THE HONG KONG HOUSING AUTHORITY. Memorandum for the Building Committee. Current Density Guidelines for Public Housing Development
|
|
- Phoebe Lloyd
- 5 years ago
- Views:
Transcription
1 BC 93/99 THE HONG KONG HOUSING AUTHORITY Memorandum for the Building Committee Current Density Guidelines for Public Housing Development PURPOSE The purpose of this paper is to brief Members on the current density controls for public housing development under Housing Authority (HA). BACKGROUND 2. The development of both private and public housing in Hong Kong is controlled by statutory and administrative measures. The main vehicles of control are - (a) Outline Zoning Plans (OZP) ) Statutory (b) Building (Planning) Regulations (B(P)R) ) (c) Hong Kong Planning Standard and ) Guidelines (HKPSG) ) Administrative (d) Metroplan Broad Density Guidelines (BDG) ) 3. The first set of administrative measures which applied specifically to public housing estates were introduced in 1973, when the new HA was established. Gross population density was adopted as the key factor, and the guidelines specified 2,500 to 3,000 persons per hectare, with 2,700 being taken as the average for long term planning and land reservation purposes. However, with the introduction of new block designs (such as Trident 1 and Trident 2), it became apparent that the these density guidelines could not be followed on a regular basis in practice as the achievable densities depend very much on the efficiency of blocks that could be accommodated on site. 4. In recognition of the need to review the density guidelines, a consultancy study was commissioned by the Department in 1990 with a view
2 - 2 - to establish an appropriate yardstick for the optimum development of public housing sites. As a result, a new concept known as Development Ratio (DR) was introduced, and endorsed by the then Land Development Policy Committee and incorporated in the HKPSG in May APPLICATION OF THE DENSITY GUIDELINES Development Ratio 5. DR is defined as the Gross Floor Space (including domestic and commercial) of an estate divided by its Net Estate Area (excluding peripheral slopes, free-standing GIC facilities and roads). It is a concept similar to Plot Ratio (PR), both of which relate the floor area of the buildings to their site area. They are, however, based on different definitions of floor area and site area. A comparison of the two approaches is attached at Annex. 6. DR applies to both public rental and HOS estates. PSPS on the other hand is treated as private developments and would be controlled by PR instead of DR. DR is used in public housing in order to achieve a better consistency with densities achieved in private sector. It allows the exclusion of schools and other free-standing G/IC facilities from the gross site area of the public housing estates to enable its site area to be more comparable to that of the private development which does not normally have these facilities. 7. A DR range between 5 and 7 had been recommended for public housing developments. This range was intended to reflect the diversity of site constraints and planning policies likely to be encountered in the Territory. For estates situated on sites with little development constraints and where infrastructure and transport facilities are adequate, the upper bound value of DR7 would be adopted. For estates situated on sites with severe development constraints such as slopes or irregular shape and where transport and infrastructure capacities are limited, a DR of 5 should be followed. In spite of the DR 5-7 guidelines, past experience has confirmed that many public housing developments were able to exceed the density threshold of DR7. This approach has been generally accepted by the Planning Department (PlanD) on a case by case basis and provided that there is adequate infrastructure to support it.
3 - 3 - Plot Ratio 8. The level of development for private housing (including PSPS) is guided by way of PR which is defined in the B(P)R as the gross floor area of a building divided by the area of the site on which the building is erected. To cater for a wide range of building types and different circumstances in relation to the provision of infrastructure and utilities as well as other environmental conditions, two systems of PR control have been adopted by PlanD, one statutory and the other administrative. 9. In Hong Kong Island, private housing comparable to public housing can normally be developed up to the PR limits stipulated in the B(P)R (i.e. between PR8 and PR10). In Kowloon, domestic plot ratios are restricted to a maximum under the statutory Outline Zoning Plans. 