1 Ur City of Bowie eons Development Sites Highway Projects outline Prepared 6y the Department of Planning F Economic Development Updated it

2 GLOSSARY DEFINITIONS Basic Plan a plan approved in conjunction with a ZMA for a CDZ This plan identifies the general location of the different land uses within the project and the general location of access to property from outside roads as well as a general design for internal road system This plan does not contain any specifics as to building locations density etc This is the first step in the CDZ process CDP Comprehensive Design Plan the second step in the CDZ process where among other aspects of the project comprehensive design details including land uses densitiesnon residential land uses access to the project setbacks from streets and property lines and buffering are approved CDZ Comprehensive Design Zone a special zoning district requiring multi step review of development proposals which are typically more intensive than a traditional subdivision and may consist of a mixture of residential commercial office or institutional uses NOTE Projects marked with an asterisk are projects in a CDZ Cluster Subdivision a Preliminary Subdivision Plan which is not within a CDZ where lot sizes are reduced and grouped more tightly than would normally be permitted within that zone in exchange for preserving environmental characteristics including steep slopes flooded areas 100 year floodplain and wetlands etc in the form of common open space DSP Detailed Site Plan a detailed design plan similar to an SDP required for special subdivisions such as cluster developments within a standard zoning district not a CDZ Two aspects of the DSP are architectural and landscaping plans i4 Preliminary Subdivision Plan the County process for legally dividing property into smaller parcels such as lots for sale and development Except for projects within CDZ s or for special subdivisions such as cluster developments within a standard zoning district no further public review may be necessary beyond this stage in the development process before proceeding to Record Plat or final plat and then to the issuance of building permit s Final Subdivision Plan a plan which is placed in the County Land Records to record and establish property boundaries on parcels created through a Preliminary Subdivision Plan to permit the lawful sale of the parcel s SDP Specific Desiqn Plan a detailed plan identifying precisely where all improvements such as roads buildings landscaping entrance drives and trails etc will be located in a CDZ project This is the third step review process Architectural plans are a part of this review process in the CDZ Special Exception a land use not permitted by right in a zone unless the use is found to meet very specific criteria and will have minimal or negligible impacts on adjacent properties WSSC Washington Suburban Sanitary Commission abi County agency responsible for providing public water and sewer service outside of the City spublic sewer and water system ZHE Hearing Examiner aquasi judicial official of the County responsible for reviewing and preparing a written recommendation for ZMA s and Special Exceptions as to conformity with County laws and ordinances ZMA Map Amendment a proposal to change the zoning of land to permit a use other than or in addition to that previously permitted on the property SMA Sectional Map Amendment a comprehensive rezoning for an entire planning area that systematically considers zoning and land use issues in conjunction with approval of a Master Plan w NOTE s may be reached at

3 DSO NUMERICA L LISTING 2006 PIPELINE PROJECTS PIPELINE PROJECTS CONT P1 COLT S NECK aka Race Track Road Cluster P2 CORNERSTONE ASSEMBLY OF GOD CHURCH EXPAN P3 FREESTATE SHOPPING CENTER P53 THE SHOPPES AT HIGHBRIDGE P54 WOODMORE NORTH P55 FAIRWOOD P4 MARYLAND SCIENCE TECHNOLOGY CENTER MSTC P56 MARLEIGH P5 TOYOTA OF BOWIE P6 PATUXENT OVERLOOK P7 BOWIE GATEWAY CENTER P8 BOWIE TOWN CENTER P9 NORTHVIEW ELEMENTARY SCHOOL P10 BOWIE EMERGENCY MEDICAL SERVICES EMS STATION P57 BEECHFIELDS Formerly Christian Hope Ministries P58 FOREST COVE P59 PHEASANT RIDGE P60 ASHTON ESTATES P61 OAKSTONE P62 ADNELL P11 PIN OAK LAC P63 DANNER PROPERTY P12 P13 MILL BRANCH KINGDOM HALL OF JEHOVAH S WITNESS OF BOWIE P64 NORMAL SCHOOL ROAD SUBDIVISION P65 HUNTINGTON RIDGE P14 P15 PEACH PRESERVE PAGE COURT SUBDIVISION P16 BOWIE NISSAN P17 AMBER RIDGE SHOPPING CENTER GENERAL INTEREST PROJECTS P18 CHESAPEAKE HOMES HEADQUARTERS aka Pointer Ridge Office Building G1 JESUIT PROPERTY P19 GREATER MT NEBO AME CHURCH G2 ZEHNER PROPERTY P20 BELMONT FARM G3 CHARLES CARROLL PROPERTY P21 MARSHALL LANDING G4 MILL BRANCH PROPERTY P22 CADEAUX DE MA MERE G5 SHELTER GROUP PROPERTY P23 CLAGGETT LANDING G6 SPRIGGS AND MILLS PROPERTIES P24 P25 COLLINGTON CENTER FOREIGN TRADE ZONE G7 KARINGTON EZ STORAGE G8 WILLOWBROOK BUSINESS CAMPUS P26 ASHLEIGH STATION aka Jones Property G9 GABRIEL S RUN P27 HALL ROAD VILLAGE ACTIVITY CENTER G10 GLENN DALE GOLF COURSE P28 P29 TWELVE TALL OAKS THE HAMPTONS AT WOODMORE aka Woodmore at Oakcreek G11 HERITAGE SQUARE P30 OAK CREEK CLUB TRANSPORTATION PROJECTS P31 LOCUST HILL P32 CAMERON GROVE EAST H1 JERICHO PARK ROAD P33 CAMERON GROVE P34 BRADY PROPERTY H3 HIGHBRIDGE ROAD P35 P36 WATERFORD Formerly Pleasant Prospect KING S ISLE ESTATES H2 RACE TRACK ROAD BRIDGE REPLACEMENT H4 CHESTNUT AVENUE BRIDGE REPLACEMENT H5 MD RTE 450 P37 THE WOODS AT WOODMORE aka Mount Oak Estates H6 MD 450 BRIDGE OVER CSX RAILROAD P38 ASHLEIGH P39 WOODMORE ESTATES H8 RACE TRACK ROAD H7 RTE 197 NORTH LANDSCAPING STREETSCAPE P40 THE PRESERVE AT WOODMORE ESTATES H9 MD RTE 197 FROM KENHILL DR TO MD RTE 450 P41 WOODMORE HIGHLANDS aka Rodenhauser Subdivision H10 RTE 197 SOUTH LANDSCAPING PLAN P42 P43 P44 P45 PDC RODENHAUSER PROPERTY H11 MD RTE 3 LONERGAN RODENHAUSER PROPERTY FAIRVIEW MANOR aka Collingbrook COLLINGTON H12 GOVERNOR BRIDGE ROAD H13 US RTE 301 IMPROVEMENTS INCL RTE 301 MD RTE 197 INTERCHANGE P46 TRINITY COMMUNITY CHURCH H14 US RTE 301 SOUTH CORRIDOR STUDY P47 WOODLAND MANOR H15 US 301 IMPROVEMENTS P48 WOODMONT ESTATES H16 MT OAK RD CHURCH RD WOODMORE RD INTER P49 COLEMAN PROPERTY H17 CHURCH ROAD P50 DIXON PROPERTY H18 OAKGROVE ROAD LEELAND ROAD REALIGNMENTS P51 SPRING MEADOWS P52 COLLINGTON PARK

4 r i DSO ALPHABETICAL LISTING 2006 PIPELINE PROJECTS PIPELINE PROJECTS CONT P62 ADNELL P29 THE HAMPTONS AT WOODMORE P17 AMBER RIDGE SHOPPING CENTER P40 THE PRESERVE AT WOODMORE ESTATES P38 ASHLEIGH P53 THE SHOPPES AT HIGHBRIDGE P26 ASHLEIGH STATION aka Jones Property P37 THE WOODS AT WOODMORE aka Mount Oak Estates P60 ASHTON ESTATES P5 TOYOTA OF BOWIE P57 BEECHFIELDS Formerly Christian Hope Ministries P46 TRINITY COMMUNITY CHURCH P20 BELMONT FARM P28 TWELVE TALL OAKS P10 BOWIE EMERGENCY MEDICAL SERVICES EMS STATION P35 WATERFORD Formerly Pleasant Prospect P7 BOWIE GATEWAY CENTER P47 WOODLAND MANOR P16 BOWIE NISSAN P48 WOODMONT ESTATES P8 BOWIE TOWN CENTER P39 WOODMORE ESTATES P34 BRADY PROPERTY P41 WOODMORE HIGHLANDS aka Rodenhauser Subdivision P22 CADEAUX DE MA MERE P54 WOODMORE NORTH P33 CAMERON GROVE 9 P32 CAMERON GROVE EAST GENERAL INTEREST PROJECTS P18 CHESAPEAKE HOMES HEADQUARTERS P23 CLAGGETT LANDING G3 CHARLES CARROLL PROPERTY P49 COLEMAN PROPERTY G7 EZ STORAGE P45 COLLINGTON G9 GABRIEL S RUN P24 COLLINGTON CENTER FOREIGN TRADE ZONE G10 GLENN DALE GOLF COURSE P52 t P1 P2 P63 P50 P44 P55 P58 P3 P19 P27 P65 P25 P13 P36 P31 P43 P56 P21 COLLINGTON PARK COLT SNECK aka Race Track Road Cluster CORNERSTONE ASSEMBLY OF GOD CHURCH EXPAN DANNER PROPERTY DIXON PROPERTY FAIRVIEW MANOR aka Collingbrook FAIRWOOD FOREST COVE FREESTATE SHOPPING CENTER GREATER MT NEBO AME CHURCH HALL ROAD VILLAGE ACTIVITY CENTER HUNTINGTON RIDGE KARINGTON KINGDOM HALL OF JEHOVAH SWITNESS OF BOWIE KING SISLE ESTATES LOCUST HILL LONERGAN RODENHAUSER PROPERTY MARLEIGH MARSHALL SLANDING G11 HERITAGE SQUARE G1 JESUIT PROPERTY G4 MILL BRANCH PROPERTY G5 SHELTER GROUP PROPERTY G6 SPRIGGS AND MILLS PROPERTIES G8 WILLOWBROOK BUSINESS CAMPUS G2 ZEHNER PROPERTY TRANSPORTATION PROJECTS H4 CHESTNUT AVENUE BRIDGE REPLACEMENT H17 CHURCH ROAD H12 GOVERNOR BRIDGE ROAD H3 HIGHBRIDGE ROAD H1 JERICHO PARK ROAD H6 MD 450 BRIDGE OVER CSX RAILROAD H9 MD RTE 197 FROM KENHILL DR TO MD RTE 450 H11 MD RTE 3 P4 MARYLAND SCIENCE TECHNOLOGY CENTER MSTC H5 MD RTE 450 P12 MILL BRANCH H16 MT OAKRD CHURCH RD WOODMORE RD INTER P64 P9 P30 a P61 P15 P6 P42 P14 P59 P11 P51 NORMAL SCHOOL ROAD SUBDIVISION NORTHVIEW ELEMENTARY SCHOOL OAK CREEK CLUB OAKSTONE PAGE COURT SUBDIVISION PATUXENT OVERLOOK PDC RODENHAUSER PROPERTY PEACH PRESERVE PHEASANT RIDGE PIN OAKLAC SPRING MEADOWS H18 OAKGROVE ROAD LEELAND ROAD REALIGNMENTS H8 RACE TRACK ROAD H2 RACE TRACK ROAD BRIDGE REPLACEMENT H7 RTE 197 NORTH LANDSCAPING STREETSCAPE H10 RTE 197 SOUTH LANDSCAPING PLAN H15 US 301 IMPROVEMENTS H13 US RTE 301 IMPROVEMENTS INCL RTE 301 MD RTE 197 INTERCHANGE H14 US RTE 301 SOUTH CORRIDOR STUDY l

