1 Introduction Welcome Original design concept Welcome to this exhibition which provides an update about the redevelopment of 4-24 Torwood Street. Previous plans previously received full planning consent in April 2011 to redevelop the proposal site with a high quality mixed use scheme, which included an internationally branded hotel, 12 residential apartments, offices and a gym/fitness centre, together with new retail and restaurants fronting onto Torwood Street. About this exhibition This exhibition provides the opportunity for you to meet with representatives from and its team and to find out more about the amendments which are now proposed in order to bring forward a successful, viable, mixed use development. The amendments required to the existing approved scheme, which are presented at this exhibition, demonstrate New Riviera Estates continued commitment to regenerating this important site and to ensuring a viable and beneficial scheme is delivered to Torbay. Torwood Street Exterior of approved scheme 2011 The Terrace Residential Commercial Restaurant Internal arrangement of approved scheme 2011
2 Revised plans Why are revised plans needed? Original plan 2011 Since the original planning consent was granted, the proposals have been carefully re-assessed. The revisions proposed primarily involve improvements to the internal and external design, which are required to meet the needs of the future, internationally branded hotel operator. is working closely with Torbay based architects Kay Elliott to ensure the design amendments required improve the design proposed and ensure a viable development is achieved. What are the main changes proposed? Revised internal layout to provide a more ordered internal arrangement, ensuring better separation is achieved between the uses proposed, to meet the needs of future operators/occupiers, particularly the hotel. Improved hotel space the internal layout of the hotel has been reassessed, delivering an improved hotel offering. The main entrance has been located on The Terrace, along with a new active frontage overlooking the street. access is also provided onto Torwood Street to ensure all guests have easy access to the harbourside. Increased office space the office space has been increased and now comprises the three top floors. New prestigious, 21st Century, fit for purpose office suites in the town centre, with panoramic views over the bay, will be attractive to both new businesses looking to locate to Torquay and also existing businesses seeking to remain in the town. Additional office space will also contribute to the overall employment opportunities within the scheme. Revised plan 2013 View from proposed office suites Removal of residential apartments and fitness suite to accommodate the internal layout improvements and increase the size of the hotel and office space offered, the 12 residential apartments and the gym have been removed. However, the hotel will continue to provide its own integrated hotel fitness facility. Original plan 2011 Revised plan 2013 Revised proposals at a glance The revised proposal would deliver the following beneficial uses: An internationally branded 3\4 star hotel delivering 110 bedrooms Prestigious new office space, with sea views Retail and restaurant uses providing active frontages directly onto Torwood Street A pedestrian walkway linking Torwood Street to The Terrace Reduced height
3 Layout The following plans show how the revised layout would be accommodated within the proposal site. Ext mech equip m² Electrical 9.46 m² 5400 Service Corridor m² m² ft² Mechanical m² Main' 8.34 m² m² bed bed Acc m² m² fitness room m² Void under stairs m² ft² 6095 Store m² ft² to mezzanine A3 Unit m² ft² Interior fit out by Tenant A3 Unit m² ft² Area includes plant. Interior fit out by Tenant possible recessed folding doors option shown dotted A3 Unit m² ft² Area includes plant. Interior fit out by Tenant Proposed Loading Bays (see seperate drawing) possible recessed folding doors option shown dotted Retail Unit m² ft² Area includes plant. Interior fit out by Tenant Layout 2013 Level 0 retail and restaurants 4.14 m² Vestibule m² 6700 New Public Footpath to the Terrace 6700 harbourside access bed stairs m² bed bed m² bed m² bed bed A3 Unit m² bed m² Central courtyard m² bed bed bed Layout 2013 Level 1 hotel and restaurants service riser m² m² bed bed Vestibule m² bed m² h'kpg l'ndry m² Staff WC 5.02 m² dry food st m² and office entrance circulation m² Staff L'kers m² breakroom m² m² bed Substation m² Deliveries m² food prep m² m² P WC m 9.78 m² P WC ap WC f 6.59 m² m² core breakfast m² Living Zone m² Work Zone m² LIFT LIFT circ' m² OFFICE HOTEL ENTRANCE ENTRANCE Vestibule 9.84 m² Welcome Zone m² lug cart st 2.08 m² Work rm 9.18 m² gathering zone m² Hub m² back Off 6.03 m² m² m² Elev lobby m² Terrace 4.38 m² m² store 6.45 m² circulation m² Tech Comp' 9.04 m² gathering zone m² GM 9.15 m² 9550 meeting room m² 7000 Layout 2013 Level 2 hotel Layout 2013 Level 3 hotel circ' m² circ' m² circ' m² m² ft² m² ft² m² ft² Roof m² ft² m² ft² m² 6th Floor Terrace 6th Floor Terrace 5th floor terrace stairs m² Terrace 4th floor terrace m² ft² 5th floor terrace Terrace 4th floor terrace 3rd floor Layout 2013 Level 4 office suites Layout 2013 Level 5 office suites Layout 2013 Level 6 office suites Layout 2013 Roof level
4 Improved design How has the design changed? The proposed internal changes have resulted in a number of significant design improvements, including: Image of revised section 2013 Red outline shows height of previous 2011 scheme line of previous approval A smaller building is now proposed The Terrace The overall height of the building proposed has been reduced, including: adjacent to The Terrace by approx. 1m the removal of a storey, level seven, in the middle tier of the building The natural surveillance and overlooking of the pedestrian walkway between The Terrace and Torwood Street has been increased, to achieve a safer, more attractive public area Restaurant Torwood Street The main entrances to the hotel and office suites have been relocated to The Terrace Significant reduction in dead circulation within the scheme greatly improving the efficiency of the design Computer model of 2013 revised proposal viewed from bay Red outline shows height of previous scheme The stepped office space reduces the visual impact from views from the harbourside The design principles remain unchanged from the approved scheme to provide active and attractive new frontages to Torwood Street and The Terrace and to adopt a stepped design that reflects the existing built form of the bay and its natural setting.
