1 ENVIRONMENTAL DUE DILIGENCE Developing Solar on Landfills & Brownfields June 12-13, 2017 Chicago, Illinois Matthew E. Cohn Greensfelder Hemker & Gale, P.C. 200 West Madison Street Suite 3300 Chicago, Illinois (312)

2 What is environmental due diligence? Phase I Environmental Site Assessment (noninvasive - records, conversations, and a walk through) Phase II Environmental Site Assessment (invasive soil borings, groundwater testing, vapor samples, sediment samples, surface water samples, etc.)

3 Why are you doing environmental due diligence? 1. To learn if there are or are not any environmental concerns and decide whether or not to walk away 2. To find no environmental concerns and become an innocent landowner 3. To find environmental concerns and become a bona fide prospective purchaser 4. Because the bank said to do it 5. Because that is what buyers do

4 What is not in a Phase I Environmental Site Assessment? Asbestos Lead-based paint Mold Radon Regulatory compliance (e.g., environmental permits)

5 What is CERCLA? Comprehensive Environmental Response, Compensation and Liability Act (Superfund Law), 42 U.S.C. 9601, et seq. Enacted in 1980 after Love Canal Amended in 1986 (contribution, settlements) Amended in 1996 (lender liability) Amended in 2002 (brownfields) Liability is strict responsible for conduct that was once acceptable Liability is typically joint and several, divisibility is the exception

6 CERCLA Section 107 (a) Covered persons (b) Defenses (1) owner and operator (2) owner or operator at the time of disposal (3) disposal arrangers (4) transporters (1) acts of God (2) acts of war (3) act or omission of third party in connection with a contractual relationship if the defendant exercised due care

7 CERCLA Defenses CERCLA 101(35) contractual relationship Includes contracts for the sale of real estate unless the property was contaminated before acquisition and (A)(i) At the time the defendant acquired the facility the defendant did not know and had no reason to know that any hazardous substance which is the subject of the release or threatened release was disposed of on, in, or at the facility.

8 CERCLA Defenses CERCLA 101(35) contractual relationship (B) Reason to know (i) All appropriate inquiries. -- To establish that the reason to know, the defendant must demonstrate that defendant had no (I) [before the purchase], the defendant carried out all appropriate inquiries into the previous ownership and uses of the facility in accordance with generally accepted good commercial and customary standards and practices find no contamination innocent landowner defense (II) the defendant took reasonable steps to stop any continuing release, prevent any threatened future release, prevent or limit any human, environmental, or natural resource exposure to any previously released hazardous substance find contamination bona fide prospective purchaser defense

9 CERCLA Defenses If the buyer will be asserting an innocent landowner or bona fide prospective purchaser defense, the All Appropriate Inquiries documentation (i.e., Phase I and Phase II ESAs) must be perfect. An inadequate Phase I ESA makes the purchaser not innocent. Failure to identify and implement continuing obligations makes the purchaser not bona fide.

10 All Appropriate Inquires Pointers The All Appropriate Inquiries process is self-executing. The EPA will never tell you that your Phase I and Phase II Environmental Site Assessments are good enough. Your environmental consultant will always tell you that they are. You won t really know until the buyer gets sued as a Section 107 liable party (i.e., owner) and has to defend the environmental consultant s work. The environmental consultant should be hired by the buyer. Buyer should be skeptical of Phase I and Phase II Environmental Site Assessment reports provided by the seller.

11 What other authority should I look to besides the CERCLA statute? EPA regulations at 40 CFR 312 ASTM E standards State law in Illinois, 415 ILCS 5/22.2(j) Federal Register publication of All Appropriate Inquiries rule, 70 FR

12 Ten Criteria for All Appropriate Inquiries (Must Be in the Phase I ESA Report) 1. Environmental Professional PE or PG and 3 years relevant experience Licensed by state to perform AAIs Bachelors degree or higher and 5 years experience 10 years experience

13 Ten Criteria for All Appropriate Inquiries (Must Be in the Phase I ESA Report) 2. Interviews Owners, operators, and occupants Current and past facility managers Past owners, operators and occupants Employees of past and current occupants For abandoned properties, owners and operators of neighboring properties

14 Ten Criteria for All Appropriate Inquiries (Must Be in the Phase I ESA Report) 3. Historical Records Look back to as far back as property contained structures or to time first time the property was used. Types of records: aerial photographs, fire insurance maps, building department records, chain of title documents, and land use records.

15 Ten Criteria for All Appropriate Inquiries (Must Be in the Phase I ESA Report) 4. Environmental Cleanup Liens Search for existence liens filed or recorded under federal, state, local or tribal law Records obtained by the person for whom report is being prepared may be provided to the environmental professional

16 Ten Criteria for All Appropriate Inquiries (Must Be in the Phase I ESA Report) 5. Review Government Records Databases of government records Government records Federal, state, local or tribal Subject property and adjoining properties Records of reported releases and investigation reports Records of activities that may cause contamination landfill, storage tanks, waste handling CERCLIS records Public health records

17 Ten Criteria for All Appropriate Inquiries (Must Be in the Phase I ESA Report) 5. Review Government Records (cont.) Registries of engineering controls, land use controls, institutional controls Records of releases or threatened releases on nearby properties Records of nearby NPL sites Records of nearby leaking storage tanks sites Records of RCRA generator sites Distance of nearby release sites relevant and considers: nature of release, geology, land development density, property type, past use, migration pathways

18 Ten Criteria for All Appropriate Inquiries (Must Be in the Phase I ESA Report) 6. Site Inspection Visual inspection of facility and locations where hazardous substances may have been used, stored, treated, handled, and disposed Visual inspection of adjoining facilities from the subject property line Visual inspection must be performed and cannot accept seller denial of access

19 Ten Criteria for All Appropriate Inquiries (Must Be in the Phase I ESA Report) 7. Specialized Knowledge or Experience Buyer s knowledge of the subject property Buyer s knowledge of area surrounding subject property Buyer s knowledge of conditions of adjoining properties Any other experience American Nat l Bank v. Harcros, 1997 WL (N.D. Ill.)

20 Ten Criteria for All Appropriate Inquiries (Must Be in the Phase I ESA Report) 8. Purchase Price Property being sold for less than the market value, because the seller knows the property is contaminated Deal is too good to be true

21 Ten Criteria for All Appropriate Inquiries (Must Be in the Phase I ESA Report) 9. Commonly Known or Reasonably Attainable Information Information generally known about the property in the local community Current owners or occupants Local and state governmental officials Other persons in the community Local newspapers, websites, organizations, libraries, historical societies Hemingway Transport v. Kahn, 74 FR 148 (Bankr. D. Mass. 1994) had [defendants] exerted a modicum of effort, would inspect further

22 Ten Criteria for All Appropriate Inquiries (Must Be in the Phase I ESA Report) 10. Degree of Obviousness Consideration of the totality of information collected Foster v. US, 922 F.Supp. 642 (D.D.C. 1996) cursory visual inspection, soil stained, in run-down industrial area, and did no testing not an innocent landowner The All Appropriate Inquiries process does not require sampling, but in some cases, it is obvious that sampling should be performed.

