2 Serving our community for over 80 years! Overriding premise: Retain GFHS Architectural Integrity

3 Infrastructure

4 Issues 1) Heat, ventilation, controls (Great Falls High School, Fieldhouse and South Campus) 2) Inadequate electrical power throughout GFHS 3) Inadequate and inefficient lighting throughout GFHS. Retain existing historical lighting in main corridors 4) Inadequate / outdated plumbing and toilets 5) Original windows replaced then covered up; (little natural light)

5

6 Issues Solutions Costs 1) Heat, ventilation controls (Great Falls High School and South Campus) New high efficiency modular boilers New digital controls Utilize existing ventilation shafts for duct work for air distribution Electrical upgrades to support new mechanical systems and controls $7,000,000 2) Inadequate electrical power throughout GFHS 3) Inadequate and inefficient lighting throughout GFHS. Do not replace existing historical lighting in main corridors (s); supplement with new New electrical power distribution New electrical outlets everywhere New energy efficient lighting $4,416,000 4) Inadequate / outdated plumbing and toilets New Plumbing - - water supply - gas supply - waste lines - add water in appropriate areas not currently served $552,000 5) Original windows replaced then covered up; (little natural light) Replace windows with energy efficient units historically acceptable to SHPO $2,415,000

7 21 st Century Learning Environment In 1930 S Era Building

8 21 st Century Learning Environment

9 Issues 1) Classrooms do not support 21 st Century Teaching / Learning techniques 2) Public spaces (auditorium / old gym, corridors) are in need of refreshing 3) Create more flexible classroom space 4) Existing library is too small and outdated 5) Existing science labs are not fully functional and are outdated 6) Technology not keeping up with 21 st Century and hard to incorporate (mostly on carts)

10

11 Technology Integration Model Ruben Puentedura, PhD, Hippasus

12 Room 107

13 Issues Solutions Costs 1) Classrooms do not support 21 st Century Teaching / Learning techniques 2) Public spaces (auditorium / old gym, corridors) are in need of refreshing Remodel all classrooms - - refinish wood floors - new white boards - new finishes - new integrated storage - new furnishings Remodel public spaces - finishes - lockers - seating - flooring (except terrazzo) $22,080,000 3) Need more classrooms 4) Existing library is too small and outdated 5) Existing science labs are not fully functional and are outdated Remodel former office spaces on main level into 5 new classrooms Incorporate adjacent counseling area and remodel the library into an info commons Remodel / update all science labs 6) Technology not keeping up with 21 st Century and hard to incorporate (mostly on carts) Incorporate new technology in all areas of building $5,520,000

14 Safety & Security

15 Issues 1) Unsafe and unsecured conditions between campus buildings (difficult slope between buildings) 2) No controllable main entrance / exit from GFHS / campus 3) Cafeteria inadequate for numbers of students and bad location 4) No place for students to congregate (social, studying, interact with faculty 5) Traffic, parking and drop-off emphasis is to the main residential area to the east (20 th St) 6) 1 st responder (Fire/EMS/Police) access is poor and unorganized (conflicts with traffic on east drop-off (20 th St) 7) East side (20 th St) has extreme vehicular / pedestrian conflicts)

16

17

18 STREET S STREET S PARKING PARKING STREET S 2 ND AVENUE S STAFF PARKING 3 RD AVENUE S STADIUM CAMPUS GREEN STUDENT/ EVENT PARKING PRACTICE FIELDS MAIN CAMPUS PARKING th AVENUE S 4 th STUDENT ENTRY PROPOSED CONNECTOR MAIN ENTRY ENTRANCE VISITOR 17 th STREET S 18 th STREET S SOUTH CAMPUS 20 th STREET S 5 th AVENUE S

19 Issues Solutions Costs 1) Unsafe and unsecured conditions between campus buildings 2) No controllable main entrance / exit from GFHS / campus 3) Cafeteria inadequate for numbers of students and bad location The connector! Enclosed from GFHS to fieldhouse and south campus Student commons Food service (s) Culinary arts Support back of house areas Main offices include counseling (frees up 5 classrooms in GFHS) $8,900,000 4) No place for students to congregate (social, studying, interact with faculty 5) Traffic, parking and drop-off emphasis is to the main residential area to the east (20 th St) 6) 1 st responder (Fire/EMS/Police) access is poor and unorganized (conflicts with traffic on east drop-off (20 th St) Redirect main entrance into the connector building and from the west Create single location for first responders Create multiple drop-off areas to reduce congestion around campus 7) East side (20 th St) has extreme vehicular / pedestrian conflicts)

20 Neighborhood Impacts / Traffic

21 Issues 1) Parking is inadequate (numbers) and poorly located (to the east on 20 th St) forcing parking onto adjacent city streets 2) Traffic pattern around campus is broken up and difficult to navigate with closed streets creating congestion and confusion 3) Traffic T s on 20 th and 3 rd Ave. S turn around real bottleneck

22

23 17 th STREET S 18 th STREET S PARKING PARKING 20 th STREET S 2 ND AVENUE S STAFF PARKING 80 NEW SPACES STUDENT/ EVENT PARKING 3 RD AVENUE S PRACTICE FIELDS 230 NEW SPACES PARKING 4 th AVENUE S STADIUM CAMPUS GREEN MAIN CAMPUS PROPOSED CONNECTOR MAIN ENTRANCE SOUTH CAMPUS 5 th AVENUE S

