1 STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION RIGHT OF WAY DATA SHEET (Form #) Date 07/16/2015 Dist 03 Co PLA Rte 80 P/M 0.1/2.2 and 4.1/6.0 EA 03-3F230 EXHIBIT 4-EX-1 (REV 3/2004) Page 1 of 6 Project Description: Propose to widen the existing Interstate 80 (I-80) adding an eastbound auxiliary lane between State Route 65 (SR 65) and Rocklin Road, and a westbound auxiliary lane between Douglas Boulevard and Riverside Avenue. Subject: Right of Way Data Alternate No. 1 This Alternate meets the criteria for a Design/Build project: Yes No X 1. Right of Way Cost Estimate: To be entered into PMCS COST RW1-5 Screens. Current Value Future Use Escalation Rate Escalated Value A. Total Acquisition Cost Acquisition, including Excess Lands, $ 36,964 Damages, and Goodwill. $ 30,450 3* % $ 31,364 Project Permit Fees. $ 5,600 0 $ 5,600 B. Utility Relocation (State Share) $ 0 3 % $ 0 C. Relocation Assistance $ 0 0 % $ 0 D. Clearance/Demolition $ 0 0 % $ 0 E. Title and Escrow $ 6,000 0 % $ 6,000 F. Total Estimated Cost $ 42,050 $ 42,964 G. Construction Contract Work $ 0 (These are construction costs that are to be included in the projects PS&E.) 2. Current Date of Right of Way Certification January Parcel Data: To be entered into PMCS EVNT RW Screen. Type Dual/Appr Utilities RR Involvements X U4-1 0 None X A 8** -2 0 C&M Agrmt B 4*** -3 0 Svc Contract C -4 0 Design D U5-7 4 Const. E XXXX -8 0 Lic/RE/Clauses F XXXX -9 0 Misc. R/W Work Total 12 RAP Displ No Clear/Demo No Const Permits Yes Areas: R/W 1.0 Ac. Excess No No. Excess Parcels 0 Entered PMCS Screens / / by Entered AGRE Screen (Railroad data only) / / *Escalation rate is 3% for 1 year for Right of Way and Utilities **5 properties will require a TCE, 1 property will be zero value *** 4 properties will require Fee Acquisitions by Condemnation No
2 RIGHT OF WAY DATA SHEET (Cont.) (Form #) EXHIBIT 4-EX-1 (REV 3/2004) Page 2 of 6 4. Are there any major items of construction contract work? Yes X No (If Yes, explain.) The project will include roadway widening, bridge widening, retaining walls, and sound walls. Impacts to utilities will occur as part of the construction contract; however the work will be paid for with utility funds authorized during the right of way phase. 5. Provide a general description of the right of way and excess lands required (zoning, use, major improvements, critical or sensitive parcels, etc.). No right of way required. Acquisitions are both Permanent Fee and Temporary Construction Easements. The surrounding areas are devoted to a mix of commercial and residential zoning. One major improvement includes sound wall relocation within residential property. 6. Is there an effect on assessed valuation? Yes Not Significant No X (If Yes, explain.) 7. Are utility facilities or rights of way affected? Yes X No (If Yes, attach Utility Information Sheet, Exhibit 4-EX-5.) The following checked items may seriously impact lead time for utility relocation: Longitudinal policy conflict(s) Environmental concerns impacting acquisition of potential easements Power lines operating in excess of 50 KV and substations No policy exceptions exist. (See attached Exhibit 4-EX-5 for explanation.) 8. Are Railroad facilities or rights of way affected? Yes No X (If Yes, attach Railroad Information Sheet, Exhibit 4-EX-6.)
3 EXHIBIT RIGHT OF WAY DATA SHEET (Cont.) 4-EX-1 (REV 3/2004) (Form #) Page 3 of 6 9. Were any previously unidentified sites with hazardous waste and/or material found? Yes X None Evident (If Yes, attach memorandum per R/W Manual, Chapter 4, Section ) See Initial Site Assessment (ISA) Executive Summary attached. 10. Are RAP displacements required? Yes No X (If Yes, provide the following information.) No. of single family No. of multi-family No. of business/nonprofit No. of farms Based on Draft/Final Relocation Impact Statement/Study dated sufficient replacement housing (will/will not) be available without Last Resort Housing., it is anticipated that 11. Are there Material Borrow and/or Disposal Sites required? Yes No X (If Yes, explain.) 12. Are there potential relinquishments and/or abandonments? Yes No X (If Yes, explain.) 13. Are there any existing and/or potential airspace sites? Yes No X (If Yes, explain.)
4
5
6 EXECUTIVE SUMMARY PCTPA, together with Caltrans, Placer County, City of Rocklin, and City of Roseville, have identified the need for additional transportation improvements in the area. Two key improvements to the regional plan are the addition of auxiliary lanes on I-80 in the easterly direction between SR 65 and Rocklin Road (Location 1) and in the westerly direction between Douglas Boulevard and Riverside Avenue (Location 2). Consideration is also being given to constructing a fifth through lane in the westbound direction instead of the auxiliary lane. Both the eastbound and westbound auxiliary lanes by definition are a portion of roadway, supplementary to the through movements, which enter at an on-ramp and exit at the following off-ramp. They provide an area for weaving and speed changes and enhance capacity. A through lane carries vehicles through an interchange and traffic can continue past an off-ramp. This report presents the results of an Initial Site Assessment (ISA) for property associated with the Placer I-80 Auxiliary Lanes project. The properties assessed for this ISA (Subject Properties) include existing Caltrans right-of-way, as well as two privately owned residential and four undeveloped properties immediately adjacent to the proposed improvements. Multiple other adjacent properties were assessed within a 1-mile radius of both Location 1 and 2. During project design, it will be determined if the 1116 Melrose Ave property (APN ) will be acquired and if the existing structure will be demolished. Accordingly, if necessary, an interior/exterior property inspection should be performed, to identify potential hazardous wastes/materials, prior to acquisition of the property. It is not anticipated that any other structures will be taken for this project. Based on the results of the ISA evaluation, the Summary Table below describes evidence of the potential for Recognized Environmental Conditions (RECs) or Activity and Use Limitations (AULs) on the Subject Properties. Location Existing roadways within project boundaries including I-80, Rocklin Road, Douglas Boulevard, and Riverside Avenue Linda Creek Bridge Soils adjacent to I-80 SUMMARY TABLE Description of REC Evidence Found Potential lead and heavy metals associated with pavement striping. Implementation of improvements may require the removal and disposal of yellow traffic stripe and pavement marking materials (paint, thermoplastic, permanent tape, and temporary tape). Yellow paints made prior to 1995 may exceed hazardous waste criteria under Title 22, California Code of Regulations, and require disposal in a Class I disposal site. Previous study of the Linda Creek Bridge indicated evidence of asbestos containing material in the Metal Beam Guard Rail bearing pad shim. If removal of the bearing pad shims is necessary to widen the bridge, they will require removal and proper disposal by a licensed and certified asbestos abatement contractor in conjunction with the planned bridge widening. In order to complete the necessary asbestos abatement/removal, a Placer County Air Pollution Control District (PCAPD) permit for the Linda Creek Bridge will be attained. Potential contaminated soils associated with aerially deposited lead. Implementation of improvements may require the disturbance and removal of contaminated soils. Disturbance of these soils will require a preparation of a Lead Compliance Plan and Lead Awareness Training. Further sampling and analysis of soil will be initiated during PS&E to determine the extent of lead-contaminated soils. Soils containing hazardous levels of aerially deposited lead will be excavated and disposed of at a Class 1 Disposal Facility or a Class 2 Disposal Facility permitted by the Central Valley Regional Water Quality Control Board (CVRWQCB) before completion of the proposed project. Description of Associated AUL None Found None Found None Found December 2014 Hazardous Waste Initial Site Assessment Placer I-80 Auxiliary Lanes Project i
