Emil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619

Size: px
Start display at page:

Download "Emil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619"

Transcription

1 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main ,770 $9,696,6 SITE $286,205 Campus Total 27,770 $9,982,6 Category: Building Exterior Entrance Entrance Control - Audio and Video EA 6 $702 Exterior Doors - Exterior Steel Door 0 EA 6 $48 Exterior Doors - Exterior Steel Door 3 EA 7 Exterior Doors - Exterior Steel Door 5 2 EA 6 $96 Exterior Doors - Exterior Steel Door 6 4 EA 6 $,922 Exterior Doors - Exterior Steel Door 7 2 EA 6 $96 Exterior Doors - Exterior Steel Door 2 2 EA 6 $96 Exterior Doors - Exterior Steel Door 3 6 EA 5 $8,048 Exterior Doors - Exterior Steel Door 4 2 EA 7 Exterior Doors - Exterior Steel Door 5 2 EA 6 $96 Exterior Doors - Exterior Steel Door 6 EA 6 $48 Exterior Doors - Exterior Steel Door 8 2 EA 7 Exterior Doors - Exterior Steel Door 9 2 EA 6 $96 Exterior Doors - Exterior Steel Door Garage Door West EA 6 $48 Exterior Doors - Exterior Wood Door 2 EA 5 $2,683 Exterior Doors - Exterior Wood Door 3 EA 5 $4,024 Exterior Doors - Exterior Wood Door 2 2 EA 6 $96 Exterior Doors - Exterior Wood Door 4 EA 5 $,34 Exterior Doors - Exterior Wood Door 8 2 EA 6 $96 Exterior Doors - Exterior Wood Door 9 2 EA 6 $96 Exterior Doors - Exterior Wood Door 7 3 EA 6 $,442 HIRSCH HS Page of 52

2 Category: Building Exterior Entrance Exterior Doors - Side lite 8 EA 7 Exterior Doors - Transom Lite EA 5 $822 Exterior Doors - Transom Lite 2 2 EA 6 $627 Exterior Doors - Transom Lite 3 EA 7 Exterior Doors - Transom Lite 4 EA 6 $33 Exterior Doors - Transom Lite 5 2 EA 6 $627 Exterior Doors - Transom Lite 6 4 EA 5 $3,287 Exterior Doors - Transom Lite 7 2 EA 6 $627 Exterior Doors - Transom Lite 8 2 EA 6 $627 Exterior Doors - Transom Lite 9 2 EA 6 $627 Exterior Doors - Transom Lite 2 2 EA 6 $627 Exterior Doors - Transom Lite 3 6 EA 6 $,880 Exterior Doors - Transom Lite 4 2 EA 6 $627 Exterior Doors - Transom Lite 5 2 EA 6 $627 Exterior Doors - Transom Lite 7 3 EA 6 $9 Exterior Doors - Transom Lite 9 2 EA 6 $627 Exterior Stairs - Concrete 60 LF 6 $4,906 Exterior Stairs - Concrete 2 60 LF 7 Exterior Stairs - Concrete 5 0 LF 6 $88 Exterior Stairs - Concrete 8 LF 6 $3,27 Exterior Stairs - Concrete 2 5 LF 7 Exterior Stairs - Concrete 3 70 LF 6 $5,724 Exterior Stairs - Concrete 5 60 LF 6 $4,906 Exterior Stairs - Concrete 6 70 LF 6 $5,724 Exterior Stairs - Concrete 7 45 LF 6 $3,680 Exterior Stairs - Steel or Aluminum 0 60 LF 6 $23 Exterior Stairs - Stone 25 LF 6 $2,825 Exterior Stairs - Stone 30 LF 6 $3,390 Exterior Stairs - Stone 3 3 LF 6 $339 Exterior Stairs - Stone 5 50 LF 6 $5,649 Exterior Stairs - Stone 6 2 LF 6 $,356 Exterior Stairs - Stone 7 35 LF 6 $3,954 Exterior Stairs - Stone 8 5 LF 6 $,695 Exterior Stairs - Stone 9 75 LF 5 $20,338 Exterior Stairs - Stone 2 60 LF 6 $6,779 Exterior Stairs - Stone 3 93 LF 6 $0,508 Exterior Stairs - Stone 5 0 LF 6 $,30 HIRSCH HS Page 2 of 52

3 Category: Building Exterior Entrance Exterior Stairs - Stone 7 LF 6 $4,59 Exterior Stairs - Stone 8 30 LF 6 $3,390 Exterior Stairs - Stone 9 85 LF 6 $9,604 Ramp Handrail - Steel_Ramp Handrail 4 32 LF 6 $277 Ramps - Concrete 2 8 LF 7 Ramps - Concrete 4 5 LF 6 $2,254 Stair Handrail - Steel_Stair Handrail 2 0 LF 6 $87 Foundation Lighting Roof System Foundation - Concrete Entire Building 2,492 LF 7 Foundation - Concrete Entire Building 500 LF 7 seepage throughout Superstructure - Concrete Entire Building 2,56 SF 7 Superstructure - Concrete Entire Building 0 SF 7 corroded rebar, spalled concrete Exterior Lighting - Wall Mounted Entire Site 58 EA 6 $6,747 Chimney - Brick Chimney- Concrete/ Mortar Liner A 29 LF 5 $82,695 no liner Chimney - Brick Chimney- Concrete/ Mortar Liner A 50 LF 4 $28,598 no liner; stepcracking, cap displaced, cracking along metal ladder Coping - Metal C 3 LF 5 $4,777 Coping - Metal E 30 LF 5 $5,495 Coping - Metal F 274 LF 5 $,582 Coping - Terra Cotta A 46 LF 5 $77,380 cracking throughout Coping - Terra Cotta B 55 LF 5 $86,445 Coping - Terra Cotta C 276 LF 5 $46,328 Coping - Terra Cotta D 78 LF 5 $3,094 Coping - Terra Cotta E 375 LF 5 $62,945 Coping - Terra Cotta F 37 LF 5 $53,20 Coping - Terra Cotta G 328 LF 5 $55,056 Coping - Terra Cotta H 94 LF 5 $5,778 Downspouts - Exterior Downspouts B 54 LF 5 $4,36 Downspouts - Interior Downspouts A 87 LF 5 $9,254 all roof drains clogged Downspouts - Interior Downspouts B 564 LF 5 $24,87 clogged Downspouts - Interior Downspouts C 5 LF 5 $25,450 clogged Downspouts - Interior Downspouts D 472 LF 5 $04,457 clogged Downspouts - Interior Downspouts E 5 LF 5 $25,450 clogged Downspouts - Interior Downspouts F 88 LF 5 $4,606 clogged HIRSCH HS Page 3 of 52

4 Category: Building Exterior Roof System Downspouts - Interior Downspouts G 30 LF 5 $28,770 clogged Downspouts - Interior Downspouts H 22 LF 5 $4,869 clogged Parapet - 6" - 30" Height A / Entire Building 222 LF 4 $25,905 mod bit has been applied over areas of coping throughout. step cracking, open joints, bulging Parapet - 6" - 30" Height C 3 LF 4 $64,087 step cracking, open joints, bulging Parapet - 6" - 30" Height D 58 LF 4 $89,608 step cracking, open joints, bulging Parapet - 6" - 30" Height E 76 LF 4 $99,86 step cracking, open joints, bulging Parapet - 6" - 30" Height G 328 LF 4 $86,02 step cracking, open joints, bulging Parapet - 6" - 30" Height H 94 LF 4 $53,3 step cracking, open joints, bulging Parapet - Parapet < 6" Height A / Entire Building 239 LF 5 $22,09 mod bit has been applied over areas of coping throughout Parapet - Parapet < 6" Height B 55 LF 4 $252,227 step cracking, open joints, bulging Parapet - Parapet < 6" Height C 3 LF 4 $55,343 step cracking, open joints, bulging Parapet - Parapet < 6" Height E 3 LF 4 $55,343 step cracking, open joints, bulging Parapet - Parapet < 6" Height F 37 LF 4 $55,254 step cracking, open joints, bulging Parapet - Parapet > 30" C 50 LF 4 $44,680 parapets require repointing throughout, bulging, stepcracking, open joints Parapet - Parapet > 30" D 623 LF 4 $556,708 step cracking, open joints, bulging Parapet - Parapet > 30" E 86 LF 4 $76,849 step cracking, open joints, bulging Roof Structure - Concrete A 0,556 SF 7 Roof Structure - Concrete B 3,455 SF 7 Roof Structure - Concrete C 9,36 SF 7 Roof Structure - Concrete D 6,724 SF 7 Roof Structure - Concrete E 9,959 SF 7 Roof Structure - Concrete F 5,980 SF 7 Roof Structure - Concrete G 8,0 SF 7 Roof Structure - Concrete H,309 SF 7 Roof - Asphalt Shingle B 3,573 SF 6 $6, Roof - Asphalt Shingle C 678 SF 6 $3,2 Roof - Asphalt Shingle E 678 SF 6 $3,2 Roof - Asphalt Shingle F,794 SF 6 $8,235 Roof - Modified Bitumen A 0,556 SF 5 $222,049 all roof drains clogged with debris, vegetal growth Roof - Modified Bitumen B 9,882 SF 5 $207,87 Roof - Modified Bitumen C 8,638 SF 5 $8,703 Roof - Modified Bitumen D 6,724 SF 5 $35,794 Roof - Modified Bitumen E 9,28 SF 5 $95,229 Roof - Modified Bitumen F 4,86 SF 5 $88,054 Roof - Modified Bitumen G 8,0 SF 5 $69,24 HIRSCH HS Page 4 of 52

5 Category: Building Exterior Roof System Roof - Modified Bitumen H 0 SF 4 $0,965 ponding Roof - Modified Bitumen H 909 SF 5 $9,2 Walls Cheek-Wall - Stone Entire Building 62 SF 6 $,66 Cheek-Wall - Stone Entire Building 02 SF 5 $2,427 bulging, cracks, spalled Exterior Walls - Brick Entire Building 55,044 SF 5 $978,2 Exterior Walls - Brick Entire Building 620 SF 4 $02,083 stepcracking Exterior Walls - Brick Entire Building 745 SF 4 $22,664 bulging below parapets, at corners and lintels Exterior Walls - Brick Entire Building 00 SF 3 $6,465 bricks displaced " or more Exterior Walls - Brick Entire Building 00 SF 3 $6,465 bulging Exterior Walls - Brick Entire Building,000 SF 4 $64,650 require repointing Exterior Walls - Stone-Cut Entire Building 7,476 SF 5 $00,492 Exterior Walls - Stone-Cut Entire Building / East Façade 8 SF 4 $,703 spalled stone Exterior Walls - Terra Cotta Entire Building 5,000 SF 4 $2,963,75 straps around terra cotta Exterior Walls - Terra Cotta Entire Building 00 SF 5 $,559 cracking Exterior Walls - Terra Cotta Entire Building 4 SF 4 $2,595 terra cotta missing Exterior Walls - Terra Cotta Entire Building 9,968 SF 5 $8,595 Windows Guard - Guards wire guard Entire Building / st Floor 654 SF 5 $0,026 Lintels - Concrete Entire Building 6 LF 5 $3,60 Lintels - Steel Entire Building 902 LF 4 $8,395 bulging throughout Lintels - Terra Cotta Entire Building 598 LF 4 $20,095 cracking, netting throughout Windows - Insulated Panel Entire Building 4,268 SF 5 $34,55 condition similar to that of windows Windows - Sash Lexan Entire Building 0,477 SF 5 $307,583 weather strip deteriorated, panes damaged, graffiti Building Exterior Subtotal: $0,43,875 Category: Electrical System Emergency System Automatic Transfer Switch Electrical Room 2 EA 6 $86 Emergency A/C Power - Auditoium and Aisle Lighting Entire Building 7,220 SF 2 $32,006 Emergency A/C Power - Corridors and Stairs Entire Building 43,270 SF 6 $2,994 Emergency A/C Power - Gym Entire Building / 2nd Floor,238 SF 6 $4,78 Emergency A/C Power - Lunchrooms Entire Building / st Floor 4,90 SF 6 $,822 HIRSCH HS Page 5 of 52