24 Issues Solutions Costs 1) Parking is inadequate (numbers) and poorly located (to the east on 20 th St) forcing parking onto adjacent city streets 2) Traffic pattern around campus is broken up and difficult to navigate with closed streets creating congestion and confusion 3) Traffic T s on 20 th and 3 rd Ave. S turn around real bottleneck Add 230+/- parking spaces to the west for students and events Add 80 +/- parking spaces on the NE corner of the campus (2oth St & 2 nd Ave S. for faculty and staff Implement a parking plan with a management plan - - incentives - enforcement Continue to work with City and City s consultants to further define the desired traffic patterns $975,000

25 Industrial Technology - Shop

26 Issues 1) Shop building is inadequate to house all programs 2) Shop building has unresolved structural issues 3) Shop building is in a very poor location - traffic (pedestrian vs vehicle) - no good expansion - blocks historic view of GFHS from SW

27

28 17 th STREET S 18 th STREET S PARKING PARKING 20 th STREET S 2 ND AVENUE S STAFF PARKING STUDENT/ EVENT PARKING 3 RD AVENUE S PRACTICE FIELDS STADIUM CAMPUS GREEN MAIN CAMPUS PARKING 4 th AVENUE S PROPOSED CONNECTOR MAIN ENTRANCE SOUTH CAMPUS NEW SHOPS 5 th AVENUE S

29 20 th STREET S CONNECTOR VISITOR ENTRY SOUTH CAMPUS NEW SHOPS 5 th AVENUE S

30 Issues Solutions Costs 1) Shop building is inadequate to house all programs 2) Shop building has unresolved structural issues 3) Shop building is in a very poor location - traffic (pedestrian vs vehicle) - no good expansion - blocks historic view of GFHS from SW New construction for entry level shop classes on south side of south campus Upper level Industrial Technology classes relocated to Paris Gibson Education Center Demolish existing building OR New construction for entry level shop classes on south side of south campus Upper level Industrial Technology classes relocated to Paris Gibson Education Center Repurpose existing building $5,000,000 * OR $6,750,000 * * Costs not including work to be done at Paris Gibson Education Center Note: The Task Force feels this issue needs additional study.

31 An Investment of $57,000,000-$59,000,000 Result: A revitalized Great Falls High School to last our community another 80 years!

32 Questions & Answers

33 Thank you

New Hope-Solebury School District Campus Revitalization Plan

New Hope-Solebury School District Campus Revitalization Plan Campus Revitalization Plan 20 January 2016 GODSHALL KANE O ROURKE ARCHITECTS, LLC 12 East Butler Avenue, Suite 205, Ambler, PA 19002 T: 215.646.2003 F: 215.646.5707 www.gkoarchitects.com Site Rendering

More information

PROGRAM AREAS - MIDDLE SCHOOL

PROGRAM AREAS - MIDDLE SCHOOL CAPACITY Enrollment 4.0 10.00 3.81 Building Size 4.0 10.00 3.81 ACCESSIBILITY Site Access 4.0 3.00 1.14 Building Access 2.0 3.00 0.57 Disabled Access 1.0 3.00 0.29 Some site and building areas not ADA

More information

CUMBERLAND SCHOOLS WORK PROPOSED 2018

CUMBERLAND SCHOOLS WORK PROPOSED 2018 Cost Ashton Elementary School 2 2 Replace HVAC $ 375,000.00 5 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 2 3 Various Technological Improvements $ 191,258.00 2 4 Replace Plumbing Fixtures

More information

Waverley Elementary School Feasibility Study

Waverley Elementary School Feasibility Study Waverley Elementary School Feasibility Study FREDERICK COUNTY PUBLIC SCHOOLS Feasibility Study Meeting #6 January 18, 2018 1 AGENDA 1. PROJECT OVERVIEW schedule 2. 1/11 COMMUNITY MEETING recap of Community

More information

POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY PTA PRESENTATION MAY 15, 2013

POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY PTA PRESENTATION MAY 15, 2013 Montgomery County Public Schools POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY PTA PRESENTATION MAY 15, 2013 Jim Henderson, AIA, LEED BD+C Managing Principal Meeting Schedule Work Session #1 February 6,

More information

Gym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers

Gym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers New Bleachers Gym Capacity: 710 Stage Auditeria Capacity: 390 Enlarged plan of new stage configuration showing greater seating capacity of the gym vs. that of the auditeria Proposed 2018 Bond Projects

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: R. F. WAGNER SEC SCL ARTS & TECH-Q, 47-07 30TH PLACE, New York, 11101 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-16

More information

Governors State University Tornado & Severe Weather Shelter Plan March 18, 2016

Governors State University Tornado & Severe Weather Shelter Plan March 18, 2016 Introduction Tornado and Severe Weather Shelter Areas on Campus Tornados produce violent winds, sometimes in excess of 250 miles per hour that can cause major property damage and loss of life. The greatest

