1 ning Document Short Grant Number: 0150 December 2010 Nepal: Emergency Flood damage Rahabilitation Project Laukahi Water Supply and Sanitation Subproject, Sunsari Prepared by the Government of Nepal for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the terms of use section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

2 LaukahiOHT Subproject Government of Nepal Ministry of Physical Planning and Works Department of Water Supply and Sewerage Water Supply and Sanitation Division office Jute Bikas chowk, Itahari, Sunsari District EMERGENCY FLOOD DAMAGE REHABILITATION PROJECT Component C: Water Supply and Sanitation (Asian Development Bank, Grant No 0150-NEP (SF) SHORT RESETTLEMENT PLAN Laukahi Water Supply and Sanitation Sub- Project December

3 LaukahiOHT Subproject LIST OF ABBREVIATIONS ADB Asian Development Bank AP Affected Person BPL Below Poverty Level CDC Compensation Determination Committee CDO Chief District Officer DDC District Development Committee DOR Department of Roads DSC Design and Supervision Consultants EA Executing Agency GON Government of Nepal GRC Grievance Redress Committee HH Household IA Implementing Agency Km Kilo-meter lr Involuntary Resettlement MOPPW Ministry of Physical Planning and Works NGO Non Governmental Organization NRs Nepalese Rupees PAF Project Affected Family PAH Project Affected Household PAP Project Affected Person PCO Project Coordination Office PD Project Director PIU Project Implementation Unit RP Sq.m. Square Metres SRN Strategic Road Networks ToR Terms of Reference VDC Village Development Committee - 2 -

4 LaukahiOHT Subproject 1.0 INTRODUCTION Project Background Water Supply and Sanitation Component Sub-project Background Aims of Social Impact Assessment (SIA) IMPACT OF THE SUBPROJECT APPLICABLE LEGAL AND POLICY FRAMEWORK CUT-OFF DATE ASSESSMENT OF VOLUNTARY DONATION CRITERIA INFORMATION DISSEMINATION, CONSULATION AND DISCLOSURE Consultation and Participation Issues Raised in Public Consultation Disclosure 9 Table 2: Entitlement Policy Matrix GRIEVANCE REDRESS MECHANISM INCOME GENERATION AND VOCATIONAL TRAINING IMPLEMENTATION ARRANGEMENTS RESETTLEMENT BUDGET AND FINANCING MONITORING AND EVALUATION 13 ANNEX

5 LaukahiOHT Subproject 1.0 INTRODUCTION 1.1 Project Background 1. On 18 August 2008, Koshi River breached its left embankment and changed its course towards east and caused heavy damages to the four VDCs (Shreepur, Haripur, Laukahi and Paschim Kusaha) of the Sunsari district in the Esatern Develoment Region. The floods damaged/destroyed many private/public houses, standing crops and other infrastructures. About people had to be evacuated and settled in safer area in Sunsari district. Similarly heavy and incessant rainfall from 17 to 19 September, 2008 in the Far-Western Region of the country inundated considerable area of farmland in the Terai region of the Kalai and Kanchanpur districts and damaged/destroyed many infrastructures. The landslides caused by the rainfall also damaged the intake, transmission pipeline, river bed crossing of various water supply systems of both districts. 2. These two flood events of 2008 have directly or indirectly affected about 300,000 people and caused a loss equivalent to about US$ million in the three districts of Sunsari, Kailali and Kanchanpur. The present project (EFDRP) is designed to restore the livelihoods of people of these three districts through revival of agriculture and rehabilitation of infrastructure facilities damaged by the floods. The project design is based on the results of needs assessment studies of flood affected areas carried out jointly by the Government, ADB, and other UN agencies. The project Area is located in Sunsari district of Eastern development Region and Kailali and Knachanpur districts of Far-Western Development Region. 1.2 Water Supply and Sanitation Component 3. Expected benefits of this component is hygiene improvements in the flood affected areas, reduced pollution of ground water and surface water, and access to drinking water. This component has three activities; (i) water supply scheme; (ii) sanitation; and (iii) Community mobilization. The project will rehabilitate 28 gravity flow water supply systems in Kailali and Kanchanpur, and construct four small overhead water supply systems and install 3500 shallow tube wells in Sunsari to provide drinking water and sanitation facilities. The sanitation activity will cover health and hygiene education awareness program and support construction of house hold latrines for returnees in Sunsari district. In kailali and Kanchanpur districts, the project will focus on promoting hygiene and sanitation behavioral change through integrated community and school based program. Community mobilization will enhance and facilitate active participation of community to ensure equitable access to benefits, and long term sustainability of water supply and sanitation facilities. 1.3 Sub-project Background 4. The 2008 Koshi flood damaged 4 VDCs in Sunsari district. Water supply system is washed away by such flood completely in Sripur & Haripur VDC while partially in Paschim kusaha & Laukahi. Shallow tube wells and dug wells are the main source of water supply system in whole of terai area. Due to arsenic problem in the subproject area, 3 deep tube wells with small over head tanks have been proposed. Laukahi, Haripur and Bhantabari Water Supply and Sanitation Scheme are among four (4) anticipated schemes and identified for Small over head tank in the Sunsari flooded/ flood affected area. The Laukahi Water Supply and Sanitation Sub-Project is one of the among three OHT systems planned for - 4 -

