1 NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate SASEC: Power System Expansion Project KALIGANDAKI TRANSMISSION CORRIDOR PROJECT BIDDING DOCUMENT FOR Procurement of Plant for New Butwal Bardaghat 220kV Transmission Line (Design, Supply, Installation & Commissioning) Single-Stage, Two-Envelope Bidding Procedure Issued on: Invitation for Bids No.: ICB No.: Employer: Country: ICB-PMD-KGTCP 073/74-02 ICB-PMD-KGTCP-073/74-02 Nepal Electricity Authority Nepal VOLUME III OF III May 2017 Project Management Directorate Satungal Bauthali Chowk Marga, Chandragiri Municipality, Matatirtha, Kathmandu, Nepal Telephone: , Facsimile number: Electronic mail address: kgtcp220kv.nbb@nea.org.np, chandankghosh@gmail.com
2
3 TENDER No.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 1: PAGE 1 of 28 Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad Item No. Item description NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE New Butwal-Bardaghat 220kV D/C Transmission Line Country of origin Estimated Total Amount (Excluding Taxes and Duties) FC Custom, VAT and other taxes Unit Quantity FC LC Currency# Unit Rate Amount = (7) x (5) 11= Design, fabrication & supply of following types of towers & tower extension parts complete with stubs, step bolts, hangers, D-shackles, bolts & nuts etc but excluding tower accessories such as danger plates, number plates, phase plates, anticlimbing devices Suspension Tower DA a) Basic tower Nos. 18 a)(i) Stubs Nos. 72 a)(ii) Basic tower body Nos. 18 b) -4.5 m Leg Extension Nos. 2 c) -3 m Leg Extension Nos. 2 d) -1.5 m Leg Extension Nos. 4 e) +/- 0 m Leg Extension Nos. 60 f) +1.5 m Leg Extension Nos. 2 g) +3 m Leg Extension Nos. 2 h) +4.5 m Leg Extension Nos. 2 i) +6 m Leg Extension Nos. 2 j) +7.5 m Leg Extension Nos. 2 k) +9 m Leg Extension Nos. 2 l) +18 m Leg Extension Nos. 4 m) +25 m Leg Extension Nos Tension Tower DB a) Basic tower Nos. 17 a)(i) Stubs Nos. 68 a)(ii) Basic tower body Nos. 17 b) -4.5 m Leg Extension Nos. 2 c) -3 m Leg Extension Nos. 1 CIP Project Site including insurance, clearing, forwarding and transportation to site (Excluding Taxes and Duties applicable in Nepal) 220KV D/C New Butwal-Bardaghat Transmission Line
4 TENDER No.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 1: PAGE 2 of 28 Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad Estimated CIP Project Site including insurance, clearing, forwarding and transportation to site (Excluding Taxes Total Amount (Excluding Taxes Item description and Duties applicable in Nepal) and Duties) Item No. Custom, VAT and other taxes Country of origin FC Unit Quantity Currency# Unit Rate Amount FC LC = (7) x (5) 11=8 13 d) -1.5 m Leg Extension Nos. 3 e) +/- 0 m Leg Extension Nos. 48 f) +1.5 m Leg Extension Nos. 1 g) +3 m Leg Extension Nos. 11 h) +4.5 m Leg Extension Nos. 12 i) +6 m Leg Extension Nos. 11 j) +7.5 m Leg Extension Nos. 10 k) +9 m Leg Extension Nos Tension Tower DC a) Basic tower Nos. 8 a)(i) Stubs Nos. 32 a)(ii) Basic tower body Nos. 8 b) -4.5 m Leg Extension Nos. 1 c) -3 m Leg Extension Nos. 2 d) -1.5 m Leg Extension Nos. 3 e) +/- 0 m Leg Extension Nos. 26 f) +1.5 m Leg Extension Nos. 2 g) +3 m Leg Extension Nos. 4 h) +4.5 m Leg Extension Nos. 6 i) +6 m Leg Extension Nos. 4 j) +7.5 m Leg Extension Nos. 6 k) +9 m Leg Extension Nos. 3 l) +18 m Leg Extension Nos. 2 m) +25 m Leg Extension Nos Tension Tower DD a) Basic tower Nos. 7 a)(i) Stubs Nos. 28 a)(ii) Basic tower body Nos. 7 b) -4.5 m Leg Extension Nos. 1 c) -3 m Leg Extension Nos. 1 d) -1.5 m Leg Extension Nos. 2 e) +/- 0 m Leg Extension Nos KV D/C New Butwal-Bardaghat Transmission Line
5 TENDER No.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 1: PAGE 3 of 28 Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad Estimated CIP Project Site including insurance, clearing, forwarding and transportation to site (Excluding Taxes Total Amount (Excluding Taxes Item description and Duties applicable in Nepal) and Duties) Item No. Custom, VAT and other taxes Country of origin FC Unit Quantity Currency# Unit Rate Amount FC LC = (7) x (5) 11=8 13 f) +1.5 m Leg Extension Nos. 1 g) +3 m Leg Extension Nos. 1 h) +4.5 m Leg Extension Nos. 2 i) +6 m Leg Extension Nos. 1 j) +7.5 m Leg Extension Nos. 2 k) +9 m Leg Extension Nos. 1 l) +18 m Leg Extension Nos. 2 m) +25 m Leg Extension Nos. 2 MT Emergency Restoration System (ERS) for 400 kv; also suitable for kv; detail scope will be as mentioned in the technical specification (Vol-II, Section XI) 2.1 ERS Towers 6 I Bypass ERS, for 0-60 Tension Tower Set 6 a Construction Tools: all necessary construction hydraulic tools and hand tools shall be provided for assembly and erection of a complete emergency restoration structure; each set of the construction tools shall be included with as written in the technical specification Set Container for ERS Components (20') with storage system; shall be outfitted with all components as mentioned in the technical Nos. 2 specification 2.4 ERS Computer Software compactible for personal computers/laptop of any make; one software license per laptop Nos Laptops for ERS software, built with rugged features and pre-loaded with genuine Windows operating system; other specs. As written in Nos. 10 tech spec. 2.6 Portable Diesel Generator Set, loading take kw kva capacity No GPS Receiver: 2.2 monochrome display, high-sensitivity WAASenabled, Hot Fix and GLONASS support, worldwide basemap, supporting paperless geocaching, USB interface, rugged & Nos. 6 waterproof etc. 2.8 Total Station Surveying Equipment: latest features, speed, accuracy, ease-of-use and reliability; tech spec as mentioned in tech document Nos KV D/C New Butwal-Bardaghat Transmission Line
6 TENDER No.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 1: PAGE 4 of 28 Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad Estimated CIP Project Site including insurance, clearing, forwarding and transportation to site (Excluding Taxes Total Amount (Excluding Taxes Item description and Duties applicable in Nepal) and Duties) Custom, VAT and other taxes Item Country No. of origin FC Unit Quantity Currency# Unit Rate Amount FC LC = (7) x (5) 11= Tripod with chain pulley block system having capacity to lift 10 MT load No Motorised Capstan Hoist having lifting/pulling capacity of 10 MT No WALKIE-TALKIE Set: Water, shock, vibration & impact proof Walky- Talky with working frequency range / / / / / MHz with 16 Channel Capacity and Set 8 having Battery backup of 10 to 12 Hrs (preferably Li-Ion Battery) 2.12 Material requirement for complete set of ERS structures i. ERS Structure Components Set 6 ii. Conductor Hardware Set 6 iii. Polymer Insulators Set a Suspension insulators with corona rings Nos. 684 b Post Insulators Nos. 78 iv. Guy assembles Set 6 v. Anchor assembles Set 6 3 Supply of Earthing of towers i. Pipe Type Nos. 40 ii. Counterpoise Type Nos Supply of following tower accessories i. Danger Plate Nos. 50 ii. Number Plate Nos. 50 iii. Phase Plate ( Set of three) Sets 100 iv. Circuit Plate(Set of two) Sets 50 v. Anti climbimg device Nos. 50 vi. Bird Guard(set of three) Sets 36 5 Supply of following Line Materials 5.1 GS Earthwire i) 7/3.35mm Earthwire KM Conductor i) ACSR Bison Conductor KM KV D/C New Butwal-Bardaghat Transmission Line
7 TENDER No.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 1: PAGE 5 of 28 Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad Estimated CIP Project Site including insurance, clearing, forwarding and transportation to site (Excluding Taxes Total Amount (Excluding Taxes Item description and Duties applicable in Nepal) and Duties) Item No. Country of origin Custom, VAT and other taxes FC FC LC Unit Quantity Currency# Unit Rate Amount = (7) x (5) 11= Insulators for 220kV line with Twin ACSR Bison conductor A. Option-1: Composite Insulators (i) 70kN Composite Long Rod Insulator Nos 154 (ii 120kN Composite Long Rod Insulator Nos 872 B Option-2: Disc Insulators (i) 70kN Disc Insulator Nos 2156 (ii 120kN Disc Insulator Nos Hardware Fittings suitable for Twin ACSR Bison conductor i) Single "I" Suspension Insulator String Sets 111 ii) Single 'I' Suspension PILOT String Sets 31 iii) Double Tension Insulator String Sets Conductor and Earthwire Accessories i) Mid span compression joint for ACSR Bison conductor Nos 111 ii) Repair Sleeve for ACSR Bison conductor Nos 37 iii) Rigid Spacer for ACSR Bison conductor Nos 588 iv) Bundle Spacer for ACSR Bison conductor Nos 2185 v) Vibration Damper for ACSR Bison conductor Nos 2057 vi) Mid span compression joint for 7/3.35mm GS earthwire Nos 11 vii) Flexible Copper Bond for 7/3.35mm GS Earthwire Nos 86 viii) Vibration Damper for for 7/3.35mm GS Earthwire Nos 172 ix) Earthwire Suspension Clamp Nos 19 x) Earthwire Tension Clamp Nos Suplly of Fibre Cable & Accessories OPGW cable & Accessories i) 24 Fibre (DWSM) OPGW fibre optic cable km 17 ii) Installation Hardware set for above 24 Fibre OPGW Fibre Optic Sets* 17 cabling including all cable fittings & accessories as per below : iii) Joint Box No KV D/C New Butwal-Bardaghat Transmission Line
