1 COUNTY OF SAN LUIS OBISPO Department of Public Works Colt Esenwein, Director REFERRAL Date: June 5, 2018 To: Terry Wahler, Project Planner From: Glenn Marshall, Development Services Subject: Public Works Project Referral for DRC , ABR Property CUP, Blue Heron Dr, Avila Beach, APN Thank you for the opportunity to provide information on the proposed subject project. It has been reviewed by several divisions of Public Works, and this represents our consolidated response. PUBLIC WORKS REQUESTS THAT AN INFORMATION HOLD BE PLACED ON THIS PROJECT UNTIL THE APPLICANT PROVIDES THE FOLLOWING DOCUMENTS FOR PUBLIC WORKS REVIEW AND COMMENT: 1. Revise project site plans and submittal to: a. Show FEMA flood zone and flood way information on plans and show how project can comply with the County flood hazard ordinance. b. Remove proposed driveway/road connections in Area G to Avila Beach Drive. No new project connections to Avila Beach Drive or San Luis Bay Drive will be permitted. c. Provide evidence the project has existing, or can secure future, access easements over Lupine Canyon Road, Sparrow Street, Bay Laurel Place, and Blue Heron Drive from the project site back to San Luis Bay Drive (a public roadway) d. Modify Sheet G-5 to: i. Show Avila Beach Drive as a Class 2 Bike Lane in accordance with the County s Bikeways Plan, not the Class 1 trail as shown. ii. Include an onsite circulation plan showing connection between each phased development with onsite amenities (registration, parking, restaurant, golf, etc.), and onsite parking. Show and label the number of dedicated onsite parking places for each Area development. iii. Provide a label and count of the designated parking spaces for each proposed development that requires cart access only. 2. This project is a regulated project as it meets the applicability criteria for Stormwater Management and is therefore required to submit a Stormwater Control Plan Application. The Stormwater Control Plan application, SWCP template, and LID Handbook guidance can be found at: Requirements-for-New-Construction.aspx 3. Submit a Traffic Engineers Report for review and approval by Public Works that addresses both Vehicle Miles Traveled (VMT) and Level of Service (LOS), as follows: a. Assess project CEQA transportation impacts in accordance with California Senate Bill (SB) 743, VMT, regarding assessment of VMT, thresholds of significance, and proposed mitigation measures. b. Assess project LOS in accordance with the County s Traffic Impact Study Policies, Revised County of San Luis Obispo Department of Public Works Page 1 of 9
2 2015. Include the additional analysis: i. Setup coordination meeting with Public Works. We are in the process of performing a capacity analysis for Avila Beach with Omni-Means ii. Site Access: 1. Propose and evaluate an extension of Cave Landing Road from Avila Beach Drive to Blue Heron Drive that provides project access and serves Area F (Phase 2) and Area G (Phase 3) 2. Provide sight distance analysis for Avila Beach Drive at Ana Bay Road 3. Provide sight distance analysis for San Luis Bay Drive at Bay Laurel Place 4. Provide left turn lane warrant analysis for EB Avila Beach Drive, and right turn lane analysis for WB Avila Beach Drive to NB First Street project access 5. Provide left turn lane warrant analysis for EB Avila Beach Drive to Ana Bay Road project access iii. Onsite Circulation (see policy) iv. Alternative modes 1. Provide bike parking near all areas. 2. Provide onsite bike parking and storage for community use (Bob Jones Trail, employees, etc.) at Beach Recreation/Adventure Center v. Roadway Safety Analysis 1. San Luis Bay Drive road segment between Avila Beach Drive and US 101, and at all County road and state highway intersections in between 2. Avila Beach Drive road segment between Port San Luis Obispo and Monte Road, and at all County road and state highway intersections in between vi. Queuing 1. Right and left turn lane queuing analysis at all project entrances based on typical and worse case scenarios (full occupancy with concurrent project and community events). c. In addition, the Traffic Engineers Report must also address the following: i. Identify and evaluat a 24-hour all-weather secondary access routes. ii. Provide onsite improvements consistent with the Avila Parking Study (to be updated in 2018). May include lighting, parking or other amenities to encourage visitor and commuters to not park downtown. 1. Parking Analysis for both on-site improvements and event parking addressing conditions of: a. Full lodge attendance and 3,000 person event attendance b. Full lodge attendance and 5,000 person event attendance c. Provide means to build suitable parking capacity without impact to current on street parking in town of Avila d. Prepare a draft Traffic Management Plan to address project related uses and events. The Traffic Management Plan should incorporate, at a minimum the following: i. Establish and implement a mandatory shuttle program for event guests and visitors, including identification of offsite park-and-ride facilities. County of San Luis Obispo Department of Public Works Page 2 of 9
3 ii. Establish and implement a program that limits or prohibits guests and visitors from using their private vehicles to access events by encouraging alternative modes of transportation, high occupancy vehicle preferences, parking passes, free shuttle, etc. iii. Establish a monitoring and recording program to document TMP compliance that includes event day vehicle counts for morning and afternoon peak hour trips, and total daily trips iv. Identify a traffic control plan to include CHP for traffic control and enforcement, a signage plan to prevent event attendees from parking in town, etc. Public Works Comments: A. This project should be processed as part of the Avila Area Plan update currently in year two of five for development. Sara Sanders in Planning & Building is leading the update plan development. Omni-Means is doing the capacity metrics for Avila and TJKM parking. The applicant is encouraged to meet with County staff to discuss. B. The proposed project triggers road improvements per Resolution C. The proposed public serving project site is not located further that 1-mile from a collector or arterial ( D2a). Avila Beach Drive is designated a collector. D. The proposed project is located off non-county maintained roads. In accordance with Resolution no proposed land development which attracts general public traffic shall be permitted on privately maintained roads without a submission of a road maintenance agreement. E. The proposed project