A 0.1. Cover Sheet HH RESIDENCES PROJECT DIRECTORY
|
|
- Linda Heath
- 5 years ago
- Views:
Transcription
1 PROJECT DESCRIPTION The proposed project at 400 Healdsburg Ave will be a small, design-oriented boutique hotel with 16 guestrooms. The hotel will operate 24 hours a day, 7 days a week, year-round. Along with the guestrooms, the hotel will include a reception lobby, at-grade entry courtyard, podium courtyard & pool area, and street-level retail. The on-site parking garage will accommodate spaces for 34 cars, with valet service, provided by a parking lift system (similar to Harmon Guest House). At grade, there is an entry courtyard that serves as a transitional space as one enters into the hotel lobby, as well as a respite along the streetscape. The lobby entry will be pronounced by prominent, custom "K-doors". On either side of the lobby, along both Healdsburg Ave and North Street, retail spaces line the sidewalks with each space framed by textured concrete columns covered in lush green vines. Above the podium, the massing of the building has been broken down into 3 smaller masses. Two of the masses contain (12) guestroom apartment flats and the third provides (4) townhouse guestrooms. The three volumes will each be treated differently in both materiality and articulation to ensure smaller scale buildings and create a rhythm along Healdsburg Ave. The materials reference the local natural palette and rely on naturally sustainable materials. Like it s sister properties, h2hotel and Harmon Guest House, HH Residences will take a sustainable and environmentally-responsible approach to construction and operations. Included in the plan are solar-thermal roof panels for water heating to conserve electricity, stormwater management, and a focus on recycled & reused materials. The project goal is to achieve a LEED certification. PROJECT DIRECTORY OWNER Piazza Hospitality 414 Healdsburg Ave Healdsburg, CA Tel: (707) CIVIL ENGINEER Carlile Macy 15 Third Street Santa Rosa CA Tel: (707) ARCHITECT David Baker Architects 461 Second Street Loft C-127 San Francisco, CA Tel: (415) LIGHTING DESIGN Hiram Banks 461 Second Street, #659 San Francisco, CA Tel: (415) LANDSCAPE ARCHITECT Andrea Cochran Landscape Architecture 2325 Third Street #210 San Francisco, CA Tel: (415) SHEET INDEX Architectural A 0.1 Cover Sheet A 0.2 Notes A 0.3 Parking Lift System A 0.4 Bike Racks A 1.0 Site Aerial - View from Northwest A 1.1 Site Aerial - View from Southwest A 1.2 3D View from Southwest - Healdsburg Ave A 1.3 3D View from South - North St A 1.4 3D View from Southeast - North St A 1.5 3D View of Entry Plaza - Healdsburg Ave A 1.6 3D View from Northwest - Healdsburg Ave A 1.7 3D View from Northwest - Healdsburg Ave A 1.8 3D View of Courtyard from Above - Healdsburg Ave A 2.0 Site Plan A 2.1 Level 1 Floor Plan A 2.2 Level 2 Floor Plan A 2.3 Level 3 Floor Plan A 2.4 Level 4 Floor Plan A 2.5 Unit Plans - Flats A 2.6 Unit Plans - Townhouse - Level 2 & 3 A 2.7 Unit Plans - Townhouses - Level 4 & Alt A 3.0 Street Elevation -West A 3.1 Street Elevation -South A 3.2 East Elevation A 3.3 North Elevation A 4.0 Section -A A 5.0 Materials and Finishes A 5.1 Materials and Finishes A 6.0 Context Photos Civil C 1.0 Demo & Existing Conditions Plan C 2.0 Grading and Drainage Plan Landscape L 1.0 Landscape Plan - Ground Floor L 1.1 Landscape Plan - Podium Roof Deck L 2.1 Landscape Planting Images L 3.1 Site Elements Reference Images Lighting LP.00 Conceptual Lighting Design LP.01 Overall Plans and Concepts LP.02 Entry View LP.03 Side View LP.04 Design Narratives Signage SI 1.0 Exterior Signage SI 2.0 Exterior Signage SI 3.0 Exterior Signage - 3D View PROJECT INFORMATION VICINTIY MAP ADDRESS 400 Healdsburg Ave. Healdsburg CA ZONING CD- Downtown Commercial TOTAL LOT AREA 13,960sf GROSS BUILDING AREA 33,962sf F.A.R. (FLOOR AREA RATIO) ALLOWED: 2 PROPOSED 2.00 (27,896sf / 13,960sf = 1.998) GUEST ROOM SUMMARY PARKING SUMMARY REQUIRED: PROVIDED: *Excluded mechanical spaces/shafts, balconies, patios, terraces, and storage per planning code. Excluded parking (auto storage) per discussion with planners. 12 Apartment Guestroom Flats (2-bed) 4 Townhouse Guestrooms (3-bed) 16 Total Guestrooms 30 spaces (36 guestroom beds / 2 = 18; 2 employees / 2 = 1; 3245sf of retail / 300sf = 11) *1 space per 2 beds, 1 spaces per 2 employees, 1 space per 300sf of retail 34 spaces Floor Area By Occupany Circulation Guest Room Lobby Retail Stair Bike Parking Elevator Green Space Mechanical Parking Storage 2050 SF SF 1530 SF 3245 SF 1356 SF 0 SF 433 SF 4367 SF 1445 SF 4718 SF 345 SF SF Area Plans (Area for FAR) Circulation Guest Room Lobby Retail Stair 2050 SF SF 1530 SF 3245 SF 1356 SF SF HEALDSBURG AVE NORTH STREET Cover Sheet David Baker Architects HH HOTELS A 0.1
