Draft LARAP STUDY. (Land Acquisition and Resettlement Action Plan)

Size: px
Start display at page:

Download "Draft LARAP STUDY. (Land Acquisition and Resettlement Action Plan)"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DIF MINISTRY OF PUBLIC WORK DIRECTORATE GENERAL OF HIGHWAY CONSTRUCTION AND MAINTENANCE SPECIFIC NON-VERTICAL TASK FORCE OF ROAD AND BRIDGE PLANNING AND SUPERVISION (P2JJ) PROVINCE OF WEST SUMATERA JL. Rasuna Said No. 85 A Padang Phone (0751) Fax (0751) Draft LARAP STUDY (Land Acquisition and Resettlement Action Plan) PADANGSAWAH-SIMPANGEMPAT (STRETCH 047.2) AND CONSTRUCTION OF AIA GADANG BRIDGE IN PASAMANT BARAT ROAD PRESERVATION PROJECT Pasaman and Pasaman Barat Regencies West Sumatra (Sumatra Barat) Province March 2011 RP1040 V9 Road and Bridge Improvement Project of West Sumatera Province i

2 TABLE OF CONTENTS I. INTRODUCTION AND PROJECT DESCRIPTION 1 II. SOCIAL ECONOMIC SURVEY AND ASSET INVENTORY 4 Result of socio-economic research 9 Public perception into the project 14 Compensation 15 III. COMPENSATION ARRANGEMENTS 15 IV. ACTION PLAN 21 Land acquisition 21 Procedures and process for land acquisition 22 Complaint handling procedures 22 Monitoring and reporting 25 Operational Schedule 25 Matrix of Action Plan 26 Annex 1: Detailed list of affected people and assets Annex 2: Sample form of documentation on socialization and consultation meeting Annex 3: Flow chart of grievance redressed mechanism Annex 4: Sample form of monthly monitoring report of LARAP implementation Road and Bridge Improvement Project of West Sumatera Province ii

3 LIST OF TABLES Table 1.1 Administration Site of Road Widening Plan for stretch and Bridge 2 Construction Table 1.2 Technical Dimension of National Road Stretch Widening Plan for 3 Padangsawah - Simpangempat Table 2.1 Population on Study Area of Pasaman Regency (Condition on 2008) 4 Table 2.2 Resident s Main Profession (ten years above) in Ladangpanjang Village 4 (condition on 2008) Table 2.3 Compilation of Population in Study Area of Pasaman Barat Regency (condition 5 on 2008) Table 2.4 Main Profession Compilation of Nagari Residents (ten years above) 6 in Study Area of Pasaman Barat Regency (condition on 2008) Table 2.5 Questionnaire Distribution based on Study Area 8 Table 3.1 Governmental Standard Price based on Building Construction 16 Table 3.2 Market Price of Building based on Function and Construction 16 Table 3.3 Market Price of other Building under Dimension and Type of Construction 17 Table 3.4 Study Result of LARAP for Economic Plants 17 Table 3.5 Governmental Standard Price for Economic Plants 17 Table 3.6 Market Price (Estimation) for Economic Plants 18 Table 3.7 Cost Recapitulation of LARAP for National Road Improvement of 18 Padangsawah Simpangempat Link Table 3.8 Compensation Fee Recapitulation for Road Widening of Pasangsawah 19 Simpangempat in Pasaman Regency Table 3.9 Compensation Fee of Resident s Building in Pasaman Regency 19 Table 3.10 Compensation Fee Calculation of other Resident s Building in Pasaman 19 Regency Table 3.11 Compensation Fee Recapitulation for Road Widening of Pasangsawah 20 Simpangempat in Pasaman Regency (Replace Its Table) Table 3.12 Compensation Fee for Resident s Building under Administrative Area in 20 Pasaman Barat Regency Table 3.13 Compensation Fee Calculation for other Resident s Building in Pasaman Barat 20 Regency Table 3.14 Compensation Fee for Resident s Economic Plants in Pasaman Barat Regency 21 Table 3.15 Handling cost of Nagari Market Area 21 Table 3.16 Action-Plan for Land Acquistion 26 Road Stretch Improvement of Padangsawah Simpangempat (Stretch 047.1) in Pasaman Regency Table 3.17 Action-Plan for Land Acquistion Road Stretch Improvement of Padangsawah Simpangempat (Stretch 047.1) and Construction of Aia gadang Bridge in Pasaman Barat Regency 29 Road and Bridge Improvement Project of West Sumatera Province iii

4 INTRODUCTION AND PROJECT DESCRIPTION 1. Background. The Indonesian Government, through the Ministry of Public Works, plans to implement a project of capacity improvement for the National Road segment of Padangsawah Simpangempat (Stretch 047.2) and the construction of the Aia Gadang Bridge (herein collectively referred to as the Project ), located in the District of Pasaman and District of Pasaman Barat, Province of West Sumatera. This project will be financed by a loan from the World Bank through its Western Indonesia National Road Improvement Project (WINRIP). The road segment falls within the Sumatra Central Corridor, which is an alternative road for distributing goods and services on Sumatra. 2. National road widening for the Project will be undertaken to enhance road performance and smooth transportation to and from Padang (Teluk Bayur Seaport). Widening activities will take place in the Right of Way alongside 4040, 693 KM from KM till KM from Padang City. New bridge construction will take place close to the current Aia Gadang Bridge, in accordance with Government Regulation Number 38/2004 on Roads. 3. Though widening will take place in Right of Way area, there will still be land acquisition activites for buildings, plants and other assets belonging to Project Affected Persons (PAPs). Meanwhile, bridge construction activities will require acquiring land belonging to local communities (ulayat). Acquisition activities will affect sidewalk traders and areas for vehicles to park on the road shoulder at Kinali and Tampuruang Market. These areas are a major area for traffic jams on Monday and Sunday respectively. Because acquisition activities activity will have an impact on the current socio-economic environment, according to Operational Guideline 4.12 of the World Bank, a Land Acquisition and Resettlement Action Plan (LARAP) is required. 4. LARAP activities will examine the current state of land, building and plant assets in the area. Using a participatory approach for local communities to provide their inputs on the Project, the authorities will develop a framework for acquisition activities needed for construction. The road widening activities between Padangsawah Simpangempat will not require resettlement. The result of a preliminary study on the construction results and effects on local communities will be made into the basis of a land acquisition process with the following purposes: Gather information on the social and economic conditions of Project Affected Persons (PAPs) whose land or other assets are affected by the project, and to determine the aspirations of local inhabitants regarding the Project as well as their requested compensation for assets affected by the Project or land acquisition; Prepare policy alternatives for land acquisition and resettlement toward PAPs; Prepare a workplan for land acquisition and resettlement as guidance as well as planning efforts for the land acquisition and resettlement process for PAPs; Propose a market restructuring pattern for Pasar Bawan according to the aspirations of local communities, under the assumption that road widening will be able to enhance road performance without causing serious social issues. 5. Project Location and Description. This Project along the West-Track Trans Sumatra along 40,693 KM is intended to improve road performance and ease transportation routes to and from Padang (Teluk Bayur Seaport). Administratively this activity lies in two (2) regencies and four (4) sub-districts that include one village-level unit (Nagari) as noted in Table 1.1. A location map of the Project is included in Figure 1.1. Road and Bridge Improvement Project of West Sumatera Province 1

5 Table 1.1 Administration Site of Road Widening Plan for stretch and Bridge Construction No. REGENCY/ SUB-DISTRICT NAGARI REMARK A. REGENCY OF PASAMAN 1. Subdistrict of III Nagari Ladang Panjang Link Road B. REGENCY OF PASAMAN BARAT 1. Subdistrict of Kinali Kinali Link Road Subdistrict of Luhak Nan Duo Koto Baru Link Road Subdistrict of Pasaman Lingkuang Aua Link Road Aia Gadang Bridge of Aia Gadang Figure 1.1 Location Map of the Project Setment 6. Stretch starts in Padangsawah, Nagari Ladang Panjang, Regency of Pasaman and ends in Simpangempat, Nagari Lingkuang, Regency of Pasaman Barat. This represents a distance from KM to KM from Padang City. If reviewed from its administration area, then only 2,200 Km of this road stretch lies within the Pasaman Regency, namely from KM to KM , and along 38,493 Km are within the Pasaman Barat Regency from KM till KM Meanwhile, construction of Aia Gadang Bridge will begin from KM to KM from Padang City. 7. As noted above, market facilities in Kinali and Tampuruang markets fall adjacent to the roadside. On market day once in a week, namely on Monday and Sunday respectively, traffic jams are frequent as a result of market spill over on the roadside and also because of parked vehicles. There are frequent efforts to better manage the space used by traders but these activities have not been completely successful. Figure 1.2 Images of Pasa Kinali and Pasar Tampuruang Traffic Conditions Road and Bridge Improvement Project of West Sumatera Province 2

