1 Implementing the DCR Dam Break Inundation Zone Regulations with Local Government By Zhengang (Michael) Wang, Ph.D., P.E., CFM Regional Dam Safety Engineer (Region 1) 98 Alexandria Pike, Suite 33Warrenton, VA Office Phone: (540) October 16, 2014
2 Disclaimer I use some firms plans and inundation studies. Credits belong to whoever performed the studies.
3 Code of Virginia Requirement for development in dam break inundation zones For any development proposed within the boundaries of a dam break inundation zone that has been mapped, the locality shall, (i) review the dam break inundation zone map on file with the locality for the affected impounding structure, (ii) notify the dam owner, and (iii) within 10 days forward a request to DCR to make a determination of the potential impacts of the proposed development on the SDF standards required of the dam.
4 continued If DCR determines that the plan of development would change the SDF standards of the impounding structure, the locality shall not permit development in the dam break inundation zone unless 1) the developer agrees to alter the plan of development so that it does not alter the SDF standard required of the impounding structure; or 2) the developer contributes payment to the necessary upgrades to the affected impounding structure
5 continued The requirements of this subsection shall not apply to any development proposed downstream of a dam for which a dam break inundation zone map is not on file with the locality as of the time of the official submission of a development plan to the locality.
6 Payment by developer or subdivider A. If DCR determines that a plan of development proposed by a developer or subdivider is wholly or partially within a dam break inundation zone and would change the spillway design flood standards of an impounding structure, a locality shall require, prior to its final approval of a subdivision or development, that a developer or subdivider of land submit an engineering study. The study shall provide a contract-ready cost estimate for conducting the upgrades. DCR shall verify that the study conforms to the Board's standards.
7 Payment by developer or subdivider - continued B. Following the completion of the engineering studies in accordance with subsection A, and prior to any development within the dam break inundation zone, a locality shall require that a developer or subdivider of land pay 50 percent of the contract-ready costs for necessary upgrades to an impounding structure attributable to the development or subdivision, together with administrative fees not to exceed one percent of the total amount of payment required or $1,000, whichever is less. Necessary upgrades shall not include costs associated with routine operation, maintenance, and repair, nor shall necessary upgrades include repairs or upgrades to the impounding structure not made necessary by the proposed development or subdivision.
8 Payment by developer or subdivider - continued C. Where a payment under subsection B is required, such payment shall be made by the developer or subdivider in accordance with the following provisions: 1. A locality may elect to receive such payment. 2. If the locality elects not to receive such payment, any payments shall be made to the Dam Safety, Flood Prevention and Protection Assistance Fund. D. No locality shall be required to assume financial responsibility for upgrades except as an owner of an impounding structure.
9 Example 1 DCR Warrenton Office forwarded inundation maps received from simplified dam break study to localities OEM DCR Warrenton Office forwarded the inundation zone maps received from the simplified dam break inundation study to the Office of Emergency Management (OEM) of localities so that the inundation zone maps can be incorporated into the Emergency Operations Plan (EOP) of localities Diguilian Dam, #06102, Fauquier County Little Lake Arrowhead Dam, #17907 and Lake Arrowhead Dam, #17908, Stafford County Other dams
10 Diguilian Dam, # GIS Shapefile Inundation Areas PMF Failure
11 Diguilian Dam, # GIS Shapefile Inundation Areas - Sunny Day Failure
12 Consequence 1 Overtop Sawyer Dam in both PMF failure and Sunny-day failure, inventory # 06103, that is under Agricultural Exemption. (Sawyer Dam is not modeled, the failure of Sawyer Dam is also not modeled)
13 Sawyer Dam, inventory # Evidences: Sawyer Dam: capacity at normal pool 107 acre-ft; capacity at top of dam 258 acre-ft. The capacity between normal pool and top of dam is: = 151 acre-ft DiGiulian Dam: capacity at normal pool 224 acre-ft, capacity at top of dam 275 acre-ft Conclusion: both the PMF failure flood and sunny-day failure flood will overtop Sawyer Dam and cause overtopping failure of Sawyer Dam
14 PMF Failure of DiGiulian Dam and the induced overtopping failure of Sawyer Dam
15 Consequence 2 inundate public roads Inundate County Road 635, Hume Rd, DOT 2010 road count 380, depth x velocity: 6.1 ft x 10 ft/s (No bridge/culvert is modeled) Inundate County Road 734, Washwright Rd, DOT 2010 road count 180, depth x velocity: 4.5 ft x 15 ft/s (No bridge/culvert is modeled) Total road count = = 560
16 Consequence 2-1 inundate County Road 635, Hume Rd, DOT 2010 road count 380, depth x velocity: 6.1 ft x 10 ft/s (No bridge/culvert is modeled)
17 Consequence 2-2 inundate County Road 734, Washwright Rd, DOT 2010 road count 180, depth x velocity: 4.5 ft x 15 ft/s (No bridge/culvert is modeled)
18 For Dams without dam break inundation maps and EAP with OEM, localities can do something: 1. The locality is authorized to map the dam break inundation zone in accordance with criteria set out in the Virginia Impounding Structure Regulations (4VAC 50-20) and recover the costs of such mapping from the owner of an impounding structure for which a dam break inundation zone map is not on file with the locality and a map has not been prepared by the impounding structure owner - Code of Virginia Requirement for development in dam break inundation zones
19 For Dams with inundation maps and EAP with OEM, localities can do something - continued 2. DHS s DSAT can be used to develop EAP, which will be available in spring 2015 as I was told The Dams Sector Analysis Tool (DSAT) is intended to provide Dams Sector partners with secure access to a series of modules and applications covering a range of analytical capabilities. Created in collaboration with the U.S. Army Corps of Engineers, the DSAT serves as an effective Web-based tool to integrate available information on critical infrastructure facilities across the sector. DSAT provides an integrated platform to consolidate analysis tools and data collection mechanisms supporting the screening, prioritization, characterization, and analysis of critical assets. For more information please contact the Dams Sector-Specific Agency at dams@hq.dhs.gov
