Subdivision Staff Report

Size: px
Start display at page:

Download "Subdivision Staff Report"

Transcription

1 Subdivision Staff Report Subdivision Name Honeymoon Cove Subdivision File Number SUB Approval Preliminary/ Final Plat Lead Agency Boise City Annexation Date December 30, 2004 Comp. Plan Complies Public Hearing Date April 7, 2008 Heard by Boise City Planning & Zoning Commission Analyst Joan Johnson Reviewed by David Abo, AICP Description: This is a proposed mixed use subdivision with six buildable lots on 5.0 acres. The subject property is currently zoned R-1C and contains one single family structure which will be removed. This subdivision is subject to approval of two companion applications that include a rezone request (CAR ) from R-1C to N-OD and a Conditional Use Permit application (CUP ) that will also be heard at the April 7, 2008 Planning and Zoning Commission meeting. The proposal also includes a perpetual ingress/egress easement and cross parking easement intended to provide internal driveway access and parking to all of the buildable pad sites. This parcel was previously approved for 24 residential townhouses with Continuum Subdivision (CUP and SUB ). The property has changed ownership, resulting in the current mixed use proposal. Location: The site is located on the on the south side of West Overland Road, approximately ¼ mile east of Five Mile Road at W. Overland Road. Traffic Analysis: This development is estimated by ACHD to generate an additional 379 additional vehicle trips (10 existing) per day. The trip generation for Continuum Subdivision was 338 vehicle trips per day. Impacted Roadways: Roadway Frontage Functional Classification Traffic Count W. Overland 300-Feet Principal Arterial 27,774 east of Five Road Mile Road on 4/13/2006 Level of Service* Better than C Speed Limit 40 MPH

2 Page 2 of 24 18,767 west of Five Mile Road on 9/20/05 Southerland 50-feet Local Residential N/A Acceptable for local 2,000 ADT 20 MPH *Acceptable level of service for a 5-lane principal arterial roadway is E (37,000 VDT). Contents: Staff Report: Basis for Recommendation Technical Review and Agency Comments Recommended Conditions of Approval Attachments: Vicinity map Preliminary Plat Final Plat Aerial Map

3 Page 3 of 24 Basis for Recommendation The plat design and layout is in conformance with the Boise City Comprehensive Plan and complies with the basic requirements of the Boise City Subdivision and Zoning Ordinances. Staff is recommending the following special conditions of approval: Condition 1 Condition 2 Condition 3 This condition requires that the associated Rezone Application (CAR ) be approved by the Boise City Council prior to submittal of the Final Plat. The applicant is required to comply with all of the site specific conditions imposed by CUP , and a note shall be placed on the Final Plat. This condition addresses requirements for a perpetual ingress/egress access easement and cross parking easement. Condition 4 This condition addresses the removal/demolition of the existing structures located on the subject property. Condition 5 This condition addresses the perpetual ingress/egress turnaround easement for W. Southerland Street. Condition 6 This condition requires compliance with all requirements of the Boise Airport. Staff Perspective General The recommended conditions of approval are required to bring the proposed Preliminary Plat and Final Plat into compliance with Boise City and Idaho State Codes and have been confirmed by the Boise City Planning and Development Services Department. Boise City Staff has reviewed the agency comments and Staff recommends approval based upon Staff's finding that all concerns of the commenting agencies have been addressed. To avoid potential problems the developer is directed to review the concerns identified in the technical reviews to verify that this statement is correct. Street Connectivity The subject property is bordered on the east, west, and south by existing developed single family lots. The applicant is proposing to extend a foot wide permanent access easement and service drive with sidewalks from Overland Road that meanders through the property and aligns up with West Southerland Drive. This public street is stubbed into the subject property from the west; however the applicant is not proposing to construct any additional public rights-of-way. As the alternative, this project proposes a circuitous service drive that ultimately connects W. Southerland to Overland Road and discourages cut through traffic.

4 Page 4 of 24 There is no potential of further development occurring to the east as the adjacent property is developed with single family homes. This development is compatible with the neighborhood and will add additional office space and housing for the elderly within a new complex site of one story construction. The assisted living facility is intended to provide a specific housing type that is increasing in need in the area. The applicant is also proposing a future cross access connection to the office development abutting the site to the west. Each of the previous applications generated a substantial amount of public opposition. The property owners were opposed to the previous applications stating following concerns: the proposed density, cut through traffic, and two story townhouses adjacent to single family homes. Note on Street Connectivity vs. internal service drive associated with CUP Southerland Drive is currently stubbed to the southwestern corner of the property. Unlike past requests, the applicant is not proposing to extend this street through the site to Overland Road. Rather, the applicant is proposing a service drive through the site that will connect Southerland to Overland. A service drive would typically still allow vehicular connectivity through the development. However, the applicant has proposed to gate the drive in two locations, essentially prohibiting vehicular circulation through the property. Objective of the Comprehensive Plan encourages the completion of the existing street system, within reasonable constraints throughout the city. However, Policy strives to limit access to all arterial roadways, and Objective promotes land use decisions that limit access as necessary to maintain safe and efficient operation of the existing street system while allowing reasonable access to individual development parcels. Staff is supportive of the applicant s proposal to utilize a service drive in lieu of a public street. Objective promotes safe and comfortable neighborhoods by minimizing speeding and cutthrough traffic. More specifically, Policy encourages traffic calming methods that minimize adverse effects on adjacent streets. As designed, the service drive could provide for vehicular connectivity through the site, if the gates were removed. Staff has included a recommended condition of approval that requires public access be provided through the site, and that gates not be installed. The circuitous design of the service drive should discourage most of the cut through traffic through the site. With modifications to the fencing plan, a safe and secure environment can still be provided for the residents of the assisted living facility. The applicant is also proposing a future cross access connection to the office development west of the site, adjacent to Overland. Along with the service drive connection, a combination of attached and detached sidewalks is proposed within the project, and along Overland Road. Staff finds this to be an appropriate design solution, matching the existing walkways already located along Southerland. However, a detached walkway may be more appropriate along Overland Road. Staff has included a condition of approval requiring a detached sidewalk along this frontage. A walkway system along the face of future office buildings may be appropriate. As a result, staff recommends the final sidewalk design in this location be reviewed in the Design Review submittal. Sidewalk Design The subject property is improved with sidewalks on Overland Road. The applicant is proposing to construct a combination of attached and detached five foot wide sidewalks within the project on

5 Page 5 of 24 alternating sides of the meandering service drive that provide a safe pedestrian route within the planned unit development and connect with the public sidewalk network. None are known. Conditions in Dispute

6 Page 6 of 24 Technical Review and Agency Comments Boise City Planning and Development Services: Subdivision Section Joan Johnson, Staff has reviewed the Preliminary Plat and noted the subject site is under review for an N-OD Zoning District designation. There is a request for a Planned Unit Development under case number CUP Compliance with the zoning ordinance will be addressed through the Planned Unit Development process with the associated application. The lots are accessed via the service drive that is proposed to meander through the development from Southerland Drive to Overland Road. The location of the proposed use allows for compatible development with the general neighborhood. Comprehensive Planning Section Cody Riddle This project is located in the Southwest Planning Area with the following specific or applicable goals, objectives and policies in the Boise City Comprehensive Plan. Policy Throughout the Southwest area, particular attention shall be paid to new development to ensure compatibility with existing development including street system interconnections. Additional Boise City Comprehensive Plan Goals, Objectives and Policies CHAPTER 6 TRANSPORTATION Goal 6.1 Maintain the function of the street system for current users, emergency response efforts and for use by future generations. Policy When reviewing land use amendments, zone changes, master plans, conditional uses and other significant entitlement requests, the City shall take into consideration the impact of the project on street levels of service. The City s preferred standards shall be those identified for new streets in ACHD s Development Policy manual, or its successor. Service level impacts shall be minimized through project modifications, traffic management plans, street improvement plans or other means. Objective Encourage completion of the existing street system and creation of new links, within reasonable constraints, as the transportation system develops. Policy

7 Page 7 of 24 All new development shall be reviewed for appropriate opportunities to connect to local roads and collectors in adjacent developments. Objective Promote land use policies that limit access as necessary to maintain safe and efficient operation of the existing street system while allowing reasonable access to individual development parcels. Policy Limit access to all arterial streets. Objective Maintain safe and comfortable neighborhoods by minimizing speeding and cut-through traffic. Policy Encourage traffic-calming in a way that minimizes adverse effects on adjacent streets. CHAPTER 7 COMMUNITY QUALITY GOAL 7.1 Provide an adequate supply of safe, sanitary housing at price and rent levels appropriate to the varied financial capabilities of City residents, and provide for diversity in type, density and location of housing with special emphasis on maintaining neighborhood stability. Objective In order to accommodate the projected Boise Planning Area population of 253,000 by the year 2015, anticipate a need for the production of 19,100 single-family detached units, 11,700 singlefamily attached units and 13,800 multifamily units by the year Goal 7.2 Create a community composed of neighborhoods in which services and amenities are convenient, visually pleasing and properly integrated and designed to encourage walking and cycling. Objective Provide for the protection of character and the enhancement of services in existing residential neighborhoods. Policy Require that all new residential development in existing residential neighborhoods (i.e., infill) be compatible with existing structures, including the following criteria: 1. Use of complimentary setbacks, building heights, grade elevations, orientation, bulk, building materials, colors and forms, while allowing flexibility for distinctive design solutions.

