1 Canadian Wood Council G063 TIMBER FOR THE MASSES Liam Dewar, Director, EURBAN October 27, 2015
2 Credit(s) earned on completion of this course will be reported to AIA CES for AIA members. Certificates of Completion for both AIA members and non-aia members are available upon request. This course is registered with AIA CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.
3 Course Description With so many compelling reason to build with mass timber the question is no longer why? but how?. As a construction method in its own right, mass timber construction has its own rules and regulations which need to be understood by all if mass timber is to achieve its potential of becoming the construction method of choice for most building types. This presentation will discuss focus on best practice in terms of design, procurement and construction through a number of case studies of recent projects that Eurban have been involved in.
4 Learning Objectives At the end of the this course, participants will be able to: Key learning points: KEY LEARNING OBJECTIVE 1 Understand what is being done in the UK in order to optimise the delivery of mass timber projects in terms of design and construction. KEY LEARNING OBJECTIVE 2 Understand the role of a CLT designer / specialist contractor on mass timber building projects and how knowledge and experience can inform design decisions and help deliver such projects effectively and safely. KEY LEARNING OBJECTIVE 3 Understand the risks associated with the design and delivery of large-scale mass timber buildings and how one might overcome such risks KEY LEARNING OBJECTIVE 4 Understand how mass timber construction differs from concrete construction and stick build construction, particularly in terms of the perceived risks of fire and moisture, and how to design for them.
5 Timber for the Masses Building a Timber Revolution LIAM DEWAR
6 Winery, Vauvert, France, 1998 Perraudin Architecture Gilles Perraudin, 1 installer IMAGE PERRAUDIN ARCHITECTURE
7 Architecture should be about satisfying a social need, not about addressing a financial condition. Using natural materials will escape the constraints of speculative industries, and return to a socially-alert, environmentally sustainable architecture. Gilles Perraudin, 2013
8 Can Lis & Can Feliz, Majorca, 1971 & 1994 Jørn Utzon IMAGE JAN UTZON
9 Can Lis, Porto Petro, Majorca, 1971 Jørn Utzon We have to understand the structure of wood, the weight and hardness of stone, the character of glass; we must become at one with our materials and be able to fashion and use them in accordance with their constitution. Jørn Utzon, The Innermost Being of Architecture, 1948
10 Brettstapel Dowelled or Nailed Laminated Timber (NLT)
11 Crosslam Cross Laminated Timber (CLT) IMAGEE STORA ENSO
12 Advantages of Crosslam
13 Structural Stability 7-Storey Test Building, Miki, Japan, 2007 IMAGE PROGETTOSOFIE
14 Dimensional Stability Unaffected by Moisture (within reason) IMAGE EURBAN
15 Dimensional Stability Unaffected by Temperature IMAGE EURBAN
16 Simplicity Airtightness IMAGE EURBAN
17 Simplicity Large Components (Less Joints) IMAGE DAVID GRANDORGE
18 Simplicity No Movement Joints IMAGE EURBAN
19 Simplicity Interface Detailing Support Structure IMAGE EURBAN
20 Simplicity Interface Details - Windows IMAGE EURBAN
21 Simplicity M&E Services IMAGE EURBAN
22 Thermal Stability Mass Timber - Five times better than Concrete MATERIAL THERMAL STABILITY λ / c.ρ (cm2/s) Mass Timber 12 Water 14 Brickwork 44 Concrete 68 SIP Panel (EPS) 167 Air 2,500 IMAGE EURBAN
23 Climate Stability Mass Timber Buildings - Eighty times better than Firewood TIMBER USE LIFE EXPECTANCY Timber Structure Woodfibre Insulation Furniture Books Wood Products Packaging Firewood 80 years 60 years 30 years 25 years 10 years 2 years 1 year IMAGEE EURBAN
24 Climate Stability The quickest and most cost-effective Carbon Store IMAGEE EURBAN
25 Health Benefits Reduced Heart Rate 600 heartbeats less per day IMAGE SOS
26 Health Benefits Reduced Heart Rate Medical evidence that timber as a construction material has a positive influence on human health. Evidence to support the argument that mass timber construction should be the favoured construction method for all buildings. IMAGE SOS
27 Arcadia Nursery, Edinburgh, Scotland, 2015 Malcolm Fraser Architects Eurban LIAM DEWAR IMAGE ANGUS BREMNER
28 Arcadia Nursery Designed around the concept of free play Children choose what activities they would like to participate in instead of being allocated to a playroom for the day. A place to learn, play and imagine LIAM DEWAR IMAGE M J RICHARDSON
29 Arcadia Nursery LIAM DEWAR IMAGE MFA
30 Arcadia Nursery LIAM DEWAR IMAGE EURBAN
31 Arcadia Nursery LIAM DEWAR IMAGE EURBAN
32 Arcadia Nursery LIAM DEWAR IMAGE EURBAN
33 Arcadia Nursery LIAM DEWAR IMAGE EURBAN
34 Arcadia Nursery LIAM DEWAR IMAGE EURBAN
35 Arcadia Nursery LIAM DEWAR IMAGE EURBAN
36 Arcadia Nursery LIAM DEWAR IMAGE EURBAN
37 Arcadia Nursery LIAM DEWAR IMAGE ANGUS BREMNER