8 TENDER No.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 1: PAGE 6 of 28 Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad Estimated CIP Project Site including insurance, clearing, forwarding and transportation to site (Excluding Taxes Total Amount (Excluding Taxes Item description and Duties applicable in Nepal) and Duties) Item No. Country of origin Custom, VAT and other taxes FC FC LC Unit Quantity Currency# Unit Rate Amount = (7) x (5) 11= FODP i) FODP 48F : Indoor Type, rack mounted with FCPC coupling and pig tails (5 mtrs each). No Fibre Optic approach cable i) 24 Fibre (DWSM) Km Mandatory Spares of OPGW Cabling OPGW cable & Accessories i) 24 Fibre (DWSM) OPGW fibre optic cable Km. 2 ii) Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling including all cable fittings & accessories as per below : Sets* 2 iii) Joint Box (24 fibre) No Fibre Optic approach cable i) 24 Fibre (DWSM) Km. 1 6 Supply of Safty accessories i) Safety Helmets Nos. 500 ii) Safety Boots Pairs 350 iii) Hand safety Gloves Pairs 500 iv) Protective eye goggles Nos. 300 v) Construction Life Jackets with trousers Pairs 350 vi) Primary health kit Set 300 vii) Raincoat Set 400 viii) Site Bag Set 400 TOTAL (Total of column 11 and 12 to be carried forward to Schedule No. 5: Grand Summary) Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items. 2.) The Prices of equipments are inclusive of type test charges except.towers, conductors and earthwires. 3.) BOQ given above is indicative only based on the scope of work as given in Employer's Requirements. The quantities mentioned above may undergo 220KV D/C New Butwal-Bardaghat Transmission Line
9 TENDER No.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 1: PAGE 7 of 28 Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad Estimated CIP Project Site including insurance, clearing, forwarding and transportation to site (Excluding Taxes Total Amount (Excluding Taxes Item description and Duties applicable in Nepal) and Duties) Item No. Custom, VAT and other taxes Country of origin FC Unit Quantity Currency# Unit Rate Amount FC LC = (7) x (5) 11=8 13 # Specify currency in accordance with BDS ITB Clause 32.1, Part-I of the Bidding Documents. * Bidders should quote for one of the options for insulators. Name of Bidder: Signature of Bidder: (Printed Name) (Designation) (Common Seal) Date: 220KV D/C New Butwal-Bardaghat Transmission Line
10 TENDER NO.: ICB-PMD-KGTCP-073/74-02 SCHEDULE - 2 : PAGE 8 of 28 Schedule No.2: Plant and Equipment including Mandatory Spares to be supplied from within Nepal including type test charges Item No. Item description NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE New Butwal-Bardaghat 220kV D/C Transmission Line Estimated Total Amount (Excluding Taxes ) Unit Quantity Unit Rate Amount Unit Rate Amount = (7) x (5) Design, fabrication & supply of following types of towers & tower extension parts complete with stubs, step bolts, hangers, D- shackles, bolts & nuts etc but excluding tower accessories such as danger plates, number plates, phase plates, anti-climbing devices Suspension Tower DA a) Basic tower Nos. 18 a)(i) Stubs Nos. 72 a)(ii) Basic tower body Nos. 18 b) -4.5 m Leg Extension Nos. 2 c) -3 m Leg Extension Nos. 2 d) -1.5 m Leg Extension Nos. 4 e) +/- 0 m Leg Extension Nos. 60 f) +1.5 m Leg Extension Nos. 2 g) +3 m Leg Extension Nos. 2 h) +4.5 m Leg Extension Nos. 2 i) +6 m Leg Extension Nos. 2 j) +7.5 m Leg Extension Nos. 2 k) +9 m Leg Extension Nos. 2 l) +18 m Leg Extension Nos. 4 m) +25 m Leg Extension Nos Tension Tower DB a) Basic tower Nos. 17 a)(i) Stubs Nos. 68 a)(ii) Basic tower body Nos. 17 b) -4.5 m Leg Extension Nos. 2 Ex Factory price (Excluding VAT) Inland transportation up to site
11 TENDER NO.: ICB-PMD-KGTCP-073/74-02 SCHEDULE - 2 : PAGE 9 of 28 Schedule No.2: Plant and Equipment including Mandatory Spares to be supplied from within Nepal including type test charges Ex Factory price (Excluding Estimated Inland transportation up to site VAT) Item description Unit Quantity Unit Rate Amount Unit Rate Amount = (7) x (5) 9 Item No. c) -3 m Leg Extension Nos. 1 d) -1.5 m Leg Extension Nos. 3 e) +/- 0 m Leg Extension Nos. 48 f) +1.5 m Leg Extension Nos. 1 g) +3 m Leg Extension Nos. 11 h) +4.5 m Leg Extension Nos. 12 i) +6 m Leg Extension Nos. 11 j) +7.5 m Leg Extension Nos. 10 k) +9 m Leg Extension Nos Tension Tower DC a) Basic tower Nos. 8 a)(i) Stubs Nos. 32 a)(ii) Basic tower body Nos. 8 b) -4.5 m Leg Extension Nos. 1 c) -3 m Leg Extension Nos. 2 d) -1.5 m Leg Extension Nos. 3 e) +/- 0 m Leg Extension Nos. 26 f) +1.5 m Leg Extension Nos. 2 g) +3 m Leg Extension Nos. 4 h) +4.5 m Leg Extension Nos. 6 i) +6 m Leg Extension Nos. 4 j) +7.5 m Leg Extension Nos. 6 k) +9 m Leg Extension Nos. 3 l) +18 m Leg Extension Nos. 2 m) +25 m Leg Extension Nos Tension Tower DD a) Basic tower Nos. 7 a)(i) Stubs Nos. 28 a)(ii) Basic tower body Nos. 7 b) -4.5 m Leg Extension Nos. 1 c) -3 m Leg Extension Nos. 1 Total Amount (Excluding Taxes )
12 TENDER NO.: ICB-PMD-KGTCP-073/74-02 SCHEDULE - 2 : PAGE 10 of 28 Schedule No.2: Plant and Equipment including Mandatory Spares to be supplied from within Nepal including type test charges Ex Factory price (Excluding Estimated Inland transportation up to site VAT) Item description Unit Quantity Unit Rate Amount Unit Rate Amount = (7) x (5) 9 Item No. d) -1.5 m Leg Extension Nos. 2 e) +/- 0 m Leg Extension Nos. 20 f) +1.5 m Leg Extension Nos. 1 g) +3 m Leg Extension Nos. 1 h) +4.5 m Leg Extension Nos. 2 i) +6 m Leg Extension Nos. 1 j) +7.5 m Leg Extension Nos. 2 k) +9 m Leg Extension Nos. 1 l) +18 m Leg Extension Nos. 2 m) +25 m Leg Extension Nos. 2 Emergency Restoration System (ERS) for 400 kv; also suitable for kv; detail scope will be as mentioned in the technical specification (Vol-II, Section XI) 2.1 ERS Towers 6 I Bypass ERS, for 0-60 Tension Tower Set 6 Total Amount (Excluding Taxes ) a Construction Tools: all necessary construction hydraulic tools and hand tools shall be provided for assembly and erection of a complete emergency restoration structure; each set of the construction tools shall be included with as written in the technical specification Set Container for ERS Components (20') with storage system; shall be outfitted with all components as mentioned in the technical specification ERS Computer Software compactible for personal computers/laptop of any make; one software license per laptop Laptops for ERS software, built with rugged features and pre-loaded with genuine Windows operating system; other specs. As written in tech spec. Nos. 2 Nos. 10 Nos Portable Diesel Generator Set, loading take kw kva capacity No. 1
13 TENDER NO.: ICB-PMD-KGTCP-073/74-02 SCHEDULE - 2 : PAGE 11 of 28 Schedule No.2: Plant and Equipment including Mandatory Spares to be supplied from within Nepal including type test charges Ex Factory price (Excluding Estimated Inland transportation up to site VAT) Item description Unit Quantity Unit Rate Amount Unit Rate Amount = (7) x (5) 9 Item No. 2.7 GPS Receiver: 2.2 monochrome display, high-sensitivity WAASenabled, Hot Fix and GLONASS support, worldwide basemap, supporting paperless geocaching, USB interface, rugged & waterproof etc. Nos. 6 Total Amount (Excluding Taxes ) 2.8 Total Station Surveying Equipment: latest features, speed, accuracy, ease-of-use and reliability; tech spec as mentioned in tech document Nos Tripod with chain pulley block system having capacity to lift 10 MT load No Motorised Capstan Hoist having lifting/pulling capacity of 10 MT No WALKIE-TALKIE Set: Water, shock, vibration & impact proof Walky- Talky with working frequency range / / / / / MHz with 16 Channel Capacity and having Battery backup of 10 to 12 Hrs (preferably Li-Ion Battery) Set Material requirement for complete set of ERS structures i. ERS Structure Components Set 6 ii. Conductor Hardware Set 6 iii. Polymer Insulators Set a Suspension insulators with corona rings Nos. 684 b Post Insulators Nos. 78 iv. Guy assembles Set 6 v. Anchor assembles Set 6 3 Supply of Earthing of towers i. Pipe Type Nos. 40 ii. Counterpoise Type Nos Supply of following tower accessories i. Danger Plate Nos. 50 ii. Number Plate Nos. 50 iii. Phase Plate ( Set of three) Sets 100 iv. Circuit Plate(Set of two) Sets 50