fronts Avila Beach Drive, identified in the 2016 County Bikeways Plan as a Class 2 Bike Lanes. Road widening improvements are required for compliance with the County Bikeways Plan. F. The proposed project is within the Avila Valley Road Fee Area. Payment of Road Improvement Fees is required prior to building permit issuance. G. The proposed project is within a drainage review area. Drainage plan is required to be prepared by a registered civil engineer and it will be reviewed at the time of Building Permit submittal by Public Works. The applicant should review Chapter or of the Land Use Ordinance prior to future submittal of development permits. H. The proposed project is currently located within the 100-year flood zone. The project engineer should be prepared to determine the 100-year base flood elevation and comply with County requirements for flood hazard. I. This project is a regulated project as it meets the applicability criteria for Stormwater Management and is therefore required to submit a Stormwater Control Plan (SWCP) Application. The Stormwater Control Plan application, SWCP template, and LID Handbook guidance can be found at: Requirements-for-New-Construction.aspx J. The applicable Post Construction Stormwater Performance Requirement(s) to fulfill shall be based on cumulative new or replaced impervious surface development on the project site, including the required public improvements to the project frontage. The applicant must prepare a SWCP for all improvements to encompass the entire project site and ensure a decentralized approach. When stormwater management facilities are required: i. Structural Control Measures (SCM) for public or common area improvements (including those for fronting and interior roadways) shall be constructed with those improvements and remain outside the County maintained road right-of-way. Private stormwater systems may use one of two mechanisms for recording an Operation and Maintenance Plan (i.e. Agreement, CCRs) County of San Luis Obispo Department of Public Works Page 3 of 9
4 ii. Structural Control Measures (SCMs) and Flood Control Basins shall remain separate unless otherwise approved by the Public Works Department. K. If the project site disturbs 1.0 acre or more the applicant must enroll for coverage under California s Construction General Permit, which may require preparation of a project Stormwater Control Plan even though its located outside a Stormwater Management Area. Recommended Project Conditions of Approval: Access 2. On-going condition of approval (valid for the life of the project), to minimize project related traffic impacts in accordance with the project traffic report (TO BE DETERMINED, dated XXXXXX), the following project specific mitigations must be met to the satisfaction of the County: a. TO BE DETERMINED FROM PROJECT TRAFFIC STUDY 3. At the time of application for construction permits, the applicant shall submit to the Department of Public Works an encroachment permit application, plans, fees, and post a cash damage bond to install improvements within the public right-of-way in accordance with County Public Improvement Standards. The plans are to include, as applicable: a. Street plan and profile for widening Avila Beach Drive to: i. Complete the project frontage to an A-1 rural road section with Class II bike lanes within necessary dedicated right-of-way easements. ii. Complete center left turn lane channelization, including adequate storage lengths, at each approved site access point in accordance with California Highway Design Manual, Chapter 400, within necessary dedicated right-of-way easements. iii. Complete right turn lane channelization, including adequate storage lengths, at each approved site access point in accordance with County road standards, within necessary dedicated right-of-way easements. iv. Reconstruct, if necessary, all deteriorated or non-compliant Avila Beach Drive project frontage improvements to current County standards for curb, gutter, sidewalk, driveway approach, and curb ramp. b. Street plan and profile for improving Cave Landing Road to an A-1 rural road section from its intersection with Avila Beach Drive through the project site to Blue Heron Drive. c. Reconstruct, if necessary, all deteriorated or non-compliant Bob Jones Trail improvements through and adjacent to the project site to current County standards for Class 1 trails. d. To remove or relocate all existing non-permitted obstructions from within the public right-of-way of the project frontage. Known obstruction include, but are not limited to, fences and trees. e. Public utility plan, showing all existing utilities and installation of all new utilities to serve the site. f. Tree removal/retention plan for trees to be removed and retained associated with the required public improvements. The plan shall be approved jointly with the Department of Planning and Building. g. Traffic control plan for construction in accordance with the California Manual on Uniform Traffic Control Devices (CA-MUTCD). h. The applicant shall provide satisfactory evidence that the Army Corps of Engineers and the California Department of Fish and Game environmental permits have either been secured or that the regulatory agency has determined that their permit is not required. County of San Luis Obispo Department of Public Works Page 4 of 9
5 4. On-going condition of approval (valid for the life of the project), and in accordance with County Code Section 13.08, no activities associated with this permit shall be allowed to occur within the public right-of-way including, but not limited to, project signage; tree planting; fences; etc. without a valid encroachment permit issued by the Department of Public Works. 5. On-going condition of approval (valid for the life of the project), the property owner shall be responsible for operation and maintenance of public road frontage sidewalks, landscaping, maintaining County driveway sight distance standards, street lighting, and pedestrian amenities in a viable condition and on a continuing basis into perpetuity. 6. At the time of application for construction permits, the applicant shall enter into an agreement and post a deposit with the county for the cost of checking the improvement plans and the cost of inspection of any such improvements by the County or its designated representative. The applicant shall also provide the county with an Engineer of Work Agreement retaining a Registered Civil Engineer to furnish construction phase services, Record Drawings and to certify the final product to the Department of Public Works. 