6 Category: Electrical System Emergency System Main Service Emergency A/C Power - Students Toilets Entire Building,949 SF 6 $725 Emergency Generator- Outdoor- Diesel KW Central Courtyard EA 6 $2,534 Exit Signs - Auditoium Entire Building 9 EA 6 $,348 Exit Signs - Corridors and Stairs Entire Building 55 EA 6 $8,236 Exit Signs - Gym Entire Building / 2nd Floor 5 EA 6 $787 Exit Signs - Lunchroom Entire Building / st Floor 2 EA 6 $299 Exit Signs - Pool Entire Building / st Floor 2 EA 6 $30 Security System - CCTV Entire Building 2,56 SF 6 $63,40 Engineer said cameras are scheduled to be installed soon. Security System - Intrusion Detection Entire Building 2,56 SF 6 $54,352 Main Electrical Service A 20/208/3PH Electrical Room / Basement EA 6 $5,078 Main Electrical Service A 20/208/3PH Electrical Room / Basement EA 6 $8,232 Main Electrical Service to 3000 A 20/208/3PH Electrical Room / Basement EA 6 $0,867 PA System Entire Building 2,56 SF 6 $69,449 Power Distribution Lighting and Power Panels - 00 A Entire Building / 3rd Floor EA 5 There are no labels on panel Lighting and Power Panels - 00 A Entire Building 37 EA 6 $,067 Main Distribution Panels amp Entire Building / Electrical Room 3 EA 6 $,583 0 A Main Distribution Panels - Less than 0 amp Entire Building 9 EA 6 $4,528 Transformers - 20/2-20/208 Entire Building / Electrical Room EA 6 $3,02 50 Kva Electrical System Subtotal: $307,644 Category: Safty System Fire Alarm Fire Alarm Panel Entire Building / st Floor EA 6 $6,6 Gamewell system (2006); o other information available Fire Alarm Strobe Lights Entire Building 2,56 SF 6 $75,488 Fire Alarm_System Entire Building 2,56 SF 6 $02,664 Safty System Subtotal: $84,558 HIRSCH HS Page 6 of 52

7 Category: Mechanical System Air Handling Systems Boiler Systems Air Handling Unit- Built Up- Single Zone- Steam Coils cfm Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils cfm Basement Basement EA 5 $44,262 3 EA 5 $66,946 ew ork Blower Company, CFM The fan is old, the housing wall is deteriorating, and the pneumatic control system is old and not functioning well. Air Handling Unit- Built Up-Multi Zone- Steam Coils Basement EA 5 $78,608 Approx 22,476 CFM. The fan is old, dampers do not work well, and some bypass dampers are held open with objects. Air Handling Unit- Built Up-Multi Zone- Steam Coils - Less than 8000 cfm Basement EA 5 $36,09 Approx 6566 CFM. The fan is old, dampers do not work well, and some bypass dampers are held open with objects. Air Handling Unit- Built Up-Multi Zone- Steam Coils - Less than 8000 cfm Basement EA 5 $36,09 Air Intake Basement / Roof 3 EA 6 $7,294 All three units Air Intake Basement / Roof EA 6 $5,765 Air Intake Basement / Roof 3 EA 5 $22,42 Approx 4,800 CFM. The fan is old, dampers do not work well, and some bypass dampers are held open with objects. Auxiliaries cfm Basement EA 4 $36,420 Steam valves are old and corroded, housing was is deteriorated Auxiliaries cfm Basement EA 4 $39,696 The housing walls are deteriorating, many of the steam pipes are rusted, and the paint on the fans is chipping off. Auxiliaries cfm Basement 3 EA 4 $9,089 The housing wall is deteriorated and old, some of the steam valves are old and corroding, dampers need to be repaired. Auxiliaries - Less than 8000 cfm Basement EA 4 $25,5 The housing walls are deteriorating, many of the steam pipes are rusted, and the paint on the fans is chipping off. Auxiliaries - Less than 8000 cfm Basement EA 4 $25,5 The housing walls are deteriorating, many of the steam pipes are rusted, and the paint on the fans is chipping off. Reheat Boxes - Reheat Boxes with Steam Coil Basement 25 EA 5 $07,207 Housing wall on reheat boxes is deteriorated and controls on many of the dampers are not working properly. Return Duct Work - Masonry and Ducts- Missing or Existing Shaft Basement / Balcony 00 LF 5 $3,34 o return duct work. Return Duct Work - Masonry and Ducts- Missing or Existing Shaft Basement 300 LF 5 $394,024 There is no return duct work for any of the 3 units. Return Duct Work - Masonry and Ducts- Missing or Existing Shaft Basement / Entire Building 300 LF 5 $394,024 o return duct work for any of the 3 units. Roof Top Unit-Single Zone-Roof Mounted- Gas Heating and DX Cooling Roof EA 5 $37,963 RTU package is heated the adjacent hw boiler. Coil - Greater than 45 tons Zone Dampers Basement 30 EA 5 $57,6 All three units Zone Dampers Basement 7 EA 5 $50,957 Dampers are old, controls do not work properly Boiler Auxiliary- on Condensing Hot Water MBH Roof EA 5 $26,293 Serves RTU HIRSCH HS Page 7 of 52

8 Category: Mechanical System Boiler Systems Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler HP Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - Greater than 300 HP Boiler Room EA 5 $9,533 Boiler Room 2 EA 5 $5,050 Chemical Feeder Boiler Room 2 EA 6 $2,56 Combustion Dampers Boiler Room / Basement 2 EA 6 $88 Combustion Dampers Boiler Room EA 6 $9 Condensate Pump Boiler Room / Basement 4 EA 6 $8,084 Pumps located all throughout basement Feed Water Pumps and Tank Boiler Room EA 5 $36,450 4 pumps on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler HP on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - Greater than 300 HP on Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler MBH Boiler Room EA 5 $9,533 Boiler Room 2 EA 5 $5,050 Roof EA 5 $35,549 Piping - Condensate Pipe- Steel Boiler Room / Entire Building,000 LF 5 $3,099 Piping for entire system Piping - Steam Pipe- Steel Boiler Room / Entire Building,000 LF 5 $4,986 Piping for entire system Steam Traps Boiler Room / Entire Building EA 4 $2,50 Engineer stated he has issues with steam traps during heating Heat Exchangers Heating Devices Heat Exchanger - Steam to Hot Water Shell Type Boiler Room EA 6 Fin Tube - Steam Entire Building 90 LF 6 $849 Radiators - Steam Entire Building 95 EA 5 $59,55 Radiators are very old Unit Heater - Electric st Floor EA 4 $2,00 Unit is very old and in poor condition Unit Heater - Gas Boiler Room EA 5 $,527 Unit is very old Unit Heater - Steam Boiler Room / Basement EA 5 $909 Unit is very old Unit Heater - Steam Boiler Room EA 5 $909 Wall Heater - Electric Entire Building 4 EA 5 $7,52 Wall Heater - Electric Entire Building 8 EA 6 $, Mechanical Plumbing Hydronic Supply and Return - Galvanized Roof LF 6 $3,093 Piping supplies the RTU Temperature Control Pneumatic System Entire Building 2,56 SF 4 $,099,09 Controls are very old, many dampers are operated manually, and not all sensors are responding Thermostats - Pneumatic Entire Building 03 EA 4 $75,935 Engineer said that most thermostats do not work. HIRSCH HS Page 8 of 52

9 Category: Mechanical System Ventilation Exhaust Fans- Indoor CFM Entire Building / Basement 3 EA 4 $2,734 Exhaust fan is more than 5 years of age and is not working. Exhaust Fans- Indoor CFM Entire Building 3 EA 6 $,777 Exhaust Fans- Roof Mounted CFM Entire Building / Roof 2 EA 6 $,85 Exhaust Fans- Roof Mounted CFM Entire Building / Roof EA 6 $592 Lab Exhaust Hood Entire Building / 3rd Floor EA 6 $,248 Type I Exhaust Hood- Kitchen Entire Building / st Floor EA 5 $4,647 Type II Exhaust Hood- Warming Kitchen Entire Building / st Floor EA 6 $920 Mechanical System Subtotal: $3,563,209 Category: Plumbing System Hot Water Electric Heater - Greater than 50 KW Basement EA 6 $682 Steam Storage Tank Gallons Boiler Room EA 5 $2,249 Piping Domestic Piping-Cold Water from Risers to Fixtures Entire Building 2,56 SF 6 $42,273 Domestic Piping-Cold Water Horizontal Lines Entire Building 2,56 SF 6 $5,332 Domestic Piping-Cold Water Risers Entire Building 2,56 SF 6 $39,254 Domestic Piping-Hot Water from Risers to Fixtures Entire Building 2,56 SF 6 $33,25 Domestic Piping-Hot Water Horizontal Lines Entire Building 2,56 SF 6 $39,254 Domestic Piping-Hot Water Return Lines Entire Building 2,56 SF 6 $30,95 Domestic Piping-Hot Water Return Risers Entire Building 2,56 SF 6 $30,95 Sanitary Piping Entire Building 2,56 SF 6 $93,250 Storm Piping Entire Building 2,56 SF 6 $84,9 Vent Piping Entire Building 2,56 SF 6 $4,98 Pool Systems Pool Drain Piping Basement 60 LF 6 $,78 Pool Filtration System including Pump Basement EA 6 $2,330 Pool Hot Water Heater - Steam Heat Exchanger Basement EA 6 Pool Supply and Return Piping Basement 20 LF 6 $5,766 Pumps Pumps - Domestic Booster Pump-Simplex Basement EA 6 $,446 o information available on pump HIRSCH HS Page 9 of 52

10 Category: Plumbing System Pumps Pumps - Ejector-Duplex Basement 2 EA 6 $2,774 Pumps - Sump-Duplex Basement 2 EA 6 $2,774 Pumps - Sump-Simplex Basement EA 6 $745 Plumbing System Subtotal: $85,562 Category: Classrooms Classroom #08 - Weight Rm (Weight) Ceiling - Exposed Basement,8 SF 4 $5,00 damaged and deteriorated Doors - Wood Doors inclu hw Basement EA 4 $3,43 end of serviceable life. Floor - Concrete Basement,8 SF 5 $,98 Lighting - Pendent/Surface Basement EA 6 $24 Lighting - Pendent/Surface Basement 6 EA 5 $,095 Storage/ Closet Basement 80 SF 6 $580 Walls - Concrete Block Basement,450 SF 6 $4,25 Classroom #02 (Unsafe/Unusable Condition) Ceiling - Exposed Basement,32 SF 5 $3,08 peeling paint Doors - Wood Doors inclu hw Basement 2 EA 6 $602 Floor - Carpet Basement,32 SF 3 $0,9 standing water in nw corner. Mildew odor. Lighting - Pendent/Surface Basement 2 EA 6 $,487 Walls - Concrete Block Basement,438 SF 4 $5,552 peeling paint + signs of water infiltration Classroom #06 (Computer Lab) AC Units st Floor 2 EA 6 $99 Casework st Floor 5 LF 6 $379 Ceiling - Lay-in st Floor,65 SF 6 $3,498 Charging Station st Floor 2 EA 7 Doors - Wood Doors inclu hw st Floor EA 5 $,74 Floor - Carpet st Floor,65 SF 7 Lighting - Lay-in st Floor 33 EA 7 Storage/ Closet st Floor 8 SF 6 $58 Walls - Plaster/Drywall st Floor,67 SF 7 Classroom #0 () AC Units 2nd Floor EA 6 $496 HIRSCH HS Page 0 of 52

11 Category: Classrooms Classroom #0 () Casework 2nd Floor 8 LF 6 $202 Ceiling - Lay-in 2nd Floor 662 SF 6 $,988 Chalk Board 2nd Floor 55 LF 4 $5,049 Obsolete Material. Doors - Transom Window 2nd Floor 9 SF 6 $52 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Floor - Tile 2nd Floor 662 SF 6 $,448 Lighting - Lay-in 2nd Floor 8 EA 7 Walls - Plaster/Drywall 2nd Floor 30 SF 4 $44 Cracking and peeling paint at door frame. Walls - Plaster/Drywall 2nd Floor 900 SF 6 $2,484 Classroom #9 (Special Program) AC Units st Floor 2 EA 6 $99 Casework st Floor 9 LF 5 $3,973 Ceiling - Exposed st Floor,00 SF 6 $,502 Chalk Board st Floor 8 LF 4 $734 Obsolete Material. Doors - Transom Window st Floor 9 SF 6 $52 Doors - Wood Doors inclu hw st Floor EA 6 $30 Floor - Wood st Floor,00 SF 6 $7,20 Lighting - Pendent/Surface st Floor 20 EA 7 Marker Board st Floor 6 LF 6 $29 Storage/ Closet st Floor 05 SF 5 $,694 Walls - Plaster/Drywall st Floor,032 SF 6 $2,848 Walls - Structural Glazed Tile st Floor 280 SF 6 $88 Work Sink st Floor EA 6 $379 One triple sink. Classroom #22 () AC Units st Floor 2 EA 7 Casework st Floor 4 LF 5 $2,927 Ceiling - Lay-in st Floor,450 SF 4 $4,743 water damage throughout, warped tiles, ceiling framing needs to be painted. Chalk Board st Floor 27 LF 4 $2,479 Obsolete Material. Doors - Transom Window st Floor 9 SF 6 $52 Doors - Wood Doors inclu hw st Floor EA 5 $,74 Floor - Tile st Floor 50 SF 4 $649 under drinking fountain- warped and deteriorated Floor - Tile st Floor,0 SF 6 $3,063 Lighting - Lay-in st Floor 33 EA 7 Storage/ Closet st Floor 5 SF 6 $834 Walls - Plaster/Drywall st Floor 765 SF 6 $2, Walls - Structural Glazed Tile st Floor 725 SF 6 $2,28 HIRSCH HS Page of 52