10. In order to provide a better living environment to attract residents from the main urban areas, the Land Development Policy Committee (LDPC) in November 1973 agreed that a set of density guidelines with a maximum PR5 should be applied to the new towns through administrative means. These guidelines have been used as the basis for the planning of the first generation new towns (including Tuen Mun, Sha Tin, Tsuen Wan/Kwai Tsing, Fanling/Sheung Shui, Tai Po and Yuen Long) and have been consistently applied via the leases ever since. However, due to development pressure, these administrative density guidelines have subsequently been raised to a maximum of PR8 for the second generation new towns (including Ma On Shan, Tseung Kwan O, Tung Chung/Tai Ho), which are comparable to the limits set down in the B(P)R. Definition of site 11. It is noted that the crux of application of PR controls is the definition of site. As a matter of fact, neither the Building Ordinance nor the B(P)R contains such a definition. The lack of a precise definition of a site is particularly important when PR controls are applied to public housing development. In the past, the gross site area excluding through roads would be taken as the site in calculating the PR for public housing developments. Based on this site definition, public housing developments with higher proportion of peripheral slopes and free-standing GIC uses would have high DRs (about or even exceed 7) but low PRs (may be less than 4). 12. As advised by PlanD, although there is no clear definition in the Buildings Ordinance, the site could be interpreted from a Privy Council ruling in AG vs Cheng Yick Chi and others. Based on the court case, a
4 - 4 - site for the purpose of B(P)R should not take into account land which has, or would be, taken into account and used up in enabling some other developments to comply with the same Regulations. In other words, a site is equivalent to the Net Site Area as defined in Figure 1 - it should exclude schools, other GIC facilities, public open space and access roads. FUTURE DIRECTIONS 13. In the past, the choice of DR of 5, 6 or 7 would depend on the relevant constraints and opportunities as mentioned in para. 7 above. However, as a measure to increase flat production, at the 9th HOUSCOM meeting on 15 October 1997, it was determined that the concept of DR should be applied to public housing development and DR7 would be adopted as a basis for initial planning. However, every opportunity will be taken to maximize the development intensity beyond DR7 subject to resolution of various constraints like transport and other utility infrastructure capacity. 14. To implement HOUSCOM s directive the Department has attempted to maximize flat production by achieving the highest DR possible. It is, therefore, envisaged that some projects may exceed the maximum permitted under the B(P)Rs or their corresponding OZPs, if measured according to PR (according to the PlanD s advice on the definition of site ). 15. An increasing proportion of the new developments undertaken by the Department will likely be for sale or transfer (from public rental to HOS) in the future. As such, it is considered that the density of all future public housing developments should be assessed according to the plot ratio system to ensure compliance with statutory controls in the B(P)Rs and OZPs to avoid any hold up at the later site possession or land lease stage. 16. Negotiation with concerned departments, such as Planning and Lands, is currently underway to consider any technical issues which may arise from the application of PR to public housing developments, including potential impact on flat production if plot ratio was adopted. A paper on Public Housing Density Policy is under preparation by PlanD for agreement Members will be informed of the outcome in due course. INFORMATION 17. This paper is submitted for Members information.
5 File Ref. : HD(P) 10/2/4 Date : 18 May 1999
Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong
Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong Ir Enoch LAM Deputy Secretary (Works)2, Development Bureau The Government of the Hong Kong Special
More informationThe Past, Present and Future Land-forming in Hong Kong
The Past, Present and Future Land-forming in Hong Kong 27 April 2013 Thematic Series Engineering Advancement in Hong Kong Land-forming (HKIE and HKIP) Planning Department Population: 7.07 million (2011)
More informationTHE HONG KONG HOUSING AUTHORITY. Memorandum for the Rental Housing Committee. Fixing of Domestic Rents for New Estates
PAPER NO. RHC 49/2002 THE HONG KONG HOUSING AUTHORITY Memorandum for the Rental Housing Committee Fixing of Domestic Rents for New Estates PURPOSE To propose to maintain the best rents (i.e. rents of newly
More informationBUILDING FOR THE BETTER CHINA. Hong Kong
CHINA Hong Kong BUILDING FOR THE BETTER The Group always strives to maximize the aesthetic potential of development lots so as to integrate its projects into their surroundings harmoniously with minimal
More informationUnopened Space: Mapping Equitable Availability of Open Space in Hong Kong Press Conference Report by Carine Lai
Unopened Space: Mapping Equitable Availability of Open Space in Hong Kong Press Conference Report by Carine Lai 24 Feb 2017 Open Space Why do we need open space? How does HKSAR Govt define open space?
More informationProject Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong.
