SOUTH FLORIDA SHOOTING GROUNDS Revised Major Final Site Plan

Size: px
Start display at page:

Download "SOUTH FLORIDA SHOOTING GROUNDS Revised Major Final Site Plan"

Transcription

1 { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information SOUTH FLORIDA SHOOTING GROUNDS Revised Major Final Site Plan Applicant: South Florida Shooting Grounds, LLC Property Owner: South Florida Shooting Grounds, LLC Agent for the Applicant: The Milcor Group, Inc., Melissa G. Corbett, P.E. County Project Coordinator: Catherine Riiska, Principal Planner Growth Management Director: Nicki van Vonno, AICP Project Number: S Application Type and Number: D Report Number: 2017_0131_S _DRT_Staff_FINAL.docx Application Received: 02/22/2016 Transmitted: 02/22/2016 Staff Report: 05/17/2016 Joint Workshop: 05/19/2016 Resubmittal Received: 07/26/2016 Transmitted: 07/28/2016 Staff Report: 01/31/2017 Joint Workshop: TBD B. Project description and analysis This is an application for a revised commercial, major development final site plan for an outdoor shooting range. The project site is a sub-portion of a parent parcel of approximately 630 acres located at 500 SW Long Drive, approximately 2.3 miles north of SW Martin Highway. The entire parcel has a designated future land use of Agricultural. The original development site of approximately acres received approval of a zoning change from A-2 to AG-20A in The remainder of the parent parcel received approval of a zoning change from A-2 to AG-20A in The South Florida Shooting Grounds project received a final site plan approval on February 25, This application is a request to revise the approved plan to accommodate the addition of four cart barns, an observation tower, bunker and shade structures. The site is not located within an urban service district and is therefore currently serviced by a potable water well and septic systems. Included in this application is a request for a Certificate of Public Facilities Reservation.

2 C. Staff recommendation The specific findings and conclusion of each review agency related to this request are identified in Sections F through T of this report. The current review status for each agency is as follows: Section Division or Department Reviewer Phone Assessment F Comprehensive Plan Catherine Riiska Non-Comply F ARDP Samantha Lovelady N/A G Development Review Catherine Riiska Non-Comply H Urban Design Santiago Abasolo N/A H Community Redevelopment Santiago Abasolo N/A I Property Management Colleen Holmes N/A J Environmental Shawn McCarthy Comply J Landscaping Karen Sjoholm Non-Comply K Transportation Stephanie Molloy Non-Comply L County Surveyor Michael O Brien Comply M Engineering Michelle Cullum Non-Comply N Addressing Emily Kohler Comply N Electronic File Submission Emily Kohler Comply O Water and Wastewater James Christ Non-Comply O Wellfields James Christ Comply P Fire Prevention Doug Killane Comply P Emergency Management Debra McCaughey N/A Q ADA Judy Lamb Comply R Health Department Todd Reinhold Review Pending R School Board Garret Grabowski N/A S County Attorney Krista Storey Review Ongoing T Adequate Public Facilities Catherine Riiska Review Pending D. Review Board action This application requests approval of a revised final site plan for an outdoor shooting range, which is classified as a commercial major development as set forth in Section B.1., LDR, Martin County, Fla. (2016). Pursuant to Sections 10.1.D., 10.4.A.1., and 10.5.A.1., LDR, Martin County, Fla. (2016), applications for a major development which has not received master site plan approval shall be subject to a review and recommendation of the Local Planning Agency (LPA) with final action to be determined by the Board of County Commissioners (BCC). Both the LPA and BCC meetings shall be public hearings in accordance with Section 10.7., LDR, Martin County, Fla. (2016). E. Location and site information Parcel number(s) and address: SW Long Dr Existing Zoning: A-2, Agricultural Future land use: FLU-AG, Future Land Use Agricultural Census tract: Not Applicable Commission district: 5 Community redevelopment area: Not Applicable Municipal service taxing unit: District 5 Page 2 of 20

3 Planning area: West County Storm surge zone: Not Available Taxing district: District F Traffic analysis zone: 51 Figure 1: Location Map Figure 2: Subject Site 2016 Aerial Page 3 of 20

4 Adjacent existing or proposed development: To the north: N/A (C-23) To the south: Undeveloped To the east: Agriculture To the west: Undeveloped/Agriculture Figure 3: Local 2016 Aerial Zoning district designations of abutting properties: To the north: N/A (C-23 Canal) To the south: PC, Public Conservation To the east: A-2,,Agricultural To the west: PC, Public Conservation Figure 4: Zoning Map Page 4 of 20

5 Future land use designations of abutting properties: To the north: N/A (C-23 Canal) To the south: Conservation To the east: Agricultural To the west: Conservation Figure 5: Future Land Use Map F. Determination of compliance with Comprehensive Growth Management Plan requirements - Growth Management Department Unresolved Issues: Item #1: Maximum Height No land uses or development shall be more than 40 feet high. Building height shall be measured from the average finished grade at the perimeter of the building, except in flood hazard areas. In flood hazard areas building height shall be measured from the base flood elevation requirement for the lowest floor as shown on the flood insurance rate map published by the Federal Emergency Management Agency (FEMA). Building height shall be the difference between the finished grade or the base flood elevation described above and either the highest point of the coping of a flat roof, the deck line of a mansard roof, or the mean height level between eaves and ridge of gable, hip, and gambrel roofs. The mean height level between the ridge and the eaves shall be determined on the highest section of roof. Limited exceptions shall be allowed for structures such as church steeples, roof structures, utility poles, park lighting, emergency structures, agricultural and industrial structures, and communications facilities as detailed in Article 3, Section 3.14., Land Development Regulations, Martin County Code on August 13, MARTIN COUNTY, FLA., CGMP POLICY 2.1A.1(3) (2016) Pursuant to Section 3.12, LDR, Martin County, Fla. (2013), the maximum allowable height in the AG- 20A zoning district is thirty (30) feet. Page 5 of 20

6 The methodology for determining the height of structures has changed via a revision to the Comprehensive Growth Management Plan (CGMP), which is effective. Please see the attached Exhibit 1 for an excerpt of the current requirements. All existing structures that were developed in conformance with the Final Site Plan approved in 2009 will not be required to utilize the new methodology. All structures that are proposed, other than those shown on the 2009 approved site plan, must be identified as proposed and may not exceed thirty (30) feet in height as measured using the current methodology. 1. Please revise the data tables for clarity: a. Utilize names/labels for each building, or building type, consistent with the labeling shown on the revised site plan. b. All structures constructed in conformance with the 2009 approved site plan shall be identified as 'existing'. c. All structures not authorized by the 2009 development order and site plan shall be identified as 'proposed' whether or not they have already been installed. d. All observation towers must be included. 2. Please submit elevation drawings for all proposed permanent structures: a. Depict NAVD ground elevations for the measurement starting point pursuant to Policy 2.1A.1(3), CGMP, Martin County, Fla. (2016) as provided in the attached Exhibit 1. b. Any portions of any structures proposed to exceed the maximum allowable height must be demonstrated to meet the exemption criteria pursuant to Section 3.14.B.5., LDR, Martin County, Fla. (2005). c. Please provide elevations for all other structures, installed and proposed to remain or proposed to be installed, on the property in association with the commercial use. G. Determination of compliance with land use, site design standards, zoning, and procedural requirements - Growth Management Department Unresolved Issues: Item #1: Site Plan Compliance-GMD Development activity shall be in compliance with the development order at all times. Failure to comply with a development order or unauthorized development activity may result in the suspension of the current development order, and the cessation of county processing of all applications for development on the subject property and any associated phases or termination of the development order. MARTIN COUNTY, FLA., LDR SECTION 10.8.A. (2016) Site plans shall be required for minor and major development proposals in accordance with the provisions of this section in order to ensure that the proposed development complies with the requirements of the Comprehensive Plan, the LDR and the Code. MARTIN COUNTY, FLA., LDR SECTION A.1. (2016) The discharge of firearms shall be conducted only within areas specifically designated for such use on an approved site plan. MARTIN COUNTY, FLA., LDR SECTION A (2008) There appear to be additional firing positions and associated structures, including shelters and observation towers, located outside the shooting areas designated on the approved site plan: Page 6 of 20