12 Category: Classrooms Classroom #22 () Classroom #24 () AC Units 2nd Floor 2 EA 7 AC Units 2 EA 7 Casework 2nd Floor 4 LF 6 $354 Casework 4 LF 6 $354 Ceiling - Lay-in 2nd Floor 570 SF 6 $,72 Ceiling - Lay-in 2nd Floor 00 SF 4 $,33 damaged/ displaced ceiling tiles Ceiling - Lay-in 00 SF 4 $,33 Ceiling - Lay-in 570 SF 6 $,72 Chalk Board 2nd Floor 23 LF 4 $2,2 Chalk Board 23 LF 4 $2,2 Doors - Side-lite 2nd Floor 220 SF 7 storefront Doors - Side-lite 220 SF 7 Doors - Wood Doors inclu hw 2nd Floor 2 EA 5 $2,348 Doors - Wood Doors inclu hw 2 EA 5 $2,348 Floor - Tile 2nd Floor 670 SF 5 $3,008 Floor - Tile 670 SF 5 $3,008 Lighting - Lay-in 2nd Floor 8 EA 7 Lighting - Lay-in 8 EA 7 Walls - Plaster/Drywall 2nd Floor 375 SF 6 $,035 Walls - Plaster/Drywall 375 SF 6 $,035 damaged/ displaced ceiling tiles storefront Walls - Structural Glazed Tile 2nd Floor 95 SF 6 $299 glazed brick Walls - Structural Glazed Tile Classroom #25 (Store Room) 95 SF 6 $299 AC Units st Floor EA 7 Casework st Floor 0 LF 6 $253 Ceiling - Lay-in st Floor 660 SF 6 $,982 Chalk Board st Floor 4 LF 4 $,285 Doors - Wood Doors inclu hw st Floor 3 EA 6 $903 Floor - Tile st Floor 660 SF 6 $,444 Lighting - Lay-in st Floor 5 EA 7 Walls - Plaster/Drywall st Floor 620 SF 6 $,7 glazed bricks Walls - Structural Glazed Tile st Floor 85 SF 6 $582 glazed brick Classroom #26 () AC Units st Floor EA 3 $6,086 unit is not supported properly per CPS standards. AC Units EA 5 $,826 HIRSCH HS Page 2 of 52

13 Category: Classrooms Classroom #26 () Casework st Floor 2 LF 5 $2,509 Casework 2 LF 5 $2,509 Ceiling - Lay-in st Floor 970 SF 6 $2,93 Ceiling - Lay-in 970 SF 6 $2,93 Chalk Board st Floor 8 LF 4 $734 Obsolete Material. Chalk Board 8 LF 4 $734 Doors - Transom Window st Floor 9 SF 6 $52 Doors - Transom Window 9 SF 6 $52 Doors - Wood Doors inclu hw st Floor EA 6 $30 Doors - Wood Doors inclu hw EA 6 $30 Floor - Tile st Floor 970 SF 5 $4,355 Floor - Tile 970 SF 5 $4,355 Lighting - Lay-in st Floor 2 EA 6 $2,498 Lighting - Lay-in 2 EA 6 $2,498 Walls - Plaster/Drywall st Floor 0 SF 4 $47 evidence of previous leak; moisture damage Walls - Plaster/Drywall st Floor 575 SF 6 $,587 Walls - Plaster/Drywall 575 SF 6 $,587 Walls - Plaster/Drywall 0 SF 4 $47 Walls - Structural Glazed Tile st Floor 560 SF 6 $,762 Walls - Structural Glazed Tile 560 SF 6 $,762 Work Sink st Floor EA 6 $379 one triple sink. Work Sink EA 6 $379 Classroom #32 (Store Room) Casework st Floor 8 LF 5 $,673 Ceiling - Lay-in st Floor 700 SF 6 $2,02 Chalk Board st Floor 48 LF 4 $4,7 Obsolete Material. Doors - Transom Window st Floor 9 SF 6 $52 Doors - Wood Doors inclu hw st Floor EA 5 $,74 Floor - Tile st Floor 700 SF 6 $,532 Lighting - Lay-in st Floor 8 EA 6 $2,42 Walls - Plaster/Drywall st Floor 900 SF 5 $6,82 Classroom #35 (Faculty Lounge) Casework st Floor 8 LF 5 $,673 Ceiling - Lay-in st Floor 690 SF 7 evidence of previous leak; moisture damage Chalk Board st Floor 42 LF 4 $3,856 Partially covered; obsolete material. Doors - Wood Doors inclu hw st Floor 2 EA 6 $602 HIRSCH HS Page 3 of 52

14 Category: Classrooms Classroom #35 (Faculty Lounge) Floor - Tile st Floor 690 SF 6 $,50 Lighting - Lay-in st Floor 8 EA 7 Walls - Plaster/Drywall st Floor 0 SF 4 $47 cracking around doorframe Walls - Plaster/Drywall st Floor 865 SF 6 $2,387 Classroom #37 () Casework st Floor 8 LF 5 $,673 Ceiling - Lay-in st Floor 680 SF 7 Chalk Board st Floor 48 LF 4 $4,7 Doors - Wood Doors inclu hw st Floor EA 5 $,74 Floor - Tile st Floor 680 SF 6 $,488 Lighting - Lay-in st Floor 8 EA 7 Walls - Plaster/Drywall st Floor 85 SF 6 $2,249 Classroom #39 (Music Room) AC Units st Floor EA 7 Casework st Floor 55 LF 5 $,499 Chipped wood doors, missing casework drawers. Ceiling - Lay-in st Floor,05 SF 7 Chalk Board st Floor 2 LF 4 $,02 Obsolete Material. Doors - Transom Window st Floor 9 SF 6 $52 Doors - Wood Doors inclu hw st Floor EA 6 $30 Floor - Tile st Floor,05 SF 6 $2,22 Lighting - Lay-in st Floor 29 EA 7 Walls - Plaster/Drywall st Floor 920 SF 6 $2,539 Walls - Plaster/Drywall st Floor 250 SF 5 $,05 Classroom #4 (Music Room) AC Units st Floor EA 7 Casework st Floor 8 LF 5 $3,763 Ceiling - Lay-in st Floor,75 SF 6 $3,529 Ceiling - Lay-in st Floor 20 SF 4 $28 water damage. Chalk Board st Floor 24 LF 4 $2,203 Obsolete Material. Doors - Transom Window st Floor SF 6 $7 Doors - Wood Doors inclu hw st Floor EA 6 $30 Floor - Tile st Floor,95 SF 5 $5,366 Lighting - Lay-in st Floor 35 EA 7 Storage/ Closet st Floor 70 SF 6 $508 Walls - Plaster/Drywall st Floor,080 SF 6 $2,98 HIRSCH HS Page 4 of 52

15 Category: Classrooms Classroom #205 () Casework 2nd Floor 8 LF 6 $202 Ceiling - Lay-in 2nd Floor 552 SF 7 Chalk Board 2nd Floor 20 LF 4 $,836 Doors - Transom Window 2nd Floor 0 SF 7 Doors - Wood Doors inclu hw 2nd Floor EA 5 $,74 Floor - Tile/Sheet 2nd Floor 552 SF 5 $2,479 Lighting - Lay-in 2nd Floor 5 EA 7 Walls - Metal Panel 2nd Floor 258 SF 7 Glass Wall Walls - Plaster/Drywall 2nd Floor 590 SF 6 $,628 Classroom #206 () Casework 2nd Floor 8 LF 6 $455 Ceiling - Lay-in 2nd Floor 684 SF 6 $2,054 Chalk Board 2nd Floor 20 LF 4 $,836 Doors - Wood Doors inclu hw 2nd Floor EA 5 $,74 Floor - Tile/Sheet 2nd Floor 684 SF 6 $685 Lighting - Lay-in 2nd Floor 2 EA 7 Walls - Plaster/Drywall 2nd Floor 967 SF 6 $2,669 Work Sink 2nd Floor EA 6 $379 Classroom #207 () Ceiling - Lay-in 2nd Floor 552 SF 7 Chalk Board 2nd Floor 26 LF 4 $2,387 Doors - Transom Window 2nd Floor 0 SF 7 Doors - Wood Doors inclu hw 2nd Floor EA 5 $,74 Floor - Tile/Sheet 2nd Floor 552 SF 5 $2,479 Lighting - Lay-in 2nd Floor 5 EA 7 Walls - Metal Panel 2nd Floor 258 SF 7 Glass Wall Walls - Plaster/Drywall 2nd Floor 590 SF 7 Classroom #208 () AC Units EA 6 $496 Casework 2 LF 6 $303 Ceiling - Lay-in 684 SF 7 Chalk Board 28 LF 4 $2,57 Doors - Wood Doors inclu hw 2 EA 5 $2,348 Floor - Tile/Sheet 684 SF 6 $685 Lighting - Lay-in 2 EA 7 Walls - Plaster/Drywall 967 SF 6 $2,669 HIRSCH HS Page 5 of 52

16 Category: Classrooms Classroom #208 () Classroom #209 () Casework 2nd Floor 8 LF 6 $202 Ceiling - Lay-in 2nd Floor 684 SF 7 Chalk Board 2nd Floor 26 LF 4 $2,387 Doors - Transom Window 2nd Floor 0 SF 7 Doors - Wood Doors inclu hw 2nd Floor 2 EA 5 $2,348 Floor - Tile/Sheet 2nd Floor 684 SF 6 $685 Lighting - Lay-in 2nd Floor 8 EA 7 Walls - Plaster/Drywall 2nd Floor 967 SF 6 $2,669 Classroom #20 () Casework 2nd Floor 8 LF 6 $202 Ceiling - Lay-in 2nd Floor 684 SF 6 $2,054 Chalk Board 2nd Floor 34 LF 4 $3,2 Doors - Transom Window 2nd Floor 0 SF 7 Doors - Wood Doors inclu hw 2nd Floor EA 5 $,74 Floor - Tile/Sheet 2nd Floor 684 SF 6 $685 Lighting - Lay-in 2nd Floor 2 EA 7 Walls - Plaster/Drywall 2nd Floor 967 SF 6 $2,669 Work Sink 2nd Floor EA 6 $379 Classroom #2 () AC Units 2nd Floor EA 6 $496 Casework 2nd Floor 8 LF 5 $,673 Ceiling - Lay-in 2nd Floor 684 SF 7 Chalk Board 2nd Floor 49 LF 4 $4,498 Doors - Wood Doors inclu hw 2nd Floor EA 5 $,74 Floor - Tile/Sheet 2nd Floor 684 SF 6 $685 Lighting - Lay-in 2nd Floor 8 EA 7 Walls - Plaster/Drywall 2nd Floor 967 SF 6 $2,669 Classroom #23 (Computer Lab) AC Units 2nd Floor EA 6 $496 Casework 2nd Floor 42 LF 5 $8,78 Ceiling - Lay-in 2nd Floor 782 SF 6 $2,348 Chalk Board 2nd Floor 5 LF 4 $,377 Doors - Transom Window 2nd Floor 6 SF 5 $677 Doors - Wood Doors inclu hw 2nd Floor 2 EA 5 $2,348 HIRSCH HS Page 6 of 52

