PROJECT REPORT. Submitted To : Submitted by. Deputy Director Revenue Officer Training Institute
|
|
- Erica Montgomery
- 5 years ago
- Views:
Transcription
1 PROJECT REPORT TOPIC: DIFFERENCE BETWEEN HITECH SURVEY AND TRADITIONAL SURVEY HOW IS HI-TECH SURVEY BEING CONDUCTED. ROLE OF REVENUE OFFICIALS IN VERIFICATION, VALIDATION, AND PREPARATION OF ROR AND MAPS UNDER ODISHA SPECIAL SURVEY AND SETTLEMENT ACT & RULE 2012 Submitted To : Deputy Director Revenue Officer Training Institute Submitted by Sambit Sangramjeet Sahoo Addl Tahasildar, Morada,Mayurbhanj
2 Hitech Survey Hitech Survey is a process of survey through Modern Technology like Aerial Photography, High Resolution Satellite Imagery,Differential Global Positioning System (DGPS), Electronic Total Station (ETS). In Odisha it is carried out under Odisha Special Survey and Settlement Act and Rule Difference between Hitech Survey and Traditional Survey In traditional Procedure Survey were being made manually using Gunter chain, Plane Table method, Prismatic Compass and Theodolite. It was time consuming and more cost and man power required. Limitations of Traditional system of surveying Survey operations are not regular- gap between records and field reality Associated with human errors Out dated method- Low level of accuracy Areas above 10 degree slope can not be surveyed Time consuming- gap between measurement takenand final output Maps in paper form- difficulty in updation Reference point of land were subject to displacement. Through Hi-Tech Survey the map is prepared digitally with highest level of accuracy which can be preserved and updated digitally and Re-Survey is not required. The map is Co-ordinate based having latitude and Longitude of each point or location of the village which helps in post survey demarcation. This Survey Process is less Time Consuming, Cost effective, and map prepared through it is of high level accuracy. Land is the mainstay of all developmental activities. It is impossible to conceive development without land. Now, it is being widely regarded that efficiency in land management is one of the indices of developmental status in the State. In our society, ownership of land has an emotional and social value. In an agrarian economy like ours, it is treated as an instrument for economic growth.
3 Ownership of land not only provides socio- economic security but also invests its owner with certain privileges. In view of the above, survey, preparation and maintenance of record of rights are important facets of revenue administration particularly for odisha which is predominantly an agricultural economy. The survey and settlement operations are being carried out in the State by following conventional methods which are time consuming, cumbersome and exorbitantly expensive. The very purpose of survey and settlement is defeated if the operation takes a long time as changes in the ownership and status of land are a continuous process. In this electronic age, as the State embarks on e- Governance initiatives, it is necessary to revamp the survey and settlement system to keep pace with the time to provide service that are fair, efficient and transparent to the land owners of the State. The Govt. of India has launched a flagship programme called "National Land Records Modernization Programme" which inter alia provides for computerization of land records including mutation, digitization of maps, survey/re- survey using modern technology including aerial photography, computerization of registration and its integration with land records maintenance system, training and capacity building of concerned officials and functionaries. Keeping the above facts in view, the Odisha Special Survey and Settlement Act, 2012 has been enacted which provides for undertaking survey and settlement operations in the State by adopting modern technology to minimize the time span without compromising quality, transparency and grievance redressal. Instead of traditional methods like gunter chain, Plain Table or Thedolite Survey, modern technology is being adopted which includes Aerial photography, High Resolution Satellite Imagery, Differential Global Positioning System and Electronic Total System During the stage of preparation of preliminary record of rights, a team of persons shall be constituted to update and prepare basicrecord of rights with the assistance of licensed surveyors. The team of persons shall physically verify each plot of the concerned revenue village with the map and shall take in to account the ground realities, changes, transfers, subdivisions. partitions, hereditary devolution, exchanges and the like in matters of determining right, title and ownership of the land holdings.during the field verification, the team of persons shall identify and demarcate lands, government lands, lands treated as common property resources and record the same in
4 Preliminary Record of Rights. After preparation of preliminary record of rights land owner wise, claims and objections are invited from the land owners and interested persons and the same are disposed of within a maximum period of thirty working days of filing such claims and objections by an officer not below the rank of Tahasildar after following the prescribed procedure. The draft record of rights including map prepared and attested by the Tahasildar shall be published for a period of thirty days in the prescribed manner inviting claims and objections. The claims and objections shall be disposed of in a summary manner by an officer not below the rank of Addl. Sub- Collector within a maximum period of sixty days. In order to prepare the record of rights and map of a village correctly, the 'Recess' in introduced where the final checking of records, fair copying, comparing and arrangement of records alphabetically according to the names of land owners are carried out in the prescribed manner. There after record of rights of a revenue village are published finally under the hand and seal of the collector.any land owner or any person who has an interest in land may file claims and objections against the entries of the finally published record of rights including the map within three months from the date of final publication. The claim and objections so filed shall be heard and disposed of by an officer not below the rank of Addl. District Magistrate in the prescribed manner. The Act provides that every entry in the record of rights prepared and finally published shall be evidence of the matter referred to in such entry and shall be presumed to be correct unless it is proved by evidence to be incorrect. Presumption of correctness shall be attached to the later settlement entry till such presumption is dispelled or rebutted by convincing evidence and wherever there is conflict between the previous entry and latter entry, the latter entry must prevail. In order to ensure efficient, accurate and transparent delivery mechanism and conflict resolution in ownership of land, an inbuilt computerized and digital system of maintenance of record of rights including map is essential. To accomplish this task, adequate provisions are made under the Act for engagement of technically qualified persons (Licensed surveyors) on outsourcing basis to prepare maps to scale, update maps prepared in course of cadastral and revisional survey, prepare record of rights in post mapping stage, facilitate inter
5 connectivity among revenue offices etc.the Odisha Special Survey and Settlement Rules, 2012 provides elaborate procedure to carry out the purposes of the Act and also envisages to issue technical guidelines with regard to method of survey by modern technology, works to be done during different stages of survey and settlement operations, the manner of maintenance and making available the record of rights and map of a revenue village in digital form to interested persons and the technical aspects of work of the Licensed Surveyors. Advantages of re-survey using modern technologies Maximum use of machines-errors due to human factors in survey and map preparation are negated Availability of modern techniques which are more accurate, less time consuming and cost effective. Coordinate based ground control points- no fear of misplacement. Final output in digital form- further updation How is Hi-Tech Survey being conducted. Role of Revenue Officials in verification, validation, and preparation of RoR and maps under Odisha Special Survey and Settlement Act & Rule 2012 Methods used in Hi-Tech Survey These are of Three type Pure ground method using ETS & DGPS. Hybrid method using Aerial Photography and ground truthing by ETS & DGPS. Hybrid method using High Resolution Satellite Imagery and ground truthing by ETS & DGPS. STEPS FOR RESURVEY
6 1. Ground control point (gcp) establishment monumentation 2. Aerial photography or Tasking and acquisition of worldview stereo satellite data, digitization of existing cadastral maps and authenticated up-to-date record of rights (ror) 3. Orthoimage generation and ground validation 4. Georeferencing of cadastral map for village boundary and area confirmation 5. parcel vector generation from ortho-image 6. Field validation of image derived parcel vector 7. Obscured area survey 8. Vectorisation and integration of mutation data up to the date of survey notification 9. integration of field survey vector with image derived vector to 10.Generate the draft cadastral map 11.Finalisation of draft cadastral map Establishment of Ground Control Point Network Primary GCPs- 16 km x 16 km Secondary GCPs- 4 km x 4 km Tertiary GCPS- 1 km x 1 km Primary and Secondary GCPs have permanent value and hence need to be preserved.
