SCANDINAVIAN DESIGNS - CORTE MADERA
|
|
- Trevor Lyons
- 6 years ago
- Views:
Transcription
1 CONCEPT PHASE - PRELIMINARY PLANNING REVIEW DOCUMENTS FEBRUARY 4, 2017
2 SCANDINAVIAN DESIGNS HISTORY FAMILY RUN COMPANY : 32 FURNITURE STORES IN 7 STATES MARIN COUNTY RESIDENTS : 3 GENERATIONS FIRST STORE OPENED ON CORNER OF 4TH AND C STREET IN SAN RAFAEL IN 1963 FEBRUARY 4,
3 CORTE MADERA HISTORY AND CULTURAL VALUES CORTE MADERA = CHOP WOOD FARMERS MARKETS ARTISTIC TRADITION CORTE MADERA ECO RESERVE FEBRUARY 4,
4 CORTE MADERA TAMAL VISTA BLVD CORRIDOR LIMIT SCALE NEAR TAMAL VISTA ENHANCE AMENITIES MIXED USES TRANSITION TO PEDESTRIAN SCALE FEBRUARY 4,
5 SCANDINAVIAN DESIGNS VALUES corte madera community crayon initiative volunteers CORTE MADERA MARSHES AND ECOLOGICAL RESERVE CORTE MADERA city aerial with hwy 101 running through HYGGE FORMGIVING FUNKIS + ELEGANS COMMUNITY SENSE OF PLACE GATHERING ORGANIC REJUVENATION PLASTICITY LIGHT NATURE DISINTEGRATING MINIMALISM RATIONAL SIMPLE AUTHENTIC CLEAN FEBRUARY 4,
6 CORTE MADERA + SCANDINAVIAN SHARED VALUES CORTE MADERA HISTORY OF LUMBER PRODUCTION SCANDINAVIAN DESIGN NATURAL MATERIALS/USE OF WOOD PEDESTRIAN SCALE DEVELOPMENT PRAGMATIC BEAUTY VITALITY REJUVENATION AND GATHERING NATURE AND WILDLIFE NATURE AND ORGANIC FORM RICH ARTS AND CULTURE COMMUNITY AND PLACE FEBRUARY 4,
7 SCANDINAVIAN DESIGNS ALGONQUIN ICONIC ROOF FORM AS BRANDING SIMPLE + CLEAN LINES WOOD + NATURAL MATERIAL PALETTE COURTYARD SPACE TO EASE TRANSITION FROM STREET FEBRUARY 4,
8 SCANDINAVIAN DESIGNS ROCKLIN ICONIC ROOF FORM AS BRANDING GARDEN ENTRY COURTYARD WOOD + NATURAL MATERIAL PALETTE FEBRUARY 4,
9 VICINITY MAP SITE EXISTING THEATRE TAMAL VISTA BLVD HIGHWAY 101 FEBRUARY 4,
10 ZONING REQUIREMENTS FLOOD PLAIN 210 FT 419 FT 7-0 TO FLOOD PLAIN (AT 11 NAVD) UNDERGROUND POWER LINES 2.03 ACRES SIDEwALK AT 4 NAVD 7-0 TO FLOOD PLAIN (AT 11 NAvD) 6-0 PERSON ON STREET (SIDEwALK AT 4 NAvD) FEBRUARY 4,
11 ZONING REQUIREMENTS HEIGHT RESTRICTIONS 40-0 MAXIMUM HEIGHT w/ PC APPROvAL (35-0 w/o approval) 25-0 ALLOWABLE VARIATION MAXIMUM HEIGHT w/ PC APPROvAL (25-0 w/o approval) 25 +/ / ALLOwABLE variation 30-0 MAX HEIGHT w/ pc approval 40-0 MAX HEIGHT w/ pc approval FEBRUARY 4,
12 ZONING REQUIREMENTS 50-0 REAR SETBACK (30-0 w/ pc approval) SETBACKS 15-0 ADDITIONAL REAR SETBACK (if above 25-0 ) 10-0 SIDE SETBACKS 10-0 ADDITIONAL FRONT SETBACK (if above 1st story) 40-0 FRONT SETBACK (front 20-0 street scape) MINIMUM FRONTAGE REQUIREMENT: 33.3% (BY ZONING) +/ SETBACKS S I T E +/ TAMAL vista BOULEvARD FEBRUARY 4,
13 ZONING REQUIREMENTS 10% OF PARKING AREA REQUIRED AS LANDSCAPE (BY ZONING) 15-0 W LANDSCAPE SCREEN 10-0 H MIN (E side) LANDSCAPE 5-0 W LANDSCAPE SCREEN 6-0 H MIN (N & S sides) 20-0 PUBLIC REALM BY RSA (w side) 20-0 STREET SCAPE BY CITY (w side) LANDSCAPE S I T E 41 TAMAL vista BOULEvARD FEBRUARY 4,
14 EXISTING CONDITIONS EXISTING HOTEL +/- 35 FT HEIGHT +/- 25 FT SETBACK +/- 10% GREEN SPACE 100 PARKING SPACES SITE PLAN ZONING REQUIRED +/- 25 FT PROPERTY LINE 20 SETBACK (BY CITY) 20 SETBACK (BY RSA) 10 ADDITIONAL SETBACK (ANY STORY ABOVE FIRST) EXISTING THEATRE 25 HEIGHT MAX (30 W/ PC APPROVAL) HIGHWAY 101 +/- 40 FT HEIGHT +/- 25 FT SET BACK +/- 1% GREEN SPACE 160 PARKING SPACES EXISTING OFFICE +/ FT HEIGHT +/- 125 FT SET BACK +/- 15% GREEN SPACE 130 PARKING SPACES TAMAL VISTA BLVD. +/- 25 FT +/- 125 FT FEBRUARY 4,
15 SCANDINAVIAN DESIGNS INITIAL IDEAS A B C TAMAL VISTA BLVD TAMAL VISTA BLVD TAMAL VISTA BLVD CENTER DRIVE STRIP SHOP CENTER COURTYARD FEBRUARY 4,
16 SCANDINAVIAN DESIGNS DESIGN APPROACH THE ESSENCE : LOCAL SIMPLICITY FUNCTION THE WELCOMING : SENSE OF PLACE/TIME HUMAN SCALE RELATIONSHIP OF ELEMENTS THE GATHERING : FOCAL POINT EXPERIENCE CONNECTION VS. DISCONNECTION THE LIGHT : NATURAL VS. ARTIFICIAL EXPOSURE TO COLOR SOURCE OF LIFE THE NATURE : BALANCE HARMONY REJUVENATION FEBRUARY 4,
17 SCANDINAVIAN DESIGNS CONCEPT DIAGRAM TAMAL VISTA BLVD COURTYARD LOBBY HIGHWAY FEBRUARY 4,
