EASEMENT BASICS. Definition of Easement Types. Easements are part of our assets. Easement Research. Access, maintenance and operations.
|
|
- Godwin Brown
- 5 years ago
- Views:
Transcription
1 EASEMENT BASICS Definition of Easement Types. Easements are part of our assets. Easement Research. Access, maintenance and operations.
2 Right-of-Way Regardless of how sophisticated we become, this is still a people business. WHY?
3 Right-of-Way Services Right of way is more than just acquisition. This is only news to those who do not work in the profession on a daily basis.
4 ACQUISITION The act of obtaining land rights from another for the good of the public. Following Federal Highway Administration Office of Real Estate Services Policies Act of 1970, as amended.
5 Surveying Mapping Record Search Pre-Project Planning Alignment Analysis Acquisitions Right of Way Acquisitions Flow Chart NO Rejected Right of Way Negotiations Letter Of Offer Accepted Rejected* Eminent Domain* (*Action with Agency Authorization Only) Yes Appraisals To Agency permit process Escrow Coordination ROW Certification Possession of Property Court Procedure Project Notice to Proceed
6 Right-of-Way Services Once its in the ground you never have to worry about it. What do you people do in your spare time? Completion of construction usually marks the beginning of a continuing series of activates for the Right of Way group. Encroachments!!
7
8 EASEMENT A right created by grant, reservation, agreement, prescription, or necessary implication, which one has in the land of another. It is either for the benefit of land (appurtenant) such as right to cross A to get to B, or in gross, such as a public utility easement.
9 Typical ROW Requirements EXISTING S.D.C.W.A. R0W Load Limit Restrictions on Adjacent Pipelines TRENCH ZONE CL 130 RESTRICTED ZONE 9 9 RESTRICTED ZONE 9 9 Residential and Commercial Neighbors PIPELINE C L PIPELINE 4 96 CL PIPELINE 3 69 Encroachments TYPICAL CONSTRUCTION SECTION FOR PIPELINE 5 N:\ACAD\SDCWA\SECTION.CDR
10 Right of Way E.C.L Emergency Construction Limits Right of Way = 1
11 Safety Issues Installation of Pipe Through Material and Equipment Access Steep Terrain
12 Provide me with the permit! Why can t I do this?
13
14
15 Right-of-Way Services Right of Way groups participate with other departments like Engineering, Environmental, Public Relations, and Operations in construction projects.
16 YOUR PROPERTY RIGHTS DO YOU KNOW WHAT PROPERTY RIGHTS YOU HOLD? Grant Deed, easement, permit, encroachment permit or joint use agreement. CAN YOU LOCATE THE DOCUMENTS?
17 WHAT DO YOU DO? Private Development Utility Easement Existing pipe
18
19 Cover prior to 1990
20 ROW Encroachment Modifications to Ground Cover Top of Pipe
21 Construction in Public ROW /
22 Conservation Easements
23 International Right of Way Association Right of Way Agents Development Program. Course 215
24 ABOUT THE COURSE Developed by the IRWA Pipeline Committee Primary Target is the Agent working in the Field Design to also Provide Training to In-house Personnel Involved in Linear Projects Focus is on the Primary Duties that a Right-of - Way Professional May be Required to Undertake Many of the Examples used in this Course were Taken from Real Experiences
25 GOALS OF THE COURSE Introduce the Entry Level Right of Way Agent and the Non-Right of Way person to the Basic Elements of Right of Way Provide Guidance in Information Gathering Provide Guidance in When to Ask Questions Develop a More Knowledgeable Right of Way Professional Fill the Growing Skill Gap Within the Profession
26
27 ROW Management Services 1 Agency Program Assessment 2 Creation/Review of ROW Policy & Procedure Manuals 3 Inter-Governmental/Agency Liaison Assistance 4 ROW Identification & Monumentation 5 Document Management & Control 6 Easement Preparation & Interpretation 7 Unauthorized Encroachments & Removal 8 Permit & Agreement Processing 9 Plan Review Services 10 Plat & Legal Preparation 11 ROW Security/Access/Patrolling 12 Pipeline Loading & Structural Reviews 13 ROW Acquisition 14 Pipeline Planning & Alignment Studies 15 Facility Relocation Assistance 16 Conflict Resolution 17 Construction Management & Inspection/Observation 18 ROW Clearing & Maintenance Services 19 Environmental Documentation Assessments 20 Phase I & II Environmental Assessments