7 Appointment of Vendor/ Agency The Director Land Record and Survey will appoint one or more vendor/agency having technical qualification of Survey and Preparatin of map and ROR. Acquisition of Stereo Satellite Data/ Aerial Photographs Satellite data need to be procured from National Remote Sensing Agency, Hyderabad. In other case the aerial photographs need to be taken by low flying aircrafts loaded with GPS and high resolution camera. Geo-referencing of Sabik Digital Cadastral Map and delineation of Village boundary on the ortho-image After completion of Geo-referencing, the Survey Team will delineate the Village Boundary on the ortho-image; adjust, if required, the boundary vector at, Edge Plots to ensure that it runs on the physical demarcation features and finalize the Village Boundary on the image. The area computed from the newly generated Village Boundary should be confirmed by the competent authority. FLOW CHART OF OPERATING OF ETS (ELECTRONICS TOTAL STATION) SETTING OF INSTRUMENT (LEVELING AND CENTERING)
8 POWER BUTTON ON GENERAL SURVEY INSTRUMENT ELECTRONIC LEVEL CENTRING THE DEGITAL LEVEL WITH FOOT SCREW FILE / JOB NEW JOB GIVEN JOB NAME ENTER MESURE STATION SETUP TEMPERATURE PRESSURE BY DEFULT INSTRUMENT POINT NAME (GIVEN POINT NAME) CODE (BASE) INSTRUMENT HEIGHT (GIVEN HEIGHT FROM STONE POINT TO + MARK OF THE INSTRUMENT) NORTHING - EASTING (ENTER N E OF THIS POINT) ELEVATION (GIVEN HEIGHT OF TH EPOINT FROM MEAN-SEA LEVEL ENTER BACK SIDE POINT NAME CODE (BACK) BACK SIDE HIEGHT (HEIGHT OF TH EPRIZM POLE) NORTHING-EASTING OF THE BACK STATION ENTER INTERSECT CROSS WIRE OF THE INSTRUMENT WITH CROSS WIRE OF THE PRIZM MEASURE STORE (A VOICE WILL COME STATION SETUP COMPLETED) MEASUREMENT OF PLOTS MEASURE / SURVEY MEASURE TOPO
9 POINT NAME (GIVEN POINT NAME OF CORNER OF THE PLOT) ENTER INTERSECT CROSS WIRE OF THE INSTRUMENT WITH CROSS WIRE OF THE PRIZM MEASURE STORE (A VOICE WILL COME OBSERVATION STORED) MEASURE STORE (A VOICE WILL COME OBSERVATION STORED) AND CONTINUE THIS PROCESS AS PER REQUIREMENT OF THE PLOT TO FIND THE CO-ORDINATE FAVORITE POINT MANAGER TO FIND THE DISTANCE COGO COMPUTE INVERSE FROM (GIVEN THE DISTANCE OF THE POINT WHICH REQUIRED ) TO (GIVEN THE DISTANCE OF THE POINT WHICH REQUIRED MAP AND AREA COGO AREA CALCULATION (THE MAP AND THE AREA WILL SHOW) TO CHANGE THE UNIT OF THE AREA ARROW MARK OPTION ACRE / HECTOR / SQ. MTR ETC. (REQUIRED UNIT WILL SHOW) SHUT DOWN THE INSTRUMENT EXIT SHUT DOWN GENERAL SURVEY YES CLOSE THE PAGE OK PUSH POWER BOTTON OPTION
10 SHUT DOWN Yes FLOW CHART OF OPERATING OF DGPS GLOBAL POSITIONING SYSTEM ) (DIFFERENTIAL SETTING OF RECEIVER CUM ANTEENA WITH TRIPOD (LEVELING AND CENTERING) POWER BUTTON ON BOTH CONTROLLER AND RECEIVER SURVEY CONTROLLER CONFIGURATION CONTROLLER BLUETOOTH SELECT THE SL. NO OF ANTENA/ RECEIVER CONFIGURATION SURVEY STYLE P P K (POST PORCESS KINAMETIC) /RTK (REAL TIME KINAMETIC) / FAST STATIC (As per requirement) BASE OPTION (CHECK & CORRECT THE PAGES) STORE ESCAPE FILE NEW JOB GIVEN JOB NAME ENTER SURVEY P P K / FAST STATIC / R T K (As per requirement) START BASE RECEIVER POINT NAME ENTER START END BASE STATION COMPLETED SETTING OF ANOTHER RECEIVER CUM ANTEENA IN BIPOD AND LEBLE CONFIGURATION CONTROLLER BLUETOOTH
11 SELECT THE SL. NO OF ANTENA/ RECEIVER CONFIGURATION SURVEY STYLE P P K (POST PORCESS KINAMETIC) /RTK (REAL TIME KINAMETIC) / FAST STATIC (As per requirement) ROVER OPTION ( CHECK THE PAGES) STORE ESCAPE FILE JOB NAME (GIVEN JOB NAME) ENTER SURVEY P P K (POST PORCESS KINAMETIC) /RTK (REAL TIME KINAMETIC) / FAST STATIC MEASURE POINT POINT NAME (GIVEN POINT NAME) ENTER MEASURE (WAIT 8 MINS FOR INITIALITION) AFTER 8 MINS A VOICE WILL COME INITIALIATION HAS BEEN GAINED MEASURE STORE (A VOICE WILL COME OBSERVATION STORED) CONTINUE THIS PROCESS AS PER YOUR REQUIREMENT OF A PLOT TO FIND THE CO-ORDINATE FAVORITE POINT MANAGER TO FIND THE DISTANCE COGO COMPUTE INVERSE FROM (GIVEN THE POINTS OF THE DISTANCE WHICH REQUIRED) TO (GIVEN THE POINTS OF THE DISTANCE WHICH REQUIRED) MAP AND AREA COGO AREA CALCULATION (THE MAP AND THE AREA WILL SHOW) TO CHANGE THE UNIT OF THE AREA
12 ARROW MARK OPTION ACRE / HECTOR / SQ. MTR ETC. (REQUIRED UNIT WILL SHOW) SHUT DOWN PROCESS SHUT DOWN ROVER RECEIVER ESCAPE EXIT YES SHUT DOWN RECEIVER YES SHUT DOWN BASE RECEIVER SURVEY PPK END GNSS SURVEY YES SHUT DOWN SURVEY CONTROLLER PUSH POWER BOTTON AND HOLD SHUT DOWN Preparatory work for Ground truthing and Obscure Area Survey Obscured areas and Gharabari Plots are to be surveyed on Ground using ETS/ DGPS based on locally available GCPs after demarcation by concerned Rl/ Amin in presence of land owners/enjoyers.