14 TENDER NO.: ICB-PMD-KGTCP-073/74-02 SCHEDULE - 2 : PAGE 12 of 28 Schedule No.2: Plant and Equipment including Mandatory Spares to be supplied from within Nepal including type test charges Ex Factory price (Excluding Estimated Inland transportation up to site VAT) Item description Unit Quantity Unit Rate Amount Unit Rate Amount = (7) x (5) 9 Item No. v. Anti climbimg device Nos. 50 vi. Bird Guard(set of three) Sets 36 5 Supply of following Line Materials 5.1 GS Earthwire i) 7/3.35mm Earthwire KM Conductor i) ACSR Bison Conductor KM Insulators for 220kV line with Twin ACSR Bison conductor A. Option-1: Composite Insulators (i) 70kN Composite Long Rod Insulator Nos 154 (ii 120kN Composite Long Rod Insulator Nos 872 B Option-2: Disc Insulators (i) 70kN Disc Insulator Nos 2156 (ii 120kN Disc Insulator Nos Hardware Fittings suitable for Twin ACSR Bison conductor i) Single "I" Suspension Insulator String Sets 111 ii) Single 'I' Suspension PILOT String Sets 31 iii) Double Tension Insulator String Sets Conductor and Earthwire Accessories i) Mid span compression joint for ACSR Bison conductor Nos 111 ii) Repair Sleeve for ACSR Bison conductor Nos 37 iii) Rigid Spacer for ACSR Bison conductor Nos 588 iv) Bundle Spacer for ACSR Bison conductor Nos 2185 v) Vibration Damper for ACSR Bison conductor Nos 2057 vi) Mid span compression joint for 7/3.35mm GS earthwire Nos 11 vii) Flexible Copper Bond for 7/3.35mm GS Earthwire Nos 86 viii) Vibration Damper for for 7/3.35mm GS Earthwire Nos 172 Total Amount (Excluding Taxes )
15 TENDER NO.: ICB-PMD-KGTCP-073/74-02 SCHEDULE - 2 : PAGE 13 of 28 Schedule No.2: Plant and Equipment including Mandatory Spares to be supplied from within Nepal including type test charges Ex Factory price (Excluding Estimated Inland transportation up to site VAT) Item description Unit Quantity Unit Rate Amount Unit Rate Amount = (7) x (5) 9 Item No. ix) Earthwire Suspension Clamp Nos 19 x) Earthwire Tension Clamp Nos Suplly of Fibre Cable & Accessories OPGW cable & Accessories i) 24 Fibre (DWSM) OPGW fibre optic cable km 17 ii) Installation Hardware set for above 24 Fibre OPGW Fibre Optic Sets* 17 cabling including all cable fittings & accessories as per below : iii) Joint Box No. 6 Total Amount (Excluding Taxes ) FODP i) FODP 48F : Indoor Type, rack mounted with FCPC coupling and pig tails (5 mtrs each). No Fibre Optic approach cable i) 24 Fibre (DWSM) Km Mandatory Spares of OPGW Cabling OPGW cable & Accessories i) 24 Fibre (DWSM) OPGW fibre optic cable Km. 2 ii) Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling including all cable fittings & accessories as per below : Sets* 2 iii) Joint Box (24 fibre) No Fibre Optic approach cable i) 24 Fibre (DWSM) Km. 1 6 Supply of Safty accessories i) Safety Helmets Nos. 500 ii) Safety Boots Pairs 350 iii) Hand safety Gloves Pairs 500 iv) Protective eye goggles Nos. 300
16 TENDER NO.: ICB-PMD-KGTCP-073/74-02 SCHEDULE - 2 : PAGE 14 of 28 Schedule No.2: Plant and Equipment including Mandatory Spares to be supplied from within Nepal including type test charges Ex Factory price (Excluding Estimated Inland transportation up to site VAT) Item description Unit Quantity Unit Rate Amount Unit Rate Amount = (7) x (5) 9 Item No. v) Construction Life Jackets with trousers Pairs 350 vi) Primary health kit Set 300 vii) Raincoat Set 400 viii) Site Bag Set 400 Total Amount (Excluding Taxes ) TOTAL Ex works price (Total of column 9 to be carried forward to Schedule No. 5: Grand Summary) Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items. 2.) The Prices of equipments are inclusive of type test charges except.towers, conductors and earthwires. 3.) BOQ given above is indicative only based on the scope of work as given in Employer's Requirements. The quantities mentioned above may undergo change during detailed engineering to meet the functional requirement and scope of work defined in Employer's Requirements. 4) For Bought out items, all applicable taxes, duties and levies except Octroi/ Entry tax are to be included in the Ex works price * Bidders should quote for one of the options for insulators. Name of Bidder: Signature of Bidder: (Printed Name) (Designation) (Common Seal) Date:
17 TENDER NO.: ICB-PMD-KGTCP-073/74-02 SCHEDULE - 3 : PAGE 15 of 28 NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE New Butwal-Bardaghat 220kV D/C Transmission Line Schedule A-3: Design Services Item No. Item Description Estimated Local Currency portion Foreign Currency Portion Quantity Unit NRs Currency LC FC =3x5 8=3x6 1 Tower Type DA 1 No. 2 Tower Type DB/DBE 1 No. 3 Tower Type DC/DCE 1 No. 4 Tower Type DD/ DDE 1 No. 5 Any special tower required to be designed 1 No. 6 ERS 1 No. Total (Total of column 7 and 8 to be carried forward to Schedule No. 5: Grand Summary) Unit Prices Total Prices Name of Bidder: Date: Signature of Bidder: (Printed Name) (Designation) (Common Seal)
18 TENDER NO.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 4(a) : PAGE 16 of 28 Schedule No. 4: Installation Services (a): Installation and Construction Charges Installation Charges Sl. No. Item Description Unit Qty. Portion in Foreign Currency Portion in Nepaln Currency Currency* Unit Rate Total Charges Unit Rate Total Charges (1) (2) (4) (5) (6) (7) (8)=(5)X(7) (9) (10)=(5)X(9) 1 Survey a) Detailed survey including route alignment, profiling, tower spotting KM 17 b) Check Survey with detail tower spotting KM 17 c) Cadastral Survey KM Detailed soil Investigation i. All kind of soil except FR & HR Loc. 12 ii. Fissured/soft rock Loc. 5 3 Benching i) All kind of soil except FR & HR Cum. 500 ii) Fissured Rock Cum Work associated with tower foundations. 4.1 Suspension Tower DA a) Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m Body Extension) i) Dry Foundation Nos. 2 ii) Wet Foundation Nos. 2 iii) Partially Submerged Foundation Nos. 2 iv) Fully Submerged Foundation Nos. 2 v) Dry Fissured Rock Nos. 1 vi) Wet Fissured Rock Nos. 2 vii) Submerged Fissured Rock Nos. 1 viii) Sandy Soil Foundation Nos. 1 NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE New Butwal-Bardaghat 220kV D/C Transmission Line
19 TENDER NO.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 4(a) : PAGE 17 of 28 Schedule No. 4: Installation Services (a): Installation and Construction Charges Installation Charges Sl. No. Item Description Unit Qty. Portion in Foreign Currency Portion in Nepaln Currency Currency* Unit Rate Total Charges Unit Rate Total Charges (1) (2) (4) (5) (6) (7) (8)=(5)X(7) (9) (10)=(5)X(9) b) Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Body Extension i) Dry Foundation Nos. 0 ii) Wet Foundation Nos. 1 iii) Partially Submerged Foundation Nos. 1 iv) Fully Submerged Foundation Nos. 0 v) Dry Fissured Rock Nos. 0 vi) Wet Fissured Rock Nos. 1 vii) Submerged Fissured Rock Nos. 0 viii) Sandy Soil Foundation Nos. 0 c) Common Foundation for +18m, +25m Body Extension i) Dry Foundation Nos. 0 ii) Wet Foundation Nos. 1 iii) Partially Submerged Foundation Nos. 0 iv) Fully Submerged Foundation Nos. 1 v) Dry Fissured Rock Nos. 0 vi) Wet Fissured Rock Nos. 0 vii) Submerged Fissured Rock Nos. 0 viii) Sandy Soil Foundation Nos Tension Tower DB a) Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m Body Extension) i) Dry Foundation Nos. 0 ii) Wet Foundation Nos. 1 iii) Partially Submerged Foundation Nos. 1 iv) Fully Submerged Foundation Nos. 1 v) Dry Fissured Rock Nos. 1 vi) Wet Fissured Rock Nos. 1 vii) Submerged Fissured Rock Nos. 0 viii) Sandy Soil Foundation Nos. 0
20 TENDER NO.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 4(a) : PAGE 18 of 28 Schedule No. 4: Installation Services (a): Installation and Construction Charges Installation Charges Sl. No. Item Description Unit Qty. Portion in Foreign Currency Portion in Nepaln Currency Currency* Unit Rate Total Charges Unit Rate Total Charges (1) (2) (4) (5) (6) (7) (8)=(5)X(7) (9) (10)=(5)X(9) b) Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Body Extension i) Dry Foundation Nos. 1 ii) Wet Foundation Nos. 2 iii) Partially Submerged Foundation Nos. 3 iv) Fully Submerged Foundation Nos. 3 v) Dry Fissured Rock Nos. 1 vi) Wet Fissured Rock Nos. 3 vii) Submerged Fissured Rock Nos. 2 viii) Sandy Soil Foundation Nos Tension Tower DC a) Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m Body Extension) i) Dry Foundation Nos. 0 ii) Wet Foundation Nos. 1 iii) Partially Submerged Foundation Nos. iv) Fully Submerged Foundation Nos. 1 v) Dry Fissured Rock Nos. vi) Wet Fissured Rock Nos. 1 vii) Submerged Fissured Rock Nos. 0 viii) Sandy Soil Foundation Nos. 0 b) Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Body Extension i) Dry Foundation Nos. 1 ii) Wet Foundation Nos. iii) Partially Submerged Foundation Nos. 1 iv) Fully Submerged Foundation Nos. v) Dry Fissured Rock Nos. 1 vi) Wet Fissured Rock Nos. vii) Submerged Fissured Rock Nos. viii) Sandy Soil Foundation Nos. 1
