Design and Construction of Foundation in Schedule Area No 2 (North-western New Territories) with vibration performance consideration
|
|
- Louise Bradley
- 5 years ago
- Views:
Transcription
1 Design and Construction of Foundation in Schedule Area No 2 (North-western New Territories) with vibration performance consideration Presented by Ir. Adam Choy (Director Meinhardt (C&S) Ltd) Ir. Alex Lai (Technical Director Meinhardt (C&S) Ltd) Ir. Jacqueline Tse (Senior Engineer Meinhardt (C&S) Ltd) 31 Aug 213
2 Content of Presentation Project Information Site Constraints Schedule Area No.2 Classification System Foundation Design in Marble Zone Vibration Assessment Monitoring and Public Relation Plan Construction Consideration
3 Project Information Proposed development in YLTL 518. Yuen Long Bounded by Yuen Long On Ning Road at the southern side, Tai Kiu Road at the western side and Yuen Long On Lok Road at the northern side Consists of 4 towers and each contains storeys with Podium and basement below West Rail Long Ping Station aligned along the northern side and 16m away from site WEST RAIL STATION YUEN LONG ON LOK ROAD WANG CHAU ROAD THE SITE TAI KIU ROAD YUEN LONG ON NING ROAD
4 Site Constraints Photo of the site Existing Aged Village THE SITE Housing Authority s Site
5 Major Concerns on Design and Construction Complex geology and possible presence of cavity Limitations of increased vertical stress on marble surface karst Vibration Effect on existing aged buildings Limitations of Induced Vibration to Surrounding Existing Structures
6 Schedule Area No. 2 Scheduled Area No. 2 is defined as an area where the presence of marble containing cavities is possible at depth. Scheduled Area No. 2 covers a large area where complex geology and marble-bearing rocks of the Yuen Long Formation and Tuen Mun Formation can be expected.
7 Geology of Yuen Long Distribution of marble-bearing sedimentary rock Typical geological section
8 Features in Marble Factors affecting Karst Dissolution Surface Karst Overhangs Dissolution Joints Deep Cavity Zone Underground Channel Underground Cavity Form by weakened and dissected marble Rock mass undercut Joints locally opened by dissolution Form by concentrated water flow, usually in form of series of medium size cavities. Form by collapse of small cavities Occurred at marble/non-marble boundary, usually large cavity.
9 Classification System Marble Quality Designation (MQD): Site Zoning and Classification: Stage 1 GI Calculate MQD (every 5m of all BH) Borehole Rating Plot BH Rating and Identify problem area Assign Site Classes
10 Classification System Marble Class
11 Classification System Site Zoning and Classification: BH Rating Site Classification Ref. GEO report 29 page 11&12
12 Site Zoning Of Classification Stage 1 BH / Existing BH rating = Stage 1 BH / Existing BH rating 5 Stage 2 BH rating = Zone 1 (Very Difficult Site) Stage 2 BH rating 5 2 Tower Tower Adjacent Site (Very Difficult Site) 5 Zone 2 (Fair Site) 2 2 Podium Tower 2 5 Tower 3 Adjacent Site (Fair Site)
13 Design Guidelines 1. Redundancy Factor Easy Site: Driven H-piles with 1% 2% redundancy Fair Site: Driven H-piles with 2% 3% redundancy Very Difficult / Extremely Difficult Site: No simple rules Ref. GEO report Limits on Increase of Vertical Stress on marble surface (Easy Site) (Fair Site) (Very Difficult Site) (Extremely Difficult Site) Ref. GEO publication No.1/26
14 Foundation Design in Marble Zone
15 Ground Investigation Problems need to verify in GI works: Present of cavities Cavity-fill material Highly irregular rockhead level Associated with collapse feature Special requirement in GI works: Carry out GI in stage 2m of continuous MARBLE / METHAMORPHIC rock class II or better cavity free rock with TCR> 85% Layout of the BH Drillholes shall be at the edges of the main pile foundation area
16
17 Layers Appear Alternatively Stratum Description Approximate thickness(m) / level (mpd) Fill Sandy silty CLAY 2.m 9.1m Alluvium Stiff to very stiff sandy, silty CLAY and silty fine to medium SAND 5.5m 26.1m Metamorphosed Completely to highly decomposed 16.m 145m Siltstone metamorphosed SILTSTONE Fault Gouge Very stiff slightly sandy SILT 2.m 35m Karst Collapse Angular medium to coarse GRAVEL, COBBLES and BOULDERS of impure marble and pure marble 2m 35m Sound Marble Slightly decomposed MARBLE Approx. -82mPD ~ - 29mPD
18 T1 Average rockhead level (-1 ~ -11mPD) T5 Average rockhead level (below -15mPD) T2 Average rockhead level (-12 ~ -13mPD) T3 Average rockhead level (below -15mPD)