17 Category: Classrooms Classroom #23 (Computer Lab) Floor - Tile/Sheet 2nd Floor 782 SF 6 $783 Lighting - Lay-in 2nd Floor 2 EA 7 Walls - Plaster/Drywall 2nd Floor 962 SF 6 $2,655 Classroom #27 (Computer Lab) AC Units 2nd Floor EA 6 $496 AC Units 2nd Floor EA 4 $6,086 in state of disrepair, does not appear cost effective to repair Casework 2nd Floor 42 LF 5 $8,78 Ceiling - Lay-in 2nd Floor 782 SF 6 $2,348 Chalk Board 2nd Floor 5 LF 4 $,377 Charging Station 2nd Floor 3 EA 7 Doors - Transom Window 2nd Floor 6 SF 5 $677 Doors - Wood Doors inclu hw 2nd Floor 2 EA 5 $2,348 Floor - Tile/Sheet 2nd Floor 782 SF 6 $783 Lighting - Lay-in 2nd Floor 2 EA 6 $2,498 Walls - Plaster/Drywall 2nd Floor 962 SF 6 $2,655 Wireless System 2nd Floor EA 7 WAP Work Sink 2nd Floor 2 EA 6 $758 Classroom #222 (Science Lab Level 3) AC Units 2nd Floor EA 6 $496 Casework 2nd Floor 68 LF 5 $4,27 Ceiling - Lay-in 2nd Floor 92 SF 6 $2,739 Chalk Board 2nd Floor 2 LF 4 $,02 Doors - Steel Doors incl hw 2nd Floor EA 6 $30 Doors - Transom Window 2nd Floor 20 SF 7 Doors - Wood Doors inclu hw 2nd Floor 2 EA 5 $2,348 Eye Wash Station 2nd Floor EA 4 $3,08 Most parts missing Floor - Concrete Epoxy/ Painted 2nd Floor 92 SF 7 Gas Line 2nd Floor EA 6 $509 Lighting - Lay-in 2nd Floor 27 EA 7 Storage/ Closet 2nd Floor 5 SF 7 Walls - Plaster/Drywall 2nd Floor, SF 6 $3,46 Work Sink 2nd Floor 3 EA 5 $4,523 Controls need replacing Classroom #223 (Office) AC Units EA 7 Ceiling - Lay-in 92 SF 7 HIRSCH HS Page 7 of 52

18 Category: Classrooms Classroom #223 (Office) Doors - Wood Doors inclu hw 2 EA 5 $2,348 Doors - Wood Doors inclu hw 2 EA 7 Floor - Tile/Sheet 92 SF 5 $4,095 Lighting - Lay-in 24 EA 7 Walls - Plaster/Drywall,70 SF 7 corridor doors covered with metal plating Classroom #225 (Art Room) AC Units 2nd Floor EA 7 Casework 2nd Floor 73 LF 6 $,844 Ceiling - Lay-in 2nd Floor 92 SF 7 Chalk Board 2nd Floor 5 LF 4 $,377 Doors - Transom Window 2nd Floor 20 SF 7 Doors - Wood Doors inclu hw 2nd Floor 2 EA 5 $2,348 Eye Wash Station 2nd Floor EA 6 $336 Floor - Tile/Sheet 2nd Floor 92 SF 6 $93 Gas Line 2nd Floor EA 6 $509 Lighting - Lay-in 2nd Floor 27 EA 7 Walls - Plaster/Drywall 2nd Floor, SF 5 $8,6 Work Sink 2nd Floor 2 EA 5 $3,06 Contrls need replacing Classroom #226 (Science Classroom) AC Units 2nd Floor EA 6 $496 Casework 2nd Floor 68 LF 5 $4,27 Ceiling - Lay-in 2nd Floor 92 SF 6 $2,739 Chalk Board 2nd Floor 2 LF 4 $,02 Doors - Transom Window 2nd Floor 20 SF 7 Doors - Wood Doors inclu hw 2nd Floor 2 EA 6 $602 Eye Wash Station 2nd Floor EA 5 $844 Floor - Tile/Sheet 2nd Floor 92 SF 5 $4,095 Lighting - Lay-in 2nd Floor 27 EA 7 Storage/ Closet 2nd Floor 5 SF 7 Walls - Plaster/Drywall 2nd Floor, SF 6 $3,46 0 sf of wall needs patching Work Sink 2nd Floor 3 EA 5 $4,523 Controls needed for sinks Classroom #227 () Casework 2nd Floor 23 LF 5 $4,809 Ceiling - Lay-in 2nd Floor 747 SF 6 $2,243 Chalk Board 2nd Floor 36 LF 4 $3,305 Doors - Transom Window 2nd Floor 5 SF 7 HIRSCH HS Page 8 of 52

19 Category: Classrooms Classroom #227 () Doors - Wood Doors inclu hw 2nd Floor EA 5 $,74 Floor - Tile/Sheet 2nd Floor 747 SF 6 $748 Lighting - Lay-in 2nd Floor 22 EA 7 Walls - Plaster/Drywall 2nd Floor,02 SF 6 $2,793 Classroom #229 () Casework 2nd Floor 8 LF 6 $202 Ceiling - Lay-in 2nd Floor 708 SF 7 Chalk Board 2nd Floor 52 LF 4 $4,774 Doors - Transom Window 2nd Floor 0 SF 7 Doors - Wood Doors inclu hw 2nd Floor EA 5 $,74 Floor - Tile/Sheet 2nd Floor 708 SF 6 $709 Lighting - Lay-in 2nd Floor 8 EA 6 $2,42 Two lights missing lenses Walls - Plaster/Drywall 2nd Floor 930 SF 6 $2,567 Classroom #230 () Casework 2nd Floor 8 LF 5 $,673 Ceiling - Lay-in 2nd Floor 708 SF 7 Chalk Board 2nd Floor 35 LF 4 $3,23 Doors - Transom Window 2nd Floor 0 SF 7 Doors - Wood Doors inclu hw 2nd Floor EA 5 $,74 Floor - Tile/Sheet 2nd Floor 708 SF 5 $3,79 Lighting - Lay-in 2nd Floor 6 EA 7 Walls - Plaster/Drywall 2nd Floor 903 SF 6 $2,492 Classroom #23 (Vacant) Casework 2nd Floor 8 LF 5 $,673 Ceiling - Lay-in 2nd Floor 684 SF 7 Chalk Board 2nd Floor 48 LF 4 $4,7 Doors - Transom Window 2nd Floor 0 SF 7 Doors - Wood Doors inclu hw 2nd Floor 2 EA 5 $2,348 Floor - Tile/Sheet 2nd Floor 684 SF 5 $3,07 Lighting - Lay-in 2nd Floor 8 EA 7 Walls - Plaster/Drywall 2nd Floor 967 SF 6 $2,669 Classroom #232 () Casework 2nd Floor 8 LF 5 $,673 Ceiling - Lay-in 2nd Floor 684 SF 6 $2,054 Chalk Board 2nd Floor 46 LF 4 $4,223 HIRSCH HS Page 9 of 52

20 Category: Classrooms Classroom #232 () Doors - Transom Window 2nd Floor 0 SF 7 Doors - Wood Doors inclu hw 2nd Floor EA 5 $,74 Floor - Tile/Sheet 2nd Floor 684 SF 6 $685 Lighting - Lay-in 2nd Floor 8 EA 7 Walls - Plaster/Drywall 2nd Floor 967 SF 6 $2,669 Classroom #233 () Casework 2nd Floor 8 LF 5 $,673 Ceiling - Lay-in 2nd Floor 684 SF 6 $2,054 Chalk Board 2nd Floor 43 LF 4 $3,948 Doors - Wood Doors inclu hw 2nd Floor 2 EA 5 $2,348 Floor - Tile/Sheet 2nd Floor 684 SF 6 $685 Lighting - Lay-in 2nd Floor 8 EA 7 Walls - Plaster/Drywall 2nd Floor 967 SF 6 $2,669 Classroom #234 () Casework 2nd Floor 8 LF 5 $,673 Ceiling - Lay-in 2nd Floor 684 SF 6 $2,054 Chalk Board 2nd Floor 42 LF 4 $3,856 Doors - Transom Window 2nd Floor 0 SF 7 Doors - Wood Doors inclu hw 2nd Floor 2 EA 5 $2,348 Floor - Tile/Sheet 2nd Floor 684 SF 5 $3,07 Lighting - Lay-in 2nd Floor 8 EA 6 $2,42 bank of lay-in lights out Walls - Plaster/Drywall 2nd Floor 967 SF 7 Classroom #235 () Casework 2nd Floor 8 LF 5 $,673 Ceiling - Lay-in 2nd Floor 684 SF 6 $2,054 Chalk Board 2nd Floor 43 LF 4 $3,948 Doors - Wood Doors inclu hw 2nd Floor 2 EA 5 $2,348 Floor - Tile/Sheet 2nd Floor 684 SF 6 $685 Lighting - Lay-in 2nd Floor 8 EA 7 Walls - Plaster/Drywall 2nd Floor 967 SF 6 $2,669 Classroom #236 () Casework 2nd Floor 8 LF 5 $,673 Ceiling - Lay-in 2nd Floor 684 SF 6 $2,054 Chalk Board 2nd Floor 20 LF 4 $,836 Doors - Transom Window 2nd Floor 0 SF 7 HIRSCH HS Page 20 of 52

21 Category: Classrooms Classroom #236 () Doors - Wood Doors inclu hw 2nd Floor 2 EA 5 $2,348 Floor - Tile/Sheet 2nd Floor 684 SF 5 $3,07 Lighting - Lay-in 2nd Floor 8 EA 7 Walls - Plaster/Drywall 2nd Floor 967 SF 6 $2,669 Classroom #237 () AC Units 2nd Floor 2 EA 7 Casework 2nd Floor 8 LF 5 $,673 Ceiling - Lay-in 2nd Floor 684 SF 7 Chalk Board 2nd Floor 5 LF 4 $,377 Doors - Wood Doors inclu hw 2nd Floor EA 5 $,74 Floor - Tile/Sheet 2nd Floor 684 SF 6 $685 Lighting - Lay-in 2nd Floor 8 EA 7 Walls - Plaster/Drywall 2nd Floor 967 SF 6 $2,669 Classroom #33 () AC Units 3rd Floor EA 7 Casework 3rd Floor 47 LF 5 $9,827 Ceiling - Lay-in 3rd Floor 96 SF 6 $2,75 Chalk Board 3rd Floor 8 LF 4 $734 Doors - Transom Window 3rd Floor 20 SF 7 Doors - Wood Doors inclu hw 3rd Floor 2 EA 5 $2,348 Floor - Tile/Sheet 3rd Floor 96 SF 6 $97 Lighting - Lay-in 3rd Floor 2 EA 7 Walls - Plaster/Drywall 3rd Floor,57 SF 6 $3,93 Work Sink 3rd Floor 2 EA 5 $3,06 Sinks don't work Classroom #35 (Store Room) AC Units 3rd Floor EA 6 $496 Casework 3rd Floor 39 LF 6 $985 Ceiling - Lay-in 3rd Floor 435 SF 6 $,306 Chalk Board 3rd Floor 2 LF 4 $,928 Doors - Side-lite 3rd Floor 50 SF 7 Doors - Transom Window 3rd Floor 50 SF 7 Doors - Wood Doors inclu hw 3rd Floor EA 6 $30 Floor - Tile/Sheet 3rd Floor 435 SF 6 $435 Lighting - Lay-in 3rd Floor 9 EA 7 Walls - Plaster/Drywall 3rd Floor 765 SF 6 $2, HIRSCH HS Page 2 of 52