Overview of IRWA Courses
IRWA has nearly 50 courses, which serves a variety of professional needs. IRWA categorizes courses based on specific content, which usually correspond with the disciplines of the right of way profession:
More informationPutting it all together. Presented by: RIGHT OF WAY SERVICES
Putting it all together Presented by: RIGHT OF WAY SERVICES OUTLINE Introduction Purpose Federal & State Laws Project Process and Timeline NEPA Requirements Right of Way Plans Title OUTLINE CONTINUED Survey
More informationBefore the Office of Administrative Hearings. For the. Minnesota Public Utility Commission
Mr. Michael Harris Mr. Paul Norgren EXHIBIT Before the Office of Administrative Hearings For the Minnesota Public Utility Commission In the Matter of the Application of Enbridge Pipelines (Southern Lights)
More informationWelcome to the Easement Webinar Call-In Number for audio: Conference Code:
Welcome to the Easement Webinar Call-In Number for audio: 1.866.422.4457 Conference Code: 2113365039 Easement Issues Ellen Kreifels BLANKENAU WILMOTH JARECKE LLP ellen@nebenergylaw.com christina@aqualawyers.com
More informationOhio Department of Transportation. Division of Engineering. Office of Real Estate. Synergy. Real Estate Business Analysis
Ohio Department of Transportation Division of Engineering Office of Real Estate Synergy Real Estate Business Analysis Appraisal System Specification Version 1.02 Revision History Date Version Modified
More informationThe Importance of Performing Route Surveys in the State of Indiana. Presented to: March 6 th, 2013
The Importance of Performing Route Surveys in the State of Indiana Presented to: March 6 th, 2013 Parsons Cunningham & Shartle Engineers 317-837-9900 www.pcsengineers.com Presented By: Chet Parsons, PE
More informationBrad Faiman, NDDOT Right of Way Raymond Barchenger, NDDOT Right of Way
Brad Faiman, NDDOT Right of Way Raymond Barchenger, NDDOT Right of Way 1 Brad Faiman - NDDOT Right of Way Agent 2 Preliminary Certificate of Title (PCT) Fee Simple Acquisitions Permanent Easements Surface
More informationDWR REAL ESTATE COORDINATION PLAN
DWR REAL ESTATE COORDINATION PLAN Exhibit E DWR PROPERTY ACQUISTION PLAN EXHIBIT E Revised Date: 5 10 18 DWR PROPERTY ACQUISTION PLAN EXHIBIT E Revised Date: 5-10-2018 California WaterFix Real Estate Coordination
More informationSARASOTA COUNTY GOVERNMENT CAREER TRACK
SARASOTA COUNTY GOVERNMENT CAREER TRACK RIGHT-OF-WAY AGENT SUB-CLASS CODES: See Below EEO Code: 02 FLSA: Exempt W/C Code: 8810 PAY BAND: Professional/Technical MAJOR FUNCTIONS These are professional positions
More informationState Revolving Fund Loan Programs Guidance for Project Land Acquisition For SRF Financed Projects
Revised November 30, 2006 State Revolving Fund Loan Programs Guidance for Project Land Acquisition For SRF Financed Projects I. Introduction: If an SRF financed project requires access to or acquisition
More informationREQUEST FOR PROPOSALS Solicitation Number: RE AM
REQUEST FOR PROPOSALS Solicitation Number: RE-16-001-AM REAL ESTATE PROPERTY ACQUISITION SERVICES Addendum 1 December 1, 2016 This Addendum provides responses to questions and changes to the RFP. I. Questions
More informationOFFICE OF REAL ESTATE
OFFICE OF REAL ESTATE DATE: October 25, 2017 TO: FROM: RE: Users of the Real Estate Manual Wayne Pace, Manager Acquisition Unit Changes and Updates to the Real Estate Manual The only current and accurate
More informationRESOLUTION NUMBER 2017-
RESOLUTION NUMBER 2017- RESOLUTION BY THE CITY COUNCIL OF THE CITY OF ORLANDO, FLORIDA, DETERMINING THE NECESSITY OF ACQUIRING CERTAIN REAL PROPERTY ALONG BOGGY CREEK ROAD FOR THE PURPOSE OF CONSTRUCTING
