1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FEDERAL REPUBLIC OF NIGERIA ADAMAWA STATE GOVERNMENT RURAL ACCESS & MOBILITY PROJECT (RAMP II) CONSULTANCY SERVICES FOR DETAILED ENGINEERING, SAFEGUARDS STUDIES AND PREPARATION OF BIDDING DOCUMENTS FOR PRIORITIZED ROADS IN ADAMAWA STATE (RAMP II) CLIENT National Coordinator Federal Project Management Unit Rural Access & Mobility Project (RAMP) Federal Ministry of Agriculture & Rural Development NAIC House, Plot 590, Zone AO Along Airport Road, Central Area Abuja - Nigeria. PREPARED BY YAROSON PARTNERSHIP LIMITED, NIGERIA CONSULTANTS YAROSON PARTNERSHIP LIMITED Halford Pavey House IB Aliyu Turaki Road, P. O. Box 843, Kaduna, Nigeria. yarosonpartnership@yahoo.com AND Plot 576 Mobolaji Crescent Gudu - Abuja, Nigeria. JUNE, 2012

2 EXECUTIVE SUMMARY In line with the provisions of World Bank Operational Policy on resettlement (OP 4.12), and Abridged Resettlement Action Plan (ARAP) was conducted at Dubwangun along the Gyawana-Hadiyo-Lamurde road in Adamawa State Nigeria. Specifically, the ARAP was targeted at a compound, the household of Mr. J.J. where the road has been encroached upon by the tree fence of the compound. An attempt was made to find an alternative alignment for the road but the option was less attractive because farmlands would have to be acquired and some farmers dispossessed of their farmlands or at least sizeable parts of them. It was therefore decided to explore the option of felling the trees in Mr. J.J s fence as well as acquiring part of his compound, to obtain adequate width for the road carriageway. Consequently, consultations were held with household members at which it was agreed that the trees fence could be removed to create way for the road provided compensation is paid for the trees and narrow strip of land to be acquired. The details of the acquisition are tabulated below with the estimated cost implications Assets Census with Cost Estimates Items Description A. Trees i) Neem (6) full grown l Unit Cost ($) 1, Amount ($) 9, ii) Newboldia levis (aduluku) , Sub - total 31,500.00

3 B. Fence 30 X 3 (90m 2 ) cement block fence. i) 1200 cement blocks plus transport ii) 10 bags of cement plus transport. iii) 1 trip of sharp sand iv) Labour (6 days, 3 workers) , , /day 3, Sub - total 8, C. Land 30 x 2m (60m 2 ) of land to be acquired from Mr. J.J. s compound /m 2 9, Sub - total 9, Grand - Total 49, Note: The provision for the trees includes cost of replacement. The proposed action (i.e. felling of trees and acquisition of the narrow strip of land) would not affect the livelihoods of any of the members of the household; nor would it necessitate their displacement or the restoration of anyone s income. The payment of compensation is to be co-ordinated by the SPIU and it should be completed before construction work commences. That done, the trees can be felled, the householder assisted to build a new fence and construction work commenced. The proposed action (i.e felling of trees and acquisition of the narrow strip of land) would not affect the livelihoods of any of the members of the household; nor would it necessitate their displacement or the restoration of anyone s income. The payment of compensation is to be co-ordinated by the SPIU and it should be completed before construction work commences. That done, the trees can be felled, the householder assisted to build a new fence and construction work commenced.

4 TABLE OF CONTENTS Page EXECUTIVE SUMMARY SECTION ONE Introduction Project components: The Scope of Work (ToR) Project component requiring land requisition Interactive Discussions and Consultations 2 SECTION TWO Effort made to Minimize Displacement 5 SECTION THREE Census of household members by sex, age, occupation Census of assets inventories and natural resources 6 SECTION FOUR Legal Framework Relevant Land Laws and Construction Gaps between Nigerian Law and World Bank Policy 0P4.12 Regards Compensation Valuation Procedure Consultations with PAPs Entitlement Nature 9 SECTION FIVE 10 Conclusion 10 i

5 LIST OF PLATES Description Page Plate 1 Consultations with community women (Kebali) 3 Plate 2 Consultations with community members (Kebali) 3 Plate 3 Consultations with community women (Yanga) 3 Plate 4 Consultations with community members (Yanga) 3 Plate 5 PAP at Dubwangun along the road 5 Plate 6 Cross section of Consultees at Dubwangun 9 LIST OF TABLES Description Page Table1.1 Site - Specific Negative Socio-Economic Impacts with Mitigation 2 Table 1.2 Consultations at Various Critical Communities along the Road Routes 4 Table 3.1 Household members by sex, age and occupation 6 Table 3.2 Assets marked for compensation at Dubwangun 6 Table 4.1 Differences between the Nigerian land law and the operational policy (OP 4.12) of the World Bank 7 Table 4.2 Assets Census with Cost Estimates 9 ii

6 LIST OF ACRONYMS Description EIA - Environmental Impact Assessment EMP - Environmental Management Plan ES - Environmental Setting LFN - Law of the Federal Republic of Nigeria FGN - Federal Government of Nigeria FMWHUD - Federal Ministry of Works, Housing and Urban development FEPA - Federal Environmental Protection Agency UNCED - United Nations Conference on Environmental Developments WSSD - Water Supply and Sanitation Development MDG - Millennium Development Goals HIV - Human Immuno-deficiency Virus AIDS - Acquired Immuno- Deficiency Syndrome RAMP - Rural Access and Mobility Project LHS - Left Hand Side RHS - Right Hand Side EII - Environmental Impact Identification 4WD - Four Wheel Drive ESIA - Environmental and Socio-economic Impact Assessment ESMF - Environmental and Socio-economic Management Framework ITCZ - Inter Tropical Convergence Zone iii