7. Prior to commencing permitted activities, all work in the public right-of-way must be constructed or reconstructed to the satisfaction of the Public Works Inspector and in accordance with the County Public Improvement Standards; the project conditions of approval, including any related land use permit conditions; and the approved improvement plans. 8. At the time of application for construction permits, the applicant shall provide evidence to the Department of Planning and Building that onsite circulation and pavement structural sections have been designed and shall be constructed in conformance with Cal Fire, or the regulating fire agency standards and specifications back to the nearest public maintained roadway. 9. At the time of application for construction permits, the applicant shall submit evidence to the Department of Planning and Building of a road maintenance agreement. The agreement shall establish an organized and perpetual mechanism to ensure adequate maintenance of the shared access roads in a form acceptable to the County. The road maintenance agreement shall be signed by the owners of all properties which have shared access rights or be fully assumed by the applicant for the full width across their property frontage and back to the nearest county maintained road; be binding upon their heirs and assigns; and be recorded with the County Clerk on each of the effected properties. Transportation Management Plan 10. At the time of application for construction permits, the applicant shall submit a Transportation Management Plan (TMP) prepared by a licensed civil or traffic engineer for review and approval by the Planning and Building Department, in consultation with the Public Works Department. The intent of the TMP will be to minimize impacts to the surrounding road network for events of any size. The elements of the TMP must include: a. The recommendations from the preliminary Transportation Demand Management Plan prepared by XXXXX, dated XXXXX. i. Establish and implement a mandatory shuttle program for event guests and visitors, including identification of offsite park-and-ride facilities. ii. Establish and implement a program that limits or prohibits guests and visitors from using their private vehicles to access events by encouraging alternative modes of transportation, high occupancy vehicle preferences, parking passes, free shuttle, etc. iii. Establish a monitoring and recording program to document TMP compliance that includes event day vehicle counts for morning and afternoon peak hour trips, and total daily trips iv. Establish a CHP traffic control and enforcement program. v. Establish a community signage program to prevent event parking in town. County of San Luis Obispo Department of Public Works Page 5 of 9
6 b. Event traffic control plan including signage and flag-persons. Note that an encroachment permit issued by Public Works will be required for any traffic control proposed within the right-of-way. c. No site event shall occur during PG&E Diablo Canyon shift changes. d. No site event shall occur during historic community events. e. Limit event delivery services to off-peak event hours. f. Designate a TMP coordinator and provide contact information. Together with implementing the TMP, the coordinator must also respond to all agency and public inquires. g. Establish and implement an enforcement program to ensure compliance with the approved TMP and a records keeping plan to substantiate compliance. h. Establish and implement a procedure to request county approval for subsequent TMP amendments. 11. On-going condition of approval (valid for the life of the project), the property owner(s) shall adhere to and enforce the Transportation Management Plan (TMP). Amendments to the TMP may be allowed but must be submitted by a registered civil or transportation engineer for prior approval by the County Planning and Building Department, in consultation with the Department of Public Works. Fees 12. On-going condition of approval (valid for the life of the project), and in accordance with Title of the County Code, the applicant shall be responsible for paying to the Department of Public Works the Avila Valley Road Improvement Fee. The fee shall be imposed at the time of application for building permits and shall be assessed for each building permit to be issued. These fees are subject to change by resolution of the Board of Supervisors. The applicant shall be responsible for paying the fee in effect at the time of issuance of building permits. Coastal Well Permit 13. Within 30-days of permit approval, in accordance with Title 8, Section (for Coastal Zones), and to the satisfaction of the Department of Public Works, the applicant shall establish ongoing water well monitoring and reporting requirements for incorporation into the resource management system. 14. On-going condition of approval (valid for the life of the project): In accordance with Title 8, Section (for Coastal Zones), water well monitoring requirements as established by the Department of Public Works will be met prior to issuance of the Environmental Health Department s water well permit Drainage & Flood Hazard 15. At the time of application for construction permits, the applicant shall submit complete drainage plans prepared by a licensed civil engineer for review and approval in accordance with Section (Drainage) or (Drainage) of the Land Use Ordinance. 16. At the time of application for construction permits, the applicant shall show the 100-year flood hazard boundary on the project plans. 17. At the time of application for construction permits, the applicant shall submit evidence to the Department of Public Works that all new structures comply with County flood hazard construction standards. 18. At the time of application for construction permits, the applicant shall submit complete erosion and sedimentation control plan for review and approval. 19. Prior to issuance of construction permits, the applicant shall provide evidence satisfactory to the Department of Planning and Building that the Army Corps of Engineers and the California Department County of San Luis Obispo Department of Public Works Page 6 of 9
