BRINGING OLDER RESIDENCE HALLS INTO THE FUTURE. Rob Spagnoletti Dennis Spina, AIA, RRC
|
|
- Muriel Day
- 5 years ago
- Views:
Transcription
1 BRINGING OLDER RESIDENCE HALLS INTO THE FUTURE Rob Spagnoletti Dennis Spina, AIA, RRC
2 Best Practices The Eastern Regional Association of Physical Plant Administrators (ERAPPA) is a Registered Provider with the American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-aia members are available on request. This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.
3 Learning Objectives Upon completion of this program you will be able to: 1. Learn how to achieve current code compliance by gender and ADA. 2. Evaluate how feedback from students and housekeeping were incorporated into later projects. 3. Examine how this approach maintained bed count and enhanced student desire to live in buildings without extensive building renovations. 4. Demonstrate how ceiling heights as low as 8-0 to underside of deck were overcome to install ventilation, plumbing, lights, etc.
4 Syracuse University Housing History
5 Established in Private, Nonsectarian, Coeducational University. 14,798 Undergraduates. 6,231 Postgraduates. 900 acre campus. 300 buildings including 170 academic buildings. 21 residence halls.
6 SYRACUSE UNIVERSITY CAMPUS MAP 1873 Hall of Languages was the first building constructed on main campus.
7 SYRACUSE UNIVERSITY CAMPUS MAP - POST WWII academic buildings. 5 residence halls. Winchell Hall, Haven Hall, and Lehman Hall were later demolished.
8 SYRACUSE UNIVERSITY HOUSING - POST WWII Haven Hall was built in 1904 and demolished in Lehman Hall was built in 1927, consisted of 40 apartments and was demolished in Residence halls on campus were designated as Men s or Women s; no coed dormitories. Winchell Hall was built in 1896 and demolished in 1984.
9 SYRACUSE UNIVERSITY ENROLLMENT - POST WWII In 1944 the GI Bill was passed by the federal government to provide aid to returning veterans. Syracuse University was one of the few private institutions to admit veterans covered by the program.
10 SYRACUSE UNIVERSITY ENROLLMENT BOOM Enrollment more than TRIPLED Within 3 years of the legislation. ENROLLMENT (THOUSANDS) NON-VETERANS, WOMEN NON-VETERANS, MEN VETERANS
11 SYRACUSE UNIVERSITY BUILDINGS - POST WWII Classes were held in prefabricated metal buildings on North Campus.
12 SYRACUSE UNIVERSITY HOUSING - POST WWII Students were housed in trailers on South Campus. Housing for families of veteran students s.
13 DATED DORMITORIES 14 RESIDENCE HALLS 35 APARTMENT BUILDINGS 14 YEARS BUILT PURCHASED DEMOLISHED RESIDENCE HALL WINCHELL HALL HAVEN HALL 1906 SIMS HALL LEHMAN HALL WASHINGTON ARMS 1952 SHAW HALL 1954 WATSON HALL 1954 MARION HALL 1956 FLINT HALL 1958 DAY HALL 1960 SADLER HALL 1961 DELLPLAIN HALL 1962 KIMMEL HALL 1963 BOOTH HALL SLOCUM HEIGHTS 1964 HAVEN HALL 1965 LAWRINSON HALL 1966 BREWSTER HALL 1966 BOLAND HALL 1966 SKYHALLS I, II, III LYONS HALL SKYTOP APARTMENTS WALNUT HALL 2009 ERNIE DAVIS HALL
14 RESIDENCE HALL CONSTRUCTION 5, ,500 4,000 3,500 BED COUNT 3,000 2,500 2,000 BEDS ADDED BY YEAR 1,500 1, CUMULATIVE BED COUNT
15 CAMPUS CONSTRUCTION Housing: : 764 apartment units constructed on South Campus. Minor residence hall interior renovations: Primarily cosmetic & maintenance related. Minor residence hall additions: Bed count increased through building additions in lieu of construction of new residence halls. 50 years after the first housing construction boom on campus, the first residence halls were being slated for major renovations. Academic: 23 Academic buildings constructed over 36 years. Primarily new construction during this time period.
16 SYRACUSE UNIVERSITY CAMPUS MAP buildings on main campus.
17 SYRACUSE UNIVERSITY HOUSING MAP buildings on main campus. 18 residence halls.
18 A Conventional Approach to Residence Hall Renovation
19 RESIDENCE HALL RENOVATION TIMELINE ( ) BREWSTER/BOLAND/BROCKWAY Majority of residence halls on campus are 50 years old. Facilities have for the most part been left unchanged from original construction.
20 BREWSTER/BOLAND/BROCKWAY: FULL BUILDING RENOVATION Complex originally constructed as coed by building. Housing later reconfigured to coed by floor. BOLAND BUILT: 1966 BED COUNT: 315 BREWSTER BUILT: 1966 BED COUNT: floor, 12-floor, 1-floor renovations including: Renovation of all common spaces. Renovation of all bedrooms. Bathroom renovations in-kind. Construction Timeline: 4 phases/4 years. ( ) Methodology: Upgrade bathroom finishes while adhering to the existing layout. Configuration: From coed-by-floor to coed-by-door. BROCKWAY BUILT: 1966 BED COUNT: 27
21 BREWSTER/BOLAND/BROCKWAY: AFTER Toilet partitions upgraded in the existing configuration. Seamless epoxy floor. Ceramic wall tile. New light fixtures. Upgraded plumbing fixtures.
22 BREWSTER/BOLAND/BROCKWAY: AFTER Sinks replaced with solid surface countertop. Changing areas incorporated into shower stalls for added privacy.
23 Developing a New Approach to Residence Hall Renovations
24 RESIDENCE HALL RENOVATION TIMELINE ( ) BREWSTER/BOLAND/BROCKWAY LAWRINSON HALL LYONS HALL WALNUT HALL
25 LYONS HALL: BATHROOM RENOVATION INDIVIDUAL-USE BATHROOMS 1969 Constructed as a sorority house (single sex). BUILT: 1969 BED COUNT: Purchased by University as student housing (coed by floor). Testing a new approach on a small scale. Construction Timeline: 1 Year (2007) Methodology: Upgrade finishes, revise layout to provide individual-use bathrooms. Configuration: From coed-by-floor to coed-by-door.
26 LYONS HALL - BEFORE 6 Gang Sinks 4 Toilet Stalls 4 Shower Stalls Typical Floor Plan
27 LYONS HALL - AFTER 4 Individual-use bathrooms with shower, toilet and sink. Shared sink in common area. Access provided through secondary corridor. Typical Floor Plan
28 LYONS HALL - AFTER Individual shower stalls. Upgraded finishes.
29 WALNUT HALL: BATHROOM RENOVATION INDIVIDUAL-USE BATHROOMS 1989 Constructed as a fraternity house (single sex) Purchased by University as student housing (coed by floor). BUILT: 1989 BED COUNT: 57 Testing a new approach on a small scale. Construction Timeline: 2 Phases/ 2 years ( ) Methodology: Upgrade finishes, revise layout to provide individual-use bathrooms. Configuration: From coed-by-floor to coed-by-door.