More information

St. Charles High School Emergency Plan Instructions. Fire Drill Evacuation Procedures

St. Charles High School Emergency Plan Instructions. Fire Drill Evacuation Procedures Keep the following items in this folder: St. harles High School Emergency Plan Instructions urrent class rosters (student names only, update quarterly) School Emergency Plan for St. harles High School

More information

The Partnership for Building Reuse: Learning from Los Angeles

The Partnership for Building Reuse: Learning from Los Angeles The Partnership for Building Reuse: Learning from Los Angeles 1 Partnership for Building Reuse Why Los Angeles? Strong local partners Track record of building reuse Transit system expansion Opportunities

More information

Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017

Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017 Projects Completed FY16, FY17 and FY18 (arranged alphabetically) Abrams Planetarium Install automatic door opener on main doors of the Planetarium. Completed: Summer 2016 Cost: $13,000 Bessey Hall 1 st

More information

Architectural Renderings. The following is intended to provide a preview of renovations and additions planned for McKinney High School.

Architectural Renderings. The following is intended to provide a preview of renovations and additions planned for McKinney High School. Architectural Renderings The following is intended to provide a preview of renovations and additions planned for McKinney High School. The final appearance of the campus after construction may vary slightly

More information

4. connect city road to the arts centre and yarra river

4. connect city road to the arts centre and yarra river 4. connect city road to the arts centre and yarra river At St Kilda Road, City Road is lowered below grade, re-emerging eastbound from the underpass as Alexandra Avenue. This underpass creates an inhospitable

More information

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning UNIVERSITY HOUSING DIVISION OF STUDENT AFFAIRS BRIEFING SUMMER 2013 What is RLI? The Residential Life Initiatives (RLI) is a planned approach for the renewal, revitalization, and expansion of University

More information

Room & Floor Renumbering. Floor Level Numbering Room Renumbering

Room & Floor Renumbering. Floor Level Numbering Room Renumbering & Floor Floor Level Numbering Room 1/01 This page is intentionally left blank. Introduction This section of the Sign and Graphic Design Guide covers two basic fundamental foundations to an effective sign

More information

RGM Architects. Eduardo Mata Elementary School

RGM Architects. Eduardo Mata Elementary School Insert Google Map Image Overall Scope ADA Improvements Exterior site upgrades Roof replacement Restroom upgrades Kitchen upgrades Mechanical, electrical, and plumbing upgrades Fire alarm and Life Safety

More information

Learning to Leverage

Learning to Leverage STRATEGIES AND PRACTICES IN LEASE RENEGOTIATIONS -- Learning to Leverage Janet E. Jackim, Esq. May 18, 2018 WEST VALLEY COMMERCIAL REAL ESTATE GROUP WHY RENEGOTIATE A LEASE? o An anchor has gone dark,

More information

Governors State University Tornado & Severe Weather Shelter Plan August 4, 2016

Governors State University Tornado & Severe Weather Shelter Plan August 4, 2016 Introduction Tornado and Severe Weather Shelter Areas on Campus Tornados produce violent winds, sometimes in excess of 250 miles per hour that can cause major property damage and loss of life. The greatest

More information

Charles Kozminski Elementary Community Academy

Charles Kozminski Elementary Community Academy Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DRAFT -- PROPOSED EXPANSION AND REVISIONS TO DIVISION 24. SPECIAL DISTRICT--COLLEGE AND UNIVERSITY NEIGHBORHOODS DISTRICT

DRAFT -- PROPOSED EXPANSION AND REVISIONS TO DIVISION 24. SPECIAL DISTRICT--COLLEGE AND UNIVERSITY NEIGHBORHOODS DISTRICT DRAFT -- PROPOSED EXPANSION AND REVISIONS TO DIVISION 24. SPECIAL DISTRICT--COLLEGE AND UNIVERSITY NEIGHBORHOODS DISTRICT Sec. 28-831. Purpose. The college and university neighborhoods district purposes

More information

Ashby, Pepperell, Townsend North Middlesex Regional High School. Preferred Schematic Report Update

Ashby, Pepperell, Townsend North Middlesex Regional High School. Preferred Schematic Report Update Ashby, Pepperell, Townsend North Middlesex Regional High School Preferred Schematic Report Update June 3, 2013 AGENDA Preferred Schematic Report (PSR) Options Review Criteria and Goals Project Costs Factors

More information

PLUMBING SYSTEMS CHAPTER 29

PLUMBING SYSTEMS CHAPTER 29 CHAPTER 29 PLUMBING SYSTEMS SECTION 2901 GENERAL 2901.1 Scope. The provisions of this chapter and the International Plumbing Code shall govern the erection, installation, alteration, repairs, relocation,

More information

BOARD WORK SESSION Construction Projects Discussion & Superintendent Evaluation MINUTES

BOARD WORK SESSION Construction Projects Discussion & Superintendent Evaluation MINUTES District Office 471 NE Ochoco Plaza Dr., Prineville, OR 97754 (541) 447-5664 August 16, 2014 BOARD WORK SESSION Construction Projects Discussion & Superintendent Evaluation DISTRICT ADMINISTRATION OFFICE