5 DEVELOPMENT SITES OUTLINE PIPELINE PROJECTS Pipeline projects are generally identified as major projects for which an official subdivision or zoning application has been filed is under review or a decision is pending Also pipeline projects include properties such as surplus schools undergoing renovation use active projects with approved Water and Sewer Systems Area changes and projects under construction NOTE Projects marked with an asterisk are projects in a CDZ P1 COLT S NECK SUBDIVISION aka Race Track Road Cluster R Rural Residential 54 acres Land Use Residential Detailed Site Plan for 85 single family detached units approved by County Planning Board in 2004 was remanded back to Planning Board by District Council to address design and noise issues 2005 Property recommended for downzoning in SMA Cherrywood Development Mr Torben Agesen P2 CORNERSTONE ASSEMBLY OF GOD CHURCH EXPANSION 8 acres R Rural Residential Land Use square foot two story addition to existing church building Detailed Site Plan approved by County Planning Board 2004 Building permit issued 2005 Cornerstone Church Meyers Rodbell Rosenbaum PA Pastor Mark Lehman Mr Russ Warfel P3 FREESTATE SHOPPING CENTER CSCCommercial Shopping Center 32 acres R Rural Residential Land Use square foot renovated shopping center including 73 square foot Giant grocery store and a square foot pad site Renovation of portion of mall completed 2004 Retail pad site under construction and building permit for Giant food store approved 2005 JBG Rosenfeld Retail Mr Bill Heygster P4 MARYLAND SCIENCE 8 TECHNOLOGY CENTER MSTC EIAEmployment and Institutional Area 466 acres Land Use Mixed employment office uses of up to64 million sq ft Preliminary Subdivision Plan for195 million sq ft re approved 1999 Specific Design Plans for sq ft in two 2four story office buildings sq ft in a single story office building four 4 single story office buildings approved 2001 Specific Design Plan for square feet in six 6 flex buildings disapproved by City but square feet in three buildings approved by County 2002 Specific Design Plan for signage two stormwater management ponds in Phase 2 1

6 Completed Under Construction and Preliminary Subdivision Plan for three parcels in Phase 2 approved by County 2003 Specific Design Plan for square feet of office use in Pod 1 disapproved by City 2003 Specific Design Plan for two square foot office buildings in Phase 1 approved and redesign of two 2 stormwater management ponds in Phase 2 approved 2004 Specific Design Plan fora sq ftone story flex building and a sq fttwo story office building in Pod 4 approved sq ft Supercomputing Research Center sq ft US Census Bureau Computing Facility sq ft one story office building sq ft in seven 7single story office flex buildings Grading and storm water management improvements approved for Parcel 2E in Phase square foot four story office building under construction St John Properties Inc Mr Ramon Benitez P5 TOYOTA OF BOWIE Land Use CM Commercial Miscellaneous 5 acres Second story addition and expansion of existing auto dealership total 3016 square feet Detailed Site Plan revision approved 2003 Addition completed 2005 on expansion hold Joyce Engineering OMalley Miles Nilen Gilmore PA Mr Mike Lyle Mr Larry Taub P6 PATUXENT OVERLOOK Land Use RA Residential Agricultural OS Open Space 14 single family detached units Preliminary Subdivision Plan approved submitted and Stormwater Management Paving Plan approved 2005 Apex Engineering Ms Karen Carpenter acres 2003 Detailed Site Plan Plan and Storm Drain and P7 BOWIE GATEWAY CENTER formerly known as the International Renaissance Center and the City of Capitals CM Commercial Miscellaneous 102 acres Land Use Up to 1 million sq ft of mixed commercial retail restaurant office use on five blocks See below Completed sq ft of office and commercial as completed follows sq ft existing office building Omni 5400 sq ftnon fast food restaurant Applebee s opened sq ft home center Lowe s opened sq ft non fast food restaurant Bob Evans Farms opened sq ft bank office building BBT formerly Community Bank of Maryland opened sq ft gas station shop car wash Exxon opened sq ft auto car

7 rental office Enterprise Car Rental formerly insurance office claims center State Farm Insurance opened sq ft department store Target opened sq ft sporting goods store The Sports Authority opened sq ft office supply store Staples opened sq ft book music store Borders opened sq ftfast food restaurant McDonalds opened sq ft department store Kohl s opened sq ft bank office building Washington Savings Bank opened sq ft 114 seat fast food restaurant Wendy s opened sq ft pet supply store PETsMART opened sq ft tire retail service center NTB opened 1997 and a 948 sq ft retail store Haverty s formerly HomePlace opened sq ft variety retail store Pier 1 Imports and a2956 sq ft office retail Eye Care Center opened sq ft 130 seat non fast food restaurant Memphis Bar BQopened 1999 now vacant 923 sq ft retail craft store Michael s Crafts opened sq ft 299 seat non fast food restaurant On the Border opened sq ft 225 seat non fast food restaurant Chili s opened 2000 and a 3 story sq ft medical office building opened 2000 an 8495 sq ft electronics store Tweeter and 1900 sq ft communications retail store Sprint opened 2005 Trammell Crow Company Ms Joan McCarty VP Retail Property Management J r P8 BOWIE TOWN CENTER MAC Major Activity Center 274 acres RS Residential Suburban Development a Land Use 1225 million sq ft of retail sq ft of office and 1365 multi family and townhouse units Submission pending to revisions to the BTC iii Basic Plan and Comprehensive Design Plan CDP and of new Specific Design Plan SDP for 269 residential units apartments condominiums 5story parking garage and a sqft multi story retail building See below Completed sq ft of office as space completed follows sq ft office building and sq ft office condominiums 1406 dwelling units completed including 915multi family and condominium units and 491 townhouse units sq ft commercial retail restaurants and hotel including 3119 sq ft Chipotle opened sq ft retail center The Shoppes at Bowie Town Center opened 2005 and free standing bank Bank of America opened 2004 a sqft 4story 119 unit extended stay hotel Marriott Towne Place Suites opened 2005 a sq ft expansion of Hecht store opened 2005 and 262 residential condominium units Parcel U 2005 Under Construction A5story sq ft office building and a 4070 sq ft bank Wachovia both in the Bowie Corporate Center BTC Parcels J and K 3

8 Approved A sq ft expansion to Sears footprintpre approved as part of the original BTC SDP and a 3200 sq ft bank Bowie Corporate Center Parcels J and K s The Simon Property Group Mr David Gott Mall On Site Manager Mall Site Parcel N Mr Rod Vosper Vice President New Development The Hanover Company proposed residential units Mr Brandt Bowden Development Partner MLS Commercial Real Estate Services Ms Kathy Coakley The Shoppes at Bowie Town Center and banks on Parcels J and K Buchanan Partners Office building at Bowie Corporate Center Mr Steve Hubert P9 NORTHVIEW ELEMENTARY SCHOOL R80 One Family Detached Residential 20 acres r 1 Land Use Two story 476 seat sq ft public elementary school Building permit issued 2005 Building under construction Loiederman Soltesz Associates Inc Mr Tim Davis RLA Grimm and Parker Architects Ms Melissa Eschbach P10 BOWIE EMERGENCY MEDICAL SERVICES EMS STATION RU Residential Urban Development 8 acres Land Use Two story5000 sq ft two bay emergency services facilities station Amended Comprehensive Design Plan and Specific Design Plan being prepared Stakeholders meeting held 2004 Memorandum of Understanding being prepared 2005 Bowie Volunteer Fire Department Mr Pete Mellits Fire Chief P11 PIN OAK LAC RU Residential Urban Development 2 acres LAC Local Activity Center Land Use square foot commercial center Developer reviewing use alternatives Property recommended for rezoning to the CO Commercial Office zone in SMA Mr Bill Lee Knight Manzi Nussbaum LaPlaca PA Mr Dan Lynch

9 I o P12 MILL BRANCH RA Residential Agricultural 99 acres Land Use 2single family detached units Water and Sewer Plan amendment denied 2003 Prelimin C Subdivision Plan using private sewage disposal systems K P Builders Knight Manzi Nussbaum LaPlacaPA Mr Roy Kilby Mr William Knight Beth Chaisson P13 KINGDOM HALL OF JEHOVAH SWITNESS OF BOWIE R80 One Family Detached Residential Land Use 4900 square foot reconstruction of existing church Sediment control and stormwater management plan approved 2004 stormwater management engineering plans under revision Bowie Kingdom Hall Mr John Tracy acres P14 PEACH PRESERVE Land Use Family Detached Residential R80 One 14 single family detached units 6 acres Preliminary Subdivision Plan approved 2003 Detailed Site Plan approved 2005 Grading permits under review K P Builders Knight Manzi Nussbaum LaPlaca PA Mr William Knight Mr Roy Kilby P15 PAGE COURT SUBDIVISION R80 One Family Detached Residential 2 acres Land Use Five 5single family detached units Preliminary Subdivision Plan approved 2004 Final Subdivision Plan and stormwater management plans approved 2005 Permit plans being prepared Vitech Engineering Inc Mr Victor Amole P16 BOWIE NISSAN CM Commercial Miscellaneous 6 acres Land Use square foot automobile dealership Preliminary Subdivision Plan approved 2004 Detailed Site Plan approved 2005 Rifkin Livingston Levitan Silver LLC Mr Michael Nagy