6 8. Technical aspects. Based on a Detailed Engineering Design (DED) study, a road widening project will enlarge the road by 7m of carriage way, complete with a road shoulder and drainage channel. Further technical dimensions of the widening plan are presented in Table 1.2 below. The Aia Gadang Bridge will be constructed with the existing bridge, with a length of 100 m and a width of 9m. This section of the Project will also include improvements to the two-track bridge. Table 1.2. Technical Dimension of Padangsawah Simpangempat Sub-Project No. Planning Unit Dimension 1. Width of Road Surface meter 7,00 2. Width of Road Stretch (Left and Right) meter 4,00 3. Width of Drainage (Left and Right) meter 1,00 4. Hardening Normal Inclination % 2,00 5. Road Shoulder Inclination % 4,00 Source: P2JJ Province of West Sumatera, Process and Methodology. The identification of affected assets belonging to either community groups, corporations or the state was conducted through a field study by considering its position in relation to the existing Right of Way. Asset recording in Right of Way is undertaken for futher examination. Research on public assets will be conducted through enumeration by considering the following issues: People s Assets. Public buildings are distinguished by whether they are permanent, semipermanent or non-permanent; their function as a house or business place; and their location on the roadside in relation to Padang City. Other Buildings are identified by considering the kinds of terrace, fences, culvert and decker, land limit foundations and other assets. The economic value of plants and other assets were also considered by calculating numbers, types and location. The types of plants included Palm, Chocolate, Coconut, Areca, Teak and other Fruit plants such as Mango, Guava, and Durian. Public Assets. Some public facilities belong to the government or businesses. These include electric and telephone poles, an underground cable network, and a clean water pipeline. A survey recorded the numbers of these assets and their sites. The economic activities of sidewalk traders and persons parking on the roadside close to the Kinali and Tampuruang markets were also scrutinized in order to examine the potential impact of the Project on their physical space. There were also focus group discussions (FGD) with participants from Government (staff of Regency, Sub-District, and Village-level governments, public figures and community leaders, and academic and non-governmental organizations. Finally, there was a free interview (spotcheck) with selected respondents. 10. Social Data Research. The LARAP study is a descriptive field research exercise to obtain information regarding the social-economic conditions of the communities around the Project site. The study isneeded to obtain information on public opinion towards the planned road enlargement of the National Road from Padangsawah to Simpangempat as well as the construction of the Aia Gadang Bridge in Pasaman and Pasaman Barat Regencies. 11. The research will use survey research methods, wherein information is compiled from asset owning respondents affected by the widening of the roads and construction of the bridge, as well as sidewalk traders in Kinali and Tampuruang markets. Questionnaires were provided that obtained information regarding aspects of community life that will be affected by the planned Project activities. Four major aspects to be revealed by the study are: Characteristics or conditions of local people s socio-economics aspect; Socio-economic environment of the community; Social knowledge of the Project plans; Road and Bridge Improvement Project of West Sumatera Province 3

7 Public perception of the Project plans; 12. Besides the primary data to be obtained above, the LARAP also drew on secondary data from relevant sources such as the Central Bureau of Statistics (BPS) at the Regency level and various governmental agencies within the Regency administration. This secondary data focused on the socioeconomic and cultural profiles of the affected communities, laws and regulations governing the price assessment of affected goods, as well as models for compensation payment mechanisms. All data and results were used for the purposes of LARAP. These data can be used at a later data by the Land Acquisition Committee (LAC) as part of a more detailed database in order to prepare the land acquisition process and compensation payments. SOCIAL ECONOMIC SURVEY AND ASSET INVENTORY 13. Identification of Project Affected Persons and Assets. The administrative territory applicable to this LARAP falls within 2 (two) regencies and 4 (four) sub-districts: 1 (one) sub-district in Pasaman Regency, namely Sub-district III Nagari, and 3 (three) sub-districts in Pasaman Barat Regency namely Kinali, Luhak Nan Duo and Pasaman. Each sub-district includes one Nagari (same level as a Village unit) repectively Nagari Ladang Padanjang in Pasaman Regency and Nagari Kinali, Koto Baru and Lingkuang Aus in Pasaman Barat Regency. Meanwhile, the construction of Aia Gadang Bridge lies in Nagari Aia Gadang, Sub-district of Pasaman, and Regency of Pasaman Barat. 14. Land in these areas is mainly used for plantation areas of oil-palm, cocoa, corn and other plant products. In the subdistricts of Kinali and Tampuruang, there are markets once a week, Monday at Kinali and Sunday at Tampuruang. There are often traffic jams as a result of economic activity spill over and parked vehicles. Pasaman Regency 15. Population characteristics. The 2008 recorded population in Ladangpanjang was 10,434 people, consisting of 2,613 family units (Kelompok Keluarga, or KK), as indicated in Table 2.1. Population density provides a picture of the number of inhabitants per km 2 within nagari, in this case the lowest administrative level. Based on this administrative boundary of approximately 62.16km 2, the population density of Nagari Ladangpanjang is 168 people/km 2. This district lies at a T-intersection between three regional government centers: Lubukbasung in Agam, Simpangempat in Pasaman Barat and Lubuksikaping in Pasaman. No. Table 2.1 Population Statistics for Pasaman Regency (2008) Land General Data on Demography Area Study mass Man Woman Total Numbers (km 2 ) (people) (people) (people) of KK 1. Sub-district of Tigo Nagari a. Nagari Ladang Panjang 62, Source: Subdistrict in Year Number 2008, (processed from respective areas). Density (people /km 2 ) 16. Residents livelihood along the Project area is dominated by agricultural activities, which in this case includes plantations sustained by industrial business and plantation crop processing. This way is also seen from financial sector, Company s Leasing and Service and other services that has close-relationship with plantation sector, such as banking, business cooperative, heavy equipment rental and other plantation production utilities. Table 2.2 Residents Main Profession (10 Year Above) in Nagari Ladangpanjang (2008) Road and Bridge Improvement Project of West Sumatera Province 4

8 No. Main Profession Total (Life) Remark 1 Agriculture Excavation Mining 95 3 Processing Industry Building 41 5 Trading, Hotel & Restaurant Transportation & Communication Finance, Rental & Service Services Other 564 Total Source: Sub-district in Year Number 2009, (processed from respective areas) 17. Land-use Patterns and Ownership. Land use in Pasaman Regency depends on its existing natural and human resource potential, as well as the area s topography, geomorphology, and the local community s unique social cultural characteristics and culture. The Project s location lies at a site developed for a plantation business and has high levels of productivity. A large portion of the surrounding area has previously been used for plantation activities. Based on a district-level survey, almost the entire area is used by the surrounding community, either by local residents, non-resident cooperatives, or by agricultural investors. Land ownership falls mainly with the Ulayat Kaum and Ulayat Nagari, belonging mainly to certified companies and individuals. This indicates that in general, land ownership characteristics in Minangkabau are closely tied to local development undertaken by large plantation companies. 18. Socio-cultural characteristics. The community structure of the local population is dominated by the Minangkabau ethnicity, followed by members of the Mandailing, Javanese, Nias and other ethnicities. Although there is a dominant ethnic group in terms of numbers of residents, patterns of interaction suggest relatively harmonious relations. Instead, social relations are dominated by residents groupings in agricultural cooperatives and other social community groups. Pasaman Barat Regency 19. Population characteristics. The population in the Nagari (village level) adjacent to the outlined road area is 111,056 persons and 23,520 households. The population spread follows the administrative boundaries provided in Table 2.3. There are more male residents (56,595) than female residents (56,461). The majority of the population is in Kenagarian Kinali, Subdistrict of Kimali ( people), whereas the lowest population are people is in Kenagarian Aia Gadang in Pasaman Regency. There are no significant populations of indigenous people present in this area. No. Area Study Table 2.3 Compilation of Population in Area Study (Condition on 2008) Land General Data of Demography mass Man Woman Total Number (km 2 ) (people) (people) (people) s of KK 1. Subdistrict of Kinali a. Nagari Kinali 365, Subdistrict of Luhak Nan Duo a. Nagari Koto Baru 211, Subdistrict of Pasaman a. Nagari Lingkuang Aua 158, b. Nagari Aia Gadang Source : Subdistrict in Year Number 2009, (processed from respective areas) Density (people /km 2 ) 20. Population density. Population density provides a picture of the number of inhabitants per km 2 within nagari, in this case the lowest administrative level. Based on the administrative boundaries Road and Bridge Improvement Project of West Sumatera Province 5

9 intersected by the Project areas reaching 735,210 km 2, the population density range is between people per-km 2 with an average density of 151 people/km 2. The most crowded area (164 people per km 2 ) of residents is in Kenagarian Aua, Subdistrict of Luhak Nan Dua and the lowest is in Kenagarian Aia Gadang, Subdistrict of Pasaman, with approximately namely around 80 people per km Economic characteristics. Residents livelihood along the enhanced road stretch is detailed in Table 2.4. Residents are mainly engaged in agricultural activities, in this case mainly large plantatations sutained by industrial business of plantation crop processing. These employment patterns are also seen in the financial sector, including leasing services and other services that have close relationships with the plantation sector, such as banking, business cooperatives, heavy equipment rentals and other plantation production utilities. Table 2.4 Main Profession Compilation of Nagari Residents (ten years above) in Study Area (2008) Sub-district No. Main Profession Luhak Amount Kinali Pasaman Nan 2 1 Agriculture Excavation Mining Processing Industry Electricity and Clean Water Building Trading, Hotel & Restaurant Transportation & Communication Finance, Rental & Service Services Other Total Source: Subdistrict in Year Number 2009, (processed from respective areas) 22. Utilization Pattern and Land Ownership. Land use patterns in Pasaman Barat regency are similar to those in Pasaman regency. The Project site falls in areas developed for the plantation business and with high productivity value. Nearly the whole land area has been utilized by local residents, non-resident cooperative members, or plantation investors. Land ownership status comprises Ulayat Kaum and Ulayat Nagari, and belongs to certified companies or individuals. 23. Socio-Cultural Characteristics. Similar to Pasaman Regency, the community structure of the local population is dominated by the Minangkabau ethnicity, followed by members of the Mandailing, Javanese, Nias and other ethnicities. Although there is a dominant ethnic group in terms of numbers of residents, patterns of interaction suggest relatively harmonious relations. Instead, social relations are dominated by residents groupings in agricultural cooperatives and other social community groups. Identification results of field data 24. Field research used a questionnaire survey approach after socialization efforts were completed. This was complemented with open-ended interviews and focus group discussions. These methods were used to obtain and identify all lands, buildings and plants with economic value within the Right of Way of the Project site and the bridge construction area. The census survey was conducted on November This date will be the cut of date to record affected persons in the project area who are entitled to compensation, resettlement assistance and livelihood restoration assistance. In case there is a time gap between the LARAP approval and the implementation of the WINRIP project or sub-project under WNRIP, the Land Acquisition Committee will do verification of the current situation based on the list of affected people and assets from the survey. Road and Bridge Improvement Project of West Sumatera Province 6