2 OPERATION CONSTRUCTION FIRE DEPT HH Residences is expected to operate with a maximum of (2) day-shift employees composed of one valet and one desk staff. For the night shift we expect to have one employee who serves as both valet and night audit. Two housekeepers will be utilized for cleaning from the other three hotels. The hotel will have 24 hours staffing and an employee available 24 hours a day who can operate the parking system. Guests arriving to the hotel will be instructed at time of reservation to turn into the driveway off of Healdsburg Avenue, arriving from the southern direction. Once in the garage entry, guests will be greeted by a valet who will unload luggage and then move cars into parking lift spaces. Employees will be encouraged to cycle to work, and any employee automobiles will be accommodated within the parking structure. Adequate bicycle storage will be provided to accommodate both employee and guest bicycles. Many resources required for the hotel will be shared with the (3) existing Piazza hotels (Hotel Healdsburg, h2hotel, and Harmon Guest House). Staff will be shared on the management level. Room service options will be available from Spoonbar and Pizzando, in a take-out format, so there will be minimal deliveries due to the lack of food and beverage operations on-site. Many deliveries will be shared among all three properties. Deliveries will be routed to h2hotel and Hotel Healdsburg yellow zones, then transferred as needed to this hotel. Trash will be stored on site in (3) receptacles. Trash pick-up will be done as needed with a minimum of 2x per week, Mon, Wed, Friday between 7-8am. The duration of construction is expected to be 18 months. All staging activities will be onsite as much as the site restrictions allows. The contractor will make use of the first level concrete podium construction for staging both above and below the elevated slab. Should off-site staging be required, the contractor will arrange for a constrcution yard to be used. Notes: 1. Water Supply: An approved water supply for fire protection shall be made available as soon as combustible material arrives on the site. 2. Standpipes: Standpipe shall be provided for use during construction. Such standpipes shall be installed when the progress of construction is not more than 40 feet in height above the lowest level of fire department vehicle access. Such standpipe shall be provided with fire department hose connections at accessible locations adjacent to usable stairs. 3. Program Superintendent; The owner shall designate a person to be the fire prevention program superintendent who shall be responsible for fire prevention and ensure that it is carried out through completion of the project. Because of the nearby exposures, this person would have the authority to enforce the fire prevention program and guard service. This person would ensure compliance with fire code regulations including but not limited to hot work, water supply, emergency vehicle access, hazardous materials and security of the building when it is vulnerable to fire. This program does not take the place of City of Healdsburg fire inspections. 4. Class I Standpipe: Standpipe hose connections shall be provided in the south stairway, a hose connection shall be provided for each floor level above or below grade. Hose connections shall be located at an intermediate floor level landing between floors, unless otherwise approved by the fire code official. CFC Stairway to the Roof CFC CFC Provide Class I standpipes as approved by the fire department in both new stairwells that extend to the roof and have fire department connections on every floor and roof excluding ground level. Location of hose connections will be reviewed upon submittal of sprinkler plans. Notes David Baker Architects HH HOTELS A 0.2
3 CityLift Parking provides independent parking spaces for cars, one group behind the other in-tandem. It is a drive-through system combined with a pit for a stack of three levels. The platforms of the upper and pit levels are moved vertdically, the platforms on the ground (approach) level horizontally. At approach level, there is always one empty space in each of the front and rear groups. This vacant space is used for shifting the ground floor parking spaces sideways, thus enabling the upper and pit platforms to be lowered or raised to approach level. Both the front and rear systems have one vacant space. For more information visit: cityliftparking.com Parking Lift System David Baker Architects HH HOTELS A 0.3
4 Bike Racks David Baker Architects HH HOTELS A 0.4
5 h2 Hotel Harmon Guest House Healdsburg Plaza Hotel Healdsburg HH Residences Site Aerial - View from Northwest David Baker Architects HH HOTELS A 1.0
6 HH Residences Healdsburg Plaza Hotel Healdsburg Site Aerial - View from Southwest David Baker Architects HH HOTELS A 1.1
7 3D View from Southwest - Healdsburg Ave David Baker Architects HH HOTELS A 1.2
8 3D View from South - North St David Baker Architects HH HOTELS A 1.3
9 3D View from Southeast - North St David Baker Architects HH HOTELS A 1.4
10 3D View of Entry Plaza - Healdsburg Ave David Baker Architects HH HOTELS A 1.5
11 HH HOTELS 3D View from Northwest - Healdsburg Ave A 1.6
12 HH HOTELS 3D View from Northwest - Healdsburg Ave A 1.7
13 HH HOTELS 3D View of Courtyard from Above - Healdsburg Ave A 1.8
14 RAVEN PERFORMING ARTS THEATRE TOWN- HOUSES POOL PODIUM COURTYARD APT FLATS 1-STORY RETAIL APT FLATS NORTH STREET 2-STORY BUILDING 1-STORY RETAIL 1-STORY RETAIL PRIVATE PATIOS HEALDSBURG AVE PARKING ENTRY AT-GRADE COURTYARD MAIN HOTEL ENTRY HEALDSBURG PLAZA 2-STORY BUILDING 2-STORY BUILDING N FOSS STREET David Baker Architects HH HOTELS Site Plan 1" = 50'-0" A 2.0
15 8 8 1 A ' - 1" MECHANICAL 1314 SF RETAIL 1228 SF PARKING 4381 SF 34 PARKING SPACES BIKE PARKING 28 SPACES 8 LOBBY 1490 SF 8 STORAGE 301 SF ELEV 75 SF STAIR 185 SF 23' - 8" RETAIL 1871 SF STAIR 4' - 6"5' - 6" 16' - 6" 16' - 6" 16' - 0" 7' - 0" 12' - 0" OPEN AIR STAIR DRIVE AISLE 18' - 11" 35' - 0" 34' - 6" 26' - 0" 4' - 6" 14' - 0" 14' - 3" 14' - 3" 5' - 0" 0' 8' 16' David Baker Architects HH HOTELS Level 1 Floor Plan 1/16" = 1'-0" A 2.1