13 Vectors generated from Ortho-Image & DGPS/ETS survey are to be integrated to prepare draft Village Map. Comparison of village area of cadastral map, ortho-image and RoR data Maximum tolerable limit 2% between different sources of village area For the purpose, RoR data should be up to date In case of variation (above 2% tolerable limit) field survey is necessary for boundary demarcation. Field survey is necessary if the village boundary falls under obscure areas or incase large scale variation in the village boundaries. The area obtained from filed survey will be treated as final
14 Digitised cadastral maps of one tahasil georeferenced and verified Generation of Draft Village Map and RoR : After compliance of the orders of the Camp Officer/ Tahasildar relating to one Village, the survey team shall furnish Village Map complete with integration of textual data, plot schedule with area and corresponding Sabik reference in Form No.06 (T) to the Tahasildar. QUALITY CHECKING : The QC checks will be done by ORSAC QC team in following stages or as when required: After generation of ortho-image. After geo-referencing of 'Sabik' cadastral maps with the image: Georeferencing of individual parcels and the village as a whole for delineation/demarcation of village boundary. After plot vector generation and prior to ground truthing/verification:
15 The geometry of parcels, the village boundary, matched andmismatched plots as seen on the image. Before submission of Draft Map to Tahasil for verification: The village incompleteness, correctness of matched and mismatched parcels as identified by the vendor. Before final submission: Village map as a whole and the statistics after RoR linkage and 'Khanapuri Operation'. Some of the bund dimensions will be verified by ORSAC for ensuring correctness and quality of survey by the vendor. Pre-Survey activities It includes Notification of villages to be covered under Hi-tech surveyoperation by Revenue & DM Department Planning and execution of awareness meetings at village level associating the vendor Proclamation in Form No.1 by Tahasildar under Section-3 (2) of OSS&S Act, 2012 Soliciting self-declaration in Form-2 from the land owners Rule 6 (1) of OSS&S Rules, 2012 within 30 working days from the date of notification Verification of self-declaration by Tahasildar/ Additional Tahasildar. After verification Tahasildar prepare a verification certificate register in Form-3. If self declaration could not be verified due to non availability of record or due to dispute, It is to be entered in separate register in Form No- 4 Verification of Map so prepared by Vendor under Rule 7(3) Vendor to Submission of map so prepared to Tahasildar for verification indicating plot numbers ofexisting map/ror and a comparative statement of image derived parcel area with RoR area in Form 6-T.
16 The Amin shall verify cent percent plots of the map and Revenue Inspector, Revenue Supervisor, Tahasildar and Sub Collector shall randomly check 25%,10% 2% 1%.(Rule 7(3)) The map after necessary correction shall be displayed inlocality and GP office and Tahasil Office. Preparation of preliminary RoR Team of persons shall be Constituted by Sub-Collector for preparation of Preliminary RoR headed by a Revenue Supervisor. Steps for preparation of prelim ROR Preparation of abstract of RoR and plot register in Form-5 & 6 Re-verification of self-declarations with reference to above abstract and plot register and available records Physical verification of all plots and noting of all changes in respect of configuration, area, boundaries and ownerships. Vendor personnel shall assist the team of persons in demarcation of plots during the process Team of persons must ensure incorporation of all plots in existing RoR and those obtained from self declarations in the draft map so prepared Sub-divided plots need to be marked in broken lines Digital updation of village map upto a cut-off date i.e. till publication of draft RoR by Tahasildar Preparation of land owner wise preliminary RoR in Form-7 Generation of LPM of hal plots and serving of same to land owners and officers of other Departments in Form-4(T) with display for public scrutiny for 15 days Soliciting claims and objections within 15 days in Form-8 Disposal of all claims and objections by Tahasildar in a summary manner within a maximum period of 30 working days of receipt of the same ( Rule-10) The vendor surveyor shall assist the Tahasildar for disposal of objection cases which may require parcel measurement Draft Record of Rights Draft RoR shall be prepared in Form-12 stating the orders passed in respect of claims and objections and shall be published for a period of 30 days (Rule-12)
17 Public notice shall be issued in Form-13 inviting claims and objections within a period of 30 days Disposal of claims and objections in a summary manner shall be done by Addl. Sub-Collector on the basis of available records, documentary evidence and spot verification if needed within 60 days of filing of such claims/objections Recess Addition and alterations in the draft RoR per the orders passed by Addl. Sub- Collector Addition and alterations in the draft RoR per the orders passed by Addl. Sub- Collector Checking and verification of area of each plot and area and boundaries of each revenue village to ensure its correctness both in RoR and in maps. Passing of new area by Tahasildar Preparation of abstract of new RoR in Form-18 and new plot Register in Form- 19 Preparation of copies of RoR in quadruplicates for final Publication Final Record of Rights Final RoR will be published in Form-20 under seal and signature of Collector and shall be placed for public inspection for 30 days Both soft & hard copies shall be prepared by the vendor for distribution among land owner,ri, Tahasildar, Collector and DLR&S Any person can file claim/objection against the entries of final RoR within 90 days of publication of final RoR before the ADM Disposal of claims and objections in a summary manner by ADM on the basis of available records, documentary evidence and spot verification if needed within 90 days of filing of such claims/objections. After final publication of RoR and map, the soft copy and hard copy of RoR (Form 20, of O.S.S & S. Rules, 2012) shall be prepared by the Survey Team and handed over to the Tahasildar for distribution as mentioned below : 1. Softcopy and hardcopy of both RoR and map to concerned Tahsildar. 2. Softcopy and hardcopy of both RoR and map to concernedcollector.