10 25. Assets owned by PAPs within the Right of Way on Section and the brige construction in the second sub-district are spread throughout sixty two (62) persons. These assets are categorized in the form of land with landmasses of 320 m 2 owned by 2 people; houses or business buildings facing the Right of Way owned by 42 people; and other buildings such as fences, culverts or house terraces and other plants with economic value belonging to 13 people. Description of respective assets under the administration area is explained below. A detailed data table on PAPs is included in Annex 1, including appendix 1a-1e. 26. Project-Affected Assets in Pasaman Regency. Based on result of field data processing, three units are affected by the Project: 1 unit of shack used as garage; 1 unit semipermanent used as small-shop; 1 semi-permanent unit used as house. 27. Both building in the Right of Way will be affected by between 75% - 100% of its landmass. Therefore, they should be dismantled and be replaced by new structures in the lands of the respective land owners close to or behind the Right of Way being used. Other assets affected are terrace of one house and 1 palm-tree in the Right of Way. 28. Project-Affected Assets in Pasaman Barat Regency. Land. Construction of the Aia Gadang bridge will require land belonging to neighboring communities, where currently there are two buildings standing. The Project will require at leas 320m 2 of land belonging to 2 affected people on which had erected 2 units of building and need to be displaced. The status of the affected land is communal land but already acknowledged as private ownership (such as girik). The remaining lands are still large. The 2 affected people will rebuild their replacement building on the remaining land. Building. Based on the results of data management, widening of the road of the Project will affect 37 building units and for the bridge construction 2 units will be affected. A description of the buildings affected by the Project includes: i. Twenty five (25) shacks, of which twenty four are used four businesses and 1 unit is a residence; ii. Ten (10) semipermanent units used for business; iii. Four (4) permanent units, 2 of which are houses and the rest are small-shops. As many 25 shack units and 8 semipermanent buildings in the Project s Right of Way are affected by more than 75% till 100% of their landmass, meaning that they must be dismantled. They will be relocated into their own land close to or adjacent to the Project. 1 semipermanent building and 2 permanent buildings will be affected by the Project s land acquisition. Meanwhile 2 units of permanent buildings located in communal land (Ulayat) that has traditional status due to bridge construction should be dismantled because they will be affected by more than 75 % of their landmass, meaning that the owner should move. Nevertheless because the owners are members of the Ulayat, these buildings will be moved to the closest ulayat space. Following the results of the research, they are asking for compensation in the form of cash money following a subsequent agreement. Other Buildings in the Right of Way. Observation result and field data found that 6 other building sites belong to residents are built in the Project s Right of Way. Those buildings are in form of culvert and fence as explained below: i. Culverts in 2 sites; ii. Fences in 4 sites Economic Plants in Right of Way. Plants with discernible economic value that lay in the Project s Right of Way number as follows: 34 trees owned by 12 Households, consisting of Palm, Cocoa, Coconut, Areca and other fruit trees such as Mango, Rambutan (Nephelium lappaceum), and Jackfruit. Details include: i. Palm 17 stems ii. Cocoa 12 stems iii. Areca 5 stems Road and Bridge Improvement Project of West Sumatera Province 7

11 Government and Corporate-Owned Assets. Public and corporate-owned asset affected by the road widening include electric and telephone poles, cable-line of underground optical-fibre and PDAM network in the Simpangempat area. 29. Kinali and Tampuruang Market. Kinali Market, as well as Bawan Market on Stretch are forms of Nagari Markets that are open once a week on Mondays, while Tampuruang Market open every Sunday. On other days, a portion of the shops and food stalls are open but only serve the adjacent community and no sidewalk traders present. The shops and food stalls in the market are all outside of the Project s Right of Way, though on market days to becomes very crowded and a number of sidewalk traders spill into the street and cause traffic to worsen. These conditions are aggravated by unorganized parking. The Administration of Nagari Kinali has tried to better manage this situation but their efforts have been unsuccessful. Total sidewalk traders in Kinali Market occupying ROW and should be moved, based on data from Nagari, will be 15 persons, whereas side walk traders using road rollen-empty land between building and border of ROW, are around 10 persons. The numbers every week vary. This condition is the same with Tampuruang Market. Sidewalk traders on the road shoulder generally sell daily household needs such as vegetables, fruits, dried fish, and other needs like kitchen tools and finished clothes. Particularly traders of agricultural crops make transactions if they get products from farmers. This LARAP s study succeeds to interview 7 respondent side walk traders in Kinali Market, consisting of 4 occupy the road shoulder and 3 are in the road rollen, and 11 respondents in Tampuruang Market (9 occupying road shoulder and two are selling in the road rollen). Nevertheless, considering both locations are also in the widened road stretch, then these sidewalk traders are affecting arrangements. 30. Questionnaire: Project-Affected Asset. A study conducted from November 2010 in both regencies showed that as many as 60 people (96.77% of the total respondents) will be affected across 4 Sub-districts and 4 Nagari as explained in next table. Data in Table 2.5 shows that thet rate of respondents in Nagari Kinali, Subdistrict of Kinali, describes that many residents erect the building or its eqipments, or cultivate economic plant in right of way. This way is caused by their ignorance on the function and ownership of right of way, and lack of supervision from relevant parties. 31. Questionnaire: Sidewalk Trader of Kinali and Tampuruang Markets. Total respondents of sidewalk traders in both markets interviewed upon research conducted on Sunday and Monday at January 16 and 17 are as many 18 people, 7 people in Kinali and 11 people in Tampuruang respectively include those selling in road-rollen and road shoulder. This amount represents for those affected widening impact. No. Study Area Table 2.5 Questionnaire Distribution based on Area Study Landmass (km 2 ) Total (Life) Resident Head of Family Respondent (KK) Road and Bridge Improvement Project of West Sumatera Province 8 Total Percentag e Remark A. Regency of Pasaman 1. Sub-district of III Nagari Nagari Ladang Panjang 62, , % PAP Sub-Total 62, ,191 B. Regency of Pasaman Barat 1. Sub-district of Kinali a. Nagari Kinali 365, , % PAP 2. Sub-district of Luhak Nan Duo a. Nagari Koto Baru 211, , % PAP 3. Sub-district of Pasaman a. Nagari Lingkuang Aua 158, b. Nagari Aia Gadang , % PAP Sub-Total 735, ,0242

12 Total 797, ,237 Source : Subdistrict in Year Number 2009, (processed) and Field Research 2010 RESULT OF SOCIO-ECONOMIC RESEARCH 32. Main Occupation of PAPs in Regency of Pasaman. One of the 5 respondents whose assets are affected by the Project, 2 are working as farmers, two are in service sector and one is a trader. The socioeconomic condition of respondents can be seen from their respective jobs. There were 57 respondents in 3 nagaris in 3 sub-districts interviewed for theis research as demonstrated in Tables 2.1 and 2.2. This is the same amount (100%) as the number of households affected by acquisition for both buildings and land. Of all respondents, most are employed as farmers (61.4%) and traders (19.3%). Figure 2.1. Diagram of Respondent Based on Profession in Pasaman Regency Based on main job Unanswered Service Trader Farmer Figure 2.2. Diagram of Respondent based on Profession in Pasaman Barat Regency Respondent Based on main is jobbased on Main Profession Unanswered Farmer Worker Service Ojek/Driver Trader Private Employee Farmer Public Servant/TNI/Polri 33. Income Level of PAPs in Regency of Pasaman. Of the 5 respondents who were interviewed regarding their income level, 1 said that he earned more than IDR per month and 3 other people earned between Rp till IDR ,- per month. This is shown in Figure 2.3 Beyond that, 2 respondents have additional income between IDR 300,000 and 500,000/month and 1 respondent earns more than IDR 800,000 per month. Meanwhile 2 respondents did not provide answers. Figure 2.3 Diagram of Respondent s Income in Pasaman Regency Based on income of main job Unanswered Month Month Road and Bridge Improvement Project of West Sumatera Province 9

13 Figure 2.4 Diagram of Respondents Extra Income in Pasaman Regency Based on additional employment Unanswered Month Month 34. Income Levels of PAPs in Regency of Pasaman Barat. From 57 respondents who were asked their income levels, 24 respondents say their income is between Rp till IDR per month and 16 other respondents earn more than Rp per month. Figure 2.5 Diagram of Respondent s Income in Pasaman Barat Regency Unanswered Month Month Month 35. Respondents income in this regency is relatively greater than other research area. Respondents also still have extra-income from other business. 12 respondents earn extra income more than IDR per month and 11 respondent say that they have extra-income among Rp till IDR ,- per month as seen in this diagram below. Figure 2.6 Diagram of Respondent s Extra-Income in Regency of Pasaman Barat Respondent is based on Part-time Profession Income Unanswered Month Month None Month Month 36. Number of family members in PAPs in Regency of Pasaman. Two respondents have between 7 9 family members, and 2 respondents have 4 6 family members. The smallest amount was 1 respondent who had 4 family members. Figure 2.7 Diagram of Respondent is based on Total Family Number in Pasaman Respondent of Family Member that becomes commitment Unanswered Persons Persons Road and Bridge Improvement Persons Project of West Sumatera Province 10