7 Location Existing buildings that could be demolished/altered due to planned construction activities. Existing buildings that could be demolished/altered due to planned construction activities. SUMMARY TABLE Description of REC Evidence Found Potential for Asbestos Containing Materials (ACM). New uses of ACM were banned by the EPA in Revisions to regulations issued by the Occupational Safety & Health Administration (OSHA) on June 30, 1995, require that all thermal systems insulation, surfacing materials, and resilient flooring materials installed prior to 1981 be considered Presumed Asbestos Containing Materials (PAC) and treated accordingly. In order to rebut the designation as PAC, OSHA requires that these materials be surveyed, sampled, and assessed in accordance with 40 CFR 763 (Asbestos Hazard Emergency Response Act [AHERA]). ACM have also been documented in the rail shim sheet packing, bearing pads, support piers, and expansion joint material of bridges. Potential lead-based paint on painted portions of existing buildings. Structures constructed prior to 1978 are presumed to contain lead-based paint unless proven otherwise, although buildings constructed after 1978 may also contain lead-based paints. Description of Associated AUL None Found None Found The scope of an ISA is limited to anecdotal and visual evidence of potential RECs and does not include verification of RECs based upon environmental testing. Based on the governmental records search, aerial photograph and topographic map review and visual site survey, the following actions are recommended to verify the presence/extent of RECs and evaluate the potential for remediation during the Plans, Specifications & Estimate (PS&E) phase of the Placer I-80 Auxiliary Lanes project: To avoid impacts from pavement striping during construction it is recommended that testing and removal requirements for yellow striping and pavement marking materials be performed in accordance with Caltrans Standard Special Provisions for REMOVE TRAFFIC STRIPE AND PAVEMENT MARKINGS. The Linda Creek Bridge bearing pad shims will require removal and proper disposal by a licensed and certified asbestos abatement contractor in conjunction with the planned bridge widening. In order to complete the necessary asbestos abatement/removal, a Placer County Air Pollution Control District (PCAPD) permit for the Linda Creek Bridge will be attained. The proposed project will require a Non-Standard Special Provision (NSSP) for excavation and handling of soils contaminated with aerially deposited lead. The NSSP should address CCR Title 8, Section , Lead, which includes a Lead Compliance Plan and Lead Awareness training. Further sampling and analysis of soil will be initiated during PS&E to determine the extent of lead-contaminated soils. Soils containing hazardous levels of aerially deposited lead will be excavated and disposed of at a Class 1 Disposal Facility or a Class 2 Disposal Facility permitted by the Central Valley Regional Water Quality Control Board (CVRWQCB) before completion of the proposed project. Buildings constructed prior to 1989 may have been constructed using asbestos containing materials. Conduct asbestos surveys utilizing a certified consultant prior to any modification to, or demolition of the buildings or structures within the study area (e.g. APN ; 1116 Melrose Ave) that may be altered or demolished to accommodate the planned construction. The survey should include a Health and Safety Plan for worker safety and Work Plan for removal/disposal of asbestos containing material, if encountered. December 2014 Hazardous Waste Initial Site Assessment Placer I-80 Auxiliary Lanes Project ii
8 Buildings constructed prior to 1978 are presumed to contain lead based paints. Conduct lead-based paint surveys utilizing a certified consultant prior to modifications/demolition of any existing buildings or structures within the study area (e.g. APN ; 1116 Melrose Ave) that may be altered or demolished to accommodate the planned construction. The survey should include a Health and Safety Plan for worker safety and Work Plan for removal/disposal of lead-based paint, if encountered. Conduct an interior/exterior hazardous materials/hazardous wastes inspection of any existing structures that will be altered or demolished to accommodate the planned construction (e.g. APN ; 1116 Melrose Ave). Should the inspections indicate the presence of hazardous materials/hazardous wastes, a Health and Safety Plan for worker safety and Work Plan for removal/disposal of hazardous materials should be prepared, if encountered. If the project area is anticipated to change (due to a change in the proposed project or staging area), further investigation for potential hazardous waste generators would be required to determine their impact to the revised project limits. The project study area is not anticipated to change; therefore, with the exception of the environmental screening described above, no additional Phase I or Phase II investigations are recommended at this time for the proposed project. I declare that to the best of my professional knowledge and belief, I meet the definition of an Environmental Professional as defined in 40 Code of Federal Regulations, Part 312. Ryan Neves, PE Professional Registration Date December 2014 Hazardous Waste Initial Site Assessment Placer I-80 Auxiliary Lanes Project iii
9 EXHIBIT RIGHT OF WAY DATA SHEET (Cont.) 4-EX-1 (REV 3/2004) (Form #) Page 5 of 6 Instructions for Completing the Right of Way Data Sheet To provide complete and consistent data for input into Right of Way s portion of PMCS, the Right of Way Data Sheet and Right of Way Estimate Worksheet will be used. The Right of Way Data Sheet has been designed to accomplish dual purposes: 1) function as an estimating form that is incorporated into the Project Report/Environmental Document as appropriate, and 2) provide essential data for PMCS by entry of Right of Way workload and cost estimates on the EVNT RW, COST RW1, and other PMCS screens for which Right of Way is responsible. Data required to complete Item 1 on the Right of Way Data Sheet is obtained from the totals of various columns on the Right of Way Estimate Worksheet. All sections of the Right of Way Data Sheet must be completed. If a section is not applicable, it should be so indicated. The following instructions relate to completion of Right of Way Data Sheet Items 1, 2, and 3. The balance of the Right of Way Data Sheet is self-explanatory. Entry 1.A.1. - Entry 1.A.2., 3., and 4. - Entry 1.A.5. - Entry 1.B.1., 2., and 3. - Entry 1.C.1., 2., and 3. - Entry 1.D.1., 2., and 3. - Entry 1.E.1., 2., and 3. - is the total Acquisition cost for the project alternative. It includes acquisition, including excess lands, damages, goodwill, and project permit fees. It is the total of entries 1.A.4. and 1.A.5. 1.A.2. is the grand total of Column 4 on the Right of Way Estimate Worksheet plus contingency costs. 1.A.3. is the escalation rate for Acquisition activities. 1.A.4. is 1.A.2. escalated to the year of Right of Way Certification using escalation rate 1.A.3. is the grand total of Column 15 on the Right of Way Estimate Worksheet. 1.B.1. is obtained from the Utility Information Sheet provided by the Utility Estimator plus contingency costs. 1.B.2. is the escalation rate provided by the Utility Estimator. 1.B.3. is 1.B.1. escalated to the year of Right of Way Certification using escalation rate 1.B.2. 1.C.1. is the total of Column 5 on the Right of Way Estimate Worksheet plus contingency costs. 1.C.2. is the Relocation Assistance escalation rate. 1.C.3. is 1.C.1. escalated to the year of Right of Way Certification using escalation rate 1.C.2. 1.D.1. is the total of Column 6 on the Right of Way Estimate Worksheet plus contingency costs. 1.D.2. is the Clearance/Demolition escalation rate. 1.D.3. is 1.D.1. escalated to the year of Right of Way Certification using escalation rate 1.D.2. 1.E.1. is the total of Column 11 on the Right of Way Estimate Worksheet. 1.E.2. is the Title and Escrow escalation rate. 1.E.3. is 1.E.2. escalated to the year of Right of Way Certification using escalation rate 1.E.2.
10 RIGHT OF WAY DATA SHEET (Cont.) (Form #) EXHIBIT 4-EX-1 (REV 3/2004) Page 6 of 6 Entry 1.F.1. and 2. - Entry 1.G. - Entry 2 - Entry 3.A. - Entry 3.B. - Entry 3.C. - Entry 3.D. - Entry 3.E. - Entry 3.F. - Entry 3.G. - Entry 3.H. - Entry 3.I. - 1.F.1. is the total of the Current Value column of the Right of Way Data Sheet. 1.F.2. is the total of the Escalated Value column of the Right of Way Data Sheet, excluding items 1A4 and 1A5. is the total of Column 10 on the Right of Way Estimate Worksheet. The total estimate for Construction Contract Work is to be reported to Project Development and the Project Manager to ensure inclusion in the projects PS&E. is the anticipated Right of Way Certification date. Each parcel is typed in Column 1 of the Right of Way Estimate Worksheet (see Exhibit 4-EX-3 for definitions of each type). The total of each type is inserted on the appropriate line. Total of all parcels in the estimate. Total should equal the sum of Items X through D in the Type Column. Do not include a double count for dual appraisal parcels. Indicates the number of parcels per type that will require a dual appraisal. Refer to Right of Way Manual, Chapter 7, Section , for a definition of parcels requiring a dual appraisal. Utilities workload involvement obtained from the Utility Information Sheet is provided by the Utility Estimator. Refer to Right of Way Manual, Chapter 13, Exhibit 13-EX-6, for definitions of the various utility workload involvements. Railroad workload involvements obtained from the Railroad Information Sheet provided by the Railroad Coordinator. Enter railroad data in both EVNT RW and AGRE Screens. Note: Service Contracts are entered into for both Design and Construction services. Enter the number of each in the appropriate location; the total of both is entered on the Svc Contract line on the Data Sheet. Total RAP displacements. Amount is total of Column 7 on the Right of Way Estimate Worksheet. Clearance/Demolition units. Amount is the total of Column 8 on the Right of Way Estimate Worksheet. Construction Permits include material and disposal sites. Number is the total of Column 9 on the Right of Way Estimate Worksheet. Condemnation Suits. Total number of condemnation suits anticipated in conjunction with the project based on district experience.
