City of Palo Alto (ID # 4882) City Council Staff Report

Size: px
Start display at page:

Download "City of Palo Alto (ID # 4882) City Council Staff Report"

Transcription

1 City of Palo Alto (ID # 4882) City Council Staff Report Report Type: Consent Calendar Meeting Date: 12/15/2014 Summary Title: Easements for San Francisquito Creek Joint Powers Authority Initial Flood Protection Project Title: Grant of Easements to Santa Clara Valley Water District, Pacific Gas and Electric Company, City of East Palo Alto and East Palo Alto Sanitary District for the San Francisquito Creek Joint Powers Authority s (JPA) Initial Flood Protection Project (Highway 101 to San Francisco Bay) From: City Manager Lead Department: Administrative Services RECOMMENDATION Staff recommends that Council: 1. Authorize the City Manager or designee to approve and execute the attached City of Palo Alto grant of easement to Pacific Gas and Electric Company (PG&E) and to accept the attached quitclaim deed from PG&E to the City of Palo Alto for abandonment of an existing easement; and 2. Authorize the City Manager or designee to approve and execute additional City of Palo Alto Grants of Easements to Santa Clara Valley Water District (SCVWD), PG&E, City of East Palo Alto, and East Palo Alto Sanitary District (EPASD) to be granted in the future and accept additional quitclaim deeds from PG&E, as needed, for the implementation of the San Francisquito Creek Joint Powers Authority s (JPA) Initial Flood Protection Project (Highway 101 to San Francisco Bay). EXECUTIVE SUMMARY The San Francisquito Creek (see attachment A) Flood Reduction, Ecosystem Restoration, and Recreation Project Highway 101 to San Francisco Bay (the Project ), which affects City owned parcels APN (portion) and APN (portion), is a joint endeavor of the JPA and its member agencies to realign San Francisquito Creek (Creek) in order to provide flood protection between Highway 101 and San Francisco Bay. The Project includes creek widening, construction of new levees and floodwalls, wetlands restoration, and improvements to the Baylands trail network. In order to support the construction of the Project, several existing utility facilities, including PG&E gas and electric lines and an EPASD sanitary sewer pipeline, will need to be relocated, requiring new utility City of Palo Alto Page 1

2 easements to be granted across City-owned land. In addition, the modifications to the Creek width will require the SCVWD and the City of East Palo Alto (the agencies that will assume maintenance responsibility for the Creek improvements) to acquire new flood control easements across City-owned land. In order to provide rights for future land use, access, maintenance and utilization of the land area, the City of Palo Alto will need to grant various real estate access rights in the form of right of entry, permanent easements, and temporary construction easements to the SCVWD, PG&E, the City of East Palo Alto and the EPASD. BACKGROUND In April 1999, the cities of Palo Alto, Menlo Park, and East Palo Alto, the Santa Clara Valley Water District and the San Mateo County Flood Control District formed the San Francisquito Creek JPA in order to cooperatively pursue a flood damage reduction and ecosystem restoration project for San Francisquito Creek. For the past three years, the JPA has been pursuing the implementation of a locally-funded Initial Flood Protection Project that would provide 100-year flood protection for properties downstream of Highway 101. In 2009, the JPA contracted with HDR Engineering, Inc. to design and prepare construction documents for the Project and with ICF International, Inc. to prepare an Environmental Impact Report to identify and analyze potential project impacts and to describe appropriate mitigation measures to address those impacts. The design consultant has completed 95% construction documents for the Project, and the JPA Board certified the Final Environmental Impact Report for the Project on October 25, The Project will accommodate a 100-year flow in conjunction with a 100-year tide, with additional design considerations to meet FEMA freeboard requirements consistent with the National Research Center s highest estimate of potential Sea Level Rise over the next 50 years. This Project is the first in the Bay Area to take such a progressive approach towards planning a flood protection and ecosystem restoration project that considers the best available scientific evidence of potential environmental and climatic change that could be experienced during the design life of the project. The Project s goals are to improve flood protection, habitat, and recreational opportunities within the project reach, with the following specific objectives: Protect properties and infrastructure between Highway 101 and the San Francisco Bay from 100-year San Francisquito Creek riverine flood flows in conjunction with a 100-year tide and projected 50-year Sea Level Rise; Accommodate future flood protection measures upstream of the Project that may be constructed; Enhance habitat along the project reach, particularly habitat for threatened and endangered species; Enhance recreational uses; and Minimize operational and maintenance requirements. City of Palo Alto Page 2