30 WALNUT HALL - BEFORE 4 Gang Sinks 2 Toilet Stalls 4 Shower Stalls Typical Floor Plan
31 WALNUT HALL - AFTER 5 individual-use bathrooms with shower, toilet and sink including 1 ADA compliant bathroom. Shared sink in common area. Access provided through secondary corridor. Typical Floor Plan
32 WALNUT HALL - AFTER Upgraded finishes. Individual bathroom.
33 LAWRINSON HALL: PLANNING FULL BUILDING RENOVATION 21 floors of renovations planned including: Renovation of all common spaces. Bathroom renovations. Window replacement. Provide laundry facilities at each floor. Construction Timeline: 5 phases/5 years ( ) Phase I Methodology: Upgrade finishes, revise layout to provide individual-use bathrooms and reconfigure common areas. PHASE I: 20 TH FLOOR BATHROOM RENOVATION (2008) A new approach to upgrading bathrooms as a component of full building renovations. Configuration: From coed-by-floor to coed-by-door. BUILT: 1965 BED COUNT: 537
34 LAWRINSON HALL: FEEDBACK PHASE I: 20 TH FLOOR BATHROOM RENOVATION (2008) Upgraded facilities on the 20 th floor were so successful that students from lower floors walked upstairs and waited in lines to use them. Extremely positive feedback from the student population regarding the revised bathroom layouts. Decision made to convert all gang bathrooms on lower floors into individual bathrooms during the next 4 phases of renovations.
35 LAWRINSON HALL: PHASING INPLEMENTING INDIVIDUAL BATHROOMS CONSTRUCTION PHASING PLANNED FOR SEVERAL YEARS: PHASE I: 20 TH FLOOR BATHROOM RENOVATION (2008) PHASE II: 16 TH -20 TH FLOORS (2009) PHASE III: 9 TH -15 TH FLOORS (2010) PHASE IV: 3 RD -8 TH FLOORS (2011) PHASE V: BASEMENT-2 ND FLOORS (2012)
36 LAWRINSON HALL - BEFORE 5 Gang Sinks 4 Toilet Stalls 4 Shower Stalls Typical Floor Plan
37 LAWRINSON HALL - AFTER 6 individual-use bathrooms with shower, toilet and sink, including 1 ADA bathroom. 1 ADA compliant bathroom at RA bedroom. Shared sink. LAUNDRY Laundry room. 1 study lounge. 1 recreational lounge. Typical Floor Plan
38 LAWRINSON HALL - AFTER Individual-use shower and toilet. Accent tile band color varies by floor. Individual-use sink and mirror.
39 SHIFT IN RESIDENCE HALL RENOVATIONS Renovation of all student rooms. Renovation of common spaces. Renovation of bathrooms. (replacement-in-kind) Renovation of bathrooms ONLY. (convert gang to individual-use)
40 Design Considerations
41 DESIGN CONSIDERATIONS: EXISTING CONDITIONS HAZARDOUS MATERIALS ASBESTOS CONTAINING MATERIAL (ACM) : Plaster Thinset grout Mechanical insulations Vinyl tile Carpet mastic Tile mastic Ceiling tiles POLYCHLORINATED BIPHENYL (PCBs) Carpet mastic Window caulk Window glazing LEAD BASED PAINT (LBP) Interior walls Ceilings Windows Plumbing piping
42 DESIGN CONSIDERATIONS: EXISTING CONDITIONS CONCRETE FLOOR SLAB Existing gang bathrooms often have depressed floor slabs to provide slope at floor drains. Reconfiguration of bathroom footprint requires pouring of new concrete prior to framing
43 DESIGN CONSIDERATIONS: EXISTING CONDITIONS FLOOR TO FLOOR HEIGHT Existing floor to floor height of many residence halls built in the 1950 s and 1960 s can be very limiting. New framing at existing floor to ceiling height of 8-0.
44 DESIGN CONSIDERATIONS: CODES FIRE CODE OF NEW YORK STATE FIRE RATING Secondary bathroom corridor must retain same fire rating as main corridor. Utilize fire rated doors, door closers, and proper hardware. Sadler Hall bathroom corridor.
45 DESIGN CONSIDERATIONS: CODES PLUMBING CODE OF NEW YORK STATE Section requires a 50/50 split of fixtures for occupants of each sex. University housing student population is roughly 60/40 (female/male) and varies with each year s enrollment. PLUMBING FIXTURE REQUIREMENTS The New York State Plumbing Code requires: 1 water closet and 1 lavatory per 10 occupants. 1 shower per 8 occupants. Syracuse University implements: 1 water closet, 1 lavatory, and 1 shower per 5-6 occupants.
46 DESIGN CONSIDERATIONS: CODES ADA STANDARDS: DOORS ADA STANDARDS FOR ACCESSIBLE DESIGN Door Width: 32 min. clear. Door Clearance: Door Swing: May overlap turning space but not clear floor space of any fixture. Door Threshold: ½ max.
47 DESIGN CONSIDERATIONS: CODES ADA STANDARDS: TOILET & BATHING ROOMS ADA STANDARDS FOR ACCESSIBLE DESIGN Clearance: 60 clear turning space. Toilet: Centerline located from wall. Toilet Seat: Height of 17-19, Seats shall not be sprung to return to lifted position. Flush Controls: Hand operated controls located on open side of toilet. Sink: Higher of rim or counter 34 max. above fin. floor. Faucets: Hand operated faucets must remain open for 10 seconds min. Side Wall Grab Bar: 42 min. (12 min. from rear wall) Circular diameter 1¼ -2. Rear Wall Grab Bar: 36 min. (12 min. from center of toilet) Circular diameter 1¼ -2. Vertical Grab Bar: 18 min. Circular diameter 1¼ -2.
48 DESIGN CONSIDERATIONS: CODES ADA STANDARDS: ACCESSORIES ADA STANDARDS FOR ACCESSIBLE DESIGN Mirrors Above Lavatory: Bottom edge of the reflecting surface 40 max. above fin. floor. Mirrors : Bottom edge of the reflecting surface 35 max. above fin. floor. Shelves: Located above finish floor. Toilet Paper Dispenser: 7-9 from face of toilet, above fin. floor. Coat Hooks: above fin. floor. Soap Dispenser: above fin. floor. Hand Dryer: above fin. floor.
49 DESIGN CONSIDERATIONS: INSTALLATION FLOOR PENETRATIONS - PIPING Chase locations at existing gang bathrooms often do not accommodate new piping. Piping at individual bathrooms vary in location and are often decentralized. Proximity to structural systems must be considered when coredrilling. Locations of existing electrical conduit in concrete slabs are often unknown. Care must be taken when core-drilling slabs. Disrupted electrical circuits must be repaired.
50 DESIGN CONSIDERATIONS: INSTALLATION FLOOR PENETRATIONS - DUCTWORK Chase locations at existing gang bathrooms often do not accommodate new ductwork. New mechanical chases are often needed. Proximity to structural systems must be considered when cutting new openings. Shear loads are higher at column interfaces. When making additional openings, existing openings also require review, particularly when located in close proximity to structural systems. Reduction of shear reinforcement adjacent to concrete column required steel angle reinforcing at the opening.
51 DESIGN CONSIDERATIONS: INSTALLATION STRUCTURAL REINFORCING AT NEW CHASE LOCATIONS Carbon fiber reinforced plates can be used at floor penetrations that would otherwise detract from the capacity of the original structural design. Carbon fiber reinforced plates set in epoxy at existing structural concrete slab (above & below) prior to cutting of new opening. Carbon fiber reinforced plate. Carbon fiber reinforcing after completion of new opening.
52 DESIGN CONSIDERATIONS: INSTALLATION CONCEALING M/E/P/FP Existing mechanical, electrical, plumbing and fire protection is often exposed in gang bathrooms. Extremely limited space (less than 12 ) to conceal mechanical, electrical, plumbing, and fire protection in soffits due to 8-0 height from floor to underside of existing concrete slab above. New M/E/P/FP installation within 12 soffit.
53 DESIGN CONSIDERATIONS: INSTALLATION COORDINATING PLUMBING Plumbing is often the most difficult trade to coordinate due to slope and drop requirements of piping and the restricted soffit heights. Coordination of all trades is important during construction and is beneficial to allow for installation of plumbing lines first. Improperly installed piping can be difficult to raise after other trades have completed installation. Installation of new p-trap at toilet above must remain within 12 soffit.