7 1. Please submit a revised site plan encompassing the developable area to show: a. All existing firing positions b. All proposed firing positions c. All existing structures d. All proposed structures e. All stabilized cart paths 2. Please revise the data table to reflect the existing and proposed conditions within the revised project area for all required development standards associated with the AG-20A zoning district and Agricultural Future Land Use designation. 3. Please dimension the distance of all firing positions from the parcel boundaries to demonstrate compliance with Section B., LDR, Martin County, Fla. (2008). 4. Please provide the allowable and proposed building coverages in the data table. All structures, including observation towers and buildings, must be included. 5. Please label all structures and provide dimensions. Unique dimensions should be provided where necessary (e.g. each different style of observation tower); or, in the case of a standard structure utilized throughout the site, a single typical and a total count for the cumulative coverage proposed (e.g. the dimensions, elevation and number of shade structures, if all the same). 6. Please provide for a fence or wall, a minimum of six feet in height with warning signs of at least one square foot each for every 100 linear feet for the perimeter of the shooting range activity for compliance with Section C., LDR, Martin County, Fla. (2008). 7. Please provide the records documenting the facility's conformance with the Best Management Practices (BMPs) identified within the approved Hazardous Waste Management Plan (OR Bk 2401 Pgs ) to demonstrate compliance with Section E and F., LDR, Martin County, Fla. (2008). 8. Please review the Hazardous Waste Management Plan that is tailored to the use and conditions of the site. The original 2008 Plan identified multiple general BMPs that were identified as potentially to be utilized dependent upon site specific conditions yet to be determined. If necessary, please update the Plan based upon the current state and federal guidelines and incorporate the applicant s experience with the historic and ongoing operations and the expansion of the use. 9. Please review the range design to ensure it complies with the Hazardous Waste Management Plan and FDEP Guidelines. Item #2: Legal Description Of The Property A legal description of the property that is the subject of this application must be provided. MARTIN COUNTY, FLA., LDR SECTION 10.2.B (2016) Please provide a revised legal description consistent with the developable area of the site. See Item #1, Section G. Item #3: Boundary & Topographic Surveys Provide recent boundary and topographic surveys of all properties that are the subject of this application. MARTIN COUNTY, FLA., LDR SECTION 10.2.B (2016) Page 7 of 20

8 Please provide a revised survey consistent with the project boundaries of the developable area. See Item #1, Section G. Item #4: Acreage Of Site Indicate the gross acreage of the project on the site plan, measured in square feet and acres. MARTIN COUNTY, FLA., LDR SECTION 10.2.B (2016) Please provide a revised gross acreage that encompasses the developable portion of the property. See Item #1, Section G. The project site appears be the entire tract (approx. 630 acres). Please clearly identify those areas that are in Agricultural use. The remainder of the site utilized for the shooting courses and stations (approx. 350 acres) must be identified as the outdoor shooting range area, which appears to be the developable portion and project boundary. Item #5: Notice 1,000 Feet Provide a current list of the names and addresses all property owners within 1,000 feet of the boundaries of the property that is the subject of this application and is located outside the Primary Urban Service District. Include in the list any condominium and homeowner associations and the name and address of each property owner in each association. (Section 10.6.E.1) Please submit a revised list that encompasses all owners located within 1,000 feet of the subject parcel boundaries, i.e. property lines. Item #6: Posted Property Notarized Certification No later than ten (10) days after a complete application is filed (when a letter indicating the application is sufficient has been released), the applicant is to post the property with a waterproofed sign entitled 'Notice of Development Application.' The applicant is to provide to the Growth Management Department a signed, notarized certification that the property has been posted with the appropriate notice and within the prescribed time period. MARTIN COUNTY, FLA., LDR SECTION 10.6.B (2016) If the property does not abut a public right-of-way, signs shall be placed at the nearest public right-ofway with an indication of the location of the subject property. MARTIN COUNTY, FLA., LDR SECTION 10.6.B.2. (2016) The posted notice sign does not appear to be located on a public right-of-way. Please relocate the sign as appropriate and provide photographs and a location map to demonstrate compliance with Section 10.6.B., LDR, Martin County, Fla. (2016). Page 8 of 20

9 Item #7: Structure Setbacks Show existing and proposed structures and their required setbacks measured in feet from the closest point of each to the nearest property line on the site plan. Minimum setbacks for the AG-20A zoning district for all structures are fifty (50) feet. MARTIN COUNTY, FLA., LDR SECTION 3.12 (2013) Please see Item 1 Section G. Item #8: Parking Calculations Show the calculation for parking on the site plan in the required table of existing and proposed uses. (Section 4.6; Section 10.2.B, LDR) Please provide revised parking calculations consistent with the project. See Item 1, Section G. Please include applicable loading spaces for the ancillary uses (e.g. retail sales, lounge etc.). Item #9: Vehicle Access From Adjacent Streets Show all vehicle access to the property and provide the distance and accessway dimensions in feet, on the site plan. MARTIN COUNTY, FLA., LDR SECTION 10.2.B (2016) Thank you for labeling the width of the access drive from SW Long Drive to the range area. As previously requested please provide the distance of the accessway. Item #10: Site Plan A complete site plan is required as part of the application pursuant to Section 10.2.B.5., LDR, Martin County, Fla. Please see prior comments. Additional Information: Information #1: Site Clearing No land clearing is authorized prior to the mandatory pre-construction meeting for the project. Property corners and preservation areas shall be located by a licensed land surveyor and clearly marked in the field prior to the pre-construction meeting. Authorization for clearing to install erosion control devices and preserve barricades will be granted at the pre-construction meeting. No additional land clearing Page 9 of 20

10 shall commence until a satisfactory inspection of the required control structures and barricades has been obtained. Authorization for the relocation of gopher tortoises within the development, as provided for on state agency permits, may be granted by the Growth Management Department upon review of required permit materials. MARTIN COUNTY, FLA., LDR SECTION (2016) Information #2: The applicant has elected Option 2, regarding Agency permit submittal for a consistency review after project approval. Prior to scheduling the mandatory pre-construction meeting for construction commencement authorization, all applicable local, state, and federal approved permits are to be submitted for review by the County Administrator with remittance of a $ review fee. If an application is made to any permitting agency for a modification to a permit that was required to be issued prior to final site plan approval, the application for the permit modification must be submitted concurrently to Martin County. MARTIN COUNTY, FLA., LDR SECTION 10.9.a. (2016) Information #3: Timetable Of Development - Final The timetable of development for final site plans require all permits to be obtained within one year of approval and require all construction to be completed within two years of approval. MARTIN COUNTY, FLA., LDR SECTIONS AND (2016) H. Determination of compliance with the urban design and community redevelopment requirements Community Development Department Commercial Design The proposed project is not located within the General Commercial, Limited Commercial, Commercial Office/Residential or Waterfront Commercial Future Land Use Designations. Therefore, the Commercial Design reviewer was not required to review this application. MARTIN COUNTY, FLA., LDR SECTION B. (2016) Community Redevelopment Area The proposed project is not located within a Community Redevelopment Area. Therefore, the Community Redevelopment Area reviewer was not required to review this application. MARTIN COUNTY, FLA., LDR ARTICLE 3, DIVISION 6 (2016) I. Determination of compliance with the property management requirements Engineering Department No dedication of additional right of way is required or proposed by the Applicant pursuant to the Roadway Classifications set forth in Section B, Land Development Regulations, Martin County, Fla. (2001), which includes Table that lists the minimum right-of-way requirements. Therefore, the Applicant is not required to submit due diligence materials for review by Real Property Management. Page 10 of 20