More information

McCLATCHY FACILITY SUMMARIES

McCLATCHY FACILITY SUMMARIES McCLATCHY FACILITY SUMMARIES BRANCH SUMMARY The historic E.K. McClatchy Library building is highly valued by the city and the community. Its size and barriers to access prevent it from completely meeting

More information

CITY HALL PROJECT UPDATE/DIRECTION BRIEF September 19, 2017

CITY HALL PROJECT UPDATE/DIRECTION BRIEF September 19, 2017 CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF September 19, 2017 1 2017 IN REVIEW January 17 th Deficiencies / Space Needs February 28 th Buildings & Assets Presentation May 23 rd Options / Schedules /

More information

BALLOT MEASURE SUBMITTAL FORM. Jurisdiction Name: San Leandro Unified School District Election Date: 8 November 2016

BALLOT MEASURE SUBMITTAL FORM. Jurisdiction Name: San Leandro Unified School District Election Date: 8 November 2016 Official Use Only: Date Stamp BALLOT MEASURE SUBMITTAL FORM Jurisdiction Name: San Leandro Unified School District Election Date: 8 November 2016 BALLOT TITLE & QUESTION TO BE PRINTED Note: The information

More information

Equality and Access Plan The Abbey School, Reading

Equality and Access Plan The Abbey School, Reading Equality and Access Plan 2017-2020 The Abbey School, Reading , Reading Accessibility Plan Scope The School recognises the benefits of a diverse School Community, with individuals who value one another

More information

Summary of Tower Road Property Planning and Maintenance

Summary of Tower Road Property Planning and Maintenance Issue Background Findings Conclusions Recommendations Responses Attachments Summary of Tower Road Property Planning and Maintenance Tower Road Property Needs Master Planning and Maintenance Plans Issue

More information

2019 SUMMER CONSTRUCTION PROGRAM 4/16/19

2019 SUMMER CONSTRUCTION PROGRAM 4/16/19 2019 SUMMER CONSTRUCTION PROGRAM 4/16/19 1 2 P.4 Barnes & Powers Hall P.5 City of Mount Pleasant Sidewalk Work P.6 Center for Integrated Health Studies P.7 Graduate Housing P.8 Grawn Hall P.9 Health Professions

More information

Pocatello High School New Building Addition Board Interview

Pocatello High School New Building Addition Board Interview Pocatello High School New Building Addition Board Interview 9.6.2018 Agenda Introduction The Team Project Team Expectations Related Experience The Scope Building Site(s) The Site The Building / Site The

More information

Element Z General Design Requirements Owner Standards and Other Requirements

Element Z General Design Requirements Owner Standards and Other Requirements Definitions of Building Areas PART 1 - GENERAL 1.01 OVERVIEW A. The A/E shall submit an estimate for the project s Gross Area and Assignable Area with the Schematic Design Phase submission and shall submit

More information

RSA Coffee House Fellows Evening 04 August 2016

RSA Coffee House Fellows Evening 04 August 2016 Fellows Evening 04 August 2016 Key objectives of the Project: 1 To create a better environment for users of the house to congregate, assimilate ideas and work; To address issues arising from the Fellows

More information

Chapter 3. Planning Options

Chapter 3. Planning Options Chapter 3 Planning Options Drummey Rosane Anderson, Inc. 3.1 Study Goals The goals of this study are to review Town of Madison facilities, to provide an existing building use study to determine 1) Efficient

More information

EAST-WEST CORRIDOR EXISTING CONDITIONS

EAST-WEST CORRIDOR EXISTING CONDITIONS EAST-WEST CORRIDOR EXISTING CONDITIONS EXISTING CONDITIONS : PREVIOUS PLANS & STUDIES 7 recent planning efforts areas of overlap are of particular interest EXISTING CONDITIONS : LAND USE large concentration

More information

2. The Purpose of the Estates Strategy

2. The Purpose of the Estates Strategy Royal National Orthopaedic Hospital NHS Trust Trust Board - December 2012 Estates Strategy 2012 to 2017 - Executive Summary 1. Purpose of the Report The purpose of this report is to advise the Trust Board

More information

Harvard University Science and Engineering Complex BCDC 01 December 2015

Harvard University Science and Engineering Complex BCDC 01 December 2015 Harvard University Science and Engineering Complex BCDC 01 December 2015 PROJECT TEAM PROJECT NAME: Science and Engineering Complex ADDRESS/LOCATION: Western Avenue, Allston PROPONENT: President and Fellows

More information

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University Campus Tornado Shelters Weather Department Environmental Health & Safety Northern Illinois University A B C D E F G H I J K L M N O P Q R S T U V W X Y Z A Academic Advising Center: South/southwest end

More information

Theodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625

Theodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

OPTION 1 MAX RENOVATION/ADDITION

OPTION 1 MAX RENOVATION/ADDITION OPTION 1 MAX RENOVATION/ADDITION MASSING TWO STORY NEW ADDITION OUTDOOR CLASSROOM ON ROOF MULTI PURPOSE ROOM ADDITION PARKING PLAY AREA 1886 HISTORIC BUILDING 12TH PLACE NE C ST NE 13TH ST NE CONSTITUTION