More informationTask Central Office Real Estate Responsibilities District Responsibilities
PAGE 1 Appraisal 1. Procedures relative to the entire appraisal process. 1. Prepare preliminary fee schedules, setting monetary guidelines. 2. Prepare and issue contractual agreements with fee appraisers
More informationRight-of-Way Acquisition and
Request for Proposals On Call Right-of-Way Acquisition and Appraisal Services Requested by: CityofElCentro Department of Public Works 307 W. Brighton Avenue El Centra, Ca. 92243 Phone: (760) 337-4505 Fax:(760)337-3172
More informationBLUEPRINT REAL ESTATE POLICY
DATE September 19,2007 TITLE BLUEPRINT REAL ESTATE POLICY ORG. AGENCY Blueprint Intergovernmental Agency APPROVED.01 STATEMENT OF POLICY The purpose of this administrative regulation is to establish a
More informationWelcome to District 6-0
Welcome to District 6-0 Introductions Traffic Services Manager Fran Hanney 610.205.6560 fhanney@pa.gov District Permits Manager Matthew Miele 610.205.6795 mmiele@pa.gov Right-of-Way Administrator Matthew
More informationTownship of Collier 2418 Hilltop Road Presto, PA 15142
Township of Collier 2418 Hilltop Road Presto, PA 15142 Fees: Major: 2 checks $600 + $50 per lot & $1700 Escrow) APPLICATION FOR SUBDIVISION major FINAL only Plans must be folded Rolled plans will not be
More informationExercises direct supervision over assigned professional and technical personnel.
SENIOR RIGHT OF WAY AGENT - Range B93 BOD 10/10/12 Class specifications are intended to present a descriptive list of the range of duties performed by employees in the class. Specifications are not intended
More informationR/W PREQUALIFICATION ODOT, 3/14/2018
R/W PREQUALIFICATION ODOT, 3/14/2018 BRETT SHEARER, C.O. REAL ESTATE PROPOSED RIGHT OF WAY DESIGN 172 PROPOSED RIGHT OF WAY DESIGN PROPOSED RIGHT OF WAY DESIGN Section 3200 Types of Title 173 PROPOSED
More informationIC Chapter 7. Real Property Transactions
IC 8-23-7 Chapter 7. Real Property Transactions IC 8-23-7-0.1 Application of certain amendments to chapter Sec. 0.1. The amendments made to section 19 of this chapter by P.L.133-2007 apply only to public
More informationAGENDA ITEM SUMMARY January 2, 2018 City Council
Agenda Item 10 AGENDA ITEM SUMMARY January 2, 2018 City Council STAFF Kerri Allison, Real Estate Specialist II Tracy Dyer, Engineering Project Manager Chris Van Hall, Legal SUBJECT First Reading of Ordinance
More informationTABLE OF CONTENTS General Legal Authority for Certification of Right of Way Control 24-2
TABLE OF CONTENTS 2400 CERTIFICATION OF RIGHT OF WAY CONTROL PAGE 2401 General 24-1 2402 Legal Authority for Certification of Right of Way Control 24-2 2403 Right of Way Certification and Advertising for
More informationOhio Department of Transportation. Division of Engineering. Office of Real Estate. Synergy. Real Estate Business Analysis
Ohio Department of Transportation Division of Engineering Office of Real Estate Synergy Real Estate Business Analysis Fiscal System Specification Version 1.02 Revision History Date Version Modified By
More informationWHEN A PUBLIC AGENCY IS INTERESTED IN ACQUIRING AN EASEMENT
Form 6-H When a Public Agency is interested in Acquiring an Easement Booklet WHEN A PUBLIC AGENCY IS INTERESTED IN ACQUIRING AN EASEMENT Introduction This booklet describes important features of the Uniform
More informationReal Estate Process 101: A Presentation to Explain the Basics
Real Estate Process 101: A Presentation to Explain the Basics 1 Myrlene Francis, Tierra Right-of-Way Division Manager Beth Abramovitz, P.E. Tucson DOT Project Manager Other Key Staff Dorothy Weideman City
More informationRequest for Proposals
Request for Proposals On Call Right-of-Way and Easement Acquisition and Related Services Requested by: Charter Township of Shelby Department of Public Works 6333 23 Mile Road Shelby Township, MI 48316