11 STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION RIGHT OF WAY DATA SHEET (Form #) Date 07/16/2015 Dist 03 Co PLA Rte 80 P/M 0.1/2.2 and 4.1/6.0 EA 03-3F230 EXHIBIT 4-EX-1 (REV 3/2004) Page 1 of 6 Project Description: Propose to widen the existing Interstate 80 (I-80) adding an eastbound auxiliary lane between State Route 65 (SR 65) and Rocklin Road, and a westbound fifth lane between Douglas Boulevard and Riverside Avenue. Subject: Right of Way Data Alternate No. 2 This Alternate meets the criteria for a Design/Build project: Yes No X 1. Right of Way Cost Estimate: To be entered into PMCS COST RW1-5 Screens. Current Value Future Use Escalation Rate Escalated Value A. Total Acquisition Cost Acquisition, including Excess Lands, $ 36,964 Damages, and Goodwill. $ 30,450 3* % $ 31,364 Project Permit Fees. $ 5,600 0 $ 5,600 B. Utility Relocation (State Share) $ 0 3 % $ 0 C. Relocation Assistance $ 0 0 % $ 0 D. Clearance/Demolition $ 0 0 % $ 0 E. Title and Escrow $ 6,000 0 % $ 6,000 F. Total Estimated Cost $ 42,050 $ 42,964 G. Construction Contract Work $ 0 (These are construction costs that are to be included in the projects PS&E.) 2. Current Date of Right of Way Certification January Parcel Data: To be entered into PMCS EVNT RW Screen. Type Dual/Appr Utilities RR Involvements X U4-1 0 None X A 8** -2 0 C&M Agrmt B 4*** -3 0 Svc Contract C -4 0 Design D U5-7 4 Const. E XXXX -8 0 Lic/RE/Clauses F XXXX -9 0 Misc. R/W Work Total 12 RAP Displ No Clear/Demo No Const Permits Yes Areas: R/W 1.0 Ac. Excess No No. Excess Parcels 0 Entered PMCS Screens / / by Entered AGRE Screen (Railroad data only) / / *Escalation rate is 3% for 1 year for Right of Way and Utilities **6 properties will require a TCE, 2 properties will be zero value *** 4 properties will require Fee Acquisitions by Condemnation No
12 RIGHT OF WAY DATA SHEET (Cont.) (Form #) EXHIBIT 4-EX-1 (REV 3/2004) Page 2 of 6 4. Are there any major items of construction contract work? Yes X No (If Yes, explain.) The project will include roadway widening, bridge widening, retaining walls, and sound walls. Impacts to utilities will occur as part of the construction contract; however the work will be paid for with utility funds authorized during the right of way phase. 5. Provide a general description of the right of way and excess lands required (zoning, use, major improvements, critical or sensitive parcels, etc.). No right of way required. Acquisitions are both Permanent Fee and Temporary Construction Easements. The surrounding areas are devoted to a mix of commercial and residential zoning. One major improvement includes sound wall relocation within residential property. 6. Is there an effect on assessed valuation? Yes Not Significant No X (If Yes, explain.) 7. Are utility facilities or rights of way affected? Yes X No (If Yes, attach Utility Information Sheet, Exhibit 4-EX-5.) The following checked items may seriously impact lead time for utility relocation: Longitudinal policy conflict(s) Environmental concerns impacting acquisition of potential easements Power lines operating in excess of 50 KV and substations No policy exceptions exist. (See attached Exhibit 4-EX-5 for explanation.) 8. Are Railroad facilities or rights of way affected? Yes No X (If Yes, attach Railroad Information Sheet, Exhibit 4-EX-6.)
13 EXHIBIT RIGHT OF WAY DATA SHEET (Cont.) 4-EX-1 (REV 3/2004) (Form #) Page 3 of 6 9. Were any previously unidentified sites with hazardous waste and/or material found? Yes X None Evident (If Yes, attach memorandum per R/W Manual, Chapter 4, Section ) See Initial Site Assessment (ISA) Executive Summary attached. 10. Are RAP displacements required? Yes No X (If Yes, provide the following information.) No. of single family No. of multi-family No. of business/nonprofit No. of farms Based on Draft/Final Relocation Impact Statement/Study dated sufficient replacement housing (will/will not) be available without Last Resort Housing., it is anticipated that 11. Are there Material Borrow and/or Disposal Sites required? Yes No X (If Yes, explain.) 12. Are there potential relinquishments and/or abandonments? Yes No X (If Yes, explain.) 13. Are there any existing and/or potential airspace sites? Yes No X (If Yes, explain.)
14
15
16 EXECUTIVE SUMMARY PCTPA, together with Caltrans, Placer County, City of Rocklin, and City of Roseville, have identified the need for additional transportation improvements in the area. Two key improvements to the regional plan are the addition of auxiliary lanes on I-80 in the easterly direction between SR 65 and Rocklin Road (Location 1) and in the westerly direction between Douglas Boulevard and Riverside Avenue (Location 2). Consideration is also being given to constructing a fifth through lane in the westbound direction instead of the auxiliary lane. Both the eastbound and westbound auxiliary lanes by definition are a portion of roadway, supplementary to the through movements, which enter at an on-ramp and exit at the following off-ramp. They provide an area for weaving and speed changes and enhance capacity. A through lane carries vehicles through an interchange and traffic can continue past an off-ramp. This report presents the results of an Initial Site Assessment (ISA) for property associated with the Placer I-80 Auxiliary Lanes project. The properties assessed for this ISA (Subject Properties) include existing Caltrans right-of-way, as well as two privately owned residential and four undeveloped properties immediately adjacent to the proposed improvements. Multiple other adjacent properties were assessed within a 1-mile radius of both Location 1 and 2. During project design, it will be determined if the 1116 Melrose Ave property (APN ) will be acquired and if the existing structure will be demolished. Accordingly, if necessary, an interior/exterior property inspection should be performed, to identify potential hazardous wastes/materials, prior to acquisition of the property. It is not anticipated that any other structures will be taken for this project. Based on the results of the ISA evaluation, the Summary Table below describes evidence of the potential for Recognized Environmental Conditions (RECs) or Activity and Use Limitations (AULs) on the Subject Properties. Location Existing roadways within project boundaries including I-80, Rocklin Road, Douglas Boulevard, and Riverside Avenue Linda Creek Bridge Soils adjacent to I-80 SUMMARY TABLE Description of REC Evidence Found Potential lead and heavy metals associated with pavement striping. Implementation of improvements may require the removal and disposal of yellow traffic stripe and pavement marking materials (paint, thermoplastic, permanent tape, and temporary tape). Yellow paints made prior to 1995 may exceed hazardous waste criteria under Title 22, California Code of Regulations, and require disposal in a Class I disposal site. Previous study of the Linda Creek Bridge indicated evidence of asbestos containing material in the Metal Beam Guard Rail bearing pad shim. If removal of the bearing pad shims is necessary to widen the bridge, they will require removal and proper disposal by a licensed and certified asbestos abatement contractor in conjunction with the planned bridge widening. In order to complete the necessary asbestos abatement/removal, a Placer County Air Pollution Control District (PCAPD) permit for the Linda Creek Bridge will be attained. Potential contaminated soils associated with aerially deposited lead. Implementation of improvements may require the disturbance and removal of contaminated soils. Disturbance of these soils will require a preparation of a Lead Compliance Plan and Lead Awareness Training. Further sampling and analysis of soil will be initiated during PS&E to determine the extent of lead-contaminated soils. Soils containing hazardous levels of aerially deposited lead will be excavated and disposed of at a Class 1 Disposal Facility or a Class 2 Disposal Facility permitted by the Central Valley Regional Water Quality Control Board (CVRWQCB) before completion of the proposed project. Description of Associated AUL None Found None Found None Found December 2014 Hazardous Waste Initial Site Assessment Placer I-80 Auxiliary Lanes Project i