More information

EXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE

EXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE EXHIBIT A FULL TEXT OF BOND PROPOSITION 4152-6874-3188.6 HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE This proposition may be known and referred to as the Hilmar

More information

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS A 2008 City Code amendment requires the owners of all rental dwelling units in the city to have a certificate of occupancy (CO) before

More information

2015 Limited Campus Master Plan Update NSHE Board of Regents Informational Update October 23, 2015

2015 Limited Campus Master Plan Update NSHE Board of Regents Informational Update October 23, 2015 2015 Limited Campus Master Plan Update NSHE Board of Regents Informational Update October 23, 2015 TABLE OF CONTENTS I II III DEVELOPMENT IV DISTRICT V OVERVIEW FRAMEWORK PLAN OPPORTUNITIES EXPERIENCE

More information

Goals, Objectives and Policies

Goals, Objectives and Policies Goals, Objectives and Policies 1. GOAL SUPPORT THE PROVISION OF DECENT, SAFE AND SOUND HOUSING IN A VARIETY OF TYPES, SIZES, LOCATIONS AND COSTS TO MEET THE NEEDS OF CURRENT AND FUTURE RESIDENTS OF UNINCORPORATED

More information

Project overview. Golden Sand Hotel DOHA QATAR

Project overview. Golden Sand Hotel DOHA QATAR Golden Sand Hotel DOHA QATAR MARCH 29, 2011 1. GUESTROOM FLOORS 1.1. A minimum of ONE handicapped guestroom must be provided. Handicapped room shall be connected to a standard guestroom (for the use a

More information

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

2016 Annual Report. Enid Public Schools 2016 Bond. February 2017

2016 Annual Report. Enid Public Schools 2016 Bond. February 2017 2016 Annual Report Enid Public Schools 2016 Bond February 2017 Enid Public Schools Strategic Action Plan The initial goals of the Enid Public Schools Strategic Action Plan have been met, and we are well

More information

HOLLEY NAVARRE WATER SYSTEM, INC. IMPACT FEE POLICIES, PROCEDURES & CALCULATIONS

HOLLEY NAVARRE WATER SYSTEM, INC. IMPACT FEE POLICIES, PROCEDURES & CALCULATIONS HOLLEY NAVARRE WATER SYSTEM, INC. IMPACT FEE POLICIES, PROCEDURES & CALCULATIONS EFFECTIVE: AUGUST 4, 2017 REVISED: NOVEMBER 9, 2017 8574 Turkey Bluff Road, Navarre, FL 32566 Phone: (850) 939 2427 Fax:

More information

TROWBRIDGE & WOLF. August 21, 2002 WEST CAMPUS RESIDENTIAL INITIATIVE DEIS ADDENDUM THREE

TROWBRIDGE & WOLF. August 21, 2002 WEST CAMPUS RESIDENTIAL INITIATIVE DEIS ADDENDUM THREE TROWBRIDGE & WOLF L a n d s c a p e A r c h i t e c t s P l a n n e r s August 21, 2002 WEST CAMPUS RESIDENTIAL INITIATIVE DEIS ADDENDUM THREE 1. Replace pages 121-a, 121-b and 121-c Section 2.11 Community

More information

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

FLOOR AND ROOM NUMBERING GUIDELINES

FLOOR AND ROOM NUMBERING GUIDELINES FLOOR AND ROOM NUMBERING GUIDELINES November 2018 GENERAL: These numbering conventions have been developed and should be followed throughout University of Hawaii at Manoa controlled facilities for the

More information

CONSTRUCTION COST ESTIMATE AND ANALYSIS

CONSTRUCTION COST ESTIMATE AND ANALYSIS CONSTRUCTION COST ESTIMATE AND ANALYSIS As can be seen in the exhibits to this analysis, the total construction cost for the Alteration project is $790,324.11. However, under the state statute, section

More information

Section 3: Primary Function, Employee Work Areas, & Kitchens

Section 3: Primary Function, Employee Work Areas, & Kitchens Section 3: Primary Function, Employee Work Areas, & Kitchens TEXAS ACCESSIBILITY ACADEMY Architectural Barriers Program 106.5.45 Primary Function A major activity for which the facility is intended Examples:

More information

Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type

Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type Parking Lot Priorities Type 1 Program na Use 1 Severity na New Parking Lots and restriping / regradeing existing

More information

Financing Municipal Services for Sustainable Development Getting the Prices Right

Financing Municipal Services for Sustainable Development Getting the Prices Right Financing Municipal Services for Sustainable Development Getting the Prices Right Presentation to the Urban Development Conference University of Alberta April 10, 2014 Enid Slack Institute on Municipal

More information

3. Miscellaneous Instructions and Definitions.

3. Miscellaneous Instructions and Definitions. Last page revision- March 31st, 1999 TEXAS ACCESSIBILITY STANDARDS (TAS) TAS Table of Contents 3. Miscellaneous Instructions and Definitions. 3.1 Graphic Conventions. Graphic conventions are shown in Table

More information

ORDINANCE # CITY OF MOUNDVILLE BUILDING INSPECTOR RULES AND PROCEDURE AND BUILDING CODES AND FEES

ORDINANCE # CITY OF MOUNDVILLE BUILDING INSPECTOR RULES AND PROCEDURE AND BUILDING CODES AND FEES ORDINANCE #2008-09 CITY OF MOUNDVILLE BUILDING INSPECTOR RULES AND PROCEDURE AND BUILDING CODES AND FEES ARTICLE I AUTHORITY AND JURISDICTION Section 1-1 Enactment These regulations are adopted by the

More information

NORTH CAMPUS. North Campus & Northwest Residence Halls. North Garage. Jorgensen. Center. X Lot H2. Admissions. Werth. Residence.