3 The primary Project elements proposed to improve management of flood flows along San Francisquito Creek from Highway 101 to San Francisco Bay include: Reconfiguring levees; Creating a marsh plain terrace to convey high flows; Installing floodwalls; Widening of the Creek channel; and Constructing access roads for maintenance purposes. DISCUSSION In order to enable the relocation of utility facilities associated with the Project and to convey temporary and permanent access rights to the agencies with maintenance responsibility for the Project, real estate access and easement rights will need to be granted by the City of Palo Alto to various public agencies and PG&E. At the present time, the JPA is waiting to obtain the necessary permits from the San Francisco Bay Regional Water Quality Control Board (Water Board) and other state and federal resource agencies to begin the Project. Once all of the permits have been acquired, the Project will start. By authorizing the City Manager to approve the easements needed to accommodate the Project, the necessary real estate documents can be approved quickly after they have been reviewed and approved by Public Works, the Real Estate Division of ASD, and the City Attorney s Office. Over the past two years, City staff have been meeting and working with the staff of the agencies seeking new or revised easements to develop and review the plats, legal descriptions, and real estate rights that will be included in the easements to be granted to facilitate the Project. The City will be granting the following agencies easement rights in conjunction with the Project: Santa Clara Valley Water District: The SCVWD will be administering the construction of the Project on behalf of the JPA. The SCVWD will also assume permanent maintenance responsibility for the Creek improvements on the south side of the channel (the portion within the City of Palo Alto corporate limits). Therefore, the SCVWD will require both temporary construction easements and permanent flood control easements from the City. The purpose of a permanent non exclusive easement and a temporary construction easement is to facilitate the water management and/or storm water drainage system installation to prevent future flooding and to support the construction of the Project. The new permanent easement will be used to construct a new earthen levee, which will be set back from the existing levee in order to increase channel conveyance. That new setback levee will extend from the vicinity of Geng Road to just beyond the Friendship Bridge. The existing ramp at Geng Road will be reconstructed to provide access to the new levee for maintenance vehicles and bicyclists and pedestrians utilizing the Bay Trail segment along the levee. Upstream of Geng Road, a sheetpile floodwall will be constructed with a widened channel, extending to the US Postal Service property. The City bike/pedestrian trail on top of the existing levee will be restored atop the new levee. The temporary construction City of Palo Alto Page 3

4 easement will be used to allow access by equipment and material during construction of the Project. PG&E PG&E will be relocating two electric transmission lines and one gas transmission line to accommodate the creek widening included in the Project. PG&E will quitclaim current easements for its existing gas and electric facilities to the City. The City will grant three new permanent easements to PG&E for the relocated gas and electric facilities. The City will issue the following new easements to PG&E: 1) 60kV Transmission Wood Pole Line: A new easement will cover electric transmission lines along the wood pole line, which have already been relocated by PG&E. (see attachment B) 2) 230kV Steel Tower Line: Two new easements will be granted for relocated overhead electric facilities. These facilities needed to be relocated and raised because one of the steel towers will be within the widened creek channel. Because of this change, the original easement s area of use will need to be widened. 3) Gas Transmission Line 101: This easement will address an underground gas transmission line that will be relocated to facilitate the creek widening. PG&E has established a conceptual alignment for the relocated gas line. It will be relocated to the east side (within the Golf Course) of the new easterly levee. The City will be granting easement rights of ingress and egress to construct, reconstruct, replace, remove, maintain and use for the transmission of electric (or gas) energy, and for communication purposes. The existing easements to be quitclaimed by PG&E are: The easement (see attachment C) granted by City of Palo Alto to PG&E on April 20, 1966, for the gas line which would be relocated into the new easement area at a later date. City of East Palo Alto The City of East Palo Alto will assume permanent maintenance responsibility for the Creek improvements on the north side of the channel (the portion within the City of East Palo Alto corporate limits). The County of San Mateo holds existing permanent easements along San Francisquito Creek between O'Connor Street and Daphne Way that will be relied upon to construct the Project. The County of San Mateo will transfer their existing easement rights to the City of East Palo Alto. However, the planned construction activities of the Project may extend beyond the existing easements on City-owned lands. If it is determined that additional land rights will be needed for construction, the City of East Palo Alto would seek from the City City of Palo Alto Page 4

5 of Palo Alto new temporary construction easements in the subject area. The easements would be required for construction activities related to building the new levee on the East Palo Alto side of the Creek, and for the traversal of equipment and materials from a staging area near O'Connor Street to the rest of the Project site. The easement would be in place for a two-year period, the beginning of which shall be determined during the drafting of the easement agreement. East Palo Alto Sanitary District The EPASD will be relocating its sanitary sewer trunk pipeline to accommodate the creek widening included in the Project. A 20-foot wide sanitary sewer easement is needed for the legal installation of the relocated sewer pipeline and manholes, and their ongoing inspection and maintenance. The sewer infrastructure is routinely inspected and maintained to ensure proper operation. The easement provides the EPASD the legal right to access and perform maintenance as needed. RESOURCE IMPACT As a policy, public agencies waive easement preparation fees when they are working together with other government agencies on publically-sponsored project. The City s easement fee of $1,363 set forth in the Municipal Fee Schedule has been waived for SCVWD, East Palo Alto, and EPASD. City also waived the easement fee for PG&E since they will be undertaking work that has been requested by the JPA to support the San Francisquito Creek Flood Reduction Project. POLICY IMPLICATIONS Granting the easement rights to PG&E and other public agencies to support the San Francisquito Creek flood prevention project is consistent with policies and programs in the Comprehensive Plan, promoting public safety and infrastructure investments to develop a safer regional area and to work in cooperation with neighborhood cities to solve regional issues that impact many residents and communities. ENVIRONMENTAL REVIEW An Environmental Impact Report for the Project, including the related utility relocations, has been adopted by the JPA. Attachments: Attachment A: Map of the San Francisquito Creek (DOCX) Attachment B: Easement Deed (PDF) Attachment C: Easement Quitclaim Deed (PDF) City of Palo Alto Page 5

6 ATTACHMENT A 1 P a g e

7 ATTACHMENT B Page 1 of 7

8 ATTACHMENT B Page 2 of 7

9 ATTACHMENT B Page 3 of 7

10 ATTACHMENT B Page 4 of 7

11 ATTACHMENT B Page 5 of 7

12 ATTACHMENT B Page 6 of 7

13 ATTACHMENT B Page 7 of 7

14 ATTACHMENT C Page 1 of 5

15 ATTACHMENT C Page 2 of 5

16 ATTACHMENT C Page 3 of 5

17 ATTACHMENT C Page 4 of 5

18 ATTACHMENT C Page 5 of 5

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY Adopted January 3, 2012 PURPOSE: The purpose of the policy statement is to clarify the policies and procedures of the City of Fort

More information

VI. SAFETY ELEMENT I. INTRODUCTION A. PURPOSE B. AUTHORITY. 1. Safety

VI. SAFETY ELEMENT I. INTRODUCTION A. PURPOSE B. AUTHORITY. 1. Safety AB 162 and SB 1241 Amendment to the Safety Element New sections are underlined, deleted sections are shown as strikethrough and the denotes text remaining in place. VI. SAFETY ELEMENT I. INTRODUCTION A.