19 Geological Profile Fill Alluvium Founding E1 E1 Metamorphosed Siltstone, Fault Gouge, Karst Collapse Appear Alternatively Sound Marble Section E1-E1
20 Geological Profile Alluvium Fill F1 Founding Metamorphosed Siltstone, Fault Gouge, Karst Collapse Appear Alternatively F1 Marble Section F1-F1
21 Geological Profile Marble (light grey, depth 95-99m) Marble (white, depth 13-17m)
22 Geological Profile Cavity /cavity infill
23 Geological Profile Fault zone (fault gouge, depth ~68m)
24 Foundation Options Options Advantage Disadvantage Remark Driven H- pile with preboring Shaft- Grouted Friction Barrette / Friction Bored Pile End Bearing Bored Pile 1. Lower construction cost 2. Conventional foundation type for marble area 1. Higher capacity for piles terminated at shallower depth to avoid stress increase on the cavities 2. Minimal vibration and noise to the local residents 3. The existing Franki piles within the site can be removed by chiselling or pulling out 4. Hard layers can be overcome by trench cutter or chiseling 1. Higher capacity achieved at rockhead 2. Minimal vibration and noise to the local residents 1. H-pile driven to design level, otherwise review of additional stress on cavity is required 2. More nos. of pile required due to redundancy control 1. Trial pile with load-test is required 2. Excessive grout loss in Karst collapse layer 3. Friction cannot developed in Karst collapse layer 4. High construction cost 1. Sound marble bedrock over 11m below ground and exceeded the practical limit of conventional end bearing bored pile (except Tower 1) Adopted for Tower 2, 3 & 5 NOTadopted for this site Adoptedfor Tower 1 to minimize the additional stress due to Tower 2,3 & 5 foundation loading
25 Tower 1 Bored pile layout Average founding level around -1mPD~-11mPD Bored Piles dia. are 2.5m with 3.75m bellout Pile Capacity = kn
26 Tower 1 Bored pile section E2 T1 Average founding level (-1~-11mPD) T5 Average founding level (below -15mPD) E2 T2 Average founding level (-12~-13mPD) T3 Average founding level (below -15mPD)
27 Grade S45 35X35X18 kg/m to be used Pile length vary from 44-89m T2,3 and Zone B Podium T5 and Zone A Podium Pile Capacity (Without Wind) Pile Capacity (With Wind) Pile Capacity (Without Wind) Pile Capacity (With Wind) Without Group With Group Factor Factor 2958 kn 2514 kn 3697 kn 3143 kn 2 kn 17 kn 25 kn 2125 kn
28 The site is divided into three parts: T5 & Zone A Podium (Driven H-Pile) T2,3 & Zone B Podium (Driven H-Pile) T1 (Bored Pile) T5 ZONE A PODIUM T1 T2 T3 ZONE B PODIUM
29 Pile termination criteria will be based on : (i) ±5m range of proposed founding level (ii) Final set table If the pile terminated outside the termination criteria, the subjected pile will be investigated and foundation amendment will be submitted for approval
30 Overcome underground obstruction / Karst Cobbles obstruction Minimize vibration effect Backfill with compacted sand after preboring
31 Scope of vibration assessment: Piling activities, i.e. driven H-pile, induce vibration which may bring negative effect on surround structures. To control the effect of piling activities on surround structures and meet the requirement stated in PNAP APP-137 (Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations)
32 Assessment on structure conditions of surround existing structures. Estimation of vibration effect on surround existing structures.
33 Housing Authority s Site Nullah Low-rise Building along Yuen Long On Ning Road Tai Kiu Village West-Rail Station
34 Surround Existing Structures Distance No. of Storeys Foundation Type Age(yr) Condition Tai Kiu Village, Tai Kiu Road ~ 2m 1 4 Footings 5-4 Fair Precast Low Rise Buildings, Yuen Long On Ning Road ~ 23m 6 13 Concrete Piles Nullah between On Lok Road, Long Yip Street Good ~ 2m N/A N/A N/A Good Site Occupied by Housing Authority Adjacent N/A N/A N/A N/A
35 Condition of surrounding buildings WANG CHAU ROAD YUEN LONG ON LOK ROAD YUEN LONG ON NING ROAD GOOD THE SITE TAI KIU ROAD FAIR GOOD WEST RAIL STATION
36 Photo 1 - Tai Kiu Village 1
37 Photo 2 - Tai Kiu Village (Arch) 2
38 Photo 3 - Tai Kiu Village (Entrance Tower) 3
39 Photo 4 - Tai Kiu Village (indoor condition) 4
40 Photo 5 - Tai Kiu Village (indoor condition) 5
41 Photo 6 - Tung Cheong Building, 59B Yuen Long On Ning Road 7 6 Photo 7 - Po Fung Building, 59A Yuen Long On Ning Road
42 9 8 Photo 8 - Nullah along Yuen Long On Lok Road Photo 9 - Adjacent site occupied by Housing Authority
