1 Hilti HUD-1 / HUD-L Submission Folder Sample Submission and Approval Form 2 Product Information 3-4 Technical Data HUD-1 HUD-L Method Statement Letter from Diado Country of Origin Job Reference Make your submission simple! To download the most updated submission folders and technical manuals, visit Recycling one ton of paper saves 17 trees and 7000 gallons of water. Please consider your environmental responsibility before using the hard copy version! Customer Hotline Hong Kong Macau (Toll free) May 2016

2 Contract Title : Ref. No. : Date : Ref. No. of Previous Submission: Contract No. : (1) : File Reference : (2) : To : Contract Manager s Representative (Attn: Mr. ) *(Name of Consultant Projects) From : (State Name of Contract) To enclosed sample boards and catalogue* / technical date* / test report* / job reference* as described below have been checked for compliance with the Specifications and Drawings, and are herewith submitted for approval. a) Materials Description : Hilti HUD-1 Universal Plastic Anchor Hilti HUD-L Universal Plastic Anchor (Long version) b) Specification Ref. Page : Item : c) Drawing Ref. No. d) B.Q. Ref. No. : e) Location (application) : f) Brand Name : Hilti g) Manufacturer : Hilti Corporation h) Source of Origin : Germany i) Supplier : Hilti (Hong Kong) Ltd. j) Catalogue : Attached k) Technical Data : Attached l) Test Report : Attached m) Job Reference : Attached n) Material Safety Data Sheet : NIL o) Anticipated date of approval : A.S.A.P. For and on behalf of the Contractor: Quality Control Engineer To : (State Name of Contract) From : Contract Manager s Representative (Mr. ) *(Name of Consultant for Consultant Projects) On the basis of the sample and information given, the above sample submitted is: 1)* Approved : 2)* Approved subject to : 3)* Not approved because : Remarks : And resubmission is required. Approval does not alter the requirements of the Contract unless specifically noted. Contract Manager s Representative (Mr. ) Date: c.c. Project Clerk of Work with sample PQS Contract File (* Delete if inappropriate) 2 May 2016

3 Anchor Systems HUD Base materials Applications Advantages Universal plastic anchor HUD-1 Technical data Anchor type Head configuration Material composition Material, corrosion In-service temperature range Installation direction Ordering designation Anchor size Drill bit diameter Drilling depth Base plate clearance hole Sales pack quantity Item number HUD-1 5x HUD-1 6x HUD-1 8x HUD-1 10x HUD-1 12x HUD-1 14x May J

4 Anchor Systems Universal plastic anchor HUD-L Technical data Anchor type Head configuration Material composition Material, corrosion In-service temperature range Installation direction Base materials Ordering designation Anchor size Drill bit diameter Drilling depth Base plate clearance hole Sales pack quantity Item number HUD-L 6x HUD-L 8x HUD-L 10x May

5 5 May 2016

6 6 May 2016

7 7 May 2016

8 8 May 2016

9 9 May 2016

10 Anchor Technology Setting Operation Versions : HUD-1, HUD-L Reference : Product Information / Fastening Technology Manual 1. Drill the anchor hole with the requirement in accordance with the setting details. 2. Insert the anchor and pu t part to be fastened in place. 3. Drive the screw into hole through in-place part until flush with part surface. 10 May 2016

11 11 May 2016

12 12 May 2016

13 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon, Hong Kong Hotline: Job / Application Reference Product Name: Universal anchor HUD-1 / HUD-L Date Project Name Main Contractor Product Name Application Project Type:ASD 2014 Kai Tak Development HUD-1 Electrical services fixing Kai Tak Trade & Industry Tower 2014 工業及貿易發展局大樓 Dragages HUD-1 Electrical services fixing 2014 Kai Tak Trade & Industry Tower 工業及貿易發展局大樓 Dragages HUD-1 Temporary fixing 2015 Kai Tak Trade & Industry Tower 工業及貿易發展局大樓 Dragages HUD-1 Electrical services fixing 2015 Kai Tak Trade & Industry Tower 工業及貿易發展局大樓 Dragages HUD-1 MVAC services fixing 13 May Reprovisioning of Queen Elizabeth Hospital 伊利沙伯醫院 Yau Lee HUD-1 Electrical services fixing Project Type:Buildings Mount Nicholson Road Residential Development 聶歌信山道 103 號住宅發展 Gammon HUD-1 Interior finishings fixing 2014 Kau To Shan Residential Development 九肚山住宅發展 Hsin Chong HUD-1 Interior finishings fixing 2014 Kau To Shan Residential Development 九肚山住宅發展 Hsin Chong HUD-L Interior finishings fixing 2014 Lohas Park Development LANON HUD-L Window frame fixing Lok Wo Sha Complex Development 2014 落禾沙綜合發展 Hip Hing / Eman HUD-1 Electrical services fixing 2014 Lok Wo Sha Complex Development 落禾沙綜合發展 Hip Hing / Eman HUD-1 MVAC services fixing 2014 Science Park Phase 3 HUD-1 Electrical services fixing 2014 Seymour Road Residential HIP HING HUD-1 Interior finishings fixing Kau To Shan Residential Development 2015 九肚山住宅發展 Hsin Chong HUD-1 Interior finishings fixing 2015 Kau To Shan Residential Development 九肚山住宅發展 Hsin Chong HUD-L Interior finishings fixing 2015 Lok Wo Sha Complex Development 落禾沙綜合發展 Hip Hing / Eman HUD-1 Aluminium cladding fixing 2015 Lok Wo Sha Complex Development 落禾沙綜合發展 Hip Hing / Eman HUD-1 Electrical services fixing 2015 Lok Wo Sha Complex Development 落禾沙綜合發展 Hip Hing / Eman HUD-1 Plumbing & drainage fixing

14 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon, Hong Kong Hotline: Job / Application Reference Product Name: Universal anchor HUD-1 / HUD-L 14 May 2016 Date Project Name Main Contractor Product Name Application SHK Ho Man Tin Fat Kwong St 2015 何文田佛光街住宅發展 Sanfield HUD-1 Drywall/gymsum panel fixing 2015 SHK Ho Man Tin Fat Kwong St 何文田佛光街住宅發展 Sanfield HUD-1 Electrical services fixing 2015 SHK Tung Chung Area 55A Residential Development 新鴻基東浦 55A 住宅發展 Sanfield HUD-1 MVAC services fixing Project Type:HKAA 2014 Airport Development 機場主要發展 Gammon HUD-1 Drywall/gymsum panel fixing 2014 Airport Development 機場主要發展 Gammon HUD-1 Electrical services fixing 2014 Airport Development 機場主要發展 Gammon HUD-1 MVAC services fixing 2015 Airport Development 機場主要發展 Gammon HUD-1 Electrical services fixing 2015 Airport Development 機場主要發展 Gammon HUD-1 Temporary fixing 2015 Airport Development 機場主要發展 Gammon HUD-L Electrical services fixing Project Type:Macau - Casino & Hotel 2014 Macao Studio City 星麗門 Paul Y & Yau Lee JV HUD-1 Electrical services fixing 2014 Macao Studio City 星麗門 Paul Y & Yau Lee JV HUD-1 Fire services fixing 2014 Macau Fisherman's Wharf (Phase 1&2) 漁人碼頭 Lik Cheong HUD-L Electrical services fixing Shangri-la and Traders Hotels Sheraton and St. Regis Hotels (Parcel 5&6) 威尼斯人 ( 五六期 ) VOL HUD-L Interior finishings fixing Venetian (Parcel 3) - Parisian 威尼斯人 ( 三期 ) - 巴黎人 Hsin Chong HUD-1 Plumbing & drainage fixing Wynn Palace 永利皇宮 Leighton HUD-1 Lighting system fixing Louis XIII Hotel Development 路易十三酒店發展 Paul Y HUD-1 Electrical services fixing