20 Example 2 Request from Stafford County In July 2013, Stafford County requested DCR to determine the potential impacts of a proposed development on spillway design flood standards of Lake Curtis Dam and Seven Lakes Dam (Virginia Code ) Some lots of the proposed development appear to be encroaching to the Dam Break Inundation Zone of Lake Curtis Dam and Seven Lakes Dam
21 Vicinity Map
22 Area in Concern
23 Topographic Information and Proposed Development
24 Cross Section Layout in HEC-RAS Model Lake Curtis Dam Seven Lakes Dam
25 TOPO
26 Lot #xxx: Lowest Adjacent Grade (LAG) = ft Lake Curtis Dam WSE in PMF w/ Breach: ft Seven Lakes Dam: WSE in PMF w/ Breach: ft
27 DCR s Determination No Impact WSE, PMF Breach(ft) Proposed LAG (ft) LF (ft) Lake Curtis Seven Lakes House Dam, #17912 Dam, #17922 Lot #xxx Lot #xxx Lot #xxx Lot #xxx Lot #xxx Lot #xxx * LAG - Lowest Adjacent Grade * LF - Lowest Floor * WSE - Water Surface Elevation I conclude that the houses at those Lots will not be impacted by the PMF dam failure flood of either Lake Curtis Dam or Seven Lakes Dam if those houses are built as proposed The submitted development will have no potential impact on the spillway design flood standards required of either Lake Curtis Dam or Seven Lakes Dam if it is built as proposed on the submitted grading plan.
28 Code of Virginia Notice to the public A. When applying to the Department for a permit to construct a new high or significant hazard potential impounding structure, the applicant shall provide localities that lie within the inundation zone with copies of the construction permit request and the dam break inundation zone map. B. When submitting the application to the Department, the permit applicant shall publish a notice in a newspaper of general circulation in the affected localities summarizing the permit request and providing the address of locations where copies of the construction permit request and the dam break inundation zone map may be examined. The applicant shall provide copies of the published notice to the Department and to the local government offices with plat and plan approval authority or zoning responsibilities as designated by the locality.
29 Notice to the public - continued C. The Department may hold a public hearing on safety issues associated with the construction permit application for the impounding structure. D. The Department may require a permit applicant to provide other forms of reasonable notice, such as the placement of a sign on the proposed site, to ensure that affected parties have been informed.
30 Notice to the public - continued E. The permit applicant shall send, by certified mail, to each property owner within the dam break inundation zone, a summary of the permit request and the addresses of locations where the map of the dam break inundation zone may be viewed. In the case of a condominium or cooperative, such information shall be sent to each property owner or the owners' association. The permit applicant may rely upon real estate assessment records to identify property owners. If requested by the Department, the applicant shall provide a list of the persons to whom notice has been sent.
31 Example 3 Lake Ashby and Lake Anne in Fauquier County Studied area Lake Ashby Dam, Inventory #06152 Lake Anne Dam, Inventory #06110 Both dams have the same owner and same engineer
32 Draft Plan of Development near Lake Ashby and Lake Anne
33 Timelines from DCR s viewpoint DCR received construction/alteration permit application for Lake Ashby Dam, including dam break inundation study
34 Timelines from DCR s viewpoint I visited the dam and met with owner s engineer at the dam. After that, my review comments were ed to owner s engineer. Major problems: SDF without a breach is the control event, which gave a wider inundation zone than PMF with a breach Emergency spillway should meet either the stability or integrity standards HEC-RAS steady model was used, which could be accepted if no major concern is raised.
35 Chosen breach location at the existing pipes (close to trees)
36 The existing Lake Ashby Dam
37 Timelines from DCR s viewpoint - continued At the County s request, I met with Fauquier County Dept. of Community Development, Zoning and Permitting to discuss a project and answer some questions regarding mapping of these zones. County officials expressed concern from property owners about proposed inundation zone in Lake Wesley As a result, I also requested owner s engineer to use HEC-RAS unsteady model because impacted property owners have concern.
38 Timelines from DCR s viewpoint - continued One month later, I met with Fauquier County Dept. of Community Development and County attorney again, total 5~6 officials, at the County s request. County officials expressed strong concern about proposed inundation zone in Lake Wesley.
39 Timelines from DCR s viewpoint - continued Then I met with owner s engineers. Engineers wanted to confirm my review comments. Engineers didn t understand why I requested HEC-RAS unsteady model. I told them the concern about proposed inundation zone in Lake Wesley from impacted property owners and Fauquier County. I asked the engineers: The dam is really flat, and the breach location can be here, or can be there. Why did you choose that breach location, not elsewhere? Engineers couldn t give me a defendable reason. At my insist during our meeting, I convinced the engineers and we all agreed that the dam may breach somewhere else other than the chosen location.
40 Topographic Information Breach Location #1 is at the proposed emergency spillway
41 Timelines from DCR s viewpoint - continued After the meeting, I made my determination and ed to the owner, engineers, and Fauquier County: (1) The dam may breach somewhere else other than the chosen location. (2) The Different breach location will result in different dam break inundation zone. The dam breach location is uncertain. (3) The submitted dam break inundation zone map is the engineer s selection, not a fact, because the breach location is the engineer s selection. (4) During my meeting with Fauquier County, I felt the safety concern from the property owners around Lake Wesley. Because of the above reasons, I request Fauquier County s acceptance of the selected dam breach location and the resulted dam break inundation zone on behalf the impacted property owners before I recommend an alteration or construction permit for this dam.