22 Category: Classrooms Classroom #37 () AC Units 3rd Floor EA 7 Casework 3rd Floor 47 LF 5 $9,827 Ceiling - Lay-in 3rd Floor 96 SF 6 $288 Chalk Board 3rd Floor 8 LF 4 $734 Doors - Transom Window 3rd Floor 20 SF 7 Doors - Wood Doors inclu hw 3rd Floor 2 EA 5 $2,348 Floor - Wood 3rd Floor 96 SF 6 $6,458 Lighting - Lay-in 3rd Floor 2 EA 7 Walls - Plaster/Drywall 3rd Floor,57 SF 5 $8,769 Work Sink 3rd Floor 2 EA 5 $3,06 Sinks don't work Classroom #32 (Science Lab Level ) AC Units 3rd Floor 2 EA 6 $99 Casework 3rd Floor 93 LF 6 $2,349 Ceiling - Lay-in 3rd Floor,032 SF 6 $3,099 Doors - Transom Window 3rd Floor 20 SF 7 Doors - Wood Doors inclu hw 3rd Floor 2 EA 5 $2,348 Eye Wash Station 3rd Floor EA 5 $844 ot working Floor - Tile/Sheet 3rd Floor,032 SF 6 $,033 Fume Hood 3rd Floor EA 6 $86 Gas Line 3rd Floor 5 EA 6 $7,637 Lighting - Lay-in 3rd Floor 8 EA 7 Marker Board 3rd Floor 9 LF 7 Walls - Plaster/Drywall 3rd Floor,278 SF 6 $3,527 Work Sink 3rd Floor 0 EA 6 $3,790 Classroom #322 (Science Lab Level ) Casework 3rd Floor 73 LF 6 $,844 Ceiling - Lay-in 3rd Floor,03 SF 6 $3,096 Chalk Board 3rd Floor 0 LF 4 $98 Doors - Steel Doors incl hw 3rd Floor EA 7 Doors - Transom Window 3rd Floor 20 SF 7 Doors - Wood Doors inclu hw 3rd Floor 2 EA 5 $2,348 Floor - Tile/Sheet 3rd Floor,03 SF 6 $,032 Fume Hood 3rd Floor EA 5 $3,773 Gas Line 3rd Floor EA 6 $509 Lighting - Lay-in 3rd Floor 28 EA 7 Science Lab Shower 3rd Floor EA 4 $3,326 Does not work; eye wash parts missing HIRSCH HS Page 22 of 52

23 Category: Classrooms Classroom #322 (Science Lab Level ) Storage/ Closet 3rd Floor 98 SF 7 Walls - Plaster/Drywall 3rd Floor 94 SF 6 $2,523 Work Sink 3rd Floor 3 EA 5 $4,523 Controls need replacing Classroom #325 () AC Units 3rd Floor 2 EA 6 $99 Casework 3rd Floor 57 LF 7 Ceiling - Lay-in 3rd Floor,080 SF 7 Chalk Board 3rd Floor 4 LF 4 $367 Doors - Wood Doors inclu hw 3rd Floor 2 EA 6 $602 Floor - Tile/Sheet 3rd Floor,080 SF 7 Lighting - Lay-in 3rd Floor 30 EA 7 Walls - Plaster/Drywall 3rd Floor,295 SF 6 $3,574 Work Sink 3rd Floor EA 6 $379 Sink does not work Classroom #326 (Science Lab Level 3) Casework 3rd Floor 77 LF 5 $37,007 Ceiling - Lay-in 3rd Floor 906 SF 6 $2,72 Chalk Board 3rd Floor 5 LF 4 $,377 Doors - Steel Doors incl hw 3rd Floor EA 7 Doors - Transom Window 3rd Floor 20 SF 7 Doors - Wood Doors inclu hw 3rd Floor 2 EA 5 $2,348 Eye Wash Station 3rd Floor EA 4 $3,08 Does not work Floor - Tile/Sheet 3rd Floor 906 SF 6 $907 Gas Line 3rd Floor EA 6 $509 Lighting - Lay-in 3rd Floor 27 EA 7 Storage/ Closet 3rd Floor 5 SF 6 $834 Walls - Plaster/Drywall 3rd Floor 920 SF 6 $2,539 Work Sink 3rd Floor 3 EA 5 $4,523 Controls need replacing Classroom #327 (Other Instructional Use) Casework 3rd Floor LF 7 Ceiling - Lay-in 3rd Floor,89 SF 7 Chalk Board 3rd Floor 8 LF 4 $734 Doors - Transom Window 3rd Floor 0 SF 7 Doors - Wood Doors inclu hw 3rd Floor EA 5 $,74 Floor - Tile/Sheet 3rd Floor,89 SF 5 $5,339 Lighting - Lay-in 3rd Floor 27 EA 7 Walls - Plaster/Drywall 3rd Floor,262 SF 6 $3,483 HIRSCH HS Page 23 of 52

24 Category: Classrooms Classroom #327 (Other Instructional Use) Work Sink 3rd Floor EA 6 $379 Classroom #328 (Science Classroom) Casework 3rd Floor 46 LF 6 $3,687 Ceiling - Lay-in 3rd Floor 937 SF 6 $2,84 Chalk Board 3rd Floor 5 LF 4 $,377 Doors - Side-lite 3rd Floor 20 SF 7 Doors - Steel Doors incl hw 3rd Floor EA 7 Doors - Transom Window 3rd Floor 20 SF 7 Doors - Wood Doors inclu hw 3rd Floor 3 EA 5 $3,522 Eye Wash Station 3rd Floor EA 4 $3,08 Most parts missing Floor - Tile/Sheet 3rd Floor 937 SF 5 $4,207 Lighting - Lay-in 3rd Floor 23 EA 7 Storage/ Closet 3rd Floor 65 SF 5 $,048 Room 328A Walls - Plaster/Drywall 3rd Floor,343 SF 6 $3,707 Work Sink 3rd Floor 3 EA 5 $4,523 Controls need replacing Classrooms Subtotal: $847,477 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices AC Unit 05 Library Office EA 6 $496 Ceiling - Lay-in 05 Library Office 320 SF 6 $96 Doors - Transom Window 05 Library Office 9 SF 6 $52 Doors - Wood Doors inclu hw 05 Library Office EA 5 $,74 Floor - Tile 05 Library Office 320 SF 6 $700 Lighting - Lay-in 05 Library Office 6 EA 7 Power Distribution 05 Library Office 4 EA 6 $8,500 Walls - Plaster/Drywall 05 Library Office 690 SF 6 $,904 AC Unit 07 Library Work Room EA 6 $496 Ceiling - Lay-in 07 Library Work Room 245 SF 7 Doors - Wood Doors inclu hw 07 Library Work Room EA 6 $30 Floor - Tile 07 Library Work Room 245 SF 6 $536 Power Distribution 07 Library Work Room 6 EA 7 Walls - Plaster/Drywall 07 Library Work Room 490 SF 6 $,352 HIRSCH HS Page 24 of 52

25 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Work SInk 07 Library Work Room EA 7 AC Unit 3 Main Office 2 EA 7 Ceiling - Lay-in 3 Main Office 85 SF 6 $2,447 Doors - Transom Window 3 Main Office 9 SF 5 $38 Doors - Wood Doors inclu hw 3 Main Office EA 6 $30 Floor - Tile 3 Main Office 85 SF 6 $,783 Lighting - Lay-in 3 Main Office 7 EA 7 Power Distribution 3 Main Office 2 EA 7 Storage/ Closet 3 Main Office 0 SF 6 $73 Walls - Plaster/Drywall 3 Main Office,090 SF 6 $3,008 AC Unit 3A EA 7 Ceiling - Lay-in 3A 55 SF 7 Doors - Wood Doors inclu hw 3A EA 6 $30 Floor - Tile 3A 55 SF 6 $339 Lighting - Lay-in 3A 4 EA 7 Power Distribution 3A 6 EA 7 Walls - Plaster/Drywall 3A 450 SF 6 $,242 AC Unit 3B EA 7 Ceiling - Lay-in 3B 55 SF 7 Doors - Wood Doors inclu hw 3B EA 6 $30 Floor - Tile 3B 55 SF 6 $339 Lighting - Lay-in 3B 4 EA 7 Power Distribution 3B 6 EA 7 Walls - Plaster/Drywall 3B 450 SF 6 $,242 AC Unit 3C Principal EA 7 Ceiling - Lay-in 3C Principal 350 SF 6 $,05 Doors - Wood Doors inclu hw 3C Principal EA 6 $30 Floor - Carpet 3C Principal 350 SF 6 $746 Lighting - Lay-in 3C Principal 4 EA 7 Power Distribution 3C Principal 8 EA 7 Walls - Plaster/Drywall 3C Principal 690 SF 6 $,904 Ceiling - Exposed 2 Attendance Office 530 SF 7 Doors - Steel Doors incl hw 2 Attendance Office EA 7 Doors - Wood Doors inclu hw 2 Attendance Office 2 EA 6 $602 Doors - Wood Doors inclu hw 2 Attendance Office EA 7 Floor - Wood 2 Attendance Office 530 SF 5 $7,753 Lighting - Pendent/Surface 2 Attendance Office 2 EA 7 HIRSCH HS Page 25 of 52

26 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Power Distribution 2 Attendance Office 4 EA 7 Walls - Plaster/Drywall 2 Attendance Office 755 SF 6 $2,084 Walls - Structural Glazed Tile 2 Attendance Office 2 SF 6 $755 glazed brick AC Unit 23 Program Office EA 6 $496 Ceiling - Lay-in 23 Program Office 595 SF 6 $,787 Doors - Transom Window 23 Program Office 9 SF 6 $52 Doors - Wood Doors inclu hw 23 Program Office 2 EA 6 $602 Floor - Tile 23 Program Office 595 SF 5 $2,672 Lighting - Lay-in 23 Program Office 5 EA 7 Power Distribution 23 Program Office 2 EA 7 Storage/ Closet 23 Program Office 6 SF 6 $44 Walls - Plaster/Drywall 23 Program Office 420 SF 6 $,59 Walls - Structural Glazed Tile 23 Program Office 270 SF 6 $849 Ceiling - Lay-in 24A Office 275 SF 6 $826 Doors - Wood Doors inclu hw 24A Office EA 6 $30 Floor - Tile 24A Office 275 SF 5 $,235 Lighting - Lay-in 24A Office 6 EA 7 Power Distribution 24A Office 2 EA 7 Walls - Plaster/Drywall 24A Office SF 6 $386 Walls - Structural Glazed Tile 24A Office 85 SF 6 $582 glazed brick AC Unit 28 Counselor 4 EA 6 $,982 Ceiling - Lay-in 28 Counselor,065 SF 6 $3,98 Doors - Transom Window 28 Counselor 8 SF 6 $305 Doors - Wood Doors inclu hw 28 Counselor 2 EA 6 $602 Floor - Tile 28 Counselor,065 SF 6 $2,330 Lighting - Lay-in 28 Counselor 30 EA 7 Power Distribution 28 Counselor 20 EA 7 Walls - Metal Panel 28 Counselor 620 SF 6 $4,628 Walls - Plaster/Drywall 28 Counselor,78 SF 6 $3,25 AC Unit 29 Counselor EA 6 $496 Ceiling - Lay-in 29 Counselor 20 SF 6 $63 Doors - Steel Doors incl hw 29 Counselor EA 6 $30 Floor - Tile 29 Counselor 20 SF 5 $943 Lighting - Lay-in 29 Counselor 6 EA 6 $74 Power Distribution 29 Counselor 0 EA 6 $2,249 Walls - Plaster/Drywall 29 Counselor 375 SF 6 $,035 Walls - Structural Glazed Tile 29 Counselor 70 SF 6 $535 glazed brick HIRSCH HS Page 26 of 52

27 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices AC Unit 30 urse EA 7 Ceiling - Lay-in 30 urse 325 SF 6 $976 Doors - Wood Doors inclu hw 30 urse EA 5 $,74 Floor - Tile 30 urse 325 SF 5 $,459 Lighting - Lay-in 30 urse 9 EA 7 Power Distribution 30 urse 4 EA 6 $8,500 Walls - Plaster/Drywall 30 urse 655 SF 6 $,808 AC Unit 3 Community Room 3 EA 6 $,487 Ceiling - Lay-in 3 Community Room,030 SF 5 $6,27 Doors - Transom Window 3 Community Room 9 SF 6 $52 Doors - Wood Doors inclu hw 3 Community Room EA 5 $,74 Floor - Carpet 3 Community Room,030 SF 6 $2,95 Lighting - Lay-in 3 Community Room 20 EA 7 recessed Lighting - Lay-in 3 Community Room 2 EA 7 Power Distribution 3 Community Room 2 EA 7 Walls - Plaster/Drywall 3 Community Room,060 SF 6 $2,925 Ceiling - Lay-in 33 Kitchenette 0 SF 6 $330 Doors - Transom Window 33 Kitchenette 8 SF 6 $305 Doors - Wood Doors inclu hw 33 Kitchenette EA 5 $,74 Floor - Tile 33 Kitchenette 0 SF 5 $494 Lighting - Lay-in 33 Kitchenette 3 EA 7 Power Distribution 33 Kitchenette 2 EA 6 $4,250 Storage/ Closet 33 Kitchenette 20 SF 6 $870 locked Walls - Plaster/Drywall 33 Kitchenette 335 SF 6 $925 Work SInk 33 Kitchenette EA 7 Ceiling - Exposed 36 Music Office 85 SF 7 Doors - Wood Doors inclu hw 36 Music Office EA 6 $30 Floor - Terrazzo 36 Music Office 85 SF 6 $5 Lighting - Pendent/Surface 36 Music Office 3 EA 7 Power Distribution 36 Music Office 2 EA 7 Storage/ Closet 36 Music Office 5 SF 6 $834 Walls - Concrete Block 36 Music Office 85 SF 7 Walls - Structural Glazed Tile 36 Music Office 745 SF 6 $2,344 glazed brick Ceiling - Exposed 38 - Transcripts Office 37 SF 4 $,692 water damage, peeling paint. Doors - Wood Doors inclu hw 38 - Transcripts Office 2 EA 6 $602 Floor - Terrazzo 38 - Transcripts Office 37 SF 6 $82 Lighting - Pendent/Surface 38 - Transcripts Office 7 EA 6 $867 HIRSCH HS Page 27 of 52