10 P17 AMBER RIDGE SHOPPING CENTER CSCCommercial Shopping Center 19 acres Land Use sq ft commercial shopping center Preliminary Plan approved in 1998 appealed to Circuit Court by the City Circuit Court upheld approval of Preliminary Plan 2003 Circuit Court s decision regarding validity of Final Plat approved in 2002 appealed to Court of Special Appeals by the City Court of Special Appeals upheld Circuit Court regarding Final Plat 2004 Contact The Rappaport Companies Mr Gary Rappaport P18 CHESAPEAKE HOMES HEADQUARTERS aka Pointer Ridge Office Building CO Commercial Office 1 acre Land Use square foot office building Building permit issued 2005 Building under construction Chesapeake Custom Homes Mr Jim Pearo Knight Manzi Nussbaum Mr Bill Knight LaPlaca PA P19 GREATER MT NEBO AME CHURCH RA Residential Agricultural 81 acres Land Use sq ft church including accessory church offices3000 sq ft sanctuary and day care facilities Preliminary Subdivision Plan approved 2001 Detailed Site Plan for day care approved 2002 Revision to Detailed Site Plan fora60 student private school approved 2004 All facilities completed 2004 KCI Technologies Inc Mr Tim Miller P20 BELMONT FARM Land Use RA Residential Agricultural 56 acres 12 single family detached units Final Subdivision Plan approved 2004 Grading permit and building permits issued 2005 Site develop ent urrttfe ratac Chesapeake Custom Homes G Mr Greg Wilby Elizabeth Chaisson z P21 MARSHALL SLANDING Land Use RA Residential Agricultural 116 acres 36 single family detached units 1 2 Preliminary Subdivision Plan approved 2004 recent activity RDA Engineering Inc Mr Jim Craig 4 Mr F2escee id Elizabeth Chaisson l 6 J

11 y C r i P22 CADEAUX D111111E MA MERE Land Use RA Residential Agricultural 26 single family detached units Preliminary Subdivision Plan approved 2004 Wilkerson Associates Inc Mr Roland Joun vl tv j Elizabeth Chaisson yu No recent activity 125 acres P23 Gia6 ZT LADING RA Residential Agricultural Land Use isi gje family detached units Final Sub ivi n approv 2000 T x REQf Engineering arp c 1 Inc r Mid Atlantic Companies Mr Bud Worthington ct Mr Wes Z Staff Cont ad Elizabeth Chaisson M P24 COLLINGTON CENTER FOREIGN TRADE ZONE EIA Employment and Institutional Area 920 acres Land Use Offices research laboratories specialty retail and wholesalers manufacturing Central Area Collington Center Revision to CDP for up to65million square feet of office light industrial uses on 708 acres approved 1990 Approximately 2 million square feet completed 50 developable acres remain Two 2 flex buildings totaling square feet under construction on 13 acres completed 2005 Specific Design Plan fora square foot warehouse building on 785 acres approved 2004 South Area Safeway Distribution Center 198 million square feet on 168 acres for manufacturing warehousing and distribution facilities completed The south area is fully developed fm t Y Collington Center Prince George s County Economic Development Corporation Ms Patricia Parker Gingery Development Group The Tower Organization 1001 Rockville Pike Suite 503 Rockville MD Scheer Partners Inc 6305 Ivy Lane Suite 410 Greenbelt MD P25 KARINGTON EIA Employment and Institutional Area Land Use square feet of office use square feet of retail use and1239 dwelling units including 490 multi family apartments 210 multi family condominium units 20 live work units 120 multi family senior units 245 townhouse units and 154 single family detached units acres E

12 Conceptual Site Plan approved by District Council and Preliminary Subdivision Plan approved by County Planning Board 2004 Detailed Site Plan for grading and infrastructure approved 2005 Kenneth H Michael Companies Mr Tom Milborne Knight Manzi Nussbaum Mr Bill Knight LaPlaca PA P26 ASHLEIGH STATION aka JONES PROPERTY R Rural Residential 19 acres Land Use 29 single family detached units Preliminary Subdivision Plan approved 2004 Stormwater management plans approved and Final Subdivision Plan and gradingis W Mid Atlantic Developers Inc Meyers Rodbell Rosenbaum PA Mr Jason Sylheer tug Mr Russ Warfel ext Elizabeth Chaisson P27 HALL ROAD VILLAGE ACTIVITY CENTER LACLocal Activity Center 15 acres Land Use square feet retail use 114 multi family units and a minimum square foot public library ZMA application approved by District Council 2005 Knight Manzi Nussbaum LaPlaca PA Mr Dan Lynch P28 TWELVE TALL OAKS R Rural Residential 11 acres Land Use 15single family detached units Preliminary Subdivision Plan approved 2004 Stormwater management plan approved 2005 Developer preparing Detailed Site Plan Mr Ross Snider Meyers Rodbell Rosenbaum PA Mr Russ Warfel j P29 THE HAMPTONS AT WOODMORE aka WOODMORE AT OAK CREEK PHASES I AND II RA Residential Agricultural 163 acres Land Use 64 single family detached units Final Subdivision Plan storm drain and paving plan approved 2004 City permits issued 2005 Seven 7 units under construction and site grading and utility installation underway Washington Homes Greenman Pedersen Inc Mr Mike Irons Mr Dan Jackson

13 J r P30 OAK CREEK CLUB a w I LACLocal Activity Center 33 acres RL Residential Low Development 910 acres Land Use 179 dwelling units square feet retail office center church and day care facility and 18 golf course Preliminary Subdivision Plan and Comprehensive Design Plan CDP revision approved 2001 Specific Design Plan for Phase and IA F approved 2003 Phase I consists of 631 dwelling units including 412 d iti single family detached units and 219 townhouse units Phase IA consists of an 18 hole golf course Specific Design Plan for Phase II including uacf 86 qt single family detached units approved 2004 Site clearing and s s infrastructure installation underway with all landbays paved units added to project from The Palisades odels Montgomery Development Knight Manzi Nussbaum LaPlaca PA Ms Evelyn Scalia Mr Bill Knight G P31 LOCUST HILL Land Use Up Elizabeth Chaison xpfd l J f 3 mar Ff RA Residential Agriculture RE Residential Estate to 718 dwelling units including up to 574 single family detached units and 144 townhouse units 507 acres Application for rezoning to the RL Residential Low Density Comprehensive Design Zone filed 2005 OMalley Miles Nylen Gilmore PA Loiederman Soltesz Associates Mr Ken Dunn Mr John McDonough a j 32 THE PALISADES AT OAK CREEK I RLResidential Low Development 180 acres Land Use 135 single family detached units Specific Design Plan approved 2004 Final Subdivision Plan approved fir re es LoiedernSoltesz S ciates Mr Michael Goodman ye i5 r2cy 4F s Staff C tr ntac Eliz Beth Chaisson I P3 AMERON GROVE I oning RL Residential Low Development Land Use Mixed retirement community with a maximum 856 dwelling units Specific Design Plan Phases and II approved units completed Specific Design Plan for 349 units Phase III approved tl 2003 Final Subdivision Plan approved single family d detached units under construction Stavrou Associates MeY ers Rodbell Rosenbaum PA Mr Steve Moore Mr Russ Warfel ti c s staff Contact Elizabeth Chaisson J yy 158 acres 9

14 a P34 BRADY PROPERTY r RE Residential Estate 28 acres Land Use 26 single family detached units Preliminary Subdivision Plan approved 2002 Final Subdivision Plan approved 2005 Developer preparing permit plans Facchina Developers Mr Luke Hannah Mr P35 WATERFORD formerly Pleasant Prospect RA Residential Agricultural Land Use 126 single family detached units Preliminary Subdivision Plan approved 2004 Detailed Site Plan approved and engineering underway 2005 Washington Management Development Company Mr John Pyles 36 KING SISLE ESTATES Land Use RA Residential Agricultural 20 single family detached units Final Subdivision Plan approved 200 Triangle Homes ar Mr Nello Caltabianco Elizabeth Chaisson 261 acres 40 acres 37 THE WOODS AT WOODMORE aka Mount Oak Estates RA Residential Agricultural Land Use 50single family detached units Final Subdivision Plan approved 1984 ttre units under construction Z Realty Executives 2000 Visnic Builders Mr Mark Ellington Mr Ted Visnic P38 ASHLEIGH Land Use Elizabeth Chaisson Ro 172 acres R Rural Residential 97 acres RE Residential Estate 118 single family detached units Final Subdivision Plan approved 1998 Revised Detailed Site Plan approved units completed 10 units under construction Sakellaris Construction Co Mr James Sakellaris Lr 10

15 P39 WOODMORE ESTATES aka Tall Oaks Estates the Franklin Property RE Residential Estate 235 acres Land Use 132 single family detached units Final Subdivision Plan approved 1991 Limited Detailed Site Plan re approved 2000 s 68 units completed 14 units under construction K Hovnanian Homes of MD Washington Management Development Ms Maura Arndt Mr John Pyles P40 THE PRESERVE AT WOODMORE ESTATES RE Residential Estate 18 acres Land Use 16 detached residential units single family Preliminary Subdivision Plan approved 2005 s Mastercraft Communities LLC OMalley Myles Nylen Gilmore Mr Gary Berman Mr Larry Taub Esquire Greenhorne andomara Inc Mr Jeffrey Winter P41 WOODMORE HIGHLANDS SECTION FOUR Lonergan aka Rodenhauser Subdivision RE Residential Estate 16 acres Land Use 14 detached single family residential units Final Subdivision Plan approved units completed construction Lonergan Homes Mr Ed Lonergan units under P42 PDC RODENHAUSER PROPERTY RE Residential Estate 68 acres Land Use 62 detached single family units Re submission of Preliminary Subdivision Plan pending 2005 s PDC Inc Apex Engineering Mr Michael Carnock Ms Karen Carpenter P43 LONERGAN RODENHAUSER PROPERTY RE Residential Estate 24 acres Land Use 19 detached residential units single family Re submission of Preliminary Subdivision Plan pending 2005 s Lonergan Homes Apex Engineering Mr Ed Lonergan Ms Karen Carpenter a 11

16 P44 FAIRVIEW MANOR aka COLLINGBROOK RE Residential Estate 235 acres Land Use 191 single family detached dwelling units Final Subdivision Plan ap roved units under construction 2cer i PDC Inc Lonergan Homes Ryan Homes Mr Michael Carnock y Ed Lonergan Elizabeth Chaisson j Doug Mclltrot P45 COLLINGTON R Rural Residential 18 acres Land Use 21 single family detached units Final Subdivision Plan approved 2004 Grading sediment control WSSC and County Public Works permits approved 2005 Marco Homes Mr Anthony Decesaris P46 TRINITY COMMUNITY CHURCH R Rural Residential 8 acres Land Use Church sanctuary and classroom space Preliminary Subdivision Plan approved 2004 Trinity Community Church Meyers Rodbell Rosenbaum PA Mr Todd Watanabe Mr Russ Warfel P47 WOODLAND MANOR Land Use Eight R Rural Residential 8 single family detached units Final Subdivision Plan approved 1996 Seven 7 units completed one 1 unit under construction Foster Communities of Maryland Inc Mr Bill Hoffman acres P48 WOODMONT ESTATES Land Use Five 3 acres R Rural Residential 5single family detached units Limited Detailed Site Plan for five 5 single family detached dwelling units approved 2005 Rifkin Livingston Levitan Silver LLC W F Chesley Companies Mr Michael Nagy Esquire Mr Russell Baker The Tech Group Inc Ms Kim Morgan P49 COLEMAN PROPERTY Land Use Seven RE Residential Estate 7 detached single family 12 detached units 8 acres