18 DESIGN FOCUS PROGRAM RESTAURANT ROOF DECK ABOVE DOUBLE HEIGHT LOBBY RESTAURANT 3,607 SF BRIDGE FURNITURE 23,888 SF FIRST FLOOR RETAIL 1,675 SF RESIDENCE GARAGE RES (4) UNITS PARKING BELOW NON-RESIDENTIAL MAX FAR:.34 RESIDENTIAL MAX FAR:.06 TOTAL MAX FAR ALLOWED:.40 NON-RESIDENTIAL FAR PROVIDED:.34 RESIDENTIAL FAR PROVIDED:.06 TOTAL FAR PROVIDED:.40 FEBRUARY 4,
19 RESTAURANT VISION FEBRUARY 4,
20 DESIGN FOCUS PUBLIC SPACE + LANDSCAPE PUBLIC CORRIDOR BIKE PATH RESTAURANT COURTYARD RETAIL RESIDENTIAL RES COURTYARD RESIDENTIAL LOBBY GARDEN ACCESS AISLE 10% 22% REQUIRED PROVIDED 4,986 SF 10,992 SF FEBRUARY 4,
21 DESIGN FOCUS PARKING FIRE TRUCK ACCESS SIMPLE DRIvE AISLE CIRCULATION SITE ENTRY/ EXIT COURTYARD PARKING CIRCULATION 41 TAMAL vista BOULEvARD FEBRUARY 4,
22 PARKING CALCULATIONS RESTAURANT PARKING 1 SPACE PER 75 SQUARE FEET 1 SPACE PER EVERY 3 EMPLOYEES (7.5 EMPLOYEES PER 1,000 SQUARE FEET) RESTAURANT SQUARE FOOTAGE: EMPLOYEES: RETAIL PARKING 1 SPACE PER 250 SQUARE FEET RETAIL SQUARE FOOTAGE: RESIDENTIAL PARKING 1 SPACE PER BEDROOM FURNITURE RETAIL PARKING 1 SPACE PER 400 SQUARE FEET FURNITURE RETAIL SQUARE FOOTAGE: ,607 SF EMPLOYEES 1,675 SF 4 APARTMENTS BICYCLE PARKING REQUIRED: 25 23,888 SF 35 COMPACT SPACES ALLOWED: TOTAL PARKING: FEBRUARY 4,
23 PARKING SCANDINAVIAN DESIGNS STORES MAX NUMBER OF CARS ON SITE AT ONE TIME: 14 AVERAGE NUMBER OF CARS PER DAY: 32.5 CURRENT ZONING REQUIREMENT: 1 SPACE/400 SF 60 = 5 CARS FEBRUARY 4,
24 PARKING SOLUTIONS LIFTS FOR EMPLOYEE PARKING RIDE SHARE PROGRAM FOR EMPLOYEES RESTAURANT AND RETAIL MIX SHARED USE AGREEMENT WITH COMMERCIAL NEIGHBORS SF RESTAURANT SPACES 1607 SF RETAIL DELI FEBRUARY 4,
25 DESIGN FOCUS OVERALL LONG FACADE EXPOSURE TO HIGHwAY AND VIEWS TO THE BAY GREENSPACE BELOw FURNITURE STORE CREATES AN ACCESS AISLE BETwEEN PARKING 40 HEIGHT OPEN CENTRAL COURTYARD LOCATED FOR PUBLIC USE +/- 35 HEIGHT 25 RESTAURANT FURNITURE RESIDENTIAL 25 HEIGHT RESIDENCES/ RETAIL AND RESTAURANT HAvE EXPOSURE AND VIEWS TO THE STREET FRONT AND MT. TAM RETAIL 25 HEIGHT +/ TAMAL vista BOULEvARD FEBRUARY 4,
26 CONCEPT PERSPECTIVE WEST FEBRUARY 4,
27 CONCEPT PERSPECTIVE WEST FEBRUARY 4,
28 CONCEPT PERSPECTIVE WEST FEBRUARY 4,
29 CONCEPT PERSPECTIVE SOUTHWEST TAMAL VISTA BLVD 7 FT 25 FT FEBRUARY 4,
30 CONCEPT PERSPECTIVE SOUTHWEST TAMAL VISTA BLVD FEBRUARY 4,
31 CONCEPT PERSPECTIVE SOUTHWEST FEBRUARY 4,
32 CONCEPT PERSPECTIVE NORTHWEST TAMAL VISTA BLVD FEBRUARY 4,
33 CONCEPT PERSPECTIVE NORTHWEST TAMAL VISTA BLVD FEBRUARY 4,
34 CONCEPT PERSPECTIVE NORTHWEST TAMAL VISTA BLVD FEBRUARY 4,
35 CONCEPT PERSPECTIVE NORTHWEST FEBRUARY 4,
36 CONCEPT PERSPECTIVE NORTH FEBRUARY 4,
37 CONCEPT PERSPECTIVE NORTH FEBRUARY 4,
38 CONCEPT PERSPECTIVE NORTH FEBRUARY 4,
39 CONCEPT PERSPECTIVE NORTHEAST FEBRUARY 4,
40 CONCEPT PERSPECTIVE SOUTHEAST FEBRUARY 4,
41 CONCEPT PERSPECTIVE COURTYARD FEBRUARY 4,
CORTE MADERA PLANNING COMMISSION STAFF REPORT
CORTE MADERA PLANNING COMMISSION STAFF REPORT REPORT DATE: MARCH 10, 2017 MEETING DATE: MARCH 14, 2017 TO: FROM: SUBJECT: APPLICANT: PURPOSE: PLANNING COMMISSIONERS ADAM WOLFF, DIRECTOR PLANNING AND BUILDING
More informationFor Lease: Class A Office Space
200 Tamal Plaza, Ground Floor, Corte Madera, CA Flexible Floor Plans Fiber Optics On Site Medical Uses Permitted Close to Hwy. 101 Views of Mt. Tamalpais Available Now Available Sq Ft: Initial Base Rent:
More informationFor Sublease: Class A Office Space
200 Tamal Plaza, Ste. 109/111, Corte Madera Great Floor Plan Fiber Optics On Site Medical Uses Permitted Close to Hwy. 101 Windows on 2 Sides Available Now Offering Summary Available Sq Ft: 2,509 +/- sf
More informationRiver Glen Apartments
River Glen Apartments Rochester, Minnesota Developed by Village Capital Corporation, A Pedcor Company Vicinity Map Site River Glen Apartments are a multi-family residential community to be located in Northern
More information722 WILLIAMSON STREET
PROJECT DESCRIPTION The organizing principle of the design is a simple stepped massing that initially addresses urban context of Williamson Street; relating contextually to the height, mass, materials
More informationKENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018
KENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018 INDEX 1 2 3 4 5 6 7 8 9 10 12 13 Index Page Project Introduction Summary Building Character Context
More informationArticle 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT
Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT this page left intentionally blank Contents ARTICLE 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT DIVISION 3.1 NEIGHBORHOOD CONTEXT DESCRIPTION...3.1-1 Section 3.1.1
More informationth Avenue NW Early Design Guidance Meeting - SDCI # EDG Meeting
- Proposed New Residential Construction Project (SDCI #3024352) 1 SEATTLE DESIGN REVIEW Date of EDG Meeting Early Design Guidance Meeting 1 PROJECT SUMMARY The proposed project consists of 74 residential
More informationActive Planning Applications (Projects are alphabetical by street name) Updated December 2018
Active Planning Applications (Projects are alphabetical by street name) Updated December 2018 360 Corte Madera Ave. Residential Addition and Remodel (8021) Date Filed: October 4, 2018 Requested Action(s):
More informationIntroduction. General Development Standards
Introduction The development standards will set the zoning regulations for the East Park development. This section will illustrate lot standards, approximate open space locations and road standards. The
More informationSouth Park Residential Urban Village Site
South Park Residential Urban Village Site 8914 14th Ave S Seattle, WA 98108 For more information contact: Andrew P. Langsford Founder & Principal (425)531-7966 andy@vreg.co Brian Suite Broker Director
More informationEXHIBIT 1 PROJECT DESCRIPTION AND DESCRIPTION OF REQUESTED AREA VARIANCES REDEVELOPMENT OF 201 ELLICOTT STREET
EXHIBIT 1 PROJECT DESCRIPTION AND DESCRIPTION OF REQUESTED AREA VARIANCES REDEVELOPMENT OF 201 ELLICOTT STREET I. PROJECT DESCRIPTION: Ciminelli Real Estate Corporation (the Applicant ) is seeking area
More informationCommunity Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016
Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016 1 Project Team City: David Belmer Planning and Building Director Jonathan Borrego, AICP Planning Services Manager Gustavo
More informationMEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres
Department of Community Planning & Economic Development 250 South 4th Street, Room 300 Minneapolis, MN 55415-1385 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Peter Crandall,
More informationPLANNING COMMISSION. Study Session: Beach Boulevard Specific Plan Workshop
PLANNING COMMISSION Study Session: Beach Boulevard Specific Plan Workshop Project Background Sustainable Communities Grant Funding Phase 1 Outreach: Improve the Boulevard A Specific Plan is a long-term
More information3804 Wilson Boulevard (Staples Site) Special General Land Use Plan Study
1 3804 Wilson Boulevard (Staples Site) Special General Land Use Plan Study Long Range Committee of the Planning Commission Meeting May 16, 2018 Department of Community Planning, Housing and Development
More informationSITE PLAN REVIEW COMMITTEE MEETING AGENDA Clarendon Boulevard Conference Rooms C & D Arlington, VA 22201
SITE PLAN REVIEW COMMITTEE MEETING AGENDA DATE: Monday, July 24, 2017 TIME: 7:00 9:00 p.m. PLACE: 2100 Clarendon Boulevard Conference Rooms C & D Arlington, VA 22201 Item 1. 6711 Lee Highway (SP #3) (RPC#
More informationText Amendment July 29, Charlotte - Mecklenburg Planning Department
Text Amendment July 29, 2009 TONIGHT S AGENDA Welcome and Introductions Background, Purpose and Process Presentation of Draft Text Amendment Provisions Review and Discussion of Follow-Up Information from
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016
PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016 DEVELOPMENT NAME SUBDIVISION NAME Mullinax Ford Subdivision Mullinax Ford Subdivision LOCATION CITY COUNCIL DISTRICT District 6 Southeast
More informationMARKET COMMON CLARENDON - SP #339 AMENDMENT Arlington, VA
2801 Clarendon 1 Design Updates + Additional Information Sidewalk Updates Bike Parking HALRB Recap View from Lyon Village Truck Turning Studies Open Space Areas Community Benefits Construction Information