42 Follow-ups The dam is modeled to breach at the main stream, at the Breach Location #2. Two alteration permit applications were submitted to DCR Warrenton Office in 2014, the latest application contains fuse plug. A brand-new design was proposed at each application.
43 Follow-ups continued in 2014 Because of the concerns raised by Fauquier County, I see some possible safety issues AGAIN associated with the alteration permit application including a fuse plug for Lake Ashby Dam. The proposed fuse plug is built above the proposed auxiliary spillway which has a concrete level section. The fuse plug is about 2 feet in height, and is to comply with the CLOMR on file. For the latest application, because the proposed alteration to Lake Ashby Dam will enlarge the capacity of the lake and raise the height of the dam, at my judgment, it is subject to at least part of the requirements of Code of Virginia Notice to the public. DCR will meet with Fauquier County to collect any safety concerns/safety issues associated with the proposed fuse plug.
44 Lake Anne Dam, Inventory #06110
45 Proposed by owner s engineer: separate Lake Anne into two lakes, consider two dams, and make one or two dams size-exempt from Dam Safety Regulations.
46 DCR s response For dam safety purpose, DCR considers Lake Willow and Lake Anne as one lake and one dam. The reason is: if two lakes and two dams were considered, both dams should be L shape dams, and the potion that separates two lakes would be a shared potion of two dams. If the shared potion of two dams failed at the same time when any other potion of any dam failed, Lake Willow and Lake Anne would share water and become one lake.
47 Engineer s decisions, with DCR s permission, during a meeting in September 2013 One dam and one lake will be considered for dam safety purpose This dam will have two possible breach locations: one to Lake Brittle, another to Lake Ashby. 100% lake water (both Lake Anne and Lake Willow) will go through each breach location to map the dam break inundation zone. This is similar to FEMA s floodplain mapping on alluvial fan. Both Lake Ashby Dam and Lake Anne Dam will be high hazard dams. Each will have 90% PMP flood spillway capacity.
48 My recommendation and Fauquier County s Reply Even though not required by Regulations, for the sake of future property owners, I recommend engineers to raise the Lowest Adjacent Grade (LAG) of each new house above the water surface elevation in PMF with a breach. Fauquier County Official: We will strive to see that the LAG is above the water surface elevation as you recommend Lowest Floor (LF) with basement (source: FEMA s Lowest Floor Guide)
49 Lessons learnt Breach location of a long dam can determine the inundation zone. The selection of breach location may be the interest of dam owner, developer, impacted property owners, and localities. If localities have safety concerns about a dam project including the resulted dam break inundation zone, please tell DCR directly so that DCR knows them. Within the gray areas, the better and more communications between DCR and localities, the better service DCR and localities can provide to the public, and the less trouble we would have. DCR may need to hold a public hearing if any safety issue associated with Lake Ashby in this construction/alteration permit application still remains.
50 Example 4 At Loudon County s Request, Developer Brought Quail Ridge Dam into Compliance with State Regulations Quail Ridge Dam, #10720, was a low hazard dam without O&M certificate Loudon County Requested Owner/Developer to Have O&M Certificate in order to get zoning permits As a result, one dam owner (the dam has two owners), who is also the developer, worked very hard with DCR. The other owner, as I was told, did nothing. The dam got a regular O&M certificate in November It is still a low hazard dam.
51 Quail Ridge Dam
52 Loudon County s Conditions for Developer/Subdivider Zoning permits for Lots xx-xx shall not be issued until the developer/subdivider has acquired a Conditional or Regular Operation and Maintenance Certificate for the Quail Ridge Lake dam If it is determined that any portion of a lot is located within the dam break inundation zone, then prior to the sale of that lot the developer/subdivider shall provide disclosure in writing to all prospective purchasers that a portion of the lot is located within the dam break inundation zone, accompanied by a map of the affected area and information pertaining to the Impounding Structure Regulations, including the hazard classification of the dam and associated dam inspection requirements.
53 Proposed Development Proposed Development Aerial Photo
54 Inundation Zone in PMF with Breach
55 Inundation Zone in PMF with Breach
56 Look downstream the development is leveled up (on the left side)
57 Comments or questions? Thank you!
REQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS DAM BREAK INUNDATION ZONE STUDY AND MAPPING Town of Woodstock, VA The Town of Woodstock, Virginia is requesting proposals from engineering firms to perform Dam Break Inundation Studies
More informationSECTION 10: FLOOD HAZARD EVALUATION 10-1
10) SECTION 10: FLOOD HAZARD EVALUATION A. General. Land subject to being flooded by a Flood of 100-Year Frequency as defined by Title 76, Chapter 5, MCA, or land subject to flooding pursuant to these
More informationChapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation
5.0 Introduction This chapter summarizes the Town s rules and regulations regarding floodplain management and development. The requirements presented in this chapter should be used by the design engineer
More informationChapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation
5.0 Introduction This chapter summarizes the County s rules and regulations regarding floodplain management and development. The requirements presented in this chapter should be used by the design engineer
More informationCONDITIONAL USE PERMIT Application Packet
CONDITIONAL USE PERMIT Application Packet Community Development Department 1020 East Pioneer Road, Draper, UT 84020 (801) 576-6539 Fax (801) 576-6526 Dear Applicant, This application packet has been developed
More informationPurpose: Regulations:
Administrative Procedures for the Designation and Refinement Of Chesapeake Bay Preservation Area Boundaries Guidance on the Chesapeake Bay Preservation Area Designation and Management Regulations September,
More informationBACKGROUND There are 23 flood control structures in the Upper Brushy Creek Water Control and Improvement District (District). See attached map.