54 DESIGN CONSIDERATIONS: INSTALLATION ELECTRICAL Existing electrical wiring in the building requires review when determining how to provide power to new rooms. New electrical service required at existing electrical panel locations. Replace existing circuits while upgrading controls. Incorporating occupancy sensors. New electrical panel being installed at framing to provide power to new bathrooms.
55 DESIGN CONSIDERATIONS: INSTALLATION WATERPROOFING At tile applications, waterproofing can be applied to cement fiber board prior to floor and wall tile installation providing a continuous barrier in the shower area. Waterproofing applied 1-0 minimum up face of wall in bathroom. Waterproofing applied full height in showers & stripped-in to floor drain.
56 DESIGN CONSIDERATIONS: INSTALLATION WINDOWS Window replacement at bathroom locations may be desired or required to accommodate individual bathrooms. Replacement windows installed at bathroom locations only. Insulated metal panel used to conceal interior wall partitions allowing for natural light in both common space and individual-use bathrooms.
57 DESIGN CONSIDERATIONS: INSTALLATION ROOFING New roof penetrations are often required when installing individual bathrooms including: Plumbing vents Duct openings Modifications to existing rooftop equipment curbs may be necessary. Any alterations to roofing assembly must be properly flashed and integrated with existing roofing system. New rooftop equipment to be installed through opening in existing penthouse wall and supported on new sleepers.
58 Design Implementations
59 RESIDENCE HALL RENOVATION TIMELINE ( ) BREWSTER/BOLAND/BROCKWAY LAWRINSON HALL LYONS HALL WALNUT HALL FLINT HALL
60 FLINT HALL: BATHROOM ONLY RENOVATION INDIVIDUAL-USE BATHROOMS Two 4-story wings are joined by a main lounge/recreation space, classrooms and offices. Originally constructed as coed-by-wing. Previous bathroom renovation converted one bathroom block into two gang bathrooms allowing for coed-by-door configuration. BUILT: 1956 BED COUNT: gang bathrooms 99 individual-use bathrooms. Construction Timeline: 13 weeks (including abatement) May 15 th - August 15 th (2010) Methodology: Upgrade finishes, revise layout to provide individual-use bathrooms. Configuration: Coed-by-door.
61 FLINT HALL: BATHROOM ONLY RENOVATION INDIVIDUAL-USE BATHROOMS Two bathroom locations at each wing: Three typical bathroom layouts. One atypical elbow bathroom layout.
62 FLINT HALL: SCHEMATIC DESIGN STUDIES Scheme 1: 5 bathrooms (1 ADA). Scheme 2: 6 bathrooms, 2 sinks. Scheme 3: 5 bathrooms, 2 sinks. Scheme 4: 5 bathrooms, 2 sinks.
63 FLINT HALL: REDESIGNED FLOORPLAN TYPICAL BATHROOM BLOCK BATHROOM BATHROOM BATHROOM COMMON SPACE BATHROOM BATHROOM BATHROOM CORRIDOR Typical Floor Plan
64 FLINT HALL: SCHEMATIC DESIGN STUDIES Scheme 1: 6 bathrooms (1 ADA), 2 sinks. Scheme 2: 6 bathrooms, 1 sink. Scheme 3: 6 bathrooms, 3 sinks.
65 FLINT HALL: REDESIGNED FLOORPLAN ELBOW BATHROOM BLOCK ADA BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM CORRIDOR Typical Floor Plan
66 FLINT HALL: FINISHES Presentation boards of colors and finishes prepared for multiple schemes.
67 FLINT HALL: BEFORE & AFTER Typical toilet stalls prior to renovation. Typical toilet room following renovation.
68 FLINT HALL: BEFORE & AFTER Typical shower stalls prior to renovation. Typical individual shower following renovation.
69 FLINT HALL: BEFORE & AFTER Typical bathroom entrances prior to renovation. Existing bathrooms segregated by gender. Entrances to individual-use bathrooms located off of common space. New windows allow for natural light to reach interior corridor.
70 RESIDENCE HALL RENOVATION TIMELINE ( ) BREWSTER/BOLAND/BROCKWAY LAWRINSON HALL LYONS HALL WALNUT HALL FLINT HALL SKYHALLS I, II, III
71 SKYHALLS I, II, III: BATHROOM ONLY RENOVATION INDIVIDUAL-USE BATHROOMS 18 gang bathrooms 72 individual-use bathrooms. Three 3-story residence halls with gang bathrooms flanking existing lounge space on each floor. BUILT: 1960 BED COUNT: 351 Configuration: Coed-by-door. Construction Timeline: 12 weeks (including abatement) May 15 th August 8th (2011) Methodology: Upgrade finishes, revise layout to provide individual-use bathrooms. Provide laundry facilities and kitchenette on each floor.
72 SKYHALLS I, II, III: BEFORE CORRIDOR
73 SKYHALLS I, II, III: BEFORE 4 Gang Sinks 3 Toilet Stalls Layout typical of all bathroom locations. (two per floor) 3 Urinals 4 Shower Stalls
74 SKYHALLS I, II, III: SCHEMATIC DESIGN STUDIES Scheme 1: 4 bathrooms (1 ADA), 1 sink. Scheme 2: 3 bathrooms (1 ADA), 1 sink. Scheme 3: 3½ bathrooms (1 ADA), 1 sink.
75 SKYHALLS I, II, III: REDESIGNED FLOOR PLAN CORRIDOR
76 SKYHALLS I, II, III: FINISHES Presentation boards of colors and finishes prepared for multiple schemes. Skyhalls: Scheme 1 Skyhalls: Scheme 2
77 SKYHALLS I, II, III: FINISHES Presentation boards of colors and finishes prepared for multiple schemes. Skyhalls: Scheme 3 Skyhalls: Scheme 4 Although the use of different schemes at each of the three buildings was discussed, the University ultimately selected Scheme 3 for all bathrooms.
78 SKYHALLS I, II, III: AFTER Individual-use bathroom: toilet, sink, shower. Frosted glass shower partition. Glass tile accent strip. Stainless steel accent strip. Porcelain wall tile, ceramic floor tile. Recessed hand dryer, and toilet tissue dispenser. 2 Robe hooks. Mirror. Soap dispenser. Typical bathroom following renovation.
79 SKYHALLS I, II, III: AFTER Secondary corridor provides interior corridor with natural daylight.
80 SKYHALLS I, II, III: AFTER Wall mounted & recessed toilet room accessories.
81 SKYHALLS I, II, III: AFTER Extent of building renovation limited to the bathroom area and transition to existing corridor.
82 SKYHALLS I, II, III: AFTER Typical individual-use shower. Typical roll-in ADA compliant shower.
83 RESIDENCE HALL RENOVATION TIMELINE ( ) BREWSTER/BOLAND/BROCKWAY LAWRINSON HALL LYONS HALL WALNUT HALL FLINT HALL SKYHALLS I, II, III SADLER HALL SHAW HALL
84 SADLER HALL: BATHROOM ONLY RENOVATION INDIVIDUAL-USE BATHROOMS 15 gang bathrooms 114 individual-use bathrooms. 8-story residence hall with a gang bathroom at each wing. One existing bedroom adjacent to gang bathroom was taken in order to provide additional bathrooms and increase ratio of plumbing fixtures to residents. BUILT: 1960 BED COUNT: 485 Configuration: From coed-by-wing to coed-by-door. Construction Timeline: 2 Phases/2 years ( ) Methodology: Upgrade finishes, revise layout to provide individual-use bathrooms.
85 SADLER HALL: SCHEMATIC DESIGN STUDIES Scheme 1: 4 bathrooms, no loss of beds. Scheme 2: 8 bathrooms, loss of 2 beds. Scheme 3: 5 bathrooms, loss of 1 bed. Scheme 4: 6 bathrooms, loss of 1 bed. Scheme 5: 6 bathrooms, loss of 1 bed. Scheme 6: 8 bathrooms, loss of 2 beds.
