tranche 1 project has four components: (i) Northern Basins Development (NBD) that includes rehabilitation and upgrading of irrigation infrastructure, and development of a river basin agency (RBA) and water users associations (WUAs) for water management; (ii) Nangarhar Valley Development Authority (NVDA) Improvement that includes irrigation rehabilitation and upgrading, development of WUAs, and a management reform plan for the NVDA; (iii) Flood Management that includes development of flood protection infrastructure along the Amu Darya River and development of a national flood management program; and (iv) Project Management and Program Development that includes a program development facility to prepare the subsequent two tranches of the MFF. 3. The two components under Tranche 1 - C1: Northern Basins Development (NBD) and C3: Flood Management, fall under the responsibility of the Ministry of Energy and Water (MEW). The component C2 of the Tranche - Nangarhar Valley Development Authority (NVDA) Improvement is under the Ministry of Agriculture, Irrigation and Livestock (MAIL). 4. The NBD sub-components involve the design and construction of a new Bangala Weir, rehabilitation and upgrading of the Samarkandian and Nehri Shahi weirs, and construction of large number of water apportionment and other structures on 6 main traditional canals spreading over Balkh and Jowzjan provinces. This Due Diligence Report (DDR) is concerned with the construction of NBD main canal structures. 5. Construction of the water apportionment and other structures was originally planned based on the concept of implementing the physical works involving no land acquisition and resettlement (LAR) impact. The sub-project thereby was classified as Category C project as per ADB safeguards policy. Preparation of a Land Acquisition and Resettlement Plan (LARP) therefore was not necessary to be in place. However, during implementation of the infrastructure works, the sub-project requires compliance with ADB s safeguards requirements on involuntary resettlement (IR), adhering to laws and policies, in order to make sure that the project followed all safeguard requirements and no one is disadvantaged in the process of development. This DDR is formulated to assess that the safeguard plans are adequately covered under the subprojects impacts and mitigation measures. The report presents the findings from the study conducted in the area where the aforementioned infrastructure works were planned to take place. This document is presented as a. 6. The sub-project physical works comprise the construction of 250 main structures new water apportionment structures on the six major canals, together with 13 miscellaneous structures. Implementation of all physical works are planned to be carried out on existing canals or roadways, involving no new land acquisition. 7. Field surveys of all 250 sites were conducted to ensure that the safeguard measures are adequately complied with the ADB s safeguard requirements on involuntary resettlement. A standard questionnaire was used in conducting the survey which ended in September Survey result shows that implementation of physical works will neither Page iv

8 Islamic Republic of Tranche 1 C1: Northern Basin Development require any permanent acquisition of land, nor will involve physical displacement of any household. Also, no household will lose any part of its land-holding. As shown in the Table 2, out of 250 structures, only 28 will involve temporary land acquisition issues. However, some temporary acquisition of land will be required for diversion works. In such cases, the owners have indicated that they have no objection to the temporary use of their lands for works related to flow diversion or other purpose. The project will pay careful attention to avoid or minimize any unforeseen impacts. 8. Under the terms of the construction contract, the Contractor is responsible for negotiating and agreeing any compensation with the owners or tenants before the works commence. This is either paid in cash or in kind, whereby the Contractor may agree to assist the farmers with some land drainage works, or cleaning old or blocked tertiary irrigation ditches etc. Whilst this is largely a self-regulating process, the PIO Office also monitors the situation and can intervene and act as a mediator in the event of any disputes arising. 9. After reviewing the information on land area, it is clear that the sub-project will not result in any permanent land acquisition. No family is required to be resettled. Very minor temporary impact will occur and proper steps have been taken to mitigate those impacts. Although the project areas are inhabited by different ethnic groups, no significant differences in cultural and socio-economic identity among the different language groups, no specific adverse impacts are anticipated to warrant separate indigenous peoples plans. Since the sub-project will not require permanent acquisition of any land, residential houses or buildings and will not cause any impact involving physical displacement of any household, it can be classified as Category C as per ADB safeguard policy. Page v

9 Islamic Republic of 1. INTRODUCTION 1.1 Background 1. The Government of (GoA) entered into a Framework Financing Agreement (FFA) with Asian Development Bank (ADB) under the tranche 1 of Multitranche Financing Facility (MFF) to finance the Water Resources Development Investment Program (WRDIP). The purpose of this investment program is to increase the productivity of irrigated agriculture and improve environmental sustainability due to improved water resources management through infrastructure development, capacity building and institutional strengthening. 2. The Tranche 1 project has four components: (i) Northern Basins Development (NBD) that includes rehabilitation and upgrading of irrigation infrastructure, and development of a river basin agency (RBA) and water users associations (WUAs) for water management; (ii) Nangarhar Valley Development Authority (NVDA) Improvement that includes irrigation rehabilitation and upgrading, development of WUAs, and a management reform plan for the NVDA; (iii) Flood Management that includes development of flood protection infrastructure along the Amu Darya River and development of a national flood management program; and (iv) Project Management and Program Development that includes a program development facility to prepare the subsequent two tranches of the MFF. 3. The two components under Tranche 1 - C1: Northern Basins Development (NBD) and C3: Flood Management, fall under the responsibility of the Ministry of Energy and Water (MEW). The component C2 of the Tranche - Nangarhar Valley Development Authority (NVDA) Improvement is under the Ministry of Agriculture, Irrigation and Livestock (MAIL). 4. The NBD sub-components involve the design and construction of a new Bangala Weir, rehabilitation and upgrading of the Samarkandian and Nehri Shahi weirs, and construction of large number of water apportionment and other structures on 6 main traditional canals spreading over Balkh and Jowzjan provinces. This Due Diligence Report (DDR) is concerned with the construction of NBD main canal structures. NBD location map is presented in Figure 1. Figure 1: NBD Location Map North Basins Development area Page 1