BACKGROUND There are 23 flood control structures in the Upper Brushy Creek Water Control and Improvement District (District). See attached map. The U.S Department of Agriculture - Natural Resources Conservation
More informationLetter of Map Change Fundamentals
Letter of Map Change Fundamentals FEMA Region III National Flood Insurance Program Essentials and Best Practices Jana Green, CFM, RAMPP Topics of Discussion Why Apply for a Letter of Map Change (LOMC)?
More informationPRELIMINARY PLAT Application Packet
PRELIMINARY PLAT Application Packet Community Development Department 1020 East Pioneer Road, Draper, UT 84020 (801) 576-6539 Fax (801) 576-6526 Dear Applicant, This application packet has been developed
More informationNational Flood Insurance Program
National Flood Insurance Program Base Flood Elevations in Zone A Streams Surveyor Training Presented by Thomas F. Smith, PE, PLS January 22, 2018 1 FEMA Region III Mitigation Division Floodplain Management
More informationTown of North Topsail Beach
Town of North Topsail Beach Build-Out and Non-Conforming Lot Study In Coordination with The Eastern Carolina Council of Governments February 2010 Introduction The Town of North Topsail Beach has conducted
More information201 General Provisions
201 General Provisions 201.01 Title 201.09 Amendments 201.02 Purpose and Intent 201.10 Public Purpose 201.03 Authority 201.11 Variances and Appeals 201.04 Jurisdiction 201.12 Nonconformances 201.05 Enactment
More informationSECTION 4: PRELIMINARY PLAT
SECTION 4: PRELIMINARY PLAT After the completion of the sketch plan process, if submitted, the owner or developer shall file with the City an application for preliminary plat. The preliminary plat stage
More informationFinnerty, Shawn & Lori Water Front Setback
BONNER COUNTY PLANNING DEPARTMENT PLANNING AND ZONING COMMISSION STAFF REPORT FOR NOVEMBER 2, 2017 Project Name: Finnerty, Shawn & Lori Water Front Setback File Number, Type: FILE #V492-17, Variance Request
More informationCHAPTER 24 F FLOOD ZONE OVERLAY DISTRICT
CHAPTER 24 OVERLAY DISTRICT SECTION 24.01 PURPOSE It is the intent of this district to apply special regulation to the use of land in those areas subject to periodic inundation. Such regulation is deemed
More informationLower Gwynedd Township 1130 N. Bethlehem Pike, P.O. Box 625 Spring House, PA (215) phone (215) fax
Lower Gwynedd Township 1130 N. Bethlehem Pike, P.O. Box 625 Spring House, PA 19477 (215)646-5302- phone (215)646-3357-fax www.lowergwynedd.org Subdivision and Land Development Application Procedures Requests
More informationFinnerty, Shawn & Lori Water Front Setback
BONNER COUNTY PLANNING DEPARTMENT BOARD OF COUNTY COMMISSIONERS STAFF REPORT FOR JANUARY 10, 2018 Project Name: Finnerty, Shawn & Lori Water Front Setback File Number, Type: FILE #V492-17, Variance Request
More informationTRANSFERABLE DEVELOPMENT RIGHTS PROCESS GUIDE
TRANSFERABLE DEVELOPMENT RIGHTS PROCESS GUIDE Clear Creek County Planning Department P.O. Box 2000 Georgetown, Colorado 80444 (303) 679-2436 - phone (303) 569-1103 - fax 1 PURPOSE: A Transfer of Development
More informationFebruary 29, To: Sarah Absher Senior Planner Tillamook County Department of Community Development
February 29, 2016 To: Sarah Absher Senior Planner Tillamook County Department of Community Development From: Richard Hook Chair, Neskowin Citizen Advisory Committee Subject: Application 851-15-000265-PLNG:
More informationMT 1, MT 2, Elevation Certificates & the Role of Surveyors
MT 1, MT 2, Elevation Certificates & the Role of Surveyors Rocky Mountain Surveyors Summit March 3, 2016 Floods are acts of God, but flood losses are largely acts of man. - Dr. Gilbert White the father
More informationAppendix E: Hydrologic & Hydraulic Report. Proposed Bridge Replacement SR 1008, Section 02B (Henry Road) Over Bushkill Creek
Hydrologic & Hydraulic Report Proposed Bridge Replacement SR 1008, Section 02B (Henry Road) Over Bushkill Creek Appendix E: Existing Conditions Hydraulic Analysis 425 Bushkill Creek Henry Woods WS 500-yr
More informationDIVISION 1. - GENERAL PROVISIONS
Sec. 90-708. - Statutory authorization and purpose. Sec. 90-709. - Applicability. Sec. 90-710. - Compliance and liability. Sec. 90-711. - Records. Sec. 90-712. - Abrogation and greater restrictions. Sec.
More informationAPPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW
APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW COMMUNITY DEVELOPMENT DEPARTMENT CHARTER TOWNSHIP OF PLYMOUTH 9955 N. Haggerty Road Plymouth, MI 48170 Fees Revised 9.13.2017 1. PURPOSE APPLICATION
More informationInstructions for APPLICATION FOR CONSENT
Instructions for APPLICATION FOR CONSENT THE CORPORATION OF THE CITY OF LONDON DEVELOPMENT & COMPLIANCE SERVICES, DEVELOPMENT SERVICES, 6 TH FLOOR, CITY HALL, 300 DUFFERIN AVENUE, LONDON, ONTARIO N6A 4L9
More information(Continued on back of page)
Definitions Certificate of Survey is the subdivision of land into three or fewer tracts of land. The remnant tract counts as one tract. Plat is the subdivision of land into more than three tracts of land.