17 t Preliminary Subdivision Plan approved 2005 Timberlake Homes Gibbs and Haller Mr Greg McAninch Mr Tom Haller Esquire P50 DIXON PROPERTY Land Use 44 acres R Rural Residential 56 single family detached units PralfreS it ary ttf cititstern Pta rr 5 Preliminary Subdivision Plan cyth Washington Management Development 7 a Mr John Pyles dewberry Davis Mr Alex Villegas Beth Chaisson P51 SPRING MEADOWS Land Use Contact R Rural Residential 30 acres t 52 single family detached dwellings Final Subdivision Plan approved 2005 Site development underway and eight 8 units under construction K P Builders Knight Manzi Nussbaum LaPlaca PA Mr Roy Kilby Mr William Knight P52 COLLINGTON PARK Land Use CM Commercial Miscellaneous Warehouse office complex including two acres 000 square foot flex buildings and three 3 other buildings Two square foot buildings completed 2005 Engineering for a two story square foot flex building and aone story square foot flex building underway Santos LLC Ms Tina Santos P53 THE SHOPPES AT HIGHBRIDGE PARK RS Residential Suburban Development 136 acres LAC Local Activity Center Land Use square foot commercial center with a bank gas station carwash and pharmacy 204 townhouse units and 171 single family Residential component completed 1997 Specific Design Plan for commercial component ap roved 2005 e detached units 1djF mike ixd 5 3 Yi ica titi v E t e a LAC Contact Highbridge LLCcoMLS Properties Gibbs and Haller Ms Kathy Coakley Mr Tom Haller Elizabeth Chaisson 13

18 4 t ai P54 WOODMORE NORTH formerly Westwood RE Residential Estate Land Use 229 single family detached units Final Subdivision Plan approved units completed under construction Mid Atlantic Builders Mr Bud Worthington acres 24 units 55 FAIRWOOD P56 MXC Mixed Use Community RE Residential Estate Land Use Maximum of 1799 dwelling units plus additional estate lots Roberts Estate sq ft of retail and sq ft of various non residential uses office institutional and educational Phase Approvals Comprehensive Sketch Plan for up to 1000 dwellings 100 of retail and sq ft of office institutional space on 471 acres 1997 Detailed Site Plans for Phase I PartI The Choice 75 townhomes Y single family units 2002 and The Retreat 157 f townhomes acres 47 acres 000 sq ft t w Detailed Site Plans for Phase I Part single family units 2002 fc The Delight 44 villas 52 coach units and 117 condominium t s apartments 2004 Fairwood Green Shopping Center sq ft of retail and sq ft of office Detailed Site Plan Phase I Part 3 for 189 single family units Phase II Approvals Comprehensive Sketch Plan for up to 1000 on dwellings 580 acres Detailed Site Plans Phase II Part 1 for 66 single family units single family units 2004 Final Development Plan and Preliminary Plan of Subdivision for Phase II Part 2 and Phase I Part 4 for 459 single family lots 2003 Roberts Property Approval Preliminary Plan of Subdivision for Ingle family lots 2004 Detailed Site Plan e Construction Status Protect Contact ti C S 477 homes occupied 416 under construc ion Tie fo25fply nja Gibbs Haller 2 IArds c srr Mr E d Gibbs x 6027 YjZvi Town Home Builders 0033 G I Single Family Builders f i f 5 fd Rocky Gorge Allan Homes os Goodi r Builders Goodier Builders tl Mid Atlantic Builders NU Homes ttat V Patriot Homes MARLEIGH Land Use J Elizabeth Chaisson c 4 R land Homes Williamsburg Group RLResidential Low Development 164 acres 175 single family detached units and 46 townhouse units SDP for Phase I for 34 single family detached units approved 1995 SDP For Phase II for 151 single family detached units 46 townhouse units community pool and bathhouse tot and pre teen lots active 14

19 recreation area and hiker biker trail system approved 1996 Final Subdivision Plans approved All residential units clubhouse and community pool completed 2004 Revised SDP submitted to modify park recreation equipment 2005 Gutschick Little and Weber PA Mr Kevin Foster ASLA i t P57 BEECHFIELDS formerly Christian Hope Ministries RE Residential Estate Land Use Senior housing assisted living development Preliminary Subdivision Plan approved 2003 Special Exception application fora 400 unit250 condo units and 150 townhouse units planned retirement community under review 2005 Rifkin Livingston Levitan Silver PA Greenhorne OMara Mr Chip Reed Ms Linda Ryan acres P58 FOREST COVE Land Use R Rural Residential 13single family detached units Preliminary Subdivision Plan approved 2004 sediment control plans under review 2005 Gibbs and Haller Mr Tom Haller acres Final Subdivision Plan and P59 PHEASANT RIDGE Land Use 15 acres R Rural Residential 19 single family detached units Water and Sewer Plan amendment approved by County Council 2004 Preliminary Subdivision Plan approved 2005 Gibbs and Haller Mr Tom Haller P60 ASHTON ESTATES formerly Nazario Woods R 26 Rural Residential acres Land Use 43 single family detached units Final Subdivision Plan and Detailed Site Plan for unit types and architecture approved 2002 Utilities infrastructure and streets installed 2005 Caruso Homes Inc Ms Karen Samoy P61 OAKSTON E Land Use R Rural Residential 33 single family detached units 17 acres 15

20 Final Subdivision Plan approved units completed under construction Haverford Homes Mr Sevag Balian units P62 ADNELL R Rural Residential 89 acres Land Use Final Subdivision Plan approved single family detached units 149 units completed 1 unit under construction 2005 PDC Adnell LLC Rifkin Livingston Levitan Silver LLC Mr Michael Carnock Norman Rivera P63 DANNER PROPERTY R Rural Residential 22 acres Land Use 72 single family detached units Grading and stormwater management installation completed 2005 Water and sewer line installation underway Hunt Valley LLC Mr Dennis Danner P64 NORMAL SCHOOL ROAD SUBDIVISION RA Residential Agricultural 30 acres Land Use Six 6single family residential lots Final Subdivision Plan approved 2003 Four 4 detached single family Triangle Ms Betty Ryan units under construction 2005 Homes Greenhorne OMara Mr Gary Rubino P65 HUNTINGTON RIDGE R Rural Residential Land Use 172 elderly apartment complex Special Exception application submitted 2005 Alta Vista Inc OMalley Miles Nylen Gilmore PA Mr Stanley Robinson Mr Larry Taub acres 16

21 i General Interest Projects General interest projects are properties that have been recognized or considered for development due to their location scale proposed use etc and are constantly monitored by the City due to potential impacts The General interest category should not be considered all inclusive as the sheer number of potential projects would be unmanageable for purposes of monitoring Even though a proposed land use maybe listed no official application has yet been filed for these projects G1 JESUIT PROPERTY Land Use Residential R Rural Residential OS Open Space Owner rev ewing downzon in the SMA use alternat ves Property r Maryland Province of the Society Mr James S Schaefer of Jesus OMalley Miles Nylen Gilmore PA Mr Larry Taub n a 3e85 4 Elizabeth Chaisson t 500 acres G2 ZEHNER PROPERTY Land Use 117 acres VLVillage Low 146 single family detached lots Property rezoned during 1991 Sectional Map Amendment Water and Sewer Category Change request withdrawn 2000 Property recommended for downzoning to the OS zone Open Space in the SMA Martin Zehner et al G3 CHARLES CARROLL PROPERTY Land Use CM Commercial Miscellaneous Car wash and quick lube facility Developer preparing Preliminary Subdivision Plan RDA Engineering Inc Ms Stephanie Clevenger G4 MILL BRANCH PROPERTY CHESLEY GIBRALTAR 74 RA Residential Agricultural acres Land Use Commercial office Water and Sewer Category Change and General Plan amendment for the Developing Tier approved 2002 Property recommended for rezoning to the CSC Commercial Shopping Center zone in the SMA William F Chesley Real Estate Inc Mr William F Chesley

22 G5 SHELTER GROUP PROPERTY CO Commercial Office 13 acres Land Use Multi family senior housing Property recommended forr18multi family Medium Density Residential zone in SMA The Shelter Group Gingles LLC Mr Robert Stoddard Mr Andre Gingles G6 SPRIGGS AND MILLS PROPERTIES R Rural Residential 27 acres Land Use 18single family detached units and two 2 parcels Preliminary Subdivision Plan being prepared Owner requested commercial zoning for US 301 frontage during SMA Washington Management Development Company Mr John Pyles Dewberry Davis LLC Mr Alex Villegas G7 EZ STORAGE CMCommercial Miscellaneous 9 acres Land Use square foot three story addition to existing self storage facility Stakeholder meeting held with community 2005 Siena Corporation Mr Craig Pittinger Shipley and Horne PA Mr Russ Shipley G8 WILLOWBROOK EIA Employment and Institutional Area 453 acres Land Use Mixed residential and light industrial employment uses Property rezoned during 1991 Sectional Map Amendment Property recommended for rezoning to the RS Residential Suburban andi1 Light Industrial in Bowie and Vicinity Sectional Map Amendment OMalley Miles Nylen and Gilmore PA Mr John McDonough G9 GABRIEL SRUN Storch Proaert RE Residential Estate R Rural Residential Land Use 103 single family detached units Final Subdivision Plan approved Site development underway and 77 acres streets paved in first phase building permits obtained for eight 8 units One 1 model home under construction Project located outside of Planning Area 18

23 Artery Development Co Inc Ryan Homes Mr Paul Mawicke Mr Doug Mclltrot NV Homes G10 GLENN DALE GOLF COURSE Land Use Residential R Rural Residential 125 acres Detailed Site Plan for 207single family detached units approved by County Planning Board 2004 Request for Preliminary Plan extension filed 2005 Property recommended for downzoning in East Glenn Dale Sector Plan Project located outside of Planning Area Mr John Shields Golf Course owner G11 HERITAGE SQUARE Land Use CO Commercial Office Business Office Variance approved by County Board of Appeals in 1986 for proposed sq ft office building No recent activity William F Chesley Real Estate Inc t Mr Brandon Smith Sa I Elizabeth Chaisson 1 acre Pjoe Dso