43 Assessments process Based on BS5228-2:29 Given the Empirical formula, v res W 1. r = k p 3 Where v res resultant PPV (mm s -1 ) W nominal hammer energy (J) L pile toe depth (m) x distance measured along the ground surface (m) r slope distance from pile toe (m), r 2 = L 2 + x 2 kp for piles not at refusal 1 k p 3 depending on soil type (kp =1 adopted in vibration assessments) Range of parameters suggested in BS L 27m 1 x 111m 1.5 W 85kJ
44 According to PNAP APP-137, the following empirical values are used for assessment : Location Type of Building Maximum ppv (mm/s) Transient Vibration (e.g. Drop Continuous Vibration (e.g. hammer) Vibration hammer) Low rise side Tai Kiu Village side Robust and stable buildings in general Vibration sensitive / dilapidated buildings PNAP Proposed PNAP Proposed
A New Page of the NEC Expedition - DSD s Initial Experience on 5 More NEC Pilot Contracts
Drainage Services Department A New Page of the NEC Expedition - DSD s Initial Experience on 5 More NEC Pilot Contracts Ir. TSUI Wai Deputy Director of Drainage Services 31 May 2013 1 A New Page of the
More informationRailway Developments and Highlights of the Construction Features of Recent Railway Projects
Railway Developments and Highlights of the Construction Features of Recent Railway Projects Statistics on Rail Transport KCR rail lengths & stations Statistics on Rail Transport MTR rail lengths & stations
More informationAppendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017
Appendix1,Page1 Urban Design Guidelines DRAFT September 2017 Back to Back and Stacked Townhouses Appendix1,Page2 Table of Contents 1 Introduction 1 1.1 Purpose 1 1.2 Urban Design Objectives 1 1.3 Building
More informationParallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong
Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong Ir Enoch LAM Deputy Secretary (Works)2, Development Bureau The Government of the Hong Kong Special
More informationDevelop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach
Develop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach Presented by Spencer Li, Howard Cheng 24 Nov 2010 Electronic Mark Plant Circulation (EMPC)
More informationARTICLE 7 UTILITIES AND EASEMENTS
7.1 PLACEMENT OF UTILITIES ARTICLE 7 UTILITIES AND EASEMENTS 7.1.1 All authorized public underground utilities shall be located within the right-of-way of a public street or within an easement designated
More informationBridging Research and Practice
Bridging Research and Practice the VLA experience Edited by Victor Li Order for this Publication can be made through the Centre for Research & Professional Development Room 1103 Kowloon Investment Co Ltd
More informationProject Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong.
Project Summary Major Property Development Projects in Hong Kong Project Summary Major Property Development Projects in Hong Kong Queen s Terrace Parc Palais 10 Seaview Crescent Wang Chau Yuen Long 31
More informationRM-1 and RM-1N Districts Schedule
Districts Schedule 1 Intent The intent of this Schedule is to encourage development of courtyard rowhouses on larger sites while continuing to permit lower intensity development on smaller sites. Siting
More informationBUILDING FOR THE BETTER CHINA. Hong Kong
CHINA Hong Kong BUILDING FOR THE BETTER The Group always strives to maximize the aesthetic potential of development lots so as to integrate its projects into their surroundings harmoniously with minimal
More informationRM-7, RM-7N and RM-7AN Districts Schedules
1 Intent Districts Schedules The intent of this schedule is to encourage development of ground-oriented stacked townhouses or rowhouses, while continuing to permit lower intensity development. In RM-7AN,
More informationRM-8 and RM-8N Districts Schedule
Districts Schedule 1 Intent The intent of this schedule is to encourage development of ground-oriented stacked townhouses or rowhouses, including courtyard rowhouses, while continuing to permit lower intensity
More informationHKBN Mass Deploys Fiber-To-The-Home Making the Future Today in Hong Kong
For Immediate Release HKBN Mass Deploys Fiber-To-The-Home Making the Future Today in Hong Kong (Hong Kong, 19th September 2007) Hong Kong Broadband Network Limited ( HKBN ) today announced a revolution
More informationCHAPTER IV. ELECTRIC
SPRINGFIELD UTILITY BOARD POLICIES 51 CHAPTER IV. ELECTRIC SECTION I. CONNECTIONS TO SERVICE 4-1-1 DEVELOPMENT/REDEVELOPMENT CHARGES 1. General A. Definition Developer: Individual or entity responsible
More informationJEFFERSON COUNTY, ALABAMA
JEFFERSON COUNTY, ALABAMA Major Development Checklist, Notes and Information A Major Development is any proposed new structure or addition to an existing structure which will cause a change in the topography