7 of Fish and Game environmental permits have either been secured or that the regulatory agency has determined that their permit is not required. 20. At the time of application for construction permits, the applicant shall demonstrate that the project construction plans are in conformance with their Stormwater Control Plan. 21. On-going condition of approval (valid for the life of the project): In accordance with (Article III), non-stormwater discharges into the county storm drain system shall require an encroachment permit as described in Chapter of the County Code. Permits shall only be issued when applicant successfully demonstrates compliance with all requirements of Article III. Stormwater Pollution Prevention Plan (SWPPP) 22. At the time of application for construction permits, if the project disturbs more than 1.0 acre or is part of a common plan of development, the applicant must enroll for coverage under California s Construction General Permit. Sites that disturb less than 1.0 acre must implement all required elements within the site s erosion and sediment control plan as required by San Luis Obispo County Codes. Stormwater Control Plan (SWCP): 23. At the time of application for construction permits, the applicant shall demonstrate whether the project is subject post-construction stormwater requirements by submitting a Stormwater Control Plan application. a. The applicant must submit a Stormwater Control Plan (SWCP) prepared by an appropriately licensed professional to the County for review and approval. Applicants must utilize the County s latest SWCP template. b. If applicable, the applicant shall submit a draft stormwater operations and maintenance plan for review by the County. The operations and maintenance plan may be incorporated into existing or proposed CC&Rs or drafted as an Agreement. c. If applicable, following approval by the County, the applicant shall record with the County Clerk-Recorder a Stormwater Operations and Maintenance plan to document on-going and permanent storm drainage control, management, treatment, inspection and reporting. d. If applicable, the applicant shall submit a draft General Notice to document the location and type of control measures that were installed to mitigate Performance Requirement No. 2. Following approval by the County, the applicant shall record the General Notice with the County Clerk-Recorder. The recorded control measures shall remain in good working order in perpetuity. 24. Prior to approval of the improvement plans or construction permits, if necessary, the applicant shall submit a draft Storm Water Operations and Maintenance Plan for all structural post-construction storm water treatment or retention facilities and it must be provided for review. 25. Prior to approval of the improvement plans or construction permits, the Stormwater Operations and Maintenance plan and General Notice must be updated to reflect as-built changes, approved by the County, and re-recorded with the County Clerk-Recorder as amendments to the original document. Recycling 26. On-going condition of approval (valid for the life of the project), the applicants shall provide recycling opportunities to all facility users at all events in accordance with Ordinance of the County of San Luis Obispo Department of Public Works Page 7 of 9
8 San Luis Obispo County Integrated Waste Management Authority (mandatory recycling for residential, commercial and special events). Offers 27. Prior to issuance of construction permits, the applicant shall offer for dedication to the public rightof-way easements by separate document for Avila Beach Drive road widening purposes a sufficient width as necessary to contain all elements of the roadway prism including slopes, sidewalks, driveway aprons, curb returns and other improvements. Offers are to be recorded by separate document with the County Clerk upon review and approval by Public Works. 28. Prior to issuance of construction permits, the applicant may be required to offer for dedication to the public drainage easement(s) as necessary to contain both existing and proposed drainage features where those features accept public road storm flows. Offers are to be recorded by separate document with the County Clerk upon review and approval by Public Works. G:\Development\_DEVSERV Referrals\Land Use Permits\CUP\DRC2018\DRC ABR Prop CUP Avila Beach\DRC ABR Prop CUP Avila Beach.docx County of San Luis Obispo Department of Public Works Page 8 of 9
9 County of San Luis Obispo Department of Public Works Page 9 of 9
CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811
CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811 ACTION OF THE ZONING ADMINISTRATOR On Thursday, September 14, 2017, the Zoning
More informationJEFFERSON COUNTY, ALABAMA
JEFFERSON COUNTY, ALABAMA Major Development Checklist, Notes and Information A Major Development is any proposed new structure or addition to an existing structure which will cause a change in the topography
More informationa. provide for the continuation of collector streets and thoroughfare streets between adjacent subdivisions;
Section 7.07. Intent The requirements of this Section are intended to provide for the orderly growth of the Town of Holly Springs and its extra-territorial jurisdiction by establishing guidelines for:
More informationSITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST
SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST Completed DRC Application for Review Required for Application Process DRC Processing Fee 1 Commercial $2,500.00 Fire Department Review Fee 150.00 Total $2,650.00
More informationCommitted to Service
Committed to Service Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner August 25, 2017 Development Services TO:
More informationMEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR
MEMORANDUM TO: FROM: BY: PLANNING COMMISSION TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR MATTHEW DOWNING, ASSISTANT PLANNER SUBJECT: CONSIDERATION OF TENTATIVE PARCEL MAP CASE NO. 14-002; SUBDIVISION
More information5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.
Conditions Relating to Draft Plan of Subdivision Approval East Fonthill 26T 01014 (Draft Plan dated December 1, 2013, and revised August 28, 2014), the Town of Pelham 1. This approval applies to the Draft
More informationLYON COUNTY COMMUNITY DEVELOPMENT DEPARTMENT
LYON COUNTY COMMUNITY DEVELOPMENT DEPARTMENT B UILDING D EVELOPMENT E NGINEERING P LANNING 27 S. MAIN S TREET Y ERINGTON, NEVADA 89447 (775) 463-6591 F AX: (775) 463-5305 34 LAKES B OULEVARD D AYTON, NEVADA
More informationCobb County Community Development Agency Zoning Division 1150 Powder Springs St. Marietta, Georgia 30064
Cobb County Community Development Agency Zoning Division 1150 Powder Springs St. Marietta, Georgia 30064 Case # Z-63 Public Hearing Dates: PC: 11-06-18 BOC: 11-20-18 SITE BACKGROUND Applicant: Loyd Development
More informationSECTION 7000 LAND DEVELOPMENT REQUIREMENTS