Project Summary Major Property Development Projects in Hong Kong Project Summary Major Property Development Projects in Hong Kong Queen s Terrace Parc Palais 10 Seaview Crescent Wang Chau Yuen Long 31
More informationMTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area
PR068/18 6 August 2018 MTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area The MTR Corporation notes that a new announcement mechanism has
More informationAppendix: List of CLP Power s EV charging stations (14 December 2018)
Appendix: List of CLP Power s EV charging stations (14 December 2018) Quick EV charging stations No. Location Address Parking Bay Qty. District Type 1 CLP Centenary Building CLP Centenary Building, G/F
More informationAmendments to the Approved South West Kowloon Outline Zoning Plan No. S/K20/24
Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing For discussion on 16 March 2011 TFK/05/2011 Amendments to the Approved South West Kowloon Outline Zoning Plan No. S/K20/24 PURPOSE
More informationProperty Development 26 SUN HUNG KAI PROPERTIES LIMITED. Manhattan Hill, West Kowloon
Property Development The Group is constantly raising standards and coming up with new innovations to satisfy homebuyers ever-changing aspirations. Its brand name and reputation for quality enhance the
More informationDelia Memorial School (Hip Wo) Guidance notes on filling Student s Particulars Record
Delia Memorial School (Hip Wo) Guidance notes on filling Student s Particulars Record 2014-2015 Part (1) Candidate s Particulars: Name in English STRN No. Given Name Surname Name in Chinese Sex C C Code
More informationFor the Hong Kong Housing Society, 1998/1999 has been a year of. facing challenges and finding solutions
1 For the Hong Kong Housing Society, 1998/1999 has been a year of facing challenges and finding solutions 2 1 In our new flat, we can have our own rooms. Review of Operations The year 1998/1999 was a year
More informationTHE HONG KONG HOUSING AUTHORITY. Memorandum for the Housing Authority. Secretary s Report Committee Work (September November 1998)
HA 1/99 THE HONG KONG HOUSING AUTHORITY Memorandum for the Housing Authority Secretary s Report Committee Work (September November 1998) Purpose This paper summarises the work of the Housing Authority
More informationTHE HONG KONG HOUSING AUTHORITY. Memorandum for the Commercial Properties Committee. Shopping Centres Scheduled for Completion in 2000/2001
PAPER NO. CPC 6/2000 THE HONG KONG HOUSING AUTHORITY Memorandum for the Commercial Properties Committee Shopping Centres Scheduled for Completion in 2000/2001 PURPOSE To inform Members of the details of
More informationHKBN Mass Deploys Fiber-To-The-Home Making the Future Today in Hong Kong
For Immediate Release HKBN Mass Deploys Fiber-To-The-Home Making the Future Today in Hong Kong (Hong Kong, 19th September 2007) Hong Kong Broadband Network Limited ( HKBN ) today announced a revolution
More informationProperty Development. 1. YOHO Town, Yuen Long 2. Park Island, Ma Wan 3. Severn 8, The Peak 4. The Arch, Kowloon Station. Park Island, Ma Wan
Property Development The Group s trusted brand name for quality enhances marketability and development margins on new projects. It will continue satisfying homebuyers by offering premiumquality developments
More informationGross Floor Area of HOS Flat by Phase / Estate
Gross Floor Area of HOS Flat by / Estate 1 February 1978 12.6.80 Shun Chi Court East Kowloon 49.1-77.9 12.5.81 Chun Man Court Ho Man Tin 54.1-66.5 13.8.80 Yue Fai Court, I Aberdeen 42.7-46.6 23.9.80 Sui
More informationThe highly distinctive Manulife Financial Centre sets a precedent for the regeneration of the older districts of Hong Kong, providing over one
Gateway to the future The highly distinctive Manulife Financial Centre sets a precedent for the regeneration of the older districts of Hong Kong, providing over one million square feet of Grade-A office
More informationCLP Power Extends Electric Vehicle Charging Network as Popularity of Green Motoring Accelerates
24 November 2016 中華電力有限公司 CLP Power Hong Kong Limited CLP Power Extends Electric Vehicle Network as Popularity of Green Motoring Accelerates CLP Power Hong Kong Limited (CLP Power) today (24 November)
More informationS.F. Service Points Update Notice
S.F. Service Points Update Notice The update of S.F. Service Points during 15 th July to 15 th August 2017 is as follows: Effective Date District Address LK02, 3/F, Sau Mau Ping Shopping Centre, 14-Jul
More informationTHE HONG KONG HOUSING AUTHORITY. Memorandum for the Subsidised Housing Committee. Domestic Rents for New Estates
PAPER NO. SHC 4/2005 THE HONG KONG HOUSING AUTHORITY Memorandum for the Subsidised Housing Committee Domestic Rents for New Estates PURPOSE This paper sets domestic rents for 16 453 flats in five new public
