1 Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INDONESIA POWER TRANSMISSION DEVELOPMENT PROJECT APPROVED ON JULY 8, 2010 TO THE REPUBLIC OF INDONESIA REPORT NO.: RES32007 Public Disclosure Authorized ENERGY & EXTRACTIVES GLOBAL PRACTICE EAST ASIA AND PACIFIC REGION Public Disclosure Authorized Regional Vice President: Country Director: Senior Global Practice Director: Practice Manager/Manager: Task Team Leader: Victoria Kwakwa Rodrigo A. Chaves Riccardo Puliti Julia M. Fraser Tendai Gregan

2 ABBREVIATIONS AND ACRONYMS Acronym DSCR ESIA kv MoF MVA PDO PLN Definition Debt Service Coverage Ratio Environmental & Social Impact Assessment Kilo Volt Ministry of Finance, Indonesia Mega Var Ampere Project Development Objective PT PLN (Persero)

3 BASIC DATA Product Information Project ID P Original EA Category Partial Assessment (B) Approval Date 08-Jul-2010 Financing Instrument Investment Project Financing Current EA Category Partial Assessment (B) Current Closing Date 30-Jun-2018 Organizations Borrower Republic of Indonesia Responsible Agency PT PLN Project Development Objective (PDO) Original PDO The development objective of the project is to assist the Borrower to meet growing electricity demand and improve the reliability of electricity supply in Java and South-Central Sumatra by strengthening the power transmission system. Current PDO The development objective of the project is to assist PLN to meet growing electricity demand, improve the reliability of electricity supply, strengthen the power transmission system, and support the preparation of hydropower projects. Summary Status of Financing Ln/Cr/Tf Approval Signing Effectiveness Closing Net Commitment Disbursed Undisbursed IBRD Jul Nov May Jun

4 Policy Waiver(s) Does this restructuring trigger the need for any policy waiver(s)? No I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING 1. The original loan of US$225 million Indonesia Power Transmission Development Project was approved on July 10, 2010, signed on November 18, 2010, and became effective on May 30, The original closing date of December 31, 2015 was first extended in December 2015 by 12 months, to December 31, 2016, to enable the completion of existing project packages, and to prepare the project for a follow-up Level 1 restructuring. A second extension of another 18 months, to June 30, 2018, was approved on June 29, 2016, as part of the Level 1 restructuring. In addition, the 2016 Level 1 restructuring: (i) revised the Project Development Objective (PDO) to reflect the broader scope of the project; (ii) elevated the Environmental Category from B to A to reflect preparation of the Poko Hydro Electrical Power Project (Poko HPP); (iii) triggered new safeguards policies to account for the preparation of Poko HPP; (iv) added a new component, hydropower project preparations ; (v) cancelled US$20 million, resulting in a revised loan amount of US$205 million; and (vi) revised the results framework in line with the changes. 2. The revised PDO as approved on June 29, 2016 is, to assist PLN to meet growing electricity demand, improve the reliability of electricity supply, strengthen the power transmission system, and support the preparation of hydropower projects. The project now has three components: (a) Java-Bali Transmission Substation Expansion and Construction; (b) South-Central Sumatra Transmission Substation Upgrading and Expansion; and (c) preparation of hydropower projects. 3. Project implementation is divided into three phases: (i) the original Java (J-series) and Sumatera (S-series) contracts (US$145 million IBRD allocation), awarded in 2012; (ii) project savings contracts (US$52 million IBRD allocation), awarded in June and July 2016; and (iii) hydropower project preparation (US$8 million IBRD allocation), relating to Poko HPP, which were added on June 29, Status of each of these is described below. Project Status 4. The overall rating for achievement of Development Objectives and Implementation Progress is Moderately Satisfactory. The Overall Borrower performance has been satisfactory over the last six months as evidenced by: (a) the original component of the project, relating to substation upgrades in Java and Sumatra, has been completed; (b) substantial positive progress has been made with Project Savings contracts (US$52 million) awarded in 2016, with around half of the substation upgrades energized; and (c) preparations of the proposed Poko hydropower project are advancing. The financial management, procurement, counterpart funding and monitoring and evaluation performance ratings have been rated MS or better in the June 2018 ISR. However, the Project Management rating has been rated as Moderately Unsatisfactory primarily due to contract management issues, with insufficient overall progress on the civil works design, construction and electrical installation of the incomplete 14 substation sites under the Project