SECTION 7000 LAND DEVELOPMENT REQUIREMENTS 7000 LAND DEVELOPMENT REQUIREMENTS... 1 7001 LEGISLATIVE AUTHORITY... 1 7001.1 LAND DEVELOPMENT... 1 7001.1.1 Title 40, Idaho Code... 1 7001.1.2 Idaho Code 40-1415
More informationM-43 CORRIDOR OVERLAY ZONE
ARTICLE 26.00 M-43 CORRIDOR OVERLAY ZONE Section 26.01 Findings A primary function of the M-43 state highway is to move traffic through the Township and to points beyond. As the primary east-west arterial
More informationCommitted to Service
Committed to Service Kent Goldthorpe, President Paul Woods, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner July 18, 2016 Development Services TO:
More informationDate: March 16, Jake Centers ERD, LLC P.O. Box 1610 Eagle, ID Elevation Ridge Subdivision (SUB & PUD ) Street Address
Rebecca W. Arnold, President Sara M. Baker, Vice President John S. Franden, Commissioner Carol A. McKee, Commissioner David L. Case, Commissioner Date: March 16, 2012 To: Jake Centers ERD, LLC P.O. Box
More informationChapter Plat Design (LMC)
Chapter 18.14 Plat Design (LMC) Sections: 18.14.010 Lot width 18.14.020 Right-of-way requirements 18.14.030 Pipe stem lots 18.14.040 Division resulting in minimum lot sizes 18.14.050 Flood prone and bad
More informationMay 21, ACHD Board of Commissioners Stacey Yarrington, Planner II DRH /DRH
Development Services Department May 21, 2013 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner II DRH13-00106/DRH13-00108 Executive Summary: This is a design review application
More informationWRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC
WRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC Application of Hayden Signature, LLC, an Idaho limited liability company,
More informationPLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT
PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DATE: TO: Hearing Officer SUBJECT: Minor Variance #11876 LOCATION: APPLICANT: ZONING DESIGNATION: GENERAL PLAN DESIGNATION: CASE PLANNER: STAFF
More informationARTICLE IV: DEVELOPMENT STANDARDS
ARTICLE IV: DEVELOPMENT STANDARDS IV-53 409 PRIVATE STREETS A private street means any way that provides ingress to, or egress from, property by means of vehicles or other means, or that provides travel
More informationTENTATIVE PARCEL MAP APPLICATION GUIDE TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS
TENTATIVE PARCEL MAP APPLICATION GUIDE SISKIYOU COUNTY PLANNING DIVISION 806 South Main Street, Yreka CA 96097 Phone: (530) 841-2100 / Fax: (530) 841-4076 TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS
More informationSUBDIVISION DESIGN PRINCIPLES AND STANDARDS
SECTION 15-200 SUBDIVISION DESIGN PRINCIPLES AND STANDARDS 15-201 STREET DESIGN PRINCIPLES 15-201.01 Streets shall generally conform to the collector and major street plan adopted by the Planning Commission
More informationRESOLUTION NO. FILE NO. PT14-047
RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE APPROVING A VESTING TENTATIVE MAP TO SUBDIVIDE ONE (1) LOT INTO NINE (9) LOTS FOR RESIDENTIAL USES, AND ONE (1) LOT FOR COMMON USES ON
More informationFinancial Impact Statement There are no immediate financial impacts associated with the adoption of this report.
STAFF REPORT Planning and Development Department Subject: Application by RYC Property to rezone a portion of lands on John Murray Dr. and Megan Lynn Dr. from R2 to R3 and to enter into a Development Agreement
More informationAPPENDIX B. SUBMISSION REQUIREMENTS
Master Major Site Minor Site Landscape Section B.1 Table of /Plat Requirements Proposed or approved name of development, project, subdivision, and/or phase. Location, including township, county, and state.
More informationIf you have any questions, please feel free to contact me at (208)
Sara M. Baker, President John S. Franden, Vice President Rebecca W. Arnold, Commissioner Mitchell A. Jaurena, Commissioner Jim Hansen, Commissioner Date: March 21, 2013 To: Subject: Hornet Construction
More informationARTICLE 3 DEFINITIONS
Sections: 3-1 Rules of Construction 3-2 Definitions ARTICLE 3 DEFINITIONS SECTION 3-1 RULES OF CONSTRUCTION 3-101. a. The language set forth in these regulations shall be interpreted in accordance with
More informationAPPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps
CITY OF EL CERRITO Community Development Department Planning and Building Division 10890 San Pablo Avenue, El Cerrito, CA 94530 (510) 215-4330 FA (510) 233-5401 planning@ci.el-cerrito.ca.us APPLICATION
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 3 Date: 01-31-13 Preliminary Plan 120090300, Boyds Highlands Calvin Nelson, Jr. Planner Coordinator,
More informationCOMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321
COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321 Ph: 541-917-7550 Fax: 541-917-7598 www.cityofalbany.net STAFF REPORT Application for Site Plan Review SP-07-18 and
More informationSUB /CAR /PUD
Development Services Department Project/File: Lead Agency: Site address: Balntyre Court Subdivision/BPP16-0036/ SUB16-00066/CAR16-00035/PUD16-00040 This is a rezone, planned unit development, and subdivision
More informationROAD APPROACH ORDINANCE #44 TILLAMOOK COUNTY OREGON. ADOPTED September 18, UPDATED June 23, UPDATED June 28, UPDATED July 24, 1996
ROAD APPROACH ORDINANCE #44 TILLAMOOK COUNTY OREGON ADOPTED September 18, 1991 UPDATED June 23, 1993 UPDATED June 28, 1995 UPDATED July 24, 1996 UPDATED June 23, 1999 UPDATED January 1, 2009 UPDATED November
More informationGENERAL GUIDELINES ROAD SYSTEMS, MAPPING AND ADMINISTRATION
GENERAL GUIDELINES ROAD SYSTEMS, MAPPING AND ADMINISTRATION The road system in Montezuma County consists of state highways, county roads, city streets, and other public and private road systems. 1. The
More informationCOUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT
COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT DATE: October 20, 2016 TO: FROM: Zoning Hearing Officer Planning Staff SUBJECT: Consideration of a Non-Conforming Use Permit, pursuant to Sections 6135
More informationBEFORE THE LAND USE HEARINGS OFFICER OF CLACKAMAS COUNTY, OREGON
BEFORE THE LAND USE HEARINGS OFFICER OF CLACKAMAS COUNTY, OREGON Regarding an Application for a Conditional Use ) Case File No. Permit to Establish a New Headquarters and ) Demonstration Center. ) (Soils
More informationCommitted to Service
Committed to Service Sara M. Baker, President Rebecca W. Arnold, Vice President Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner Paul Woods, Commissioner January 16, 2018 Development Services
More informationExecutive Summary: This is a preliminary plat to construct 8 residential lots and 2 commons lots with a private road on 3.87-acres in Meridian, Idaho.