11 J. Determination of compliance with environmental and landscaping requirements - Growth Management Department Unresolved Issues: Environmental Item #1: General Compliance-Environmental As a result of new information and a site inspection conducted on November 2, 2016, additional environmental information may be required and further review may be needed prior to staff giving a 'comply' determination under the environmental review. Please see Section G, Item #1, of this staff report for further information. Additional Information: Information #1: County environmental staff conducted an inspection on June 29, 2016 and found portions of the wetland buffer adjacent to the proposed shotgun range had been cleared of native vegetation. In order to resolve this environmental compliance issue, the county requested a restoration plan and the applicant agreed to restore the area prior to issuance of this development order. The restoration plan has been approved by the county and the restoration work will be completed prior to issuance. For record keeping purposes, an electronic copy of the plan can be found under the correspondence project folder for this DO. Unresolved Issues: Landscape Item #1: Landscape Tabular Data Landscape plans shall include a table which lists the gross and net acreage, acreage of development and preservation areas, number of trees and tree clusters to be protected within the developed area and within perimeter areas, and square footage of vehicular use areas (Ref. Section A.10, LDR). Interior and perimeter vehicular use areas should be quantified separately in the table. Tabular data shall also indicate a calculation of the minimum total number of trees and shrubs required to be planted based upon the proposed developed area and separately based upon quantities required to meet the vehicular use area planting requirements and any required bufferyard requirements. Please also include the following: a. Document compliance with the requirement that twenty (20) percent of the total developed area shall be landscaped. b. Document that nonresidential developments provide at least one tree per 2,500 square feet of site area. Service function areas including solid waste collection and mechanical equipment requiring screening shall be summarized in a table to identify equipment and the type of screening proposed. Verify that prior landscaping installed, as documented on the As-built Landscape Plan dated 12/6/10 has Page 11 of 20

12 established successfully and that existing landscaping is in compliance with that plan and meets requirements of the current landscape code contained in Martin County., LDR [Article 4, Division 15] [2013] Certification of existing landscaping has been provided in the response letter stating that landscaping as detailed on the 12/6/10 as-built plan has been verified and is in compliance with the Code. However, the Existing Plant List on Sheet 6 is not consistent with the Plant List on the 2010 Asbuilt, The proposed plant list is also not consistent with quantities labeled on the plan. Please explain the discrepancies. In addition there is a note on the landscape plan that states there are no landscape requirements in Agricultural Land Use. That is only correct if the land use is an agricultural use. While shooting ranges are permitted on a parcel zoned as agricultural, shooting ranges are considered to be a Commercial and Business Use. See Section 3.11 Table , Code of Ordinances, Martin County, FL (2013) This parcel must be developed in accordance with the requirements set forth in Divisions 3 and 4 and all other applicable requirements of this Article and the LDR. The Landscape Tabular data indicates that Bahia sod is a native grass: Bahia is not a species native to Florida or North America, please correct this designation. The existing plant list indicates that Hamelia patens 'Compacta' is a native species; the variety 'Compacta' is also not a native Florida species but is an introduced species generally believed to have come from South Africa or southern Mexico. In the interest of accuracy please correct this designation. K. Determination of compliance with transportation requirements - Engineering Department Unresolved Issues: Item #1: Traffic Impact 1. Distribution map must show distribution of trips. The study network will be illustrated in both tabular and map formats, and clearly show the percentage of project traffic of the level of service capacity up to and including the link where the project traffic falls below the two percent threshold. The map or maps will illustrate the project location, existing and proposed traffic control devices, existing and proposed ingress and egress locations for the project, existing and proposed bicycle and pedestrian facilities, and existing and proposed public transportation services and facilities on the study network. [Martin County, Fla., LDR Article 5, Division 3, Section 5.64.C.7 (2009)] 2. Per Section 5.64.C.5, Land Development Regulations, Martin County, Fla. 2009, if no links are impacted at the two percent or greater level, the analysis will consider the first directly accessed road on the major road network. 3. Exhibit D should reference PM traffic, not AM. 4. The trips generated by this project are greater than 1% of the generalized service capacity of the first directly assessed road on the major road network; therefore, the project cannot be deemed deminimis. L. Determination of compliance with county surveyor - Engineering Department Findings of Compliance: Page 12 of 20

13 The Survey Division of the Engineering Department has reviewed the boundary and topographic surveys submitted with the application. The Survey Division finds that both surveys are in conformance with the requirements of Article 4 of the LDRs, the standards and practices listed in Chapter 472, Florida Statutes, and other applicable requirements as identified in Chapter 177, Florida Statutes. [Martin County, Fla., LDR Article 4; Chs. 472 and 177, Fla. Stat.] M. Determination of compliance with engineering, storm water and flood management requirements - Engineering Department Unresolved Issues: Item #1: Stormwater Mgmt Post-Development 1. The amount of water quality provided is not represented accurately on the Post Development Basin Boundary Map. Referring to the stage storage calculations, the available storage at NAVD is 12.07ac-ft. The site provides ac-ft in the dry detention areas and the green space areas prior to discharging. Revise the Basin Summary on the Post Development Basin Boundary Map to reflect ac-ft of water quality provided. 2. Due to the existing 3 inch bleeders at elevation 26.56' NAVD, the dry detention areas will recover half the water quality treatment volume within 24 hours and 5 days. As previously stated in the staff report dated 5/17/2016, the narrative in the Drainage Calculations does not accurately reflect the ICPR modeling results. The stormwater system recovers half the treatment volume at hour (4.10 days from the start of the storm event). Revise your narrative to reflect the ICPR results. Item #2: Stormwater Mgmt Construction Plans 1. As previously requested in the staff report dated 5/17/16, remove references to The City of Stuart Minimum Design and Construction Standards in the construction notes (sheet 5, note 5) 2. It appears the existing "8 inch Weep Hole" will need to be reconstructed to the previously permitted 3 inch bleeder. The Engineer shall field verify and provide a detail as necessary. Remove the note " Field Verify and Reconstruct as Necessary." N. Determination of compliance with addressing and electronic file submittal requirements Growth Management and Information Technology Departments Addressing Findings of Compliance: The application has been reviewed for compliance with Division 17, Addressing, of the Martin County Land Development Regulations. Staff finds that the proposed site plan / plat complies with applicable addressing regulations. All street name SW Long Dr is in compliance. It was named and approved during original final plan approval. It meets all street naming LDRs. MARTIN COUNTY, FLA., LDR [4.767] ([2014]). Page 13 of 20

