1 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or ) or full replacement (rank, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main ,900 $,34,97 SITE $953,09 Campus Total 39,900 $3,99,3 Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video # S EA $70 Entrance Control - Audio and Video #9_Exit S EA $70 Exterior Doors - Exterior FRP Door # S EA $,3 Exterior Doors - Exterior FRP Door #0 S EA $,3 Exterior Doors - Exterior FRP Door #_Exit S EA $,3 Exterior Doors - Exterior FRP Door #_Exit S EA $,3 Exterior Doors - Exterior FRP Door #3 S EA $3,788 Exterior Doors - Exterior FRP Door #4_Exit E EA $,3 Exterior Doors - Exterior FRP Door #5_Exit E EA $,3 Exterior Doors - Exterior FRP Door #._Exit E EA $,3 Large Stage Doors (Approx. 3'-0" AFF) Exterior Doors - Exterior FRP Door #_Exit E EA $,3 Exterior Doors - Exterior FRP Door #7_Exit E EA $,3 Exterior Doors - Exterior FRP Door #8_Exit E EA $,3 Exterior Doors - Exterior FRP Door #9_Exit E EA $,3 Exterior Doors - Exterior FRP Door #_Exit W EA $,3 Exterior Doors - Exterior FRP Door #. EA $3 Engineer Office Area Exterior Doors - Exterior FRP Door #. EA $3 Engineer Office Area Exterior Doors - Exterior FRP Door # S EA $3 Exterior Doors - Exterior FRP Door #4 E EA $,3 Exterior Doors - Exterior FRP Door #5 E EA $,3 Exterior Doors - Exterior FRP Door # EA $3 ROOSEVELT HS Page of Assessment Date: 8/4/5

2 Category: Building Exterior Entrance Exterior Doors - Exterior FRP Door #3_Exit 3 EA $,894 Exterior Doors - Exterior FRP Door #5 W EA $,3 Exterior Doors - Exterior FRP Door #_Exit W EA $,3 Exterior Doors - Exterior FRP Door #7 W EA $,3 Exterior Doors - Exterior FRP Door #8_Exit S EA $3,788 Exterior Doors - Exterior FRP Door #9_Exit S EA $,3 Exterior Doors - Exterior Steel Door #7._Exit E (Basement) EA $9 Exterior Doors - Exterior Steel Door # EA $48 Boiler Rm. Exterior Doors - Exterior Steel Door #3 E EA $48 Elevator Machine Rm. Exterior Doors - Exterior Wood Door #4. (Basement) EA $48 Screwed Shut Exterior Doors - Overhead Rolling/ Garage Door #0 EA 4 $0,49 Worn Exterior Doors - Store Front #3. E EA 4 $,80 Worn and damaged Exterior Doors - Transom Lite #0 S 3 EA $9 Exterior Doors - Transom Lite #_Exit S 3 EA $9 Exterior Doors - Transom Lite #_Exit S 3 EA $9 Exterior Doors - Transom Lite #3 S 9 EA $,80 Exterior Doors - Transom Lite #4_Exit E 3 EA $9 Exterior Doors - Transom Lite #_Exit W EA $7 Exterior Doors - Transom Lite #0 EA $7 Exterior Doors - Transom Lite #3 E EA $33 Louver Exterior Doors - Transom Lite #4 E 3 EA $9 Exterior Doors - Transom Lite # EA $33 Exterior Doors - Transom Lite #3_Exit EA $33 Solid panel Exterior Doors - Transom Lite #8_Exit S 9 EA $,80 Exterior Doors - Transom Lite #9_Exit S 3 EA $9 Exterior Stairs - Concrete # S LF $899 Exterior Stairs - Concrete #4_Exit E LF $98 Exterior Stairs - Concrete #_Exit E LF $899 Exterior Stairs - Concrete #7._Exit E (Basement) 0 LF $4,90 Exterior Stairs - Concrete #7_Exit E 0 LF $88 Exterior Stairs - Concrete #8_Exit E 9 LF $73 Exterior Stairs - Concrete #_Exit W 0 LF $4,90 Exterior Stairs - Concrete # S 4 LF $3,434 Exterior Stairs - Concrete #3 E 3 LF $45 Exterior Stairs - Concrete #3. E 3 LF $45 Exterior Stairs - Concrete #4. (Basement) 3 LF $,944 Exterior Stairs - Stone # S 55 LF $,4 ROOSEVELT HS Page of Assessment Date: 8/4/5

3 Category: Building Exterior Entrance Exterior Stairs - Stone #0 S 8 LF $9,77 Exterior Stairs - Stone #_Exit S 8 LF $9,77 Exterior Stairs - Stone #_Exit S 8 LF $9,77 Exterior Stairs - Stone #3 S 3 LF $,099 Exterior Stairs - Stone #4_Exit E 7 LF $8,35 Exterior Stairs - Stone #5_Exit E 59 LF $, Exterior Stairs - Stone #_Exit E 9 LF $,07 Exterior Stairs - Stone #7_Exit E 4 LF $,7 Exterior Stairs - Stone #9_Exit E 30 LF $3,390 Exterior Stairs - Stone #. 3 LF $339 Exterior Stairs - Stone #. 3 LF $339 Exterior Stairs - Stone # S 3 LF $3,5 Exterior Stairs - Stone #4 E 5 LF $55 Exterior Stairs - Stone #3_Exit LF $78 Exterior Stairs - Stone #5 W 7 LF $8,35 Exterior Stairs - Stone #_Exit W 4 LF $5,97 Exterior Stairs - Stone #7 W 85 LF $9,04 Exterior Stairs - Stone #8_Exit S 80 LF $0,337 Exterior Stairs - Stone #9_Exit S 8 LF $904 Power Door Operator and Controls # S EA 5 Building Engineer stated that operators are malfunctioning Power Door Operator and Controls #9_Exit S EA 5 Building Engineer stated that operators are malfunctioning Ramp Handrail - Steel_Ramp Handrail # S 35 LF $,70 Ramp Handrail - Steel_Ramp Handrail #4 E LF $5 Ramp Handrail - Steel_Ramp Handrail #9_Exit S 35 LF $,70 Ramps - Concrete # S 74 LF $,7 Ramps - Concrete #4 E LF $,53 Ramps - Concrete #9_Exit S 74 LF $,7 Stair Handrail - Steel_Stair Handrail # S 30 LF $0 Stair Handrail - Steel_Stair Handrail #0 S 0 LF $73 Stair Handrail - Steel_Stair Handrail #_Exit S 0 LF $73 Stair Handrail - Steel_Stair Handrail #_Exit S 30 LF $0 Stair Handrail - Steel_Stair Handrail #3 S LF $347 Stair Handrail - Steel_Stair Handrail #4_Exit E 35 LF $303 Stair Handrail - Steel_Stair Handrail #5_Exit E 4 LF $ Stair Handrail - Steel_Stair Handrail #_Exit E 5 LF $30 Stair Handrail - Steel_Stair Handrail #7._Exit E (Basement) LF $39 ROOSEVELT HS Page 3 of Assessment Date: 8/4/5

4 Building: Main Category: Building Exterior Entrance Stair Handrail - Steel_Stair Handrail #7_Exit E LF $04 Stair Handrail - Steel_Stair Handrail #9_Exit E 5 LF $30 Stair Handrail - Steel_Stair Handrail #_Exit W 8 LF $5 Stair Handrail - Steel_Stair Handrail # S LF $8 Stair Handrail - Steel_Stair Handrail #5 W 0 LF $73 Stair Handrail - Steel_Stair Handrail #_Exit W LF $04 Stair Handrail - Steel_Stair Handrail #7 W LF $04 Stair Handrail - Steel_Stair Handrail #8_Exit S 30 LF $0 Stair Handrail - Steel_Stair Handrail #9_Exit S LF $39 Foundation Lighting Roof System Foundation - Concrete Entire Building 3,0 LF 7 Foundation - Concrete Entire Building 5 LF 5 LF of foundation wall has water Seepage in basement at W corner of Lunch Room. Should be resealed. Superstructure - Concrete Entire Building 39,900 SF 7 Exterior Lighting - Parapet or Roof Mounted Entire Building 57 EA $30,583 Exterior Lighting - Wall Mounted Entire Building 5 EA $4,33 Chimney - Brick Chimney- Concrete/ Mortar Liner Roof #3 00 LF $95,48 Chimney - Metal Flue Roof # 0 LF $,58 Coping - Stone Roof #,53 LF $9,50 Painted to resemble Terra Cotta Coping - Stone Roof # 44 LF $4,35 Coping - Stone Roof #3 87 LF $7,975 Coping - Stone Roof #4 49 LF $3,457 Painted to resemble terra cotta Downspouts - Exterior Downspouts Roof # 0 LF $,994 Downspouts - Exterior Downspouts Roof # 4 LF $798 Downspouts - Exterior Downspouts Roof #3 LF $99 Downspouts - Exterior Downspouts Roof #4 3 LF $00 Downspouts - Interior Downspouts Roof #,080 LF $9,5 Downspouts - Interior Downspouts Roof # 385 LF $,795 Downspouts - Interior Downspouts Roof #3 350 LF $,3 Downspouts - Interior Downspouts Roof #4 40 LF $3,958 Parapet - " - 30" Height Roof #,50 LF $5,94 Parapet - " - 30" Height Roof # 44 LF $7,80 Parapet - " - 30" Height Roof #3 87 LF $34,800 ROOSEVELT HS Page 4 of Assessment Date: 8/4/5

5 Category: Building Exterior Roof System Walls Windows Parapet - " - 30" Height Roof #4 49 LF $,74 Parapet - Parapet > 30" Roof # 503 LF $3,5 Roof Structure - Concrete Roof # 75,70 SF 7 Roof Structure - Concrete Roof #,000 SF 7 Roof Structure - Concrete Roof #3,9 SF 7 Roof Structure - Concrete Roof #4,78 SF 7 Roof - Modified Bitumen Roof # 75,70 SF $7,480 Roof - Modified Bitumen Roof #,000 SF $03,503 Roof - Modified Bitumen Roof #3,8 SF $58,454 Roof - Modified Bitumen Roof #3 00 SF 5 $,85 Minor ponding issue at SW corner Roof - Modified Bitumen Roof #4,78 SF $0,309 Cheek-Wall - Concrete Entire Building 345 SF $3,537 Exterior Walls - Brick Entire Building 0,74 SF $77,9 Exterior Walls - Stone-Cut Entire Building 9,980 SF $34,8 Painted to resemble terra cotta Guard - Guards perforated Entire Building / st Floor,450 SF $4,5 Lintels - Steel Entire Building,945 LF $85,490 Lintels - Stone Entire Building 37 LF Skylite - Glass Single-Pane Entire Building 44 SF $3,44 Windows - Casement Aluminum Double-pane Entire Building,0 SF $8,30 Windows - Sash Aluminum Double-pane Entire Building 30,80 SF $,08 Building Exterior Subtotal: $3,09,94 Building: Main Category: Electrical System Emergency System Automatic Transfer Switch Electrical Room EA 4 $,399 Past useful life. Automatic Transfer Switch Electrical Room EA $8 Emergency A/C Power - Auditoium and Aisle Lighting st, nd floor, Entire Building / st Floor 9, SF $4,975 Emergency A/C Power - Corridors and Stairs st, nd floor, Entire Building / Entire 54, SF $,3 Building Emergency A/C Power - Gym st, nd floor, Entire Building / nd Floor 7,05 SF $,30 Emergency A/C Power - Lunchrooms st, nd floor, Entire Building / st Floor 9,33 SF $3,470 ROOSEVELT HS Page 5 of Assessment Date: 8/4/5