8 Page 8 of Maintenance of privacy. CHAPTER 8 LAND USE Objective The land-use map and attendant policies shall be the official guide for development of the planning area and shall be implemented through zoning and development review. Policy The Land Use/Zoning Consistency Matrix shall identify the zoning districts that are permissible within each land-use designation. Conformance with the Land Use/Zoning Consistency Matrix shall be a necessary finding of approval for all zone changes and conditional uses, unless one or more of the forms of flexibility identified in the policies under Objective 2 are implemented. Policy Zone change requests that are consistent with the Land Use/Zoning Consistency Matrix and the policies of the Boise City Comprehensive Plan should be approved by the City pursuant to appropriate findings related to service levels and other requirements of the Boise City Comprehensive Plan. Objective Achieve a compact city comprised of a central Downtown with surrounding neighborhoods that have a center focus combining residential, commercial, employment, civic, cultural, and recreational uses. Policy Office uses are appropriately located along arterials and collectors and may be used as buffers between intense retail uses and residential uses. CHAPTER 10 GROWTH MANAGEMENT Goal 10.1 Preserve, protect and enhance the overall quality of life in Boise and its Area of Impact by ensuring that growth occurs in an orderly manner and that public services are available along with development. Objective Ensure that growth is planned and directed in a way that minimizes sprawl and creates a functional and pleasing community. Building Section - Marlene Southard The existing structure is to be demolished or removed prior to the City Engineer signing of the Final Plat. Sediment and Erosion Control Steve Webb

9 Page 9 of 24 An erosion and sediment control plan (ESC) conforming to the requirements B.C.C. Title 8 Chapter 17 is to be submitted to the Director of Planning and Development Services for review. No grading or earth disturbing activities may start until approval of the ESC plan has been received and an ESC permit issued. An individual who has attended the Boise City Responsible Person (RP) certification class, or has obtained Interim Certification for Responsible Person is not identified for this project. A permit will not issue until such time as the name and certification number of the RP has been provided to Boise City. Boise City Public Works: Engineering, Drainage/Hillside - Rob Bousfield Comply with standard drainage conditions. Pressure Irrigation - Kent Johnson Comply with Idaho Code, Section and Boise City Code Section J. Standard Irrigation Conditions. Sewer - John Johnson Sewer easements required. Connection and inspection fees required. Sewer assessment required Standard sewer conditions. Street Lights - Henry Alarcon Street light easements are required. Street light 55544A may require relocation. Boise City Fire Department Mark Senteno, February 27, 2008 The Boise Fire Department has reviewed and can approve the application subject to compliance with the following code requirements and conditions of approval. Any deviation from this plan is subject to Fire Department approval. Please note that unless stated otherwise this memo represents requirements of the International Fire Code as adopted and amended by Ordinance Code Requirement: Fire Department vehicular access shall be provided to within 150' of all portions of the nonsprinklered buildings. Dead end roads are prohibited from exceeding 700 feet. These distances can be increased somewhat for sprinklered buildings but exact distances are on a case-by-case basis. All Fire Department access roads, fire lanes, bridges, and gates are to be a minimum of 20' wide with 13' 6" overhead clearance, shall be capable of supporting 70,000 lbs GVW (24,000 lbs per axle), and shall be paved. Fire Department access roads and fire lanes shall have a minimum outside turning radius of 48' with an inside radius of 28'. Any dead-end road in excess of 150' needs a Fire Department approved turnaround. No grade may exceed 10% (please note that fire apparatus are designed for a maximum 6% grade). Width and turning radius measurements specified by this paragraph can include those surfaces vehicles generally drive upon. Specifically, gutter and rolled curb are generally considered useable, while vertical curb or sidewalks are not. Code Requirement:

10 Page 10 of 24 For streets having a width less than 36 feet back of curb to back of curb parking shall be restricted on (1) one side; for streets having a width less than 29 feet back of curb to back of curb parking shall be restricted on both sides; and for standard ACHD cul-de-sacs parking shall be restricted on both sides. A note on the face of the Final Plat is required noting the parking restriction prior to signing of the Final Plat by the Boise City Engineer. In addition, No Parking signs shall be installed in accordance with the requirements of the IFC. Code Requirement: Maximum spacing for hydrants in commercial areas is dependant on fire flow requirement. Comments: Several proposed fire hydrants have been noted. In the absence of information on existing hydrants it appears that no new hydrant may/will be needed. However, we reserve the right to modify requirements as more information comes to light. Variables affecting hydrant numbers and location include, but are not limited to, area, construction type, existing hydrants, accuracy of information provided in the application, strategic location for fire fighting forces, and required fire flow. New hydrants must be "non-private" installations. Condition of Approval: Install proposed hydrants. General Requirement: Fire Department required fire hydrants, access, and street identification shall be installed prior to construction or storage of combustible materials on site. Provisions may be made for temporary access and identification measures. Specific building construction requirements of the International Building Code, International Fire Code, and Boise City Code will apply. However, these provisions are best addressed by a licensed Architect at building permit application. Please feel free to have the applicant contact Mark Senteno, Ada County Street Name Committee The following existing street names shall appear on the plat: W. Southerland Drive W. Overland Road Intermountain Gas Company Michelle Singleton Intermountain Gas Company has received your subdivision application. In order to best serve this development Intermountain Gas does require that a 5 minimum utility easement along the interior lot lines and a 10 minimum utility easement along all right of ways or private drive. The private drive of the development would also be required to include a utility easement for Intermountain Gas to encroach into with the gas lines. If you have any questions please contact Michelle Singleton at Ada County Highway District Coby Harrod, February 18, 2008 Acreage: 5.02

11 Page 11 of 24 Current Zoning: R-1C/N-OD Proposed Zoning: N-0D Assisted Living: 51 Beds Pre-School: 3,250 sf. Office Buildings: 11,952 sf. A. Findings of Fact Existing Conditions 1. Site Information: The site is currently used as a single family dwelling with a garage and barn. Description of Adjacent Surrounding Area: Direction Land Use Zoning North Commercial C-2D South Residential R-1B East Single Family Residential R-1B West Single Family Residential L-OD 2. Existing Roadway Improvements and Right-of-Way Abutting or Near the Site: West Overland Road is currently improved with 4-traffic lanes, 1 turning lane, 65-feet of pavement with vertical curb, gutter and sidewalk abutting the site. There is 80-feet of rightof-way existing for West Overland Road (40-feet from centerline). Southerland Road is currently improved with 2-traffic lanes, 36-feet of pavement with curb, gutter and sidewalk abutting the site. There is 50-feet of right-of-way existing for Southerland Road (25-feet from centerline). 3. Existing Access: There is one defined access point to West Overland Road and another defined access point to Southerland Road from this property. 4. Site History: ACHD has previously reviewed this site with the development application Honeymoon Cove. Development Impacts 5. Trip Generation: This development is estimated to generate 379 additional vehicle trips per day (10 existing) based on the Institute of Transportation Engineers Trip Generation general office and assisted living land-use designation. 6. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 7. Traffic Study: A traffic impact study was not required with this application.

