1 Ruling No.: Application No.: B BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clause (2)(f) and Sentences (8) and (9) of Regulation 350/06, as amended, (the Building Code ). AND IN THE MATTER OF an application by Paul Wright, ACI Wright Inc., for the resolution of a dispute with Jason Schmidt-Shoukri, Chief Building Official, City of Burlington, to determine whether the proposed configuration for the exiting from the second storey of a Group D and F, Division 2, two storey building, which leads through a lobby that is located within an interconnected floor space, provides sufficiency of compliance with Clause (2)(f) and Sentences (8) and (9) of Division B of the Building Code at 5555 North Service Road, Burlington, Ontario. APPLICANT RESPONDENT PANEL PLACE Paul Wright ACI Wright Inc. City of Toronto, Ontario Jason Schmidt-Shoukri Chief Building Official City of Burlington Tony Chow, Chair Marina Huissoon Neal Barkhurst City of Toronto, Ontario DATE OF HEARING September 9, 2010 DATE OF RULING September 9, 2010 APPEARANCES Jonathan Rubes Leber Rubes Inc. City of Toronto, Ontario Agent for the Applicant John La Selva Building Inspector City of Burlington Agent for the Applicant 1

2 RULING 1. Particulars of Dispute The Applicant has received a permit under the Building Code Act, 1992, to renovate an existing two storey, office building in order to convert it from a single tenant building to a multiple tenant building at 5555 North Service Road, Burlington, Ontario. The subject building is a two storey, multiple use occupancy building with a building area of 2394 m². The building is comprised of non-combustible construction, and is equipped with a sprinkler system and fire alarm system. The subject building has undergone a series of renovations mainly to accommodate multiple tenants, which was previously a single tenant building. In the newly renovated building, two tenants are expected to occupy the first storey and a single tenant is expected to occupy the second storey. The two suites on the first storey are provided with two exterior exits, while the second storey is served with one fire-rated enclosed exit and the second required exit from this storey opens onto an interconnected floor space leading to the first storey through an unenclosed stair. The dispute before the Commission revolves around the exiting requirements from the second storey of the subject building. More specifically, the second required exit from the second storey, which passes through the interconnected floor space, is the focus of the dispute and whether the interconnected floor space between the first and second storey can be considered as a twostorey lobby. The Building Code permits exits to lead through lobbies under specified conditions under Article of Division B of the Building Code. The dispute focuses on whether the exit meets these conditions, and further, whether the stair within the lobby is considered to be an exit stair that is required to be enclosed with fire-rated construction. It is understood that in this case, the interconnected floor space in question complies with Sentence (6) and is permitted by Clause (2)(d) to contain a lobby. 2. Provisions of the Building Code in Dispute Exits through Lobbies (2) Not more than one exit from a floor area is permitted to lead through a lobby provided, (f) a fire separation, constructed in accordance with Sentence (1), is maintained between the lobby and any exit permitted by this Sentence to lead through the lobby, and Means of Egress (8) Except as required by Sentence (9) and permitted by Sentences (6) and (7), each suite in a floor area that contains more than one suite shall have, (a) an exterior exit doorway, or (b) a doorway, (i) into a public corridor, or (ii) to an exterior passageway. (9) Except as permitted by this Section and by Sentence (2), at the point where a doorway referred to in Sentence (8) opens onto a public corridor or exterior passageway, it shall be possible to go in opposite directions to each of 2 separate exits. 2

3 3. Applicant s Position The Agent for the Applicant submitted that the existing building was renovated under permit to convert the existing single tenant building into a multiple tenant building. The Agent explained that two tenants will occupy the ground floor and the third tenant will occupy the second floor. The Agent reported that the subject building has Group D and Group F, Division 2 occupancies with a building area of approximately 2400 m². The Agent also reported that the floor assemblies have a 45 minute fire-resistance rating and further, the vertical fire separations between the two ground floor office suites are rated with a 1 hour fire-resistance rating, although the Code does not require a fire separation between these suites. The Agent submitted that the two office suites on the ground floor are served by a minimum of two exit doors that discharge directly to the outdoors. The office suite on the second floor, the Agent maintained, is served by a 45 minute fire separated exit stair in addition to the exit through the lobby. Thus, the Agent purported, each tenant has access to two or more exits from the floor area, only one of which is through the lobby. Sentence (6) of the Building Code, the Agent submitted, permits the ground and second floor to be interconnected where the interconnected floor space is sprinklered and contains only Group A, Division 1, 2, or 3, Group D, Group E, or Group F, Division 2 or 3 major occupancies. In this case, the Agent pointed out, the lobby in the subject building interconnects the ground and second floors, the entire building has been sprinklered, and the interconnected floor space contains a Group D major occupancy only, thus, the interconnected floor space is in compliance with Sentence (6). Focusing on Sentence (2) of the Building Code, the Agent explained that this Sentence permits one of the required exits to be through a lobby. The Agent submitted that Sentence (2) requires the following: a) a lobby floor to be not more than 4.5 m above grade; b) a travel distance through the lobby to the outdoors must not exceed 15 m; c) rooms having direct access to the lobby not to contain residential or industrial occupancies; d) if the lobby is in an interconnected floor space, it must comply with Sentence (6); e) the lobby must conform to the requirements for exits except that rooms other than service rooms are permitted to open onto the lobby, and where the lobby and adjacent occupancies that are permitted to open onto the lobby are sprinklered, the fire separation around the lobby need not have a fire-resistance rating; f) a fire separation constructed in accordance with Sentence (1) be provided between the lobby and the exit that lead through the lobby; g) the lobby not be in an interconnected floor space if the exit through the lobby serves a hotel. The Agent reported that the subject building complies with each of the exit through lobby requirements as follows: a) the upper level of the lobby in this case is approximately 3.7 m above grade, which is less than 4.5 m; b) the travel distance through the lobby from the upper level to the exterior door on the lower level is 14.3 m, which is less than 15 m; c) rooms that open onto the lobby are offices (Group D) occupancies; 3