86 SADLER HALL: REDESIGNED FLOOR PLAN KITCHENETTE ADA BATHROOM BATHROOM BATHROOM RA BATHROOM RA BEDROOM BATHROOM BATHROOM CORRIDOR CORRIDOR
87 SADLER HALL: FINISHES Presentation boards of colors and finishes prepared for multiple schemes. Sadler: Scheme 1 Sadler: Scheme 2
88 SADLER HALL: BEFORE & AFTER Toilet stalls with exposed fire protection prior to renovation. Individual toilet with concealed sprinklers following renovation.
89 SADLER HALL: BEFORE & AFTER Shower stalls with exposed plumbing and exposed fire protection prior to renovation. Individual shower with recessed shroud following renovation.
90 SADLER HALL: BEFORE & AFTER Gang sinks, mirrors and shelf. Exposed plumbing from floor above, prior to renovation. Individual sink with mirror and shelf following renovation.
91 SADLER HALL: BEFORE & AFTER Gang bathroom access through single door prior to renovation. Individual bathrooms accessed through secondary bathroom corridor following renovation.
92 SADLER HALL: AFTER Typical accent tile band. Typical upper and lower shower niche.
93 SUCCESSFUL DESIGN ELEMENTS Large wall tile: fewer grout joints for cleaning. Small floor tile: more gout joints for added traction. Simple tile layout: expedite installation. Floor mounted toilets: minimize chase widths. Water spigots at walls: facilitates cleaning. Occupancy indicators on door hardware: displays when bathroom is in use. Low shelf in shower: accommodates shaving of legs. Robe hooks: allows for hanging of towels and garments. Floor drains in bathroom: drains any excess water from shower area. Recessed shower shrouds: provides more clear area in shower. Fixed shower heads: isolate water in shower from water closet.
94 Bathroom Renovation Considerations
95 BATHROOM RENOVATION CONSIDERATIONS COST Cost per bathroom: Approximately $30,000-$40,000. Finishes: 29% of contract sum. Durability. Slip-resistance. Ease of installation. Ease of cleaning. Coordinated Classic color scheme. Plumbing: 19% of contract sum. Electrical: 17% of contract sum. Costs of previous in-kind bathroom renovations were comparable to individual-use renovations. Construction costs increase with the addition of associated amenities, i.e. laundry, kitchenettes, study lounges, janitor closets. Mechanical: 8% of contract sum. Fire Protection: 2% of contract sum.
96 BATHROOM RENOVATION CONSIDERATIONS SCHEDULE SUMMER CONSTRUCTION Building to be vacated. Hazardous materials abatement. Temporary protection. Phasing (by floor, by wing).
97 BATHROOM RENOVATION CONSIDERATIONS SCHEDULE DESIGN & CONSTRUCTION SITE INVESTIGATION DESIGN OPTIONS DOCUMENT PREPARATION BIDDING AWARD SHOP DRAWING/ ORDERING MOBILIZATION/ CONSTRUCTION SUBSTANTIAL COMPLETION PUNCH LIST HOUSEKEEPING STUDENT ARRIVAL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
98 BATHROOM RENOVATION CONSIDERATIONS SCHEDULE RESOURCES NEEDED Contractors: Prioritize shop drawings to order long lead items. Selection and commitment from sub-contractors for manpower and schedule. Highly organized work plan. Understanding of need for double-shifts and weekend work. Coordination drawings from each trade. Design Team: Comprehensive site investigation at onset of project. Understanding tight spacing of overhead mechanical systems and wall-mounted accessories. High level of oversight and participation during Construction Administration phase.
99 BATHROOM RENOVATION CONSIDERATIONS MAINTENANCE Fixture Count: Individual-use bathrooms provide many more plumbing fixtures to maintain. Accessibility: Access panels are required in hard ceilings and soffits at locations of shut-off valves. Floor Drains: Floor Drains at showers and common spaces require regular cleaning to prevent clogging and back-flowing of water. Mechanical: Added HVAC exhaust with heat recovery at each individual-use bathroom location.
100 BATHROOM RENOVATION CONSIDERATIONS HOUSEKEEPING Cleaning: Individual-use bathrooms have more fixtures and surfaces to clean than a gang bathroom. Cleaning Accessibility: Housekeeping staff able to close one space at a time for cleaning. There is no longer the need to wait until an entire gang bathroom is unoccupied to clean facilities. Cleaning Time: Time needed to clean individual-use bathrooms and gang bathrooms is comparable due to wait times and accessibility restraints. Actual cleaning time is increased at individual bathrooms. Cleaning Staff: Additional staff may be needed due to increased cleaning load. Syracuse University has not increased housekeeping staff since renovating bathrooms. Cleaning Tools: Installation of water spigots for hose attachment at each room expedites cleaning process without using flexible shower heads as water source in bathrooms.
101 BATHROOM RENOVATION CONSIDERATIONS OCCUPANT BEHAVIOR Vandalism: The installation of higher-end finishes has lead to fewer instances of vandalism in bathrooms and common areas. Hours of Operation: Bathroom use in residence halls is practically around-the-clock due to the varied schedules of the student population. Sense of Ownership: Use of upgraded finishes has given students a greater sense of pride in facilities. In many cases students have claimed specific bathrooms. Gender Designation: Student response to gender neutral bathrooms has been very positive. However, there have been some cases where students have designated specific bathrooms in a block to be male or female only.
102 BRINGING OLDER RESIDENCE HALLS INTO THE FUTURE: Bathroom renovations provide the largest return on investment with respect to student satisfaction. Negative feedback from students regarding other residence hall amenities (furnishings, bedrooms, common areas, laundry, location etc.) is greatly reduced following a bathroom renovation. Individual-use bathrooms provide flexibility needed to accommodate summer housing for programs like athletic camps, conferences, and other offseason academic offerings. Individual-use bathrooms can better accommodate the future student population by addressing: Privacy Issues Accessibility Issues Gender Identification Issues Fluctuations in Student Population
103 Review Questions
104 BRINGING OLDER RESIDENCE HALLS INTO THE FUTURE: Practicing Institute of Engineering QUESTION #1: New openings adjacent to columns in concrete flat plate floors/roofs tend to reduce shear capacity. TRUE or FALSE ANSWER: TRUE
105 BRINGING OLDER RESIDENCE HALLS INTO THE FUTURE: Practicing Institute of Engineering QUESTION #2: Carbon fiber reinforcement can be used to compensate for interruptions to the existing flexural reinforcement in concrete flat plate floors/roofs. ANSWER: TRUE or FALSE TRUE
106 BRINGING OLDER RESIDENCE HALLS INTO THE FUTURE: Practicing Institute of Engineering QUESTION #3: Positive bending is reinforced at the top of the slab. TRUE or FALSE ANSWER: FALSE
107 BRINGING OLDER RESIDENCE HALLS INTO THE FUTURE: Practicing Institute of Engineering QUESTION #4: Negative bending is reinforced at the bottom of the slab. TRUE or FALSE ANSWER: FALSE
108 BRINGING OLDER RESIDENCE HALLS INTO THE FUTURE: Practicing Institute of Engineering QUESTION #5: The New York State Plumbing Code requires which of the following for a college residence hall occupancy? a. 1 water closet & 1 lavatory per 10 occupants. b. 1 shower per 8 occupants. c. 1 water closet, 1 lavatory, 1 shower per 5-6 occupants. ANSWER: a. & b.
109 Thank you for joining us today. This concludes the American Institute of Architects Continuing Education Systems Program Questions? Rob Spagnoletti Maintenance Manager Syracuse University Syracuse, NY Dennis Spina, AIA, RRC Principal Bell & Spina Architects Syracuse, NY Pittsford, NY
Ontario s 2012 Building Code Barrier-Free Design Amendments Ontario Regulation 332/12 Amended by O. Regs. 368/13 and 191/14
Ontario s 2012 Building Code Barrier-Free Design Amendments Ontario Regulation 332/12 Amended by O. Regs. 368/13 and 191/14 Notice: This E Learning module is intended for general information purposes only.