6 LaukahiOHT Subproject implementation under the Grant assistance of the Asian Development Bank and Nepal Government. This Sub-project covers ward 1-9 of Laukahi VDC of Sunsari district. 1.4 Aims of 5. The aim for preparation of this (RP) is to provide policy and procedures of land acquisition, compensation and resettlement of affected persons. It has been prepared based on the findings of social impact assessment done during project design in April This assessment aimed to identify impact on property and income sources of affected persons with documentation of loss of land, houses, trees etc. within construction site. This RP particularly addresses adverse impacts associated with construction of overhead tank and pumping systems. The social considerations have been incorporated into design. However, geological and topographical factors, as well as land use and settlement patterns, make the acquisition of private property for construction inevitable. 1.5 Social Impact Assessment (SIA) 6. Social impact assessment was undertaken as a part of resettlement impact assessment. With leadership of cadastral surveyor from District Land Survey Office, Itahari, Sunsari, Cadastral survey identified only one household's land will be required for construction of OHT and related component, while pipelines and tap stands will be constructed using public land. Socio-economic survey of affected household was carried out to prepare profile of affected persons, assess incomes, identify productive activities and plan for income restoration. This survey also recorded demographic features and verification of lost assets ownership. 2.0 IMPACT OF THE SUBPROJECT 7. The SIA and Census Survey show that proposed subproject affects only one household, primarily through acquisition of land. Approximately ten people will be affected by the sub-project. None of houses, businesses and other minor structures will need relocating. A total of two katha ( sqm) of agricultural land will be acquired for the construction works. Required land is located at Ward No.4, Laukahi of Laukahi VDC. Sumitra Devi Shaha has provided required land (parcel number 269, 532 and 535) consisting total area sqm. Santosh Kumar Shah was head of household and Sumitra Shah is mother of household head. The household has total land holding sqm which forms loss 6.26% of total holding. 8. The social assessment has been carried out by the team of PIU in order to assess the resettlement works. During the focus group discussion a brief and initial assessment has been done for acquire of land, social issue and impacts. There is no effect or direct impact due to construction/rehabilitation of sub-projects. The subproject will have on one household and comes under category B of Resettlement Framework of the project. Therefore, a short resettlement plan has been prepared. 9. The land is primarily agricultural land but the flood has changed into barren. Wheat used to be main crop in these area followed by jute. Wage Labour, Farm Labour are the main other sources of income of affected people. Mr. Santosh Kumar Shah has business and is also an agriculturalist. Land requirement particularly for Laukahi Water Supply and Sanitation sub-project (for the construction of OHT) was determined by experts from ICON Consultant, who suggested possible location for OHT for sub-system. Table 1: Land holding and % loss of affected Household - 5 -

7 LaukahiOHT Subproject S. No. Name of Land Owner Area of land required (sqm) Total Land holding (sqm) 1 Ms. Sumitra Devi Shah % Loss Delineated Area East- Land of Anil Jha West- Musahari Tole North- Raod South- land of Bhola Shah 3.0 APPLICABLE LEGAL AND POLICY FRAMEWORK 10. This section reviews the policy framework that applies to the project. The RP follows Land Acquisition Act 1977, ADB involuntary resettlement policy, and the approved Resettlement framework for the project. This RP has been prepared based on project Involuntary Resettlement Framework, which is in harmony to GoN policies and ADB Policy on Involuntary Resettlement. Both ADB policy and GoN legislation emphasize avoiding or minimizing involuntary resettlement. Where the acquisition of private property is unavoidable, involuntary resettlement should be an integral part of project design and preparation. 11. The Interim Constitution of Nepal (2007) guarantees the fundamental rights of a citizen. Article 19(1) establishes the right to property for every citizen of Nepal, whereby every citizen is entitled to earn, use, sell and exercise their right to property under existing laws. Article 19(2) states that except for social welfare, the state will not acquire or exercise authority over individual property. Article 19(3) states that when the state acquires or establishes its right over private property, the state will compensate for loss of property and the basis and procedure for such compensation will be specified under relevant laws. 12. The Land Acquisition Act (1977) specifies procedures of land acquisition and compensation. The Act empowers the Government to acquire any land, on the payment of compensation, for public purposes or for the operation of any development project initiated by government institutions. There is a provision of Compensation Determination Committee (CDC) chaired by Chief District Officer (CDO)) to determine compensation rates for affected properties. Chief of Land Revenue Office, representative from District Development Committee (DDC) and concerned Project Manager are the member of committee and other relevant person can be invited as invitee. As per the Act, the compensation to be provided for affected asset is generally in cash based on recurrent market value. However, there is also a provision of land for land option in case of 100% loss of land under Clause 14 of the Act. 13. The Land Reform Act (1964) is also relevant. This Act establishes the tiller's right on the land which he is tilling. The land reform act additionally specifies the compensation entitlements of registered tenants on land sold by the owner or acquired for the development purposes. As per the Act, when state acquires land under tenancy, the tenant and the landlord will each be entitled to 50 percent of the total compensation amount. 14. The Public Roads Act, 2031 (1974) empowers the government to acquire any land on a temporary basis for storage facilities, construction camps and so on during construction and upgrading of roads. Any buildings and other structures such as houses, sheds, schools, and temples are to be avoided wherever possible. The government is required to pay compensation for any damages caused to buildings, standing crops and trees. Compensation rates are negotiated between the government and the landowners. 15. Land acquisition must also comply with the provisions set out in the Guthi Corporation Act The Section 42 of the Act states that Guthi (religious/trust) land acquired for a development must be replaced with other land