15 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon, Hong Kong Hotline: Job / Application Reference Product Name: Universal anchor HUD-1 / HUD-L 15 May 2016 Date Project Name Main Contractor Product Name Application 2015 Macao Studio City 星麗門 Paul Y & Yau Lee JV HUD-1 Curtain wall fixing 2015 Macao Studio City 星麗門 Paul Y & Yau Lee JV HUD-1 Electrical services fixing 2015 Macao Studio City 星麗門 Paul Y & Yau Lee JV HUD-L Drywall/gymsum panel fixing 2015 SJM Lisboa Palace 澳博路氹城 上葡京 Multiple contractors HUD-1 Aluminium cladding fixing 2015 SJM Lisboa Palace 澳博路氹城 上葡京 Multiple contractors HUD-1 Curtain wall fixing 2015 Venetian (Parcel 3) - Parisian 威尼斯人 ( 三期 ) - 巴黎人 Hsin Chong HUD-1 Electrical services fixing 2015 Venetian (Parcel 3) - Parisian 威尼斯人 ( 三期 ) - 巴黎人 Hsin Chong HUD-1 Others 2015 Venetian (Parcel 3) - Parisian 威尼斯人 ( 三期 ) - 巴黎人 Hsin Chong HUD-1 Window frame fixing 2015 Wynn Palace 永利皇宮 Leighton HUD-1 Aluminium cladding fixing 2015 Wynn Palace 永利皇宮 Leighton HUD-1 Drywall/gymsum panel fixing 2015 Wynn Palace 永利皇宮 Leighton HUD-1 Electrical services fixing Project Type:Railway 2014 MTR - Express Rail Link 港深廣高速鐵路 MTRC HUD-1 Electrical services fixing 2014 MTR - Express Rail Link 港深廣高速鐵路 MTRC HUD-1 Temporary fixing 2014 MTR - Express Rail Link 港深廣高速鐵路 MTRCL HUD-1 Curtain wall fixing 2014 MTR - Kwun Tong Line Extension 地鐵觀塘延長線 MTRC HUD-1 Catchfence fixing 2014 MTR - Shatin to Central Link 沙中線 MTRC HUD-1 Interior finishings fixing 2014 MTR - South Island Line 地鐵南港島線 MTRC HUD-1 Electrical services fixing 2014 MTR - South Island Line 地鐵南港島線 MTRC HUD-1 Lighting system fixing

16 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon, Hong Kong Hotline: Job / Application Reference Product Name: Universal anchor HUD-1 / HUD-L Date Project Name Main Contractor Product Name Application MTR - West Island Line 2014 地鐵西港島線 MTRC HUD-1 Aluminium cladding fixing 2014 MTR - West Island Line 地鐵西港島線 MTRC HUD-1 Drywall/gymsum panel fixing 2014 MTR - West Island Line 地鐵西港島線 MTRC HUD-1 Fire services fixing 2014 MTR - West Island Line 地鐵西港島線 MTRC HUD-1 Lighting system fixing 16 May Tuen Mun Station Development (TMTL 447) SHK HUD-1 Interior finishings fixing MTR - Express Rail Link 2015 港深廣高速鐵路 MTRC HUD-1 Drywall/gymsum panel fixing 2015 MTR - Express Rail Link 港深廣高速鐵路 MTRC HUD-1 Temporary fixing 2015 MTR - Kwun Tong Line Extension 地鐵觀塘延長線 MTRC HUD-1 Aluminium cladding fixing 2015 MTR - Shatin to Central Link 沙中線 MTRC HUD-1 Electrical services fixing 2015 MTR - Shatin to Central Link 沙中線 MTRC HUD-1 Steel beam/bracket fixing 2015 MTR - South Island Line 地鐵南港島線 MTRC HUD-1 Others 2015 MTR - South Island Line 地鐵南港島線 MTRC HUD-1 Steel beam/bracket fixing 2015 MTR - South Island Line 地鐵南港島線 MTRC HUD-1 Window frame fixing 2015 MTR - South Island Line 地鐵南港島線 MTRC HUD-L Window frame fixing 2015 MTR - West Island Line 地鐵西港島線 MTRC HUD-1 Electrical services fixing

BIM in Current MTR Railway Projects. SDI Conference Presented by Andrew Lee Manager Land Surveying 9 Aug Harry Wu Manager CADD

BIM in Current MTR Railway Projects. SDI Conference Presented by Andrew Lee Manager Land Surveying 9 Aug Harry Wu Manager CADD BIM in Current MTR Railway Projects SDI Conference 2013 Presented by Andrew Lee Manager Land Surveying 9 Aug 2013 Harry Wu Manager CADD 1 June 2013/8/8 2009 Page 1 BIM in Current MTR Railway Projects CONTENT

More information

Challenges & Opportunities for Surveyors. Speaker: Peter Wong Bay, MBA, DMS, FHKIS, FRICS, MCIArb, RPS(BS) President of HKIS Date: 14.6.

Challenges & Opportunities for Surveyors. Speaker: Peter Wong Bay, MBA, DMS, FHKIS, FRICS, MCIArb, RPS(BS) President of HKIS Date: 14.6. Challenges & Opportunities for Surveyors Speaker: Peter Wong Bay, MBA, DMS, FHKIS, FRICS, MCIArb, RPS(BS) President of HKIS Date: 14.6.2011 1 History and Development of The Surveying Profession 2 Surveying

More information

Job Reference : DRAGAGES ET TRAVAUX PUBLICS LIMITED : KMB BUS DEPOT, NGONG SHUEN CHAU : SECURITY VERTICAL GRILLE TYPE ROLLER SHUTTER

Job Reference : DRAGAGES ET TRAVAUX PUBLICS LIMITED : KMB BUS DEPOT, NGONG SHUEN CHAU : SECURITY VERTICAL GRILLE TYPE ROLLER SHUTTER : SUN FOOK KONG CONST. LTD. : TKO AREA 73A PHASE 1 : 17100 x 7250mm HIGH : HSIN CHONG CONST. CO., LTD. : CYBERPORT C3/C4 : 10325 x 4120mm HIGH : PAT DAVIE LTD : 3/F-5/F, CITY UNIVERSITY HK : 8090 x 3640mm