23 Other Things to Look for in a Phase I Environmental Site Assessment Report An opinion The environmental professional must describe any conditions indicative of releases or threatened releases Recognized Environmental Conditions (RECs). This is the whole point of the process. Make the consultant say what he/she believes no squishy language, no passive voice. Identification of data gaps How do those data gaps impact the environmental professional s opinion? Qualifications of environmental professional (resume) Statement that environmental professional is such and a signature

24 Other Things to Look for in a Phase I Environmental Site Assessment Report Statement that report and work done complies with the 40 CFR 312 rules Statement that report and work done complies with the ASTM E standard Statement that report and work done complies with any state law requirements (in Illinois, see 415 ILCS 5/22.2(j)) Certification of the environmental professional at the end of the report using language consistent with 40 CFR 312 and 415 ILCS 5/22.2(j)

25 Other Things to Look for in a Phase I Environmental Site Assessment Report Contains the sections identified in Appendix X4 of the ASTM E standard recommended table of contents. Conclusions that contain a summary of all Recognized Environmental Conditions. Conclusions which contain the statement contained in paragraph of ASTM E The report was prepared or updated in the last 6 months. Reliance on the report is authorized to any party other than the original party for whom the report was prepared.

26 Other Things to Look for in a Phase I Environmental Site Assessment Report May address non-scope items described in paragraph of the ASTM E standard Asbestos Radon Lead-based paint Lead in drinking water Wetlands Regulatory compliance Cultural or history resources Industrial hygiene, health & safety Ecological resources, endangered species Indoor air quality Biological agents, mold

27 Phase II Environmental Site Assessments Invasive investigation of Recognized Environmental Conditions (RECs) How much testing is enough? Soil borings around perimeter of site Soil borings in hazardous material areas Looking for the right chemicals EPA analytical test methods Looking in right media soil, groundwater, soil gas, sediment, surface water This is case-by-case, and a matter of professional judgment. You must be confident in your environmental consultant and environmental lawyer.

28 State Voluntary Programs Should I get a No Further Remediation letter before the closing? Do not be in a hurry. Lengthen the due diligence period. Recognize the limitations basically, it is protection from state enforcement. Compliments your environmental due diligence, does not replace it.

29 Ways to Manage Environmental Risk Associated with Contaminated Property Knowledge Engineering Controls Institutional Controls Insurance Indemnification Escrow

30 Consulting Agreement for Phase I Environmental Site Assessments States that the work will meet requirements of 40 CFR 312. States that the work will meet requirements of ASTM E States that the work will meet requirements of 415 ILCS 5/22.2(j) (for Illinois). Look at the limitation of liability. Look at the indemnity. Look at the price is it realistic? Who will actually be doing the work is he/she competent?

31 Most Phase I Environmental Site Assessments Fail to Meet the Standard EPA Must Implement Controls to Ensure Proper Investigations Are Conducted at Brownfields Sites, US EPA Office of Inspector, Report No. 11-P-0107 (February 14, 2011) EPA has relied on the environmental professional conducting the AAI to self-certify that requirements are met. Of the 35 AAI reports we reviewed, from three EPA regions, none contained all the required documentation elements.

32 Grand Pier Center v. ATC Group Services 2008 WL (N.D. Ill.) Streeterville, Chicago, Illinois Neighboring property was the Lindsey Light EPA site. After the Phase I was performed, EPA discovered radioactive thorium at the Grand Pier site and over 10,000 cubic yards of contaminated soil had to be removed. Phase I report incorrectly said that remediation was completed at the Lindsey Light site. ATC learned of radiation issues in the area within days of the report and did not amend the report.

33 Grand Pier Center v. ATC Group Services ATC said that it focused on VOCs, SVOCs, and priority pollutant metals. These tests do not include thorium. ATC placed one boring proximal to the Lindsey Light site, but never tested for radioactive waste. Phase I and Phase II ESAs were prepared for R.M. Chin and Associates, not Grand Pier Center LLC Only reliance for the Phase II ESA was only granted to Grand Pier Center Grand Pier cannot rely on the Phase I ESA and blame the consultant for the inadequate Phase I ESA

34 PCS Nitrogen v. Ashley II of Charleston 714 F.3d 161 (4 th Cir. 2013) First appellate court decision on the bona fide prospective purchaser defense Ashley II purchased a property with a long history of industrial use. Redevelopment plan was mixed-use. Ashley II knew the property was contaminated. Ashley sued prior owner and operator for response costs. Ashley II said that it was not itself liable. Ashley II said it was a bona fide prospective purchaser and met the eight requirements.

35 PCS Nitrogen v. Ashley II of Charleston Eight requirements of a bona fide prospective purchaser 1. Disposal of hazardous substances occurred before purchase 2. Buyer made all appropriate inquiries into property condition before purchase 3. Buyer provided required notices concerning hazardous substances 4. Buyer exercised appropriate care with respect to hazardous substances 5. Buyer complied with institutional controls for hazardous substances 6. Buyer cooperated and assisted response action personnel 7. Buyer complied with EPA information requests 8. Buyer not related to person potentially liable for response costs

36 PCS Nitrogen v. Ashley II of Charleston Ashley II ran into trouble with appropriate care (criterion 4) What is appropriate care take reasonable steps to: Stop any continuing release Prevent any threatened future release Prevent or limit human, environmental, or natural resource exposure to any previously released hazardous substance These are the buyer s continuing obligations

37 PCS Nitrogen v. Ashley II of Charleston Ashley II did not take the reasonable steps to prevent any threatened future release that a similarly situated reasonable and prudent person would have taken Why did the court find Ashley II failed to exercise appropriate care? Ashley II did not timely clean out and fill sumps Ashley II did not monitor and address a debris pile Ashley II did not maintain a crushed rock cover on part of the site

38 Environmental Due Diligence Advice Start early Take it seriously Involve competent and smart people Manage expectations Be creative Make a record

39 DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS June 12-13, 2017 Chicago DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS

40 Due Diligence and CERLA Liability: Process and Pitfalls of Phase I ESAs and AAI June 12, 2017 Chicago DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS

41 Process and Pitfalls of Phase I ESAs and AAI What is a Phase I ESA What the goal of the Phase I? Who performs the Phase I? What's in the report? What are my responsibilities? What makes it successful? DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS

42 What is a Phase I ESA? Non-invasive Environmental Due Diligence Inspection Intended to identify conditions or issues which may pose current of future environmental risk: Recognized Environmental Conditions (RECs) Driven by lender requirements, need for business risk analysis, and/or need for CECRLA liability protection Performed on behalf of the User, typically the buyer or lessee DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS

43 Phase I ESA Standardization ASTM International E Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process US EPA All Appropriate Inquiries Final Rule (40 CFR Part 312) Performance under the direction of an Environmental Professional (EP) DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS

44 Who is an Environmental Professional? PE/PG with 3 years experience B.A./B.S. degree or higher in relevant discipline (engineering, environmental science, or earth science) with 5 years experience BA./B.S degree or higher with 10 years experience Essentially requires hiring and environmental consulting firm DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS

45 What is a REC? means the presence or likely presence of any hazardous substances or petroleum products in, on, or at a property: (1) due to any release to the environment; (2) under conditions indicative of a release to the environment; or (3) under conditions that pose a material threat of a future release to the environment. It is NOT: asbestos, wetlands, lead based paint, compliance issues, etc.- these concerns must be addressed separately DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS

46 Components of the Phase I ESA 1.Records Review Federal, State and Tribal Environmental Records City, County, and State Records Review Building Department County Environmental Health Department City Fire Department Historical Records Review Aerial Photographs Fire Insurance Maps (Sanborn) Topographic Maps City directories Former Reports DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS

47 Components of the Phase I ESA 2. Site Reconnaissance Current Property Use Presence of Hazardous Materials and Petroleum Products Indications of Historical Use Adjacent Site Observations 3. Interviews Current owners and occupants Past owners and occupants, if available 4. Report Compile all data obtain and review Identify Findings and Document Opinion on RECs DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS

48 What is the role of the Consultant/EP? Conduct Site Inspection and Interviews Review Historical Records Compile Report and Identify RECs Guide the next steps as necessary, understanding your needs and risk tolerance DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS

49 What is the role of the User? Satisfy User Responsibilities (E Section 6) User Questionnaire- as provided by Consultant Review Title and Judicial Records for Environmental Liens and Activity and Use Limitations (AULs) Specialized Knowledge or Experience Actual Knowledge or Experience Purchase Price Commonly Known Information Understand the Process- What is likely to be found and what s next? DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS

50 What drives a successful Phase I ESA? Knowledgeable and Careful Consultant: Understands the ASTM/AAI requirements Understands the needs of the User Understands the next steps and their context User involvement: Understanding Who is the User? Understanding the responsibilities of the User Involved and cooperative parties: Knowledgeable site contacts Inclusion of previous reports and known issues DEVELOPING SOLAR ON LANDFILLS & BROWNFIELDS

Change is in the air with regard. feature

Change is in the air with regard. feature em feature Amy L. Edwards is a partner in the law firm of Holland & Knight LLP, Washington, DC, where she co-chairs the firm s national environmental team. Sarah C. Smith is an associate at Holland & Knight.

More information

Due Diligence & Environmental Compliance Issues for Tribal Energy Projects: Hazardous Waste

Due Diligence & Environmental Compliance Issues for Tribal Energy Projects: Hazardous Waste Due Diligence & Environmental Compliance Issues for Tribal Energy Projects: Law Seminars International Seattle, WA October 23, 2007 Connie Sue Manos Martin Hazardous Waste Overview Environmental Due Diligence:

More information

Voluntary standard; accepted by USEPA to comply with AAI rule. 2. Regulatory/Developmental History

Voluntary standard; accepted by USEPA to comply with AAI rule. 2. Regulatory/Developmental History This table summarizes some of the primary differences between the New Jersey Department of Environmental Protection (NJDEP) Preliminary Assessment Report (PAR), pursuant to the April 2013 NJDEP Site Remediation

More information

Highlights of USEPA All Appropriate Inquiries (AAI) Final Rule and Revised ASTM Phase I Environmental Site Assessment

Highlights of USEPA All Appropriate Inquiries (AAI) Final Rule and Revised ASTM Phase I Environmental Site Assessment chapter 9b Highlights of USEPA All Appropriate Inquiries (AAI) Final Rule and Revised ASTM Phase I Environmental Site Assessment Barry A. Cik, PE, CP, DEE, QEP, CHMM, REM Chief Engineer G.E.M. Testing

More information

Environmental Audit Standards

Environmental Audit Standards Environmental Audit Standards Lender requires an acceptable Phase I Environmental Audit Report, directed to Lender and historical in nature, which is to be prepared in accordance with the standards set

More information

BROWNFIELDS Connecticut All Grantee Meeting July Getting the most out of All Appropriate Inquiries (AAI)

BROWNFIELDS Connecticut All Grantee Meeting July Getting the most out of All Appropriate Inquiries (AAI) BROWNFIELDS Connecticut All Grantee Meeting July 11 2012 Getting the most out of All Appropriate Inquiries (AAI) 1 AAI in Perspective All Appropriate Inquiries often is a critical step in a continuum of

More information

New Environmental Diligence Standards for All Appropriate Inquiries (AAI)

New Environmental Diligence Standards for All Appropriate Inquiries (AAI) New Environmental Diligence Standards for All Appropriate Inquiries (AAI) (a live interactive 90-Minute Teleconference Program) Peter Murphy 1050 Connecticut Ave., N.W. Washington, D.C. 20036 pmurphy@gibsondunn.com

More information

Hazardous Materials in Project Development Additional Guidance

Hazardous Materials in Project Development Additional Guidance Hazardous Materials in Project Development Additional Guidance Contents:...2 AASHTO Guidance...3 USDOT Brownfields Guidance...4 ASTM Standard Practices...6 Hazardous Materials in Project Development 1

More information

EPA s All Appropriate Inquiry Rule: When is Enough, Enough?

EPA s All Appropriate Inquiry Rule: When is Enough, Enough? EPA s All Appropriate Inquiry Rule: When is Enough, Enough? JANE KIMBALL WARREN McCarter & English LLP, Hartford, CT In January 2002, CERCLA was amended to provide liability protection for certain landowners

More information

ENVIRONMENTAL SITE ASSESSMENT (AAI COMPLIANT PHASE I)

ENVIRONMENTAL SITE ASSESSMENT (AAI COMPLIANT PHASE I) ENVIRONMENTAL SITE ASSESSMENT (AAI COMPLIANT PHASE I) IPP.MORELAND AVENUE ASSEMBLAGE 785-793 MORELAND AVENUE ATLANTA, GEORGIA, 30316 ONE GROUP PROJECT #A6092 JANUARY 28, 2008 PREPARED FOR: FAIRVIEW COMMERCIAL

More information

Managing Environmental Risks

Managing Environmental Risks Managing Environmental Risks Presented by: Jeff Civins Mary Mendoza November 4, 2014 Agenda Basic Principles Tools for managing environmental risks Environmental due diligence Contractual Extra-contractual

More information

Technical Information Paper No

Technical Information Paper No Environmental Condition of Property (ECOP) Investigations Technical Information Paper No. 38-001-0312 PURPOSE. To provide information on ECOP investigations for Federal real property transactions and military

More information

New Phase I Requirements for Real Estate Transactions: Implications of the New All Appropriate Inquiries Rule

New Phase I Requirements for Real Estate Transactions: Implications of the New All Appropriate Inquiries Rule New Phase I Requirements for Real Estate Transactions: Implications of the New All Appropriate Inquiries Rule Helen Currie Foster Graves, Dougherty, Hearon & Moody, P.C. 1 State Bar of Texas 28 th Annual

More information

Environmental Legal Issues and Due Diligence When Cities Acquire Real Property

Environmental Legal Issues and Due Diligence When Cities Acquire Real Property Environmental Legal Issues and Due Diligence When Cities Acquire Real Property Thursday, September 4, 2014 General Session; 8:00 9:30 a.m. Danielle G. Sakai, Best Best & Krieger DISCLAIMER: This paper

More information

Different Levels of Environmental Site Assessment and the Benefits to M&A Due Diligence

Different Levels of Environmental Site Assessment and the Benefits to M&A Due Diligence Different Levels of Environmental Site Assessment and the Benefits to M&A Due Diligence A White Paper by Dennis Papa, PE, BCEE, Principal of dpstudio environmental consulting & design LLC November 2016

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT

PHASE I ENVIRONMENTAL SITE ASSESSMENT PHASE I ENVIRONMENTAL SITE ASSESSMENT ACME Gas 55 Garden Street Columbus, Ohio, 45123 Prepared for ACME Oil & Gas Ltd. Prepared by GAEA Environmental Services 87 Garden Street Whitby, Ontario L1N 9E7 November

More information

The University of Texas System Systemwide Policy. Policy: UTS Title. Environmental Review for Acquisition of Real Property. 2.