NORTH CAMPUS. North Campus & Northwest Residence Halls. North Garage. Jorgensen. Center. X Lot H2. Admissions. Werth. Residence. CONSTRUCTION ACTIVITY Significant Projects September 2018 N4 Building / Site Project N1 North Campus & Northwest s Infrastructure Project Central Warehouse NORTH N1 North Eagleville Road Infrastructure

More information

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive Master Plan Presentation for: 520 Virginia Drive May 22, 2018 Design Presentation Agenda Master Plan Design for 520 Virginia Drive Existing Conditions & Opportunities Project Goals Site Plan & Floor Plans

More information

CONRAD ENGINEERS Description of Scheme. The disciplines imposed upon the design and grouping of off-site preassembled residential units follow:

CONRAD ENGINEERS Description of Scheme. The disciplines imposed upon the design and grouping of off-site preassembled residential units follow: CONRAD ENGINEERS Description of Scheme The disciplines imposed upon the design and grouping of off-site preassembled residential units follow: 1. All plumbing and utilities will consist of one stack for

More information

Local Ballot Measure: E. Enterprise Elementary School District Bond Measure

Local Ballot Measure: E. Enterprise Elementary School District Bond Measure E Enterprise Elementary School District Bond Measure Ballot question To improve educational quality; upgrade/renovate/construct classrooms, restrooms and facilities; repair/replace leaky roofs; upgrade

More information

RA After Hours On Call (971) Your Guide to. Broadway. 625 SW Jackson St Portland, OR 97201

RA After Hours On Call (971) Your Guide to. Broadway. 625 SW Jackson St Portland, OR 97201 RA After Hours On Call (971) 246-1388 Your Guide to Broadway 625 SW Jackson St Portland, OR 97201 This ten story building was built in 2004. It features 383 studio apartments, a computer lab on the second

More information

Hardwick State of the Town Forum & Charrette Summary

Hardwick State of the Town Forum & Charrette Summary Hardwick State of the Town Forum & Charrette Summary May 2014 Introduction The purpose of this report is to summarize the positions of approximately 50 residents of Hardwick provided at a State of the

More information

PROPOSED BOND PROJECT DETAILS. New School Facilities to Prevent Overcrowding

PROPOSED BOND PROJECT DETAILS. New School Facilities to Prevent Overcrowding PROPOSED BOND PROJECT DETAILS New School Facilities to Prevent Overcrowding New High School - Phase I What: First phase of a 2,000 student comprehensive high school. Capacity of Phase I - 1,000 students.

More information

paddington house words by Tom Rubenach

paddington house words by Tom Rubenach paddington house words by Tom Rubenach An honest building can be difficult to come by, particularly with residential architecture. The story told from the street is often disingenuous with respect to the

More information

PASSAIC BOARD OF EDUCATION IMPROVEMENT OF FACILITIES REPORT

PASSAIC BOARD OF EDUCATION IMPROVEMENT OF FACILITIES REPORT PASSAIC BOARD OF EDUCATION IMPROVEMENT OF FACILITIES REPORT School No.10 Annex Renovations Contractor: Malanga Construction (Employed by Archdiocese) Architectural Firm: Kellen Chapin Architects Start

More information

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628 11411 S Eggleston Ave Chicago, IL 6628 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors

More information

Ashland City Hall Feasibility Study City Council Presentation Monday, October 17, 2016

Ashland City Hall Feasibility Study City Council Presentation Monday, October 17, 2016 Ashland City Hall Feasibility Study City Council Presentation Monday, October 17, 2016 Space Needs: Summary Space Needs: Summary 23,472 SF Option 1: City Hall Expansion: New Construction Consolidate functions

More information

Request for Information (RFI)

Request for Information (RFI) COMMONWEALTH OF KENTUCKY Finance and Administration Cabinet Division of Real Properties Request for Information (RFI) For TOURISM, ARTS AND HERITAGE CABINET Kentucky State Fair Board Kentucky Exposition

More information

# Alexander Leigh Center for Autism Final PUD and SUP Amendment Project Review for Planning and Zoning Commission

# Alexander Leigh Center for Autism Final PUD and SUP Amendment Project Review for Planning and Zoning Commission #2016-44 Alexander Leigh Center for Autism Final PUD and SUP Amendment Project Review for Planning and Zoning Commission Meeting Date: October 19, 2016 Requests: 1) Final PUD Amendment to allow changes

More information

PART ONE - GENERAL INFORMATION

PART ONE - GENERAL INFORMATION Corrected Date: Page 7 Date of Submittal Changed to Coincide with Submittal Date on Page 5 PART ONE - GENERAL INFORMATION A. INTRODUCTION B. Background Miami Shores Village is soliciting responses to this

More information

SALVATION ARMY: HARBOR LIGHT CENTER EXISTING PROPOSED SALVATION ARMY: HARBOR LIGHT CENTER

SALVATION ARMY: HARBOR LIGHT CENTER EXISTING PROPOSED SALVATION ARMY: HARBOR LIGHT CENTER Salvation Army s Harbor Light center is the largest shelter for homeless individuals in the state of Minnesota. Other than the recent Chapel addition east of the main building, the facility was last remodeled

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: DIV. OF INSTR. & INFO. TECH.-K, 335 ADAMS STREET, New York, 11201 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-17 8:05

More information

Review #1 They also have a 2% discount for students/employees of UTHSCSA.