More information

NWFB Route 796 Series New Service Arrangements

NWFB Route 796 Series New Service Arrangements NWFB Route 796 Series New Service Arrangements (6 February 2014, Hong Kong) Effective 9 February (Sunday), the routeing of New World First Bus ( NWFB ) Route 796C and 796S will be altered to better meet

More information

基法水管配件有限公司 Gate Way Valve & Fitting Ltd

基法水管配件有限公司 Gate Way Valve & Fitting Ltd Page: 1 / 8 1 MGM (Cotai) - Podium (P&D) PLOUGHTEK-SHARPNAIL JOINT VENTURE CO. 05/01/2017 JBA LTD. 2 TW6 Property Development ( Waterfront Fluid Controls Ltd 29/12/2016 PYROFOE ) 3 GC24 CSB KRUEGER ENGINEERING

More information

基法水管配件有限公司 Gate Way Valve & Fitting Ltd

基法水管配件有限公司 Gate Way Valve & Fitting Ltd Page: 1 / 6 outlet pressure: 1.5 to 6 bar. WSD & WRAS Approved. 1 TUEN MUN 508 YEE TAT PLUMBING ENG.LIMITED 11/05/2017 FAR EAST 2 WONG CHUK HANG ROAD, CHEUNG FUNG ENGINEERING CO., LTD. 02/05/2017 NO.54

More information

WELCOME AIR-TECH LTD.

WELCOME AIR-TECH LTD. ELCOME AIR-TECH LTD. www.saiver-welaire.com.hk ELC COMANY ROFILE 1988 elcome Oncho Denki Ltd. established 1996 2000 elcome Air-Tech Ltd. established Zhongshan AIVER ELAIRE Air-Cond. Equip. Co. Ltd. established

More information

基法水管配件有限公司 Gate Way Valve & Fitting Ltd

基法水管配件有限公司 Gate Way Valve & Fitting Ltd Page: 1 / 72 1 兒兒兒兒 Kin Win Eng. Ltd. 10/05/2017 Mott 2 HK Zhuhai Macao Bridge (A/C) Leighton - Chun Wo JV 10/05/2017 3 何何何何何何 1 號 CHOI SUM WATER PIPE SERVICE CO.,LTD. 10/05/2017 P&T 4 AUSTIN ROAD NO.148,

More information

JOB REFERENCE FOR CLEARSEAL II(R) ROLLER SHUTTER

JOB REFERENCE FOR CLEARSEAL II(R) ROLLER SHUTTER RETAIL SHOPS & CHAIN STORES WAI YUEN TONG (RETAIL) LTD. SHOP 2118, VENETIAN HOTEL, MACAU COMPLETION DATE : 8/2012 GIORDANO LTD. SHOP 2132-2133, COTAI PARCEL 5&6, VENETIAN, MACAU (2 NOS.) COMPLETION DATE

More information

NO. 57A NGA TSIN WAI ROAD 九龍九龍塘衙前圍道 57 號 A KOWLOON TONG, KOWLOON, HONG KONG 九龍塘具重建價值優質住宅用地出售

NO. 57A NGA TSIN WAI ROAD 九龍九龍塘衙前圍道 57 號 A KOWLOON TONG, KOWLOON, HONG KONG 九龍塘具重建價值優質住宅用地出售 PRIME RESIDENTIAL SITE WITH REDEVELOPMENT POTENTIAL IN KOWLOON TONG FOR SALE Rare and Unique investment opportunity for sizable residential development site along Nga Tsin Wai Road 罕有住宅發展用地位於衙前圍道 Strategically

More information

Shatin to Central Link. Transport Advisory Committee 4 May 2011

Shatin to Central Link. Transport Advisory Committee 4 May 2011 Shatin to Central Link Transport Advisory Committee 4 May 2011 MTR Corporation 05/05/2011 Page 1 Background One of the ten major infrastructure projects in 2007-2008 Policy Address Government invited MTRCL

More information

Appendix: List of CLP Power s EV charging stations (14 December 2018)

Appendix: List of CLP Power s EV charging stations (14 December 2018) Appendix: List of CLP Power s EV charging stations (14 December 2018) Quick EV charging stations No. Location Address Parking Bay Qty. District Type 1 CLP Centenary Building CLP Centenary Building, G/F

More information

Progress Update on Shatin to Central Link (SCL) 2 May 2013

Progress Update on Shatin to Central Link (SCL) 2 May 2013 Progress Update on Shatin to Central Link (SCL) 2 May 2013 MTR Corporation 02/05/2013 Page 1 Alignment Tai Wai Hin Keng SCL (Tai Wai to Hung Hom Section) Diamond Hill Kai Tak To Kwa Wan Ma Tau Wai Ho Man

More information

H.K. General Building Contractors Association - List of Registered Practices

H.K. General Building Contractors Association - List of Registered Practices H.K. General Building Contractors Association Flat A 15/F Wing Wong Commercial Building 557-559 Nathan Road Tel : (852) 2507 5088 Fax : (852) 2507 4088 Email : hkgbca@netvigator.com Website: http://www.hkgbca.com/

More information

12/2/2017( 星期日 ) 渣打香港馬拉松巴士改道安排

12/2/2017( 星期日 ) 渣打香港馬拉松巴士改道安排 E 東九龍 East Kowloon s 1*, 1A*, 3C*, 7*, 9*, 203E*, 93K, 95* 13X, 26, 98D, 296D 10, 13D, 16 11, 14, 14X, 213X, 219X N216 106 601, 606 619, 671, 690, N619, N691 凌晨 01:30am - 上午 10:15am 改道詳情 Particulars of

More information

CLP Power Extends Electric Vehicle Charging Network as Popularity of Green Motoring Accelerates

CLP Power Extends Electric Vehicle Charging Network as Popularity of Green Motoring Accelerates 24 November 2016 中華電力有限公司 CLP Power Hong Kong Limited CLP Power Extends Electric Vehicle Network as Popularity of Green Motoring Accelerates CLP Power Hong Kong Limited (CLP Power) today (24 November)

More information

基法水管配件有限公司 Gate Way Valve & Fitting Ltd

基法水管配件有限公司 Gate Way Valve & Fitting Ltd Page: 1 / 8 1 Nova City Ph. 5, Macau HONGWAY ENGINEERING LIMITED. 28/04/2017 2 Cotton Tree Drive No. 22, 紅紅紅紅 BESPARK TECHNOLOGIES ENGINEERING LTD 21/04/2017 利利利利利 3 New World Centre BESPARK TECHNOLOGIES

More information

COMPETITIVE ADVANTAGES OF OUTDOOR TV NETWORK

COMPETITIVE ADVANTAGES OF OUTDOOR TV NETWORK COMPETITIVE ADVANTAGES OF OUTDOOR TV NETWORK Reaching the active local workforce and tourists effectively Broadcasting audiovisual commercial messages along with attractive infotainment Enabling interactive