More informationAccessible Plumbing Fixture Requirements
Accessible Plumbing Fixture Requirements Module 9 Module 9 1 Objectives Upon completion of this module, you will be better able to: Identify when bathrooms have to be accessible. Identify when family/assisted
More informationResidential Accessible, Type A, and Type B Dwelling Unit Requirements 2012 International Building Code and 2009 ICC/ANSI A117.1
Residential Accessible, Type A, and Type B Dwelling Unit Requirements 2012 International Building Code and 2009 ICC/ANSI A117.1 20 E Olive Street STE 208 PO Box 1230 Bozeman, MT 59771-1230 Phone: (406)
More informationExisting Building Accessibility Quick Checklist (CBC 11B) Job Address Permit
Existing Building Accessibility Quick Checklist (CBC 11B) Job Address Permit DIVISON 5: GENERAL SITE AND BUILDING ELEMENTS ENTRY (Items 1.1 & 1.6) Y N Parking Spaces Path from street accessible throughout
More informationSITEMAP. (775)
SITEMAP PLAN 1-1309 PLAN - 1654 PLAN 3-1831 DUPLEX PLAN 4-474 DUPLEX PLAN 5-319 FLOORPLANS PLAN 1309 Stories: Square Feet: Bedrooms: Bathrooms: Garage: 1,309 1 Car Walk up one flight of stairs from your
More informationAPPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE NEWNHAM CAMPUS TORONTO, ONTARIO
APPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE NEWNHAM CAMPUS TORONTO, ONTARIO Prepared by: Rita Cherniavskaya & Elias Frechette Technical Consultants
More informationUC SANTA CRUZ HOUSING GUIDELINES
CAMPUS STANDARDS APPENDIX B UC SANTA CRUZ HOUSING GUIDELINES March 1, 2016 STUDENT HOUSING A. GENERAL The following supplemental guidelines apply to projects and are in addition to the related Campus Standards
More informationAccessible drinking fountain does not have a clear 30 wide floor space centered on the drinking fountain (centerline to the counter edge is 12 ).
ADA STANDARD: PARKS SERVICE CENTER GARAGE 4.15.5(1), Figs. 4(e) and 27(b) Accessible drinking fountain does not have a clear 30 wide floor space centered on the drinking fountain (centerline to the counter
More informationCLIENT CHANGE HISTORY DATE INIT
FEATURES EXTERIOR Covered entrance way Custom crafted cosmetic detailing Private individual parking for two vehicles in a secured parking garage for townhomes or an optional double garage for the garden
More informationSMITH DOUGLAS H OMES P RE SENT S HIGHLANDS AT MADISON PARK BASE PRICE SHEET. The Benson 3 Beds / 2.5 Baths Approx 1,801 Sq. Ft.
BASE PRICE SHEET The Benson 3 Beds / 2.5 Baths Approx 1,801 Sq. Ft. See Pricing Below The Benson A $221,900 The Benson E $221,900 The Benson B $219,900 The Benson F $217,900 The Benson D $218,900 The Campbell
More informationDESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK
DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK I. LANDLORD'S WORK Landlord's Work shall be done in accordance with the specifications set forth below, shall be limited to the work set forth in this Section
More informationa) Tenant shall require its Contractor to provide and maintain the following insurance coverage:
TENANTS WORK Tenant shall perform its work, at its sole cost and expense, in accordance with Landlord s criteria and all applicable code requirements. All Tenant Work shall be subject to Landlord s prior
More informationQHOChomes.com. our Standard Features
our Standard Features Excellent Exteriors Low maintenance vinyl siding Exterior cornice wrapped in aluminum with decorative bend Decorative raised panel vinyl shutters on front windows (per plan/elevation)
More information518 3 rd Avenue South St. Petersburg, Florida
518 3 rd Avenue South St. Petersburg, Florida 33701 813.895.8591 www.viridianfl.com Project Summary Preservation of Senior Housing Project Name: Viridian Address: 518 3 rd Avenue South St. Petersburg,
More informationJanet Campbell Howard Hanna Real Estate Services. 85 South Union Street Main Line: (585) Spencerport NY Office Fax: (585)
Quality Built Homes By: Iuppa Homes Inc. Rich Iuppa Builder & Howard Hanna Real Estate Services Spencerport Office Janet Campbell Broker Associate Office: (585)-352-8524 Cell: (585)-739-8065 Subdivision
More informationApartment Lifts There are individual lifts dedicated to the Building. Security lifts to all levels including car park.
Atrium Building components The major components of the building consist of the following: Entry lobby The entry lobby will consist of paint finish walls and ceilings, tiled externally and internally, glass
More informationOFFERING MEMORANDUM. 415 Washington Street. Waukegan, IL PRESENTED BY: COLLIERS INTERNATIONAL
OFFERING MEMORANDUM 415 Washington Street PRESENTED BY: CONFIDENTIALITY AGREEMENT This Offering Memorandum contains select information pertaining to the business and affairs of the Property at 415 Washington
More informationHomes starting in the $330,000 s
TURNER Turner, Oregon Homes starting in the $330,000 s Chad E. Davis Construction, LLC is a northwest-grown, locally owned and operated business established in 1998. Davis is a second generation builder
More informationSmith Douglas Homes Presents RAINHILL
BASE PRICE SHEET The Penrose 3 Beds / 2 Baths Approx. 1,348 Sq. Ft. See Pricing Below Defined by its exceptionally efficient use of space, the Penrose packs a lot of flexibility into its modest dimensions.
More informationADAPTABLE DESIGN GUIDELINES
ADAPTABLE DESIGN GUIDELINES Adaptable design creates liveable residences for a wider range of persons than current building codes require. By considering design features that can be easily and inexpensively
More information12/18/2017. Objective. Accessibility Code MN 1341 Frequent Questions and Key Criteria. Agenda. Code Documents
Objective Accessibility Code MN 1341 Frequent Questions and Key Criteria Highlight frequently asked Accessibility Code Questions Review the intent of the requirements Clarify the why behind the what of
More informationTHIS CHECKLIST HAS BEEN AMENDED TO INCLUDE ONLY LEVEL ONE CRITERIA AS REQUESTED BY TIR REAL PROPERTY. As such it does not form a complete Checklist.
Nova Scotia Building Accessibility Checklist Note OTE THIS CHECKLIST HAS BEEN AMENDED TO INCLUDE ONLY LEVEL ONE CRITERIA AS REQUESTED BY TIR REAL PROPERTY. As such it does not form a complete Checklist.
More informationFICO Realty Group Presents 485 Washington Street Woburn MA 01801
FICO Realty Group Presents 485 Washington Street Woburn MA 01801 TO BE BUILT! 485 Washington St. Woburn MA 01801 is a beautiful 8 Room, 4 Bedroom, 2 1/2 Bath, Colonial. Very close to the Reading line.