More informationThe Uniform Act. Acquisition, Relocation & Demolition. Disaster Recovery CDBG Administration Training. February 14, 2012
The Uniform Act Acquisition, Relocation & Demolition Disaster Recovery CDBG Administration Training February 14, 2012 Uniform Act Overview 49 CFR 24 Protections and assistance to establish minimum standards
More informationUnderstanding Rights of Way. Bryan L. Jones, PE
Understanding Rights of Way Bryan L. Jones, PE Right of Way Former Director of Right of Way Oscar Rucker refers to right of way as the width of area that is under the control of the department for construction
More informationwww. Allenbrand-Drews.com
www. Allenbrand-Drews.com Why Choose a Professional Surveyor? A Professional Land Surveyor renders a highly technical service in compliance with applicable laws, regulations, codes and court decisions
More informationCHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 3 AGENDA. Meeting Date: November 18, Item Number: 8.D.5. Subject: Summary of Information:
CHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 3 AGENDA Meeting Date: November 18, 2009 Item Number: 8.D.5. Subject: Approval of Design, Authorization to Enter Into Agreements, and Award of Construction
More informationACQUISITION. Real Property Acquisition For Kansas Highways, Roads, Streets and Bridges
ACQUISITION Real Property Acquisition For Kansas Highways, Roads, Streets and Bridges KANSAS DEPARTMENT OF TRANSPORTATION BUREAU OF RIGHT OF WAY DWIGHT D. EISENHOWER STATE OFFICE BUILDING 700 S.W. HARRISON
More informationFrequently Asked Questions From the Certification of R/W Training Sessions
Frequently Asked Questions From the Certification of R/W Training Sessions 1. There are differences between appropriations of vacant land and appropriations of structures. What is a structure? A structure
More informationRIGHT OF WAY PRIMARY ROLES & RESPONSIBILITIES
RIGHT OF WAY PRIMARY ROLES & RESPONSIBILITIES PRIMARY TASK ODOT (REA unless otherwise noted) LPA EECUTE LPA PROJECT AGREEMENT LPA Manager; REA may require Real Estate Checklist to be signed off at this
More information7 EXPROPRIATION OF LAND - DAVIS DRIVE, VIVA PROJECT TOWN OF NEWMARKET
7 EXPROPRIATION OF LAND - DAVIS DRIVE, VIVA PROJECT 90760 TOWN OF NEWMARKET The Finance and Administration Committee recommends the adoption of the recommendations contained in the following report dated
More informationPlan of Survey (Feature Plans)
October 4, 2014 Plan of Survey (Feature Plans) NOTE: This document is a Controller of Surveys Policy manual to be used as a general guideline for the preparation and examination of plans. Reference should
More informationRIGHT-of-WAY in INDIAN COUNTRY
RIGHT-of-WAY in INDIAN COUNTRY REALTY and the TTP PROGRAM James Brophy FHWA Tribal Transportation Program What is a Right-of-Way? right of way also right-of-way (rtv-w) n. pl. rights of way or right of
More informationEXTENDED COVERAGE. Extended Coverage 7/2000
EXTENDED COVERAGE Definition: is the Company s term for providing title insurance coverage on an owner s policy over the five general exceptions. Each of them relates to matters that are unrecorded and
More informationRight of Way Acquisition
Right of Way Acquisition LPA Days Scott Recker, Realty Specialist Manager Shell Miller, Real Estate Administrator R/W DESIGN PHASE R/W Plan Manual LPA RX forms for legal descriptions Designer to use R/W
More informationCITY OF YUBA CITY STAFF REPORT
CITY OF YUBA CITY STAFF REPORT Agenda Item 5 Date: May 3, 2016 To: From: Presentation by: Honorable Mayor & Members of the City Council Department of Public Works Diana Langley, Public Works Director Summary
More informationRoad Rights of Way And Obstructions
CEAO Superintendents & Mechanics Conference Road Rights of Way And Obstructions Chris Bauserman, PE, PS Delaware County Engineer October 14, 2015 Introduction Topics Road Right-of-Way Rights of others
More informationARIZONA DEPARTMENT OF REAL ESTATE 2910 N. 44th Street, Ste. 100, Phoenix, AZ