More information

Encountering Development in the Age of Global Capitalism

Encountering Development in the Age of Global Capitalism Encountering Development in the Age of Global Capitalism Kin-Ling Tang Encountering Development in the Age of Global Capitalism A Case Study Kin-Ling Tang The Education University of Hong Kong Hong Kong,

More information

NS3 Notice of Intention to Issue New Share Certificate 擬發出新股份證明書的公告

NS3 Notice of Intention to Issue New Share Certificate 擬發出新股份證明書的公告 Company Number 公司編號 Company Name 公司名稱 MTR Corporation Limited 香港鐵路有限公司 714016 NOTICE is hereby given that application has been received by the above-mentioned Company for the issue of a new certificate

More information

Hong Kong General Building Contractors Association - List of Registered Practices

Hong Kong General Building Contractors Association - List of Registered Practices General Building Contractors Association - List of Registered Practices HONG KONG GENERAL BUILDING CONTRACTORS ASSOCIATION Flat A 15/F Wing Wong Commercial Building 557-559 Nathan Road Tel : (852) 2507

More information

滙聯營造有限公司 WUI LUEN ENGINEERING COMPANY LIMITED. A Subsidiary of WLS Holdings Ltd.* Website 網址 香港總公司 : 6 樓 室

滙聯營造有限公司 WUI LUEN ENGINEERING COMPANY LIMITED. A Subsidiary of WLS Holdings Ltd.*   Website 網址 香港總公司 : 6 樓 室 滙聯營造有限公司 WUI LUEN ENGINEERING COMPANY LIMITED A Subsidiary of WLS Holdings Ltd.* 香港總公司 : Hong Kong Head Office: 香港香港仔黃竹坑業興街 11 號南滙廣場 6 樓 601-606 室 Rm 601-606, 6/F., Southmark, 11 Yip Hing Street, Wong

More information

Media Kit. Effective Date: 1 January 2017

Media Kit. Effective Date: 1 January 2017 Media Kit Effective Date: 1 January 2017 Asia Travel Media Group About Us About ATMG H Advertising Asia Travel Media Group works hand-in-hand with our hotel partners, local tourism officials, retailers,

More information

Booth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F25 ALFALFA ATELIER AMEBA DESIGN LIMITED ARTECH GRAPHICS LIMITED

Booth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F25 ALFALFA ATELIER AMEBA DESIGN LIMITED ARTECH GRAPHICS LIMITED Booth no: 1E-F12 ALFALFA ATELIER Unit F, 5/F, Block 4 Kwun Tong Industrial Centre 436-446 Kwun Tong Road Kwun Tong, Tel: (852) 3705 5711 Fax: (852) 3702 0615 Email: melin@alfalfagift.com Website: www.alfalfagift.com

More information

香港 Q 嘜優質服務計劃. Hong Kong Q-Mark Service Scheme 香港. Licensee Name 公司名稱 : Funing Property Management Ltd 富寧物業管理有限公司 Website Address 網址 :

香港 Q 嘜優質服務計劃. Hong Kong Q-Mark Service Scheme 香港. Licensee Name 公司名稱 : Funing Property Management Ltd 富寧物業管理有限公司 Website Address 網址 : Funing Property Management Ltd 富寧物業管理有限公司 www.funing.com.hk Customer Service Hotline 查詢熱線 : (852) 2961 0888 Unit 2103-07, Marine House, 68 Hing Man Street, Sai Wai Ho, Hong Kong 香港西灣河興民街 68 號海天廣場 2103-2107

More information

農曆新年煙花滙演巴士改道安排. Bus Diversion During Chinese New Year Fireworks Display

農曆新年煙花滙演巴士改道安排. Bus Diversion During Chinese New Year Fireworks Display 1, 1A, 2, 6, 7 Temp/Alt. Diversion Details ( 一 ) 由 2 0 1 9 年 2 月 6 日 6:00PM 至 6:30PM 及 ( 二 ) 由 2 0 1 9 年 2 月 6 日 6:30PM 至 10:00PM 往尖沙咀碼頭 : 油麻地長樂街 / 尖沙咀德成街 / 金巴利道 (Rt.7)/ 金馬倫道 / 尖沙咀中間道 / 香港文化中心 / 尖沙咀碼頭

More information

S.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: New Territories

S.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: New Territories Sheung Shui 852A2002 852A2007 Shop 301 & 302, Choi Wah House, Choi Yuen Estate, Sheung Shui, Shop 1005-1006, G/F, Sheung Shui Centre Shopping Arcade, Sheung Shui, 852A2012 Shop 13, Ching Ho Shopping Centre,

More information

Job Reference for "LH" Cable Trunking, Cable Trays & Cable Ladders

Job Reference for LH Cable Trunking, Cable Trays & Cable Ladders Job Reference for "LH" Cable Trunking, Cable Trays & Cable Ladders Housing Authority, H.K Housing Association & Highway Department 1 Tung Tau Estate Phase 8 2018-2019 2 Shek Mun Phase 2, Shatin 2017-2018

More information

JOB REFERENCE CONTRACT PERIOD. 12/Jun/ /Aug/ /May/ /Aug/ /May /Aug/ /Mar/2018-5/May/ /Apr/ /Nov/2018

JOB REFERENCE CONTRACT PERIOD. 12/Jun/ /Aug/ /May/ /Aug/ /May /Aug/ /Mar/2018-5/May/ /Apr/ /Nov/2018 NAME OF MAIN OR Replacing of Light Bulbs Happy Valley Racecourse & Sha Tin Racecourse 12/Jun/2018-31/Aug/2018 Philips Lighting Hong Kong HKJC Refurbishment at Mongkok District Police Station PD 27/May/2018-15/Aug/2018

More information

China Representative Office Registration Order Form 中國代表處登記表格

China Representative Office Registration Order Form 中國代表處登記表格 Kaizen Certified Public Accountants Limited Room 2101-2103, Futura Plaza, 111 How Ming Street Kwun Tong, Hong Kong Tel: +852 23411444 Fax: +852 23411414 Email: info@bycpa.com Shenzhen Office, China Room

More information

香港物業管理公司協會有限公司 The Hong Kong Association of Property Management Companies Limited

香港物業管理公司協會有限公司 The Hong Kong Association of Property Management Companies Limited C Ching Ho Shopping Centre Ching Hiu Road Sheung Shui NT hopping Arcad 16 C Chow Shing Kee Comm. Building 25 Tong Mei Road Tai Kwok Tsui KLN 1 42 C Hung Fuk Shopping Centre Hung Fuk Estate 1 3456 C Tai

More information

Job Reference for "LH" Cable Trunking, Cable Trays & Cable Ladders

Job Reference for LH Cable Trunking, Cable Trays & Cable Ladders Job Reference for "LH" Cable Trunking, Cable Trays & Cable Ladders Housing Authority, H.K Housing Association & Highway Department 1 Shek Mun Phase 2 2017 2 Tung Chung Area 39 2017 3 Tuen Mun - Chek lap

More information

Building Area (s.f.) Rental (HK$ psf) 23 Queen's Road East 皇后大道東 23 號 1,000 $ Brim 28 (Causeway Centre) Brim $160.00

Building Area (s.f.) Rental (HK$ psf) 23 Queen's Road East 皇后大道東 23 號 1,000 $ Brim 28 (Causeway Centre) Brim $160.00 FOR LEASE - Wanchai 19-03-18 Building Area (s.f.) Rental (HK$ psf) 23 Queen's Road East 皇后大道東 23 號 1,000 $30.00 239 Hennessy Road 239 號軒尼詩道 1,654 $33.00 3 Lockhart Road 駱克道 3 號 1,457-3,818 (G) $45.00 75

More information

Project Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong.

