1 Village Roads Component on the GAUNGXI ROADS DEVELOPMENT II PROJECT in THE PEOPLE S REPUBLIC OF CHINA (PRC) Guangxi Comnications Department Nanning, PRC This report was prepared by the Borrower and is not an ADB document. Version dated: 30 June 2004

2 CONTENTS 1. Introduction Scope Of Resettlement Impacts Legal Framework Resettlement Principles and Eligibility for Compensation Entitlements Compensation Standards Rehabilitation Approaches Institutional Arrangements Resettlement Funding, Cost Estimate, Flow of Funds Consultation, Disclosure, and Grievance Redress Resettlement Monitoring and Evaluation Arrangement Procedure Guidelines for RP Preparation...7 Annex Data to be Collected for RP Preparation and Resettlement Budget Estimates...8

3 1. Introduction The Guangxi Roads II Project includes the construction on an expressway from Tanlou to Baise, including interchanges, connector roads and a 250 km inter-county road. A full Resettlement Plan (RP) has been prepared for these components. The Project will also include upgrading 500 km of village roads, but the plans for these roads are very general at this time. In accordance with ADB requirements, this policy framework addresses any village roads that involve land acquisition and resettlement. The users and beneficiaries of the village roads are all the villagers along those village roads. The rural land is owned by rural collective, and is contracted, managed and used by collective, village groups or individuals. If the village roads use some land contracted by very few villagers, the affected village will readjust the land within that village. So usually it isn t necessary for the government to pay the compensation and subsidy for the land (for details, please refer to Section 6.1). The village roads are narrow and low in standard, and will use little land or no land for upgrading. Therefore, it is estimated that basically there is no significant land acquisition and that house relocation can be avoided. In case a few houses are demolished for the village roads, it will be implemented according to the national and local laws and regulations, ADB s related policies and this policy framework. The civil work for upgrading village roads will be done by the county or township road construction teams, and local labor will be hired for unskilled jobs. 2. Scope Of Resettlement Impacts Based on the experience with the upgrading of village roads, the land acquisition and resettlement impacts are considered minor and not significant. At this time, there is no estimate of the amount of land acquisition, demolished structures and affected people. The road sections have only been generally identified and there will likely be some changes before implementation. 3. Legal Framework In China, rural land acquisition and resettlement is based on Land Administration Law (1998) and relevant provincial implementation measures, which clarify land rights and provide a basic legal structure and policy framework for addressing all land acquisition and resettlement issues. Land Tenure (ownership): Village land is owned by the collectives and is contracted, managed and used by collectives, groups or individuals. At present land is normally contracted to villagers for 30 years. Land Acquisition: 1) For simple village roads ( km), where works are conducted entirely within the village by the collective, there is no requirement for land compensation payments because there is no transfer of land ownership. 2) For township-village roads, the road is 1

4 owned by the township government; therefore, land transfer and compensation would be required for the affected village(s). Land Compensation and Subsidy: The village is required to readjust the remaining land or pay cash compensation to households that lose some of their contracted land. For townshipvillage roads, compensation and subsidies will be paid by the County Comnications Office (CCO) to the affected village collective in accordance with the standards in Section 6. Demolished housing and affected assets on the land: The village committee is required to pay compensation for demolished or affected housing, attachments, trees and young crops belonging to groups or individuals; such compensation will be paid in cash directly to the affected owners. Consultation and Disclosure The village committee will consult with villagers and solicit comments and suggestions before finalizing the compensation arrangement and mitigation measures. Resettlement information booklets (or the Resettlement Framework) will be distributed to the affected villages as soon as the road section is confirmed to be in the program by the CCO. 4. Resettlement Principles and Eligibility for Compensation Following the Chinese laws & regulations on land acquisition and resettlement and incorporating ADB policy on involuntary resettlement, the basic principles of land acquisition and resettlement for the Guangxi Roads II Project include the following elements: Minimize negative impacts as ch as possible; Carry out land adjustment or compensation to improve or at least restore the pre-project income and living standards of the affected people; Fully inform and consult closely with affect people on compensation arrangements; Provide compensation for private assets at replacement rates, prior to commencement of civil work on the affected section. Regarding the eligibility of compensation, all affected people will be provided with compensation and rehabilitation if: their land area is reduced, income source is adversely affected, houses partially or fully demolished, and other properties (crops, trees, and other facilities) or access to these properties will be reduced or damaged due to land acquisition. Lack of legal documents of their customary rights of occupancy certificates shall not affect their eligibility for compensation. This resettlement policy shall apply to all village roads under the project regardless whether or not they are directly funded by ADB. The policy applies to all affected persons regardless of the number or the severity of impact. Particular attention is to be paid to the needs of vulnerable groups, defined as affected households that are: the extremely poor households, elderly living alone, disabled, household headed by women, and ethnic minorities other than Zhuang people 1, such as Yao people. 1 The Zhuang people comprise the vast majority (80% to 100%) of the people in the project townships. The basic provisions in the RF reflect preferential compensation standards and entitlements for the Zhuang people. 2