14 Electronic File Submittal Findings of Compliance: The Information Services Department staff has reviewed the electronic file submittal and finds it in compliance with the applicable county requirements. Both AutoCAD site plan and boundary survey were received and found to be in compliance with Section 10.2.B.5, Land Development Regulations, Martin County, Fla. ([2016]) Both AutoCAD site plan and boundary survey were in State Plane coordinates and found to be in compliance with Section 10.2.B.5, Land Development Regulations, Martin County, Fla. ([2016]) The AutoCAD boundary survey was received and found to be in compliance with Section 10.2.B.5, Land Development Regulations, Martin County, Fla. ([2016]) O. Determination of compliance with utilities requirements - Utilities Department Unresolved Issues: Please see Items #1 and #17, Section G of this report. Water and Wastewater Service Item #1: Submit MCHD Permit-Septic Sys The applicant must submit a copy of the Martin County Health Department Permit for the onsite sewage disposal system prior any final approval. Item #2: Utilities Compliance Water and wastewater is limited to 2,000 gallons per day of wastewater per [Martin County, Fla. Comp Plan, Section 10.2.B(2)(2016)] and 2000 gallons of water per [Martin County, Fla. LDR, Article 4, Division 6, Subdivision2, B (2016): 10.2.B(2) Nonresidential use of on-site sewage treatment and disposal systems. On-site sewage treatment and disposal systems can serve nonresidential uses on existing lots when a regional sewage system is not available. All systems shall be consistent with the policies in Section No on-site sewage treatment and disposal system shall exceed a flow of 2,000 gpd per lot. A use must be deemed by the Health Department not to constitute a high expected failure rate. On-site sewage treatment and disposal systems shall not be allowed for the treatment and disposal of industrial, toxic or hazardous wastes. Martin County Land Development Code: B. The use of individual potable water treatment systems shall be limited to the following: 1. Nonresidential uses outside the primary urban service district, provided that such use generates a potable water demand at total site build-out of no more than 2,000 gallons per day and water treatment is mandated by governing agencies. The nonresidential potable water demand shall be calculated in Page 14 of 20

15 accordance with the following: a. Standards for on-site sewage disposal systems, section 10D-6.048, table II, of the State of Florida Department of Health and Rehabilitative Services, F.A.C. ch. 10D-6, as may be amended from time to time; or b. Documented potable water consumption volumes generated by similar development(s). Wellfield and Groundwater Protection Findings of Compliance: The application has been reviewed for compliance under the Wellfield Protection Program. The reviewer finds the application in compliance with the Wellfield Protection and Groundwater Protection Ordinances. The proposed changes to the approved site plan does not intensify the use of the land for utilities(no existing irrigation will be modified pg 96 of applicants submittal package), therefore the County's concern for level of service and concurrency for water and wastewater is eliminated. [ref. Code, LDR, s.5.32.b.3.f. Code, LDR, Art.5, Div.2] P. Determination of compliance with fire prevention and emergency management requirements Fire Rescue Department Fire Prevention Findings of Compliance: The Fire Prevention Bureau finds this submittal to be in compliance with the applicable provisions governing construction and life safety standards. This occupancy shall comply with all applicable provisions of governing codes whether implied or not in this review, in addition to all previous requirements of prior reviews. Resubmittal displays private storage building under the threshold of 2500 square feet, eliminating the requirement for fire sprinkler protection. Additional Information: Information #1: The following fire suppression water flow is the minimum for industrial/warehouse/storage use: Buildings Other Than One- and Two-Family Dwellings. The minimum fire flow and flow duration for buildings other than one- and two-family dwellings shall be as specified in NFPA 1[2012 edition] Table Additional water flow may be required to supplement fire sprinkler systems or to support other hazardous uses. The developer is responsible to meet any additional flow requirements beyond that which is within the capacity of the utility provider [NFPA 1]. Emergency Management The proposed project is non-residential and is not anticipated to impact Martin County Emergency Management resources. Therefore, the Emergency Management department was not required to review this application. MARTIN COUNTY, FLA., LDR SECTION 10.1.F. (2016) Page 15 of 20

16 Q. Determination of compliance with Americans with Disability Act (ADA) requirements - General Services Department Findings of Compliance: The General Services Department staff has reviewed the application and finds it in compliance with the applicable Americans with Disability Act requirements. R. Determination of compliance with Martin County Health Department and Martin County School Board Martin County Health Department Review Pending: Please see Section G, Item #1. Please contact Nick Clifton or Todd Reinhold at with any questions. Martin County School Board The applicant has indicated that this project is for a non-residential use, pursuant to Section 10.1.F., LDR, Martin County, Fla. (2016). Therefore, the Martin County School Board was not required to review this application for the purposes of school capacity concurrency. S. Determination of compliance with legal requirements - County Attorney's Office Review Ongoing T. Determination of compliance with the adequate public facilities requirements - responsible departments The following is a summary of the review for compliance with the standards contained in Article 5.7.D of the Adequate Public Facilities LDR for a Certificate of Adequate Public Facilities Reservation. Potable water facilities service provider On-site Well Source - Environmental Services Department Reference - see Section O of this staff report Sanitary sewer facilities service provider On-site Septic Source -Environmental Services Department Reference - see Section O of this staff report Solid waste facilities Findings In Place Source - Growth Management Department Stormwater management facilities Findings - Pending Source - Engineering Department Reference - see Section N of this staff report Page 16 of 20

17 Community park facilities Findings N/A Source - Growth Management Department Roads facilities Findings - Pending Source - Engineering Department Reference - see Section M of this staff report Mass transit facilities Findings N/A Source - Engineering Department Reference - see Section L of this staff report Public safety facilities Findings - Pending Source - Growth Management Department Reference - see Section P of this staff report A timetable for completion consistent with the valid duration of the development is to be included in the Certificate of Public Facilities Reservation. The development encompassed by Reservation Certificate must be completed within the timetable specified for the type of development. U. Post-approval requirements Approval of the development order is conditioned upon the applicant s submittal of all required documents, executed where appropriate, to the Growth Management Department (GMD), including unpaid fees, within sixty (60) days of the final action granting approval. Item #1: Post Approval Requirements List: After approval the applicant will receive a letter and a Post Approval Requirements List that identifies the documents and fees required. The applicant will return the Post Approval Requirements List along with the required documents in a packet with the documents arranged in the order shown on the list. Item #2: Post Approval Fees: The applicant is required to pay all remaining fees when submitting the post approval packet. If an extension is granted, the fees must be paid within 60 days from the date of the development order. Checks should be made payable to Martin County Board of County Commissioners. Item #3: Post Approval Impact Fees: Impact fees must be paid after the development order has been approved. Submit a check made payable to Martin County Board of County Commissioners within 60 days of project approval. Page 17 of 20

18 Item #4: Recording Costs: The applicant is responsible for all recording costs. The Growth Management Department will calculate the recording costs and contact the applicant with the payment amount required. Checks should be made payable to the Martin County Clerk of Court. Item #5: One (1) copy of the recorded warranty deed if a property title transfer has occurred since the site plan approval. If there has not been a property title transfer since the approval, provide a letter stating that no title transfer has occurred. Item #6: Original and one (1) copy of the current Unity of Title in standard County format if a property title transfer has occurred since the site plan approval. If there has not been a property title transfer since the approval, provide a letter stating so that no transfer has occurred. Item #7: Ten (10) 24" x 36" copies of the approved construction plans signed and sealed by the Engineer of Record licensed in the State of Florida. Fold to 8 by 12 inches. Item #8: Ten (10) copies 24" x 36" of the approved site plan and one (1) reduced copy 8 1/2" x 11". Item #9: Original approved site plan on Mylar or other plastic, stable material. Item #10: Ten (10) 24" x 36" copies of the approved landscape plan signed and sealed by a landscape architect licensed in the State of Florida. Item #11: One (1) digital copy of site plan in AutoCAD 2006 or 2007 drawing format (.dwg). The digital version of the site plan must match the hardcopy version as submitted. Item #12: Original of the construction schedule. Item #13: Original of the Engineer's Design Certification, on the County format which is available on the Martin County website, signed and sealed by the Engineer of Record licensed in the State of Florida. Page 18 of 20