More informationA mix of uses. Housing:
7 Massing and uses Page 79 7:1. A mix of uses % Total Habitable Occ/ People Rooms HR Studio 6.8% 308 1 0.90 277 1 bed 32.0% 1442 2 0.90 2,595 2 bed 37.6% 1691 3 0.90 4,567 3 bed 21.2% 955 4 0.90 3,438
More informationRT-11 and RT-11N Districts Schedules
Districts Schedules 1 Intent The intent of this schedule is to allow a variety of housing options by encouraging development of multiple small houses and duplexes on larger lots and assembled sites, while
More informationProspective Builders, Utilities, Public Agencies, and Engineering Firms
MEMORANDUM To: Prospective Builders, Utilities, Public Agencies, and Engineering Firms Subject: District Procedures for Plan Review and Approval This document was prepared to provide guidance to developers,
More informationDRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes
Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes 1 Local Area Plan - Project Alignment Overview Directions Report, October 2008 (General Summary Of Selected
More informationREPORT HUTT CITY COUNCIL. Preliminary Land Development Assessment 8 Harold Grove, Stokes Valley. Report prepared for: HUTT CITY COUNCIL
REPORT HUTT CITY COUNCIL Preliminary Land Development Assessment 8 Harold Grove, Stokes Valley Report prepared for: HUTT CITY COUNCIL Report prepared by: TONKIN & TAYLOR LTD Distribution: HUTT CITY COUNCIL
More informationProposed Demolition of Existing Shop & Erection of New Build Development to Form 11 Flats
Proposed Demolition of Existing Shop & Erection of New Build Development to Form 11 Flats Wern Goch Hirani Stores, 56 Wern Goch West, Cardiff CF23 7AB Design & Access Statement for Pre-Application Consultation
More informationSummary of Major Properties At 31st March, 2001
Summary of Major Properties MAJOR PROPERTIES UNDER DEVELOPMENT Approx. Approx. no. of car Nature Develop- Expected Major properties Approx. gross parking of Group s ment completion under development site
More informationRailway Development in Hong Kong
Railway Development in Hong Kong The development of railways in Hong Kong has seen a burst of activity in recent years, extending a local rail system first conceived in 1898. Raymond Wong Wai Man reports
More informationSOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. S/1744/05/F Thriplow House and Garage on land Adjacent 22 Middle Street for S Hurst
SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Development and Conservation Control Committee 2 nd November 2005 AUTHOR/S: Director of Development Services S/1744/05/F Thriplow House and Garage on land
More informationHOME ENROLLMENT NOTIFICATION OF CONSTRUCTION AND INSPECTION BUILDER/SELLER APPLICATION FOR HOME ENROLLMENT
HOME ENROLLMENT You should have now completed the necessary documents for your registration. On the following pages you will find the forms needed for the enrollment process of our program. NOTIFICATION
More informationPolicy and Standards for Public Local Residential Streets And Private Streets
Appendix A City of Toronto Development Infrastructure Policy & Standards Policy and Standards for Public Local Residential Streets And Private Streets November 2005 Policy and Standards For Public Local
More informationBuild Over Easement Guidelines
Build Over Easement Guidelines Document Owner Creation Date 13/04/2015 Revision Date 20/04/2015 Manager Engineering Services Engineering Services Please check Council s Intranet to ensure this is the latest
More informationCollection Point Address
Collection Point Hong Kong Island Business Hours Mon to Fri Aberdeen Ap Lei Chau Shau Kei Wan Sai Wan North Point Office 1, 9/F, Goodview Centre, 12 Wu Pak Street, Aberdeen, Hong Kong Shop S11, G/F, Wah
More informationTHE HONG KONG HOUSING AUTHORITY. Memorandum for the Building Committee. Current Density Guidelines for Public Housing Development
BC 93/99 THE HONG KONG HOUSING AUTHORITY Memorandum for the Building Committee Current Density Guidelines for Public Housing Development PURPOSE The purpose of this paper is to brief Members on the current
More informationLes Saisons Sai Wan Ho Building Journal, June 2002
Project name Location Publication Les Saisons Sai Wan Ho Building Journal, June 2002 C O V E R S T O R Y L E S S A I S O N S Les Saisons, Sai Wan Ho Seasonal change by Tim Youngs When joint developers
More informationTask Force on Kai Tak Harbourfront Development. Residential Development at 1-5 Kai Hing Road, Kai Tak South (Kowloon Godown Site)