More informationThe New NYC Building Code Chapter 11 Accessibility. New York City Department of Buildings. Technical Affairs. Keith Wen, R.A. Copyright Materials
The New NYC Building Code Chapter 11 Accessibility New York City Department of Buildings Technical Affairs Keith Wen, R.A. Copyright Materials This presentation is protected by US and International Copyright
More informationVILLAGES AT WALNUT CREEK
BASE PRICE SHEET The Campbell 3 Beds / 2 Baths Approx. 1,808 Sq. Ft. See Pricing Below Single-level living at its finest can be found in the Campbell, featuring a large kitchen that would pamper any chef
More informationThe Peaks Features List
The Peaks Features List INSIDE SRY Luxuriously appointed two-story residences Generous outdoor living spaces integral to plan Versatile dry bars at all great rooms 10 high ceilings downstairs, 9 upstairs
More informationUnderstanding Accessibility Features to Meet Housing Needs
Understanding Accessibility Features to Meet Housing Needs For more information about the K-W VisitAble Housing initiative: www.waterlooregion.org/visitable spckw@waterlooregion.org 519-579-1096 X *3006
More informationRESIDENCES EFFORTLESS LUXURY IN ONE OF CANBERRA S MOST PRESTIGIOUS SUBURBS BY VILLAGE BUILDING CO. 15 CURLEWIS CRESCENT GARRAN
RESIDENCES BY VILLAGE BUILDING CO. EFFORTLESS LUXURY IN ONE OF CANBERRA S MOST PRESTIGIOUS SUBURBS 15 CURLEWIS CRESCENT GARRAN SITEPL AN NORTH CURLEWIS CRESCENT 15A 15B Conveniently located in the established,
More informationCUMBERLAND SCHOOLS WORK PROPOSED 2018
Cost Ashton Elementary School 2 2 Replace HVAC $ 375,000.00 5 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 2 3 Various Technological Improvements $ 191,258.00 2 4 Replace Plumbing Fixtures
More informationNo rt he a st Alb a n y Homes starting in the $310,000 s
WEo o d s STATES No rt he a st Alb a n y Homes starting in the $310,000 s Chad E. Davis Construction, LLC is a northwest-grown, locally owned and operated business established in 1998. Davis is a second
More informationSOPHISTICATED, RELAXED LIVING.
SOPHISTICATED, RELAXED LIVING. 36 SPAFFORD CRESCENT FARRER As the latest edition to our exclusive townhouse collection, 36 Spafford Crescent, Farrer, features two stunning architecturally designed homes
More informationThe. Conveniently Located on Heydenreich, Just North of Hall Road
A Bradbury cathedral ceiling in the great room and bank of windows encircling the nook impart an open, airy feeling to this charming 2-bedroom, 2-bath ranch condominium. Preparing meals and entertaining
More informationADA/TAS Plan Review & Inspection Worksheet Texas Access
ADA/TAS Plan Review & Inspection Worksheet Texas Access www.texasaccess.com Client: Project No: Address: City/Town: State/ZIP: Project Type: PLAN REVIEW INSPECTION BY DATE Applicable to project scope Results:
More informationRenovation Progress. June 2-15, Weeks 35 & 36
Renovation Progress June 2-15, 2012 Weeks 35 & 36 Jun 2 Sisters investigate the progress and ponder the finished arrangement of the reception area (right) and the residence area on 2 nd Ottilia (below)
More information20294 E. Maplewood Pl. Centennial, CO List Of Custom Property Features & Amenities
List Of Custom Property Features & Amenities Outside: Two Story Home Built By Village Homes in 1996 Larger Lot 11,456 Square Foot Lot =.263 Acres Finished Walk Out Basement 3 Car Tandem 606 Square Foot
More informationSINGLE STORIES PLANS 4, 4X AND 5
SINGLE STORIES PLANS 4, 4X AND 5 Tuscan Cliffs Single Stories Plans 4, 4X and 5 Features List INSIDE STORY/ELEGANT INTERIORS Private guard gated community Single story luxury residences Bathrooms at all
More informationCLOSE. PROPERTY OF DMCI HOMES
CLOSE X LOCATION Address: EDSA, Guadalupe Viejo, Makati City How to get there: FROM EDSA NORTHBOUND Approaching Southbound, just turn right after PET PLANS Building FROM EDSA NORTHBOUND Approaching Northbound,
More informationTRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045
TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION 9123 Route 108, Old Annapolis Road Columbia, MD 21045 RETAIL/OFFICE/MEDICAL/EXECUTIVE SUITES OFFERED FOR LEASE PROPERTY IDENTIFICATION: ADDRESS:
More information294 Carling Avenue Dows Lake
294 Carling Avenue Dows Lake Welcome to 294 Carling Avenue LIVING ROOM Welcoming DINING ROOM Luxurious KITCHEN EAT-IN AREA Create MASTER BEDROOM ENSUITE Tranquil Private BEDROOMS BATHROOM Enjoy
More informationArlington County. Smart Choice Homes. Arlington County. Homes for all of us. Homes for a lifetime. Home
Arlington County Smart Choice Homes Home Arlington County Homes for all of us. Homes for a lifetime Why Smart Choice Homes? Smart design equals smart living. This booklet provides the building blocks to
More informationContemporary villas Panoramic view 3 minutes from Bonita Beach
Contemporary villas Panoramic view 3 minutes from Bonita Beach 4 individual villas with private pool - 3 bedrooms + optional studio Situated on a 4000 square meter terrain VILLAS AUM 3 or 4 bedroom villas,
More information172 Railway Parade, WEST LEEDERVILLE. Marketing Plans for VIP clients only
172 Railway Parade, WEST LEEDERVILLE Marketing Plans for VIP clients only Motive Apartments Poolside Cabana Artist Impression Only. Motive Apartments Type G kitchen and dining. GENERAL
More informationTHE INSIDE STORY EXTERIOR VARIETY KITCHENS TO SAVOR PERSONALIZING OPPORTUNITIES LUXURIOUS BATHS WATER AND ENERGY SAVERS
jadecollection FEATURES LIST Sure, you say, these model homes look great, but how much will all the extras cost me? Well, chances are a lot of those extras aren t. They re included, as a quick look at
More informationThe Peaks Features List
The Peaks Features List INSIDE STORY Luxuriously appointed two-story residences Generous outdoor living spaces integral to plan Versatile dry bars at all great rooms 10 high ceilings downstairs, 9 upstairs
More informationBUILDING SPECIFICATIONS
We build homes with people in mind BUILDING SPECIFICATIONS PORT FORUM HOMES III Building FOUNDATIONS AND STRUCTURE Foundations via piles and reinforced concrete slab. Reinforced concrete pile and piled
More informationMeticulously crafted finishes come as standard at Jade
Meticulously crafted finishes come as standard at Jade 2 1 3 5 4 6 1 Westinghouse Ducted Rangehood 2 AEG 9 Function Oven 3 Everhard Squareline Double Bowl Sink 4 AEG Induction Hot Plate 5 Dorf Viridian
More informationTHE INSIDE STORY EXTERIOR VARIETY PERSONALIZING OPPORTUNITIES KITCHENS TO SAVOR LUXURIOUS BATHS WATER AND ENERGY SAVERS
onyxcollection FEATURES LIST Sure, you say, these model homes look great, but how much will all the extras cost me? Well, chances are a lot of those extras aren t. They re included, as a quick look at
More informationCOLD DARK SHELL LEASE EXHIBIT
COLD DARK SHELL LEASE EXHIBIT COLD DARK SHELL Lease Exhibit 1 EXHIBIT C Leasehold Improvements Work Letter I. ALL WORK TO BE PERFORMED HEREUNDER SHALL CONFORM TO CODE. CODE SHALL BE DEFINED FOR PURPOSES
More informationResidence 51. LOCATION John Kennedy Area, Limassol. STATUS Under Construction for SALE. COMPLETION DATE September 2010
LOCATION John Kennedy Area, Limassol STATUS Under Construction for SALE COMPLETION DATE September 2010 DESCRIPTION is situated in a prime location in the heart of the city s business and leisure amenities,