6 Category: Electrical System Emergency System Main Service Emergency A/C Power - Multipurpose Room st, nd floor, Entire Building / st Floor,05 SF $78 Emergency A/C Power - Pool st, nd floor, Entire Building / st Floor 7,90 SF $,94 Emergency A/C Power - Students Toilets st, nd floor, Entire Building / st Floor 3,70 SF $,79 Locker rooms. Emergency Battery Packs - Corridors and Stairs st, nd floor, Entire Building / Entire EA $5 Building Emergency Battery Packs - Gym st, nd floor, Entire Building / nd Floor EA $5 Emergency Battery Packs - Lunchrooms st, nd floor, Entire Building / st Floor 3 EA $08 Emergency Battery Packs - Pool st, nd floor, Entire Building / st Floor EA $03 Emergency Battery Packs - Students Toilets st, nd floor, Entire Building / Entire 0 EA $,05 Locker rooms. Building Emergency Generator- Outdoor- Diesel KW orth of Boiler Room Outdoors / orth EA $,59 Auto start function needs programming. Exit Signs - Auditoium st, nd Floor and Entire Building / st EA 7 Floor Exit Signs - Corridors and Stairs st, nd Floor and Entire Building / 8 EA 7 Entire Building Exit Signs - Gym st, nd Floor and Entire Building / nd EA 7 Floor Exit Signs - Lunchroom st, nd Floor and Entire Building / st 8 EA 7 Floor Exit Signs - Multipurpose Room st, nd Floor and Entire Building / st EA 7 Floor Exit Signs - Pool st, nd Floor and Entire Building / st EA 7 Floor Security System - CCTV Entire Building 39,900 SF $9,0 Security System - Intrusion Detection Entire Building 39,900 SF $8,34 Main Electrical Service - 00 to 3000 A 0/08/3PH Electrical Room EA $0,87 East electrical room. Main Electrical Service - 00 to 3000 A 0/08/3PH Electrical Room EA $0,87 Central electrical room. Main Electrical Service - 00 to 3000 A 0/08/3PH Electrical Room EA $0,87 West electrical room. PA System Entire Building 39,900 SF $05,5 Power Distribution Lighting and Power Panels - 00 A Entire Building / st Floor EA 4 $4,849 Exposed buss bar. Lighting and Power Panels - 00 A Entire Building 8 EA 7 Lighting and Power Panels - 00 A Entire Building EA 7 Lighting and Power Panels - 00 A Entire Building 3 EA 4 $4,548 Exposed wiring or buss bar. Lighting and Power Panels - 00 A Entire Building EA 7 Lighting and Power Panels - Above 00 A Entire Building 8 EA 7 Lighting and Power Panels - Above 00 A Entire Building EA 7 Lighting and Power Panels - Above 00 A Entire Building 4 EA 7 ROOSEVELT HS Page of Assessment Date: 8/4/5

7 Category: Electrical System Power Distribution Lighting and Power Panels - Above 00 A Entire Building 8 EA 7 Lighting and Power Panels - Above 00 A Entire Building EA 4 $3,5 Exposed wires or buss bar. Lighting and Power Panels - Above 00 A Entire Building EA 7 Lighting and Power Panels - Above 00 A Entire Building EA 7 Emergency power panel with fuses. Main Distribution Panels amp Entire Building / Electrical Room EA 7 Main Distribution Panels amp Entire Building EA 7 Main Distribution Panels - Greater than 00 amp Entire Building / Electrical Room EA 7 Electrical System Subtotal: $4,85 Building: Main Category: Safty System Fire Alarm Fire Alarm Panel Electrical Room EA $, Fire Alarm Strobe Lights Electrical Room / Entire Building 39,900 SF $4,34 Fire Alarm_System Electrical Room / Entire Building 39,900 SF $55,535 Safty System Subtotal: $7,305 Building: Main Category: Mechanical System Air Handling Systems Air Handling Unit- Built Up- Single Zone- Steam Coils - Greater than Mechanical Room EA 5 $7,3 Serves the Auditorium cfm Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils - Mechanical Room EA 5 $44, Serves the shops cfm Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils - Mechanical Room EA 5 $7,3 Serves the southwest classrooms. Greater than cfm Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils - Mechanical Room EA 5 $7,3 Serves southeast classrooms. Greater than cfm Air Handling Unit- Built Up-Multi Zone- Steam Coils Mechanical Room EA 5 $,438 Serves the pool and lockers. Air Handling Unit- Built Up-Multi Zone- Steam Coils Mechanical Room EA 5 $78,08 Serves the lunchrooms. Air Handling Unit- Built Up-Multi Zone- Steam Coils - Greater than Mechanical Room EA 5 $95, cfm Air Intake Mechanical Room / East Façade EA $5,75 Air Intake Mechanical Room / East Façade EA $5,75 Serves the locker rooms and gyms. ROOSEVELT HS Page 7 of Assessment Date: 8/4/5

8 Category: Mechanical System Air Handling Systems Boiler Systems Air Intake Mechanical Room / orth Façade EA $5,75 Air Intake Mechanical Room / orth Façade EA $5,75 Air Intake Mechanical Room / South Façade EA $5,75 Air Intake Mechanical Room / West Façade EA $5,75 Air Intake Mechanical Room / West Façade EA $5,75 Auxiliaries cfm Mechanical Room EA 5 $4,899 Auxiliaries cfm Mechanical Room EA 5 $4,899 Auxiliaries cfm Mechanical Room EA 5 $,577 Auxiliaries - Greater than cfm Mechanical Room EA 5 $0,98 Auxiliaries - Greater than cfm Mechanical Room EA 5 $8,883 Auxiliaries - Greater than cfm Mechanical Room EA 5 $0,98 Auxiliaries - Greater than cfm Mechanical Room EA 5 $0,98 Make Up Air Unit- Roof Mounted- Gas Heating and DX Cooling Coil ,000 cfm Roof EA $3,350 Make Up Air Unit- Roof Mounted- Gas Heating and DX Cooling Coil - Roof EA $3,350 Less than 000 cfm Reheat Boxes - Reheat Boxes with Steam Coil Mechanical Room / Plenum 3 EA $3,53 Reheat Boxes - Reheat Boxes with Steam Coil Mechanical Room / Plenum EA $,3 Reheat Boxes - Reheat Boxes with Steam Coil Mechanical Room / Plenum 3 EA $3,5 Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / st Floor 50 LF 7 Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 75 LF 7 Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 50 LF 7 Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 00 LF 7 Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 50 LF 7 Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 00 LF 7 Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 75 LF 7 Zone Dampers Mechanical Room 4 EA $3,33 Zone Dampers Mechanical Room 9 EA $7,497 Serves culinary arts. Serves health center. Zone Dampers Mechanical Room 3 EA 4 $4,378 Damaged or missing actuators. Zone Dampers Mechanical Room 7 EA $5,83 Zone Dampers Mechanical Room / Plenum 38 EA $3,55 Zone Dampers Mechanical Room / Plenum 5 EA $4,5 Zone Dampers Mechanical Room / Plenum 37 EA $30,8 Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler HP Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - Greater than 300 HP Boiler Room EA $,545 Boiler Room EA $,99 ROOSEVELT HS Page 8 of Assessment Date: 8/4/5

9 Category: Mechanical System Boiler Systems Gas Booster Boiler Auxiliary- Steam Boiler - Less than 50 HP Mechanical Room EA $,04 Chemical Feed System Boiler Room / Mechanical Room EA $,078 Chemical Feeder Mechanical Room EA $,078 Combustion Dampers Boiler Room 3 EA $,7 Combustion Dampers Boiler Room EA $9 Condensate Pump Boiler Room / Entire Building EA $, Feed Water Pumps and Tank Boiler Room / Mechanical Room EA $,545 Has pumps. () 3 hp and (4) -/ hp. on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler HP on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - Greater than 300 HP on Condensing- Water Tube- Flexible Tube- Force Draft- Steam Boiler - Less than 50 HP Heating Devices Boiler Room Boiler Room Mechanical Room EA $,545 EA $,99 EA $,04 Summer boiler. Shared chemical feed and steam traps with winter boilers. Winter boilers. Serves the greenhouse. Piping - Condensate Pipe- Steel Boiler Room / Entire Building,000 LF 4 $5,5 Many pipe clamps and leaks. Older than years. Piping - Condensate Pipe- Steel Mechanical Room / Entire Building 50 LF $94 Piping - Steam Pipe- Steel Boiler Room / Entire Building,000 LF 4 $588,4 Many pipe clamps and leaks. Older than years. Piping - Steam Pipe- Steel Mechanical Room / Entire Building 50 LF $94 Steam Traps Boiler Room / Entire Building 0 EA 5 $34,0 Steam Traps Mechanical Room / Entire Building 5 EA $,3 Gas Booster Boiler Room 3 EA $,497 Cabinet Heaters - With Steam Coil Entire Building 0 EA $3,5 Fin Tube - Steam Entire Building 450 LF 5 $3,4 Manual control valves. Radiators - Steam Entire Building 3 EA 5 $53,0 Manual control valve. Unit Heater - Gas Boiler Room 3 EA $833 Wall Heater - Electric Entire Building 8 EA $,500 Wall Heater - Electric Entire Building EA 5 $,073 Missing front covers. Temperature Control Unit Ventilation Hybrid Pneumatic/DDC System Entire Building 39,900 SF $88,98 0 was upgrade to hybrid system. Boilers have not been included in upgrade. Thermostats - Pneumatic Entire Building 9 EA Includes unit ventilator thermostats. Thermostats - Pneumatic Entire Building 9 EA 4 $,35 Damaged or missing covers. Unit Ventilators- Floor Mounted- Steam Heating Coils Only Entire Building 4 EA 5 $38,54 Serve central classrooms 0/30 on north facade. ROOSEVELT HS Page 9 of Assessment Date: 8/4/5

10 Category: Mechanical System Ventilation Exhaust Fans- Indoor CFM Entire Building / Attic EA $59 Exhaust Fans- Indoor CFM Entire Building / Mechanical Room EA $59 Exhaust Fans- Indoor - Greater than 8000 CFM Entire Building / Attic EA $59 Belt guard was removed. Exhaust Fans- Roof Mounted CFM Entire Building / Roof EA $,85 Exhaust Fans- Roof Mounted CFM Entire Building / Roof 5 EA $,9 Exhaust Fans- Roof Mounted - Greater than 8000 CFM Entire Building / Roof EA $,85 Exhaust Fans- Roof Mounted - Less than 500 CFM Entire Building / Roof 3 EA $889 Lab Exhaust Hood Entire Building / st Floor EA 4 $4,785 o exhaust connection. Lab Exhaust Hood Entire Building 3 EA $3,743 Roof Mounted Duct Work Entire Building / Roof 0 LF $7,580 Type I Exhaust Hood- Culinary Arts Entire Building / st Floor EA $,48 Type I Exhaust Hood- Kitchen Entire Building / st Floor EA $8,5 o fire suppression system. Type II Exhaust Hood- Warming Kitchen Entire Building / st Floor 3 EA $,70 Mechanical System Subtotal: $,49,55 Building: Main Category: Plumbing System Hot Water Electric Heater KW Entire Building / st Floor EA $8 Dishwasher booster heater. Electric Heater - Less than 0 KW Entire Building / st Floor EA $,34 Dishwasher booster heater. Steam Heat Exchanger Boiler Room EA Domestic hot water. Piping Domestic Piping-Cold Water from Risers to Fixtures Entire Building 39,900 SF $4,044 Domestic Piping-Cold Water Horizontal Lines Entire Building 39,900 SF $77,78 Many clogs are present. Domestic Piping-Cold Water Risers Entire Building 39,900 SF $59,49 Domestic Piping-Hot Water from Risers to Fixtures Entire Building 39,900 SF $50,30 Domestic Piping-Hot Water Horizontal Lines Entire Building 39,900 SF $59,49 Many clogs are present. Domestic Piping-Hot Water Return Lines Entire Building 39,900 SF $45,74 Domestic Piping-Hot Water Return Risers Entire Building 39,900 SF $45,74 Sanitary Piping Entire Building 39,900 SF $9,77 Many clogs are present. Storm Piping Entire Building 39,900 SF $79,049 Vent Piping Entire Building 39,900 SF $5,005 ROOSEVELT HS Page 0 of Assessment Date: 8/4/5