38 Arcadia Nursery LIAM DEWAR IMAGE ANGUS BREMNER
39 Arcadia Nursery LIAM DEWAR IMAGE ANGUS BREMNER
40 Arcadia Nursery LIAM DEWAR IMAGE ANGUS BREMNER
41 Arcadia Nursery LIAM DEWAR IMAGE ANGUS BREMNER
42 Arcadia Nursery LIAM DEWAR IMAGE M J RICHARDSON
43 Arcadia Nursery LIAM DEWAR IMAGE ANGUS BREMNER
44 Crosslam Considerations IMAGE EURBAN
45 Logistics (maximum panel size) Road Transport IMAGE EURBAN
46 Logistics (maximum panel size) Site Access IMAGE BINDER HOLZBAUSYSTEME
47 Logistics Craneage IMAGE EURBAN
48 Logistics Craneage IMAGE EURBAN
49 Health & Safety Not Like This.. IMAGE MERK
50 LIAM DEWAR Mass Timber Construction in the UK
51 UK Service Providers Specialist Sub-Contractors & Market Share (Projects) We estimate that approximately 450 solid timber projects have been delivered in the UK to date, approx. 200 in the last 4 years. DESIGN-LED SUPPLY-LED CONTRACTOR-LED 45% 40% 15% LIAM DEWAR IMAGE EURBAN
52 UK Built Projects LIAM DEWAR SCOURCE: TIMBER FIRST
53 Eurban What We Are Eurban is a consultancy and construction company specializing in the design, procurement and delivery of solid timber building structures LIAM DEWAR
54 What We Do Architect / Employer Perspective LIAM DEWAR IMAGE EURBAN
55 What We Do Supplier Perspective DESIGN ASSEMBLY LIAM DEWAR IMAGE EURBAN
56 Integrated Service Provider Design, Supply & Install TIMBER DESIGN MATERIAL SUPPLY SITE ASSEMBLY LIAM DEWAR IMAGE EURBAN
57 Timber Design Integrated Service Provider In-house Specialist Timber Engineers 3D CAD & BIM technology Level 2 TIMBER DESIGN LIAM DEWAR IMAGE EURBAN
58 Material Supply Integrated Service Provider CAD interface direct with manufacturers Project-specific solutions Work with leading European manufacturers MATERIAL SUPPLY LIAM DEWAR IMAGE EURBAN
59 Materials Supply Transportation LIAM DEWAR IMAGE EURBAN
60 Site Assembly Integrated Service Provider Directly-employed site installation teams Valuable feedback and lessons learnt from every project delivered. Retained knowledge / skill base SITE ASSEMBLY LIAM DEWAR IMAGE EURBAN
61 In-house Installers Quality on Site (Workmanship) LIAM DEWAR IMAGES DAVID GRANDORGE & ED REEVE
62 In-house Installers Safer Build Process Statistics fatalities 0 major injuries 0 dangerous occurrences 0 reportable ill-health 3 non-reportable incidents LIAM DEWAR IMAGE EURBAN
63 LIAM DEWAR Eurban Services
64 Component Modelling For Costing Purposes LIAM DEWAR IMAGE EURBAN
65 Design Guidance For Architects / Client Reassurance LIAM DEWAR IMAGE EURBAN
66 Timber Engineering For Design Verification & Issue to Approval Bodies LIAM DEWAR IMAGE EURBAN
67 Fabrication & Delivery Information For Component Manufacture & Issue to Manufacturers LIAM DEWAR IMAGE EURBAN
68 Logistics For Programming & Issue to Main Contractor (Employer) LIAM DEWAR IMAGE EURBAN
69 Assembly Drawings For Site Teams LIAM DEWAR IMAGE EURBAN
70 Dune House, Suffolk, 2009 LIAM DEWAR IMAGE JVA
71 Timber Engineering LIAM DEWAR IMAGE EURBAN
72 Drawings Approval Manufacture LIAM DEWAR IMAGE EURBAN
73 Panelisation LIAM DEWAR IMAGE EURBAN
74 Materials Procurement LIAM DEWAR IMAGE EURBAN
75 Drawings Site Information LIAM DEWAR IMAGE EURBAN
76 Site Assembly LIAM DEWAR IMAGE EURBAN
77 Site Assembly LIAM DEWAR IMAGE EURBAN
78 Site Assembly LIAM DEWAR IMAGE EURBAN
79 Site Assembly LIAM DEWAR IMAGE EURBAN
80 Site Assembly LIAM DEWAR IMAGE EURBAN
81 European CLT Production IMAGE TU GRAZ
82 LIAM DEWAR IMAGE LIVING ARCHITECTURE
83 LIAM DEWAR IMAGE LIVING ARCHITECTURE
84 Eurban Projects Project Breakdown by Package Value Breakdown of Projects 2012/ /15 35% Contracts up to $200k CAD 50% Contracts from $200k to $1m CAD 15% Contracts over $1m CAD LIAM DEWAR
85 Mass Timber Projects
86 Henry Yorke Mann Architect 14 Mass Timber Residences, North Vancouver, Integral natural materials, as opposed to synthetic, or plastic materials, are utilized for their timeless qualities, inherent safety and predictability, and their non-toxicity to humans. IMAGE BARRY DOWNS
87 Clark Residence, North Vancouver, 1969 Henry Yorke Mann Senec & Mann IMAGE RICHARD OLSEN
88 Clark Residence, 1969 Henry Yorke Mann Senec & Mann IMAGE RICHARD OLSEN
89 Clark Residence, 1969 Henry Yorke Mann Senec & Mann IMAGE RICHARD OLSEN
90 Clark Residence, 1969 Henry Yorke Mann Senec & Mann Constructed of 4" solid fir planks splined to each other - treated on the exterior with a preservative and on the interior with a wax sealer. IMAGE HENRY YORKE MANN
91 Studio in Bristol, Wisconsin, USA, 1970 Alfred Caldwell IMAGE ARCHITECTURE AND NATURE
92 Studio in Bristol, Wisconsin, USA, 1970 Alfred Caldwell The four inch depth of wood is its own insulation, so the building is intrinsically warm in winter and cool in Summer. Werner Blaser Architecture and Nature: The Work of Alfred Caldwell IMAGE ARCHITECTURE AND NATURE
93 Colosseum, Rome, 80 AD Flavian Dynasty Skilled Roman Builders & 100,000 Prisoners 0.39m 3 stone / ft 2 area SOURCE: BUILDING THE COLLOSEUM IMAGE DUDVA WIKIMEDIA