24 BOWIE AREA TRANSPORTATION PROJECTS H1 Jericho Park Road Bowie State University The section of the road passing through Bowie State University will be relocated within the campus to be done by Bowie State University in the future H2 Race Track Road Bridge Replacement Prince George s Countv This project consists of the replacement of the existing 30 span concrete encased steel beam bridge over Horsepen Branch The bridge was originally constructed in 1945 and reconstructed in 1950 Project is under construction with completion expected by Fall 2006 H3 High Bridge Road Prince George s Countv This project consists of atwo lane urban reconstruction from MD 450 to Fletchertown Road The project will provide drainage improvements and improve pedestrian movement as well as provide access to the WB A trail The existing roadway is narrow has drainage problems and does not provide for pedestrian and bicyclist movement The project is funded for planning to begin in FY2011 H4 Chestnut Avenue Bridge Replacement Prince George s Countv This project consists ofthe replacement of the existing Chestnut Avenue bridge over Newstop Branch and reconstruction of the approach roadways The existing 19 foot span steel and reinforced concrete bridge is experiencing deterioration and is in need of structural replacement Planning funds are proposed to begin in FY 2008 construction funds are programmed for FY 2010 H5 MD Route 450 Annapolis Road SHA This project involves upgrading and widening the existing road between MD 193 and Stonybrook Drive including a relocated section between High Bridge Road and MD 197 to amulti with sidewalks and hiker biker facility on the north side Estimated completion is Winter 2005 lane divided highway A second related project involves upgrading existing MD 450 to a Stonybrook Drive and west of MD 3137 miles Sidewalks will be included where appropriate Wide curb lanes will accommodate bicycles Full engineering funding is programmed in FY multi lane divided road between H6 MD Route 450 Bridge Over CSX Railroad SHA This project involves reconstruction of the existing bridge with a wider span meeting current engineering standards The new bridge will include wide shoulders to allow for future installation pedestrian facililities Project under construction Completion expected by Fall 2006 H7 Route 197 North Landscaping Streetscape SHA This project involves creation of a concept plan for the corridor from relocated Route 450 to Rustic Hill Drive A task force consisting of local residents and business owners met regularly during 2000 and developed a proposal to convert the continuous center turn lane to a landscaped median and to install other Streetscape improvements to enhance the safety and appearance of the corridor City Council approved a concept plan and recommended the proposal to SHA 2002 Funding for preliminary engineering placed on indefinite hold due to State budgetary constraints 1

25 H8 Race Track Road Prince George s Countv This project involves the widening an urbanization of Race Track Road including construction of curbs gutters crosswalks and sidewalks to a collector roadway from MD 450 to Old Chapel Road Plannign funds are programmed for FY 2011 H9 MDRoute 197 from Kenhill Drive to MD Route 450 SHA This project would consist of the planning required to convert this segment of MD Route 197 to a four lane roadway with medians and significant landscaping to relieve congestion and improve safety result of a study undertaken for the City in 1996 it was found that the existing two lane section is a congested segment of road in the morning and evening rush hours The project is the highest priority for project planning on the County stransportation Priority List Planning funds are included in the Prince George scounty Capital Improvement Program for FY 2006 and in the State Consolidated Transportation Program for FY 2007 As a H10 Route 197 South Landscaping Plan SHA This project involves installing landscaping in the median ofmd 197 between US 50 and US 301 to improve the appearance to travelers entering our community A task force formed with the objective of creating a landscape concept plan for this section ofmd Route 197 submitted its final report to Council in February 2000 Installation of the landscaping is pending SHA funding approval H11 MD Route 3 SHA This project would consist of the planning required to upgrade MD Route 3 from US Route 50 to MD Route 32 a distance of 89 miles to address safety and capacity concerns The City SHA Crofton Odenton and representatives of western Anne Arundel County MD Route 3 Study Commission concluded that there is a need to upgrade MD Route 3 including construction of interchanges at the two MD Route3450 intersections Project planning completed 2005 Right of way funding to begin in FY 2006 H12 Governor Bridge Road Prince George s Countv This project involves reconstruction of the existing road to a multi lane urban roadway in the vicinity of US 301 and atwo lane roadway with paved shoulders from that point to the Anne Arundel County line The project is funded for planning to begin in FY 2011 H13 US Route 301 Improvements including US Route 301 MDRoute 197 Interchange SHA This project consists ofthe planning and preliminary design of a new interchange and a continuous fully integrated frontage road system This project is necessary for the continued safe and efficient movement of traffic into out of and through the City A focus group concluded its review ofdesign alternatives and SHA conducted a public hearing on the selected alternates in 2002 This project is only funded for planning purposes through FY 2006 Additional alternates are being considered 2

26 H14 US Route 301 South Corridor Transportation Study SHA This multi modal corridor study continues to examine highway and transit improvements from south of La Plata to the US LTS 50 interchange in Bowie Right of way funding is programmed in FY 2006 H15 US 301 Improvements Prince George s Countyl This is atwo phase project The first phase consists of minor geometric and landscaping improvements at selected intersections The second phase consists of the improvement of US 301 by providing a third through lane northbound and southbound between MD 214 and MD 725 and further widening at Trade Zone Avenue MD 214 and MD 725 as needed Associated intersection improvements at Old Central Avenue Trade Zone Avenue Leeland Road and Village Drive will also be undertaken Some planning 1rr funds are programmed in FY 2006 County funding for construction begins in FY 2007 Developer funded improvements north and south of Trade Zone Avenue are under construction H16 Mount Oak Road Church Road Woodmore Road Intersections This project provides for geometric improvements to the Mount Oak Road Church Road Woodmore Road intersections and approaching roads including realignment of Woodmore Road at half the ultimate arterial section for a length of approximately2000 feet Planning funds and right of way funding begins in FY 2006 full construction funds are programmed in FY H17 Church Road This project provides geometric and safety improvements to Church Road between Woodmore Road and MD 214 Central Avenue Improvements will include intersection improvements some local realignment of the roadway and the addition of shoulders and roadside drainage where necessary Planning funds are proposed to begin in FY 2009 Construction funding is programmed to begin in FY 2010 Developer funded improvements of the portion between US 50 and Fairwood Parkway are under construction The Church Road Task Force final report presented to the City and County 2005 H18 Oak GroveRoad Leeland Road Reali nment Relocation and widening to a future four lane collector roadway will be done by area developers Pjoe transportation DS02006transportati ondsojoe L

27 i i r rflr rnirr lrrr rrrri ri d irr rwr rrnli rr w r rrii H H2 BQ VIEAT IJIGHWA PRC JECTS January r 6j J A 9C NORTH c x H3 A H7 O G f y O H8 O rn p H5 O Hfi 4 H11 V O G H9 q ROUTE 50 r 4 O ROUTE 5O r R H72 Cj9 GpVERN rdge H10 H13 Roan t y GC z o W ARE ROp Hs MOU C r OAK ROADr O CI m w 0 0 o H7 HT4 2 R 21a Q a 0 z UI U H75 s i Ha FF oroq 0 O c O L1 1

City of Bowie 2018 Development Sites & Transportation Projects Outline Prepared by the Department of Planning and Economic Development

City of Bowie 2018 Development Sites & Transportation Projects Outline Prepared by the Department of Planning and Economic Development City of Bowie 2018 Development Sites & Transportation Projects Outline Prepared by the Department of Planning and Economic Development Updated 12/14/17 GLOSSARY & DEFINITIONS Basic Plan: a plan approved

More information

MEMORANDUM. SUBJECT: Status Report DATE: December 14, 2017

MEMORANDUM. SUBJECT: Status Report DATE: December 14, 2017 MEMORANDUM TO: FROM: City Council Alfred D. Lott, ICMA-CM, CPM City Manager SUBJECT: Status Report DATE: December 14, 2017 Status Report 1. Senior Center Bus Replacement The Adopted Fiscal Year 2018 Budget

More information

CITY OF BOWIE 2014 DEVELOPMENT SITES & HIGHWAY PROJECTS OUTLINE

CITY OF BOWIE 2014 DEVELOPMENT SITES & HIGHWAY PROJECTS OUTLINE CITY OF BOWIE 2014 DEVELOPMENT SITES & HIGHWAY PROJECTS OUTLINE PREPARED BY THE DEPARTMENT OF PLANNING & ECONOMIC DEVELOPMENT UPDATED 12/16/13 GLOSSARY & DEFINITIONS Basic Plan: a plan approved in conjunction

More information

Monthly Report of Zoning Activity

Monthly Report of Zoning Activity Monthly Report of Zoning Activity APRIL, 26 DATE ACCEPTED: 4/29/26 6 ELECTION DISTRICT: 2 SHEET: OUT OUT ROSP-358-2 TITLE: STARBUCKS @ BELTSVILLE, REVISION TO ROSP-358- TO RESTRIPE PARKING, RELOCATE DUMPSTER,

More information

Monthly Report of Zoning Activity

Monthly Report of Zoning Activity Monthly Report of Zoning Activity DATE ACCEPTED: 6/2/26 6 ELECTION DISTRICT: OUT OUT CNU-326-2 TITLE: MT LANEY, CERTIFICATION OF NON-CONFORMING USE FOR A CONCRETE RECYCLING FACILITY. 4852 OLD GUNPOWDER

More information

Monthly Report of Zoning Activity

Monthly Report of Zoning Activity Monthly Report of Zoning Activity DECEMBER, 214 1 DATE ACCEPTED: 12/5/214 61 ELECTION DISTRICT: 1 2 SHEET: OUT 2 CNU-35629-12 TITLE: POWDER MILL VILLAGE APARTMENTS, CERTIFICATION OF NON-CONFORMING USE

More information

Implementation. Approved Master Plan and SMA for Henson Creek-South Potomac 103

Implementation. Approved Master Plan and SMA for Henson Creek-South Potomac 103 Implementation Approved Master Plan and SMA for Henson Creek-South Potomac 103 104 Approved Master Plan and SMA for Henson Creek-South Potomac Sectional Map Amendment The land use recommendations in the

More information

Monthly Report of Zoning Activity

Monthly Report of Zoning Activity Monthly Report of Zoning Activity OCTOBER, 26 2 DATE ACCEPTED: /26/26 68 ELECTION DISTRICT: 6 2 SHEET: OUT SP-6 TITLE: SAINT MARY ERITREAN ORTHODOX TEWAHDO CHURCH, SPECIAL PERMIT FOR THE ADAPTIVE REUSE

More information

Monthly Report of CBCA Activity

Monthly Report of CBCA Activity Monthly Report of CBCA Activity MARCH, 217 DATE ACCEPTED: ELECTION DISTRICT: 2 SHEET: OUT OUT TITLE: Record No: 1 Total Page No: 1 C:\inetpub\wwwroot\DAMS\Reports\CBCAMonthly. Page 1 4/5/217 2:38:53PM

More information

Note: Staff reports can be accessed at

Note: Staff reports can be accessed at The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

MEMORANDUM. City Council. David J. Deutsch City Manager. Resolution R TLBT, LLC Annapolis Road Annexation Plan. DATE: September 3, 2015

MEMORANDUM. City Council. David J. Deutsch City Manager. Resolution R TLBT, LLC Annapolis Road Annexation Plan. DATE: September 3, 2015 MEMORANDUM TO: FROM: RE: City Council David J. Deutsch City Manager Resolution R-66-15 TLBT, LLC 13401 Annapolis Road Annexation Plan DATE: September 3, 2015 In accordance with the Annotated Code of Maryland,

More information

LONG RANGE AGENDA July 19, 2018 July 26, 2018

LONG RANGE AGENDA July 19, 2018 July 26, 2018 LONG RANGE AGENDA July 19, 2018 July 26, 2018 4-16001 PARKSIDE, SECTIONS 5 & 6...14 4-16037 FAIRVIEW CENTER...5 4-17026 ALDI DISTRICT HEIGHTS... 8 4-17039 CRAIN COMMONS... 15 4-18002 7618 MARLBORO PIKE...