This is an outline of the prescribed curriculum for the Arizona real estate salesperson's pre-license course. The course comprises a minimum of 90 hours of classroom instruction and is one prerequisite
More informationMIAMI-DADE EXPRESSWAY AUTHORITY PROPERTY ACQUISITION POLICY
MIAMI-DADE EXPRESSWAY AUTHORITY PROPERTY ACQUISITION POLICY PURPOSE It is the policy of the Miami-Dade Expressway Authority to acquire property in an economical and efficient manner pursuant to MDX s statutorily
More informationARIZONA DEPARTMENT OF REAL ESTATE 2910 North 44 Street, Suite 100, Phoenix, AZ
OUTLINE OF PRESCRIBED 90 HOUR PRELICENSE CURRICULUM FOR This is an outline of the prescribed curriculum for the Arizona real estate broker's prelicense course. The course comprises a minimum of 90 hours
More information2019 9% Competitive Housing Credit Application
2019 9% Competitive Housing Credit Application Application Checklist This checklist includes all the items from the CFA application and the LIHTC Addendum that are required for the 2019 9% Application
More informationFederal Aid Acquisition Guide. For Property Owners
Federal Aid Acquisition Guide For Property Owners Federal Aid Acquisition Guide for Property Owners INTRODUCTION The purpose of this Guide is to summarize the land acquisition process, including eminent
More informationSarpy Transmission Project & La Vista Transmission Project Project Updates. Tim Nissen, PE Director T&D Engineering & Substation August 17, 2017
Sarpy Transmission Project & La Vista Transmission Project Project Updates Tim Nissen, PE Director T&D Engineering & Substation August 17, 2017 Sarpy Transmission Project (STP) Purpose serve the scheduled
More informationPublic Sewer Extension Information Packet
Mason Farm/Whitehead Circle eighborhood Public Sewer Extension Information Packet Residents of the Mason Farm/Whitehead Circle eighborhood requested information on the status of sewer extension with their
More informationR/W PREQUALIFICATION ODOT, 3/14/2018 PROPERTY MAP SHEET
R/W PREQUALIFICATION ODOT, 3/14/2018 3A Title Block 3B Sheet Heading 3C Station Limit Flags 3D Revision Block 3E Ownership Name and Number 3F Centerline Stationing 3G Proposed R/W and Pavement 3H Structures
More informationOAKGREEN AVENUE. Project Goals. (County Road 65) Corridor Improvement Project. Turn lanes Resurfacing Stormwater management
Project Overview Washington County is leading a study to develop a preliminary design concept for Oakgreen Avenue (County Road 65) between 40th Street N and 10th Street N in Baytown Township and West Lakeland
More informationURBAN REDEVELOMENT AUTHORITY OF PITTSBURGH REQUEST FOR PROPOSALS (RFP) Appraisal Services
SUMMARY INFORMATION URBAN REDEVELOMENT AUTHORITY OF PITTSBURGH REQUEST FOR PROPOSALS (RFP) Appraisal Services RFP Issue Date: Wednesday, November 15, 2017 Proposal Due Date: Thursday, November 30, 2017
More informationHudson Yards Redevelopment. Discussion of Property Acquisition and Relocation
Hudson Yards Redevelopment Discussion of Property cquisition and Relocation Note: This document is for informational purposes only and is not intended to be, and should not be relied upon as, a comprehensive
More informationAppendix B Real Estate Plan
Appendix B Real Estate Plan B-1 REAL ESTATE PLAN Prepared for U.S. Army Corps of Engineers Southwestern Division Little Rock District As of May 1, 2013 Prepared by Ronald Bridges Real Estate Division ANY
More informationDISTRICT RESPONSIBILITIES: ASSIST WITH ACQUISITION ISSSUES AUDIT TO ASSURE THAT REQUIREMENTS ARE MET
REAL ESTATE STAFF INTRODUCTIONS FHWA OVERSITE RESPONSIBILITES R/W ACQUISITION & USE OF PRE-QUALIFIED STAFF UTILITY RELOCATION PROCESS R/W CERTIFICATIONS REAL ESTATE STAFF BETH IMMELL- LIASON FOR LPA PROJECTS
More informationAcquiring Real Property for Federal and Federal-Aid Programs and Projects
Acquiring Real Property for Federal and Federal-Aid Programs and Projects Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 as Amended. Modified specifically for Alaska.