11 Category: Plumbing System Pool Systems Pumps Pool Drain Piping Mechanical Room, Basement / 00 LF $,83 Mechanical Room Pool Filtration System including Pump Mechanical Room, Basement / EA $,330 Mechanical Room Pool Hot Water Heater - Steam Heat Exchanger Mechanical Room, Basement / EA Mechanical Room Pool Supply and Return Piping Mechanical Room, Basement / 300 LF 4 $49,8 Many leaks and multiple piping material types. Pumps - Domestic Booster Pump-Duplex Basement, Boiler Room, Mechanical Room / Mechanical Room EA $,977 Pumps - Sump-Duplex Basement, Boiler Room, Mechanical Room / Basement 5 EA $,935 Pumps - Sump-Duplex Basement, Boiler Room, Mechanical Room / Boiler Room EA 4 $5,749 Located in pit below boilers. Doesn't appear to be working. Inch of standing water in pit above pump cover. Pumps - Sump-Simplex Basement, Boiler Room, Mechanical Room / Basement EA $,490 Elevator sump pumps. Plumbing System Subtotal: $,8,590 Building: Main Category: Classrooms Classroom #0 () AC Units st Floor EA $49 Ceiling - Lay-in st Floor 8 SF $,5 Doors - Transom Window st Floor 7 SF $9 Doors - Wood Doors inclu hw st Floor EA $30 Floor - Tile st Floor 8 SF $893 Lighting - Lay-in st Floor 9 EA 7 Marker Board st Floor LF 7 Walls - Plaster/Drywall st Floor 780 SF $,53 Classroom #08 (Science Lab Level ) Casework st Floor 5 LF 4 $5,994 damaged and old Ceiling - Lay-in st Floor 8 SF $,48 Chalk Board st Floor 4 LF 4 $,03 Doors - Transom Window st Floor 7 SF $9 Doors - Wood Doors inclu hw st Floor EA $30 ROOSEVELT HS Page of Assessment Date: 8/4/5

12 Building: Main Category: Classrooms Classroom #08 (Science Lab Level ) Eye Wash Station st Floor EA $33 Floor - Tile st Floor 8 SF $,798 Gas Line st Floor 4 EA $7,8 Lighting - Lay-in st Floor 4 EA 7 Marker Board st Floor 4 LF 7 Walls - Plaster/Drywall st Floor,5 SF $3,5 Work Sink st Floor 3 EA $,37 Classroom #0 (Science Lab Level ) Casework st Floor 70 LF $,78 Ceiling - Lay-in st Floor,8 SF $3,387 Chalk Board st Floor LF 4 $,0 Doors - Transom Window st Floor 4 SF $37 Doors - Wood Doors inclu hw st Floor EA $0 Eye Wash Station st Floor EA $33 Floor - Tile/Sheet st Floor,8 SF $,9 Fume Hood st Floor EA $8 Lighting - Lay-in st Floor 4 EA 7 Marker Board st Floor LF 7 Science Lab Elements st Floor 9 SF $ Storage/ Closet st Floor 98 SF $7 vault Walls - Plaster/Drywall st Floor,40 SF $3,89 Work Sink st Floor 3 EA $,37 Classroom # () AC Units st Floor EA $99 Casework st Floor LF $78 Ceiling - Lay-in st Floor 70 SF $, Doors - Transom Window st Floor 7 SF $9 Doors - Wood Doors inclu hw st Floor EA $30 Floor - Wood st Floor 70 SF $5,07 Lighting - Lay-in st Floor EA 7 Marker Board st Floor 4 LF 7 Walls - Plaster/Drywall st Floor 990 SF $,73 Classroom # () Casework st Floor LF $78 Ceiling - Lay-in st Floor 70 SF $, Doors - Transom Window st Floor 7 SF $9 ROOSEVELT HS Page of Assessment Date: 8/4/5

13 Building: Main Category: Classrooms Classroom # () Doors - Wood Doors inclu hw st Floor EA $30 Floor - Wood st Floor 70 SF $5,07 Lighting - Lay-in st Floor EA 7 Marker Board st Floor 4 LF 7 Walls - Plaster/Drywall st Floor 990 SF $,73 Classroom #3 () AC Units st Floor EA $99 Casework st Floor 7 LF $8 Ceiling - Lay-in st Floor 70 SF $, Doors - Transom Window st Floor 7 SF $9 Doors - Wood Doors inclu hw st Floor EA $30 Floor - Wood st Floor 70 SF $5,07 Lighting - Lay-in st Floor EA 7 Marker Board st Floor LF 7 Walls - Plaster/Drywall st Floor 990 SF $,73 Classroom #4 () Ceiling - Lay-in st Floor 70 SF $, Doors - Transom Window st Floor 7 SF $9 Doors - Wood Doors inclu hw st Floor EA $30 Floor - Tile st Floor 705 SF $,54 Floor - Tile st Floor 5 SF 4 $95 damaged Lighting - Lay-in st Floor EA 7 Marker Board st Floor 0 LF 7 Walls - Plaster/Drywall st Floor 990 SF $,73 Classroom # (Special Education) Casework st Floor 7 LF $49 Ceiling - Lay-in st Floor 490 SF $,47 Doors - Transom Window st Floor 7 SF $9 Doors - Wood Doors inclu hw st Floor EA $30 Floor - Tile st Floor 470 SF $,08 Floor - Tile st Floor 0 SF 5 $5 damaged Lighting - Lay-in st Floor EA 7 Marker Board st Floor LF 7 Storage/ Closet st Floor 98 SF $7 Walls - Plaster/Drywall st Floor 880 SF $,49 ROOSEVELT HS Page 3 of Assessment Date: 8/4/5

14 Category: Classrooms Classroom #30 (Computer Lab) AC Units st Floor EA $49 Casework st Floor 3 LF $38 Ceiling - Lay-in st Floor 984 SF $,955 Chalk Board st Floor 3 LF 4 $75 Doors - Transom Window st Floor 8 SF $305 Doors - Wood Doors inclu hw st Floor EA $0 Floor - Tile st Floor 984 SF 4 $8,457 in bad condition & old Lighting - Lay-in st Floor 7 EA 7 Marker Board st Floor 30 LF 7 Walls - Plaster/Drywall st Floor,080 SF $,98 Wireless System st Floor EA $37 Classroom #3 (Computer Lab) AC Units st Floor EA $49 Casework st Floor 9 LF $7 Ceiling - Lay-in st Floor,8 SF $3,387 Chalk Board st Floor 4 LF 4 $,85 Doors - Transom Window st Floor 9 SF $5 Doors - Wood Doors inclu hw st Floor EA $30 Floor - Tile st Floor,08 SF $,44 Floor - Tile st Floor 0 SF 5 $5 damaged Lighting - Lay-in st Floor 33 EA 7 Marker Board st Floor 4 LF 7 Walls - Plaster/Drywall st Floor,7 SF $4,74 Wireless System st Floor EA $37 Classroom #44 (Science Lab Level ) Casework st Floor 85 LF $4,7 Ceiling - Lay-in st Floor,03 SF $3,099 Chalk Board st Floor 48 LF 4 $4,7 Doors - Transom Window st Floor 8 SF $305 Doors - Wood Doors inclu hw st Floor EA $0 Eye Wash Station st Floor EA $33 Floor - Tile/Sheet st Floor,03 SF $,033 Gas Line st Floor EA $,08 Lighting - Lay-in st Floor 30 EA 7 Science Lab Elements st Floor 0 SF $8 Storage/ Closet st Floor 80 SF $580 vault ROOSEVELT HS Page 4 of Assessment Date: 8/4/5

15 Building: Main Category: Classrooms Classroom #44 (Science Lab Level ) Walls - Plaster/Drywall st Floor, SF $3,4 Work Sink st Floor 3 EA $,37 Classroom #48 (Science Lab Level ) AC Units st Floor EA $49 Casework st Floor 90 LF $,73 Ceiling - Lay-in st Floor,03 SF $3,099 Chalk Board st Floor LF 4 $,0 Doors - Transom Window st Floor 8 SF $305 Doors - Wood Doors inclu hw st Floor EA $0 Eye Wash Station st Floor EA $33 Floor - Tile/Sheet st Floor,03 SF $,033 Lighting - Lay-in st Floor 30 EA 7 Science Lab Elements st Floor 8 SF $54 Storage/ Closet st Floor 80 SF $580 vault Walls - Plaster/Drywall st Floor, SF $3,4 Work Sink st Floor 3 EA $,37 Classroom #50 (Special Program) Ceiling - Lay-in st Floor 70 SF $, Chalk Board st Floor LF 4 $,49 Doors - Transom Window st Floor 9 SF $5 Doors - Wood Doors inclu hw st Floor EA $30 Floor - Tile st Floor 880 SF $,95 Lighting - Lay-in st Floor EA 7 Marker Board st Floor 4 LF 7 Walls - Plaster/Drywall st Floor 855 SF $,30 Walls - Plaster/Drywall st Floor 5 SF 5 $8 peeling Work Sink st Floor EA $379 Classroom #7 (Other Instructional Use) AC Units st Floor EA $49 Ceiling - Lay-in st Floor,00 SF $4,805 Doors - Transom Window st Floor SF $7 Doors - Wood Doors inclu hw st Floor EA $0 Floor - Tile Quarry st Floor,00 SF $3,38 Lighting - Lay-in st Floor 3 EA 7 Marker Board st Floor LF 7 Storage/ Closet st Floor SF $94 ROOSEVELT HS Page 5 of Assessment Date: 8/4/5

16 Building: Main Category: Classrooms Classroom #7 (Other Instructional Use) Walls - Plaster/Drywall st Floor,005 SF $,774 Walls - Structural Glazed Tile st Floor,005 SF $3, Work Sink st Floor 5 EA $,895 Classroom #8 (Other Instructional Use) Casework st Floor 9 LF $7 Ceiling - Exposed st Floor,00 SF $,380 Doors - Transom Window st Floor 8 SF $305 Doors - Wood Doors inclu hw st Floor EA $0 Floor - Tile st Floor,00 SF $3,50 Lighting - Pendent/Surface st Floor 4 EA 7 Marker Board st Floor LF 7 Storage/ Closet st Floor SF $87 Walls - Plaster/Drywall st Floor,00 SF $5,547 Walls - Structural Glazed Tile st Floor 350 SF $,0 Work Sink st Floor EA $379 Classroom #9 (Other Instructional Use) Ceiling - Lay-in st Floor,80 SF $3,544 Doors - Transom Window st Floor SF $03 Doors - Wood Doors inclu hw st Floor EA $0 Floor - Tile st Floor,80 SF $,58 Lighting - Lay-in st Floor EA 7 Marker Board st Floor LF 7 Walls - Plaster/Drywall st Floor,700 SF $4,9 Walls - Plaster/Drywall st Floor 30 SF 5 $53 damaged Classroom #04 (Music Room) Casework nd Floor 9 LF $,743 Ceiling - Lay-in nd Floor,40 SF $4,4 Chalk Board nd Floor 4 LF 4 $37 Doors - Transom Window nd Floor 7 SF $9 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Tile nd Floor,40 SF $3,07 Lighting - Lay-in nd Floor EA 7 Storage/ Closet nd Floor 30 SF $943 Storage/ Closet nd Floor 5 SF 5 $4 VCT missing Walls - Plaster/Drywall nd Floor,8 SF $5,00 ROOSEVELT HS Page of Assessment Date: 8/4/5

