3 Overall Scope ADA Improvements Exterior site upgrades Roof replacement Restroom upgrades Kitchen upgrades Mechanical, electrical, and plumbing upgrades Fire alarm and Life Safety upgrades (3) Story Addition which includes a new storm shelter New courtyard (2) Cover drop off canopies New marquee signage

4 Parent Drop Off / Fire lane Detail Site Plan Scope La Vista Drive New fire lane and parent drop off loop starting from La Vista Drive and looping around the new addition towards East Grand Avenue service road with additional parking Extend the existing bus lane que area allowing the buses to fully station out of the right of way of La Vista Drive. (1) New Campus Playground within courtyard New courtyard with outdoor seating areas New Cover Canopies for drop off areas New Marquee Signage Designated Montessori Playground Area By Others Proposed Temporary 7 th Grade Classroom as construction of the addition is completed. Existing Building New Bus Lane Extension Existing (3) Three Story Building New (3) Three Story Addition Designated Montessori Playground Area By Others Parent Drop Off / Fire Lane Overall Site Plan

5 Detail Courtyard Plan Scope Provide new outdoor terrace seating area Provide new outdoor amphitheater seating terrace Provide new playground with safe fall zone

6 LIGHT RENOVATION MEDIUM RENOVATION Overall First Floor Plan HEAVY RENOVATION NEW ADDITION NO WORK TO BE PERFORMED

7 LIGHT RENOVATION MEDIUM RENOVATION Overall Second Floor Plan HEAVY RENOVATION NEW ADDITION NO WORK TO BE PERFORMED

8 LIGHT RENOVATION MEDIUM RENOVATION Overall Third Floor Plan HEAVY RENOVATION NEW ADDITION NO WORK TO BE PERFORMED

9 LIGHT RENOVATION MEDIUM RENOVATION Overall Roof Plan HEAVY RENOVATION NEW ADDITION NO WORK TO BE PERFORMED

10 Detail scope for first floor addition New Choral Classroom with 3 Practice Rooms, office and storage New Drama Classroom with Drama Storage and Scene Shop next to Auditorium Stage Physical Education Equipment Storage New Group Restroom near Cafeteria New Orchestra Room with 5 Practice Rooms, Storage, and Office 2 New Montessori Classrooms for 7 th and 8 th grades Storm Shelter with Control Room and Backup Generator Mechanical and Electrical Rooms to support new addition Relocate Music Room behind stage to the addition. Reconfigure the existing kitchen to incorporate two new serving lines New courtyard design with outdoor seating terrace and new playground equipment Provide new safety vestibule at main entrance Provide new breakroom and MDF room

11 Detail scope for second floor addition New art classrooms for both elementary and middle with a kiln room Small group classroom for Dyslexia, conference room, and speech classroom New nurse station with (4) cot rooms, exam room, nurse office, and ADA Restroom ESL Classroom IDF, break room, and staff restrooms Group restrooms Donations and storage room

12 Detail scope for third floor addition (3) new science classrooms for 6 th, 7 th, and 8 th grades World Language Classroom Administrative Conference Room Robotics Storage Counselor Office and Conference Room Assistant Principal office, instructional storage, breakroom and staff restrooms Group restrooms

13 PRE-DESIGN Fall 2017 SCHEMATIC DESIGN Winter 2018 DESIGN DEVELOPMENT Spring 2018 CONSTRUCTION DOCUMENTS Summer Fall 2017 Winter 2018 Spring 2018 Summer 2018 Fall Construction Phase 2018 Fall 2018 Fall

14

15

16

17

18

19

New Hope-Solebury School District Campus Revitalization Plan

New Hope-Solebury School District Campus Revitalization Plan Campus Revitalization Plan 20 January 2016 GODSHALL KANE O ROURKE ARCHITECTS, LLC 12 East Butler Avenue, Suite 205, Ambler, PA 19002 T: 215.646.2003 F: 215.646.5707 www.gkoarchitects.com Site Rendering

More information

PROGRAM AREAS - MIDDLE SCHOOL

PROGRAM AREAS - MIDDLE SCHOOL CAPACITY Enrollment 4.0 10.00 3.81 Building Size 4.0 10.00 3.81 ACCESSIBILITY Site Access 4.0 3.00 1.14 Building Access 2.0 3.00 0.57 Disabled Access 1.0 3.00 0.29 Some site and building areas not ADA

More information

Gym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers

Gym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers New Bleachers Gym Capacity: 710 Stage Auditeria Capacity: 390 Enlarged plan of new stage configuration showing greater seating capacity of the gym vs. that of the auditeria Proposed 2018 Bond Projects

More information

Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017

Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017 Projects Completed FY16, FY17 and FY18 (arranged alphabetically) Abrams Planetarium Install automatic door opener on main doors of the Planetarium. Completed: Summer 2016 Cost: $13,000 Bessey Hall 1 st