16 48' - 8" 56' - 1" 35' - 0" 8' - 0" 14' - 0" 8' - 0" 35' - 0" 1 A ' - 7 1/2" 17' - 9" 17' - 9" 17' - 0" PRIVATE PATIOS TOWNHOUSE SF TOWNHOUSE SF TOWNHOUSE SF CANOPY POOL COURTYARD STAIR PRIVATE PATIO UNIT SF UNIT SF CORRIDOR 641 SF STAIR 158 SF ELEV 75 SF STAIR 154 SF STAIR UNIT SF UNIT SF PRIVATE BALCONY 30' - 3" 11' - 0" 18' - 9" 6' - 0" 18' - 6" 18' - 6" 19' - 7 1/2" TOWNHOUSE SF 37' - 6" 24' - 9" 2' MAX OVER P.L. PRIVATE BALCONIES 13' - 7" 35' - 0" 8' - 0" 14' - 0" 8' - 0" 35' - 0" 15' - 0" 0' 8' 16' David Baker Architects HH HOTELS Level 2 Floor Plan 1/16" = 1'-0" A 2.2
17 48' - 8" 56' - 1" 35' - 0" 8' - 0" 14' - 0" 8' - 0" 35' - 0" 1 A ' - 7 1/2" 17' - 9" 17' - 0" TOWNHOUSE SF TOWNHOUSE SF TOWNHOUSE SF UNIT SF UNIT SF CORRIDOR 641 SF STAIR 158 SF ELEV 75 SF STAIR 154 SF UNIT SF UNIT SF PRIVATE BALCONY 30' - 3" 11' - 0" 18' - 9" 6' - 0" TOWNHOUSE SF 18' - 6" 18' - 6" 17' - 9" 19' - 7 1/2" 24' - 9" 2' MAX OVER P.L. PRIVATE BALCONIES 37' - 6" 13' - 7" 35' - 0" 9' - 0" 13' - 0" 8' - 0" 35' - 0" 15' - 0" HH HOTELS Level 3 Floor Plan 1/16" = 1'-0" A 2.3
18 48' - 8" 56' - 1" 35' - 0" 8' - 0" 14' - 0" 8' - 0" 35' - 0" 1 A ' - 7 1/2" 17' - 9" 17' - 0" PRIVATE TERRACES PRIVATE TERRACES UNIT SF UNIT SF CORRIDOR 641 SF STAIR 158 SF ELEV 75 SF STAIR 154 SF UNIT SF UNIT SF PRIVATE BALCONY 30' - 3" 11' - 0" 18' - 9" 6' - 0" 17' - 0" 17' - 0" 17' - 0" 17' - 9" 19' - 7 1/2" 37' - 6" 24' - 9" 2' MAX OVER P.L. PRIVATE BALCONIES 13' - 7" 35' - 0" 9' - 0" 13' - 0" 8' - 0" 35' - 0" 15' - 0" 0' 8' 16' David Baker Architects HH HOTELS Level 4 Floor Plan 1/16" = 1'-0" A 2.4
19 5' - 0" 6' - 10" 6' - 0" 15' - 0 1/2" 11' - 0" 22' - 7 1/2" STAIR LIVING ROOM 11' - 1 1/2" BATHROOM W / D MASTER BEDROOM (KING) 11' - 1 1/2" 13' - 4 1/2" BEDROOM (QUEEN) WET BAR 17' - 9" 4' - 0" UNIT SF 4' - 0" UNIT SF 13' - 4 1/2" BEDROOM (QUEEN) WET BAR LIVING ROOM 17' - 9" 11' - 1 1/2" BATHROOM W / D MASTER BEDROOM (KING) PRIVATE BALCONY 11' - 1 1/2" PRIVATE BALCONY 11' - 0" 9' - 0" 22' - 7 1/2" 8' - 0" 6' - 0" 14' - 9" 1 Level 2 Unit Plans - Flats Unit Type B 3/16" = 1'-0" 2 Level 2 Unit Plans - Flats Unit Type A 3/16" = 1'-0" David Baker Architects HH HOTELS Unit Plans - Flats 3/16" = 1'-0" A 2.5
20 19' - 7 1/2" 11' - 9" 6' - 4 1/2" BEDROOM (QUEEN) LIVING ROOM 13' - 4 1/2" W/D 37' - 6" TOWNHOUSE SF 6' - 0" BATHROOM DINING KITCHEN 15' /2" OFFICE NOOK ENTRY MASTER BEDROOM (KING) 1 Level 2 Unit Plan - Townhouses 3/16" = 1'-0" 2 Level 3 Unit Plan - Townhouses 3/16" = 1'-0" David Baker Architects HH HOTELS Unit Plans - Townhouse - Level 2 & 3 3/16" = 1'-0" A 2.6
21 MASTER BEDROOM (KING) DEN BATHROOM BATHROOM HALLWAY DEN MASTER BEDROOM (KING) DECK 1 Level 4 Unit Plan - Townhouses 3/16" = 1'-0" 2 Level 4 Unit Plan Alternate - Townhouses 3/16" = 1'-0" David Baker Architects HH HOTELS Unit Plans - Townhouses - Level 4 & Alt 3/16" = 1'-0" A 2.7
22 A. THIN BRICK - WARM GREYS B. ZINC STANDING SEAM - BLUE-GREY & GRAPHITE C. ZINC - GRAPHITE D. TEXTURED CONCRETE W/ VINES E. WOOD SIDING F. ALL-GLASS STOREFRONT G. WOOD STOREFRONT H. ALUMINUM STOREFRONT I. WEATHERED STEEL RAILING J. METAL MESH RAILING D J G E B J D I A J I F C H G I J A PARAPET 50' - 0" 10' - 0" 10' - 0" 9' - 0" 6' - 0" TH ROOF 47' - 0" ROOF T.O.P. 44' - 0" TH LEVEL 4 37' - 0" LEVEL 4 35' - 0" TH LEVEL 3 27' - 0" LEVEL 3 25' - 0" LEVEL 2 15' - 0" 9' - 0" 15' - 0" LEVEL 1 0' - 0" David Baker Architects HH HOTELS Street Elevation -West 1/16" = 1'-0" A 3.0
23 A. THIN BRICK - WARM GREYS B. ZINC STANDING SEAM - BLUE-GREY & GRAPHITE C. ZINC - GRAPHITE D. TEXTURED CONCRETE W/ VINES E. WOOD SIDING F. ALL-GLASS STOREFRONT G. WOOD STOREFRONT H. ALUMINUM STOREFRONT I. WEATHERED STEEL RAILING J. METAL MESH RAILING D G J I A C PARAPET 50' - 0" ROOF T.O.P. 44' - 0" LEVEL 4 35' - 0" LEVEL 3 25' - 0" LEVEL 2 15' - 0" LEVEL 1 0' - 0" David Baker Architects HH HOTELS Street Elevation -South 1/16" = 1'-0" A 3.1
24 A. THIN BRICK - WARM GREYS B. ZINC STANDING SEAM - BLUE-GREY & GRAPHITE C. ZINC - GRAPHITE D. TEXTURED CONCRETE W/ VINES E. WOOD SIDING F. ALL-GLASS STOREFRONT G. WOOD STOREFRONT H. ALUMINUM STOREFRONT I. WEATHERED STEEL RAILING J. METAL MESH RAILING B A D J B E PARAPET 50' - 0" TH ROOF 47' - 0" ROOF T.O.P. 44' - 0" TH LEVEL 4 37' - 0" LEVEL 4 35' - 0" TH LEVEL 3 27' - 0" LEVEL 3 25' - 0" LEVEL 2 15' - 0" LEVEL 1 0' - 0" David Baker Architects HH HOTELS East Elevation 1/16" = 1'-0" A 3.2
25 A. THIN BRICK - WARM GREYS B. ZINC STANDING SEAM - BLUE-GREY & GRAPHITE C. ZINC - GRAPHITE D. TEXTURED CONCRETE W/ VINES E. WOOD SIDING F. ALL-GLASS STOREFRONT G. WOOD STOREFRONT H. ALUMINUM STOREFRONT I. WEATHERED STEEL RAILING J. METAL MESH RAILING B J D E PARAPET 50' - 0" TH ROOF 47' - 0" TH LEVEL 4 37' - 0" TH LEVEL 3 27' - 0" LEVEL 2 15' - 0" LEVEL 1 0' - 0" David Baker Architects HH HOTELS North Elevation 1/16" = 1'-0" A 3.3
26 PARAPET 50' - 0" TH ROOF 47' - 0" ROOF T.O.P. 44' - 0" TH LEVEL 4 37' - 0" LEVEL 4 35' - 0" TH LEVEL 3 27' - 0" LEVEL 3 25' - 0" LEVEL 2 15' - 0" LEVEL 2 15' - 0" LEVEL 1 0' - 0" LEVEL 1 0' - 0" David Baker Architects HH HOTELS Section -A 1/16" = 1'-0" A 4.0
27 A. THIN BRICK - WARM GREYS B. ZINC STANDING SEAM- BLUE-GREY & GRAPHITE D. TEXTURED CONCRETE W/ VINES E. WOOD SIDING F. ALL-GLASS STOREFRONT G. WOOD STOREFRONT Materials and Finishes David Baker Architects HH HOTELS A 5.0
28 H. ALUMINUM STOREFRONT - BLACK I. WEATHERED STEEL J. STAINLESS STEEL MESH RAILING 'FLATS BUILDING' MATERIAL STUDY 'TOWNHOUSE BUILDING' MATERIAL STUDY HH HOTELS Materials and Finishes A 5.1
29 B A B A C C David Baker Architects HH HOTELS Context Photos 1" = 100'-0" A 6.0
30 HH HOTELS Demo & Existing Conditions Plan C 1.0
31 HH HOTELS Grading and Drainage Plan C 2.0