5 5. Entitlements The affected households will receive their entitlement in accordance to the type of impact, their eligibility and compensation standards set out in Table 1. Type of Loss I. LOSS OF LAND USE Temporarily Affected Agricultural Land Table 1 Entitlement Matrix Entitled Persons Compensation and rehabilitation measures Households with land use rights or lease rights Cash compensation for loss of income potential (1,000 yuan/ for farmland, and 200 yuan/ for nonfarmland). Restoration of land to its previous or better quality. Implementation Issues Temporary use of land will range from 6 to 12 months Permanently Affected Agricultural Land Households with land use rights and Village Collective 1) If land use for the village road construction is within the village, no land acquisition fees should be paid by the Project. However, if the land use affects some contracted households, the village should take some mitigation measures to the APs, such as readjustment of the contracted land, providing the affected households a replacement land, or paying in cash to the affected households if no land can be readjusted or given to the APs. The APs will be free from taxes, registration and land transfer resulting from the village road construction. 2) If land use for the village road construction is out of the original village, such as town-village road construction, the compensation standard for permanent land acquisition, including land compensation, resettlement subsidy, and young crop compensation, is 5,000 yuan/ for farmland, and 1,000 yuan/ for non-farmland. Permanently Acquired Residential or Commercial Land Households with land use rights Households with lease rights (e.g., market stalls) A new housing plot will be provided of equivalent size and accessibility. A new housing plot will be provided of equivalent size and accessibility. Cost of the plot and fees will be paid by the project. In the case of new markets, the AP will be entitled to lease a stall at a preferential rate. II. LOSS OF HOUSES & OTHER STRUCTURES Affected Houses and Structures (private or public) Registered owner of house/property Compensation in cash for affected houses and structures based on size and quality of construction and compensation standards. Compensation is at the replacement cost, without deduction for depreciation or salvageable materials. 3

6 Type of Loss Entitled Persons Compensation and rehabilitation measures Implementation Issues III. LOSS OF COMMON PROPERTY RESOURCES Irrigation Facilities Affected villages and households Restoration of irrigation facilities to at least previous condition. IV. SPECIAL MEASURES Special assistance for vulnerable households extremely poor households, elderly living alone, disabled, household headed by women, and ethnic minorities other than Zhuang people, such as Yao people Households will receive priority for road construction jobs. One member of affected households will be provided training to develop alternative livelihood sources. 6. Compensation Standards Since the village road subprojects have not yet been specifically identified, the detailed project impacts and local compensation standards for land acquisition and building demolition will not been fixed. However, following the national laws and provincial regulations and ADB policy, this policy framework has established entitlements, minim land compensation rates and rehabilitation approaches to address anticipated types of project impacts. 6.1 Land compensation For simple village roads where the land use for the village road construction is within the village, land will be still owned by the village. There is no transfer of land ownership, and this only requires the replanning of the land use within the village. No land acquisition fees are required to be paid because the road is owned by the village. However, if the land use affects some contracted households, the village should take some mitigation measures for the APs, such as readjustment of the contracted land, providing the affected households a replacement land, or paying in cash to the affected households if no land can be readjusted or given to the APs. Most villages have 5 % cultivated land in reserve, which may be allocated to those individuals losing land use rights. The amount of reserve land is ch greater than the potential loss of land from upgrading village roads. For township-village road construction where the land use in several villages may be affected, the compensation standard for permanent land acquisition, including land compensation, resettlement subsidy, and young crop compensation, is as follows: - farmland - 5,000 yuan/ - non-farmland - 1,000 yuan/ For temporary land occupation, in general compensation will be paid directly to affected persons for the time of occupation, based on average annual yield of different types of 4

7 cultivated lands, plus the cost of restoring the land to its original condition. Since village road construction will only require land for short periods not exceeding on year, the compensation standard for temporary land occupation is as follows: - farmland - 1,000 yuan/ - non-farmland yuan/ 6.2 House relocation For demolished houses, the affected household is entitled to the replacement value of lost structures (without depreciation or deduction of salvage materials) and land attachments. The village will provide the affected household a comparable or better housing plot. The APs will be free from taxes, registration and land transfer resulting from the village road construction. From the experience with village road construction, there is usually no impact on the houses, so the detailed house compensation standards can not be fixed for the present. However, before the village road subprojects which will cause house demolition are selected, the related house compensation standards will be decided in accordance with the local regulations in the affected areas. The compensation will be paid directly to the affected household/owner. The affected households will rebuild their houses by themselves with compensation received and construction materials from their old houses. For those vulnerable households, the village committees will provide assistance in house rebuilding. 7. Rehabilitation Approaches In general, the impacts of the Project will be very minor in most cases and rehabilitation options will be selected by each individual household. Some households may be seriously affected or may risk becoming worse off, despite the full payment of compensation. Such households will receive the following entitlements: - guarantee hire for road construction labor - skills training (one person per household, at least 50% females) - priority for involvement in local poverty reduction programs. 8. Institutional Arrangements The Guangxi Roads II Project Management Office (PMO) has overall coordination responsibilities for Project components, including the village roads. The county comnications office (CCOs) in each of the 5 counties and districts (Long an County of Nanning City, Pingguo County, Tiandong County, Tianyang County, and Youjiang District of Baise city) will be responsible for supervising implementation of village roads. The GCD will prepare annual internal monitoring reports for village roads to be included under the Project, and submit the reports to ADB. 5