4 d) the lobby is in an interconnected floor space that complies with (6) as previously stated; e) the rooms that open onto the lobby are offices rather than service rooms and storage rooms, and on the basis the entire building is sprinklered, the fire separation around the lobby is permitted to be unrated; f) in this building, the second floor lobby is the means of egress as is the case on the ground floor. As such, there is no actual exit discharging in to the lobby for which a fire separation is required. The lobby itself only requires an unrated separation as per Clause (2)(e); g) the exit through the lobby does not serve a hotel. The Agent summarized, that as a result of the above, the exit through the lobby at the subject property complies with Sentence (2) of the Building Code. 4. Respondent s Position The Designate for the Respondent submitted that the construction in dispute concerns the second required exit from the second floor, which leads through a lobby that is located on the first floor of the subject two storey building. The Designate explained that the lobby is located at the front portion of the multi-tenant building. The Designate submitted that as per Sentence (1) of the Building Code, this building requires two exits from every floor. In this case, he reported that only two exits are provided from the second floor and one of the required exits leads through a lobby which is permitted under Sentence (2) of the Building Code. The Designate submitted that the Applicant has interpreted that the exit stair leading from the second floor through the interconnected lobby is not required to be enclosed by a fire separation. The Designate argued that Clause (2)(f) of the Building Code requires a fire separation to be constructed in accordance with Sentence (1) between the lobby and the exit permitted to lead through the lobby. The Designate agreed that a lobby is permitted to be located in an interconnected floor space however he suggested that the exit stair, leading from the second floor through the second floor lobby to the first floor lobby, is required to be protected from the lobby by a fire separation in accordance with Clause (2)(f). The Designate argued that the lobby needs to conform to the requirements for exits as required by the Building Code, except as permitted in Division B, Clause (2)(e). The Designate explained that in order to have an open exit stair from the second floor to the lobby, the exit in question would need to be separated from the remainder of the building by an appropriate fire separation having the requisite fire-resistance rating. The Designate submitted that consideration must be given to Sentences (8) and (9) for means of egress in floor areas containing more than one suite, where floor areas containing more than one suite shall not open directly into an exit. The Designate maintained that it is the City s position that although the Code permits a lobby to be located in an interconnected floor space, the exit stair from the second floor leading through the lobby is required to be protected from the lobby by a fire separation as per Clause (2)(f), and as such, the subject proposal not to separate the exit stair does not comply with the Code. 4

5 5. Commission Ruling It is the Decision of the Building Code Commission that the proposed configuration for the exiting from the second storey of a Group D and F, Division 2, two storey building, which leads through a lobby that is located within an interconnected floor space, provides sufficiency of compliance with Clause (2)(f) and Sentences (8) and (9) of Division B of the Building Code at 5555 North Service Road, Burlington, Ontario. 6. Reasons i) It is the Commission s opinion that the pair of exterior doors located between the lobby on the ground floor and the outside of the building is considered the exit door for the second storey floor area. Therefore the set of stairs, located within the interconnected floor space containing the lobby, is not considered an exit stair but rather an access to exit and therefore, is not required to be fire separated from the second floor. ii) iii) Clause (2)(f) of Division B of the Building Code states, Not more than one exit from a floor area is permitted to lead through a lobby provided a fire separation, constructed in accordance with Sentence (1), is maintained between the lobby and any exit permitted by this Sentence to lead through the lobby. This Clause requires a fire separation between the lobby and any exit permitted to pass through a lobby. However, as stated previously, it is the Commission s opinion that the stairs within the interconnected floor space is not considered an exit stair and therefore, is not required to be fire separated from the second floor. Sentences (8) and (9) of Division B of the Building Code pertains to the means of egress from multiple suites within a floor area. The Commission heard that there is only a single suite located on the second storey of the subject building, therefore, Sentences (8) and (9) of the Code are not applicable in this case. 5

6 Dated at Toronto this 9 th day in the month of September in the year 2010 for application number B Tony Chow, Chair Marina Huissoon Neal Barkhurst 6

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 09-03-1215 Application No. B-2009-01 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Sentences 3.3.1.3.(9)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 08-03-1177 Application No. 2007-26 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 3.4.4.1.,

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-43-898 Application No. 2002-46 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.2.1.1.(4),

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 08-04-1178 Application No. B-2007-47 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND AND IN THE MATTER OF Sentence 3.2.9.2.(1)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 04-33-988 Application No. 2004-28 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 3.4.6.3.(2)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-06-1020 Application No. 2004-74 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 1.1.3.2 of

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 09-05-1217 Application No. 2009-03 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 3.3.1.15. and

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-13-1027 Application No. 2005-05 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.1.3.2.(2)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 09-10-1222 Application No. 2009-07 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 3.1.2.1 and

More information

Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements

Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements Alberta Building Code 2006 Alberta Building Code 2014 Change 9.37.2. Construction 9.37.2.1. Height of Rooms and Spaces 1) The