28 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Storage/ Closet 38 - Transcripts Office 94 SF 5 $,56 Walls - Structural Glazed Tile 38 - Transcripts Office,0 SF 6 $3,492 Ceiling - Plaster/Drywall 42A - PE Office 89 SF 6 $654 Doors - Wood Doors inclu hw 42A - PE Office EA 6 $30 Floor - Concrete 42A - PE Office 89 SF 6 $00 Lighting - Pendent/Surface 42A - PE Office 3 EA 6 $372 Walls - Plaster/Drywall 42A - PE Office 643 SF 6 $,775 Ceiling - Exposed 45 - Teachers' Lounge 2,64 SF 4 $9,872 peeling paint at ductwork. Doors - Transom Window 45 - Teachers' Lounge 9 SF 4 $688 Broken glass. Doors - Transom Window 45 - Teachers' Lounge 9 SF 6 $52 Doors - Wood Doors inclu hw 45 - Teachers' Lounge 2 EA 5 $2,348 Floor - Terrazzo 45 - Teachers' Lounge,449 SF 4 $88,270 patches throughout from conversion from boys' locker room Floor - Tile Ceramic/ Porcelain 45 - Teachers' Lounge 75 SF 4 $9,999 patched from boys' locker room conversion Lighting - Pendent/Surface 45 - Teachers' Lounge 35 EA 6 $4,336 Walls - Structural Glazed Tile 45 - Teachers' Lounge 3,80 SF 6 $,958 Ceiling - Exposed 49 - Custodial Office 20 SF 7 Doors - Transom Window 49 - Custodial Office 2 SF 6 $203 Doors - Wood Doors inclu hw 49 - Custodial Office 2 EA 5 $2,348 Floor - Terrazzo 49 - Custodial Office 20 SF 6 $459 Lighting - Pendent/Surface 49 - Custodial Office 3 EA 6 $372 Walls - Plaster/Drywall 49 - Custodial Office,83 SF 6 $3,265 Ceiling - Exposed 5 - Custodial Office 29 SF 7 Doors - Wood Doors inclu hw 5 - Custodial Office 2 EA 5 $2,348 Floor - Terrazzo 5 - Custodial Office 29 SF 6 $282 Lighting - Pendent/Surface 5 - Custodial Office 2 EA 7 Power Distribution 5 - Custodial Office 4 EA 6 $8,500 Walls - Plaster/Drywall 5 - Custodial Office 556 SF 6 $,535 Work SInk 5 - Custodial Office EA 6 $508 Ceiling - Plaster/Drywall 53 - Engineer Office 89 SF 6 $308 Doors - Transom Window 53 - Engineer Office 2 SF 6 $203 Doors - Wood Doors inclu hw 53 - Engineer Office EA 6 $30 Floor - Tile 53 - Engineer Office 89 SF 6 $95 Lighting - Pendent/Surface 53 - Engineer Office EA 7 Storage/ Closet 53 - Engineer Office 2 SF 6 $87 Walls - Plaster/Drywall 53 - Engineer Office 434 SF 6 $,98 Ceiling - Plaster/Drywall 57 B - Pool Office 33 SF 7 Doors - Side-lite 57 B - Pool Office 2 SF 7 HIRSCH HS Page 28 of 52

29 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Doors - Steel Doors incl hw 57 B - Pool Office EA 7 Floor - Tile Ceramic/ Porcelain 57 B - Pool Office 33 SF 6 $70 Lighting - Pendent/Surface 57 B - Pool Office EA 7 Power Distribution 57 B - Pool Office 2 EA 7 Walls - Structural Glazed Tile 57 B - Pool Office 25 SF 7 Ceiling - Plaster/Drywall 62 Engineer Office 3 SF 6 $39 Doors - Wood Doors inclu hw 62 Engineer Office EA 5 $,74 Floor - Terrazzo 62 Engineer Office 3 SF 6 $247 Lighting - Pendent/Surface 62 Engineer Office 3 EA 6 $372 Power Distribution 62 Engineer Office 4 EA 6 $8,500 Walls - Plaster/Drywall 62 Engineer Office 8 SF 5 $3,092 AC Unit 73 Cafeteria Manager EA 6 $496 Ceiling - Lay-in 73 Cafeteria Manager 25 SF 6 $375 Doors - Wood Doors inclu hw 73 Cafeteria Manager EA 6 $30 Floor - Tile 73 Cafeteria Manager 25 SF 6 $273 Lighting - Pendent/Surface 73 Cafeteria Manager 3 EA 7 Power Distribution 73 Cafeteria Manager 8 EA 7 Storage/ Closet 73 Cafeteria Manager 2 SF 6 $5 Walls - Plaster/Drywall 73 Cafeteria Manager 280 SF 6 $773 Walls - Structural Glazed Tile 73 Cafeteria Manager 395 SF 6 $,243 Ceiling - Lay-in 205A Office/Storage 225 SF 7 Doors - Wood Doors inclu hw 205A Office/Storage 2 EA 6 $602 Floor - Tile/Sheet 205A Office/Storage 225 SF 6 $225 Lighting - Lay-in 205A Office/Storage 5 EA 7 Power Distribution 205A Office/Storage 8 EA 7 Walls - Metal Panel 205A Office/Storage 462 SF 7 Walls are glass Walls - Plaster/Drywall 205A Office/Storage 225 SF 6 $62 AC Unit 25 Student Dean's Office 2 EA 6 $99 Ceiling - Lay-in 25 Student Dean's Office 428 SF 7 Doors - Side-lite 25 Student Dean's Office 70 SF 6 $,70 Doors - Transom Window 25 Student Dean's Office 8 SF 6 $35 Doors - Wood Doors inclu hw 25 Student Dean's Office EA 6 $30 Floor - Tile/Sheet 25 Student Dean's Office 428 SF 5 $,922 Lighting - Lay-in 25 Student Dean's Office 9 EA 7 Lighting - Wall Mounted 25 Student Dean's Office EA 7 Power Distribution 25 Student Dean's Office 6 EA 6 $33,998 Walls - Plaster/Drywall 25 Student Dean's Office 82 SF 6 $2,24 HIRSCH HS Page 29 of 52

Theodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625

Theodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS Facility Assessment Report Co-locating on this campus are MARIE MILITAR HS and PHOEIX MILITAR HS This report contains the detailed findings of a facility assessment completed on the date noted in the document

More information

Charles Kozminski Elementary Community Academy

Charles Kozminski Elementary Community Academy Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John F Kennedy High School 6325 W 56th St Chicago, IL Co-locating on this campus are KENNEDY HS and KINZIE

John F Kennedy High School 6325 W 56th St Chicago, IL Co-locating on this campus are KENNEDY HS and KINZIE Facility Assessment Report 6325 W 56th St Chicago, IL 6638 Co-locating on this campus are KEED HS and KIZIE This report contains the detailed findings of a facility assessment completed on the date noted

More information

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628 11411 S Eggleston Ave Chicago, IL 6628 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors

More information

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

Salmon P Chase Elementary School 2021 N Point St Chicago, IL 60647

Salmon P Chase Elementary School 2021 N Point St Chicago, IL 60647 221 Point St Chicago, IL 47 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each

More information

William Howard Taft High School

William Howard Taft High School Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

CUMBERLAND SCHOOLS WORK PROPOSED 2018

CUMBERLAND SCHOOLS WORK PROPOSED 2018 Cost Ashton Elementary School 2 2 Replace HVAC $ 375,000.00 5 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 2 3 Various Technological Improvements $ 191,258.00 2 4 Replace Plumbing Fixtures

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: R. F. WAGNER SEC SCL ARTS & TECH-Q, 47-07 30TH PLACE, New York, 11101 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-16

More information

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live! U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or

More information

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015 TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Solomon Pond Mall is a two-level super-regional mall located on Donald J. Lynch Boulevard, just off I-290 and I- 495, in Marlborough. The mall opened

More information

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015 TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW Sawgrass Mills is located on the Sawgrass Expressway (SR 869) just west of Ft. Lauderdale, FL. The center is less than 30 minutes from both Boca

More information

HOME INVESTMENTS PARTNERSHIP PROGRAM Local Housing Standards Checklist

HOME INVESTMENTS PARTNERSHIP PROGRAM Local Housing Standards Checklist : Initial Inspection Annual Inspection Re-Inspection Pass Tenant Name: Address: Number of Bedrooms: Build : Housing Type: Single Family Residence Duplex Low Rise(2-4 stories) High Rise(5 or More Stories)

More information

Shoreview Corporate Center

Shoreview Corporate Center Table of Contents Section Page # Property Overview Executive Summary 4 Property Description 4 Area Map 5 Aerial Photograph Area 6 Aerial Photograph Property 7 Campus Map 8 1005 Gramsie Building Physical

More information

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION City of Oregon City Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION 1.1 Building - Plan Review 1.1.01 Building Plan Review 65% of building permit fee 1.1.02

More information

TENANT DESIGN MANUAL UPDATED MAY 2016

TENANT DESIGN MANUAL UPDATED MAY 2016 TENANT DESIGN MANUAL UPDATED MAY 2016 PROJECT OVERVIEW Burlington Mall is located along I-95 at the Middlesex Turnpike Intersection in Burlington, Massachusetts. It is 12 miles northwest of downtown Boston

More information

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00 City of Huntington Beach Department of Community Development BUILDING PERMIT FEES 2000 Main Street, Huntington Beach, CA 92648 Office: Fax: (714) 374-1647 Permit Processing Charge Flat fee @ Permit or

More information

HOUSING CODE CHECKLIST FOR RENTAL INSPECTIONS

HOUSING CODE CHECKLIST FOR RENTAL INSPECTIONS HOUSING CODE CHECKLIST FOR RENTAL INSPECTIONS GENERAL 410.200 Heating facilities must be fully operational and well maintained with facilities capable of heating every room (including bathroom and kitchen).