8 9. Resettlement Funding, Cost Estimate, Flow of Funds Any costs for resettlement for the village roads will be covered in the lump sum provision provided to each village by the CCOs. If cash compensation is required, the village committee will make payments directly to the affected households. The amount of fund for resettlement will be small compared to the cost of civil works, and is included in the total estimated cost of the village road program. More detailed costs will be included in the detailed village road program. In order to minimize or resolve problems in arranging compensation or rehabilitation, CCOs will inspect the completed roads before making final payment. 10. Consultation, Disclosure, and Grievance Redress The consultation with the APs will take place in the early process of village road planning. Prior to project construction, village leaders will conduct a survey of all affected land and assets. The village committee will consult with affected groups and households to discuss options for replacement land or cash compensation. A comprehensive Resettlement Plan (RP) for the minority village road resettlement plans will be submitted to ADB for posting on ADB's resettlement website. The RP will list all the road segments in the program and will quantify the resettlement impacts, if any, for each segment. A Resettlement Information Booklet (RIB) will be distributed to affected households in the village as soon as the villages have been approved in the road program. Consultation and participation will be continued through the village road implementation. Grievances can first be addressed to the village committee. If no settlement is reached within two weeks, the complainant has one month to elevate the grievances to the township government office. If it still unresolved within two weeks, the case can be sent to CCOs. Final appeal is available in the civil courts as established by the Regulations for Administrative Redress. 11. Resettlement Monitoring and Evaluation Arrangement Following the requirements of the ADB, during the resettlement implementation, both internal and external resettlement monitoring and evaluation will be carried out in order to monitor resettlement implementation and ensure all APs or villages are compensated adequately and their income and livelihood are restored after resettlement and rehabilitation. The internal resettlement monitoring will be carried out by each CCO. During the land acquisition stage, the CCO will collect information of impacts, compensation payments, employment activities, training and grievances. GCD will prepare annual internal monitoring reports and submit to ADB. For external resettlement monitoring and evaluation, an independent agency will be contracted 2 over 3 years to assess socio-economic progress and to carry out independent monitoring and evaluation of village roads and any land compensation and resettlement 2 This may be the same monitoring institute that is hired for the main expressway component. 6

9 activities. The method of resettlement monitoring and evaluation will be based on a combination of sample household surveys and rapid appraisal in the field. The sociologist will assess whether: (i) project implementation is in compliance with the policies and entitlements set out in the RF; (ii) the affected people have fully restored their livelihoods; and (iii) the affected people have directly benefited from the Project. The sociologist should make recommendations to improve implementation. The resettlement monitoring and evaluation should be carried out once every year and an annual report prepared for submission to ADB. 12. Procedure Guidelines for RP Preparation For each year of the village road program, a short resettlement plan should be prepared by GCD with assistance from the CCOs. The RP will include all village road segments to be upgrading in the subsequent fiscal year. The RP will be disclosed to the affected persons and endorsed by the GCD. The RP will be sent to ADB for concurrence prior to the award of civil works on the village roads for that year s program. Following ADB requirements, the resettlement plan will include following key elements: estimate of the numbers affected persons and extent of losses; the policies and legal framework applicable (as per this Resettlement Framework); asset valuation, compensation standards, entitlements of affected village and households; proposed method of compensation (cash or replacement land) and rehabilitation measures; agencies responsible for measuring, delivering and monitoring compensation entitlements; cost estimate and source of funding; timing for compensation, land acquisition and rehabilitation measures; consultation and grievance mechanisms for people affected (as per this framework). 7

10 Annex Data to be Collected for RP Preparation and Resettlement Budget Estimates A1. DATA TO BE COLLECTED IN ORDER TO PREPARE THE RP The related sample tables (for reference only) are as follows: Sample Table Estimates of Land Affected Permanently Item unit amount Paddy field Dry land Sugarcane field Vegetable land Orchard Fish pond Cash forest land Timber forest land Waste land Total Sample Table Estimates of Land Affected Temporarily Item unit Amount Paddy field Dry land Sugarcane field Vegetable land Orchard Fish pond Cash forest land Timber forest land Waste land Total Sample Table Estimates of Affected Structure item Unit Amount Brick concrete structure square meters Brick timber structure square meters Wooden structure square meters Earth wood structure square meters Simple structure square meters Total square meters 8

11 Sample Table Estimates of Affected people Item Persons Households People affected by permanent land acquisition People affected by temporary land occupation People affected by house demolition Sample Table Estimates of Affected other assets Item Unit Amount Trees Well Tomb Pool Comnication line Electricity line 9