8 LaukahiOHT Subproject 16. The ADB's Policy on Involuntary Resettlement states that involuntary resettlement should be avoided where feasible. Where unavoidable, it should be minimized by exploring all viable options. Affected people/persons (APs) should be compensated and assisted, so that their economic and social future would be generally as favorable with the project as it would have been in the absence of the project. APs should be informed fully and consulted on resettlement and compensation options. The absence of formal legal title to land by some APs should not be a bar to compensation; particular attention should be paid to households headed by women and other vulnerable groups, such as indigenous peoples and ethnic minorities, and appropriate assistance provided to help them to improve their status. As far as possible, involuntary resettlement should be conceived in the presentation of project costs and benefits. 17. The Project's resettlement objectives are to (i) avoid land acquisition and involuntary resettlement wherever feasible; and (ii) minimize it where it is unavoidable, and ensure that APs receive assistance, so that they would be at least as well off as they would have been in the absence of the project. The key resettlement principles for the Project are as following: i. Involuntary land acquisition and resettlement impact will be avoided or minimized through careful planning and design of the project; ii. For any unavoidable involuntary land acquisition and resettlement, APs will be provided compensation at replacement cost and/or assistance so that they will be as well-off as without the project; iii. APs will be fully informed and consulted during project design and implementation, particularly on land acquisition and compensation options; iv. The absence of formal legal title to land will not be a bar to compensation for house, structures and trees/crops, and particular attention will be paid to vulnerable groups and appropriate assistance provided to help them improve their socio-economic status; v. Land compensation and resettlement assistance will be completed before award of civil works contracts, while other rehabilitation activities will continue during project construction; and vi. Land acquisition and resettlement will be conceived part of the project and the costs related to resettlement will be included in and financed out of the project cost. 18. Given that most local people are willing to voluntarily donate part of their land in building community and small-scale rural infrastructure that provide direct benefit to community, the Project has also accepted Nepal s tradition of land donation. However, adequate process and safeguards has been built in resettlement plan to ensure that the voluntary land donation is unforced and it doesn t lead to impoverishment of affected people, including: (i) (ii) (iii) (iv) Full consultation with affected persons and communities on selection of sites and appropriate design to avoid/minimize additional land take and resettlement effects; As a first principle, APs will be informed of their right to entitle compensation for any loss of their property (house, land, and trees) that might be caused by the project construction, and the land donation might be accepted only as a last option; No one will be forced to donate their land and APs will have the right to refuse land donation proposal from EA; In case APs are directly linked to project benefits and thus are willing to voluntarily donate their land after they are fully informed about their entitlement, the project will assess their socio-economic status and potential impact of land donation and accept land donation only from those APs who do not fall below the poverty line after the land donation and donation limited with 20% of total land holding; - 7 -

9 LaukahiOHT Subproject (v) (vi) (vii) Any voluntary land donation (after the process as mentioned above) will be confirmed through a written record, including a "no coercion" clause verified by an independent third party; The donation will be limited to only land and minor assets (houses and major assets will be excluded from donation); A grievance redress committees (GRC) will be set up in every road section and APs who are not satisfied with the land donation can file their complaint with GRC. If GRC found out that the above provisions were not complied with, APs will be excluded from the land donation. 4.0 CUT-OFF DATE 19. Any person directly affected by the project through the acquisition of assets belonging to him/her of his/her household or community are considered as Project Affected Person. This includes any person whose rights, standard of living, subsistence and income-generating capacity are adversely affected through the acquisition of assets, whether full/partial, or permanent/temporary. The groups of people residing in one house and operating as a single economic unit, who are adversely affected by the project, are defined as affected household. 20. The cut-off date for eligibility to compensation and assistance will be the date of the joint census of affected households and affected assets. For this subproject the cut-off date is fixed for 10 October ASSESSMENT OF VOLUNTARY DONATION CRITERIA 21. Total 10 People of a single joint family are affected by the project. All family members are literate and 8 have formal education and two are informally literate. Two family members are engaged in trade and business which is contributing major part of family income. Total annual income of this family is rupees and per capita annual income is which are higher than the district poverty level The land owner and household head arrived at conclusion that they will donate the required land in view of community benefit. The consultant project team assessed the voluntary donation criteria and found that the household was eligible for donation. Donation was made in public place and donation was witnessed by third party NGO. The verification letter provided by NGO on no coercion to affected household for donation has been attached as annex. 6.0 INFORMATION DISSEMINATION, CONSULATION AND DISCLOSURE 22. Both primary and secondary stakeholders are continuously consulted and requested to participate in each stage of project planning and implementation in line with ADB s policies on Involuntary Resettlement and Public Communication. The primary stakeholders are APs, beneficiaries, project staffs and district officials involved in the resettlement planning and implementation. 6.1 Consultation and Participation 23. This RP has been prepared in close consultation with stakeholders such as district level line agencies and community people. The study team has visited and consulted with different governmental organization, project affected people, key informants and other relevant people of the project area. The government organizations which were directly consulted within the field study period are: District Administration Office, District Land Survey Office, District Land Revenue Office, - 8 -

10 LaukahiOHT Subproject and District Agriculture Office. The team recorded information of affected assets of the affected household and other socio-economic information through household census and survey. 24. Individual consultations as well as group discussions were held in different places of the project area. The consultation process is a continuous process and will be continued till the completion of subproject implementation. Especially the local people and project affected population were focused to inform them about the nature of project and its activities. During the consultation information about the possibilities of acquisition of private assets by paying compensation was also shared. In addition, along with information dissemination the consultation also aimed at taking people s opinion and suggestions on the project and its impact Issues Raised in Public Consultation 25. Most issues are related to timely completion of construction work and sustainable availability of pure drinking water. People raised concern on delay of subproject implementation. They are committed to help necessary support for installation of pipeline, identification of public tap stand place and distribution system. Affected land owner was elected as WUSC and provided required land for OHT construction voluntarily in community meeting. 6.2 Disclosure 26. The information dissemination and consultation with APs is starting point for all activities concerning resettlement. Participation of APs as well as other stakeholders is continuously facilitated throughout the subproject cycle. To disseminate information about the Project to APs and local people public meetings were carried out in the subproject area. Further, project information was made available to the community concerned during the SIA and prior to preparation of RP. The draft RP has been disclosed to APs and concerned stakeholders prior to finalization. In addition, copies of RP have been placed at VDC and SPIU offices accessible to the public