17 Location Existing buildings that could be demolished/altered due to planned construction activities. Existing buildings that could be demolished/altered due to planned construction activities. SUMMARY TABLE Description of REC Evidence Found Potential for Asbestos Containing Materials (ACM). New uses of ACM were banned by the EPA in Revisions to regulations issued by the Occupational Safety & Health Administration (OSHA) on June 30, 1995, require that all thermal systems insulation, surfacing materials, and resilient flooring materials installed prior to 1981 be considered Presumed Asbestos Containing Materials (PAC) and treated accordingly. In order to rebut the designation as PAC, OSHA requires that these materials be surveyed, sampled, and assessed in accordance with 40 CFR 763 (Asbestos Hazard Emergency Response Act [AHERA]). ACM have also been documented in the rail shim sheet packing, bearing pads, support piers, and expansion joint material of bridges. Potential lead-based paint on painted portions of existing buildings. Structures constructed prior to 1978 are presumed to contain lead-based paint unless proven otherwise, although buildings constructed after 1978 may also contain lead-based paints. Description of Associated AUL None Found None Found The scope of an ISA is limited to anecdotal and visual evidence of potential RECs and does not include verification of RECs based upon environmental testing. Based on the governmental records search, aerial photograph and topographic map review and visual site survey, the following actions are recommended to verify the presence/extent of RECs and evaluate the potential for remediation during the Plans, Specifications & Estimate (PS&E) phase of the Placer I-80 Auxiliary Lanes project: To avoid impacts from pavement striping during construction it is recommended that testing and removal requirements for yellow striping and pavement marking materials be performed in accordance with Caltrans Standard Special Provisions for REMOVE TRAFFIC STRIPE AND PAVEMENT MARKINGS. The Linda Creek Bridge bearing pad shims will require removal and proper disposal by a licensed and certified asbestos abatement contractor in conjunction with the planned bridge widening. In order to complete the necessary asbestos abatement/removal, a Placer County Air Pollution Control District (PCAPD) permit for the Linda Creek Bridge will be attained. The proposed project will require a Non-Standard Special Provision (NSSP) for excavation and handling of soils contaminated with aerially deposited lead. The NSSP should address CCR Title 8, Section , Lead, which includes a Lead Compliance Plan and Lead Awareness training. Further sampling and analysis of soil will be initiated during PS&E to determine the extent of lead-contaminated soils. Soils containing hazardous levels of aerially deposited lead will be excavated and disposed of at a Class 1 Disposal Facility or a Class 2 Disposal Facility permitted by the Central Valley Regional Water Quality Control Board (CVRWQCB) before completion of the proposed project. Buildings constructed prior to 1989 may have been constructed using asbestos containing materials. Conduct asbestos surveys utilizing a certified consultant prior to any modification to, or demolition of the buildings or structures within the study area (e.g. APN ; 1116 Melrose Ave) that may be altered or demolished to accommodate the planned construction. The survey should include a Health and Safety Plan for worker safety and Work Plan for removal/disposal of asbestos containing material, if encountered. December 2014 Hazardous Waste Initial Site Assessment Placer I-80 Auxiliary Lanes Project ii
18 Buildings constructed prior to 1978 are presumed to contain lead based paints. Conduct lead-based paint surveys utilizing a certified consultant prior to modifications/demolition of any existing buildings or structures within the study area (e.g. APN ; 1116 Melrose Ave) that may be altered or demolished to accommodate the planned construction. The survey should include a Health and Safety Plan for worker safety and Work Plan for removal/disposal of lead-based paint, if encountered. Conduct an interior/exterior hazardous materials/hazardous wastes inspection of any existing structures that will be altered or demolished to accommodate the planned construction (e.g. APN ; 1116 Melrose Ave). Should the inspections indicate the presence of hazardous materials/hazardous wastes, a Health and Safety Plan for worker safety and Work Plan for removal/disposal of hazardous materials should be prepared, if encountered. If the project area is anticipated to change (due to a change in the proposed project or staging area), further investigation for potential hazardous waste generators would be required to determine their impact to the revised project limits. The project study area is not anticipated to change; therefore, with the exception of the environmental screening described above, no additional Phase I or Phase II investigations are recommended at this time for the proposed project. I declare that to the best of my professional knowledge and belief, I meet the definition of an Environmental Professional as defined in 40 Code of Federal Regulations, Part 312. Ryan Neves, PE Professional Registration Date December 2014 Hazardous Waste Initial Site Assessment Placer I-80 Auxiliary Lanes Project iii
19 EXHIBIT RIGHT OF WAY DATA SHEET (Cont.) 4-EX-1 (REV 3/2004) (Form #) Page 5 of 6 Instructions for Completing the Right of Way Data Sheet To provide complete and consistent data for input into Right of Way s portion of PMCS, the Right of Way Data Sheet and Right of Way Estimate Worksheet will be used. The Right of Way Data Sheet has been designed to accomplish dual purposes: 1) function as an estimating form that is incorporated into the Project Report/Environmental Document as appropriate, and 2) provide essential data for PMCS by entry of Right of Way workload and cost estimates on the EVNT RW, COST RW1, and other PMCS screens for which Right of Way is responsible. Data required to complete Item 1 on the Right of Way Data Sheet is obtained from the totals of various columns on the Right of Way Estimate Worksheet. All sections of the Right of Way Data Sheet must be completed. If a section is not applicable, it should be so indicated. The following instructions relate to completion of Right of Way Data Sheet Items 1, 2, and 3. The balance of the Right of Way Data Sheet is self-explanatory. Entry 1.A.1. - Entry 1.A.2., 3., and 4. - Entry 1.A.5. - Entry 1.B.1., 2., and 3. - Entry 1.C.1., 2., and 3. - Entry 1.D.1., 2., and 3. - Entry 1.E.1., 2., and 3. - is the total Acquisition cost for the project alternative. It includes acquisition, including excess lands, damages, goodwill, and project permit fees. It is the total of entries 1.A.4. and 1.A.5. 1.A.2. is the grand total of Column 4 on the Right of Way Estimate Worksheet plus contingency costs. 1.A.3. is the escalation rate for Acquisition activities. 1.A.4. is 1.A.2. escalated to the year of Right of Way Certification using escalation rate 1.A.3. is the grand total of Column 15 on the Right of Way Estimate Worksheet. 1.B.1. is obtained from the Utility Information Sheet provided by the Utility Estimator plus contingency costs. 1.B.2. is the escalation rate provided by the Utility Estimator. 1.B.3. is 1.B.1. escalated to the year of Right of Way Certification using escalation rate 1.B.2. 1.C.1. is the total of Column 5 on the Right of Way Estimate Worksheet plus contingency costs. 1.C.2. is the Relocation Assistance escalation rate. 1.C.3. is 1.C.1. escalated to the year of Right of Way Certification using escalation rate 1.C.2. 1.D.1. is the total of Column 6 on the Right of Way Estimate Worksheet plus contingency costs. 1.D.2. is the Clearance/Demolition escalation rate. 1.D.3. is 1.D.1. escalated to the year of Right of Way Certification using escalation rate 1.D.2. 1.E.1. is the total of Column 11 on the Right of Way Estimate Worksheet. 1.E.2. is the Title and Escrow escalation rate. 1.E.3. is 1.E.2. escalated to the year of Right of Way Certification using escalation rate 1.E.2.
20 RIGHT OF WAY DATA SHEET (Cont.) (Form #) EXHIBIT 4-EX-1 (REV 3/2004) Page 6 of 6 Entry 1.F.1. and 2. - Entry 1.G. - Entry 2 - Entry 3.A. - Entry 3.B. - Entry 3.C. - Entry 3.D. - Entry 3.E. - Entry 3.F. - Entry 3.G. - Entry 3.H. - Entry 3.I. - 1.F.1. is the total of the Current Value column of the Right of Way Data Sheet. 1.F.2. is the total of the Escalated Value column of the Right of Way Data Sheet, excluding items 1A4 and 1A5. is the total of Column 10 on the Right of Way Estimate Worksheet. The total estimate for Construction Contract Work is to be reported to Project Development and the Project Manager to ensure inclusion in the projects PS&E. is the anticipated Right of Way Certification date. Each parcel is typed in Column 1 of the Right of Way Estimate Worksheet (see Exhibit 4-EX-3 for definitions of each type). The total of each type is inserted on the appropriate line. Total of all parcels in the estimate. Total should equal the sum of Items X through D in the Type Column. Do not include a double count for dual appraisal parcels. Indicates the number of parcels per type that will require a dual appraisal. Refer to Right of Way Manual, Chapter 7, Section , for a definition of parcels requiring a dual appraisal. Utilities workload involvement obtained from the Utility Information Sheet is provided by the Utility Estimator. Refer to Right of Way Manual, Chapter 13, Exhibit 13-EX-6, for definitions of the various utility workload involvements. Railroad workload involvements obtained from the Railroad Information Sheet provided by the Railroad Coordinator. Enter railroad data in both EVNT RW and AGRE Screens. Note: Service Contracts are entered into for both Design and Construction services. Enter the number of each in the appropriate location; the total of both is entered on the Svc Contract line on the Data Sheet. Total RAP displacements. Amount is total of Column 7 on the Right of Way Estimate Worksheet. Clearance/Demolition units. Amount is the total of Column 8 on the Right of Way Estimate Worksheet. Construction Permits include material and disposal sites. Number is the total of Column 9 on the Right of Way Estimate Worksheet. Condemnation Suits. Total number of condemnation suits anticipated in conjunction with the project based on district experience.