94 Colosseum, Rome, 80 AD The invention of concrete enabled this massive building to be built quickly, efficiently and to great effect. Early example of off-site manufacture (stairs and seats) SOURCE: BUILDING THE COLLOSEUM
95 Norwich Open Academy, Norfolk, 2010 Sheppard Robson Ramboll UK KLH UK, 12 installers 0.03m 3 timber / ft 2 area (7.7%) IMAGE HUFTON + CROW
96 Tower Houses, Ireland & Scotland, 1400s JD O Donaghue IMAGE JG O DONOGHUE
97 Stadthaus, London, 2008 Waugh Thistleton Techniker KLH UK, 6 Austrians 0.036m 3 timber / ft 2 area (20% more) LIAM DEWAR IMAGE WAUGH THISTLETON
98 Carbon Offset British Citizen, 1970s British Citizen: Carbon Footprint = 789 t CO 2 e Crosslam Equivalent = 1,000 m 3 Building Equivalent = 32,300 ft 2 Housing Equivalent = 20 houses IMAGE STEVE COLEMAN
99 Timber Resource British Columbia Mountain Pine Beetle British Columbia: Dead Pine = 1 billion m 3 Crosslam Equivalent = 333 million m 3 Building Equivalent = 1 billion ft 2 Housing Equivalent = 620,000 houses Carbon Offset = 31,000 people IMAGE PROVINCE OF BRITISH COLUMBIA
100 Two Options More timber houses: Build timber in lieu of concrete; Build more houses (more completions / annum) More timber per house: Mass timber rather than timber frame; Heavy mass timber increase m 3 timber / ft 2 area Use woodfibre insulation, timber cladding, etc. IMAGE PROVINCE OF BRITISH COLUMBIA
101 Heavy Mass Timber Mass Timber Structure + Insulation + Cladding IMAGE EURBAN
102 Sunken House, London, 2006 Adjaye Associates Eurban, 4 installers 0.045m 3 timber / ft 2 area (50% more) IMAGE ED REEVE
103 Sunken House IMAGE EURBAN
104 Sunken House IMAGE EURBAN
105 Sunken House IMAGE EURBAN
106 Sunken House IMAGE EURBAN
107 Sunken House IMAGE EURBAN
108 Sunken House IMAGE EURBAN
109 Sunken House IMAGE MERK TIMBER
110 Sunken House IMAGE MERK TIMBER
111 Sunken House IMAGE MERK TIMBER
112 Sunken House IMAGE EURBAN
113 Sunken House IMAGE EURBAN
114 Sunken House IMAGE EURBAN
115 Sunken House IMAGE EURBAN
116 Sunken House
117 Sunken House
118 Sunken House
119 Sunken House IMAGE EURBAN
120 Sunken House IMAGE EURBAN
121 Sunken House LIAM DEWAR IMAGE EURBAN
122 Sunken House IMAGE ED REEVE
123 Sunken House IMAGE EURBAN
124 Sunken House
125 Sunken House IMAGE EURBAN
126 Sunken House IMAGE EURBAN
127 Sunken House IMAGE EURBAN
128 Sunken House IMAGE EURBAN
129 Sunken House IMAGE EURBAN
130 Sunken House IMAGE EURBAN
131 Sunken House IMAGE EURBAN
132 Sunken House IMAGE EURBAN
133 Sunken House
134 Sunken House IMAGE EURBAN
135 Sunken House IMAGE EURBAN
136 Sunken House IMAGE EURBAN
137 Sunken House IMAGE ED REEVE
138 Sunken House IMAGE ED REEVE
139 Sunken House IMAGE ED REEVE
140 Sunken House IMAGE ED REEVE
141 Sunken House, London, 2006 Project Data CLIENT Private ARCHITECT Adjaye Associates CONCRETE ENGINEER Techniker TIMBER ENGINEER Eurban MAIN CONTRACTOR None (Construction Management) TIMBER CONTRACTOR Eurbanm2 FLOOR AREA 1,615 ft 2 INSTALLATION PERIOD 1 week MATERIALS USED Crosslam / LVL / Cassettes MANUFACTURER Merk Timber COMPONENT THICKNESSES 160mm (Walls); 300mm (Roof) STORED CARBON 58 t CO2e
142 Architecture Archive, Somerset, 2014 Hugh Strange Architects Eurban, 4 installers 0.075m 3 timber / ft 2 area (150% more) IMAGE DAVID GRANDORGE
143 Architecture Archive IMAGE HUGH STRANGE ARCHITECTS
144 Architecture Archive IMAGE HUGH STRANGE ARCHITECTS
145 Architecture Archive IMAGE HUGH STRANGE ARCHITECTS
146 Architecture Archive IMAGE EURBAN
147 Architecture Archive IMAGE EURBAN
148 Architecture Archive IMAGE EURBAN
149 Architecture Archive IMAGE DAVID GRANDORGE
150 Architecture Archive IMAGE DAVID GRANDORGE
151 Architecture Archive IMAGE DAVID GRANDORGE
152 Architecture Archive IMAGE DAVID GRANDORGE
153 Architecture Archive IMAGE DAVID GRANDORGE
154 Architecture Archive IMAGE EURBAN
155 Architecture Archive IMAGE DAVID GRANDORGE
156 Architecture Archive IMAGE DAVID GRANDORGE
157 Architecture Archive IMAGE DAVID GRANDORGE
158 Architecture Archive IMAGE DAVID GRANDORGE
159 Architecture Archive IMAGE DAVID GRANDORGE
160 Winery, Vauvert, France, 1998 Perraudin Architecture Gilles Perraudin, 1 installer IMAGE PERRAUDIN ARCHITECTURE
161 Architecture Archive IMAGE DAVID GRANDORGE
162 Architecture Archive IMAGE DAVID GRANDORGE
163 Architecture Archive, Somerset, 2014 Project Data CLIENT Private ARCHITECT Hugh Strange Architects CONCRETE ENGINEER Price & Myers TIMBER ENGINEER Eurban MAIN CONTRACTOR None (Construction Management) TIMBER CONTRACTOR Eurban/ m2 FLOOR AREA 1,290 ft 2 INSTALLATION PERIOD 2 weeks MATERIALS USED Crosslam / Glulam MANUFACTURER Stora Enso Wood Products COMPONENT THICKNESSES 300mm (Walls); 420mm (Roof) STORED CARBON t CO2e
UMass Amherst Design Building Leading the Way with Mass Timber Solutions
UMass Amherst Design Building Leading the Way with Mass Timber Solutions Tom S. Chung, AIA LEED BD+C Principal, Leers Weinzapfel Associates Disclaimer: This presentation was developed by a third party
More informationUMass Design Building A Firsthand Account from Design through Owner Occupancy