12 A2. ESTIMATE OF RESETTLEMENT COSTS The related sample table (for reference only) is as follows: Affected Item Unit amount 1. Permanent Land Acquisition and Temporary Land Use 1.1 Land compensation, resettlement subsidy and young crop compensation - Farmland - Non-farmland 1.2 Temporary land use Fee 2. House Demolition and Relocation 2.1 House compensation - Brick concrete structure - Brick timber structure - Wooden structure - Earth wood structure - Simple structure 2.2 Housing attachments 2.3 Scattered Trees 3. Reconstruction of Infrastructure 4. Management Costs 5. Contingencies 5.1 Physical contingencies 5.2 Price contingencies Total Unit Cost (yuan) Compensation amount (Yuan) 10

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PIP annex 9 - C of GEF Hai Basin Integrated Water and Environment Management Project

More information

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors. SUMMARY LAND ACQUISITION PLAN Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the RURAL ROADS SECTOR I PROJECT in INDIA Ministry of Rural Development

More information

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION

More information

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Project preparation under the PDF-B grant RP337

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LAO PDR: AGRICULTURAL DEVELOPMENT PROGRAM RP-59 POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT

More information

COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation

COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN CMM and CBM Production for Power Generation Shanxi Jincheng Coal Mining Group Co., Ltd. September 2004 THIS IS NOT AN ADB BOARD

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP275 Socialist Republic of Vietnam Ministry of Transport and National Traffic Safety

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document June 2012 Pakistan: Sindh Cities Improvement Investment Program (SCIP) Prepared by North Sindh Urban Services Corporation Limited for the Asian Development Bank. PFR-2 Annex-11

More information

PRC: Fujian Soil Conservation and Rural Development II Project

PRC: Fujian Soil Conservation and Rural Development II Project Resettlement Monitoring Report Project Number: 33439-013 July 2012 PRC: Fujian Soil Conservation and Rural Development II Project Prepared by Research Institute of Agricultural Economy, Fujian Academy

More information

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project I. Introduction The overall length of the road network in Albania totals

More information

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Vision Contribute to overall development of the nation and its citizens by creating conducive

More information

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Summary of Land Acquisition Policy Framework JAMAICA: JM Hurricane Dean ERL Project RP607

More information

REPUBLIC OF MACEDONIA

REPUBLIC OF MACEDONIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Municipal Services Improvement Project (MSIP) LAND ACQUISITION

More information

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND (DRAFT) Public Disclosure Authorized RP337 v2 LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND Public Disclosure Authorized Public

More information

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy

More information

RESETTLEMENT POLICY FRAMEWORK (RPF)

RESETTLEMENT POLICY FRAMEWORK (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JANUARY 2013 Republic of Mozambique Mozambique Climate Resilience: Transforming Hydro-Meteorological

More information

PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program

PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Resettlement Due Diligence Report Project Number: 50050 September 2016 PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Prepared by the Guangxi Zhuang Autonomous Region Government

More information

PRC: Xinjiang Municipal Infrastructure and Environmental Improvement Project

PRC: Xinjiang Municipal Infrastructure and Environmental Improvement Project Social Monitoring Report Project Number: 39228 August 2010 PRC: Xinjiang Municipal Infrastructure and Environmental Improvement Project Prepared by Xinjiang Agricultural University Xinjiang Uygur Autonomous

More information

PRC: Xinjiang Urban Transport and Environmental Improvement Project

PRC: Xinjiang Urban Transport and Environmental Improvement Project Resettlement Plan April 2013 PRC: Xinjiang Urban Transport and Environmental Improvement Project Prepared by Xinjiang Project Management Office, Hami Construction Bureau for the Asian Development Bank.

More information

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis: Code No: 1.9 Social Screening and Impact Assessment for Sub Projects A. Sub Project Description: Proposed Activity Walkability and Parking Improvements Lotus Road Implementing Agency: Colombo Municipal

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document Land Acquisition and Resettlement Plan (LARP) for Mirishkor Subproject Document Stage: Final Project Number: UZB: 2208 July 2009 UZB: Kashkadarya and Navoi Rural Water Supply

More information

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4 Vietnam: Transmission

More information

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency

More information

PRC: Xinjiang Altay Urban Infrastructure and Environment Improvement Project Habahe County

PRC: Xinjiang Altay Urban Infrastructure and Environment Improvement Project Habahe County Updated Resettlement Plan October 2011 PRC: Xinjiang Altay Urban Infrastructure and Environment Improvement Project Habahe County Prepared by Habahe County Construction Bureau for the Asian Development

More information

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PT PLN (Persero) INDONESIA POWER SECOND TRANSMISSION DEVELOPMENT PROJECT (IPTD-2) RP1232

More information

External Monitoring Report - RP Implementation PRC: Yunnan Integrated Road Network Development Project (Longrui Expressway)