32 NORTH STREET Parking Parking Lobby Retail Existing Street Tree Succulent and Vine Planting Retail Street Furniture Existing Street Tree HEALDSBURG AVENUE Existing Street Tree David Baker Architects ANDREA COCHRAN LANDSCAPE ARCHITECTURE 2325 Third Street #210 San Francisco CA LANDSCAPE PLAN - GROUND FLOOR 1 = 20 1/10/2018 L1.0
33 PLANT LIST SHRUBS & GROUNDCOVER GRASSES & BAMBOO SUCCULENTS FERNS + VINES Escallonia bifida - White Escallonia Olea europaea Montra - Dwarf Olive Salvia spathacea - Hummingbird Sage Sarcococca ruscifolia - Fragrant Sweet Box Calamagrostis x acutiflora - Feather Reed Grass Hakonechloa macra - Hakone Grass Lomandra longifolia - Basket Grass Pleioblastus pygmaea - Dwarf Bamboo Semiarundinaria fastuosa - Temple Bamboo Aeonium undulatum - Stalked Aeonium Beschorneria yuccoides - Mexican Lily Dracena draco - Dragon Tree Furcraea foetida - Green Aloe Yucca filamentosa - Adam s Needle Nephrolepsis coridfolia - Sword Fern Parthnocissus tricuspidata Veitchii - Veitchii Boston Ivy Trachelospermum jasminoides - Star Jasmine Woodwardia fimbriata - Giant Chain Fern Pool Fence with Vines Pool Furniture Bamboo in Metal Planter Grasses in Metal Planter Seating Area with Fire Pit Grasses in Metal Planter Wood Decking Decomposed Gravel Screening Shrubs Concrete Unit Pavers Pool Potted Plants Planted Trellis Corten Steel Canopy Above David Baker Architects ANDREA COCHRAN LANDSCAPE ARCHITECTURE 2325 Third Street #210 San Francisco CA LANDSCAPE PLAN - ROOF DECK 1 = 20 1/10/2018 L1.1
34 SHRUBS & GROUNDCOVER GRASSES & BAMBOO SUCCULENTS FERNS + VINES David Baker Architects ANDREA COCHRAN LANDSCAPE ARCHITECTURE 2325 Third Street #210 San Francisco CA LANDSCAPE PLANTING IMAGES NTS 1/10/2018 L2.1
35 FENCE + TRELLIS FIRE PIT PLANTER POTS SEATING David Baker Architects ANDREA COCHRAN LANDSCAPE ARCHITECTURE 2325 Third Street #210 San Francisco CA SITE ELEMENTS REFERENCE IMAGES NTS 1/10/2018 L3.1
36 HH RESIDENCE
37 FIRST FLOOR PRELIMINARY LIGHTING PLAN SECOND FLOOR PRELIMINARY LIGHTING PLAN
38 1 ILLUMINATED FEATURE STAIRWAY FLOOR RECESSED LINEAR UPLIGHT 3 RAILING INTEGRATED LIGHTING 4 INGRATE FLOOR MARKER LIGHTING 5 GREEN WALL ACCENT
39 1 CATENARY LIGHTS FLOOR RECESSED LINEAR UPLIGHT 3 BUILDING MOUNTED SCONCE LANSCAPE LIGHTING POSSIBLE FEATURES David Baker Architects SIDE VIEW 1/2/2018 LP.03
40 GENERAL LIGHTING GUIDELINE - The lighting design will be based on the concept of balanced light from a combination of sources including but not limited to: direct, indirect and decorative lighting. - Glare is to be minimized on glass curtain walls to preserve exterior views - Correlated Color Temperature (CCT) shall be cohesive throughout the project for continuity between spaces. Exact color temperature to be developed by design team. - The lighting design will utilize LED fixtures/ lamps wherever possible. LED fixtures will provide/ follow the following criteria: CONTROL INTENT - Controls shall at a minimum shall be provided to comply with T24 requirements. - LED drivers shall provide continuous, flicker free dimming down to specified levels (to be provided during design) - Commissioning of lighting system to be carried out by programmer provided by system manufacturer. *In key areas, preferred light levels shall be provided by lighting designer. LIGHTING LEVEL TARGET - Private Office: 30fc - Reception/Lobby: 20fc - Lounges: 10-20fc - Conference/Boardrooms: 30fc - Elevator Lobby: 10fc (min at thresholds) - Circulation/Corridors: 10fc - Kitchen: 50fc (food prep), 20fc (cleaning/ storage) - Bathrooms: 15-20fc *CRI minimum of 80+ *R9 value minimum of 50+ *Value must also be published for reference *Color/binning tolerance within 3 MacAdams ellipses, unless otherwise stated. *Minimum rated life of at least L70 at 50,000hrs
41 Exterior Signage David Baker Architects HH HOTELS SI 1.0
42 4" 6" 8" 1 Signage " = 1'-0" 2 Signage - HH Residences 3" = 1'-0" HH HOTELS Exterior Signage 3" = 1'-0" SI 2.0
43 HH HOTELS Exterior Signage - 3D View SI 3.0
erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT
erie street hotel 12-22 WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT PROJECT F.A.R. BASE F.A.R. PROPOSED F.A.R. 13,819 SF 111,933 SF 14 LEVELS+
More information320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525
320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525 July 28, 2015 (a) What are you proposing/use? A 47,00 S.F., 3-story, mixed used project with 30 for-sale condo residential units and 2
More informationHUDSON COUNTY NEW CONSTRUCTION MULTI-FAMILY RESIDENTIAL: NEWARK AVE JERSEY CITY, NJ BLOCK:11010, LOT:4. Design:
BLOCK:00, LOT:4 ZONING TABULATION CHART ITEM REQUIRED EXISTING PROPOSED NOTE VARIANCE MIN. LOT SIZE*,500 SF,93.35 SF,93.35 SF CONFORMING NO MAX. STRUCTURE HEIGHT 5 STORIES 3 5 CONFORMING NO MIN. LOT WIDTH
More informationSAFEWAY - OAKLAND, CALIFORNIA PLANNING REVISIONS 1 - JULY 26, 2010
60 COLLEGE AVENUE OAKLAND, CA 9468 STORE #80 CURRENT OWNER: STORE NUMBER: 80 598 STONERIDGE MALL ROAD PLEASANTON, CA 94588-9 P) 95.46.08 F) 95.46.86 ASSESSOR'S PARCEL NUMBER: 048A00000 NO. DATE ISSUES
More informationMEMORANDUM. C3A District Shoreland Overlay District 32,055 square feet / 0.74 acres. West Calhoun, adjacent to Cedar-Isles-Dean
Department of Community Planning & Economic Development 250 South 4th Street, Room 300 Minneapolis, MN 55415-1385 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Peter Crandall,
More informationArchitectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual ch
Architectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual character of the building is intended to symbolically
More informationThe demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.