UMass Design Building A Firsthand Account from Design through Owner Occupancy Tom S. Chung, AIA LEED BD+C, Principal, Leers Weinzapfel Associates Peggi L. Clouston, PEng, MASc, PhD, University of Massachusetts
More informationRIBA Tender Brief RIBA Core CPD 2018 programme
Royal Institute of British Architects RIBA Tender Brief RIBA Core CPD 2018 programme 1.0 Context The RIBA CPD programme is designed to help delegates get the CPD they need. Methods of CPD learning are
More informationDelivering Construction 2025 RIBA Action Plan. RIBA Award Winners Endorsed by the Construction Industry Council
Delivering Construction 2025 RIBA Action Plan RIBA Award Winners 2014 Endorsed by the Construction Industry Council Good design UK Government recognises the role of the UK s world class expertise in architecture
More informationCutting-edge Building Skins and Structures
Cutting-edge Building Skins and Structures Barbara McDuffie, Baker Tilly Virchow Krause, LLP Steve White, AIA LEED AP BD+C, Fentress Architects Jeff Vaglio, PhD, PE, AIA, Enclos Corp Barbara Schaefer McDuffie,
More informationArchitecture - Reaching for the Sky
Reading Practice Architecture - Reaching for the Sky Architecture is the art and science of designing buildings and structures. A building reflects the scientific and technological achievements of the
More informationUMass Design Building
UMass Design Building: Timber Talk Dr. Peggi Clouston, Ph.D., P. Eng. Associate Professor Building and Construction Technology Program, UMass clouston@umass.edu UMass Design Building, Amherst MA UMass
More informationCHANGE IN VALUE ALTERATIONS MADE OCCUPANCY CHANGES
INTRODUCTION This assignment is based on a residential house situated on 104 Rochester Road in Salt River, Cape Town. The house has an erf size of 238m 2 and floor size 350.82 m 2 with two storeys. The
More informationRawlinson House, Lewisham, London SE13 5EL
Rawlinson House, Lewisham, London SE13 5EL Client: Lewisham Homes Old Town Hall Catford London SE6 4RU Date: 18 February 2016 Job No: 2540-MA-N-RP-0001-D00 Martin Arnold Ltd 4 Gunnery Terrace The Royal
More informationUK Housing Awards 2011
UK Housing Awards 2011 Excellence in Housing Finance and Development: Finalist North Lanarkshire Council: Building For The Future Summary North Lanarkshire Council has been proactive in establishing, developing
More informationGlobal Markets and Cost Comparison for Tall Timber Buildings Andrew Dunn CEO Timber Development Association
Global Markets and Cost Comparison for Tall Timber Buildings Andrew Dunn CEO Timber Development Association Contents Australia s Tall Timber Buildings and CLT use to date Cost Comparison Tall Timber Buildings
More informationChecker Building Architectural Design and Details
Checker Building Architectural Design and Details Dr. Mohamad Nadim Adi 1, Robert Drew 2, Dr. Mohamad Al-Hussein 1 University of Alberta 1, Perkins + Will 2 Introduction Wood is one of the most widely
More informationExpanding the Use of Wood Products
Expanding the Use of Wood Products Non-residential and Multifamily/Midrise April 7, 2015 2016 Wood Design Award Winner: Commercial Wood Design Framework Works Partnership Architecture, TM Rippey Consulting
More informationProject Overview. Midwest Commerce Center Gardner, Kansas. Continued on next page.
Midwest Commerce Center Gardner, Kansas Midwest Commerce Center is a 155-acre premier business park that represents a $160,000,000 investment in the Gardner community. The park has been master planned
More informationPrecedent Analysis arc 572 UT Solar Decathlon 2009 Pierre Koenig Case Study House #22 I 1959
01 The Stahl House The Stahl House, or Case Study House No.22, was designed by Pierre Koenig in 1959. It was the second House which Koenig had deigned for a competition hosted by Arts and Architecture
More informationProperty Management through the eyes of an owner - A Better Solution for your Property Management Needs
PROPERTY MANAGEMENT Maximizing the value of your asset requires an understanding of every aspect of real estate. By utilizing a full-service developer and builder for your property management needs, you
More informationCorporate. Report COUNCIL DATE: March 24, Mayor & Council NO: R056 REGULAR COUNCIL TO: DATE: March 20, 2003 FILE:
Corporate NO: R056 Report COUNCIL DATE: March 24, 2003 REGULAR COUNCIL TO: Mayor & Council DATE: March 20, 2003 FROM: General Manager, Planning & Development FILE: 4815-20 SUBJECT: Home Ownership Assistance
More informationAJ / Curtins Inspiring Graduate Award Darren Wilson, ArchitecturePLB
AJ / Curtins Inspiring Graduate Award 2015 Darren Wilson, ArchitecturePLB Hertfordshire Community Free Schools Hertfordshire County Council / Balfour Beatty, 2015, 12m Two new 2FE primary schools each
More informationA new home, a new life
A new home, a new life An exclusive development of stylish homes Phase I BaronsGrange, a home to grow with your family Perfectly located Located in the thriving community of Carryduff, BaronsGrange is
More informationBrown + Brown Architects