External Monitoring Report - RP Implementation PRC: Yunnan Integrated Road Network Development Project (Longrui Expressway) External Monitoring Report - RP Implementation # 5 Semi-Annual Report July 2014 2709-PRC: Yunnan Integrated Road Network Development Project (Longrui Expressway) Prepared by Beijing Zhongkehongce Consulting

More information

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION RP762 v30 1. Information About Project Name &Location of Subproject Project Sponsor Project Cost Installed Generation

More information

People s Republic of China: Xinjiang Changji Integrated Urban-Rural Infrastructure Demonstration Project

People s Republic of China: Xinjiang Changji Integrated Urban-Rural Infrastructure Demonstration Project Xinjiang Changji Integrated Urban Rural Infrastructure Demonstration Project (RRP PRC 49029-002) Resettlement Plan January 2017 People s Republic of China: Xinjiang Changji Integrated Urban-Rural Infrastructure

More information

Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT POLICY FRAMEWORK FOR

Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT POLICY FRAMEWORK FOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP47 Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT

More information

RESETTLEMENT PLAN LIANBAN WWTP SEWER NETWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors

RESETTLEMENT PLAN LIANBAN WWTP SEWER NETWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors RESETTLEMENT PLAN LIANBAN WWTP SEWER NETWORK Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the FUZHOU ENVIRONMENTAL IMPROVEMENT PROJECT in the PEOPLE

More information

BIOMASS-BASED DISTRICT HEATING PROJECT

BIOMASS-BASED DISTRICT HEATING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Biomass-Based District Heating Project BIOMASS-BASED DISTRICT HEATING PROJECT Construction

More information

World Bank Loan. Hohhot-Zhangjiakou Rapid Railway. Resettlement Policy Framework

World Bank Loan. Hohhot-Zhangjiakou Rapid Railway. Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized World Bank Loan Hohhot-Zhangjiakou Rapid Railway Resettlement Policy Framework The Foreign

More information

Mongolia: Western Regional Road Corridor Investment Program

Mongolia: Western Regional Road Corridor Investment Program Western Regional Road Corridor Investment Program (RRP MON 41193) Resettlement Framework September 2011 Mongolia: Western Regional Road Corridor Investment Program Prepared by the Ministry of Roads, Transportation,

More information

RESSETTLEMENT POLICY FRAMEWORK

RESSETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Department of Water Resources and Land Improvement of the Kyrgyz Republic Project Implementation

More information

Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program

Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program Resettlement Framework Project Number: 42414 April 2010 Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program ABBREVIATIONS ADB Asian Development Bank

More information

Report on Review of Land Acquisition and Compensation

Report on Review of Land Acquisition and Compensation Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Nanning Sugar Industry Co., Ltd. Nanning Sugar Industry Co., Ltd. Pumiao Paper Mill Technical

More information

Andhra Pradesh Rural Roads Connectivity Project The Asian Infrastructure Investment Bank assisted

Andhra Pradesh Rural Roads Connectivity Project The Asian Infrastructure Investment Bank assisted GOVERNMENT OF ANDHRA PRADESH PANCHAYAT RAJ ENGINEERING DEPARTEMNT The (RPF) July 2018 Samaj Vikas Development Support Organisation Table of Contents List of Acronyms... 3 Glossary of Resettlement & Rehabilitation

More information

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Involuntary Resettlement Safeguards Objectives: To avoid resettlement wherever possible;

More information

PRC: Xi an Urban Road Network Improvement Project

PRC: Xi an Urban Road Network Improvement Project Updated Resettlement Plan September 2013 PRC: Xi an Urban Road Network Improvement Project Prepared by Xi an Urban Road Network Improvement Project Management Office for the Asian Development Bank. This

More information

ENTITLEMENT MATRIX. Gujarat State Highway Project - II. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

ENTITLEMENT MATRIX. Gujarat State Highway Project - II. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ROADS AND BUILDINGS DEPARTMENT GOVERNMENT OF GUJARAT Gujarat State Highway Project -

More information

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework 1. BACKGROUND Dhaka Water Supply and Sanitation Project Resettlement Policy Framework The Dhaka Water and Sewerage Authority (DWASA) currently supplies water to about 70% of the population of the Dhaka

More information

AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals

AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals Due Diligence Report April 2013 AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals Prepared by for the Ministry of Finance and the Asian

More information

People s Republic of China: Gansu Tianshui Urban Infrastructure Development Project

People s Republic of China: Gansu Tianshui Urban Infrastructure Development Project Resettlement Plan July 2013 People s Republic of China: Gansu Tianshui Urban Infrastructure Development Project Prepared by Tianshui Urban Construction Investment Group Co. Ltd. for the Asian Development

More information

DRAFT EXECUTIVE SUMMARY

DRAFT EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT EXECUTIVE SUMMARY IPUH - BANTAL (LINK 015.1) KABUPATEN MUKO-MUKO YEAR 2010 EXECUTIVE

More information

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS MINISTRY OF EDUCATION GOVERNMENT OF NEPAL August 2011 2 A. Introduction 1.