7 SECTION ONE 1.1 Introduction The Federal Ministry of Agriculture and Rural Development through the Federal Government of Nigeria (FGN), has received credit from the World Bank (WB), and the French Development Agency, to support and finance its policy on Rural Access and Mobility Projects (RAMP). The RAMP is aimed at improving and enhancing accessibility and mobility in rural areas towards an effective regional integration and poverty alleviation. Adamawa State is one of the states of the federation identified to benefit from RAMP projects. The World Banks Involuntary Resettlement Policy OP4.12 requires that environmental and social impacts be mitigated in all the projects the Bank supports. Wherever property is to be acquired or modified, the Banks Involuntary Resettlement Policy (IRP) applies; whether the property is occupied legally or otherwise. The preparation of this ARAP is predicated on the Banks policy on resettlement OP 4.12 and the legal provisions of Nigeria. It is targeted at Mr. J.J. s compound at Dubwangun along Gyawana-Lamurde road. 1.2 Project components: The Scope of Work (ToR) The scope of this ESIA study is specifically based on the ToR provided by the client. The ToR requires the standard preparation of the ESIA for the road development projects, and entails the following; Consultation with relevant Government agencies and affected local community members. The establishment of an environmental and social baseline information for the project area and description of the proposed road works. The assessment and quantification of the potential environmental and socioeconomic impacts resulting from the road development, especially within the zone of influence of the project. The development of Environmental and Social Management Plan (ESMP) detailing actions and responsibilities for impacts mitigation and monitoring. Prepare environmental monitoring plan to reflect the management measures in the EMP; specifying indicators to be observed or measured, frequency of observations, and identity of monitors. 1

8 1.3 Project component requiring land requisition One of the roads (Gyawana-Hadiyo-Lamurde) passes through a community Dubawangun. At some point, the road width is not up to the 6m required because of encroachment. Mr. J.J. s compound fence of trees and reed mats is on the ROW and would have to be removed to create adequate access for the road. Even at that, additional land space is required so that the road can have shoulders. It is for this reason that a part of Mr. J.J. s compound (2m) width is to be acquired (see table 1.1). A. TABLE 1.1: Site - Specific Negative Socio-Economic Impacts with Mitigation S/N Negative Impacts Mitigation Location 1. Destruction of compound fence to create way for road. Some trees to be felled Pay compensation for trees and fence; and for 60m 2 of land Dubwangun 1.4 Interactive Discussions and Consultations During the detailed field visits, consultants held consultations with community members along each road not only to intimate them of the project but also to find out their feelings and disposition to the project. Community members were encouraged to ask questions and offer their opinions/advice regarding the project. Community members everywhere were anxious to have the roads rehabilitated and even expressed willingness to participate in the construction, monitoring and maintenance of roads. When informed about the possible security concerns when the roads have been built and the need to establish vigilante groups by the youth, they generally accepted the challenge and expressed their willingness to participate in the security of their communities. Plates 1-4 show consultants consulting members of some communities. In special cases (especially at locations where the road alignment passes through built up areas), traditional rulers and/or chiefs were also consulted to seek their consent to re-route the roads. Such was the case at Bille, Kodomum and Borrong. At Dubwangun where it is necessary to remove an existing fence of trees, the affected household (Mr. J. J.s ) was consulted and their consent was given provided adequate compensation is paid. Consultants also met with community members (see plates 5 and 6). Details of the compensations to be paid are presented in Table 1.2 2

9 Along each road, consultations were also held with women groups about their socio-economic lives and their empowerment requirements. Consultants noted that many women (Bazza-Kalikassa road, Gyawanna Lamurde for example), are farmers with their own plots of land. Quite often, women take responsibility for feeding the family (children mainly). Plate 1: Consultations with community members at Kebali Numa Plate 2: Consultations with community members at Kebali Numa Plate 3: Consultations with community members Plate 4: Consultations with community members atyanga 3

10 Table 1.2: Consultations at Various Critical Communities along the Road Routes Location Dubwangun Lamurde LGA Bille Lamurde LGA Attendance (NO) Concerns Expressed by Stakeholders Male Female 32 7 Would compensation be paid for any property removed? Would it be paid before construction work starts? What will happen to the water pipe in the ground along the road? Issue of compensation for economic trees along the new road alignment Would contractor employ local people? Remark Yes Before It will be relocated Will be paid Yes Kodomun Demsa LGA Borrong Gerei LGA Why is the bank not refurbishing the road from Mararaba to Bille instead of Bille to Mayo Belwa Will contractor employ local People What type of road is to be constructed? How are community members going to feed the contractors workforce? 40 6 When will work commence? Will it be this year? As much as possible That is already been repaired Yes Earth road Prepare the food for workers to purchase Definitely not during the rainy season How would the marshy portion of the road be constructed? Some people have stockpiles of construction materials. Will the contractor patronise us? There would be culverts If the materials meet the required standards The chief would prefer the road to terminate at the palace, deviating from proposed alignment. There are some challenges along that route. 4

11 Plate 5: PAP at Dubwangun along the road Plate 6: Cross section of Consultees at Dubwangun SECTION TWO 2.1 Effort made to Minimize Displacement Consultations were held with members of Mr. J. J. s household to sensitize them. Alternatives routes were explored for possible road re-alignment and the alternatives were compared with the option of maintaing the present road route. 2.2 Results of the efforts After an appraisal of the alternatives, it was noted that the only one feasible would take the road through farmland that would result in displacement of farmers and the payment of more compensation. Also, the cost of road construction would be much higher because the terrain to be traversed is marshy. However, after consultations, Mr. J.J. was quite amenable to the suggestions of removing the fence of his compound and acquiring a part of his land provided he would be compensated. No other physical structure would be affected and nobody in the household would be displaced. The livelihoods of the members of the household would not be affected. 5