More information

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

Preliminary Subdivision Application (Minor) (Three (3) lots or less) Gunnison City Offices www.gunnisoncity.org 38 West Center Gunnison, Utah 84634 (435) 528 7969 Date of Application: Preliminary Subdivision Application (Minor) (Three (3) lots or less) APPLICANT INFORMATION

More information

3. Adopt the Preliminary Use and Management Plan for the property granted to the District.

3. Adopt the Preliminary Use and Management Plan for the property granted to the District. R-13-119 Meeting 13-34 December 11, 2013 AGENDA ITEM AGENDA ITEM 8 Approval of an Agreement to Exchange Real Property Interests with Santa Clara County (County) Roads & Airports concerning County property

More information

Preliminary Subdivision Application (Major) (Four (4) lots or more)

Preliminary Subdivision Application (Major) (Four (4) lots or more) Gunnison City Offices www.gunnisoncity.org 38 West Center Gunnison, Utah 84634 (435) 528 7969 Date of Application: Preliminary Subdivision Application (Major) (Four (4) lots or more) APPLICANT INFORMATION

More information

Proposed Overland Park Kansas Ordinance RE-1 Residential Estates Community

Proposed Overland Park Kansas Ordinance RE-1 Residential Estates Community 18.171 RE-1 Residential Estate Community 18.171.010 Statement of intent. The zoning of property as RE-1, (Residential Estates Community, 1 dwelling unit per Gross acre density), is intended to provide

More information

1. The reason provided for the opposing votes was that the two commissioners wanted something else to be developed on their parcel.

1. The reason provided for the opposing votes was that the two commissioners wanted something else to be developed on their parcel. Agenda Item #6.2 SUBJECT: PUBLIC HEARING - APPEAL OF PLANNING COMMISSION DECISION DENYING THE APPROVAL OF THE TENTATIVE PARCEL MAP, CONDITIONAL USE PERMIT, AND SITE AND ARCHITECTURAL REVIEW FOR THE CONSTRUCTION

More information

ZONING & LAND USE APPLICATION

ZONING & LAND USE APPLICATION City of Maple Plain 5050 Independence St P.O. Box 97 Maple Plain, MN 55359 Office: (763) 479-0515 Fax: (763) 479-0519 ZONING & LAND USE APPLICATION APPLICANT INFORMATION Applicant Name Company, if applicable

More information

Residential Major Subdivision Review Checklist

Residential Major Subdivision Review Checklist Residential Major Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

COASTAL CONSERVANCY. Staff Recommendation January 18, Carmel River Parkway Acquisitions. File No Project Manager: Trish Chapman

COASTAL CONSERVANCY. Staff Recommendation January 18, Carmel River Parkway Acquisitions. File No Project Manager: Trish Chapman COASTAL CONSERVANCY Staff Recommendation January 18, 2006 Carmel River Parkway Acquisitions File No. 06-104 Project Manager: Trish Chapman RECOMMENDED ACTION: Authorization to disburse up to $3,500,000

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 15, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 15, 2017 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 15, 2017 DATE: July 7, 2017 SUBJECT: Deed of Easement from Highland Holdings, LLC, to the County Board of Arlington County, Virginia

More information

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services. Conditions Relating to Draft Plan of Subdivision Approval East Fonthill 26T 01014 (Draft Plan dated December 1, 2013, and revised August 28, 2014), the Town of Pelham 1. This approval applies to the Draft

More information

Residential Subdivision Preliminary Plat Application

Residential Subdivision Preliminary Plat Application WATER MODELING FEES Major : $650 or Minor : $550 # of lots x $35 per lot Residential Preliminary Plat Application Lots: 1-9 10-19 20-49 50-99 100-199 $300 $400 $475 $625 $825 200-349 350-499 500-499 700-999

More information

Section 6 Easements and Rights-of-Way

Section 6 Easements and Rights-of-Way Section 6 Easements and Rights-of-Way GENERAL REQUIREMENTS...6-1 I. EASEMENTS...6-1 6.1 ROADWAY EASEMENT...6-1 6.2 UTILITY EASEMENT...6-1 6.3 SEWER EASEMENT...6-1 6.4 WATER MAIN EASEMENT...6-2 6.5 CHANNEL

More information

TENTATIVE MAP APPLICATION GUIDE (BCC 20-1)( 20-2 to )( to 20-91)( to )

TENTATIVE MAP APPLICATION GUIDE (BCC 20-1)( 20-2 to )( to 20-91)( to ) Butte County Department of Development Services PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 Planning Division Phone 530.552.3701 Fax 530.538.7785 Email dsplanning@buttecounty.net FORM NO PLG-05

More information

Appendix G. Non-Federal Letters of Support and Draft Real Estate Plan

Appendix G. Non-Federal Letters of Support and Draft Real Estate Plan Appendix G Non-Federal Letters of Support and Draft Real Estate Plan REAL ESTATE PLAN UPPER DELAWARE RIVER WATERSHED FEASABILITY STUDY LIVINGSTON MANOR, NEW YORK 1. GENERAL 2. REAL ESTATE REQUIREMENTS