5 Improved design The following images show how the proposed building and its overall height and size will be amended. Computer model of 2013 revised proposal viewed from Torwood Street Red outline shows height of previous 2011 scheme Sketch of revised 2013 scheme looking west down Torwood Street Red outline showing 2011 consented scheme Computer model of 2013 revised proposal viewed from Torwood Street Red outline shows height of previous 2011 scheme
6 Sketch of revised 2013 scheme of Torwood Street Red outline showing 2011 consented scheme Sketch of revised 2013 scheme of Torwood Street Red outline showing consented 2011 scheme Sketch of revised 2013 scheme of The Terrace Red outline showing consented 2011 scheme Clock tower comparison 2012
7 Benefits and timescales Summary of benefits Commitment to regenerating the proposal site: is committed to delivering a high quality mixed use proposal, which will significantly enhance this part of Torquay, delivering major new investment to the bay. Enhanced hotel offering: The revised proposal will deliver an improved hotel, which will be occupied by an internationally branded 3\4 star hotel operator, boosting the town s tourism and conferencing capability. Increased employment opportunities: The additional office space proposed will result in additional employment opportunities within the development and contribute to the vitality and viability of the town centre; the proposal has the potential to create in the order of 80/100 jobs plus the office space. Improved design: The revised proposal has improved both the internal and external design and achieved a reduction in the overall height and size of the building proposed when compared to the existing approved planning consent. Comment Form Public exhibition You can pop this comment form in the ballot box or send it to us by post, fax, or visit our website. Telephone: Fax: feedback@consultation-online.co.uk Website: Post: Remarkable Consultation, The Pump House, Garnier Road, Winchester, SO23 9QG Please let us know your contact details below: Name: Address: Postcode: Telephone: Comment Form what is the nature of your interest in these proposals? Local resident Local business Other, please state below additional comments 4-24 Torwood STreeT, Torquay Timescales Revised application to be submitted March 2013 Subject to planning consent, construction scheduled to begin Autumn revised scheme Torwood Street Thank you 4-24 Torwood STreeT, Torquay Anticipated completion of scheme Spring 2015 Thank you for taking the time to visit our exhibition. If you have any questions please ask a member of the team here today. Alternatively you can visit our website or call
The Westgate. Falkland Road, Torquay, TQ2 5JP
Beautifully Presented Semi-Detached Guest House. Excellent Location Within Walking Distance of The Sea Front, Town Centre Harbourside, Riviera International Conference Centre, Torre Abbey Wedding Venue
More informationSales Presentation 8.Nov.2016
Sales Presentation 8.Nov.2016 Project Location and Access B A -2- Project Location and Access -3- Project Location and Access RTA Roundabout -4- 1 / JBR - Project Brief Iconic High-Rise Tower, 46 Floors
More informationMARRIOTT HQ BETHESDA, MD DESIGN ADVISORY PANEL November 8th, 2017 VICINITY MAP ILLUSTRATIVE SITE PLAN HOTEL ENTRANCE BAR OFFICE LOBBY RESTAURANT LAYBY LANE DIAGRAMS SHARING STEPPING EMBRACING ARTICULATING
More informationProposals for the Redevelopment of the Magistrates Court & Police Station, Normandy Street / Orchard Lane, Alton
THE SITE THE SITE The Site in Context WELCOME Welcome to our public exhibition in connection with our draft proposals ahead of a planning application being proposals for the redevelopment of the magistrates
More informationST. TERESA S GARDENS REGENERATION PARTNERSHIP
ST. TERESA S GARDENS REGENERATION PARTNERSHIP ST. TERESA S GARDENS REGENERATION - Dublin City Council / DoECLG / Residents / St. Teresa s Regeneration Board St. Teresa s Gardens was initially designed
More information5.0 Development Strategy 32
5.0 Development Strategy 32 Objectives To ensure the long term future of the Bazaar Market building by giving it a higher order retail use, reflecting the development of retail on the Guy s site To ensure
More informationVauxhall Sky Gardens Wandsworth Road London SW8
Proposed development of Vauxhall Sky Gardens 143 161 Wandsworth Road London SW8 Affordable Housing Viability Submission Explanatory Notes January 2013 HEDC 230 Court Road London SE9 4TX 020 8265 3456 07711
More informationLIBERTY HOUSE. Paul Keogh Architects. Paul Keogh Architects LIBERTY HOUSE HOMES
150 151 Award: Highly Commended 2015 RIAI Irish Architecture Awards Client: Dublin City Council Liberty House takes its inspiration from the Georgian brick terraces Project Photography: Peter Cook Location:
More informationQuay West, Douglas, Isle of Man.