10 Islamic Republic of 1.2 Rationale and Status of the Report 5. Construction of the water apportionment and other structures was originally planned based on the concept of implementing the physical works involving no land acquisition and resettlement (LAR) impact. The sub-project thereby was classified as Category C project as per ADB safeguards policy. Preparation of a Land Acquisition and Resettlement Plan (LARP) therefore was not necessary to be in place. However, during implementation of the infrastructure works, the sub-project requires compliance with ADB s safeguards requirements on involuntary resettlement (IR), adhering to laws and policies, in order to make sure that the project followed all safeguard requirements and no one is disadvantaged in the process of development. This DDR is formulated to assess that the safeguard plans are adequately covered under the subprojects impacts and mitigation measures. The report presents the findings from the study conducted in the area where the aforementioned infrastructure works were planned to take place. This document is presented as a. 1.3 Sub-Project Physical Works 6. The sub-project physical works comprise the construction of 250 main structures new water apportionment structures on the six major canals, together with 13 miscellaneous structures. Implementation of all physical works are planned to be carried out on existing canals or roadways, involving no new land acquisition. Distribution of the structures across the canals is shown in Table 1. Table 1: Distribution of 250 Main Structures Canal Number of Structures Remarks Nehri Shahi 60 Chemtal 42 Aqcha 52 Includes Mangajin, Khamaqa and Muridan canals Abdullah 29 Mustaq 33 Daulatabad 20 Sub-total of water apportionment structures Miscellaneous locations 13 Total Miscellaneous structures such as culverts etc. 7. The water apportionment structures are un-gated but hydraulically designed to limit the flow from the primary canal into the secondary canal in accordance with signed water apportionment agreements, based upon the irrigated land area attributed to the secondary and tertiary canals. All works are on existing canals or roadways and do not involve any new land acquisition. 2. FIELD SURVEYS AND FINDINGS 2.1 Approach 8. Field surveys of all 250 sites have been conducted to ensure that the safeguard measures are adequately complied with the ADB s safeguard requirements on involuntary resettlement. A standard questionnaire (Annex 1) was used in conducting the survey which ended in September Given the ethnic diversity of the people in project areas, careful attention was given to ensuring that the survey team was able to interview people using Page 2

11 Islamic Republic of their preferred language to avoid any possible misunderstandings arising from mistranslation of words or concepts. 9. Given the considerable volume of paperwork in the process of collecting field data, these have not been reproduced as part of this report, but are summarized in the subsequent sections. However, bound copies of the interview sheets are retained in the PIO offices and may be inspected at any time, should this be deemed necessary. 10. Mention should be made that the obvious constraint in carrying out the survey works had been the threat of insurgency in certain areas of the project. The frequent changes of security situation from unstable to volatile, sometimes reduced the possibilities to carry out more detailed field surveys. However, consultants have attempted to carry out the relevant tasks to the extent possible. 3. IMPACT AND MITIGATION MEASURES 3.1 Impact 11. The sub-project implementation works will neither require any permanent acquisition of land, nor will involve physical displacement of any household. Also, no household will lose any part of its land-holding. As shown in Table 2, out of 250 structures, only 28 will involve temporary land acquisition issues. All of these issues are related to temporary use of land for diversion works. In all cases the owners have indicated that they have no objection to the temporary use of their lands for works related to flow diversion or other purpose. Canal No of Structure No. of Land Acquisition Issues Table 2: Summary of Impact Land Owner and/or Tenants identified Objections from Land Owner and/or Tenants on Construction % of Total Structures NahriShahi 60 1 Yes No 1.7% Remarks Temporary land acquisition only Chemtal Yes No 42.8% Temporary land acquisition only Aqcha 52 Nil Yes No Nil Temporary land acquisition only Abdullah 29 3 Yes No 10.3% Temporary land acquisition only Mustaq 33 2 Yes No 6.1% Temporary land acquisition only Daulatabad 20 3 Yes No 15.0% Temporary land acquisition only Miscellaneous 13 1 Yes No 7.7% Temporary land acquisition only Total (all canals/struct ures) % 12. In most cases, if not in all, the impacts are likely to arise from the needed work to temporarily divert the flow in the canal. There is no adverse impact on the downstream flows as these are maintained at all times. Site specific impacts include: Page 3