More information

ARTICLE 23 CONDOMINIUM STANDARDS

ARTICLE 23 CONDOMINIUM STANDARDS ARTICLE 23 CONDOMINIUM STANDARDS Section 23.01 Intent. The intent of this Article is to provide regulatory standards for condominiums and site condominiums similar to those required for projects developed

More information

VTA s BART SILICON VALLEY PROGRAM Phase 1 Berryessa Extension Project

VTA s BART SILICON VALLEY PROGRAM Phase 1 Berryessa Extension Project VTA s BART SILICON VALLEY PROGRAM Phase 1 Berryessa Extension Project Addendum No. 6 to the 2 nd Supplemental Environmental Impact Report Santa Clara Valley Transportation Authority March 2015 1 Table

More information

RESOLUTION NO. CONTAINING APPROXIMATELY 587 SQ.FT. RD:EEH:LCP

RESOLUTION NO. CONTAINING APPROXIMATELY 587 SQ.FT. RD:EEH:LCP RD:EEH:LCP 12-2-15 RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE VACATING, UPON THE SATISFACTION OF CERTAIN CONDITIONS, A PORTION OF A PUBLIC EASEMENT ON PRIVATE PROPERTY LOCATED AT

More information

BY BOARD OF COUNTY COMMISSIONERS AN ACT TO BE ENTITLED

BY BOARD OF COUNTY COMMISSIONERS AN ACT TO BE ENTITLED BY BOARD OF COUNTY COMMISSIONERS ORDINANCE NO. AN ACT TO BE ENTITLED AN ORDINANCE AMENDING THE PASCO COUNTY LAND DEVELOPMENT CODE, ARTICLE 700, BY REPEALING EXISTING SECTION 702, ENVIRONMENTALLY SENSITIVE

More information

GWINNETT COUNTY CSO CONSERVATION SUBDIVISION OVERLAY DISTRICT REQUIREMENTS

GWINNETT COUNTY CSO CONSERVATION SUBDIVISION OVERLAY DISTRICT REQUIREMENTS GWINNETT COUNTY CSO CONSERVATION SUBDIVISION OVERLAY DISTRICT REQUIREMENTS Section 1316. CSO Conservation Subdivision Overlay District. 1. Purposes. The purposes of this overlay district are as follows:

More information

DEVELOPMENT POLICY INFRASTRUCTURE GUIDELINES FOR NEW DEVELOPMENT

DEVELOPMENT POLICY INFRASTRUCTURE GUIDELINES FOR NEW DEVELOPMENT CITY OF HAYS SUBJECT DEVELOPMENT POLICY INFRASTRUCTURE GUIDELINES FOR NEW DEVELOPMENT ISSUED BY LAST REVISION DATE POLICY MANUAL REVISION DATE City Commission 3-13-08 10-22-09 POLICY STATEMENT: The City

More information

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

TOWN OF WHITBY REPORT RECOMMENDATION REPORT TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Planning and Development Committee REPORT NO: PL 4-08 DATE OF MEETING: January 21, 2008 FILE NO(S): MI-01-07 (SW- 2002-03) PREPARED BY: Planning Department

More information

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012 Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012 IMPORTANT NOTE: This document was created to accompany the City of Fort Collins

More information

Date: June 17, Recreation and Park Commission. Dawn Kamalanathan Planning Director

Date: June 17, Recreation and Park Commission. Dawn Kamalanathan Planning Director Date: June 17, 2010 To: From: Recreation and Park Commission Dawn Kamalanathan Planning Director Subject: Candlestick Point Hunters Point Shipyard Phase 2 Project Agenda Wording: Resolution approving and

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 17, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 17, 2017 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 17, 2017 DATE: June 7, 2017 SUBJECT: Deed of Easement, Temporary Construction Easement and Construction Agreement For Parcel "A," Hurley's

More information

Honorable Mayor and Members of the City Council. Sewer Easement Deed Agreement at 2705 Walker Street

Honorable Mayor and Members of the City Council. Sewer Easement Deed Agreement at 2705 Walker Street Office of the City Manager CONSENT CALENDAR October 30, 2012 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Andrew Clough, Director, Public Works

More information

Appendix B Real Estate Plan

Appendix B Real Estate Plan Appendix B Real Estate Plan B-1 REAL ESTATE PLAN Prepared for U.S. Army Corps of Engineers Southwestern Division Little Rock District As of May 1, 2013 Prepared by Ronald Bridges Real Estate Division ANY

More information

CHECKLIST FOR DEVELOPMENT REVIEW

CHECKLIST FOR DEVELOPMENT REVIEW CHECKLIST FOR DEVELOPMENT REVIEW Petitions and related documents and plans for land development or other proposals regulated by Title 16 of the Municipal Code (Development Ordinance) and Title 17 of the

More information

AGENDA OF THE COUNCIL OF THE CITY OF FORT COLLINS, COLORADO. September 18, Proclamations and Presentations 5:30 p.m. Regular Meeting 6:00 p.m.