More information

CUMBERLAND SCHOOLS WORK PROPOSED 2018

CUMBERLAND SCHOOLS WORK PROPOSED 2018 Cost Ashton Elementary School 2 2 Replace HVAC $ 375,000.00 5 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 2 3 Various Technological Improvements $ 191,258.00 2 4 Replace Plumbing Fixtures

More information

Ashby, Pepperell, Townsend North Middlesex Regional High School. Preferred Schematic Report Update

Ashby, Pepperell, Townsend North Middlesex Regional High School. Preferred Schematic Report Update Ashby, Pepperell, Townsend North Middlesex Regional High School Preferred Schematic Report Update June 3, 2013 AGENDA Preferred Schematic Report (PSR) Options Review Criteria and Goals Project Costs Factors

More information

POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY PTA PRESENTATION MAY 15, 2013

POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY PTA PRESENTATION MAY 15, 2013 Montgomery County Public Schools POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY PTA PRESENTATION MAY 15, 2013 Jim Henderson, AIA, LEED BD+C Managing Principal Meeting Schedule Work Session #1 February 6,

More information

Tisbury Elementary School

Tisbury Elementary School SLIDE TITLE Slide Sub Title Building Committee Presentation for: Tisbury Elementary School MAY 10, 2017 AGENDA 1. Discussion of Options 1. Addition / Renovation (Site, Phasing, Plans) 2. New 2 Story School

More information

Equality and Access Plan The Abbey School, Reading

Equality and Access Plan The Abbey School, Reading Equality and Access Plan 2017-2020 The Abbey School, Reading , Reading Accessibility Plan Scope The School recognises the benefits of a diverse School Community, with individuals who value one another

More information

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161 1 School Name Year Built/Renovation Classroom quantity, size, type, usage Glover School Construction 2012-14 Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor

More information

Ithaca College Accessibility Guide

Ithaca College Accessibility Guide Ithaca College Accessibility Guide This guide was created to offer information about the accessibility features of the Ithaca College campus for individuals with mobility and hearing impairments. While

More information

FREEHOLD BOROUGH SCHOOL DISTRICT. Proposed Referendum Schematic Designs & Preliminary Costs

FREEHOLD BOROUGH SCHOOL DISTRICT. Proposed Referendum Schematic Designs & Preliminary Costs FREEHOLD BOROUGH SCHOOL DISTRICT Proposed Referendum Schematic Designs & Preliminary Costs Introduction The foundation of every state is the education of its youth. - Diogenes Laertius Greek Philosopher

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction August 2018 Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

More information

2016 Annual Report. Enid Public Schools 2016 Bond. February 2017

2016 Annual Report. Enid Public Schools 2016 Bond. February 2017 2016 Annual Report Enid Public Schools 2016 Bond February 2017 Enid Public Schools Strategic Action Plan The initial goals of the Enid Public Schools Strategic Action Plan have been met, and we are well

More information

St. Charles High School Emergency Plan Instructions. Fire Drill Evacuation Procedures

St. Charles High School Emergency Plan Instructions. Fire Drill Evacuation Procedures Keep the following items in this folder: St. harles High School Emergency Plan Instructions urrent class rosters (student names only, update quarterly) School Emergency Plan for St. harles High School

More information

BALLOT MEASURE SUBMITTAL FORM. Jurisdiction Name: San Leandro Unified School District Election Date: 8 November 2016

BALLOT MEASURE SUBMITTAL FORM. Jurisdiction Name: San Leandro Unified School District Election Date: 8 November 2016 Official Use Only: Date Stamp BALLOT MEASURE SUBMITTAL FORM Jurisdiction Name: San Leandro Unified School District Election Date: 8 November 2016 BALLOT TITLE & QUESTION TO BE PRINTED Note: The information

More information

PROPOSED BOND PROJECT DETAILS. New School Facilities to Prevent Overcrowding

PROPOSED BOND PROJECT DETAILS. New School Facilities to Prevent Overcrowding PROPOSED BOND PROJECT DETAILS New School Facilities to Prevent Overcrowding New High School - Phase I What: First phase of a 2,000 student comprehensive high school. Capacity of Phase I - 1,000 students.

More information

FORMER EDUCATIONAL FACILITY HOAGLAND RD., HOAGLAND, IN FOR SALE PROPERTY HIGHLIGHTS FOR SALE: $275,000

FORMER EDUCATIONAL FACILITY HOAGLAND RD., HOAGLAND, IN FOR SALE PROPERTY HIGHLIGHTS FOR SALE: $275,000 PROPERTY HIGHLIGHTS This former educational facility is located on the north side of Hoagland, IN on 11.42 acres. The one-story, steel building is 61,266 SF with access off Hoagland Rd. Zoning: RS-1 (Suburban

More information

Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type

Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type Parking Lot Priorities Type 1 Program na Use 1 Severity na New Parking Lots and restriping / regradeing existing