More information

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017 TENANT DESIGN MANUAL UPDATED FEBRUARY 2017 PROJECT OVERVIEW Montgomery Mall is located at the intersection of US 202 and SR 309 in the heart of Philadelphia s affluent northern suburbs. 2 PROJECT OVERVIEW

More information

TOWN CENTER Property Description 2000 Tower Town Center 2000 Tower Overview Completed in 1986, the 2000 Tower at Town Center has one of its most striking entry lobbies. The polished granite lobby is two

More information

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE A listing of fees associated with Building, Plumbing, Mechanical and Electrical Permits issued by Lane County Land Management Division Effective

More information

New Hope-Solebury School District Campus Revitalization Plan

New Hope-Solebury School District Campus Revitalization Plan Campus Revitalization Plan 20 January 2016 GODSHALL KANE O ROURKE ARCHITECTS, LLC 12 East Butler Avenue, Suite 205, Ambler, PA 19002 T: 215.646.2003 F: 215.646.5707 www.gkoarchitects.com Site Rendering

More information

The Promenade at Casa Grande 1005 N Promenade Pkwy Casa Grande, AZ 85294

The Promenade at Casa Grande 1005 N Promenade Pkwy Casa Grande, AZ 85294 ADDENDUM LOG August, 2011 Manual generated September, 2011 Waterproof membrane requirement updated March, 2014 Distribution of utilities through exit corridors is prohibited with exception (t11) October,

More information

TECHNICAL CRITERIA ARROWHEAD TOWNE CENTER THE PLACE TO SHOP

TECHNICAL CRITERIA ARROWHEAD TOWNE CENTER THE PLACE TO SHOP TECHNICAL CRITERIA THE PLACE TO SHOP ADDENDUM LOG May, 2009 TCM Generated/Layout Updated June, 2009 Updated with TC comments September, 2011 Waterproof membrane requirement updated February, 2012 Updated

More information

TENANT DESIGN MANUAL UPDATED JANUARY 2016

TENANT DESIGN MANUAL UPDATED JANUARY 2016 TENANT DESIGN MANUAL UPDATED JANUARY 2016 PROJECT OVERVIEW College Mall is located in Bloomington, Indiana and is the only regional mall in the market. It is home to Indiana University s flagship campus

More information

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, 2014 COMMERCIAL FEES Minimum Fee $120.00 - unless stated otherwise 1 Churches and Schools IBC Use Groups A-3 and E.15 cents per

More information

14400 Bear Valley Road, Victorville, CA 92392

14400 Bear Valley Road, Victorville, CA 92392 ADDENDUM LOG January, 2008 Entire Criteria Manual January, 2009 Full update March, 2009 Contact revisions/additions July, 2009 Revised full update June, 2011 Plumbing content updated to include Seismic

More information

Exhibit C - Shops 1 & 2

Exhibit C - Shops 1 & 2 Exhibit C - Shops 1 & 2 EXHIBIT "C" LANDLORD S WORK MOUNTAIN GROVE SHOPS (Revised 02/12/2013) Landlord agrees, at its sole cost and expense, to furnish and install the following "Landlord's Work", limited

More information

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS A 2008 City Code amendment requires the owners of all rental dwelling units in the city to have a certificate of occupancy (CO) before

More information

3435 MAIN 3435 Main Street Kansas City, MO RESTAURANT SPACE Available for Lease 1. BUILDING LOCATION

3435 MAIN 3435 Main Street Kansas City, MO RESTAURANT SPACE Available for Lease 1. BUILDING LOCATION 1. BUILDING LOCATION E. 34TH TERRACE MAIN STREET ARMOUR BLVD, at the corner of Main and 34th Terrace Restaurant Space - 2,238 SF, with 38 LF of Main Street frontage - On-site parking - Accomodation for

More information

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK I. LANDLORD'S WORK Landlord's Work shall be done in accordance with the specifications set forth below, shall be limited to the work set forth in this Section

More information

San Tan Village 2218 E. Williams Field Rd. #235, Gilbert, AZ 85295

San Tan Village 2218 E. Williams Field Rd. #235, Gilbert, AZ 85295 ADDENDUM LOG December, 2009 Updated to current layout January, 2010 Revised per TC AVP Comments September, 2011 Waterproof membrane requirement updated March, 2014 Distribution of utilities through exit

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: DIV. OF INSTR. & INFO. TECH.-K, 335 ADAMS STREET, New York, 11201 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-17 8:05

More information

Property Details 916 Youngs Road

Property Details 916 Youngs Road Property Details 916 Youngs Road PRINCIPAL RESIDENCE o 4 bedrooms, 4 bathrooms, plus 2 half baths Master Suite 1100 sq ft master suite Master Closets His & Hers separate walk-in closets with Custom built-ins

More information

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015 TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Mall of Georgia is located on SR 20 (Buford Drive) in the Mill Creek District of Gwinnett County, Georgia. It is 30 miles northeast of Atlanta. 2

More information

TENANT DESIGN MANUAL UPDATED DECEMBER 2018

TENANT DESIGN MANUAL UPDATED DECEMBER 2018 TENANT DESIGN MANUAL UPDATED DECEMBER 2018 PROJECT OVERVIEW South Hills Village is located at US 19 (Washington Road) and Ft. Couch Road, in the Bethel Park suburb of Pittsburgh. 2 PROJECT OVERVIEW Anchored

More information

518 3 rd Avenue South St. Petersburg, Florida

518 3 rd Avenue South St. Petersburg, Florida 518 3 rd Avenue South St. Petersburg, Florida 33701 813.895.8591 www.viridianfl.com Project Summary Preservation of Senior Housing Project Name: Viridian Address: 518 3 rd Avenue South St. Petersburg,

More information

Tenant Design Criteria Section t Technical Criteria Updated: August Wilton Mall at Saratoga 3065 Route 50, Saratoga Springs, NY 12866

Tenant Design Criteria Section t Technical Criteria Updated: August Wilton Mall at Saratoga 3065 Route 50, Saratoga Springs, NY 12866 Wilton Mall at Saratoga TABLE OF CONTENTS TECHNICAL CRITERIA Electric / Water Sub-meter Requirements t3 Wilton Mall at Saratoga ADDEMDUM August, 2016 Added information regarding all sanitary lines must

More information

PROGRAM AREAS - MIDDLE SCHOOL

PROGRAM AREAS - MIDDLE SCHOOL CAPACITY Enrollment 4.0 10.00 3.81 Building Size 4.0 10.00 3.81 ACCESSIBILITY Site Access 4.0 3.00 1.14 Building Access 2.0 3.00 0.57 Disabled Access 1.0 3.00 0.29 Some site and building areas not ADA

More information

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015 TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Northshore Mall is located at the intersection of Routes 114 and 128, just minutes from major thoroughfares US 1 and I-95. 2 PROJECT OVERVIEW As

More information

TENANT DESIGN MANUAL UPDATED OCTOBER 2016

TENANT DESIGN MANUAL UPDATED OCTOBER 2016 TENANT DESIGN MANUAL UPDATED OCTOBER 2016 PROJECT OVERVIEW Conveniently located just off US 65 (Glenstone Avenue) and just five miles south of I-44, Battlefield Mall is perfectly positioned to serve the

More information

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015 TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Castleton Square is located on East 82 nd Street and is adjacent to both I-465 and I-69 on the northeast side of Indianapolis. It also serves the

More information

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015 TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW Santa Rosa Plaza is located on US 101, between College Avenue and State Road 12, in Santa Rosa, just 55 miles north of San Francisco, in the heart

More information

Fee Resolution

Fee Resolution Fee Resolution 2016-6 A resolution establishing fees for the filing of applications, permits and licenses for the Township of Leet. WHEREAS, the Board of Commissioners of the Township of Leet has adopted

More information

TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045

TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045 TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION 9123 Route 108, Old Annapolis Road Columbia, MD 21045 RETAIL/OFFICE/MEDICAL/EXECUTIVE SUITES OFFERED FOR LEASE PROPERTY IDENTIFICATION: ADDRESS:

More information

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015 TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Cape Cod Mall is located on Route 132 in Hyannis, the largest of seven towns in Cape Cod, MA. Hyannis is known as the Capitol of the Cape. 2 PROJECT

More information

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE A listing of fees associated with Building, Plumbing, Mechanical and Electrical Permits issued by Lane County Land Management Division Effective

More information

FOR LEASE. Capitol Hill Corner Cafe/Restaurant Space th Avenue, Seattle, WA Please call brokers for more information:

FOR LEASE. Capitol Hill Corner Cafe/Restaurant Space th Avenue, Seattle, WA Please call brokers for more information: FOR LEASE Capitol Hill Corner Cafe/Restaurant Space Cal Anderson Park Seattle Central College / Capitol Hill 1634 11th Avenue, Seattle, WA 98122 Light Rail 1.5 blocks 1634 11th Ave. New 6 story mixed-use

More information

TECHINICAL CRITERIA DEPTFORD MALL THE PLACE TO SHOP

TECHINICAL CRITERIA DEPTFORD MALL THE PLACE TO SHOP TECHINICAL CRITERIA THE PLACE TO SHOP TABLE OF CONTENTS PLEASE VISIT WWW.MACERICH.COM TO VIEW PLAN SUBMITTAL & APPROVAL PROCEDURES and CONTRACTOR RULES & REGULATIONS TECHNICAL CRITERIA Electric / Water

More information

TENANT DESIGN MANUAL UPDATED JULY 2016

TENANT DESIGN MANUAL UPDATED JULY 2016 TENANT DESIGN MANUAL UPDATED JULY 2016 PROJECT OVERVIEW South Shore Plaza is located at the intersection of Route 3 and I-93 in Braintree, MA. It is approximately 10 miles from historic downtown Boston

More information

th Street Boulder CO 80301

th Street Boulder CO 80301 1600 28th Street Boulder CO 80301 ADDENDUM LOG August, 2009 Criteria Manual Series updated via current template September, 2011 Waterproof membrane requirement updated March, 2014 Distribution of utilities

More information

Feelwood Village. Baabdat. Technical specifications for the buildings on lots # 569 & Baabdat

Feelwood Village. Baabdat. Technical specifications for the buildings on lots # 569 & Baabdat Feelwood Village Baabdat Technical specifications for the buildings on lots # 569 & 3208 - Baabdat Public services of the project will include: Technical building equipped with computer(s) for services

More information

Investigation Reference No. Investigation Status. Investigation Description

Investigation Reference No. Investigation Status. Investigation Description IBMS Reports MLS Building Audit Program - Details Property Address : 4 ADANAC DR Legal Description: PLAN 84 PT BLK A PLAN 49 LOT TO 8 PT LOT TO 6PT Roll : 99 Building : 4 ADANAC DR Report : Building Audit

More information

TENANT DESIGN MANUAL UPDATED JUNE 2016

TENANT DESIGN MANUAL UPDATED JUNE 2016 TENANT DESIGN MANUAL UPDATED JUNE 2016 PROJECT OVERVIEW The Shops at Chestnut Hills is located is located along State Route 9 (Boylston Street) and Hammond Pond Parkway in the heart of Chestnut Hills.

More information

Attic Floor Bedrooms 1 & 2 Family Dwellings

Attic Floor Bedrooms 1 & 2 Family Dwellings Habitable Room Definition (2015 MN Residential Code R202) A space in a building for living, sleeping, eating or cooking is considered a habitable space. Bathrooms, toilet rooms, closets, halls, storage

More information

320 Bay Street TORONTO ONTARIO. Tracy Macdonald Vice President,

320 Bay Street TORONTO ONTARIO. Tracy Macdonald Vice President, 320 Bay Street TORONTO ONTARIO LEASING 5 154 SF - OCCUP 320 BAY STREET In 1992, after many years of research into the correct fixtures and materials of the original construction era, the restoration of

More information

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015 TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW St. Charles Towne Center is a two-level super-regional mall located at the intersection of Smallwood Drive and US 301, in Waldorf, Maryland, just

More information

CENTURY OFFICE CAMPUS. 4, 5 & 6 Century Drive, Parsippany, N.J.

CENTURY OFFICE CAMPUS. 4, 5 & 6 Century Drive, Parsippany, N.J. CENTURY OFFICE CAMPUS 4, 5 & 6 Century Drive, Parsippany, N.J. PROPERTY OVERVIEW Century Office Campus consists of three office buildings located at 4,5 & 6 Century Drive in Parsippany, N.J. Three Class

More information

General Information RETAIL AND RESTAURANT

General Information RETAIL AND RESTAURANT General Information RETAIL AND RESTAURANT Landlord s Tenant Coordinator The role of the Tenant Coordinator is to serve as liaison between Landlord and the Tenant, Tenant's architect and Tenant's contractor.