19 Item #14: Original and one (1) copy or two (2) copies of the executed and signed Water and Wastewater Service Agreement with Martin County Regional Utilities and one (1) copy of the payment receipt for Capital Facility Charge (CFC) and engineering and recording fees. V. Local, State, and Federal Permits Approval of the development order is conditioned upon the applicant's submittal of all required applicable Local, State, and Federal Permits, to the Growth Management Department (GMD), prior to the commencement of any construction. An additional review fee will be required for Martin County to verify that the permits are consistent with the approved development order. Item #1: STORMWATER MGMT PERMITS The following permits must be submitted prior to scheduling a Pre-Construction meeting: 1. South Florida Water Management District (SFWMD) Environmental Resource Permit (ERP) 2. South Florida Water Management District (SFWMD) Dewatering Permit 3. Army Corps of Engineers (ACOE) Nationwide 4. Florida Department of Transportation (FDOT) Drainage Connection Permit W. Fees Public advertising fees for the development order will be determined and billed subsequent to the public hearing. Fees for this application are calculated as follows: Fee type: Fee amount: Fee payment: Balance: Application review fees: $9, $9, $0.00 Advertising fees*: TBD Recording fees**: TBD Mandatory impact fees: TBD Non-mandatory impact fees: TBD * Advertising fees will be determined once the ads have been placed and billed to the County. ** Recording fees will be identified on the post approval checklist. X. General application information Applicant: Agent: South Florida Shooting Grounds, LLC Shapiro Pertnoy Companies 3222-C Commerce Place West Palm Beach, FL The Milcor Group, Inc. Melissa G. Corbett, P.E. Page 19 of 20

20 6525 South Kanner Highway #236 Stuart, FL Y. Acronyms ADA... Americans with Disability Act AHJ... Authority Having Jurisdiction ARDP... Active Residential Development Preference BCC... Board of County Commissioners CGMP... Comprehensive Growth Management Plan CIE... Capital Improvements Element CIP... Capital Improvements Plan FACBC... Florida Accessibility Code for Building Construction FDEP... Florida Department of Environmental Protection FDOT... Florida Department of Transportation LDR... Land Development Regulations LPA... Local Planning Agency MCC... Martin County Code MCHD... Martin County Health Department NFPA... National Fire Protection Association SFWMD... South Florida Water Management District W/WWSA... Water/Waste Water Service Agreement Z. Attachments Page 20 of 20

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 ED FIELDING Commissioner, District 2 ANNE SCOTT Commissioner, District 3 SARAH HEARD

More information

THE GROVE GOLF CLUB PLAT

THE GROVE GOLF CLUB PLAT { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information THE GROVE GOLF CLUB PLAT Applicant: Hobe Sound Equestrian, LLC Property Owner: Becker B-14 Grove, Ltd Agent for the Applicant:

More information

THE GROVE GOLF CLUB PLAT

THE GROVE GOLF CLUB PLAT { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information THE GROVE GOLF CLUB PLAT Applicant: Hobe Sound Equestrian, LLC Property Owner: Becker B-14 Grove, Ltd Agent for the Applicant:

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 ED FIELDING Commissioner, District 2 HAROLD E. JENKINS II Commissioner, District

More information

DRIFTWOOD CAY MINOR FINAL SITE PLAN

DRIFTWOOD CAY MINOR FINAL SITE PLAN { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information DRIFTWOOD CAY MINOR FINAL SITE PLAN Applicant and Property Owner: Driftwood Cay of Stuart, LLC Agent for the Applicant:

More information

DRIFTWOOD CAY MINOR FINAL SITE PLAN

DRIFTWOOD CAY MINOR FINAL SITE PLAN { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information DRIFTWOOD CAY MINOR FINAL SITE PLAN Applicant: Driftwood Cay of Stuart, LLC Property Owner: Driftwood Cay of Stuart,

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 ED FIELDING Commissioner, District 2 HAROLD E. JENKINS II Commissioner, District

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 ED FIELDING Commissioner, District 2 HAROLD E. JENKINS II Commissioner, District

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 ED FIELDING Commissioner, District 2 ANNE SCOTT Commissioner, District 3 July 25,

More information

STUART JET CENTER HANGAR A REVISED MAJOR FINAL SITE PLAN

STUART JET CENTER HANGAR A REVISED MAJOR FINAL SITE PLAN { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information STUART JET CENTER HANGAR A REVISED MAJOR FINAL SITE PLAN Applicant: Stuart Jet Center, LLC, Dan Capen Property Owner:

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 ED FIELDING Commissioner, District 2 ANNE SCOTT Commissioner, District 3 SARAH HEARD

More information

KANNER BUSINESS PARK LOT 3 MINOR FINAL SITE PLAN

KANNER BUSINESS PARK LOT 3 MINOR FINAL SITE PLAN { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information KANNER BUSINESS PARK LOT 3 MINOR FINAL SITE PLAN Applicant: Stuart Kanner 1 LLC Property Owner: Stuart Kanner 1 LLC Agent

More information

COSTCO MAJOR FINAL SITE PLAN

COSTCO MAJOR FINAL SITE PLAN { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information COSTCO MAJOR FINAL SITE PLAN Applicant and Property Owner: Nemec Limited Partnership Agent for the Applicant: Brandon

More information

Treasure Coast Commerce Center Lots 2&3 Minor Final Site plan

Treasure Coast Commerce Center Lots 2&3 Minor Final Site plan { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information Treasure Coast Commerce Center Lots 2&3 Minor Final Site plan Applicant: TC 789, LLC Property Owner: Ted Glassrud Associates

More information

RIO TOWN CENTER (F/K/A STUART HARBOR) Revised Major Master and Phasing, Phase 1 Final Site Plan

RIO TOWN CENTER (F/K/A STUART HARBOR) Revised Major Master and Phasing, Phase 1 Final Site Plan { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information RIO TOWN CENTER (F/K/A STUART HARBOR) Revised Major Master and Phasing, Phase 1 Final Site Plan Applicant: Istar Financial

More information

JUPITER POINTE MARINA AND RESORT Revised Major Master/Final Site Plan

JUPITER POINTE MARINA AND RESORT Revised Major Master/Final Site Plan { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information JUPITER POINTE MARINA AND RESORT Revised Major Master/Final Site Plan Applicant: Jupiter Pointe Marina Property Owner:

More information

PHIPPS PARK REVISED MAJOR FINAL SITE PLAN

PHIPPS PARK REVISED MAJOR FINAL SITE PLAN { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information PHIPPS PARK REVISED MAJOR FINAL SITE PLAN Applicant: Martin County Property Owner: Martin County Agent for the Applicant:

More information

THE FLORIDIAN GOLF CLUB PUD Fourth Amendment to the PUD Zoning Agreement, Revised Master Site Plan, Revised Phasing Plan, Phase 4 Final Site Plan

THE FLORIDIAN GOLF CLUB PUD Fourth Amendment to the PUD Zoning Agreement, Revised Master Site Plan, Revised Phasing Plan, Phase 4 Final Site Plan { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information THE FLORIDIAN GOLF CLUB PUD Fourth Amendment to the PUD Zoning Agreement, Revised Master Site Plan, Revised Phasing Plan,

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 ED FIELDING Commissioner, District 2 HAROLD E. JENKINS II Commissioner, District

More information

JUPITER POINTE MARINA AND RESORT Revised Major Master Site Plan

JUPITER POINTE MARINA AND RESORT Revised Major Master Site Plan { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information JUPITER POINTE MARINA AND RESORT Revised Major Master Site Plan Applicant: Jupiter Pointe Marina Property Owner: Jupiter

More information

RIVER OAKS (F/K/A HOLMAN SUBDIVISION) Minor Final Site Plan

RIVER OAKS (F/K/A HOLMAN SUBDIVISION) Minor Final Site Plan { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information RIVER OAKS (F/K/A HOLMAN SUBDIVISION) Minor Final Site Plan Applicant: Holman, James & Debora K. Property Owner: Holman,