AGENDA OF THE COUNCIL OF THE CITY OF FORT COLLINS, COLORADO. September 18, Proclamations and Presentations 5:30 p.m. Regular Meeting 6:00 p.m. AGENDA OF THE COUNCIL OF THE CITY OF FORT COLLINS, COLORADO September 18, 2001 Proclamations and Presentations 5:30 p.m A. Presentation of a Plaque to the Neighborhood Task Force for its Award of Excellence

More information

Corte Madera Marsh Restoration Project Update

Corte Madera Marsh Restoration Project Update Corte Madera Marsh Restoration Project Update Building and Operating Committee Agenda Item No. 5 August 25, 2016 Photo credit: WRA Background of Site 1. 72 acre parcel carved out of larger property acquired

More information

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento 915 I Street, Sacramento, CA 95814-2671 www.cityofsacramento.org 9 PUBLIC HEARING December 10, 2015 To: Members of the Planning and Design Commission

More information

CITY OF FAYETTEVILLE, ARKANSAS PROPERTY LINE ADJUSTMENT

CITY OF FAYETTEVILLE, ARKANSAS PROPERTY LINE ADJUSTMENT CITY OF FAYETTEVILLE, ARKANSAS PROPERTY LINE ADJUSTMENT FOR STAFF USE ONLY FEE: $200.00 Date Application Submitted: Date Accepted as Complete: S-T-R: Project Number: PP#: Public Hearing Zone: Please fill

More information

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB ARTICLE VI: LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS VI-21 610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB 610-1 Property Line Adjustments (Property Line Relocation) A property line

More information

Agreement to purchase Water Utility Easement, APN & Acceptance of Water Utility Easement on APN &

Agreement to purchase Water Utility Easement, APN & Acceptance of Water Utility Easement on APN & Agenda: 01.18.07 Item: 8b TO: FROM: District Manager District Engineer DATE: January 4, 2007 SUBJECT: Agreement to purchase Water Utility Easement, APN 089-441-29 & Acceptance of Water Utility Easement

More information

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

ARTICLE 15 - PLANNED UNIT DEVELOPMENT Section 15.1 - Intent. ARTICLE 15 - PLANNED UNIT DEVELOPMENT A PUD, or Planned Unit Development, is not a District per se, but rather a set of standards that may be applied to a development type. The Planned

More information

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation 5.0 Introduction This chapter summarizes the Town s rules and regulations regarding floodplain management and development. The requirements presented in this chapter should be used by the design engineer

More information

EXHIBIT A Welk Resort Occupancy by Month Resort 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 January February March April May June July August September October November December Lawrence

More information

Residential Minor Subdivision Review Checklist

Residential Minor Subdivision Review Checklist Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

Planning Commission Preliminary Plan LRC Subdivision Montville Township

Planning Commission Preliminary Plan LRC Subdivision Montville Township Planning Commission Preliminary Plan LRC Subdivision Montville Township Meeting: February 1, 2017 App. No.: 002-2017-PP Owner: Faith & Hope Land Dev. Co. Applicant: Montville Investors LLC Engineer: Weber

More information

ARTICLE FIVE FINAL DRAFT

ARTICLE FIVE FINAL DRAFT ARTICLE FIVE 021218 FINAL DRAFT Sec. 503.6 Open Space Preservation Option Open Space Preservation Option Open Space Preservation developments may be approved in the AR, R-1, R-2 and R-3 zoning districts,

More information

Tentative Map Application Review Procedures

Tentative Map Application Review Procedures FOR REFERENCE ONLY This page is not part of the application. Tentative Map Application Review Procedures The tentative map process in Churchill County is designed to provide a mechanism in order to divide

More information

APPLICATION PROCEDURE

APPLICATION PROCEDURE ANTRIM PLANNING BOARD P. O. Box 517 Antrim, New Hampshire 03440 Phone: 603-588-6785 FAX: 603-588-2969 APPLICATION FORM AND CHECKLIST FOR MINOR OR MAJOR SITE PLAN REVIEW File Date Received By APPLICATION

More information

Drainage Maintenance Policy

Drainage Maintenance Policy Drainage Maintenance Policy The purpose of this Drainage Maintenance Policy is to clarify how the City of McKinney may address various drainage and stormwater related concerns of residents. BACKGROUND

More information

7 February 8, 2012 Public Hearing APPLICANT : 1168 ASSOCIATES, LLC, A VA LIMITED LIABILITY COMPANY

7 February 8, 2012 Public Hearing APPLICANT : 1168 ASSOCIATES, LLC, A VA LIMITED LIABILITY COMPANY 7 February 8, 2012 Public Hearing APPLICANT : 1168 ASSOCIATES, LLC, A VA LIMITED LIABILITY COMPANY STAFF PLANNER: Leslie Bonilla REQUEST AND ADDRESS: Discontinuance, closure and abandonment of a portion

More information

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT RECEIVED STAMP SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT A checklist of background information and submission requirements for processing of a sketch plan, preliminary plat

More information

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation 5.0 Introduction This chapter summarizes the County s rules and regulations regarding floodplain management and development. The requirements presented in this chapter should be used by the design engineer

More information

DEVELOPMENT PLAN ORDINANCE

DEVELOPMENT PLAN ORDINANCE DEVELOPMENT PLAN ORDINANCE CITY OF GLASGOW Ordinance No. 2026 SECTION A. Section 1. INTENT AND PURPOSE The purpose of this Ordinance is to establish and define development plans, which may be utilized

More information

Condominium Unit Requirements.