12 Islamic Republic of Temporary loss of crops on the affected land. Temporary loss of arable land for grazing. Reduced crop yields after reinstatement. 3.2 Mitigation Measures 13. The project will pay careful attention to avoid or minimize the impacts on likely affected people, even though the level of impact will be limited. The project will undertake the following mitigation measures: Minimizing working areas and hence temporary land take. Timing of the works to, wherever possible, allow owners or tenants sufficient time to harvest crops before commencing any works. Expediting the works to mitigate loss of agricultural potential. Stripping and preserving top soil from the affected areas for future reinstatement. Reinstating the working areas, including replacing top soil to mitigate any longer term reduction on crop yields etc. Minimizing cutting or removal of trees, particularly cash producing fruit or nut trees. Replanting trees as necessary once the area has been reinstated. 3.3 Compensation 14. Under the terms of the construction contract, the Contractor is responsible for negotiating and agreeing any compensation with the owners or tenants before the works commence. This is either paid in cash or in kind, whereby the contractor may agree to assist the farmers with some land drainage works, or cleaning old or blocked tertiary irrigation ditches etc. Whilst this is largely a self-regulating process, the PIO Office also monitors the situation and can intervene and act as a mediator in the event of any disputes arising. 4. CONCLUSION 15. After reviewing the information on land area, it is clear that the sub-project will not result in any permanent land acquisition. No family is required to be resettled. Very minor temporary impact will occur and proper steps have been taken to mitigate those impacts. Although the project areas are inhabited by different ethnic groups, no significant differences in cultural and socio-economic identity among the different language groups, no specific adverse impacts are anticipated to warrant separate indigenous peoples plans. Since the sub-project will not require permanent acquisition of any land, residential houses or buildings and will not cause any impact involving physical displacement of any household, it can be classified as Category C as per ADB safeguard policy. Page 4

13 Islamic Republic of ANNEX 1 IR Check list Page 5

14 Islamic Republic of INVOLUNTARY RESETTLEMENT CHECKLIST (Due Diligence Activity) A. Introduction 1. Each subsection/ section needs to be screened for any involuntary resettlement impacts which will occur or already occurred. This screening determines the necessary action to be taken by the project team. B. Information on subsection/ section: a. District/ Administrative Name: b. Location (km): c. Civil work dates (proposed): d. Technical Description: C. Screening Questions for Involuntary Resettlement Impact 2. Below is the initial screening for involuntary resettlement impacts and due diligence exercise. Both permanent and temporary impacts must be considered and reported in the screening process. Involuntary Resettlement Impacts Yes No Not known Remarks Will the project include any physical construction work? Does the proposed activity include upgrading or rehabilitation of existing physical facilities? Will it require permanent and/or temporary land acquisition? Is the ownership status and current usage of the land known? Are there any non titled people who live or earn their livelihood at the site or within the corridor of impact (COI) / Right of Way (ROW)? Will there be loss of housing? Will there be loss of agricultural plots? Page 6

15 Islamic Republic of Involuntary Resettlement Impacts Yes No Not known Remarks Will there be losses of crops, trees, and fixed assets (i.e. fences, pumps, etc.)? Will there be loss of businesses or enterprises? Will there be loss of incomes and livelihoods? Will people lose access to facilities, services, or natural resources? Will any social or economic activities be affected by land use related changes? Are any of the affected persons (AP) from indigenous or ethnic minority groups? If yes, please describe the situation D. Involuntary Resettlement Impact 3. After reviewing the answers above, EA/ Safeguard Team confirm that the assigned/ proposed subsection/ section is [ ] Has involuntary resettlement (IR) impact, a resettlement plan (or corrective action plan) is required [ ] Has No IR impact, no resettlement plan is required. A due diligence report for the assigned section is prepared. Prepared By: Verified by: Signature: Name: Position: Signature: Name: Position: Date: Date: Page 7

16 Islamic Republic of Additional Notes: (sketch map or pictures) Page 8

17 Islamic Republic of ANNEX 2 LOCATION AND SELECTED PHOTOGRAPHS OF AFFECTED AREA MAP Page 9

18 Islamic Republic of Chemtal district selected photos of affected areas Page 10

19 Islamic Republic of Page 11

20 Islamic Republic of Page 12

21 Islamic Republic of Page 13

22 Islamic Republic of Page 14

23 Islamic Republic of Page 15

24 Islamic Republic of Abdullah Canal photos of affected areas Page 16

25 Islamic Republic of Page 17

26 Islamic Republic of Daulat Abad Canal photos of affected areas Page 18

27 Islamic Republic of Page 19

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis: Code No: 1.9 Social Screening and Impact Assessment for Sub Projects A. Sub Project Description: Proposed Activity Walkability and Parking Improvements Lotus Road Implementing Agency: Colombo Municipal

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document June 2012 Pakistan: Sindh Cities Improvement Investment Program (SCIP) Prepared by North Sindh Urban Services Corporation Limited for the Asian Development Bank. PFR-2 Annex-11