12 SECTION THREE 3.1 Census of household members by sex, age, occupation etc. The Census of Mr. J.J s household taking details of members by sex, age, occupation is presented in Table 3.1. Table 3.1: Household members by sex, age and occupation S/N Names Sex Occupation Age 1. Mr. J. F. Male Farmer 45 years 2. B. J. Female Farmer 35 years 3. P. J. Female Farmer 22 years 4. N. J. Female Student 18 years 5. S. J. Male Student 8 years 6. A. J. Male Student 4 years 7. I. F. Male Student 30 years 8. M. I. Female Farmer 23 years 9. F. I. Male Farmer 7 years 10. F. I. Male Student 6 years 11. D. I. Male Student 4 years 12. E. F. Male Farmer 50 years 3.2 Census of assets inventories and natural resources Table 3.2: Assets marked for compensation at Dubwangun Community Assets Affected Action Proposed Dubwangun Cut some trees and expand road carriageway about 2m into adjacent compound for a length of 30m Compensation for: 36 trees Replacement of fence Acquire 60m 2 land (not farm land) but part of a compound 6

13 SECTION FOUR 4.1 Legal Framework Relevant Land Laws and Construction The relevant legislative provisions applicable to this project are in Nigeria the Land Use Act of 1978 and Resettlement. The Land Use Act Cap 202, 1990 laws of the Federal Republic of Nigeria deal with land ownership, transfer, acquisition and all other issues relating to land. By the Act, all land is vested in the Executive Governor of the state where it occurs. The Governor holds the land in trust for the people and government of the states but individuals enjoy a right of occupancy which may be revoked should such land be required by Local, State or Federal Government for public purpose. In this case however, the holder and occupier shall be entitled to compensation for the value of the land at the date of revocation. 4.2 Gaps between Nigerian Law and World Bank Policy 0P4.12 Regarding Compensation The table below (4.1) shows the differences between the Nigerian land law and the operational policy (OP 4.12) of the World Bank regarding the payment of compensations. Table 4.1 Differences between the Nigerian land law and the operational policy (OP 4.12) of the World Bank. Category of S/no Nigerian Law World Bank OP4.12 PAP 1. Land Owners Cash Compensation Recommends land-for-land based on current compensation. market value Other compensation is at replacement cost 2. Land Tenants Entitled to Entitled to some form of compensation based compensation whatever the legal on the amount of recognition of their occupancy. rights they hold on the land 3. Land Users Not entitled to Entitled to compensation for compensation except crops. May be entitled to for crops replacement of land and income must be restored to pre-project levels at least. 7

14 4. Owners of Cash Compensation Non- based on current permanent Market value structures (Building) 5. Owners of Cash Compensation Permanent at Cement Market Building Value After Okeibunor, J.C. (2012) Entitled to in-kind compensation. A cash at full replacement cost including labour and relocation expenses prior to displacement. Entitled to in-kind compensation or cash compensation at full replacement cost building labour and relocation expenses prior to displacement. Note: In all there however, the provisions of OP4.12 of the World Bank shall take precedence over the Land Use Act of Nigeria. 4.3 Valuation Procedure The PAP of this ARAP are members of household/compound which falls within the ROW of the Gyawana - Lamurde Road. Based on this and the World Bank policy OP4.12, the occupants of the compound qualify for compensation if any of their properties are to be demolished. Consequently, in this instance, the compensation would be paid to the Head of the household since he is the owner of the compound and trees in question. There are no occupants or tenants (vulnerable persons), whose means of livelihood are being threatened or whose access to productive assets is being denied as a result of the project. The details of the compensation being proposed are presented below in table Consultations with PAPs Consultations were held with members of the household on April, 2, Mr. J.J. (the brother of the owner of the house represented the owner. Other members of the household (table 4.2) were also present. The purpose of the project was explained to him and the need to acquire part of the compound was stated. Mr. J.J. responded by stating that he is aware that the fence of the compound has encroached on the road and that he is aware that Government could one day require the fence to be removed. He had no objection to that intention to remove the fence and fell the trees. He was then informed that in any event that the trees are felled and part of his land acquired, he would be adequately compensated and assisted to replace his fence. He was pleased to hear this and wanted to know when the compensation would be paid. 8

15 Consultant responded that all he could say is that it would be before the project commences. 4.5 Entitlement Nature During the consultation, consultants and members of the household identified and counted the trees to be felled; as well as measure the land to be acquired to create adequate space for the road. The entitlement matrix is tabulated below for easy reference. Table: 4.2: Assets Census with Cost Estimates Items Description Unit Cost ($) Amount ($) D. Trees i) Neem (6) full grown l 1, , ii) Newboldia levis (aduluku) , Sub total 31, E. Fence 30 x 3 (90m 2 ) cement block fence. i) 1200 cement blocks plus transport , ii) 10 bags of cement plus transport , iii) 1 trip of sharp sand iv) Labour (6 days, 3 workers) /day 3, Sub total 8, F. Land 30 x 2m (60m 2 ) of land to be acquired from Mr. J.J. s compound /m 2 9, Sub total 9, Grand Total 49,

16 SECTION FIVE 5.1 This ARAP does not require resettlement sites to be provided nor does it involve any income restoration. The institutional framework for implementing both RAP and ARAP are at Federal, State and Local levels. The focal point for all aspects of the project is the Federal Project Management Unit (FPMU). At state level, the State Project Implementation Unit (SPIU) set up specifically for the project and probably constituted with representatives from relevant focal agencies/ministries. The state could establish a site-level implementation unit especially to take charge of road maintenance and rehabilitation monitoring. Civil Society Organizations at state and site levels could also form part of the implementation arrangement. At local site level, community members (traditional rulers, religious leaders, CBOs, LGA officials etc), could be constituted into a monitoring and /or maintenance unit. 5.2 Conclusion After due consultations with community members along the different roads, only at Dubwangun (Mr. J.J. s compound) was an ARAP indicated. The outcome of the exercise is that although some compensation has to be paid for trees, fence replacement and strip of land, no person living in the compound would be displaced. Therefore, there would be no relocation of any person for resettlement. Also, the incomes and livelihood would not be affected by the felling of the trees or acquisition of the narrow strip of land in Mr. J.J. s compound. 10