More information

Appendix A: Guide to Zoning Categories Prince George's County, Maryland

Appendix A: Guide to Zoning Categories Prince George's County, Maryland Appendix A: Guide to Zoning Categories Prince George's County, Maryland RESIDENTIAL ZONES 1 Updated November 2010 R-O-S: Reserved Open Space - Provides for permanent maintenance of certain areas of land

More information

Town of Cary, North Carolina Rezoning Staff Report 14-REZ-24 Indian Wells Road Properties Town Council Meeting November 20, 2014

Town of Cary, North Carolina Rezoning Staff Report 14-REZ-24 Indian Wells Road Properties Town Council Meeting November 20, 2014 Town of Cary, North Carolina Rezoning Staff Report 14-REZ-24 Indian Wells Road Properties Town Council Meeting November 20, 2014 REQUEST To amend the Town of Cary Official Zoning Map by revising a condition

More information

GOALS, OBJECTIVES, AND STRATEGIES

GOALS, OBJECTIVES, AND STRATEGIES GOALS, OBJECTIVES, AND STRATEGIES What follows is a series of goals, recommendations and actions that reflect the themes outlined in the Mineral Springs Vision Plan (incorporated into this document as

More information

Planning Department Oconee County, Georgia

Planning Department Oconee County, Georgia Planning Department Oconee County, Georgia STAFF REPORT REZONE CASE #: 6985 DATE: October 31, 2016 STAFF REPORT BY: Andrew C. Stern, Planner APPLICANT NAME: Williams & Associates, Land Planners PC PROPERTY

More information

County of Loudoun. Department of Planning MEMORANDUM

County of Loudoun. Department of Planning MEMORANDUM County of Loudoun Department of Planning MEMORANDUM DATE: September 3, 2013 TO: FROM: Marchant Schneider, Project Manager Land Use Review Marie Genovese, AICP, Planner III, Community Planning SUBJECT:

More information

Bowie Marketplace Residential Detailed Site Plan Statement of Justification January 13, 2017 Revised February 2, 1017

Bowie Marketplace Residential Detailed Site Plan Statement of Justification January 13, 2017 Revised February 2, 1017 Bowie Marketplace Residential Detailed Site Plan Statement of Justification January 13, 2017 Revised February 2, 1017 Submitted on behalf of: BE Bowie LLC 5410 Edson Lane, Suite 220 Rockville, MD 20852

More information

LONG RANGE AGENDA June 21, 2018 July 12, 2018

LONG RANGE AGENDA June 21, 2018 July 12, 2018 LONG RANGE AGENDA June 21, 2018 July 12, 2018 2008 Water and Sewer Service Area Changes,... 7 A-10047 ST. BARNABAS MIXED USE PARK... 5 A-9975-01 LOCUST HILL PHASE 1... 10 CAPITAL TRAILS COALITION... 4

More information

Sectional Map Amendment Brandywine

Sectional Map Amendment Brandywine 15 Location: West side of 301, Exhibit 70 approximately 3200 feet north of Dyson Road Speaker 44 Mike Nagy, Attorney Request: Retain existing I-1 Zone South 301 Investments, Proposed SMA: I-1 to R-R (B-2)

More information

PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item

PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item PC Staff Report 11/12/12 Item No. 2B- 1 PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item ITEM NO. 2B: A TO GPI; 110 ACRES; E OF K-10 & N OF W 6 TH ST (MKM) : Consider a request to rezone approximately

More information

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached: Staff Report: Completed by Jeff Palmer Director of Planning & Zoning Date: November 7, 2018, Updated November 20, 2018 Applicant: Greg Smith, Oberer Land Developer agent for Ronald Montgomery ET AL Property

More information

Monthly Report of Zoning Activity

Monthly Report of Zoning Activity Monthly Report of Zoning Activity MARCH, 216 2 DATE ACCEPTED: 3/17/216 65 ELECTION DISTRICT: 17 2 SHEET: OUT 2 CNU-11469-2 TITLE: SARGENT CLEANERS, CERTIFICATION OF NON-CONFORMING USE FOR A DRY CLEANING

More information

1/11/2019 Committee Chairperson: Sherri Conner

1/11/2019 Committee Chairperson: Sherri Conner SUBDIVISION Development Activity Monitoring System Report SDRC Agenda 1/11/2019 Committee Chairperson: Sherri Conner 5-18099 ASPEN AT MELFORD TOWN CENTER, PLAT M-NCPPC CONNER, SHERRI ACRES: 129.16 M-X-T

More information

O-I (Office-Institutional) and AG-1(Agricultural)

O-I (Office-Institutional) and AG-1(Agricultural) PROPERTY INFORMATION ADDRESS 3503 and 3505 Bethany Bend DISTRICT, LAND LOTS 2/1 973 and 974 OVERLAY DISTRICT State Route 9 PETITION NUMBERS EXISTING ZONING O-I (Office-Institutional) and AG-1(Agricultural)

More information

WHEREAS, the staff of The Maryland-National Capital Park and Planning Commission recommended APPROVAL of the application with conditions; and

WHEREAS, the staff of The Maryland-National Capital Park and Planning Commission recommended APPROVAL of the application with conditions; and R E S O L U T I O N WHEREAS, Redeemed Christian Church of God is the owner of a 2.83-acre parcel of land known as Lot 9, Lot 19, P/O Lot 1 and P/O Lot 18, Block B, Plat Book A, Plat 5, said property being

More information

RECOMMENDATION Following the public hearing, consider Zoning Case PD14-16, with a Development Plan.

RECOMMENDATION Following the public hearing, consider Zoning Case PD14-16, with a Development Plan. Staff Report Zoning Case PD14-16 (Helzer Tract) Planning and Zoning Meeting Date: 12-17-14 Document Being Considered: Ordinance RECOMMENDATION Following the public hearing, consider Zoning Case PD14-16,

More information

Town of Cary, North Carolina Rezoning Staff Report 14-REZ-31 Cary Park PDD Amendment (Waterford II) Town Council Meeting January 15, 2015

Town of Cary, North Carolina Rezoning Staff Report 14-REZ-31 Cary Park PDD Amendment (Waterford II) Town Council Meeting January 15, 2015 Town of Cary, North Carolina Rezoning Staff Report 14-REZ-31 Cary Park PDD Amendment (Waterford II) Town Council Meeting January 15, 2015 REQUEST To amend the Town of Cary Official Zoning Map by amending

More information

Monthly Report of Subdivision Activity

Monthly Report of Subdivision Activity Monthly Report of Subdivision Activity DECEMBER, 28 5 PRELIM NO: 4-87 DATE ACCEPTED: 2/8/28 73 ELECTION DISTRICT: 3 98 LANDOVER ROAD LANDOVER 6 E-3 2 SHEET: 23NE8 OUT 2 OUT TITLE: TOTAL ACREAGE: WOODMORE

More information

Rezoning Petition Final Staff Analysis May 21, 2018

Rezoning Petition Final Staff Analysis May 21, 2018 Rezoning Petition 2017-182 Final Staff Analysis May 21, 2018 REQUEST LOCATION Current Zoning: R-3 (single family) and no zoning (current NC State right-of-way) Proposed Zoning: B-2(CD) (general business,

More information

13 Sectional Map Amendment

13 Sectional Map Amendment 13 Sectional Map Amendment Introduction This chapter reviews land use and zoning policies and practices in Prince George s County and presents the proposed zoning in the sectional map amendment (SMA) to

More information

Cases Accepted or Approved between: 12/10/2018 and 12/16/2018

Cases Accepted or Approved between: 12/10/2018 and 12/16/2018 CSP-05007 ACCEPTED: 12/10/2018 GREENBELT TOWN CENTER AT BELTWAY PLAZA; A MIXED USE AND MULTI-PHASE PROJECT CONSISTING OF 175-250 TWO-OVER-TWO AND TOWNHOUSE UNITS; 875-2,250 MULTIFAMILY DWELLI 5705 CHERRYWOOD

More information

THE SUBDIVISION AND LAND DEVELOPMENT REVIEW PROCESS

THE SUBDIVISION AND LAND DEVELOPMENT REVIEW PROCESS THE SUBDIVISION AND LAND DEVELOPMENT REVIEW PROCESS INTRODUCTION: Howard County Subdivision and Land Development Regulations are intended to promote the health, safety and general welfare of County residents.

More information

Chapter VI: Implementation

Chapter VI: Implementation Chapter VI: Implementation Introduction This chapter reviews land use and zoning policies and practices in Prince George s County and presents the sectional map amendment (SMA) to implement the vision

More information

PLAINFIELD CHARTER TOWNSHIP COMMUNITY DEVELOPMENT DEPARTMENT PLANNING, ZONING & BUILDING SERVICES MEMORANDUM

PLAINFIELD CHARTER TOWNSHIP COMMUNITY DEVELOPMENT DEPARTMENT PLANNING, ZONING & BUILDING SERVICES MEMORANDUM PLAINFIELD CHARTER TOWNSHIP COMMUNITY DEVELOPMENT DEPARTMENT PLANNING, ZONING & BUILDING SERVICES 6161 BELMONT AVENUE N.E. BELMONT, MI 49306 PHONE 616-364-1190 FAX: 616-364-1170 www.plainfieldchartertwp.org

More information

Condominium Unit Requirements.

Condominium Unit Requirements. ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

ARTICLE Encourage well planned, efficient development.