12 Page 12 of Impacted Roadways: Roadway Frontage Functional Classification W. Overland Road Traffic Count 300-Feet Principal Arterial 27,774 east of Five Mile Road on 4/13/2006 Level of Service* Better than C Speed Limit 40 MPH 18,767 west of Five Mile Road on 9/20/05 Southerland 50-feet Local Residential N/A Acceptable 20 MPH planning thresholds for local roadways are 2,000 ADT *Acceptable level of service for a 5-lane principal arterial roadway is E (37,000 VDT). 9. Capital Improvements Plan/Five Year Work Program There are currently no roadways, bridges or intersections in the general vicinity of the project that are currently in the Five Year Work Program. West Overland Road is currently listed in the Capital Improvements Plan for future expansion to a 7-lane roadway from Five Mile Road to Locust Grove between 2018 and B. Findings for Consideration 1. West Overland Road District Right-of-Way Policy: District policy requires 120-feet of right-of-way on arterial roadways (Figure 72-F1B). This right-of-way allows for the construction of a 7-lane roadway with vertical curb, gutter and 5-foot detached concrete sidewalks. District Sidewalk Policy: District policy requires 7-foot wide attached (or 5-foot detached) concrete sidewalk on all collector roadways and arterial roadways ( ). Applicant Proposal: The applicant is proposing to dedicate 20-feet of additional right-ofway (60-feet from centerline. Staff Comment/Recommendation: The applicant s proposal meets District policy and should be approved with this application. 2. Stub Streets District Stub Street Policy: District policy states that the street design in a proposed development shall cause no undue hardship to adjoining property. An adequate and convenient access to adjoining property for use in future development may be required. If a street ends at the development boundary, it shall meet the requirements of sub section 7205, non-continuous streets. District policy states that stub streets will be required to provide intra-neighborhood circulation or to provide access to adjoining

13 Page 13 of 24 properties. Stub streets will conform with the requirements described in Section , and , except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Applicant Proposal: The applicant is not proposing to continue Southerland Drive as a public street. Rather the applicant is proposing to continue connectivity as a private lane. Staff Comment/Recommendation: The applicant will be required to construct an alternative type hammerhead turnaround within an easement at the terminus of the stub street Southerland Drive. The specific design of the turnaround to be determined by ACHD Development Review. 3. Driveways Access Policy: District policy states that direct access to arterials and collectors is normally restricted. The developer shall try to use combined access points. If the developer can show that the use of a combined access point to a collector or arterial street is impractical, the District may consider direct access points. Access points for proposed developments at intersections should be located as far from the intersection as practical, and in no case closer than as illustrated on Figure 72-F4, unless a waiver for the access point has been approved by the District Commission. District Driveway Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, , the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii abutting the existing roadway edge. District Driveway Width Policy: District policy restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 36-feet. Most commercial driveways will be constructed as curb-cut type facilities if located on local streets. Curb return type driveways with 15-foot radii will be required for driveways accessing collector and arterial roadways. Applicant Proposal: The applicant has is proposing to construct a 31-foot curb return driveway intersecting W. Overland Road 110-feet west of the east property line (measured property line to near edge), which aligns with the access on the north side of Overland. Staff Comment/Recommendation: The applicant s proposal meets District policy and should be approved with this application. Pave the driveway to its full width and at least 30- feet into the site from the edge of pavement. 4. District Tree Planters: District s Tree Planter Width Policy prohibits all trees in planters less than 6-feet in width. In addition to prohibiting trees in planters less than 6-feet in width, the policy requires a minimum planter width of 6-feet for class II tress with the installation of root barriers on both sides of the planter strip or a minimum planter width of 8-feet without the installation

14 Page 14 of 24 of a root barrier. The policy also requires Class I and Class III trees to provide a minimum planter width of 10-feet. C. Site Specific Conditions of Approval 1. Dedicate 60-feet of right-of-way from the centerline of Overland Road abutting the parcel. The right-of-way purchase and sale agreement and deed must be completed and signed by the applicant prior to scheduling the Final Plat for signature by the ACHD Commission or prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The District will purchase the right-of-way which is in addition to existing right-of-way from available Corridor Preservation Funds. 2. Construct an alternative type hammerhead turnaround at the terminus of the stub street Southerland Drive. The applicant may locate the turnaround within an easement. Specific turnaround design to be determined by ACHD Development Review. 3. Construct the driveway intersecting W. Overland Road as proposed. Pave the driveway to its full width and at least 30-feet into the site from the edge of pavement. 4. Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. Private sewer or water systems are prohibited from being located within any ACHD roadway or right-of-way. 3. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at (with file number) for details. 5. Comply with the District s Tree Planter Width Interim Policy. District s Tree Planter Width Policy prohibits all trees in planters less than 6-feet in width. In addition to prohibiting trees in planters less than 6-feet in width, the policy requires a minimum planter width of 6-feet for class II tress with the installation of root barriers on both sides of the planter strip or a minimum planter width of 8-feet without the installation of a root barrier. The policy also requires Class I and Class III trees to provide a minimum planter width of 10-feet.

15 Page 15 of Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District s Utility Coordinator at (with file numbers) for details. 7. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 9. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 10. Payment of applicable road impact fees is required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Road Impact Fee Ordinance. 11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE ( ) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 12. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant s authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 13. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. E. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development.

16 Page 16 of 24 Boise Airport Matt Petaja, February 6, 2008 Boise Airport staff has no objections to the project as proposed. This project is located within the Airport Influence Area A, which is affected by average sound levels in the DNL, and/or aircraft traffic patterns below 1,000 feet. Standard conditions of approval are contingent upon an avigation easement executed on the entire property. New residential development and new schools located within the overlay area are required to meet the sound attenuation standards of a minimum noise level reduction (NLR) of 25 db. If you have any questions, please call the Airport at Central District Health Department Malcohm McGregor After written approvals from appropriate entities are submitted, we can approve this proposal for central sewage and central water. The following plans must be submitted to and approved by the Idaho Department of Health and Welfare, Division of Environmental Quality: A. Central Sewage B. Central Water Street runoff is not to create a mosquito breeding problem. STORMWATER MANAGEMENT RECOMMENDATIONS It is recommended that storm water be pre-treated prior to discharge to the subsurface to prevent impact to groundwater and surface water quality. The engineers and architects involved with the design of this project should obtain current best management practices for stormwater disposal and design a stormwater management system that is preventing groundwater and surface water degradation. Manuals that could be used for guidance are: 1) State of Idaho Catalog of Stormwater Best Management Practices For Idaho Cities and Counties. Prepared by the Idaho Department of Environmental Quality, July ) Stormwater Best Management Practices Guidebook Prepared by the City of Boise Public Works Department, May Independent School District of Boise City #1 Sarah Stobaugh, February 6, 2008 At the present time, the Developer and/or Owner have made arrangements to comply with all requirements of the Boise School District. The schools assigned to the proposed project area are: Elementary School: Maple Grove Junior High School: South West effective August 2008 High School: Borah

17 Page 17 of 24 If you have any further questions, please contact our office at United States Postal Service Dan Frasier, Postmaster The following are the basic conditions requested by the Postal Service. 1. In all new residential areas, service will be provided to Cluster Box Units (CBUs). It will be the responsibility of the contractor to pour a cement pad meeting the required specifications in a location(s) approved by the Postal Service. 2. The clustering of all boxes in one approved area is recommended for multi-family dwellings, e.g., condos, duplexes, triplexes, etc. All locations must still be approved. 3. Infill development, defined as three or less residential lots, may receive the existing mode of delivery as the rest of the neighborhood. All locations must still be approved. 4. Prior to the signing of the Final Plat by the Boise City Engineer, the Developer and/or Owner shall provide a letter from the United States Postal Service stating: the Developer and/or Owner has received approval for location of mailboxes by the United States Postal Service.