More informationHONG KONG EXAMINATIONS AND ASSESSMENT AUTHORITY 2019 HONG KONG DIPLOMA OF SECONDARY EDUCATION EXAMINATION ENGLISH LANGUAGE
P.1 HONG KONG EXAMINATIONS AND ASSESSMENT AUTHORITY 2019 HONG KONG DIPLOMA OF SECONDARY EDUCATION EXAMINATION ENGLISH LANGUAGE General Notes to Applicants As a general rule, only ONE service agreement
More informationSummary of Major Properties At 31st March, 2001
Summary of Major Properties MAJOR PROPERTIES UNDER DEVELOPMENT Approx. Approx. no. of car Nature Develop- Expected Major properties Approx. gross parking of Group s ment completion under development site
More informationS.F. Service Points Update Notice
S.F. Service Points Update Notice The update of S.F. Service Points during 16 th October to 15 th November 2017 is as follows: Effective Date District Address Podium, 3/F, Block 2, Belvedere Garden Phase
More informationCollection Point Address
Collection Point Hong Kong Island Business Hours Mon to Fri Aberdeen Ap Lei Chau Shau Kei Wan Sai Wan North Point Office 1, 9/F, Goodview Centre, 12 Wu Pak Street, Aberdeen, Hong Kong Shop S11, G/F, Wah
More informationFOR VIBRANT LIFESTYLES THE REACH, YUEN LONG, HONG KONG
FOR VIBRANT LIFESTYLES THE REACH, YUEN LONG, HONG KONG Review of Operations Business in Hong Kong Progress of Major Development Projects Status of property developments with anticipated completion during
More information18 D Shop D & Portion of Shop B, G/F, B. 16 B Shop B, G/F and Shop A2 & A3, Upper G/F, A2
126 FAIRWOOD FAST FOOD RESTAURANTS Hong Kong 41A-434-9 Shop Nos. 4-9, G/F, Smithfield Court, 2856 8688 41A-43 Smithfield, Kennedy Town 93-103 G/F, New Victory House, Nos. 93-103, 2856 8650 Wing Lok Street,
More informationSupplementary Material
Supplementary Material 15-Year PM 2.5 Trends in the Pearl River Delta Region and Hong Kong from Satellite Observation C.Q. Lin 1,2, Y. Li 3, A.K.H. Lau 1,2,4,*, C.C. Li 5, J.C.H. Fung 2,4,6 * Corresponding
More informationMemorandum for the Subsidised Housing Committee of the Hong Kong Housing Authority
PAPER NO. SHC 53/2012 Memorandum for the Subsidised Housing Committee of the Hong Kong Housing Authority Sale of Remaining Surplus Home Ownership Scheme Flats and New Home Ownership Scheme Flats PURPOSE
More informationHONG KONG: LIKE NO OTHER
HONG KONG: LIKE NO OTHER SEE ALSO Hong Kong: Freeways, Suburbs & Junkyards (www.rentalcartours.net/rac-hk-freeway.pdf) Shenzhen: Start of China s Future (www.rentalcartours.net/rac-shenzhen.pdf) Guangzhou:
More informationFY2013 Annual Results. 26 September New World One Step Forward We Create New Living Experience
FY2013 Annual Results 26 September 2013 New World One Step Forward We Create New Living Experience Disclaimer IMPORTANT NOTICE The information contained in these materials is intended for reference and
More informationMemorandum for the Subsidised Housing Committee of the Hong Kong Housing Authority. Public Rental Housing Allocation Plan for 2010/11
PAPER NO. SHC 29/2010 Memorandum for the Subsidised Housing Committee of the Hong Kong Housing Authority Public Rental Housing Allocation Plan for 2010/11 PURPOSE This paper informs Members of the result
More informationHOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 MARCH 1998 to 31 MAY 1998) Abbreviations : PDB Provisional District Board
Annex HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 MARCH 1998 to 31 MAY 1998) Abbreviations : PDB Provisional District Board CAC CBC CILAC CWDC DFCC DHC DMC EAC EC EIC EIDDC EPC
More informationProperty Investment. 1. Two IFC, Central 2. International Commerce Centre, Kowloon Station 3. East Point City, Tseung Kwan O 4.
Property Investment The local retail sector has flourished and the Group s shopping centres keep attracting more visitors, benefiting retail tenants with higher traffic and turnover. The Group will keep
More informationGovernment Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination
Government Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination Anne Black General 1/F, 140 Tsat Tse Mui Road, North Point 2561 6161 Chai Wan General G/F, 1 Hong Man Street, Chai Wan 2556
More informationForeseeable Problems of Redevelopment of. Public Housing Estates a case study of Tsui. Ping (North) Estate
Centre of Land Resources and Housing Policy @CUHK Working Paper 201401 Foreseeable Problems of Redevelopment of Public Housing Estates a case study of Tsui Ping (North) Estate by Yiu, Chung Yim April 2014
More informationS.F. Service Points Update Notice
Points Update Notice The update of Points during 16 th Mar 2018 to 15 th May 2018 is as follows: Business Effective Date District Address Points Code Types Business Hours (Mon-Fri) Business Hours (Sat)