21 TENDER NO.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 4(a) : PAGE 19 of 28 Schedule No. 4: Installation Services (a): Installation and Construction Charges Installation Charges Sl. No. Item Description Unit Qty. Portion in Foreign Currency Portion in Nepaln Currency Currency* Unit Rate Total Charges Unit Rate Total Charges (1) (2) (4) (5) (6) (7) (8)=(5)X(7) (9) (10)=(5)X(9) b) Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Body Extension i) Dry Foundation Nos. ii) Wet Foundation Nos. 1 iii) Partially Submerged Foundation Nos. iv) Fully Submerged Foundation Nos. v) Dry Fissured Rock Nos. vi) Wet Fissured Rock Nos. vii) Submerged Fissured Rock Nos. viii) Sandy Soil Foundation Nos. 4.4 Tension Tower DD a) Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m Body Extension) i) Dry Foundation Nos. ii) Wet Foundation Nos. iii) Partially Submerged Foundation Nos. 1 iv) Fully Submerged Foundation Nos. v) Dry Fissured Rock Nos. vi) Wet Fissured Rock Nos. 1 vii) Submerged Fissured Rock Nos. viii) Sandy Soil Foundation Nos. b) Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Body Extension i) Dry Foundation Nos. 0 ii) Wet Foundation Nos. 1 iii) Partially Submerged Foundation Nos. 0 iv) Fully Submerged Foundation Nos. 1 v) Dry Fissured Rock Nos. 0 vi) Wet Fissured Rock Nos. 1 vii) Submerged Fissured Rock Nos. 0 viii) Sandy Soil Foundation Nos. 0
22 TENDER NO.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 4(a) : PAGE 20 of 28 Schedule No. 4: Installation Services (a): Installation and Construction Charges Installation Charges Sl. No. Item Description Unit Qty. Portion in Foreign Currency Portion in Nepaln Currency Currency* Unit Rate Total Charges Unit Rate Total Charges (1) (2) (4) (5) (6) (7) (8)=(5)X(7) (9) (10)=(5)X(9) c) Common Foundation for +18m, +25m Body Extension i) Dry Foundation Nos. ii) Wet Foundation Nos. 1 iii) Partially Submerged Foundation Nos. iv) Fully Submerged Foundation Nos. 1 v) Dry Fissured Rock Nos. vi) Wet Fissured Rock Nos. vii) Submerged Fissured Rock Nos. viii) Sandy Soil Foundation Nos. 4.5 Temporary fencing during tower foundation works Nos Temporaty access road to the tower locations KM 3 5 Erection of following types of towers & tower extension parts complete with stubs, step bolts, hangers, D-shackles, bolts & nuts etc but excluding tower accessories such as danger plates, number plates, phase plates, anti-climbing devices Suspension Tower DA a) Basic tower Nos. 18 b) -4.5 m Leg Extension Nos. 2 c) -3 m Leg Extension Nos. 2 d) -1.5 m Leg Extension Nos. 4 e) +/- 0 m Leg Extension Nos. 60 f) +1.5 m Leg Extension Nos. 2 g) +3 m Leg Extension Nos. 2 h) +4.5 m Leg Extension Nos. 2 i) +6 m Leg Extension Nos. 2 j) +7.5 m Leg Extension Nos. 2 k) +9 m Leg Extension Nos. 2 l) +18 m Leg Extension Nos. 4 m) +25 m Leg Extension Nos. 4
23 TENDER NO.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 4(a) : PAGE 21 of 28 Schedule No. 4: Installation Services (a): Installation and Construction Charges Installation Charges Sl. No. Item Description Unit Qty. Portion in Foreign Currency Portion in Nepaln Currency Currency* Unit Rate Total Charges Unit Rate Total Charges (1) (2) (4) (5) (6) (7) (8)=(5)X(7) (9) (10)=(5)X(9) Tension Tower DB a) Basic tower Nos. 17 a)(i) Stubs Nos. 68 a)(ii) Basic tower body Nos. 17 b) -4.5 m Leg Extension Nos. 2 c) -3 m Leg Extension Nos. 1 d) -1.5 m Leg Extension Nos. 3 e) +/- 0 m Leg Extension Nos. 48 f) +1.5 m Leg Extension Nos. 1 g) +3 m Leg Extension Nos. 11 h) +4.5 m Leg Extension Nos. 12 i) +6 m Leg Extension Nos. 11 j) +7.5 m Leg Extension Nos. 10 k) +9 m Leg Extension Nos Tension Tower DC a) Basic tower Nos. 8 a)(i) Stubs Nos. 32 a)(ii) Basic tower body Nos. 8 b) -4.5 m Leg Extension Nos. 1 c) -3 m Leg Extension Nos. 2 d) -1.5 m Leg Extension Nos. 3 e) +/- 0 m Leg Extension Nos. 26 f) +1.5 m Leg Extension Nos. 2 g) +3 m Leg Extension Nos. 4 h) +4.5 m Leg Extension Nos. 6 i) +6 m Leg Extension Nos. 4 j) +7.5 m Leg Extension Nos. 6 k) +9 m Leg Extension Nos. 3 l) +18 m Leg Extension Nos. 2 m) +25 m Leg Extension Nos. 2
24 TENDER NO.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 4(a) : PAGE 22 of 28 Schedule No. 4: Installation Services (a): Installation and Construction Charges Installation Charges Sl. No. Item Description Unit Qty. Portion in Foreign Currency Portion in Nepaln Currency Currency* Unit Rate Total Charges Unit Rate Total Charges (1) (2) (4) (5) (6) (7) (8)=(5)X(7) (9) (10)=(5)X(9) Tension Tower DD a) Basic tower Nos. 7 a)(i) Stubs Nos. 28 a)(ii) Basic tower body Nos. 7 b) -4.5 m Leg Extension Nos. 1 c) -3 m Leg Extension Nos. 1 d) -1.5 m Leg Extension Nos. 2 e) +/- 0 m Leg Extension Nos. 20 f) +1.5 m Leg Extension Nos. 1 g) +3 m Leg Extension Nos. 1 h) +4.5 m Leg Extension Nos. 2 i) +6 m Leg Extension Nos. 1 j) +7.5 m Leg Extension Nos. 2 k) +9 m Leg Extension Nos. 1 l) +18 m Leg Extension Nos. 2 m) +25 m Leg Extension Nos. 2 6 Installation of Earthing of towers i. Pipe Type Nos. 40 ii. Counterpoise Type Nos Installation of following tower accessories i. Danger Plate Nos. 50 ii. Number Plate Nos. 50 iii. Phase Plate ( Set of three) Sets 100 iv. Circuit Plate(Set of two) Sets 50 v. Anti climbimg device Nos. 50 vi. Bird Guard(set of three) Sets 36 8 Protection of tower footing i) Random rubble stone masonary including excavation (1:5 cementconcrete) Cu.m. 500 ii) Stone bound in galvanising wire netting including excavation Cu.m. 100 iii) Back filling and levelling of volumes enclosed by revetment Cu.m. 500 iv) M15 Conc. Nominal Mix 1:2:4 for top seal cover Cu.m. 50
25 TENDER NO.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 4(a) : PAGE 23 of 28 Schedule No. 4: Installation Services (a): Installation and Construction Charges Installation Charges Sl. No. Item Description Unit Qty. Portion in Foreign Currency Portion in Nepaln Currency Currency* Unit Rate Total Charges Unit Rate Total Charges (1) (2) (4) (5) (6) (7) (8)=(5)X(7) (9) (10)=(5)X(9) 9 Installation of insulator strings complete with arcing horns & necessary hardware, installing of bundle conductor including fixing of conductor accessories, installing & stringing of one earthwire including fixing of earthwire/ OPGW accessories (Twin bundle Conductor).except joint box (i) Normal Stretch (Double Ckt. Portion) kms 17 (ii) Installation / Erection of Joint Box No (i) Installation / Erection of FODP 48F: Indoor type, rack mounted with FCPC No. 2 coupling and pig tails (5m each) (ii) Installation / Erection of Fibre Optic Approach cable 24 Fibre (DWSM) km 1 11 Installation of ERS in one location for Demonstration No. 1 TOTAL INSTALATION SERVICES (Total of column 8 and 10 to be carried forward to Schedule No. 5: Grand Summary) Note: * 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items. Φ 2.) BOQ given above is indicative only based on the scope of work as given in Employer's Requirements. The quantities mentioned above may undergo change during detailed engineering to meet the functional requirement and scope of work defined in Employer's Requirements. Specify currency in accordance with BDS ITB Clause 32.1, Part-I of the Bidding Documents. Strike out if not applicable Name of Bidder: Signature of Bidder: (Printed Name) (Designation) (Common Seal) Date:
26 TENDER NO.: ICB-PMD/KGTCP-073/74-02 SCHEDULE 4(b) : PAGE 24 of 28 Schedule No. 4 : Installation and Other Services (b):training Charges for training to be imparted abroad Sl. No. Description Item for which training is to be imparted. Currency Total Training Charges = 4x5 x 6 1 Training on Applicable statndards and codes for Transmission Line including IEC, IS & BS including supply of one set of ALL APPLICABLE STANDARDS for the EMPLOYER Total for Training Charges (Total of column 7 to be carried forward to Schedule No. 5: Grand Summary) NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE New Butwal-Bardaghat 220kV D/C Transmission Line Country where training is to be imparted Nos. of Trainee 6 10 days Training duration in days Total Training Charges Name of Bidder: Signature of Bidder: (Printed Name) (Designation) (Common Seal) Date:
27 TENDER NO.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 4(c) : PAGE 25 of 28 Schedule No. 4 : Installation and Other Services (c):training Charges for training to be imparted to Employer's Personnel by Bidder's Instructor in Nepal Sl. No. Duration Training Charges for Contractors Description of the Test Item for which training is to be imparted. No. of Trainees Currency Total Training Charges = 4x 5 1 Structural design of Electrical Transmission Tower using conventional design method as well as using PLS Tower for Electrical Engineers 3 Months 8 2 Foundation Design for Electrical Engineer 3 Months 8 3 TL design using PLS CADD including coding and decoding of.wir files for Electrical Engineers NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE New Butwal-Bardaghat 220kV D/C Transmission Line 3 Months 8 4 ERS field training 5 days 30 Total for Training Charges ( total of column 6 To be carried forward to Schedule 5: Grand Summary) Date: Signature: Printed Name: Designation: Common Seal:
28 TENDER NO. ICB-PMD/KGTCP-073/74-02 SCHEDULE - 4 (d) PAGE 26 of 28 PROJECT MANAGEMENT DIRECTORATE New Butwal-Bardaghat 220kV D/C Transmission Line Schedule No. 4 : Installation and Other Services (d): Type Test charges for Type Tests to be conducted abroad Sl. No. Description of Tests Country of Testing Unit Qty. Unit Rate Currency # Amount (USD) (2) (3) (4) (5) (6) (7) (8)=(5) x ( 6) 1 Proto Type Testing of towers 1.1 Tower Type DA with extension No Tower Type DB with extension No Tower Type DC with extension No Tower Type DD with extension No. 1 2 Type Testing of Bison Conductor 3 Proto Type Testing of ERS Towers No. 1 4 Insulator 160kN & 120 kn No. 1 TOTAL (Total of column 7 to be carried forward to Schedule No. 5: Grand Summary) # Specify currency in accordance with BDS ITB Clause 32.1, Part-I of the Bidding Documents. Name of Bidder: Signature of Bidder: (Printed Name) (Designation) (Common Seal) Date:
29 TENDER NO.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 5 : PAGE 27 of 28 NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE New Butwal-Bardaghat 220kV D/C Transmission Line Schedule No. 5: Grand Summary for Part A and Part B Sl. No. Description 1 TOTAL SCHEDULE NO. 1 Plant and Equipment including Mandatory Spares to be supplied from abroad. 2 TOTAL SCHEDULE NO. 2 Plant and Equipment including Mandatory Spares Parts to be supplied from within Nepal 3 TOTAL SCHEDULE NO. 3 Design Services 4 TOTAL SCHEDULE NO. 4 (a) Installation and construction charges (b) Training charges for training to be imparted abroad ( c) Training charges for training to be imparted in Nepal (d) Type Tests charges for type Tests to be conducted abroad Part A: Transmission Line Total Price Foreign ( US Dollar )* Total Price Local ( NPR )* Date: TOTAL FOR PART A [ ] 1% 13% on Installation Charges Grand Total Total in USD Total in NRs. Signature: Printed Name: Designation: Common Seal:
30 TENDER NO.: ICB-PMD/KGTCP-073/74-02 SCHEDULE - 6 : PAGE 28 of 28 NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE New Butwal-Bardaghat 220kV D/C Transmission Line Schedule No. 6: Recommended Availability/Optional Spares parts and Recommended Test Equipment (in line with Technical Specifications) Item No. Name & Description of Parts Name of Original Manufacturer Part No. Number of Units in each set Total No. of Sets to be provided Unit Price Total Price Remarks Name of Bidder: Date: Signature of Bidder: (Printed Name) (Designation) (Common Seal)
18 V CORDLESS HYDRAULIC CRIMPING TOOL B500E KV
1 18 V CORDLESS HYDRAULIC CRIMPING TOOL B500E KV VERSION ISOLATED also available for Power Supply Companies 18 V cordless hydraulic crimping tool, lightweight and balanced for single hand operation. The
More informationCustomer Guidelines For Construction of New API Power Lines
Customer Guidelines For Construction of New API Power Lines Customer Guidelines For Construction of New API Power Lines As indicated in our Conditions of Service, contestable work is any work that will
More information18.0 V CORDLESS HYDRAULIC CRIMPING TOOL B1300L CE
1 18.0 V CORDLESS HYDRAULIC CRIMPING TOOL B1300L CE The next generation of Cembre cordless hydraulic tools represents a significantly advantageous evolution from current models. Born of the renowned B131LN
More informationKENDRIYA VIDYALAYA, SINGRAULI` DISTT. SINGRAULI, M.P फ़ क सFax फ न न.Ph.No , (O) , (R)
F.01/KV/SGRL/2018-19 / Dated 15/11/2018 TENDER DOCUMENT Year 2018-19 Sealed tenders are invited for the on-site Comprehensive Annual Service Maintenance of various brands of CCTV CAMERA located in the
More informationInternational Gas Union Research Conference 2014 Development of New Model Residential PEMFC micro-chp Systems
International Gas Union Research Conference 2014 Development of New Model Residential PEMFC micro-chp Systems September 18, 2014 Takayuki Watanabe Residential Fuel Cell Business Development Dept. Tokyo
More informationThe average annual turnover of the Bidder, should not be less than 200 crores INR (Indian Rupees two
Addendum 2 Sl. Clause No 1 1.2.7.2. 1 8/ The Bidder should have designed, supplied, erected/ supervised erection and commissioned/ supervised commissioning of solar PV based grid connected power plant(s)
More information: 156 m to 177 m above Mean Sea Level
MAITHON POWER LIMITED INVITATION TO BID (ITB) INTERNATIONAL COMPETITIVE BIDDING (ICB) WAGON TIPPLER, SIDE ARM CHARGER, APRON FEEDER WITH ACCESSORIES PACKAGE FOR THE PULVERISED COAL FIRED POWER PLANT OF
More informationBANK OF BARODA BARODA CORPORATE CENTRE MUMBAI
BANK OF BARODA BARODA CORPORATE CENTRE MUMBAI TENDER NOTICE FOR ANNUAL MAINTENANCE CONTRACT OF FIRE HYDRANT & SPRINKLER SYSTEM INSTALLED AT BARODA CORPORATE CENTRE, MUMBAI NAME OF WORK: Bank of Baroda
More informationLC Engineering Services Pte Ltd
PROCEDURE (FLOW-CHART) FOR APPLICATION OF ELECTRICITY CONNECTION FOR CONTESTABLE CONSUMER Note: Procedure as shown is applicable to temporary (steps for temporary supply CS3 are indicated with red box)
More informationADDENDUM #2. September 14, 2018
ADDENDUM #2 September 14, 2018 PROJECT: Virginia Polytechnic Institute & State University, Blacksburg, Virginia Perry Street Steam System Improvements IFB: 0057278 Changes and Clarifications - General
More informationFax: Telephone: /9600. Njrpa fhrneha; Muha;r;rp epwtdk; BID DOCUMENT
Fax: +91-44-28362528 Telephone: +91-4428369500/9600 E-Mail: nirt@icmr.org.in Website: www.nirt.res.in Njrpa fhrneha; Muha;r;rp epwtdk; NATIONAL INSTITUTE FOR RESEARCH IN TUBERCULOSIS (Indian Council of
More informationPURCHASE OF LAPTOPs. The details of the bid and other terms and conditions are enclosed in Annexure-A.
CO/IT/RFP/1704 28 th July, 2014 PURCHASE OF LAPTOPs We intend to purchase total 50 no s of enterprise series laptops over a period of 6 months as part of our expansion requirements. Quotations are invited
More informationDirector (Medical)Noida
EMPLOYEE'S STATE INSURANCE CORPORATION DIRECTORATE (MEDICAL) NOIDA ESI MODEL HOSPITAL, SECTOR-24,NOIDA NOTICE INVITING E-TENDER FOR REQUIREMENT OF ACCOMMODATION FOR ESI DISPENSARY, GREATER NOIDA E- Tenders
More informationIndian Institute of Technology Bombay
Sealed Tenders are invited by the Indian Institute of Technology Bombay from reputed manufactures / suppliers for the supply of the following item :- Tender Details Tender Number: 201500495 Tender Date:
More informationLC Engineering Services Pte Ltd
PROCEDURE (FLOW-CHART) FOR APPLICATION OF ELECTRICITY CONNECTION FOR TEMPORARY SUPPLY USAGE FOR CONSTRUCTION / REVATION WORK FOR N CONTESTABLE CONSUMER Note: Tenant Unit electrical design Tenant LEW design
More informationExtension of Due Date
INDIAN INSTITUTE OF TECHNOLOGY MADRAS Chennai 600 036 Telephone : [044] 2257 8356/9760 FAX : [044] 22570545/8366 E-mail: arpp@iitm.ac.in Dr. Rajiv Sharma Ref: OEC/RaJ/07/2016 Project Coordinator Dated:
More informationTENDER DOCUMENT FOR HIRING OF BUILDING FOR BRANCH OFFICE RAJIV CHOWK
EMPLOYEES STATE INSURANCE CORPORATION (Ministry of Labour & Employment, Govt. of India) SUB-REGIONAL OFFICE, Plot No. 47, Sector 34, Near Hero Honda Chowk, Gurgaon - 122001 TENDER DOCUMENT FOR HIRING OF
More informationUniversity of Delhi REVISED TENDER DOCUMENT. Purchase of ST-2613 and ST-2614 Digital Trainer Kits
REVISED TENDER DOCUMENT Date: July 12, 2010 Purchase of ST-2613 and ST-2614 Digital Trainer Kits University of Delhi, invites sealed tender offers from authorized dealers of Original Equipment Manufacturer
More informationUniversity of Delhi REVISED TENDER DOCUMENT. Purchase of Dyna-85 Microprocessor Kit
July 12, 2010 REVISED TENDER DOCUMENT Purchase of Dyna-85 Microprocessor Kit University of Delhi, invites sealed tender offers from authorized dealers of Original Equipment Manufacturer (OEM). The tender
More informationWelcome! Sarpy Transmission Project. Public Hearing October 23, 2018
Welcome! Sarpy Transmission Project Public Hearing October 23, 2018 Agenda Safety Introductions Purpose of Hearing Explain the project need Present the project timeline Describe rights of each property
More informationOFFICE OF THE GENERAL MANAGER, (Technical) TSECL. Electrification rehabilitation para at Hatirleta (Lahore Tilla), Chowmohni Bazar, Sekercote due to
NOTICE INVITING E-TENDER (SINGLE STAGE TWO ENVELOPE BIDDING) 3 4 Electrification of rehabilitation para at Hatirleta (Lahore Tilla), Chowmohni Bazar, Sekercote due to construction of IOCL Complex I/c construction
More information(Core-1, SCOPE Complex, 7, Institutional Area, Lodi Road) New Delhi (India) Sub: Tender for sale of LAM Coke, Ex-NINL, Duburi (Odisha).