14 37. Number of family members in PAPs in Regency of Pasaman Barat. Respondents in this regency have small family member (31,58%) to middle (57,89%) with total family member among 4 6 persons per family. Figure 2.8 Diagram of Respondents based on Total Family Member in Pasaman Barat Respondent of Family Member that becomes commitment Unanswered Persons Persons 38. Educational Level Persons of PAPs in Regency of Pasaman. Average respondents have educational levels of Elementary School till Senior High School Graduates. Two of five respondents have educational levels of Senior High School graduate. Meanwhile educational level of respondents, 4 and 5 are Senior High School graduate. Figure 2.9. Diagram of Respondent based on Education in Regency Pasaman Educational Level Unanswered Elementary School graduate Senior High School graduate Junior High School graduate 39. Educational Level of PAPs in Regency of Pasaman Barat. Average respondents in this location are relatively higher than peripheral area namely 42, 11% have educational level of Senior High School graduate and 35,09% have educational level of Junior High School graduate as presented in the following diagram. Figure 2.10 Diagram of Respondent based on Educational Level in Regency of Pasaman Barat Respondents based on Educational Level Unanswered Academic graduate Elementary School graduate Senior High School graduate Junior High School graduate 40. Expected impact of Project on Economic Activities in Regency of Pasaman. Road widening activity is perceived will impact into comprehensive soci-economic life in society. But during implementation of its construction, 3 of 5 respondnets feel their economic business will be interrupted. Figure 2.11 Diagram of Project Influence into Economics in Regency of Pasaman Does implementation of road construction interferes with your economic/business activity? Unanswered No Road and Bridge Improvement Project Yes of West Sumatera Province 11

15 41. Expected impact of Project on Economic Activities in Regency of Pasaman Barat. It s only 10,33% respondents stating that activity implementation is not interfere with public economic activity, whereas % state they are interrupted. Figure 2.12 Diagram of Project Influence into Economics in Regency of Pasaman Barat Does implementation of road construction interferes with your economic/business activity? Unanswered No Yes 42. Income level of Affected Sidewalk Traders in Kinali and Tampuruang Markets. From 7 respondents of sidewalk trader of Kinali Market who probed on their income level, only 1 person has low income from IDR per month, whereas 6 other persons, respectively 2 persons have income among IDR till IDR , among IDR till IDR and above IDR monthly as presented below. Figure 2.13 Diagram of Sidewalk Respondent s Income in Kinali Market Respondents based on selling income month month month month 43. Reviewed from total of family number, then sidewalk respondents in Kinali Market average are middle and small family with total of small family member in 4 persons and with family member 4 6 persons as the following graph. Figure 2.14 Diagram of Respondent based on Total of Trader s Family Member in Kinali Market Respondent of Family Member that becomes commitment persons persons 44. Income level of sidewalk traders in Tampuruang Market shows a nearly apportionment, either for the lowest Rp monthly or for the higher than IDR monthly. Figure 2.15 Diagram of Sidewalk Respondent s Income in Tampuruang Market Respondents based on selling income month month month month 45. From eleventh respondents, only one is big family, whereas 7 other people are small family with number of family member 4 people. Road and Bridge Improvement Project of West Sumatera Province 12

16 Figure Diagram of Respondent based on Total of Trader s Family Member in Tampurang Market Respondent of Family Member that becomes commitment people people people 46. Educational level of sidewalk traders. Average respondents of sidewalk traders in Kinali Market have educational level of Junior High School and Senior High School Graduates. Respectively 42,86 %, meanwhile in Tampurang Market are dominated by Junior High School and Elementary School Graduates. These educational levels are influential to one s insight and mind-set and result of interview, questionnaires filling and response to the project. Figure 2.17 Diagram of Responden s Educational Level in Kinali Market Educational Level Elementary School Graduate Senior High School Graduate Junior High School Graduate Figure 2.18 Diagram of Responden s Educational Level in Tampuruang Market Educational Level Unanswered Elementary School Graduate Senior High School Graduate Junior High School Graduate Not graduate Elementary School 47. Perception of sidewalk traders on Project. Networking of trader s perception is necessary done before beginning of widening activity, in order that known how many are residents supporting or rejecting this activity. Result of research indicates that all respondents in both markets say to agree and very agree. No respondents disagreeing or rejecting road widening. Figure 2.19 Diagram of Trader s Perception in Kinali Market concerning Activity Plan How about your opinion into widening plan of this road? Very agree agree Figure 2.20 Diagram of Trader s Perception in Tampuruang Market concerning Activity Plan How about your opinion into widening plan of this road? Very agree agree 48. In other side, traders highly know that consequence of this widening will interfere with their existence in bith markets. But based on questionnares, it seems that 5 of 7 traders in Kinali Market and 8 of 11 traders in Tampuruang Market are ready to be arranged and relocated in location offered by government, namely pertinent market site. Road and Bridge Improvement Project of West Sumatera Province 13

17 Figure 2.21 Diagram of Sidewalk Traders Response in Kinali Market Concerning Market Arrangement In case your selling place is affected to road construction, where do you move? Move into other site that self-sought near to original place Move into other site offered by government Figure 2.22 Diagram of Sidewalk Traders Response in Tampuruang Market Concerning Market Arrangement In case your selling place is affected to road construction, where do you move? Move into other site that self-sought near to original place Move into other site offered by government Public perceptions of the project 49. Regency of Pasaman. Result of questionnaire in Pasaman indicates that 60% of PAPs feel that their economic activities are interrupted, but 80% agree with the widening plan. 1 respondent did not provide an opinion. Figure Diagram of Residents Perception concerning Activity Implementation In Regency of Pasaman Does implementation of road construction interfere with your economic/business activity? Unanswered No Yes Figure 2.24 Diagram of Residents Attitude concerning Activity Implementation In Regency of Pasaman How about your opinion into widening plan of this road? Unanswered Agree 50. Regency of Pasaman Barat. 74,55 % of respondents in Regency of Pasaman indicated that their economic activities would be interrupted during construction, but all agree or highly agree that the widening should take place. 2 respondents did not provide opnions. Road and Bridge Improvement Project of West Sumatera Province 14

18 Figure 2.25 Diagram of Resident s Perception about Activity Implementation in Regency of Pasaman Barat Does implementation of road construction interfere with your economic/business activity? Unanswered No Yes Figure 2.26 Diagram of Resident s Attitude about Activity Plan In Regency of Pasaman Barat How about your opinion into widening plan of this road? Unanswered Very agree agree Compensation 51. Regency of Pasaman. PAPs prefer to deliberate on compensation rates before undertaking decisions regarding compensation. They agree fully with the deccision mechanism stated in the Government Regulations. However, if studied from desirable compensation form, 80% of residents want financial compensation and 20 % dosent give opinion. Figure Diagram of Desirable Compensation Form from Pasaman s residents Does the form of replacement for building/economic plants affected to road widening plan Unanswered Compensation 52. Regency of Pasaman Barat. Similar to respondents in Regency of Pasaman, 55 of 57 respondents in Pasaman Barat desire financial compensation. Figure Diagram of Desirable Compensation Form from Pasaman residents Does the form of replacement for building/economic plants affected to road widening plan Unanswered Compensation COMPENSATION ARRANGEMENTS 53. Principle of compensation. A policy taken by the Project initiator so that all public assets affected by the Project will be compensated. Compensation may be in the form or cash payments or reconstruction of the affected assets following agreements between asset owners/ Project Affected Persons and the Road and Bridge Improvement Project of West Sumatera Province 15

19 Government. The LARAP study will calculate a budget of the compensation costs to be made available for later implementation. 54. Compensation for land. Compensation for the affected land will be based on its real replacement cost or market price. The sum of compensation will be jointly discussed between the PAPs and Local Government based on land valuation made by Independent Land Appraisal Team in accordance with land acquisition mechanism (as spelled out in Presidential Decree No. 36/2005; Presidential Decree RI No. 65/2006 and the Head of Land Agency Regulation No. 3/2007) on land acquisition for public purpose. The appraisal result will be given to the Land Acquistion Committee (LAC) as a basis for conducting negotiations with PAPs. Costs of any registration and transfer taxes will be paid by the Government. 55. For the budget needs of this LARAP, an analysis has been conducted to assume compensation rate for the affected lands. The assumptions were made by considering market price, the location and the function of affected asset. The market price of the land in the site presently based on the LARAP s analysis is as much /m 2. This analysis will become input to Independent Land Appraising Team. However, the market price of the land for LAC s reference during negotiation will come from the Land Appraisal Team. 56. Compensation for Buildings. Affected buildings will be compensated based on material market prices for replacement buildings. A thorough LARAP analysis on market price of affected building is conducted in order for involved PAPs to rebuild their acquired assets for budget estimations. This analysis is conducted by considering Government Standard Price and market prices of materials, types and function/usage of the building and asset dimension. The analysis is conducted without calculating depreciation value. This price will then be proposed to the Human Settlement Agency as inputs that then will be given to LAC for negotiation with PAPs. The result of analysis is that the market price ranges of the building from IDR /m2 for permanent buildings and IDR /m2 for semipermanent buildings, and IDR /m2 for shack buildings. It is also presented standar price from government and from market price as comparison. Table 3.1 Government Standard Price based on Building Construction No. Construction of Bulding Function Price x IDR1.000/m2) 1. Permanent Shop ,0 2. Semipermanent Shop ,0 3. Shack Stall ,0 4. Permanent House ,0 5. Semipermanen House ,0 6. Shack House ,0 Source: Administration of respective Regencies 2010 (processed) Table 3.2 Market Price of Building based on Function and Construction No. Construction of Bulding Function Price x IDR1.000/m2) 1. Permanent Shop ,0 2. Semipermanent Shop ,0 3. Shack Stall ,0 4. Permanent House ,0 5. Semipermanen House ,0 6. Shack House Source: Study Result in respective Regencies 2010 (processed) 57. Market pricing for buildings acquisition accounts for size and age of construction, location and function of building and pertinent area development prospect. Studies found that buildings functioning as stalls or shops are more expensive per m 2 in the capital city than similar buildings far from the Government Road and Bridge Improvement Project of West Sumatera Province 16