Project Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong Project Summary Major Property Development Projects in Hong Kong Queen s Terrace Parc Palais 10 Seaview Crescent Wang Chau Yuen Long 31

More information

(1) Building Services Installation

(1) Building Services Installation Project Reference List of U-Tech Engineering Co. Ltd. (as at Dec 2018) (1) Building Services Installation Description of Work Name of Client Completion Date/ Estimated Completion Date Fire Services Installation

More information

SHOP NAME ADDRESS Tel No. Fax No. SHOP G2, AON CHINA BUILDING, 29 QUEEN'S ROAD CENTRAL, CENTRAL, H.K.

SHOP NAME ADDRESS Tel No. Fax No. SHOP G2, AON CHINA BUILDING, 29 QUEEN'S ROAD CENTRAL, CENTRAL, H.K. 1 st CENTRAL BRANCH SHOP G2, AON CHINA BUILDING, 29 QUEEN'S ROAD CENTRAL, CENTRAL, 25237128 25371309 2 nd CENTRAL BRANCH 42-46 QUEEN'S ROAD CENTRAL, CENTRAL, 25243374 25371312 3 rd CENTRAL BRANCH 39 QUEEN'S

More information

The highly distinctive Manulife Financial Centre sets a precedent for the regeneration of the older districts of Hong Kong, providing over one

The highly distinctive Manulife Financial Centre sets a precedent for the regeneration of the older districts of Hong Kong, providing over one Gateway to the future The highly distinctive Manulife Financial Centre sets a precedent for the regeneration of the older districts of Hong Kong, providing over one million square feet of Grade-A office

More information

Government Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination

Government Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination Government Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination Anne Black General 1/F, 140 Tsat Tse Mui Road, North Point 2561 6161 Chai Wan General G/F, 1 Hong Man Street, Chai Wan 2556

More information

TAI PO JOCKEY CLUB SWIMMING POOL

TAI PO JOCKEY CLUB SWIMMING POOL TAI PO JOCKEY CLUB SWIMMING POOL Project : A & A Works Construction of a 50m 8-lane, Standard Swimming Pool and Foundation Works, Renovation Works to the Existing 2-Storey Club House including All Building

More information

S.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: Kowloon

S.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: Kowloon Kowloon City 852H2008 Shop B002, G/F, Ching Long Shopping Centre, Kowloon City, 852K2008 Flat C, G/F, 47 Nga Tsin Wai Road, Kowloon City, Kowloon Bay 852H2001 852H2002 852H2003 Shop 27-30, G/F, Amoy Plaza

More information

Develop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach

Develop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach Develop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach Presented by Spencer Li, Howard Cheng 24 Nov 2010 Electronic Mark Plant Circulation (EMPC)

More information

Keynote Speaker 專題講者 香港特別行政區政府建築署建築師 ( 香港 )

Keynote Speaker 專題講者 香港特別行政區政府建築署建築師 ( 香港 ) (Left to right) Mr. Thomas WAN, Mr. William TSANG, Mr. Benny CHAN, Mrs. Sylvia LAM JP, Mr. MC CHUNG, Mr. Michael LI Architects, Architectural Services Department, HKSARG, Hong Kong ( 左至右 ) 溫灼均建築師 曾偉倫建築師

More information

BUILDING FOR THE BETTER CHINA. Hong Kong

BUILDING FOR THE BETTER CHINA. Hong Kong CHINA Hong Kong BUILDING FOR THE BETTER The Group always strives to maximize the aesthetic potential of development lots so as to integrate its projects into their surroundings harmoniously with minimal

More information

MTR Transformation of CBDs in Hong Kong

MTR Transformation of CBDs in Hong Kong MTR Transformation of CBDs in Hong Kong Thomas Ho Property Director, MTR Corporation 17 September 2011 港鐵公司 19/09/2011 Page 1 How MTR Helps to Transform the CBDs? 2 Evolution of Hong Kong s CBDs 1970 Today

More information

項目名稱應用完工年份建築師承辦商 1. 2 nos of Plant Room at Yau Oi Roof Sport Cladding Centre WIP ASD Shui On Bldg Co Ltd

項目名稱應用完工年份建築師承辦商 1. 2 nos of Plant Room at Yau Oi Roof Sport Cladding Centre WIP ASD Shui On Bldg Co Ltd 1. 2 nos of Plant Room at Yau Oi Roof Sport Cladding Centre WIP ASD Shui On Bldg Co 2. Community Green Station Purpose, Roof Oi Cladding Shun RoadWIP ASD Shui On Bldg Co And Hing Man Street, Shau Kei Wan

More information

基法 Gate Way Valve & Fitting Ltd. Tel: (852) Fax: (852)

基法 Gate Way Valve & Fitting Ltd. Tel: (852) Fax: (852) Page: 1 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) 19) 20) 21) 22) 23) 24) 25) 26) 27) Science Park Phase 3 (A/C) Lockhart Road Sports Centre (A/C) Lei Yue Mun Park & Holiday Village

More information

NOTIFIER JOB REFERENCE IN HONG KONG

NOTIFIER JOB REFERENCE IN HONG KONG 1 Pacific Place 1 Atrium & Mech. Floor Upgrade 1990 2 Pacific Place I Mall Upgrade 1990 3 Central Plaza (78-storey) 1992 4 Tai Po Convalescent & Infirmary Hospital 5 Dorset House & HK Telecom HQ. Taikoo

More information

(1) Gas Pipe Installation

(1) Gas Pipe Installation Project Reference List of U-Tech Engineering Co. Ltd. As at Dec 2018 (1) Gas Pipe Installation Steel Pipeline Welding and Construction Contract No. Description of Work Name of Client Completion Date/ Estimated

More information

Development Projects Completed

Development Projects Completed Development Projects Completed The following development projects were completed during the financial year: Group s Interest Site Area Floor Area Floor Area Location (sq.ft.) (sq.ft.) Purpose (%) (sq.ft.)