More informationMonthly update of MTR facilities for passengers with disabilities December 2017
Monthly update of MTR facilities for passengers with disabilities 1. Ma On Shan Line The installation of Automatic Platform Gates at Ma On Shan Line has commenced at Tai Wai Station in November 2014. It
More informationHONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON
HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON APPLICATION FOR CHANGE IN MORTGAGE ARRANGEMENT Prepared
More informationTHE HONG KONG HOUSING AUTHORITY. Memorandum for the Building Committee. Review of Harmony Block Designs
BC 11/99 THE HONG KONG HOUSING AUTHORITY Memorandum for the Building Committee Review of Harmony Block Designs PURPOSE This is to seek Members endorsement to revised designs for the Harmony 1 and Harmony
More informationShatin to Central Link. Transport Advisory Committee 4 May 2011
Shatin to Central Link Transport Advisory Committee 4 May 2011 MTR Corporation 05/05/2011 Page 1 Background One of the ten major infrastructure projects in 2007-2008 Policy Address Government invited MTRCL
More informationTask Force on Kai Tak Harbourfront Development. Residential Development at 1-5 Kai Hing Road, Kai Tak South (Kowloon Godown Site)
For discussion on 23 November 2010 TFKT/04/2010 Residential Development at 1-5 Kai Hing Road, Kai Tak South (Kowloon Godown Site) PURPOSE This paper is intended to (i) report the status of the statutorily
More informationCentre and the Hong Kong Sectio
Reconstructing Urbanscape Research Repor rt on Development Strategies of the Hong Kong Secondary City Centre and the Hong Kong Sectio on of fthe Hi-Speed HiS National Rail Network Executive Summary The
More informationA Dissertation On Hang Hau Town And Ap Chai Wan By Kwok-shing Pun READ ONLINE
A Dissertation On Hang Hau Town And Ap Chai Wan By Kwok-shing Pun READ ONLINE Your Travel Guide to Hong Kong PUBLIC HEALTH AND MUNICIPAL SERVICES ORDINANCE Chai Wan Pool-side Garden Ha Wan Tsuen Basketball
More informationTHE HONG KONG HOUSING AUTHORITY. Memorandum for the Housing Authority and Home Ownership Committee. Motion Debate on the Tenants Purchase Scheme
PAPER NO. HA 43/2001 HOC 59/2001 THE HONG KONG HOUSING AUTHORITY Memorandum for the Housing Authority and Home Ownership Committee Motion Debate on the Tenants Purchase Scheme PURPOSE To inform Members
More informationSHOP NAME ADDRESS Tel No. Fax No. SHOP G2, AON CHINA BUILDING, 29 QUEEN'S ROAD CENTRAL, CENTRAL, H.K.
1 st CENTRAL BRANCH SHOP G2, AON CHINA BUILDING, 29 QUEEN'S ROAD CENTRAL, CENTRAL, 25237128 25371309 2 nd CENTRAL BRANCH 42-46 QUEEN'S ROAD CENTRAL, CENTRAL, 25243374 25371312 3 rd CENTRAL BRANCH 39 QUEEN'S
More informationSummary of Decision Made by the Home Ownership Committee
Summary of Decision Made by the Home Ownership Committee Paper Number : HOC 96 /2001 Paper Title : Tenants Purchase Scheme Phase 5 Date of Meeting : 4 January 2002 Summary of Recommendations Members were
More informationS.F. Service Points Update Notice
S.F. Service oints Update Notice The update of S.F. Service oints during 15 th Jul 2018 to 15 th Aug 2018 is as follows: Effective Date 2018/07/11 Ap Lei Chau 2018/07/12 Yuen Long 2018/07/12 Yuen Long
More informationSelection Method for Shaw College Student Hostel Places 2014/2015 (Second draft)
Selection Method for Shaw College Student Hostel Places 2014/2015 (Second draft) 1. Quota 1.1 Category of special quota Number President of the Student Union of The Chinese University of Hong Kong 1 Chief
More informationUphold the Rule of Law Seize the Opportunities Make the Right Choices
The 2015 Policy Address Uphold the Rule of Law Seize the Opportunities Make the Right Choices Pursue Democracy Boost the Economy Improve People s Livelihood (Extract on Housing, Land and Youth Hostel)
More informationBusiness in Hong Kong Property Development
Review of Operations Business in Hong Kong 2006 Highlights Approximately 680,448 square feet of residential properties completed for sale An attributable HK$3,434.6 million worth of properties in Hong
More informationProperty Investment. International Commerce Centre, Kowloon Station 38 SUN HUNG KAI PROPERTIES LIMITED
Property Investment International Commerce Centre, Kowloon Station 38 SUN HUNG KAI PROPERTIES LIMITED With over six million square feet of investment property under development in Hong Kong and other projects
More informationDevelopment Projects Completed
Development Projects Completed The following development projects were completed during the financial year: Group s Interest Site Area Floor Area Floor Area Location (sq.ft.) (sq.ft.) Purpose (%) (sq.ft.)