More information

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161 1 School Name Year Built/Renovation Classroom quantity, size, type, usage Glover School Construction 2012-14 Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor

More information

CHAPTER 1321 Permit and Inspection Fees

CHAPTER 1321 Permit and Inspection Fees CHAPTER 1321 Permit and Inspection Fees 1321.01 General building permit fees. 1321.02 Heating, ventilating, air conditioning and refrigeration permit fees. 1321.03 Plumbing and sewer permit fees. 1321.04

More information

Residencial Cármenes Balcón de Granada c/ Zahareña (Barranco del Abogado),

Residencial Cármenes Balcón de Granada c/ Zahareña (Barranco del Abogado), Look through your new window Balcón de Granada is a proposal to appreciatte the beauty of one of the most wonderful landscapes of the world. In "Inmobiliaria Osuna" we want to keep the tradition of thhe

More information

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017 TENANT DESIGN MANUAL UPDATED FEBRUARY 2017 PROJECT OVERVIEW Pier Park is an approximately 1.1 million square feet combination town/ community/lifestyle center located in the heart of Panama City Beach

More information

Renovation Progress. July 21 Aug 3, Week 42 & 43

Renovation Progress. July 21 Aug 3, Week 42 & 43 Renovation Progress July 21 Aug 3, 2012 Week 42 & 43 Jul 21 Saturday work: hardwood sanding on 2nd Ottilia and masonry outside BSRC dining room Jul 23 Carpet removal outside of chapel Jul 23 2 nd Ottilia

More information

Multi-Family Properties Available

Multi-Family Properties Available Vol Cert Case Number PIN Property Address City All Outstanding Taxes To Deed Estimated Taxes Due To Deed Property Description Target Pricing for Cert/Deed Property Image 42 1458 2015COTD003051 16-21-413-032-0000

More information

Renovation Progress. June 2-15, Weeks 35 & 36

Renovation Progress. June 2-15, Weeks 35 & 36 Renovation Progress June 2-15, 2012 Weeks 35 & 36 Jun 2 Sisters investigate the progress and ponder the finished arrangement of the reception area (right) and the residence area on 2 nd Ottilia (below)

More information

City of Wausau Building, Housing and Zoning Fee Schedule 2019

City of Wausau Building, Housing and Zoning Fee Schedule 2019 ONE- AND TWO-FAMILY: Plan Review New one- and two-family dwellings Additions and alterations to one- and two-family dwellings (not including garages) 500 sq. ft. or less Over 500 sq. ft. New accessory

More information

ACCESSORY DWELLING UNITS

ACCESSORY DWELLING UNITS ACCESSORY DWELLING UNITS Category: Residential Construction Revised: [Paul L. Scarlett], Director Responsible Bureau Sections: Development Services Center 1900 SW Fourth Avenue Portland, OR 97201 503-823-7310

More information

Sr. No This option is applicable for Options Remarks / Details required

Sr. No This option is applicable for Options Remarks / Details required SDIL/MOD/1 26 th February, 2012 Dear Customers, This letter is being written to all of you to give the details on the modifications that are possible in the 2 BHK Flats (Apartments) that you have booked

More information

Residencial El Prado - "Viviendas desde *. Plaza y Trastero Incluido" Ensanche de Vallecas (caseta nº 1)

Residencial El Prado - Viviendas desde *. Plaza y Trastero Incluido Ensanche de Vallecas (caseta nº 1) A NEW CITY IN MADRID El Prado residential complex is located in Madrid, in a new area that will soon be considered as one of the most important residential areas in the autonomous community, the place

More information

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015 TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Hamilton Town Center is located at the intersection of 146th Street (SR 238) and I-69 in Noblesville, IN. It s location in Hamilton County enables

More information

Contemporary villas Panoramic view 3 minutes from Bonita Beach

Contemporary villas Panoramic view 3 minutes from Bonita Beach Contemporary villas Panoramic view 3 minutes from Bonita Beach 4 individual villas with private pool - 3 bedrooms + optional studio Situated on a 4000 square meter terrain VILLAS AUM 3 or 4 bedroom villas,

More information

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015 TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015 Ordinance- To adjust the building, mechanical, plumbing and gasfitting, and electrical permit fees and to make other conforming changes. BE IT ORDAINED

More information

TENANT DESIGN MANUAL UPDATE JUNE 2015

TENANT DESIGN MANUAL UPDATE JUNE 2015 TENANT DESIGN MANUAL UPDATE JUNE 2015 PROJECT OVERVIEW IN THE HEART OF LONG ISLAND, NY, WALT WHITMAN SHOPS IS FOUND AT THE INTERSECTION OF THE JERICHO TURNPIKE (RT 25) AND WALT WHITMAN ROAD (RT 110). 2

More information

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015 TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW Gurnee Mills is located at the intersection of I-94 and Grand Avenue (SR 132) in Lake County, Illinois. It is halfway between Chicago and Milwaukee.

More information

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015 TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW At the heart of the Orange Crush Interchange, The Outlets at Orange is located at the junction of The City Drive South and the Garden Grove Freeway

More information

PETITION B Reductions in Maintenance and Services, Habitability Problems, and/or Failure to Provide Maintenance and Services Required by Law

PETITION B Reductions in Maintenance and Services, Habitability Problems, and/or Failure to Provide Maintenance and Services Required by Law Rental unit address: Date you moved into this rental unit: 1. I am seeking (check all that apply): A Rent Reduction A Rent Rebate 2. Check if you have any of the following habitability, maintenance and/or

More information

ACCESSORY DWELLING UNITS

ACCESSORY DWELLING UNITS ACCESSORY DWELLING UNITS Category: Residential Construction Revised: [Paul L. Scarlett], Director Responsible Bureau Sections: Development Services Center 1900 SW Fourth Avenue Portland, OR 97201 503-823-7310

More information

BAUHAUS IN THE HEART OF PASARÉT, 1026 BUDAPEST, HŰVÖSVÖLGYI ST 53/B

BAUHAUS IN THE HEART OF PASARÉT, 1026 BUDAPEST, HŰVÖSVÖLGYI ST 53/B CALLIS INVESTMENT LTD. +36 1 201 77 27 SALES@H53.HU 1 GENERAL DESCRIPTION 3 STRUCTURE 5 BUILDING ENVELOPES 5 DOORS AND WINDOWS 5 PAVEMENTS 6 MECHANICS 7 ELECTRICITY, LOW-VOLTAGE APPLIANCES 8 ELEVATOR 8

More information

General Statement Regarding Assessment Analysis Recommendations

General Statement Regarding Assessment Analysis Recommendations Summary For Berkley Court Apartments VA018182000 General Statement Regarding Assessment Analysis Recommendations Pursuant to the Franklin Redevelopment and Housing Authority, VA agreement with The Nelrod

More information

DEPARTMENT OF BUILDING AND SAFETY

DEPARTMENT OF BUILDING AND SAFETY DEPARTMENT OF BUILDING AND SAFETY INDEPENDENCE OFFICE BISHOP OFFICE P.O. Drawer Q 377 W. Line St. Independence, CA 93526 Bishop, CA 93514 Ph. (760) 878-0201 Ph. (760) 873-7858 Fax. (760) 878-2001 Fax.

More information

Type A-g 1-Bedroom 66 sq m / 710 sq ft #01-01

Type A-g 1-Bedroom 66 sq m / 710 sq ft #01-01 Type A-g 1-Bedroom 66 sq m / 710 sq ft #01-01 Type A-G1 1-Bedroom 67 sq m / 721 sq ft #01-07 Type A-G2 1-Bedroom 70 sq m / 754 sq ft #01-13 Type A-G3 1-Bedroom 69 sq m / 743 sq ft #01-19 Type A 1-Bedroom

More information

Beirut East Gate is a residential and commercial project majestically rising on the shoulder of a beautiful hill

Beirut East Gate is a residential and commercial project majestically rising on the shoulder of a beautiful hill Dear Sir, Beirut East Gate is a residential and commercial project majestically rising on the shoulder of a beautiful hill cliff coasting Baabda Damascus International Highway and overlooking the fabulous

More information

BUILDING PERMIT FEE ESTIMATE

BUILDING PERMIT FEE ESTIMATE BUILDING PERMIT FEE ESTIMATE CONSTRUCTION COSTS $ TYPE OF IMPROVEMENT [ ] New [ ] Addition [ ] Alteration [ ] Repair [ ] Replace [ ] Demolition [ ] Change of Occupancy: FROM TO Structure Type: [ ] Commercial

More information

M001 EAGLECREST LEARNING CENTER CITY & BOROUGH OF JUNEAU. Inc. CBJ CONTRACT No. E SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE

M001 EAGLECREST LEARNING CENTER CITY & BOROUGH OF JUNEAU. Inc. CBJ CONTRACT No. E SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE PLUMBING CONNECTION SCHEDULE PUMP SCHEDULE SHEET LIST SYMBOLS & SCHEDULE FILE: 303 M00 FLOWSETTER AND AUTOMATIC VALVE SCHEDULE CODE NOTES:

More information

ENFIELD HOUSING AUTHORITY SECTION 8 OFFICE 1 Pearson Way, Enfield, CT Phone: Fax:

ENFIELD HOUSING AUTHORITY SECTION 8 OFFICE 1 Pearson Way, Enfield, CT Phone: Fax: ENFIELD HOUSING AUTHORITY SECTION 8 OFFICE 1 Pearson Way, Enfield, CT 06082 Phone: 860-745-7493 Fax: 860-741-8439 www.enfieldha.org SECTION 8 PROGRAM INFORMATION BOOKLET FOR PROPERTY OWNERS & MANAGERS

More information

1. PRESENTATION OF THE PROJECT

1. PRESENTATION OF THE PROJECT 1. PRESENTATION OF THE PROJECT Luxury chalets - Alpe d Huez LOCATION The project is located at the highest point of the Alpe d Huez resort, beside the ski slopes and opposite the Grandes Rousses mountain

More information

ADAPTABLE DESIGN GUIDELINES

ADAPTABLE DESIGN GUIDELINES ADAPTABLE DESIGN GUIDELINES Adaptable design creates liveable residences for a wider range of persons than current building codes require. By considering design features that can be easily and inexpensively

More information

TENANT DESIGN CRITERIA V. Technical Criteria 34

TENANT DESIGN CRITERIA V. Technical Criteria 34 TECHNICAL CRITERIA Electrical Landlord shall furnish a main electrical service disconnect fusible switch and a telephone backboard at a central distribution point located within Landlord s main electrical

More information

SOUTHLAKE MALL. Southlake Mall Tenant Design & Construction Criteria TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

SOUTHLAKE MALL. Southlake Mall Tenant Design & Construction Criteria TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS SOUTHLAKE MALL TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS 1 TABLE OF CONTENTS 1.0 PROPERTY INTRODUCTION...3 1.1 Base Building Information 1.2 Contact Information 1.3 Vicinity

More information

ARLINGTON S COOLEST SQUARE BLOCK HAS RISEN TO ITS EXPECTATIONS. #HQCOOL

ARLINGTON S COOLEST SQUARE BLOCK HAS RISEN TO ITS EXPECTATIONS. #HQCOOL ARLINGTON S COOLEST SQUARE BLOCK HAS RISEN TO ITS EXPECTATIONS. #HQCOOL #businesscool - Nine stories, all with generous floorto-ceiling windows for optimal natural light and views - Flexible and efficient

More information

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015 TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW Opened in 1997 and located just 10 miles southeast of downtown Phoenix, Arizona Mills is located at the intersection of US-60 and I-10, at the Arizona

More information

TENANT DESIGN MANUAL UPDATED AUGUST 2016

TENANT DESIGN MANUAL UPDATED AUGUST 2016 TENANT DESIGN MANUAL UPDATED AUGUST 2016 PROJECT OVERVIEW Ingram Park Mall is located in the northwest suburbs of San Antonio, Texas, the seventh largest city in the United States. The center is strategically

More information

Janet Campbell Howard Hanna Real Estate Services. 85 South Union Street Main Line: (585) Spencerport NY Office Fax: (585)

Janet Campbell Howard Hanna Real Estate Services. 85 South Union Street Main Line: (585) Spencerport NY Office Fax: (585) Quality Built Homes By: Iuppa Homes Inc. Rich Iuppa Builder & Howard Hanna Real Estate Services Spencerport Office Janet Campbell Broker Associate Office: (585)-352-8524 Cell: (585)-739-8065 Subdivision

More information

Positano Waterfront Residences. Copyright 2016, Miromar Development Corporation.

Positano Waterfront Residences. Copyright 2016, Miromar Development Corporation. Positano Waterfront Residences by Gulfshore Homes Copyright 2016, Miromar Development Corporation. Residence 01 3 Bedrooms, 3 Bathrooms, Den, Powder Bath, Balcony and Covered Lanai Residence 01 Square

More information

TENANT DESIGN MANUAL UPDATED AUGUST 2015

TENANT DESIGN MANUAL UPDATED AUGUST 2015 TENANT DESIGN MANUAL UPDATED AUGUST 2015 PROJECT OVERVIEW JCPenny Nordstrom Macy s Lord & Taylor Sears WOODFIELD MALL 2 PROJECT OVERVIEW The largest shopping center in the state of Illinois and one of

More information

Tiny House on Wheels A Tiny House

Tiny House on Wheels A Tiny House TINY HOUSES November 2018 The term Tiny House means different things to different people. Some people use the term to refer to a Tiny House on Wheels while others refer to a smaller version of a detached

More information

TENANT DESIGN MANUAL UPDATED OCTOBER 2016

TENANT DESIGN MANUAL UPDATED OCTOBER 2016 TENANT DESIGN MANUAL UPDATED OCTOBER 2016 PROJECT OVERVIEW Bangor Mall is conveniently located off exits 186 and 187 on I-95, the only major highway that runs north and south in the state, providing easy

More information