Quay West, Douglas, Isle of Man. Computer Generated Image. This unique setting overlooking the North Quay Marina and in the heart of Douglas offers the opportunity to purchase a superb apartment within
More informationEquality and Access Plan The Abbey School, Reading
Equality and Access Plan 2017-2020 The Abbey School, Reading , Reading Accessibility Plan Scope The School recognises the benefits of a diverse School Community, with individuals who value one another
More informationDESIGN, ACCESS & PLANNING STATEMENT
(MADRON STREET) LONDON SE1 5UB DESIGN, ACCESS & PLANNING STATEMENT The architectural response for the site has been designed with regard to the following: The New Southwark Plan The London Plan: Spatial
More informationSouthall Gas Works: Design Statement by URBED with Capita Symonds, WYG, Lovejoys, Jestico and Whiles and RPSDesign Statement. Typologies.
9 Typologies Page 95 9:1. Approach to typologies 1. 3. 2. 4. Far left: Traditional walk-up flats: With 2 of 4 flats per landing off a core. The bottom plan shows a perimeter block arrangement based on
More informationBEACHFRONT BUILDING 9 MIDDLE UNITS BEACHFRONT BUILDING 9 CORNER UNITS
STUDIO Beachfront Apartments BEACHFRONT BUILDING 9 MIDDLE UNITS Living 137 12.73 En-suite 66 6.13 Entry/Kitchen 90 8.36 Internal Walls/Ducts 15 1.39 Total 580 53.88 BEACHFRONT BUILDING 9 CORNER UNITS The
More informationAn iconic riverside building, offering 134 one, two and three bedroom apartments and penthouses with stunning views across The Thames and London.
LOMBARD WHARF 12-14 LOMBARD ROAD BATTERSEA LONDON SW11 3GP Potential B1 office use subject to planning TO LET LANDMARK NEW TOWER DEVELOPMENT APPROX. 3,250 sq. ft (302 sq. m) Gross Potential net 2,035 sq
More informationq/., S Lt _ _.._--.
~'ii..,... """:." LONDON BOROUGH OF LEWISHAM PLANNING SERVICE LIFETIME HOMES STATEMEf\ t:b~ DEVELOPMENT OF Land to the RIO 13 Calmant Road BR14BY q/., S Lt-7- ----------------.._---- ---_.._--. CASE No
More information4.5 Residential mix. MARLOWE ROAD DESIGN AND ACCESS STATEMENT May 2015
4.5 Residential mix Policy WS9 of the London Borough of Waltham Forrest Wood Street Area Action Plan states that development proposals will be required to provide a balanced provision of dwelling sizes
More informationWELCOME TIMESCALES. Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. ANTHOLOGY S COMMITMENTS
WELCOME Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. Since the second consultation in October 2018, which asked your views on the preferred approach,
More informationLITTLE MOUNTAIN ADJACENT AREA REZONING POLICY
LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY JANUARY 2013 CONTENTS 1.0 INTENT & PRINCIPLES...1 2.0 APPLICATION...2 3.0 HOUSING TYPES, HEIGHT & DENSITY POLICIES...3 3.1 LOW TO MID-RISE APARTMENT POLICIES...4
More information150 North Riverside Street Chicago IL
Fact Sheet Building 53-story Class A office building with approximately 1.2 million rentable square feet 3 elevator zones, 21 total passenger elevators 9'-6" typical finished ceiling height 12'-0" finished
More informationProject overview. Golden Sand Hotel DOHA QATAR
Golden Sand Hotel DOHA QATAR MARCH 29, 2011 1. GUESTROOM FLOORS 1.1. A minimum of ONE handicapped guestroom must be provided. Handicapped room shall be connected to a standard guestroom (for the use a
More informationNo , Crwys Road, Cardiff. Conversion and New Build Student Accommodation Development in Crwys Road, Cardiff
No. 38-48, Crwys Road, Cardiff Conversion and New Build Student Accommodation Development in Crwys Road, Cardiff Contents 1.0 Introduction 2.0 Site Analysis 3.0 Context 4.0 Planning History 5.0 Planning
More informationWELCOME! to the resident consultation on the initial designs for Bessborough Road. Bessborough Road. Your Views Matter
Your Views Matter WELCOME! to the resident consultation on the initial designs for Bessborough Road The Bessborough Road site will be the first site to be developed for the regeneration of the Alton Estate
More informationCAMBOURNE VILLAGE COLLEGE: THE BRIEF/ SITE
CAMBOURNE VILLAGE COLLEGE: THE BRIEF/ SITE THE BRIEF: EXISTING SITE ACCESS AND SURFACE TREATMENTS Cambridgeshire County Council have identified the need for the provision of additional secondary school
More informationAccessible Housing Standards 2015