Development Services Department DATE: July 7, 2015 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner III Kentucky Villas/ MPP15-0012/ PP15-009 Executive Summary: This is a preliminary
More informationARTICLE 900 PLAT AND PLAN REQUIREMENTS
ARTICLE 900 PLAT AND PLAN REQUIREMENTS SEC. 900.1 ITEMS TO BE SHOWN ON PLAT OR PLAN General (1) Property lines of all property owners adjacent to the exterior boundaries of the project shall be located
More informationSection 4 Master Plan Framework
Section 4 Master Plan Framework 4.1 PURPOSE The Master Plan, as an implementation tool of the SPC District, establishes the primary framework for the overall development of the Property. Detailed site
More informationSubdivision (Plat) Checklist
Subdivision (Plat) Checklist This Checklist is intended to assist you in preparing a complete application for submittal. Occasionally, additional items may be required to complete the review. Incomplete
More informationTown of Lisbon, Maine SUBDIVISION REVIEW APPLICATION
Date Received: Fee Paid (amount): Applicant: Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION Subdivision Name/Title: This application must be received at the Town Office by close of business on the
More informationTENTATIVE PARCEL MAP TIME EXTENSION
EL DORADO COUNTY DEVELOPMENT SERVICES ZONING ADMINISTRATOR STAFF REPORT Agenda of: October 15, 2008 Item No.: Staff: 4.a. Mel Pabalinas TENTATIVE PARCEL MAP TIME EXTENSION APPLICATION FILE NO.: APPLICANT:
More information#1 (CAR /SUB )
Development Services Department Project/File: Lead Agency: Site address: Fork South #1 (CAR14-00009/SUB14-00024) The applicant is requesting annexation, rezone and preliminary plat approvals for a 52-lot
More informationTOWN OF WHITBY REPORT RECOMMENDATION REPORT
TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Planning and Development Committee REPORT NO: PL 4-08 DATE OF MEETING: January 21, 2008 FILE NO(S): MI-01-07 (SW- 2002-03) PREPARED BY: Planning Department
More informationThe purpose of this Chapter is to establish rules, regulations, standards and procedures for approval of subdivisions of land to promote and ensure:
CHAPTER 7 SUBDIVISION SECTION 7.1 PURPOSE The purpose of this Chapter is to establish rules, regulations, standards and procedures for approval of subdivisions of land to promote and ensure: A. Conformity
More informationKitsap County Department of Community Development. Hearing Examiner Staff Report and Recommendation
Kitsap County Department of Community Development Hearing Examiner Staff Report and Recommendation Report Date: Application Submittal Date: May 7, 2018 Hearing Date: January 24, 2019 Application Complete
More informationthe Comprehensive Plan and local land development regulations.
RESOLUTION NO. R-90-522 RESOLUTION APPROVING ZONING PETITION NO. 87-103(B) SPECIAL EXCEPTION PETITION OF ADAMHILL FINANCIAL CORPORATION WHEREAS, the Board of County Commissioners, as the governing body,
More informationFINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina
FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina This document is a public record under the North Carolina Public Records Act and may be published on the Town s website or disclosed to third
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No.: Date: 06-21-12 The Plantations, Preliminary Plan -120090240 Benjamin Berbert, Senior Planner,
More informationGuide to Preliminary Plans
Guide to Preliminary Plans Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures
More informationCOMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST
Community Development 110 South Main Street Springville, UT 84663 COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST 801.491.7861 www.springville.org Prior to the issuance of a building
More information9. REZONING NO Vicinity of the northwest corner of 143 rd Street and Metcalf Avenue
9. REZONING NO. 2002-15 Vicinity of the northwest corner of 143 rd Street and Metcalf Avenue 1. APPLICANT: Andrew Schlagel is the applicant for this request. 2. REQUESTED ACTION: The applicant is requesting
More informationGuidelines for the Approval of New Homes Sales Offices (Building Permits, Agreements, Securities)
Guidelines for the Approval of New Homes Sales Offices (Building Permits, Agreements, Securities) ENCLOSURES: Site Plan Application Building Permit Application Grading and Drainage Approval Requirements
More information***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS
105.11. Permit requirements. 105.12. Waiver of permit requirements. Title 25 Environmental Protection Part I. Department of Environmental Protection Subpart C. Protection of Natural Resources Article I.
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 12/4/14 Preliminary Plan No. 120140200, Northwood Knolls Description Patrick Butler,
More informationCity of Brooklyn Park Planning Commission Staff Report
City of Brooklyn Park Planning Commission Staff Report Agenda Item: 6D Meeting Date: August 9, 2017 Originating Agenda Section: Public Hearing Department: Community Development Resolution: X Ordinance:
More informationARTICLE 5 GENERAL REQUIREMENTS
5.1 SUITABILITY OF THE LAND ARTICLE 5 GENERAL REQUIREMENTS 5.1.1 Land subject to flooding, improper drainage or erosion, and land deemed to be unsuitable for development due to steep slope, unsuitable
More informationRESOLUTION NO. FILE NO. PT15-066
RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE APPROVING A VESTING TENTATIVE MAP TO ALLOW AN EXTENSION FOR UP TO 15 YEARS FOR TENTATIVE SUBDIVISION MAP FILE NO. PT13-061, CONSISTENT
More informationKitsap County Department of Community Development. Staff Report and Administrative Decision
Kitsap County Department of Community Development Report Date: Staff Report and Administrative Decision Application Complete Date: March 19, 2018 Application Submittal Date: March 19, 2018 To: Seth Hanson,
More informationThis project is categorically exempt from the requirements of CEQA under Categorical Exemption, Section Existing Facilities.