More information

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT Village Roads Component on the GAUNGXI ROADS DEVELOPMENT II PROJECT in THE PEOPLE S REPUBLIC OF CHINA (PRC) Guangxi Comnications Department Nanning, PRC This report was prepared by the Borrower and is

More information

VOLUNTARY LAND DONATION FRAMEWORK

VOLUNTARY LAND DONATION FRAMEWORK Community-Managed Irrigated Agriculture Sector Project Additional Financing (RRP NEP 33209) A. The Project and Context 1. Project Description VOLUNTARY LAND DONATION FRAMEWORK 1. The proposed Community

More information

Land Acquisition and Resettlement Plan Corrective Action Plan

Land Acquisition and Resettlement Plan Corrective Action Plan Land Acquisition and Resettlement Plan Corrective Action Plan Faizabad Baharak Road Project Prepared in February 2018 Grant 0261/0262-AFG: Transport Network Development Investment Program Tranche 1 Prepared

More information

LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT. ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II

LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT. ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT SUBPROJECT 1, ARMAVIR ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II Project Number: L2860-ICB-1-01 Prepared by the Project Management

More information

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PIP annex 9 - C of GEF Hai Basin Integrated Water and Environment Management Project

More information

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION

More information

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing Involuntary Resettlement Due Diligence Report Loan 2860 (SF) July 2015 ARM: Water Supply and Sanitation Sector Project Additional Financing Prepared by the Armenian Water and Sewerage Closed Joint Stock

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LAO PDR: AGRICULTURAL DEVELOPMENT PROGRAM RP-59 POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT

More information

Social Safeguards Due Diligence Report

Social Safeguards Due Diligence Report Social Safeguards Due Diligence Report June 2018 IND: Bihar State Highways III Project Establishment of Bihar Road Research Institute Prepared by Bihar State Roads Development Corporation Limited, Government

More information

Regional Power Transmission Interconnection Project Afghanistan-Tajikistan 220 kv Power Transmission Project (Section B New Kunduz Substation to AP23)

Regional Power Transmission Interconnection Project Afghanistan-Tajikistan 220 kv Power Transmission Project (Section B New Kunduz Substation to AP23) Resettlement Planning Document Land Acquisition and Resettlement Plan Project Number: 40043 September 2010 Regional Power Transmission Interconnection Project Afghanistan-Tajikistan 220 kv Power Transmission

More information

Mongolia: Western Regional Road Corridor Investment Program

Mongolia: Western Regional Road Corridor Investment Program Western Regional Road Corridor Investment Program (RRP MON 41193) Resettlement Framework September 2011 Mongolia: Western Regional Road Corridor Investment Program Prepared by the Ministry of Roads, Transportation,

More information

Due Diligence Report on Social Safeguards. IND: Rural Connectivity Investment Program Projects I and II

Due Diligence Report on Social Safeguards. IND: Rural Connectivity Investment Program Projects I and II Due Diligence Report on Social Safeguards December 2015 IND: Rural Connectivity Investment Program Projects I and II Rural Road Network Management Unit in Midnapur, West Bengal Prepared by Ministry of

More information

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) ARRANGEMENT OF REGULATIONS Regulations 1. Claims for compensation 2. Assessment of compensation 3. Compensation principles

More information

DRAFT EXECUTIVE SUMMARY

DRAFT EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT EXECUTIVE SUMMARY IPUH - BANTAL (LINK 015.1) KABUPATEN MUKO-MUKO YEAR 2010 EXECUTIVE

More information

PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program

PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program Resettlement Framework July 2017 PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program Prepared by the National Highway Authority, Pakistan

More information

B. Justification of project design and alternative analysis:

B. Justification of project design and alternative analysis: Social Screening and Impact Assessment for Sub Projects Code No: 3 A. Sub Project Description: Proposed Activity Town Hall Square Development Implementing Agency: Colombo Municipal Council (CMC) Sub project

More information

ENTITLEMENT MATRIX. Gujarat State Highway Project - II. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

ENTITLEMENT MATRIX. Gujarat State Highway Project - II. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ROADS AND BUILDINGS DEPARTMENT GOVERNMENT OF GUJARAT Gujarat State Highway Project -

More information

YEREVAN MUNICIPALITY

YEREVAN MUNICIPALITY THE REPUBLIC OF ARMENIA YEREVAN MUNICIPALITY CONSTRUCTION OF ROAD LINKS OF YEREVAN WESTERN RING ROAD MFF Sustainable Urban Development Investment Program, Tranche 1 LAND ACQUISITION AND RESETTLEMENT PLAN

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP275 Socialist Republic of Vietnam Ministry of Transport and National Traffic Safety

More information

Republic of Azerbaijan: Water Supply and Sanitation Investment Program (Tranche 2)

Republic of Azerbaijan: Water Supply and Sanitation Investment Program (Tranche 2) Appendix 5 Resettlement Planning Document Land Acquisition and Resettlement Plan for Subprojects Under Tranche 2 (Goychay, Nakhcivan, Beylagan, and Agdash) Document Stage: Final November 11, 2011 Republic