More information739 Channing Way PRELIMINARY DESIGN REVIEW
739 Channing Way PRELIMINARY DESIGN REVIEW D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t For Majority Recommendations SEPTEMBER 21, 2017 Design Review #DRCP2017-0005 to construct two
More informationThe Mississippi Gold Coast
Redefining Coastal Living C o m p r e h e n s i v e M a s t e r p l a n INTRODUCTION Luxury On The Coast RW Development Brings it all Together RW Development is a visionary developer specializing in premier
More informationJasper 115 Street DC2 Urban Design Brief
Jasper 115 Street DC2 Urban Design Brief Greenlong Construction Ltd. Stantec Consulting Ltd. 2017 Overview The proposed rezoning application supports the development of two mixed-use high-rise buildings
More informationRIVER VALE MASTER PLAN PZ CITY COUNCIL PUBLIC HEARING JULY 19, 2017 CITY OF BEND
RIVER VALE MASTER PLAN PZ-16-0954 CITY COUNCIL PUBLIC HEARING JULY 19, 2017 RIVER VALE MASTER PLAN Master Plan process Required for developments over 20 acres Application submitted under old Master Plan
More informationProject Team. Community Workshop Draft Specific Plan Review West Anaheim Youth Center September 4, /6/2018.
Community Workshop Draft Specific Plan Review West Anaheim Youth Center September 4, 2018 Project Team City: David Belmer Planning and Building Director Susan Kim, AICP Principal Planner Gustavo Gonzalez,
More informationDEVELOPMENT STANDARDS FOR RESIDENTIAL PROJECTS RESIDENTIAL BUILDING TYPES: APPROPRIATE ZONES AND DENSITIES 2-1
2 DEVELOPMENT STANDARDS FOR RESIDENTIAL PROJECTS RESIDENTIAL BUILDING TYPES: APPROPRIATE ZONES AND DENSITIES 2-1 This Chapter presents the development standards for residential projects. Section 2.1 discusses
More information38 th & Blake Height Amendments: Public Meeting #5 Building Design Comments July 13 th, 2016
38 th & Blake Height Amendments: Public Meeting #5 Building Design Comments July 13 th, 2016 Table 1 1. Require people-oriented ground floors 2. Preserve sunlight, views, and architectural variety 3. Treat
More informationSUBJECT: Application for Planned Unit Development and Rezoning 1725 Winnetka Road
TO: FROM: CHAIRMAN BILL VASELOPULOS AND MEMBERS OF THE PLAN & ZONING COMMISSION STEVE GUTIERREZ DIRECTOR OF COMMUNITY DEVELOPMENT MEETING DATE: September 5, 2017 SUBJECT: Application for Planned Unit Development
More informationThe demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.
D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t 2072 ADDISON STREET PRELIMINARY DESIGN REVIEW For Committee Discussion/ Majority Recommendation JULY 20, 2017 Design Review #DRCP2016-0002
More informationDEVELOPMENT DEPARTMENT STAFF REPORT STAFF REPORT DRESDEN DRIVE TOWNHOMES DCI
DEVELOPMENT DEPARTMENT STAFF REPORT Meeting Date: September 13, 2018 Item #: PZ2018-319 STAFF REPORT DRESDEN DRIVE TOWNHOMES DCI Request: Project Name: Development of Community Compact (DCI) and six concurrent
More informationAGENDA SLOT HOME EVALUATION & TEXT AMENDMENT. 5:30 - Welcome
AGENDA 5:30 - Welcome Please sign-in, put a sticker on the map, grab snacks, materials and a seat 5:45 - Staff Presentation 6:15 - Open House Stations Background Information Mixed Use Districts Multi Unit
More informationEAST WEST PARTNERS SCOTT MURRAY LAND PLANNING, INC.
WhyMixedUse? Trac Combiningresidentialdwellingswith workplace,shoppingandentertainmentcommercial developmentreducestheuseofautomobilesand encouragestheuseofalternativemethodsof transportation,includingpedestrian,bicycleandpublic
More informationCITY COUNCIL AGENDA MEMORANDUM
City and County of Broomfield, Colorado CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: George Di Ciero, City and County Manager Prepared by: Anna Bertanzetti, Principal Planner David Shinneman,
More informationVILLAGE CENTER ARLINGTON, VIRGINIA ADVISORY WORKING GROUP/ PLANNING COMMISSION FOR ORR PARTNERS 01/
VILLAGE CENTER ADVISORY WORKING GROUP/ PLANNING COMMISSION FOR ORR PARTNERS 01/21 PROJECT BACKGROUND 01 PAGE 02 01. PROJECT BACKGROUND 1 EXISTING CONDITIONS SITE 1 STREET VIEW 2 2 STREET VIEW PAGE 03 01.