More informationCOUNTY OF ALBEMARLE APPLICATION FOR FAMILY DIVISION. Family Division = $742 (Provide 5 copies of plat)
Page 1 APPLICATION FOR FAMILY DIVISION Family Division = $742 (Provide 5 copies of plat) Tier 2 Groundwater Review = $355 (Required for all plats showing lots less than 21 acres) Tier 3 Groundwater Review
More informationEstablishing a Wetland Bank in Minnesota
Establishing a Wetland Bank in Minnesota Updated February 1, 2018 This document provides a general summary of the key steps in establishing an individual wetland bank site within the state wetland banking
More informationARTICLE I. IN GENERAL
Adopted by City Council on December 7, 2009 AN ORDINANCE TO AMEND AND REORDAIN CHAPTER 10 (WATER PROTECTION) OF THE CODE OF THE CITY OF CHARLOTTESVILLE, 1990, AS AMENDED, BY DELETING SECTIONS 10-51 AND
More informationAPPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist
Prior to filing any application for SUBDIVISION approval, the applicant shall request in writing that the zoning administrator schedule a pre-submission conference. APPLICATION TO THE PLANNING BOARD TOWN
More informationAPPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW
APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW COMMUNITY DEVELOPMENT DEPARTMENT CHARTER TOWNSHIP OF PLYMOUTH 9955 N. Haggerty Road Plymouth, MI 48170 Fees Revised 7/01/2012 1. PURPOSE APPLICATION
More informationPLANNING AND ZONING COMMISSION VARIANCE
PLANNING AND ZONING COMMISSION VARIANCE DOÑA ANA COUNTY COMMUNITY DEVELOPMENT DEPARTMENT Doña Ana County Government Center 845 N. Motel Blvd. Las Cruces, New Mexico 88007 Telephone: (575) 647-7350 MEETING
More informationTENTATIVE PARCEL MAP APPLICATION GUIDE TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS
TENTATIVE PARCEL MAP APPLICATION GUIDE SISKIYOU COUNTY PLANNING DIVISION 806 South Main Street, Yreka CA 96097 Phone: (530) 841-2100 / Fax: (530) 841-4076 TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS
More information(Chapter Flood Damage Prevention)
Chapter 13.10 Flood Damage Prevention Section: 13.10.010 Purpose and Policy 13.10.020 Definitions 13.10.030 Applicability and Areas of Special Flood Hazard 13.10.040 Administration 13.10.050 Provisions
More information2016 Fredericksburg Area Floodplain Management Workshop Tuesday, October 25, 2016
2016 Fredericksburg Area Floodplain Management Workshop Tuesday, October 25, 2016 Charley Banks, CFM Department of Conservation And Recreation Division of Dam Safety & Floodplain Management Some Soapbox
More informationCriteria for Appeals of Flood Insurance Rate Maps. November 30, 201 1
Criteria for Appeals of Flood Insurance Rate Maps November 30, 201 1 This document outlines the criteria for appealing proposed changes in flood hazard information on Flood Insurance Rate Maps (FIRMS)
More informationAlberta Flood Hazard Identification Program
Alberta Flood Hazard Identification Program Peter Onyshko, P.Eng., CFM River Forecast Section Alberta Environment and Parks November 5, 2015 Flood Hazard Identification Program Presentation Outline Introduction
More informationHEC Software and FEMA Submittals
HEC Software and FEMA Submittals EWRI Workshop HEC Users Conference Larry Voice Risk Analysis FEMA Region VI April 12, 2010 Overview Flood Hazard Analysis Overview of Map Changes Accepted Model List Guidance
More informationSC Dams and Reservoirs Safety
SC Dams and Reservoirs Safety Inspection of Embankment Dams John A. Poole, P.E. SCDHEC Topics Covered History of the Dam Safety Program: Time line of the program and important events Inspections Performed
More informationCOUNTY OF CHARLOTTE APPENDIX B SUBDIVISION. Adopted November 4, Violation and Penalties; Requirements after effective date
COUNTY OF CHARLOTTE APPENDIX B SUBDIVISION Adopted November 4, 2014 Contents Article 1. Sec. 1-1. Sec. 1-2. Sec. 1-3. Sec. 1-4. Sec. 1-5. Sec. 1-6. Sec. 1-7. Sec. 1-8. Article 2. Title and Purpose Title
More information13-2 SUBDIVISION PLANS AND PLATS REQUIRED EXCEPTIONS Subdivision Plats Required To be Recorded
ARTICLE XIII SUBDIVISIONS 13-1 INTENT AND PURPOSE 13-1-1 Intent: It is the intent of the County Commission through the adoption of this Article to more fully avail itself of the power granted under 17-27-601
More informationChapter 100 Planned Unit Development in Corvallis Urban Fringe
100.100 Scope and Purpose. Chapter 100 Planned Unit Development in Corvallis Urban Fringe (1) All applications for land divisions in the Urban Residential (UR) and Flood Plain Agriculture (FPA) zones within
More informationInstructions to the Applicant
CONDITIONAL USE PERMIT APPLICATION Lake of the Woods County Land and Water Planning Office 206 8 th Avenue Southeast, Suite #290 Baudette MN 56623-2867 www.co.lake-of-the-woods.mn.us Phone: (218) 634-1945
More informationMingo County, WV Community Coordination Preliminary Flood Insurance Study and Flood Insurance Rate Map. Thursday, September 25, 2014