Review #1 They also have a 2% discount for students/employees of UTHSCSA. Apartments Name of apartment complex: The Abbey at Medical Center Address: 5450 Rowley Road Phone: (210) 441-7098 Website: http://www.medicalcenter-apartments.com/ Rent: 1B from $664/mth, 2B from $824/mth

More information

Table of Contents. Concept Plan Overview. Statement of Compliance with Design Guidelines. Statement of Compliance with Comprehensive Plan

Table of Contents. Concept Plan Overview. Statement of Compliance with Design Guidelines. Statement of Compliance with Comprehensive Plan Table of Contents Concept Plan Overview Statement of Compliance with Design Guidelines Statement of Compliance with Comprehensive Plan Developer s Program Market Objective Benefit to Local Businesses Benefit

More information

Your Guide to. Blackstone SW Park Ave Portland, OR 97201

Your Guide to. Blackstone SW Park Ave Portland, OR 97201 Your Guide to Blackstone 1831 SW Park Ave Portland, OR 97201 Blackstone is a historic brownstone building built in 1931 and is located on the Park Blocks. All first floor units are carpeted, other floors

More information

HOUSING ELEMENT. 3. group and foster home construction. 1. increase the supply of new affordable housing with: a regional housing trust fund;

HOUSING ELEMENT. 3. group and foster home construction. 1. increase the supply of new affordable housing with: a regional housing trust fund; Goal 8.0. Facilitate an adequate supply of decent, safe, and sanitary housing in suitable neighborhoods, including housing for special needs populations; available in a range of housing types, architectural

More information

PINNACLE PROPERTIES ANNEXATION AND ADOPTION OF PROPOSED ZONING REGULATIONS

PINNACLE PROPERTIES ANNEXATION AND ADOPTION OF PROPOSED ZONING REGULATIONS Submitted by Pierce County On Behalf of the City of Auburn PINNACLE PROPERTIES ANNEXATION AND ADOPTION OF PROPOSED ZONING REGULATIONS Ballot Title: The City Council of the City of Auburn, Washington, adopted

More information

smart remodeling renovations that will yield you the greatest return when you sell

smart remodeling renovations that will yield you the greatest return when you sell smart remodeling renovations that will yield you the greatest return when you sell OUTLINE 1 2 3 4 Introduction Background Definition of Renovations Typical Homeowner Concerns Concern Resolution Process

More information

The University of Texas at Dallas Campus Master Plan Update Town Hall Meetings. September 6-7, 2018

The University of Texas at Dallas Campus Master Plan Update Town Hall Meetings. September 6-7, 2018 he University of exas at Dallas Campus Master Plan Update own Hall Meetings September 6-7, 2018 UDallas has experienced tremendous growth and quickly developed an aspiring and ambitious culture of leadership,

More information

BOARD OF REGENTS BRIEFING PAPER. 1. Agenda Item Title: GBC Pahrump Property Exchange Meeting Date: March 1-2,2012

BOARD OF REGENTS BRIEFING PAPER. 1. Agenda Item Title: GBC Pahrump Property Exchange Meeting Date: March 1-2,2012 BOARD OF REGENTS BRIEFING PAPER 1. Agenda Item Title: GBC Pahrump Property Exchange Meeting Date: March 1-2,2012 2. BACKGROUND & POLICY CONTEXT OF ISSUE: NSHE owns a High Tech Center (HTC) building in

More information

RA2.01. Building Area: 89,222 SF. Cost per Square Foot: $162.22

RA2.01. Building Area: 89,222 SF. Cost per Square Foot: $162.22 Project Description: This complete renovation of a historic elementary school into a much needed affordable senior housing community is in an ideal location immediately adjacent to downtown with close

More information

Innovative features such as bridges (3 total on this site), leak detection for the gas main crossing, acoustic berm/barrier adjacent to the railway,

Innovative features such as bridges (3 total on this site), leak detection for the gas main crossing, acoustic berm/barrier adjacent to the railway, Innovative features such as bridges (3 total on this site), leak detection for the gas main crossing, acoustic berm/barrier adjacent to the railway, and creative site layout and planning all came together

More information

Urbanization. Urbanization in Chindia -- India Struggles with the Next 500 Million. Asian Experience with Compact Growth

Urbanization. Urbanization in Chindia -- India Struggles with the Next 500 Million. Asian Experience with Compact Growth Urbanization in Chindia -- India Struggles with the Next 500 Million Don Elliott Clarion Associates Asian Experience with Compact Growth Structure of the Paper & Presentation 1. Intro to Urbanization 2.