11 .. Subproject Table 2: Entitlement Policy Matrix Type of Loss 1. Acquisition of private, tenancy, or Guthi land Application Entire or part of land to be acquired from owner of the land as recorded at cut-off date Definition of Entitled Persons Titleholder Tenants Policy/Entitlement Land with equivalent size and category, or cash compensation at replacement cost In case of vulnerable group, preference will be in replacing land for land. Any transfer costs, registration fees or charges Tenant will receive the 50% value of the land Non-titled persons will receive compensation/ allowance for one year crop, and provided with replacement land if ailani or Gov. land is available in the village. 2. Temporary loss of land Temporary land taken by the project Titleholder Tenants Compensation at replacement cost for net loss of income, damaged assets, crops and trees etc. An agreement between contractors and APs before entering the site. 3. Loss of residential, commercial, and other structure Structures, buildings including cattle shed, walls, toilets etc. affected by the project. Owner Tenants Non-titled Compensation at replacement cost without depreciation or deduction for salvaged material. Transportation allowance for residential and commercial structures to cover actual transact cost. Rental stipend equivalent of three months' rent for tenants who have to relocate from rented building. 4. Loss of community structures / resources Community facilities (e.g. irrigation, water.) affected by the project. The users of the facility or community or group Reconstruction by the project leaving such facilities in a better condition than they were before. or Cash compensation at full replacement cost without depreciation for salvaged material. Affected fruit/nut trees Owner of the affected fruit/nut trees Cash compensation based on annual value of the produce according to the Department of Agriculture norms. RPs to confirm that the DOA norms and techniques are sufficient and updated regularly. 5. Loss of trees and crops Affected timber and fodder trees Affected crops Owner of the affected timber and fodder trees Owner of the affected crops Sharecropper of the affected crops Cash compensation based on calculation of the production and calculated according to the District norms as decided by the Department of Forestry. Cash compensation based on the locally market prices for the produce of one year and calculated as per the norms of District Agriculture Development Office. 50% cash compensation of the lost crop for the sharecropper. 6. Loss of economic opportunity Economic opportunity lost as result of loss of livelihood base. Persons in the vicinity who may be adversely affected, although they do not lose assets as such Preferential involvement in project construction works. Skills training support for economic restoration Priority in poverty reduction/social development program

12 .. Subproject Type of Loss 7. Loss of time and travel expenses Application All expenses incurred in traveling to fill application and making claims and time lost. 8. Land donations Loss of land and other assets by means of voluntary donation Definition of Entitled Persons The entire project affected persons eligible for compensation. Voluntary donation is accepted only if AP: Is project beneficiary and is fully consulted and informed about their rights; Doesn t fall below poverty line after land donation; Donating up to 20% land holding, Unforced or freely willing to donate (with an agreement, including a "no coercion" verified by third party; Project facilitates transportation in official process Payment in the same day as other compensation. Policy/Entitlement No compensation for the donated land, but entitled for compensation of other assets such as house, structures etc. Transfer of land ownership by negotiation. Free/escape of any transfer costs, registration fees or charges. Preferential employment in wage labour in project construction work. 9. Additional Assistance 9.1 Preferential treatment in employment in project activities All APs Construction contracts include provision that APs will have priority in wage labor/employment on project construction during implementation. APs shall be given priority after construction for work as maintenance worker, mandated in local body agreement. 9.2 Skill training and income generation support One member of each PAF belonging to vulnerable group/below poverty line Skill training and income generation support financed by project RP to include a need assessment and skill training program for APs. 9.3 Priority in poverty reduction/social development programs All APs Participation of APs with priority in life skills, income generation, and other entrepreneurship facilitated by the Project

13 Emergency Flood Damage Rehabilitation Project Subproject 7.0 GRIEVANCE REDRESS MECHANISM 27. A committee has been formed to handle grievance received for immediate response at site. The SPIU head lead the committee with representation of APs and local leader. Representative from design and supervision consultant will present for facilitation of the process. Other than disputes relating to legal rights, it will review all grievances relating to land acquisition. Grievances will be redressed within two to four weeks from the date of lodging the complaints. 28. The key functions of the GRC are to (i) provide support for APs to lodge their complains; (i) record the complains, categories and prioritize them; (iii) settle the grievances in consultation with APs and IA staff; (v) report to the aggrieved parties about the decision/solution; and (vi) forward the unresolved cases to higher authorities. 29. Project affected people as well as local people can lodge their complaints at these offices related to assets acquisition and construction related activities either orally or in written. A register will be in SPIU for the grievance recording. The PAPs will be made fully aware of their rights and the procedures. Special project grievance mechanisms such as on site provision of complain hearings allows project affected persons to get fair treatment on time. There will be another system of appeal i.e. formal courts appeal. Under this system every PAP can appeal to the court if they feel that they are not compensated appropriately. They may appeal to appellate court within 35 days of the public notice given to them. PAPs will be exempt from all administrative fees incurred, pursuant to the grievance redress procedures except for cases filed in court. 8.0 INCOME GENERATION AND VOCATIONAL TRAINING 30. PAPs income will be enhanced by development of skills on village maintenance and sanitation workers training, Pre and Post Construction trainings. Pre & Post construction training cost for individuals will be about NRs and VMSW training cost will be NRs. 3000/ head. One member of the PAP will be provided with Village Maintenance and Sanitation Workers (VMSW) Training. He/she will be involved in pre and post construction trainings for skill development. 9.0 IMPLEMENTATION ARRANGEMENTS 31. This section outlines the implementation arrangements to be adopted for the timely completion of resettlement activities as recommended by RP. The EA has overall coordination responsibility and IA has planning and implementation responsibilities. The resettlement officer/supervisor of Works from design consultants will be engaged to assist APs and IA to implement the RP. The consultants will also liaise with IAs and the contractor to assist the affected persons, especially women and other vulnerable persons to obtain jobs in construction during the construction period. The IA will ensure that funds are delivered on time to the SPIU for timely implementation of resettlement plan RESETTLEMENT BUDGET AND FINANCING 32. This section provides cost estimates, budgets, and cash flows for meeting the objectives of the RP, according to the established schedules. The costs required for RP implementation (including