For discussion on 23 November 2010 TFKT/04/2010 Residential Development at 1-5 Kai Hing Road, Kai Tak South (Kowloon Godown Site) PURPOSE This paper is intended to (i) report the status of the statutorily
More informationRM-11 and RM-11N Districts Schedule
Districts Schedule 1 Intent The intent of this Schedule is to permit medium density residential development primarily in the form of four-storey T -shaped apartments, and to foster compact, sustainable,
More informationPLANNING REPORT. Lot 5, SDR Lot 6 and 7 Concession 3 Township of Normanby Municipality of West Grey County of Grey
PLANNING REPORT Dwelling Surplus to a Farm Operation Official Plan and Zoning By-law Amendment and Consent to Sever Lot 5, SDR Lot 6 and 7 Concession 3 Township of Normanby Municipality of West Grey County
More information149(+/-) Acres. Prime Location Development Opportunity. Partially Completed. 260 Shepherd of the Hills Expressway Branson Mo
Price Reduced!! 149(+/-) Acres Prime Location Development Opportunity Partially Completed 260 Shepherd of the Hills Expressway Branson Mo Attention Developers! Bank owned 149(+/-) acres in town! Partially
More informationProperty condition survey for the Ewa Silo building located in the premises of the Port of Szczecin
1 PROJEKTOWANIE Badanie Konstrukcji i Obiektów M.Sc. Eng. Zdzisław Woźniak 71-118 Szczecin, ul. Kaliny 51/29 telephone number 603 583 702 Property condition survey for the Ewa Silo building located in
More informationGovernment Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination
Government Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination Anne Black General 1/F, 140 Tsat Tse Mui Road, North Point 2561 6161 Chai Wan General G/F, 1 Hong Man Street, Chai Wan 2556
More informationOF CHANGE IN SHEAR WALL LOCATION ON STOREY DRIFT OF MULTISTOREY BUILDING SUBJECTED TO LATERAL LOADS
EFFECT OF CHANGE IN SHEAR WALL LOCATION ON STOREY DRIFT OF MULTISTOREY BUILDING SUBJECTED TO LATERAL LOADS AshishS.Agrawal*, S.D.Charkha** *Post Graduate Student in Structural Engineering, Babasaheb College
More informationRM-10 and RM-10N Districts Schedule
Districts Schedule 1 Intent The intent of this Schedule is to permit medium density residential development primarily in the form of 6-storey apartments, and to foster compact, sustainable, multi-family
More informationPLANNING RATIONALE REPORT CODEAU BUILDING LTD RIDEAU STREET OTTAWA DECEMBER 2013
PLANNING RATIONALE REPORT CODEAU BUILDING LTD 541-545 RIDEAU STREET OTTAWA DECEMBER 2013 1 This report has been prepared on behalf of Codeau Building Ltd. in support of a Zoning By-law Amendment Application
More informationSTAFF REPORT. March 14, Toronto and East York Community Council. Director, Community Planning, South District
STAFF REPORT March 14, 2005 To: From: Subject: Toronto and East York Community Council Director, Community Planning, South District Preliminary Report Official Plan Amendment and Rezoning Application 05
More informationDetermination of p-y Curves and Pile Lateral Capacity by Direct Use of CPT Data
Determination of p-y Curves and Pile Lateral Capacity by Direct Use of CPT Data Scott J. Brandenberg, Ph.D., P.E. Professor, Civil and Environmental Engineering, UCLA Shawn Ariannia, Ph.D., G.E. President,
More informationRM-3 District Schedule
District Schedule 1 Intent The intent of this Schedule is to permit medium density residential development, including high-rise apartment buildings, and to secure a higher quality of parking, open space
More informationStandards of Practice for Surveying in the State of Alabama
Standards of Practice for Surveying in the State of Alabama Effective January 1, 2017 RULE NO. 1.01 PURPOSE The purpose of these rules is to establish standards for the practice of surveying in the State
More informationDevin Defriza Harisdani 1*, Edward Anugrah Zai 1
International Journal of Architecturee and Urbanism Vol. 02, No. 02, 2018 108 114 Flat Rental Housing in Medan Labuhan Devin Defriza Harisdani 1*, Edward Anugrah Zai 1 1 Department of Architecture, Universitas
More informationInitial Project Report Appl # Brink/Harrison
1. 6:30 P.M. 2018-02-21 KPAC Agenda Documents: 2 21 18 KPAC Agenda.pdf 2018-02-21 Initial Project Report Appl #876518 Brink/Harrison Documents: Brink-Harrison IPR KPAC-DB.pdf MEETING AGENDA KEY PENINSULA
More informationGUIDELINES FOR BUILD OVERS
GUIDELINES FOR BUILD OVERS 2018 Table of Contents 1 Introduction... 3 2 Definitions... 4 3 Application Process... 6 3.1 Pre Application... 6 3.2 Assessment (2 weeks)... 6 3.3 Final Approval... 6 3.4 Change
More informationAttached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.