More information

HOBE SOUND VILLAGE MAJOR FINAL SITE PLAN

HOBE SOUND VILLAGE MAJOR FINAL SITE PLAN { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information HOBE SOUND VILLAGE MAJOR FINAL SITE PLAN Applicant: Palm Beach Capital Consultants, LLC Property Owner: Palm Beach Capital

More information

JUPITER POINTE MARINA AND RESORT Revised Major Master/Final Site Plan

JUPITER POINTE MARINA AND RESORT Revised Major Master/Final Site Plan { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information JUPITER POINTE MARINA AND RESORT Revised Major Master/Final Site Plan Applicant: Jupiter Pointe Marina Property Owner:

More information

RIO TOWN CENTER (F/K/A STUART HARBOR) Revised Major Master and Phasing Plans Phase 1 Final Site Plan

RIO TOWN CENTER (F/K/A STUART HARBOR) Revised Major Master and Phasing Plans Phase 1 Final Site Plan { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information RIO TOWN CENTER (F/K/A STUART HARBOR) Revised Major Master and Phasing Plans Phase 1 Final Site Plan Applicant: Istar

More information

KLOPENSTINE REZONING

KLOPENSTINE REZONING { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information KLOPENSTINE REZONING Applicant: Klopenstine Geoffrey A Tr Property Owner: Klopenstine Geoffrey A Tr Agent for the Applicant:

More information

2401 S. E. Monterey Road, Stuart, FL Plat Application Martin County Growth Management Department

2401 S. E. Monterey Road, Stuart, FL Plat Application Martin County Growth Management Department Martin County, Florida Growth Management Department DEVELOPMENT REVIEW DIVISION PLAT APPLICATION A. Identification of the applicant or agent: Applicant (property owner): Address: Telephone: Applicant's

More information

CHECKLIST FOR DEVELOPMENT REVIEW

CHECKLIST FOR DEVELOPMENT REVIEW CHECKLIST FOR DEVELOPMENT REVIEW Petitions and related documents and plans for land development or other proposals regulated by Title 16 of the Municipal Code (Development Ordinance) and Title 17 of the

More information

File Name: Conditional Use Application_2017

File Name: Conditional Use Application_2017 Office Use Only Recv d: By: App #: #: Meeting Date: Conditional Use Application 2017 FEE: $2,500.00. The fee is payable upon application submittal. *Any additional meeting with mailed & published notice

More information

Waseca County Planning and Zoning Office

Waseca County Planning and Zoning Office Waseca County Planning and Zoning Office 300 North State Street Waseca, Minnesota 56093 Phone: 507-835-0650 Fax: 507-837-5310 Form no. PZ 081009 Web Site: www.co.waseca.mn.us FEES: 1) CUP FEE- $400.00

More information

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS - Larimer County Planning Dept. Procedural Guide for 1041 PERMITS PLEASE NOTE: A PRE-APPLICATION CONFERENCE IS REQUIRED PRIOR TO SUBMITTING THIS APPLICATION. PURPOSE: State Statutes allow local governments

More information

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals) E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals) 1. Name(s): 2. Address: 3. Telephone Number(s): 4. E-mail: 5. Owner Name(s) (if

More information

COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY

COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY GENERAL INFORMATION: This brochure is to be used as a guide and is not intended to amend or supersede the corresponding County ordinances

More information

Plans shall be drawn at a readable scale, signed, and sealed by a Florida Registered Engineer. The application package shall include:

Plans shall be drawn at a readable scale, signed, and sealed by a Florida Registered Engineer. The application package shall include: CHAPTER 400. SECTION 403. PERMIT TYPES AND APPLICATIONS SITE DEVELOPMENT 403.3. Preliminary Site Plans (PSP) A. Intent and Purpose PSPs are used to identify existing site conditions and demonstrate general

More information

LABEL PLEASE NOTE: ALL APPLICATIONS AND SITE PLANS MUST BE COMPLETED IN BLACK OR BLUE INK ONLY Intake by:

LABEL PLEASE NOTE: ALL APPLICATIONS AND SITE PLANS MUST BE COMPLETED IN BLACK OR BLUE INK ONLY Intake by: STAFF USE ONLY Thurston County Resource Stewardship 2000 Lakeridge Dr. S.W. Olympia, WA 98502 (360)786-5490 / (360)754-2939 (Fax) TDD Line (360) 754-2933 Email: permit@co.thurston.wa.us Supplemental Application

More information

Guide to Combined Preliminary and Final Plats

Guide to Combined Preliminary and Final Plats Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested

More information

Guide to Minor Developments

Guide to Minor Developments Guide to Minor Developments Introduction The Douglas County (DCD) is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in

More information

PALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION

PALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION PALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION Application No.: CA-2012-00688 Control No.: 2011-00552 Applicant: Garry Bernardo Owners: Garry Bernardo Agent: Frogner Consulting,

More information

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST Completed DRC Application for Review Required for Application Process DRC Processing Fee 1 Commercial $2,500.00 Fire Department Review Fee 150.00 Total $2,650.00

More information

APPLICATION. Telephone Fax Address. Telephone Fax Address FOR MARTIN COUNTY USE ONLY

APPLICATION. Telephone Fax  Address. Telephone Fax  Address FOR MARTIN COUNTY USE ONLY APPLICATION PRESERVE AREA MANAGEMENT PLAN/ ABBREVIATED PRESERVE AREA MANAGEMENT PLAN Growth Management Department Environmental Division PART 1: Applicant Information A. Land Owner(s) Name Title and Company

More information

MINOR SUBDIVISION INFORMATION

MINOR SUBDIVISION INFORMATION A. POINTS OF CONTACT: MINOR SUBDIVISION INFORMATION Surveyor: Address: Phone #: Fax # E-Mail Address: Representative (If different from applicant): Address: Phone #: Fax # E-Mail Address: B. GENERAL INFORMATION:

More information

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10 Guide to Replats Introduction Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures and expectations

More information

COMPREHENSIVE PLAN FUTURE LAND USE MAP AMENDMENT APPLICATION

COMPREHENSIVE PLAN FUTURE LAND USE MAP AMENDMENT APPLICATION COUNTY STAFF DATA ONLY Date Received: Project No. CPA-20 - GADSDEN COUNTY DEPARTMENT OF PLANNING & COMMUNITY DEVELOPMENT 1-B East Jefferson Street, Post Office Box 1799, Quincy, FL 32353-1799 PLANNING

More information

CONCEPTUAL MASTER PLAN CHECKLIST Major Land Development Project

CONCEPTUAL MASTER PLAN CHECKLIST Major Land Development Project CONCEPTUAL MASTER PLAN CHECKLIST Major Land Development Project To initiate the application, the applicant shall submit to the Administrative Officer: 1. The application review fee, as established by the

More information

Site Plan Application

Site Plan Application Site Plan Application City of St. Pete Beach Community Development Department 155 Corey Avenue St. Pete Beach, Florida 33706 (727) 367-2735 www.stpetebeach.org Case Number: PROPERTY OWNER: Name: Address:

More information

Marion County Board of County Commissioners

Marion County Board of County Commissioners Marion County Board of County Commissioners Date: 6/4/217 P&Z: 9/25/217 BCC Transmittal: 1/17/217 BCC Adopt: TBD Amendment No: 217-L6 Type of Application Large-Scale Comp Plan Amendment Request: Change

More information

PRELIMINARY PLAN CHECKLIST Major Land Development Projects. To initiate the application, the applicant shall submit to the Administrative Officer:

PRELIMINARY PLAN CHECKLIST Major Land Development Projects. To initiate the application, the applicant shall submit to the Administrative Officer: PRELIMINARY PLAN CHECKLIST Major Land Development Projects To initiate the application, the applicant shall submit to the Administrative Officer: 1. The application review fee, as established by the South

More information

TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION

TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION I. SUBMITTAL REQUIREMENTS: 1. Fees per current schedule. 2. Deed to property. 3. Pre-Application meeting is mandatory. Contact the Building Official

More information

Walton County Planning and Development Services

Walton County Planning and Development Services Walton County Planning and Development Services 31 Coastal Centre Boulevard, Suite 100 47 N 6 th Street Santa Rosa Beach, Florida 32459 DeFuniak Springs, Florida 32433 Phone 850-267-1955 Phone 850-892-8157

More information

ARTICLE XXI GENERAL SITE DEVELOPMENT PLAN REQUIREMENTS

ARTICLE XXI GENERAL SITE DEVELOPMENT PLAN REQUIREMENTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 ARTICLE XXI GENERAL SITE DEVELOPMENT PLAN REQUIREMENTS Section 21.1 Purpose and Intent... 2 Section 21.2 Administrative Site Plan Review

More information

City of Midland Application for Site Plan Review

City of Midland Application for Site Plan Review City of Midland Application for Site Plan Review Submission Date: Property Owner: Mailing Address: Phone number: ( ) Cell phone: ( ) Email address: Fax: ( ) Owner s Signature: Applicant Name (if not owner):

More information

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED SECTION 950 GENERALLY All applications shall be properly signed and filed by the owner or, with the owner s specific written consent, a contract purchaser

More information

City of Sanibel. Planning Department STAFF REPORT

City of Sanibel. Planning Department STAFF REPORT City of Sanibel Planning Department STAFF REPORT Planning Commission Meeting: July 23, 2013 Planning Commission Agenda Item: No 7b. Application Number: 13-7438DP Applicant Name: Attorney Beverly Grady

More information

AQUARIUS LAND HOLDINGS, LLC TRACTS 3 AND 6 REZONING

AQUARIUS LAND HOLDINGS, LLC TRACTS 3 AND 6 REZONING { MARTIN COUNTY, FLORIDA DEVELOPMENT REVIEW STAFF REPORT A. Application Information AQUARIUS LAND HOLDINGS, LLC TRACTS 3 AND 6 REZONING Applicant: Aquarius Land Holdings, LLC Property Owner: Aquarius Land

More information

CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES

CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES The Sufficiency Table is a checklist to help identify the types of information and documentation needed for various types of projects. The

More information

Plat/Site Plan Application

Plat/Site Plan Application Instructions Plat/Site Plan Application For your application to be officially accepted for processing, you must complete this application in full. The owner/agent certification must be signed and notarized

More information

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513) CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT 11700 SPRINGFIELD PIKE SPRINGDALE, OHIO 45246 TELEPHONE: (513) 346-5730 SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR MINOR REVISIONS TO PUD/TRANSITION

More information

Residential Major Subdivision Review Checklist

Residential Major Subdivision Review Checklist Residential Major Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record. 200 W. Oak Street, 3rd Floor Fort Collins, CO 80521 (970) 498-7683 / larimer.org/planning SITE PLAN REVIEW ADMINISTRATIVE REVIEW The submittal requirements listed in this packet are intended to collect

More information

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST TOWNSHIP OF EGG HARBOR PLANNING BOARD/ZONING BOARD OF ADJUSTMENT 3515 BARGAINTOWN ROAD EGG HARBOR TOWNSHIP, NJ 08234 MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST The following checklist is designed to

More information

Initial Subdivision Applications Shall Include the Following:

Initial Subdivision Applications Shall Include the Following: Initial Subdivision Applications Shall Include the Following: 1) Subdivision Application Form: completely filled out (12 copies) 2) Plat: The Plat must adhere to the requirements set forth in the Town

More information

APPLICATION PROCEDURE

APPLICATION PROCEDURE ANTRIM PLANNING BOARD P. O. Box 517 Antrim, New Hampshire 03440 Phone: 603-588-6785 FAX: 603-588-2969 APPLICATION FORM AND CHECKLIST FOR MINOR OR MAJOR SITE PLAN REVIEW File Date Received By APPLICATION

More information

ORANGE BLOSSOM GARDENS PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC.

ORANGE BLOSSOM GARDENS PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC. ORANGE BLOSSOM GARDENS A PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC. REVISED OCTOBER 19, 1992 BY THE COLLIER COUNTY LONG RANGE PLANNING DEPARTMENT REVISED DECEMBER, 2008

More information

Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division

Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division Portland s Planning and Urban Development Department

More information

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. June 3, 2011

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. June 3, 2011 MOBILE CITY PLANNING COMMISSION LETTER OF DECISION P.O. Box 421 Mobile, AL 36601 Re: Case #SUB2011-00029 (Subdivision) Alabama West Subdivision, Unit Four 2600 McVay Drive North (North side of McVay Drive

More information

To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal agreements.

To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal agreements. ARTICLE 5 FINAL PLAT 501 Intent DOUGLAS COUNTY SUBDIVISION RESOLUTION To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal

More information

Guide to Preliminary Plans

Guide to Preliminary Plans Guide to Preliminary Plans Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures

More information

Article 7: Residential Land Use and Development Requirements

Article 7: Residential Land Use and Development Requirements Article 7: Residential Land Use and Section 701: Statement of Intent (A) (B) (C) The intent of Article 7 is to develop certain land use and development requirements for the residential uses within Cumru

More information

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513) CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT 11700 SPRINGFIELD PIKE SPRINGDALE, OHIO 45246 TELEPHONE: (513) 346-5730 SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR DEVELOPMENT PLAN APPROVAL An

More information

DEVELOPMENT PLAN REVIEW CHECKLIST. To initiate the application, the applicant shall submit to the Administrative Officer:

DEVELOPMENT PLAN REVIEW CHECKLIST. To initiate the application, the applicant shall submit to the Administrative Officer: DEVELOPMENT PLAN REVIEW CHECKLIST To initiate the application, the applicant shall submit to the Administrative Officer: 1. Sixteen (16) copies of the Project Review Application Form, printed double-sided;

More information

Form 11.A.9.17 INSTRUCTIONS FOR APPLICATION FOR PLAT WAIVER (Art. 11.A.8)

Form 11.A.9.17 INSTRUCTIONS FOR APPLICATION FOR PLAT WAIVER (Art. 11.A.8) Form 11.A.9.17 INSTRUCTIONS FOR APPLICATION FOR PLAT WAIVER (Art. 11.A.8) All questions in each part must be completed. When a question is not applicable to the property, enter "N/A" or other phrase indicating

More information

Residential Minor Subdivision Review Checklist

Residential Minor Subdivision Review Checklist Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513) CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT 11700 SPRINGFIELD PIKE SPRINGDALE, OHIO 45246 TELEPHONE: (513) 346-5730 SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR REVISIONS TO APPROVED DEVELOPMENT

More information

Instructions and Application Procedures Plan Amendments

Instructions and Application Procedures Plan Amendments Glades County Instructions and Application Procedures Plan Amendments Small Scale Plan Amendments are changes to the Future Land Use Map designation of properties 10 acres or less in size, or, in some

More information

City of Eustis Development Services Checklist for Submittals by Application Type

City of Eustis Development Services Checklist for Submittals by Application Type I. General Requests A. Alcoholic Beverage Review (Regular & Special Event) (Sec. 109-4.3) 1 Regular Sales Alcoholic Beverage Review Application - Completed & Signed Application Fee $50 State of Florida

More information

Application for a Public Hearing for PUD Rezone, Amendment to PUD or PUD to PUD Rezone

Application for a Public Hearing for PUD Rezone, Amendment to PUD or PUD to PUD Rezone GROWTH MANAGEMENT DEPARTMENT www.colliergov.net NAPLES, FLORIDA 34104 (239) 252-2400 FA: (239) 252-6358 Application for a Public Hearing for PUD Rezone, Amendment to PUD or PUD to PUD Rezone PETITION NO

More information

City of Fort Lupton Amended Plat Process

City of Fort Lupton Amended Plat Process City of Fort Lupton Amended Plat Process Purpose The Amended Plat process is an administrative process to amend a recorded Plat. An Amended Subdivision is an administrative revision to a recorded Subdivision

More information

TOWN OF OCEAN ISLE BEACH

TOWN OF OCEAN ISLE BEACH TOWN OF OCEAN ISLE BEACH PLANNED UNIT DEVELOPMENT ORDINANCE ADOPTED IN EFFECT FEBRUARY 13, 2001 This ordinance has been prepared by the Ocean Isle Beach Planning & Inspections Department. Section 66-55.