14 Emergency Flood Damage Rehabilitation Project Subproject any land compensation) will be financed out of sub-project grant provided to the district. These costs include (i) compensation for acquired assets; (ii) costs for rehabilitation of APs; and (iii) administrative costs for RP implementation and capacity building of the project agencies. 33. Entire land required for the construction of OHT has been donated by affected household free of cost. Budget requires for vocational training proposed for affected person and land registration fees is a part of resettlement cost. Total budget required for mentioned item is The cost is already available in project account and will be available as required MONITORING AND EVALUATION 34. The project has the objective to ensure that the economic condition of affected households shall not be worse than that of their situation without the project intervention. Regular monitoring will be carried out. Implementing Aagency will be responsible for monitoring of the resettlement planning and implementation throughout the sub-project cycle. A performance data sheet will be developed to monitor the project at the field level. Quarterly reports will be received from the SPIUs and Resettlement Officer will monitor the RP implementation and will report on a quarterly basis to DWSS and ADB on the progress of all aspects of resettlement activities. 35. The satisfactory implementation of RP including completion of land compensation is a condition for contract award and commencement of civil works. A verification report in this regard will be prepared by IA assisted by resettlement specialist/construction Supervisor and submitted to ADB along with proposal to award the contract(s)

15 Emergency Flood Damage Rehabilitation Project Subproject ANNEX Involuntary resettlement Categorization Check list WUSC registration certificate Agreement Copy Land ownership certification Recommendation Letter from NGO( Maa Bhagwati Mahila Sewa Sanstha)

16

17

18

19

20

21

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS MINISTRY OF EDUCATION GOVERNMENT OF NEPAL August 2011 2 A. Introduction 1.

More information

FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATIONS OR WILLING BUYER/WILLING SELLER PROCESSES

FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATIONS OR WILLING BUYER/WILLING SELLER PROCESSES Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SCHOOL SECTOR REFORM PROGRAM (SSRP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY

More information

Rural Reconstruction and Rehabilitation Sector Development Program

Rural Reconstruction and Rehabilitation Sector Development Program Government of Nepal Ministry of Local Development Department of Local Infrastructure Development & Agricultural Roads District Development Committee/District Technical Office Kavre Rural Reconstruction

More information

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Vision Contribute to overall development of the nation and its citizens by creating conducive

More information

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT Village Roads Component on the GAUNGXI ROADS DEVELOPMENT II PROJECT in THE PEOPLE S REPUBLIC OF CHINA (PRC) Guangxi Comnications Department Nanning, PRC This report was prepared by the Borrower and is

More information

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors. SUMMARY LAND ACQUISITION PLAN Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the RURAL ROADS SECTOR I PROJECT in INDIA Ministry of Rural Development

More information

VOLUNTARY LAND DONATION FRAMEWORK

VOLUNTARY LAND DONATION FRAMEWORK Community-Managed Irrigated Agriculture Sector Project Additional Financing (RRP NEP 33209) A. The Project and Context 1. Project Description VOLUNTARY LAND DONATION FRAMEWORK 1. The proposed Community

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LAO PDR: AGRICULTURAL DEVELOPMENT PROGRAM RP-59 POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT

More information

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PIP annex 9 - C of GEF Hai Basin Integrated Water and Environment Management Project

More information

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Summary of Land Acquisition Policy Framework JAMAICA: JM Hurricane Dean ERL Project RP607

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document June 2012 Pakistan: Sindh Cities Improvement Investment Program (SCIP) Prepared by North Sindh Urban Services Corporation Limited for the Asian Development Bank. PFR-2 Annex-11

More information

REPUBLIC OF MACEDONIA

REPUBLIC OF MACEDONIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Municipal Services Improvement Project (MSIP) LAND ACQUISITION

More information

Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal

Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal Tanahu Hydropower Project (RRP NEP 43281) Resettlement Framework October 2012 NEP: TANAHU HYDROPOWER PROJECT Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal

More information

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Project preparation under the PDF-B grant RP337

More information

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis: Code No: 1.9 Social Screening and Impact Assessment for Sub Projects A. Sub Project Description: Proposed Activity Walkability and Parking Improvements Lotus Road Implementing Agency: Colombo Municipal

More information

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency

More information

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION

More information

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2 Resettlement Plan March 2018 Indonesia: Neighborhood Upgrading and Shelter Project Phase 2 Prepared by the City of Kendari and Directorate General of Human Settlements, Ministry of Public Works and Housing

More information

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK BACKGROUND MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK The objective of the above project is to support municipal development in a sustainable manner. To this end, the project will a) support

More information

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in the Lok Sabha by the Minister for Rural

More information

Social Safeguards Due Diligence Report

Social Safeguards Due Diligence Report Social Safeguards Due Diligence Report June 2018 IND: Bihar State Highways III Project Establishment of Bihar Road Research Institute Prepared by Bihar State Roads Development Corporation Limited, Government

More information

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project)

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project) Resettlement Plan October 2014 GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project) Prepared by United Water Supply Company of Georgia LLC of the Ministry

More information

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing Resettlement Planning Document Due Diligence Report Loan Number: 2796 and Grant Number: 0267 NEP March 2013 Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing Garma-Nele-Bogal

More information

LAND ACQUISITION FRAMEWORK

LAND ACQUISITION FRAMEWORK LAND ACQUISITION FRAMEWORK (This framework was prepared in accordance to the ADB requirements for preparing Resettlement Framework as described in the ADB Safeguards Policy Statement, 2009) Project Number:

More information

Integrated Urban Development Project (IUDP)

Integrated Urban Development Project (IUDP) SOCIAL MONITORING REPORT Semi-Annual Report (July-December 2017) Loan/Grant Number(s): L2851-NEP; G0284-NEP Integrated Urban Development Project (IUDP) Prepared by Department of Urban Development and Building

More information

RESSETTLEMENT POLICY FRAMEWORK

RESSETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Department of Water Resources and Land Improvement of the Kyrgyz Republic Project Implementation

More information

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND (DRAFT) Public Disclosure Authorized RP337 v2 LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND Public Disclosure Authorized Public

More information

ENTITLEMENT MATRIX. Gujarat State Highway Project - II. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

ENTITLEMENT MATRIX. Gujarat State Highway Project - II. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ROADS AND BUILDINGS DEPARTMENT GOVERNMENT OF GUJARAT Gujarat State Highway Project -