More information

From Page 1 of form:

From Page 1 of form: The following instructions are provided to aid you in filling out the Income and Expense Questionnaire form for Office, Retail and Industrial properties. If you have any questions, please call our office

More information

Tisbury Elementary School

Tisbury Elementary School SLIDE TITLE Slide Sub Title Building Committee Presentation for: Tisbury Elementary School MAY 10, 2017 AGENDA 1. Discussion of Options 1. Addition / Renovation (Site, Phasing, Plans) 2. New 2 Story School

More information

Village of Port Jefferson Urban Renewal Plan

Village of Port Jefferson Urban Renewal Plan Urban Renewal Plan Village of Port Jefferson Urban Renewal Plan Port Jefferson, New York PREPARED FOR Village of Port Jefferson Village Board 121 West Broadway Port Jefferson, NY 11777 631.473.4724 PREPARED

More information

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS Facility Assessment Report Co-locating on this campus are MARIE MILITAR HS and PHOEIX MILITAR HS This report contains the detailed findings of a facility assessment completed on the date noted in the document

More information

DESIGN PUBLIC HEARING

DESIGN PUBLIC HEARING DESIGN PUBLIC HEARING October 25, 2016 AT STEVENS MEMORIAL LIBRARY 345 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 7:00 PM FOR THE PROPOSED Chickering Road (Route 125) & Massachusetts Avenue Intersection

More information

Morehead State University

Morehead State University TM Morehead State University 2015-2016 On-Campus Housing (2015-2016) Double Room Rate* $2,250 Rent Included Electricity Included Water Included HD Cable Included Internet Included Laundry Included Block

More information

Post-Apartheid Cities in Transformation for Social Justice and Sustainability

Post-Apartheid Cities in Transformation for Social Justice and Sustainability Post-Apartheid Cities in Transformation for Social Justice and Sustainability Simphiwe E Mini (PhD) College of Agriculture and Environmental Sciences Department of Geography University of South Africa(UNISA)

More information

Prime Northwest gainesville parcel

Prime Northwest gainesville parcel 2925 NW 39 th Ave Gainesville, FL Property Description Large church in excellent condition, a central NW location, and on a huge 11.5 acre lot! Rare find in NW Gainesville, just 4 miles to UF and 640 feet

More information

CfE Higher Geography HUMAN ENVIRONMENTS: URBAN CHANGE IN MUMBAI

CfE Higher Geography HUMAN ENVIRONMENTS: URBAN CHANGE IN MUMBAI CfE Higher Geography HUMAN ENVIRONMENTS: URBAN CHANGE IN MUMBAI You should be able to Describe and give reasons for changes that have occurred in Housing Transport Compare developments in Mumbai to a developed

More information

PARTNERS IN ECONOMIC PROGRESS

PARTNERS IN ECONOMIC PROGRESS PARTNERS IN ECONOMIC PROGRESS The Partners in Economic Progress (PEP) Program offers incentives to building owners to renovate buildings within the PEP Zone in City Center (see map). If you are a PROPERTY

More information

From Page 1 of form:

From Page 1 of form: The following instructions are provided to aid you in filling out the Income and Expense Questionnaire form for Multi-Residential properties. If you have any questions, please call our office at 1-800-380-7775.

More information

Developing DITA Expertise Across Your Virtual Team. Martha Morgan Architect, Information Engineering October 14, 2009

Developing DITA Expertise Across Your Virtual Team. Martha Morgan Architect, Information Engineering October 14, 2009 Developing DITA Expertise Across Your Virtual Team Martha Morgan Architect, Information Engineering October 14, 2009 About NetApp Information Engineering Produces documentation for NetApp storage and datamanagement

More information

(2) Determining Occupant Loads for the Operation of a Building (The Alberta Fire Code)

(2) Determining Occupant Loads for the Operation of a Building (The Alberta Fire Code) (d) (e) (f) (g) (h) if emergency lighting is required if exit signs are required if additional requirements apply for high buildings the type of hardware required on exit and access to exit doors the required

More information

The Cannery Marketplace Narrative. Purpose: Site Design Approach: Cannery Commerce District 10/18/2017

The Cannery Marketplace Narrative. Purpose: Site Design Approach: Cannery Commerce District 10/18/2017 The Cannery Marketplace Narrative Cannery Commerce District 10/18/2017 Purpose: A number of entitlements are being requested for the Cannery Marketplace inclusive of a Master Conditional Use Permit (Master

More information

CHANGE IN VALUE ALTERATIONS MADE OCCUPANCY CHANGES

CHANGE IN VALUE ALTERATIONS MADE OCCUPANCY CHANGES INTRODUCTION This assignment is based on a residential house situated on 104 Rochester Road in Salt River, Cape Town. The house has an erf size of 238m 2 and floor size 350.82 m 2 with two storeys. The

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief Sherwood Forest (Trinity) Housing Corporation Sherwood Place Affordable Housing Apartments Trinity Presbyterian Church Orchard Park Nursery School 590 Gainsborough Road, London Urban Design Brief REVISED

More information