The University of Texas System Systemwide Policy. Policy: UTS Title. Environmental Review for Acquisition of Real Property. 2. 1. Title 2. Policy Environmental Review for Acquisition of Real Property Sec. 1 Sec. 2 Policy Statement. It is the policy of The University of Texas System to minimize its potential for exposure to claims

More information

Phase I ESAs and the USEPA's All Appropriate Inquiry Final Rule

Phase I ESAs and the USEPA's All Appropriate Inquiry Final Rule Page 1 of 8 Phase I ESAs and the USEPA's All Appropriate Inquiry Final Rule An Electronic Newsletter of EEA's Environmental Consulting Activities Spring 2007 EEA, Inc. 55 Hilton Avenue, Garden City, New

More information

In previous editions of Environment and the

In previous editions of Environment and the environment and the appraiser The EPA s Proposed All Appropriate Inquiries Rule and the Appraisal of Contaminated Properties by Thomas O. Jackson, PhD, MAI In previous editions of Environment and the Appraiser,

More information

EPA Issues Guidance On New CERCLA Landowner Defenses

EPA Issues Guidance On New CERCLA Landowner Defenses EPA Issues Guidance On New CERCLA Landowner Defenses Last December, Congress amended the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA or Superfund) to modify the innocent

More information

Credit Risk. 72 March 2013 The RMA Journal Copyright 2013 by RMA

Credit Risk. 72 March 2013 The RMA Journal Copyright 2013 by RMA The Ch CR Credit Risk 72 March 2013 The RMA Journal Copyright 2013 by RMA ENVIRONMENTAL RISK MANAGEMENT anging Landscape of Phase I ESAs A discussion of some upcoming changes to ASTM E1527-05 and what

More information

PHASE I ENVIRONMENTAL ENGINEERING PHASE I REPORT 3264 PREPARED FOR: Mark Hopkins. Liberty Real Estate, LLC. 741 North State Road.

PHASE I ENVIRONMENTAL ENGINEERING PHASE I REPORT 3264 PREPARED FOR: Mark Hopkins. Liberty Real Estate, LLC. 741 North State Road. PHASE I ENVIRONMENTAL ENGINEERING PHASE I REPORT 3264 PREPARED FOR: Mark Hopkins Liberty Real Estate, LLC 741 North State Road Salem, Utah 84653 May 25, 2012 SITE LOCATION Hawthorn Mobile Home Park 10682

More information

Broker. Environmental Concerns Affecting Real Estate Transactions. Chapter 17. Copyright Gold Coast Schools 1

Broker. Environmental Concerns Affecting Real Estate Transactions. Chapter 17. Copyright Gold Coast Schools 1 Broker Chapter 17 Environmental Concerns Affecting Real Estate Transactions Copyright Gold Coast Schools 1 Learning Objectives Define potentially responsible person List the criteria for the innocent landowner

More information

Preparing for Negotiations: The Environmental Lawyer s Checklist In Oil and Gas Transactions

Preparing for Negotiations: The Environmental Lawyer s Checklist In Oil and Gas Transactions Preparing for Negotiations: The Environmental Lawyer s Checklist In Oil and Gas Transactions Presented by Jim Morriss Thompson & Knight LLP james.morriss@tklaw.com The Process Drives the Checklist Confidentiality

More information

Minnesota Pollution Control Agency Voluntary Investigation and Cleanup

Minnesota Pollution Control Agency Voluntary Investigation and Cleanup Minnesota Pollution Control Agency Voluntary Investigation and Cleanup Summary of Applicable Laws 1.0 Introduction Guidance Document #3 Over the past few years, the Minnesota Superfund law, known as the

More information

DUE DILIGENCE. Presented at. Lydia Work, Senior Chemist Licensed Remediation Specialist Triad Engineering, Inc.

DUE DILIGENCE. Presented at. Lydia Work, Senior Chemist Licensed Remediation Specialist Triad Engineering, Inc. DUE DILIGENCE Presented at Lydia Work, Senior Chemist Licensed Remediation Specialist Triad Engineering, Inc. due dil i gence appropriate carefulness: the degree of care that a prudent person would exercise,

More information

CERCLA Amendments Will Impact How Due Diligence is Conducted. By Larry Schnapf

CERCLA Amendments Will Impact How Due Diligence is Conducted. By Larry Schnapf CERCLA Amendments Will Impact How Due Diligence is Conducted By Larry Schnapf On January 11, 2002, President Bush signed into law the Small Business Liability Relief and Brownfields Revitalization Act

More information

Phase I Environmental Site Assessment Update Memorandum Vacant Property 1585 Santa Clara Avenue Santa Ana, California 92507

Phase I Environmental Site Assessment Update Memorandum Vacant Property 1585 Santa Clara Avenue Santa Ana, California 92507 March 1, 2011 Mr. Vincent C. Fregoso, AICP City of Santa Ana 20 Civic Center Plaza Santa Ana, CA 92702 Re: Phase I Environmental Site Assessment Update Memorandum Vacant Property 1585 Santa Clara Avenue

More information

Mitigating Risk Through Environmental Due Diligence in California Real Estate Deals

Mitigating Risk Through Environmental Due Diligence in California Real Estate Deals Mitigating Risk Through Environmental Due Diligence in California Real Estate Deals Kevin C. Mayer Harmon L. (Monty) Cooper Crowell & Moring 1 Outline Why Environmental Due Diligence? I. Purpose II. Roles

More information

ASTM E : Applying the New Phase I Site Assessment Standard

ASTM E : Applying the New Phase I Site Assessment Standard Presenting a live 90-minute webinar with interactive Q&A ASTM E1527-13: Applying the New Phase I Site Assessment Standard Navigating the Material Changes to Meet All Appropriate Inquiries Requirements

More information

Condemnation Summit XIX

Condemnation Summit XIX Condemnation Summit XIX October 21, 2016 Arizona Biltmore I 2400 East Missouri Avenue I Phoenix, Arizona The Intersection of Environmental Due Diligence, Condemnation and Valuation Presenters: Barbara

More information

Speaker 10: Matthew Joy of Jorden Bischoff & Hiser PLC Page 1 TWO RECENT DEVELOPMENTS POTENTIALLY AFFECTING REAL ESTATE TRANSACTIONS