More information

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing Involuntary Resettlement Due Diligence Report Loan 2860 (SF) July 2015 ARM: Water Supply and Sanitation Sector Project Additional Financing Prepared by the Armenian Water and Sewerage Closed Joint Stock

More information

NATIONAL GANGA RIVER BASIN AUTHORITY

NATIONAL GANGA RIVER BASIN AUTHORITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL GANGA RIVER BASIN AUTHORITY (Ministry of Environment and Forests, Government

More information

Dhaka Water Supply and Sanitation Project

Dhaka Water Supply and Sanitation Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VOL. 1 Dhaka Water Supply and Sanitation Project Resettlement Policy Framework Dhaka

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP275 Socialist Republic of Vietnam Ministry of Transport and National Traffic Safety

More information

LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT. ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II

LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT. ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT SUBPROJECT 1, ARMAVIR ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II Project Number: L2860-ICB-1-01 Prepared by the Project Management

More information

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project Land Acquisition/Resettlement Framework Project Number: 46453 March 2014 Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project Prepared by the Ministry of Finance and

More information

RESETTLEMENT POLICY FRAMEWORK (RPF)

RESETTLEMENT POLICY FRAMEWORK (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JANUARY 2013 Republic of Mozambique Mozambique Climate Resilience: Transforming Hydro-Meteorological

More information

Resettlement Policy Framework

Resettlement Policy Framework Republic of Turkey Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework Background 1. The Second Renewable Energy and Energy Efficiency Project will fund private sector investments

More information

JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK

JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK I. Introduction The Jamaica Social Investment Fund (JSIF) was established in 1996 under the Government of Jamaica s National

More information

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project I. Introduction The overall length of the road network in Albania totals

More information

RHLF WORKSHOP The National Housing Code

RHLF WORKSHOP The National Housing Code RHLF WORKSHOP The National Housing Code Outline 1. Statutory requirements 2. Background- why a new Code 3. The structure of the new Code 4. National Housing Programmes 5. National Housing Programmes under

More information

DRAFT EXECUTIVE SUMMARY

DRAFT EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT EXECUTIVE SUMMARY IPUH - BANTAL (LINK 015.1) KABUPATEN MUKO-MUKO YEAR 2010 EXECUTIVE

More information

PAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing

PAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document Land Acquisition and Resettlement Plan (LARP) for Mirishkor Subproject Document Stage: Final Project Number: UZB: 2208 July 2009 UZB: Kashkadarya and Navoi Rural Water Supply

More information

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project Land Acquisition and Resettlement Framework Date: May 2016 Status: Update FIJI: Transport Infrastructure Investment Sector Project CURRENCY EQUIVALENTS (as of August 2014) Fiji Dollar (FJD) FJD 1.00 =

More information

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP)

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) Resettlement Action Plan Update Report for the ARUSHA

More information

Mongolia: Western Regional Road Corridor Investment Program

Mongolia: Western Regional Road Corridor Investment Program Western Regional Road Corridor Investment Program (RRP MON 41193) Resettlement Framework September 2011 Mongolia: Western Regional Road Corridor Investment Program Prepared by the Ministry of Roads, Transportation,

More information

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Ministry of Agriculture and Environmental Protection Directorate for Water Management 11070 Belgrade, Blvd. Umetnosti 2a ELEKTROPRIVREDA SRBIJE FLOODS EMERGENCY AND RECOVERY PROJECT (FERP) RESETTLEMENT

More information

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PT PLN (Persero) INDONESIA POWER SECOND TRANSMISSION DEVELOPMENT PROJECT (IPTD-2) RP1232

More information

Due Diligence Report on Social Safeguards. IND: Rural Connectivity Investment Program Projects I and II

Due Diligence Report on Social Safeguards. IND: Rural Connectivity Investment Program Projects I and II Due Diligence Report on Social Safeguards December 2015 IND: Rural Connectivity Investment Program Projects I and II Rural Road Network Management Unit in Midnapur, West Bengal Prepared by Ministry of

More information

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework 1. BACKGROUND Dhaka Water Supply and Sanitation Project Resettlement Policy Framework The Dhaka Water and Sewerage Authority (DWASA) currently supplies water to about 70% of the population of the Dhaka

More information

Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT POLICY FRAMEWORK FOR

Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT POLICY FRAMEWORK FOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP47 Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT

More information

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4 Vietnam: Transmission

More information

BIOMASS-BASED DISTRICT HEATING PROJECT

BIOMASS-BASED DISTRICT HEATING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Biomass-Based District Heating Project BIOMASS-BASED DISTRICT HEATING PROJECT Construction

More information

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose Expropriation Context Following from the goal of the National Land Policy, to promote and ensure a secure land tenure system that is transparent, effective, non-discriminative, equitable and just ; it

More information

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Involuntary Resettlement Safeguards Objectives: To avoid resettlement wherever possible;

More information

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Land Acquisition

More information

South African Council for Town and Regional Planners

South African Council for Town and Regional Planners TARIFF OF FEES South African Council for Town and Regional Planners PLEASE NOTE : THE TARIFF OF FEES WAS APPROVED BY THE COUNCIL CHAPTER 10 : TARIFF OF FEES 10.1 INTRODUCTION 10.1.1 General This tariff

More information

COMPONENT 2 - TSKB DRAFT

COMPONENT 2 - TSKB DRAFT 2015 Resettlement Policy Framework for the Turkey Geothermal Development Project COMPONENT 2 - TSKB DRAFT Contents 1. Project Description & Background... 2 2. Principles & Objectives... 3 3. Process for

More information

Resettlement Plan. BHU: SASEC Road Connectivity Project. Phuentsholing Bypass Road. March 2014

Resettlement Plan. BHU: SASEC Road Connectivity Project. Phuentsholing Bypass Road. March 2014 Resettlement Plan March 2014 BHU: SASEC Road Connectivity Project Phuentsholing Bypass Road Prepared by the Phuentsholing Thromde for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 12 March 2014)