17 Category: Classrooms Classroom #0 (Music Room) AC Units nd Floor EA $99 Casework nd Floor LF $,00 Ceiling - Lay-in nd Floor,0 SF $3,784 Doors - Transom Window nd Floor 7 SF $9 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Tile nd Floor,0 SF $,757 Lighting - Lay-in nd Floor 30 EA 7 Marker Board nd Floor LF 7 Sound Panels nd Floor 500 EA $,0 around top 4' of wall Storage/ Closet nd Floor 73 SF $5,53 Storage Loft 0A & a closet Walls - Structural Glazed Tile nd Floor,57 SF $4,94 Classroom #08 (Science Lab Level ) Casework nd Floor 85 LF $,47 Ceiling - Lay-in nd Floor 9 SF $,75 Doors - Transom Window nd Floor 4 SF $37 Doors - Wood Doors inclu hw nd Floor EA $0 Eye Wash Station nd Floor EA $33 Floor - Tile/Sheet nd Floor 9 SF 4 $8,855 room had a flood & although new sheet flooring was installed, the subfloor is damaged to a point that room is almost un-useable. It could potentially cause a tripping hazard. Gas Line nd Floor 5 EA $,54 Lighting - Lay-in nd Floor EA 7 Marker Board nd Floor 4 LF 7 Science Lab Elements nd Floor 9 SF $ Walls - Plaster/Drywall nd Floor,5 SF $4,73 Work Sink nd Floor 3 EA $,37 Classroom #0 (Science Lab Level ) Casework nd Floor 70 LF $,78 Ceiling - Lay-in nd Floor,47 SF $4,40 Chalk Board nd Floor 4 LF 4 $,03 Doors - Transom Window nd Floor SF $35 Doors - Wood Doors inclu hw nd Floor 3 EA $903 Eye Wash Station nd Floor EA $33 Floor - Tile/Sheet nd Floor 73 SF 4 $8,483 room had a flood. ew sheet flooring was put down, but damaged subfloor needs replacing & the new sheet is lifting already in about / of classroom. (not as bad as Rm 08) ROOSEVELT HS Page 7 of Assessment Date: 8/4/5

18 Category: Classrooms Classroom #0 (Science Lab Level ) Floor - Tile/Sheet nd Floor 73 SF $9 Lighting - Lay-in nd Floor 4 EA 7 Science Lab Elements nd Floor SF $8 student areas ok Science Lab Elements nd Floor SF 4 $,47 instructors area is very old & worn. Walls - Plaster/Drywall nd Floor,980 SF $5,45 Work Sink nd Floor 3 EA $,37 Classroom # () AC Units nd Floor EA $99 Casework nd Floor LF $78 Ceiling - Lay-in nd Floor 70 SF $, Chalk Board nd Floor 8 LF 4 $,53 Doors - Transom Window nd Floor 7 SF $9 Doors - Wood Doors inclu hw nd Floor EA 5 $,74 door operation is sticking Floor - Wood nd Floor 70 SF $5,07 Lighting - Lay-in nd Floor EA 7 Marker Board nd Floor LF 7 Walls - Plaster/Drywall nd Floor 990 SF $,73 Classroom # () Casework nd Floor LF $78 Ceiling - Lay-in nd Floor 70 SF $, Chalk Board nd Floor LF 4 $,00 Doors - Transom Window nd Floor 7 SF $9 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Wood nd Floor 70 SF $5,07 Lighting - Lay-in nd Floor EA 7 Marker Board nd Floor LF 7 Walls - Plaster/Drywall nd Floor 990 SF $,73 Classroom #3 () AC Units nd Floor EA $99 Casework nd Floor LF $78 Ceiling - Lay-in nd Floor 70 SF $, Doors - Transom Window nd Floor 7 SF $9 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Wood nd Floor 70 SF $5,07 Lighting - Lay-in nd Floor EA 7 Marker Board nd Floor LF 7 ROOSEVELT HS Page 8 of Assessment Date: 8/4/5

19 Category: Classrooms Classroom #3 () Walls - Plaster/Drywall nd Floor 5 SF 5 $ peeling paint Walls - Plaster/Drywall nd Floor 985 SF $,79 Classroom #4 () Casework nd Floor LF $78 Ceiling - Lay-in nd Floor 70 SF $, Doors - Transom Window nd Floor 7 SF $9 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Wood nd Floor 70 SF $5,07 Lighting - Lay-in nd Floor EA 7 Marker Board nd Floor LF 7 Walls - Plaster/Drywall nd Floor 990 SF $,73 Classroom # () Casework nd Floor LF $78 Ceiling - Lay-in nd Floor 70 SF $, Doors - Transom Window nd Floor 7 SF $9 Doors - Wood Doors inclu hw nd Floor EA 5 $,74 door operation sticking Floor - Tile nd Floor 70 SF $,575 Lighting - Lay-in nd Floor EA 7 Marker Board nd Floor LF 7 Walls - Plaster/Drywall nd Floor 990 SF $,73 Classroom #7A (Multi Purpose Room) AC Units nd Floor EA $49 Casework nd Floor 7 LF $8 Ceiling - Lay-in nd Floor 789 SF $,39 Doors - Transom Window nd Floor 7 SF $9 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Wood nd Floor 789 SF $5,5 Lighting - Lay-in nd Floor 7 EA 7 Walls - Plaster/Drywall nd Floor,090 SF $3,008 Classroom #7B () AC Units nd Floor EA $49 Casework nd Floor 35 LF $884 Ceiling - Lay-in nd Floor 70 SF $, Doors - Transom Window nd Floor 7 SF $9 Doors - Wood Doors inclu hw nd Floor EA $30 ROOSEVELT HS Page 9 of Assessment Date: 8/4/5

20 Category: Classrooms Classroom #7B () Floor - Wood nd Floor 70 SF $5,07 Lighting - Lay-in nd Floor 7 EA 7 Lighting - Wall Mounted nd Floor EA 5 $9 7 was split into rooms. o call button in 7B. Plus lighting & Thermometer/Supply/Return are shared between 7A & 7B which causes issues. Marker Board nd Floor LF 7 rolling marker boards Walls - Plaster/Drywall nd Floor 990 SF $,73 Classroom #0 (Computer Lab) AC Units nd Floor EA $99 Ceiling - Plaster/Drywall nd Floor,8 SF $4,5 Doors - Wood Doors inclu hw nd Floor EA $0 Floor - Tile nd Floor,8 SF $,5 Lighting - Pendent/Surface nd Floor EA 7 Marker Board nd Floor LF 7 Walls - Plaster/Drywall nd Floor,80 SF $4,37 Wireless System nd Floor EA $37 Classroom # () AC Units nd Floor EA $49 Ceiling - Plaster/Drywall nd Floor 33 SF $,3 Doors - Transom Window nd Floor 7 SF $9 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Tile nd Floor 335 SF $733 Floor - Tile nd Floor SF 5 $ hole in floor Lighting - Pendent/Surface nd Floor 4 EA 7 Marker Board nd Floor 8 LF 7 Walls - Plaster/Drywall nd Floor 770 SF $,5 Classroom #8 () AC Units nd Floor EA $99 Casework nd Floor 9 LF $7 Ceiling - Lay-in nd Floor 70 SF $, Doors - Transom Window nd Floor 9 SF $5 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Wood nd Floor 70 SF $5,07 Lighting - Lay-in nd Floor EA 7 Marker Board nd Floor 0 LF 7 ROOSEVELT HS Page 0 of Assessment Date: 8/4/5

21 Category: Classrooms Classroom #8 () Walls - Plaster/Drywall nd Floor 880 SF $,49 Walls - Plaster/Drywall nd Floor 7 SF 4 $50 water damaged & damaged by desks Classroom #9 () AC Units nd Floor EA $99 Casework nd Floor 9 LF $7 Ceiling - Lay-in nd Floor 70 SF $, Doors - Transom Window nd Floor 9 SF $5 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Wood nd Floor 70 SF $5,07 Lighting - Lay-in nd Floor EA 7 Marker Board nd Floor 3 LF 7 Walls - Plaster/Drywall nd Floor 880 SF $,49 Classroom #30 () AC Units nd Floor EA $99 Casework nd Floor 9 LF $7 Ceiling - Lay-in nd Floor 70 SF $, Doors - Transom Window nd Floor 9 SF $5 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Wood nd Floor 70 SF $5,07 Lighting - Lay-in nd Floor EA 7 Lighting - Wall Mounted nd Floor EA 5 $9 open electrical box, exposed wires Marker Board nd Floor LF 7 Walls - Plaster/Drywall nd Floor 880 SF $,49 Classroom #3 () AC Units nd Floor EA $99 Casework nd Floor 3 LF $38 Ceiling - Lay-in nd Floor,03 SF $3,099 Chalk Board nd Floor 4 LF 4 $37 Doors - Transom Window nd Floor 9 SF $5 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Wood nd Floor,03 SF $7,75 Lighting - Lay-in nd Floor 30 EA 7 Marker Board nd Floor 4 LF 7 Walls - Plaster/Drywall nd Floor, SF $3,4 ROOSEVELT HS Page of Assessment Date: 8/4/5

22 Building: Main Category: Classrooms Classroom #3 () Casework nd Floor 9 LF $7 Ceiling - Lay-in nd Floor 70 SF $, Doors - Transom Window nd Floor 9 SF $5 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Wood nd Floor 70 SF $5,07 Lighting - Lay-in nd Floor EA 7 Marker Board nd Floor 37 LF 7 Walls - Plaster/Drywall nd Floor 880 SF $,49 Classroom #33 () AC Units nd Floor EA $99 Casework nd Floor 9 LF $7 Ceiling - Lay-in nd Floor 70 SF $, Doors - Transom Window nd Floor 9 SF $5 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Wood nd Floor 70 SF 5 $0,533 damaged and cracking throughout Lighting - Lay-in nd Floor EA 7 Marker Board nd Floor 45 LF 7 Walls - Plaster/Drywall nd Floor 880 SF $,49 Classroom #35 () AC Units nd Floor EA $99 Casework nd Floor 9 LF $7 Ceiling - Lay-in nd Floor 70 SF $, Doors - Transom Window nd Floor 9 SF $5 Doors - Wood Doors inclu hw nd Floor EA $30 Floor - Tile nd Floor 70 SF $,575 Lighting - Lay-in nd Floor EA 7 Marker Board nd Floor 35 LF 7 Walls - Plaster/Drywall nd Floor 880 SF $,49 Classroom #44 (Other Instructional Use) AC Units nd Floor EA $99 Casework nd Floor 3 LF $808 Ceiling - Lay-in nd Floor,5 SF $3,799 Doors - Transom Window nd Floor 8 SF $305 Doors - Wood Doors inclu hw nd Floor EA $0 Floor - Tile nd Floor,35 SF $,70 Floor - Tile nd Floor 30 SF 5 $73 damaged tiles ROOSEVELT HS Page of Assessment Date: 8/4/5

23 Building: Main Category: Classrooms Classroom #44 (Other Instructional Use) Lighting - Lay-in nd Floor 33 EA 7 Marker Board nd Floor LF 7 Storage/ Closet nd Floor 50 SF $33 Walls - Plaster/Drywall nd Floor,3 SF $3,98 Work Sink nd Floor EA $379 Classroom #48 () Casework nd Floor LF $57 Ceiling - Lay-in nd Floor 973 SF $,9 Doors - Transom Window nd Floor 8 SF $305 Doors - Wood Doors inclu hw nd Floor EA $0 Floor - Tile nd Floor 973 SF $,9 Lighting - Lay-in nd Floor 7 EA 7 Marker Board nd Floor LF 7 Walls - Plaster/Drywall nd Floor 5 SF 5 $ damaged Walls - Plaster/Drywall nd Floor,075 SF $,97 Work Sink nd Floor EA $379 Classroom #50 () Casework nd Floor 9 LF $73 Ceiling - Lay-in nd Floor 984 SF $,955 Chalk Board nd Floor LF 4 $55 Doors - Transom Window nd Floor 8 SF $305 Doors - Wood Doors inclu hw nd Floor EA $0 Floor - Wood nd Floor 984 SF 5 $4,395 damaged and cracking throughout Lighting - Lay-in nd Floor 7 EA 7 Marker Board nd Floor LF 7 Walls - Plaster/Drywall nd Floor,080 SF $,98 Work Sink nd Floor EA $379 Classroom #30 (Science Lab Level 3) Casework 3rd Floor 50 LF 4 $9,7 old and damaged Ceiling - Lay-in 3rd Floor 9 SF $,75 Chalk Board 3rd Floor 4 LF 4 $,03 Doors - Transom Window 3rd Floor 4 SF $37 Doors - Wood Doors inclu hw 3rd Floor EA $0 Eye Wash Station 3rd Floor EA $33 Floor - Tile/Sheet 3rd Floor 9 SF $97 Gas Line 3rd Floor EA $8,4 ROOSEVELT HS Page 3 of Assessment Date: 8/4/5