More information

JOB REFERENCE FOR SUPERFINE SHUTTER (TPS8 MODEL)

JOB REFERENCE FOR SUPERFINE SHUTTER (TPS8 MODEL) JOB REFERENCE FOR SUPERFINE SHUTTER (TPS8 MODEL) FORTRESS LIMITED : SHOP G26-27, G/F, THE EDGE, TSEUNG KWAN O (2 NOS.) COMPLETION DATE : 10/2006 : SHOP 258, EAST POINT CITY, TSEUNG KWAN O (3 NOS.) COMPLETION

More information

Occupational Safety and Health Council Construction Safety Promotional Campaign 2017 Competition Winners List

Occupational Safety and Health Council Construction Safety Promotional Campaign 2017 Competition Winners List Occupational Safety and Health Council Construction Safety Promotional Campaign 2017 Competition Winners List 1. Best Program to Prevent Heat Stroke at Work Kum Shing E&M Castle Peak Power Station Integrated

More information

JV CONTRACT PROPOSED LEASE OF PROPERTIES

JV CONTRACT PROPOSED LEASE OF PROPERTIES Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to it accuracy or completeness

More information

Selected Unaudited 2015 Third Quarter Financial Data. October 15, 2015

Selected Unaudited 2015 Third Quarter Financial Data. October 15, 2015 Selected Unaudited 2015 Third Quarter Financial Data October 15, 2015 Executive Summary GEG: Delivering solid results in a potentially stabilizing market Revenue of $12.3 billion, down 29% year-on-year,

More information

Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong

Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong Ir Enoch LAM Deputy Secretary (Works)2, Development Bureau The Government of the Hong Kong Special

More information

INVEST IN NEIGHBORHOODS SURVEY RESULTS SURVEY HIGHLIGHTS DESIGN AROUND ADDITIONAL UNITS DEMOGRAPHICS LAND USE AND DESIGN VISUAL PREFERENCE SURVEY

INVEST IN NEIGHBORHOODS SURVEY RESULTS SURVEY HIGHLIGHTS DESIGN AROUND ADDITIONAL UNITS DEMOGRAPHICS LAND USE AND DESIGN VISUAL PREFERENCE SURVEY INVE IN NEIGHBORHOODS SURVEY RESULTS In the fall of 2014 the Planning Department with Supervisor Tang s office developed a survey on design and land use in the Sunset. The survey built on prior efforts,

More information

Gate Way Valve & Fitting Ltd Tel: (852)

Gate Way Valve & Fitting Ltd Tel: (852) Page: 1 / 37 1 Hong Kong Golf Club, Fanling - Wonder Engineering Company Limited 31/05/2017 P/D 2 26/05/2017 3 Water Supply and Fire Services Waterfront Fluid Controls Ltd 26/05/2017 Term (LEYLAND) 4 Pik

More information

Business in Hong Kong Property Development

Business in Hong Kong Property Development Review of Operations Business in Hong Kong 2006 Highlights Approximately 680,448 square feet of residential properties completed for sale An attributable HK$3,434.6 million worth of properties in Hong

More information

Self Service Terminal Service Hour Hong Kong District Branch

Self Service Terminal Service Hour Hong Kong District Branch Self Service Terminal Service Hour Hong Kong District Branch Head Office 83 Des Voeux Central 24 hours X 09:00-19:00 09:00-19:00 09:00-19:00 Aberdeen 10 Nam Ning Street Causeway Bay Prestige & 28 Yee Wo

More information

Collection Point Address

Collection Point Address Collection Point Hong Kong Island Business Hours Mon to Fri Aberdeen Ap Lei Chau Shau Kei Wan Sai Wan North Point Office 1, 9/F, Goodview Centre, 12 Wu Pak Street, Aberdeen, Hong Kong Shop S11, G/F, Wah

More information

THE NEW ICON IN THE HEART OF WEST KOWLOON 西九核心 創意地標

THE NEW ICON IN THE HEART OF WEST KOWLOON 西九核心 創意地標 THE NEW ICON IN THE HEART OF WEST KOWLOON 西九核心 創意地標 BRAND NEW TOP CLASS WORKSPACE 西九龍罕有全新甲級工作空間 PANORAMIC VIEWS 開揚景觀 EXCLUSIVE PACKAGE 頂級用料及配套 Open view facing the landmark, Kowloon Commerce Centre (KCC)

More information

Improvement to Hoi Bun Road Park and Adjacent Area

Improvement to Hoi Bun Road Park and Adjacent Area Improvement to Hoi Bun Road Park and Adjacent Area Task Force on Kai Tak Harbourfront Development Harbourfront Commission 4 October 2016 發展局工務科 Works Branch, Development Bureau BACKGROUND We briefed the

More information

Monthly update of MTR facilities for passengers with disabilities December 2017

Monthly update of MTR facilities for passengers with disabilities December 2017 Monthly update of MTR facilities for passengers with disabilities 1. Ma On Shan Line The installation of Automatic Platform Gates at Ma On Shan Line has commenced at Tai Wai Station in November 2014. It

More information

FOR VIBRANT LIFESTYLES THE REACH, YUEN LONG, HONG KONG

FOR VIBRANT LIFESTYLES THE REACH, YUEN LONG, HONG KONG FOR VIBRANT LIFESTYLES THE REACH, YUEN LONG, HONG KONG Review of Operations Business in Hong Kong Progress of Major Development Projects Status of property developments with anticipated completion during

More information

Gross Floor Area of HOS Flat by Phase / Estate

Gross Floor Area of HOS Flat by Phase / Estate Gross Floor Area of HOS Flat by / Estate 1 February 1978 12.6.80 Shun Chi Court East Kowloon 49.1-77.9 12.5.81 Chun Man Court Ho Man Tin 54.1-66.5 13.8.80 Yue Fai Court, I Aberdeen 42.7-46.6 23.9.80 Sui

More information

HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON

HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON APPLICATION FOR CHANGE IN MORTGAGE ARRANGEMENT Prepared

More information

Booth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F19 ALFALFA ATELIER AMEBA DESIGN LIMITED AP CREATIVE LIMITED

Booth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F19 ALFALFA ATELIER AMEBA DESIGN LIMITED AP CREATIVE LIMITED Booth no: 1E-F12 ALFALFA ATELIER Unit F, 13/F, Block 2, Yip Fat Factory Building 75 Hoi Yuen Road, Kwun Tong Tel: (852) 3118 1300 Fax: (852) 3118 1322 Email: melin@alfalfagift.com Website: www.alfalfagift.com

More information

MTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area

MTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area PR068/18 6 August 2018 MTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area The MTR Corporation notes that a new announcement mechanism has

More information

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Subsidised Housing Committee. Domestic Rents for New Estates

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Subsidised Housing Committee. Domestic Rents for New Estates PAPER NO. SHC 4/2005 THE HONG KONG HOUSING AUTHORITY Memorandum for the Subsidised Housing Committee Domestic Rents for New Estates PURPOSE This paper sets domestic rents for 16 453 flats in five new public

More information

A MAJOR PROPERTIES UNDER DEVELOPMENT

A MAJOR PROPERTIES UNDER DEVELOPMENT 40 41 42 A MAJOR PROPERTIES UNDER DEVELOPMENT Total Group s Expected Main Gross Attributable Stage of Completion Site Area Usage Floor Area Interest Completion Date Location (sq.m.) (sq.m.) (%) HONG KONG