5 Savings contracts awarded in June and July While overall implementation shows moderately satisfactory progress over the last 18 months, there have been significant delays and other challenges across a range of the substations under various contracts, as outlined below. 6. Original Java (J-series) and Sumatera (S-series) contracts (US$145 million IBRD allocation). All 49 substations under the J1, J2, S1, S2 and S3 contracts are now energized, fully completed, and are in the contract closing stage. The cumulative installed new transformer capacity is 6560 MVA, comprising: (a) Java, 3440 MVA of which 2000 MVA (500 kv, in Package J1), 60 MVA (150 kv, in Package J2), 1380 MVA (150 kv, in Package J3); and (b) Sumatra, 3120 MVA of which 1000 MVA (275 kv, in Package S1), 1250 MVA (275 kv, in Package S2), and 870 MVA (150 kv, in Package S3. There were delays in with contracts for J3 and S3 due to further additions to the scope of works for the J3 package, and delays in commissioning transmission lines that feed several substations under Package S3. PLN had earlier committed to complete all the J3 and S3 substations by June 2016 (the original schedule, per the contract, was July 2014), but the final 1 of 22 of the J3 substations (i.e. Solo Baru S/S) was only energized on March 3, 2018 and the last 1 of 17 of the S3 substations (i.e. Sungai Penuh S/S) was finally energized on October 31, In summary, after significant delays against the planned and revised schedules, all the J and S series contracts have been completed and there are no remaining activities left. 7. Project Savings Contracts (US$52 million IBRD allocation). Since the first quarter of 2017, it has become evident that the good work done in relation to procurement/award of contracts has not been matched subsequently by improved contract management following the signing of the contracts. a. On the positive side: (i) the procurement of six new packages using the US$52 million in project savings was completed quickly, with contracts worth US$45.1 million signed in June and July 2016; (ii) advance payments were disbursed to the contractors in late September and early October 2016; (iii) the effectiveness dates for these contracts are the same as the dates on which the contracts were signed, a real step forward for PLN in terms of contract management. The original schedule for completing these new contracts was 18 months from the contract signing dates, i.e., by December 2017 and January 2018, respectively. The new contracts under the Project Savings cover 30 substations, scattered across Java and Sumatra. b. In May 2018 PLN informed that 16 of the 30 substations under the Project Savings component have been energized, while 14 remain under construction. All 6/6 substations in Lot 1 have been energized, for a total installed capacity of 360 MVA (150 kv, Sumatra). However: (i) only 4 of 14 substations in Lot 2 have been upgraded, with a total capacity of 180 MVA (150/20 kv transformers, on Java); and (ii) only 6 of 10 of the substations in Lot 3 have been energized, with a total capacity of 180 MVA (150/20 kv transformers, on Sumatra). c. On the less positive side, contract management remains an issue, with insufficient overall progress on the civil works design, construction and electrical installation as a result of the incomplete 14 substation sites mentioned above. To accelerate completion of the civil and electrical works, since November 2017 PLN has asked its contractors to: (i) deploy more labor on site; (ii) improve the coordination between the contractor and sub-contractors; and (iii) incentivizing site crews to complete the works in an accelerated fashion. While these measures are appropriate, the Bank team considers that they are not sufficient and have proposed to complement them by asking the contractor to deploy additional skilled labor, heavy machinery, and improved logistics and project 5

6 management to accelerate the completion of all civil and electrical works. With the existing works and contract management capacity and considering the delays which occurred in 2017, these contracts cannot be completed by current closing date of June 30, Hydropower Project Preparations (US$8 million IBRD allocation). Hydropower project preparations are now finally underway, with the Poko Hydro Stage III Feasibility Study progressing, together with the Poko Hydro Environmental and Social Impact Assessment (ESIA) Study. PLN has also selected a consultant to carry out the Land Acquisition and Resettlement Action Plan (LARAP) for Poko Hydro, with the contract signed in January However, the ESIA consultant indicates that it will require a total of 25 months to complete the ESIA Study for Poko, i.e., an expected completion date of August While Project Management is still rated as Moderately Unsatisfactory (MU), PLN s performance over the last 6 months has improved. The MU rating is due to past delays related to contract management and execution arising from the highly disbursed project management accountabilities that spread across PLN s central, regional and sub-regional (i.e. Willaya, Rayon, and site) administrations. The improvements in Project Management in the last 6 months are demonstrated by PLN having energized 16 of the 30 of the Project Savings sites, in that period, after very slow progress in calendar That improvement in delivery is the result of: (a) faster approvals by PLN of modifications to detailed designs, which have been proposed by contractors or PLN s site-operators after detailed site surveys and discussions regarding technical operations and maintenance requirements; (b) the push by PLN to have contractors complete outstanding civil and electrical works, prior to the June 30, 2018 project closing date; (c) PLN applying liquidated damages to the S2 and S3 contracts, and advising other contractors of its intent to apply liquidated damages and enforce other contractual remedies. As discussed further below, in May 2018, PLN agreed to new reporting templates and to discuss them at monthly meetings with the Bank; indicating a stronger commitment by PLN to improved contract management on the remaining construction and electrical installation activities. The steps outlined in the Action Plan below is expected to bring the Project Management rating back to Satisfactory status. 10. As of June 14, 2018, loan disbursements totaled US$ million, or 72 percent of the project loan amount. 11. The project is in compliance with fiduciary and safeguard requirements. There are no outstanding audits or unresolved financial issues under the project. Procurement performance has improved since June 2016 and no procurement complaints have been received. The project is in compliance with the Bank s safeguards requirements, and there are no major pending safeguards related issues. The safeguard instruments remain relevant, following the June 2016 restructure that added the hydropower project preparations component and revised the project s safeguards requirements. 12. The project complies with all but one legal covenant, specifically requiring that PLN maintain a Debt Service Coverage Ratio (DSCR) of at least 1.5. PLN and the Government of Indonesia have sought and been granted waivers from this DSCR covenant over the last 4 years. On December 18, 2017, following an October 5, 2017 request from Indonesia s Minister of Finance, the World Bank issued another waiver to the DSCR covenant applying to this IBRD loan to PLN and five others, for a temporary period ending June 30, That waiver suggested that PLN and the Government take steps to: (i) develop a new Corporate Financing Strategy for PLN, which critically assesses the current power system investment plan and considers the fiscal implications 6