Speaker 10: Matthew Joy of Jorden Bischoff & Hiser PLC Page 1 TWO RECENT DEVELOPMENTS POTENTIALLY AFFECTING REAL ESTATE TRANSACTIONS Speaker 10: Matthew Joy of Jorden Bischoff & Hiser PLC Page 1 TWO RECENT DEVELOPMENTS POTENTIALLY AFFECTING REAL ESTATE TRANSACTIONS By: Matthew Joy Jorden Bischoff & Hiser, P.L.C. Phoenix, Arizona mjoy@jordenbischoff.com

More information

Phase I Environmental Site Assessment Standard Practice Update. West Virginia Brownfields Conference September 2013

Phase I Environmental Site Assessment Standard Practice Update. West Virginia Brownfields Conference September 2013 Phase I Environmental Site Assessment Standard Practice Update West Virginia Brownfields Conference September 2013 President, Wasatch Environmental, Inc. Chair of the ASTM E1527 Task Group Chair of the

More information

Environmental Due Diligence and Risk Allocation

Environmental Due Diligence and Risk Allocation Environmental Due Diligence and Risk Allocation Seth D. Jaffe, Esq. Foley Hoag LLP Boston, Massachusetts MCLE Environmental Basics September 18, 2008 Relevant To A Broad Array of Transactions Purchase/sale

More information

Environmental Due Diligence

Environmental Due Diligence 2017 NJ Land Conservation Rally Environmental Due Diligence Stephen Kehayes Michelle Slosberg Peter Sorge, LSRP 1. Introduction 2. Due Diligence Process 3. Potential Problems 4. Investigation 5. Regulatory

More information

ASTM Phase I Changes and AAI Webinar

ASTM Phase I Changes and AAI Webinar New Jersey Institute of Technology (NJIT) Technical Assistance to Brownfield Communities (TAB) ASTM Phase I Changes and AAI Webinar Elizabeth Limbrick Bob Blauvelt March 13, 2014 973-642-4165 (Hotline)

More information

Chapter XII BROWNFIELDS & BUSINESS TRANSACTIONS. A. Business Transactions

Chapter XII BROWNFIELDS & BUSINESS TRANSACTIONS. A. Business Transactions Chapter XII BROWNFIELDS & BUSINESS TRANSACTIONS A. Business Transactions Since a purchaser of real estate or corporate assets may take on environmental liabilities, it is important to conduct environmental

More information

Due Diligence April 10, 2018

Due Diligence April 10, 2018 Due Diligence April 10, 2018 Elizabeth Limbrick, LSRP New Jersey Institute of Technology (NJIT) Technical Assistance to Brownfields Communities (TAB) Meade Anderson, CPG Virginia Department of Environmental

More information

Phase I Environmental Site Assessments for Corridors

Phase I Environmental Site Assessments for Corridors Phase I Environmental Site Assessments for Corridors Prepared by: Kimberly Perkins and Jill Biesma 1 Environmental Advisors and Engineers 19211 W. 64 th Terrace, Shawnee, KS 66218 (913) 599-4326 Goal Of

More information

Assessment. Guidance CLEANUP. Liability Release. Petroleum Brownfields Eligibility Letter Remediation Oversight. Project Endorsement

Assessment. Guidance CLEANUP. Liability Release. Petroleum Brownfields Eligibility Letter Remediation Oversight. Project Endorsement BROWNFIELD PROGRAM Guidance FOR SITES CONTAMINATED BY OLD OIL AND GAS EXPLORATION AND PRODUCTION ACTIVITIES, PETROLEUM STORAGE TANKS, AND PIPELINES. Assessment Petroleum Brownfields Eligibility Letter

More information

Environmental due diligence has been an integral

Environmental due diligence has been an integral ENVIRONMENTAL LIABILITY What Level of Due Diligence Is Enough? By Samuel W. Butcher and Susan A. Bernstein A framework to evaluate costs and risks. Environmental due diligence has been an integral part

More information

A Primer on Environmental Due Diligence and Remedial Programs that Can Save a Real Estate Transaction

A Primer on Environmental Due Diligence and Remedial Programs that Can Save a Real Estate Transaction A Primer on Environmental Due Diligence and Remedial Programs that Can Save a Real Estate Transaction I. Why is Environmental Due Diligence Necessary? A. Potential Legal Liabilities from Becoming the Landowner

More information

Sustainable development for the future of Arkansas

Sustainable development for the future of Arkansas Sustainable development for the future of Arkansas The Brownfields Program Encourages the clean up and reuse of abandoned or underutilized properties. What is a Brownfield? Real Property where Expansion

More information

October 29, 2013 Florida Brownfields Association Conference, Orlando

October 29, 2013 Florida Brownfields Association Conference, Orlando Site Inventories October 29, 2013 Florida Brownfields Association Conference, Orlando Andrew M. Lawn, M.S., P.G. Principal Hydrogeologist Holden Heights Areas HSW & Orange County Environmental Protection

More information

Environmental. Due Diligence 9 Steps Companies Should Take to Effectively Manage. Environmental. Risks in Commercial Real Estate Deals

Environmental. Due Diligence 9 Steps Companies Should Take to Effectively Manage. Environmental. Risks in Commercial Real Estate Deals ESIS Health, Safety, and Advisory Series Due Diligence 9 Steps Companies Should Take to Effectively Manage Risks in Commercial Real Estate Deals By Bill Felix, Due Diligence Practice Leader, ESIS Health,

More information

CERCLA AMENDMENT CREATES NEW EXEMPTIONS AND DEFENSES

CERCLA AMENDMENT CREATES NEW EXEMPTIONS AND DEFENSES By Jay A. Jaffe and Thomas F. Quinn CERCLA AMENDMENT CREATES NEW EXEMPTIONS AND DEFENSES PROTECTS AGAINST LIABILITY FOR CLEANUP COSTS, ENCOURAGES REDEVELOPMENT OF BROWNFIELDS The Small Business Liability

More information

Due Diligence for Property Acquisitions

Due Diligence for Property Acquisitions Due Diligence for Property Acquisitions Presenters: Mary Guinee Principal, Due Diligence Services Ray Sinagra, AIA Sr. Project Manager, Property Condition Assessment Services April 28, 2009 Conference

More information

DRAFT - Subject to Change. Cathedral Building 212 North Ash Street Crookston, Minnesota. Prepared For. Project FA June 29, 2011

DRAFT - Subject to Change. Cathedral Building 212 North Ash Street Crookston, Minnesota. Prepared For. Project FA June 29, 2011 DRAFT Phase I Environmental Site Assessment Cathedral Building 212 North Ash Street Crookston, Minnesota Prepared For Braun Intertec Corporation Ms. Kay Hegge Prairie Skyline Foundation 27048 310th Street

More information

Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process 1

Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process 1 Designation: E1527 13 Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process 1 This standard is issued under the fixed designation E1527; the number immediately

More information

ENVIRONMENTAL DUE DILIGENCE AND DEFECT PROCEDURE

ENVIRONMENTAL DUE DILIGENCE AND DEFECT PROCEDURE ROCKY MOUNTAIN MINERAL LAW FOUNDATION OIL AND GAS AGREEMENTS: PURCHASE AND SALE AGREEMENTS ENVIRONMENTAL DUE DILIGENCE AND DEFECT PROCEDURE Larry Nettles (713) 758-4586 lnettles@velaw.com May 12, 2016