To Whom It May Concern: Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit. The fee for the permit application is $75.00, which shall be made payable to
More information1061 The Queensway - Official Plan and Zoning By-law Amendment Applications - Preliminary Report
STAFF REPORT ACTION REQUIRED 1061 The Queensway - Official Plan and Zoning By-law Amendment Applications - Preliminary Report Date: January 28, 2015 To: From: Wards: Reference Number: Etobicoke York Community
More informationa. provide for the continuation of collector streets and thoroughfare streets between adjacent subdivisions;
Section 7.07. Intent The requirements of this Section are intended to provide for the orderly growth of the Town of Holly Springs and its extra-territorial jurisdiction by establishing guidelines for:
More informationMANUFACTURING FACILITY
DISTRIBUTION WAREHOUSE MANUFACTURING FACILITY ±130,980 SF ±9 ACRE LOT RIALTO, CALIFORNIA ADDITIONAL OUTSIDE STORAGE INCLUDED WITH PROPERTY OWNER / USER AND/OR INVESTMENT OPPORTUNITY INLAND EMPIRE Under
More informationGross Floor Area of HOS Flat by Phase / Estate
Gross Floor Area of HOS Flat by / Estate 1 February 1978 12.6.80 Shun Chi Court East Kowloon 49.1-77.9 12.5.81 Chun Man Court Ho Man Tin 54.1-66.5 13.8.80 Yue Fai Court, I Aberdeen 42.7-46.6 23.9.80 Sui
More informationProgress Update on Shatin to Central Link (SCL) 2 May 2013
Progress Update on Shatin to Central Link (SCL) 2 May 2013 MTR Corporation 02/05/2013 Page 1 Alignment Tai Wai Hin Keng SCL (Tai Wai to Hung Hom Section) Diamond Hill Kai Tak To Kwa Wan Ma Tau Wai Ho Man
More informationRule 21 STANDARDS OF PRACTICE FOR SURVEYING
Rule 21 STANDARDS OF PRACTICE FOR SURVEYING 21.1 Whenever a survey is performed, it shall comply with Section 73-13-71 (4) and Section 73-13- 73 and the Standards of Practice for Surveying in Mississippi
More information1417, , 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report
STAFF REPORT ACTION REQUIRED 1417, 1421-1425, 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report Date: March 24, 2015 To: From: Wards: Reference Number:
More informationCity of Grande Prairie Development Services Department
City of Grande Prairie Development Services Department COUNTRYSIDE SOUTH OUTLINE PLAN Prepared by: GPEC Consulting Ltd. #202, 10712-100th Street Grande Prairie, AB Council Resolution of August 20, 2001
More informationProperty Development. 1. YOHO Town, Yuen Long 2. Park Island, Ma Wan 3. Severn 8, The Peak 4. The Arch, Kowloon Station. Park Island, Ma Wan
Property Development The Group s trusted brand name for quality enhances marketability and development margins on new projects. It will continue satisfying homebuyers by offering premiumquality developments
More informationCertified Site Program Application Bolivar Business Park
Certified Site Program Application Bolivar Business Park Sabrina Drackert Economic Development Researcher Springfield Area Chamber of Commerce 202 S. John Q. Hammons Parkway Springfield, Missouri 65806
More informationMTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area
PR068/18 6 August 2018 MTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area The MTR Corporation notes that a new announcement mechanism has
More informationCITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING
P2 CITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING Report Date: May 1, 2007 Author: Michael Naylor Phone No.: 604.871.6269 RTS No.: 06621 VanRIMS No.: 11-3600-10 Meeting Date: May 15, 2007 TO:
More informationDAYLIGHTING DESIGN. Strategies for Achieving Quality Daylighting. Spring 2014 College of Architecture, Texas Tech University 1
DAYLIGHTING DESIGN Strategies for Achieving Quality Daylighting Spring 2014 College of Architecture, Texas Tech University 1 DAYLIGHTING DESIGN TOPLIGHTING Criteria & Preliminary Sizing Based on The Architect
More informationTRANSBAY JOINT POWERS AUTHORITY
THIS STAFF REPORT COVERS CALENDAR ITEM NO.: 13 FOR THE MEETING OF: October 17, 2008 TRANSBAY JOINT POWERS AUTHORITY BRIEF DESCRIPTION: Approve Easement Agreement granting the TJPA a five-foot easement
More informationAppendix: List of CLP Power s EV charging stations (14 December 2018)
Appendix: List of CLP Power s EV charging stations (14 December 2018) Quick EV charging stations No. Location Address Parking Bay Qty. District Type 1 CLP Centenary Building CLP Centenary Building, G/F
More informationResidential Development Opportunity
La Residential Development Opportunity For Sale by Informal Tender Indicative Redline Plan With full planning permission for 5 residential units Unconditional offers invited by 12 noon Thursday 15 th March
More informationCentre and the Hong Kong Sectio
Reconstructing Urbanscape Research Repor rt on Development Strategies of the Hong Kong Secondary City Centre and the Hong Kong Sectio on of fthe Hi-Speed HiS National Rail Network Executive Summary The
More informationCLP Power Extends Electric Vehicle Charging Network as Popularity of Green Motoring Accelerates
24 November 2016 中華電力有限公司 CLP Power Hong Kong Limited CLP Power Extends Electric Vehicle Network as Popularity of Green Motoring Accelerates CLP Power Hong Kong Limited (CLP Power) today (24 November)
More informationHSIN CHONG CONSTRUCTION GROUP LTD.
Hong Kong Exchanges and Clearing and The Stock Exchange of Hong Kong take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly
More information2017 ROAD ASSET VALUATION
Appendix 1 2017 ROAD ASSET VALUATION Prepared for Gisborne District Council July 2017 This document has been prepared for the benefit of Gisborne District Council. No liability is accepted by this company
More informationORANGE BLOSSOM GARDENS PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC.