18 Page 18 of 24 Recommended Conditions of Approval Special Conditions and Plat Notes 1. Prior to submittal of the Final Plat the property shall be rezoned to N-OD in compliance with CAR The subdivision plat shall comply with the site plan and all conditions of approval for CUP , and a note on the face of the Final Plat is required stating, "The development of this property shall be in compliance with the Boise City Zoning Ordinance or as specifically approved by CUP " 3. The Final Plat shall include delineations that describe the boundaries of a perpetual ingress/egress easement for the service drive. A. Design: Where practical the boundary of said easement shall align with the service drive. The developer and/or owner shall also submit a site plan showing: B. Construction: Paving of the service drive within the easement and related utilities shall be constructed concurrently with all other required public improvements of this subdivision. Otherwise, the applicant shall bond for 110% of the value and enter into a non-build agreement for the affected lots until such time as the improvements are made. C. Plat Note Requirement: A note on the face of the Final Plat is required: i. Which states, "Vehicular access to all lots, shall be provided from a perpetual ingress/egress easement and not directly from W. Overland Road. and ii. Which set forth the legal description of the easement and conveys to those lot owners taking access from the easement, the perpetual right of ingress and egress over the described easement, and provides that such perpetual easement shall run with the land. D. Covenant Requirements: A restrictive covenant or other similar deed restriction(s) acceptable to the Boise City Attorney shall be recorded at the time of recording the Final Plat which provides: 1) For the requirement for the maintenance of the common access and improvements within the easement, and 2) That said restrictions shall run with the land, and that said easement and restrictions shall be reviewed and approved by the Boise City Attorney. 4. The existing structures shall be demolished or removed prior to the Boise City Engineer signing the Final Plat. Permits are required and can be obtained by contacting the Planning and Development Services Department Permit Desk at

19 Page 19 of A permanent turnaround with an easement approved by the Boise City Fire Department and ACHD shall be provided on Lot 5 for the terminus of W. Southerland Drive. 6. Prior to the signature of the Boise City Engineer, the applicant/owner shall submit a recorded copy of an Avigation Easement over the entire platted area approved by the Boise City Airport Director. The face of the Final Plat shall show that the subdivision is subject to an avigation easement or easements (B.C.C F). Covenant Requirements 7. Covenants, homeowners association by-laws or other similar deed restrictions acceptable to the Boise City Attorney, which provide for the use, control and maintenance of the perpetual ingress/egress easement, common party walls and any common areas shall be reviewed and approved by the Boise City Attorney. Erosion Control Requirements 8. Prior to the City Engineer's Certification of the Final Plat and prior to earth disturbing activities, an erosion and sediment control (ESC) permit must be obtained. An ESC plan conforming to the requirements B.C.C. Title 8 Chapter 17, is to be submitted to the Director of Planning and Development Services for review and approval. No grading or earth disturbing activities may start until an approved ESC permit has been issued. 9. An individual who has attended the Boise City Responsible Person (RP) certification class, or has obtained Interim Certification for Responsible Person is not identified for this project. A permit will not issue until such time as the name and certification number of the RP has been provided to Boise City. This information can be faxed to or ed to swebb@cityofboise.org. Drainage Conditions 10. Subdivision drainage shall be in accordance to B.C.C E. The developer shall submit a letter from appropriate drainage entity approving the drainage system or accepting the drainage there from; or submit a letter from a registered professional engineer certifying that all drainage shall be retained on-site. A copy of the construction drawing(s) Depicting all site drainage improvements shall be submitted with the letter. A. Developer may either construct improvement prior to Final Platting or post bond in the amount of 110% of the estimated construction costs. Estimated construction costs shall be provided by the developer s engineer. B. For drainage facilities located outside of the public right-of-way, the developer shall dedicate a storm drainage easement. Said easement shall be labeled as either an Ada County Highway District storm drainage easement or a homeowners association storm drainage easement, depending on what entity will assume responsibility for the operation and maintenance of the storm drainage system.

20 Page 20 of 24 C. Should the homeowners association be responsible for the operation and maintenance of the storm drainage facilities, covenants, homeowners association by-laws or other similar deed restrictions acceptable to the Boise City Attorney shall be reviewed and approved by the Boise City Attorney. Irrigation Conditions 11. Comply with Idaho Code Section and Boise City Code Section J concerning pressure irrigation requirements prior to signing of the Final Plat by the Boise City Engineer. A. The owner or person, firm or corporation filing the condominium plat shall provide a pressurized irrigation system. The system must conform to the minimum design standards and specifications of Boise City or of the entity that will operate and maintain the system, if that entity has published standards; or the owner, person, firm or corporation filing the subdivision plat shall provide written documentation that a valid waiver of the requirement to provide a pressure irrigation system and that Idaho Code (1)(a) regarding transfer of water rights, has been complied with. B. Prior to either commencing construction or signing of the Final Plat by the Boise City Engineer, developer shall: 1) Submit for approval by the Department of Public Works, construction plans and specifications for the pressurized system, stamped by a registered engineer. 2) Provide written assurance that provisions have been made for ownership, operation, and maintenance of the system. 3) Delineate all necessary irrigation easements on the Final Plat (B.C.C F). C. Developer shall provide for an independent inspection of the installation of irrigation facilities and written certification by the design or project engineer that the system was installed according to the approved plans. In addition, the Department of Public Works must be present for the system pressure test and participate in a final inspection. D. Developer may construct prior to Final Platting or bond in the amount of 110% of the estimated construction costs based on the approved plans. E. Fees: Developer and/or owner shall pay the current inspection and plan review fees applicable to the proposed subdivision prior to signing of the Final Plat by the Boise City Engineer (B.C.C ).

21 Page 21 of No ditch, pipe or structure for irrigation water or irrigation waste water shall be obstructed, rerouted, covered or changed in any way unless such obstruction, rerouting, covering or changing has first been approved by a signed and recorded License Agreement. a. Prior to signing of the Final Plat by the Boise City Engineer a recorded License Agreement for the relocation or alteration of any ditch, pipe or structure for irrigation water or irrigation waste water shall be provided to Boise City. The License Agreement shall be signed by the irrigation district, the water users and the applicant and shall contain a legal description and survey of the easement for the relocation of the irrigation facility. The recording number of the License Agreement shall be referenced in a note on the Final Plat and the easement shall be shown on the Final Plat. 13. Fence, cover or tile all irrigation ditches, laterals or canals and drains, exclusive of natural waterways, intersecting, crossing or lying adjacent to the subdivision prior to Final Platting or post bond in the amount of 110% of the estimated improvement cost with the Boise City Planning and Development Services Department. "Adjacent" is defined by the Boise City Code as "located within less than sixty feet (60') of any lot included in the development." a. Any covering or fencing program involving the distribution of any irrigation district shall have the prior approval of the affected district. b. If the developer requests a water amenity, such request shall comply with B.C.C F.5. c. Fencing shall be installed within 90 days of the issuance of the first building permit in the development, if building permits are obtained prior to completion of fencing improvements. Sewer Conditions 14. Developer and/or owner unless previously paid shall pay a sewer assessment along Dawn Wetline sewers are required (Boise City Code D, Improvements; Sanitary Sewers). a. Plans shall be submitted to and approved by the Boise City Department of Public Works prior to commencing with construction. Developer and/or owner may either construct improvements prior to Final Platting or execute a performance agreement and provide surety in the amount of 110% of the estimated costs. The developer and/or owner shall coordinate with the Department of Public Works for construction inspection prior to and during construction. Unless otherwise approved by the Public Works Department, all sewer construction shall be completed and accepted within 90 days of plat recordation, or within 30 days of issuance of the first building permit within the subdivision, whichever comes first. NOTE: All bonding shall conform to Boise City Code 1-19, Surety Bonds. b. Developer and/or owner shall pay the current sewer inspection fees for the proposed subdivision prior to signing of the Final Plat by the Boise City Engineer.

22 Page 22 of 24 c. Developer and/or owner shall be responsible for repairs of any failures that occur within one (1) year of the project acceptance by the appropriate sewer entity (Boise City Code D.3, Improvements; Sanitary Sewers). 15. Developer and/or owner shall delineate all necessary Boise City sanitary sewer easements on the Final Plat prior to signing of the Final Plat by the Boise City Engineer (Boise City Code F, Design Standards; Easements). 16. Developer and/or owner shall make payment, 8 equivalent cost reimbursement, and comply with Boise City Code 8-11, Sewer Ordinance, on that portion of existing sewer line within the proposed subdivision prior to signing of the Final Plat by the Boise City Engineer. Contact the Department of Public Works for specific costs. 17. Unless previously paid, developer and/or owner shall pay a sewer assessment along W. Overland Road and/or as may be approved by the Boise City Public Works Commission prior to signing of the Final Plat by the Boise City Engineer. Contact the Department of Public Works for specific costs. Street Light Conditions 18. Developer shall delineate on the face of the Final Plat a Boise City street light easement, acceptable to the Boise City Department of Public Works, for the purpose of installing and maintaining city-owned street light fixtures, conduit and wiring lying outside the dedicated public right-of-way (B.C.C F). 19. If existing Idaho Power pole with street light 55544A requires relocation, developer will pay for relocating the existing street light or replacement of the street light. General Conditions 20. No application for a building permit to construct any new structure shall be accepted until the Final Plat has been recorded pursuant to the requirements of the Boise City Subdivision Ordinance, Section A The developer shall make arrangements to comply with all requirements of the Boise City Fire Department and verify in one of the following ways: A. A letter from the Boise City Fire Department stating that all conditions for water, access, and/or other requirements have been satisfied, OR B. A non-build agreement has been executed and recorded with a note on the face of the Final Plat identifying the instrument number. NOTE:

23 Page 23 of 24 i. For streets having a width less than 36 feet back of curb to back of curb parking shall be restricted on (1) one side; for streets having a width less than 29 feet back of curb to back of curb parking shall be restricted on both sides; and for standard ACHD cul-de-sacs parking shall be restricted on both sides. A note on the face of the Final Plat is required noting the parking restriction prior to signing of the Final Plat by the Boise City Engineer. ii. "No Parking" signs and curb painting shall be required on streets having a width less than 36-feet, back of curb to back of curb. Contact the Boise City Fire Department for sign placement and spacing. Developer may either construct prior to Final Platting or post bond in the amount of 110% of the estimated costs with the Boise City Planning and Development Services Department. 22. The name, Honeymoon Cove Subdivision, is reserved and shall not be changed unless there is a change in ownership, at which time, the new owner(s) shall submit their new name to the Ada County Surveyor for review and reservation. Should a change in name occur, applicant shall submit, in writing, from the Ada County Surveyor, the new name to the Department of Planning and Development Services and reapproval by the Council of the "revised" Final Plat shall be required. Developer and/or owner shall submit all items including fees, as required by the Planning and Development Services Department, prior to scheduling the "revised" Final Plat for hearing. 23. Correct street names as approved by the Ada County Street Name Committee shall be placed on the plat (I.C. Title 50, Chapter 13). 24. A note on the face of the Final Plat is required stating, Minimum building setback lines shall be in accordance with the Boise City Zoning Ordinance at the time of issuance of the building permit or as approved by CUP A letter of acceptance for water service from the utility providing same is required (B.C.C C). 26. Developer shall provide utility easements as required by the public utility providing service (B.C.C F). 27. Prior to the signing of the Final Plat by the Boise City Engineer, the Developer shall provide a letter from the United States Postal Service stating, "The Developer and/or Owner has received approval for location of mailboxes by the United States Postal Service." Contact: Dan Frasier, Postmaster 770 South 13th Street Boise, ID Phone No. (208) Fax No. (208)

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Coldstream File Number SUB06-00040 Subdivision Approval Preliminary Plat Lead Agency Boise City Annexation Date December 9, 1974 Comp. Plan Complies Public Hearing

More information

Let me know if I need to bring you any other documentation for this withdrawl. Thanks!

Let me know if I need to bring you any other documentation for this withdrawl. Thanks! >>> david benoit 11/27/2007 10:00 AM >>> Dave, I am set to be heard on the Cranston Corner Subdivision on December 4th in front of City council. I have sold this property and am requesting

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Toli Park Subdivision File Number SUB07-00035 Approval Preliminary Plat Lead Agency Boise City Annexation Date December 30, 1987 Comp. Plan Complies Public Hearing

More information

Location: The subject property is located at the northeast corner of S. Holden Lane and E. Boise Avenue.

Location: The subject property is located at the northeast corner of S. Holden Lane and E. Boise Avenue. Subdivision Staff Report Subdivision Name Tianna Park File Number SUB11-00008 Approval Preliminary Plat Lead Agency Boise City Annexation Date December 19, 1977 Comp. Plan Complies Public Meeting Date

More information

Time Extension Staff Report

Time Extension Staff Report Time Extension Staff Report Subdivision Name Lunara Subdivision File Number SUB07-00019 Approval Time Extension for Lead Agency Boise City Certification Signature of Boise City Engineer Annexation Date

More information

Time Extension Staff Report

Time Extension Staff Report Time Extension Staff Report Subdivision Name Therrin Subdivision File Number SUB06-00020 Approval Time Extension for Lead Agency Boise City Certification Signature of Boise City Engineer Annexation Date

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Birmingham Place File Number SUB06-00051 Subdivision Approval Preliminary/Final Plat Lead Agency Boise City Annexation Date December 3, 1962 Comp. Plan Complies

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Greenfield Park File Number SUB06-00110 Subdivision Approval Preliminary/Final Plat Lead Agency Boise City Annexation Date December 9, 1974 Comp. Plan Complies

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Madera Creek File Number SUB06-00068 Subdivision Approval Final Plat Lead Agency Boise City Annexation Date December 9, 1974 Comp. Plan Complies Public Hearing

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Sunnyridge Subdivision File Number SUB07-00007 Approval Preliminary Plat Lead Agency Ada County Annexation Date NA Comp. Plan Complies (With Conditions of Approval)

More information

May 21, ACHD Board of Commissioners Stacey Yarrington, Planner II DRH /DRH

May 21, ACHD Board of Commissioners Stacey Yarrington, Planner II DRH /DRH Development Services Department May 21, 2013 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner II DRH13-00106/DRH13-00108 Executive Summary: This is a design review application

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Athletic Subdivision File Number SUB08-00023 Approval Preliminary/ Final Plat Lead Agency Boise City Annexation Date July 30, 1984 Comp. Plan Complies Public Hearing

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Name: Brownstone Subdivision Date: May 12, 2004 File: SUB04-00041 Meeting: May 18, 2004 Approval: Preliminary To: City Council Lead Agency: Ada County (04-10-S) From: Richard Beck

More information

Committed to Service

Committed to Service Committed to Service Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner August 25, 2017 Development Services TO:

More information

Date: March 16, Jake Centers ERD, LLC P.O. Box 1610 Eagle, ID Elevation Ridge Subdivision (SUB & PUD ) Street Address

Date: March 16, Jake Centers ERD, LLC P.O. Box 1610 Eagle, ID Elevation Ridge Subdivision (SUB & PUD ) Street Address Rebecca W. Arnold, President Sara M. Baker, Vice President John S. Franden, Commissioner Carol A. McKee, Commissioner David L. Case, Commissioner Date: March 16, 2012 To: Jake Centers ERD, LLC P.O. Box

More information

Hal Simmons Planning Director Boise City Planning and Development Services. CAR / 1689 South Entertainment Avenue

Hal Simmons Planning Director Boise City Planning and Development Services. CAR / 1689 South Entertainment Avenue MEMORANDUM MEMO TO: FROM: Mayor and Boise City Council Hal Simmons Planning Director Boise City Planning and Development Services DATE: November 15, 2008 RE: CAR08-00019 / 1689 South Entertainment Avenue

More information

BOI / DRH Albertsons grocery market and fueling center & pad sites

BOI / DRH Albertsons grocery market and fueling center & pad sites Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner March 28, 2017 To: Mark Palmer Albertsons Companies 250 E.

More information

Amended Subdivision Staff Report

Amended Subdivision Staff Report Amended Subdivision Staff Report Subdivision Name Silverpine Subdivision File Number SUB06-00052 No.2 Approval Preliminary Plat Lead Agency Ada County Annexation Date NA Comp. Plan Complies (With Conditions

More information

Executive Summary: This is a preliminary plat to construct 8 residential lots and 2 commons lots with a private road on 3.87-acres in Meridian, Idaho.

Executive Summary: This is a preliminary plat to construct 8 residential lots and 2 commons lots with a private road on 3.87-acres in Meridian, Idaho. Development Services Department DATE: July 7, 2015 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner III Kentucky Villas/ MPP15-0012/ PP15-009 Executive Summary: This is a preliminary

More information

If you have any questions, please feel free to contact me at (208)

If you have any questions, please feel free to contact me at (208) Sara M. Baker, President John S. Franden, Vice President Rebecca W. Arnold, Commissioner Mitchell A. Jaurena, Commissioner Jim Hansen, Commissioner Date: March 21, 2013 To: Subject: Hornet Construction

More information

Right-of-Way & Development Services Planning Review Division Committed to Service This application is approved at the staff level on February 1, 2006.