More information

THE REPUBLIC OF ARMENIA YEREVAN MUNICIPALITY

THE REPUBLIC OF ARMENIA YEREVAN MUNICIPALITY THE REPUBLIC OF ARMENIA YEREVAN MUNICIPALITY ADB Loan No. 2752-ARM MFF Sustainable Urban Development Investment Program, Tranche 1 LAND ACQUISITION AND RESETTLEMENT PLAN 3 APRIL 23 2014 Yerevan City Municipality

More information

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Land Acquisition

More information

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework 1. BACKGROUND Dhaka Water Supply and Sanitation Project Resettlement Policy Framework The Dhaka Water and Sewerage Authority (DWASA) currently supplies water to about 70% of the population of the Dhaka

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document Land Acquisition and Resettlement Plan (LARP) for Mirishkor Subproject Document Stage: Final Project Number: UZB: 2208 July 2009 UZB: Kashkadarya and Navoi Rural Water Supply

More information

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project)

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project) Resettlement Plan October 2014 GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project) Prepared by United Water Supply Company of Georgia LLC of the Ministry

More information

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors. SUMMARY LAND ACQUISITION PLAN Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the RURAL ROADS SECTOR I PROJECT in INDIA Ministry of Rural Development

More information

TONGA: Nuku alofa Urban Development Sector Project. Core Subproject 1 (Water Supply)

TONGA: Nuku alofa Urban Development Sector Project. Core Subproject 1 (Water Supply) Nuku'alofa Urban Development Sector Project (RRP TON 42394-22) Resettlement Plan TONGA: Nuku alofa Urban Development Sector Project Core Subproject 1 (Water Supply) Prepared by Planning and Urban Management

More information

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Vision Contribute to overall development of the nation and its citizens by creating conducive

More information

PAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing

PAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing

More information

UZB: Kashkadarya Regional Road Project

UZB: Kashkadarya Regional Road Project Resettlement Framework Project No.: 50063 September 2016 UZB: Kashkadarya Regional Road Project Prepared by the Road Fund under the Ministry of Finance of the Republic of Uzbekistan for the Asian Development

More information

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project Land Acquisition and Resettlement Framework Date: May 2016 Status: Update FIJI: Transport Infrastructure Investment Sector Project CURRENCY EQUIVALENTS (as of August 2014) Fiji Dollar (FJD) FJD 1.00 =

More information

COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation

COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN CMM and CBM Production for Power Generation Shanxi Jincheng Coal Mining Group Co., Ltd. September 2004 THIS IS NOT AN ADB BOARD

More information

Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program

Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program Resettlement Framework Project Number: 42414 April 2010 Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program ABBREVIATIONS ADB Asian Development Bank

More information

Mongolia: Ulaanbaatar Urban Services and Ger Areas Development Investment Program

Mongolia: Ulaanbaatar Urban Services and Ger Areas Development Investment Program Resettlement Framework August 2013 Mongolia: Ulaanbaatar Urban Services and Ger Areas Development Investment Program Prepared by {complete and accurate name of government agency or private sector project

More information

MARKETILED SMALLHOLDER

MARKETILED SMALLHOLDER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNMENT OF THE REPUBLIC OF MOZAMBIQUE MINISTRY OF PLANNING AND DEVELOPMENT RP428 MARKETILED

More information

Dhaka Water Supply and Sanitation Project

Dhaka Water Supply and Sanitation Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VOL. 1 Dhaka Water Supply and Sanitation Project Resettlement Policy Framework Dhaka

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Section I - Basic Information Date Prepared/Updated:

More information

REPUBLIC OF MACEDONIA

REPUBLIC OF MACEDONIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Municipal Services Improvement Project (MSIP) LAND ACQUISITION

More information

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS MINISTRY OF EDUCATION GOVERNMENT OF NEPAL August 2011 2 A. Introduction 1.

More information

LAND REFORM IN MALAWI

LAND REFORM IN MALAWI LAND REFORM IN MALAWI Presented at the Annual Meeting for FIG Commission 7 In Pretoria, South Africa, Held From 4 th 8 th November, 2002 by Daniel O. C. Gondwe 1.0 BACKGROUND Malawi is a landlocked country

More information

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy

More information

Land Acquisition and Resettlement Policy Framework

Land Acquisition and Resettlement Policy Framework Myanmar Agriculture Development Support Project Land Acquisition and Resettlement Policy Framework Ministry of Agriculture and Irrigation The Union Government of Myanmar Draft for Public Consultation 1

More information

ARM: Sustainable Urban Development Investment Program Tranche 2

ARM: Sustainable Urban Development Investment Program Tranche 2 Resettlement Plan May 2015 ARM: Sustainable Urban Development Investment Program Tranche 2 Argavand - Shirak Road Link Prepared by Yerevan Municipality for the Asian Development Bank. This is an updated

More information

Cambodia Health Equity and Quality Improvement Project (H-EQIP) (P157291) Resettlement Policy Framework (RPF) (DRAFT)