practice profile Brown + Brown Architects are an award winning design-led architecture practice, based in Aberdeen and Inverness, with a passion for materials, detail and craftsmanship. Our architecture
More informationUK Housing Awards 2011
UK Housing Awards 2011 Excellence in Housing Finance and Development: Winner Rettie & Co, Springfield Properties and DCHA: Resonance at Moray Apartments, Edinburgh Summary In this climate of constrained
More informationSPECIALIST, EXPERIENCED ADVICE THAT PUTS YOU IN CONTROL OF YOUR CONSTRUCTION PROJECT
SPECIALIST, EXPERIENCED ADVICE THAT PUTS YOU IN CONTROL OF YOUR CONSTRUCTION PROJECT CLIENT ADVISERS Royal Institute of British Architects 66 Portland Place London W1B 1AD T 020 7580 5533 www.architecture.com
More informationMulti-let industrial investment
GVA James Barr Multi-let industrial investment Units 1-8 Oakbank Park Way Oakbank Industrial Estate Livingston EH53 0TH gva.co.uk/7710 High Yielding, Multi-let Industrial Investment Modern, multi-let industrial
More informationCANADA - WITHDRAWAL OF TARIFF CONCESSIONS. Report of the Panel on Lead and Zinc adopted on 17 May 1978 (L/ S/42)
28 April 1978 I. INTRODUCTION CANADA - WITHDRAWAL OF TARIFF CONCESSIONS Report of the Panel on Lead and Zinc adopted on 17 May 1978 (L/4636-25S/42) 1. The Panel was established by the Council on 12 November
More informationPurchase Terms and Conditions
THE FOLLOWING TERMS AND CONDITIONS GOVERN ALL SALES OF PRODUCTS AND MATERIALS ( GOODS ) BY FIBERESIN INDUSTRIES, INC. OF OCONOMOWOC, WISCONSIN INCLUDING ITS EDGEMOLD PRODUCTS DIVISION ( SELLER ) TO ITS
More informationPENLLERGAER BUSINESS PARK, SWANSEA INDUSTRIAL INVESTMENT
PENLLERGAER BUSINESS PARK, SWANSEA INDUSTRIAL INVESTMENT MOTORWAY SERVICES M4/J47 M4 DRAGON 24 OFFICE DEVELOPMENT (UNDER CONSTRUCTION) M4 TO CARDIFF NPT COUNCIL OFFICES EMS WELSH ASSEMBLY GOVERNMENT OFFICES
More informationStark HS. Housing Solutions. By:
Stark HS Housing Solutions Stark HS Constructive technology based on a system of precast Models and spaces Stark HS offers a range of models with different construction areas between 47 and 158 m2, in
More informationARCHITECTS BRIEF (development year to RIBA stage 3 with option to progress to 7)
1. Luton Culture A lump sum quotation is sought for the Architectural Design to be undertaken as follows: Development Phase Works up to and including RIBA Stage 3 (including preparing planning application);
More informationEdinburgh Research Explorer
Edinburgh Research Explorer The innovative lightweight buildings and systems of Jean Prouvé Citation for published version: Pedreschi, R 2008, The innovative lightweight buildings and systems of Jean Prouvé.
More informationHotel Room Super-pod 4m x 4.8m model
This family sized super-pod with bathroom option is the smallest of our new 4m wide pods for the Glamping market. It is aesthetically pleasing and has space for all the luxury items needed for an extra
More informationFigure 1. The chart showing how the effort and cost of the design changes are affected as the project progresses (Anon.) Simulation tools are a key co
Survey for the Development of an Early Design Tool for Architects H.Rallapalli 1*, V.Garg 1, and R.Rawal 3 1 Centre for IT in Building Science, International Institute of Information Technology, Hyderabad,
More information86 years in the making Caspar G Haas 1922 Sales Prices as a Basis for Estimating Farmland Value
2 Our Journey Begins 86 years in the making Caspar G Haas 1922 Sales Prices as a Basis for Estimating Farmland Value Starting at the beginning. Mass Appraisal and Single Property Appraisal Appraisal
More informationThe mother art is architecture. Without an architecture of our own, we have no soul of our own civilization. Frank Lloyd Wright
Architecture The mother art is architecture. Without an architecture of our own, we have no soul of our own civilization. Frank Lloyd Wright Architecture - The art and science of designing buildings, bridges,
More informationDELIVERING BUILD TO RENT: Are you ready? Part 2
DELIVERING BUILD TO RENT: Are you ready? Part 2 Top ten Build to Rent questions answered The emergent Build to Rent sector is triggering investment and causing a stir amongst the industry. But with any
More informationWe are building future. Kodumaja.
We are building future Kodumaja www.kodumaja.ee 2018 1 What does Kodumaja mean? Kodumaja name of trademark - group of the companies who are acting under the trademark Kodumaja often used when talking about
More informationDEVELOPMENT OF A SOFTWARE ARCHITECTURE TO SUPPORT CONDOMINIUM MANAGEMENT
DEVELOPMENT OF A SOFTWARE ARCHITECTURE TO SUPPORT CONDOMINIUM MANAGEMENT Tiago Miguel Rodrigues dos Santos ABSTRACT The management of a condominium includes the building s maintenance, hiring services,
More informationSOMEDAY ALL TIMBER FLOORS WILL BE HARMONY TIMBER FLOORS
SOMEDAY ALL TIMBER FLOORS WILL BE HARMONY TIMBER FLOORS PAST PROJECTS Harmony was constructed to live up to its name, providing a complete internal and external atmosphere of relaxation and tranquillity.