Mingo County, WV Community Coordination Preliminary Flood Insurance Study and Flood Insurance Rate Map Thursday, September 25, 2014 Overview Preliminary Materials Preliminary FIS Report Digital Flood Insurance
More informationBOARD OF COUNTY COMMISSIONERS ARCHULETA COUNTY, COLORADO RESOLUTION 2018-
BOARD OF COUNTY COMMISSIONERS ARCHULETA COUNTY, COLORADO RESOLUTION 2018- ARCHULETA COUNTY IMPROPERLY DIVIDED PARCELS EXEMPTION INTERIM RESOLUTION - A RESOLUTION ADDRESSING PARCELS UNDER THE SIZE OF 35
More informationOrdinance Page 1
ORDINANCE NO. 671 (AS AMENDED THROUGH 671.20) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO. 671 ESTABLISHING CONSOLIDATED FEES FOR LAND USE AND RELATED FUNCTIONS The Board of Supervisors
More informationNOTICE OF LAND USE DECISION BY THE COOS COUNTY PLANNING DIRECTOR
NOTICE OF LAND USE DECISION BY THE COOS COUNTY PLANNING DIRECTOR Coos County Planning 225 N. Adams St. Coquille, OR 97423 http://www.co.coos.or.us/ Phone: 541-396-7770 Fax: 541-396-1022 This notice is
More informationSECTION 10 STANDARD PLATS
SECTION 10 - STANDARD PLATS Subdivision 1: Purpose Standard Plats allow the subdivision of land into lots smaller than the minimum metes and bounds size in the zoning district, and control road development
More informationAnswers to Questions Communities
Answers to Questions Communities may have about Floodplain Buyout Projects Is our community eligible to receive a mitigation grant for a floodplain buyout project? There are two key criteria for communities
More informationIV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS
IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS IV-A. General Minor subdivisions create five or fewer lots from a tract of record, each lot of which has legal and physical access. If the tract of record proposed
More informationMeeting Minutes Lodi Township Planning Commission November 27, 2012 Lodi Township Hall 3755 Pleasant Lake Road Ann Arbor, MI 48103
Meeting Minutes Lodi Township Planning Commission November 27, 2012 Lodi Township Hall 3755 Pleasant Lake Road Ann Arbor, MI 48103 1) Call to Order The meeting was called to order by Chair Jack Steeb at
More informationJurisdictional Determination Request
This form is intended for use by anyone requesting a jurisdictional determination (JD) from the U.S. Army Corps of Engineers, Wilmington District (Corps). Please include all supporting information, as
More informationCOUNTY OF ALBEMARLE APPLICATION FOR RURAL SUBDIVISION
Page 1 APPLICATION FOR RURAL SUBDIVISION The term rural subdivision means a type of subdivision that is located in the rural areas which results in two or more lots for the purpose of transfer of ownership
More informationRequest Subdivision Variance to Sections 4.4 (b) & (d) of the Subdivision Regulations. Staff Planner Kevin Kemp
Applicant Property Owner Rhae Adams, Jr. Public Hearing June 8, 2016 City Council Election District Lynnhaven Agenda Item 4 Request Subdivision Variance to Sections 4.4 (b) & (d) of the Subdivision Regulations.
More informationBLUESTONE DAM AN OVERVIEW NATIONAL INVENTORY OF DAMS ID: WV08902
1 BLUESTONE DAM AN OVERVIEW NATIONAL INVENTORY OF DAMS ID: WV08902 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 Updated 10 October 2017 255 255 255 239 65 53 80 119 27 252 174.59 110
More informationPRELIMINARY PLANNED AREA DEVELOPMENT APPLICATION (PAD)
PRELIMINARY PLANNED AREA DEVELOPMENT APPLICATION (PAD) Preliminary Planned Area Development Fee: Date Paid SECTION 1.9.4.1 PRELIMINARY PAD APPLICATION A Master development plan (showing general land use
More informationConditional Rezoning (R-15 Residential District to Conditional R-10 Residential District) Staff Planner Stephen White
Applicant Property Owner Victory Baptist Church Public Hearing June 8, 2016 City Council Election District Princess Anne Agenda Item D1 Request Modification of Conditions (Reduction of area subject to
More informationLDC AMENDMENT FLOODPLAINS
Staff Report to the Municipal Planning Board March 20, 2018 L D C 2 0 1 8-10000 I T E M # 4 LDC AMENDMENT FLOODPLAINS Applicant City of Orlando Project Planner Elisabeth Dang, AICP Description of the Request:
More informationBRIDGETON SUBDIVISION APPLICATION CHECKLIST
APPLICATION NAME AND # CHECKLIST COMPLETED BY: DATE: Signature and printed name BRIDGETON SUBDIVISION APPLICATION CHECKLIST TO SUBDIVISION APPLICANTS: The attached checklist is to assist you in the submission
More informationORDINANCE NO. 14 C2-) AN ORDINANCE OF THE COUNTY OF VENTURA REPEALING AND REENACTING THE VENTURA COUNTY FLOODPLAIN MANAGEMENT ORDINANCE SECTION 1
ORDINANCE NO. 14 C2-) AN ORDINANCE OF THE COUNTY OF VENTURA REPEALING AND REENACTING THE VENTURA COUNTY FLOODPLAIN MANAGEMENT ORDINANCE The Board of Supervisors of the County of Ventura ordains as follows:
More informationSPECIAL USE PERMIT APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS
SPECIAL USE PERMIT APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS The following table lists the information necessary to review a special use application.