More information

Waverley Elementary School Feasibility Study

Waverley Elementary School Feasibility Study Waverley Elementary School Feasibility Study FREDERICK COUNTY PUBLIC SCHOOLS Feasibility Study Meeting #6 January 18, 2018 1 AGENDA 1. PROJECT OVERVIEW schedule 2. 1/11 COMMUNITY MEETING recap of Community

More information

Sauk Prairie School District Facility User Manual

Sauk Prairie School District Facility User Manual Sauk Prairie School District Table of Contents Sections Page Responsibility, Facility Use & Application 1 Facility Use Fees and Charges 1 General Facility Procedures 1-2 Bridges Elementary 3 Community

More information

OFFICE DIVISION Rick Kleiner's Listings SALE. SIZE (Sq Ft / Ac) RATE /SQ. FT. $19.00 Full Service 1,728 N/A

OFFICE DIVISION Rick Kleiner's Listings SALE. SIZE (Sq Ft / Ac) RATE /SQ. FT. $19.00 Full Service 1,728 N/A East/Midtown St. Joseph's Medical Plaza 6565 East Carondelet Drive 1,175-11,053 $19.00 Located on the St. Joseph s Hospital campus, Abundant at-door parking, Numerous medical office suites available for

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction September 2018 Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

More information

REQUEST FOR QUALIFICATIONS AND PROPOSAL NEW POLICE STATION, LEDYARD, CONNECTICUT Bid # (Due: 2:00pm on August 30, 2013)

REQUEST FOR QUALIFICATIONS AND PROPOSAL NEW POLICE STATION, LEDYARD, CONNECTICUT Bid # (Due: 2:00pm on August 30, 2013) Principal August 26, 2013 Town of Ledyard Mayor s Office 741 Colonel Ledyard Hwy. Ledyard, CT 06339 Re: REQUEST FOR QUALIFICATIONS AND PROPOSAL NEW POLICE STATION, LEDYARD, CONNECTICUT Bid # 2014-1 (Due:

More information

M E E T I N G NOT E S

M E E T I N G NOT E S M E E T I N G NOT E S April 17, 2013 DATE PROJECT : Wayside Elementary School Modernization Schematic Design - Community Meeting #3 PROJECT NO. : 530275.000 CC : Shawn Benjaminson Cindy Ponafala Phill

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction October 2017 Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

More information

F A C I L I T I E S P L A N N I N G & C O N S T R U C T I O N

F A C I L I T I E S P L A N N I N G & C O N S T R U C T I O N F A C I L I T I E S P L A N N I N G & C O N S T R U C T I O N Planning & Building Schools of Excellence o NORWALK HIGH SCHOOL ATHLETIC FIELDS AND POSSIBLE STADIUM PROJECT (ARCHITECT: RACHLIN PARTNERS,

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2010 BOND Facilities Construction February 2014 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Ceasar Ponce, A.I.A. EXECUTIVE DIRECTOR CONSTRUCTION

More information

Office Space For Sublease 7,881-20,146 RSF. Beltway Lakes I 5825 N. Sam Houston Pkwy W Houston, Texas 77086

Office Space For Sublease 7,881-20,146 RSF. Beltway Lakes I 5825 N. Sam Houston Pkwy W Houston, Texas 77086 Office Space For Sublease 7,881-20,146 RSF GREG CIZIK +1 713 830 2123 greg.cizik@colliers.com EDWARD EDSON +1 713 830 2122 edward.edson@colliers.com COLLIERS INTERNATIONAL 1233 West Loop South, Suite 900

More information

Architectural Renderings. The following is intended to provide a preview of renovations and additions planned for McKinney High School.

Architectural Renderings. The following is intended to provide a preview of renovations and additions planned for McKinney High School. Architectural Renderings The following is intended to provide a preview of renovations and additions planned for McKinney High School. The final appearance of the campus after construction may vary slightly

More information

Sudler Annex 092/3725 Various Accessibility Improvements 04/2012 Included accessible ramp to entrance and accessible restroom.

Sudler Annex 092/3725 Various Accessibility Improvements 04/2012 Included accessible ramp to entrance and accessible restroom. KU TRANSITION PLAN 1 ACADEMIC ACCESSIBILITY PROJECTS 2 June 29, 2017 LOCATION PROJ # PROJECT TOPIC / NAME COMPLETION COMMENTS 2012 Strong Hall Fire Alarm Strobe Upgrades 12/2012 Strong Hall Add Handrails

More information

Governors State University Tornado & Severe Weather Shelter Plan August 4, 2016

Governors State University Tornado & Severe Weather Shelter Plan August 4, 2016 Introduction Tornado and Severe Weather Shelter Areas on Campus Tornados produce violent winds, sometimes in excess of 250 miles per hour that can cause major property damage and loss of life. The greatest

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction December 2018 Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

More information

Corvallis School District 2002 Long Range Facilities Master Plan Projects Update

Corvallis School District 2002 Long Range Facilities Master Plan Projects Update Corvallis School District 2002 Long Range Facilities Master Plan Projects Update Phase 1 (Each estimate includes contingency, indirect and inflation costs) 1. Replacement School for Existing Corvallis