Condominium Unit Requirements. ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

EXHIBIT A

EXHIBIT A EXHIBIT A Welk Resort Occupancy by Month Resort 2016 2016 2016 2016 2016 2016 2016 2016 2017 2017 2017 2017 2017 May June July August September October November December January February March April May

More information

Burleigh County Water Resource District 1811 East Thayer Avenue Bismarck, North Dakota (701)

Burleigh County Water Resource District 1811 East Thayer Avenue Bismarck, North Dakota (701) Burleigh County Water Resource District 1811 East Thayer Avenue Bismarck, North Dakota 58501 (701) 222-3499 www.bcwrd.org Fox Island Flood Control Project Public Hearing Summary September 7, 2016 General

More information

RESOLUTION NO. FILE NO. PT15-066

RESOLUTION NO. FILE NO. PT15-066 RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE APPROVING A VESTING TENTATIVE MAP TO ALLOW AN EXTENSION FOR UP TO 15 YEARS FOR TENTATIVE SUBDIVISION MAP FILE NO. PT13-061, CONSISTENT

More information

Planning Department st Avenue East Kalispell, MT Phone: (406) Fax: (406)

Planning Department st Avenue East Kalispell, MT Phone: (406) Fax: (406) Planning Department 201 1 st Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/planning April 1, 2015 Doug Russell, City Manager City of Kalispell 201 1 st Ave

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 28, 2017 DATE: January 19, 2017 SUBJECT: Deed of Easements, Temporary Construction Easements and Construction Agreement and Deed of

More information

2 November 9, 2011 Public Hearing APPLICANT: ASHVILLE PARK, L.L.C.

2 November 9, 2011 Public Hearing APPLICANT: ASHVILLE PARK, L.L.C. 2 November 9, 2011 Public Hearing APPLICANT: ASHVILLE PARK, L.L.C. PROPERTY OWNER: ATC REALTY SIXTEEN, INC. STAFF PLANNER: Faith Christie REQUEST: Modification of Conditional Change of Zoning approved

More information

PROJECTS: P 0083(74)56; 036E; JONES COUNTY NH 0083(79)45; 04E7; MELLETTE COUNTY NH 0083(80)44; 04E8; MELLETTE COUNTY

PROJECTS: P 0083(74)56; 036E; JONES COUNTY NH 0083(79)45; 04E7; MELLETTE COUNTY NH 0083(80)44; 04E8; MELLETTE COUNTY Public Meeting/ Open House October 16, 2014 PROJECTS: P 0083(74)56; 036E; JONES COUNTY NH 0083(79)45; 04E7; MELLETTE COUNTY NH 0083(80)44; 04E8; MELLETTE COUNTY U.S. Highway 83 From White River to South

More information

CITY OF FAYETTEVILLE, ARKANSAS FINAL PLAT FOR STAFF USE ONLY FINAL PLAT FEE: $ $ Date Application Submitted: Date Accepted as Complete:

CITY OF FAYETTEVILLE, ARKANSAS FINAL PLAT FOR STAFF USE ONLY FINAL PLAT FEE: $ $ Date Application Submitted: Date Accepted as Complete: CITY OF FAYETTEVILLE, ARKANSAS FINAL PLAT FOR STAFF USE ONLY FINAL PLAT FEE: $200.00-$800.00 Date Application Submitted: Date Accepted as Complete: Project Number: Public Hearing S-T-R: PP#: Zone: Please

More information

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO ATTENTION OF: CECW-PM (10-1-7a) THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report

More information

Submittal of the Minutes from the March 9, 2011, April 5, 2011, and April 19, 2011 Cabinet Meetings.

Submittal of the Minutes from the March 9, 2011, April 5, 2011, and April 19, 2011 Cabinet Meetings. AGENDA BOARD OF TRUSTEES OF THE INTERNAL IMPROVEMENT TRUST FUND JUNE 16, 2011 Attachments to the items below can be viewed at the following link: http://www.dep.state.fl.us/secretary/cab/public_notices.htm

More information

OFFICE BUILDING INVESTMENT OPPORTUNITY PALO ALTO DOWNTOWN CALIFORNIA. Actual Site

OFFICE BUILDING INVESTMENT OPPORTUNITY PALO ALTO DOWNTOWN CALIFORNIA. Actual Site OFFICE BUILDING INVESTMENT OPPORTUNITY DOWNTOWN PALO ALTO CALIFORNIA Actual Site EXCLUSIVELY MARKETED BY TOM POWER EXECUTIVE VICE PRESIDENT SRS REAL ESTATE PARTNERS 100 Pine Street, Suite 1550 San Francisco,

More information

Housing Commission Report

Housing Commission Report Housing Commission Report To: From: Subject: Housing Commission Meeting: July 21, 2016 Agenda Item: 4-B Chair and Housing Commission Barbara Collins, Housing Manager Draft Request for Proposals for Mountain

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 2-2 Problem: The backyards at 962, 97, and 978 Delvin Drive are located in a low area of shallow ponding that takes

More information

LAND USE APPLICATION

LAND USE APPLICATION Lincoln County Department of Planning & Development 210 SW 2nd Street, Newport, OR 97365 Phone (541) 265-4192 Fax (541) 265-6945 LAND USE APPLICATION TO BE COMPLETED BY STAFF Conditional Use Non-Conforming

More information

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

ARTICLE 900 PLAT AND PLAN REQUIREMENTS ARTICLE 900 PLAT AND PLAN REQUIREMENTS SEC. 900.1 ITEMS TO BE SHOWN ON PLAT OR PLAN General (1) Property lines of all property owners adjacent to the exterior boundaries of the project shall be located

More information

MAPLETON CITY CORPORATION. Step 7: Upon final approval and prior to plat recording the applicant shall provide the following:

MAPLETON CITY CORPORATION. Step 7: Upon final approval and prior to plat recording the applicant shall provide the following: MAPLETON CITY CORPORATION Subdivision Process The City s subdivision requirements are designed to facilitate orderly, safe and efficient development and to implement the adopted General Plan. Below is

More information

MARK TWAIN LAKE MASTER PLAN CLARENCE CANNON DAM AND MARK TWAIN LAKE MONROE CITY, MISSOURI

MARK TWAIN LAKE MASTER PLAN CLARENCE CANNON DAM AND MARK TWAIN LAKE MONROE CITY, MISSOURI MARK TWAIN LAKE MASTER PLAN CLARENCE CANNON DAM AND MARK TWAIN LAKE MONROE CITY, MISSOURI CHAPTER 4 LAND ALLOCATION, LAND CLASSIFICATION, WATER SURFACE, AND EASEMENT LANDS This Master Plan is a land use

More information

The City Engineering Division has reviewed the subject development and has the following comments.