More information

ENVIRONMENTAL QUESTIONNAIRE AND DISCLOSURE STATEMENT

ENVIRONMENTAL QUESTIONNAIRE AND DISCLOSURE STATEMENT ENVIRONMENTAL QUESTIONNAIRE AND DISCLOSURE STATEMENT The purpose of this questionnaire is to provide information about the past and present ownership and uses of the real property upon which lender will

More information

BROWNFIELD CLEANUP PROGRAM (BCP) APPLICATION FORM

BROWNFIELD CLEANUP PROGRAM (BCP) APPLICATION FORM BROWNFIELD CLEANUP PROGRAM (BCP) APPLICATION FORM PART A (note: application is separated into Parts A and B for DEC review purposes) Section I. Requestor Information - See Instructions for Further Guidance

More information

1976 Fargo, ND City Directory - R.L. Polk & Co.

1976 Fargo, ND City Directory - R.L. Polk & Co. 1986 Fargo, ND City Directory - R.L. Polk & Co. 1981 Fargo, ND City Directory - R.L. Polk & Co. 1976 Fargo, ND City Directory - R.L. Polk & Co. 1971 Fargo, ND Directory - R.L. Polk & Co. 1971 Fargo, ND

More information

Vapor Intrusion - ASTM E2600 Overview

Vapor Intrusion - ASTM E2600 Overview PDHonline Course C294 (3 PDH) Vapor Intrusion - ASTM E2600 Overview Instructor: Jeffrey R. Sotek, PE, CSP, CIH 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information

WORK PHASE I ENVIRONMENTAL SITE ASSESSMENT

WORK PHASE I ENVIRONMENTAL SITE ASSESSMENT PO Box 844523 Boston, MA 02284-4523 Tel: (781) 273-2500 www.ebiconsulting.com SENT VIA EMAIL TO: peter.krahenbuhl@simoncre.com August 4, 2015 Josh Simon 5111 N. Scottsdale Road Suite 200 Scottsdale, AZ

More information

This edition of Environment and the Appraiser

This edition of Environment and the Appraiser environment and the appraiser Innocent Landowner Programs and Their Effects on Environmental Risk and Property Value Impacts by Thomas O. Jackson, PhD, MAI, and Jennifer M. Pitts This edition of Environment

More information

Tools for Managing Potential Liabilities Associated with Contaminated Port Land. David Ashton Assistant General Counsel Port of Portland 02/13/07

Tools for Managing Potential Liabilities Associated with Contaminated Port Land. David Ashton Assistant General Counsel Port of Portland 02/13/07 Tools for Managing Potential Liabilities Associated with Contaminated Port Land David Ashton Assistant General Counsel Port of Portland 02/13/07 1 Managing Potential Liabilities Some Environmental Issues

More information

A. Threshold Criteria

A. Threshold Criteria II. Background The bona fide prospective purchaser provision, CERCLA 107(r), provides a new landowner liability protection and limits EPA s recourse for unrecovered response costs to a lien on property

More information

DRAFT FINAL FINDING OF SUITABILITY TO TRANSFER (FOST) Little Patuxent River Parcel. October 16, 2013

DRAFT FINAL FINDING OF SUITABILITY TO TRANSFER (FOST) Little Patuxent River Parcel. October 16, 2013 DRAFT FINAL FINDING OF SUITABILITY TO TRANSFER (FOST) Little Patuxent River Parcel October 16, 2013 1. PURPOSE The purpose of this Finding of Suitability to Transfer (FOST) is to document the environmental

More information

Phase 1 Legal Lessons

Phase 1 Legal Lessons Development of ASTM Methodology Prospective Purchaser Defense & Liability Protection, Recent Court Actions "Friends never let their friends bet chalk Florida Brownfields Conference 2011 November 14, 2011

More information

Municipality of Anchorage PURCHASE AND SALE AGREEMENT FOR HLB Parcel C in Chugiak, Alaska

Municipality of Anchorage PURCHASE AND SALE AGREEMENT FOR HLB Parcel C in Chugiak, Alaska Municipality of Anchorage PURCHASE AND SALE AGREEMENT FOR HLB Parcel 1-007-C in Chugiak, Alaska THIS AGREEMENT dated, 2017, by and between the MUNICIPALITY OF ANCHORAGE, an Alaska municipal corporation,

More information

Environmental Management Chapter

Environmental Management Chapter Environmental Management Chapter 335-5-1 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISIONS - UNIFORM ENVIRONMENTAL COVENANTS PROGRAM ADMINISTRATIVE CODE CHAPTER 335-5-1 GENERAL TABLE OF CONTENTS

More information

Municipality of Anchorage PURCHASE AND SALE AGREEMENT FOR LOT 17, NEVILLA PARK SUBDIVISION

Municipality of Anchorage PURCHASE AND SALE AGREEMENT FOR LOT 17, NEVILLA PARK SUBDIVISION Municipality of Anchorage PURCHASE AND SALE AGREEMENT FOR LOT 17, NEVILLA PARK SUBDIVISION THIS AGREEMENT dated, 2016, by and between the MUNICIPALITY OF ANCHORAGE, an Alaska municipal corporation, whose

More information

FACT SHEET Brownfields Cleanup Program (BCP) KEY DEFINITIONS (see also ECL )

FACT SHEET Brownfields Cleanup Program (BCP) KEY DEFINITIONS (see also ECL ) KEY DEFINITIONS (see also ECL 27-1405) Brownfield A Brownfield is any real property where redevelopment or re-use may be complicated by the presence or potential presence of a hazardous waste, petroleum,

More information

PURCHASE AGREEMENT ACCORDINGLY, FOR VALUABLE CONSIDERATION, RECEIPT OF WHICH IS HEREBY ACKNOWLEDGED, THE PARTIES AGREE AS FOLLOWS:

PURCHASE AGREEMENT ACCORDINGLY, FOR VALUABLE CONSIDERATION, RECEIPT OF WHICH IS HEREBY ACKNOWLEDGED, THE PARTIES AGREE AS FOLLOWS: PURCHASE AGREEMENT JOHN THOMAS BUILDING, 325 EAST 3 RD AVENUE, ANCHORAGE AK THIS AGREEMENT dated, 2013, by and between the MUNICIPALITY OF ANCHORAGE, an Alaska municipal corporation, whose mailing address

More information

Environmental Liabilities Associated Real Estate Transitions LIFE SCIENCES

Environmental Liabilities Associated Real Estate Transitions LIFE SCIENCES Environmental Liabilities Associated Real Estate Transitions Agenda Presentations on Limiting Liability When Engaged in Property Transactions Focus on Lab Decommissioning Panel Discussion Panel Members