24 Category: Classrooms Classroom #30 (Science Lab Level 3) Lighting - Lay-in 3rd Floor 7 EA 7 Science Lab Elements 3rd Floor SF $4 Science Lab Shower 3rd Floor EA $379 Walls - Plaster/Drywall 3rd Floor SF 5 $0 peeling paint Walls - Plaster/Drywall 3rd Floor,03 SF $,848 Work Sink 3rd Floor 7 EA $,53 Classroom #308 (Special Education) Casework 3rd Floor LF $4 Ceiling - Lay-in 3rd Floor 50 SF $,53 Doors - Transom Window 3rd Floor 7 SF $9 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Tile/Sheet 3rd Floor 50 SF $5 Lighting - Lay-in 3rd Floor 5 EA 7 Marker Board 3rd Floor 8 LF 7 Walls - Plaster/Drywall 3rd Floor 885 SF $,443 Work Sink 3rd Floor EA $379 Classroom #30 (Science Lab Level ) Casework 3rd Floor 50 LF 4 $9,7 really old & starting to fail Ceiling - Lay-in 3rd Floor 984 SF $,955 Chalk Board 3rd Floor 30 LF 4 $,754 Doors - Transom Window 3rd Floor 4 SF $37 Doors - Wood Doors inclu hw 3rd Floor EA $0 Eye Wash Station 3rd Floor EA $33 Floor - Tile/Sheet 3rd Floor 984 SF $985 Fume Hood 3rd Floor EA $8 Lighting - Lay-in 3rd Floor 7 EA 7 Science Lab Elements 3rd Floor SF $4 Science Lab Shower 3rd Floor EA $379 Walls - Plaster/Drywall 3rd Floor, SF $3,4 Work Sink 3rd Floor EA $758 Classroom #3 () AC Units 3rd Floor EA $99 Casework 3rd Floor LF $78 Ceiling - Lay-in 3rd Floor 70 SF $, Doors - Transom Window 3rd Floor 4 SF $37 Doors - Wood Doors inclu hw 3rd Floor EA $0 ROOSEVELT HS Page 4 of Assessment Date: 8/4/5

25 Building: Main Category: Classrooms Classroom #3 () Floor - Wood 3rd Floor 70 SF $5,07 Lighting - Lay-in 3rd Floor EA 7 Marker Board 3rd Floor 34 LF 7 Walls - Plaster/Drywall 3rd Floor 990 SF $,73 Classroom #3 () Casework 3rd Floor LF $78 Ceiling - Lay-in 3rd Floor 70 SF $, Chalk Board 3rd Floor 8 LF 4 $,57 Doors - Transom Window 3rd Floor 7 SF $9 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Wood 3rd Floor 70 SF $5,07 Lighting - Lay-in 3rd Floor EA 7 Marker Board 3rd Floor LF 7 Walls - Plaster/Drywall 3rd Floor 990 SF $,73 Classroom #33 () AC Units 3rd Floor EA $99 Casework 3rd Floor LF $78 Ceiling - Lay-in 3rd Floor 70 SF $, Chalk Board 3rd Floor 3 LF 4 $75 Doors - Transom Window 3rd Floor 7 SF $9 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Wood 3rd Floor 70 SF $5,07 Lighting - Lay-in 3rd Floor EA 7 Marker Board 3rd Floor 38 LF 7 Walls - Plaster/Drywall 3rd Floor 990 SF $,73 Classroom #34 () Casework 3rd Floor LF $78 Ceiling - Lay-in 3rd Floor 70 SF $, Doors - Transom Window 3rd Floor 7 SF $9 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Wood 3rd Floor 70 SF $5,07 Lighting - Lay-in 3rd Floor EA 7 Marker Board 3rd Floor LF 7 Walls - Plaster/Drywall 3rd Floor 987 SF $,74 Walls - Plaster/Drywall 3rd Floor 3 SF 5 $5 crack ROOSEVELT HS Page 5 of Assessment Date: 8/4/5

26 Category: Classrooms Classroom #35 () AC Units 3rd Floor EA $99 Casework 3rd Floor 53 LF $,338 Ceiling - Lay-in 3rd Floor 70 SF $, Chalk Board 3rd Floor LF 4 $55 Doors - Transom Window 3rd Floor 7 SF $9 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Tile 3rd Floor 70 SF 5 $3,33 damaged throughout Lighting - Lay-in 3rd Floor EA 7 Marker Board 3rd Floor LF 7 Walls - Plaster/Drywall 3rd Floor 990 SF $,73 Classroom #3 () Casework 3rd Floor LF $78 Ceiling - Lay-in 3rd Floor 70 SF $, Chalk Board 3rd Floor 0 LF 4 $,83 Doors - Transom Window 3rd Floor 7 SF $9 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Tile 3rd Floor SF 5 $9 damaged Floor - Tile 3rd Floor 708 SF $,549 Lighting - Lay-in 3rd Floor EA 7 Marker Board 3rd Floor 4 LF 7 Walls - Plaster/Drywall 3rd Floor 990 SF $,73 Classroom #37 () AC Units 3rd Floor EA $49 Casework 3rd Floor 3 LF $38 Ceiling - Lay-in 3rd Floor 909 SF $,730 Doors - Transom Window 3rd Floor 4 SF $37 Doors - Wood Doors inclu hw 3rd Floor EA $0 Floor - Wood 3rd Floor 909 SF 4 $,309 really old & buckling throughout Lighting - Lay-in 3rd Floor 7 EA 7 Marker Board 3rd Floor 4 LF 7 Walls - Plaster/Drywall 3rd Floor,05 SF $3,3 Walls - Plaster/Drywall 3rd Floor 5 SF 5 $ damaged Work Sink 3rd Floor EA $379 Classroom #38 () Ceiling - Lay-in 3rd Floor 4 SF $,874 Chalk Board 3rd Floor 8 LF 4 $,53 ROOSEVELT HS Page of Assessment Date: 8/4/5

27 Category: Classrooms Classroom #38 () Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Wood 3rd Floor 4 SF $4,399 Lighting - Lay-in 3rd Floor 5 EA 7 Marker Board 3rd Floor 4 LF 7 Storage/ Closet 3rd Floor SF $44 Walls - Plaster/Drywall 3rd Floor 980 SF $,705 Walls - Plaster/Drywall 3rd Floor 0 SF 5 $5 efflorescence Classroom #39 () AC Units 3rd Floor EA $49 Casework 3rd Floor 7 LF $8 Ceiling - Lay-in 3rd Floor,03 SF $3,099 Doors - Transom Window 3rd Floor 4 SF $37 Doors - Wood Doors inclu hw 3rd Floor EA $0 Floor - Wood 3rd Floor,03 SF $7,75 Lighting - Lay-in 3rd Floor 7 EA 7 Marker Board 3rd Floor 4 LF 7 Walls - Plaster/Drywall 3rd Floor,30 SF $3,43 Classroom #30 () AC Units 3rd Floor EA $99 Ceiling - Plaster/Drywall 3rd Floor,5 SF $4,39 Doors - Wood Doors inclu hw 3rd Floor EA $0 Floor - Tile 3rd Floor,5 SF $,80 Floor - Tile 3rd Floor SF 5 $ damaged Lighting - Pendent/Surface 3rd Floor EA 7 Walls - Plaster/Drywall 3rd Floor,575 SF $4,347 Classroom #33 () AC Units 3rd Floor EA $99 Casework 3rd Floor 3 LF $38 Ceiling - Lay-in 3rd Floor,03 SF $3,099 Chalk Board 3rd Floor LF 4 $,387 Doors - Transom Window 3rd Floor 4 SF $37 Doors - Wood Doors inclu hw 3rd Floor EA $0 Floor - Wood 3rd Floor,03 SF $7,75 Lighting - Lay-in 3rd Floor 7 EA 7 Marker Board 3rd Floor LF 7 Walls - Plaster/Drywall 3rd Floor,30 SF $3,43 ROOSEVELT HS Page 7 of Assessment Date: 8/4/5

28 Building: Main Category: Classrooms Classroom #33 () Work Sink 3rd Floor EA $379 Classroom #3 () Casework 3rd Floor 8 LF $0 Ceiling - Lay-in 3rd Floor 70 SF $, Doors - Transom Window 3rd Floor 7 SF $9 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Wood 3rd Floor 70 SF $5,07 Lighting - Lay-in 3rd Floor 8 EA 7 Marker Board 3rd Floor 44 LF 7 Walls - Plaster/Drywall 3rd Floor 990 SF $,73 includes small area of wood wainscott Classroom #38 () Casework 3rd Floor 9 LF $7 Ceiling - Lay-in 3rd Floor 70 SF $, Chalk Board 3rd Floor 3 LF 4 $,84 Doors - Transom Window 3rd Floor 9 SF $5 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Wood 3rd Floor 70 SF $5,07 Lighting - Lay-in 3rd Floor EA 7 Marker Board 3rd Floor 0 LF 7 Walls - Plaster/Drywall 3rd Floor 80 SF $,374 Walls - Plaster/Drywall 3rd Floor 0 SF $77 damaged Classroom #39 (Computer Lab) AC Units 3rd Floor EA $99 Ceiling - Lay-in 3rd Floor,03 SF $3,099 Doors - Transom Window 3rd Floor 8 SF $305 Doors - Wood Doors inclu hw 3rd Floor EA $0 Floor - Wood 3rd Floor,03 SF $7,75 Lighting - Lay-in 3rd Floor 30 EA 7 Marker Board 3rd Floor 8 LF 7 Walls - Plaster/Drywall 3rd Floor, SF $3,4 Wireless System 3rd Floor EA $37 Classroom #330 () Casework 3rd Floor 9 LF $7 Ceiling - Lay-in 3rd Floor 70 SF $, Chalk Board 3rd Floor 3 LF 4 $,84 ROOSEVELT HS Page 8 of Assessment Date: 8/4/5

29 Building: Main Category: Classrooms Classroom #330 () Doors - Transom Window 3rd Floor 9 SF $5 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Wood 3rd Floor 70 SF $5,07 Lighting - Lay-in 3rd Floor EA 7 Marker Board 3rd Floor 0 LF 7 Walls - Plaster/Drywall 3rd Floor 70 SF $,987 Classroom #33 () AC Units 3rd Floor EA $99 Casework 3rd Floor 3 LF $38 Ceiling - Lay-in 3rd Floor,03 SF $3,099 Doors - Transom Window 3rd Floor 9 SF $5 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Wood 3rd Floor,03 SF $7,75 Lighting - Lay-in 3rd Floor 30 EA 7 Marker Board 3rd Floor 4 LF 7 Walls - Plaster/Drywall 3rd Floor,09 SF $3,05 Walls - Plaster/Drywall 3rd Floor 44 SF 5 $5 damaged Classroom #33 () Casework 3rd Floor 9 LF $7 Ceiling - Lay-in 3rd Floor 70 SF $, Chalk Board 3rd Floor LF 4 $,98 Doors - Transom Window 3rd Floor 9 SF $5 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Wood 3rd Floor 70 SF $5,07 Lighting - Lay-in 3rd Floor EA 7 Marker Board 3rd Floor 3 LF 7 Walls - Plaster/Drywall 3rd Floor 880 SF $,49 Classroom #333 (Other Instructional Use) AC Units 3rd Floor EA $99 Casework 3rd Floor 4 LF $354 Ceiling - Lay-in 3rd Floor 70 SF $, Doors - Transom Window 3rd Floor 9 SF $5 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Tile/Sheet 3rd Floor 70 SF $7 Lighting - Lay-in 3rd Floor EA 7 Marker Board 3rd Floor 0 LF 7 ROOSEVELT HS Page 9 of Assessment Date: 8/4/5