More informationIT COULD HAPPEN TO YOU
L A N D C O N D E M N AT I O N IT COULD HAPPEN TO YOU Some state government agencies that commonly acquire land by condemnation in North Carolina include the North Carolina Department of Transportation
More informationAppendix 4 Agency Approval Letters
Appendix 4 Agency Approval Letters 55 Appendix4.a. Appendix 4.b. Appendix 4.c. Appendix 4.d. 3/10/2016 Clarksburg Mews, LLC c/o Michael Fisher 4938 Hampden Lane Bethesda, MD 20814 Re: Phase
More informationRESOLUTION NO
RESOLUTION NO. 2009-12 AUTHORIZATION FOR THE PRESIDENT & CEO TO EXECUTE AND DELIVER CONTRACTS FOR THE DEVELOPMENT, CONSTRUCTION, DESIGN, AND VEHICLE SUPPLY WITH PARSONS TRANSPORTATION GROUP INC. ("PARSONS")
More informationRECORDKEEPING PROCESS. All ACEDP grantees are required to develop a recordkeeping system that is comprehensive, well-organized and easy to review.
RECORDKEEPING PROCESS I. INTRODUCTION All ACEDP grantees are required to develop a recordkeeping system that is comprehensive, well-organized and easy to review. The recordkeeping system below provides
More informationChapter 7 Questions Interests in Real Estate
Chapter 7 Questions Interests in Real Estate 1. A statutory right that a family has in its residence is called a. entirety. b. survivorship. c. curtesy. d. homestead. 2. A person who has complete control
More information*** PUBLIC NOTICE ***
*** PUBLIC NOTICE *** UNIVERSITY OF ALASKA DIPLOMACY BUILDING DISPOSAL PLAN ANCHORAGE, ALASKA The University of Alaska has received a letter of interest from a bona fide purchaser and has entered into
More information2009 QBS Request for Statement of Interest (SOI) On Call Appraisal Services
2009 QBS Request for Statement of Interest (SOI) On Call Appraisal Services The Kane County Division of Transportation is in need of professional services from an appraisal firm to provide appraisals for
More informationDESIGN BUILD PROJECTS
DESIGN BUILD PROJECTS Michele Palicka FHWA Real Estate Specialist Troy Byers GDOT Asst. State R/W Administrator Agenda Federal Oversight on Design Build Projects State of Georgia Oversight on Design Build
More informationSection 3 Right-of-Way
Section 3 Right-of-Way 3.1 General For the purposes of this section, Right-of-Way (ROW) is considered fee-owned land and/or easement. CVWD owns approximately 7,000 acres of land and has approximately 3,240
More informationState of Michigan Civil Service Commission Capitol Commons Center, P.O. Box Lansing, MI POSITION DESCRIPTION
CS-214 Rev 11/2013 State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box 30002 Lansing, MI 48909 POSITION DESCRIPTION Position Code 1. This position description serves as the official
More informationResettlement Policy Framework
Republic of Turkey Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework Background 1. The Second Renewable Energy and Energy Efficiency Project will fund private sector investments
More informationPOSITION DESCRIPTION
State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box 30002 Lansing, MI 48909 Position Code 1. PROPALTE POSITIO DESCRIPTIO This position description serves as the official classification
More informationVIRGINIA DEPARTMENT OF TRANSPORTATION SURVEY SUBCOMMITTEE WHITE PAPER SURVEY IMPLEMENTATION PLAN MAY 15, 2009
VIRGINIA DEPARTMENT OF TRANSPORTATION SURVEY SUBCOMMITTEE WHITE PAPER SURVEY IMPLEMENTATION PLAN MAY 15, 2009 INTRODUCTION: It is the intention of this office to provide accurate and complete survey information,
More informationOhio Department of Transportation. Division of Engineering. Office of Real Estate. Synergy. Real Estate Business Analysis
Ohio Department of Transportation Division of Engineering Office of Real Estate Synergy Real Estate Business Analysis Relocation System Specification Version 1.00 Revision History Date Version Modified
More informationBUREAU OF RECLAMATION PROCESS FOR ABANDONMENT AND RELOCATION OF IRRIGATION LATERALS
BUREAU OF RECLAMATION PROCESS FOR ABANDONMENT AND RELOCATION OF IRRIGATION LATERALS 1/2012 Pre-application Suggestions: 1. As soon as you are aware that your project may require abandonment and relocation