More information

ATTACHMENT 4 CERCLA NOTICE, COVENANT, AND ACCESS PROVISIONS AND OTHER DEED PROVISIONS

ATTACHMENT 4 CERCLA NOTICE, COVENANT, AND ACCESS PROVISIONS AND OTHER DEED PROVISIONS ATTACHMENT 4 CERCLA NOTICE, COVENANT, AND ACCESS PROVISIONS AND OTHER DEED PROVISIONS CERCLA NOTICE, COVENANT, AND ACCESS PROVISIONS AND OTHER DEED PROVISIONS The following CERCLA Notice, Covenant, and

More information

Environmental Due Diligence in the Wake of the EPA s New All Appropriate Inquiry Rule

Environmental Due Diligence in the Wake of the EPA s New All Appropriate Inquiry Rule Environmental Due Diligence in the Wake of the EPA s New All Appropriate Inquiry Rule BY DIANNE CROCKER AS ANY SEASONED DEALMAKER KNOWS, there are regulatory hurdles that need to be addressed before initiating

More information

METRO BROKERS Checklist for Commercial Real Estate Professionals

METRO BROKERS Checklist for Commercial Real Estate Professionals METRO BROKERS Checklist for Commercial Real Estate Professionals 2017 Metro Brokers, Inc. All Rights Reserved 1 WHAT DUE DILIGENCE IS DUE? The scope, intensity and focus of any due diligence investigation

More information

CERCLA Bona Fide Prospective Purchaser

CERCLA Bona Fide Prospective Purchaser Presenting a live 90-minute webinar with interactive Q&A CERCLA Bona Fide Prospective Purchaser Defense: Securing and Maintaining Liability Protection Strategies for Overcoming BFPP Defense Challenges

More information

Allocating Environmental Risks and Liabilities

Allocating Environmental Risks and Liabilities Presenting a live 90-minute webinar with interactive Q&A Allocating Environmental Risks and Liabilities Structuring Contract Provisions to Limit Risk in Commercial Transactions THURSDAY, SEPTEMBER 13,

More information

Proposed Laurel 2 Solar Facility Jessup Road at Vaughn & Diehl Roads Imperial County, California

Proposed Laurel 2 Solar Facility Jessup Road at Vaughn & Diehl Roads Imperial County, California Phase I ESA Report Proposed Laurel 2 Solar Facility Jessup Road at Vaughn & Diehl Roads Imperial County, California Prepared for: 9FI 8ME, LLC 221 Sutter Street, 6 th Floor San Francisco, CA 9418 Prepared

More information

Environmental Due Diligence for Real Estate Buyers, Sellers and Lenders Identifying and Mitigating Risks and Liabilities in Real Estate Transactions

Environmental Due Diligence for Real Estate Buyers, Sellers and Lenders Identifying and Mitigating Risks and Liabilities in Real Estate Transactions Presenting a live 90-minute webinar with interactive Q&A Environmental Due Diligence for Real Estate Buyers, Sellers and Lenders Identifying and Mitigating Risks and Liabilities in Real Estate Transactions

More information

The Bona Fide Prospective Purchaser Defense and the use of Comfort Letters

The Bona Fide Prospective Purchaser Defense and the use of Comfort Letters The Bona Fide Prospective Purchaser Defense and the use of Comfort Letters Frank J. Deveau and Kimberly S. Lewis Taft Stettinius & Hollister, LLP Kyle Hendri IFA 1 CERCLA and Brownfield Redevelopment Historically,

More information

University of Houston Law Center. Environmental Issues in Real Estate Course #7297 SYLLABUS. Scott A. Sherman Adjunct Professor

University of Houston Law Center. Environmental Issues in Real Estate Course #7297 SYLLABUS. Scott A. Sherman Adjunct Professor University of Houston Law Center Environmental Issues in Real Estate Course #7297 SYLLABUS Scott A. Sherman Adjunct Professor Fall 2014 Environmental Issues in Real Estate Instructor Scott A. Sherman,

More information

ENVIRONMENTAL DISCLOSURE FOR TRANSFER OF REAL PROPERTY (IC ) State Form (R / 1-07) Indiana Department of Environmental Management

ENVIRONMENTAL DISCLOSURE FOR TRANSFER OF REAL PROPERTY (IC ) State Form (R / 1-07) Indiana Department of Environmental Management ENVIRONMENTAL DISCLOSURE FOR TRANSFER OF REAL PROPERTY (IC 13-25-3-7.5) State Form 52653 (R / 1-07) Indiana Department of Environmental Management A WARNING TO THE PARTIES TO A TRANSFER OF PROPERTY: The

More information

DRAFT PROPERTY TRANSFER OR CLOSURE STATUTES

DRAFT PROPERTY TRANSFER OR CLOSURE STATUTES DRAFT PROPERTY TRANSFER OR CLOSURE STATUTES Private parties usually invest resources prior to any transfer of industrial property in a process of due diligence, aimed at evaluating whether the parcel contains

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT 3.3-ACRE ECKENRODE PROPERTY WARWICK TOWNSHIP, TUSCARAWAS COUNTY, OHIO. Prepared for: OHIOLAND, LLC

PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT 3.3-ACRE ECKENRODE PROPERTY WARWICK TOWNSHIP, TUSCARAWAS COUNTY, OHIO. Prepared for: OHIOLAND, LLC PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT 3.3-ACRE ECKENRODE PROPERTY WARWICK TOWNSHIP, TUSCARAWAS COUNTY, OHIO Prepared for: OHIOLAND, LLC Prepared by: CIVIL & ENVIRONMENTAL CONSULTANTS, INC. COLUMBUS,

More information

How To Use Institutional Controls for Contaminated Sites

How To Use Institutional Controls for Contaminated Sites How To Use Institutional Controls for Contaminated Sites Lawrence P. Schnapf Institutional environmental controls are effective only if they are known and maintained. FEDERAL AND STATE ENVIRONMENTAL agencies

More information

Interstate I-10/County Road 255 Madison County, Florida 32341

Interstate I-10/County Road 255 Madison County, Florida 32341 Love s Truck Stop Red Onion Truck Stop Interstate I-10/County Road 255 Madison County, Florida 32341 Property Features 57.73 Acres Zoning: Mixed Use Tax ID: 261S101316002004, 261S121316002000 & 261S101316002003

More information

LCRA BOARD POLICY 401 LAND RESOURCES. Sept. 21, 2016

LCRA BOARD POLICY 401 LAND RESOURCES. Sept. 21, 2016 LCRA BOARD POLICY 401 LAND RESOURCES Sept. 21, 2016 401.10 PURPOSE This policy establishes guidelines for the acquisition, disposition, use and management of all LCRA land rights. 401.20 DEFINITIONS Land

More information

East Central Brownfields CoaliƟon Request for Services

East Central Brownfields CoaliƟon Request for Services East Central Brownfields CoaliƟon Request for Services In May 2016, ECIA (as the lead Coali on partner) received a U.S. EPA Brownfields Assessment grant in the amount of $550,000 to conduct Phase I and

More information

Environmental Due Diligence for Real Estate Buyers, Sellers and Lenders

Environmental Due Diligence for Real Estate Buyers, Sellers and Lenders Presenting a live 90-minute webinar with interactive Q&A Environmental Due Diligence for Real Estate Buyers, Sellers and Lenders Identifying and Mitigating Risks and Liabilities in Real Estate Transactions