The City Engineering Division has reviewed the subject development and has the following comments. DATE: May 27, 2008 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 1126 Huxley Street and 1910 Roth Street Demolition The City Engineering Division has reviewed the subject development

More information

AGENDA ITEM G-2 Public Works

AGENDA ITEM G-2 Public Works AGENDA ITEM G-2 Public Works STAFF REPORT City Council Meeting Date: 2/23/2016 Staff Report Number: 16-035-CC Consent Calendar: Adopt a resolution accepting Easements and approving the abandonment of two

More information

TENTATIVE MAP INFORMATION SHEET

TENTATIVE MAP INFORMATION SHEET TENTATIVE MAP INFORMATION SHEET GENERAL INFORMATION This information sheet explains how your Tentative Map application will be processed, what fees you must pay, and what plans you must submit. If you

More information

Planning Commission Staff Report

Planning Commission Staff Report Planning Commission Staff Report Project: Summary Vacation of a Drainage Easement for a Drainage Canal or Ditch over the Apple Computer Inc. Campus Property Finding of Consistency with the General Plan

More information

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT DATE: January 10, 2018 TO: FROM: Planning Commission Planning Staff SUBJECT: Consideration of a request by the San Mateo County Real Property Division

More information

Section 4 Master Plan Framework

Section 4 Master Plan Framework Section 4 Master Plan Framework 4.1 PURPOSE The Master Plan, as an implementation tool of the SPC District, establishes the primary framework for the overall development of the Property. Detailed site

More information

Site Selection and Acquisition

Site Selection and Acquisition Site Selection and Acquisition School site selection and acquisition involve a diligent team effort by District staff, appropriate facility planning individuals and real property professionals in cooperation

More information

ARTICLE 3 DEFINITIONS

ARTICLE 3 DEFINITIONS Sections: 3-1 Rules of Construction 3-2 Definitions ARTICLE 3 DEFINITIONS SECTION 3-1 RULES OF CONSTRUCTION 3-101. a. The language set forth in these regulations shall be interpreted in accordance with

More information

KLUGE PLACE SUBDIVISION

KLUGE PLACE SUBDIVISION KLUGE PLACE SUBDIVISION Engineering Comments: Must comply with the Mobile County Flood Damage Prevention Ordinance. Development shall be designed to comply with the storm water detention and drainage facility

More information

SOUTHERN INDUSTRIAL PARK SUBDIVISION, LOT A, RESUBDIVISION OF LOTS 7 & 8

SOUTHERN INDUSTRIAL PARK SUBDIVISION, LOT A, RESUBDIVISION OF LOTS 7 & 8 SOUTHERN INDUSTRIAL PARK SUBDIVISION, LOT A, RESUBDIVISION OF LOTS 7 & 8 Engineering Comments: Need to increase width of existing easement to include an area at least 20 from the top of the existing ditch,

More information

Sketch Plan 2018 Bargersville Plan Commission Application Kit

Sketch Plan 2018 Bargersville Plan Commission Application Kit Sketch Plan 2018 Bargersville Plan Commission Application Kit For Commercial, Industrial, and Residential Developments At least 31 days prior to the intended filing of the Primary Plat or Development Plan

More information

SANTA BARBARA COUNTY ZONING ADMINISTRATOR Staff Report for Coleman SFD Addition Coastal Development Permit with Hearing

SANTA BARBARA COUNTY ZONING ADMINISTRATOR Staff Report for Coleman SFD Addition Coastal Development Permit with Hearing SANTA BARBARA COUNTY ZONING ADMINISTRATOR Staff Report for Coleman SFD Addition Coastal Development Permit with Hearing Supervisorial District: First Staff Report Date: August 10, 2005 Staff: Lisa Hosale

More information

Community Development Committee

Community Development Committee C Date Prepared: Subject: Community Development Committee For the Metropolitan Council meeting of December 9, 2009 December 8, 2009 Committee Report SW Item: 2009-444 ADVISORY INFORMATION Rice Creek Chain

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of December 14, 2013 DATE: November 12, 2013 SUBJECT: Deed of Dedication, Deeds of Easement and Deeds of Temporary Easement and Construction

More information

QUEENSWAY HYDRO CORRIDOR LAND USE STUDY

QUEENSWAY HYDRO CORRIDOR LAND USE STUDY Exhibit 1 QUEENSWAY HYDRO CORRIDOR LAND USE STUDY November 2001 prepared by Planning and Building Department Table of Contents 1.0 INTRODUCTION...1 1.1 Background...1 1.2 Purpose...2 1.3 Study Method &

More information

Appendix B Draft Real Estate Plan

Appendix B Draft Real Estate Plan Appendix B Draft Real Estate Plan B-1 REAL ESTATE PLAN Prepared for U.S. Army Corps of Engineers Southwestern Division Little Rock District As of December 3, 2012 Prepared by Ronald Bridges Real Estate

More information

WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION

WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION DETAILED SPECIFIC WRITTEN REQUEST File Number: SDV- Number of Proposed Lots & their Dimensions: PRELIMINARY SUBDIVISION PLAN REQUIREMENTS The approval of