More information

The City of Boise Building Excellence Awards

The City of Boise Building Excellence Awards The City of Boise 2012 Building Excellence Awards Building Excellence Awards Green Building Concordia University Green Commercial Concordia University School of Law Green Commercial Concordia University

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2010 BOND Facilities Construction August 2015 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Ceasar Ponce, A.I.A. EXECUTIVE DIRECTOR CONSTRUCTION

More information

RA2.01. Building Area: 89,222 SF. Cost per Square Foot: $162.22

RA2.01. Building Area: 89,222 SF. Cost per Square Foot: $162.22 Project Description: This complete renovation of a historic elementary school into a much needed affordable senior housing community is in an ideal location immediately adjacent to downtown with close

More information

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning UNIVERSITY HOUSING DIVISION OF STUDENT AFFAIRS BRIEFING SUMMER 2013 What is RLI? The Residential Life Initiatives (RLI) is a planned approach for the renewal, revitalization, and expansion of University

More information

The following diagrams illustrate the use of various strategies outlined in this report to form more healthy and well-served communities

The following diagrams illustrate the use of various strategies outlined in this report to form more healthy and well-served communities Toward Healthier Apartment Neighbourhoods: A Healthy Toronto by Design Report Appendix A: Visualizations: Toward Healthy Apartment Neighbourhoods The following diagrams illustrate the use of various strategies

More information

PINNACLE PROPERTIES ANNEXATION AND ADOPTION OF PROPOSED ZONING REGULATIONS

PINNACLE PROPERTIES ANNEXATION AND ADOPTION OF PROPOSED ZONING REGULATIONS Submitted by Pierce County On Behalf of the City of Auburn PINNACLE PROPERTIES ANNEXATION AND ADOPTION OF PROPOSED ZONING REGULATIONS Ballot Title: The City Council of the City of Auburn, Washington, adopted

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction February 2019 Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

More information

Facility Acquisition- Beyond Compliance

Facility Acquisition- Beyond Compliance Facility Acquisition- Beyond Compliance Connie Dove, Commercial Broker Dove Property Advisors, LLC Patricia Matthews, Attorney Matthews Fox, LLC Champion Charter School Excellence 2016 Annual Conference

More information

Design Phase Award Structural Steel (Early Package) Award Final GMP for Remaining Project Construction Phase

Design Phase Award Structural Steel (Early Package) Award Final GMP for Remaining Project Construction Phase Eastlake H.S. Phase III Architect: Mijares Mora Architects CM@Risk: Buford Thompson Company Award Structural Steel (Early Package) Award Final GMP for Remaining Project Occupancy of Classrooms 20 May 11

More information

Kyle Seale MS. Lesile Road ES. Ward ES. Alamo Ranch ES. Potranco West Area HS. Rayburn MS

Kyle Seale MS. Lesile Road ES. Ward ES. Alamo Ranch ES. Potranco West Area HS. Rayburn MS Kyle Seale MS Lesile Road ES Ward ES Alamo Ranch MS Alamo Ranch ES Potranco West Area HS Stevens Ranch ES John Jay HS Rayburn MS BRENNAN HIGH SCHOOL a. Name and Location of Building: Brennan High School

More information

Interstate 35 Community School District Board of Education January 29, (pictures as of )

Interstate 35 Community School District Board of Education January 29, (pictures as of ) Interstate 35 Community School District Board of Education January 29, 2018 (pictures as of 1-26-18) East end of CTE building (note outside entrances to both classrooms) Front entrance to CTE and east

More information

Forum on University Street

Forum on University Street The University of Hong Kong University Street and Associated Works Forum on University Street 17th September 2009 West Gate Entry Plaza 3 Courtyards Central Gate Library Plaza University Street Reservoir

More information

Recreation and Park Commission Capital Committee. Angelo J. Rossi Playground Restroom Replacement Conceptual Plan Approval

Recreation and Park Commission Capital Committee. Angelo J. Rossi Playground Restroom Replacement Conceptual Plan Approval DATE: March 23, 2012 TO: THRU: FROM: RE: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager Mary Hobson, Project Manager

More information

GREAT FALLS HIGH SCHOOL MASTER PLAN. GFHS Master Plan Task Force

GREAT FALLS HIGH SCHOOL MASTER PLAN. GFHS Master Plan Task Force GREAT FALLS HIGH SCHOOL MASTER PLAN GFHS Master Plan Task Force Serving our community for over 80 years! Overriding premise: Retain GFHS Architectural Integrity Infrastructure Issues 1) Heat, ventilation,

More information

EXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE

EXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE EXHIBIT A FULL TEXT OF BOND PROPOSITION 4152-6874-3188.6 HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE This proposition may be known and referred to as the Hilmar

More information

Section 3: Primary Function, Employee Work Areas, & Kitchens

Section 3: Primary Function, Employee Work Areas, & Kitchens Section 3: Primary Function, Employee Work Areas, & Kitchens TEXAS ACCESSIBILITY ACADEMY Architectural Barriers Program 106.5.45 Primary Function A major activity for which the facility is intended Examples:

More information

ARTICLE V - DIVISION 10 RM-10 RESIDENTIAL MULTIFAMILY DISTRICT

ARTICLE V - DIVISION 10 RM-10 RESIDENTIAL MULTIFAMILY DISTRICT Development Services ARTICLE V - DIVISION 10 RM-10 RESIDENTIAL MULTIFAMILY DISTRICT Sec. 29-421. Purpose and Intent. (a) The RM-10 Residential Multifamily District is intended for areas affected by the

More information

Pocatello High School New Building Addition Board Interview

Pocatello High School New Building Addition Board Interview Pocatello High School New Building Addition Board Interview 9.6.2018 Agenda Introduction The Team Project Team Expectations Related Experience The Scope Building Site(s) The Site The Building / Site The

More information

PHASE II NOW LEASING! PRIME RETAIL + RESTAURANT OPPORTUNITIES

PHASE II NOW LEASING! PRIME RETAIL + RESTAURANT OPPORTUNITIES PHASE II NOW LEASING! PRIME RETAIL + RESTAURANT OPPORTUNITIES Now Serving Florida s West Coast and Central Florida Markets Office: 407.392.2055 Fax: 321.400.1183 Licensed Real Estate Broker LOCATION WINTER

More information

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University Campus Tornado Shelters Weather Department Environmental Health & Safety Northern Illinois University A B C D E F G H I J K L M N O P Q R S T U V W X Y Z A Academic Advising Center: South/southwest end

More information

ADMINISTRATION BUILDING

ADMINISTRATION BUILDING Tornado Procedures In case of a tornado warning, all individuals are encouraged to proceed to a designated safe place in the building in which you are present. At any time that the National Weather Service,

More information

ProgID Title Description FY18 FY19 MOF

ProgID Title Description FY18 FY19 MOF AIEA HIGH SCHOOL, OAHU PLANS AND DESIGN FOR A NEW BUILDING, AND RENOVATION AND EXPANSION FOR A GIRLS' ATHLETIC LOCKER ROOM, WEIGHT TRAINING FACILITY, AND OTHER ATHLETIC FACILITIES; GROUND AND SITE IMPROVEMENTS;

More information

ADMINISTRATION BUILDING

ADMINISTRATION BUILDING Tornado Procedures In case of a tornado warning, all individuals are encouraged to proceed to a designated safe place in the building in which you are present. At any time that the National Weather Service,

More information

Local Ballot Measure: E. Enterprise Elementary School District Bond Measure

Local Ballot Measure: E. Enterprise Elementary School District Bond Measure E Enterprise Elementary School District Bond Measure Ballot question To improve educational quality; upgrade/renovate/construct classrooms, restrooms and facilities; repair/replace leaky roofs; upgrade

More information

Athletics AT-SR. Storage 181E. 272 Auditorium 182F. Storage. 182D Nurse. 181K Workroom. 182G Cot Room 182E. Office. Restroom. Restroom.

Athletics AT-SR. Storage 181E. 272 Auditorium 182F. Storage. 182D Nurse. 181K Workroom. 182G Cot Room 182E. Office. Restroom. Restroom. 13-CC 199E Shower 197E Shower 199A Men's PE Locker Room 199D 197D 199C /Lockers 197C /Lockers 199B Staff 197B Staff 198 BG-SR Blue Gym Auxiliary Gymnasium A100 Sm A102 A104 A106 155 Boiler Room 155A Mechanical/

More information

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016 Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016 1 Project Team City: David Belmer Planning and Building Director Jonathan Borrego, AICP Planning Services Manager Gustavo

More information

Properties. TradeMark DOWNTOWN OFFICE SPACE FOR LEASE. 505 S. Duke Street, Durham, NC 27701

Properties. TradeMark DOWNTOWN OFFICE SPACE FOR LEASE. 505 S. Duke Street, Durham, NC 27701 505 S. Duke Street, Durham, NC 27701 FRED DICKENS (919) 227 5508 (Direct) (919) 673 4775 (Mobile) fdickens@trademarkproperties.com SARAH WARREN (919) 573 1755 (Direct) (919) 323 2331 (Mobile) swarren@trademarkproperties.com

More information

Commercial Property with Great Visibility for Sale or Lease. For Sale at $1,500, or For Lease at $12.00/SF NNN

Commercial Property with Great Visibility for Sale or Lease. For Sale at $1,500, or For Lease at $12.00/SF NNN EXECUTIVE SUMMARY Commercial Property with Great Visibility for Sale or Lease Monroe, Connecticut 06468 For Sale at $1,500,000.00 or For Lease at $12.00/SF NNN u 8,064 SF freestanding building on 0.95

More information

Smith Property Holdings Buchanan House, LLC. Nan Terpak, Agent/Attorney 2200 Clarendon Boulevard, 13th Floor Arlington, Virginia 22201