More informationKANE COUNTY AGRICULTURE COMMITTEE AGENDA
SMITH, Kenyon, Davoust, Haimann, Lewis, Taylor, Vazquez KANE COUNTY AGRICULTURE COMMITTEE AGENDA Monday, June 17, 2013 9:00 a.m. 1. Call to Order 2. Opening Remarks 3. Approval of Minutes: May 20, 2013
More informationAcquisition of Easements over Tribal Lands
Acquisition of Easements over Tribal Lands Establishing an effective government-to-government relationship between the State and the Tribe. We have Executive Order #39 in effect since Governor Doyle Engaging
More informationREAL PROPERTY DEVELOPMENT & MANAGEMENT
REAL PROPERTY DEVELOPMENT & MANAGEMENT The Real Property Development and Management (RPDM) group plans, secures and manages Metropolitan s real property assets, proactively seeking to enhance revenue while
More informationSection 6 Easements and Rights-of-Way
Section 6 Easements and Rights-of-Way GENERAL REQUIREMENTS...6-1 I. EASEMENTS...6-1 6.1 ROADWAY EASEMENT...6-1 6.2 UTILITY EASEMENT...6-1 6.3 SEWER EASEMENT...6-1 6.4 WATER MAIN EASEMENT...6-2 6.5 CHANNEL
More informationCHIEF REAL ESTATE OFFICER, 1949
12-10-93 CHIEF REAL ESTATE OFFICER, 1949 Summary of Duties: A Chief Real Estate Officer plans, organizes, and directs, or assists in the planning and directing of administrative and technical real estate
More informationCAPL Professional Education Program (P.Land, PSL ) Course Credit Description/Category
Ethics and the Right of Way Profession CAPL Fiduciary Duties 1999 CAPL Freehold Mineral Lease 1990 and 2015 CAPL Operating Procedures 1990 and 2015 CAPL Operating Procedures Advanced Surface Rights 1990
More informationNeighborhood Meeting
Street Civic Center Dr. to Washington Ave. Neighborhood Meeting Washington Square Artesia Pilar Flower Park Thursday, September 3, 2015 1 Previous Informational Outreach Meetings Memorial, /Warner October
More informationEngineering & Operations Committee Item 7-3 July 10, 2017
Engineering & Operations Committee Item 7-3 Appropriate $1.85 M Authorize updated field investigations to address erosion-related issues Authorize General Manager to make offers of compensation & acquire
More informationNOTICE OF INTENT TO ACQUIRE AND GOOD FAITH OFFER
Rev. 01/2011 NOTICE OF INTENT TO ACQUIRE AND GOOD FAITH OFFER June 19, 2010 Mike A. Smith, unmarried 1234 Main Street Columnus, Ohio 43223 Re: FRA-123-3.45 Parcel Number: 4 Interest Acquired: WL THE NOTICE
More informationMATTHEW MEYER COUNTY August 7, 2017
MATTHEW MEYER COUNTY EXECUTIVE @NCCDE 87 READS WAY NEW CASTLE, DE 19720 (302) 395-5118 mmeyer@nccde.org August 7, 2017 Mark Schafale Chief Financial and Administrative Officer Felician Sisters or North
More informationHank's Exchange Road Bridge Replacement Project
Hank's Exchange Road Bridge Replacement Project Public Information Meeting, Wednesday, May 12, 2014 Gold Oak School Presented By: El Dorado County Community Development Agency, Transportation Division
More informationChapter 4 Questions: Interests in Real Estate
Chapter 4 Questions: Interests in Real Estate 1. An elderly man left the family home to his second wife with the provision that when she dies, the home goes to a son by his first wife. The second wife
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 17, 2012
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of November 17, 2012 DATE: November 9, 2012 SUBJECT: Approval of an Agreement of Sale Between BREOF Thomas REO, LLC and the County Board of Arlington
More informationRESOLUTION NUMBER 4678
RESOLUTION NUMBER 4678 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PERRIS, CALIFORNIA, DECLARING THAT PUBLIC INTEREST AND NECESSITY REQUIRE ACQUISITION OF A FEE INTEREST IN A PORTION OF THE PROPERTY
More informationFROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: JULY 22, 2002 CMR:352:02
TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: JULY 22, 2002 CMR:352:02 SUBJECT: COUNCIL APPROVAL OF AN AGREEMENT AMONG THE CITY OF PALO ALTO, THE HOUSING
More informationAccelerated Right-of-Way Process for Sidewalks