A Govt. of India Enterprise (Core-1, SCOPE Complex, 7, Institutional Area, Lodi Road) New Delhi 110 003 (India) Tel. NO. 011-41083113/ Fax No: 011-24364106 E-mail: kkpaul@mmtclimited.com No.MMTC/STEEL/LAM
More informationINDIAN INSTITUTE OF TECHNOLOGY MADRAS Chennai Ref: MET MSTESABI Project Coordinator Dated:
INDIAN INSTITUTE OF TECHNOLOGY MADRAS Chennai 600 036 Telephone : [044] 2257 4755 FAX : [044] 22574752 E-mail: sabita.sarkar@iitm.ac.in Dr. Sabita Sarkar Ref: MET1617154MSTESABI Project Coordinator Dated:
More informationLe Morne Heritage Trust Fund. for. Renting of Office Space with amenities in the region of Port Louis. Procurement Reference No: LMHTF/50/2017
Le Morne Heritage Trust Fund Issued on 5 th January 2018 for Renting of Office Space with amenities in the region of Port Louis Procurement Reference : LMHTF/50/2017 Royal Road Le Morne Village Tel : 451
More informationTENDER DOCUMENT FOR HIRING OF BUILDING FOR BRANCH OFFICE DHARUHERA
EMPLOYEES STATE INSURANCE CORPORATION (Ministry of Labour & Employment, Govt. of India) SUB-REGIONAL OFFICE, Plot No. 47, Sector 34, Near Hero Honda Chowk, Gurgaon - 122001 TENDER DOCUMENT FOR HIRING OF
More informationMalta Industrial Parks Ltd.
Malta Industrial Parks Ltd. Expression of Interest Reference: Invitation to submit Proposals for the Lease of Property Published in the Government Gazette of Friday the 24 th August 2018 and on local Sunday
More informationACTIVAN SPARE PARTS PARTS DIAGRAMS
VI. T ACTIVAN SPARE PARTS his chapter contains parts diagrams and lists for the RICON conversion of the General Motors minivan. The parts diagrams are exploded 3D views of major conversion assemblies with
More information*** Minutes of the Pre-Bid Meeting. Contract LRIP/W1/02:
REPUBLIC OF MOLDOVA LOCAL ROADS IMPROVEMENT PROJECT STATE ROAD ADMINISTRATION *** Minutes of the Pre-Bid Meeting Contract LRIP/W1/02: Improvement Works on Section 1: Corridor 13, L 390 Pirlita-Nisporeni
More informationWEBSITE ADVERTISEMENT
Navi Mumbai Zone Bank of India Management Development Institute Bldg., Ground Floor, Sector 11, Plot No.30, CBD Belapur, NAVI MUMBAI 400 614 Tel: 2756 4910 / 12 / 13 Fax: 2756 4911 e-mail: ZO.NaviMumbai@bankofindia.co.in
More informationDepartment of Physics, University of Mumbai, (UDPMU), Potentiostat/Galvanostat
Department of Physics, University of Mumbai, (UDPMU), Department of Physics, University of Mumbai, Lokmanya Tilak Bhavan, 3 rd Floor, Kalina Campus, Vidyanagari, Santacruz (E), Mumbai 400 098, India. Tel:
More informationTender Enquiry No. : CDC/IT/2011/01 dated 11 Aug 2011 : Sealed Quotation for Scanner Due Date & Time : 25 th Aug,2011,15.00 hrs
Monday, Aug 11, 2011 Tender Enquiry No. : CDC/IT/2011/01 dated 11 Aug 2011 Item : Sealed Quotation for Scanner Due Date & Time : 25 th Aug,2011,15.00 hrs Consultancy Development Centre (CDC), an autonomous
More informationHYDRAULIC CRIMPING TOOL HT131LN C
1 HYDRAULIC CRIMPING TOOL HT131LN C general features Hydraulic C head tool with a large 42 mm jaw opening, for easier introduction/removal of large size compression terminations and joints. The HT131LN
More informationATM PREMISES REQUIRED
UCO BANK (A Government of India Undertaking) Zonal Office, I Floor, Vijay Towers No.22, Father Randy Street R.S. Puram COIMBATORE 641 002 Ph: 0422-4509966/4509909 ATM PREMISES REQUIRED Bank desires to
More informationSaf-T-Bar Conductor Bar C Series
Saf-T-Bar Conductor Bar C Series P/N 963001 2012.04.24 Rev. 1 SERIES C SAF-T-BAR CONDUCTOR BAR 1 Conductix Incorporated The technical data and images which appear in this manual are for informational purposes
More informationFaridabad, Haryana p.m on 26th July, p.m. on 26th July, 2016 General Instructions: 350 to 500 Sq. ft. Envelope marked as I
Offer of premises for lease at Faridabad, Haryana. Last Date and time of submission 3.00 p.m on 26 th July, 2016 Date of opening of Technical Bid 3.30 p.m. on 26 th July, 2016 Date of opening of Financial
More informationLower Rio Grande Valley Development Council. Hidalgo County Metropolitan Planning organization (HCMPO) Invitation to Bid (ITB):
The Lower Rio Grande Valley Development Council (LRGVDC) Hidalgo County Metropolitan Planning organization (HCMPO) Invitation to Bid (ITB): Thirty (30) IPads with Accessories Quotes Due Not Later than:
More informationTENDER. Supply & Commissioning of Auto Transformer/Variable Transformer
TENDER for Supply & Commissioning of Auto Transformer/Variable Transformer Tender No. NTSC(C)/EC/LAB(E)-3/14-15 Issued By NSIC TECHNICAL SERVICES CENTRE, SECTOR B-24, GUINDY INDUSTRIAL ESTATE EKKADUTHANGAL,
More informationInvitation of Tender
Invitation of Tender Page: 1 of 5 To: Due Date of Submission 30-OCT-17 Up to 14:00 Hrs Our Reference No: IST-110/2017-18/51/2 Date: 18-SEP-17. Reg No: Dear Sirs, 1. Please find enclosed Annexure-A containing
More informationTENDER FOR HIRING OFFICE ACOMMODATION AT DELHI
Government of India Ministry of Finance Central Bureau of Narcotics 19,The Mall, Morar, Gwalior (M.P.) 474006 Tel.No. 0751-2368121 Fax: 0751-2368111; 2368577 E-mail: narcom@sancharnet.in Website: www.cbn.nic.in
More informationRs. 1,54,000/- Single (01) order of executed value not less than Rs Lakhs
NTPC Tamilnadu Energy Company Limited PO: Vellivoyal Chavadi, Ponneri Taluk, Dist :Thiruvallur, Chennai 600 103 Tel. No.044-27995838 Fax: 044-27966033 / 27966065 NOTICE INVITING TENDER (NIT) (Brief) (Domestic
More informationLIFE INSURANCE CORPORATION OF INDIA CENTRAL OFFICE, " YOGAKSHEMA" JEEVAN BIMA MARG, NARIMAN POINT MUMBAI
LIFE INSURANCE CORPORATION OF INDIA CENTRAL OFFICE, " YOGAKSHEMA" JEEVAN BIMA MARG, NARIMAN POINT MUMBAI - 400021. Reference No. ANNEXURES TO BE SUBMITTED BY THE VENDOR UNDER TWO BID SYSTEM HIRING OF OFFICE
More informationCONTRACTOR EMPLOYER
INVITATION FOR BIDS 1. Mangalore SEZ Limited (MSEZL) is jointly promoted by Oil & Natural Gas Corporation Ltd. (ONGC), Infrastructure Leasing & Financial Services Ltd., Karnataka Industrial Areas Development
More informationa. RIGHTS OF WAY: Utility will own, operate and maintain extension facilities only: ISSUED BY Date Filed: July 2, 1996
SOUTHERN CALIFORNIA WATER COMPANY ORIGINAL Cal. P.U.C. Sheet No. 1005-E Page 1 APPLICABILITY: This rule is applicable to extension of electric Distribution Lines 1 of Utility s standard voltages (less
More informationThe "Buyer" as referred to herein is the "successful bidder." The "Seller" as referred to herein is the "County of Ventura."
VENTURA COUNTY PROCUREMENT SERVICES Government Center Hall of Administration Lower Plaza - GSA 800 S. Victoria Avenue, L#1080 Ventura, California 93009 (805) 654-3750 SALE NO.: 1831 Date: 10/22/18 NOTICE
More informationAPPLICATION FORM - 1/6
A TRADE FAIR DEDICATED TO BIKE RETAILERS September -2, 27 - Hall 6 / Lyon Eurexpo by LE SALON DES PROFESSIONNELS DU SPORT To be returned before april 28, 27 to benefit from a early bird prices APPLICATION
More informationTITLE 7, CHAPTER 3 TAZEWELL COUNTY
TITLE 7, CHAPTER 3 TAZEWELL COUNTY WIND FARM ORDINANCE ADOPTED SEPTEMBER 2004 Amendment Dates: February, 2008 March, 2008 February 25, 2009 September 1, 2018 7TCC 3-1. Wind Energy Conversion Systems Purpose.