18 3. Softcopy and hardcopy of RoR and hardcopy of map to concerned RI 4. Hard copy of RoR for Individual Land Owners. CONCLUSION : After successfully piloting high-tech land survey in nine districts, the State Government has decided to roll it out to other districts.the Revenue department has been asked to work out a detailed project report (DPR) for undertaking high-tech survey of the land in the entire State. A sub-committee was formed under the chairmanship of Principal Secretary IT P.K. Jena to look in to storage, security and usability of the data. Representatives from National Informatics Centre (NIC), Directorate of Land Records, Odisha Remote Sensing Application Centre (ORSAC) and Odisha Computer Application Centre (OCAC) are members of the committee. Meanwhile, Record of Rights (RoR) of all 51,675 revenue villages have been computerised and put online in Bhulekh website. Maps of 51,612 villages have been also digitised and uploaded in the website..presently, re-survey work of the land records through modern technologies have been taken up in 9 districts namely Cuttack, Khordha, Ganjam, Keonjhar, Deogarh, Sundargarh, Bolangir, Subarnapur and Sambalpur.
Hi-tech Survey Operation using Modern Technologies: Concept & Process Flow
Hi-tech Survey Operation using Modern Technologies: Concept & Process Flow Presented by Sri Biswaranjan Rath Asst. Director,CLR Board of Revenue, Odisha Limitations of present system of surveying Survey
More informationINDIAN INSTITUTE OF TECHNOLOGY ROORKEE. Presentation on REAL TIME CADASTRAL SURVEYING SOLUTION WITH A SPECIAL IMPHESIS TO MODERN GPS TECHNOLOGY.
INDIAN INSTITUTE OF TECHNOLOGY ROORKEE Presentation on REAL TIME CADASTRAL SURVEYING SOLUTION WITH A SPECIAL IMPHESIS TO MODERN GPS TECHNOLOGY By: Prof. Kamal Jain, Dept. of Civil Engg. IIT-Roorkee AIM
More informationA Geocoded Cadastral Fabric as a Precondition for a Sustainable Land Management System
A Geocoded Fabric as a Precondition for a Sustainable Land Management System Gottfried KONECNY, Germany; J.P. LAUZON, Canada; Abdul Salam MOHAMMED, India Key words: SDI,, Parcel Boundaries, GPS-GNSS, Land
More informationRegistering Property
Registering Property Delhi 1. Description of Reform: For procedure 3 Conduct charges search at the Registrar of Companies, Doing Business 2018 records that the buyer must conduct a search in office of
More information(Website: Ministry of Rural Development Government of India
Department of Land Resources (Website: www.dolr.nic.in) Ministry of Rural Development Government of India 1 Computerization of Land Records Three Centrally Sponsored Schemes (CSS) : Strengthening of Revenue
More informationCadastral Information System of Sofia
Alexander LAZAROV and Hristo DECHEV, Bulgaria Key words: ABSTRACT A new Cadastre and Property Register Act (CPRA) was passed in April 2000, setting up rules for the maintenance of these two registers.
More informationMASS REGISTRATION OF LAND PARCELS USING FIT-FOR-PURPOSE LAND ADMINISTRATION: PROCEDURES AND METHODS
MASS REGISTRATION OF LAND PARCELS USING FIT-FOR-PURPOSE LAND ADMINISTRATION: PROCEDURES AND METHODS TAREK ZEIN Hansa Luftbild AG, Germany zein@hansaluftbild.de Paper prepared for presentation at the 2017
More informationGeneral Instructions For Surveys and Plans Outside the Provincial Survey System
May 15, 2018 General Instructions For Surveys and Plans Outside the Provincial Survey System NOTE: This document is a Controller of Surveys Policy manual to be used as a general guideline for the Legal
More informationPresented by: Stewart Information International, Inc. Jack McKenna
Presented by: Stewart Information International, Inc. Jack McKenna Held at the: 2007 ESRI Survey & Engineering GIS Summit San Diego Convention Center San Diego, California June 16-19, 2007 Integrating
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name Land Registry and Cadastre Modernization Project Region EUROPE AND CENTRAL ASIA Sector Central government administration
More informationNew Models for Property Data Verification and Valuation
New Models for Property Data Verification and Valuation for 2006 IAAO Councils and Sections Joint Seminar May 9-11, 2006 Charleston, South Carolina Presented by George Donatello, CMS Principal Consultant
More informationAlternatives for Economic Boundary Determination in the Establishment of a Cadastral System. Paper to the FIG Working Week 2012 Rome, May 9, 2012
Alternatives for Economic Boundary Determination in the Establishment of a Cadastral System Paper to the FIG Working Week 2012 Rome, May 9, 2012 by Gottfried Konecny Emeritus Professor Leibniz University
More informatione-registration Project on Submitted by SOUMYAKANTA SOUMYADARSHI, ORS Addl. Tahasildar, DIGAPAHANDI Revenue Officer s Training Institute
Revenue Officer s Training Institute Project on e-registration Submitted by SOUMYAKANTA SOUMYADARSHI, ORS Addl. Tahasildar, DIGAPAHANDI (15th Batch Trainee) Table of Contents 1. Introduction... 2 2. e-registration
More informationLand Records Modernisation. Good Practices & Gaps. Policy Brief
Land Records Modernisation Good Practices & Gaps Policy Brief LAND RECORD MODERNISATION: GOOD PRACTICES & GAPS Subject LRM : Ownership ALL/ RURAL URBAN, PERI-URBAN Good Practice Gap Good Practice Gap LAND
More informationField surveying inspection using tablets
Field surveying inspection using tablets Rami Farraj, Ahmad Sghyyer Survey of Israel, Lincoln 1, Tel-Aviv, Israel rami@mapi.gov.il ahmad@mapi.gov.il Key words: Field Surveying, Cadastre, Mapping Procedures
More informationProgress Report on Green Paper. Dr. Paddy Prendergast. on behalf of the. IIS Commission on Land Registration
Progress Report on Green Paper By Dr. Paddy Prendergast on behalf of the IIS Commission on Land Registration Paddy Prendergast - Chair Brendan Sweeny - Hempenstall Surveys Paul Corrigan - P Corrigan Associates
More informationIntegration of Phodi process with Mutation in Bhoomi (Simultaneous updation of Spatial & Textual LR)
Integration of Phodi process with Mutation in Bhoomi (Simultaneous updation of Spatial & Textual LR) Presented by Sri S.M.Jaamdar Principal Secretary to Government of Karnataka Revenue Department Activities
More informationTechnology-driven solutions for the innovation of land administration and management
Technology-driven solutions for the innovation of land administration and management Technology and economic growth - Studies*find link between technology innovation and national economic prosperity especially,
More informationSection I General Information
General Information Table of Contents A. Introduction... I-2 1. Purpose... I-2 2. Scope... I-2 3. Maintenance... I-3 4. Units... I-3 B. Public Relations... I-3 1. General Public... I-3 2. Property Owners...