Briefing Accessible Housing Standards 2015 Purpose This briefing compares the technical specification provided in the 2015 Building Regulations M4(2), incorporating 2016 amendments, accessible, adaptable
More informationPROVIDENCE (BOLLARD BULRUSH SOUTH) LOCAL DEVELOPMENT PLAN. 2263Rep146E
1 PROVIDENCE (BOLLARD BULRUSH SOUTH) Prepared by: PO Box 796 Subiaco WA 6904 t: 9382 1233 f: 9382 1127 www.cleplan.com.au October 2013 This Local Development Plan has been approved by Council under the
More informationIII. PROJECT DESCRIPTION
III. PROJECT DESCRIPTION This chapter describes the 950 Mason Street Fairmont Hotel Revitalization and Residential Tower Project (proposed project), which is evaluated in this Draft Environmental Impact
More informationTO LET / MAY SELL. 16 Avis Way, Newhaven BN9 0DP
TO LET / MAY SELL Light Industrial / warehouse with secure yard and office accommodation. Size: 1,264 sq m (13,606 sq ft) Agency Lease Advisory Management Valuation Investment Development Key Features
More informationVictoria Mill Victoria Mill, Lower Vickers Street, Manchester M40 7LH
Victoria Mill Victoria Mill, Lower Vickers Street, Manchester M40 7LH Victoria Mill About the Developer Why Invest in Manchester Residential Apartments The Location Investment Units 3 4 6 7 8 About The
More informationDRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes
Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes 1 Local Area Plan - Project Alignment Overview Directions Report, October 2008 (General Summary Of Selected
More informationMulti- Storey Tower Blocks: Options Appraisal
NORTH AYRSHIRE COUNCIL Cabinet 20 March 2018 Title: Purpose: Recommendation: Multi- Storey Tower Blocks: Options Appraisal To advise Cabinet of future investment options for the seven multistorey blocks
More informationDesign and Access Statement Volume III Part 4 of 9 Plot A1. May 2018 Allies and Morrison
Design and Access Statement Volume III Part 4 of 9 Plot A1 May 2018 Allies and Morrison 4 PROPOSED SCHEME 67 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018 4.1 Use Plot A1 is a mixed-use
More informationDesign and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison
Design and Access Statement Volume III Part 6 of 9 Plot A1 May 2018 Allies and Morrison 6 OFFICE 135 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018 6.1 Introduction The office development
More informationAVAILABLE TO LET BELHABB TOWER, BUSINESS BAY, DUBAI. Al Abraaj Street, Dubai, United Arab Emirates
AVAILABLE TO LET BELHABB TOWER, BUSINESS BAY, DUBAI Al Abraaj Street, Dubai, United Arab Emirates Fitted Commercial Office Units Available For Immediate Lease at highly competitive prices. Excellent location
More informationPlanning Committee 4 March 2014
Planning Committee 4 March 2014 Agenda Item No: 9 Planning application no. Site Proposal Ward Applicant Cabinet Member with lead responsibility Accountable director 13/01262/FUL Former Sunbeam Factory,
More informationP. H. Robinson Consulting Urban Planning, Consulting and Project Management
P. H. Robinson Consulting Urban Planning, Consulting and Project Management PLANNING RATIONALE REPORT 99-101 AND 103 PINHEY - SITE PLAN APPLICATION CITY OF OTTAWA PREPARED BY: P H ROBINSON CONSULTING SEPTEMBER
More informationOpen Space, Landscape, Parking & Security by Design. Central Hill Estate 2016
Open Space, Landscape, Parking & Security by Design Central Hill Estate 2016 Recap.. Density is not just about how many homes but what housing mix / no. of people Current density on Central Hill Estate
More informationHEART OF THE CITY ABUJA
HEART OF THE CITY ABUJA w w w.h e a r to f t h e c i t ya b u ja.co m Introduction The Heart of the city The Heart of the City is a self-contained, mixed-use development encompassing high rise towers of
More informationUpper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive
Master Plan Presentation for: 520 Virginia Drive May 22, 2018 Design Presentation Agenda Master Plan Design for 520 Virginia Drive Existing Conditions & Opportunities Project Goals Site Plan & Floor Plans
More informationPLANNING BRIEF SITE ND7, TEMPLE QUAY, BRISTOL
PLANNING BRIEF SITE ND7, TEMPLE QUAY, BRISTOL Site Description Plot ND7 is located within the area known as Temple Quay North in central Bristol, north of the Floating Harbour, and is incorporated within
More informationKassner Goodspeed Architects Ltd.