Accelerated Right-of-Way Process for Sidewalks Opening Remarks Federal Highway Administration Division of Project Management Division of Right-of-Way & Access Management Division of Capital Program Support
More informationDisplacement and Relocation A. INTRODUCTION B. METHODOLOGY
Appendix F: Displacement and Relocation A. INTRODUCTION This appendix provides additional information to support the analyses provided in Chapter 8, Displacement and Relocation. The focus of Chapter 8,
More informationMINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT
MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT Complete this form, print, and mail to: Minnehaha County Highway Dept. 2124 E 60 th St N, Sioux Falls, SD 57104, or Email: jmaras@minnehahacounty.org
More informationThe Uniform Act. CDBG Disaster Recovery Regional Training Acquisition Rehabilitation Demolition Displacement August 2015
The Uniform Act CDBG Disaster Recovery Regional Training Acquisition Rehabilitation Demolition Displacement August 2015 Introductions Minnesota Wisconsin Illinois Indiana Michigan - Ohio Maureen Thurman,
More informationDrafting and Negotiating Commercial Leases. John H. Hawthorne Partner, Protorae Law PLLC June 1, 2015
Drafting and Negotiating Commercial Leases John H. Hawthorne Partner, Protorae Law PLLC June 1, 2015 Drafting and Negotiating Commercial Leases Introduction to Drafting Commercial Leases Lease Provisions
More informationARTICLE XVIII MISCELLANEOUS
88 ARTICLE XVIII MISCELLANEOUS Section 1801 Design and Construction Standards The design and construction of all sanitary sewers connected, either directly or indirectly to the wastewater treatment system
More informationTHE UNIVERSITY OF MICHIGAN REGENTS COMMUNICATION REQUEST FOR ACTION
THE UNIVERSITY OF MICHIGAN REGENTS COMMUNICATION REQUEST FOR ACTION Subject: Action Requested: State Building Authority Financing ofuniversity of Michigan-Flint French Hall Renovations Approval of Resolution
More informationLAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES TABLE OF CONTENTS
LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES TABLE OF CONTENTS Chapter 1: Chapter 2: Chapter 3: Introduction Fees Engineering & Permitting Requirements Sec. 3.1 Sec. 3.2 Sec. 3.3 Sec. 3.4 Sec. 3.5 Sec.
More informationPrecondemnation Procedures: Acquiring Right of Way in a New World October 9, Presented by David Graeler and Brad Kuhn
Precondemnation Procedures: Acquiring Right of Way in a New World October 9, 2015 Presented by David Graeler and Brad Kuhn Pre-Litigation Phases Project Planning Engineering / Design Appraisal Offer /
More informationAppendix B Draft Real Estate Plan
Appendix B Draft Real Estate Plan B-1 REAL ESTATE PLAN Prepared for U.S. Army Corps of Engineers Southwestern Division Little Rock District As of December 3, 2012 Prepared by Ronald Bridges Real Estate
More information11 Teranet Easement Mapping Data Acquisition
Clause 11 in Report No. 18 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on November 19, 2015. 11 Teranet Easement Mapping
More informationHISTORICAL CREATION OF INDIANA ROADS (How To Determine Existing Right of Way) January 19, 2017 Jason McCort, P.S.
HISTORICAL CREATION OF INDIANA ROADS (How To Determine Existing Right of Way) January 19, 2017 Jason McCort, P.S. DEFINITION OF RIGHT OF WAY The right of passage held by the public in general to travel
More informationAPPENDIX F REAL ESTATE
APPENDIX F REAL ESTATE Real Estate Plan For Broward County, Florida Shore Protection Project Segments II and III General Reevaluation Report 1. Statement Of Purpose. The Real Estate Plan is tentative in
More informationAugust 8, Letter of Findings # 1, WSSC Project No. DA6198Z16, 4820 Auburn Ave.
Nell Goradia 4820 Auburn, LLC 519 11th Street SE Washington, DC 2003 Re: Letter of Findings # 1, WSSC Project No. DA6198Z16, 4820 Auburn Ave. Dear Mr. Goradia: A hydraulic planning analysis has been completed
More informationHow to Set Up & Run a First Nation Lands Office
How to Set Up & Run a First Nation Lands Office Quick Reference Guide September 2017 1. Introduction 2 The Quick Reference Guide to Set-up and run a Lands Office is intended to be a resource and tool for
More information