17 REFERENCES Abbrivated Resstlement Action Plan. Kenya Highways; National Authority Kenya. Handbook for Preparing a Resettlement Action Plan: Environment and Social Development Department, International Finance Corporation (IFC) Resettlement Action Plan for Amugulang-Ebudouge ClassIII Porthighway. Inner Monogolia Autonomous Region Communications Department Resettlement Policy Framework (RPF) for RAMPII in Adamawa, Enugu, Niger and Osun States: Federal project Management Unit (FPMU), Federal Ministry of Agriculture and Rural Development Abuja. 11

REPUBLIC OF MACEDONIA

REPUBLIC OF MACEDONIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Municipal Services Improvement Project (MSIP) LAND ACQUISITION

More information

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PIP annex 9 - C of GEF Hai Basin Integrated Water and Environment Management Project

More information

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency

More information

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Summary of Land Acquisition Policy Framework JAMAICA: JM Hurricane Dean ERL Project RP607

More information

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project I. Introduction The overall length of the road network in Albania totals

More information

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT Village Roads Component on the GAUNGXI ROADS DEVELOPMENT II PROJECT in THE PEOPLE S REPUBLIC OF CHINA (PRC) Guangxi Comnications Department Nanning, PRC This report was prepared by the Borrower and is

More information

RESSETTLEMENT POLICY FRAMEWORK

RESSETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Department of Water Resources and Land Improvement of the Kyrgyz Republic Project Implementation

More information

Upgrading and Construction of Chumateleti-Khevi Section of the E-60 Highway

Upgrading and Construction of Chumateleti-Khevi Section of the E-60 Highway mail33 Ministry of Regional Development and Infrastructure of Georgia Roads Department of Georgia Resettlement Policy Framework EAST-WEST HIGHWAY CORRIDOR IMPROVEMENT PROJECT AF Upgrading and Construction

More information

RESETTLEMENT POLICY FRAMEWORK (RPF)

RESETTLEMENT POLICY FRAMEWORK (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JANUARY 2013 Republic of Mozambique Mozambique Climate Resilience: Transforming Hydro-Meteorological

More information

Resettlement Policy Framework (RPF) for the Sustainable Rural Water and Sanitation Project

Resettlement Policy Framework (RPF) for the Sustainable Rural Water and Sanitation Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Resettlement Policy Framework (RPF) for the Sustainable Rural Water and Sanitation Project

More information

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy

More information

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis: Code No: 1.9 Social Screening and Impact Assessment for Sub Projects A. Sub Project Description: Proposed Activity Walkability and Parking Improvements Lotus Road Implementing Agency: Colombo Municipal

More information

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PT PLN (Persero) INDONESIA POWER SECOND TRANSMISSION DEVELOPMENT PROJECT (IPTD-2) RP1232

More information

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Vision Contribute to overall development of the nation and its citizens by creating conducive

More information

KENYA URBAN WATER AND SANITATION, OUTPUT BASED AID PROJECT (OBA) FUND FOR LOW INCOME AREAS

KENYA URBAN WATER AND SANITATION, OUTPUT BASED AID PROJECT (OBA) FUND FOR LOW INCOME AREAS KENYA URBAN WATER AND SANITATION, OUTPUT BASED AID PROJECT (OBA) FUND FOR LOW INCOME AREAS RESETTLEMENT ACTION PLAN (RAP) FOR PROPOSED CONSTRUCTION OF SEWER EXTENSION PROJECT BY NYERI WATER AND SEWERAGE

More information

Government of the Republic of Malawi MINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT AGRICULTURAL SECTOR WIDE APPROACH SUPPORT PROJECT

Government of the Republic of Malawi MINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT AGRICULTURAL SECTOR WIDE APPROACH SUPPORT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Government of the Republic of Malawi The World Bank MINISTRY OF AGRICULTURE, IRRIGATION

More information

ABBREVIATED RESETTLEMENT ACTION PLAN

ABBREVIATED RESETTLEMENT ACTION PLAN Public Disclosure Authorized SFG2673 Public Disclosure Authorized Public Disclosure Authorized ABBREVIATED RESETTLEMENT ACTION PLAN FOR THE CONSTRUCTION OF THE NEW REDEMPTION HOSPITAL BY THE MINISTRY OF

More information

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors. SUMMARY LAND ACQUISITION PLAN Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the RURAL ROADS SECTOR I PROJECT in INDIA Ministry of Rural Development

More information

COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation

COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN CMM and CBM Production for Power Generation Shanxi Jincheng Coal Mining Group Co., Ltd. September 2004 THIS IS NOT AN ADB BOARD

More information

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT. Tanzania Strategic Cities Project (TSCP)

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT. Tanzania Strategic Cities Project (TSCP) Public Disclosure Authorized THE UNITED REPUBLIC OF TANZANIA SFG2072 V2 REV PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT Public Disclosure Authorized Public Disclosure Authorized Tanzania

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LAO PDR: AGRICULTURAL DEVELOPMENT PROGRAM RP-59 POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT

More information

B. Justification of project design and alternative analysis:

B. Justification of project design and alternative analysis: Social Screening and Impact Assessment for Sub Projects Code No: 3 A. Sub Project Description: Proposed Activity Town Hall Square Development Implementing Agency: Colombo Municipal Council (CMC) Sub project

More information

Republic of Uganda. Department of Refugees, Office of the Prime Minister

Republic of Uganda. Department of Refugees, Office of the Prime Minister SFG1896 V3 REV Republic of Uganda Department of Refugees, Office of the Prime Minister Regional Operation on Development Response to Displacement Project in the Horn of Africa -Uganda Project Updated Resettlement