Kassner Goodspeed Architects Ltd. 11 March 2015 Ms Jillian MacLellan, Planner 1 Planning Application, Community Development Halifax Regional Municipality P.O. Box 1749 Halifax, NS B3J 3A5 Re: Case 19281,
More information5 DUNNING STREET, BRIDGE OF EARN. PERTH. PH2 9AA 5 DUNNING STREET, BRIDGE OF EARN. PERTH. PH2 9AA GUIDE PRICE 190,000
5 DUNNING STREET, BRIDGE OF EARN. PERTH. PH2 9AA 5 DUNNING STREET, BRIDGE OF EARN. PERTH. PH2 9AA GUIDE PRICE 190,000 This substantial Terraced Townhouse enjoys a central location within the popular village
More information2.0 EXISTING SITE CONDITIONS ALASKAN WAY WESTERN AVE POST ALLEY ANALYSIS
2.0 ANALYSIS EXISTING SITE CONDITIONS The Union Street corridor offers an excellent visual connection to the waterfront and bay, but due to the sharp changes in grade, its role as a pedestrian link is
More informationA 135,000 sq ft BREEAM Excellent Office Building. The premier professional services office location in the centre of CARDIFF
A 135,000 sq ft BREEAM Excellent Office Building The premier professional services office location in the centre of CARDIFF 2. INTRODUCTION Rightacres is the exclusive developer of Capital Square Cardiff
More informationHospitality. Elaf Taiba Hotel, Madinah
Hospitality Our specialist Hospitality team within SAK Consultants has an unrivalled wealth of experience across the sector and has successfully delivered projects across the Kingdom of Saudi Arabia. Within
More informationOVERVIEW PROJECT SUMMARY
OVERVIEW Good terraced house development that creates an excellent edge to the street while accommodating the car via rear lane access. PROJECT SUMMARY The six terraced houses at Buckley Avenue are part
More informationShawmut Avenue Washington Street Block. Boston, MA BCDC Meeting May 1, 2018
Boston, MA BCDC Meeting May 1, 2018 Refinements to PDA scheme in response to BCDC comments Davis Companies, 112 Shawmut Avenue: Relocated approximately 22,000 sf from rear court area to Shawmut Ave. frontage
More informationThe site is located within the area forming phase 2 of the Town Centre redevelopment scheme. The relevant previous planning history is as follows:-
2017/1601 Applicant: Barnsley Metropolitan Borough Council, C/o IBI Group Description: Erection of an electrical substation. Site Address: Land at Kendray Street, Barnsley, S70 2JL No comments have been
More informationCressingham Gardens Estate, Brixton. DRAFT Masterplan Objectives for discussion. September 2015
Cressingham Gardens Estate, Brixton DRAFT Masterplan Objectives for discussion September 2015 Contents Introduction 1 Project objectives 2 Masterplan objectives 4 Draft masterplan objectives for the Cressingham
More informationVILLAGE CENTER ARLINGTON, VIRGINIA ADVISORY WORKING GROUP/ PLANNING COMMISSION FOR ORR PARTNERS 01/
VILLAGE CENTER ADVISORY WORKING GROUP/ PLANNING COMMISSION FOR ORR PARTNERS 01/21 PROJECT BACKGROUND 01 PAGE 02 01. PROJECT BACKGROUND 1 EXISTING CONDITIONS SITE 1 STREET VIEW 2 2 STREET VIEW PAGE 03 01.