21
22
23
Butte County Board of Supervisors Agenda Transmittal
Butte County Board of Supervisors Agenda Transmittal Clerk of the Board Use Only Agenda Item: 3.18 Amendment 1 with Quincy Engineering, Inc. for design services related to the Midway Bridge Replacement
More informationINFORMATIONAL HANDOUT
OPEN HOUSE PUBLIC INVOLVEMENT MEETING ROOTSTOWN ELEMENTARY SCHOOL 4190 STATE ROUTE 44, ROOTSTOWN, OHIO Thursday, May 11, 2017 5:00 PM to 7:00 PM ODOT Project: POR-SR44-7.71; PID 102204 Rootstown Township,
More informationBoot Camp Breakout Session #3. September 19, 2018 Carolyn France Moderator Transportation Alternatives Program Manager, Central Office
Boot Camp Breakout Session #3 September 19, 2018 Carolyn France Moderator Transportation Alternatives Program Manager, Central Office Environmental Overview Kevin Bradley Lynchburg District Environmental
More informationWelcome to the Location Public Hearing for Highway 89 Improvements
Welcome to the Location Public Hearing for Highway 89 Improvements AHTD Job 080457 April 6, 2017 How do I get involved? Please sign in at the registration table. Gather information, view the displays,
More informationOFFICE OF REAL ESTATE
OFFICE OF REAL ESTATE DATE: October 25, 2017 TO: FROM: RE: Users of the Real Estate Manual Wayne Pace, Manager Acquisition Unit Changes and Updates to the Real Estate Manual The only current and accurate
More informationTHE REGULATIONS GOVERNING SOIL DISPLACEMENT AND DISPOSAL IN THE EAST HELENA SUPERFUND AREA IN LEWIS AND CLARK COUNTY, MONTANA.
THE REGULATIONS GOVERNING SOIL DISPLACEMENT AND DISPOSAL IN THE EAST HELENA SUPERFUND AREA IN LEWIS AND CLARK COUNTY, MONTANA. 2013 Lewis & Clark City-County Health Department Lead Education and Abatement
More informationDEMOLITION REQUIREMENTS
DEMOLITION REQUIREMENTS It is the responsibility of the owner and/or contractor to comply with the requirements and rules of all authorities and government agencies having jurisdiction. Permit will not
More informationDWR REAL ESTATE COORDINATION PLAN
DWR REAL ESTATE COORDINATION PLAN Exhibit E DWR PROPERTY ACQUISTION PLAN EXHIBIT E Revised Date: 5 10 18 DWR PROPERTY ACQUISTION PLAN EXHIBIT E Revised Date: 5-10-2018 California WaterFix Real Estate Coordination
More informationEnvironmental Audit Standards
Environmental Audit Standards Lender requires an acceptable Phase I Environmental Audit Report, directed to Lender and historical in nature, which is to be prepared in accordance with the standards set
More informationDESIGN PUBLIC HEARING JANUARY 12, 2017 TOWN HALL SULLIVAN MEETING ROOM 558 SOUTH MAIN STREET RAYNHAM, MASSACHUSETTS 7:00 PM FOR THE PROPOSED
DESIGN PUBLIC HEARING JANUARY 12, 2017 AT TOWN HALL SULLIVAN MEETING ROOM 558 SOUTH MAIN STREET RAYNHAM, MASSACHUSETTS 7:00 PM FOR THE PROPOSED REPLACEMENT OF BRIDGE NO. R-02-013 US ROUTE 44 OVER STATE
More informationReview Fee Receipt No. Total Amount Rec d Credit Card Authorization FLORIDA BUILDING AND ACCESSIBILITY CODE, 2010 EDITION APPLIES
APPLICATION FOR BUILDING PERMIT CITY OF OLDSMAR- PLANNING & REDEVELOPMENT 100 STATE STEET WEST, OLDSMAR, FL 34677-3655 PHONE: (813) 749-1124 FAX: (813) 855-2730 PERMIT NO. PERMIT FEES DUE: $ RECEIPT NO:
More informationPhase I Environmental Site Assessment Update Memorandum Vacant Property 1585 Santa Clara Avenue Santa Ana, California 92507
March 1, 2011 Mr. Vincent C. Fregoso, AICP City of Santa Ana 20 Civic Center Plaza Santa Ana, CA 92702 Re: Phase I Environmental Site Assessment Update Memorandum Vacant Property 1585 Santa Clara Avenue
More informationNEVADA EMINENT DOMAIN LAW AND PROCEDURES
Last Revised 7-6-11 NEVADA EMINENT DOMAIN LAW AND PROCEDURES Negotiation/Precondemnation Process: Negotiation Requirements By: Kermitt L. Waters, Esq. and Michael A. Schneider, Esq. Law Offices of Kermitt
More information1976 Fargo, ND City Directory - R.L. Polk & Co.
1986 Fargo, ND City Directory - R.L. Polk & Co. 1981 Fargo, ND City Directory - R.L. Polk & Co. 1976 Fargo, ND City Directory - R.L. Polk & Co. 1971 Fargo, ND Directory - R.L. Polk & Co. 1971 Fargo, ND
More informationa. RIGHTS OF WAY: Utility will own, operate and maintain extension facilities only: ISSUED BY Date Filed: July 2, 1996
SOUTHERN CALIFORNIA WATER COMPANY ORIGINAL Cal. P.U.C. Sheet No. 1005-E Page 1 APPLICABILITY: This rule is applicable to extension of electric Distribution Lines 1 of Utility s standard voltages (less
More informationMega SITE CLASSIFICATION STANDARDS & APPLICATION INSTRUCTIONS
Mega SITE CLASSIFICATION STANDARDS & APPLICATION INSTRUCTIONS Application Checklist SUBMISSION Submit one hard copy in a three-ring binder. Submit one digital copy on a USB flash drive. Send the hard copy
More informationI-820 / SH 121 INTERCHANGE IN NE TARRANT COUNTY
/ SH 121 INTERCHANGE IN NE TARRANT COUNTY / SH 121 Interchange Public Hearing October 5, 2017 1 PUBLIC HEARING / SH 121 INTERCHANGE from approximately 2,000 feet north of Pipeline Road/Glenview Drive to
More informationDESIGN BUILD PROJECTS
DESIGN BUILD PROJECTS Michele Palicka FHWA Real Estate Specialist Troy Byers GDOT Asst. State R/W Administrator Agenda Federal Oversight on Design Build Projects State of Georgia Oversight on Design Build
More informationR/W PREQUALIFICATION ODOT, 3/14/2018 PROPERTY MAP SHEET
R/W PREQUALIFICATION ODOT, 3/14/2018 3A Title Block 3B Sheet Heading 3C Station Limit Flags 3D Revision Block 3E Ownership Name and Number 3F Centerline Stationing 3G Proposed R/W and Pavement 3H Structures
More informationJANUARY 2016 MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK APPENDIX E
U.S. Army Corps of Engineers New York District MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK JANUARY 2016 APPENDIX E REAL ESTATE
More informationFloodplain Development Land Use Review
PUBLIC WORKS - COMMUNITY DEVELOPMENT 333 Broadalbin Street SW, PO Box 490, Albany, Oregon 97321-0144 BUILDING 541-917-7553 PLANNING 541-917-7550 Floodplain Development Land Use Review Application Information
More informationR/W PREQUALIFICATION ODOT, 3/14/2018
R/W PREQUALIFICATION ODOT, 3/14/2018 BRETT SHEARER, C.O. REAL ESTATE PROPOSED RIGHT OF WAY DESIGN 172 PROPOSED RIGHT OF WAY DESIGN PROPOSED RIGHT OF WAY DESIGN Section 3200 Types of Title 173 PROPOSED
More informationLight Industrial CLASSIFICATION STANDARDS & APPLICATION INSTRUCTIONS
CLASSIFICATION STANDARDS & APPLICATION INSTRUCTIONS Application Checklist SUBMISSION Submit one hard copy in a three-ring binder. Submit one digital copy on a USB flash drive. Send the hard copy application
More informationAppendix B Real Estate Plan
Appendix B Real Estate Plan B-1 REAL ESTATE PLAN Prepared for U.S. Army Corps of Engineers Southwestern Division Little Rock District As of May 1, 2013 Prepared by Ronald Bridges Real Estate Division ANY
More informationCHIEF REAL ESTATE OFFICER, 1949
12-10-93 CHIEF REAL ESTATE OFFICER, 1949 Summary of Duties: A Chief Real Estate Officer plans, organizes, and directs, or assists in the planning and directing of administrative and technical real estate