More information

KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT

KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT SFG1940 REV KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT RESETTLEMENT POLICY FRAMEWORK JUNE 2016 Public Disclosure Authorized Public Disclosure

More information

Land Acquisition and Resettlement Policy Framework

Land Acquisition and Resettlement Policy Framework Myanmar Agriculture Development Support Project Land Acquisition and Resettlement Policy Framework Ministry of Agriculture and Irrigation The Union Government of Myanmar Draft for Public Consultation 1

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Ministry of Agriculture and Environmental Protection Directorate for Water Management 11070 Belgrade, Blvd. Umetnosti 2a ELEKTROPRIVREDA SRBIJE FLOODS EMERGENCY AND RECOVERY PROJECT (FERP) RESETTLEMENT

More information

SOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT

SOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Armenia SOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT RESETTLEMENT POLICY

More information

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION

More information

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP)

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) Resettlement Action Plan Update Report for the ARUSHA

More information

MARKETILED SMALLHOLDER

MARKETILED SMALLHOLDER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNMENT OF THE REPUBLIC OF MOZAMBIQUE MINISTRY OF PLANNING AND DEVELOPMENT RP428 MARKETILED

More information

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework 1. BACKGROUND Dhaka Water Supply and Sanitation Project Resettlement Policy Framework The Dhaka Water and Sewerage Authority (DWASA) currently supplies water to about 70% of the population of the Dhaka

More information

THE UNITED REPUBLIC OF TANZANIA PRIME MINISTER S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PMO-RALG)

THE UNITED REPUBLIC OF TANZANIA PRIME MINISTER S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PMO-RALG) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE UNITED REPUBLIC OF TANZANIA PRIME MINISTER S OFFICE REGIONAL ADMINISTRATION AND LOCAL

More information

Dhaka Water Supply and Sanitation Project

Dhaka Water Supply and Sanitation Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VOL. 1 Dhaka Water Supply and Sanitation Project Resettlement Policy Framework Dhaka

More information

Resettlement Action Plan (RAP)

Resettlement Action Plan (RAP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Resettlement Action Plan (RAP) FOR THE 33 kv SUB TRANSMISSION LINE IN THE WESTERN AREA

More information

1. Description of the project, project area and area of influence

1. Description of the project, project area and area of influence RESETTLMENT ACTION PLAN (RAP) SUMMARY Project Name: ETHIOPIA INTEGRATED TRANSPORT PROGRAM PHASE I (Jima Chida & Sodo-Sawla Road Upgrading Project) Country: Ethiopia Division: OITC Department: OITC 2 Project

More information

Summary: Resettlement Action Plan for the Thwake Multi- Purpose Dam-Kenya

Summary: Resettlement Action Plan for the Thwake Multi- Purpose Dam-Kenya Summary: Resettlement Action Plan for the Thwake Multi- Purpose Dam-Kenya 1. Introduction and Background The proposed Thwake water supply and sanitation Dam is a project conceived and intended to be constructed

More information

RESETTLEMENT ACTION PLAN (RAP)

RESETTLEMENT ACTION PLAN (RAP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RUIRU SEWERAGE INFRASTRUCTURE PROJECT (RSIP) RESETTLEMENT ACTION PLAN (RAP) June 2013 Draft Version Public Disclosure

More information

12 El Saleh Ayoub St., Zamalek, Cairo, Egypt Tel: Fax:

12 El Saleh Ayoub St., Zamalek, Cairo, Egypt Tel: Fax: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SUBMITTED TO: PORT CITIES DEVELOPMENT PROGRAM Port Cities Development Program () 12 El

More information

RESETTLEMENT POLICY FRAMEWORK FOR KENYA POWER PROJECTS

RESETTLEMENT POLICY FRAMEWORK FOR KENYA POWER PROJECTS RESETTLEMENT POLICY FRAMEWORK FOR KENYA POWER PROJECTS REVISED SEPTEMBER - 2012 i EXECUTIVE SUMMARY The Kenya power and Lighting Company Ltd (KPLC) falls under the Ministry of Energy (MoE). KPLC, which

More information

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Land Acquisition

More information

Andhra Pradesh Rural Roads Connectivity Project The Asian Infrastructure Investment Bank assisted

Andhra Pradesh Rural Roads Connectivity Project The Asian Infrastructure Investment Bank assisted GOVERNMENT OF ANDHRA PRADESH PANCHAYAT RAJ ENGINEERING DEPARTEMNT The (RPF) July 2018 Samaj Vikas Development Support Organisation Table of Contents List of Acronyms... 3 Glossary of Resettlement & Rehabilitation

More information

MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT

MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT Public Disclosure Authorized RP1787 Public Disclosure Authorized MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT Kenya Informal Settlements Improvement Project Public Disclosure Authorized RESETTLEMENT

More information

KENYA ELECTRICITY EXPANSION PROJECT (EASP)- RURAL ELECTRIFICATION AUTHORITY (REA) COMPONENT

KENYA ELECTRICITY EXPANSION PROJECT (EASP)- RURAL ELECTRIFICATION AUTHORITY (REA) COMPONENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized KENYA ELECTRICITY EXPANSION PROJECT (EASP)- RURAL ELECTRIFICATION AUTHORITY (REA) COMPONENT

More information

Resettlement Policy Framework

Resettlement Policy Framework Republic of Turkey Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework Background 1. The Second Renewable Energy and Energy Efficiency Project will fund private sector investments

More information

ALBANIA - VLORA BYPASS RESETTLEMENT ACTION PLAN REPORT

ALBANIA - VLORA BYPASS RESETTLEMENT ACTION PLAN REPORT ALBANIA - VLORA BYPASS RESETTLEMENT ACTION PLAN REPORT February 2013 TABLE OF CONTENTS Page 1. INTRODUCTION AND SCOPE OF THE DOCUMENT 1 2. PROJECT DESCRIPTION 2 3. POLICY AND REGULATORY BACKGROUND 4 3.1.