More informationReplies to Queries of the Bidders
Date: 07.12.2018 Replies to Queries of the Bidders SUB: Replies to queries of the bidders against Tender for carrying out survey works, opening of ROU & Manmad in Nashik GA to Dhule GA (approx. 300 km)
More informationWEST BENGAL RENEWABLE ENERGY DEVELOPMENT AGENCY
WEST BENGAL RENEWABLE ENERGY DEVELOPMENT AGENCY Tender Document For Design & engineering, manufacture / procurement, testing, supply, installation and commissioning ETC based Solar Water Heating Systems
More informationSection A OFFICE OF THE DISTRICT INSPECTOR OF SCHOOLS (SECONDARY EDUCATION), KOLKATA BIDDING DOCUMENTS FOR FILING OF E-TDS CORRECTION RETURN
OFFICE OF THE DISTRICT INSPECTOR OF SCHOOLS (SECONDARY EDUCATION), KOLKATA BIDDING DOCUMENTS FOR FILING OF E-TDS CORRECTION RETURN No. 555/D Date: 23.05.2018 NOTICE INVITING e-tender NO. I/2018 FOR FILING
More informationChennai Telephone: [044] /9761 FAX: [044] /
INDIAN INSTITUTE OF TECHNOLOGY MADRAS Chennai 600 036 Telephone: [044] 2257 9798/9761 FAX: [044] 22570545/8366 E-mail: arpp@iitm.ac.in V.Sathyanarayanan Senior Manager (Project Purchase) Ref: MEE/SUJA/004/2018
More informationPOWER SUPPLY CONNECTION / CS3 APPLICATION PROCEDURES & GUIDELINES FOR NON-CONTESTABLE CONSUMER INSTALLATION
POWER SUPPLY CONNECTION / CS3 APPLICATION PROCEDURES & GUIDELINES FOR NON-CONTESTABLE CONSUMER INSTALLATION NOTE: This application guide is suitable for applying supply connection CS3 for temporary supply
More informationPLEASE QUOTE PRICES FOB DESTINATION TO BE DELIVERED TO ITEM DESCRIPTION/SPECIAL INSTRUCTIONS QTY UNIT PRICE EXTENDED PRICE
35 Carolina Avenue Stephenville, NL A2N 3P8 www.cna.nl.ca/tenders DATE OF INVITATION: 22 May 2014 RE-TENDER NUMBER: 2014-22 Closing : 29 May 2014 2:00 P.M. Newfoundland Local Public Opening: 29 May 2014
More informationName of work. SR (P) to Gommateshwara Statue on Vindhyagiri hill at Shravanabelagola
Government of India Archaeological Survey of India Bangalore circle, Bangalore TENDER NOTICE File No.63/04/19/2014-15/Cons Date: The Superintending Archaeologist Archaeological survey of India Bangalore
More informationTender Enquiry inviting offers for Hiring of Office Space for IGNOU Regional Center Nagpur for a period of Three years.
Indira Gandhi National Open University Regional Centre, GYANVATIKA, 14, Hindustan Colony, Amravati Road, Nagpur-440 033 Ref.: IG/NRC/36/ Date :- 01/11/2017 Sub: - Tender Enquiry inviting offers for Hiring
More informationNOTICE INVITING BID. Chief Engineer (NMIA) CIDCO Limited.
NOTICE INVITING BID CIDCO of Maharashtra Limited through the process of e-tendering invites item rate percentage bids in two bid system (Part I : Technical Bid & Part- II : Commercial Bid) from the experienced
More informationBYLAW 5781 ****************
BYLAW 5781 **************** A BYLAW OF THE CITY OF LETHBRIDGE PROVIDING FOR THE IMPOSITION OF AN OFF-SITE LEVY IN RESPECT OF LAND TO BE DEVELOPED OR SUBDIVIDED FOR THE YEARS 2013, 2014, 2015 and 2016 ************************************************************
More informationALLAHABAD BANK H.O, 2, N.S. Road, Kolkata
ALLAHABAD BANK H.O, 2, N.S. Road, Kolkata Notice Inviting Tender Notice inviting tendering for the disposal of old and damaged computer hardware lying at 2 nd Floor at 2-NS Road Sealed offers from interested
More informationSHIAWASSEE COUNTY ZONING ORDINANCE Article 4 Specific Use Regulations
SHIAWASSEE COUNTY ZONING ORDINANCE Article 4 Specific Use Regulations Section 4.3.76 Wind Energy Conversion Systems 1. Purpose A. Through this section it is hereby set forth that Shiawassee County promotes
More informationBid for Purchase of Tablets on behalf of Commissionerate of Rural Development, Gandhinagar
GUJARAT INFORMATICS LIMITED Block No: 1, 8 th Floor, Udhyog Bhavan, Sector-11, Gandhinagar: 382 010 Phone No: 23256022 Fax No: 23238925 Bid for Purchase of Tablets on behalf of Commissionerate of Rural
More informationSPECIFICATIONS AND PROPOSAL FOR GENERAL BANKING SERVICES FOR THE TOWNSHIP OF DEERFIELD September 1, 2013 August 31, 2016
SPECIFICATIONS AND PROPOSAL FOR GENERAL BANKING SERVICES FOR THE TOWNSHIP OF DEERFIELD September 1, 2013 August 31, 2016 The Township of Deerfield is issuing a Request for Proposals (RFP) to financial
More informationTENDER SCHEDULE LIFE INSURANCE CORPORATION OF INDIA DIVISIONAL OFFICE, INDIA LIFE BUILDING 1543/44 TRICHY ROAD, POST BOX COIMBATORE
LIFE INSURANCE CORPORATION OF INDIA DIVISIONAL OFFICE, INDIA LIFE BUILDING 1543/44 TRICHY ROAD, POST BOX - 3810 COIMBATORE 641 018. TENDER SCHEDULE Sl No Description 1 Location Tender for Purchase of FOUR
More informationGUJARAT STATE ELECTRICITY CORPORATION LIMITED
GUJARAT STATE ELECTRICITY CORPORATION LIMITED Ukai Dam, Taluka: Fort Songadh, Dist:Tapi 394680. Ph. 91-2624-233215, 233257 Fax: 91-2624-233300, 233315.e-mail: ukaitps@gebmail.com. Website: www.gsecl.in
More informationCharter Township of Van Buren Tyler Van Buren Township, MI 48111
To whom it may concern: Charter Township of Van Buren Van Buren Township, MI 48111 INVITATION TO BID Building Security Card Access System Sealed Bids will be received by Charter Township of Van Buren at
More information1 Office Space on Lease at Guwahati. Ref. No. Casf Date : Bharat Petroleum Corporation Limited (A Government of India Enterprise)
1 Ref. No. Casf.26.3.0 Date : 09.06.2013 Bharat Petroleum Corporation Limited (A Government of India Enterprise) APPLICATION FOR OFFICE SPACE ON LEASE AT GUWAHATI Press advertisement for Application dated
More informationLIFE INSURANCE CORPORATION OF INDIA Bongaigaon Divisional Office, Jeevan Prakash, Barpara, Main Road, Bongaigaon, PIN No
LIFE INSURANCE CORPORATION OF INDIA Bongaigaon Divisional Office, Jeevan Prakash, Barpara, Main Road, Bongaigaon, PIN No. 783380 Life Insurance Corporation of India intends to purchase vacant land / plots
More informationTHE PLANTATION CORPORATION OF KERALA LTD KOTTAYAM - 4 PCK/SEC/
THE PLANTATION CORPORATION OF KERALA LTD KOTTAYAM - 4 PCK/SEC/01 18.09.2018 E-TENDER CONDITIONS FOR THE WORK OF TOTAL STATION SURVEY OF ESTATES OF PCK. Sealed competitive e-tenders are invited for the
More informationDOMESTIC ELECTRICAL INSTALLATION PERIODIC INSPECTION REPORT (FOR A SINGLE DWELLING)
DOMESTIC ELECTRICAL INSTALLATION PERIODIC INSPECTION REPORT (FOR A SINGLE DWELLING) Issued in accordance with British Standard 7671 Requirements for Electrical Installations by an Approved Contractor or
More informationTOWN OF FREEDOM FREEDOM, NH ZONING-BUILDING PACKET
TOWN OF FREEDOM FREEDOM, NH 03836 ZONING-BUILDING PACKET BUILDING INSPECTOR: DAVID SENECAL OFFICE HOURS: THURSDAYS 9am - 2pm OFFICE PHONE: 539-6323 CELL PHONE: 387-0866 Email: freedombuildinspect@gmail.com
More informationINDIAN ASSOCIATION FOR THE CULTIVATION OF SCIENCE JADAVPUR, KOLKATA Price Bid as per NIT No. IACS/WS/ELECT/ /72, Dated: 03/12/2018
INDIAN ASSOCIATION FOR THE CULTIVATION OF SCIENCE JADAVPUR, KOLKATA - 700 032. Price Bid as per NIT No. IACS/WS/ELECT/2018-19/72, Dated: 03/12/2018 Sl. 1 28 Watt T5 Tube light.make Philips 241 Nos. Electronic
More informationTENDER FOR PURCHASE OF CRUDE PALM OIL
TENDER FOR PURCHASE OF CRUDE PALM OIL TENDER NO. STC/EOIL/OGL/03/2010-11 DATED 29.07.2010 CLOSING AT 12.00 HRS IST ON 02.08.2010 TERMS AND CONDITIONS OF TENDER 1. INVITATION FOR BIDS THE STC OF INDIA LIMITED
More informationNOTICE INVITING E-TENDER (DOMESTIC COMPETITIVE BIDDING) (SINGLE STAGE TWO ENVELOPE BIDDING)
NOTICE INVITING E-TENDER (DOMESTIC COMPETITIVE BIDDING) (SINGLE STAGE TWO ENVELOPE BIDDING) DATE OF ISSUANCE OF NIT : 06.03.2019 FUNDING : IPDS 1.0 Item No. 1 General Manager, Technical, TSECL, Agartala
More informationTender for offer of office premises at
Offer of premises for lease at Agra, Uttar Pradesh Last Date and time of submission 3.00 p.m on 22 nd September, 2016 Date of opening of Technical Bid 3.30 p.m. on 22 nd September, 2016 Date of opening
More informationTechnical Specifications per RFP