More informationMEMORANDUM. C3A District Shoreland Overlay District 32,055 square feet / 0.74 acres. West Calhoun, adjacent to Cedar-Isles-Dean
Department of Community Planning & Economic Development 250 South 4th Street, Room 300 Minneapolis, MN 55415-1385 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Peter Crandall,
More informationVICINITY PLAN SITE PLAN
STUDY SITE The Eastside Mixed-Use Study is comprised of Blocks 67, 68, 69, 74, 75, and 76. Bound to the south by the Burnside Bridge and to the east by NE Jr. Blvd, Block 76 presents the ability to prominently
More informationMetropolitan Park Phase 4/5
Metropolitan Park Phase 4/5 SPRC #1 November 20, 2012 Project Team Vornado/Charles E. Smith Owner Developer Torti Gallas Urban Design Architect / Architect of Record Maurice Walters Architect Design Architect
More informationChapter DOWNTOWN ZONING DISTRICTS
Chapter 20.14 Sections: 20.14.010 Purpose of the Downtown Zoning Districts 20.14.020 Land Use Regulations for Downtown Zoning Districts 20.14.030 Development Standards for Downtown Zoning Districts 20.14.010
More informationShawmut Avenue Washington Street Block. Boston, MA BCDC Meeting May 1, 2018
Boston, MA BCDC Meeting May 1, 2018 Refinements to PDA scheme in response to BCDC comments Davis Companies, 112 Shawmut Avenue: Relocated approximately 22,000 sf from rear court area to Shawmut Ave. frontage
More informationDEVELOPMENT DEPARTMENT STAFF REPORT THE PARK AT 5 TH
DEVELOPMENT DEPARTMENT STAFF REPORT ARB Meeting Date: July 3, 2018 Item #: _PZ2018-293_ THE PARK AT 5 TH Request: Site Address: Project Name: Parcel Number: Applicant: Proposed Development: Current Zoning:
More information3445 Sheppard Avenue East - Zoning Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 3445 Sheppard Avenue East - Zoning Amendment Application - Preliminary Report Date: August 14, 2013 To: From: Wards: Reference Number: Scarborough Community Council Director,
More informationZA and ZA Zoning Change and Concept / Site Plan Preliminary Plat Delta Southlake Center
ZA16-051 and ZA16-052 Zoning Change and Concept / Site Plan Preliminary Plat Delta Southlake Center ZA16-051 and ZA16-052 Owner: Applicant: Requests: Dominion Southlake Properties, LLC, White Chapel Village
More information5.1 Site Planning & Building Form
5 Built Form 5.1 Site Planning & Building Form Pearson Dogwood Policy Statement Site Planning & Building Form The redevelopment of Pearson Dogwood will create an attractive and sustainable urban community
More information1417, , 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report
STAFF REPORT ACTION REQUIRED 1417, 1421-1425, 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report Date: March 24, 2015 To: From: Wards: Reference Number:
More information4 DEVELOPMENT STANDARDS FOR
4 DEVELOPMENT STANDARDS FOR RESIDENTIAL MIXED-USE PROJECTS This chapter presents standards for residential mixed-use projects in the Ashland-Cherryland Business District and the Castro Valley Central Business
More information40 +/- Acres Cornerstone Group- Colonial Boulevard 40 Acres Section 32, Township 44, Range 25. For Cornerstone Group. Prepared by
DUE DILIGENCE REPORT 40 +/- Acres Cornerstone Group- Colonial Boulevard 40 Acres Section 32, Township 44, Range 25 For Cornerstone Group Prepared by David Douglas Associates, Inc. 2037 West First Street
More informationMetropolitan Park - Phase 4/5 VORNADO CHARLES E. SM I T H
Metropolitan Park - Phase 4/5 VORNADO CHARLES E. SM I T H Planning Commission July 1, 2013 Project Team Vornado/Charles E. Smith Owner Developer Torti Gallas Urban Design Architect / Architect of Record
More informationDRAFT Plan Incentives. Part A: Basic Discount
DRAFT 2030 Plan Incentives July 26, 2006 Part A: Basic Discount In order for a development to be eligible for any 2030 Land Resource Management Plan Discounts it must be located in the Urban Corridor and
More informationArticle 6. GENERAL URBAN (G-) NEIGHBORHOOD CONTEXT
Article 6. GENERAL URBAN (G-) NEIGHBORHOOD CONTEXT this page left intentionally blank Contents ARTICLE 6. GENERAL URBAN (G-) NEIGHBORHOOD CONTEXT DIVISION 6.1 NEIGHBORHOOD CONTEXT DESCRIPTION...6.1-1 Section
More informationChapter URBAN VILLAGE ZONING DISTRICTS
Chapter 20.16 Sections: 20.16.010 Purpose of the Urban Village Zoning Districts 20.16.020 Land Use Regulations for the Urban Village Zoning Districts 20.16.030 Development Standards & Guidelines for the
More informationThe Miramar Santa Monica
The Miramar Santa Monica Project Description The Santa Monica Miramar Hotel (the Miramar or the Hotel ) has been an institution in the City of Santa Monica since originally opening on the site in 1920.