More information

DESIGN-BUILD- MAINTENANCE

DESIGN-BUILD- MAINTENANCE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Consultancy Services for Design Review, Preparation of Concept Design and Resettlement

More information

NORTH EASTERN CORRIDOR ROAD ASSET MANAGEMENT PROJECT (NECRAMP): TORORO-MBALE- SOROTI-LIRA-KAMDINI ROAD

NORTH EASTERN CORRIDOR ROAD ASSET MANAGEMENT PROJECT (NECRAMP): TORORO-MBALE- SOROTI-LIRA-KAMDINI ROAD Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DECEMBER 2013 REPUBLIC OF UGANDA UGANDA NATIONAL ROADS AUTHORITY NORTH EASTERN CORRIDOR

More information

SFG kv İzmir Substation Abbreviated Resettlement Action Plan (ARAP) Turkish Electricity Transmission Company. Public Disclosure Authorized

SFG kv İzmir Substation Abbreviated Resettlement Action Plan (ARAP) Turkish Electricity Transmission Company. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Turkish Electricity Transmission Company 380 kv İzmir Substation Abbreviated Resettlement

More information

Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand

Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand TS03H_ REAL ESTATE ECONOMICS & EXPROPRIATION SOLUTIONS TO LAND POLICY PROBLEMS- Paper 8312 Compensation Assessment for

More information

Legal Analysis of Memorandum of Understanding between the Government of Timor Leste and GTLeste Biotech. Legal issues concerning land and evictions

Legal Analysis of Memorandum of Understanding between the Government of Timor Leste and GTLeste Biotech. Legal issues concerning land and evictions Legal Analysis of Memorandum of Understanding between the Government of Timor Leste and GTLeste Biotech Legal issues concerning land and evictions A Memorandum of Understanding (MOU) was signed between

More information

ISLAMIC REPUBLIC OF AFGHANISTAN. Ministry of Rural Rehabilitation and Development (MRRD) And. Independent Directorate of Local Governance (IDLG)

ISLAMIC REPUBLIC OF AFGHANISTAN. Ministry of Rural Rehabilitation and Development (MRRD) And. Independent Directorate of Local Governance (IDLG) Public Disclosure Authorized SFG2396 Public Disclosure Authorized Public Disclosure Authorized ISLAMIC REPUBLIC OF AFGHANISTAN Ministry of Rural Rehabilitation and Development (MRRD) And Independent Directorate

More information

ENTITLEMENT MATRIX. Gujarat State Highway Project - II. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

ENTITLEMENT MATRIX. Gujarat State Highway Project - II. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ROADS AND BUILDINGS DEPARTMENT GOVERNMENT OF GUJARAT Gujarat State Highway Project -

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Nile Equatorial Lakes Subsidiary Action Program (NELSAP) THE REPUBLIC OF KENYA Sio-Malaba-Malakisi

More information

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) ARRANGEMENT OF REGULATIONS Regulations 1. Claims for compensation 2. Assessment of compensation 3. Compensation principles

More information

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS MINISTRY OF EDUCATION GOVERNMENT OF NEPAL August 2011 2 A. Introduction 1.

More information

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION RP762 v30 1. Information About Project Name &Location of Subproject Project Sponsor Project Cost Installed Generation

More information

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Involuntary Resettlement Safeguards Objectives: To avoid resettlement wherever possible;

More information

MANO RIVER UNION ROAD DEVELOPMENT AND TRANSPORT FACILITATION PROGRAMME (MRU/RDTFP) (PHASE II)

MANO RIVER UNION ROAD DEVELOPMENT AND TRANSPORT FACILITATION PROGRAMME (MRU/RDTFP) (PHASE II) Language: English Original: English PROJECT: MANO RIVER UNION ROAD DEVELOPMENT AND TRANSPORT FACILITATION PROGRAMME (MRU/RDTFP) (PHASE II) COUNTRY: MULTINATIONAL (COTE D IVOIRE & LIBERIA) RESETTLEMENT

More information

Valuation Methodology of Unregistered Properties in East Africa

Valuation Methodology of Unregistered Properties in East Africa FIG KL 2014 Valuation Methodology of Unregistered Properties in East Africa James Kavanagh MRICS John Tracey-White FRICS Valuation Methodology of Unregistered Properties in East Africa Origin of the Study

More information

Resettlement Policy Framework for the Turkey Geothermal Development Project

Resettlement Policy Framework for the Turkey Geothermal Development Project SFG1378 V3 Public Disclosure Authorized 2016 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Resettlement Policy Framework for the Turkey Geothermal Development Project

More information

In light of this objective, Global Witness is providing feedback on key sections of the 6 th draft of the national land policy:

In light of this objective, Global Witness is providing feedback on key sections of the 6 th draft of the national land policy: Summary Global Witness submission on the 6 th draft of Myanmar s draft national land policy June 2015 After a welcome extension to public participation on the 5 th draft of the national land policy, in

More information

Koridori Srbije Corridor X Highway Project Land Acquisition and Resettlement Framework LARF

Koridori Srbije Corridor X Highway Project Land Acquisition and Resettlement Framework LARF Land Acquisition and Resettlement Framework LARF Issue 1 June 2018 PREPARED BY Contents List of Abbreviations 2 Glossary 3 1 Introduction 7 1.1 Principles and Objectives 12 2 Gaps Between RS Legislation

More information

Resettlement Compensation Framework Railway Corridor VIII - Eastern section

Resettlement Compensation Framework Railway Corridor VIII - Eastern section Republic of Macedonia February 2012 Resettlement Compensation Framework Railway Corridor VIII - Eastern section Contract No: C21196/EBSF-2010-07-101 Macedonian Railways: Feasibility Study for Corridor