Right-of-Way & Development Services Planning Review Division Committed to Service This application is approved at the staff level on February 1, 2006. Right-of-Way & Development Services Planning Review Division Committed to Service This application is approved at the staff level on February 1, 2006. Tech Review for this item was held with the applicant

More information

SUB /CAR /PUD

SUB /CAR /PUD Development Services Department Project/File: Lead Agency: Site address: Balntyre Court Subdivision/BPP16-0036/ SUB16-00066/CAR16-00035/PUD16-00040 This is a rezone, planned unit development, and subdivision

More information

Committed to Service

Committed to Service Committed to Service Kent Goldthorpe, President Paul Woods, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner July 18, 2016 Development Services TO:

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Cayenne Corner File Number SUB06-00060 Subdivision Approval Final Plat Lead Agency Boise City Annexation Date January 1, 1987 Comp. Plan Complies Public Hearing

More information

RE: CAR / 4280 N.

RE: CAR / 4280 N. MEMORANDUM TO: FROM: Mayor and Boise City Council Hal Simmons - Planning Director Boise City Planning and Development Services DATE: April 29, 2009 RE: CAR09-00006 / 4280 N. Eagle Road The following application

More information

#1 (CAR /SUB )

#1 (CAR /SUB ) Development Services Department Project/File: Lead Agency: Site address: Fork South #1 (CAR14-00009/SUB14-00024) The applicant is requesting annexation, rezone and preliminary plat approvals for a 52-lot

More information

Committed to Service

Committed to Service Committed to Service Sara M. Baker, President Rebecca W. Arnold, Vice President Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner Paul Woods, Commissioner January 16, 2018 Development Services

More information

3. The preliminary plats were approved on March 27, 2014 and August 14, 2014.

3. The preliminary plats were approved on March 27, 2014 and August 14, 2014. Jim D. Hansen, President Sara M. Baker, Vice President Rebecca W. Arnold, Commissioner Kent Goldthorpe, Commissioner Paul Woods, Commissioner February 12, 2015 Development Services Department To: From:

More information

ARTICLE IV: DEVELOPMENT STANDARDS

ARTICLE IV: DEVELOPMENT STANDARDS ARTICLE IV: DEVELOPMENT STANDARDS IV-53 409 PRIVATE STREETS A private street means any way that provides ingress to, or egress from, property by means of vehicles or other means, or that provides travel

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Name: Madronawood Subdivision Date: January 26, 2005 File: SUB05-00005 Meeting: February 1, 2005 Approval: Preliminary To: City Council Lead Agency: Ada County (04-31-S) From:

More information

a. provide for the continuation of collector streets and thoroughfare streets between adjacent subdivisions;

a. provide for the continuation of collector streets and thoroughfare streets between adjacent subdivisions; Section 7.07. Intent The requirements of this Section are intended to provide for the orderly growth of the Town of Holly Springs and its extra-territorial jurisdiction by establishing guidelines for:

More information

SECTION 7000 LAND DEVELOPMENT REQUIREMENTS

SECTION 7000 LAND DEVELOPMENT REQUIREMENTS SECTION 7000 LAND DEVELOPMENT REQUIREMENTS 7000 LAND DEVELOPMENT REQUIREMENTS... 1 7001 LEGISLATIVE AUTHORITY... 1 7001.1 LAND DEVELOPMENT... 1 7001.1.1 Title 40, Idaho Code... 1 7001.1.2 Idaho Code 40-1415

More information

ARTICLE 24 PRIVATE ROAD, SHARED PRIVATE DRIVEWAY AND ACCESS EASEMENT STANDARDS

ARTICLE 24 PRIVATE ROAD, SHARED PRIVATE DRIVEWAY AND ACCESS EASEMENT STANDARDS ARTICLE 24 PRIVATE ROAD, SHARED PRIVATE DRIVEWAY AND ACCESS EASEMENT STANDARDS SECTION 24.00 INTENT AND PURPOSE The standards of this Article provide for the design, construction and maintenance of private

More information

Date: August 29, Dave Scaggs (sent via ) Summit Development Inc th Ave. Rd. #384 Nampa, ID 83686

Date: August 29, Dave Scaggs (sent via  ) Summit Development Inc th Ave. Rd. #384 Nampa, ID 83686 Sara M. Baker, President John S. Franden, Vice President Rebecca W. Arnold, Commissioner Mitchell A. Jaurena, Commissioner Jim Hansen, Commissioner Date: August 29, 2013 To: Dave Scaggs (sent via email)

More information

ARTICLE 23 CONDOMINIUM STANDARDS

ARTICLE 23 CONDOMINIUM STANDARDS ARTICLE 23 CONDOMINIUM STANDARDS Section 23.01 Intent. The intent of this Article is to provide regulatory standards for condominiums and site condominiums similar to those required for projects developed

More information

Section Preliminary Plat Checklist and Application Forms

Section Preliminary Plat Checklist and Application Forms Section 201 - Preliminary Plat Checklist and Application Forms PRELIMINARY SUBDIVISION PLAT REVIEW PROCESS CHART PRELIMINARY SUBDIVISION PLAT APPLICATION PRELIMINARY PLAT REVIEW CHECKLIST CITY OF NAMPA

More information

M-43 CORRIDOR OVERLAY ZONE

M-43 CORRIDOR OVERLAY ZONE ARTICLE 26.00 M-43 CORRIDOR OVERLAY ZONE Section 26.01 Findings A primary function of the M-43 state highway is to move traffic through the Township and to points beyond. As the primary east-west arterial

More information

Chapter Plat Design (LMC)

Chapter Plat Design (LMC) Chapter 18.14 Plat Design (LMC) Sections: 18.14.010 Lot width 18.14.020 Right-of-way requirements 18.14.030 Pipe stem lots 18.14.040 Division resulting in minimum lot sizes 18.14.050 Flood prone and bad

More information

BYRON TOWNSHIP ZONING APPLICATION

BYRON TOWNSHIP ZONING APPLICATION BYRON TOWNSHIP ZONING APPLICATION Phone: (616) 878-9104 * Fax: (616) 878-3980 * Website: www.byrontownship.org This application will not be accepted if incomplete. APPLICATION FOR & REQUIRED COPIES Private

More information

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION OF LAND REGULATIONS TITLE 17

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION OF LAND REGULATIONS TITLE 17 ARTICLE VI -- GENERAL REGULATIONS AND PROVISIONS Sec. 17-50. Sec. 17-51 General Plan. Sec. 17-52 Lot and Block Design and Configuration. Sec. 17-53 Lot Access. Sec. 17-54 Private Roads. Sec. 17-55 Water

More information

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013 ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013 NAME SUBDIVISION NAME PV-Magnolia, LLC Twelve Trees Subdivision LOCATION 2860, 2862 and 2866 Pleasant Valley Road

More information

DAUPHIN CREEK ESTATES SUBDIVISION

DAUPHIN CREEK ESTATES SUBDIVISION # 12 SUB-000076-2017 DAUPHIN CREEK ESTATES SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer):

More information

APPLICANT NAME SUBDIVISION NAME DEVELOPMENT NAME LOCATION. CITY COUNCIL DISTRICT Council District 4 PRESENT ZONING PROPOSED ZONING

APPLICANT NAME SUBDIVISION NAME DEVELOPMENT NAME LOCATION. CITY COUNCIL DISTRICT Council District 4 PRESENT ZONING PROPOSED ZONING SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, ZONING AMENDMENT, & SIDEWALK WAIVER REQUEST STAFF REPORT Date: February 17, 2010 APPLICANT NAME SUBDIVISION NAME DEVELOPMENT NAME LOCATION David

More information

SUB / Diamante Subdivision / Northside Management

SUB / Diamante Subdivision / Northside Management SU15-00062 / Diamante Subdivision / Northside Management Summary: Subdivision application for a Preliminary Plat consisting of 20 buildable lots and 3 common lots. Prepared y: Todd Tucker, Senior Planner

More information

SUBDIVISION DESIGN PRINCIPLES AND STANDARDS

SUBDIVISION DESIGN PRINCIPLES AND STANDARDS SECTION 15-200 SUBDIVISION DESIGN PRINCIPLES AND STANDARDS 15-201 STREET DESIGN PRINCIPLES 15-201.01 Streets shall generally conform to the collector and major street plan adopted by the Planning Commission

More information

INTEROFFICE MEMORANDUM

INTEROFFICE MEMORANDUM INTEROFFICE MEMORANDUM DATE: February 3, 2009 TO: Public Works Commission FROM: Mike Sheppard, P.E, Civil Engineer SUBJECT: Appeal of Boise City Public Works Denial of Request for an Alternative Sewer