ARTICLE Encourage well planned, efficient development. ARTICLE 14.00 PD PLANNED SECTIONS: 14.01 Intent 14.02 Procedure 14.03 Initial Development Plan 14.04 Final Development Plan 14.05 Amendments 14.06 Planned Development Districts PD-1 Willow Run PD PD-2

More information

Marion County Board of County Commissioners

Marion County Board of County Commissioners Marion County Board of County Commissioners Date: 12/29/2015 P&Z: 12/28/2015 BCC: 1/12/2016 Item Number 160113Z Type of Application Rezoning Request From: A-1 (General Agriculture) To: PUD (Planned Unit

More information

EDMOND PLANNING COMMISSION MEETING. Tuesday, October 5, 2004

EDMOND PLANNING COMMISSION MEETING. Tuesday, October 5, 2004 124 EDMOND PLANNING COMMISSION MEETING Tuesday, 5:30 P.M. The Edmond Planning Commission Meeting was called to order by Chairperson David Woods at 5:30 p.m., Tuesday,, in the City Council Chambers at 20

More information

DEVELOPMENT ACTIVITY AND DISCLOSURE REPORT

DEVELOPMENT ACTIVITY AND DISCLOSURE REPORT DEVELOPMENT ACTIVITY AND DISCLOSURE REPORT For the Quarter Ending June 30, 2008 Frederick County, Maryland Special Obligation Bonds (Urbana Community Development Authority) $30,000,000 Series 1998 $26,513,000

More information

Mohave County General Plan

Mohave County General Plan 63 64 65 66 67 68 69 70 71 The Land Use Diagram is not the County's zoning map. 13 It is a guide to future land use patterns. Zoning and area plan designations may be more restrictive than the land use

More information

United States Post Office and Multi-Family Residential; and, Single- Family Residence with an Apartment

United States Post Office and Multi-Family Residential; and, Single- Family Residence with an Apartment Planning Commission File No.: AME2013 0009 January 9, 2014 Page 2 of 9 Existing Land Use: United States Post Office and Multi-Family Residential; and, Single- Family Residence with an Apartment Surrounding

More information

WESTMINSTER PARK SUBDIVISION

WESTMINSTER PARK SUBDIVISION WESTMINSTER PARK SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer): A. Provide all of the required

More information

DeWITT CHARTER TOWNSHIP 1401 W. HERBISON ROAD, DeWITT, MI PLANNING COMMISSION MINUTES MONDAY, MARCH 6, 2006

DeWITT CHARTER TOWNSHIP 1401 W. HERBISON ROAD, DeWITT, MI PLANNING COMMISSION MINUTES MONDAY, MARCH 6, 2006 DeWITT CHARTER TOWNSHIP 1401 W. HERBISON ROAD, DeWITT, MI PLANNING COMMISSION MINUTES MONDAY, MARCH 6, 2006 The regularly scheduled meeting of the DeWitt Charter Township Planning Commission was called

More information

Rural Living (RL) Rural Living

Rural Living (RL) Rural Living Place Types Rural Living (RL) Rural Living Rural living areas are characterized by very large lots, abundant open space, pastoral views, and a highdegree of separation between buildings. The lots are typically

More information

3 July 13, 2011 Public Hearing APPLICANT / PROPERTY OWNER: MARQUETTE & ASSOCIATES, L.L.C. /G.S. DEVELOPERS, L.L.C.

3 July 13, 2011 Public Hearing APPLICANT / PROPERTY OWNER: MARQUETTE & ASSOCIATES, L.L.C. /G.S. DEVELOPERS, L.L.C. 3 July 13, 2011 Public Hearing APPLICANT / PROPERTY OWNER: MARQUETTE & ASSOCIATES, L.L.C. /G.S. DEVELOPERS, L.L.C. STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (AG-2 Agricultural

More information

CREEKSIDE TOWNHOMES Chevy Chase, Maryland Site Plan No Preliminary Plan No

CREEKSIDE TOWNHOMES Chevy Chase, Maryland Site Plan No Preliminary Plan No +1 (301) 656 5901 info@nova-habitat.com CREEKSIDE TOWNHOMES Chevy Chase, Maryland Site Plan No. 820160050 Preliminary Plan No. 120160130 Application Statement of Justification October 28, 2015 Nova-Habitat,

More information

2 April 9, 2014 Public Hearing

2 April 9, 2014 Public Hearing 2 April 9, 2014 Public Hearing APPLICANT (Street Closure): EBENEZER BAPTIST CHURCH APPLICANT & PROPERTY OWNER (Use Permit Modification): EBENEZER BAPTIST CHURCH STAFF PLANNER: Kevin Kemp REQUESTS: A. Street

More information

THE REDEVELOPMENT PLAN

THE REDEVELOPMENT PLAN PAGE 37 THE REDEVELOPMENT PLAN FUTURE LAND USE The Silver Terrace Redevelopment Area is currently designated as Redevelopment Area #4 on the City of Delray Beach Future Land Use Map (FLUM). This designation

More information

CITY OF DURHAM DURHAM COUNTY NORTH CAROLINA. Zoning Map Change Report. RR Existing Zoning. Rural Rural Density Residential Site Characteristics

CITY OF DURHAM DURHAM COUNTY NORTH CAROLINA. Zoning Map Change Report. RR Existing Zoning. Rural Rural Density Residential Site Characteristics CITY OF DURHAM DURHAM COUNTY NORTH CAROLINA Zoning Map Change Report Meeting Date: February 26, 2007 Reference Name Arrowhead () Jurisdiction County Proposed Zoning RR Existing Zoning RS-20 Request Proposed

More information

PGCPB No File No R E S O L U T I O N

PGCPB No File No R E S O L U T I O N R E S O L U T I O N WHEREAS, Jemal s Calvert II, LLC is the owner of a 1.69-acre parcel of land known as Greenhorne & O Mara s Addition to Riverdale Gardens, Parcel 1, said property being in the 19th Election

More information

LONG RANGE AGENDA May 17, 2018 June 7, 2018

LONG RANGE AGENDA May 17, 2018 June 7, 2018 LONG RANGE AGENDA May 17, 2018 June 7, 2018 4-17025 HYATT VIEW...9 A-9975-01 LOCUST HILL PHASE 1... 10 CP-17005 ERITREAN CHURCH...5 CSP-17004 PEERLESS RESIDENTIAL & RETAIL DEVELOPMENT...9 DDS-645 HEAVENLY

More information

Holding Provisions General Prohibition Exceptions to Prohibition Holding Provisions

Holding Provisions General Prohibition Exceptions to Prohibition Holding Provisions 16.1 General Prohibition Portions of this by-law not yet in effect are covered with a blue tone. This version consolidates all amendments and orders of the OMB up to the consolidation date shown below.

More information

Community Development Department 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321

Community Development Department 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321 SUMMARY Community Development Department 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321 STAFF REPORT Application for Tentative Partition Plat Review Planning File PA-06-17 Phone: 541-917-7550

More information

R E S O L U T I O N. 2. Development Data Summary:

R E S O L U T I O N. 2. Development Data Summary: R E S O L U T I O N WHEREAS, the Prince George s County Planning Board has reviewed Special Permit Application No. SP-170001, Mama s Care Assisted Living Facility, requesting to expand an existing congregate

More information

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

4.2 RESIDENTIAL ZONING DISTRICTS

4.2 RESIDENTIAL ZONING DISTRICTS 4.2 RESIDENTIAL ZONING DISTRICTS A. Purpose: To define regulations and standards for each residential zoning district in the City. The following sections identify uses, regulations, and performance standards

More information

PGCPB No File No R E S O L U T I O N

PGCPB No File No R E S O L U T I O N R E S O L U T I O N WHEREAS, Quad Construction Corp. is the owner of a 167.70-acre parcel of land known as Forest Hills (Parcel 38), located on Tax Map 92 and Grid E-3, said property being in the 3rd Election

More information

ARTICLE 13 CONDOMINIUM REGULATIONS

ARTICLE 13 CONDOMINIUM REGULATIONS ARTICLE 13 CONDOMINIUM REGULATIONS Section 13.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

TILDEN TOWNSHIP PLANNING COMMISSION

TILDEN TOWNSHIP PLANNING COMMISSION TILDEN TOWNSHIP PLANNING COMMISSION Tuesday, Regular Meeting The Tilden Township Planning Commission met in the Township Municipal Building on Tuesday, with the following present: Dale Keener, William

More information

FINAL DRAFT 12/1/16, Rev. to 7/18/17

FINAL DRAFT 12/1/16, Rev. to 7/18/17 FINAL DRAFT 12/1/16, Rev. to 7/18/17 (As Adopted 8/8/17 Effective 9/1/17) SHELTON PLANNING AND ZONING COMMISSION Proposed Amendments to Zoning Regulations I. Amend Section 23 PERMITTED USES by inserting

More information

TOTTENHAM SECONDARY PLAN

TOTTENHAM SECONDARY PLAN TOTTENHAM SECONDARY PLAN AMENDMENT NO. 11 TO THE OFFICIAL PLAN OF THE TOWN OF NEW TECUMSETH The following text and schedules to the Official Plan of the Town of New Tecumseth constitute Amendment No. 11

More information

Monthly Report of CBCA Activity

Monthly Report of CBCA Activity Monthly Report of CBCA Activity DECEMBER, 217 5 DATE ACCEPTED: ELECTION DISTRICT: CP-172 12/4/217 68 16 4633 ARUNDEL PLACE TITLE: CITY OF HYATTSVILLE DEPARTMENT OF PUBLIC WORKS OPERATIONS CENTER REDEVELOPMENT,

More information

Request for Decision STAFF REPORT. Recommendation. Applicant: Location: Application: Proposal: Presented To: Planning Committee

Request for Decision STAFF REPORT. Recommendation. Applicant: Location: Application: Proposal: Presented To: Planning Committee Request for Decision Application for rezoning in order to permit an automotive lube shop in the southeasterly corner of the Lasalle Court Mall property, 900 Lasalle Boulevard, Sudbury - Laurentian Shield

More information

THE CITY OF RAYMORE, MISSOURI Single-Family Residential Zoning Districts

THE CITY OF RAYMORE, MISSOURI Single-Family Residential Zoning Districts THE CITY OF RAYMORE, MISSOURI Single-Family Residential Zoning Districts REGULATIONS COMMON TO ALL DISTRICTS: Uses permitted in each district include detached single-family dwellings, manufactured homes

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No.: Date: 11-12-15 15931 Frederick Road (CarMax) Annexation Request ANX2015-00145 Patrick Butler,

More information

WESTMINSTER PARK PLACE SUBDIVISION

WESTMINSTER PARK PLACE SUBDIVISION WESTMINSTER PARK PLACE SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer): A. Provide all of

More information

The entire Fairwood project is staged into two phases, Phase I and Phase II:

The entire Fairwood project is staged into two phases, Phase I and Phase II: R E S O L U T I O N WHEREAS, the Prince George's County Planning Board is charged with approval of Final Development Plans pursuant to Part 10, Division 2 of the Zoning Ordinance of the Prince George's

More information

PUBLIC HEARING INFORMATION PACKAGE

PUBLIC HEARING INFORMATION PACKAGE PUBLIC HEARING INFORMATION PACKAGE ADDRESS: APPLICANT: 8522 Nottman Street Analytical Consulting PLANNING FILE(S): OCP17-002 R17-015 This Public Hearing Information Package has been compiled to provide