30 Category: Classrooms Classroom #333 (Other Instructional Use) Storage/ Closet 3rd Floor 3 SF $457 Walls - Plaster/Drywall 3rd Floor 880 SF $,49 Walls - Plaster/Drywall 3rd Floor 5 SF 4 $74 water damaged Work Sink 3rd Floor EA $758 Classroom #335 () AC Units 3rd Floor EA $99 Casework 3rd Floor 9 LF $7 Ceiling - Lay-in 3rd Floor 70 SF $, Doors - Transom Window 3rd Floor 9 SF $5 Doors - Wood Doors inclu hw 3rd Floor EA $30 Floor - Tile 3rd Floor 70 SF $,575 Lighting - Lay-in 3rd Floor EA 7 Marker Board 3rd Floor 0 LF 7 Walls - Plaster/Drywall 3rd Floor 80 SF $,3 Walls - Plaster/Drywall 3rd Floor 0 SF 5 $30 damaged drywall Classroom #344 (Art Room) Casework 3rd Floor 35 LF $884 Ceiling - Lay-in 3rd Floor 984 SF $,955 Chalk Board 3rd Floor 8 LF 4 $,53 Doors - Transom Window 3rd Floor 8 SF $305 Doors - Wood Doors inclu hw 3rd Floor EA $0 Floor - Wood 3rd Floor 984 SF $,937 Instructional Surface 3rd Floor LF $539 Lighting - Lay-in 3rd Floor 7 EA 7 Marker Board 3rd Floor 0 LF 7 Walls - Plaster/Drywall 3rd Floor,080 SF $,98 Work Sink 3rd Floor EA $758 Classroom #348 (Science Lab Level 3) Casework 3rd Floor 00 LF $,55 Ceiling - Lay-in 3rd Floor 984 SF $,955 Doors - Transom Window 3rd Floor 8 SF $305 Doors - Wood Doors inclu hw 3rd Floor EA $0 Eye Wash Station 3rd Floor EA $33 Floor - Tile/Sheet 3rd Floor 984 SF $985 Fume Hood 3rd Floor EA $8 Gas Line 3rd Floor EA $5,00 ROOSEVELT HS Page 30 of Assessment Date: 8/4/5

31 Building: Main Category: Classrooms Classroom #348 (Science Lab Level 3) Lighting - Lay-in 3rd Floor 5 EA 7 Marker Board 3rd Floor 0 LF 7 Science Lab Elements 3rd Floor 3 SF $7 Science Lab Shower 3rd Floor EA $379 Walls - Plaster/Drywall 3rd Floor,080 SF $,98 Work Sink 3rd Floor 0 EA $3,790 Classroom #350 () Casework 3rd Floor 37 LF $934 Ceiling - Lay-in 3rd Floor 984 SF $,955 Chalk Board 3rd Floor 3 LF 4 $75 Doors - Transom Window 3rd Floor 8 SF $305 Doors - Wood Doors inclu hw 3rd Floor EA $0 Floor - Wood 3rd Floor 984 SF $,937 Lighting - Lay-in 3rd Floor 7 EA 7 Marker Board 3rd Floor LF 7 Walls - Plaster/Drywall 3rd Floor,080 SF $,98 Work Sink 3rd Floor EA $758 Classrooms Subtotal: $,043,30 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices AC Unit st Flr- Asst Engineer Office EA $49 Ceiling - Plaster/Drywall st Flr- Asst Engineer Office 00 SF $,07 Doors - Wood Doors inclu hw st Flr- Asst Engineer Office EA $30 Floor - Concrete Epoxy/ Painted st Flr- Asst Engineer Office 00 SF $37 Lighting - Pendent/Surface st Flr- Asst Engineer Office EA 7 Power Distribution st Flr- Asst Engineer Office EA 7 Walls - Plaster/Drywall st Flr- Asst Engineer Office,79 SF $4,34 AC Unit st Flr- Engineer Office EA $49 Ceiling - Plaster/Drywall st Flr- Engineer Office 00 SF $,07 Doors - Wood Doors inclu hw st Flr- Engineer Office EA $30 Floor - Tile st Flr- Engineer Office 00 SF $,33 Lighting - Pendent/Surface st Flr- Engineer Office EA 7 ROOSEVELT HS Page 3 of Assessment Date: 8/4/5

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS Facility Assessment Report Co-locating on this campus are MARIE MILITAR HS and PHOEIX MILITAR HS This report contains the detailed findings of a facility assessment completed on the date noted in the document

More information

John F Kennedy High School 6325 W 56th St Chicago, IL Co-locating on this campus are KENNEDY HS and KINZIE

John F Kennedy High School 6325 W 56th St Chicago, IL Co-locating on this campus are KENNEDY HS and KINZIE Facility Assessment Report 6325 W 56th St Chicago, IL 6638 Co-locating on this campus are KEED HS and KIZIE This report contains the detailed findings of a facility assessment completed on the date noted

More information

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

Emil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619

Emil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628 11411 S Eggleston Ave Chicago, IL 6628 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors

More information

Charles Kozminski Elementary Community Academy

Charles Kozminski Elementary Community Academy Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Salmon P Chase Elementary School 2021 N Point St Chicago, IL 60647

Salmon P Chase Elementary School 2021 N Point St Chicago, IL 60647 221 Point St Chicago, IL 47 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each

More information

William Howard Taft High School

William Howard Taft High School Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live! U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or

More information

CUMBERLAND SCHOOLS WORK PROPOSED 2018

CUMBERLAND SCHOOLS WORK PROPOSED 2018 Cost Ashton Elementary School 2 2 Replace HVAC $ 375,000.00 5 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 2 3 Various Technological Improvements $ 191,258.00 2 4 Replace Plumbing Fixtures

More information

Tiny House on Wheels A Tiny House

Tiny House on Wheels A Tiny House TINY HOUSES November 2018 The term Tiny House means different things to different people. Some people use the term to refer to a Tiny House on Wheels while others refer to a smaller version of a detached

More information

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS A 2008 City Code amendment requires the owners of all rental dwelling units in the city to have a certificate of occupancy (CO) before

More information

3435 MAIN 3435 Main Street Kansas City, MO RESTAURANT SPACE Available for Lease 1. BUILDING LOCATION

3435 MAIN 3435 Main Street Kansas City, MO RESTAURANT SPACE Available for Lease 1. BUILDING LOCATION 1. BUILDING LOCATION E. 34TH TERRACE MAIN STREET ARMOUR BLVD, at the corner of Main and 34th Terrace Restaurant Space - 2,238 SF, with 38 LF of Main Street frontage - On-site parking - Accomodation for

More information

TENANT DESIGN MANUAL UPDATED DECEMBER 2018

TENANT DESIGN MANUAL UPDATED DECEMBER 2018 TENANT DESIGN MANUAL UPDATED DECEMBER 2018 PROJECT OVERVIEW South Hills Village is located at US 19 (Washington Road) and Ft. Couch Road, in the Bethel Park suburb of Pittsburgh. 2 PROJECT OVERVIEW Anchored

More information

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015 TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Solomon Pond Mall is a two-level super-regional mall located on Donald J. Lynch Boulevard, just off I-290 and I- 495, in Marlborough. The mall opened

More information

TENANT DESIGN MANUAL UPDATED JULY 2016

TENANT DESIGN MANUAL UPDATED JULY 2016 TENANT DESIGN MANUAL UPDATED JULY 2016 PROJECT OVERVIEW South Shore Plaza is located at the intersection of Route 3 and I-93 in Braintree, MA. It is approximately 10 miles from historic downtown Boston

More information

Attic Floor Bedrooms 1 & 2 Family Dwellings

Attic Floor Bedrooms 1 & 2 Family Dwellings Habitable Room Definition (2015 MN Residential Code R202) A space in a building for living, sleeping, eating or cooking is considered a habitable space. Bathrooms, toilet rooms, closets, halls, storage

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: R. F. WAGNER SEC SCL ARTS & TECH-Q, 47-07 30TH PLACE, New York, 11101 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-16

More information

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015 TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Northshore Mall is located at the intersection of Routes 114 and 128, just minutes from major thoroughfares US 1 and I-95. 2 PROJECT OVERVIEW As

More information

HOUSING CODE CHECKLIST FOR RENTAL INSPECTIONS

HOUSING CODE CHECKLIST FOR RENTAL INSPECTIONS HOUSING CODE CHECKLIST FOR RENTAL INSPECTIONS GENERAL 410.200 Heating facilities must be fully operational and well maintained with facilities capable of heating every room (including bathroom and kitchen).

More information

TENANT DESIGN MANUAL UPDATED MAY 2016

TENANT DESIGN MANUAL UPDATED MAY 2016 TENANT DESIGN MANUAL UPDATED MAY 2016 PROJECT OVERVIEW Burlington Mall is located along I-95 at the Middlesex Turnpike Intersection in Burlington, Massachusetts. It is 12 miles northwest of downtown Boston

More information

Fee Resolution

Fee Resolution Fee Resolution 2016-6 A resolution establishing fees for the filing of applications, permits and licenses for the Township of Leet. WHEREAS, the Board of Commissioners of the Township of Leet has adopted

More information

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00 City of Huntington Beach Department of Community Development BUILDING PERMIT FEES 2000 Main Street, Huntington Beach, CA 92648 Office: Fax: (714) 374-1647 Permit Processing Charge Flat fee @ Permit or

More information

Sr. No This option is applicable for Options Remarks / Details required

Sr. No This option is applicable for Options Remarks / Details required SDIL/MOD/1 26 th February, 2012 Dear Customers, This letter is being written to all of you to give the details on the modifications that are possible in the 2 BHK Flats (Apartments) that you have booked

More information

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017 TENANT DESIGN MANUAL UPDATED FEBRUARY 2017 PROJECT OVERVIEW Montgomery Mall is located at the intersection of US 202 and SR 309 in the heart of Philadelphia s affluent northern suburbs. 2 PROJECT OVERVIEW

More information

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION City of Oregon City Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION 1.1 Building - Plan Review 1.1.01 Building Plan Review 65% of building permit fee 1.1.02

More information

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015 TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW Santa Rosa Plaza is located on US 101, between College Avenue and State Road 12, in Santa Rosa, just 55 miles north of San Francisco, in the heart

More information

TENANT DESIGN MANUAL UPDATED JANUARY 2016

TENANT DESIGN MANUAL UPDATED JANUARY 2016 TENANT DESIGN MANUAL UPDATED JANUARY 2016 PROJECT OVERVIEW College Mall is located in Bloomington, Indiana and is the only regional mall in the market. It is home to Indiana University s flagship campus

More information

The Promenade at Casa Grande 1005 N Promenade Pkwy Casa Grande, AZ 85294

The Promenade at Casa Grande 1005 N Promenade Pkwy Casa Grande, AZ 85294 ADDENDUM LOG August, 2011 Manual generated September, 2011 Waterproof membrane requirement updated March, 2014 Distribution of utilities through exit corridors is prohibited with exception (t11) October,

More information

TOWN CENTER Property Description 2000 Tower Town Center 2000 Tower Overview Completed in 1986, the 2000 Tower at Town Center has one of its most striking entry lobbies. The polished granite lobby is two

More information

HOME INVESTMENTS PARTNERSHIP PROGRAM Local Housing Standards Checklist

HOME INVESTMENTS PARTNERSHIP PROGRAM Local Housing Standards Checklist : Initial Inspection Annual Inspection Re-Inspection Pass Tenant Name: Address: Number of Bedrooms: Build : Housing Type: Single Family Residence Duplex Low Rise(2-4 stories) High Rise(5 or More Stories)

More information

TECHNICAL CRITERIA ARROWHEAD TOWNE CENTER THE PLACE TO SHOP

TECHNICAL CRITERIA ARROWHEAD TOWNE CENTER THE PLACE TO SHOP TECHNICAL CRITERIA THE PLACE TO SHOP ADDENDUM LOG May, 2009 TCM Generated/Layout Updated June, 2009 Updated with TC comments September, 2011 Waterproof membrane requirement updated February, 2012 Updated

More information

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE A listing of fees associated with Building, Plumbing, Mechanical and Electrical Permits issued by Lane County Land Management Division Effective

More information

14400 Bear Valley Road, Victorville, CA 92392

14400 Bear Valley Road, Victorville, CA 92392 ADDENDUM LOG January, 2008 Entire Criteria Manual January, 2009 Full update March, 2009 Contact revisions/additions July, 2009 Revised full update June, 2011 Plumbing content updated to include Seismic

More information

TENANT DESIGN MANUAL UPDATED JUNE 2016

TENANT DESIGN MANUAL UPDATED JUNE 2016 TENANT DESIGN MANUAL UPDATED JUNE 2016 PROJECT OVERVIEW The Shops at Chestnut Hills is located is located along State Route 9 (Boylston Street) and Hammond Pond Parkway in the heart of Chestnut Hills.