D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t 2072 ADDISON STREET PRELIMINARY DESIGN REVIEW For Committee Discussion/ Majority Recommendation JULY 20, 2017 Design Review #DRCP2016-0002
More informationDESIGN CRITERIA Ridegedale Center-Outparcel Restaurant, Minnetonka, MN
DESIGN CRITERIA January 26, 2018 DESIGN CRITERIA The Outparcel Design Criteria is established as a reference guide for Multi-tenant Outparcel Development projects at Ridgedale Center located in Minnetonka,
More informationMEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres
Department of Community Planning & Economic Development 250 South 4th Street, Room 300 Minneapolis, MN 55415-1385 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Peter Crandall,
More informationLANCASTER AVENUE WARREN STREET N. 33RD STREET N. 34TH STREET FILBERT STREET SITE PLAN ACC-DREXEL UNIVERSITY LANCASTER TOWER HALL CALHOUN HALL
TOWER HALL CALHOUN HALL LANCASTER AVENUE COMMUNITY EDUCATION CENTER N. 36TH STREET 7-ELEVEN ARCH STREET WARREN STREET BUCKLEY GREEN URBN CENTER ANNEX FILBERT STREET N. 34TH STREET RUSH BUILDING N. 33RD
More informationEMERYVILLE PLANNING COMMISSION STAFF REPORT. Study Session II: Marketplace Redevelopment Project, Theater Site (FDP14-003)
EMERYVILLE PLANNING COMMISSION STAFF REPORT Agenda Date: January 22, 2015 Report Date: January 15, 2015 TO: FROM: SUBJECT: Planning Commission Community Development Department Miroo Desai, Senior Planner
More information4 DEVELOPMENT STANDARDS FOR
4 DEVELOPMENT STANDARDS FOR RESIDENTIAL MIXED-USE PROJECTS This chapter presents standards for residential mixed-use projects in the Ashland-Cherryland Business District and the Castro Valley Central Business
More informationLINVILL, C P PINK, D A EDWARDS, B P MITCHELL, L P KAHN, C P JENSON, K P CLARKE, T P
Planning and Development Department Land Use Planning Division ACTION SUMMARY FOR DESIGN REVIEW COMMITTEE MEETING September 21, 2017 7:00 PM LINVILL, C P PINK, D A EDWARDS, B P MITCHELL, L P KAHN, C P
More information2075 BROADWAY LOFTS DOWNTOWN ARAPAHOE SQUARE DESIGN DEVELOPMENT REVIEW SUBMISSION OCTOBER 8, 2015
2075 BROADWAY LOFTS DOWNTOWN ARAPAHOE SQUARE DESIGN DEVELOPMENT REVIEW SUBMISSION OCTOBER 8, 2015 U.S. POSTAL FACILITY / 20TH STREET GYM / SKYLOFTS ARRAJ COURT COMPLEX BRYON RODGERS FEDERAL BUILDING SKYLOFTS
More informationEmma Grand Mixed-use Building 100, 108 & 114 Emma St. South Grand Valley, Ontario
PROJECT TEAM OWNER: GOLDEN CANADIAN HOMES INC. Tel. 7..00 mohsinsam7@yahoo.ca ARCHITECT: LINE ARCHITECT INC. YONGE ST. SUITE 0 Toronto, Ontario MT Z Tel..0. Loghman@LINEarchitect.com www.linearchitect.com
More informationSPRINGBANK SIX CORNERS, LLC
SITE ADDRESS: 305 NORTH SOUTHPORT 356 WEST WELLINGTON ZONING DISTRICT: B3-2 (CURRENT) B3-2 (CURRENT) PROPOSED ZONING DISTRICT: B2-3 B2-3 PROPOSED USE: RESIDENTIAL RETAIL / ASSEMBLY / RESIDENTIAL F.A.R.:
More information739 Channing Way PRELIMINARY DESIGN REVIEW
739 Channing Way PRELIMINARY DESIGN REVIEW D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t For Majority Recommendations SEPTEMBER 21, 2017 Design Review #DRCP2017-0005 to construct two
More informationBOROUGH OF HOPATCONG ORDINANCE No
BOROUGH OF HOPATCONG ORDINANCE No. 10-2014 AN ORDINANCE OF THE BOROUGH OF HOPATCONG, SUSSEX COUNTY, NEW JERSEY TO ADOPT A FORM BASED CODE AS AN OVERLAY DISTRICT AFFECTING PORTIONS OF THE B-1 AND R-1 ZONING
More informationSINGPOLI BD DEVELOPMENT, LLC PROPOSED MIXED-USE PROJECT 83 N. LAKE AVE. PASADENA, CA 91101
ABBREVIATIONS SHEET INDEX SINGPOLI BD DEVELOPMENT, LLC PROPOSED MIXED-USE PROJECT 3 N. LAKE AVE. PASADENA, CA 91101 154 SNG SITE SUMMARY SITE AREA: 0,132 Sq. Ft. BUILDING GROSS AREA: TOTAL : TOTAL S: TOTAL
More information900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1
50 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca 900 BURRARD STREET
More informationSodded Area. 8.5 m Storm Easement Typ. R12000 FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE
. m 0.0 m Standard Municipal Notes Standard Municipal Notes CIVIL AND GRADING INFO: REFER TO DRAWINGS BY GHD DATED: Mar., 0 SITE LIGHTING INFO: REFER TO DRAWINGS BY HAMMERSCHLAG + JOFFE INC. DATED: Jan.,
More informationMARRIOTT HQ BETHESDA, MD DESIGN ADVISORY PANEL November 8th, 2017 VICINITY MAP ILLUSTRATIVE SITE PLAN HOTEL ENTRANCE BAR OFFICE LOBBY RESTAURANT LAYBY LANE DIAGRAMS SHARING STEPPING EMBRACING ARTICULATING
More informationL1.01 LEE HIGHWAY SHREVE APARTMENTS ENLARGEMENT 2 SEE SHEET - L COURTYARD HARDSCAPE PLAN SEE SHEET - L COURTYARD LANDSCAPE PLAN
6416 Grovedale Drive, Suite 100-A Alexandria, Virginia 10 Tel: 70.719.6500 Fax: 70.719.650 Email: frontdesk@studio9.com TY PER E LIN PRO IL O E L SIT CA ORI HIST RK T EN EXT O FW O ENLARGEMENT SEE SHEET
More informationUCSD Revelle College Apartments
UCSD Revelle College Apartments Regents Committee on Grounds and Buildings Preliminary Review of Design November 18, 2008 Project Information In-fill project of 510 student beds Six students per apartment
More informationKieran Boughan. San Francisco Architect RESIDENTIAL
LOEVEN/BURRBIDGE RESIDENCE 159 DAY STREET San Francisco, CA Right: Front Sketch Elevation Renovation and 2-story additions to a cottage-style house in Noe Valley. The existing house had living space above
More information353 W. Grand June 18, 2018
353 W. Grand COMMUNITY MEETING June 18, 2018 Developer / Owner / CG : The Onni Group Architect of Record : Brininstool + Lynch Zoning Counsel : Taft Stettinius & Hollister LLP Traffic Consultant : Eriksson
More information8 Delanson Circle Wellesley, MA PROJECT NARRATIVE
8 Delanson Circle Wellesley, MA 02482 PROJECT NARRATIVE Located in the heart of Wellesley at the intersection of Linden and Hollis Streets, directly across the street from the Wellesley Square MBTA Commuter
More information14 SE 4th Street, Boca Raton, FL Tel Fax Web
SIGN LOCATION BACK UP SPACE (NO ) OUTDOOR DINING POCKET PARK SIGN LOCATION CANOPY ABOVE BIKE (7) SECURED BIKE STORAGE (1) OPEN MESH SCREEN WALL POCKET PARK PROPERTY LINE 7'-0" PARKWAY 7'-0" PARKWAY A B
More information625 San Anselmo Ave. Planning Submittal A0.00
LIVE OAK DESIGN COMPANY 855 POLK STREET #0 SAN FRANCISCO, CA 9409 65 SAN ANSELMO AVE. LLC SHEET NUMBER INDEX OF DRAWINGS SHEET NAME 0/09/08 - Planning Submittal 0/5/08 - Planning Submittal Rev 0 A0.00
More informationKENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018
KENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018 INDEX 1 2 3 4 5 6 7 8 9 10 12 13 Index Page Project Introduction Summary Building Character Context
More information8150 SUNSET BOULEVARD 8150 SUNSET BLVD., LOS ANGELES, CA ALTERNATIVE 9 DRAWING SET MAY 13, 2016
BOULEVARD BLVD., LOS ANGELES, CA 90046 DRAWING SET MAY 13, 2016 SHEET # SHEET TITLE SCALE ISSUE AND DATE MAY 13, 2016 A000 SERIES GENERAL INFORMATION, SITE INFORMATION A001 DRAWING INDEX NTS A002 VICINITY
More informationTHE SAVOY 5TH & G STREETS, WEST SACRAMENTO, CALIFORNIA A0.1 SHEET INDEX PROJECT DIRECTORY BUILDING SUMMARY VICINITY MAP PROJECT SUMMARY
, WEST SACRAMENTO, CALIFORNIA 95605 VICINITY MAP BUILDING SUMMARY PROJECT SUMMARY PROJECT DIRECTORY SHEET INDEX TOTAL 13 SHEETS N.T.S. PROJECT DESCRIPTION ADDRESS COUNTY JURISDICTION ASSESSORS PARCEL NUMBER
More informationTOWN OF WYTHEVILLE LICENSE REGULATIONS FOR OUTDOOR DINING/ OUTDOOR FURNITURE
TOWN OF WYTHEVILLE LICENSE REGULATIONS FOR OUTDOOR DINING/ OUTDOOR FURNITURE Adopted June 11, 2018 SECTION 1. GENERAL PURPOSE 1. 1 The Open Air Dining/Outdoor Furniture regulations are intended for the
More informationTHE CORPORATION OF DELTA ADVISORY DESIGN PANEL. Alex Cauduro, Planner Wendy Li, Recording Clerk. The meeting was called to order at 6:28 p.m.