More information

Committed to Service

Committed to Service Development Services Department Committed to Service June 23, 2015 TO: FROM: SUBJECT: ACHD Board of Commissioners Mindy Wallace, AICP Planner III Linder Apartments - EAG15-0005/ CPA-01-15/A-01-15/RZ-04-15

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019 DEVELOPMENT NAME SUBDIVISION NAME Springhill Village Subdivision Springhill Village Subdivision LOCATION 4350, 4354, 4356, 4358,

More information

WRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC

WRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC WRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC Application of Hayden Signature, LLC, an Idaho limited liability company,

More information

Medical Marijuana Special Exception Use Information

Medical Marijuana Special Exception Use Information Medical Marijuana Special Exception Use Information The Special Exception Use information below is a modified version of the Unified Development Code. It clarifies the current section 5:104 Special Exceptions

More information

ZONING AMENDMENT, SUBDIVISION & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 16, 2006

ZONING AMENDMENT, SUBDIVISION & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 16, 2006 ZONING AMENDMENT, SUBDIVISION & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 16, 2006 NAME SUBDIVISION NAME Terhaar & Cronley Investment Partnership P & E Subdivision LOCATION 4210 and 4218 Halls

More information

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS 2.1 Required Plan Sheets 2.2 Drawing Requirements 2.3 Graphic Standards 2.4 Easements 2.5 Utility Locations 2.6 Private Facility Locations

More information

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2011

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2011 ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2011 NAME SUBDIVISION NAME LOCATION Stratford, L.L.C. Grelot Office Park Subdivision North side of Grelot Road,

More information

Waseca County Planning and Zoning Office

Waseca County Planning and Zoning Office Waseca County Planning and Zoning Office 300 North State Street Waseca, Minnesota 56093 Phone: 507-835-0650 Fax: 507-837-5310 Form no. PZ 081009 Web Site: www.co.waseca.mn.us FEES: 1) CUP FEE- $400.00

More information

WESTMINSTER PARK SUBDIVISION

WESTMINSTER PARK SUBDIVISION WESTMINSTER PARK SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer): A. Provide all of the required

More information

ORDINANCE NO. Be it ordained by the City Council of the City of Abilene, Texas:

ORDINANCE NO. Be it ordained by the City Council of the City of Abilene, Texas: ORDINANCE NO. An ordinance repealing Chapter 23, Subpart B of the Code of the City of Abilene, Texas, entitled Mobile Homes and Vacation Travel Trailers; stating the authority; setting forth the scope

More information

Committed to Service. License Agreement Application Form

Committed to Service. License Agreement Application Form Committed to Service License Agreement Application Form PLEASE NOTE: Effective February 16, 2010 - License Agreements within the downtown Boise area for public structures, objects and uses on ACHD sidewalks

More information

Cover Letter with Narrative Statement

Cover Letter with Narrative Statement Cover Letter with Narrative Statement March 31, 2017 rev July 27, 2017 RE: Rushton Pointe Residential Planned Unit Development Application for Public Hearing for RPUD Rezone PL2015 000 0306 Mr. Eric Johnson,

More information

b) Tangerine Corridor Overlay District 1) Tangerine Corridor District Regulations

b) Tangerine Corridor Overlay District 1) Tangerine Corridor District Regulations Attachment 1 Tangerine Road Corridor Overlay District Section 27.10.D.3.f.vi.b Initiation of Code Amendment September 2, 2014, Planning and Zoning Commission b) Tangerine Corridor Overlay District 1) Tangerine

More information

SUBDIVISION, PLANNED UNIT DEVELOPMENT, ZONING AMENDMENT, & SIDEWALK WAIVER STAFF REPORT Date: July 19, 2018

SUBDIVISION, PLANNED UNIT DEVELOPMENT, ZONING AMENDMENT, & SIDEWALK WAIVER STAFF REPORT Date: July 19, 2018 SUBDIVISION, PLANNED UNIT DEVELOPMENT, ZONING AMENDMENT, & SIDEWALK WAIVER STAFF REPORT Date: July 19, 2018 NAME SUBDIVISION NAME LOCATION West Mobile Properties, LLC U.S. Machine Subdivision 556, 566,

More information

Draft Model Access Management Overlay Ordinance

Draft Model Access Management Overlay Ordinance Draft Model Access Management Overlay Ordinance This model was developed using the City of Hutchinson and the Trunk Highway 7 corridor. The basic provisions of this model may be adopted by any jurisdiction

More information

MAJOR ISSUES DISCUSSED To date, there has been no opposition to this request and no member of the public has testified. ***

MAJOR ISSUES DISCUSSED To date, there has been no opposition to this request and no member of the public has testified. *** CAR07-00051 Page 2 SUMMARY Larry and Barbara Woolf request approval to rezone ± 1.33 acres from R-1C (Single Family Residential with a maximum of 8.0 DU/acre) to R-2D (Combined Residential with a maximum

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 20, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 20, 2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 20, 2017 DEVELOPMENT NAME SUBDIVISION NAME LOCATION Rangeline Crossing III Subdivision Rangeline Crossing III Subdivision 5289 Halls Mill

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016 DEVELOPMENT NAME SUBDIVISION NAME Mullinax Ford Subdivision Mullinax Ford Subdivision LOCATION CITY COUNCIL DISTRICT District 6 Southeast

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: November 17, 2016

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: November 17, 2016 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: November 17, 2016 DEVELOPMENT NAME SUBDIVISION NAME LOCATION Autonation Ford of Mobile Autonation Ford of Mobile Subdivision 901, 909, and 925

More information

Condominium Unit Requirements.

Condominium Unit Requirements. ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

SOS / Waiver of Subdivision Standards / John Cashin

SOS / Waiver of Subdivision Standards / John Cashin SOS15-00012 / Waiver of Subdivision Standards / John Cashin Summary John Cashin requests a Waiver of Subdivision Standards in the Boise Development Code that requires construction of new sidewalk for approval

More information

PLANNED DEVELOPMENT DISTRICT STANDARDS. Cadence Site

PLANNED DEVELOPMENT DISTRICT STANDARDS. Cadence Site PLANNED DEVELOPMENT DISTRICT STANDARDS Cadence Site A Planned Development District 1. Statement of General Facts, Conditions and Objectives Property Size: Approximately 57.51 Acres York County Tax Map

More information

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB ARTICLE VI: LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS VI-21 610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB 610-1 Property Line Adjustments (Property Line Relocation) A property line

More information

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, ZONING AMENDMENT, & SIDEWALK WAIVER REQUEST STAFF REPORT Date: February 17, 2010

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, ZONING AMENDMENT, & SIDEWALK WAIVER REQUEST STAFF REPORT Date: February 17, 2010 SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, ZONING AMENDMENT, & SIDEWALK WAIVER REQUEST STAFF REPORT Date: February 17, 2010 APPLICANT NAME SUBDIVISION NAME DEVELOPMENT NAME LOCATION David

More information

APPLICATION PROCEDURE

APPLICATION PROCEDURE ANTRIM PLANNING BOARD P. O. Box 517 Antrim, New Hampshire 03440 Phone: 603-588-6785 FAX: 603-588-2969 APPLICATION FORM AND CHECKLIST FOR MINOR OR MAJOR SITE PLAN REVIEW File Date Received By APPLICATION

More information

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

ARTICLE 15 - PLANNED UNIT DEVELOPMENT Section 15.1 - Intent. ARTICLE 15 - PLANNED UNIT DEVELOPMENT A PUD, or Planned Unit Development, is not a District per se, but rather a set of standards that may be applied to a development type. The Planned

More information

ARTICLE XI CONDITIONAL USE PERMITS

ARTICLE XI CONDITIONAL USE PERMITS ARTICLE XI CONDITIONAL USE PERMITS 11.1 Purpose. The City of Hailey recognizes that certain uses possess unique and special characteristics with respect to their location, design, size, method of operation,

More information

JEFFERSON COUNTY, ALABAMA

JEFFERSON COUNTY, ALABAMA JEFFERSON COUNTY, ALABAMA Major Development Checklist, Notes and Information A Major Development is any proposed new structure or addition to an existing structure which will cause a change in the topography

More information

AAAA. Planning and Zoning Staff Report Zoning Text Amendment, ZOA-PH Request

AAAA. Planning and Zoning Staff Report Zoning Text Amendment, ZOA-PH Request AAAA Hearing Date: September 3, 2015 Planning and Zoning Staff Report Zoning Text Amendment, ZOA-PH2015-23 Development Services Department Applicant: Request Staff: Christian Samples, 455-5958 csamples@canyonco.org

More information

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: July 9, 2015

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: July 9, 2015 ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: July 9, 2015 APPLICANT NAME 2513 Dauphin Street, Inc. SUBDIVISION NAME Audubon Place Extension No. 3, Resubdivision of Lots 1-5 LOCATION 2513 Dauphin Street

More information

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: June 18, 2015

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: June 18, 2015 ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: June 18, 2015 APPLICANT NAME SUBDIVISION NAME EAA LLC / Eryka Rogers Aaiden Place Subdivision LOCATION 2480 Government Boulevard (North side of Government

More information

ARTICLE VI. SUBDIVISION STANDARDS, PUBLIC

ARTICLE VI. SUBDIVISION STANDARDS, PUBLIC ARTICLE VI. SUBDIVISION STANDARDS, PUBLIC IMPROVEMENTS, AND DESIGN REQUIREMENTS ARTICLE VI. SUBDIVISION STANDARDS, PUBLIC IMPROVEMENTS, AND DESIGN REQUIREMENTS DIVISION 1. GENERAL PROVISIONS Sec. 21-6100.