20 center (rural). Subsequently, houses are cheaper than shop or stall buildings. This is consistent for all forms of construction: permanent, semipermanent and shacks. 58. Compensation for other affected structure. Residents fences and terraces falling in the Right of Way will be replaced through compensation. The results of questionnaires and interviews with owners of the terraces and fences reveals that a portion of the PAPs want the physical product to be re-constructed by the Project, and another portion prefer financial payment as agreed by the LARAP study. Because the Government has no standard for the reconstruction of these assets, a thorough analysis should be done for affected assets. Compensation costs are explained below and are a result of the LARAP study done by considering dimension and type of resident s fence and terrace. Table 3.3. Market Price of Other Buildings under dimension and type of construction No. Construction of Building Function Price under study result of LARAP Remark A. Terrace 2. Permanent Cement-Floor ,0 4. Semipermanent Cement-Floor ,0 5. Wooden Frame of Cement-Floor ,0 6. Wooden Frame of Ground-Floor ,0 B. Fence Iron Fence of Stone-Frame ,0 Stone-Fence ,0 C. Ground Border Foundation (Helical) Relocation Fee of Border Foundation ,0 Source : Result of Study 2010 (processed). 59. Economic Plants Price. Compensation for affected plants will be based on age and size of the affected plant and also presently crop price. An analysis on the compensation rate for the affected plant was conducted as inputs for responsible institutions (Agriculture/Plantation Agency) and also for LAC and to estimate budget. This analysis used Government Standard Price and also market price from the survey result. The result of the analysis is on Table 3.6 and ranges from IDR /tree for cropped plam plants and not too old (highly productive) and RP /tree for palm had been aged more than 20 years or still bear fruit of sand. Table 3.4 Study Result of LARAP for Economic Plants No Standard Price (IDR/batang) Type of Plants. Big Middle Small 1. Palm , , ,0 2. Coconut , , ,- 3. Chocolate ,0 600,000, ,0 4. Areca , , ,0 5. Other Fruits , ,0 100,000,0 Source : Result of study in respective Regencies 2010 (processed). Table 3.5 Government Standard Price for Economic Plants based on age or size No Standard Price (IDR/stem) Type of Plants. Big Middle Small 1. Palm , , ,0 2. Coconut , , ,0 3. Chocolate , , ,0 4. Areca , , ,0 5. Other Fruits , , ,0 Source : Administration of respective Regencies 2010 (processed) Road and Bridge Improvement Project of West Sumatera Province 17

21 Table 3.6 Market Price (estimation) for Economic Plants based on field research (type, age and presently crop price) No Standard Price (IDR/stem) Type of Plants. Big Middle Small 1. Palm , , ,0 2. Coconut , , ,- 3. Chocolate ,0 600,000, ,0 4. Areca , , ,0 5. Other Fruits , ,0 75,000,0 Source : Administration of respective Regencies 2010 (processed) 60. All affected buildings and assets will be dismantled after compensation payments are finished and construction of the replacement buildings is completed. Research into market prices and and problem handling efforts of road widening and market condition that always spill upon market day is conducted through structured discussion and interview, and continued with focus discussion group (FGD). Result of research indicates that residents realize that every day the market always crowded and occurrence of traffic jam and hope existence of market area arrangement. Therefore, executive society of road widening project, namely P2JJ Province of West Sumatera may outright undertake arrangement with parking and stall yard preparation for sidewalk traders. 61. Existence of sidewalk trader stall and vehicle parking, either trader s fleet, village transportation, or private two-wheel vehicle and ojek in every market day namely on Friday, had caused traffic jam in this road stretch. Though residents realize this, but heretofore had not been problem-solving effort like sidewalk trader arrangement or vehicle parking. 62. Action plan submitted for this problem is parking yard and sidewalk trader yard as well. Required landmass for Tampuruang Market is m2 and 1000 m2 for Kinali Market just with surface hardening of asphalt construction. This effort certainly requires land preparation besides the hardening itself in Bawan Market area around s from the border of right of way. Outlet arrangement will be surrendered to market administrator namely the administration of Nagari, where this project-stricken people are prioritized to obtain this place. 63. Estimated Compensation Budget. The estimated value of public assets is IDR , as shown in Table 3.7. Preparation is needed for land compensation payments, house buildings, garage-shop, other economic facilities, and other public building such as fences, home terraces or residents land border, and economic plants that all lie in the Right of Way. This budget is allocated for the improvement of some market utilities in Kinali and Tampuruang. These cost are also allocated for the LACs, both at the Regency and Provincial levels. The financing for respective regencies is described below in Table 3.7. Table 3.7 Recapitulation of LARAP Costs for National Road Stretch Impovement (Padangsawah Simpangempat Link 047.2) No. Description RAB Remark A REGENCY OF PASAMAN Compensation of Building Compensation of Terrace and Other Building Costs of Land Acquisition Committee and Compensation , , ,00 Sub-Total ,00 Regional Revenues and Expenditure Budged I&II Road and Bridge Improvement Project of West Sumatera Province 18

DRAFT EXECUTIVE SUMMARY

DRAFT EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT EXECUTIVE SUMMARY IPUH - BANTAL (LINK 015.1) KABUPATEN MUKO-MUKO YEAR 2010 EXECUTIVE

More information

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PIP annex 9 - C of GEF Hai Basin Integrated Water and Environment Management Project

More information

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors. SUMMARY LAND ACQUISITION PLAN Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the RURAL ROADS SECTOR I PROJECT in INDIA Ministry of Rural Development

More information

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT Village Roads Component on the GAUNGXI ROADS DEVELOPMENT II PROJECT in THE PEOPLE S REPUBLIC OF CHINA (PRC) Guangxi Comnications Department Nanning, PRC This report was prepared by the Borrower and is

More information

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PT PLN (Persero) INDONESIA POWER SECOND TRANSMISSION DEVELOPMENT PROJECT (IPTD-2) RP1232

More information

KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan 12110

KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan 12110 KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan 12110 LARP IMPLEMENTATION REPORT For Regional Roads Development Project West Kalimantan

More information

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) ARRANGEMENT OF REGULATIONS Regulations 1. Claims for compensation 2. Assessment of compensation 3. Compensation principles

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LAO PDR: AGRICULTURAL DEVELOPMENT PROGRAM RP-59 POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT

More information

Past & Present Adjustments & Parcel Count Section... 13

Past & Present Adjustments & Parcel Count Section... 13 Assessment 2017 Report This report includes specific information regarding the 2017 assessment as well as general information about both the appeals and assessment processes. Contents Introduction... 3

More information

REPUBLIC OF MACEDONIA

REPUBLIC OF MACEDONIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Municipal Services Improvement Project (MSIP) LAND ACQUISITION

More information

ACQUISITION OF LAND HOLDINGS AND COMPENSATION PRACTICE IN ETHIOPIA: AMHARA REGION - BAHIR DAR CITY SURROUNDING FARMING AREA.

ACQUISITION OF LAND HOLDINGS AND COMPENSATION PRACTICE IN ETHIOPIA: AMHARA REGION - BAHIR DAR CITY SURROUNDING FARMING AREA. ACQUISITION OF LAND HOLDINGS AND COMPENSATION PRACTICE IN ETHIOPIA: AMHARA REGION - BAHIR DAR CITY SURROUNDING FARMING AREA. Presented at the Innagural Conference on Land Policy in Africa 11-14 November

More information

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS MINISTRY OF EDUCATION GOVERNMENT OF NEPAL August 2011 2 A. Introduction 1.