THE CORPORATION OF DELTA ADVISORY DESIGN PANEL Minutes of the Regular Meeting of the Advisory Design Panel held Thursday, August 27, 2015 at 6:30 p.m. in the Tilbury Room at Delta Municipal Hall, 4500
More informationDOT BLOCK 22 SEP 2015 RODE ARCHITECTS INC
LOCUS MAP SOUTH BOSTON UMASS JFK/UMASS SAVIN HILL SOUTHEAST EXPRESSWAY FREEPORT ST ANDREW DORCHESTER AVENUE NEWMARKET SOUTH BAY CENTER PLEASANT ST UPHAMS CORNER HANCOCK ST DOT BLOCK FIELDS CORNER UPHAMS
More informationArchitect: Lucio Trabucco Nunes Trabucco Architects 109 Highland Avenue Needham, MA Tel: Fax:
Boston Redevelopment Authority Article 80 Small Project Review Submittal for Proposed Residential Building 317 Belgrade Avenue Roslindale, Massachusetts 02131 Architect: Lucio Trabucco Nunes Trabucco Architects
More informationVillage of Vernon Hills Committee of the Whole January 10, 2017 Project No. 610 January 10, 2017 PROPOSED PROJECT Regional Map 2 PROPOSED PROJECT Context Map 3 N:\Projects\8847\SURVEY\8847ALTA-01.dgn Sheet
More informationM E M O. September 14, 2017 Agenda Item #4. Planning Commission. David Goodison, Planning Director
September 14, 2017 Agenda Item #4 M E M O To: From: Planning Commission David Goodison, Planning Director Re: Preliminary review of an application for a mixed-use development proposed for 870 Broadway
More informationPLANNING COMMISSION AGENDA REPORT. Proposed Five-Story, 50-Unit Multiple-Family Building at 4856 El Camino Real
Meeting Date: September 20, 2018 PLANNING COMMISSION AGENDA REPORT Subject: Prepared by: Initiated by: Zachary Dahl, Planning Services Manager Applicant and Owner Mircea Voskerician, LuxOne LLC Attachments:
More informationSherwood Forest (Trinity) Housing Corporation. Urban Design Brief
Sherwood Forest (Trinity) Housing Corporation Sherwood Place Affordable Housing Apartments Trinity Presbyterian Church Orchard Park Nursery School 590 Gainsborough Road, London Urban Design Brief REVISED
More informationth Avenue NW Early Design Guidance Meeting - SDCI # EDG Meeting
- Proposed New Residential Construction Project (SDCI #3024352) 1 SEATTLE DESIGN REVIEW Date of EDG Meeting Early Design Guidance Meeting 1 PROJECT SUMMARY The proposed project consists of 74 residential
More information12th Avenue Arts 29,058 SF (0.67 acres) 149,501 SF Seattle, WA Midrise, Mixed-Use Residential
Project Name : Lot Size : Building Size : Location : Project Type : 12th Avenue Arts 29,058 SF (0.67 acres) 149,501 SF Seattle, WA Midrise, Mixed-Use Residential Project Narrative : Rapid redevelopment
More informationSPAR SUBMITTAL COMMENT RESPONSES - NOVEMBER 3, 2016
File Name & Location: Z:\230 - SNM - Essex San Mateo Study\Drawings\AutoCad\09 Sheet Files\A000.dwg Layout: A000 - COVER Printed: Wed, 02 Nov 206-8:09 COMMENT RESPONSES - NOVEMER 3, 206 CIVIL ENGINEER:
More informationLOOP HOUSE. elevated tube for working and a wrapping tube for living.
58 56 54 52 8 5 50 6 5 48 54 46 52 50 48 46 44 4 4 42 42 40 40 8 46 2 28 0 8 6 26 4 24 22 22 24 26 28 0 2 4 6 8 4 6 40 8 42 40 N HELICOPTER VIEW FROM SOUTHWEST PROJECT LOOP HOUSE TYPE NEW CONSTRUCTION
More informationVERTICAL MIXED USE DEVELOPMENT (Urban Village)
VERTICAL MIXED USE DEVELOPMENT (Urban Village) Overall Goal Statement Vertical Mixed Use (Urban Villages) have similar goals to Horizontal Mixed Use except densities are usually higher and projects frequently
More informationLAKE JONATHAN FLATS 1 1/14/2017
LAKE JONATHAN FLATS 3D VIEW 1 1/14/2017 UDIO ARCHITECTS Studio 55 Architects, LLP 10700 Highway 55, suite 275 Plymouth, MN 55441 763.544.8370 studio55architects.com 190'-5" 200'-0" 152'-5" 14'-8" 100 TRASH
More informationSaint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale or Lease Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: R. F. WAGNER SEC SCL ARTS & TECH-Q, 47-07 30TH PLACE, New York, 11101 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-16
More informationSTAFF DESIGN REVIEW RESIDENTIAL BUILDING APPLICATION SUPPLEMENT
STAFF DESIGN REVIEW RESIDENTIAL BUILDING APPLICATION SUPPLEMENT OFFICIAL USE ONLY Case #: Received By: Master File #: Project Planner: Date: Related Cases: Single Family, including Townhomes (ln-fill housing
More informationChapter DOWNTOWN ZONING DISTRICTS
Chapter 20.14 Sections: 20.14.010 Purpose of the Downtown Zoning Districts 20.14.020 Land Use Regulations for Downtown Zoning Districts 20.14.030 Development Standards for Downtown Zoning Districts 20.14.010
More informationSTANDARDS FOR OUTDOOR DINING AREAS ON 8 th STREET
STANDARDS FOR OUTDOOR DINING AREAS ON 8 th STREET ADOPTED BY THE CCDC BOARD OF COMMISSIONERS ORIGINAL ADOPTION: APRIL 10, 2006 REVISION: AUGUST 12, 2013 Introduction CCDC owns the 8 th Street right-of-way
More information8.14 Single Detached with Granny Flat or Coach House Edgemere
8.14 Single Detached with Granny Flat or Coach House Edgemere [Bylaw 8922, Nov 19/12] (RE1) 8.14.1 Purpose The zone applies to the Edgemere (RE1) neighbourhood and provides for single detached housing
More informationRODE. Article 80 Small Project Review Application. 232 Old Colony Avenue Mixed Use Development 232 Old Colony Avenue South Boston, MA 02127
Article 80 Small Project Review Application 232 Old Colony Avenue South Boston, MA 02127 RODE Architects Inc. Contents Project Summary Project Team 05 Project Summary 06 Community Benefi ts 06 Detailed
More information1950 ADDISON. Berkeley, CA December 17, Design Reivew. Westwood BayRock Addison, L.P. c/o BayRock Multifamily, LLC
Page 1 of 38 1950 ADDISON Berkeley, CA Design Reivew c/o BayRock Multifamily, LLC Vicinity Map Drawing list Project team Martin Luther Jr. Way 1911 Addison 1915 Addison 1912 Addison Existing Residential
More informationMARCH 2011 San Francisco
TENANT SIGNAGE CRITERIA MARCH 2011 San Francisco Introduction The Westfield Tenant Criteria Manuals assist in familiarizing you and your team with the image, character and objectives that set the tone
More informationMemo to the Planning Commission HEARING DATE: JUNE 30, 2016
Memo to the Planning Commission HEARING DATE: JUNE 30, 2016 Date: June 23, 2016 Case No.: 2014.0519CUAVAR Project Address: 2100 Market Street Zoning: Upper Market Street Neighborhood Commercial Transit
More information722 WILLIAMSON STREET
PROJECT DESCRIPTION The organizing principle of the design is a simple stepped massing that initially addresses urban context of Williamson Street; relating contextually to the height, mass, materials
More informationJurys Inn Nottingham. Property. Introduction. Pre-Arrival
This access statement does not contain personal opinions as to our suitability for those with access needs, but aims to accurately describe the facilities and services that we offer all our guests/visitors
More informationHotelRED Revitalization and Expansion 1501 Monroe Street Madison, WI 53711
Tuesday, June 27, 2017 Tim Parks City of Madison Department of Planning & Community & Economic Development 126 S. Hamilton Street Madison, WI 53701 RE: Letter of Intent: Conditional Use HotelRED Dear Mr.