More informationENVIRONMENTAL QUESTIONNAIRE AND DISCLOSURE STATEMENT
ENVIRONMENTAL QUESTIONNAIRE AND DISCLOSURE STATEMENT The purpose of this questionnaire is to provide information about the past and present ownership and uses of the real property upon which lender will
More informationPhase I Environmental Site Assessments for Corridors
Phase I Environmental Site Assessments for Corridors Prepared by: Kimberly Perkins and Jill Biesma 1 Environmental Advisors and Engineers 19211 W. 64 th Terrace, Shawnee, KS 66218 (913) 599-4326 Goal Of
More informationCommercial Requirements Packet Sheridan, Indiana Hamilton County
Commercial Requirements Packet Sheridan, Indiana Hamilton County Town of Sheridan 506 S. Main Street Sheridan, IN 46069 317 758 5293 FAX: 317 758 2505 Needed Information For All Commercial (Office, Retail,
More informationTHE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE
BOARD AGENDA: 4/27/10 ITEM: 8.1 THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE MEMORANDUM TO: HONORABLE MAYOR, CITY COUNCIL, AND AGENCY BOARD SUBJECT: SEE BELOW FROM: HARRY S. MAVROGENES EXECUTIVE DIRECTOR
More informationFrequently Asked Questions From the Certification of R/W Training Sessions
Frequently Asked Questions From the Certification of R/W Training Sessions 1. There are differences between appropriations of vacant land and appropriations of structures. What is a structure? A structure
More informationDown Payment and Closing Cost Assistance. Neighborhood Housing Services of Bedford Stuyvesant 1012 Gates Avenue Brooklyn, NY 11221
NEW YORK STATE HOUSING TRUST FUND HOME PROGRAM PROGRAMMATIC ENVIRONMENTAL REVIEW RECORD FOR LOCAL PROGRAM ADMINISTRATOR (LPA) PROGRAMS PROGRAM NAME: Down Payment and Closing Cost Assistance SHARS NUMBER:
More informationGuide to Combined Preliminary and Final Plats
Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested
More information5.5 Relocations and Displacements
I-70 East Final EIS 5.5 Relocations and Displacements 5.5 Relocations and Displacements This section investigates the impacts from the project alternatives resulting from land acquisition of residential
More informationTask Central Office Real Estate Responsibilities District Responsibilities
PAGE 1 Appraisal 1. Procedures relative to the entire appraisal process. 1. Prepare preliminary fee schedules, setting monetary guidelines. 2. Prepare and issue contractual agreements with fee appraisers
More informationUSEPA Brownfield Assessment Grant Application for Financial Assistance
The Port of Greater Cincinnati Development Authority (Port Authority) is accepting applications for funding under its United States Environmental Protection Agency (USEPA) Brownfield Assessment Grant.
More informationAdministration and Projects Committee STAFF REPORT July 3, 2014 Page 2 of 3 Changes from Committee B. CT 208 Historical Summary of Contract s. C. Reso
Administration and Projects Committee STAFF REPORT Meeting Date: July 3, 2014 Subject SR4 Widening Project, Somersville Road to SR160 (Project 1407/3001) Authorization to Execute No. 6 to Agreement No.
More informationEARLY PLANNING - SCHOOL SITE SELECTION
EARLY PLANNING - SCHOOL SITE SELECTION CASH / CCFC Workshop January 14, 2003 Michael O'Neill - Calif. Dept. of Education School Facilities Planning Division ASSUMPTIONS (Already done?) Identified need
More informationState of Florida Department of Transportation EXHIBIT A, SCOPE OF SERVICES
State of Florida Department of Transportation EXHIBIT A, SCOPE OF SERVICES DISTRICTWIDE PROPERTY AND FACILITY MANAGEMENT SERVICES FOR THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) DISTRICT SIX. PROJECT/PROPOSAL
More informationCounty of Kern HOME Program Housing Developer Pre-Application
County of Kern HOME Program Housing Developer Pre-Application Instructions: Complete Items 1 through 4 below. On separate pages respond to Items 5 through 16 listed on the following pages. Respond as completely
More informationENVIRONMENTAL SITE ASSESSMENT (AAI COMPLIANT PHASE I)
ENVIRONMENTAL SITE ASSESSMENT (AAI COMPLIANT PHASE I) IPP.MORELAND AVENUE ASSEMBLAGE 785-793 MORELAND AVENUE ATLANTA, GEORGIA, 30316 ONE GROUP PROJECT #A6092 JANUARY 28, 2008 PREPARED FOR: FAIRVIEW COMMERCIAL
More informationApplication of the TAHPR and NESHAP to the Demolition of a Public Building
Subject: BACKGROUND Application of the TAHPR and NESHAP to the Demolition of a Public Building The Texas Asbestos Health Protection Rules (TAHPR) and the National Emission Standards for Hazardous Air Pollutants
More informationDESIGN PUBLIC HEARING
DESIGN PUBLIC HEARING October 25, 2016 AT STEVENS MEMORIAL LIBRARY 345 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 7:00 PM FOR THE PROPOSED Chickering Road (Route 125) & Massachusetts Avenue Intersection
More informationChange is in the air with regard. feature
em feature Amy L. Edwards is a partner in the law firm of Holland & Knight LLP, Washington, DC, where she co-chairs the firm s national environmental team. Sarah C. Smith is an associate at Holland & Knight.
More informationTEMPORARY CONSTRUCTION EASEMENT AND AGREEMENT
Recording Requested By and When Recorded Mail to: City Clerk City of Albany 1000 San Pablo Avenue Albany, CA 94706 TEMPORARY CONSTRUCTION EASEMENT AND AGREEMENT No recording fee pursuant to Government
More informationPROJECT NH 0050(99)381 PCN 6926 YANKTON COUNTY. SD HWY 50 (4 th Street) from Broadway Ave to Archery Road in Yankton, SD
Public Meeting/ Open House April 4, 2013 PROJECT NH 0050(99)381 PCN 6926 YANKTON COUNTY SD HWY 50 (4 th Street) from Broadway Ave to Archery Road in Yankton, SD Grading, PCC Pavement, Asphalt Concrete
More informationThe Lead-Based Paint Disclosure Manual. Your key to working with Federal HUD/EPA Disclosure Regulations
The Lead-Based Paint Disclosure Manual Your key to working with Federal HUD/EPA Disclosure Regulations Published by the Illinois REALTORS 522 South Fifth Street Springfield, IL 62701 Copyright 2016, Illinois
More informationHOME Investment Partnerships (HOME) Program Funding Application
HOME Investment Partnerships (HOME) Program Funding Application City of New Rochelle Department of Development 515 North Avenue New Rochelle, NY 10801 May 2016 HOME FUNDING APPLICATION INTRODUCTION AND
More informationOHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE
OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE DATE: April 3, 2017 TO: FROM: RE: Users of the Real Estate Manual Jared Miller, Manager Appraisal Unit Changes and Updates to the Real Estate Manual
More informationDue Diligence & Environmental Compliance Issues for Tribal Energy Projects: Hazardous Waste
Due Diligence & Environmental Compliance Issues for Tribal Energy Projects: Law Seminars International Seattle, WA October 23, 2007 Connie Sue Manos Martin Hazardous Waste Overview Environmental Due Diligence:
More information1.1 Purpose. The purpose of this chapter is to summarize guidance on those requirements generally applicable to grant programs.