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No.03-10-908 Application No. 2003-06 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.3.1.8.(1)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-14-912 Application No. 2003-05 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clause 10.1.1.2.(1)(a)

More information

COUNCIL ORDER No

COUNCIL ORDER No SAFETY CODES COUNCIL #000, 0665 Jasper Avenue N.W., Edmonton, Alberta, Canada, T5J 389 Tel: 780430099 I 888430099 Fax: 78044534 I 88844534 www.safetycodes.ab.ca COUNCIL ORDER No. 005443 BEFORE THE BUILDINGTECHNICALCOUNCIL

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling # 01-20-813 Application # 2001-23 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24 (1) of the Building Code Act, 1992. AND IN THE MATTER OF Article 9.5.2.1. and Clause 3.8.1.1.(1)(c) of Regulation

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 01-30-823 Application # 2001-04 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24 (1) of the Building Code Act, 1992. AND IN THE MATTER OF Article 3.2.9.1. of Regulation 403, as amended

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-21-919 Application No. 2003-20 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 3.8.3.3. (5)

More information

E1-12: Final Decision AS

E1-12: Final Decision AS BCAC COMPILATION OF GROUP A E1-12: Final Decision AS 202, 1006 (New), 1007 (New), 1014.3, 1015, 1020.1, 1021 (IFC [B] 1006 (New), 1007 (New), 1014.3, 1015, 1020.1, 1021) Proponent: Charles S. Bajnai, Chesterfield

More information

Regional District of Nanaimo Secondary Suite Program

Regional District of Nanaimo Secondary Suite Program Regional District of Nanaimo Secondary Suite Program Secondary suites are recognized for the important role they play in providing affordable housing in the region. They also provide many benefits to homeowners,

More information

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES SCHEDULE A TO BY-LAW NUMBER 2010-24 (Amended by By-law 2016-40) CLASSES OF PERMITS AND PERMIT FEES 1. Except where a minimum flat fee is indicated for the Occupancy Classification or Type of Construction,

More information

ERRATA AND REVISIONS MEASURES FOR FIRE SAFETY IN HIGH BUILDINGS

ERRATA AND REVISIONS MEASURES FOR FIRE SAFETY IN HIGH BUILDINGS National Research Council Canada Conseil national de recherches Canada Associate Committee on the NATIONAL BUILDING CODE of Canada Comite associe du CODE NATIONAL DU BATIMENT du Canada Ottawa ERRATA AND

More information

Suite Permission. Suites complying with shall be permitted to be used to meet the corridor access requirements of

Suite Permission. Suites complying with shall be permitted to be used to meet the corridor access requirements of Categorical Waiver Available: 5. Suites Sections 18/19.2.5 of the 2000 LSC requires every habitable room to have an exit access door leading directly to an exit access corridor; allows for exit access

More information

Discuss the history of fires that resulted in much of the development of codes related to means of egress. Review mean of egress terminology

Discuss the history of fires that resulted in much of the development of codes related to means of egress. Review mean of egress terminology Discuss the history of fires that resulted in much of the development of codes related to means of egress Review mean of egress terminology Discuss 8 Elements to an Effective Means of Egress. Modern code

More information

2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS

2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS 2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS Section 1001 ADMINISTRATIVE 1001.1 General 1001.2 Alterations to existing means of egress 1001.3 Maintenance 1001.4 Fire safety and evacuation plans

More information

(2) Determining Occupant Loads for the Operation of a Building (The Alberta Fire Code)

(2) Determining Occupant Loads for the Operation of a Building (The Alberta Fire Code) (d) (e) (f) (g) (h) if emergency lighting is required if exit signs are required if additional requirements apply for high buildings the type of hardware required on exit and access to exit doors the required

More information

The New NYC Building Code Chapter 10 Means of Egress. New York City Department of Buildings. Technical Affairs. Fatma M. Amer, P.E.

The New NYC Building Code Chapter 10 Means of Egress. New York City Department of Buildings. Technical Affairs. Fatma M. Amer, P.E. The New NYC Building Code Chapter 10 Means of Egress New York City Department of Buildings Technical Affairs Fatma M. Amer, P.E. Copyright Materials This presentation is protected by US and International

More information

êéëé~êåü=üáöüäáöüí Code Requirements and Costs of Incorporating Accessory Apartments in Houses

êéëé~êåü=üáöüäáöüí Code Requirements and Costs of Incorporating Accessory Apartments in Houses êéëé~êåü=üáöüäáöüí May 2009 Technical Series 09-102 Code Requirements and Costs of Incorporating Accessory Apartments in Houses áåíêççìåíáçå Canada Mortgage and Housing Corporation commissioned a study

More information

2018 CSBC / 2018 CSFSC Part III. Chapter #10. Means of Egress. Table of Contents. Based on the 2015 IBC and the 2015 IFC.

2018 CSBC / 2018 CSFSC Part III. Chapter #10. Means of Egress. Table of Contents. Based on the 2015 IBC and the 2015 IFC. 2018 CSBC / 2018 CSFSC Part III. Chapter #10. Means of Egress. Table of Contents. Based on the 2015 IBC and the 2015 IFC. October 23, 2018 Section 1001. Administration. See Section 107.2.3 for Egress Drawing

More information

The following information is required at submission. Complete submissions can be processed within 10 business days.