More informationSelection Method for Shaw College Student Hostel Places 2017/2018 (First Draft)
Selection Method for Shaw College Student Hostel Places 2017/2018 (First Draft) 1. Quota 1.1 Category of special quota Quota President of the Student Union of the Chinese University of Hong Kong 1 Editor-in-chief
More informationSelection Method for Shaw College Student Hostel Places 2016/2017 (Final Version)
Selection Method for Shaw College Student Hostel Places 2016/2017 (Final Version) 1. Quota 1.1 Category of special quota Number President of the Student Union of The Chinese University of Hong Kong 1 Editor-in-chief
More informationSUN HUNG KAI PROPERTIES LIMITED ANNUAL REPORT 2001/02
38 39 PROPERTY INVESTMENT The Group maintains an optimal tenant mix in its investment property portfolio, and strives to raise the standard of customer and tenant service. Aiming to be the landlord of
More informationDEVELOPMENT PROJECTS COMPLETED
DEVELOPMENT PROJECTS COMPLETED The following development projects were completed during this financial year: Group s Interest Site Area Floor Area Land-Use Floor Area Location (sq.ft.) (sq.ft.) Purpose
More informationSelection Method for Shaw College Student Hostel Places 2017/2018 (Second Draft)
Selection Method for Shaw College Student Hostel Places 2017/2018 (Second Draft) 1. Quota 1.1 Category of special quota Quota President of the Student Union of the Chinese University of Hong Kong 1 Editor-in-chief
More informationShaw College Selection Method for Student Hostel Places 2019/2020
Shaw College Selection Method for Student Hostel Places 2019/2020 (1st Draft) 1. Quota 1.1 Category of special quota Quota 20 President of the Student Union of the Chinese University of Hong Kong 1 Editor-in-chief
More informationBANK OF CHINA LIMITED (A joint stock company incorporated in the People s Republic of China with limited liability) Stock Code: 3988
This announcement is for information purposes only and does not constitute an invitation or offer to acquire, purchase or subscribe for securities. The Stock Exchange of Hong Kong Limited and Hong Kong
More informationProposed Residential Development at 1-5 Kai Hing Road, Kai Tak South
Paper No. 16/2009 For discussion by HEC Sub-committee on Harbour Plan Review 22 July 2009 Proposed Residential Development at 1-5 Kai Hing Road, Kai Tak South 1. Purpose This paper is intended to solicit
More informationHOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JULY 1999 to 30 SEPTEMBER 1999) Abbreviations : PDB Provisional District Board
HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JULY 1999 to 30 SEPTEMBER 1999) Annex Abbreviations : PDB Provisional District Board CAC CBC CILAC CWDC DFCC DHC DMC EAC EC EIC Community
More informationShaw College Selection Method for Student Hostel Places 2018/2019 (1st Draft)
Shaw College Selection Method for Student Hostel Places 2018/2019 (1st Draft) 1. Quota 1.1 Category of special quota Quota President of the Student Union of the Chinese University of Hong Kong 1 Editor-in-chief
More information(sq.ft.)!!"!!!" HONG KONG 1. No. 1 Chatham Path % 7,800 R Completed Existing Mid-levels, Hong Kong!"#$1
" Completed investment properties HONG KONG 1. No. 1 Chatham Path 2072 100.0% 7,800 R Completed Existing Mid-levels, "#$1 2. No. 8 Mount Cameron Road 2082 100.0% 15,617 5,500 R Completed Existing The Peak,
More information(sq.ft.)!!"!!!" HONG KONG 1. No. 1 Chatham Path % 4,017 R Completed Existing Mid-levels, Hong Kong!"#$1
" Completed investment properties HONG KONG 1. No. 1 Chatham Path 2072 51.5% 4,017 R Completed Existing Mid-levels, "#$1 2. No. 8 Mount Cameron Road 2082 51.5% 15,617 2,833 R Completed Existing The Peak,
More informationTHE UNIVERSITY OF HONG KONG LIBRARIES. This book was a gift from. Hong Kong Policy Research Institute Ltd.