More informationLand Administration in Jordan
Land Administration in Jordan Problems and Challenges Eng. Director of Registration Services Department of Lands & Survey q General information q Historical Background q Properties Initiation q Problems
More informationREVENUE OFFICER S TRAINING INSTITUTE (ROTI) Project Report on
REVENUE OFFICER S TRAINING INSTITUTE (ROTI) Project Report on Conversion of Agricultural land for non-agricultural purpose under 8-A of OLR Act 1960- A Boon or Bane? & Upto date instructions issued by
More informationGovernment of India Ministry of Rural Development Department of Land Resources *******
Government of India Ministry of Rural Development Department of Land Resources Notice Inviting Expression of Interest (EoI) G Wing, NBO Building, Nirman Bhawan, New Delhi ******* The Department of Land
More informationJournal of Environmental Science, Computer Science and Engineering & Technology
E-ISSN: 2278 179X JECET; December 2012 February 2013; Vol.2, No.1, 70-74. Journal of Environmental Science, Computer Science and Engineering & Technology Available online at www.jecet.org Computer Science
More informationPFC Consulting Limited (A Govt. of India Undertaking) 9 th Floor, Statesman Building, Barakhamba Lane, Connaught Place, New Delhi
PFC Consulting Limited (A Govt. of India Undertaking) 9 th Floor, Statesman Building, Barakhamba Lane, Connaught Place, New Delhi-110001 PREMISES REQUIRED ON LEASE PFC Consulting Limited invites offers
More informationBy: Barney I. S. Laseko Programme Coordinator Prime Minister s Office TANZANIA
2014 CONFERENCE ON LAND POLICY IN AFRICA 11 14 NOVEMBER, 2014 Focussed Discussion VIII Converting from Manual Land Registration to GIS Enabled Land Information System Case of Sub Saharan Africa Tanzania
More information1. It is mandatory for the real estate developer to register the project with the RERA and obtain a valid registration number before proceeding
OVER VIEW OF RERA Promoter is required to register the project before starting any form of advertising, marketing, booking, selling, offer for selling or inviting people to purchase plots, apartment or
More informationJaipur Development Authority e-auction :Business Rules Document 2014
JAIPUR DEVELOPMENT AUTHORITY, hereby referred to as JDA, has decided to make sale of Properties through online forward e-auction mode. JDA has made arrangements for forward auction; e-payment integrated
More informationStandards of Practice for Surveying in the State of Alabama
Standards of Practice for Surveying in the State of Alabama Effective January 1, 2017 RULE NO. 1.01 PURPOSE The purpose of these rules is to establish standards for the practice of surveying in the State
More informationArlington County, Virginia. Internal Audit of the Real Estate Assessment Appeals Process Calendar Year Ended December 31, 2014
Arlington County, Virginia Internal Audit of the Real Estate Assessment Appeals Process Calendar Year Ended December 31, 2014 Table of Contents Transmittal Letter... 1 Executive Summary... 2-9 Background...
More informationFAQs for MahaRERA Website
FAQs for MahaRERA Website I. General FAQs 1. What are the objects and reasons for which the Real Estate (Regulation and Development) Act 2016 has been framed? Ans: The Real Estate Act is intended to achieve
More informationPRoperty Evaluation & RegistratioN Application (PRERNA) in the State of U.P.
PRoperty Evaluation & RegistratioN Application (PRERNA) in the State of U.P. Dr.L.R.Yadav* & V.K.Singh** National Informatics Centre, Department of Information Technology, MCIT, Government of India, Yojana
More informationAssociation of Ontario Land Surveyors
Association of Ontario Land Surveyors Interpretive Guide and Supplement to The Performance Standards for the Practice of Cadastral Surveying (Ontario Regulation 216/10) March 15, 2015 Page 1 Contents Introduction...
More informationIT Solutions in Supporting Rwanda Land Administration System
Ease of Doing Business Initiative Conference 2016 Digitizing Government business Leveraging ICT to enhance the Business Environment IT Solutions in Supporting Rwanda Land Administration System Pothin MUVARA
More informationLand Administration India Overview. March 17
Land Administration India Overview March 17 1 Administration Criminal Administration law and order, policing, investigation, prosecution, jails... Revenue (Land) Administration land tenures, revenue, reforms,
More informationⅡ-2. The Resurvey Project
Presenter : JANG, Bong-Bae MLTM Ministry of land,transport and Maritime Affairs KIM, Soon-Tae KCSC Korea Cadastral Survey Corp., JANG, Bong-Bae Ⅰ. INTRODUCTION The Korean modern cadastral system was established
More informationThe Survey Data Model Technology A practical survey solution to generate all levels of spatial and e-governance outcomes.
Land Governance in a Rapidly Changing Environment Annual World Bank Conference on Land and Poverty April 24 & 25, 2012 The Survey Data Model Technology A practical survey solution to generate all levels
More informationHybrid Cadastre Pilot Project Guidelines for Public Land Disposition Surveys Operations Division
Hybrid Cadastre Pilot Project Guidelines Operations Division January 12, 2015 Version Update Version No. Date Summary of Changes 2.0 January 12, Table of Contents 2015 Table of Contents added to Guidelines.
More informationFROM RESIDENTIAL LICENSES TO FULL TITLE IN TANZANIA
FORMALISATION OF LANDED PROPERTIES IN UNPLANNED SETTLEMENTS FROM RESIDENTIAL LICENSES TO FULL TITLE IN TANZANIA by Sarah A. Kyessi, Assistant Director Settlements Regularisation Ministry of Lands Housing
More informationDAWSON COUNTY MINOR PLAT REVIEW CHECKLIST $50.00 FEE PER PLAT REVIEW, $5.00 FEE FOR SCAN & CD FOR RECORDING
DAWSON COUNTY MINOR PLAT REVIEW CHECKLIST $50.00 FEE PER PLAT REVIEW, $5.00 FEE FOR SCAN & CD FOR RECORDING NAME ON PLAT: CONTACT/PHONE #: NAMED STREET/ADDRESS: LAND LOT: DISTRICT: SECTION: ZONING: SETBACKS:
More informationELECTRONIC DEEDS REGISTRATION SYSTEMS BILL
REPUBLIC OF SOUTH AFRICA ELECTRONIC DEEDS REGISTRATION SYSTEMS BILL (As introduced in the National Assembly (proposed section 75); explanatory summary of Bill published in Government Gazette No. 41308
More informationGOVERNMENT OF ANDHRA PRADESH ABSTRACT
GOVERNMENT OF ANDHRA PRADESH ABSTRACT Survey settlement Resources Mobilization Collection of user charges for the service rendered to the public as well as private and public institution orders issued.