More informationWESTBROOK III & HIGHLAND III Live Work Town Center Townhomes
WESTBROOK III & HIGHLAND III Live Work Town Center Townhomes Westbrook III Lot 8 Lot 7 Lot 6 Lot 5 Lot 4 Lot 3 Lot 2 Westbrook III Lot 1 The Westbrook III and are unique three-level live work townhomes
More informationACCESSORY DWELLING UNITS
ACCESSORY DWELLING UNITS Category: Residential Construction Revised: [Paul L. Scarlett], Director Responsible Bureau Sections: Development Services Center 1900 SW Fourth Avenue Portland, OR 97201 503-823-7310
More informationBUILDING CODE INTERPRETATION
BUILDING CODE INTERPRETATION March 2008 06-BCI-010 Page 1 of 9 ADAPTABLE DWELLING UNITS DISCUSSION This STANDATA has been developed to clarify the requirements for adaptable dwelling units in residential
More informationArtist impression. 2 & 3 Bedroom Penthouses. 20 Galore St, CRACE, ACT 2911
Artist impression 2 & 3 Bedroom Penthouses 20 Galore St, CRACE, ACT 2911 PENTHOUSE APARTMENTS 2 & 3 Bedrooms 2 x 2 bedroom Penthouse options 10 x 3 bedroom Penthouse options Exclusive top level location
More informationUnderstanding Accessibility Features to Meet Housing Needs
Understanding Accessibility Features to Meet Housing Needs For more information about the K-W VisitAble Housing initiative: www.waterlooregion.org/visitable trudy@waterlooregion.org 519-579-1096 X *3006
More informationFour Bedroom 2.5 Bath Colonial: The Grand Maple 2,319 sq. ft. Starting at $329,990
3 Car Garages Available Four Bedroom 2.5 Bath Colonial: The Grand Maple 2,319 sq. ft. Starting at $329,990 The Grand Maple features open floor plan (kitchen/dining/great room), large mud room, first floor
More informationEXHIBIT C. Leasehold Improvements Work Letter
EXHIBIT C Leasehold Improvements Work Letter I. ALL WORK TO BE PERFORMED HEREUNDER SHALL CONFORM TO CODE. CODE SHALL BE DEFINED FOR PURPOSES HEREOF AS ALL FEDERAL, STATE, REGIONAL, COUNTY, MUNICIPAL AND
More information2014 Vancouver Building By-Law
2014 Vancouver Building By-Law GoToWebinar - Webinar on Policy Development for VisitAble Housing October, 21, 2014 Presented by Jason Watt P.Eng, CP Overview New Look, Websites, Stakeholders, By-law Structure,
More informationCOOMERA GARDEN HOTEL GOLD COAST HOTEL SERVICE APARTMENT MARKETING BOOK
COOMERA GARDEN HOTEL GOLD COAST HOTEL SERVICE APARTMENT MARKETING BOOK www.coomeragardenhotel.com.au 2017 1. Market Positioning and Free Visa Services 2017 1.1Target Markets Student Accommodation Holiday
More informationACCESSORY DWELLING UNITS
ACCESSORY DWELLING UNITS Category: Residential Construction Revised: [Paul L. Scarlett], Director Responsible Bureau Sections: Development Services Center 1900 SW Fourth Avenue Portland, OR 97201 503-823-7310
More informationSMITH DOUGL AS HOMES PRESENTS IRIS PARK
BASE PRICE SHEET THE BENSON 3 Bedrooms / 2.5 Baths Approximately 1800 Sq. Ft. See Pricing Below An impressive, light-filled entry welcomes you into the Benson and leads to a connected living-dining-kitchen
More informationHIGHLANDS AT MADISON PARK
BASE PRICE SHEET The Benson 3 Beds / 2.5 Baths Approx. 1,801 Sq. Ft. See Pricing Below An impressive, light-filled entry welcomes you into the Benson and leads to a connected living-dining-kitchen layout
More informationAccessibility and ADA: Facility Standards Update. Technical Specifications: Chapters 8-10
Accessibility and ADA: Facility Standards Update Technical Specifications: Chapters 8-10 1 Today s Agenda Chapter 8: Special Rooms, Spaces, and Elements Chapter 9: Built-In Elements Chapter 10: Recreation
More informationTHE INSIDE STORY EXTERIOR VARIETY KITCHENS TO SAVOR PERSONALIZING OPPORTUNITIES LUXURIOUS BATHS WATER AND ENERGY SAVERS
TopaZ COLLECTION FEATURES LIST Sure, you say, these model homes look great, but how much will all the extras cost me? Well, chances are a lot of those extras aren t. They re included, as a quick look at
More informationINFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS
INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS Prepared by: Community Development Standards Branch Town of Innisfil www.innisfil.ca June 2016 Contents 1. Introduction... 1 2. Ontario Building
More informationHIGHLANDS AT MADISON PARK
BASE PRICE SHEET The Benson 3 Beds / 2.5 Baths Approx. 1,801 Sq. Ft. See Pricing Below An impressive, light-filled entry welcomes you into the Benson and leads to a connected living-dining-kitchen layout
More informationSmith Douglas Homes Presents MORGAN S RUN
BASE PRICE SHEET The Bayfield 4 Beds / 2-3 Baths See Pricing Below The popular Bayfield packs a lot of living space into its compact dimensions, including an open living area with access to a covered patio
More informationHOME FOR ELIZABETH RESIDENTS KITCHEN
MOSAIC. A BETTER HOME. Natural light. Space. Presence. From deliberating every detail and making the most of every inch to creating beautiful street appeal, our obsession with design is evident in each
More informationReservation Agreement 10ARROS. A Townhouse-Style Condominium Community
Reservation Agreement 10ARROS A Townhouse-Style Condominium Community This Reservation Agreement (Agreement) dated the day of, 20 is between Grist Realty, Inc, Listing Agent for the Seller, 10ARROS, LLC
More informationTENANT DESIGN MANUAL UPDATED JUNE 2015
TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Hamilton Town Center is located at the intersection of 146th Street (SR 238) and I-69 in Noblesville, IN. It s location in Hamilton County enables
More informationPositano Waterfront Residences. Copyright 2016, Miromar Development Corporation.
Positano Waterfront Residences by Gulfshore Homes Copyright 2016, Miromar Development Corporation. Residence 01 3 Bedrooms, 3 Bathrooms, Den, Powder Bath, Balcony and Covered Lanai Residence 01 Square
More informationFlats at Flora Finish Package. Welcome Home to the Flats at Flora N. 27th Street 1 & 2 - Philadelphia PA 19121
Flats at Flora Finish Package 1210 N. 27th Street 1 & 2 - Philadelphia PA 19121 Welcome Home to the Flats at Flora Two new construction condos Brewerytown Fall 2015 delivery Flexible floor plans Two bedrooms
More informationSKYLINE HOMES OF ARKANSAS CIT Y, KANSAS 24' 28' 32' SERIES
SKYLINE HOMES OF ARKANSAS CIT Y, KANSAS 24' 28' 32' SERIES East Side Homes 12061 SW US Hwy 54 Augusta, KS 57010 316-688-5101 eastsidehomeswichita.net 24' SERIES Living is easy in the generously spacious
More informationBrilliant finishes come as standard at Ruby
Brilliant finishes come as standard at Ruby 2 1 3 5 4 6 1 Westinghouse Ducted Rangehood 2 AEG 8 Function Oven 3 Everhard Squareline Double Bowl Sink 4 AEG Induction Hot Plate 5 Dorf Viridian Spring Pull
More informationTENANT DESIGN MANUAL UPDATED JUNE 2015
TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Northshore Mall is located at the intersection of Routes 114 and 128, just minutes from major thoroughfares US 1 and I-95. 2 PROJECT OVERVIEW As
More informationSr. No This option is applicable for Options Remarks / Details required
SDIL/MOD/1 26 th February, 2012 Dear Customers, This letter is being written to all of you to give the details on the modifications that are possible in the 2 BHK Flats (Apartments) that you have booked
More informationHighland Park. Under construction 945 Rollingview. 232 Mill Valley Pkwy Sq.Ft. 2-Car 4/2.5 $466, Mill Valley Pkwy.