More information

KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan 12110

KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan 12110 KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan 12110 LARP IMPLEMENTATION REPORT For Regional Roads Development Project West Kalimantan

More information

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project Land Acquisition/Resettlement Framework Project Number: 46453 March 2014 Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project Prepared by the Ministry of Finance and

More information

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Land Acquisition

More information

Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal

Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal Tanahu Hydropower Project (RRP NEP 43281) Resettlement Framework October 2012 NEP: TANAHU HYDROPOWER PROJECT Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal

More information

Shaanxi Poor Rural Areas Community Development Project (P153541)

Shaanxi Poor Rural Areas Community Development Project (P153541) Public Disclosure Authorized Public Disclosure Authorized SFG2262 REV World Bank Loan Project Shaanxi Poor Rural Areas Community Development Project (P153541) Resettlement Policy Framework (RPF) Public

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Regional Development and Infrastructure of Georgia Roads Department of Georgia

More information

Mongolia: Ulaanbaatar Urban Services and Ger Areas Development Investment Program

Mongolia: Ulaanbaatar Urban Services and Ger Areas Development Investment Program Resettlement Framework August 2013 Mongolia: Ulaanbaatar Urban Services and Ger Areas Development Investment Program Prepared by {complete and accurate name of government agency or private sector project

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized HAI PHONG DEPARTMENT OF TRANSPORT RP1035 V. 3 PROJECT MANAGEMENT UNIT OF REGIONAL TRANSPORT

More information

TONGA: Nuku alofa Urban Development Sector Project

TONGA: Nuku alofa Urban Development Sector Project Nuku'alofa Urban Development Sector Project (RRP TON 42394-22) Resettlement Framework TONGA: Nuku alofa Urban Development Sector Project Prepared by Planning and Urban Management Department, Ministry of

More information

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing Involuntary Resettlement Due Diligence Report Loan 2860 (SF) July 2015 ARM: Water Supply and Sanitation Sector Project Additional Financing Prepared by the Armenian Water and Sewerage Closed Joint Stock

More information

Rural Reconstruction and Rehabilitation Sector Development Program

Rural Reconstruction and Rehabilitation Sector Development Program Government of Nepal Ministry of Local Development Department of Local Infrastructure Development & Agricultural Roads District Development Committee/District Technical Office Kavre Rural Reconstruction

More information

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project Land Acquisition and Resettlement Framework Date: May 2016 Status: Update FIJI: Transport Infrastructure Investment Sector Project CURRENCY EQUIVALENTS (as of August 2014) Fiji Dollar (FJD) FJD 1.00 =

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Ministry of Agriculture and Environmental Protection Directorate for Water Management 11070 Belgrade, Blvd. Umetnosti 2a ELEKTROPRIVREDA SRBIJE FLOODS EMERGENCY AND RECOVERY PROJECT (FERP) RESETTLEMENT

More information

Resettlement Policy Framework

Resettlement Policy Framework Republic of Turkey Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework Background 1. The Second Renewable Energy and Energy Efficiency Project will fund private sector investments

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM HO CHI MINH CITY PEOPLE S COMMITTEE INVESTMENT MANAGEMENT

More information

JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK

JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK I. Introduction The Jamaica Social Investment Fund (JSIF) was established in 1996 under the Government of Jamaica s National

More information

Land Acquisition and Resettlement Policy Framework

Land Acquisition and Resettlement Policy Framework Myanmar Agriculture Development Support Project Land Acquisition and Resettlement Policy Framework Ministry of Agriculture and Irrigation The Union Government of Myanmar Draft for Public Consultation 1

More information

LAND ACQUISITION FRAMEWORK

LAND ACQUISITION FRAMEWORK LAND ACQUISITION FRAMEWORK (This framework was prepared in accordance to the ADB requirements for preparing Resettlement Framework as described in the ADB Safeguards Policy Statement, 2009) Project Number:

More information

Republic of Kazakhstan. Ministry of Transport and Communications. Committee for Roads. Central Asia Regional Cooperation (CAREC) Corridors 1, 3, 6

Republic of Kazakhstan. Ministry of Transport and Communications. Committee for Roads. Central Asia Regional Cooperation (CAREC) Corridors 1, 3, 6 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Kazakhstan Ministry of Transport and Communications Committee for Roads Central

More information

LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT. ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II

LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT. ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT SUBPROJECT 1, ARMAVIR ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II Project Number: L2860-ICB-1-01 Prepared by the Project Management

More information

Syr Darya Control and North Aral Sea Project Phase 2 (SYNAS-2) Land Acquisition Framework

Syr Darya Control and North Aral Sea Project Phase 2 (SYNAS-2) Land Acquisition Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Syr Darya Control and North Aral Sea Project Phase 2 (SYNAS-2) Land Acquisition Framework

More information

Land Acquisition and Resettlement Plan Corrective Action Plan

Land Acquisition and Resettlement Plan Corrective Action Plan Land Acquisition and Resettlement Plan Corrective Action Plan Faizabad Baharak Road Project Prepared in February 2018 Grant 0261/0262-AFG: Transport Network Development Investment Program Tranche 1 Prepared