7 Action Plan and risks; and (ii) develop a credible and sustainable method of achieving the DSCR covenant from July 1, 2018 onwards. The Bank has mobilized funding for technical assistance to support PLN and MOF with those two steps, with a consulting firm expected to be appointed in July In the meantime, ahead of the new financing strategy, the Government is increasing its electricity Public Service Obligation (PSO) subsidy payments to PLN and providing other forms of financial support to help PLN as it seeks to implement the Government s ambitious electricity sector capital expenditure program. It is expected that the Government will seek another waiver of the DSCR loan covenant, in the period from July 2018 until such time that the Government implements a credible and sustainable method of achieving the DSCR covenant. 13. An action plan was originally agreed to in 2015 following earlier delays in project implementation, and leading up to the tendering of the Project Savings contracts. The original action plan included, among other things: (a) PLN awarding the six contracts under the Project Savings component of the project (US$52 million) within 60 days of the opening of bids (which it achieved); (b) minimizing the time taken to make the signed contracts effective; (c) improvements in contract management and contract enforcement, to ensure works were completed in a timely manner; and where not, either amendments be made in a timely manner or contractual remedies applied. 14. A range of enhancements to that original action plan were agreed to in November 2017, specifically: 1) For each site and contract lot (under the J-series, S-series and Savings packages), PLN should: (a) quickly and carefully document the root causes of delays and which party PLN or the contractor was responsible; (b) apply liquidated damages under the contract for any delays due to the contractor; and (c) push to have all the remaining works completed as quickly as possible and latest before June 30, ) PLN is to ensure that its submission to the Ministry of Finance for the 2018 fiscal budget (DIPA) includes: (a) all the remaining funds under the project loan that are needed to complete the J-series, S-series, and Savings sub-projects in calendar 2018; (b) the necessary funds to complete all the scheduled works for 2018 for the hydropower component; (c) PLN should allocate enough of its own 2018 budget funds to co-finance the activities under (a) and (b), so that they can be completed on time. 3) A range of enhanced project implementation support activities will henceforth be undertaken in between the formal supervision missions, including: (i) regular site visits by members of the Bank team; and (ii) monthly meetings with PLN Headquarters and Regional Construction teams in Java and Sumatra. To assist with this, additional engineering consultants are to be recruited within Indonesia as part of the World Bank s implementation support task team. 15. Recent additional steps have been taken on the action plan to get the Project Management rating back to a satisfactory rating, including: (a) PLN to apply liquidated damages and accelerate the completion of outstanding works; (b) J-Series and S-Series sub-projects close out contracts, now that all sub-stations are energized; (c) Savings sub-projects complete and energize the 14 remaining substations by December 31, 1 As of June 20, 2018, all of the substation upgrades in Java and Sumatra under the original component of the project have be energized, as have 16 of the planned 30 upgrades to substations financed through project savings. The remaining 14 substations are all expected to be completed before the proposed new closing date. 7

8 2018; (d) Hydropower project preparations time-bound action plan for advancing the Poko HPP Phase III Feasibility Study and the environmental and social safeguards studies during 2018, in order to ensure that all Poko HPP preparations can be completed. 16. In addition, in May 2018, it was agreed with PLN to further enhance project implementation monitoring. Specifically, henceforth, new templates would be used for detailed monthly reporting to the Bank of: (a) progress and remedial actions, by substation site; and (b) disbursements by contract package. The monthly meetings between the Bank and PLN project teams would use these new templates to even more closely track physical progress and financial disbursements, with the aim of having all the remaining substation subprojects completed by the end of calendar PLN s agreement to regularly update the new reporting templates and discuss that them at monthly meetings with the Bank indicates a commitment by PLN to improved contract management on the remaining construction and electrical installation activities. 17. These steps aim to accelerate delivery of project activities and outcomes, prior to the proposed new closing date of October 31, II. DESCRIPTION OF PROPOSED CHANGES 18. An additional extension of the closing date is required for two reasons. First, the delay in contracting a firm to carry out the Environmental & Social Impact Assessment (ESIA) for the proposed Poko Hydropower development and the related Bakaru Hydropower projects on the same river catchment and cascade, means that various baseline studies that are inputs into the ESIA have also been delayed. Second, the Phase III Feasibility Study for Poko HPP has also been delayed, in part because ESIA study findings are a key input into the Phase III FS, because they can impact on the proposed basic design of Poko HPP, water availability, and hence its economics. In turn, any changes in the basic design of Poko HPP arising from the ESIA will affect the preparation of the Poko HPP design and tender documents. 19. The proposed extension from June 30, 2018 to June 30, 2019 will enable the completion of Phase IIII Feasibility Study (FS) and Environmental & Social Impact Assessment (ESIA) of the proposed Poko Hydropower project. Such an extension would mean that the cumulative extensions of the project would be 46 months. 20. The restructuring will not affect the PDO, project components, results framework, institutional arrangements, implementing agency, or procurement or financial management arrangements. 21. There will not be any changes to the loan s covenants, including the DSCR covenant that PLN is currently not complied with. 22. The Results Framework remains relevant in terms of the indicators agreed to as part of the June 2016 restructure. However, it was agreed that the end targets of the indicators should be adjusted to reflect the proposed new closing date of the project, October 31, In addition, other adjustments have been made to reflect: (a) low growth in energy sales across Indonesia; and (b) transformer capacity installed (MVA) as part of the Project Savings sub-projects. For update on the project s KPIs under the Results Framework, and an explanation of the adjustments proposed, see Annex Citizen Engagement (CE) actions are being carried out as part of Poko HPP preparation, including the Phase 8

9 III Feasibility Study, ESIA, and LARAP/AMDAL and are being documented as part of those preparations. 24. The overall risk for the project remains Moderate. The main identified risks are: (i) Institutional capacity for implementation and sustainability specifically, there are substantial risks relating to PLN s contract management capacity and practices; and (ii) social and environmental safeguard compliance going forward. PLN has developed and is implementing risk mitigation measures for the Poko Hydro project. No changes to risk ratings are proposed. III. SUMMARY OF CHANGES Changed Change in Results Framework Not Changed Change in Loan Closing Date(s) Change in Disbursement Estimates Change in Implementation Schedule Change in Implementing Agency Change in DDO Status Change in Project's Development Objectives Change in Components and Cost Cancellations Proposed Reallocation between Disbursement Categories Change in Disbursements Arrangements Change in Overall Risk Rating Change in Safeguard Policies Triggered Change of EA category Change in Legal Covenants Change in Institutional Arrangements Change in Financial Management Change in Procurement Other Change(s) Change in Economic and Financial Analysis Change in Technical Analysis 9

10 PDO_IND_TABLE The World Bank Change in Social Analysis Change in Environmental Analysis IV. DETAILED CHANGE(S) OPS_DETAILEDCHANGES_RESULTS_TABLE RESULTS FRAMEWORK Project Development Objective Indicators Electricity sales in the project areas in Java (GWh) Unit of Measure: Number Value Date 31-Dec Mar Oct-2019 Electricity sales in the project areas in south-central Sumatra (GWh) Unit of Measure: Number Value Date 31-Dec Mar Oct-2019 Transmission losses in the Java-Bali system Unit of Measure: Percentage Value Date 31-Dec Mar Oct-2019 Transmission losses in the Sumatra system Unit of Measure: Percentage Value Date 31-Dec Mar Oct-2019 x