More informationAT Land Adjacent to Tollgate Cottage, Broughton Grounds Lane, Milton Keynes. Parish: Broughton & Milton Keynes Parish Council
APPLICATION 06 Application Number: 13/00553/FUL Major Revision to plans approved under 11/01760/MKPC for Plots 59-71 to provide 16 affordable one, two and three bedroom apartments with associated parking
More informationThe Horizon, 54 New Coventry Road, Sheldon, Birmingham, B26 3BB
Committee Date: 17/07/2014 Application Number: 2014/02479/PA Accepted: 22/04/2014 Application Type: Full Planning Target Date: 22/07/2014 Ward: Sheldon The Horizon, 54 New Coventry Road, Sheldon, Birmingham,
More informationTHE ATRIUM LE MONT GRAS D'EAU ST BRELADE
THE ATRIUM LE MONT GRAS D'EAU ST BRELADE JUST A STONES THROW Located on the leafy green lane of Le Mont Gras d Eau, the five apartments of The Atrium development enjoy peaceful surroundings while benefiting
More informationFor Sale Penthouse Apartment, 6 The Waterfront, Clonakilty Co. Cork
For Sale Penthouse Apartment, 6 The Waterfront, Clonakilty Co. Cork Main Points: Luxurious & bright 2 bedroom penthouse apartment C. 850 ft² - Within easy walking distance of all town amenities Superb
More informationEAST CAMPUS DEVELOPMENT UPDATE Board of Trustees January 20, 2011
EAST CAMPUS DEVELOPMENT UPDATE Board of Trustees January 20, 2011 Introduction I. Long Range Development Plan (LRDP), East Campus II. Proposed University Student Apartments III. Parking/Transit 2 2 LRDP
More informationTHE NEW ENDEAVOUR FOR BUSINESS. themerchantplymouth.com
THE NEW ENDEAVOUR FOR BUSINESS themerchantplymouth.com THE BUILDING The Merchant is a bold example of post-industrial architecture providing 31,785 sq. ft. of open plan, contemporary office space of the
More informationFelnex Trading Estate
Felnex Trading Estate The Application Site Site for Future Business Forest The Application Site This exhibition is being held to give residents the opportunity to view and ask questions about the design
More informationCARLTON HOUSE. The Bishops Avenue London N2
CARLTON HOUSE The Bishops Avenue London N2 1 Introduction Carlton House is a fine example of the imposing mansions located on the prestigious The Bishop s Avenue one of London s most exclusive residential
More informationARTICLE 4: SCHEDULE OF DISTRICT, USE AND SETBACK REGULATIONS
Page 1 of 48 City of Hollywood Zoning and Land Development Regulations 4.6.I Beach Community Redevelopment Districts. 1. Purpose. To establish development standards for the Beach Community Redevelopment
More informationThe Lakes Estate Serpentine Court Regeneration Group. 5 December 2017
The Lakes Estate Serpentine Court Regeneration Group 5 December 2017 Welcome! Memory Lane Lakes Estate in 1975 Serpentine Court in 1975 1960s 1966 1968 1975 1968 construction starts Serpentine Court completed
More informationTIMELESS. DISTINCT. AT THE HEART OF THE MOST VIBRANT LIFESTYLE.
TIMELESS. DISTINCT. AT THE HEART OF THE MOST VIBRANT LIFESTYLE. Wake up to breathtaking views of the sea, Palm Jumeirah and Dubai Eye. Wake up to exclusivity. 6 7 DAZZLING DUBAI. WHERE THE WORLD COMES
More information8.5.1 R1, Single Detached Residential District
8.5.1 R1, Single Detached Residential District The purpose of this district is to provide for residential development in the form of single detached dwellings. Dwelling, Single Detached Home Business,
More informationSupporting Information
Response Table Pring and St Hill/Malago Road Plot 01. Point raised by residents attending 1. What provision has been made for the older generation 2. What communal outdoor space has been provided Response
More informationPLANNING REPORT Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 17, Project No. 1507
PLANNING REPORT 1131 Gordon Street City of Guelph Prepared on behalf of 1876698 Ontario Inc. March 17, 2016 Project No. 1507 423 Woolwich Street, Suite 201, Guelph, Ontario, N1H 3X3 Phone (519) 836-7526
More informationTHE SILVER FIN BUILDING ABERDEEN
THE SILVER FIN BUILDING ABERDEEN THE SILVER FIN BUILDING IS AN EXEMPLAR NEW DEVELOPMENT IN ABERDEEN CITY CENTRE, DESIGNED TO SET NEW STANDARDS FOR GRADE A OFFICE ACCOMMODATION 1_2 EXECUTIVE SUMMARY THE
More informationSchool Without Walls Partnership District of Columbia Public Schools and The George Washington University
Without Walls Partnership District of Columbia Public s and The George COMMUNITY PRESENTATION - DMJM CGS Without Walls PartnershipDMJM CGS The History of the Partnership In partnership since 1980 Facilities
More informationGrosvenor House, Drury Lane, London, WC2. October 2003
Grosvenor House, 141-143 Drury Lane, London, WC2 October 2003 The material contained in this document is private and confidential and for issue to and use by the client and the project team only. Acknowledgments
More informationPre-Applica on Design Statement : Residen al Development, The Gas Works, 113 Bury Road, The ord, Norfolk 1
13-188 Pre-Applica on Design Statement: Residen al Development, The Gas Works, 113 Bury Road, The ord, Norfolk Prepared by: Gary Johns Architects Date: October 2015 15-311 Pre-Applica on Design Statement
More information3.0 Project Description