Highland Park unit 2 HOMES 650 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $542,800 6 Mt. Shasta Views 643 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $552,800 8 Mt. Shasta Views Under construction 945 Rollingview
More informationPRELIMINARY AU G U S T 7, 201 7
PRELIMINARY AUGUST 7, 2017 YOUR NEIGHBORHOOD *ADA HOMES WELCOME HOME Set yourself apart from the rest at one of the newest residences in Chula Vista. Bringing together modern finishes and spacious plans,
More informationPLANS 1-3
PLANS 1-3 Tuscan Cliffs Plans 1-3 Features List INSIDE STORY/ELEGANT INTERIORS Private guard gated community Two story luxury residences Dedicated bathrooms at all bedrooms (all plans) Functional butler
More informationCommon Areas and Building Finishes
Common Areas and Building Finishes EXTERNAL WALLS Reinforced concrete / glazing / precast / block and render to Architect s detailed S LANDSCAPING Reinforced concrete suspended slab To Landscape CORRIDORS
More informationTENANT DESIGN MANUAL UPDATED AUGUST 2015
TENANT DESIGN MANUAL UPDATED AUGUST 2015 PROJECT OVERVIEW JCPenny Nordstrom Macy s Lord & Taylor Sears WOODFIELD MALL 2 PROJECT OVERVIEW The largest shopping center in the state of Illinois and one of
More informationRegulation Outline. Under section 59 of the Community Planning Act, the Lieutenant-Governor in Council makes the following Regulation:
1 Regulation Outline Citation....1 Definitions....2 Act Loi Code Code tourist establishment établissement touristique tourist home maison pour touristes Approval of building code....3 Interpretation....4
More informationSchedule C Barrier-Free Design
1 Schedule C Barrier-Free Design As amended by Article 3.1.1.5. of these regulations Section 3.8 Barrier- Free Design of the Code is replaced with the following: Section 3.8 Barrier-Free Design 3.8.1.
More informationBUILDING AN ADU GUIDE TO ACCESSORY DWELLING UNITS PLANNING DIVISION
BUILDING AN ADU GUIDE TO ACCESSORY DWELLING UNITS PLANNING DIVISION 1 451 S. State Street, Room 406 Salt Lake City, UT 84114-5480 P.O. Box 145480 CONTENT 04 OVERVIEW 08 ELIGIBILITY 11 BUILDING AN ADU Types
More informationGreen Valley s premier builder, enhancing the Southwest s natural beauty for over 40 years.
Green Valley s premier builder, enhancing the Southwest s natural beauty for over 40 years. The Villas at Canoa Ranch The Estates at Canoa Ranch Solterra at Las Campanas 1.800.830.5135 FairfieldHomesArizona.com
More information2018 CSBC / 2018 CSFSC Part III. Chapter #10. Means of Egress. Table of Contents. Based on the 2015 IBC and the 2015 IFC.
2018 CSBC / 2018 CSFSC Part III. Chapter #10. Means of Egress. Table of Contents. Based on the 2015 IBC and the 2015 IFC. October 23, 2018 Section 1001. Administration. See Section 107.2.3 for Egress Drawing
More informationAffordable Rental Housing Design Guidelines
Affordable Rental Housing Design Guidelines City of Toronto Affordable Housing Office City of Toronto Affordable Housing Office January 2015 Purpose T he Affordable Housing Design Guidelines have been
More informationRenovation Progress. Apr , Week 29
Renovation Progress Apr. 23 27, 2012 Week 29 Apr. 23 Drilling and making adjustments to steel posts that need to be in place before the upper level is cemented Apr. 23 Masonry on north porch of kitchen
More informationFor more information, please call: GINA ALLEN (757)
Built by: For more information, please call: GINA ALLEN (757) 439-3003 ginaallen@williamewood.com Standard Features INTERIOR FEATURES: Hardwood Flooring in Foyer 9 Ceilings First Floor Walls Gas Fireplace
More informationThe New NYC Building Code Chapter 10 Means of Egress. New York City Department of Buildings. Technical Affairs. Fatma M. Amer, P.E.
The New NYC Building Code Chapter 10 Means of Egress New York City Department of Buildings Technical Affairs Fatma M. Amer, P.E. Copyright Materials This presentation is protected by US and International
More informationSDA APARTMENTS AT ARATI INTRODUCTION
APARTMENTS AT ARATI INTRODUCTION A TOTAL OF 12 APARTMENTS, ARATI S LATEST AND LAST PART OF DEVELOPMENT WILL HAVE SINGLE, COUPLE AND FAMILY HOMES WITH SPACIOUS FLOOR PLANS RANGING BETWEEN 52 AND 116 SQM
More informationTENANT DESIGN MANUAL UPDATED JUNE 2015
TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Cape Cod Mall is located on Route 132 in Hyannis, the largest of seven towns in Cape Cod, MA. Hyannis is known as the Capitol of the Cape. 2 PROJECT
More informationSection 3: Primary Function, Employee Work Areas, & Kitchens
Section 3: Primary Function, Employee Work Areas, & Kitchens TEXAS ACCESSIBILITY ACADEMY Architectural Barriers Program 106.5.45 Primary Function A major activity for which the facility is intended Examples:
More information2012 Texas Accessibility Standards Reference Guide for changes to the code
2012 Texas Accessibility Standards Reference Guide for changes to the code SCOPING ITEMS Children s Mounting Heights Elements primarily used by children are no longer required to comply with the appropriate
More information01 RESIDENCE FLOORPLAN
01 RESIDENCE FLOORPLAN 2,017 Sq. Ft. One Story 3 Bedroom 2 2-Car Garage Bedroom Great Room Island Upper & Lower Cabinets Dining Refrigerator Kitchen DW A/C Pad Options 4 Shelves Coats BA. 2 Pantry with
More informationThe landscape along the Pacific Coast of California is diverse and intricate. Mirroring that terrain is a collection of innovative architectural
The landscape along the Pacific Coast of California is diverse and intricate. Mirroring that terrain is a collection of innovative architectural styles distinctively recognized as Californian. Ivory Homes
More informationCommon Areas and Building Finishes
UNIT TYPES 2A, 2B, 2C, 2D, 2E & 2F Common Areas and Building Finishes EXTERNAL WALLS S LANDSCAPING Reinforced concrete (off-form and painted finish) / glazing / aluminium/ aluminium composite panel / block
More informationCAS PAR. Comprehensive Assessment and Solution Process For Aging Residents INTRODUCTION MATERIALS NEEDED 1 CASPAR
CAS PAR Comprehensive Assessment and Solution Process For Aging Residents INTRODUCTION CASPAR consists of 6 sections.the suggested order of completing the protocol is as follows:. Contact Information.
More information3510 Plan Two Story Approx. 2,382 Sq. Ft. 3 Bedrooms 2.5 Baths Kitchen with Island Great Room Loft Covered Loggia 2 Bay Garage
PRICE SHEET at 3510 Plan Two Story Approx. 2,382 Sq. Ft. 3 Bedrooms 2.5 Baths Kitchen with Island Great Room Loft Covered Loggia 2 Bay Garage Options: Bedroom 4 ILO Loft Bedroom 5 ILO Study Outdoor Fireplace
More informationSmith Douglas Homes Presents ESCALADES
BASE PRICE SHEET The Campbell (Ranch) Beds / Baths Approx., Sq. Ft. See Pricing Below Single-level living at its finest can be found in the Campbell, featuring a large kitchen that would pamper any chef
More information1513 & 1515 Greenleaf Street Evanston, IL Karla Thomas & Lina Zoraikat
1513 & 1515 Greenleaf Street Evanston, IL 60202 2 New Construction Homes with Live/Work Flexibility Karla Thomas & Lina Zoraikat Cell 773.505.1121 or 312.721.8554 Email karla.thomas@urb2burb.com www.urb2burb.com
More information