More informationNEWLEEF 2015 Conference St. John s, Newfoundland October 9 th,2015
NSC NEWLEEF 2015 Conference St. John s, Newfoundland October 9 th,2015 Marianne Berube, Executive Director, Ontario Wood WORKS! Overview Wood WORKS! creating new market opportunities What s new in the
More informationSigned Sealed Delivered
Signed Sealed Delivered Walsall s New Canalside Community Thank you Our thanks to all the organisations that acted in partnership with Jessup Build Develop to make Walsall s Waterfront South community
More informationADMINISTRATIVE REPORT
LATE DISTRIBUTION FOR COUNCIL FEBRUARY 17, 2009 A10 ADMINISTRATIVE REPORT Report Date: February 16, 2009 Contact: Cameron Gray/ Ian Smith Contact No.: 604.871.6857 RTS No.: 7918 VanRIMS No.: 08-2000-20
More informationFLIGHTS OF FANCY Some fancy stairs and some practicalities
FLIGHTS OF FANCY Some fancy stairs and some practicalities Geometrical stairs A geometrical stair does not have newel posts, and the handrail for a flight and landing is continuous. The flight may be curved
More informationPower Production Facilities: Lenders Need a UCC Insurance Policy for Full Coverage
The Leading Provider of UCC Insurance Power Production Facilities: Lenders Need a UCC Insurance Policy for Full Coverage AUTHOR A lender providing financing for power production facilities must be aware
More informationContents. Introduction to Akehurst Epps & Team. Church Lane New Romney. Nobles Wood What House? Award
AKEHURST EPPS Contents Introduction to Akehurst Epps & Team Church Lane New Romney Nobles Wood What House? Award Green Farmhouse, Meopham Green, receives Sunday Times New Home Commendation award Key Points
More informationScottish Election 2007 Summary of Party Manifestos. Scottish Labour Party Election Manifesto 2007
Scottish Election 2007 Summary of Party Manifestos Scottish Labour Party Election Manifesto 2007 Housing Communities There is clearly an under supply of new homes. Through the National Planning Framework,
More informationTenancy Deposit Protection Overview
Tenancy Deposit Protection Overview Introduction Tenancy Deposit Protection (TDP) will add to the measures already brought in to drive up standards in the private rented sector set out in Housing Act 2004.
More informationmeasures of apartment buildings
1 Renovation and energy efficiency measures of apartment buildings Åke Blomsterberg Energy and Building Design Architecture and the built environment Lund University WSP Environmental 2 Million homes being
More information3 STEP BUYERS GUIDE STEP FINANCE STEP LAND STEP HOME
3 STEP BUYERS GUIDE STEP FINANCE 1 STEP LAND 2 STEP HOME 3 STEP FINANCE 1 WORKING OUT YOUR BUDGET Before you can borrow money for your first home, you need to answer two big questions: WHAT S THE MAXIMUM
More informationLOOKS GOOD, FEELS GOOD, STAYS GOOD
LOOKS GOOD, FEELS GOOD, STAYS GOOD Image shows close-up of a FT7961 Fog 38mm Formica Infiniti worktop with a Formica Infiniti Contour profile and matching splashback. 1 Matte, no matter what Formica Infiniti
More informationPROPERTY FACTS. Your Green Office In The Heart of The City
PROPERTY FACTS Your Green Office In The Heart of The City arion.green Office Building. The new sustainable eco-friendly home destined, exclusively, for tenants seeking a unique building to house their
More informationONE GALWAY CENTRAL. 1,672 sq.m of offices located in the very heart of Europe s number 1 Micro City.
ONE GALWAY CENTRAL 1,672 sq.m of offices located in the very heart of Europe s number 1 Micro City. R864 R338 N6 R336 Location, Location, Location DYKE ROAD UNIVERSITY ROAD RIVER CORRIB HEADFORD ROAD PROSPECT
More informationRenovating older apartment buildings A multi-disciplinary international project. Architectural design & construction
Renovating older apartment buildings A multi-disciplinary international project Architectural design & construction Town House apartment in Århus Roger Howard Taylor BTH The Project Urban renewal of Bülowsgade
More informationLUXURY CANAL FRONT LIVING
LUXURY CANAL FRONT LIVING NCB Group is pleased to introduce SOLARA a distinctive collection of luxury town houses that will provide the ultimate lifestyle haven in a location that continually inspires.
More informationARCHITECTURE (ARCH) Architecture (ARCH) 1
Architecture (ARCH) 1 ARCHITECTURE (ARCH) ARCH 1112 Introduction to Architecture Description: An introduction to the professions of architecture and architectural engineering. Previously offered as ARCH
More informationWeb Brochure. Contents
A R C H I T E C T S Web Brochure Contents page 1 Introduction page 2 Commissioned Houses page 3 Speculative Development page 4 Conversions page 5 Refurbishment page 6 Domestic Alterations page 7 Commercial
More informationADAPTATIONS POLICY 2012
ADAPTATIONS POLICY 2012 1.0 INTRODUCTION Adaptations make properties more accessible and useable for people with a medical condition or disability and thereby enable them to maximise their independence
More informationSELECTED CASE STUDIES
SELECTED CASE STUDIES INTRODUCTION The projects highlighted in this book demonstrate the breadth of Ardmore s capability in the delivery of London s most complex and iconic construction projects. Whether
More informationA home of your own SHARED OWNERSHIP (PART BUY/PART RENT)
A home of your own SHARED OWNERSHIP (PART BUY/PART RENT) www.graingerplc.co.uk Shared Ownership Home ownership is something prior generations took for granted. Now, with rising house prices and rising
More information1.1.1 The Role of. the Architect
1.1 The Architectural Profession 1.1.1 The Role of 1.1.1 the Architect Canadian Handbook of Practice for Architects 1.1.1 The Architect in Society Challenges and Opportunities for Architects in the 21st
More informationTHE BENEFITS OF MODULAR BUILD