More information

Offers Details and Merchant's Additional Terms and Conditions. 10% off on regular-priced items

Offers Details and Merchant's Additional Terms and Conditions. 10% off on regular-priced items The hyperlinks of merchant websites will bring to you to another website on the Internet, which is published and operated by a third party. Such links are only provided on our website for the convenience

More information

HKT Trust (a trust constituted on 7 November 2011 under the laws of Hong Kong and managed by HKT Management Limited)

HKT Trust (a trust constituted on 7 November 2011 under the laws of Hong Kong and managed by HKT Management Limited) This announcement is for information purposes only and does not constitute an offer or an invitation to induce an offer by any person to acquire, purchase or subscribe for securities. Potential investors

More information

Michel Sudarskis 國際都市發展協會 (INTA) 秘書長 INTA 專家學者. INTA Panelists

Michel Sudarskis 國際都市發展協會 (INTA) 秘書長 INTA 專家學者. INTA Panelists Michel Sudarskis 國際都市發展協會 (INTA) 秘書長 Michel Sudarskis 擁有經濟學和政治學博士學位 在加入國際城市發展協會 (INTA) 之前, 他於多所大學擔任副教授, 教授國際合作與外交, 並且與義大利及比利時的國際組織共同合作 Michel Sudarskis 在 INTA 中領導多項城市永續發展之國際活動, 也多次參與了全球性空間分析與策略的諮詢, 為基礎設施規劃建立空間架構,

More information

Booth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F19 ALFALFA ATELIER AMEBA DESIGN LIMITED AP CREATIVE LIMITED

Booth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F19 ALFALFA ATELIER AMEBA DESIGN LIMITED AP CREATIVE LIMITED Booth no: 1E-F12 ALFALFA ATELIER Unit F, 13/F, Block 2, Yip Fat Factory Building 75 Hoi Yuen Road, Kwun Tong Tel: (852) 3118 1300 Fax: (852) 3118 1322 Email: melin@alfalfagift.com Website: www.alfalfagift.com

More information

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Commercial Properties Committee. Shopping Centres Scheduled for Completion in 2000/2001

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Commercial Properties Committee. Shopping Centres Scheduled for Completion in 2000/2001 PAPER NO. CPC 6/2000 THE HONG KONG HOUSING AUTHORITY Memorandum for the Commercial Properties Committee Shopping Centres Scheduled for Completion in 2000/2001 PURPOSE To inform Members of the details of

More information

Development Projects Completed

Development Projects Completed Development Projects Completed The following development projects were completed during the financial year: The City Culture Located in Hunghom, Kowloon, this project consists of a 20-storey residential

More information

Chan Chu Kee Engineering Ltd. (i) NDT Welding Test

Chan Chu Kee Engineering Ltd. (i) NDT Welding Test Project Main Contractor / Related Contractor Test Method 1. Hud 2nd Concrete Plant Anderson Concrete Ltd (i) 2. South Island Line (East)-Contract 901 Admiralty Integrated Station And SCL Enabling Works

More information

International Society of Public Law 2018 Annual Conference June 25-27, 2018, The University of Hong Kong INFORMATION ON ACCOMMODATION

International Society of Public Law 2018 Annual Conference June 25-27, 2018, The University of Hong Kong INFORMATION ON ACCOMMODATION International Society of Public Law 2018 Annual Conference June 25-27, 2018, The University of Hong Kong INFORMATION ON ACCOMMODATION GENERAL ADVICE ON ACCOMMODATION: Participants are advised to stay at

More information

Property Development. 1. YOHO Town, Yuen Long 2. Park Island, Ma Wan 3. Severn 8, The Peak 4. The Arch, Kowloon Station. Park Island, Ma Wan

Property Development. 1. YOHO Town, Yuen Long 2. Park Island, Ma Wan 3. Severn 8, The Peak 4. The Arch, Kowloon Station. Park Island, Ma Wan Property Development The Group s trusted brand name for quality enhances marketability and development margins on new projects. It will continue satisfying homebuyers by offering premiumquality developments

More information

考生及家长注意事项. Important information for candidates and parents

考生及家长注意事项. Important information for candidates and parents * 香港考试及评核局 SAT 考场资料 2018 年 12 月 1 日 Information of the HKEAA SAT Test Centres 1 December 2018 考生及家长注意事项 所有考场并不会不会于考试前开放供考生及家长参观 考试当日考场只供只供开放予考生进入 内地考生不可不可使用 中国居民身份证 用作考试的身份证明文件, 兹因没有英文姓名, 请使用 往来港澳通行证 或

More information

DEVELOPMENT PROJECTS COMPLETED

DEVELOPMENT PROJECTS COMPLETED DEVELOPMENT PROJECTS COMPLETED The following development projects were completed during this financial year: Group s Interest Site Area Floor Area Land-Use Floor Area Location (sq.ft.) (sq.ft.) Purpose

More information

MTR Kwun Tong Line Extends to Ho Man Tin and Whampoa Stations From 23 October 2016

MTR Kwun Tong Line Extends to Ho Man Tin and Whampoa Stations From 23 October 2016 PR081/16 21 September 2016 MTR Kwun Tong Line Extends to Ho Man Tin and Whampoa Stations From 23 October 2016 Commuters travelling to and from Ho Man Tin and Whampoa will be able to enjoy the convenience

More information

List of Registered Fire Service Installation Contractors

List of Registered Fire Service Installation Contractors List of Registered Fire Service Installation Contractors 1) Pursuant to regulation 5(4)(a) of the Fire Service (Installation Contractors) Regulations, Chapter 95A, Laws of Hong Kong, the following (except

More information

Kowloon Region. Unit No. District Meeting Venue & Contact Tel. Meeting Time. The Salvation Army Chuk Yuen Children and Youth Centre

Kowloon Region. Unit No. District Meeting Venue & Contact Tel. Meeting Time. The Salvation Army Chuk Yuen Children and Youth Centre Kowloon Region Happy Bee (Age: 4-6) 84 KLN HBH vacancy K3) Lok Fu The Salvation Army Chuk Yuen Children and Youth Centre (2/F, Chuk Yuen (South) Estate,Community Centre,. Tel: 2351 5321 5:30 pm-6:30pm

More information

Hong Kong Out-patient Direct Settlement Network - April 2015

Hong Kong Out-patient Direct Settlement Network - April 2015 Allianz Worldwide Care Out-patient Direct Settlement Network - April 2015 In order to provide our insured membership with access to the best possible medical care and service, AWC has developed a network

More information

CONTINUING CONNECTED TRANSACTIONS RENEWAL OF TENANCY AGREEMENT AND PROPERTY MANAGEMENT AGREEMENT

CONTINUING CONNECTED TRANSACTIONS RENEWAL OF TENANCY AGREEMENT AND PROPERTY MANAGEMENT AGREEMENT Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Visualizing the economic flows of local economy in Japan