11 Hydropower projects prepared Unit of Measure: Megawatt Value Date 01-Apr Mar Oct-2019 Intermediate Indicators IO_IND_TABLE Incremental Capacity of 500/150 kv Substations in Java (MVA) Unit of Measure: Number Value Date 31-Dec Mar Oct-2019 Incremental Capacity of 275/150 kv Substations in Sumatra (MVA) Unit of Measure: Number Value Date 31-Dec Mar Oct-2019 Incremental Capacity of 150/20 kv Substations in Sumatra (MVA) Unit of Measure: Number Value Date 31-Dec Mar Oct-2019 Incremental Capacity of 150/20 kv Substations in Java (MVA) Unit of Measure: Number Value xi

12 OPS_DETAILEDCHANGES_LOANCLOSING_TABLE The World Bank Date 31-Dec Mar Oct-2019 Hydropower project preparation studies prepared satisfactory to the Bank Unit of Measure: Number Value Date 01-Apr Mar Oct-2019 LOAN CLOSING DATE(S) Ln/Cr/Tf Status Original Closing IBRD Effective 31-Dec-2015 Closing(s) 31-Dec-2016, 30- Jun-2018, 31-Oct- 2019, 30-Jun-2018 Proposed Closing 31-Oct-2019 Proposed Deadline for Withdrawal Applications 29-Feb-2020 OPS_DETAILEDCHANGES_DISBURSEMENT_TABLE DISBURSEMENT ESTIMATES Change in Disbursement Estimates Yes Year Current Proposed ,335, ,335, ,640, ,640, ,331, ,331, ,123, ,111, ,285, ,224, ,283, ,000, ,000, ,128, xii

13 xiii

14 Annex 1: Proposed changes to KPIs in Results Framework PDO Indicators PREVIOUS REVISED Comment on revisions Indicator Baseline Current End Target End Target Electricity sales in the project areas in Load growth lower than originally Java (GWh) Value 50, , , ,000 projected across Indonesia. End target date extended to new closing Date 31-Dec Mar Jun Oct-2019 date of project. Electricity sales in the project areas in Load growth lower than originally south-central Sumatra (GWh) Value 4,919 32,060 37,580 34,000 projected across Indonesia. End target date extended to new closing Date 31-Dec Mar Jun Oct-2019 date of project. Higher system losses due to more Transmission losses in the Java-Bali system Value generation in distant East and Central Java is being used to meet load in West Java. Date 31-Dec Mar Jun Oct-2019 End target date extended to new closing date of project. Transmission losses in the Sumatra system Value Lower end target for losses in Sumatra, reflecting major power system efficiency improvements from installation of 275kV and 500kV transmission. Date 31-Dec Mar Jun Oct-2019 End target date extended to new closing date of project. Hydropower projects prepared Value Value unchanged. Date 1-Apr Mar Jun Oct-2019 End target date extended, to reflect closing date extension in 3rd restructure due to delays in hydropower project preparations

15 INTERMEDIATE RESULTS INDICATORS PREVIOUS REVISED Comment on revisions Indicator Baseline Current End Target End Target Incremental Capacity of 500/150 kv Substations in Java (MVA) Value Value unchanged. End target date extended to new closing Date 31-Dec Mar Jun Oct-2019 date of project. Incremental Capacity of 275/150 kv Substations in Sumatra (MVA) Value Value unchanged End target date extended to new closing Date 31-Dec Mar Jun Oct-2019 date of project. MVA capacity increased to incorporate Incremental Capacity of 150/20 kv Project Savings additional transformer Substations in Sumatra (MVA) Value capacity. End target date extended to new closing Date 31-Dec Mar Jun Oct-2019 date of project. Incremental Capacity of 150/20 kv Substations in Java (MVA) Value Value unchanged End target date extended to new closing Date 31-Dec Mar Jun Oct-2019 date of project. Hydropower project preparation studies prepared satisfactory to the Bank Value Value unchanged. Date 31-Dec Mar Jun Oct-2019 End target date extended, to reflect closing date extension in 3rd restructure due to delays in hydropower project preparations

16

The World Bank Support to the Afghanistan Independent Land Authority (P156225)

The World Bank Support to the Afghanistan Independent Land Authority (P156225) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SUPPORT TO THE AFGHANISTAN INDEPENDENT LAND AUTHORITY APPROVED ON JUNE

More information

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126)

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126) Operation Name: Real

More information

Proposal to Restructure

Proposal to Restructure ~ Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date: November 10,2008 Country: Ukraine Project Name: Rural Land Titling and Cadastre

More information

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126)

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126) Operation Name: Real

More information

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126)

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126) Operation

More information

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126)

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126) Operation Name: Real

More information

Implementation Status & Results Colombia Bogota Urban Services Project (P074726)

Implementation Status & Results Colombia Bogota Urban Services Project (P074726) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Bogota Urban Services Project (P074726) Operation Name: Bogota Urban Services Project (P074726)

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominican Republic Water Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 19 ARCHIVED on 31-Dec-2017 ISR30652 Implementing

More information

Implementation Status & Results Brazil Santos Municipality (P104995)

Implementation Status & Results Brazil Santos Municipality (P104995) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Santos Municipality (P104995) Operation Name: Santos Municipality (P104995) Project Stage:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 03/03/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284)

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Turkey Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2008 Seq No: 20 ARCHIVED on 20-Dec-2017

More information

Implementation Status & Results Colombia Bogota Urban Services Project (P074726)

Implementation Status & Results Colombia Bogota Urban Services Project (P074726) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Bogota Urban Services Project (P074726) Operation Name: Bogota Urban Services Project (P074726)

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Tajikistan Agriculture and Rural Development Global Practice IBRD/IDA Specific Investment Loan FY 2005 Seq No: 27 ARCHIVED on 01-Jun-2015 ISR19129 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominican Republic Water Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 18 ARCHIVED on 30-Jun-2017 ISR28927 Implementing Agencies:

More information

Implementation Status & Results Brazil Santos Municipality (P104995)

Implementation Status & Results Brazil Santos Municipality (P104995) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Santos Municipality (P104995) Operation Name: Santos Municipality (P104995) Project Stage:

More information

Implementation Status & Results Croatia Integrated Land Administration System Project (P122219)

Implementation Status & Results Croatia Integrated Land Administration System Project (P122219) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Integrated Land Administration System Project (P122219) Operation Name: Integrated Land

More information

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284)

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Turkey Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 19 ARCHIVED on 30-Jun-2017

More information

The World Bank Integrated Land Administration System Project (P122219)

The World Bank Integrated Land Administration System Project (P122219) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Croatia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 14 ARCHIVED on 07-Dec-2017

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominican Republic Water Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 17 ARCHIVED on 12-Dec-2016 ISR26095 Implementing Agencies:

More information

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Colombia Water Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 04-Jun-2015 ISR19433 Implementing Agencies: Public

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Bosnia and Herzegovina Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 10 ARCHIVED

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Kosovo Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 19 ARCHIVED on 10-Jan-2018

More information

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6306-MD. Public Disclosure Authorized

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6306-MD. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS Financing Agreement (Land Registration and Property Valuation Project) CREDIT NUMBER 6306-MD Public Disclosure Authorized between

More information

FIRST CADASTRE PROJECT

FIRST CADASTRE PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY INTERNATIONAL DEVELOPMENT ASSOCIATION

More information

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284)

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Turkey Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 15 ARCHIVED on 22-Dec-2015

More information

The World Bank Competitiveness and Enterprise Development Project (CEDP) (P130471)

The World Bank Competitiveness and Enterprise Development Project (CEDP) (P130471) Public Disclosure Authorized AFRICA Uganda Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 04-Apr-2018 ISR31388 Implementing

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Section I - Basic Information Date Prepared/Updated:

More information

Implementation Status & Results Brazil Sergipe State Integrated Project: Rural Poverty (P110614)

Implementation Status & Results Brazil Sergipe State Integrated Project: Rural Poverty (P110614) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Sergipe State Integrated Project: Rural Poverty (P110614) Operation Name: Sergipe State Integrated

More information

The World Bank Modernization of Real Property Registration and Cadastre (P151746)

The World Bank Modernization of Real Property Registration and Cadastre (P151746) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Uzbekistan Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 23-Apr-2018

More information

Second Land and Real Estate Registration Project. between KYRGYZ REPUBLIC. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Second Land and Real Estate Registration Project. between KYRGYZ REPUBLIC. and INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H380 KG Public Disclosure Authorized Financing Agreement Second Land and Real Estate Registration Project between Public Disclosure Authorized KYRGYZ

More information

Implementation Status & Results Guatemala LAND ADMINISTRATION II APL (P087106)

Implementation Status & Results Guatemala LAND ADMINISTRATION II APL (P087106) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Guatemala LAND ADMINISTRATION II APL (P087106) Operation Name: LAND ADMINISTRATION II APL (P087106)

More information

Implementation Status & Results Croatia Integrated Land Administration System Project (P122219)

Implementation Status & Results Croatia Integrated Land Administration System Project (P122219) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Integrated Land Administration System Project (P122219) Operation Name: Integrated Land

More information

Implementation Status & Results Guatemala LAND ADMINISTRATION II APL (P087106)

Implementation Status & Results Guatemala LAND ADMINISTRATION II APL (P087106) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Guatemala LAND ADMINISTRATION II APL (P087106) Operation Name: LAND ADMINISTRATION II APL (P087106)

More information

REPORT 2014/050 INTERNAL AUDIT DIVISION. Audit of United Nations Human Settlements Programme operations in Sri Lanka

REPORT 2014/050 INTERNAL AUDIT DIVISION. Audit of United Nations Human Settlements Programme operations in Sri Lanka INTERNAL AUDIT DIVISION REPORT 2014/050 Audit of United Nations Human Settlements Programme operations in Sri Lanka Overall results relating to the effective and efficient implementation of the UN-Habitat

More information

Implementation Status & Results Turkey Turkey Land Registration and Cadastre Modernization Project (P106284)

Implementation Status & Results Turkey Turkey Land Registration and Cadastre Modernization Project (P106284) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Turkey Turkey Land Registration and Cadastre Modernization

More information

Real Estate Acquisitions Audit (Green Line LRT Stage 1)

Real Estate Acquisitions Audit (Green Line LRT Stage 1) Real Estate Acquisitions Audit (Green Line LRT Stage 1) October 10, 2018 ISC: Unrestricted THIS PAGE LEFT INTENTIONALLY BLANK ISC: Unrestricted Table of Contents Executive Summary... 5 1.0 Background...

More information

PORTFOLIO COMMITTEE ON HOUSING 13 MAY 2008

PORTFOLIO COMMITTEE ON HOUSING 13 MAY 2008 DEPARTMENT OF LOCAL GOVERNMENT & HOUSING PORTFOLIO COMMITTEE ON HOUSING 13 MAY 2008 Integrated Sustainable Human Settlement: Progress Report 7/8 and Annual Performance Plans for 2008/2009 Financial Year

More information

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington Issue Date: March 2, 2018 Prepared By: Rural Municipality of Wellington Wellington, PEI

More information

Panama - Land Administration Project Project Restructuring Project Paper

Panama - Land Administration Project Project Restructuring Project Paper Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. Introductory Statement Panama - Land Administration Project Project Restructuring

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Resettlement Policy Framework

Resettlement Policy Framework Republic of Turkey Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework Background 1. The Second Renewable Energy and Energy Efficiency Project will fund private sector investments

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 66367-TJ Public Disclosure Authorized Public Disclosure Authorized PROJECT PAPER ON A PROPOSED ADDITIONAL GRANT

More information

Implementation Status & Results Turkey Turkey Land Registration and Cadastre Modernization Project (P106284)