Cambodia Health Equity and Quality Improvement Project (H-EQIP) (P157291) Resettlement Policy Framework (RPF) (DRAFT) Cambodia Health Equity and Quality Improvement Project (H-EQIP) (P157291) Resettlement Policy Framework (RPF) (DRAFT) Date: December 2, 2015 Contents 1. Introduction... 1 2. Project Description... 2 Project

More information

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PT PLN (Persero) INDONESIA POWER SECOND TRANSMISSION DEVELOPMENT PROJECT (IPTD-2) RP1232

More information

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency

More information

Resettlement Policy Framework

Resettlement Policy Framework Republic of Turkey Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework Background 1. The Second Renewable Energy and Energy Efficiency Project will fund private sector investments

More information

ARM: Water Supply and Sanitation Sector Project Phase II

ARM: Water Supply and Sanitation Sector Project Phase II Social Due Diligence Report December 2014 ARM: Water Supply and Sanitation Sector Project Phase II Prepared by Project Management Unit, Armenian Water and Sewerage Company for the Asian Development Bank.

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Ministry of Agriculture and Environmental Protection Directorate for Water Management 11070 Belgrade, Blvd. Umetnosti 2a ELEKTROPRIVREDA SRBIJE FLOODS EMERGENCY AND RECOVERY PROJECT (FERP) RESETTLEMENT

More information

TONGA: Nuku alofa Urban Development Sector Project

TONGA: Nuku alofa Urban Development Sector Project Nuku'alofa Urban Development Sector Project (RRP TON 42394-22) Resettlement Framework TONGA: Nuku alofa Urban Development Sector Project Prepared by Planning and Urban Management Department, Ministry of

More information

Islamic Republic of Afghanistan

Islamic Republic of Afghanistan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Islamic Republic of Afghanistan Ministry of Energy and Water (MEW) Irrigation Restoration

More information

ARM: Proposed Armenia Georgia Border Regional Road (M6 Vanadzor Bagratashen) Improvement Project

ARM: Proposed Armenia Georgia Border Regional Road (M6 Vanadzor Bagratashen) Improvement Project Resettlement Plan Land Acquisition and Resettlement Plan July 2016 ARM: Proposed Armenia Georgia Border Regional Road (M6 Vanadzor Bagratashen) Improvement Project Prepared by the Ministry of Transport

More information

Resettlement Plan. May 2011

Resettlement Plan. May 2011 Resettlement Plan May 2011 GEO: Road Corridor Investment Program, Tranche 1 Kobuleti Bypass, Kobuleti Batumi Section and Batumi Bypass Design Project (Kobuleti Section of Contract 1 (km 4.7 km 12.4 and

More information

India: Madhya Pradesh Irrigation Efficiency Improvement Project. Subproject: Pipeline Distribution System for 500 Hectares of Command Area

India: Madhya Pradesh Irrigation Efficiency Improvement Project. Subproject: Pipeline Distribution System for 500 Hectares of Command Area Madhya Pradesh Irrigation Efficiency Improvement Project (RRP IND 45371) Resettlement Plan/Land Acquisition Plan (This document is prepared in accordance to the ADB Resettlement Plan Requirement as described

More information

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Involuntary Resettlement Safeguards Objectives: To avoid resettlement wherever possible;

More information

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in the Lok Sabha by the Minister for Rural

More information

RESETTLEMENT POLICY FRAMEWORK (RPF)

RESETTLEMENT POLICY FRAMEWORK (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JANUARY 2013 Republic of Mozambique Mozambique Climate Resilience: Transforming Hydro-Meteorological

More information

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Summary of Land Acquisition Policy Framework JAMAICA: JM Hurricane Dean ERL Project RP607

More information

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4 Vietnam: Transmission

More information

AFG: Energy Sector Development Investment Program Tranche 4 (New Andkhoy 220/110/20 KV Substation Project)

AFG: Energy Sector Development Investment Program Tranche 4 (New Andkhoy 220/110/20 KV Substation Project) Resettlement Due Diligence Report February 2018 AFG: Energy Sector Development Investment Program Tranche 4 (New Andkhoy 220/110/20 KV Substation Project) Prepared by Da Afghanistan Breshna Sherkat for

More information

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION RP762 v30 1. Information About Project Name &Location of Subproject Project Sponsor Project Cost Installed Generation

More information

Draft Land Acquisition and Resettlement Plan (LARP) TAJ: CAREC Corridors 2, 5 and 6 (Dushanbe-Kurgonteppa) Road Project

Draft Land Acquisition and Resettlement Plan (LARP) TAJ: CAREC Corridors 2, 5 and 6 (Dushanbe-Kurgonteppa) Road Project Draft Land Acquisition and Resettlement Plan (LARP) Project Number: 49042-004 August 2016 TAJ: CAREC Corridors 2, 5 and 6 (Dushanbe-Kurgonteppa) Road Project Prepared by the Ministry of Transport. This