More informationDESIGN, ACCESS & PLANNING STATEMENT
(MADRON STREET) LONDON SE1 5UB DESIGN, ACCESS & PLANNING STATEMENT The architectural response for the site has been designed with regard to the following: The New Southwark Plan The London Plan: Spatial
More informationWilson Bridge Corridor Zoning. Department of Planning & Building
Wilson Bridge Corridor Zoning Department of Planning & Building Background: Wilson Bridge Road Corridor Study The City conducted a strategic study of one of the community s primary economic centers, the
More informationSCANDINAVIAN DESIGNS - CORTE MADERA
CONCEPT PHASE - PRELIMINARY PLANNING REVIEW DOCUMENTS FEBRUARY 4, 2017 SCANDINAVIAN DESIGNS HISTORY FAMILY RUN COMPANY : 32 FURNITURE STORES IN 7 STATES MARIN COUNTY RESIDENTS : 3 GENERATIONS FIRST STORE
More informationURBAN DESIGN BRIEF WELLINGTON STREET GREY STREET, CITY OF LONDON April 23, 2018
URBAN DESIGN BRIEF 147-149 WELLINGTON STREET + 253-257 GREY STREET, CITY OF LONDON April 23, 2018 TABLE OF CONTENTS INTRODUCTION SECTION 1 LAND USE PLANNING CONTEXT 1.1 The Subject Lands 1.2 The Proposal
More informationGoal 1 - Retain and enhance Cherry Creek North s unique physical character.
Introduction This document summarizes the proposed new zoning for the area of roughly bordered by University Boulevard, Steele Street, 3rd Avenue, and 1st Avenue. It provides a high-level review of the
More information1 EAST ELEVATION 2 NORTH ELEVATION 3 COURTYARD ELEVATION
EAST ELEVATION NORTH ELEVATION 3 3 COURTYARD ELEVATION WEST ELEVATION SOUTH ELEVATION NORTH ELEVATION EAST ELEVATION 3 3 COURTYARD ELEVATION SOUTH ELEVATION WEST ELEVATION 3 3 COURTYARD ELEVATION EAST
More informationProperty. Introduction
This access statement does not contain personal opinions as to our suitability for those with access needs, but aims to accurately describe the facilities and services that we offer all our guests/visitors
More informationTHIRD & SIDNEY MIXED USE + COMMERCIAL
ISSUED FOR DEVELOPMENT PERMIT - 20.0.0 DRAWING LIST P LANDAPE PLAN NORTH-WEST PERSPECTIVE SIDNEY AVE 2ND ST COVER + SITE PLAN STREET VIEWS (UNDERGROUND) PLAN LEVEL PLAN - MIXED USE + COMMERCIAL BLDG. LEVELS
More informationRESIDENTIAL Site Plan Architecture Review Cannon Trail Project Narrative
RESIDENTIAL Site Plan Architecture Review Cannon Trail Project Narrative Thank you for the opportunity to present the architecture planned for Cannon Trail. The challenge Diverge Homes faced when creating
More informationCozy by Design Communities for the 21 st Century
Cozy by Design Communities for the 21 st Century Rome 5,150/sq mi London 11,000/sq mi Paris 64,000/sq mi Phoenix 2,700/ sq mi Kowloon 154,000/sq mi Amsterdam 11,200/sq mi Athens 26,500/ sq mi Coziness
More informationREQUEST FOR ALTERATION REVIEW VERANDA GARDENS HOMEOWNERS ASSOCIATION, INC.
Please Complete The Following Name: Directions: 1. Fill in requested information 2. Attach required checks Address: 3. Attach required certificates 4. Sign required forms and return to: Lot number GRS
More informationUrban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London
Urban Design Brief 1635 (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London Site Plan Control Application Holding Provision Application April 1, 2015 Prepared for: Rise Real
More informationModel of Camino Crossroads: (a) Looking north and (b) looking south.
PROJECT DESCRIPTION (a) (b) Model of Camino Crossroads: (a) Looking north and (b) looking south. Overview This section describes the design concept and objectives; the contextual issues; and Planned Community
More informationMINNETONKA PLANNING COMMISSION Feb. 15, Amendments to the design criteria for the Ridgedale Restaurant Properties at Wayzata Boulevard
MINNETONKA PLANNING COMMISSION Feb. 15, 2018 Brief Description Amendments to the design criteria for the Ridgedale Restaurant Properties at 12415 Wayzata Boulevard Recommendation Adopt the resolution approving
More informationPenny Flats North 323 N Mason
Taft Hill Lemay Mason Ct Timberline Mason Ct Penny Flats North 323 N Mason Vicinity Map Aerial Site Map 287 «1 Douglas 25 Mountain Vista UV 14 287 ^_ Vine Mulberry Prospect Shields Drake Horsetooth 25
More informationMEMORANDUM. TO: Plan Commission. FROM: Jeff Ryckaert, Principal Planner and Dan Nakahara, Planner. DATE: October 5, 2017
MEMORANDUM TO: Plan Commission FROM: Jeff Ryckaert, Principal Planner and Dan Nakahara, Planner DATE: October 5, 2017 RE: Public Hearing on the Request for Approval of a Class B Special Use to Permit the
More information74af ANTELOPE VALLEY REDEVELOPMENT PLAN
74af T. Telegraph District Phase 2: Telegraph Flats & Telegraph Lofts East 1. Project Area Description Phase 2 will include two building subphase areas with connecting streetscape enhancements: The Telegraph
More informationPUBLIC NOTICE* Studies Requested: Parking analysis. Other Required Permits: Building Permit, Site Development Permit
C I T Y O F T A C O M A Planning & Development Services Department 747 Market St, Rm 345 Tacoma, WA 98402 PUBLIC NOTICE* Date of Notification: 1/15/2019 Application Received: 12/03/2018 Application Complete:12/07/2018
More informationARTICLE 3: RESIDENTIAL DISTRICTS
ARTICLE 3: RESIDENTIAL DISTRICTS SECTION 2.3.010 DISTRICTS 1) Purpose Roseburg s residential Zoning Districts are primarily intended to create, maintain and promote a variety of housing opportunities for
More informationProperty. Introduction
This access statement does not contain personal opinions as to our suitability for those with access needs, but aims to accurately describe the facilities and services that we offer all our guests/visitors
More informationCYCLE HOUSE. Seattle, Washington 2500 sf. 18 bicycles. Two people. One house.