Smith Property Holdings Buchanan House, LLC. Nan Terpak, Agent/Attorney 2200 Clarendon Boulevard, 13th Floor Arlington, Virginia 22201 January 28, 2003 TO: FROM: APPLICANT: BY: SUBJECTS: The County Board of Arlington, Virginia Ron Carlee, County Manager Smith Property Holdings Buchanan House, LLC Nan Terpak, Agent/Attorney 2200 Clarendon

More information

Update on the New Avondale Public School

Update on the New Avondale Public School Community Meeting Update on the New Avondale Public School Monday, May 26, 2014 Agenda. Time: 7:00 8:30 p.m. Moderator: Manon Gardner 1. Welcome, Introductions and Purpose of Meeting Manon Gardner TDSB,

More information

Governors State University Tornado & Severe Weather Shelter Plan March 18, 2016

Governors State University Tornado & Severe Weather Shelter Plan March 18, 2016 Introduction Tornado and Severe Weather Shelter Areas on Campus Tornados produce violent winds, sometimes in excess of 250 miles per hour that can cause major property damage and loss of life. The greatest

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction February 2018 Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

More information

PLUMBING SYSTEMS CHAPTER 29

PLUMBING SYSTEMS CHAPTER 29 CHAPTER 29 PLUMBING SYSTEMS SECTION 2901 GENERAL 2901.1 Scope. The provisions of this chapter and the International Plumbing Code shall govern the erection, installation, alteration, repairs, relocation,

More information

Base Lease Rate: $12.00/SF, NNN.

Base Lease Rate: $12.00/SF, NNN. 3825 South Florida Ave. Suite 5 Lakeland, FL 33813 Rare Downtown Bartow Prime Corner Building on 1.05 Acre For Lease / Sale Phone: 863-619-6740 Fax: 863-619-6750 maria@mahoneygroupinc.com www.mahoneygroupinc.com

More information

Column 1 Column 2 Column 3 USE OR USE CATEGORY SPACES REQUIRED PER BASIC ADDITIONAL MEASURING UNIT. 2 per dwelling unit

Column 1 Column 2 Column 3 USE OR USE CATEGORY SPACES REQUIRED PER BASIC ADDITIONAL MEASURING UNIT. 2 per dwelling unit Sections: 10-101 Parking Requirements 10-102 Interpretation of the Chart 10-103 Joint Use and Off-Site Facilities 10-104 Design Standards 10-105 Performance Standards 10-101 Parking Requirements: When

More information

Charles Kozminski Elementary Community Academy

Charles Kozminski Elementary Community Academy Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Pulaski Park Framework Plan. Proposed by: Department of Planning and Development Chicago Park District

Pulaski Park Framework Plan. Proposed by: Department of Planning and Development Chicago Park District Pulaski Park Framework Plan Proposed by: Department of Planning and Development Chicago Park District Table of Contents Framework Plan Purpose Page 2 Location Page 3 Aerial Map Page 3 Base Map Page 4 History

More information

Landmark District Proposed on Northwestern University's Chicago Campus

Landmark District Proposed on Northwestern University's Chicago Campus FOR IMMEDIATE RELEASE July 30, 2014 Mayor s Press Office (312) 744-3334 press@cityofchicago.org Department of Planning and Development (DPD) (312) 744-9267 Landmark District Proposed on Northwestern University's

More information

12/18/2017. Objective. Accessibility Code MN 1341 Frequent Questions and Key Criteria. Agenda. Code Documents

12/18/2017. Objective. Accessibility Code MN 1341 Frequent Questions and Key Criteria. Agenda. Code Documents Objective Accessibility Code MN 1341 Frequent Questions and Key Criteria Highlight frequently asked Accessibility Code Questions Review the intent of the requirements Clarify the why behind the what of

More information

237 S Florence Ave, Springfield, MO 65806

237 S Florence Ave, Springfield, MO 65806 McDaniel School; Center City 237 S Florence Ave, Springfield, MO 65806 Listing ID: 28829729 Status: Active Property Type: Office For Sale Office Type: Executive Suites, Institutional Size: 24,300 SF Sale

More information

Guide to the Morley Baer Photographs,

Guide to the Morley Baer Photographs, http://oac.cdlib.org/findaid/ark:/13030/tf8s20074n No online items Processed by Patricia White; machine-readable finding aid created by Patricia White Department of Special Collections Green Library Stanford

More information

ARCHITECTURAL FACT SHEET

ARCHITECTURAL FACT SHEET 2 E 91ST STREET NEW YORK NY 10128 COOPERHEWITT.ORG ARCHITECTURAL FACT SHEET June 17, 2014 MEDIA ONLY LAURIE BOHLK COOPER HEWITT 212.849.8420 BOHLKL@SI.EDU JENNIFER NORTHROP COOPER HEWITT 212.849.2954 NORTHROPJ@SI.EDU