Implementation Status & Results Turkey Turkey Land Registration and Cadastre Modernization Project (P106284) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Turkey Turkey Land Registration and Cadastre Modernization

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Section I - Basic Information Date Prepared/Updated:

More information

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PT PLN (Persero) INDONESIA POWER SECOND TRANSMISSION DEVELOPMENT PROJECT (IPTD-2) RP1232

More information

Report No.: ISDSA15389

Report No.: ISDSA15389 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 12-ct-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

OFFICE OF THE CITY ADMINISTRATIVE OFFICER

OFFICE OF THE CITY ADMINISTRATIVE OFFICER REPORT from OFFICE OF THE CITY ADMINISTRATIVE OFFICER Date: August 19, 201 5 CAO File No. Council File No. Council District: Citywide To: The Mayor The Council From: Miguel A. Santana, City Administrative

More information

Evaluating your co-op manager

Evaluating your co-op manager June 17, 2013 Evaluating your co-op manager When co-ops sign a contract with a person to be their co-op manager, the contract usually includes a provision to conduct an evaluation of the service. This

More information

Tel: (617) Fax: (617) OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2

Tel: (617) Fax: (617) OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2 MITT ROMNEY GOVERNOR KERRY HEALEY LIEUTENANT GOVERNOR The Commonwealth of Massachusetts Executive Office for Administration and Finance Division of Capital Asset Management One Ashburton Place Boston,

More information

Implementation Status & Results Nicaragua LAND ADMINISTRATION (P056018)

Implementation Status & Results Nicaragua LAND ADMINISTRATION (P056018) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nicaragua LAND ADMINISTRATION (P056018) Operation Name: LAND ADMINISTRATION (P056018) Project Stage:

More information

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project I. Introduction The overall length of the road network in Albania totals

More information

Implementation Status & Results Nicaragua LAND ADMINISTRATION (P056018)

Implementation Status & Results Nicaragua LAND ADMINISTRATION (P056018) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nicaragua LAND ADMINISTRATION (P056018) Operation Name: LAND ADMINISTRATION (P056018) Project Stage:

More information

LOCAL GOVERNMENT PROMPT PAYMENT ACT

LOCAL GOVERNMENT PROMPT PAYMENT ACT LOCAL GOVERNMENT PROMPT PAYMENT ACT 218.70 Popular name. 218.71 Purpose and policy. 218.72 Definitions. 218.73 Timely payment for nonconstruction services. 218.735 Timely payment for purchases of construction

More information

VILLAGE OF MT. HOREB, WISCONSIN TAX INCREMENTAL FINANCE DISTRICT #5 PROJECT PLAN. April 8, Prepared By: MSA Professional Services, Inc.

VILLAGE OF MT. HOREB, WISCONSIN TAX INCREMENTAL FINANCE DISTRICT #5 PROJECT PLAN. April 8, Prepared By: MSA Professional Services, Inc. VILLAGE OF MT. HOREB, WISCONSIN TAX INCREMENTAL FINANCE DISTRICT #5 PROJECT PLAN April 8, 2009 Prepared By: MSA Professional Services, Inc. TABLE OF CONTENTS Page I. INTRODUCTION AND PURPOSE 3 II. STATEMENT

More information

Construction. Required Documentation From Owner/Developer

Construction. Required Documentation From Owner/Developer 3: 1.1.1 Demonstrated development and management capacity of owner/operator and professional development/ management team throughout all phases of the project (e.g. project vision, site selection, feasibility;

More information

Arbitration and Dispute Resolution

Arbitration and Dispute Resolution and Dispute Resolution Page 1 of 7 Why Attend Effective dispute resolution helps minimize the costs and adverse effects to relationships that often arise from the commercial disputes. If informal negotiation

More information

Financial Analysis Workshop. Contents are subject to change. For the latest updates visit

Financial Analysis Workshop. Contents are subject to change. For the latest updates visit Financial Analysis Workshop Page 1 of 11 Why Attend In today s world, finance professionals are challenged with providing management a detailed analysis of the impact of the organization's financial decisions.

More information

BOROUGH OF POOLE BUSINESS IMPROVEMENT OVERVIEW AND SCRUTINY COMMITTEE 17 MARCH 2016 CABINET 22 MARCH 2016

BOROUGH OF POOLE BUSINESS IMPROVEMENT OVERVIEW AND SCRUTINY COMMITTEE 17 MARCH 2016 CABINET 22 MARCH 2016 BOROUGH OF POOLE AGENDA ITEM 7 BUSINESS IMPROVEMENT OVERVIEW AND SCRUTINY COMMITTEE 17 MARCH 2016 CABINET 22 MARCH 2016 DEVELOPING A COMMERCIAL APPROACH TO THE USE OF ASSETS REPORT OF THE STRATEGIC DIRECTOR

More information

BIOMASS-BASED DISTRICT HEATING PROJECT

BIOMASS-BASED DISTRICT HEATING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Biomass-Based District Heating Project BIOMASS-BASED DISTRICT HEATING PROJECT Construction

More information

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LAO PDR: AGRICULTURAL DEVELOPMENT PROGRAM RP-59 POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT

More information

Housing Price Forecasts. Illinois and Chicago PMSA, December 2015

Housing Price Forecasts. Illinois and Chicago PMSA, December 2015 Housing Price Forecasts Illinois and Chicago PMSA, December 2015 Presented To Illinois Association of Realtors From R E A L Regional Economics Applications Laboratory, Institute of Government and Public

More information

International Financial Reporting Standards (IFRS) and 2018 Updates

International Financial Reporting Standards (IFRS) and 2018 Updates International Financial Reporting Standards (IFRS) and 2018 Updates Page 1 of 11 Why Attend Our 'International Financial Reporting Standards (IFRS) and 2018 Updates' course will help build the knowledge

More information

Assets, Regeneration & Growth Committee 11 July Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