More information

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2 Resettlement Plan March 2018 Indonesia: Neighborhood Upgrading and Shelter Project Phase 2 Prepared by the City of Kendari and Directorate General of Human Settlements, Ministry of Public Works and Housing

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Mongolia Municipality of Ulaanbaatar city Community based infrastructure development

More information

Serbia Corridor X Highway Project E-75 and E-80. Resettlement Policy Framework. Final Version June 4, 2009

Serbia Corridor X Highway Project E-75 and E-80. Resettlement Policy Framework. Final Version June 4, 2009 Public Disclosure Authorized Serbia Corridor X Highway Project E-75 and E-80 Resettlement Policy Framework RP789 rev Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

More information

PAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing

PAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing

More information

Dhaka Water Supply and Sanitation Project

Dhaka Water Supply and Sanitation Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VOL. 1 Dhaka Water Supply and Sanitation Project Resettlement Policy Framework Dhaka

More information

In light of this objective, Global Witness is providing feedback on key sections of the 6 th draft of the national land policy:

In light of this objective, Global Witness is providing feedback on key sections of the 6 th draft of the national land policy: Summary Global Witness submission on the 6 th draft of Myanmar s draft national land policy June 2015 After a welcome extension to public participation on the 5 th draft of the national land policy, in

More information

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action

More information

COMPONENT 2 - TSKB DRAFT

COMPONENT 2 - TSKB DRAFT 2015 Resettlement Policy Framework for the Turkey Geothermal Development Project COMPONENT 2 - TSKB DRAFT Contents 1. Project Description & Background... 2 2. Principles & Objectives... 3 3. Process for

More information

Social Due Diligence Report. People's Republic of China: Municipal Waste to Energy Project. Zhenjiang Waste-to-Energy Project

Social Due Diligence Report. People's Republic of China: Municipal Waste to Energy Project. Zhenjiang Waste-to-Energy Project Social Due Diligence Report Project Number: 43901-01 Loan 2522/7296 July 2011 People's Republic of China: Municipal Waste to Energy Project Zhenjiang Waste-to-Energy Project This report is made publicly

More information

RESETTLEMENT FRAMEWORK. Transport Sector Development Project (RRP SOL 41171)

RESETTLEMENT FRAMEWORK. Transport Sector Development Project (RRP SOL 41171) RESETTLEMENT FRAMEWORK Transport Sector Development Project (RRP SOL 41171) ii ABBREVIATIONS ADB Asian Development Bank CDO Community Development Officer CLAC Customary Land Appeal Court CLO Community

More information

Pakistan: Barani Integrated Water Resources Sector Project

Pakistan: Barani Integrated Water Resources Sector Project Resettlement Planning Document Land Acquisition and Resettlement Framework Document Stage: Final Version Project Number: 39364 September 2007 Pakistan: Barani Integrated Water Resources Sector Project

More information

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose Expropriation Context Following from the goal of the National Land Policy, to promote and ensure a secure land tenure system that is transparent, effective, non-discriminative, equitable and just ; it

More information

India: Madhya Pradesh Irrigation Efficiency Improvement Project. Subproject: Pipeline Distribution System for 500 Hectares of Command Area

India: Madhya Pradesh Irrigation Efficiency Improvement Project. Subproject: Pipeline Distribution System for 500 Hectares of Command Area Madhya Pradesh Irrigation Efficiency Improvement Project (RRP IND 45371) Resettlement Plan/Land Acquisition Plan (This document is prepared in accordance to the ADB Resettlement Plan Requirement as described

More information

SFG kv İzmir Substation Abbreviated Resettlement Action Plan (ARAP) Turkish Electricity Transmission Company. Public Disclosure Authorized

SFG kv İzmir Substation Abbreviated Resettlement Action Plan (ARAP) Turkish Electricity Transmission Company. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Turkish Electricity Transmission Company 380 kv İzmir Substation Abbreviated Resettlement

More information

UZB: Kashkadarya Regional Road Project

UZB: Kashkadarya Regional Road Project Resettlement Framework Project No.: 50063 September 2016 UZB: Kashkadarya Regional Road Project Prepared by the Road Fund under the Ministry of Finance of the Republic of Uzbekistan for the Asian Development

More information

Viet Nam: Secondary Cities Development Project - Buon Ma Thuot Subproject

Viet Nam: Secondary Cities Development Project - Buon Ma Thuot Subproject Resettlement Monitoring Report Semi-Annual Report January 2017 Viet Nam: Secondary Cities Development Project - Buon Ma Thuot Subproject Prepared by Nguyen Van Trung, External Resettlement Monitoring Consultant,

More information

Global Witness submission on Myanmar s draft national land policy

Global Witness submission on Myanmar s draft national land policy Global Witness submission on Myanmar s draft national land policy November 2014 Summary As part of its transition to democratic reform, in October 2014, the Government of Myanmar released a draft national