More informationCITY OF CHARLOTTESVILLE DEPARTMENT OF NEIGHBORHOOD DEVELOPMENT SERVICES PLANNING COMMISSION
CITY OF CHARLOTTESVILLE DEPARTMENT OF NEIGHBORHOOD DEVELOPMENT SERVICES PLANNING COMMISSION PRELIMINARY DISCUSSION: SPECIAL USE PERMIT Author of Memo: Brian Haluska, Neighborhood Planner Date of Meeting:
More informationDAVIDSON PLANNING ORDINANCE AMENDMENTS AFTER SEPTEMBER 2009 SECTION 9
AMENDMENT ADOPTED 6/12/2012 Section 9.1.3.3.1 Wall Murals Entire Section Added: 9.1.3.3.1 Wall Murals DAVIDSON PLANNING ORDINANCE AMENDMENTS AFTER SEPTEMBER 2009 SECTION 9 Exterior wall murals are only
More informationCounty Board Meeting Columbia Pike FBC Redevelopment Proposal
County Board Meeting June 18, 2016 2400 Columbia Pike FBC Redevelopment Proposal A. FBC Use Permit U-3436-16-1 B. Vacations 1 Outline 1. Form Based Code Background & Review Process 2. Subject Site Location
More informationRODE. Article 80 Small Project Review Application. 232 Old Colony Avenue Mixed Use Development 232 Old Colony Avenue South Boston, MA 02127
Article 80 Small Project Review Application 232 Old Colony Avenue South Boston, MA 02127 RODE Architects Inc. Contents Project Summary Project Team 05 Project Summary 06 Community Benefi ts 06 Detailed
More informationPenny Flats North 323 N Mason
Taft Hill Lemay Mason Ct Timberline Mason Ct Penny Flats North 323 N Mason Vicinity Map Aerial Site Map 287 «1 Douglas 25 Mountain Vista UV 14 287 ^_ Vine Mulberry Prospect Shields Drake Horsetooth 25
More informationCITY COUNCIL STUDY SESSION MEMORANDUM
City and County of Broomfield, Colorado To: From: Prepared by: Owner Applicant Property Size Property Location: CITY COUNCIL STUDY SESSION MEMORANDUM Mayor and City Council Charles Ozaki, City and County
More informationCITY OF SANTA ROSA COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT FOR PLANNING COMMISSION SEPTEMBER 10, 2015 APPLICANT FILE NUMBER MJP
ITEM NO. 9 CITY OF SANTA ROSA COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT FOR PLANNING COMMISSION SEPTEMBER 10, 2015 PROJECT TITLE Yogurt Time Center ADDRESS/LOCATION 3093 Marlow Road ASSESSOR S PARCEL
More informationArticle 7. URBAN CENTER (C-) NEIGHBORHOOD CONTEXT
Article 7. URBAN CENTER (C-) NEIGHBORHOOD CONTEXT this page left intentionally blank Contents ARTICLE 7. URBAN CENTER (C-) NEIGHBORHOOD CONTEXT DIVISION 7.1 NEIGHBORHOOD CONTEXT DESCRIPTION.........................
More information14 SE 4th Street, Boca Raton, FL Tel Fax Web
SIGN LOCATION BACK UP SPACE (NO ) OUTDOOR DINING POCKET PARK SIGN LOCATION CANOPY ABOVE BIKE (7) SECURED BIKE STORAGE (1) OPEN MESH SCREEN WALL POCKET PARK PROPERTY LINE 7'-0" PARKWAY 7'-0" PARKWAY A B
More informationCOMMERCIAL AND MIXED USE zones COMMERCIAL AND MIXED USE ZONES. Zoning By-law PLANNING & ECONOMIC DEVELOPMENT PLANNING DEPARTMENT DIVISION
Zoning By-law 05-200 COMMERCIAL AND MIXED USE zones PLANNING & ECONOMIC DEVELOPMENT PLANNING DEPARTMENT DIVISION CONTENTS CONTEXT... 1 URBAN HAMILTON OFFICIAL PLAN... 2 COMMERCIAL AND MIXED USE ZONES...
More information8 Delanson Circle Wellesley, MA PROJECT NARRATIVE
8 Delanson Circle Wellesley, MA 02482 PROJECT NARRATIVE Located in the heart of Wellesley at the intersection of Linden and Hollis Streets, directly across the street from the Wellesley Square MBTA Commuter
More informationPublic Review of the Slot Home Text Amendment
Public Review of the Slot Home Text Amendment The proposed amendments to the Denver Zoning Code have been informed by the Slot Home Strategy Report. This document has been developed out of a robust process
More informationCAN TRADITIONAL ZONING ACHIEVE OUR GOALS FOR DOWNTOWN ANN ARBOR?
TRADITIONAL ZONING TRADITIONAL ZONING CAN TRADITIONAL ZONING ACHIEVE OUR GOALS FOR DOWNTOWN ANN ARBOR? A dense, mixed use core with flexible land uses A range of housing types and costs A walkable, pedestrian-oriented
More informationPALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION
PALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION Application No.: W-2014-00288 Application Name: O Reilly Auto Parts Control No.: 2013-00286 Applicant: Hutton Growth Blue Sky
More informationTHE CORPORATION OF THE DISTRICT OF PEACHLAND BYLAW NUMBER 2065, A Bylaw to Amend Zoning Bylaw Number 1375, 1996
THE CORPORATION OF THE DISTRICT OF PEACHLAND BYLAW NUMBER 2065, 2013 A Bylaw to Amend Zoning Bylaw Number 1375, 1996 WHEREAS the Council of the Corporation of the District of Peachland has adopted Zoning
More information2075 BROADWAY LOFTS DOWNTOWN ARAPAHOE SQUARE DESIGN DEVELOPMENT REVIEW SUBMISSION OCTOBER 8, 2015
2075 BROADWAY LOFTS DOWNTOWN ARAPAHOE SQUARE DESIGN DEVELOPMENT REVIEW SUBMISSION OCTOBER 8, 2015 U.S. POSTAL FACILITY / 20TH STREET GYM / SKYLOFTS ARRAJ COURT COMPLEX BRYON RODGERS FEDERAL BUILDING SKYLOFTS
More informationDEVELOPMENT DEPARTMENT STAFF REPORT DRESDEN HEIGHTS PHASE II DCI
DEVELOPMENT DEPARTMENT Meeting Date: January 10, 2019 Item #: PZ2019-393 Project Name: Applicant and Owner: Proposed Development: Requests: STAFF REPORT DRESDEN HEIGHTS PHASE II DCI Dresden Heights Phase
More informationKassner Goodspeed Architects Ltd.