More information

MISSOURI HOUSING DEVELOPMENT COMMISSION ENVIRONMENTAL REVIEW GUIDELINES. MHDC Form 1400

MISSOURI HOUSING DEVELOPMENT COMMISSION ENVIRONMENTAL REVIEW GUIDELINES. MHDC Form 1400 MISSOURI HOUSING DEVELOPMENT COMMISSION ENVIRONMENTAL REVIEW GUIDELINES MHDC Form 1400 Original Version 10.09.2009 Amended 06.23.2015 3435 Broadway Boulevard Kansas City, Missouri 64111 ENVIRONMENTAL REVIEW

More information

ADMINISTRATIVE GUIDANCE

ADMINISTRATIVE GUIDANCE 11 ADMINISTRATIVE GUIDANCE ON CONTAMINATED SITES Effective date: April 1, 2013 Version 1.1 May 2013 Expectations and Requirements for Contaminant Migration Introduction This guidance focusses on the ministry

More information

Minnesota s Brownfield Programs. Gary L Krueger Supervisor, Superfund/Brownfields May 23, 2018

Minnesota s Brownfield Programs. Gary L Krueger Supervisor, Superfund/Brownfields May 23, 2018 Minnesota s Brownfield Programs Gary L Krueger Supervisor, Superfund/Brownfields May 23, 2018 Minnesota s Brownfield Program Petroleum Brownfields Program (PBP) MN Statute 115.C, the Petroleum Tank Release

More information

Phase I Environmental Site Assessment Phase I Environmental Site Assessment. Siena Lakes Site Naples, Collier County, Florida

Phase I Environmental Site Assessment Phase I Environmental Site Assessment. Siena Lakes Site Naples, Collier County, Florida `` Phase I Environmental Site Assessment Phase I Environmental Site Assessment Siena Lakes Site Naples, Collier County, Florida Parcel ID Nos. 00235960009, 00236000007, 00235560001, 855 NW State 00235520009

More information

SOLAR MASSACHUSETTS RENEWABLE TARGET PROGRAM (225 CMR 20.00) GUIDELINE

SOLAR MASSACHUSETTS RENEWABLE TARGET PROGRAM (225 CMR 20.00) GUIDELINE PURPOSE Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs DEPARTMENT OF ENERGY RESOURCES DEPARTMENT OF ENVIRONMENTAL PROTECTION SOLAR MASSACHUSETTS RENEWABLE TARGET PROGRAM

More information

ADDENDUM #1 TO THE INVITATION TO BID PHASE 1 ENVIROMENTAL SITE ASSESSMENTS

ADDENDUM #1 TO THE INVITATION TO BID PHASE 1 ENVIROMENTAL SITE ASSESSMENTS ADDENDUM #1 TO THE INVITATION TO BID PHASE 1 ENVIROMENTAL SITE ASSESSMENTS ISSUED: September 15, 2016 The answers to questions, additions and revisions to the INVITATION TO BID PHASE 1 ENVIROMENTAL SITE

More information

Flawed Phase 1 CREC Definition Poses Challenges to Property Owners and Lenders

Flawed Phase 1 CREC Definition Poses Challenges to Property Owners and Lenders Flawed Phase 1 CREC Definition Poses Challenges to Property Owners and Lenders Larry Schnapf Purchasers should not assume that a CREC means human exposures are safely controlled. Lawrence P. Schnapf is

More information

Renewable Energy Development on Contaminated Properties. Liability Concerns

Renewable Energy Development on Contaminated Properties. Liability Concerns Renewable Energy Development on Contaminated Properties Addressing Potential Liability Concerns Suzanne Armor Associate Regional Counsel Office of CERCLA Legal Support U.S. Environmental Protection Agency

More information

Environmental Questionnaire

Environmental Questionnaire SBA Loan Number: Environmental Questionnaire Applicant Name: of Site Visit: Name/Title of Person Doing Site Visit: Site Name or Business Name: Site Street Address: City, State, Postal Code: County: Site

More information

Due Care Obligations

Due Care Obligations Sec 324.XXXXX Due Care; duties of owner or operator, residential tenant, having knowledge of facility; compliance with section. (1) A current owner or operator of real property, or a residential tenant,

More information

CAMPBELL COUNTY AND CAMPBELL COUNTY SCHOOL DISTRICT NO. 1 GROUND LEASE

CAMPBELL COUNTY AND CAMPBELL COUNTY SCHOOL DISTRICT NO. 1 GROUND LEASE CAMPBELL COUNTY AND CAMPBELL COUNTY SCHOOL DISTRICT NO. 1 GROUND LEASE THIS LEASE made and executed this day by and between Campbell County, 500 South Gillette Avenue, Gillette, WY 82716 (hereinafter referred

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT

PHASE I ENVIRONMENTAL SITE ASSESSMENT PHASE I ENVIRONMENTAL SITE ASSESSMENT ST. MALACHY PROPERTY, BROWNSBURG HENDRICKS COUNTY, INDIANA Terra Project No. 13-013 Environmental Audit Report Privileged Document PREPARED FOR: Town of Brownsburg

More information

TRANSBAY JOINT POWERS AUTHORITY

TRANSBAY JOINT POWERS AUTHORITY STAFF REPORT FOR CALENDAR ITEM NO.: 15 FOR THE MEETING OF: March 10, 2011 TRANSBAY JOINT POWERS AUTHORITY BRIEF DESCRIPTION: Approving a Temporary Easement Agreement (Temporary Easement) between the Transbay

More information

STANDARD FORM Proposal to Purchase and Agreement for Transfer of Ownership of Distribution Systems Form No

STANDARD FORM Proposal to Purchase and Agreement for Transfer of Ownership of Distribution Systems Form No PROPOSAL TO PURCHASE AND AGREEMENT FOR TRANSFER OF OWNERSHIP OF DISTRIBUTION SYSTEMS This Proposal to Purchase ( Proposal ) and Agreement for Transfer of Ownership of Distribution Systems ( Agreement )

More information

Resolution No R. A resolution authorizing the City Manager to execute an amendment to the

Resolution No R. A resolution authorizing the City Manager to execute an amendment to the purposes. Resolution No. 2017-103 R A resolution authorizing the City Manager to execute an amendment to the professional consulting services agreement with Burns & McDonnell for landfill evaluation services

More information

How Many Brownfields Does California Have? by Corynn Brodsky. Where are all the brownfields? This question is posed frequently by environmental

How Many Brownfields Does California Have? by Corynn Brodsky. Where are all the brownfields? This question is posed frequently by environmental How Many Brownfields Does California Have? by Corynn Brodsky Where are all the brownfields? This question is posed frequently by environmental regulators, city planners, and academics alike, as they attempt

More information

How the CERCLA Notification Requirements Facilitate the Creation of Brownfields and What EPA Can Do to Address this Problem

How the CERCLA Notification Requirements Facilitate the Creation of Brownfields and What EPA Can Do to Address this Problem Sustainable Development Law & Policy Volume 11 Issue 1 Fall 2010: Sustainable Development in the Urban Environment Article 11 How the CERCLA Notification Requirements Facilitate the Creation of Brownfields

More information