The following information is required at submission. Complete submissions can be processed within 10 business days. Building Permit Requirements Temporary Tent Town of Innisfil Building Services (CDSB) 2101 Innisfil Beach Road Innisfil, Ontario L9S 1A1 705-436-3710 A building permit is required for a tent or group of

More information

Presentation By. Chris Poujol. Jeffery Rodriguez. James Rigley

Presentation By. Chris Poujol. Jeffery Rodriguez. James Rigley Means of Egress Presentation By Chris Poujol Jeffery Rodriguez James Rigley Table of Contents I. Means of Egress Definition II. History III. NYC Building Code IV. General Requirements IX. Exit Signs X.

More information

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS Prepared by: Community Development Standards Branch Town of Innisfil www.innisfil.ca June 2016 Contents 1. Introduction... 1 2. Ontario Building

More information

Vestibule Requirement Intent

Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Requirement Intent Page 1 of 14 The primary intent behind the requirement for a vestibule is to reduce infiltration into a space

More information

Background: 5 th Edition (2014) Florida Building Code, Building

Background: 5 th Edition (2014) Florida Building Code, Building Issue DS 2017-019. The petitioner Robert C Shumake of Shumake Architecture is seeking a declaratory statement on whether FBC 1029.1 require an emergency escape and rescue opening from sleeping units located

More information

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

PREPARED FOR: ADI DEVELOPMENT GROUP INC. Acronym Urban Design and Planning/Mark Sterling Consulting Inc. 111 Clendenan Avenue, Toronto, Ontario M6P 2W7 URBAN DESIGN BRIEF PROPOSED DEVELOPMENT 4880 VALERA ROAD, CITY OF BURLINGTON PREPARED FOR:

More information

Floor and Room Numbering Guidelines

Floor and Room Numbering Guidelines Facilities University of Ottawa Room Numbering Guidelines Floor and Room Numbering Guidelines Background Each building has a unique number assigned by Facilities. This number is used for inventories, Fire

More information

A001 DEMOLITION SITE PLAN A001 1:300 ADDITION DICKINSON DRIVE INGLESIDE, ONTARIO CATHOLIC DISTRICT SCHOOL BOARD OF EASTERN ONTARIO

A001 DEMOLITION SITE PLAN A001 1:300 ADDITION DICKINSON DRIVE INGLESIDE, ONTARIO CATHOLIC DISTRICT SCHOOL BOARD OF EASTERN ONTARIO DEMOLITION SITE AS NOTED No J.V.D. A001 1:300 0 10.0 m 50 m J.J. 2016-04-25 A001 ACAD FILE/FICHIER: 1619-A001.DWG SITE 1:300 No J.V.D. J.J. A002 A002 1:300 0 10.0 m 50 m 2016-04-20 ACAD FILE/FICHIER: 1619-A002.DWG

More information

DRS RWANDA STANDARD. Code of practice for fire safety. of building. Part 5: Exit requirements and personal hazard.

DRS RWANDA STANDARD. Code of practice for fire safety. of building. Part 5: Exit requirements and personal hazard. RWANDA STANDARD DRS 186-5 Seconde dition Code of practice for fire safety of building Part 5: Exit requirements and personal hazard Reference number DRS 186-5: 2018 RBS yyyy CD RS 186-5:2013 ii Error!

More information

The UBBL Applications of Fire Safety Provisions

The UBBL Applications of Fire Safety Provisions The UBBL Applications of Fire Safety Provisions Atriums Open Structures and Corridors Fire Appliance Access Ar Chong Lee Siong APAM MIFireE MIArbs PAM-IFEM SEMINAR 2016 ATRIUMS UBBL clause 137 UBBL clause

More information

Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: CLASSES OF PERMITS AND PERMIT FEES 1. CALCULATION OF PERMIT FEES FOR CONSTRUCTION: (6) Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit

More information

c 211 Hotel Fire Safety Act

c 211 Hotel Fire Safety Act Ontario: Revised Statutes 1970 c 211 Hotel Fire Safety Act Ontario Queen's Printer for Ontario, 1970 Follow this and additional works at: http://digitalcommons.osgoode.yorku.ca/rso Bibliographic Citation

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario EB-2013-0040 EB-2013-0041 IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B); AND IN THE MATTER OF an application

More information

City of South Portland Office of the City Clerk 25 Cottage Road South Portland, ME Registration of Short-Term Rental Checklist

City of South Portland Office of the City Clerk 25 Cottage Road South Portland, ME Registration of Short-Term Rental Checklist City of South Portland Office of the City Clerk 25 Cottage Road South Portland, ME 04106 207-767-7628 Registration of Short-Term Rental Checklist Applicant Name: Date: Registration Fee Registration Application

More information

UNIVERSITY OF HONG KONG LIBRARY. This book was received in accordance with the Books Registration Ordinance Section 4

UNIVERSITY OF HONG KONG LIBRARY. This book was received in accordance with the Books Registration Ordinance Section 4 UNIVERSITY OF HONG KONG LIBRARY This book was received in accordance with the Books Registration Ordinance Section 4 CODE OF PRACTICE ON PROVISION OF MEANS OF ESCAPE IN CASE OF FIRE AND ALLIED REQUIREMENTS

More information

ACCESSORY APARTMENTS OLDER THAN FIVE YEARS

ACCESSORY APARTMENTS OLDER THAN FIVE YEARS ACCESSORY APARTMENTS OLDER THAN FIVE YEARS INCLUDED: LIST OF REQUIREMENTS SAMPLE DRAWINGS Planning & Development Services Tel. 905-683-4550 Fax. 905-686-0360 TOWN OF AJAX 65 Harwood Ave South Ajax ON L1S