Assets, Regeneration & Growth Committee 11 July Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes ) Assets, Regeneration & Growth Committee 11 July 2016 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Development of new affordable homes by Barnet Homes Registered Provider (

More information

Scheme of Service. for. Housing Officers

Scheme of Service. for. Housing Officers REPUBLIC OF KENYA Scheme of Service for Housing Officers APPROVED BY THE PUBLIC SERVICE COMMISSION AND ISSUED BY THE PERMANENT SECRETARY MINISTRY OF STATE FOR PUBLIC SERVICE OFFICE OF THE PRIME MINISTER

More information

State of Rhode Island. National Housing Trust Fund Allocation Plan. July 29, 2016

State of Rhode Island. National Housing Trust Fund Allocation Plan. July 29, 2016 HTF Program: Method of Distribution State of Rhode Island National Housing Trust Fund Allocation Plan July 29, 2016 The Housing Trust Fund (HTF) is a new affordable housing production program that will

More information

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY I. Introduction In accordance with the requirements of Title 5-A of Article 9 and Section

More information

Implementing Agency Department of Housing, Ministry of Local Government, Urban Development, Housing and Environment

Implementing Agency Department of Housing, Ministry of Local Government, Urban Development, Housing and Environment Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC56649

More information

Suite Metering Provisions Under the Residential Tenancies Act, 2006 and the Energy Consumer Protection Act, Consultation Paper

Suite Metering Provisions Under the Residential Tenancies Act, 2006 and the Energy Consumer Protection Act, Consultation Paper Suite Metering Provisions Under the Residential Tenancies Act, 2006 and the Energy Consumer Protection Act, 2009 Consultation Paper Ministry of Municipal Affairs and Housing March 2010 TABLE OF CONTENTS

More information

Welsh Government Housing Policy Regulation

Welsh Government Housing Policy Regulation www.cymru.gov.uk Welsh Government Housing Policy Regulation Regulatory Assessment Report August 2015 Welsh Government Regulatory Assessment The Welsh Ministers have powers under the Housing Act 1996 to

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

CITY OF BOISE HOUSING AND COMMUNITY DEVELOPMENT DIVISION CDBG MONITORING FORM

CITY OF BOISE HOUSING AND COMMUNITY DEVELOPMENT DIVISION CDBG MONITORING FORM CITY OF BOISE HOUSING AND COMMUNITY DEVELOPMENT DIVISION CDBG MONITORING FORM GENERAL INFORMATION Date of Monitoring Visit: / / Number of Monitoring Visit for the Fiscal Year: # Subrecipient Name: Subgrantee

More information

New Accounting Rules for Revenue and Leases

New Accounting Rules for Revenue and Leases New Accounting Rules for Revenue and Leases CFMA Education Summit March 22, 2017 Presented by: Carole McNees, CPA, Partner, Plante & Moran, PLLC Recently released standards New guidance from the Financial

More information

HOME Investment Partnership Program Project Development Funds. Application

HOME Investment Partnership Program Project Development Funds. Application City of Spartanburg Neighborhood Services 145 West Broad Street Spartanburg, South Carolina 29306 HOME Investment Partnership Program Project Development Funds Application Applicant Name: Project Name:

More information

Christchurch Housing Accord Monitoring Report. For quarter ending June 2015

Christchurch Housing Accord Monitoring Report. For quarter ending June 2015 Christchurch Housing Accord Monitoring Report For quarter ending June 2015 Executive Summary This report provides an overview of the Christchurch housing market and an update on priority Accord actions.

More information

Assets, Regeneration & Growth Committee 17 March Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

Assets, Regeneration & Growth Committee 17 March Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes ) Assets, Regeneration & Growth Committee 17 March 2016 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Development of new affordable homes by Barnet Homes Registered Provider

More information

NSP Rental Basics: A Primer on Using Rental Projects to Meet NSP Obligation and 25% Set-Aside Requirement. About this Tool

NSP Rental Basics: A Primer on Using Rental Projects to Meet NSP Obligation and 25% Set-Aside Requirement. About this Tool NSP Rental Basics: A Primer on Using Rental Projects to Meet NSP Obligation and 25% Set-Aside Requirement About this Tool Description: This tool is intended for NSP grantees and their partners seeking

More information

IFRS 16 Lease overview and EY s enabling toolkit

IFRS 16 Lease overview and EY s enabling toolkit IFRS 16 Lease overview and EY s enabling toolkit Content Page Section I IFRS 16 overview 2 Appendix I EY Lease enabling technology suite 9 Appendix II EY Contacts 17 Page 1 IFRS 9 Classification and measurement

More information

SOCIAL HOUSING THE WAY FORWARD

SOCIAL HOUSING THE WAY FORWARD Social Housing Policy - The implementation process Kobus van Wyk, NMMU CONTENTS 1. BACKGROUND AND INTRODUCTION 2.WHAT THE POLICY SET OUT TO ACHIEVE 3.HOW IT HAD TO BE ACHIEVED AND BY WHO 4.IMPLEMENTING

More information

CITY CLERK. Consolidated Clause in Policy and Finance Committee Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005.

CITY CLERK. Consolidated Clause in Policy and Finance Committee Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005. CITY CLERK Consolidated Clause in Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005. 3 Regent Park Revitalization - Financial Strategy (Ward 28) City Council on July 19, 20,

More information

INTERNAL AUDIT DIVISION AUDIT REPORT 2013/098. Audit of the United Nations Human Settlements Programme operations in Bangladesh

INTERNAL AUDIT DIVISION AUDIT REPORT 2013/098. Audit of the United Nations Human Settlements Programme operations in Bangladesh INTERNAL AUDIT DIVISION AUDIT REPORT 2013/098 Audit of the United Nations Human Settlements Programme operations in Bangladesh Overall results relating to effective and efficient implementation of activities

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name Land Registry and Cadastre Modernization Project Region EUROPE AND CENTRAL ASIA Sector Central government administration

More information

IAS Revenue. By:

IAS Revenue. By: IAS - 18 Revenue International Accounting Standard No 18 (IAS 18) Revenue In 1998, IAS 39, Financial Instruments: Recognition and Measurement, amended paragraph 11 of IAS 18, adding a cross-reference to

More information

Lease Accounting: Are you prepared?