3.0 Project Description City of Long Beach Shoreline Gateway Project Environmental Impact Report 3.0 PROJECT DESCRIPTION 3.1 PROJECT LOCATION AND SETTING PROJECT LOCATION The proposed Shoreline Gateway
More informationCARRUTHERS AVENUE SCOTT STREET SHED STIRLING AVENUE
CARRUTHERS AENUE EXISTING 2 STOREY RESIDENCE PROPOSED 3 STOREY STACKED TOWNS 12 UNITS FFL 63.31 RAMP UP 20% ZONING GM[2093] H53 F(4.5) PROPOSED 18 STOREY APARTMENT BUILDING 187 UNITS X X 62.03 FFL SHED
More informationPARK FARM BARNS NEAR SEAVIEW, ISLE OF WIGHT
PARK FARM BARNS NEAR SEAVIEW, ISLE OF WIGHT PARK FARM BARNS NEAR SEAVIEW, ISLE OF WIGHT A RARE OPPORTUNITY TO ACQUIRE A CHOICE OF PLOTS WITH PLANNING CONSENT FOR CONVERSION OF BARNS INTO DWELLINGS, SITUATED
More informationComputer Generated Image of the consented scheme
Computer Generated Image of the consented scheme For sale via informal tender, freehold development site with outline planning permission for 359 apartments with 12,000 sq ft ground floor retail, 29 minutes
More informationThe other way of living in Sóller
The other way of living in Sóller THREE SOLD : LAST TWO APARTMENTS REMAINING View towards Port de Sóller from the terraces at Posada de Balitx The Posada de Balitx offers you a different way of living
More informationSotheron Place, Fulham
5 Minute Walk Stamford Bridge BUSES Fulham Broadway Fulham Road King s Road BUSES Harwood Road SITE 5 Minute Walk BUSES Wandsworth Bridge Road Imperial Road River Thames Imperial Wharf Chelsea Harbour
More information9 DERRYLORAN INDUSTRIAL ESTATE, COOKSTOWN, CO. TYRONE, BT80 9LU
INVESTMENT SALE High Specification Industrial, Office, and Showroom Facility. 9 DERRYLORAN INDUSTRIAL ESTATE, COOKSTOWN, CO. TYRONE, BT80 9LU CONTACT Andrew Gawley 028 9050 1501 agawley@lisney-belfast.com
More informationDAYLIGHTING / COURTYARD
SITE / CONTEXT MASS / MODULAR DAYLIGHTING / COURTYARD VIEWS /VENTILATION CIRCULATION / PARKING The building is located in the San Fernando Valley. On the West Side of the site is the main access road;
More informationTHE HONG KONG HOUSING AUTHORITY. Memorandum for the Building Committee. Review of Harmony Block Designs
BC 11/99 THE HONG KONG HOUSING AUTHORITY Memorandum for the Building Committee Review of Harmony Block Designs PURPOSE This is to seek Members endorsement to revised designs for the Harmony 1 and Harmony
More informationCoding For Places People Love Main Street Corridor District
Coding For Places People Love Main Street Corridor District 1) Scope a) District boundaries are assigned according to the District Boundary Map. b) The Primary Retail Corridor is assigned according to
More information27 St James s Avenue, Brighton East Sussex BN2 1QD. 7 bedroom Guest House located in Kemp Town area of Brighton For Sale
27 St James s Avenue, Brighton East Sussex BN2 1QD 7 bedroom Guest House located in Kemp Town area of Brighton For Sale Agency Lease Advisory Management Valuation Investment Development Key Features Kemp
More informationLatest Properties for Sale
Latest Properties for Sale To explore these exciting global investment opportunities and QNB mortgage financing options, please call QNB First Customer Care Center at +974 4440 7788 UK Porto Arabia T14
More informationBrought to you by A COSMOPOLITAN LIFE LINKED TO THE HEART OF LEEDS
Brought to you by A COSMOPOLITAN LIFE LINKED TO THE HEART OF LEEDS THE PLACE TO INVEST Mabgate Gateway is an exciting new, high specification development of apartments in the heart of Leeds city centre.
More information50+54 BELL STREET NORTH
50+54 BELL STREET NORTH SITE PLAN CONTROL APPLICATION OCTOBER 2014 PREPARED BY: FOTENN Consultants Inc. 223 Mcleod Street Ottawa, ON K2P OZ8 (613) 730-5709 PREPARED FOR: Ottawa Chinese Alliance Church
More informationFOUR FLOORS OF THE MOST FLEXIBLE SPACE IN LONDON
FOUR FLOORS OF THE MOST FLEXIBLE SPACE IN LONDON Novotel London West provides 5,500 square metres of highly adaptable space, spread over 4 dedicated floors. Each of these interconnects, with lifts rising
More informationTHE PREBUILTS AT ONE WORLD TRADE CENTER
INNOVATIVE FLEXIBLE CLASSIC INSPIRING IMIATE COLLABORATIVE THE PREBUILTS AT ONE WORLD TRADE CENTER THE PREBUILTS AT ONE WORLD TRADE CENTER CLASSIC PREBUILT STANDARD COLLABORATIVE PREBUILT STANDARD 4,500
More informationPlanning Justification Report
Planning Justification Report 101 Kozlov Street, Barrie, Ont. Destaron Property Management Ltd. November 2015 Revised February 2017 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 DESCRIPTION OF SUBJECT
More informationNo. 1 Ho Man Tin Hill Road
Project name Location Publication No. 1 Ho Man Tin Hill Road Ho Man Tin, Kowloon, Hong Kong Building Journal February 2003 C O V E R S T O R Y Building Journal Hongkong China February 2003 NO.1 HO MAN
More informationa new community at the former burwood brickworks Burwood East Artist s impression Retail and Social Hub
a new community at the former burwood brickworks Burwood East Artist s impression Retail and Social Hub A New Addition to the Burwood East Community Australand Overview With our proven track record of
More informationMaraqia Resort HURRY TO TAKE ADVANTAGE OF CURRENT LOW, LOW HOME INVESTEMENT PRICES IN SHARM EL SHEIKH.