More information

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project I. Introduction The overall length of the road network in Albania totals

More information

Assessment to Low-cost Apartment in Sidoarjo District, East Java Province

Assessment to Low-cost Apartment in Sidoarjo District, East Java Province 192 Simposium I Jaringan Perguruan Tinggi untuk Pembangunan Infrastruktur Indonesia, 2016 Assessment to Low-cost Apartment in Sidoarjo District, East Java Province Ria A.A. Soemitro 1, Farida Rachmawati

More information

Introduction. Bruce Munneke, S.A.M.A. Washington County Assessor. 3 P a g e

Introduction. Bruce Munneke, S.A.M.A. Washington County Assessor. 3 P a g e Assessment 2016 Report This report includes specific information regarding the 2016 assessment as well as general information about both the appeals and assessment processes. Contents Introduction... 3

More information

STATE OF OHIO FINANCIAL REPORTING APPROACH GASB 34 IMPLEMENTATION ISSUES TRANSPORTATION INFRASTRUCTURE

STATE OF OHIO FINANCIAL REPORTING APPROACH GASB 34 IMPLEMENTATION ISSUES TRANSPORTATION INFRASTRUCTURE TRANSPORTATION INFRASTRUCTURE GASB 34 Reporting Requirements (Paragraphs 19 through 26) Paragraph 19 includes infrastructure assets in the definition of capital assets. Infrastructure assets are defined

More information

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Summary of Land Acquisition Policy Framework JAMAICA: JM Hurricane Dean ERL Project RP607

More information

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION

More information

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency

More information

R E Q U E S T F O R P R O P O S A L S

R E Q U E S T F O R P R O P O S A L S P.O. Box 3209, Houghton, 2041 Block A, Riviera Office Park, 6-10 Riviera Road, Riviera R E Q U E S T F O R P R O P O S A L S M A R K E T S U R V E Y T O I N F O R M R E S I D E N T I A L H O U S I N G

More information

Indonesia: Metropolitan Sanitation Management Investment Project

Indonesia: Metropolitan Sanitation Management Investment Project Resettlement Plan June 2013 Indonesia: Metropolitan Sanitation Management Investment Project Land Acquisition and Resettlement Plan PEKANBARU CITY OFF-SITE WASTEWATER COLLECTION SYSTEM AND TREATMENT (FINAL)

More information

EXECUTIVE SUMMARY. Land Use Management and Democratic Governance in the City of Johannesburg. Case Study: Diepkloof

EXECUTIVE SUMMARY. Land Use Management and Democratic Governance in the City of Johannesburg. Case Study: Diepkloof EXECUTIVE SUMMARY Land Use Management and Democratic Governance in the City of Johannesburg Case Study: Diepkloof Authors: Fazeela Hoosen & Jonathan Mafukidze This study was funded by Ford and Urban Landmark,

More information

CHAPTER I INTRODUCTION. Since The Basic Law of Agrarian Affairs was issued in 1960, the

CHAPTER I INTRODUCTION. Since The Basic Law of Agrarian Affairs was issued in 1960, the CHAPTER I INTRODUCTION 1.1. Background Since The Basic Law of Agrarian Affairs was issued in 1960, the Indonesian government has tried to implement land reform in order to open the access to land especially

More information

A Guide to Establishing Additional Service Areas in Rural Municipalities

A Guide to Establishing Additional Service Areas in Rural Municipalities A Guide to Establishing Additional Service Areas in Rural Municipalities February 2014 Contents Introduction... 3 Purpose of this Guide... 3 Background... 3 What are the benefits to Rural Municipalities

More information

A. Land Use Relationships

A. Land Use Relationships Chapter 9 Land Use Plan A. Land Use Relationships Development patterns in Colleyville have evolved from basic agricultural and residential land uses, predominate during the early stages of Colleyville

More information

Assessment of mass valuation methodology for compensation in the land reform process in Albania

Assessment of mass valuation methodology for compensation in the land reform process in Albania 1 Assessment of mass valuation methodology for compensation in the land reform process in Albania Fatbardh Sallaku Agricultural University of Tirana, Department of AgroEnvironmental & Ecology Agim Shehu

More information

Lack of supporting evidence It is not accepted that there is evidence to support the requirement of Sec 56 (2) Housing Act 2004

Lack of supporting evidence It is not accepted that there is evidence to support the requirement of Sec 56 (2) Housing Act 2004 DASH Services Response to Nottingham City Council s consultation on proposed designation for additional licensing under Section 56 of the Housing Act 2004 Introduction DASH Services operates the DASH Landlord

More information

SURVEY OF LAND AND REAL ESTATE TRANSACTIONS IN THE RUSSIAN FEDERATION REGIONAL REPORT: IRKUTSK OBLAST

SURVEY OF LAND AND REAL ESTATE TRANSACTIONS IN THE RUSSIAN FEDERATION REGIONAL REPORT: IRKUTSK OBLAST Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Foreign Investment Advisory Service, a joint service of the International Finance Corporation

More information

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Vision Contribute to overall development of the nation and its citizens by creating conducive

More information

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Project preparation under the PDF-B grant RP337

More information

SURVEY OF LAND AND REAL ESTATE TRANSACTIONS IN THE RUSSIAN FEDERATION REGIONAL REPORT: SAKHALIN OBLAST

SURVEY OF LAND AND REAL ESTATE TRANSACTIONS IN THE RUSSIAN FEDERATION REGIONAL REPORT: SAKHALIN OBLAST Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Foreign Investment Advisory Service, a joint service of the International Finance Corporation

More information

METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO. Valuation Date: January 1, 2016

METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO. Valuation Date: January 1, 2016 METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO Valuation Date: January 1, 2016 August 2017 August 22, 2017 The Municipal Property Assessment Corporation (MPAC) is responsible for accurately assessing

More information

Ludgvan Parish HOUSING NEED SURVEY. Report Date: 21 st January Version: 1.2 Document Status: Final Report

Ludgvan Parish HOUSING NEED SURVEY. Report Date: 21 st January Version: 1.2 Document Status: Final Report Ludgvan Parish HOUSING NEED SURVEY Report Date: 21 st January 2019 Version: 1.2 Document Status: Author: Final Report Andrew Prendergast Rural Housing Enabler Affordable Housing Team, Cornwall Council

More information

Current affordability and income

Current affordability and income Current affordability and income 21.1 Introduction...1 21.2 The relationship between intermediate and private rented markets...2 21.3 Renting privately...3 Table 1: Lower quartile rent, required household

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document June 2012 Pakistan: Sindh Cities Improvement Investment Program (SCIP) Prepared by North Sindh Urban Services Corporation Limited for the Asian Development Bank. PFR-2 Annex-11

More information

Available through a partnership with

Available through a partnership with The African e-journals Project has digitized full text of articles of eleven social science and humanities journals. This item is from the digital archive maintained by Michigan State University Library.

More information

Review of the Prices of Rents and Owner-occupied Houses in Japan

Review of the Prices of Rents and Owner-occupied Houses in Japan Review of the Prices of Rents and Owner-occupied Houses in Japan Makoto Shimizu mshimizu@stat.go.jp Director, Price Statistics Office Statistical Survey Department Statistics Bureau, Japan Abstract The

More information

Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand

Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand TS03H_ REAL ESTATE ECONOMICS & EXPROPRIATION SOLUTIONS TO LAND POLICY PROBLEMS- Paper 8312 Compensation Assessment for

More information

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP)

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) Resettlement Action Plan Update Report for the ARUSHA

More information

Various Means of Public Participation in Government Compulsory Acquisition of Land

Various Means of Public Participation in Government Compulsory Acquisition of Land Various Means of Public Participation in Government Compulsory Acquisition of Land Wang Zhouhu, Professor, School of Administrative Law, Northwest University of Politics and Law An Ziming, Lecturer, School

More information

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action

More information

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis: Code No: 1.9 Social Screening and Impact Assessment for Sub Projects A. Sub Project Description: Proposed Activity Walkability and Parking Improvements Lotus Road Implementing Agency: Colombo Municipal

More information

Surabaya River Improvement Project (II-1)

Surabaya River Improvement Project (II-1) Indonesia 1. Project Profile and Japan s ODA Loan (1) Background Surabaya River Improvement Project (II1) Report Date: June 2 Field Survey: February 2 When this project was planned in 199, the city of

More information

Developing a Comprehensive Plan. New York State Department of State Office of Coastal, Local Government & Community Sustainability

Developing a Comprehensive Plan. New York State Department of State Office of Coastal, Local Government & Community Sustainability Developing a Comprehensive Plan New York State Department of State Office of Coastal, Local Government & Community Sustainability What is a Comprehensive Plan? Expression of a goals and recommended actions

More information

2012 Profile of Home Buyers and Sellers Texas Report

2012 Profile of Home Buyers and Sellers Texas Report 2012 Profile of Home and Sellers Report Prepared for: Association of REALTORS Prepared by: NATIONAL ASSOCIATION OF REALTORS Research Division December 2012 2012 Profile of Home and Sellers Report Table

More information

Vietnam Land Administration - the Past, Recent and for the Future

Vietnam Land Administration - the Past, Recent and for the Future Mr. Ton Gia Huyen, Former Director General of General Department of Land Administration and Mrs. Tran Thi Minh Ha, Director of International Relation Department, Ministry of Natural Resources and Environment,

More information

New Hampshire Report. Prepared for: New Hampshire Association of REALTORS. Prepared by: NATIONAL ASSOCIATION OF REALTORS.

New Hampshire Report. Prepared for: New Hampshire Association of REALTORS. Prepared by: NATIONAL ASSOCIATION OF REALTORS. New Hampshire Report Prepared for: New Hampshire Association of REALTORS Prepared by: Research Division January 2016 New Hampshire Report Table of Contents Introduction... 2 Highlights... 3 Methodology..8

More information

Asset valuation. Advancing Methodology on Measuring Asset Ownership from a Gender Perspective

Asset valuation. Advancing Methodology on Measuring Asset Ownership from a Gender Perspective Advancing Methodology on Measuring Asset Ownership from a Gender Perspective Asset valuation Workshop on the Production of Statistics on Asset Ownership from a Gender Perspective through Household Surveys

More information

People, Property and Power Lines. Frequently asked questions about power lines on or near your property

People, Property and Power Lines. Frequently asked questions about power lines on or near your property People, Property and Power Lines Frequently asked questions about power lines on or near your property Great River Energy is a not-for-profit wholesale electric power cooperative which provides electricity

More information

Charlotte Report. Prepared for: Greater Regional Charlotte Association of REALTORS. Prepared by: NATIONAL ASSOCIATION OF REALTORS.