More informationResidential Major Subdivision Review Checklist
Residential Major Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining
More informationZONING BOARD OF ADJUSTMENT BOROUGH OF MOUNTAIN LAKES, NEW JERSEY. CHECKLIST Section 40-22
ZONING BOARD OF ADJUSTMENT BOROUGH OF MOUNTAIN LAKES, NEW JERSEY CHECKLIST Section 40-22 1. Application Form - Original and 13 copies with all items completed. 2. Fee required by Land Use Ordinances, section
More informationREZONING APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS
REZONING APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS The following table lists the information necessary to review a rezoning application. All
More informationResidential Minor Subdivision Review Checklist
Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining
More informationRULE C2 ZONE STANDARDS - SUBDIVISION
RULE C SUBDIVISION 1 RULE C2 ZONE STANDARDS - SUBDIVISION NB Words outlined in bold type below have a specific definition contained in Chapter 2 (Definitions). 2.1 STANDARDS RESIDENTIAL ZONE (Refer Part
More informationMINOR SUBDIVISION APPLICATION
MINOR SUBDIVISION APPLICATION Complete with required information (write "n/a" if information is not applicable to proposal). Title of Plat Has any other plat been recorded for this site? ( ) Yes ( ) No
More informationZONING VARIANCES - ADMINISTRATIVE
Planning Department 200 W. Oak Street 3 rd Floor Fort Collins, CO 80521 970-498-7683 www.larimer.org/planning ZONING VARIANCES - ADMINISTRATIVE The submittal requirements listed in this packet are intended
More informationFLOOD HAZARD AREA LAND USE MANAGEMENT
FLOOD HAZARD AREA LAND USE MANAGEMENT Introduction Guidance For Selection of Qualified Professionals and Preparation of Flood Hazard Assessment Reports This document is intended to provide guidance for
More informationWaseca County Planning and Zoning Office
Waseca County Planning and Zoning Office 300 North State Street Waseca, Minnesota 56093 Phone: 507-835-0650 Fax: 507-837-5310 Form no. PZ 081009 Web Site: www.co.waseca.mn.us FEES: 1) CUP FEE- $400.00
More informationAppendix A Reproducible Forms
Appendix A Reproducible Forms Form LD-33 LD-34 LD-35 LD-40 LD-41 LD-42 LD-50 LD-51 LD-52 LD-53 Subject County Engineer Approval Form Storm Sewer Computation Sheet Ohio Drainage Design Criteria Form Gutter
More informationApplication for Subdivision and Land Development
Application for Subdivision and Land Development Montgomery Township 1001 Stump Road Montgomeryville, PA 18936-9605 Telephone: 215-393-6920 Fax: 215-855-1498 www.montgomerytwp.org 9-2017 TO: FROM: RE:
More informationThe Strategic Plan can be viewed by clicking this link.
What is the purpose of the Land Information Office? Many of Brown County's most basic services rely on accurate and up-to-date land information. Emergency response, resource conservation, infrastructure
More informationRetail Leases Amendment Act 2005 No 90
New South Wales Retail Leases Amendment Act 2005 No 90 Contents Page 1 Name of Act 2 2 Commencement 2 3 Amendment of Retail Leases Act 1994 No 46 2 4 Amendment of Fines Act 1996 No 99 2 Schedule 1 Amendment
More informationAmendment to the Zoning and Subdivision Ordinances; Consider Repeal Cluster Development Standards
2 Board of Supervisors Meg Bohmke, Chairman Gary F. Snellings, Vice Chairman Jack R. Cavalier Thomas C. Coen L. Mark Dudenhefer Wendy E. Maurer Cindy C. Shelton February 28, 2018 Thomas C. Foley County
More informationPLANNING AND ZONING COMMISSION
PLANNING AND ZONING COMMISSION DOÑA ANA COUNTY COMMUNITY DEVELOPMENT DEPARTMENT Doña Ana County Government Center 845 N. Motel Blvd. Las Cruces, New Mexico 88007 Telephone: (575) 647-7350 MEETING DATE:
More informationCHAPTER XIX FLOOD DAMAGE PROTECTION. Article. 1 Definitions 2 General Provisions 3 Administration 4 Provisions for Flood Hazard Reduction
CHAPTER XIX FLOOD DAMAGE PROTECTION Article 1 Definitions 2 General Provisions 3 Administration 4 Provisions for Flood Hazard Reduction CHAPTER XIX FLOOD DAMAGE PROTECTION Article 1 Definitions 19.0101
More informationBASICS OF FLOODPLAIN MANAGEMENT & PLANNING IN NEW JERSEY
BASICS OF FLOODPLAIN MANAGEMENT & PLANNING IN NEW JERSEY STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION VINCENT J. MAZZEI, JR., PE November 12, 2008 Flood Hazard Areas What is a 100-year flood?
More informationBLUESTONE DAM DAM SAFETY ASSURANCE MEGA-PROJECT NATIONAL INVENTORY OF DAMS ID: WV08902
1 BLUESTONE DAM DAM SAFETY ASSURANCE MEGA-PROJECT NATIONAL INVENTORY OF DAMS ID: WV08902 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 Updated 10 October 2017 255 255 255 239 65 53
More information(Ord. No. 743, )
CHAPTER 330. - FLOODPLAIN MANAGEMENT Section 330-1. - Purpose. (a) (b) (c) (d) It is hereby determined that the flood hazard areas of the City of Chamblee are subject to periodic inundation which may result
More informationTAX ABATEMENT GUIDELINES SUMMARY
TAX ABATEMENT GUIDELINES SUMMARY OBJECTIVES Primary job creation -- target industries. Amount abatement -- minimum to be competitive. Fair to taxing jurisdictions -- It is a local option. Fair to existing
More informationImplementation Guidance for The Sustainable Growth and Agricultural Preservation Act of 2012 Senate Bill 236
Implementation Guidance for The Sustainable Growth and Agricultural Preservation Act of 2012 Senate Bill 236 May 22, 2012 Version 1.0 Table of Contents 1. Executive Summary... 1 1.1 Bill Highlights...