More information

Codes Checklist Document 3

Codes Checklist Document 3 Ohio University Interior Architecture Codes Check p1 of 7 atthew Ziff,.Arch, Associate Professor Codes Checklist Document 3 General Construction Code Requirements Construction type of Building (Table 601)

More information

MSC Guidelines for Review of Means of Escape (Subchapter H)

MSC Guidelines for Review of Means of Escape (Subchapter H) S. E. HEMANN, CDR, Chief, Hull Division Purpose The purpose of the Plan Review Guideline is to provide the submitter with general guidance and information for the preparation and submission of Means of

More information

TENTS PERMIT APPLICATION & INFORMATION

TENTS PERMIT APPLICATION & INFORMATION TENTS PERMIT APPLICATION & INFORMATION Building Department Anne Lalonde- Planning & Building Information Officer - anne.lalonde@southglengarry.com - ext 258 Permit Application Checklist for Tents Building

More information

DECISION AND ORDER APPEARANCES. Decision Issue Date Thursday, March 22, 2018

DECISION AND ORDER APPEARANCES. Decision Issue Date Thursday, March 22, 2018 Court Services 40 Orchard View Blvd Telephone: 416-392-4697 Toronto Local Appeal Body Suite 211 Fax: 416-696-4307 Toronto, Ontario M4R 1B9 Email: tlab@toronto.ca Website: www.toronto.ca/tlab DECISION AND

More information

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019 How to Calculate Permit Fees: To calculate the mit fee required at the time of application the following is used 1. Determine which Class of Work is applicable 2. Determine the Area of Work (i.e. project

More information

2015 IBC Allowable Heights and Areas

2015 IBC Allowable Heights and Areas 2015 IBC Allowable Heights and Based on the 2015 International Building Code (IBC ) Course Description This seminar addresses the key issues of the 2015 International Building Code (IBC ) Chapter 5 regarding

More information

A Brief Overview of the New BOMA Measurement Standards for Lawyers Jan. 20, 2011 By William B. Tracy, MBA, NCARB

A Brief Overview of the New BOMA Measurement Standards for Lawyers Jan. 20, 2011 By William B. Tracy, MBA, NCARB 1) The BOMA Standard for measuring Floor Area in Office Buildings a) Commonly called The BOMA Standard b) Voluntary ANSI consensus standard since 1915 i) Multiple reincarnations (1) To stay relevant to

More information

PP Course # Instructor Information. Patrick Vandergriff 35 Cottonwood Canyon Road La Luz, NM

PP Course # Instructor Information. Patrick Vandergriff 35 Cottonwood Canyon Road La Luz, NM Instructor Information PP Course #15788 Patrick Vandergriff 35 Cottonwood Canyon Road La Luz, NM 88337 1-575-430-8752 pvandergriff@codeconsult.org 1 Detailing of Mixed Occupancy Structures within the 2018

More information

Township of Georgian Bay (Name of municipality, upper-tier municipality, board of health or conservation authority)

Township of Georgian Bay (Name of municipality, upper-tier municipality, board of health or conservation authority) Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. Application number: For use by Principal Authority Permit number (if different):

More information

2.2 72ND STREET STATION ENTRANCE ALTERNATIVES

2.2 72ND STREET STATION ENTRANCE ALTERNATIVES Chapter 2: Entrance Alternatives 2.1 INTRODUCTION This chapter describes the alternatives that are evaluated in this Supplemental Environmental Assessment (EA) for the 72nd Street Station and 86th Street

More information

OPTION 1 MAX RENOVATION/ADDITION

OPTION 1 MAX RENOVATION/ADDITION OPTION 1 MAX RENOVATION/ADDITION MASSING TWO STORY NEW ADDITION OUTDOOR CLASSROOM ON ROOF MULTI PURPOSE ROOM ADDITION PARKING PLAY AREA 1886 HISTORIC BUILDING 12TH PLACE NE C ST NE 13TH ST NE CONSTITUTION

More information

For use by Principal Authority. Township of Georgian Bay (Name of municipality, upper-tier municipality, board of health or conservation authority)

For use by Principal Authority. Township of Georgian Bay (Name of municipality, upper-tier municipality, board of health or conservation authority) SEPTIC Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. For use by Principal Authority Application number: Permit number (if different):

More information

Building Permit Requirements New / Enlarged Openings

Building Permit Requirements New / Enlarged Openings Building Permit Requirements New / Enlarged Openings Building Permit Application The following information is required at submission. Incomplete applications cannot be accepted. Required Documents & Plans

More information

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: SCHEDULE A CLASSES OF PERMITS AND PERMIT FEES 1. CALCULATION OF PERMIT FEES FOR CONSTRUCTION: (6) Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

More information

THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW 2016-

THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW 2016- THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW 2016- TO GOVERN THE ISSUANCE AND ADMINISTRATION OF BUILDING AND DEMOLITION PERMITS, AS WELL AS AN ADDENDUM TO THE CORPORATE CODE OF CONDUCT Whereas

More information

Housing Issues Report Shoreline Towers Inc. Proposal 2313 & 2323 Lake Shore Boulevard West. Prepared by PMG Planning Consultants November 18, 2014

Housing Issues Report Shoreline Towers Inc. Proposal 2313 & 2323 Lake Shore Boulevard West. Prepared by PMG Planning Consultants November 18, 2014 Housing Issues Report Shoreline Towers Inc. Proposal 2313 & 2323 Lake Shore Boulevard West Prepared by PMG Planning Consultants November 18, 2014 PMG Planning Consultants Toronto, Canada M6A 1Y7 Tel. (416)