More information

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy

More information

How Swaziland Is Upgrading Its Slums

How Swaziland Is Upgrading Its Slums Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized How Swaziland Is Upgrading Its Slums CIVIS chose to profile this example from Swaziland

More information

KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT

KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT SFG1940 REV KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT RESETTLEMENT POLICY FRAMEWORK JUNE 2016 Public Disclosure Authorized Public Disclosure

More information

COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation

COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN CMM and CBM Production for Power Generation Shanxi Jincheng Coal Mining Group Co., Ltd. September 2004 THIS IS NOT AN ADB BOARD

More information

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) ARRANGEMENT OF REGULATIONS Regulations 1. Claims for compensation 2. Assessment of compensation 3. Compensation principles

More information

The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013

The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 CAME INTO FORCE ON 1.1.2014 (VIDE GOI GAZETTE NOTIFICATION DT. 19.12.2013) DR. R. K. SRIVASTAVA

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Regional Development and Infrastructure of Georgia Roads Department of Georgia

More information

RENEWABLE ENERGY INTEGRATION PROJECT

RENEWABLE ENERGY INTEGRATION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT TURKISH ELECTRICITY TRANSMISSION COMPANY TEIAS RP1530 RENEWABLE ENERGY INTEGRATION

More information

Resettlement Compensation Framework Railway Corridor VIII - Eastern section

Resettlement Compensation Framework Railway Corridor VIII - Eastern section Republic of Macedonia February 2012 Resettlement Compensation Framework Railway Corridor VIII - Eastern section Contract No: C21196/EBSF-2010-07-101 Macedonian Railways: Feasibility Study for Corridor

More information

ISLAMIC REPUBLIC OF AFGHANISTAN. Ministry of Rural Rehabilitation and Development (MRRD) And. Independent Directorate of Local Governance (IDLG)

ISLAMIC REPUBLIC OF AFGHANISTAN. Ministry of Rural Rehabilitation and Development (MRRD) And. Independent Directorate of Local Governance (IDLG) Public Disclosure Authorized SFG2396 Public Disclosure Authorized Public Disclosure Authorized ISLAMIC REPUBLIC OF AFGHANISTAN Ministry of Rural Rehabilitation and Development (MRRD) And Independent Directorate

More information

Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program

Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program Resettlement Framework Project Number: 42414 April 2010 Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program ABBREVIATIONS ADB Asian Development Bank

More information

Regional Power Transmission Interconnection Project Afghanistan-Tajikistan 220 kv Power Transmission Project (Section B New Kunduz Substation to AP23)

Regional Power Transmission Interconnection Project Afghanistan-Tajikistan 220 kv Power Transmission Project (Section B New Kunduz Substation to AP23) Resettlement Planning Document Land Acquisition and Resettlement Plan Project Number: 40043 September 2010 Regional Power Transmission Interconnection Project Afghanistan-Tajikistan 220 kv Power Transmission

More information

Land Acquisition and Resettlement Policy Framework

Land Acquisition and Resettlement Policy Framework Myanmar Agriculture Development Support Project Land Acquisition and Resettlement Policy Framework Ministry of Agriculture and Irrigation The Union Government of Myanmar Draft for Public Consultation 1

More information

AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals

AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals Due Diligence Report April 2013 AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals Prepared by for the Ministry of Finance and the Asian

More information

Andhra Pradesh Rural Roads Connectivity Project The Asian Infrastructure Investment Bank assisted

Andhra Pradesh Rural Roads Connectivity Project The Asian Infrastructure Investment Bank assisted GOVERNMENT OF ANDHRA PRADESH PANCHAYAT RAJ ENGINEERING DEPARTEMNT The (RPF) July 2018 Samaj Vikas Development Support Organisation Table of Contents List of Acronyms... 3 Glossary of Resettlement & Rehabilitation

More information

Cambodia Health Equity and Quality Improvement Project (H-EQIP) (P157291) Resettlement Policy Framework (RPF) (DRAFT)

Cambodia Health Equity and Quality Improvement Project (H-EQIP) (P157291) Resettlement Policy Framework (RPF) (DRAFT) Cambodia Health Equity and Quality Improvement Project (H-EQIP) (P157291) Resettlement Policy Framework (RPF) (DRAFT) Date: December 2, 2015 Contents 1. Introduction... 1 2. Project Description... 2 Project

More information

LAND REFORM IN MALAWI

LAND REFORM IN MALAWI LAND REFORM IN MALAWI Presented at the Annual Meeting for FIG Commission 7 In Pretoria, South Africa, Held From 4 th 8 th November, 2002 by Daniel O. C. Gondwe 1.0 BACKGROUND Malawi is a landlocked country

More information

Koridori Srbije Corridor X Highway Project Land Acquisition and Resettlement Framework LARF

Koridori Srbije Corridor X Highway Project Land Acquisition and Resettlement Framework LARF Land Acquisition and Resettlement Framework LARF Issue 1 June 2018 PREPARED BY Contents List of Abbreviations 2 Glossary 3 1 Introduction 7 1.1 Principles and Objectives 12 2 Gaps Between RS Legislation

More information

B. Justification of project design and alternative analysis:

B. Justification of project design and alternative analysis: Social Screening and Impact Assessment for Sub Projects Code No: 3 A. Sub Project Description: Proposed Activity Town Hall Square Development Implementing Agency: Colombo Municipal Council (CMC) Sub project

More information

Report No.: ISDSA15389

Report No.: ISDSA15389 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 12-ct-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011 The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in Lok Sabha on September 7, 2011. On December 17, 2012, during the winter session of Parliament, the government circulated

More information

Syr Darya Control and North Aral Sea Project Phase 2 (SYNAS-2) Land Acquisition Framework

Syr Darya Control and North Aral Sea Project Phase 2 (SYNAS-2) Land Acquisition Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Syr Darya Control and North Aral Sea Project Phase 2 (SYNAS-2) Land Acquisition Framework

More information

Port Moresby Power Grid Development Project.