More information

Kyle Seale MS. Kuentz Road ES. Ward ES. Hoffmann ES. Brennan HS. Rayburn MS

Kyle Seale MS. Kuentz Road ES. Ward ES. Hoffmann ES. Brennan HS. Rayburn MS Kyle Seale MS Kuentz Road ES Ward ES Alamo Ranch MS Hoffmann ES Brennan HS Langley ES John Jay HS Rayburn MS BRENNAN HIGH SCHOOL a. Name and Location of Building: Brennan High School Potranco West San

More information

Exclusively For Lease

Exclusively For Lease Exclusively For Lease Unique Commercial Space! 786 College Parkway, Colchester, Vermont 4 floors totaling 15,696+/- square feet Very recently upgraded General Development 2 Zoning Open Sunny Environment

More information

Final RRISD Bond 2018/19 Project List 3 Yr Sale

Final RRISD Bond 2018/19 Project List 3 Yr Sale Capital Renewal Anderson Mill ES ELEC Replace electric panels, Capital Renewal Anderson Mill ES ELEC Replace Main Switch Gear 97,200 Capital Renewal Anderson Mill ES Controller Replacement/Programming

More information

237 S Florence Ave, Springfield, MO 65806

237 S Florence Ave, Springfield, MO 65806 Prepared by Ken Schwab, Wilhoit Properties Apr 11, 2014 on Commercial IQ 417.860.1502 [M] 417.890.3226 [O] kschwab@wilhoitproperties.com Licensed to practice Real Estate in Missouri McDaniel School; Center

More information

FOR LEASE RARE CENTRAL SAN DIEGO LOCATION ± 110,819 SF CORPORATE CAMPUS OPPORTUNITY /10130/10150 Sorrento Valley Road San Diego, CA 92121

FOR LEASE RARE CENTRAL SAN DIEGO LOCATION ± 110,819 SF CORPORATE CAMPUS OPPORTUNITY /10130/10150 Sorrento Valley Road San Diego, CA 92121 ± 110,819 SF CORPORATE CAMPUS OPPORTUNITY 10110/10130/10150 Sorrento Valley Road San Diego, CA 92121 RARE CENTRAL SAN DIEGO LOCATION www.ngkf.com ± 110,819 SF CORPORATE CAMPUS OPPORTUNITY 10110/10130/10150

More information

Washington State Energy Code TABLE C (2) INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD

Washington State Energy Code TABLE C (2) INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD Washington State Energy Code TABLE C405.4.2(2) COMMON SPACE-BY-SPACE TYPES a LPD (w/ft 2 ) Atrium - First 40 feet in height Atrium - Above 40 feet in height Audience/seating area - Permanent 0.03 per ft.

More information

FOR LEASE Ground Floor Retail or Office

FOR LEASE Ground Floor Retail or Office THE PALMS BANK BUILDING FOR LEASE Ground Floor Retail or Office 3343 MOTOR AVENUE LOS ANGELES, CA 90034 NEAL GOLUB Vice President Lic 01023733 T +1 310 550 2667 neal.golub@cbre.com SPECS FRONT RETAIL/OFFICE

More information

The BSF project, September to December A photo timeline by Jack and Jacob Harris

The BSF project, September to December A photo timeline by Jack and Jacob Harris The BSF project, September to December 2012 A photo timeline by Jack and Jacob Harris September 2012 Many areas of the building reopened following refurbishment over the summer holidays. Substantial transformations

More information

Facilities. A Brief Overview: How to Secure a Facility for Your. Charter School

Facilities. A Brief Overview: How to Secure a Facility for Your. Charter School Charter School Facilities A Brief Overview: How to Secure a Facility for Your Charter School Contents 1. Forming a Facilities Team 2. Creating a Timeline 3. Identifying Your Need 4. Searching for the Ideal

More information

Tidewater Community College Crisis and Emergency Management Plan Appendix F Emergency Operations Plan. Annex 4 Tornado/Severe Weather

Tidewater Community College Crisis and Emergency Management Plan Appendix F Emergency Operations Plan. Annex 4 Tornado/Severe Weather Tidewater Community College Crisis and Emergency Management Plan Appendix F Emergency Operations Plan A. Purpose Annex 4 Tornado/Severe Weather These procedures apply in cases of locally severe weather,

More information

Base Lease Rate: $12.00/SF, NNN. Sale/Purchase Price: $1,025,000.00

Base Lease Rate: $12.00/SF, NNN. Sale/Purchase Price: $1,025,000.00 3825 South Florida Ave. Suite 5 Lakeland, FL 33813 Rare Downtown Bartow Prime Corner Building on 1.05 Acre For Lease / Sale Phone: 863-619-6740 Fax: 863-619-6750 maria@mahoneygroupinc.com www.mahoneygroupinc.com

More information

Pico Branch Library at Virginia Ave Park

Pico Branch Library at Virginia Ave Park Pico Branch Library at Virginia Ave Park Koning Eizenberg Schematic Design Workshop April 5, 2011 AGENDA 1. introductions 2. where we were 3. where we are now 4. what happens next PROJECT HISTORY September