Kassner Goodspeed Architects Ltd. 11 March 2015 Ms Jillian MacLellan, Planner 1 Planning Application, Community Development Halifax Regional Municipality P.O. Box 1749 Halifax, NS B3J 3A5 Re: Case 19281,
More informationMarch 31, 2017 WALTER REED - BUILDING V/U ANC 4B DESIGN REVIEW COMMITTEE PACKAGE
WALTER REED - BUILDING V/U ANC 4B DESIGN REVIEW COMMITTEE PACKAGE W GEORGIA AVE NW UP E AC AC UP ASPEN ST. NW Bowman Consulting Group DC PC Existing Conditions Site Plan 2 Aerial - Existing Conditions
More informationLAND USE AND BUILT FORM
5 LAND USE AND BUILT FORM The existing zoning on Bank Street already allows for considerable general intensification, since the permitted Floor Space Index (FSI) would already allow several times more
More informationTOHIMU (Transit-Oriented Higher-Intensity Mixed Use)
AGENDA Community Development Department PECIAL MEETING OF THE DEIGN REVIEW BOARD AND PLANNING COMMIION Wednesday, October 5, 2016 7:45 PM El Cerrito City Hall Council Chambers 10890 an Pablo Avenue This
More informationTable of Contents. Concept Plan Overview. Statement of Compliance with Design Guidelines. Statement of Compliance with Comprehensive Plan
Table of Contents Concept Plan Overview Statement of Compliance with Design Guidelines Statement of Compliance with Comprehensive Plan Developer s Program Market Objective Benefit to Local Businesses Benefit
More informationYonge Street, 5-9 St. Joseph Street and 11-19, 25 St. Nicholas Street Rezoning Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 606-618 Yonge Street, 5-9 St. Joseph Street and 11-19, 25 St. Nicholas Street Rezoning Application - Preliminary Report Date: December 11, 2008 To: From: Wards: Reference Number:
More information223 23rd Street Redevelopment
223 23rd Street Redevelopment APPLICANT DESIGN ARCHITECT ARCHITECT OF RECORD LANDSCAPE ARCHITECT CIVIL ENGINEER LEED CONSULTANT TRAFFIC CONSULTANT ATTORNEY Vornado/Charles E. Smith Pelli Clarke Pelli Architects,
More informationTown of Clinton, Connecticut Action Plan for the Historic Unilever Property and Area. Steering Committee Meeting #5 Implementation Strategies
Town of Clinton, Connecticut Action Plan for the Historic Unilever Property and Area Steering Committee Meeting #5 Implementation Strategies Wednesday, March 19, 2014 6:30pm Steering Committee Meeting
More information900 ALBERT STREET PLANNING RATIONALE ADDENDUM NO. 2
900 ALBERT STREET PLANNING RATIONALE ADDENDUM NO. 2 March 26, 2018 Planning Rationale Addendum No. 2 Official Plan and Zoning By-law Amendment Prepared for: TIP Albert GP Inc. 485 Bank Street, Suite 200
More informationTrenton Train Station Redevelopment Process. Applying the Principles of Successful Transit Oriented Development
Trenton Train Station Redevelopment Process Applying the Principles of Successful Transit Oriented Development The Basics The City of Trenton has designated the area around the train station and has adopted
More informationArchitect: Lucio Trabucco Nunes Trabucco Architects 109 Highland Avenue Needham, MA Tel: Fax:
Boston Planning & Development Agency Article 80 Small Project Review Submittal for Proposed Residential Building 50 Stedman Street Jamaica Plain, Massachusetts Architect: Lucio Trabucco Nunes Trabucco
More informationTo: Planning and Zoning Commission Anna Bertanzetti, Planning Director Alice Hanson, Senior Planner
To: Planning and Zoning Commission From: Anna Bertanzetti, Planning Director Alice Hanson, Senior Planner Meeting Date Agenda Category Agenda Item # June 26, 2017 Business 4.b 1. Public Hearing on a Proposed
More informationPotential Building 6-Storey (Allowable) 50' Shoulder ALEXANDER STREET. Evelyne Saller Centre Main Entrance. Rodan Lodge Entry Porch
DESIGN RATIONALE Potential Building 6-Storey (Allowable) 9th Floor Setback Historic Marr Hotel 4-Storey Building Form of Development and Public Realm The form of the building was initially dictated by
More informationSELLWOOD MORELAND IMPROVEMENT LEAGUE 8210 SE 13th AVENUE, PORTLAND, OR STATION CHURCH
SELLWOOD MORELAND IMPROVEMENT LEAGUE 8210 SE 13th AVENUE, PORTLAND, OR 97202 STATION 503-234-3570 CHURCH 503-233-1497 May 10, 2017 Dear Mr. Graves: The Sellwood-Moreland Improvement League (SMILE) is providing
More informationTruax Park Apartments
Truax Park Apartments Master Planning and Site Development Study Prepared by The Community Development Authority of the City of Madison In association with SMITH & SMITH ASSOCIATES, Inc CONSTRUCTION COST
More informationVillage of Glenview Plan Commission
Village of Glenview Plan Commission STAFF REPORT May 13, 2014 TO: Chairman and Plan Commissioners CASE #: P2014-037 FROM: Community Development Department CASE MANAGER: Tony Repp, Planner SUBJECT: Final
More informationCalgary Green Line North 64 Ave N Charrette Ideas Session
1 Calgary Green Line North 64 Ave N Charrette Ideas Session IBI Group April 19, 2016 3 Charrette Agenda Tuesday Time Activity Person-in-Charge 18:30 18:35 5 min Welcome John Forsdick / City Councillors
More informationModel of Camino Crossroads: (a) Looking north and (b) looking south.