More information

Scheme of Service. for. Housing Officers

Scheme of Service. for. Housing Officers REPUBLIC OF KENYA Scheme of Service for Housing Officers APPROVED BY THE PUBLIC SERVICE COMMISSION AND ISSUED BY THE PERMANENT SECRETARY MINISTRY OF STATE FOR PUBLIC SERVICE OFFICE OF THE PRIME MINISTER

More information

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND (DRAFT) Public Disclosure Authorized RP337 v2 LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND Public Disclosure Authorized Public

More information

DRAFT EXECUTIVE SUMMARY

DRAFT EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT EXECUTIVE SUMMARY IPUH - BANTAL (LINK 015.1) KABUPATEN MUKO-MUKO YEAR 2010 EXECUTIVE

More information

coat FEDERAL REPUBLIC OF NIGERIA SUSTAINABLE MANAGEMENT OF MINERAL RESOURCES PROJECT RESETTLEMENT POLICY FRAMEWORK (RPF) (JANUARY 2011)

coat FEDERAL REPUBLIC OF NIGERIA SUSTAINABLE MANAGEMENT OF MINERAL RESOURCES PROJECT RESETTLEMENT POLICY FRAMEWORK (RPF) (JANUARY 2011) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized coat FEDERAL REPUBLIC OF NIGERIA SUSTAINABLE MANAGEMENT OF MINERAL RESOURCES PROJECT

More information

VOLUNTARY LAND DONATION FRAMEWORK

VOLUNTARY LAND DONATION FRAMEWORK Community-Managed Irrigated Agriculture Sector Project Additional Financing (RRP NEP 33209) A. The Project and Context 1. Project Description VOLUNTARY LAND DONATION FRAMEWORK 1. The proposed Community

More information

LAND REFORM IN MALAWI

LAND REFORM IN MALAWI LAND REFORM IN MALAWI Presented at the Annual Meeting for FIG Commission 7 In Pretoria, South Africa, Held From 4 th 8 th November, 2002 by Daniel O. C. Gondwe 1.0 BACKGROUND Malawi is a landlocked country

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Regional Development and Infrastructure of Georgia Roads Department of Georgia

More information

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT. Proposed TSCP Additional Financing Sub-project

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT. Proposed TSCP Additional Financing Sub-project Public Disclosure Authorized THE UNITED REPUBLIC OF TANZANIA SFG2072 V1 REV PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT Public Disclosure Authorized Proposed TSCP Additional Financing

More information

JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK

JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK I. Introduction The Jamaica Social Investment Fund (JSIF) was established in 1996 under the Government of Jamaica s National

More information

I U B Reddy The World Bank New Delhi, India

I U B Reddy The World Bank New Delhi, India IAIA15 India s New Land Acquisition Act Right To Fair Compensation and Transparency in Land Acquisition and Rehabilitation and Resettlement Act, 2013 I U B Reddy The World Bank New Delhi, India Challenging

More information

COMPONENT 2 - TSKB DRAFT

COMPONENT 2 - TSKB DRAFT 2015 Resettlement Policy Framework for the Turkey Geothermal Development Project COMPONENT 2 - TSKB DRAFT Contents 1. Project Description & Background... 2 2. Principles & Objectives... 3 3. Process for

More information

FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA ETHIOPIAN ROADS AUTHORITY

FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA ETHIOPIAN ROADS AUTHORITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA ETHIOPIAN ROADS AUTHORITY Consultancy Services

More information

RESETTLEMENT POLICY FRAMEWORK FOR THE KAFUE TOWN-MUZUMA LIVINGSTONE 220KV TRANSMISSION LINE UP GRADE

RESETTLEMENT POLICY FRAMEWORK FOR THE KAFUE TOWN-MUZUMA LIVINGSTONE 220KV TRANSMISSION LINE UP GRADE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESETTLEMENT POLICY FRAMEWORK FOR THE KAFUE TOWN-MUZUMA LIVINGSTONE 220KV TRANSMISSION

More information

Resettlement Policy Framework for the Turkey Geothermal Development Project

Resettlement Policy Framework for the Turkey Geothermal Development Project 2016 Resettlement Policy Framework for the Turkey Geothermal Development Project COMPONENT 2 FINANCIAL INTERMEDIARIES (TSKB) FINAL 1 Contents 1. Project Description &Background...3 2. Principles & Objectives...4

More information

Western Balkans Investment Framework Infrastructure Project Facility Technical Assistance 4 (IPF 4)

Western Balkans Investment Framework Infrastructure Project Facility Technical Assistance 4 (IPF 4) Western Balkans Investment Framework Infrastructure Project Facility Technical Assistance 4 (IPF 4) TA2012054 R0 WBF Preliminary Design and Feasibility Study with EIA for construction of Highway E-80 in

More information

PROPOSED KIAMBU WATER SUPPLY PROJECT KIAMBU COUNTY ABBREVIATED RESETTLEMENT ACTION PLAN FINAL REPORT. August 2014

PROPOSED KIAMBU WATER SUPPLY PROJECT KIAMBU COUNTY ABBREVIATED RESETTLEMENT ACTION PLAN FINAL REPORT. August 2014 PROPOSED KIAMBU WATER SUPPLY PROJECT KIAMBU COUNTY ABBREVIATED RESETTLEMENT ACTION PLAN FINAL REPORT August 2014 WATER AND SANITATION SERVICES IMPROVEMENT PROJECT ADDITIONAL FINANCING (WASSIP-AF) ABBREVIATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 03/03/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Project preparation under the PDF-B grant RP337

More information

NATIONAL IRRIGATION BOARD LOWER NZOIA IRRIGATION PROJECT RESETTLEMENT ACTION PLAN JANUARY 2013

NATIONAL IRRIGATION BOARD LOWER NZOIA IRRIGATION PROJECT RESETTLEMENT ACTION PLAN JANUARY 2013 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Prepared by: NATIONAL IRRIGATION BOARD LOWER NZOIA IRRIGATION PROJECT RESETTLEMENT ACTION