Pre-Bid Queries for NIT for Installation & Commissioning of 13179 Nos. of 300Wp Solar Home Power Packs and 4184 Nos. of 40Wp Solar Street Lights including 5 years Comprehensive Maintenance and Supply of
More informationIndira Gandhi National Open University Regional Centre, G.R.Complex, 3 rd Floor, No , Anna Salai, Nandanam, Chennai
Indira Gandhi National Open University Regional Centre, G.R.Complex, 3 rd Floor, No.407-408, Anna Salai, Nandanam, Chennai 600 035. Ref.: IG/RC-25/AD/3/D//Building/2015 Date :- 24-07-2015 Sub: - Tender
More informationREQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS
REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS October 1, 2018 Northern Wasco County People s Utility District ( NWCPUD )
More informationDALE COUNTY BOARD OF EDUCATION OFFICE OF SUPERINTENDENT DALE COUNTY GOVERNMENT BUILDING 202 S HWY 123, SUITE E. OZARK, ALABAMA
DALE COUNTY BOARD OF EDUCATION OFFICE OF SUPERINTENDENT DALE COUNTY GOVERNMENT BUILDING 202 S HWY 123, SUITE E. OZARK, ALABAMA 36360 PHONE (334)774-2355 WEB SITE: www.dalecountyboe.org FAX (334)774-3503
More informationFinancial Details on standalone basis (optional)
NOMINATION FORM Company Details It is mandatory for all participants to complete details marked with an asterisk ( * ): General Information* Registered Name: Year of Establishment: Registered Address:
More informationMnDOT Contract No Exhibit B. Scope of Work. Scope of Work
MnDOT Contract No. 1032993 Contract General Description The purpose of this contract is to provide the State with the survey accurate re-establishment of designated Public Land Survey section boundaries
More informationWEST BENGAL RENEWABLE ENERGY DEVELOPMENT AGENCY
WEST BENGAL RENEWABLE ENERGY DEVELOPMENT AGENCY Tender Document For Design & Engineering, Manufacture / Procurement, Testing, Supply, Installation and Commissioning of Rooftop Grid Connected Solar PV Power
More informationTENDER NOTICE FOR DEWATERING, CLEANING &DESILTING OF ARTIFICIAL LAKE PUSHPA GUJRAL SCIENCE CITY KAPURTHALA (PUNJAB)
TENDER NOTICE FOR DEWATERING, CLEANING &DESILTING OF ARTIFICIAL LAKE AT PUSHPA GUJRAL SCIENCE CITY KAPURTHALA (PUNJAB) TN/PGSC/2016-17/10/ CLEANING & DESILTING OF ARTIFICIAL LAKE Pushpa Gujral Science
More informationPFC Consulting Limited (A Govt. of India Undertaking) 9 th Floor, Statesman Building, Barakhamba Lane, Connaught Place, New Delhi
PFC Consulting Limited (A Govt. of India Undertaking) 9 th Floor, Statesman Building, Barakhamba Lane, Connaught Place, New Delhi-110001 PREMISES REQUIRED ON LEASE PFC Consulting Limited invites offers
More informationक न द र य भ ड रण लनगम
क न द र य भ ड रण लनगम (भ रत सरक र क उपक रम) Central Warehousing Corporation (A Government of India Undertaking) जन जन क ल ए भ ड रण Warehousing For Everyone NAME OF WORK: Supply, Installation, Testing,
More informationALLAMA IQBAL LIBRARY
Tender Notice Sealed bids affixed with revenue stamp worth Rs.5/= (five) are invited from competent firms/agencies meeting the bid evaluation Criteria as stated in the detailed tender document for the
More informationTown of Whitby By-law #
Town of Whitby By-law # 7015-15 Site Plan Control By-law Being a By-law to designate the Town of Whitby as a Site Plan Control Area and to delegate to the Commissioner of Planning the approval of plans
More informationDružba za upravljanje terjatev bank, d.d., Davčna ulica 1, Ljubljana, hereby issues the following INVITATION TO TENDER:
Družba za upravljanje terjatev bank, d.d., Davčna ulica 1, Ljubljana, hereby issues the following INVITATION TO TENDER: (i) (ii) FOR THE PURCHASE OF CLAIMS AGAINST AHA EMMI, Predelava aluminija, d.o.o.
More informationSOLAR POWER INSTALLATION AND MAINTENANCE AGREEMENT
SOLAR POWER INSTALLATION AND MAINTENANCE AGREEMENT This Solar Power Installation and Maintenance Agreement is made this day of, 20, by (name) of (address), Windsor Locks, Connecticut ( Grantor ) and the
More informationTown of Alexandria. Floodplain Management Ordinance
1 of 7 8/8/2009 4:56 PM Town of Alexandria Floodplain Management Ordinance SECTION 1 PURPOSE Certain areas of the Town of Alexandria, New Hampshire are subject to periodic flooding, causing serious damages
More informationTHE COTTON CORPORATION OF INDIA LTD. (A Government of India Undertaking) Kapas Bhavan, Plot No.3-A, Sector 10, CBD-Belapur, Navi Mumbai
C C I THE COTTON CORPORATION OF INDIA LTD. (A Government of India Undertaking) Kapas Bhavan, Plot No.3-A, Sector 10, CBD-Belapur, Navi Mumbai 400 614. Tel No +91-22-27579217, Fax No 022-27576030, 27579219
More informationRule No. 15. Distribution Line Extensions Page 1 of 14
GOLDEN STATE WATER COMPANY (U 913-E) Revised Cal. P.U.C. Sheet No. 2103-E SAN DIMAS, CALIFORNIA 91773-9016 Canceling Revised Cal. P.U.C. Sheet No. 1005-E Page 1 of 14 APPLICABILITY: This rule is applicable
More informationPremises Required for Manuu Polytchnic at Kadapa, Andhra Pradesh, on Rent /Lease
MAULANA AZAD NATIONAL URDU UNIVERSITY (A Central University established by an act of parliamant in 1998) Gachibowli, Hyderabad 500 032 (Accredited with A Grade by NAAC) Premises Required for Manuu Polytchnic
More informationSBD 6.2 DECLARATION CERTIFICATE FOR LOCAL PRODUCTION AND CONTENT FOR DESIGNATED SECTORS
SBD 6.2 DECLARATION CERTIFICATE FOR LOCAL PRODUCTION AND CONTENT FOR DESIGNATED SECTORS This Standard Bidding Document (SBD) must form part of all bids invited. It contains general information and serves
More informationTender Details. 128PMETT Tender No. Tender ID. Short Description. Mode of Tender
NIT Tender Details Tender ID Short Description Mode of Tender Tender Schedule Dates Publication Date and Time Bid Submission Start Date and Time Bid Submission Closing Date and Time Tender Opening Date
More informationBANK OF INDIA NOTICE
BANK OF INDIA KOLKATA ZONE ESTATE & SERVICES DEPARTMENT 5, B. T. M. SARANI, KOLKATA 700 001 Phone Number 2248-6573 E-Mail : ZO.Kolkata @ bankofindia.co.in Ref. No. : ZO:EST:DM:2015-16 Dated: 08-02-2016
More information2. Project Implementation Agency: National Bureau of Statistics. 3. Date of the Procurement Plan Approval: June 12, 2018
Public Disclosure Authorized Plan 1. Project Information Country: United Republic of Tanzania Project Name: Development Support for Tanzania Statistics / Support to Strengthen Statistics in Tanzania Project
More informationDIVISIONAL OFFICE, INDIA LIFE BUILDING 1543/44 TRICHY ROAD, POST BOX COIMBATORE TENDER SCHEDULE LIFE INSURANCE CORPORATION OF INDIA
LIFE INSURANCE CORPORATION OF INDIA DIVISIONAL OFFICE, INDIA LIFE BUILDING 1543/44 TRICHY ROAD, POST BOX - 3810 COIMBATORE 641 018. TENDER SCHEDULE Sl No Description 1 Location Tender for Purchase of PLOTS
More informationCarmel Partners. Retail Tenant Signage. 27 August, In collaboration with:
Retail Tenant Signage 27 August, 205 In collaboration with: .0 Intent And Purpose 3.0 General Criteria For All Signage 4.0 Prohibited Signs And Sign Components. Intent: These retail signage guidelines
More informationGRAND BLANC TOWNSHIP
GRAND BLANC TOWNSHIP Request for Proposals Update of Audio/Visual Equipment in Auditorium and Conference Rooms RFP Issued March 14, 2017 Proposal Deadline March 27, 2017 @ 5:00pm to Township Clerk s Office
More informationUCO Bank Zonal Office Ahmedabad PREMISES REQUIRED
Annexure 1(B) UCO Bank Zonal Office Ahmedabad PREMISES REQUIRED Bank desires to take premises on rent having 1000 sq ft - 1200 sq ft of carpet area on Ground Floor. The premises are required in the following
More informationAnnexure 2 (B) Details for requirement for Urban/ Metro Branches/Offices UCO BANK ZONAL OFFICE PUNE REQUIREMENT OF OFFICE/BRANCH PREMISES
Annexure 2 (B) Details for requirement for Urban/ Metro Branches/Offices य क ब क, अ चल क य लय प ण UCO BANK ZONAL OFFICE PUNE REQUIREMENT OF OFFICE/BRANCH PREMISES Offers in two separate sealed covers containing
More informationTender for supply of spare parts use in RO Systems & Aquaguards
JAMIA MILLIA ISLAMIA Jamia Nagar, New Delhi-110025 Ph: 011-26982759 Tender for supply of spare parts use in RO Systems & Aquaguards No.NIT- 23/Spare-parts/RO/PICO/JMI/2018 Date: 16.1.2018 Sealed quotations
More information