More informationDI-LRMP Impact Assessment Synthesis
DI-LRMP Impact Assessment Synthesis Report Release Devendra B Gupta, Deepak Sanan & Prerna Prabhakar November 13, 2017 Outline of Impact Assessment State level status (for each state) Tehsil level Assessment
More informationThe Odisha Land Reforms Act, 1960 Odisha Act 16 of 1960 & The Odisha Land Reforms (General) Rules, 1965
The Odisha Land Reforms Act, 1960 Odisha Act 16 of 1960 & The Odisha Land Reforms (General) Rules, 1965 1 Partition among co-sharer raiyats (Section 19) 1) Partition of a holding among co-sharers shall
More information2015 VIRGINIA ENTERPRISE ZONE GRANT PROGRAM Real Property Investment Grant Qualification Form
2015 VIRGINIA ENTERPRISE ZONE GRANT PROGRAM Real Property Investment Grant Qualification Form PART I: BACKGROUND INFORMATION Please read the 2015 Real Property Investment Grant Instruction Manual before
More informationPlats and subdivisions; mapping requirements. (a) Size Requirements. All land plats presented to the register of deeds for recording in the
47-30. Plats and subdivisions; mapping requirements. (a) Size Requirements. All land plats presented to the register of deeds for recording in the registry of a county in North Carolina after September
More informationFrom Parcel to Global Cadastre: Challenges and Issues of the Post-Reform Quebec Cadastre. Elisabetta Genovese, Francis Roy
From Parcel to Global Cadastre: Challenges and Issues of the Post-Reform Quebec Cadastre Elisabetta Genovese, Francis Roy Department of Geomatic Sciences, Laval University, Québec, Canada elisabetta.genovese@scg.ulaval.ca
More informationDILRMP Implementation in Jharkhand. New Initiatives. Presented By: Rajeev Ranjan (IAS) Director Land records jharkhand
DILRMP Implementation in Jharkhand New Initiatives Presented By: Rajeev Ranjan (IAS) Director Land records jharkhand INTRODUCTION The Digital India Land Records Modernization Programme (DILRMP) is launched
More informationBylaw No. (85) of Regulating the Real Estate Brokers. Register in the Emirate of Dubai1
ByLaw no. 85 of 2006 Bylaw No. (85) of 2006 Regulating the Real Estate Brokers Register in the Emirate of Dubai1 The Chairman of the Land Department, After perusal of Law No. (7) of 2006 Concerning Real
More informationCOUNTY GOVERNMENT OF LAMU Department of Land, Physical Planning, Infrastructure & Urban Development
1 COUNTY GOVERNMENT OF LAMU Department of Land, Physical Planning, Infrastructure & Urban Development TERMS OF REFERENCE FOR OUTSOURCING OF CONSULTANCY SERVICES FOR SURVEY & REGULARIZATION OF KATSAIKAIKAIRU
More informationDifficulties in Creating a Notice filing System for Immovable Property
Difficulties in Creating a Notice filing System for Immovable Property Professor Tom Johnson, Osgoode Hall Law School EBRD Secured Lending in Commercial Transactions: Trends and Perspectives 4 5 November
More informationABSTRACT Land Administration System in Lithuania
ABSTRACT Land Administration System in Lithuania 1. General introduction to the Lithuanian Land Administration System and State Enterprise Centre of Registers ( shortly SECR) Lithuania has established
More information250 CMR: BOARD OF REGISTRATION OF PROFESSIONAL ENGINEERS AND LAND SURVEYORS DRAFT FOR DISCUSSION PURPOSES ONLY
250 CMR 6.00: LAND SURVEYING PROCEDURES AND STANDARDS Section 6.01: Elements Common to All Survey Works 6.02: Survey Works of Lines Affecting Property Rights All land surveying work is considered work
More informationPage 1 of 6 Office of the Professions Land Surveying Practice Guidelines - February 2000 The State Board for Engineering and Land Surveying issued the first draft of its proposed Land Surveying Practice
More information(10) The Board has the powers and duties of an arbitrator under sections 29(3) and 43 of the Arbitration Act.
Surveys Act [Fall 2014 STATUTE LAW] Under section 9 survey error investigation of the Surveys Act. The Minister may appoint a Board consisting of three (3) members. a. List two (2) of the three (3) members.
More informationINVESTIGATION OF TITLE & RECORD OF RIGHTS
INVESTIGATION OF TITLE & RECORD OF RIGHTS Prepared by : KRISHMA SHAH (Associate) On Date : 14 May 2016 1 3 Main Steps prior to Purchase of property: Settlement of the terms of the deal between the parties
More informationGREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY. Ref. No. Dated: Office Order
GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY Ref. No. Dated: 08-07-1999 Office Order The system of procedure for Land Acquisition has been finalised. All activities of Land Acquisition shall henceforth
More informationLower Rio Grande Valley Development Council. Hidalgo County Metropolitan Planning organization (HCMPO) Invitation to Bid (ITB):
The Lower Rio Grande Valley Development Council (LRGVDC) Hidalgo County Metropolitan Planning organization (HCMPO) Invitation to Bid (ITB): Thirty (30) IPads with Accessories Quotes Due Not Later than:
More informationDELHI DEVELOPMENT AUTHORITY NOTIFICATION
DELHI DEVELOPMENT AUTHORITY NOTIFICATION S. O.... - In exercise of the powers conferred by sub-section (1) of Section 57 of the Delhi Development Act, 1957, the Delhi Development Authority, with the previous
More informationReforming the Land Sector in Jamaica
Silburn CLARKE and Llewelyn ALLEN, Jamaica Key words: tenure, cadastre, land reform, adjudication, public awareness, land titling, GPS, parcel mapping, traversing, land legislation, tenure regularisation,
More informationCENTRAL MINE PLANNING & DESIGN INSTITUTE LIMITED
Information Brochure and Application Form for Empanelment of Firms for Development of Web GIS based Cadastral Level Land Information System (LIS) & Land Acquisition Monitoring System (LAMS) for Coal Mining
More informationRULES OF THE GEORGIA STATE BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS CHAPTER APPLICATIONS TABLE OF CONTENTS
RULES OF THE GEORGIA STATE BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS CHAPTER 180-7 APPLICATIONS TABLE OF CONTENTS 180-7-.07 Maps and Plats. All maps, plats and similar documents
More informationOVERVIEW AND PROGRESS DEPARTMENT OF LANDS, THAILAND
OVERVIEW AND PROGRESS OF DEPARTMENT OF LANDS, THAILAND presented by PEERA YOMWAN Division of Mapping Technology, DOL The Asean Federation of Land Surveying and Geomatics (AFLAG) : April 11, 2017 @ BKK
More informationCOMPUTERIZED SYSTEM SUPPORTING DEVELOPMENT OF LAND MARKET IN GEORGIA
COMPUTERIZED SYSTEM SUPPORTING DEVELOPMENT OF LAND MARKET IN GEORGIA S. G. TSIRAMUA, I. S. MELASHVILI Land Registration Unit of Government of Georgian, World Bank and IFAD Agriculture Development Project.