523 FW 1 Summary FWM#: 061 (new) Date: December 17, 1992 Series: State Grant Programs Part 523: Federal Aid Compliance Requirements Originating Office: Division of Federal Aid 1.1 Purpose. The purpose
More informationEligible and Non-Eligible Structures
1. Eligible Dwelling Units 1.1. Single Family (1-4 dwelling units) 1.2. Rental Units/Multi-Family Buildings (5 or more) 1.3. Groups, Shelters and Transitional Facilities 1.4. Religious Buildings 2. Non-Eligible
More informationUsing HEROS as an FHA Partner
Using HEROS as an FHA Partner The purpose of this document is to provide instructions to consultants and lenders assisting with environmental reviews for Multifamily FHA-insured projects. Consultants will
More information5.5 Relocations and Displacements
I-70 East Supplemental Draft EIS 5.5 Relocations and Displacements 5.5 Relocations and Displacements This section investigates the impacts to residential units, businesses, and non-profit associations
More informationThe University of Texas System Systemwide Policy. Policy: UTS Title. Environmental Review for Acquisition of Real Property. 2.
1. Title 2. Policy Environmental Review for Acquisition of Real Property Sec. 1 Sec. 2 Policy Statement. It is the policy of The University of Texas System to minimize its potential for exposure to claims
More informationCITY OF TACOMA HOUSING & COMMUNITY DEVELOPMENT 2012 APPLICATION SUPPLEMENTAL FORM
CITY OF TACOMA HOUSING & COMMUNITY DEVELOPMENT 2012 APPLICATION SUPPLEMENTAL FORM I. DEVELOPMENT PROJECT INFORMATION (Acquisition, New Construction or Rehabilitation only) A. Permanent Capital Funding
More informationLCRA BOARD POLICY 401 LAND RESOURCES. Sept. 21, 2016
LCRA BOARD POLICY 401 LAND RESOURCES Sept. 21, 2016 401.10 PURPOSE This policy establishes guidelines for the acquisition, disposition, use and management of all LCRA land rights. 401.20 DEFINITIONS Land
More informationCITY OF VAUGHAN POLICY AND PROCEDURES FOR DEALING WITH CONTAMINATED OR POTENTIALLY CONTAMINATED SITES
CITY OF VAUGHAN POLICY AND PROCEDURES FOR DEALING WITH CONTAMINATED OR POTENTIALLY CONTAMINATED SITES MAY 2001 This Report should be read in conjunction with the City of Vaughan BACKGROUND REPORT ON POLICY
More informationAccelerated ROW Process for Sidewalks FAQ s
Accelerated ROW Process for Sidewalks FAQ s General FAQs... 3 1. What is the Accelerated ROW Process for Sidewalks?... 3 2. When is the Process Available?... 3 3. Can the accelerated right-of-way process
More informationRESOLUTION OF THE REDEVELOPMENT AGENCY OF THE CITY OF VACAVILLE AUTHORIZING THE EXECUTIVE DIRECTOR TO ACCEPT A 6
Agenda Item No. 6f July 8, 2008 TO: FROM: SUBJECT: Honorable Chairman and Redevelopment Agency Members Honorable Mayor and City Council Attention: David J. Van Kirk, Executive Director/City Manager Laura
More informationBy: John R. Navratil, ASA, SR/WA, R/W-AC, R/W-NAC
By: John R. Navratil, ASA, SR/WA, R/W-AC, R/W-NAC ROW in the Fast Lane! Design-Build Project Velocity Design-Build Projects are Schedule-Driven Appraisal is the Keystone Without a Well-Supported Appraisal
More informationCounty of Monterey. Capital Asset Policy
County of Monterey Capital Asset Policy Office of the Auditor-Controller 168 W. Alisal Street Salinas, California Effective December 11, 2007 [Version November 16, 2007] County of Monterey Capital Asset
More informationEXHIBIT A SCOPE OF SERVICES. Demolition & Removal Services for Crosstown Parkway from Manth Lane to SR-5 / US-1
EXHIBIT A SCOPE OF SERVICES Demolition & Removal Services for Crosstown Parkway from Manth Lane to SR-5 / US-1 1.0 The purpose of this agreement is to retain the Vendor for three years to provide demolition,
More informationDEPARTMENT OF ECONOMIC DEVELOPMENT Unified Government of Wyandotte County/Kansas City, Kansas
DEPARTMENT OF ECONOMIC DEVELOPMENT Unified Government of Wyandotte County/Kansas City, Kansas 701 North 7 th Street, Ste. 421 Phone: (913) 573-5730 Kansas City, Kansas 66101 Fax (913) 573-5745 Neighborhood
More informationLAND FOR SALE/LEASE. NWC I-94 & Parma Road Parma Township, MI
Parma Road LAND FOR SALE/LEASE I-94 NWC I-94 & Parma Road Parma Township, MI W. Oakley Park Road Suite 220 Commerce, Michigan 48390 (248) 359-9000 Detroit Office (66) 24-2200 Grand Rapids Office www.insitecommercial.com
More informationRELOCATION ASSISTANCE PROGRAM (RAP) BOOKLET THE 10 MINUTE MANAGER
RELOCATION ASSISTANCE PROGRAM (RAP) BOOKLET THE 10 MINUTE MANAGER WHAT IS THE 10 MINUTE MANAGER? The 10 Minute Manager is an overview of the much more detailed Relocation Assistance Handbook (insert link)
More informationCommercial Seller Advisory When in doubt disclose!
Commercial Seller Advisory When in doubt disclose! Sellers are obligated by law to disclose all known material (important) facts about the property to the buyer. A r i z o n a law requires that you disclose
More informationTABLE OF CONTENTS General Legal Authority for Certification of Right of Way Control 24-2
TABLE OF CONTENTS 2400 CERTIFICATION OF RIGHT OF WAY CONTROL PAGE 2401 General 24-1 2402 Legal Authority for Certification of Right of Way Control 24-2 2403 Right of Way Certification and Advertising for
More informationHank's Exchange Road Bridge Replacement Project
Hank's Exchange Road Bridge Replacement Project Public Information Meeting, Wednesday, May 12, 2014 Gold Oak School Presented By: El Dorado County Community Development Agency, Transportation Division
More informationENVIRONMENTAL DUE DILIGENCE
ENVIRONMENTAL DUE DILIGENCE Developing Solar on Landfills & Brownfields June 12-13, 2017 Chicago, Illinois Matthew E. Cohn Greensfelder Hemker & Gale, P.C. 200 West Madison Street Suite 3300 Chicago, Illinois
More informationDemolition of Single Family House and Garage Site Address: ½ Ave. N. St. Cloud, MN 56303
Demolition of Single Family House and Garage Site Address: 426 19 ½ Ave. N. St. Cloud, MN 56303 St. Cloud HRA 1225 W St. Germain Street St. Cloud, MN 56301 (320) 202-3147 July 10, 2017 DEMOLITION OF SINGLE
More informationRule No. 15. Distribution Line Extensions Page 1 of 14
GOLDEN STATE WATER COMPANY (U 913-E) Revised Cal. P.U.C. Sheet No. 2103-E SAN DIMAS, CALIFORNIA 91773-9016 Canceling Revised Cal. P.U.C. Sheet No. 1005-E Page 1 of 14 APPLICABILITY: This rule is applicable
More informationAGREEMENT TO ACQUIRE LANDS BETWEEN THE DEPARTMENT OF THE ARMY ST. PAUL DISTRICT, CORPS OF ENGINEERS AND. THE CITY OF City, State
AGREEMENT TO ACQUIRE LANDS BETWEEN THE DEPARTMENT OF THE ARMY ST. PAUL DISTRICT, CORPS OF ENGINEERS AND THE CITY OF City, State FOR CONDEMNATION ON BEHALF OF THE SPONSOR BY THE CORPS OF ENGINEERS FOR THE
More informationDESIGN PUBLIC HEARING JULY 7, 2016 CITY COUNCIL HEARING ROOM, FIRST FLOOR ONE GOVERNMENT CENTER FALL RIVER, MASSACHUSETTS 6:30 PM FOR THE PROPOSED
DESIGN PUBLIC HEARING JULY 7, 2016 AT CITY COUNCIL HEARING ROOM, FIRST FLOOR ONE GOVERNMENT CENTER FALL RIVER, MASSACHUSETTS 6:30 PM FOR THE PROPOSED AIRPORT ROAD OVER ROUTE 24, BRIDGE DECK REPLACEMENT
More informationMinistry of Health and Long Term Care Community Health Capital Program Operational Framework-Training Narration Module 4
Ministry of Health and Long Term Care Community Health Capital Program Operational Framework-Training Narration Module 4 Health Capital Investment Branch Ministry of Health and Long Term Care July 2016
More informationDUE DILIGENCE CHECKLIST For: [PROPERTY NAME]
DUE DILIGENCE CHECKLIST For: [PROPERTY NAME] Page 1 / 10 1. List and describe ownership interests 2. A List required third party consents and releases (i.e., mortgages, regulatory) 3. Send authorization
More informationSELLER S PROPERTY DISCLOSURE STATEMENT
INSTRUCTIONS TO THE SELLER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Please complete the following form. Do not leave any spaces blank. Please refer to the line number(s) of the
More informationPerron & Campbell, Inc. COMMERCIAL REAL ESTATE BROKERAGE PHONE: FAX:
FOR LEASE 818 CHESTNUT SAN ANTONIO, TEXAS 78202 PROPERTY DISCLAIMER As to the subject property, Perron & Campbell., Inc. ("Broker") makes no warranties, representations or guarantees regarding the structural
More informationPlan Presentation Guide SECTION 60. Chapter 3 RIGHT-OF-WAY SECTION PRESENTATION
Chapter 3 RIGHT-OF-WAY SECTION PRESENTATION Right of Way plans are necessary for the acquisition of the required right of way and easements for projects. Proper representation of the right of way and easements
More informationUniversity Policy UNIVERSITY PROPERTY AND EQUIPMENT INVENTORY
University Policy 700.02 UNIVERSITY PROPERTY AND EQUIPMENT INVENTORY Responsible Administrator: Vice President of Administration Responsible Office: Auxiliary Services Originally Issued: September 2010
More informationCentral Massachusetts Brownfields Forum Assessment and Redevelopment and Everything in Between Colonial Hotel Gardner, MA Tuesday, March 12,
Central Massachusetts Brownfields Forum Assessment and Redevelopment and Everything in Between Colonial Hotel Gardner, MA 01440 Tuesday, March 12, 2013 13 parcels totaling 55 acres with frontage on Mill
More informationSeller s Property Disclosure Residential
0 0 false 0 FL 3027785 test tbd4 false 085398-200148-69326 Fernando Corona M Seller s Property Disclosure Residential Notice to Licensee and seller: Only the Seller should fill out this form. Notice to
More informationQUARTERPATH COMMUNITY DEVELOPMENT AUTHORITY CITY OF WILLIAMSBURG, VIRGINIA SPECIAL ASSESSMENT REPORT. Prepared By: MuniCap, Inc.