PROJECT DESCRIPTION (a) (b) Model of Camino Crossroads: (a) Looking north and (b) looking south. Overview This section describes the design concept and objectives; the contextual issues; and Planned Community
More informationTRANSIT-ORIENTED DEVELOPMENT PLAN PRESENTATION LAWRENCE TO BRYN MAWR MODERNIZATION PROJECT AREA
TRANSIT-ORIENTED DEVELOPMENT PLAN PRESENTATION LAWRENCE TO BRYN MAWR MODERNIZATION PROJECT AREA Purpose Create a community-led vision for redevelopment in the neighborhood Test specific concepts for CTA
More informationDraft Strategy Plan Concepts. CAC Meeting #9
Downtown San Leandro Transit-Oriented Development Strategy Draft Strategy Plan Concepts Discussion & Conclusions CAC Meeting #9 23 January 2007 Land Use Plan & Specific Areas New mixed-use districts Context-sensitive
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 16, 2012 DATE: June 7, 2012 SUBJECT: SP #397 SITE PLAN AMENDMENT to revise condition #31 to modify the retail transparency requirement
More informationTHE AREA PLAN COMMISSION OF ST. JOSEPH COUNTY, IN AGENDA
THE AREA PLAN COMMISSION OF ST. JOSEPH COUNTY, IN AGENDA Tuesday, January 17, 2017 Fourth-Floor Council Chambers 3:30 p.m. County-City Building, South Bend, IN EXECUTIVE SESSION: A. Election of Officers
More informationPLANNED UNIT DEVELOPMENT CITY OF CHAMBLEE, GA
Exhibit A Received 11/7/17 PLANNED UNIT DEVELOPMENT CITY OF CHAMBLEE, GA SHEET DESCRIPTION PAGE SITE DATA VICINITY MAP INDEX PAGE 1 EXISTING ZONING CC PUD PROJECT DESCRIPTION 2-3 PROPOSED ZONING CC PUD
More informationMemo to the Planning Commission HEARING DATE: JUNE 30, 2016
Memo to the Planning Commission HEARING DATE: JUNE 30, 2016 Date: June 23, 2016 Case No.: 2014.0519CUAVAR Project Address: 2100 Market Street Zoning: Upper Market Street Neighborhood Commercial Transit
More informationMEMORANDUM. B4S-2 Downtown Service District DP Downtown Parking Overlay District 42,390 square feet / 0.97 acres. DMNA; adjacent to North Loop
Department of Community Planning & Economic Development 0 South th Street, Room 00 Minneapolis, MN -8 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Janelle Widmeier, Senior
More informationSITE PLAN REVIEW COMMITTEE MEETING AGENDA
Page 1 SITE PLAN REVIEW COMMITTEE MEETING AGENDA DATE: Monday, July 10, 2017 TIME: 7:00 8:30 p.m. PLACE: 2100 Clarendon Boulevard Ground Floor Conference Rooms Cherry/Dogwood Arlington, VA 22202 SPRC STAFF
More informationThe Mississippi Gold Coast
Redefining Coastal Living The Mississippi Gold Coast Comprehensive Masterplan INTRODUCTION RW Development Brings it all Together RW Development is a visionary developer specializing in premier residential,
More information20 Edward Street Zoning Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 20 Edward Street Zoning Amendment Application - Preliminary Report Date: January 20, 2015 To: From: Wards: Reference Number: Toronto and East York Community Council Director,
More informationCONSTRUCTION PLANS for HALCYON A RESIDENTIAL SUBDIVISION 6100 MIDNIGHT PASS ROAD, SARASOTA, FL 34242
CONSTRUCTION PLANS for HALCYON A RESIDENTIAL SUBDIVISION 6100 MIDNIGHT PASS ROAD, SARASOTA, FL 34242 SECTION 18, TOWNSHIP 37 SOUTH, RANGE 18 EAST SARASOTA COUNTY, FLORIDA PID: 0030001 A DEVELOPMENT BY
More informationSAFEWAY - OAKLAND, CALIFORNIA PLANNING REVISIONS 1 - JULY 26, 2010
60 COLLEGE AVENUE OAKLAND, CA 9468 STORE #80 CURRENT OWNER: STORE NUMBER: 80 598 STONERIDGE MALL ROAD PLEASANTON, CA 94588-9 P) 95.46.08 F) 95.46.86 ASSESSOR'S PARCEL NUMBER: 048A00000 NO. DATE ISSUES
More information900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1
50 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca 900 BURRARD STREET
More informationOCEANSIDE DEVELOPER S CONFERENCE
1 AGENDA OCEANSIDE DEVELOPER S CONFERENCE Wednesday, September 5, 2018, 9:30 a.m. City Hall South, 1 st Floor, Guajome Room 1. 9:30-10:30 a.m. Proposed 6-story mixed-use development with (6) live/work
More information