Maraqia Resort HURRY TO TAKE ADVANTAGE OF CURRENT LOW, LOW HOME INVESTEMENT PRICES IN SHARM EL SHEIKH. Magnificent properties set in the middle of the awesome Nabq gently sloping plateau, between the dramatic
More informationST AGNES HOUSE BRISTOL
ST AGNES HOUSE BRISTOL Purpose built student accommodation in the heart of Bristol FINE AND INVESTMENT PROPERTY FINE AND INVESTMENT PROPERTY 1 78 luxury studio apartments 8% Net Yield 3 Year Rent Guarantee
More informationFACT SHEET. Office: 820,000 sf. Number of Floors. 25 floors. Optimum leasing depth - 43 ft. Sustainability. Efficiency 70% Parking.
Project Size 880,000 sf Office: 820,000 sf Retail: 60,000 sf Number of Floors Typical Floor Size Leasing Depth Sustainability 25 floors 34,000 sf Optimum leasing depth - 43 ft LEED GOLD Efficiency 70%
More informationHOUSING ISSUES REPORT
HOUSING ISSUES REPORT 8, 12 & 14 HIGH PARK AVENUE AND 1908, 1910, 1914 & 1920 BLOOR STREET WEST CITY OF TORONTO PREPARED FOR: 619595 ONTARI O INC. February 2016 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0
More information3.1 Existing Built Form
3.1 Existing Built Form There is a wide variety of built form in the study area, generally comprising 2 and 3 storey buildings. This stretch of Queen Street East is somewhat atypical of Toronto's main
More informationPhase 2, The Tower, was completed in August 2018.
The Tower The Bower is a landmark quarter for Old Street, featuring 320,000 sq ft of beautifully designed, modern, inspiring space across three buildings and a vibrant new restaurant and retail destination.
More informationS O L D. Sequoia Park. Hatch End, Pinner, Greater London, HA5 4DG.
S O L D Sequoia Park Hatch End, Pinner, Greater London, HA5 4DG. Sequoia Park, Hatch End, Pinner, Greater London, HA5 4DG. A spacious and well presented detached family house, located on a corner plot
More informationAlwyn Court Salisbury Road Cardiff
Alwyn Court Salisbury Road Cardiff Brand new student accommodation for 2012 urban start A469 Welcome to Alwyn Court Computer Generated Image of the final scheme Alwyn Court is a new concept in student
More informationHoon Ridge. Hilton, Derbyshire
Hoon Ridge Hilton, Derbyshire GRADE II LISTED ARTS & CRAFTS COUNTRY HOUSE IN APPROX 5.45 ACRES HOON RIDGE IS A FINE GRADE II LISTED COUNTRY HOUSE SET IN A VERY CONVENIENT POSITION WITH EXCELLENT ACCESS
More informationMulti-unit residential uses code
9.3.11 Multi-unit residential uses code 9.3.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Multi-unit residential uses code by the tables
More information169 CANAL STREET. 169 Canal Street VISION PROPERTIES 401 E. ELM STREET SUITE 150 CONSHOHOCKEN, PA Providence RI /20/2017
169 CANAL STREET AERIAL VIEW FROM THE SOUTH VIEW FROM THE SOUTH WEST VIEW FROM THE SOUTH EAST VIEW FROM CANAL STREET Renderings THROOP ALLEY 10' - 1" 6' - 0 1/4" 6' - 0 1/4" PROPERTY LINE NORTH MAIN STREET
More informationBEP 2: What you need to know
Revitalising Redfern & Waterloo Draft Built Environment Plan Stage 2 (BEP 2) JANUARY 2011 Draft BEP 2: to create a safer and more sustainable environment BEP 2: What you need to know The Draft Built Environment
More informationGoal 1 - Retain and enhance Cherry Creek North s unique physical character.
Introduction This document summarizes the proposed new zoning for the area of roughly bordered by University Boulevard, Steele Street, 3rd Avenue, and 1st Avenue. It provides a high-level review of the
More informationMoona Sharm Resort VACATION HOME AND INVESTMENT PROPERTY
Monna Sharm Resort is the most recent off-plan project in the heart of Nabq, the beautiful new destination in Sharm el Sheikh. The future posh residential district of Nabq is now under full development.