More information

Hanover County Board of Supervisors

Hanover County Board of Supervisors Hanover County Board of Supervisors May 24, 2017 Hanover: People, Tradition & Spirit C-2-05(c), AM. 1-17 Jennifer & Ryan Jones (Iron Hill Subdivision) South Anna Magisterial District Request Location Zoning

More information

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT MAY 18, 2017

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT MAY 18, 2017 BEL REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2016-805 TO PLANNED UNIT DEVELOPMENT MAY 18, 2017 The Planning and Development Department hereby forwards to

More information

Article 7: Residential Land Use and Development Requirements

Article 7: Residential Land Use and Development Requirements Article 7: Residential Land Use and Section 701: Statement of Intent (A) (B) (C) The intent of Article 7 is to develop certain land use and development requirements for the residential uses within Cumru

More information

Article Floating Zone Requirements

Article Floating Zone Requirements Division 5.1. In General Article 59-5. Floating Zone Requirements Section 5.1.1. Zone Categories There are 4 categories of Floating zones: A. Residential Floating zones (Division 5.2); B. Commercial/Residential

More information

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached: Staff Report: Completed by Jeff Palmer Director of Planning & Zoning Date: November 7, 2018 Applicant: Greg Smith, Oberer Land Developer agent for Ronald Montgomery ET AL Property Identification: Frontage

More information

DAUPHIN CREEK ESTATES SUBDIVISION

DAUPHIN CREEK ESTATES SUBDIVISION # 12 SUB-000076-2017 DAUPHIN CREEK ESTATES SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer):

More information

Comprehensive Plan Amendment #PLN , Reserve at Cannon Branch (Coles Magisterial District)

Comprehensive Plan Amendment #PLN , Reserve at Cannon Branch (Coles Magisterial District) COUNTY OF PRINCE WILLIAM 5 County Complex Court, Prince William, Virginia 22192-9201 PLANNING (703) 792-7615 FAX (703) 792-4758 OFFICE Internet www.pwcgov.org Christopher M. Price, AICP Director of Planning

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Hearing Date: 10/8/15 Howard Hughes Medical Institute, Limited Amendment of the Preliminary

More information

STAFF REPORT. January 25, North York Community Council. Director, Community Planning, North District

STAFF REPORT. January 25, North York Community Council. Director, Community Planning, North District STAFF REPORT January 25, 2005 To: From: Subject: Purpose: North York Community Council Director, Community Planning, North District Refusal Report OPA & Rezoning Application 04 194214 NNY 33 OZ Applicant:

More information

Proposed Overland Park Kansas Ordinance RE-1 Residential Estates Community

Proposed Overland Park Kansas Ordinance RE-1 Residential Estates Community 18.171 RE-1 Residential Estate Community 18.171.010 Statement of intent. The zoning of property as RE-1, (Residential Estates Community, 1 dwelling unit per Gross acre density), is intended to provide

More information

M-- I NUTES GLYNN COUNTY PLANNING COMMISSION OCTOBER 5, :00 A.M. Wayne Stewart, Chairman Georgia DeSain Glenda Jones Jack Kite Richard Parker

M-- I NUTES GLYNN COUNTY PLANNING COMMISSION OCTOBER 5, :00 A.M. Wayne Stewart, Chairman Georgia DeSain Glenda Jones Jack Kite Richard Parker M-- NUTES GLYNN COUNTY PLANNNG COMMSSON OCTOBER 5, 1993 9:00 A.M. PRESENT: ABSENT: ALSO PRESENT: STAFF PRESENT: Wayne Stewart, Chairman Georgia DeSain Glenda Jones Jack Kite Richard Parker ra Moore Lee

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019 DEVELOPMENT NAME SUBDIVISION NAME Springhill Village Subdivision Springhill Village Subdivision LOCATION 4350, 4354, 4356, 4358,

More information

Overview. Central Street Master Plan. Appendix B: Zoning

Overview. Central Street Master Plan. Appendix B: Zoning Central Street Master Plan Overview The City of Evanston has 36 zoning districts, of which 11 are found in the Central Street Corridor Study Area (See Figures B.1 and B.2). They include: R1: Single-Family

More information

LONG-RANGE LAND USE PLAN

LONG-RANGE LAND USE PLAN LONG-RANGE LAND USE PLAN INTENT Completion of the I-66/Route 29 interchange and future expansion of improved telecommunication networks will substantially improve the desirability of the Gainesville area

More information

Preliminary Plan

Preliminary Plan The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

ARTICLE 3: Zone Districts

ARTICLE 3: Zone Districts ARTICLE 3: Zone Districts... 3-1 17.3.1: General...3-1 17.3.1.1: Purpose and Intent... 3-1 17.3.2: Districts and Maps...3-1 17.3.2.1: Applicability... 3-1 17.3.2.2: Creation of Districts... 3-1 17.3.2.3:

More information

3 NOVEMBER 9, 2011 Public Hearing APPLICANT:

3 NOVEMBER 9, 2011 Public Hearing APPLICANT: REQUEST: Conditional Change of Zoning (B-2 & I-1 to Conditional A-18) 3 NOVEMBER 9, 2011 Public Hearing APPLICANT: S.L. NUSBAUM REALTY COMPANY PROPERTY OWNER: USF PROPCO II, LLC STAFF PLANNER: Leslie Bonilla

More information

Lincoln County Board of Commissioner s Agenda Item Cover Sheet

Lincoln County Board of Commissioner s Agenda Item Cover Sheet Lincoln County Board of Commissioner s Agenda Item Cover Sheet Board Meeting Date: Agenda Item Type: Consent Agenda: Public Hearing: Regular Agenda: Presentation Time (est): Submitting Person: Phone Number/Ext:

More information

RICHLAND COUNTY COUNCIL ZONING PUBLIC HEARING

RICHLAND COUNTY COUNCIL ZONING PUBLIC HEARING RICHLAND COUNTY COUNCIL ZONING PUBLIC HEARING MAY 27, 2014 RICHLAND COUNTY COUNCIL ZONING PUBLIC HEARING MAY 27, 2014 SC 215 Joyce Dickerson 176 Bill Malinowski 21 26 Torrey Rush Julie Ann Dixon!( Jim

More information

Community Development

Community Development Land Use Petition RZ-15-010 Concurrent Variance VC-15-010-01 Date of Staff Recommendation Preparation: August 14, 2015 Date of Planning Commission Recommendation: September 1, 2015 PROJECT LOCATION: DISTRICT/SECTION/LANDLOT(S):

More information

The following application has been scheduled for hearing by the Boise City Council on February 15, 2011:

The following application has been scheduled for hearing by the Boise City Council on February 15, 2011: MEMORANDUM TO: FROM: Mayor and City Council David Abo, AICP Chief Subdivision Review Analyst Boise City Planning and Development Services DATE: February 8, 2011 The following application has been scheduled

More information

Preliminary Plan

Preliminary Plan The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No.: Date: 06-21-12 The Plantations, Preliminary Plan -120090240 Benjamin Berbert, Senior Planner,

More information

Initial Project Review

Initial Project Review Pierce County Department of Planning and Land Services, 2401 South 35th Street, Tacoma, WA (253) 798-7037 Initial Project Review Major Amendment to Preliminary Plat: Hawks Ridge Division 1 Application

More information

PLANNING COMMISSION REPORT REGULAR AGENDA. PC Staff Report 08/25/10 ITEM NO 6: PRELIMINARY PLAT; HALLMARK ADDITION; ACRES; 151 MCDONALD DR (MKM)

PLANNING COMMISSION REPORT REGULAR AGENDA. PC Staff Report 08/25/10 ITEM NO 6: PRELIMINARY PLAT; HALLMARK ADDITION; ACRES; 151 MCDONALD DR (MKM) PP-6-6-10 Item No. 6-1 PLANNING COMMISSION REPORT REGULAR AGENDA PC Staff Report 08/25/10 ITEM NO 6: PRELIMINARY PLAT; HALLMARK ADDITION; 5.252 ACRES; 151 MCDONALD DR (MKM) PP-6-6-10: Consider a Preliminary

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 20, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 20, 2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 20, 2017 DEVELOPMENT NAME SUBDIVISION NAME LOCATION Rangeline Crossing III Subdivision Rangeline Crossing III Subdivision 5289 Halls Mill

More information

RE: 6. GILL/GREEN COMPREHENSIVE PLAN AMENDMENT, REZONING AND PRELIMINARY PLAT

RE: 6. GILL/GREEN COMPREHENSIVE PLAN AMENDMENT, REZONING AND PRELIMINARY PLAT commission memo DATE: Thursday - August 9, 2018 TO: Marion Planning & Zoning Commission FROM: David N. Hockett, AICP Principal Planner RE: 6. GILL/GREEN COMPREHENSIVE PLAN AMENDMENT, REZONING AND PRELIMINARY

More information

QUARTERPATH COMMUNITY DEVELOPMENT AUTHORITY CITY OF WILLIAMSBURG, VIRGINIA SPECIAL ASSESSMENT REPORT. Prepared By: MuniCap, Inc.

QUARTERPATH COMMUNITY DEVELOPMENT AUTHORITY CITY OF WILLIAMSBURG, VIRGINIA SPECIAL ASSESSMENT REPORT. Prepared By: MuniCap, Inc. QUARTERPATH COMMUNITY DEVELOPMENT AUTHORITY CITY OF WILLIAMSBURG, VIRGINIA SPECIAL ASSESSMENT REPORT Prepared By: MuniCap, Inc. October 25, 2011 QUARTERPATH COMMUNITY DEVELOPMENT AUTHORITY CITY OF WILLIAMSBURG,

More information

Columbia Development Tracker

Columbia Development Tracker Columbia Development Tracker October 1, 2018 The Columbia Development Tracker incorporates projects or development proposals going through their entitlement and/or planning review process. The tracker

More information

QUEENSWAY HYDRO CORRIDOR LAND USE STUDY

QUEENSWAY HYDRO CORRIDOR LAND USE STUDY Exhibit 1 QUEENSWAY HYDRO CORRIDOR LAND USE STUDY November 2001 prepared by Planning and Building Department Table of Contents 1.0 INTRODUCTION...1 1.1 Background...1 1.2 Purpose...2 1.3 Study Method &

More information

STAFF REPORT. Permit Number: Unlimited. Kitsap County Board of Commissioners; Kitsap County Planning Commission

STAFF REPORT. Permit Number: Unlimited. Kitsap County Board of Commissioners; Kitsap County Planning Commission STAFF REPORT Permit Number: 15 00550 Unlimited DATE: March 2, 2016 TO: FROM: Kitsap County Board of Commissioners; Kitsap County Planning Commission Katrina Knutson, AICP, Senior Planner, DCD and Jeff