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document June 2012 Pakistan: Sindh Cities Improvement Investment Program (SCIP) Prepared by North Sindh Urban Services Corporation Limited for the Asian Development Bank. PFR-2 Annex-11

More information

Chittagong Water Supply Improvement and Sanitation Project. Resettlement Policy Framework

Chittagong Water Supply Improvement and Sanitation Project. Resettlement Policy Framework Chittagong Water Supply Improvement and Sanitation Project Resettlement Policy Framework Chittagong Water Supply & Sanitation Authority Government of Bangladesh February 2010 Table of Contents 1. BACKGROUND

More information

DA NANG QUANG NGAI EXPRESSWAY PROJECT

DA NANG QUANG NGAI EXPRESSWAY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Transport Vietnam Expressway Corporation DA NANG QUANG NGAI EXPRESSWAY PROJECT

More information

Resettlement Policy Framework-RPF

Resettlement Policy Framework-RPF Republic of Uganda Ministry of Water and Environment Integrated Water Resources Management and Development Project-IWMDP Resettlement Policy Framework-RPF February, 2018 TABLE OF CONTENTS TABLE OF CONTENTS...

More information

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project Land Acquisition and Resettlement Framework Date: May 2016 Status: Update FIJI: Transport Infrastructure Investment Sector Project CURRENCY EQUIVALENTS (as of August 2014) Fiji Dollar (FJD) FJD 1.00 =

More information

RESETTLEMENT AUDIT AND CORRECTIVE ACTION PLAN FOR MBEYA SUBSTATION

RESETTLEMENT AUDIT AND CORRECTIVE ACTION PLAN FOR MBEYA SUBSTATION RESETTLEMENT AUDIT AND CORRECTIVE ACTION PLAN FOR MBEYA SUBSTATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT PROPONENT:

More information

Government of Mozambique. The World Bank

Government of Mozambique. The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Government of Mozambique The World Bank Education Sector Support Pool Fund (FASE) (Fundo

More information

FIG Working Week

FIG Working Week LAND TENURE SYSTEM IN EKITI STATE, NIGERIA P R E S E N T E D B Y F E L I X O. A J I B A D E D E P A R T M E N T O F S U R V E Y I N G A N D G E O I N F O R M A T I C S. F E D E R A L P O L Y T E C H N

More information

RP1744 V2 RESETTLEMENT ACTION PLAN. February 2015

RP1744 V2 RESETTLEMENT ACTION PLAN. February 2015 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized WORLD BANK GOVERNMENT OF MALAWI Accelerating Malawi s Economic Growth Credit No.: IDA8370

More information

RESETTLEMENT MANAGEMENT FRAMEWORK

RESETTLEMENT MANAGEMENT FRAMEWORK RP539 V6 RESETTLEMENT MANAGEMENT FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Rural Energy Agency Ministry of Energy and

More information

ISLAMIC REPUBLIC OF AFGHANISTAN. Ministry of Agriculture Irrigation and Livestock (MAIL) Resettlement Policy Framework (RPF) For the

ISLAMIC REPUBLIC OF AFGHANISTAN. Ministry of Agriculture Irrigation and Livestock (MAIL) Resettlement Policy Framework (RPF) For the Public Disclosure Authorized SFG3305 Public Disclosure Authorized ISLAMIC REPUBLIC OF AFGHANISTAN Ministry of Agriculture Irrigation and Livestock (MAIL) Public Disclosure Authorized Resettlement Policy

More information

Land Acquisition Rehabilitation and Resettlement Act, 2013

Land Acquisition Rehabilitation and Resettlement Act, 2013 Land Acquisition Rehabilitation and Resettlement Act, 2013 Gopal K Agarwal Member National Executive BJP Land Acquisition Issue Committee 1 History of LARR, 2013 The Primary Land Acquisition Act was the

More information

Resettlement Action Plan

Resettlement Action Plan Government of Saint Lucia Resettlement Action Plan Geothermal Resources Development Project February 2018 Government of Saint Lucia Resettlement Action Plan Geothermal Resource Development Project February

More information

The Federal Democratic Republic of Ethiopia MINISTRY OF WORKS AND URBAN DEVELOPMENT

The Federal Democratic Republic of Ethiopia MINISTRY OF WORKS AND URBAN DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Federal Democratic Republic of Ethiopia MINISTRY OF WORKS AND URBAN DEVELOPMENT RESETTLEMENT

More information

KITALE-LESSERU MARICHPASS 158 KM A1 ROAD RESETTLEMENT ACTION PLAN (RAP)

KITALE-LESSERU MARICHPASS 158 KM A1 ROAD RESETTLEMENT ACTION PLAN (RAP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized KITALE-LESSERU MARICHPASS 158 KM A1 ROAD RESETTLEMENT ACTION PLAN (RAP) February 2015

More information

RESETTLEMENT ACTION PLAN FOR THE SECTION 3A, 3B AND 3C OF THE ALAT-ASTARA HIGHWAY

RESETTLEMENT ACTION PLAN FOR THE SECTION 3A, 3B AND 3C OF THE ALAT-ASTARA HIGHWAY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESETTLEMENT ACTION PLAN FOR THE SECTION 3A, 3B AND 3C OF THE ALAT-ASTARA HIGHWAY RP359

More information

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) OF THE ROAD N13: CUAMBA MANDIMBA LICHINGA

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) OF THE ROAD N13: CUAMBA MANDIMBA LICHINGA 1 N13: MANDIMBA-CUAMBA-LICHINGA, NIASSA PROVINCE, MOZAMBIQUE - RESETTLEMENT ACTION PLAN ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) OF THE ROAD N13: CUAMBA MANDIMBA LICHINGA CONTRACT NO. 781/DG/2010

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP275 Socialist Republic of Vietnam Ministry of Transport and National Traffic Safety

More information