More information

Section 9.5. Design of Areas, Spaces and Doorways

Section 9.5. Design of Areas, Spaces and Doorways f):.-"> ~Ontario 2012 Building Code Compendium 9.5.1.5. 9.4.4.5. Reserved 9.4.4.6. Walls Supporting Drained Earth (See Appendix A.) Except where constructed in accordance with Section 9.15., walls supporting

More information

NEW YORK STATE DEPARTMENT OF STATE Division of Building Standards and Codes One Commerce Plaza - 99 Washington Ave Albany, NY 12231

NEW YORK STATE DEPARTMENT OF STATE Division of Building Standards and Codes One Commerce Plaza - 99 Washington Ave Albany, NY 12231 NEW YORK STATE DEPARTMENT OF STATE Division of Building Standards and Codes One Commerce Plaza - 99 Washington Ave Albany, NY 12231 Phone: (518) 474 4073 Fax: (518) 486 4487 www.dos.ny.gov Email: info@dos.ny.gov

More information

Homeowners Guide to Accessory Dwelling Units

Homeowners Guide to Accessory Dwelling Units Homeowners Guide to Accessory Dwelling Units Applicable to Buildings in existence AFTER July 14, 1994 In accordance with Zoning By law 2010 050 and the Ontario Building Code 2012 Town of Bradford West

More information

THE REGIONAL MUNICIPALITY OF HALTON BY-LAW NO

THE REGIONAL MUNICIPALITY OF HALTON BY-LAW NO THE REGIONAL MUNICIPALITY OF HALTON BY-LAW NO. 159-01 A BY-LAW TO ESTABLISH DEVELOPMENT CHARGES TO PAY FOR INCREASED CAPITAL COSTS REQUIRED BECAUSE OF INCREASED NEEDS FOR GO TRANSIT SERVICE FOR THE REGIONAL

More information

Purpose. Scope. Stairway Identification Signs. Emergency Evacuation and Stairwell Signage Requirements

Purpose. Scope. Stairway Identification Signs. Emergency Evacuation and Stairwell Signage Requirements TOWN OF BRIGHTON Office of the Fire Marshal 2300 Elmwood Avenue Rochester, New York 14618 (585) 784-5220 Office (585) 784-5207 Fax Emergency Evacuation and Stairwell Signage Requirements The intent of

More information

J IJ S RECEIVED RECOMMENDATION APPLICATION

J IJ S RECEIVED RECOMMENDATION APPLICATION Th J IJ STAFF REPORT Committee of Adjustment Application Date: Thursday, February 1 1, 2016 To: Chair and Committee Members of the Committee of Adjustment Etobicoke York Panel i?rom: Director, Community

More information

ROOM NUMBERING STANDARDS

ROOM NUMBERING STANDARDS ROOM NUMBERING STANDARDS June 2017 INTRODUCTION The Purpose of this document is to define the Louisiana State University Room Numbering Standards. Numbering standards shall be utilized to insure continuity

More information

PLANNING COMMISSION AGENDA REPORT. 17-CA-02 Accessory Dwelling Unit Ordinance. Jon Biggs, Community Development Director

PLANNING COMMISSION AGENDA REPORT. 17-CA-02 Accessory Dwelling Unit Ordinance. Jon Biggs, Community Development Director PLANNING COMMISSION AGENDA REPORT Meeting Date: May 3, 2018 Subject: Prepared by: Initiated by: 17-CA-02 Accessory Dwelling Unit Ordinance Jon Biggs, Community Development Director City Council Attachments:

More information

SUBJECT: Official Plan and Zoning By-law Amendment Applications for 4853 Thomas Alton Boulevard

SUBJECT: Official Plan and Zoning By-law Amendment Applications for 4853 Thomas Alton Boulevard Page 1 of Report PB-100-16 SUBJECT: Official Plan and Zoning By-law Amendment Applications for 4853 Thomas Alton Boulevard TO: FROM: Development and Infrastructure Committee Planning and Building Department

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. Application for a Permit to Construct or Demolish P10 This form is authorized under subsection 8(1.1) of the Building Code Act. Application number: For use by Principal Authority Permit number (if different):

More information

2012 IBC Mixed Occupancies

2012 IBC Mixed Occupancies Accreditation 2012 IBC Mixed Occupancies Based on the 2012 International Building Code (IBC ) The International Code Council has been accredited as an Authorized Provider by the International Association

More information

Building Code Extracts from the National Building Code of Canada 2010

Building Code Extracts from the National Building Code of Canada 2010 3.2.6. Additional Requirements for High Buildings (See Appendix B.) Building Code 3.2.6.1. Application This Subsection applies to a building a) of Group A, D, E or F major occupancy classification that

More information

CITY OF MOUNT PLEASANT ORDINANCE NO. 1017

CITY OF MOUNT PLEASANT ORDINANCE NO. 1017 CITY OF MOUNT PLEASANT ORDINANCE NO. 1017 AN ORDINANCE TO AMEND SECTIONS 152.004 AND 152.007 OF THE CODE OF ORDINANCES FOR THE CITY OF MOUNT PLEASANT TO ADOPT PROVISIONS OF THE 2012 INTERNATIONAL PROPERTY

More information

5/12/2011. To provide safe and sanitary rental housing within the City of Storm Lake through a fair and equitable, revolving inspection process.