More information

Pakistan: Barani Integrated Water Resources Sector Project

Pakistan: Barani Integrated Water Resources Sector Project Resettlement Planning Document Land Acquisition and Resettlement Framework Document Stage: Final Version Project Number: 39364 September 2007 Pakistan: Barani Integrated Water Resources Sector Project

More information

PRC: Fujian Soil Conservation and Rural Development II Project

PRC: Fujian Soil Conservation and Rural Development II Project Resettlement Monitoring Report Project Number: 33439-013 July 2012 PRC: Fujian Soil Conservation and Rural Development II Project Prepared by Research Institute of Agricultural Economy, Fujian Academy

More information

LAND ACQUISITION FRAMEWORK

LAND ACQUISITION FRAMEWORK LAND ACQUISITION FRAMEWORK (This framework was prepared in accordance to the ADB requirements for preparing Resettlement Framework as described in the ADB Safeguards Policy Statement, 2009) Project Number:

More information

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Project preparation under the PDF-B grant RP337

More information

Land Acquisition and Resettlement Plan. Uzbekistan: Water Supply and Sanitation Services

Land Acquisition and Resettlement Plan. Uzbekistan: Water Supply and Sanitation Services Supplementary Appendix D-2 Land Acquisition and Resettlement Plan Short Land Acquisition and Resettlement Plan for Rishtan City Water Supply System Document Stage: Draft Project Number: March 2010 Uzbekistan:

More information

LAND ACQUISITION AND COMPENSATION

LAND ACQUISITION AND COMPENSATION LAND ACQUISITION AND COMPENSATION 7 Land owner receiving compensation payment, Azerbaijan Village based negotiations, Turkey RAP Monitoring with RUDF, Lot C, Turkey 7 7 LAND ACQUISITION AND COMPENSATION

More information

Draft Land Acquisition and Resettlement Framework. Cambodia: National Solar Park Project

Draft Land Acquisition and Resettlement Framework. Cambodia: National Solar Park Project National Solar Park Project (RRP CAM 51182) Draft Land Acquisition and Resettlement Framework September 2018 Cambodia: National Solar Park Project Prepared by the Electricité Du Cambodge for the Asian

More information

RESSETTLEMENT POLICY FRAMEWORK

RESSETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Department of Water Resources and Land Improvement of the Kyrgyz Republic Project Implementation

More information

PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program

PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program Resettlement Plan July 217 PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program Ratodero Shikarpur Section II Prepared by the National

More information

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose Expropriation Context Following from the goal of the National Land Policy, to promote and ensure a secure land tenure system that is transparent, effective, non-discriminative, equitable and just ; it

More information

PAK: Balochistan Water Resources Development Sector Project

PAK: Balochistan Water Resources Development Sector Project Resettlement Framework February 2018 PAK: Balochistan Water Resources Development Sector Project Project No. 48098-002 Prepared by Irrigation and Power Department, Government of Balochistan for the Asian

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM HO CHI MINH CITY PEOPLE S COMMITTEE INVESTMENT MANAGEMENT

More information

Land Acquisition and Resettlement Plan. Uzbekistan: Water Supply and Sanitation Services

Land Acquisition and Resettlement Plan. Uzbekistan: Water Supply and Sanitation Services Supplementary Appendix D-1 Land Acquisition and Resettlement Plan Short Land Acquisition and Resettlement Plan for Fergana Water Supply System Document Stage: Draft Project Number: March 2010 Uzbekistan:

More information

Viet Nam: Secondary Cities Development Project - Buon Ma Thuot Subproject

Viet Nam: Secondary Cities Development Project - Buon Ma Thuot Subproject Resettlement Monitoring Report Semi-Annual Report January 2017 Viet Nam: Secondary Cities Development Project - Buon Ma Thuot Subproject Prepared by Nguyen Van Trung, External Resettlement Monitoring Consultant,

More information

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project I. Introduction The overall length of the road network in Albania totals

More information

I U B Reddy The World Bank New Delhi, India

I U B Reddy The World Bank New Delhi, India IAIA15 India s New Land Acquisition Act Right To Fair Compensation and Transparency in Land Acquisition and Rehabilitation and Resettlement Act, 2013 I U B Reddy The World Bank New Delhi, India Challenging

More information

MFF 0021-PAK: Power Distribution Enhancement Investment Program Proposed Tranche 3

MFF 0021-PAK: Power Distribution Enhancement Investment Program Proposed Tranche 3 Resettlement Plan October 2012 MFF 0021-PAK: Power Distribution Enhancement Investment Program Proposed Tranche 3 Prepared by Islamabad Electric Supply Company for the Asian Development Bank. Asian Development

More information

NATIONAL GANGA RIVER BASIN AUTHORITY

NATIONAL GANGA RIVER BASIN AUTHORITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL GANGA RIVER BASIN AUTHORITY (Ministry of Environment and Forests, Government

More information

FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATIONS OR WILLING BUYER/WILLING SELLER PROCESSES

FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATIONS OR WILLING BUYER/WILLING SELLER PROCESSES Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SCHOOL SECTOR REFORM PROGRAM (SSRP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY

More information

Decree on State Land Lease or Concession

Decree on State Land Lease or Concession Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity ~~~~~~~~~~~~~ Prime Minister s Office No. 135/PM VCC, Date 25/05/2009 Decree on State Land Lease or Concession - Pursuant

More information

Surabaya River Improvement Project (II-1)

Surabaya River Improvement Project (II-1) Indonesia 1. Project Profile and Japan s ODA Loan (1) Background Surabaya River Improvement Project (II1) Report Date: June 2 Field Survey: February 2 When this project was planned in 199, the city of

More information

People s Republic of China: Gansu Tianshui Urban Infrastructure Development Project

People s Republic of China: Gansu Tianshui Urban Infrastructure Development Project Resettlement Plan July 2013 People s Republic of China: Gansu Tianshui Urban Infrastructure Development Project Prepared by Tianshui Urban Construction Investment Group Co. Ltd. for the Asian Development

More information

Land Acquisition and Resettlement Framework

Land Acquisition and Resettlement Framework Land Acquisition and Resettlement Framework Document Stage: Updated Project Number: 43439-KAZ Date: June 2015 KAZ: Multitranche Financing Facility for the CAREC Transport Corridor 2 (Mangystau Oblast Section)

More information

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project Land Acquisition/Resettlement Framework Project Number: 46453 March 2014 Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project Prepared by the Ministry of Finance and

More information

MFF 0021-PAK: Power Distribution Enhancement Investment Program Proposed Tranche 3

MFF 0021-PAK: Power Distribution Enhancement Investment Program Proposed Tranche 3 Resettlement Plan October 2012 MFF 0021-PAK: Power Distribution Enhancement Investment Program Proposed Tranche 3 Prepared by Islamabad Electric Supply Company for the Asian Development Bank. ISLAMIC REPUBLIC

More information

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP)

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) Resettlement Action Plan Update Report for the ARUSHA

More information

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN Project Number: 42039-035 August 2012 Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program PLEIKU-MY PHUOC-CAU

More information

Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal

Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal Tanahu Hydropower Project (RRP NEP 43281) Resettlement Framework October 2012 NEP: TANAHU HYDROPOWER PROJECT Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal

More information

UZB: Second CAREC Corridor 2 Road Investment Program, Project 3

UZB: Second CAREC Corridor 2 Road Investment Program, Project 3 Resettlement Plan October 2014 UZB: Second CAREC Corridor 2 Road Investment Program, Project 3 Prepared by the Republic Road Fund for the Asian Development Bank. Resettlement Planning Document Land Acquisition

More information

Land Use Rights Transfer and Cooperation Agreements Due Diligence Report. PRC: Fujian Farmland Sustainable Utilization and Demonstration Project

Land Use Rights Transfer and Cooperation Agreements Due Diligence Report. PRC: Fujian Farmland Sustainable Utilization and Demonstration Project Land Use Rights Transfer and Cooperation Agreements Due Diligence Report Project Number: 47071-001 March 2016 PRC: Fujian Farmland Sustainable Utilization and Demonstration Project Prepared by the Fujian

More information

Results Framework for LAPs Household-level Impacts

Results Framework for LAPs Household-level Impacts Results Framework for LAPs Household-level Impacts The following results framework shows the indicators that could be used to evaluate LAP impacts at the household level. This matrix has been constructed

More information

JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK

JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK I. Introduction The Jamaica Social Investment Fund (JSIF) was established in 1996 under the Government of Jamaica s National

More information

AZE: Second Road Network Development Investment Program

AZE: Second Road Network Development Investment Program Resettlement Plan Project Number: 45389 October 2017 AZE: Second Road Network Development Investment Program Prepared by AZERAVTOYOL Open Joint Stock Company of the Republic of Azerbaijan for the Asian

More information

Andhra Pradesh Rural Roads Connectivity Project The Asian Infrastructure Investment Bank assisted

Andhra Pradesh Rural Roads Connectivity Project The Asian Infrastructure Investment Bank assisted GOVERNMENT OF ANDHRA PRADESH PANCHAYAT RAJ ENGINEERING DEPARTEMNT The (RPF) July 2018 Samaj Vikas Development Support Organisation Table of Contents List of Acronyms... 3 Glossary of Resettlement & Rehabilitation

More information

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011 The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in Lok Sabha on September 7, 2011. On December 17, 2012, during the winter session of Parliament, the government circulated

More information

Due Diligence Report for Land Acquisition and Resettlement. KAZ: CAREC Corridor 2 (Mangystau Oblast Section) Investment Program Tranche 2

Due Diligence Report for Land Acquisition and Resettlement. KAZ: CAREC Corridor 2 (Mangystau Oblast Section) Investment Program Tranche 2 Due Diligence Report for Land Acquisition and Resettlement Document Stage: Draft for team review Project Number: 43439-033 Bi-annual Report July 2015 KAZ: CAREC Corridor 2 (Mangystau Oblast Section) Investment

More information