ORANGE BLOSSOM GARDENS A PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC. REVISED OCTOBER 19, 1992 BY THE COLLIER COUNTY LONG RANGE PLANNING DEPARTMENT REVISED DECEMBER, 2008
More informationPolicy for Accepting Potentially Contaminated Lands to be Conveyed to the City under the Planning Act
STAFF REPORT ACTION REQUIRED Policy for Accepting Potentially Contaminated Lands to be Conveyed to the City under the Planning Act Date: June 3, 2014 To: From: Wards: Reference Number: Public Works & Infrastructure
More informationthe conditions contained in their respective Orders until January 1, 2025, at the discretion of the Director of Planning, Property and Development.
Part 4: Use Regulations Temporary Uses and Structures Purpose the conditions contained in their respective Orders until January 1, 2025, at the discretion of the Director of Planning, Property and Development.
More informationSection 821. PRESERVATION OF LAND MONUMENTS, CONTROL POINTS, AND PROPERTY CORNERS
821.01 Section 821. PRESERVATION OF LAND MONUMENTS, CONTROL POINTS, AND PROPERTY CORNERS 821.01. Description. This work consists of preserving the corners and control points as shown on the plans, identified
More information18 D Shop D & Portion of Shop B, G/F, B. 16 B Shop B, G/F and Shop A2 & A3, Upper G/F, A2
126 FAIRWOOD FAST FOOD RESTAURANTS Hong Kong 41A-434-9 Shop Nos. 4-9, G/F, Smithfield Court, 2856 8688 41A-43 Smithfield, Kennedy Town 93-103 G/F, New Victory House, Nos. 93-103, 2856 8650 Wing Lok Street,
More information5, 7 and 9 Dale Avenue - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report
STAFF REPORT ACTION REQUIRED 5, 7 and 9 Dale Avenue - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report Date: September 15, 2016 To: From: Wards: Reference Number: Toronto
More information250 Lawrence Avenue West - Official Plan and Zoning By-law Amendment Applications Preliminary Report
STAFF REPORT ACTION REQUIRED 250 Lawrence Avenue West - Official Plan and Zoning By-law Amendment Applications Preliminary Report Date: April 22, 2015 To: From: Wards: Reference Number: North York Community
More informationDetails of vendor / Owner / Builder / Firm
Annexure - 3. LIFE INSURANCE CORPORATION OF INDIA CENTRAL OFFICE, " YOGAKSHEMA" JEEVAN BIMA MARG, NARIMAN POINT MUMBAI - 400021. ANNEXURES TO BE SUBMITTED BY THE VENDOR UNDER TWO BID SYSTEM PURCHASE OF
More informationZoning By-law Amendment & Site Plan Control Application
1560 SCOTT Zoning By-law Amendment & Site Plan Control Application February 2014 1560 SCOTT Prepared by: FOTENN Consultants Inc. 223 McLeod Street Ottawa, ON K2P 0Z8 613-730-5709 fotenn.com Prepared for:
More informationRM 4 and RM 4N Districts Schedule
Districts Schedule 1 Intent The intent of this Schedule is to permit medium density residential development, including a variety of multiple dwelling types, to encourage the retention of existing buildings
More informationP. H. Robinson Consulting Urban Planning, Consulting and Project Management
PLANNING RATIONALE REPORT FOR SITE PLAN AND DRAFT PLAN OF CONDOMINIUM APPLICATIONS 73-75 HARVEY STREET CITY OF OTTAWA PREPARED BY: P H ROBINSON CONSULTING AUGUST 2012 1 This report has been prepared on
More informationLake of the Woods County Land Use Permit Instruction Sheet
Lake of the Woods County Land Use Permit Instruction Sheet PROPERTY DATA SECTION Legal Description: Please write out your complete legal description. A written description on a separate sheet of paper
More informationFor personal use only
Developing the +1.2Moz Pilbara Gold Project ASX Announcement 3 October 2017 ASX Code DEG FRA Code WKN 633879 ABN 65 094 206 292 DIRECTORS Simon Lill Executive Chairman Davide Bosio Non-executive Director
More informationFrequently Asked Questions About 20A Undergrounding Updated on June 17, 2014
I) General Question 1. What are the advantages of 20A undergrounding? 2. What are the disadvantages of 20A undergrounding? 3. What is 20A undergrounding of the utility lines and who pays for it? 4. How
More informationPlanning Justification Report
Planning Justification Report Kellogg s Lands City of London E&E McLaughlin Ltd. June 14, 2017 Zelinka Priamo Ltd. Page i TABLE OF CONTENTS Page No. 1.0 2.0 2.1 2.2 3.0 4.0 5.0 5.1 5.2 5.3 5.4 5.5 5.6
More informationQuarter Section Township Range Meridian 4. Mailing Address Street and number City/town Province Postal code
Property Access Approach Application (Page 1 of 3) Transportation and Agriculture Services Phone 780-417-7100 Fax 780-417-7109 Office: 370 Streambank Avenue, Sherwood Park, Alberta T8H 1N1 www.strathcona.ca