5/12/2011. To provide safe and sanitary rental housing within the City of Storm Lake through a fair and equitable, revolving inspection process. 5/12/2011 The City Council had directed City Staff to create a rental housing program and in 1999, after months of development, the City adopted the rental housing inspection program. Building Official:

More information

PROCEEDING COMMENCED UNDER section 45(12), subsection 45(1) of the Planning Act, R.S.O. 1990, c. P.13, as amended (the "Act")

PROCEEDING COMMENCED UNDER section 45(12), subsection 45(1) of the Planning Act, R.S.O. 1990, c. P.13, as amended (the Act) Court Services 40 Orchard View Blvd Telephone: 46-392-4697 Toronto Local Appeal Body Suite 2 Fax: 46-696-4307 Toronto, Ontario M4R B9 Email: tlab@toronto.ca Website: www.toronto.ca/tlab DECISION AND ORDER

More information

Approved Document B Single stairways - Residential uses Part 1

Approved Document B Single stairways - Residential uses Part 1 Approved Document B 2006 - Single stairways - Residential uses Part 1 The three most significant changes for small fore storey single stairway residential buildings in the new Approved Document B 2006

More information

Proposed Framework for Multi-Residential Rental Property Licence. Tenant Issues Committee Licensing and Standards Committee

Proposed Framework for Multi-Residential Rental Property Licence. Tenant Issues Committee Licensing and Standards Committee TD3.3 STAFF REPORT ACTION REQUIRED Proposed Framework for Multi-Residential Rental Property Licence Date: May 3, 2016 To: From: Wards: Reference Number: Tenant Issues Committee Licensing and Standards

More information

APPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE NEWNHAM CAMPUS TORONTO, ONTARIO

APPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE NEWNHAM CAMPUS TORONTO, ONTARIO APPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE NEWNHAM CAMPUS TORONTO, ONTARIO Prepared by: Rita Cherniavskaya & Elias Frechette Technical Consultants

More information

CITY COUNCIL SPECIAL MEETING NEW BUFFALO CITY HALL 224 W. BUFFALO STREET NEW BUFFALO MI AGENDA March 14, 2019 at 10:00am

CITY COUNCIL SPECIAL MEETING NEW BUFFALO CITY HALL 224 W. BUFFALO STREET NEW BUFFALO MI AGENDA March 14, 2019 at 10:00am CITY COUNCIL SPECIAL MEETING NEW BUFFALO CITY HALL 224 W. BUFFALO STREET NEW BUFFALO MI 49117 AGENDA March 14, 2019 at 10:00am 1. Call Meeting to Order & Pledge of Allegiance 2. Roll Call 3. Approval of

More information

Permanent Sign Application

Permanent Sign Application Permanent Sign Application The Corporation of the Town of Whitby A. Property Address Municipal Address Company Name on Sign Building Unit No. B. Type of Sign & Number of Signs WALL SIGN PYLON SIGN CANOPY

More information

Regarding the issue of a notice to fix for variations to consented building work to a new house at 234 Lake Road, Hauraki

Regarding the issue of a notice to fix for variations to consented building work to a new house at 234 Lake Road, Hauraki Determination 2012/070 Regarding the issue of a notice to fix for variations to consented building work to a new house at 234 Lake Road, Hauraki 1. The matters to be determined 1.1 This is a determination

More information

COMMERCIAL BUSINESS GUIDE

COMMERCIAL BUSINESS GUIDE BUILDING AND GROWTH MANAGEMENT DEPARTMENT Licensing & Code Compliance Division 18400 MURDOCK CIRCLE PORT CHARLOTTE, FL 33948 www.charlottecountyfl.com/bcs To exceed expectations in the delivery of public

More information

Chair and Members of Committee of Adjustment Toronto and East York Panel. A0596/16TEY Yonge St New 5 Storey Non-residential Building

Chair and Members of Committee of Adjustment Toronto and East York Panel. A0596/16TEY Yonge St New 5 Storey Non-residential Building Armando Barbini Planning and Permit Services Inc Armando Barbini 30 Brixham Terrace Toronto, On, M3M 2S1 (647) 991-3657 abarbini@rogers.com To: From: Chair and Members of Committee of Adjustment Toronto

More information

Ontario s 2012 Building Code Barrier-Free Design Amendments Ontario Regulation 332/12 Amended by O. Regs. 368/13 and 191/14

Ontario s 2012 Building Code Barrier-Free Design Amendments Ontario Regulation 332/12 Amended by O. Regs. 368/13 and 191/14 Ontario s 2012 Building Code Barrier-Free Design Amendments Ontario Regulation 332/12 Amended by O. Regs. 368/13 and 191/14 Notice: This E Learning module is intended for general information purposes only.

More information

HIGH-RISE BUILDING INVENTORY FORMS (B.I.F.) PRODUCTION AND APPROVAL

HIGH-RISE BUILDING INVENTORY FORMS (B.I.F.) PRODUCTION AND APPROVAL HIGH-RISE BUILDING INVENTORY FORMS (B.I.F.) PRODUCTION AND APPROVAL Only a person authorized by the Los Angeles Fire Department shall approve High-rise Building Inventory Forms. All individuals authorized

More information

BELOW GRADE ENTRANCE Requires design and review by a Professional Engineer

BELOW GRADE ENTRANCE Requires design and review by a Professional Engineer BELOW GRADE ENTRANCE Requires design and review by a Professional Engineer INCLUDED: LIST OF REQUIREMENTS SAMPLE DRAWINGS Planning & Development Services Tel. 905-683-4550 Fax. 905-686-0360 TOWN OF AJAX