Charlotte Report. Prepared for: Greater Regional Charlotte Association of REALTORS. Prepared by: NATIONAL ASSOCIATION OF REALTORS. Charlotte Report Prepared for: Greater Regional Charlotte Association of REALTORS Prepared by: Research Division January 2016 Charlotte Report Table of Contents Introduction... 2 Highlights... 3 Methodology..8

More information

The Texas 2005 Profile of Home Buyers and Sellers. Prepared by: NATIONAL ASSOCIATION OF REALTORS Research Division

The Texas 2005 Profile of Home Buyers and Sellers. Prepared by: NATIONAL ASSOCIATION OF REALTORS Research Division The Texas 2005 Profile of Home Buyers and Sellers Prepared by: NATIONAL ASSOCIATION OF REALTORS Research Division February, 2006 The 2005 NATIONAL ASSOCIATION OF REALTORS Profile of Home Buyers and Sellers

More information

2018 Profile of Home Buyers and Sellers

2018 Profile of Home Buyers and Sellers Massachusetts Report Prepared for: Massachusetts Association of REALTORS Prepared by: Research Division December 2018 Massachusetts Report Table of Contents Introduction... 2 Highlights... 4 Methodology...

More information

Real Estate Acquisitions Audit (Green Line LRT Stage 1)

Real Estate Acquisitions Audit (Green Line LRT Stage 1) Real Estate Acquisitions Audit (Green Line LRT Stage 1) October 10, 2018 ISC: Unrestricted THIS PAGE LEFT INTENTIONALLY BLANK ISC: Unrestricted Table of Contents Executive Summary... 5 1.0 Background...

More information

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose Expropriation Context Following from the goal of the National Land Policy, to promote and ensure a secure land tenure system that is transparent, effective, non-discriminative, equitable and just ; it

More information

RULES OF GEORGIA REAL ESTATE APPRAISERS BOARD TABLE OF CONTENTS

RULES OF GEORGIA REAL ESTATE APPRAISERS BOARD TABLE OF CONTENTS RULES OF GEORGIA REAL ESTATE APPRAISERS BOARD CHAPTER 539-1 SUBSTANTIVE REGULATIONS TABLE OF CONTENTS 539-1-.15 Experience Requirements. Amended. 539-1-.16 Appraiser Classifications and Their Education,

More information

Lanteglos by Fowey HOUSING NEED SURVEY. Report Date: 1 st March Version: 1.1 Document Status: Final Report

Lanteglos by Fowey HOUSING NEED SURVEY. Report Date: 1 st March Version: 1.1 Document Status: Final Report Lanteglos by Fowey HOUSING NEED SURVEY Report Date: Version: 1.1 Document Status: Author: Final Report Victoria Regan Senior Development Officer Affordable Housing Team, Cornwall Council 1. Introduction

More information

PREPARATION FOR LAND CONSOLIDATION IN LITHUANIA. Vilma Daugaliene National Land Service under the Ministry of Agriculture

PREPARATION FOR LAND CONSOLIDATION IN LITHUANIA. Vilma Daugaliene National Land Service under the Ministry of Agriculture PREPARATION FOR LAND CONSOLIDATION IN LITHUANIA Vilma Daugaliene National Land Service under the Ministry of Agriculture Symposium on Modern Land Consolidation Volvic (Clermont-Ferrand), France, September

More information

2017 Profile of Home Buyers and Sellers

2017 Profile of Home Buyers and Sellers New Jersey Report Prepared for: New Jersey REALTORS Prepared by: Research Division December 2017 New Jersey Report Table of Contents Introduction... 2 Highlights... 4 Methodology... 8 Report Prepared by:

More information

SURVEY OF LAND AND REAL ESTATE TRANSACTIONS IN THE RUSSIAN FEDERATION REGIONAL REPORT: NOVGOROD OBLAST

SURVEY OF LAND AND REAL ESTATE TRANSACTIONS IN THE RUSSIAN FEDERATION REGIONAL REPORT: NOVGOROD OBLAST Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Foreign Investment Advisory Service, a joint service of the International Finance Corporation

More information

Resettlement Policy Framework

Resettlement Policy Framework Republic of Turkey Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework Background 1. The Second Renewable Energy and Energy Efficiency Project will fund private sector investments

More information

Presentation Outline

Presentation Outline LAND TENURE SYSTEMS DEVELOPMENT IN HAZARD VULNERABILITY REDUCTION FOR CARIBBEAN STATES Jamal Browne The University of the West Indies, St. Augustine, Trinidad. Presentation Outline 2 Project Description

More information

Cadastral Template 2003

Cadastral Template 2003 PCGIAP-Working Group 3 "Cadastre" FIG-Commission 7 "Cadastre and Land Management" Cadastral Template 2003 The establishment of a cadastral template is one of the objectives of Working Group 3 "Cadastre"

More information

REQUEST FOR PROPOSAL FOR SERVICED APARTMENTS FOR: 1. CONCEPT DESIGN CONSULTATION AND/OR 2. OPERATION OF SERVICED APARTMENTS, FOR,

REQUEST FOR PROPOSAL FOR SERVICED APARTMENTS FOR: 1. CONCEPT DESIGN CONSULTATION AND/OR 2. OPERATION OF SERVICED APARTMENTS, FOR, REQUEST FOR PROPOSAL FOR SERVICED APARTMENTS FOR: 1. CONCEPT DESIGN CONSULTATION AND/OR 2. OPERATION OF SERVICED APARTMENTS, FOR, SERVICED APARTMENTS BRAND SPONSORED BY CYTONN INVESTMENTS MANAGEMENT LIMITED

More information

CENTRAL GOVERNMENT ACCOUNTING STANDARDS

CENTRAL GOVERNMENT ACCOUNTING STANDARDS CENTRAL GOVERNMENT ACCOUNTING STANDARDS NOVEMBER 2016 STANDARD 4 Requirements STANDARD 5 INTANGIBLE ASSETS INTRODUCTION... 75 I. CENTRAL GOVERNMENT S SPECIALISED ASSETS... 75 I.1. The collection of sovereign

More information

UNDERSTANDING DEVELOPER S DECISION- MAKING IN THE REGION OF WATERLOO

UNDERSTANDING DEVELOPER S DECISION- MAKING IN THE REGION OF WATERLOO UNDERSTANDING DEVELOPER S DECISION- MAKING IN THE REGION OF WATERLOO SUMMARY OF RESULTS J. Tran PURPOSE OF RESEARCH To analyze the behaviours and decision-making of developers in the Region of Waterloo

More information

GOVERNMENT OF JAMMU & KASHMIR Chief Minister s Monitoring Cell

GOVERNMENT OF JAMMU & KASHMIR Chief Minister s Monitoring Cell 1 GOVERNMENT OF JAMMU & KASHMIR Chief Minister s Monitoring Cell Physical verification report of the project namely WIDENING OF ROAD FROM QAMARWARI CHOWK TO PARIMPORA BYE-PASS JUNCTION AS FOUR LANE District

More information

REPORT - RIBA Student Destinations Survey 2014

REPORT - RIBA Student Destinations Survey 2014 REPORT - RIBA Student Destinations Survey 2014 There needs to be a stronger and more direct link between the architectural profession and the study of it as a subject at university. It is a profession

More information

REPORT - RIBA Student Destinations Survey 2013

REPORT - RIBA Student Destinations Survey 2013 REPORT - RIBA Student Destinations Survey 2013 Introduction The RIBA Student Destinations Survey is a partnership project between the RIBA and the University of Sheffield. It is a study to be delivered

More information

Informal urban land markets and the poor. P&DM Housing Course March 2009 Lauren Royston

Informal urban land markets and the poor. P&DM Housing Course March 2009 Lauren Royston Informal urban land markets and the poor P&DM Housing Course March 2009 Lauren Royston Informal land markets The importance of social relationships Property as socially embedded A false formal/informal

More information

HOUSING NEEDS ANALYSIS & ASSESSMENT REQUEST FOR PROPOSALS

HOUSING NEEDS ANALYSIS & ASSESSMENT REQUEST FOR PROPOSALS HOUSING NEEDS ANALYSIS & ASSESSMENT REQUEST FOR PROPOSALS I. Introduction Sibley County is located southwest of the seven-county metro. It directly borders Scott, Carver, McLeod, Le Sueur, Renville, and

More information

REGULATION OF HEAD OF THE NATIONAL LAND AGENCY OF THE REPUBLIC OF INDONESIA NUMBER 3 YEAR 2007 REGARDING

REGULATION OF HEAD OF THE NATIONAL LAND AGENCY OF THE REPUBLIC OF INDONESIA NUMBER 3 YEAR 2007 REGARDING REGULATION OF HEAD OF THE NATIONAL LAND AGENCY OF THE REPUBLIC OF INDONESIA NUMBER 3 YEAR 2007 REGARDING IMPLEMENTING PROVISION OF THE PRESIDENTIAL REGULATION NUMBER 36 OF 2005 REGARDING LAND PROCUREMENT

More information

2007 Profile of Home Buyers and Sellers Pennsylvania Report

2007 Profile of Home Buyers and Sellers Pennsylvania Report 2007 Profile of Home Buyers and Sellers Report Prepared for: Association of REALTORS Prepared by: NATIONAL ASSOCIATION OF REALTORS Research Division December 2007 2007 Profile of Home Buyers and Sellers

More information

Ontario Rental Market Study:

Ontario Rental Market Study: Ontario Rental Market Study: Renovation Investment and the Role of Vacancy Decontrol October 2017 Prepared for the Federation of Rental-housing Providers of Ontario by URBANATION Inc. Page 1 of 11 TABLE

More information

CHAPTER I INTRODUCTION. expansion as a whole, but also balanced economic and social development