More information

Mt. Pleasant Farmhouse. at the Howard County Conservancy

Mt. Pleasant Farmhouse. at the Howard County Conservancy Mt. Pleasant Farmhouse at the Howard County Conservancy Original painting by Alice Webb - 2011 Timeline of the Farmhouse It is believed that the farmhouse, as it stands today, was constructed or renovated

More information

ALL SENIORS CARE 175 BLOOR ST. E. SOUTH TOWER,STE.601 TORONTO, ONTARIO Dundas St. W. Oakville, Ontario, Canada, L6M 4H6 CLIENT

ALL SENIORS CARE 175 BLOOR ST. E. SOUTH TOWER,STE.601 TORONTO, ONTARIO Dundas St. W. Oakville, Ontario, Canada, L6M 4H6 CLIENT 75 BLOOR ST. E. SOUTH TOWER,STE.60 S ZBA SUBMISSION /NOV/07 Toronto ON M4V Y7 Canada 35 Dundas St. W., Oakville 35 Dundas St. W. 063 - NOV - 07 COVER PAGE / STATISTICS A000 75 BLOOR ST. E. SOUTH TOWER,STE.60

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction January 2019 Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

More information

12325 EMMET STREET. $1,900, ($ psf) 17,754 SF OFFICE FOR SALE Emmet Street Omaha, Nebraska * * CERTIFIED *

12325 EMMET STREET. $1,900, ($ psf) 17,754 SF OFFICE FOR SALE Emmet Street Omaha, Nebraska * * CERTIFIED * OFFICE FOR SALE 12325 EMMET STREET $1,900,000.00 ($107.02 psf) 17,754 SF HIGHLIGHTS Northwest Omaha office building for sale or lease New roof 2015, upgraded exterior, new parking lot lights, etc. Tons

More information

Funding Capital Projects: CHEFA Financed Bond Sales for Auxiliary Services Facilities FY

Funding Capital Projects: CHEFA Financed Bond Sales for Auxiliary Services Facilities FY Slide # 1 Funding Capital Projects: CHEFA Financed Bond Sales for Auxiliary Services Facilities FY 2012-13 Prepared by: William Bowes, Chief Finance Officer, Board of Regents Elaine Clark, VP for Real

More information

Muhlenberg College- Campus Accessibility

Muhlenberg College- Campus Accessibility Muhlenberg College- Campus Accessibility Muhlenberg College continues to strive toward accessibility for all of its buildings. Academic Buildings: Anthropology/Sociology- Shared building- see Hillel for

More information

Glendale Municipal Golf Courses Glen Lakes Analysis. City Council Workshop November 13, 2018

Glendale Municipal Golf Courses Glen Lakes Analysis. City Council Workshop November 13, 2018 Glendale Municipal Golf Courses Glen Lakes Analysis City Council Workshop November 13, 2018 Today s Presentation Notice of Violation Temporary Golf Course Operations Maintenance Building & Irrigation System

More information

1343 E Kingsley St, Springfield, MO 65804

1343 E Kingsley St, Springfield, MO 65804 Spacious Modern Office inside Tuscany Court 1343 E Kingsley St, Springfield, MO 65804 Listing ID: 30163728 Status: Active Property Type: Office For Lease Office Type: Office Building Contiguous Space:

More information

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT Number 2 - Version 2 Survey TALLAHASSEE COMMUNITY COLLEGE PAGE:1 of 49 Section 1: Survey Details PAGE:2 of 49 TALLAHASSEE COMMUNITY COLLEGE Number 2 - Version

More information

Commercial Property with Great Visibility for Sale or Lease. For Sale at $1,500, or For Lease at $12.00/SF NNN

Commercial Property with Great Visibility for Sale or Lease. For Sale at $1,500, or For Lease at $12.00/SF NNN EXECUTIVE SUMMARY Commercial Property with Great Visibility for Sale or Lease Monroe, Connecticut 06468 For Sale at $1,500,000.00 or For Lease at $12.00/SF NNN! 8,064 SF freestanding building on 0.95 acres

More information

WEST END BUSINESS CENTER 54 GM ACCESS ROAD, MARTINSBURG, WEST VIRGINIA

WEST END BUSINESS CENTER 54 GM ACCESS ROAD, MARTINSBURG, WEST VIRGINIA WEST END BUSINESS CENTER 54 GM ACCESS ROAD, MARTINSBURG, WEST VIRGINIA NEAR EXIT 16 OF I-81 Designed and constructed by local business leaders; occupied by the local business leaders; managed by the local

More information

CAMBOURNE VILLAGE COLLEGE: THE BRIEF/ SITE

CAMBOURNE VILLAGE COLLEGE: THE BRIEF/ SITE CAMBOURNE VILLAGE COLLEGE: THE BRIEF/ SITE THE BRIEF: EXISTING SITE ACCESS AND SURFACE TREATMENTS Cambridgeshire County Council have identified the need for the provision of additional secondary school

More information