Port Moresby Power Grid Development Project. Social Monitoring Report Semi-annual Report March 2017 Port Moresby Power Grid Development Project. Reporting period: July to December 2016. Prepared by PNG Power Limited for the Asian Development Bank.

More information

REPORT 2014/050 INTERNAL AUDIT DIVISION. Audit of United Nations Human Settlements Programme operations in Sri Lanka

REPORT 2014/050 INTERNAL AUDIT DIVISION. Audit of United Nations Human Settlements Programme operations in Sri Lanka INTERNAL AUDIT DIVISION REPORT 2014/050 Audit of United Nations Human Settlements Programme operations in Sri Lanka Overall results relating to the effective and efficient implementation of the UN-Habitat

More information

SFG kv İzmir Substation Abbreviated Resettlement Action Plan (ARAP) Turkish Electricity Transmission Company. Public Disclosure Authorized

SFG kv İzmir Substation Abbreviated Resettlement Action Plan (ARAP) Turkish Electricity Transmission Company. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Turkish Electricity Transmission Company 380 kv İzmir Substation Abbreviated Resettlement

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Section I - Basic Information Date Prepared/Updated:

More information

Republic of Azerbaijan: Water Supply and Sanitation Investment Program (Tranche 2)

Republic of Azerbaijan: Water Supply and Sanitation Investment Program (Tranche 2) Appendix 5 Resettlement Planning Document Land Acquisition and Resettlement Plan for Subprojects Under Tranche 2 (Goychay, Nakhcivan, Beylagan, and Agdash) Document Stage: Final November 11, 2011 Republic

More information

ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY

ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Background ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY Abbreviated Resettlement

More information

National Reconstruction Authority

National Reconstruction Authority Grant Disbursement Procedures for Private Houses Destroyed by the Earthquakes, 2073 (2016) (Approved by the Council of Ministers in 29 December, 2016) Government of Nepal National Reconstruction Authority

More information

Government of Nepal Ministry of Physical Planning and Works Department of Roads

Government of Nepal Ministry of Physical Planning and Works Department of Roads Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Government of Nepal Ministry of Physical Planning and Works Department of Roads ROAD

More information

Cibuk 1 Wind Farm Land Acquisition Plan Vetroelektrane Balkana d.o.o. October 2014

Cibuk 1 Wind Farm Land Acquisition Plan Vetroelektrane Balkana d.o.o. October 2014 Vetroelektrane Balkana d.o.o. October 2014 Table of contents Chapter Pages 1. Introduction 3 2. Project Land Acquisition 3 2.1. Land previously acquired 3 2.2. Land in the process of acquisition 4 3. Legal

More information

August 24, 2011 Ida Ayu Indira Dharmapatni World Bank Office Jakarta 1

August 24, 2011 Ida Ayu Indira Dharmapatni World Bank Office Jakarta 1 August 24, 2011 Ida Ayu Indira Dharmapatni World Bank Office Jakarta 1 Presentation Outline Voluntary land donation (VLD) and Indonesia CDD portfolio Why should the Bank be concerned about VLD? PNPM Urban

More information

National Reconstruction Authority

National Reconstruction Authority Grant Disbursement Procedures for Private Houses Destroyed by the Earthquakes, 2073 (2016) (Approved by the Council of Ministers in 29 December, 2016) Government of Nepal National Reconstruction Authority

More information

TONGA: Nuku alofa Urban Development Sector Project

TONGA: Nuku alofa Urban Development Sector Project Nuku'alofa Urban Development Sector Project (RRP TON 42394-22) Resettlement Framework TONGA: Nuku alofa Urban Development Sector Project Prepared by Planning and Urban Management Department, Ministry of

More information

MEMORANDUM OF UNDERSTANDING. between THE LOCAL GOVERNMENT AND SOCIAL CARE OMBUDSMAN & THE HOUSING OMBUDSMAN

MEMORANDUM OF UNDERSTANDING. between THE LOCAL GOVERNMENT AND SOCIAL CARE OMBUDSMAN & THE HOUSING OMBUDSMAN MEMORANDUM OF UNDERSTANDING between THE LOCAL GOVERNMENT AND SOCIAL CARE OMBUDSMAN & THE HOUSING OMBUDSMAN 1 Introduction The Localism Act 2011 introduced changes to the jurisdiction of the Local Government

More information

Scheme of Service. for. Housing Officers

Scheme of Service. for. Housing Officers REPUBLIC OF KENYA Scheme of Service for Housing Officers APPROVED BY THE PUBLIC SERVICE COMMISSION AND ISSUED BY THE PERMANENT SECRETARY MINISTRY OF STATE FOR PUBLIC SERVICE OFFICE OF THE PRIME MINISTER

More information

Addressing Land Sector Opportunities with Geospatial Information in Nepal

Addressing Land Sector Opportunities with Geospatial Information in Nepal The 20th UNRCC-AP and the 4th UN-GGIM-AP 5-10 October 2015 Jeju Island, Republic of Korea Addressing Land Sector Opportunities with Geospatial Information in Nepal Krishna Raj BC Executive Director Land

More information

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION RP762 v30 1. Information About Project Name &Location of Subproject Project Sponsor Project Cost Installed Generation

More information

RESETTLEMENT POLICY FRAMEWORK FOR KENYA POWER PROJECTS

RESETTLEMENT POLICY FRAMEWORK FOR KENYA POWER PROJECTS RESETTLEMENT POLICY FRAMEWORK FOR KENYA POWER PROJECTS REVISED SEPTEMBER - 2012 i EXECUTIVE SUMMARY The Kenya power and Lighting Company Ltd (KPLC) falls under the Ministry of Energy (MoE). KPLC, which

More information

Resettlement Policy Framework (RPF) for the Sustainable Rural Water and Sanitation Project

Resettlement Policy Framework (RPF) for the Sustainable Rural Water and Sanitation Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Resettlement Policy Framework (RPF) for the Sustainable Rural Water and Sanitation Project

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM HO CHI MINH CITY PEOPLE S COMMITTEE INVESTMENT MANAGEMENT