THE LOFT INTRODUCING THE LOFT The Loft is a two-storey holiday home designed and manufactured by Tingdene Homes under THL Modular branding. Tingdene have been active in the modular industry for 50 years
More informationFaçade Engineering and Building Physics
Façade Engineering and Building Physics examples of current best practice and recent innovations Mikkel Kragh, Associate, Arup PhD MSc CEng MCIBSE FSFE Chairman, Society of Façade Engineering INTEGRATED
More informationMEMO. Board of County Commissioners. FROM: Community Development Department Staff. DATE: January 16, Efficiency Homes (AKA Tiny Homes)
MEMO TO: Board of County Commissioners FROM: Community Development Department Staff DATE: January 16, 2017 RE: Efficiency Homes (AKA Tiny Homes) BACKGROUND Tiny homes have garnered a significant amount
More information501 Adelaide Street East: Closing Report
501 Adelaide Street East: Closing Report Item 5 November 15, 2010 Building & Investment Committee To: Building & Investment Committee Report: BIC:2010-29 From: Chief Executive Officer Date: September 30,
More informationHousing Revenue Account Rent Setting Strategy 2019/ /22
Council 13 February, 2018 Housing Revenue Account Rent Setting Strategy 2019/20 2021/22 Report by Allister Short, Joint Director, Health and Social Care & Gary Fairley, Head of Finance and Integrated Service
More informationCORY BREEGLE KENNY CHEUNG JEAN-PIERRE DEMERIUX GOMEZ DARWIN DIAZ. Team One
CORY BREEGLE KENNY CHEUNG JEAN-PIERRE DEMERIUX GOMEZ DARWIN DIAZ Team One CB Building Analysis: Original Design Designed by Jhonatan Rubio Three-Story Fitness Facility with a basement. Approximately 10,000
More informationOFFICE / DEVELOPMENT OPPORTUNITY With Potential for Residential Conversion (STP)
Clifton House, 84 Broadway, Peterborough PE1 1QZ 126 128 Park Road, Peterborough PE1 2TT OFFICE / DEVELOPMENT OPPORTUNITY With Potential for Residential Conversion (STP) OVERVIEW & Park Road Two adjacent
More informationGlamping Room Super-pod 4m x 7.2m model
This family sized super-pod with optional bathroom is the mid size version of our new 4m wide pods for the Hotel and Glamping market. It is aesthetically pleasing and has space for all the luxury items
More informationêéëé~êåü=üáöüäáöüí Code Requirements and Costs of Incorporating Accessory Apartments in Houses
êéëé~êåü=üáöüäáöüí May 2009 Technical Series 09-102 Code Requirements and Costs of Incorporating Accessory Apartments in Houses áåíêççìåíáçå Canada Mortgage and Housing Corporation commissioned a study
More informationLand adjacent to 1-7 Dace Road, Hackney Wick, E3 2NG
Land adjacent to 1-7 Dace Road, Hackney Wick, E3 2NG Residential Led Development Opportunity Land adjacent to 1-7 Dace Road, E3 2NG CGI of proposed scheme Executive Summary A development opportunity located
More informationUNDERSTANDING THE HOME BUYING PROCESS
You re Buying a HOME UNDERSTANDING THE HOME BUYING PROCESS Residential New Construction Townhomes & Condos GET TO KNOW US THE LOKEN GROUP thank you for taking the time to get to know us a little better
More informationProject Name: Mackey Residence Location: 527 Collins Lane. Bowen Island, BC. Canada Completion Date: April 2007
9 Mackey Residence The Mackey house is located on Bowen Island which is a -minute ferry ride away from West Vancouver. Although increasingly under development pressure from the growing population of the
More informationLeasing to Finance Innovation Jurgita Bucyte Senior Adviser in Statistics & Economic Affairs, Leaseurope
Leasing to Finance Innovation Jurgita Bucyte Senior Adviser in Statistics & Economic Affairs, Leaseurope AGORADA 2016 Brussels 27 May 2016 About Leaseurope Leaseurope represents the European leasing &
More informationDESIGNS BY J. DE BRUYN (FLOORING SERVICES) LTD
Bespoke DESIGNS BY J. DE BRUYN (FLOORING SERVICES) LTD 1 INTRODUCTION J De Bruyn s expertise in tile and precision design cutting has been long established. We primarily cut our designs and tiles from
More informationBalanced ventilation in apartment buildings
Indoor Air 2008, 17-22 August 2008, Copenhagen, Denmark - Paper ID: 981 Balanced ventilation in apartment buildings Kari Thunshelle * and Mads Mysen SINTEF Building and Infrastructure, Norway * Corresponding
More informationStanding Committee on City Finance and Services
ADMINISTRATIVE REPORT Report Date: April 19, 2018 Contact: Mary Clare Zak Contact No.: 604.871.6643 RTS No.: 12540 VanRIMS No.: 08-2000-20 Meeting Date: May 2, 2018 TO: FROM: SUBJECT: Standing Committee
More informationwoodlines BY naja utzon popov RUG COLLECTION EXCLUSIVELY FOR
woodlines BY naja utzon popov RUG COLLECTION EXCLUSIVELY FOR carl hansen & søn The Collection woodlines Danish multidisciplinary artist Naja Utzon Popov has developed a new rug collection exclusively for
More informationRIBA stand at Futurebuild 2019
RIBA stand at Futurebuild 2019 Open Call for an Architect in association with ROCKWOOL & Rockpanel Futurebuild Futurebuild is the number one event for forward-thinkers in the built environment. The event
More informationbe sure to check out our new website: any feedback will be greatly appreciated
Summer 2016 Newsletter be sure to check out our new website: www.mtt-limited.com any feedback will be greatly appreciated what s new? We are delighted to be part of the team refurbishing a 16,000ft 2 Grade
More informationRETROFIT OF BUILDINGS BY DUBLIN CITY COUNCIL. Matt Carroll, City Architects Division DUBLIN CITY COUNCIL
RETROFIT OF BUILDINGS BY DUBLIN CITY COUNCIL Matt Carroll, City Architects Division DUBLIN CITY COUNCIL DUBLIN CITY COUNCIL RETROFIT 1. Dublin City Council brief overview 2. City Council policies 3. City
More informationUnits C1 & C2. Avenue Industrial Estate Pentwyn CF23 8HE PRIME REVERSIONARY SINGLE LET INVESTMENT