THE UNIVERSITY OF HONG KONG LIBRARIES This book was a gift from Hong Kong Policy Research Institute Ltd. BIB. REG. NO. DATE REC'D CLASS NO. AUTHOR NO. 2 1 JUL 2001 Dominic S W WONG, QBE, JP Secretary
More informationSELWYN HOUSING ACCORD
SELWYN HOUSING ACCORD Selwyn Housing Accord 1 The Selwyn Housing Accord between the Selwyn District Council (the Council) and the Government is intended to increase land and housing supply in the Selwyn
More informationRedevelopment. The vertical green wall featured in URA redevelopment project One Wanchai Redevelopment Eng (5)a.indd 22
Redevelopment The vertical green wall featured in URA redevelopment project One Wanchai. 22 12-13 Redevelopment Eng (5)a.indd 22 6/9/13 2:50 PM Redevelopment 2012/13 saw a substantial increase in the number
More informationTHE HONG KONG HOUSING AUTHORITY. Memorandum for the Home Ownership Committee
HOC 13/98 THE HONG KONG HOUSING AUTHORITY Memorandum for the Home Ownership Committee Legal Costs and Conveyancing Arrangement for Home Ownership Scheme Conveyancing PURPOSE To inform Members of the effects
More informationHOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JUNE 1998 to 31 AUGUST 1998) Abbreviations : PDB Provisional District Board
Annex HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JUNE 1998 to 31 AUGUST 1998) Abbreviations : PDB Provisional District Board CAC CBC CILAC CWDC DFCC DHC DMC EAC EC EIC EIDDC EPC
More informationHONG KONG HOUSING AUTHORITY
HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON APPLICATION FOR TRANSFER OF OWNERSHIP Prepared by Housing
More informationTHE HONG KONG HOUSING AUTHORITY. Memorandum for the Housing Authority. Secretary s Report - Committee Work (1 March to 31 May 1997)
HA 57/97 THE HONG KONG HOUSING AUTHORITY Memorandum for the Housing Authority Secretary s Report - Committee Work (1 March to 31 May 1997) Purpose This paper summarises the work of the Housing Authority
More informationProgress Update on Shatin to Central Link (SCL) 2 May 2013
Progress Update on Shatin to Central Link (SCL) 2 May 2013 MTR Corporation 02/05/2013 Page 1 Alignment Tai Wai Hin Keng SCL (Tai Wai to Hung Hom Section) Diamond Hill Kai Tak To Kwa Wan Ma Tau Wai Ho Man
More informationMEGA CUBE. Kowloon Bay, Hong Kong
MEGA CUBE Kowloon Bay, Hong Kong Review of Operations Business in Hong Kong Progress of Major Development Projects Status of property developments with anticipated completion during the period to the end
More informationS.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: New Territories
Sheung Shui 852A2002 852A2007 Shop 301 & 302, Choi Wah House, Choi Yuen Estate, Sheung Shui, Shop 1005-1006, G/F, Sheung Shui Centre Shopping Arcade, Sheung Shui, 852A2012 Shop 13, Ching Ho Shopping Centre,
More informationHONG KONG FERRY (HOLDINGS) COMPANY LIMITED
Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, makes no representation as to its accuracy or completeness
More informationDISCLOSEABLE TRANSACTION SUCCESSFUL BIDDING FOR PROPERTY IN HONG KONG
Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness
More informationGREEN PAPER : HOUSING SUBSIDY TO TENANTS OF PUBLIC HOUSING
GREEN PAPER : HOUSING SUBSIDY TO TENANTS OF PUBLIC HOUSING Copyright: All rights reserved Information of this website, unless otherwise indicated, is protected by copyright and you may infringe it if you
More information/ 2736 BOULEVARD, NATHAN ROAD, TSIM SHA TSUI
Address Telephone 2545 1851/ 2544 G/F YU SUNG BOON BLDG 107-111 DES VOEUX ROAD, Central 3856/ 2544 4385 2121 1069/ 2121 SHOP 1 & 2, LOWER G/F., MELBOURNE PLAZA, 33 QUEEN'S ROAD CENTRAL 1077 2506 1120/
More informationMerchants Offers Details and Merchant's Additional Terms and Conditions Contact Details
The hyperlinks of merchant websites will bring to you to another website on the Internet, which is published and operated by a third party. Such links are only provided on our website for the convenience
More informationRailway Developments and Highlights of the Construction Features of Recent Railway Projects
Railway Developments and Highlights of the Construction Features of Recent Railway Projects Statistics on Rail Transport KCR rail lengths & stations Statistics on Rail Transport MTR rail lengths & stations
More informationDECLARATION FOR APPLYING HONG KONG HOUSING SOCIETY S RENTAL UNIT
To: Hong Kong Housing Society Applications Section (Rental) P.O. BOX 845 Hong Kong Note: Please pay sufficient postage for your mail item to ensure delivery in order Please read the Notes to Applicants
More informationMTR Kwun Tong Line Extends to Ho Man Tin and Whampoa Stations From 23 October 2016
PR081/16 21 September 2016 MTR Kwun Tong Line Extends to Ho Man Tin and Whampoa Stations From 23 October 2016 Commuters travelling to and from Ho Man Tin and Whampoa will be able to enjoy the convenience