More information

ARTICLE 13 CONDOMINIUM REGULATIONS

ARTICLE 13 CONDOMINIUM REGULATIONS ARTICLE 13 CONDOMINIUM REGULATIONS Section 13.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

APPLICATION REVIEW CHECKLISTS

APPLICATION REVIEW CHECKLISTS APPLICATION REVIEW CHECKLISTS The following must be submitted with and are part of each application. No application is complete until all required documentation has been submitted to the Community Development

More information

Board of Supervisors' Agenda Items

Board of Supervisors' Agenda Items A. Roll Call B. Closed Session COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, SEPTEMBER 14, 2016, 9:00 A.M. BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY,

More information

Diamond Falls Subdivision PROPOSED YELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT

Diamond Falls Subdivision PROPOSED YELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT Diamond Falls Subdivision PROPOSED YELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT The City/County Planning Staff has prepared the Findings of Fact for the Diamond Falls Subdivision. These findings

More information

The City Engineering Division has reviewed the subject development and has the following comments.

The City Engineering Division has reviewed the subject development and has the following comments. DATE: April 11, 2007 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5756 Portage Road Certified Survey Map The City Engineering Division has reviewed the subject development and

More information

WRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC

WRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC WRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC Application of Hayden Signature, LLC, an Idaho limited liability company,

More information

Prepared by: Nick Lagura, Associate Planner

Prepared by: Nick Lagura, Associate Planner CITY OF CITRUS HEIGHTS PLANNING DIVISION STAFF REPORT PLANNING COMMISSION MEETING May 25, 2016 Prepared by: Nick Lagura, Associate Planner REQUEST The applicant requests approval of a Tentative Parcel

More information

Project Narrative Cherry Street Industrial Park Expansion - Subdivision and Street Extension

Project Narrative Cherry Street Industrial Park Expansion - Subdivision and Street Extension Project Narrative Cherry Street Industrial Park Expansion - Subdivision and Street Extension The Ithaca Urban Renewal Agency (IURA) proposes to develop a 6.0 acre vacant parcel located at the southerly

More information

Prepared by and to be returned to Linn County Planning & Development nd Street S.W., Cedar Rapids, Iowa (319)

Prepared by and to be returned to Linn County Planning & Development nd Street S.W., Cedar Rapids, Iowa (319) Prepared by and to be returned to Linn County Planning & Development 935 2 nd Street S.W., Cedar Rapids, Iowa 52404-2161 (319) 892-5130 LINN COUNTY, IOWA ZONING BOARD OF ADJUSTMENT IN THE MATTER OF THE

More information

Napa County Planning Commission Board Agenda Letter

Napa County Planning Commission Board Agenda Letter Agenda Date: 9/20/2017 Agenda Placement: 8C Napa County Planning Commission Board Agenda Letter TO: FROM: Napa County Planning Commission Charlene Gallina for David Morrison - Director Planning, Building

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 DATE: November 23, 2009 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior

More information

Plat Checklist PLAT TYPES AND DESCRIPTIONS

Plat Checklist PLAT TYPES AND DESCRIPTIONS Master Plan / Revision to Master Plan (For Platting Purposes Only) Preliminary/Final Plat Preliminary Plat Final Plat Minor Plat Replat Amended Plat Plat Checklist So that we may efficiently review your

More information

SANTA BARBARA COUNTY PLANNING COMMISSION Staff Report for Flood Control Easement Quitclaim

SANTA BARBARA COUNTY PLANNING COMMISSION Staff Report for Flood Control Easement Quitclaim SANTA BARBARA COUNTY PLANNING COMMISSION Staff Report for Flood Control Easement Quitclaim Deputy Director: Steve Chase Staff Report Date: March 10, 2006 Division: Development Review South Case No.: 06GOV-00000-00004

More information

Group Sewer Only** 80 Ft Frontage* 20,000 Sq. Ft. (.46 acre) Minimum** 120 Ft Frontage* 20,000 Sq. Ft. (.46acre) Minimum** 150 Ft Frontage*

Group Sewer Only** 80 Ft Frontage* 20,000 Sq. Ft. (.46 acre) Minimum** 120 Ft Frontage* 20,000 Sq. Ft. (.46acre) Minimum** 150 Ft Frontage* Residential Lots Minimum Chart The minimum lot size of any minor subdivision where there is no public sewers shall be as shown below or as required by township zoning and/or the Tuscarawas General Health

More information

LYON COUNTY COMMUNITY DEVELOPMENT DEPARTMENT

LYON COUNTY COMMUNITY DEVELOPMENT DEPARTMENT LYON COUNTY COMMUNITY DEVELOPMENT DEPARTMENT B UILDING D EVELOPMENT E NGINEERING P LANNING 27 S. MAIN S TREET Y ERINGTON, NEVADA 89447 (775) 463-6591 F AX: (775) 463-5305 34 LAKES B OULEVARD D AYTON, NEVADA

More information

AGENDA ITEM Public Utilities Commission City and County of San Francisco

AGENDA ITEM Public Utilities Commission City and County of San Francisco WATER WASTEWATER POWER AGENDA ITEM Public Utilities Commission City and County of San Francisco MEETING DATE May 11, 2010 Approve Project - Mitigated Negative Declaration: Regular Calendar Bureau Manager:

More information

RESOLUTION NO. RD:EEH:LCP

RESOLUTION NO. RD:EEH:LCP RD:EEH:LCP 3-29-16 RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE VACATING A LANDSCAPE EASEMENT AND PORTION OF STREET EASEMENT RESTRICTING VEHICULAR ACCESS ON PRIVATE PROPERTY LOCATED

More information