Visualizing the economic flows of local economy in Japan Visualizing the economic flows of local economy in Japan Yoshifumi Ikejima ikejima@ynu.ac.jp www.ynu.ac.jp July 22, 2016 Introduction Analysis of Local Economic Circulation Boosting economic circulations

More information

HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JULY 1999 to 30 SEPTEMBER 1999) Abbreviations : PDB Provisional District Board

HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JULY 1999 to 30 SEPTEMBER 1999) Abbreviations : PDB Provisional District Board HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JULY 1999 to 30 SEPTEMBER 1999) Annex Abbreviations : PDB Provisional District Board CAC CBC CILAC CWDC DFCC DHC DMC EAC EC EIC Community

More information

HKBN Mass Deploys Fiber-To-The-Home Making the Future Today in Hong Kong

HKBN Mass Deploys Fiber-To-The-Home Making the Future Today in Hong Kong For Immediate Release HKBN Mass Deploys Fiber-To-The-Home Making the Future Today in Hong Kong (Hong Kong, 19th September 2007) Hong Kong Broadband Network Limited ( HKBN ) today announced a revolution

More information

A Dissertation On Hang Hau Town And Ap Chai Wan By Kwok-shing Pun READ ONLINE

A Dissertation On Hang Hau Town And Ap Chai Wan By Kwok-shing Pun READ ONLINE A Dissertation On Hang Hau Town And Ap Chai Wan By Kwok-shing Pun READ ONLINE Your Travel Guide to Hong Kong PUBLIC HEALTH AND MUNICIPAL SERVICES ORDINANCE Chai Wan Pool-side Garden Ha Wan Tsuen Basketball

More information

SHKP Brand New Luxury Residence in Ho Man Tin Officially Named Ultima Creates Remarkable Lifestyle with 4 Ultimate Geographical Privileges

SHKP Brand New Luxury Residence in Ho Man Tin Officially Named Ultima Creates Remarkable Lifestyle with 4 Ultimate Geographical Privileges Press Release SHKP Brand New Luxury Residence in Ho Man Tin Officially Named Ultima Creates Remarkable Lifestyle with 4 Ultimate Geographical Privileges (29 April 2015, Hong Kong) Developed by Sun Hung

More information

(sq.ft.)!!"!!!" HONG KONG 1. No. 1 Chatham Path % 7,800 R Completed Existing Mid-levels, Hong Kong!"#$1

(sq.ft.)!!!!! HONG KONG 1. No. 1 Chatham Path % 7,800 R Completed Existing Mid-levels, Hong Kong!#$1 " Completed investment properties HONG KONG 1. No. 1 Chatham Path 2072 100.0% 7,800 R Completed Existing Mid-levels, "#$1 2. No. 8 Mount Cameron Road 2082 100.0% 15,617 5,500 R Completed Existing The Peak,

More information

(sq.ft.)!!"!!!" HONG KONG 1. No. 1 Chatham Path % 4,017 R Completed Existing Mid-levels, Hong Kong!"#$1

(sq.ft.)!!!!! HONG KONG 1. No. 1 Chatham Path % 4,017 R Completed Existing Mid-levels, Hong Kong!#$1 " Completed investment properties HONG KONG 1. No. 1 Chatham Path 2072 51.5% 4,017 R Completed Existing Mid-levels, "#$1 2. No. 8 Mount Cameron Road 2082 51.5% 15,617 2,833 R Completed Existing The Peak,

More information

HKTDC Hong Kong Fashion Week for Fall/Winter 香港貿發局香港時裝節秋冬系列 18-21/1/2016. Value-for-Money Hotel Booking

HKTDC Hong Kong Fashion Week for Fall/Winter 香港貿發局香港時裝節秋冬系列 18-21/1/2016. Value-for-Money Hotel Booking FORM 14 Deadline 7 Dec 2015 HKTDC Fashion Week for Fall/Winter 香港貿發局香港時裝節秋冬系列 18-21/1/2016 Value-for-Money Hotel Booking Pls return this form directly to the selected hotel To enjoy Value-for-Money hotel

More information

Property Investment. International Commerce Centre, Kowloon Station 38 SUN HUNG KAI PROPERTIES LIMITED

Property Investment. International Commerce Centre, Kowloon Station 38 SUN HUNG KAI PROPERTIES LIMITED Property Investment International Commerce Centre, Kowloon Station 38 SUN HUNG KAI PROPERTIES LIMITED With over six million square feet of investment property under development in Hong Kong and other projects

More information

Property Investment. 1. Two IFC, Central 2. International Commerce Centre, Kowloon Station 3. East Point City, Tseung Kwan O 4.

Property Investment. 1. Two IFC, Central 2. International Commerce Centre, Kowloon Station 3. East Point City, Tseung Kwan O 4. Property Investment The local retail sector has flourished and the Group s shopping centres keep attracting more visitors, benefiting retail tenants with higher traffic and turnover. The Group will keep

More information

China New Town Development Co. Ltd. 中國新城鎮發展有限公司

China New Town Development Co. Ltd. 中國新城鎮發展有限公司 Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

18 D Shop D & Portion of Shop B, G/F, B. 16 B Shop B, G/F and Shop A2 & A3, Upper G/F, A2

18 D Shop D & Portion of Shop B, G/F, B. 16 B Shop B, G/F and Shop A2 & A3, Upper G/F, A2 126 FAIRWOOD FAST FOOD RESTAURANTS Hong Kong 41A-434-9 Shop Nos. 4-9, G/F, Smithfield Court, 2856 8688 41A-43 Smithfield, Kennedy Town 93-103 G/F, New Victory House, Nos. 93-103, 2856 8650 Wing Lok Street,

More information

MAJOR TRANSACTION DISPOSAL OF PROPERTIES. The Board wishes to announce that on 29 December 2017 (after trading hours):

MAJOR TRANSACTION DISPOSAL OF PROPERTIES. The Board wishes to announce that on 29 December 2017 (after trading hours): Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Summary of Publication by Raymond Wong Wai Man Since 1993 (Technical and Academic Nature)

Summary of Publication by Raymond Wong Wai Man Since 1993 (Technical and Academic Nature) Summary of Publication by Raymond Wong Wai Man Since 1993 (Technical and Academic Nature) Title Sources Date Published General Technical Paper 1. Debate about the 3 Gorges project in Chang Jiang, China

More information

AVT CONTRACTING. Shanghai Head Offi ce. Branch Offi ce CHINA Class 2 Qualification for Specialized Contracting of Architectural Decoration Project

AVT CONTRACTING. Shanghai Head Offi ce. Branch Offi ce CHINA Class 2 Qualification for Specialized Contracting of Architectural Decoration Project PROJECT REFERENCE AVT CONTRACTING AVT CONTRACTING is a subsidiary company of AVT DESIGN. We are Registered Contractor delivering Interior Fitting Out Work, A&A and Minor Work, as well as Design and Fitting

More information