WALNUT CREEK PLANNING COMMISSION RESOLUTION NO. > CONDITIONAL USE PERMIT (TREE REMOVAL PERMIT) APPLICATION NO. Y14-133 2055 N. BROADWAY OFFICE EXTERIOR REMODEL 2055 N. Broadway, APN: 173-141-039 (EFFECTIVE
More informationSite Plan Application
Site Plan Application City of St. Pete Beach Community Development Department 155 Corey Avenue St. Pete Beach, Florida 33706 (727) 367-2735 www.stpetebeach.org Case Number: PROPERTY OWNER: Name: Address:
More informationAPPLICATION PROCEDURE
ANTRIM PLANNING BOARD P. O. Box 517 Antrim, New Hampshire 03440 Phone: 603-588-6785 FAX: 603-588-2969 APPLICATION FORM AND CHECKLIST FOR MINOR OR MAJOR SITE PLAN REVIEW File Date Received By APPLICATION
More informationTOWN OF ELIOT PLANNING BOARD SUBDIVISION APPLICATION
TOWN OF ELIOT PLANNING BOARD SUBDIVISION APPLICATION This application shall conform in all respects to the Land Subdivision Standards of Chapter 41 of the Planning Board of the Town of Eliot code of ordinances.
More informationChapter 115 SUBDIVISION OF LAND
Chapter 115 SUBDIVISION OF LAND [HISTORY: Adopted by the Town Board of the Town of Conklin 11-9-1999 by L.L. No. 2-1999. Amendments noted where applicable.] Planning Board See Ch. 33. Fire prevention and
More informationPALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION
PALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION Application No.: DOA-2014-01111 Application Name: World Class Academy Control No.: 1998-00052 Applicant: World Class Academy Inc
More informationSUBCHAPTER 02C - SECONDARY ROADS SECTION SECTION SECONDARY ROADS
SUBCHAPTER 02C - SECONDARY ROADS SECTION SECTION.0100 - SECONDARY ROADS Note: The Department of Transportation publishes a volume entitled "Minimum Design and Construction Criteria for Subdivision Streets"
More informationSITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL
SECTION 22.01 PURPOSE ARTICLE XXII PROCEDURES The purpose of this Article is to establish uniform requirements of procedure for all developments in the Township. Certain specific types of minor development
More informationEXCERPTS FROM HALIFAX REGIONAL MUNICIPALITY CHARTER
EXCERPTS FROM HALIFAX REGIONAL MUNICIPALITY CHARTER Municipal planning strategy 227 The Council may adopt a municipal planning strategy for all, or part, of the Municipality and there may be separate strategies
More informationFINAL DRAFT 12/1/16, Rev. to 7/18/17
FINAL DRAFT 12/1/16, Rev. to 7/18/17 (As Adopted 8/8/17 Effective 9/1/17) SHELTON PLANNING AND ZONING COMMISSION Proposed Amendments to Zoning Regulations I. Amend Section 23 PERMITTED USES by inserting
More informationResidential Minor Subdivision Review Checklist
Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining
More informationArticle XII. General Provisions and Regulations
and Regulations The regulations contained in this chapter are intended to clarify, supplement or modify the regulations set forth elsewhere in this ordinance. 157.182. USE OF LAND OR STRUCTURES A. Conformity
More informationCOUNTY OF EL DORADO DEVELOPMENT SERVICES PLANNING COMMISSION STAFF REPORT TENTATIVE MAP
COUNTY OF EL DORADO DEVELOPMENT SERVICES PLANNING COMMISSION STAFF REPORT Agenda of: June 27, 2013 Item No.: 9.a Staff: Mel Pabalinas TENTATIVE MAP FILE NUMBER: APPLICANT: REQUEST: LOCATION: TM10-1501/West
More informationIndividual Well Individual Septic. Community Well 19. What is the proposed method of sewage disposal? Public. None
Please Answer the Following Questions: (attach sheet if needed). What type of facility is being proposed? Campground Recreational Vehicle (RV) Park Both 2. What is the total acreage of the proposed facility?
More informationCITY OF CORNING TENTATIVE MAPS
CITY OF CORNING TENTATIVE MAPS APPLICANT S GUIDE TO PROCEDURES WHAT IS A TENTATIVE MAP? A division of land for the purpose of sale, lease, or finance requires submittal of a map for City approval showing
More informationEL DORADO COUNTY DEVELOPMENT SERVICES ZONING ADMINISTRATOR STAFF REPORT TENTATIVE PARCEL MAP TIME EXTENSION
EL DORADO COUNTY DEVELOPMENT SERVICES ZONING ADMINISTRATOR STAFF REPORT Agenda of: March 1, 2017 Item No.: Staff: 4.a. Rob Peters TENTATIVE PARCEL MAP TIME EXTENSION FILE NO.: APPLICANT: OWNER: ENGINEER:
More information-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION OF LAND REGULATIONS TITLE 17
ARTICLE VI -- GENERAL REGULATIONS AND PROVISIONS Sec. 17-50. Sec. 17-51 General Plan. Sec. 17-52 Lot and Block Design and Configuration. Sec. 17-53 Lot Access. Sec. 17-54 Private Roads. Sec. 17-55 Water
More informationGuide to Combined Preliminary and Final Plats
Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested
More informationReferral Early Consultation
DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT 1010 10 TH Street, Suite 3400, Modesto, CA 95354 Planning Phone: (209) 525-6330 Fax: (209) 525-5911 Building Phone: (209) 525-6557 Fax: (209) 525-7759 Date:
More informationCITY COUNCIL STAFF REPORT
CITY COUNCIL STAFF REPORT TO: Honorable Mayor and City Council DATE: May 7, 2018 FROM: PREPARED BY: SUBJECT: Matthew Bronson, City Manager A. Rafael Castillo, AICP, Senior Planner Cassandra Mesa, Building
More informationKitsap County Department of Community Development. Hearing Examiner Staff Report and Recommendation
Kitsap County Department of Community Development Hearing Examiner Staff Report and Recommendation Report Date: Application Submittal Date: October 10, 2018 Hearing Date: April 4, 2019 Application Complete
More informationUse permitted by: Right Special Exemption
CENTER TOWNSHIP 150 Henricks Road Butler, PA 16001-8472 Phone (724) 282-7805 Fax (724) 282-6550 Application Number: FEE COLLECTED: Application for: Preliminary Final Land Development Location: Map and
More informationDETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT)
GENERAL DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT) ADDRESS: PERMIT #: DATE: 1. Plan is signed and sealed by an Illinois registered professional engineer including date signed and license
More informationMAPLETON CITY CORPORATION. Step 7: Upon final approval and prior to plat recording the applicant shall provide the following:
MAPLETON CITY CORPORATION Subdivision Process The City s subdivision requirements are designed to facilitate orderly, safe and efficient development and to implement the adopted General Plan. Below is
More informationREPORT TO THE SHELBY COUNTY PLANNING COMMISSION From the Department of Development Services Planning Services. February 4, 2019
REPORT TO THE SHELBY COUNTY PLANNING COMMISSION From the Department of Development Services Planning Services February 4, 2019 Case No. Request for Rezoning Approval From E-1 to E-2 SD This is a request
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019
PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019 DEVELOPMENT NAME SUBDIVISION NAME Springhill Village Subdivision Springhill Village Subdivision LOCATION 4350, 4354, 4356, 4358,
More informationDAUPHIN CREEK ESTATES SUBDIVISION
# 12 SUB-000076-2017 DAUPHIN CREEK ESTATES SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer):
More informationCHARTER TOWNSHIP OF CALEDONIA COUNTY OF KENT, MICHIGAN. at the Township and Village Hall, 8196 Broadmoor Avenue, Caledonia, Michigan on the
First Reading CHARTER TOWNSHIP OF CALEDONIA COUNTY OF KENT, MICHIGAN At a regular meeting of the Township Board of the Charter Township of Caledonia, held at the Township and Village Hall, 8196 Broadmoor
More informationCommunity Development
Land Use Petition RZ-15-010 Concurrent Variance VC-15-010-01 Date of Staff Recommendation Preparation: August 14, 2015 Date of Planning Commission Recommendation: September 1, 2015 PROJECT LOCATION: DISTRICT/SECTION/LANDLOT(S):
More informationSubdivision - Minor Plat Submittal
Subdivision - Minor Plat Submittal This Checklist is intended to provide the information and data that is necessary to assess the merits of the project proposal. Please note that this Checklist is intended
More informationPALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION
PALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION Application No.: Z-2014-01627 Application Name: Dazco Center Control No.: 2003-00040 Applicant: 4730 Hypoluxo LLC Owners: 4730
More informationBOI / DRH Albertsons grocery market and fueling center & pad sites
Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner March 28, 2017 To: Mark Palmer Albertsons Companies 250 E.
More informationTime Extension Staff Report
Time Extension Staff Report Subdivision Name Therrin Subdivision File Number SUB06-00020 Approval Time Extension for Lead Agency Boise City Certification Signature of Boise City Engineer Annexation Date
More informationI. Requirements for All Applications. C D W
108-16.1. Application checklists. Checklist for Required Submissions to the Planning Board or Zoning Board of Adjustment of Monroe Township All required submissions are to be made to the Administrative
More informationAffordable Housing Plan
Affordable Housing Plan CORDOVA HILLS SPECIAL PLANNING AREA 1 Proposed Project Conwy LLC is the master developer ( Master Developer ) of that certain real property in the County of Sacramento ( County
More informationJack & Eileen Feather (PLN030436)
MIKE NOVO ZONING ADMINISTRATOR COUNTY OF MONTEREY STATE OF CALIFORNIA RESOLUTION NO. 030436 A. P. # 008-462-008-000 In the matter of the application of Jack & Eileen Feather (PLN030436) FINDINGS & DECISION
More informationBEFORE THE HEARING EXAMINER FOR CITY OF VANCOUVER
BEFORE THE HEARING EXAMINER FOR CITY OF VANCOUVER In the Matter of the Application of ) NO. PRJ-151162/LUP-53608 ) ) Irina Leschuk, DL Design Group, Inc., ) 136th Avenue Subdivision On behalf of Omega
More informationMINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina
MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina This document is a public record under the North Carolina Public Records Act and may be published on the Town s website or disclosed
More informationMAJOR SUBDIVISION APPLICATION
Revised 2.26.18 The Department is here to assist you with your development application pursuant to the Community Development Code (CDC). This publication outlines the Major Subdivision Development Application
More informationInitial Subdivision Applications Shall Include the Following:
Initial Subdivision Applications Shall Include the Following: 1) Subdivision Application Form: completely filled out (12 copies) 2) Plat: The Plat must adhere to the requirements set forth in the Town
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016
PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016 DEVELOPMENT NAME SUBDIVISION NAME Mullinax Ford Subdivision Mullinax Ford Subdivision LOCATION CITY COUNCIL DISTRICT District 6 Southeast
More informationPublic Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Public Notice U.S. Army Corps Permit Application No: SWG-2016-00384 Of Engineers Date Issued: 27 December 2018 Galveston District Comments Due: 29 January 2019 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT
More informationREPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento
REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento 915 I Street, Sacramento, CA 95814-2671 www.cityofsacramento.org 9 PUBLIC HEARING December 10, 2015 To: Members of the Planning and Design Commission