More informationClick to edit Master title style
Click to edit Master title style Research and Development in Support of the Implementation of PRS92 Data Build-up up and Transformation of Cadastral Maps and Data from Different Local Plane Coordinate
More informationUrban-Rural Interrelationship for Sustainable Environment
Urban-Rural Interrelationship for Sustainable Environment Marrakech 2-52 5 December 2003 Department of Lands and Survey - The Modernization Journey A Paper presented by Eng. Sameer Abbadi Surveying and
More informationLouisiana Department of Transportation and Development REAL ESTATE SECTION
Louisiana Department of Transportation and Development REAL ESTATE SECTION TITLE RESEARCH REPORTS The product of title research is the Title Research Report. This Title Research Report is used by the Real
More informationOwnership Data in Cadastral Information System of Sofia (CIS Sofia) from the Available Cadastral Map
Ownership Data in Cadastral Information System of Sofia (CIS Sofia) from the Available Cadastral Map Key words: ABSTRACT Lydmila LAZAROVA, Bulgaria CIS Sofia is created and maintained by GIS Sofia ltd,
More informationApplication to Take Examination for License as a Registered Professional Land Surveyor
TEXAS BOARD OF PROFESSIONAL LAND SURVEYING 12100 Park 35 Circle, Building A, Suite 156, MC-230 Austin TX 78753 Web: www.txls.state.tx.us Phone: 512 239 5263 Fax: 512 239 5253 Office Use Only Transaction
More informationUniversity Policy UNIVERSITY PROPERTY AND EQUIPMENT INVENTORY
University Policy 700.02 UNIVERSITY PROPERTY AND EQUIPMENT INVENTORY Responsible Administrator: Vice President of Administration Responsible Office: Auxiliary Services Originally Issued: September 2010
More informationIntegrated Land Information System (ILIS) A Concept Paper
Commissionerate of Survey, Settlements and Land Records Government of Andhra Pradesh Integrated Land Information System (ILIS) A Concept Paper 1 Introduction Land is the essence of human civilization.
More informationDIRECTORATE DEEDS REGISTRATION SUB-SECTOR PROGRAMME. Title security of tenure to real property. Description
DIRECTORATE DEEDS REGISTRATION SUB-SECTOR PROGRAMME Title security of tenure to real property Description Throughout the world and from early times, countries have endeavoured to have a system of land
More informationEstablishing Efficient Cadastral Surveying Plan in Accordance with Introducing World Geodetic Reference System in Korea
Modern Environmental Science and Engineering (ISSN 2333-2581) December 2015, Volume 1, No. 6, pp. 299-303 Doi: 10.15341/mese(2333-2581)/06.01.2015/003 Academic Star Publishing Company, 2015 www.academicstar.us
More informationLow Cost Cadastral Data Aquisition?
Low Cost Cadastral Data Aquisition? Jacobus Meijer and Christiaan Lemmen (Netherlands): 21 May 2011 Abstract Spatial Cadastral Data (Mapping) Participatory Development Some low cost approaches in cadastral
More informationTENDER SCHEDULE LIFE INSURANCE CORPORATION OF INDIA DIVISIONAL OFFICE, INDIA LIFE BUILDING 1543/44 TRICHY ROAD, POST BOX COIMBATORE
LIFE INSURANCE CORPORATION OF INDIA DIVISIONAL OFFICE, INDIA LIFE BUILDING 1543/44 TRICHY ROAD, POST BOX - 3810 COIMBATORE 641 018. TENDER SCHEDULE Sl No Description 1 Location Tender for Purchase of FOUR
More informationUTTARPARA-KOTRUNG MUNICIPALITY
UTTARPARA-KOTRUNG MUNICIPALITY Miscellaneous Receipt No. SL No. Date - Date of Issue - APPLICATION FORM OF SANCTION OF BUILDING PLAN (Valid upto sixty days from the date of issue of this Form) Issued to
More informationInformation contained
Cadastral Integrity Unit Audit Survey Procedures August 2012 Table of Contents Introduction... 2 2. Objectives... 3 3. Roles, responsibilities and delegations... 4 3.1 Ethical conduct... 4 3.2 Workplace
More informationTHE XXV FIG INTERNATIONAL CONGRESS IN MALAYSIA Kuala Lumpur, Malaysia, June 2014 at Kuala Lumpur Convention Centre
CALL FOR PAPERS TO THE XXV FIG INTERNATIONAL CONGRESS IN MALAYSIA Kuala Lumpur, Malaysia, 16 21 June 2014 at Kuala Lumpur Convention Centre Dear Friend and Colleague, It is our privilege and honour to
More informationD DAVID PUBLISHING. Mass Valuation and the Implementation Necessity of GIS (Geographic Information System) in Albania
Journal of Civil Engineering and Architecture 9 (2015) 1506-1512 doi: 10.17265/1934-7359/2015.12.012 D DAVID PUBLISHING Mass Valuation and the Implementation Necessity of GIS (Geographic Elfrida Shehu
More informationetender for Selection of Agency for Generation of Resurvey Maps in 33 Districts of Bihar
etender for Selection of Agency for Generation of Resurvey Maps in 33 Districts of Bihar Directorate of Land Records & Surveys Department of Revenue & Land Reforms Main Secretariat, Patna (Bihar) PIN Code
More informationDIRECTIVE # This Directive Supersedes Directive # and #92-003
Division Of Property Valuation Docking State Office Building 915 SW Harrison St., Room 400N Topeka, KS 66612-1588 Nick Jordan, Secretary David N. Harper, Director phone: 785-296-2365 fax: 785-296-2320
More informationReplies to Queries of the Bidders
Date: 07.12.2018 Replies to Queries of the Bidders SUB: Replies to queries of the bidders against Tender for carrying out survey works, opening of ROU & Manmad in Nashik GA to Dhule GA (approx. 300 km)
More informationChief Administrator Haryana Urban Development Authority C-3, HUDA Complex, Sector-6, Panchkula , Haryana, www. huda.org.