More information

PRC: Municipal Waste to Energy Project

PRC: Municipal Waste to Energy Project Social Due Diligence Report December 2011 PRC: Municipal Waste to Energy Project Suzhou Waste-to-Energy Project (Phase III) Prepared by Everbright Environmental Energy (Suzhuo) Limited for the Asian Development

More information

B. Justification of project design and alternative analysis:

B. Justification of project design and alternative analysis: Social Screening and Impact Assessment for Sub Projects Code No: 3 A. Sub Project Description: Proposed Activity Town Hall Square Development Implementing Agency: Colombo Municipal Council (CMC) Sub project

More information

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project)

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project) Resettlement Plan October 2014 GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project) Prepared by United Water Supply Company of Georgia LLC of the Ministry

More information

Summary: Resettlement Action Plan for the Thwake Multi- Purpose Dam-Kenya

Summary: Resettlement Action Plan for the Thwake Multi- Purpose Dam-Kenya Summary: Resettlement Action Plan for the Thwake Multi- Purpose Dam-Kenya 1. Introduction and Background The proposed Thwake water supply and sanitation Dam is a project conceived and intended to be constructed

More information

TONGA: Nuku alofa Urban Development Sector Project. Core Subproject 1 (Water Supply)

TONGA: Nuku alofa Urban Development Sector Project. Core Subproject 1 (Water Supply) Nuku'alofa Urban Development Sector Project (RRP TON 42394-22) Resettlement Plan TONGA: Nuku alofa Urban Development Sector Project Core Subproject 1 (Water Supply) Prepared by Planning and Urban Management

More information

KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT

KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT SFG1940 REV KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT RESETTLEMENT POLICY FRAMEWORK JUNE 2016 Public Disclosure Authorized Public Disclosure

More information

How Swaziland Is Upgrading Its Slums

How Swaziland Is Upgrading Its Slums Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized How Swaziland Is Upgrading Its Slums CIVIS chose to profile this example from Swaziland

More information

RP-24 VOL. 1 (Revised)

RP-24 VOL. 1 (Revised) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Department of Public Works and Highways National Roads Improvement and Management Program

More information

Koridori Srbije Corridor X Highway Project Land Acquisition and Resettlement Framework LARF

Koridori Srbije Corridor X Highway Project Land Acquisition and Resettlement Framework LARF Land Acquisition and Resettlement Framework LARF Issue 1 June 2018 PREPARED BY Contents List of Abbreviations 2 Glossary 3 1 Introduction 7 1.1 Principles and Objectives 12 2 Gaps Between RS Legislation

More information

Azerbaijan Second National Water Supply and Sanitation Project (SNWSSP) Resettlement Policy Framework (RPF) Land Acquisition

Azerbaijan Second National Water Supply and Sanitation Project (SNWSSP) Resettlement Policy Framework (RPF) Land Acquisition Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Azerbaijan Second National Water Supply and Sanitation Project (SNWSSP) Resettlement

More information

Resettlement Plan. BHU: SASEC Road Connectivity Project. Phuentsholing Bypass Road. March 2014

Resettlement Plan. BHU: SASEC Road Connectivity Project. Phuentsholing Bypass Road. March 2014 Resettlement Plan March 2014 BHU: SASEC Road Connectivity Project Phuentsholing Bypass Road Prepared by the Phuentsholing Thromde for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 12 March 2014)

More information

RESETTLEMENT POLICY FRAMEWORK (RPF)

RESETTLEMENT POLICY FRAMEWORK (RPF) SOCIALIST REPUBLIC OF VIET NAM MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT ============================================= MEKONG DELTA INTEGRATED CLIMATE RESILIENCE AND SUSTAINABLE LIVELIHOODS PROJECT

More information

ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY

ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Background ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY Abbreviated Resettlement

More information

Cibuk 1 Wind Farm Land Acquisition Plan Vetroelektrane Balkana d.o.o. October 2014

Cibuk 1 Wind Farm Land Acquisition Plan Vetroelektrane Balkana d.o.o. October 2014 Vetroelektrane Balkana d.o.o. October 2014 Table of contents Chapter Pages 1. Introduction 3 2. Project Land Acquisition 3 2.1. Land previously acquired 3 2.2. Land in the process of acquisition 4 3. Legal

More information

I U B Reddy The World Bank New Delhi, India

I U B Reddy The World Bank New Delhi, India IAIA15 India s New Land Acquisition Act Right To Fair Compensation and Transparency in Land Acquisition and Rehabilitation and Resettlement Act, 2013 I U B Reddy The World Bank New Delhi, India Challenging

More information

DECREE GENERAL PROVISIONS DETAILED REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT UPON LAND EXPROPRIATION BY THE STATE

DECREE GENERAL PROVISIONS DETAILED REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT UPON LAND EXPROPRIATION BY THE STATE THE GOVERNMENT -------- SOCIALIST REPUBLIC OF VIETNAM Independence Freedom - Happiness ---------------- No.: 47/2014/NĐ-CP Hanoi, May 15, 2014 DECREE REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT

More information