More informationRecommended District Council Constituency Areas
(16,964) S01 Kwai Hing 17,975 +5.96 N Yiu ing Street Castle Peak Road - Kwai Chung NE Castle Peak Road - Kwai Chung E Kwai Chung Road SE Kwai Chung Road S Kwai Chung Road, Kwai Yik Road Hing Fong Road
More informationGross Rental Income* Gross Rental Income* by Sector
Property Investment The Group strives to generate better returns from its rental portfolio by continually monitoring the needs of its valued tenants closely. It will keep upgrading its investment portfolio
More informationSchedule of Major Properties Dated the 31st day of December, 2014
108 CK HUTCHISON HOLDINGS LIMITED Cheung Kong (Holdings) Limited Schedule of Major Properties Dated the 31st day of December, 2014 A. PROPERTIES FOR/UNDER DEVELOPMENT Group s Approx. Description Lot Number/Location
More informationSelf Service Terminal Service Hour Hong Kong District Branch
Self Service Terminal Service Hour Hong Kong District Branch Head Office 83 Des Voeux Central 24 hours X 09:00-19:00 09:00-19:00 09:00-19:00 Aberdeen 10 Nam Ning Street Causeway Bay Prestige & 28 Yee Wo
More informationAppendix. Office and Unit Lists. HKFYG Website: hkfyg.org.hk M21 Multimedia Web: M21.hk
Appendix Office and Unit Lists HKFYG Website: hkfyg.org.hk M21 Multimedia Web: M21.hk Head Office Tel: 2527 2448 Fax: 2528 2105 Email: hq@hkfyg.org.hk Youth S.P.O.Ts Youth S.P.O.T. 21 1/F, The Hong Kong
More informationRedevelopment: Tackling Urban Decay Effectively
Redevelopment: Tackling Urban Decay Effectively Yeung Uk Road project ( The Dynasty ) in Tsuen Wan. The starting point for urban renewal has to be the control of urban decay. Over the past decade, the
More informationHong Kong 2030+: Towards A Planning Vision and Strategy Transcending 2030
Hong Kong 2030+: Towards A Planning Vision and Strategy Transcending 2030 Consolidated Land Requirement and Supply Analysis Planning Department, HKSAR October 2016 Hong Kong 2030+ Table of Contents Preface
More informationDevelopment Projects Completed
Development Projects Completed The following development projects were completed during the financial year: The City Culture Located in Hunghom, Kowloon, this project consists of a 20-storey residential
More informationPROPERTIES HELD BY THE GROUP (Continued)
! " # $ % "#$%& " expiry interest site area floor area completion completion (sq.ft.) attributable date to the Group (sq.ft.) " " Completed investment properties "#$% HONG KONG 1. No. 1 Chatham Path 2072
More informationChan Chu Kee Engineering Ltd. (i) NDT Welding Test
Project Main Contractor / Related Contractor Test Method 1. Hud 2nd Concrete Plant Anderson Concrete Ltd (i) 2. South Island Line (East)-Contract 901 Admiralty Integrated Station And SCL Enabling Works
More information香港物業管理公司協會有限公司 The Hong Kong Association of Property Management Companies Limited
C Ching Ho Shopping Centre Ching Hiu Road Sheung Shui NT hopping Arcad 16 C Chow Shing Kee Comm. Building 25 Tong Mei Road Tai Kwok Tsui KLN 1 42 C Hung Fuk Shopping Centre Hung Fuk Estate 1 3456 C Tai
More informationBooth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F19 ALFALFA ATELIER AMEBA DESIGN LIMITED AP CREATIVE LIMITED
Booth no: 1E-F12 ALFALFA ATELIER Unit F, 13/F, Block 2, Yip Fat Factory Building 75 Hoi Yuen Road, Kwun Tong Tel: (852) 3118 1300 Fax: (852) 3118 1322 Email: melin@alfalfagift.com Website: www.alfalfagift.com
More informationHong Kong Out-patient Direct Settlement Network - April 2015
Allianz Worldwide Care Out-patient Direct Settlement Network - April 2015 In order to provide our insured membership with access to the best possible medical care and service, AWC has developed a network
More informationMerchants Offers Details and Merchant's Additional Terms and Conditions Contact Details. 10% off on eligible hotels booking at Expedia website
The hyperlinks of merchant websites will bring to you to another website on the Internet, which is published and operated by a third party. Such links are only provided on our website for the convenience
More informationRiverton Properties Ltd Proposed Special Housing Area
Riverton Properties Ltd Proposed Special Housing Area Housing Accords and Special Housing Areas Act 2013 Expression of Interest 1 This Expression of Interest is made on behalf of Riverton Properties Ltd,
More informationHong Kong Property Business
Hong Kong Property Business Highlights Acquired/converted four sites in Hong Kong with aggregate gross floor area of 420,000 square feet Diverse land bank of 43 million square feet by gross floor area,
More informationTAO HEUNG HOLDINGS LIMITED * 稻香控股有限公司
Hong Kong Exchange and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the content of this announcement, make no representation as to its accuracy or completeness
More information