CYCLE HOUSE Seattle, Washington 2500 sf 18 bicycles. Two people. One house. This new ground-up urban infill residence is strategically located at the intersection of two major bike routes in the Mount
More informationRM-8 and RM-8N Districts Schedule
Districts Schedule 1 Intent The intent of this schedule is to encourage development of ground-oriented stacked townhouses or rowhouses, including courtyard rowhouses, while continuing to permit lower intensity
More informationRM-7, RM-7N and RM-7AN Districts Schedules
1 Intent Districts Schedules The intent of this schedule is to encourage development of ground-oriented stacked townhouses or rowhouses, while continuing to permit lower intensity development. In RM-7AN,
More informationConditional Use Application for the proposed 222 South Bedford Apartment Building Demolition Permit and Rezoning of DR2 portion of site
LETTER OF INTENT 222 South Bedford Street To: From: Re: City of Madison Planning Department and Plan Commission 215 Martin Luther King Jr. Blvd. LL110 Madison, WI 53703 Brad Binkowski & Anne Morrison Urban
More informationCommunity Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016
Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016 1 Project Team City: David Belmer Planning and Building Director Jonathan Borrego, AICP Planning Services Manager Gustavo
More informationAuthority: Ontario Municipal Board Decisions/Orders issued June 26, 2014, August 24, 2015 and July 13, 2016 in Board File PL CITY OF TORONTO
Authority: Ontario Municipal Board Decisions/Orders issued June 26, 2014, August 24, 2015 and July 13, 2016 in Board File PL130285 CITY OF TORONTO BY-LAW 591-2018(OMB) To amend former City of Toronto Zoning
More informationZA and ZA Zoning Change and Concept / Site Plan Preliminary Plat Delta Southlake Center
ZA16-051 and ZA16-052 Zoning Change and Concept / Site Plan Preliminary Plat Delta Southlake Center ZA16-051 and ZA16-052 Owner: Applicant: Requests: Dominion Southlake Properties, LLC, White Chapel Village
More information467 FIRST STREET Three-Story Class A Boutique Office Plaza Development
Three-Story Class A Boutique Office Plaza Development EXCLUSIVE PREVIEW, CA greggd@ jhedberg@ Project Highlights ±18,300 SF Environmentally focused building design Signature Gateway corner location Warm
More informationMEMORANDUM. B4S-2 Downtown Service District DP Downtown Parking Overlay District 42,390 square feet / 0.97 acres. DMNA; adjacent to North Loop
Department of Community Planning & Economic Development 0 South th Street, Room 00 Minneapolis, MN -8 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Janelle Widmeier, Senior
More informationARTICLE 5. COMMERCIAL AND OFFICE DISTRICTS 5.1 PURPOSE STATEMENTS 5.2 USES 5.3 DIMENSIONAL STANDARDS 5.4 DESIGN STANDARDS 5.5 DK DISTRICT STANDARDS 5
ARTICLE 5. COMMERCIAL AND OFFICE DISTRICTS 5.1 PURPOSE STATEMENTS 5.2 USES 5.3 DIMENSIONAL STANDARDS 5.4 DESIGN STANDARDS 5.5 DK DISTRICT STANDARDS 5.6 CU DISTRICT STANDARDS 5.7 SW DISTRICT STANDARDS THE
More informationVillage of Glenview Plan Commission
Village of Glenview Plan Commission STAFF REPORT May 13, 2014 TO: Chairman and Plan Commissioners CASE #: P2014-037 FROM: Community Development Department CASE MANAGER: Tony Repp, Planner SUBJECT: Final
More informationSAMMAMISH COMMUNITY CENTER FEASIBILITY STUDY
Volume 1 of 2 TABLE OF CONTENTS: 1 COVER PACKAGE 2 SITE PHOTOGRAPHS 3 SITE PLAN 4 UPPER FLOOR PLAN 5 LOWER FLOOR PLAN 6 AXONOMETRIC ROOF PLAN 7 AXONOMETRIC UPPER FLOOR PLAN 8 AXONOMETRIC LOWER FLOOR PLAN
More informationAdvisory Design Panel Report For the Meeting of February 27, 2019
Advisory Design Panel Report For the Meeting of February 27, 2019 To: Advisory Design Panel Date: February 15, 2019 From: Subject: Moira Wilson, Senior Planner - Urban Design 952 Johnson Street and 1400
More informationMarina 87 Developer's Resumes
, Downtown Des Moines in the Marina District, on-site parking, secure building, tons of amenities, close 200th Link. Walking distance to all major services, restaurants, Waterfront Beach Park, Des Moines
More informationTHE STONYBROOK ISSUED FOR CONSTRUCTION CRM PROPERTY DEVELOPMENT CORP WASHINGTON ST. BOSTON, MA AUGUST 11, 2016
THE STONYBROOK CRM PROPERTY DEVELOPMENT CORP. ISSUED FOR CONSTRUCTION BOYLSTON STREET MONTEBELLO ROAD HAVERFORD STREET 3193 AERIAL VIEW THE STONYBROOK 01 copyright: Studio, llc. 8/10/2016 3:50:45 PM SCHOOL
More informationAllowing for a 3 off-street parking stall reduction.
DISTRICT OF SQUAMISH REPORT TO: Council FOR: Business PRESENTED: July 17 th, 2007 FILE: DP No. 268 FROM: SUBJECT: Planning Department Development Permit No. 268 38144 Cleveland Avenue Recommendation: THAT
More informationAppendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017
Appendix1,Page1 Urban Design Guidelines DRAFT September 2017 Back to Back and Stacked Townhouses Appendix1,Page2 Table of Contents 1 Introduction 1 1.1 Purpose 1 1.2 Urban Design Objectives 1 1.3 Building
More informationInfill & Other Residential Design Review
Infill & Other Residential Design Review December 2018 Infill and Other Residential Design Review applies to projects that are located within the Infill Regulations District, on properties immediately
More informationREPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT, ENGINEERING, AND SUSTAINABILITY DEPARTMENT
April 19, 2018 REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT, ENGINEERING, AND SUSTAINABILITY DEPARTMENT ON REZONING APPLICATION NO. REZ00631 DEVELOPMENT PERMIT APPLICATION NO. DPM00627
More informationLITTLE MOUNTAIN ADJACENT AREA REZONING POLICY
LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY JANUARY 2013 CONTENTS 1.0 INTENT & PRINCIPLES...1 2.0 APPLICATION...2 3.0 HOUSING TYPES, HEIGHT & DENSITY POLICIES...3 3.1 LOW TO MID-RISE APARTMENT POLICIES...4
More informationBethesda Downtown Design Advisory Panel Submission Form
Bethesda Downtown Design Advisory Panel Submission Form PROJECT INFORMATION Project Name File Number(s) Project Address Plan Type Concept Plan Sketch Plan Site Plan APPLICANT TEAM Primary Contact Architect
More information