More informationFLOOR AND ROOM NUMBERING GUIDELINES
FLOOR AND ROOM NUMBERING GUIDELINES November 2018 GENERAL: These numbering conventions have been developed and should be followed throughout University of Hawaii at Manoa controlled facilities for the
More informationHighland Green Estates Neighbourhood Area Structure Plan
Highland Green Estates Neighbourhood Area Structure Plan Original Outline Plan approved by Council: March 10, 1997 Outline Plan amended by Council: March 24, 1997 Converted to a Neighbourhood Area Structure
More informationHONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON
HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON APPLICATION FOR CHANGE IN MORTGAGE ARRANGEMENT Prepared
More informationHONG KONG EXAMINATIONS AND ASSESSMENT AUTHORITY 2019 HONG KONG DIPLOMA OF SECONDARY EDUCATION EXAMINATION ENGLISH LANGUAGE
P.1 HONG KONG EXAMINATIONS AND ASSESSMENT AUTHORITY 2019 HONG KONG DIPLOMA OF SECONDARY EDUCATION EXAMINATION ENGLISH LANGUAGE General Notes to Applicants As a general rule, only ONE service agreement
More informationCertified Site Program Application Trogdon Industrial Park
Certified Site Program Application Trogdon Industrial Park Sabrina Drackert Economic Development Researcher Springfield Area Chamber of Commerce 202 S. John Q. Hammons Parkway Springfield, Missouri 65806
More information66 Isabella Street Rezoning Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 66 Isabella Street Rezoning Application - Preliminary Report Date: November 15, 2010 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community
More informationSchedule of Principal Properties
Schedule of Principal Properties As at 31st December, 1999!"#$!% PROPERTIES FOR DEVELOPMENT AND/OR SALE 212 Stage of Percentage Approx.! Company Description Use Area! (1) Certain Commercial Site area Completed
More informationBoise County Planning & Zoning Department P.O Box 1300 Idaho City, Idaho Phone (208) Fax (208)
Boise County Planning & Zoning Department P.O Box 1300 Idaho City, Idaho 83631 Phone (208) 392-2293 Fax (208) 392-2259 Land Development Application Subdivision Ordinance #2006-2 Proposed Subdivision Name:
More information250, 252, 254 and 256 Royal York Road and 8 and 10 Drummond Street - Zoning By-law Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 250, 252, 254 and 256 Royal York Road and 8 and 10 Drummond Street - Zoning By-law Amendment Application - Preliminary Report Date: May 28, 2013 To: From: Wards: Reference
More informationSpecial Land Use Permit to exceed two-story height limit to allow for existing three-story office building
Petition No. SLUP 10-041 Variance Application Number: SLUP 10-041 Property Location Owner/Petitioner Request 121 Perimeter Center Parkway Dillard & Galloway, LLC Laurel David 3500 Lenox Road, NE, Suite
More informationPROVIDENCE (BOLLARD BULRUSH SOUTH) LOCAL DEVELOPMENT PLAN. 2263Rep146E
1 PROVIDENCE (BOLLARD BULRUSH SOUTH) Prepared by: PO Box 796 Subiaco WA 6904 t: 9382 1233 f: 9382 1127 www.cleplan.com.au October 2013 This Local Development Plan has been approved by Council under the
More informationTOWN OF WHITBY REPORT RECOMMENDATION REPORT
TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Planning and Development Committee REPORT NO: PL 4-08 DATE OF MEETING: January 21, 2008 FILE NO(S): MI-01-07 (SW- 2002-03) PREPARED BY: Planning Department
More informationDEVELOPMENT OPPORTUNITY FOUNDATION HOUSE, ICKNIELD WAY, LETCHWORTH GARDEN CITY, SG6 1GD
DEVELOPMENT OPPORTUNITY FOUNDATION HOUSE, ICKNIELD WAY, LETCHWORTH GARDEN CITY, SG6 1GD Site Plan - Not to scale An excellent opportunity to acquire a prime residential development opportunity within close
More information21 Old Mill Road - Official Plan and Zoning Amendment Applications - Preliminary Report
STAFF REPORT ACTION REQUIRED 21 Old Mill Road - Official Plan and Zoning Amendment Applications - Preliminary Report Date: January 30, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council
More informationCOMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING
COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN AND FINANCIAL REVIEW 401 SE 6 TH STREET- CONNOLLY
More information1098 ROUTE 46 EAST RIDGEFIELD, NEW JERSEY /- ACRES
1098 ROUTE 46 EAST RIDGEFIELD, NEW JERSEY 19.2 +/- ACRES PRIME 19.2 +/- ACRES DEVELOPMENT SITE 1098 ROUTE 46 EAST RIDGEFIELD, NEW JERSEY CALL FOR NEW INFORMATION 825 of major highway frontage with access
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 2 Chapter 2 Introduction 02.01 Purpose 1 2.02 City Utilities
More information