More informationGuide to Subdivision and Land Development
Guide to Subdivision and Land Development Fraser Thomas Ltd......is an engineering and surveying consulting firm based in Highbrook which has provided Surveying, Engineering, Planning and Resource Management
More informationMCPC MONONGALIA COUNTY PLANNING COMMISSION 243 High Street, Rm 110, Morgantown, WV Phone Fax
GENERAL APPLICATION FOR DEVELOPMENT OF SIGNIFICANT IMPACT This application shall be used for all Level III reviews of developments of significant impact (DSI) that have a broader impact. Such impacts would
More informationCHAPTER 14 SPECIAL DEVELOPMENTS
10-14-1 10-14-1 CHAPTER 14 SPECIAL DEVELOPMENTS SECTION: 10-14-1: Cluster and Inner Block Development 10-14-2: Planned Unit Development 10-14-1: CLUSTER AND INNER BLOCK DEVELOPMENT: A. Land Use: Cluster
More informationZoning Variation Request Packet
VILLAGE OF GLEN ELLYN Zoning Variation Request Packet Planning & Development Department 535 Duane Street Glen Ellyn, IL 60137 Telephone 630.547.5250 Fax 630.547.5370 X:\Plandev\PLANNING\FORMS\Zoning Variation
More informationBOUNDARY LINE ADJUSTMENT APPLICATION
OFFICE 518.747.5212 --------------FAX 518.747.2493 (Clerk s Office Use Only) BOUNDARY LINE ADJUSTMENT APPLICATION APPLICATION NO: DATE : FEE PAID: Requirements, Fees and Instructions (Please use dark blue
More informationSUBDIVISION DEFINED, EXEMPTIONS FROM DEFINITION:
12-611: SUBDIVISION DEFINED, EXEMPTIONS FROM DEFINITION: A. 1. Minor Land Division (MLD) shall mean any division of land into four (4) or fewer lots. 2. Minor Subdivision shall mean any division of land
More information# 1 HOLDOVER Revised SUB CANAL SUBDIVISION
CANAL SUBDIVISION Engineering Comments: Label each Lot showing the required minimum finished floor elevation (MFFE). It appears that Lots 2, 3 & 4 are located in the AE Flood Zone; add a note to the plat
More informationSONOMA COUNTY FLOOD ELEVATION MITIGATION PROGRAM PROGRAM DESIGN
SONOMA COUNTY FLOOD ELEVATION MITIGATION PROGRAM PROGRAM DESIGN I. INTRODUCTION A. Purpose & Objectives: 1. The purpose of the Sonoma County is to mitigate potentially hazardous conditions involving residential
More informationFederal Emergency Management Agency
Page 1 of 3 Date: July 21, 2016 Case No.: 16-05-5203A LOMA COMMUNITY AND MAP PANEL INFORMATION COMMUNITY KEWAUNEE COUNTY, WISCONSIN (Unincorporated Areas) Federal Emergency Management Agency Washington,
More informationKaufland Stores in Victoria Advisory Committee
Kaufland Stores in Victoria Advisory Committee Proposed planning provision changes to land at 1126-1146 Centre Road, Oakleigh South 1158 Nepean Highway, Mornington 1550 Pascoe Vale Road, Coolaroo February
More informationFOR DISCUSSION PURPOSES ONLY
Condominium Property Act CONDOMINIUM PROPERTY AMENDMENT REGULATION 1 The Condominium Property Regulation (AR 168/2000) is amended by this Regulation. 2 Section 1 is amended (a) in subsection (1) by adding
More information(voice) (fax) (voice) (fax) Site Plan Review
Town of South Boston PO Box 417 455 Ferry Street South Boston Virginia 24592 Planning Department Public Works Department (Engineering) 434.575.4241 (voice) 434.575.4275 (fax) 434.575.4260 (voice) 434.575.4275
More informationAttached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.
To Whom It May Concern: Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit. The fee for the permit application is $75.00, which shall be made payable to
More informationSTOREY COUNTY PLANNING COMMISSION MEETING Thursday, April 7, :00 p.m. 500 Sam Clemens Ave., Mark Twain Estates Mark Twain, NV 89403
STOREY COUNTY PLANNING COMMISSION MEETING Thursday, April 7, 2016 6:00 p.m. 500 Sam Clemens Ave., Mark Twain Estates Mark Twain, NV 89403 MEETING MINUTES CHAIRMAN: Larry Prater VICE-CHAIRMAN: Jim Hindle
More informationMAP INDEX CHECKLIST NOTES:
REVIEWING YOUR PRELIMINARY DFIRM PANELS AND FIS REPORT A GUIDE FOR COMMUNITY OFFICIALS When a Georgia community is presented with new Digital Flood Insurance Rate Map (DFIRM) panels, the State of Georgia,
More informationTown of Alexandria. Floodplain Management Ordinance
1 of 7 8/8/2009 4:56 PM Town of Alexandria Floodplain Management Ordinance SECTION 1 PURPOSE Certain areas of the Town of Alexandria, New Hampshire are subject to periodic flooding, causing serious damages
More informationZONING VARIANCES ADMINISTRATIVE
200 W. Oak Street, 3rd Floor Fort Collins, CO 80521 (970) 498-7683 / larimer.org/planning ZONING VARIANCES ADMINISTRATIVE The submittal requirements listed in this packet are intended to collect all of
More informationDEVELOPMENT PLAN ORDINANCE
DEVELOPMENT PLAN ORDINANCE CITY OF GLASGOW Ordinance No. 2026 SECTION A. Section 1. INTENT AND PURPOSE The purpose of this Ordinance is to establish and define development plans, which may be utilized
More informationApplication Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012
Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012 IMPORTANT NOTE: This document was created to accompany the City of Fort Collins
More information