Chief Administrator Haryana Urban Development Authority C-3, HUDA Complex, Sector-6, Panchkula-134109, Haryana, www. huda.org.in email : huda@hry.nic.in Helpline (Toll free): 1800 180 3030 It really is
More informationSchedule A. Citation 1 These regulations may be cited as the Land Registration Administration Regulations. Definitions 2 (1) In these regulations,
Schedule A Regulations Respecting Administration of the Land Registration Act made by the Minister of Service Nova Scotia and Municipal Relations under Section 94 of Chapter 6 of the Acts of 2001, the
More informationDIVISIONAL OFFICE, INDIA LIFE BUILDING 1543/44 TRICHY ROAD, POST BOX COIMBATORE TENDER SCHEDULE LIFE INSURANCE CORPORATION OF INDIA
LIFE INSURANCE CORPORATION OF INDIA DIVISIONAL OFFICE, INDIA LIFE BUILDING 1543/44 TRICHY ROAD, POST BOX - 3810 COIMBATORE 641 018. TENDER SCHEDULE Sl No Description 1 Location Tender for Purchase of PLOTS
More informationTHE NEW ELECTRICAL INSTALLATION REGULATIONS - article published in Vector magazine April 2009 edition, pages 6-8
THE NEW ELECTRICAL INSTALLATION REGULATIONS - article published in Vector magazine April 2009 edition, pages 6-8 The long awaited new Electrical Installation Regulations (not to be confused with the Wiring
More informationVII Chapter 421J, Planned Community Associations
399 VII Chapter 421J, Planned Community Associations 421J-1 Scope. This chapter shall apply to all planned community associations existing as of the effective date of this chapter and all planned community
More informationRAJKOT BRANCH OF WIRC OF ICAI
RAJKOT BRANCH OF WIRC OF ICAI Reporting requirements under SFT (Statement of Financial Transactions) 24th May 2017 CA. Darshak M. Thakkar Rajkot Statement of Financial transactions - Form 61A filing &
More informationThe ecrv Submit application opens with the following important warning message on privacy:
Submit Form Tabs Buyers and Sellers Property Sales Agreement Supplementary Submitter The ecrv form is a single Web-page form with entry fields, choices and selections in multiple tabs for submitting a
More informationQuality Improvement to Cadastral Information in Sweden
Gunnar BLIXT, Sweden Key words: digital cadastre, quality, cadastral index map, real property register. SUMMARY Lantmäteriet is a governmental agency which gives support for creating an efficient and sustainable
More informationPerformance, Audit and Review Group Strategy and Plans
AUDIT OF KEY FINANCIAL PROCESSES AT WATERTON LAKES NATIONAL PARK FIELD UNIT FINAL REPORT June 23, 2003 Prepared by: PARAGON Review and Consulting Inc. Performance, Audit and Review Group Strategy and Plans
More informationLand Registry. Issues in current system
Land Registry The land is one of the most controversial subjects in India. It lacks proper system to maintain land records and provide a person with conclusive titles results from infrequent and long drawn
More informationBUILDINGS, LAND AND LAND IMPROVEMENTS
Approved: Effective: February 19, 2014 Office: Office of Comptroller, General Accounting Topic No. 350-090-315-g Department of Transportation BUILDINGS, LAND AND LAND IMPROVEMENTS PURPOSE: To define requirements
More informationFax: Telephone: /9600. Njrpa fhrneha; Muha;r;rp epwtdk; BID DOCUMENT
Fax: +91-44-28362528 Telephone: +91-4428369500/9600 E-Mail: nirt@icmr.org.in Website: www.nirt.res.in Njrpa fhrneha; Muha;r;rp epwtdk; NATIONAL INSTITUTE FOR RESEARCH IN TUBERCULOSIS (Indian Council of
More informationREQUEST FOR PROPOSAL (RFP) RFP AS. Appraisal Services Valuation of DBHA Properties
REQUEST FOR PROPOSAL (RFP) RFP 2019-01AS Appraisal Services Valuation of DBHA Properties Daytona Beach Housing Authority (DBHA) 211 N Ridgewood Ave Suite 300 Daytona Beach, FL 32114 (386) 253-5653 Terril
More informationR E Q U E S T F O R Q U O T A T I O N S
Houghton, 2041 Block A, Riviera Office Park, 6-10 Riviera Road, Riviera R E Q U E S T F O R Q U O T A T I O N S S U R V E Y O F T H E P R O P O S E D O U T S I D E B O U N D A R Y O F T H E R E M A I N
More informationRef. No. SCMF/ENG/ NIT-24/ Date: N O T I C E I N V I T I N G T E N D E R
Fax : 033 2441 4372 THE WEST BENGAL benfed Website :- www.benfed.org STATE CO-OPERATIVE Phones : 033 2441 4366 MARKETING FEDERATION LTD. 4367 SOUTHEND CONCLAVE 3 rd Floor. 4368 1582, Rajdanga Main Road,
More informationLIS Development Project and Measures Proposed to Enhance Trust in the Land Administration System in Uganda
Project for Design, Supply, Installation and Implementation of the Land Information System and Securing of Land Records (DeSILISoR) LIS Development Project and Measures Proposed to Enhance Trust in the
More informationFIG Congress 2010 Facing the Challenges Building the Capacity Sydney, Australia, April
Setting up the infrastructure for improving the development of Cadastre in Greece Dr. Dimitris ROKOS, Dr. Konstantinos KYRIAZIS and Dr. Panos LOLONIS KTIMATOLOGIO S.A. (Hellenic Cadastre) Source: wikipedia
More informationUse of data in Ukraine for sustainable economic growth. Oleksandr Maliuk State Service of Ukraine for Geodesy, Cartography and Cadastre
Use of data in Ukraine for sustainable economic growth Oleksandr Maliuk State Service of Ukraine for Geodesy, Cartography and Cadastre Kehl, 2017 Content of the presentation Ukraine & StateGeoCadastre:
More informationThese requirements are:
MINIMUM STANDARD DETAIL REQUIREMENTS for ALTA/ACSM LAND TITLE SURVEYS as adopted by American Land Title Association American Congress on Surveying and Mapping and National Society of Professional Surveyors
More information