QUARTERPATH COMMUNITY DEVELOPMENT AUTHORITY CITY OF WILLIAMSBURG, VIRGINIA SPECIAL ASSESSMENT REPORT Prepared By: MuniCap, Inc. October 25, 2011 QUARTERPATH COMMUNITY DEVELOPMENT AUTHORITY CITY OF WILLIAMSBURG,
More informationRESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension
RESOLUTION NO. R2018-07 To Acquire Real Property Interests Required for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 03/08/2018
More informationExercises direct supervision over assigned professional and technical personnel.
SENIOR RIGHT OF WAY AGENT - Range B93 BOD 10/10/12 Class specifications are intended to present a descriptive list of the range of duties performed by employees in the class. Specifications are not intended
More informationINSTRUCTIONS FOR COMPLETING THE APPLICATION FORM
TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT PO Box 8 Holly Springs, NC 27540 (919) 557-3938 FAX (919) 552-9881 The following items must be submitted with the complete, signed and notarized Application
More informationLead Poisoning Prevention Program
Lead Poisoning Prevention Program Department of the Environment Notice of Tenants Rights INTRODUCTION This Notice of Tenants Rights explains your legal rights pursuant to the Maryland Reduction of Lead
More informationAppendix B Draft Real Estate Plan
Appendix B Draft Real Estate Plan B-1 REAL ESTATE PLAN Prepared for U.S. Army Corps of Engineers Southwestern Division Little Rock District As of December 3, 2012 Prepared by Ronald Bridges Real Estate
More informationDue Care Obligations
Sec 324.XXXXX Due Care; duties of owner or operator, residential tenant, having knowledge of facility; compliance with section. (1) A current owner or operator of real property, or a residential tenant,
More informationABA Leasing Committee Teleconference January 16, 2013 Industrial and Warehouse Use Built-to-Suit Term Sheet Considerations 1
ABA Leasing Committee Teleconference January 16, 2013 Industrial and Warehouse Use Built-to-Suit Term Sheet Considerations 1 1. General Observations Term sheet can provide outline of business deal to be
More informationCity of Detroit Lead Clearance Ordinance
City of Detroit Lead Clearance Ordinance Part III - CITY CODE >> Chapter 9 - BUILDINGS AND BUILDING REGULATIONS >> ARTICLE I. - DETROIT PROPERTY MAINTENANCE CODE >> DIVISION 3. - REQUIREMENTS FOR RENTAL
More informationJefferson Street Center Winchester Public Schools Winchester, Virginia
Main Office: 6799 Kennedy Road Unit F Warrenton, Virginia 20187 Phone: 540.347.5001 Fax: 540.347.5021 1388 NW 2 nd Ave., Unit 4B, Boca Raton, FL. 33432 Phone: 561.416.1240 Fax: 561.416.1248 Concept -Option
More informationMINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT
MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT Complete this form, print, and mail to: Minnehaha County Highway Dept. 2124 E 60 th St N, Sioux Falls, SD 57104, or Email: jmaras@minnehahacounty.org
More informationWAYNE COUNTY/CITY OF GARDEN CITY COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) HOUSING REHABILITATION PROGRAM
WAYNE COUNTY/CITY OF GARDEN CITY COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) HOUSING REHABILITATION PROGRAM APPLICATION FOR HOUSING REHABILITATION (DEFERRED LOAN LIEN) GENERAL APPLICANT INFORMATION Name:
More informationNEBRASKA REAL ESTATE COMMISSION SELLER PROPERTY CONDITION DISCLOSURE STATEMENT Residential Real Property
Page 1 of 5 NEBRASKA REAL ESTATE COMMISSION SELLER PROPERTY CONDITION DISCLOSURE STATEMENT Residential Real Property THIS DISCLOSURE STATEMENT IS BEING COMPLETED AND DELIVERED IN ACCORDANCE WITH NEBRASKA
More informationPLANNED UNIT DEVELOPMENT (East), PLANNED UNIT DEVELOPMENT (West) STAFF REPORT Date: September 18, 2014
PLANNED UNIT DEVELOPMENT (East), PLANNED UNIT DEVELOPMENT (West) STAFF REPORT Date: September 18, 2014 DEVELOPMENT NAME LOCATION McGowin Park, LLC PLANNED UNIT DEVELOPMENT (East) 1401 Satchel Paige Drive
More informationTom Brohard, PE Licenses: 1975 / Professional Engineer / California Civil, No. 24577 1977 / Professional Engineer / California Traffic, No. 724 2006 / Professional Engineer / Hawaii Civil, No. 12321 Education:
More informationTHRESHOLDS Application DETAILED PRELIMINARY BUDGET. Development Name: Development Item. Site Acquisition
DETAILED PRELIMINARY BUDGET Development Name: Development Item Cost Site Acquisition Hard Costs: Site Preparation Infrastructure (roads, utilities) Demolition/Lead Abatement Construction Contingency Landscaping
More informationDATE: TO OWNER: Washington State Housing Finance Commission Low-Income Housing Tax Credit Program 1000 Second Avenue Suite 2700 Seattle WA
INDEPENDENT CERTIFIED PUBLIC ACCOUNTANT'S REPORT on CARRYOVER ALLOCATION BASIS PURSUANT TO IRS SECTION 42 (h)(1)(e)(ii) and AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) EXCHANGE PROGRAM 30% TEST PURSUANT
More informationPROJECT: P 0037(129)207 PCN: 039K BROWN COUNTY. S.D. Highway 37 From Aspen Ave to U.S. Highway 12 in Groton
Public Meeting/ Open House September 4, 2014 PROJECT: P 0037(129)207 PCN: 039K BROWN COUNTY S.D. Highway 37 From Aspen Ave to U.S. Highway 12 in Groton Grading, Storm Sewer, Curb & Gutter, Sidewalk, Roadway
More informationVoluntary standard; accepted by USEPA to comply with AAI rule. 2. Regulatory/Developmental History
This table summarizes some of the primary differences between the New Jersey Department of Environmental Protection (NJDEP) Preliminary Assessment Report (PAR), pursuant to the April 2013 NJDEP Site Remediation
More information