More information

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015 TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW Sawgrass Mills is located on the Sawgrass Expressway (SR 869) just west of Ft. Lauderdale, FL. The center is less than 30 minutes from both Boca

More information

TENANT DESIGN MANUAL UPDATED OCTOBER 2016

TENANT DESIGN MANUAL UPDATED OCTOBER 2016 TENANT DESIGN MANUAL UPDATED OCTOBER 2016 PROJECT OVERVIEW Conveniently located just off US 65 (Glenstone Avenue) and just five miles south of I-44, Battlefield Mall is perfectly positioned to serve the

More information

New Hope-Solebury School District Campus Revitalization Plan

New Hope-Solebury School District Campus Revitalization Plan Campus Revitalization Plan 20 January 2016 GODSHALL KANE O ROURKE ARCHITECTS, LLC 12 East Butler Avenue, Suite 205, Ambler, PA 19002 T: 215.646.2003 F: 215.646.5707 www.gkoarchitects.com Site Rendering

More information

San Tan Village 2218 E. Williams Field Rd. #235, Gilbert, AZ 85295

San Tan Village 2218 E. Williams Field Rd. #235, Gilbert, AZ 85295 ADDENDUM LOG December, 2009 Updated to current layout January, 2010 Revised per TC AVP Comments September, 2011 Waterproof membrane requirement updated March, 2014 Distribution of utilities through exit

More information

CHAPTER 1321 Permit and Inspection Fees

CHAPTER 1321 Permit and Inspection Fees CHAPTER 1321 Permit and Inspection Fees 1321.01 General building permit fees. 1321.02 Heating, ventilating, air conditioning and refrigeration permit fees. 1321.03 Plumbing and sewer permit fees. 1321.04

More information

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015 TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Castleton Square is located on East 82 nd Street and is adjacent to both I-465 and I-69 on the northeast side of Indianapolis. It also serves the

More information

M001 EAGLECREST LEARNING CENTER CITY & BOROUGH OF JUNEAU. Inc. CBJ CONTRACT No. E SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE

M001 EAGLECREST LEARNING CENTER CITY & BOROUGH OF JUNEAU. Inc. CBJ CONTRACT No. E SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE PLUMBING CONNECTION SCHEDULE PUMP SCHEDULE SHEET LIST SYMBOLS & SCHEDULE FILE: 303 M00 FLOWSETTER AND AUTOMATIC VALVE SCHEDULE CODE NOTES:

More information

TENANT DESIGN MANUAL UPDATED AUGUST 2015

TENANT DESIGN MANUAL UPDATED AUGUST 2015 TENANT DESIGN MANUAL UPDATED AUGUST 2015 PROJECT OVERVIEW JCPenny Nordstrom Macy s Lord & Taylor Sears WOODFIELD MALL 2 PROJECT OVERVIEW The largest shopping center in the state of Illinois and one of

More information

320 Bay Street TORONTO ONTARIO. Tracy Macdonald Vice President,

320 Bay Street TORONTO ONTARIO. Tracy Macdonald Vice President, 320 Bay Street TORONTO ONTARIO LEASING 5 154 SF - OCCUP 320 BAY STREET In 1992, after many years of research into the correct fixtures and materials of the original construction era, the restoration of

More information

Shoreview Corporate Center

Shoreview Corporate Center Table of Contents Section Page # Property Overview Executive Summary 4 Property Description 4 Area Map 5 Aerial Photograph Area 6 Aerial Photograph Property 7 Campus Map 8 1005 Gramsie Building Physical

More information

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, 2014 COMMERCIAL FEES Minimum Fee $120.00 - unless stated otherwise 1 Churches and Schools IBC Use Groups A-3 and E.15 cents per

More information

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015 TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW St. Charles Towne Center is a two-level super-regional mall located at the intersection of Smallwood Drive and US 301, in Waldorf, Maryland, just

More information

ADAPTABLE DESIGN GUIDELINES

ADAPTABLE DESIGN GUIDELINES ADAPTABLE DESIGN GUIDELINES Adaptable design creates liveable residences for a wider range of persons than current building codes require. By considering design features that can be easily and inexpensively

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: DIV. OF INSTR. & INFO. TECH.-K, 335 ADAMS STREET, New York, 11201 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-17 8:05

More information

ACCESSORY DWELLING UNITS

ACCESSORY DWELLING UNITS ACCESSORY DWELLING UNITS Category: Residential Construction Revised: [Paul L. Scarlett], Director Responsible Bureau Sections: Development Services Center 1900 SW Fourth Avenue Portland, OR 97201 503-823-7310

More information

ACCESSORY DWELLING UNITS

ACCESSORY DWELLING UNITS ACCESSORY DWELLING UNITS Category: Residential Construction Revised: [Paul L. Scarlett], Director Responsible Bureau Sections: Development Services Center 1900 SW Fourth Avenue Portland, OR 97201 503-823-7310

More information

Feelwood Village. Baabdat. Technical specifications for the buildings on lots # 569 & Baabdat

Feelwood Village. Baabdat. Technical specifications for the buildings on lots # 569 & Baabdat Feelwood Village Baabdat Technical specifications for the buildings on lots # 569 & 3208 - Baabdat Public services of the project will include: Technical building equipped with computer(s) for services

More information

City of Wausau Building, Housing and Zoning Fee Schedule 2019

City of Wausau Building, Housing and Zoning Fee Schedule 2019 ONE- AND TWO-FAMILY: Plan Review New one- and two-family dwellings Additions and alterations to one- and two-family dwellings (not including garages) 500 sq. ft. or less Over 500 sq. ft. New accessory

More information

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE A listing of fees associated with Building, Plumbing, Mechanical and Electrical Permits issued by Lane County Land Management Division Effective

More information

Property Details 916 Youngs Road

Property Details 916 Youngs Road Property Details 916 Youngs Road PRINCIPAL RESIDENCE o 4 bedrooms, 4 bathrooms, plus 2 half baths Master Suite 1100 sq ft master suite Master Closets His & Hers separate walk-in closets with Custom built-ins

More information

Renovation Progress. July 21 Aug 3, Week 42 & 43

Renovation Progress. July 21 Aug 3, Week 42 & 43 Renovation Progress July 21 Aug 3, 2012 Week 42 & 43 Jul 21 Saturday work: hardwood sanding on 2nd Ottilia and masonry outside BSRC dining room Jul 23 Carpet removal outside of chapel Jul 23 2 nd Ottilia

More information

Janet Campbell Howard Hanna Real Estate Services. 85 South Union Street Main Line: (585) Spencerport NY Office Fax: (585)

Janet Campbell Howard Hanna Real Estate Services. 85 South Union Street Main Line: (585) Spencerport NY Office Fax: (585) Quality Built Homes By: Iuppa Homes Inc. Rich Iuppa Builder & Howard Hanna Real Estate Services Spencerport Office Janet Campbell Broker Associate Office: (585)-352-8524 Cell: (585)-739-8065 Subdivision

More information

Investigation Reference No. Investigation Status. Investigation Description

Investigation Reference No. Investigation Status. Investigation Description IBMS Reports MLS Building Audit Program - Details Property Address : 4 ADANAC DR Legal Description: PLAN 84 PT BLK A PLAN 49 LOT TO 8 PT LOT TO 6PT Roll : 99 Building : 4 ADANAC DR Report : Building Audit

More information

th Street Boulder CO 80301

th Street Boulder CO 80301 1600 28th Street Boulder CO 80301 ADDENDUM LOG August, 2009 Criteria Manual Series updated via current template September, 2011 Waterproof membrane requirement updated March, 2014 Distribution of utilities

More information

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015 TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Cape Cod Mall is located on Route 132 in Hyannis, the largest of seven towns in Cape Cod, MA. Hyannis is known as the Capitol of the Cape. 2 PROJECT

More information

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015 TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015 Ordinance- To adjust the building, mechanical, plumbing and gasfitting, and electrical permit fees and to make other conforming changes. BE IT ORDAINED

More information

Beirut East Gate is a residential and commercial project majestically rising on the shoulder of a beautiful hill

Beirut East Gate is a residential and commercial project majestically rising on the shoulder of a beautiful hill Dear Sir, Beirut East Gate is a residential and commercial project majestically rising on the shoulder of a beautiful hill cliff coasting Baabda Damascus International Highway and overlooking the fabulous

More information

General Information RETAIL AND RESTAURANT

General Information RETAIL AND RESTAURANT General Information RETAIL AND RESTAURANT Landlord s Tenant Coordinator The role of the Tenant Coordinator is to serve as liaison between Landlord and the Tenant, Tenant's architect and Tenant's contractor.