CHAPTER I INTRODUCTION. expansion as a whole, but also balanced economic and social development CHAPTER I INTRODUCTION The region-based national development not only requires economic expansion as a whole, but also balanced economic and social development throughout the country. Furthermore, it is

More information

PEORIA HOUSING AUTHORITY JOB DESCRIPTION

PEORIA HOUSING AUTHORITY JOB DESCRIPTION PEORIA HOUSING AUTHORITY JOB DESCRIPTION JOB TITLE: REPORTS TO: DEPARTMENT: FLSA STATUS: ASSISTANT ASSET MANAGER ASSET MANAGER ASSET MANAGEMENT NON-EXEMPT JOB SUMMARY Working under the supervision of the

More information

Economic Impact of Commercial Multi-Unit Residential Property Transactions in Toronto, Calgary and Vancouver,

Economic Impact of Commercial Multi-Unit Residential Property Transactions in Toronto, Calgary and Vancouver, Economic Impact of Commercial Multi-Unit Residential Property Transactions in Toronto, Calgary and Vancouver, 2006-2008 SEPTEMBER 2009 Economic Impact of Commercial Multi-Unit Residential Property Transactions

More information

Economic Significance of the Property Industry to the. OTAGO Economy PREPARED FOR PROPERTY COUNCIL NEW ZEALAND BY URBAN ECONOMICS

Economic Significance of the Property Industry to the. OTAGO Economy PREPARED FOR PROPERTY COUNCIL NEW ZEALAND BY URBAN ECONOMICS Economic Significance of the Property Industry to the OTAGO Economy PREPARED FOR PROPERTY COUNCIL NEW ZEALAND BY URBAN ECONOMICS 2016 ABOUT PROPERTY COUNCIL NEW ZEALAND Property Council New Zealand is

More information

Economic Significance of the Property Industry to the. WELLINGTON Economy PREPARED FOR PROPERTY COUNCIL NEW ZEALAND BY URBAN ECONOMICS

Economic Significance of the Property Industry to the. WELLINGTON Economy PREPARED FOR PROPERTY COUNCIL NEW ZEALAND BY URBAN ECONOMICS Economic Significance of the Property Industry to the WELLINGTON Economy PREPARED FOR PROPERTY COUNCIL NEW ZEALAND BY URBAN ECONOMICS 2016 ABOUT PROPERTY COUNCIL NEW ZEALAND Property Council New Zealand

More information

Land Use. Land Use Categories. Chart 5.1. Nepeuskun Existing Land Use Inventory. Overview

Land Use. Land Use Categories. Chart 5.1. Nepeuskun Existing Land Use Inventory. Overview Land Use State Comprehensive Planning Requirements for this Chapter A compilation of objectives, policies, goals, maps and programs to guide the future development and redevelopment of public and private

More information

World Bank Loan. Hohhot-Zhangjiakou Rapid Railway. Resettlement Policy Framework

World Bank Loan. Hohhot-Zhangjiakou Rapid Railway. Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized World Bank Loan Hohhot-Zhangjiakou Rapid Railway Resettlement Policy Framework The Foreign

More information

LAND REFORM IN MALAWI

LAND REFORM IN MALAWI LAND REFORM IN MALAWI Presented at the Annual Meeting for FIG Commission 7 In Pretoria, South Africa, Held From 4 th 8 th November, 2002 by Daniel O. C. Gondwe 1.0 BACKGROUND Malawi is a landlocked country

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP275 Socialist Republic of Vietnam Ministry of Transport and National Traffic Safety

More information

D DAVID PUBLISHING. Mass Valuation and the Implementation Necessity of GIS (Geographic Information System) in Albania

D DAVID PUBLISHING. Mass Valuation and the Implementation Necessity of GIS (Geographic Information System) in Albania Journal of Civil Engineering and Architecture 9 (2015) 1506-1512 doi: 10.17265/1934-7359/2015.12.012 D DAVID PUBLISHING Mass Valuation and the Implementation Necessity of GIS (Geographic Elfrida Shehu

More information

RESETTLEMENT POLICY FRAMEWORK (RPF)

RESETTLEMENT POLICY FRAMEWORK (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JANUARY 2013 Republic of Mozambique Mozambique Climate Resilience: Transforming Hydro-Meteorological

More information

Land Procedure: Allocation Procedures - Major Projects/Sales. Summary of Changes:

Land Procedure: Allocation Procedures - Major Projects/Sales. Summary of Changes: APPROVED AMENDMENTS: Effective Date Briefing Note /Approval Summary of Changes: June 1, 2011 BN 175892 Policy and Procedure update to reflect reorganization of resource ministries April 2011 FILE: 11480-00

More information

How to Read a Real Estate Appraisal Report

How to Read a Real Estate Appraisal Report How to Read a Real Estate Appraisal Report Much of the private, corporate and public wealth of the world consists of real estate. The magnitude of this fundamental resource creates a need for informed

More information

Settlement Pattern & Form with service costs analysis Preliminary Report

Settlement Pattern & Form with service costs analysis Preliminary Report Settlement Pattern & Form with service costs analysis Preliminary Report Prepared for Regional Planning Halifax Regional Municipality by Financial Services, HRM May 15, 2004 TABLE OF CONTENTS INTRODUCTION...

More information

2014 Plan of Conservation and Development

2014 Plan of Conservation and Development The Town of Hebron Section 1 2014 Plan of Conservation and Development Community Profile Introduction (Final: 8/29/13) The Community Profile section of the Plan of Conservation and Development is intended

More information

M A N N E S M A N N A.S / REAL ESTATE AND PROJECT APPRAISAL REPORT Bodrum/MUĞLA

M A N N E S M A N N A.S / REAL ESTATE AND PROJECT APPRAISAL REPORT Bodrum/MUĞLA M A N N E S M A N N A.S. 2018 / 2019 REAL ESTATE AND PROJECT APPRAISAL REPORT Bodrum/MUĞLA EXECUTIVE SUMMARY The property subject to appraisal and its use: The real estate of land type without any building

More information

2012 Profile of Home Buyers and Sellers Florida Report

2012 Profile of Home Buyers and Sellers Florida Report 2012 Profile of Home and Sellers Report Prepared for: REALTORS Prepared by: NATIONAL ASSOCIATION OF REALTORS Research Division December 2012 2012 Profile of Home and Sellers Report Table of Contents Introduction...

More information

County Survey. results of the public officials survey in the narrative. Henry County Comprehensive Plan,

County Survey. results of the public officials survey in the narrative. Henry County Comprehensive Plan, Introduction During the planning process, a variety of survey tools where used to ensure the Henry County Comprehensive Plan was drafted in the best interests of county residents and businesses. The surveys

More information

Table of Contents. Appendix...22

Table of Contents. Appendix...22 Table Contents 1. Background 3 1.1 Purpose.3 1.2 Data Sources 3 1.3 Data Aggregation...4 1.4 Principles Methodology.. 5 2. Existing Population, Dwelling Units and Employment 6 2.1 Population.6 2.1.1 Distribution

More information

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project)

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project) Resettlement Plan October 2014 GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project) Prepared by United Water Supply Company of Georgia LLC of the Ministry

More information

Shaping Our Future. Return-on-Investment Study. June 2017

Shaping Our Future. Return-on-Investment Study. June 2017 Shaping Our Future Return-on-Investment Study A June 2017 PURPOSE AND CONTEXT The 10-county Upstate Region is growing, and is projected to welcome more than 300,000 new residents by 2040 to reach a total

More information

Direct Financial Contribution of Farming Areas to Local Governments. Province of British Columbia

Direct Financial Contribution of Farming Areas to Local Governments. Province of British Columbia File Number 860.600-1 2005 Direct Financial Contribution of Farming Areas to Local Governments in British Columbia A Pilot Project in Pitt Meadows and Abbotsford Prepared by the Coast Region and Resource

More information

EN Official Journal of the European Union L 320/373

EN Official Journal of the European Union L 320/373 29.11.2008 EN Official Journal of the European Union L 320/373 INTERNATIONAL FINANCIAL REPORTING STANDARD 3 Business combinations OBJECTIVE 1 The objective of this IFRS is to specify the financial reporting

More information

EXHIBIT LIST No Exhibit Name Page 1 P7 Compensation Presentation.pdf (P7) 2-47

EXHIBIT LIST No Exhibit Name Page 1 P7 Compensation Presentation.pdf (P7) 2-47 Reference No: HOC/10001 Petitioner: Phase 2a Teach-ins Published to Collaboration Area: Friday 23-Mar-2018 EXHIBIT LIST Page 1 of 47 No Exhibit Name Page 1 P7 Compensation Presentation.pdf (P7) 2-47 HOC/10001/0001

More information

A Study of Experiment in Architecture with Reference to Personalised Houses

A Study of Experiment in Architecture with Reference to Personalised Houses 6 th International Conference on Structural Engineering and Construction Management 2015, Kandy, Sri Lanka, 11 th -13 th December 2015 SECM/15/001 A Study of Experiment in Architecture with Reference to

More information

PROJECT INITIATION DOCUMENT

PROJECT INITIATION DOCUMENT Project Name: Housing Futures Phase Two Project Sponsor: Steve Hampson Project Manager: Denise Lewis Date Issued: 15 February 2008 Version No: 1 Background: At Full Council on 31 January 2008 the following

More information

Serbia Corridor X Highway Project E-75 and E-80. Resettlement Policy Framework. Final Version June 4, 2009

Serbia Corridor X Highway Project E-75 and E-80. Resettlement Policy Framework. Final Version June 4, 2009 Public Disclosure Authorized Serbia Corridor X Highway Project E-75 and E-80 Resettlement Policy Framework RP789 rev Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

More information