More information

BUILDING CODE INTERPRETATION

BUILDING CODE INTERPRETATION BUILDING CODE INTERPRETATION March 2008 06-BCI-010 Page 1 of 9 ADAPTABLE DWELLING UNITS DISCUSSION This STANDATA has been developed to clarify the requirements for adaptable dwelling units in residential

More information

Authority: Etobicoke York Community Council Item 25.2, as adopted by City of Toronto Council on April 6, 2009 Enacted by Council: April 30, 2009

Authority: Etobicoke York Community Council Item 25.2, as adopted by City of Toronto Council on April 6, 2009 Enacted by Council: April 30, 2009 Authority: Etobicoke York Community Council Item 25.2, as adopted by City of Toronto Council on April 6, 2009 Enacted by Council: April 30, 2009 CITY OF TORONTO BY-LAW No. 501-2009 To amend Chapters 320

More information

NEW ACCESSIBILITY CHANGES

NEW ACCESSIBILITY CHANGES NEW ACCESSIBILITY CHANGES TO THE ONTARIO BUILDING CODE An outline of the accessibility changes made to the Ontario Building Code by Ontario Regulation 368/13. May 9, 2014 OAA CONFERENCE Continuing Education

More information

Building Permit Requirements

Building Permit Requirements Building Permit Requirements Below Grade Entrance NOTE TO APPLICANTS: Please check with the Zoning Plans Examiner of the Building Division to determine whether the below grade entrance is permitted in

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-52-950 Application No. 2003-55 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 1.1.3.2. of

More information

2012 IBC Means of Egress

2012 IBC Means of Egress 12/11/2017 Introductions 2012 IBC Means of Egress Based on the 2012 International Building Code (IBC ) Instructor introduction Exits Cell phones & pagers Schedule & breaks Student introductions 2 Goal

More information

Township of Perth East

Township of Perth East Application number: Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 For use by Principal Authority Permit number (if different):

More information

ORDINANCE NO City Attorney Summary

ORDINANCE NO City Attorney Summary ORDINANCE NO. 2882 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF GARDEN GROVE APPROVING AMENDMENT NO. A-017-2017 AMENDING PORTIONS OF TITLE 9 (ZONING CODE) AND REPEALING CHAPTER 5.85 OF THE GARDEN GROVE

More information

TEMPORARY TENT STRUCTU RES

TEMPORARY TENT STRUCTU RES 2-3 WEE PRIOR TO THE EVENT PLEAE UBMIT THE APPLICATION yourself. rental company application) 2. igned Authorization Letter from current owner if 3. ite Plan (see sample with application) 5. Completed form

More information

1014 Ontario Municipal Board Commission des affaires municipales de l Ontario. Quad (King & Brant) Inc.

1014 Ontario Municipal Board Commission des affaires municipales de l Ontario. Quad (King & Brant) Inc. ISSUE DATE: April 16, 2007 DECISION/ORDER NO: 1014 Ontario Municipal Board Commission des affaires municipales de l Ontario PL060421 Floyd Prager, Morton Prager, 1170480 Ontario Ltd. and the City of Toronto

More information

established 200 years Market Place, Chipping Norton

established 200 years Market Place, Chipping Norton established 200 years Market Place, Chipping Norton 18-19 Market Place Chipping Norton Oxon OX7 5NA AN IMPORTANT LANDMARK BUILDING IN THE MARKET PLACE OF THIS FAMOUS COTSWOLD TOWN, NOW FULLY VACANT AND

More information

Applicant: ONTARIO INC. JOE NUOSCI. MARK MCCONVILLE Humphries Planning Group Inc.

Applicant: ONTARIO INC. JOE NUOSCI. MARK MCCONVILLE Humphries Planning Group Inc. File: A043/15 Item # 20 Ward #1 Applicant: 2109179 ONTARIO INC. JOE NUOSCI Address: Agent: 3501 King-Vaughan Road, Woodbridge MARK MCCONVILLE Humphries Planning Group Inc. Adjournment Status: Notes: Comments/Conditions:

More information

Copyright 2013, Queen s Printer for Ontario

Copyright 2013, Queen s Printer for Ontario Contact Information Building Code Information Officer, George Brown College BuildingCode@GeorgeBrown.ca 416-415-5000x6725 http://ce.georgebrown.ca/buildingcodeinformation This course is based on the Building

More information

GREATER HARTFORD TRANSIT DISTRICT GHTD RFP # LEASE OF RETAIL SPACE, UNION STATION. ADDENDUM #2 Issued November

GREATER HARTFORD TRANSIT DISTRICT GHTD RFP # LEASE OF RETAIL SPACE, UNION STATION. ADDENDUM #2 Issued November GREATER HARTFORD TRANSIT DISTRICT GHTD RFP #04-016 LEASE OF RETAIL SPACE, UNION STATION ADDENDUM #2 Issued November 18 2015 A Pre-Proposal Conference was held at the GHTD s offices on November 13, 2015

More information

CITY CLERK. (City Council at its Special Meeting held on July 30, 31 and August 1, 2002, adopted this Clause, without amendment.)

CITY CLERK. (City Council at its Special Meeting held on July 30, 31 and August 1, 2002, adopted this Clause, without amendment.) CITY CLERK Clause embodied in Report No. 7 of the, as adopted by the Council of the City of Toronto at its Special Meeting held on July 30, 31 and August 1, 2002. 19 Affordable and Transitional Housing

More information