More information

Graduate & Family Housing Master Plan

Graduate & Family Housing Master Plan Graduate & Family Housing Master Plan University of Missouri - Columbia Project Number 400951 June 11, 2008 Prepared by Table of Contents 1 Executive Summary Introduction Recommended Plan Report Structure

More information

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT APPENDIX XII FEES Commission September 12, 2007 Appeal Council April 2, 2009 Building Department Commission October 10, 2007 Zoning Commission April, 13, 2005 Subdivision History: Subdivision Fees: 10/10/1996

More information

APPENDIX A BUILDING PERMIT AND RELATED FEES

APPENDIX A BUILDING PERMIT AND RELATED FEES APPENDIX A BUILDING PERMIT AND RELATED FEES Nothing contained herein shall relieve any person of the responsibility for obtaining any permits and paying any other fees which may be required by other codes

More information

Residencial Cármenes Balcón de Granada c/ Zahareña (Barranco del Abogado),

Residencial Cármenes Balcón de Granada c/ Zahareña (Barranco del Abogado), Look through your new window Balcón de Granada is a proposal to appreciatte the beauty of one of the most wonderful landscapes of the world. In "Inmobiliaria Osuna" we want to keep the tradition of thhe

More information

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015 TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Mall of Georgia is located on SR 20 (Buford Drive) in the Mill Creek District of Gwinnett County, Georgia. It is 30 miles northeast of Atlanta. 2

More information

INFO-PACK. Knight s Court Info Pack Page 1

INFO-PACK. Knight s Court Info Pack Page 1 INFO-PACK Knight s Court Info Pack Page 1 LIST OF CONTENTS 1) Product Brief: 3-4 2) Specifications: 5-6 3) Price List: 7-10 Knight s Court Info Pack Page 2 Location: PRODUCT BRIEF Sector 128, Noida. Positioning:

More information

THE TEN AT LAKE FORREST. FROM THE $850's

THE TEN AT LAKE FORREST. FROM THE $850's FROM THE $850's THE TEN AT LAKE FORREST Fabulous custom Brownstones by Sheehan Built Homes in Sandy Springs gated community. Elegantly appointed with finest finishes! Gourmet Kitchen with quartz counters,

More information

Tenant Design Criteria Section t Technical Criteria Updated: August Wilton Mall at Saratoga 3065 Route 50, Saratoga Springs, NY 12866

Tenant Design Criteria Section t Technical Criteria Updated: August Wilton Mall at Saratoga 3065 Route 50, Saratoga Springs, NY 12866 Wilton Mall at Saratoga TABLE OF CONTENTS TECHNICAL CRITERIA Electric / Water Sub-meter Requirements t3 Wilton Mall at Saratoga ADDEMDUM August, 2016 Added information regarding all sanitary lines must

More information

TENANT DESIGN MANUAL UPDATED AUGUST 2016

TENANT DESIGN MANUAL UPDATED AUGUST 2016 TENANT DESIGN MANUAL UPDATED AUGUST 2016 PROJECT OVERVIEW Ingram Park Mall is located in the northwest suburbs of San Antonio, Texas, the seventh largest city in the United States. The center is strategically

More information

1513 & 1515 Greenleaf Street Evanston, IL Karla Thomas & Lina Zoraikat

1513 & 1515 Greenleaf Street Evanston, IL Karla Thomas & Lina Zoraikat 1513 & 1515 Greenleaf Street Evanston, IL 60202 2 New Construction Homes with Live/Work Flexibility Karla Thomas & Lina Zoraikat Cell 773.505.1121 or 312.721.8554 Email karla.thomas@urb2burb.com www.urb2burb.com

More information

Residencial El Prado - "Viviendas desde *. Plaza y Trastero Incluido" Ensanche de Vallecas (caseta nº 1)

Residencial El Prado - Viviendas desde *. Plaza y Trastero Incluido Ensanche de Vallecas (caseta nº 1) A NEW CITY IN MADRID El Prado residential complex is located in Madrid, in a new area that will soon be considered as one of the most important residential areas in the autonomous community, the place

More information

BUILDING PERMIT FEE ESTIMATE

BUILDING PERMIT FEE ESTIMATE BUILDING PERMIT FEE ESTIMATE CONSTRUCTION COSTS $ TYPE OF IMPROVEMENT [ ] New [ ] Addition [ ] Alteration [ ] Repair [ ] Replace [ ] Demolition [ ] Change of Occupancy: FROM TO Structure Type: [ ] Commercial

More information

TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045

TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045 TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION 9123 Route 108, Old Annapolis Road Columbia, MD 21045 RETAIL/OFFICE/MEDICAL/EXECUTIVE SUITES OFFERED FOR LEASE PROPERTY IDENTIFICATION: ADDRESS:

More information

TECHINICAL CRITERIA DEPTFORD MALL THE PLACE TO SHOP

TECHINICAL CRITERIA DEPTFORD MALL THE PLACE TO SHOP TECHINICAL CRITERIA THE PLACE TO SHOP TABLE OF CONTENTS PLEASE VISIT WWW.MACERICH.COM TO VIEW PLAN SUBMITTAL & APPROVAL PROCEDURES and CONTRACTOR RULES & REGULATIONS TECHNICAL CRITERIA Electric / Water

More information

SOUTHLAKE MALL. Southlake Mall Tenant Design & Construction Criteria TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

SOUTHLAKE MALL. Southlake Mall Tenant Design & Construction Criteria TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS SOUTHLAKE MALL TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS 1 TABLE OF CONTENTS 1.0 PROPERTY INTRODUCTION...3 1.1 Base Building Information 1.2 Contact Information 1.3 Vicinity

More information

1. PRESENTATION OF THE PROJECT

1. PRESENTATION OF THE PROJECT 1. PRESENTATION OF THE PROJECT Luxury chalets - Alpe d Huez LOCATION The project is located at the highest point of the Alpe d Huez resort, beside the ski slopes and opposite the Grandes Rousses mountain

More information

Type A-g 1-Bedroom 66 sq m / 710 sq ft #01-01

Type A-g 1-Bedroom 66 sq m / 710 sq ft #01-01 Type A-g 1-Bedroom 66 sq m / 710 sq ft #01-01 Type A-G1 1-Bedroom 67 sq m / 721 sq ft #01-07 Type A-G2 1-Bedroom 70 sq m / 754 sq ft #01-13 Type A-G3 1-Bedroom 69 sq m / 743 sq ft #01-19 Type A 1-Bedroom

More information

Four Bedroom 2.5 Bath Colonial: The Grand Maple 2,319 sq. ft. Starting at $329,990

Four Bedroom 2.5 Bath Colonial: The Grand Maple 2,319 sq. ft. Starting at $329,990 3 Car Garages Available Four Bedroom 2.5 Bath Colonial: The Grand Maple 2,319 sq. ft. Starting at $329,990 The Grand Maple features open floor plan (kitchen/dining/great room), large mud room, first floor

More information

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK I. LANDLORD'S WORK Landlord's Work shall be done in accordance with the specifications set forth below, shall be limited to the work set forth in this Section

More information

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017 TENANT DESIGN MANUAL UPDATED FEBRUARY 2017 PROJECT OVERVIEW Pier Park is an approximately 1.1 million square feet combination town/ community/lifestyle center located in the heart of Panama City Beach

More information

TENANT DESIGN MANUAL UPDATE JUNE 2015

TENANT DESIGN MANUAL UPDATE JUNE 2015 TENANT DESIGN MANUAL UPDATE JUNE 2015 PROJECT OVERVIEW IN THE HEART OF LONG ISLAND, NY, WALT WHITMAN SHOPS IS FOUND AT THE INTERSECTION OF THE JERICHO TURNPIKE (RT 25) AND WALT WHITMAN ROAD (RT 110). 2

More information

Exhibit C - Shops 1 & 2

Exhibit C - Shops 1 & 2 Exhibit C - Shops 1 & 2 EXHIBIT "C" LANDLORD S WORK MOUNTAIN GROVE SHOPS (Revised 02/12/2013) Landlord agrees, at its sole cost and expense, to furnish and install the following "Landlord's Work", limited

More information

518 3 rd Avenue South St. Petersburg, Florida

518 3 rd Avenue South St. Petersburg, Florida 518 3 rd Avenue South St. Petersburg, Florida 33701 813.895.8591 www.viridianfl.com Project Summary Preservation of Senior Housing Project Name: Viridian Address: 518 3 rd Avenue South St. Petersburg,

More information

FY 2018 FEE SCHEDULE (Effective )

FY 2018 FEE SCHEDULE (Effective ) FY 2018 SCHEDULE BUILDING PERMIT S - RESIDENTIAL New SFD, TH, Duplex (Each Dwelling) Less Than or Equal To 2500 S.F. $500.00 Greater Than 2500 S.F. - Less Than Or Equal To 4000 S.F. $800.00 Greater Than

More information

1. Project No.: 812 Muslim Commercial Bank, Karachi Mechanical & Electrical System

1. Project No.: 812 Muslim Commercial Bank, Karachi Mechanical & Electrical System Scope of Services Provided FND offers a comprehensive range of engineering consultation services in a wide spectrum of electrical & mechanical fields. We serve clients in the commercial, institutional,

More information

TENANT DESIGN MANUAL UPDATED OCTOBER 2016

TENANT DESIGN MANUAL UPDATED OCTOBER 2016 TENANT DESIGN MANUAL UPDATED OCTOBER 2016 PROJECT OVERVIEW Bangor Mall is conveniently located off exits 186 and 187 on I-95, the only major highway that runs north and south in the state, providing easy

More information

3510 Plan Two Story Approx. 2,382 Sq. Ft. 3 Bedrooms 2.5 Baths Kitchen with Island Great Room Loft Covered Loggia 2 Bay Garage

3510 Plan Two Story Approx. 2,382 Sq. Ft. 3 Bedrooms 2.5 Baths Kitchen with Island Great Room Loft Covered Loggia 2 Bay Garage PRICE SHEET at 3510 Plan Two Story Approx. 2,382 Sq. Ft. 3 Bedrooms 2.5 Baths Kitchen with Island Great Room Loft Covered Loggia 2 Bay Garage Options: Bedroom 4 ILO Loft Bedroom 5 ILO Study Outdoor Fireplace

More information

Contemporary villas Panoramic view 3 minutes from Bonita Beach

Contemporary villas Panoramic view 3 minutes from Bonita Beach Contemporary villas Panoramic view 3 minutes from Bonita Beach 4 individual villas with private pool - 3 bedrooms + optional studio Situated on a 4000 square meter terrain VILLAS AUM 3 or 4 bedroom villas,

More information

Fort Myers, FL USA. Client Name Client Test

Fort Myers, FL USA. Client Name Client Test Property Addres: 12155 Metro Pkwy Report Number: Four-Point Insurance Inspection Property Information 12155 Metro Pkwy Fort Myers, FL 33966 USA Client Information Inspection Details Client Name Client

More information

CLAIM ADJUSTMENT SPECIALISTS

CLAIM ADJUSTMENT SPECIALISTS CLAIM ADJUSTMENT SPECIALISTS SUPPLEMENTAL REPORT 05/13/2014 TO: Claims Department FROM: Jason Lockridge Proctor Financial Insurance 5225 Crooks Rd. 17501 Dallas Parkway Troy, MI 48098 Dallas, TX 75287

More information

GENERAL INFORMATION * EXISTING UNITS IMMEDIATELY AVAILABLE AND MEETING THE MINIMUM REQUIREMENTS, OR

GENERAL INFORMATION * EXISTING UNITS IMMEDIATELY AVAILABLE AND MEETING THE MINIMUM REQUIREMENTS, OR SOLICITATION FOR OFFERS Solicitation number NE-18-006 (FY19) GENERAL INFORMATION SYNOPSIS THE UNITED STATES (U.S.) IS REQUESTING OFFERS TO LEASE UP TO 19 FAMILY HOUSING UNITS. THE TERM REQUIRED IS FIVE

More information

Construction Document Criteria

Construction Document Criteria Construction Document Criteria Introduction Information contained in this section has been assembled to assist the architect and the architect's consultants in preparation of Construction Documents and

More information

County of Ventura - Division of Building and Safety Report of Permits Issued for the Week Ending 2/16/2019

County of Ventura - Division of Building and Safety Report of Permits Issued for the Week Ending 2/16/2019 County of Ventura - Division of Building and Safety Report of Permits Issued for the Week Ending 2/16/2019 Date of Issuance: February 11, 2019 East County Office Permit Type: Building 8500062195 21 STALLION

More information

RENTER'S INSPECTION WORKSHEET Free form provided at

RENTER'S INSPECTION WORKSHEET Free form provided at RENTER'S INSPECTION WORKSHEET Free form provided at www.utaheviction.com In anticipation of entering into a lease where ("Landlord(s)"), will rent to, (the "Tenant(s)"), the premises described as: The

More information

Ordinance 991 CHAPTER 91 RENTAL HOUSING CODE

Ordinance 991 CHAPTER 91 RENTAL HOUSING CODE CHAPTER 91 SECTIONS: Ordinance 991 CHAPTER 91 RENTAL HOUSING CODE RENTAL HOUSING CODE 91.1 Purpose 91.2 Housing Quality Standards 91.3 Off-Street Parking Regulations 91.4 Registration Requirements 91.5

More information

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS Prepared by: Community Development Standards Branch Town of Innisfil www.innisfil.ca June 2016 Contents 1. Introduction... 1 2. Ontario Building