More information

Plans shall be drawn at a readable scale, signed, and sealed by a Florida Registered Engineer. The application package shall include:

Plans shall be drawn at a readable scale, signed, and sealed by a Florida Registered Engineer. The application package shall include: CHAPTER 400. SECTION 403. PERMIT TYPES AND APPLICATIONS SITE DEVELOPMENT 403.3. Preliminary Site Plans (PSP) A. Intent and Purpose PSPs are used to identify existing site conditions and demonstrate general

More information

TOWN OF NORTHWOOD, NEW HAMPSHIRE

TOWN OF NORTHWOOD, NEW HAMPSHIRE TOWN OF NORTHWOOD, NEW HAMPSHIRE OFFICE OF THE PLANNING BOARD 818 First New Hampshire Turnpike, Northwood NH 03261 (603)942-5586 Extension 205 Facsimile: (603)942-9107 Major Subdivision Application Form

More information

TOWN OF LEWISTON PLANNING BOARD APPLICATION

TOWN OF LEWISTON PLANNING BOARD APPLICATION TOWN OF LEWISTON PLANNING BOARD APPLICATION DESCRIPTION OF PROPOSED REQUEST: Name of Property Owner: Phone #: Name of Applicant:Phone #: Address or Location of Proposal:_SBL# Size of Parcel or Structure:Existing

More information

Chapter 22 PLANNED UNIT DEVELOPMENT.

Chapter 22 PLANNED UNIT DEVELOPMENT. Chapter 22 PLANNED UNIT DEVELOPMENT. Sec. 22.1 INTENT. The use of land and the construction and use of buildings and other structures as Planned Unit Developments in Georgetown Township may be established

More information

Policy and Standards for Public Local Residential Streets And Private Streets

Policy and Standards for Public Local Residential Streets And Private Streets Appendix A City of Toronto Development Infrastructure Policy & Standards Policy and Standards for Public Local Residential Streets And Private Streets November 2005 Policy and Standards For Public Local

More information

Committed to Service

Committed to Service Committed to Service Sara M. Baker, President Rebecca W. Arnold, Vice President Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner Paul Woods, Commissioner February 28, 2018 Development Services

More information

CONDOMINIUM REGULATIONS

CONDOMINIUM REGULATIONS ARTICLE 37 CONDOMINIUM REGULATIONS SECTION 37.01. Purpose The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

Box Elder County Land Use Management & Development Code Article 3: Zoning Districts

Box Elder County Land Use Management & Development Code Article 3: Zoning Districts Chapter 3-6 Mobile Homes, Mobile Home Subdivisions, & Recreational Vehicle Parks Box Elder Zoning Ordinance as Adopted October 2007 Sections. 3-6-010. Purpose and Intent. 3-6-020. Conditional Use Permit

More information

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: November 3, 2016

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: November 3, 2016 ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: November 3, 2016 APPLICANT NAME SUBDIVISION NAME David Shumer 5955 Airport Subdivision CITY COUNCIL DISTRICT District 6 5955 Airport Boulevard, 754 Linlen

More information

ELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO

ELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO ELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO. 3-2011 AN ORDINANCE TO REPLACE THE SUBDIVISION CONTROL ORDINANCE WITH A NEW SUBDIVISION DEVELOPMENT ORDINANCE, IN ACCORD WITH THE LAND DIVISION

More information

The following application has been scheduled for hearing by the Boise City Council on February 15, 2011:

The following application has been scheduled for hearing by the Boise City Council on February 15, 2011: MEMORANDUM TO: FROM: Mayor and City Council David Abo, AICP Chief Subdivision Review Analyst Boise City Planning and Development Services DATE: February 8, 2011 The following application has been scheduled

More information

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps CITY OF EL CERRITO Community Development Department Planning and Building Division 10890 San Pablo Avenue, El Cerrito, CA 94530 (510) 215-4330 FA (510) 233-5401 planning@ci.el-cerrito.ca.us APPLICATION

More information

Staff Report to the North Ogden Planning Commission

Staff Report to the North Ogden Planning Commission Staff Report to the North Ogden Planning Commission SYNOPSIS / APPLICATION INFORMATION Application Request: Consideration and action on an administrative application for final approval for the Legacy North

More information

Residential Major Subdivision Review Checklist

Residential Major Subdivision Review Checklist Residential Major Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

SUBDIVISION, PLANNING APPROVAL, & REZONING STAFF REPORT Date: June 4, 2015

SUBDIVISION, PLANNING APPROVAL, & REZONING STAFF REPORT Date: June 4, 2015 SUBDIVISION, PLANNING APPROVAL, & REZONING STAFF REPORT Date: June 4, 2015 APPLICANT NAME SUBDIVISION NAME DEVELOPMENT NAME LOCATION Board of Water & Sewer Commissioners of the City of Mobile MAWSS MLK

More information

ARTICLE 24 SITE PLAN REVIEW

ARTICLE 24 SITE PLAN REVIEW ARTICLE 24 SITE PLAN REVIEW 24.1 PURPOSE: The intent of these Ordinance provisions is to provide for consultation and cooperation between the land developer and the Township Planning Commission in order

More information

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

ARTICLE 900 PLAT AND PLAN REQUIREMENTS ARTICLE 900 PLAT AND PLAN REQUIREMENTS SEC. 900.1 ITEMS TO BE SHOWN ON PLAT OR PLAN General (1) Property lines of all property owners adjacent to the exterior boundaries of the project shall be located

More information

The following regulations shall apply in the R-E District:

The following regulations shall apply in the R-E District: "R-E" RESIDENTIAL ESTATE DISTRICT (8/06) The following regulations shall apply in the R-E District: 1. Uses Permitted: The following uses are permitted. A Zoning Certificate may be required as provided

More information

BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN. PRIVATE ROAD ORDINANCE Ordinance No. 11A-99. (to replace prior Private Road Ordinance No.

BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN. PRIVATE ROAD ORDINANCE Ordinance No. 11A-99. (to replace prior Private Road Ordinance No. BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN PRIVATE ROAD ORDINANCE Ordinance No. 11A-99 (to replace prior Private Road Ordinance No. 11-99) An Ordinance to protect the health, safety, and general welfare

More information

Planning Director Boise City Planning and Development Services Department. CUP (Adoption of Findings & Revised Conditions of Approval)

Planning Director Boise City Planning and Development Services Department. CUP (Adoption of Findings & Revised Conditions of Approval) MEMORANDUM TO: FROM: Mayor and Boise City Council Hal Simmons Planning Director Boise City Planning and Development Services Department DATE: May 19, 2006 RE: CUP05-00172 (Adoption of Findings & Revised

More information

Appendix A. Definitions

Appendix A. Definitions Definitions 1. Terms Defined. Words contained in this are those having a special meaning relative to the purposes of this Ordinance. Words not listed in this section shall be defined by reference to: (1)

More information

CHAPTER XVIII SITE PLAN REVIEW

CHAPTER XVIII SITE PLAN REVIEW CHAPTER XVIII SITE PLAN REVIEW Section 18.1 Section 18.2 Description and Purpose. The purpose of this chapter is to provide standards and procedures under which applicants would submit, and the Township

More information