Lease Accounting: Are you prepared? Lease Accounting: Are you prepared? In this paper, Savills Studley describes the importance of being prepared for the financial reporting changes for leases under the new FASB standards. For most companies,

More information

Regulatory Impact Statement

Regulatory Impact Statement Regulatory Impact Statement Establishing one new special housing area in Queenstown under the Housing Accords and Special Housing Areas Act 2013. Agency Disclosure Statement 1 This Regulatory Impact Statement

More information

Owners Association Management Services Asset & Facilities Management Services IT & Software Support Service

Owners Association Management Services Asset & Facilities Management Services IT & Software Support Service www.ownersunion.net Owners Association Management Services Asset & Facilities Management Services IT & Software Support Service Owners Union Community Manager was specifically created by Iong time strata

More information

Public Housing Assessment System (PHAS) Reform Discussion

Public Housing Assessment System (PHAS) Reform Discussion Section Eight Public Housing Assessment Systems: Public Housing Assessment System (PHAS) Reform Discussion U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT September 2016 Rationale For Change Address Interim

More information

2. Project Implementation Agency: National Bureau of Statistics. 3. Date of the Procurement Plan Approval: June 12, 2018

2. Project Implementation Agency: National Bureau of Statistics. 3. Date of the Procurement Plan Approval: June 12, 2018 Public Disclosure Authorized Plan 1. Project Information Country: United Republic of Tanzania Project Name: Development Support for Tanzania Statistics / Support to Strengthen Statistics in Tanzania Project

More information

Report. Property Leases Audit Report. Internal Audit Report for August 2010

Report. Property Leases Audit Report. Internal Audit Report for August 2010 Report Office of the General Auditor Summary Three reports were issued during the month: Property Leases Audit Report Skinner East Bypass Screening Structure Rehabilitation Audit Report Yuba Accord Dry

More information

CUSTOMER CONTRACT REQUIREMENTS Subcontractor CUSTOMER CONTRACT P

CUSTOMER CONTRACT REQUIREMENTS Subcontractor CUSTOMER CONTRACT P Page 1 of 7 CUSTOMER CONTRACT REQUIREMENTS Subcontractor CUSTOMER CONTRACT P010121612 CUSTOMER CONTRACT REQUIREMENTS The following customer contract requirements apply to this contract to the extent indicated

More information

Community Occupancy Guidelines

Community Occupancy Guidelines Community Occupancy Guidelines Auckland Council July 2012 Find out more: phone 09 301 0101 or visit www.aucklandcouncil.govt.nz Contents Introduction 4 Scope 5 In scope 5 Out of scope 5 Criteria 6 Eligibility

More information

A National Housing Action Plan: Effective, Straightforward Policy Prescriptions to Reduce Core Housing Need

A National Housing Action Plan: Effective, Straightforward Policy Prescriptions to Reduce Core Housing Need Co-operative Housing Federation of Canada s submission to the 2009 Consultations on Federal Housing and Homelessness Investments A National Housing Action Plan: Effective, Straightforward Policy Prescriptions

More information

Section 7. HOME Investment Partnership Program And American Dream Downpayment Act

Section 7. HOME Investment Partnership Program And American Dream Downpayment Act Section 7 HOME Investment Partnership Program And American Dream Downpayment Act HOME Investment Partnership Program Because every community has a need for adequate, affordable housing, the Federal Government

More information

NEW CHALLENGES IN URBAN GOVERNANCE AND FINANCE

NEW CHALLENGES IN URBAN GOVERNANCE AND FINANCE Final International Conference Paris January 15-16, 2015 NEW CHALLENGES IN URBAN GOVERNANCE AND FINANCE Zhi Liu Peking University Lincoln Institute of Land Policy Center for Urban Development and Land

More information

INVENTORY POLICY For Real Property

INVENTORY POLICY For Real Property INVENTORY POLICY For Real Property (Broader Public Sector Entities) Page 1-12 CONTENTS 1. TITLE... 3 2. OVERVIEW... 3 3. PURPOSE... 3 4. POLICY STATEMENT... 3 5. APPLICATION... 7 6. EVALUATION AND REVIEW...

More information

Consultation Response

Consultation Response Neighbourhoods and Sustainability Consultation Response Title: New Partnerships in Affordable Housing Lion Court 25 Procter Street London WC1V 6NY Reference: NS.DV.2005.RS.03 Tel: 020 7067 1010 Fax: 020

More information

US$M): (US$M US$M): US$M): Board Approval Date : 08/29/2002 Closing Date : 09/30/ /30/2010. Group Manager :

US$M): (US$M US$M): US$M): Board Approval Date : 08/29/2002 Closing Date : 09/30/ /30/2010. Group Manager : IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 04/21/2011 Report Number : ICRR13605 PROJ ID : P067149 Project Name : Real Property Registration & Cadastre Project Country: Croatia

More information

REAL ESTATE REGISTRATION PROJECT

REAL ESTATE REGISTRATION PROJECT Public Disclosure Authorized Report on the Federation part of the Public Disclosure Authorized Public Disclosure Authorized PROJECT FINANCIAL STATEMENTS of the REAL ESTATE REGISTRATION PROJECT financed

More information

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency

More information

Certified Internal Auditor Exam Preparation. Contents are subject to change. For the latest updates visit

Certified Internal Auditor Exam Preparation. Contents are subject to change. For the latest updates visit Certified Internal Auditor Exam Preparation Page 1 of 11 Why Attend This preparatory course is designed to equip candidates with the knowledge and skills required to write and pass the Certified Internal

More information

UK Housing Awards 2011

UK Housing Awards 2011 UK Housing Awards 2011 Excellence in Housing Finance and Development: Finalist North Lanarkshire Council: Building For The Future Summary North Lanarkshire Council has been proactive in establishing, developing

More information