PRIME REVERSIONARY SINGLE LET INVESTMENT Selling on behalf of A C Wright & S J Hunt - Joint LPA Receivers INVESTMENT SUMMARY Strategically situated in an established industrial location, with easy access
More informationVestibule Requirement Intent
[2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Requirement Intent Page 1 of 14 The primary intent behind the requirement for a vestibule is to reduce infiltration into a space
More informationManufacturing Architecture
SPEAKERS Manufacturing Architecture Michael Stacey Co-director of the Digital Fabrication Group Metropolitan University of London This paper will introduce the Digital Fabricators Exhibition, which I have
More informationIn these Terms and Conditions, unless the context otherwise requires:
Pty Ltd (Operator for the Gladstone Power Station Joint Venture) A.C.N. 061 519 275 1. INCORPORATION OF CONDITIONS Quotations provided to the Purchaser by the Seller and Orders provided by the Purchaser
More informationAs society changes, so do our housing needs. Factors
164 SOURCEBOOK DESIGNING FOR CHANGE A prefabricated garden room by Backyard Room makes for a perfect home office. Add a rooftop garden and you ll get better insulation and will replace the garden space
More informationEDMONTON, ALBERTA. RFEOI No
EDMONTON, ALBERTA Agora Borealis The intent of this proposal is to provide a template for a vibrant, diverse, sustainable, and economic community benefitting the Montrose and Eastwood neighbourhood, surrounding
More information7.0 Project Statistics
7.0 Project Statistics DEVELOPMENT STATISTICS SITE Legal Description Property Address 1636 Clark Drive and 1321-1395 East 1st Avenue, Vancouver BC Total Site Area (sq. ft.) 44,691 (*42,629 sq. ft.) *After
More informationINDEX PACKAGE SUMMARY...39
1 INDEX Slide No. Sea front Villa 1. Memo development.5 2. Accommodation type..5 3.Square meters...5 4. Why Cyprus...6 5.Map showing location and benefits.. 7-8 6. Brief Description 9-10 7. Exterior Imaginary..
More informationCluster guidance. cash-based. shelter and NFI assistance
Cluster guidance on cash-based shelter and NFI assistance Introduction The following document has been prepared by the Shelter/NFI Cluster Coordination Team to provide guidance to cluster partners on the
More informationRESIDENTIAL / HOME OCCUPATION
DEVELOPMENT BUILDING PERMIT PERMIT APPLICATION APPLICATION RESIDENTIAL / HOME OCCUPATION Planning & Engineering Services, 1 Alexandra Park, Leduc, AB T9E 4C4 Infrastructure Telephone: 780-980-7124 & Planning,
More informationBUSI 398 Residential Property Guided Case Study
BUSI 398 Residential Property Guided Case Study PURPOSE AND SCOPE The Residential Property Guided Case Study course BUSI 398 is intended to give the real estate appraisal student a working knowledge of
More informationOFFERS INVITED Camperdown House, Dundee, DD2 4TF
Completed in 1828 Camperdown House is the largest Greek Revival house remaining in Scotland, set within 400ac of parkland including a golf course For more information, please contact: Jake Poole 0131 222
More informationINRODUCTION STATISTIC DATE OF DWELLINGS STOCKS IN POLAND.
Large-panel dwelling building, current state ways of construction and architectural modifications. Author: Adam Rybka Dept. of Civil Engineering, Rzeszow University of Technology ABSTRACT: In this paper
More informationCASE STUDY Property Asset Management
The Walbrook Building, London EC4 Full service provision encompassing estates, finance and FM roles. KEY OBJECTIVES AND CONSTRAINTS Preserve construction warranties through a structured management regime
More informationSTANDARDS IN RENTED ACCOMMODATION. Housing Services
STANDARDS IN RENTED ACCOMMODATION Housing Services Introduction This leaflet describes some of the standards for rented housing. In particular, it outlines the Housing Health and Safety Rating System (or
More informationANGUS UNION CEMETERY BY-LAWS
ANGUS UNION CEMETERY BY-LAWS TABLE OF CONTENTS Section A: Section B: Section C: Section D: Section E: Section F: Section G: Section H: Section I: DEFINITIONS BY-LAWS PERTAINING TO GENERAL INFORMATION BY-LAWS
More informationDATWYLER SYSTEM WARRANTY
DATWYLER SYSTEM WARRANTY Fibre-optic cabling system General Warranty Provisions February 2016 General Warranty Provisions FO_Feb 2016_V1_EN.docx page 1/9 1. Subject matter of the Datwyler System Warranty...
More informationAndraus high-rise, Sao Paulo, Brazil, February 1972
Andraus high-rise, Sao Paulo, Brazil, February 1972 Of the 450 rescued, 350 were lifted off the roof by a fleet of 11 helicopters over a period of 4 hours 100 were saved at the 14th storey level using
More informationPublic Hearing Council Chambers 100 Newport Drive, Port Moody April 8, 2014 at 7:00pm
San Remo Drive Land Use Contract Amendment Pages 3-30 1. Business 1.1 File: 3220-09/BL2975 Public Hearing Council Chambers 100 Newport Drive, Port Moody April 8, 2014 at 7:00pm City of Port Moody Land
More informationLEASING VS OWNING: HARDWARE AND SOFTWARE
TECH NEXT SERIES LEASING VS OWNING: HARDWARE AND SOFTWARE Leasing vs Owning Hardware and Software With the constant development of new and better information technology (IT) hardware and software, the
More informationPHASE 3: THE BATTERY 2017: reflecting the sky
PHASE 3: THE BATTERY 2017: reflecting the sky PHASE 3: THE BATTERY 2017 PHASE 3: THE BATTERY 2017: Thermal Image PHASE 3: THE BATTERY 2017 $169/sf ACTUAL RENTS ACHEIVED AS-BUILT EXPENSES PROJECT(REVENUE
More informationReal Estate Licensing Education Guiding you to success. JANUARY JUNE
COLORADO Real Estate Licensing Education Guiding you to success. REAL ESTATE EDUCATION Official Prelicensing Provider of the 2019 JANUARY JUNE 3 WAYS to complete your education! THE KNOWLEDGE you need
More information