More information

TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE SITE PLAN REVIEW REGULATIONS

TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE SITE PLAN REVIEW REGULATIONS TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE Effective date March 17, 1981 Revised March 16, 1982 Revised March 13, 1986 Revised March 10, 1987 Revised March 14, 2013 Revised March 8, 2016 TOWN OF WATERVILLE

More information

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST COMPLETE: Applicant Information: Type of Proposal: OFFICE USE ONLY: New Residential Case #: Date: New Accessory

More information

Application for a Deminimus Development

Application for a Deminimus Development Okeechobee County Community Development Department 1700 NW 9 th Avenue, Suite A Okeechobee, FL 34972 Phone (863) 763-5548 Fax (863) 763-5276 planning@co.okeechobee.fl.us A deminimus development is the

More information

CONDOMINIUM REGULATIONS

CONDOMINIUM REGULATIONS ARTICLE 37 CONDOMINIUM REGULATIONS SECTION 37.01. Purpose The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

APPENDIX B. SUBMISSION REQUIREMENTS

APPENDIX B. SUBMISSION REQUIREMENTS Master Major Site Minor Site Landscape Section B.1 Table of /Plat Requirements Proposed or approved name of development, project, subdivision, and/or phase. Location, including township, county, and state.

More information

PALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION

PALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION PALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION Application No.: Z2003-094 Control No.: 2003-094 Petitioner: Mark A. & Susan L. Reinhold Owner: Mark A. & Susan L. Reinhold Agent:

More information

Cover Letter with Narrative Statement

Cover Letter with Narrative Statement Cover Letter with Narrative Statement March 31, 2017 rev July 27, 2017 RE: Rushton Pointe Residential Planned Unit Development Application for Public Hearing for RPUD Rezone PL2015 000 0306 Mr. Eric Johnson,

More information

APPLICATION FOR A COMPREHENSIVE PLAN AMENDMENT

APPLICATION FOR A COMPREHENSIVE PLAN AMENDMENT APPLICATION FOR A COMPREHENSIVE PLAN AMENDMENT Community Development Department 9220 Bonita Beach Rd, Suite 111 Bonita Springs, FL 34135 Phone: 239 444 6150 Fax: 239 444 6140 I. APPLICANT/AGENT/OWNER INFORMATION

More information

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA. Fee: (see fee schedule) Validation No.

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA. Fee: (see fee schedule) Validation No. Filing Date Petition No. SE Fee: (see fee schedule) Validation No. TO THE LEVY COUNTY PLANNING COMMISSION: Special exceptions are intended to provide for land uses and activities not permitted by right

More information

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2011

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2011 ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2011 NAME SUBDIVISION NAME LOCATION Stratford, L.L.C. Grelot Office Park Subdivision North side of Grelot Road,

More information

NUVIEW IRA, INC. REZONING

NUVIEW IRA, INC. REZONING { MARTIN COUNTY, FLORIDA DEVELOMENT REVIEW STAFF REORT A. Application Information Applicant and roperty Owner Agent for the Applicant: County roject Coordinator: Growth Management Director: roject Number:

More information

Article 2 Application Type and Standards Requirements

Article 2 Application Type and Standards Requirements Article 1 Article 2 Division 1 Application Type and Standards Requirements General Provisions Sec. 2.1.1 Division 2 Division 3 Division 4 Division 5 Division 6 Division 7 Division 8 Division 9 Sec. 2.9.1

More information

For office use only:

For office use only: VILLAGE OF COTTAGE GROVE SITE PLAN REVIEW APPLICATION APPLICANT: APPLICANT ADDRESS: TELEPHONE: FAX: EMAIL ADDRESS: ***************************************************** LOCATION OF SITE: PROPOSED USE OF

More information

CITY OF NORTH PORT Neighborhood Development Services Planning Division Rezoning Packet

CITY OF NORTH PORT Neighborhood Development Services Planning Division Rezoning Packet CITY OF NORTH PORT Neighborhood Development Services Planning Division Planninginfo@cityofnorthport.com Rezoning Packet The following items are to be included in the submission: Rezoning Application Affidavit(s)

More information

Condominium Unit Requirements.

Condominium Unit Requirements. ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

This is a New Findings of Adequacy for a Recorded Plat (Plat Book 179, Page 131) LAND USE Vacant Effective Plan: Pompano Beach

This is a New Findings of Adequacy for a Recorded Plat (Plat Book 179, Page 131) LAND USE Vacant Effective Plan: Pompano Beach Page 1 of 11 Board of County Commissioners, Broward County, Florida Environmental Protection and Growth Management Department Planning and Development Management Division DEVELOPMENT REVIEW REPORT PROJECT

More information

Request for Action form is also defined as an application to be considered by the Planning Commission.

Request for Action form is also defined as an application to be considered by the Planning Commission. CITY OF NORTH RIDGEVILLE INSTRUCTIONS FOR FILING REQUEST FOR ACTION APPLICATIONS WITH THE PLANNING COMMISSION (Please read the full instruction as it will help in providing a full complete application)

More information

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina This document is a public record under the North Carolina Public Records Act and may be published on the Town s website or disclosed

More information

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST This CHECKLIST has been adopted in accordance with Section 25:807 of the Land Development Ordinance of the Township of Bordentown and will

More information

DRAFT Resolution File No.: CU

DRAFT Resolution File No.: CU DRAFT Resolution A RESOLUTION OF THE ST. LUCIE COUNTY BOARD OF COUNTY COMMISSIONERS GRANTING COMPOST USA OF THE TREASURE COAST, LLC CONDITIONAL USE PERMIT APPROVAL FOR THE ESTABLISHMENT OF A BIOSOLIDS

More information

CITY OF HOLLYWOOD. Technical Advisory Committee Submittal Checklist. Guide to TAC Submittal Checklist. General Requirements:

CITY OF HOLLYWOOD. Technical Advisory Committee Submittal Checklist. Guide to TAC Submittal Checklist. General Requirements: CITY OF HOLLYWOOD Technical Advisory Committee Submittal Checklist Guide to TAC Submittal Checklist This document is an outline of site plan review procedures as listed in the Technical Advisory Committee

More information

Marion County Board of County Commissioners

Marion County Board of County Commissioners Marion County Board of County Commissioners Office of the County Engineer 412 SE 25th Ave. Ocala, FL 34471 Phone: 352-671-8686 Fax: 352-671-8687 DEVELOPMENT REVIEW COMMITTEE A G E N D A February 25, 2013

More information

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA Filing Date Petition Number SE Fee (See fee schedule) Validation Number TO THE LEVY COUNTY PLANNING COMMISSION: Special Exceptions are intended to provide for land use and activities not permitted By Right

More information