3 Engineering Staff Report PHASE II REFERRAL Date: July 18, 2016 To: From: RE: Molly Orkild-Larson, Planning Division Sue Liu, Engineering Division P P Sky Ranch SDP FP Scope/Location: The applicant, Pure Cycle Corporation, is requesting approval of a Final Plat and a Specific Development Plan which addresses the Neighborhood B Portion of the overall Sky Ranch Developments. Neighborhood B is anticipated to be the first phase of development, including 506 single-family units. Two collector access points are planned off of Monaghan Road; one collector access point is planned off of East 6th Avenue. Interior roadways are planned adhering to the local 50 foot right-of-way cross-section. The site is located within the First Creek Drainage Basin. A floodplain delineation study for the First Creek Tributary (T-9) that crosses the Development Neighborhood B is required and will need to be approved by both Arapahoe County and Urban Drainage Flood Control District. In this study, the 100-year floodplain limits for the T-9 tributary will be defined, and regional detention facilities are also proposed within this application. Items included with this referral: Specific Development Plan Final Plat Phase II Drainage Study Traffic Impact Study Cc: Charles V. Haskins, Engineering Services Division, Division Manager Case File No. P P

4 Findings: The Arapahoe County Division of Engineering Services has reviewed this referral and has the following findings: 1. The Sky Ranch Development is partially within the Aurora Airpark Civilian Airport influence area. 2. The site lies within the First Creek basin and its tributary. 3. This development will require a Subdivision Improvement Agreement (SIA) to guarantee onsite and off-site public improvements for each proposed final site development plan (ASP). 4. Construction activities that disturb one or more acres are required by the Environment Protection Agency (EPA) to obtain a Construction Stormwater Permit. 5. This site lies within the Southeast Metro Stormwater Authority (SEMSWA) service area. This land use application will be referred to SEMSWA for review and comment. SEMSWA jointly reviews and approves the Phase II Drainage Study for all stormwater facilities. Their comments and concerns must be addressed prior to final County approvals. 6. This project is in the boundaries of the Urban Drainage and Flood Control District (UDFCD). The applicant is required to address UDFCD concerns related to this proposal as a condition of Arapahoe County engineering staff recommendation. 7. The applicant is required to provide a Floodplain Delineation Study for the First Creek tributary, T-9 that is across the Neighborhood B development. 8. A Floodplain Development Permit (FDP) will be required for all activities within a County designated floodplain, regardless of impact. 9. The applicant shall be permitted to design and construct 774 residential dwelling units of the Sky Ranch Development as detailed in the approved Traffic Impact Study for Sky Ranch Neighborhood B without filing a 1601 process with the Colorado Department of Transportation (CDOT). No further development beyond the 774 units will be permitted until the completion of the CDOT 1601 process for the Airpark Road and I-70 Interchange improvements. Recommendations: The Division of Engineering Services recommends this case favorably subject to the following conditions: 1. The applicant agrees to address the Division of Engineering Services findings, comments, and concerns as identified within this report. 2. The applicant agrees to address SEMSWA s comments and concerns. 3. The applicant agrees to address UDFCD s comments and concerns. 4. The applicant agrees to address CDOT s comments and concerns as identified within its report

5 STAFF COMMENTS General 1. In addition to the comments listed in this report, Staff has provided redlined plans and reports illustrating clarification to comments included within this report and other minor comments to be addressed. Comments within these redlined documents shall be fully addressed. The redlined documents shall be returned to Staff and must be included with the resubmittal for it to be considered complete. 2. The application was referred to SEMSWA, UDFCD, and CDOT for review. A response to comment letter is required for all comments issued by the County, SEMSWA, UDFCD and CDOT. 3. RESUBMITTAL PROCEDURE - Attached to this report are instructions to the applicant regarding the resubmittal of documents. The applicant and their consultants must follow these instructions explicitly to avoid delays in our and processing of this case. Specific Development Plan 1. Include the Arapahoe County Case No. P in the lower left-hand corner of the plans. 2. Please clearly show and label the floodplain delineations and call out the source of designation. 3. Make text legible for all tracts. 4. Ensure Pond E is outside of the floodplain. 5. Label the elevation on the contours. 6. Need to include Floodplain in Land Use column. 7. Add a section line as a reference to Monaghan Road north of the project site (within the Sky Ranch Development but outside of the Neighborhood B). The ROW dedication to this portion of the roadway should be submitted to the County for review through a separate document. 8. Phage 3: need to verify if the proposed roadway connects to the north or it should be end at the property line (see redline comment on Sheet 3). 9. Public Urban Local Roadway Cross Section: change the sidewalk dimension to 5. Final Plat 10. Include the Arapahoe County Case No. P in the lower left-hand corner of the plans. 11. General Notes #3 and #5: FEMA FIRM Panel No C0206K has been revised; please change all references to Panel No C0206L (effective February 17, 2017). Base elevation is determined at the project location. Please revise the note as necessary 12. Recommend providing a key map on sheets 5 to An easement chart that included easement dedicated by the Plat shall be shown. The chart shall include the type of easement, its intended use, the grantee, the entity responsible for surface maintenance

6 14. Tract Summary Table: include the use of Floodplain in Tracts H and N, and include the use of emergency access in Tract U. 15. Show and label the 100-year floodplain easement. Call out the source of designation. 16. Show and call out the drainage easement for Pond E. Please know that Pond E is located outside of the floodplain. 17. AE means access easement, correct? Phase II Drainage Study 18. Include Case No. P on the cover sheet. 19. Nee to focus more on the Neighborhood B (Basins D-1, D-2 and E-1) drainage condition - more detailed sub-basin delineation and its drainage conveyances. 20. Runoff Coefficients (C): the C values were updated in March 2017 per UDFCD, Urban Storm Drainage Criteria Manual Volume 1. Please revise the drainage calculation accordingly. Traffic Impact Study (TIS) 21. Unclear if the emergency access to the site has been finalized with the Bennett Fire Protection District. If so please include the discussion of emergency access. 22. Page 2: typo appears in the first paragraph change Neighborhood A to B. 23. Page 8: Include the text of No further development beyond the 774 units will be permitted until the completion of the CDOT 1601 process for the Airpark Road and I-70 Interchange improvements at the end of Note 16. Floodplain Modification Study 24. Revise the tilt to Sky Ranch, Tributary T-9 to First Creek Floodplain Modification Study. 25. The applicant must address both SEMSWA and UDFCD s comments

7 Engineering Documents Required for Resubmittal to the County Engineering Services Division A copy of this Resubmittal Checklist Completed Review and Approval Form (Arapahoe County Form 581) available online at Completed Review and Approval Grading, Erosion and Sediment Control Form (GESC Form 403) available on-line at Copy of Latest Proposed Land Development Plan - (SDP, FP) Traffic Impact Study Phase II Drainage Study Floodplain Modification Study Engineering Cost Estimate Operations & Maintenance Manual Any comments to Stormwater Facilities Maintenance Agreement? Construction Drawings Pavement Design Report Grading, Erosion and Sediment Control (GESC) Plans & Report Legal Description and Exhibit Legal name, legal address, and title (if any) of the Owner, assign, or person with signatory authority on behalf of the Owner Exhibit that illustrates easement location(s), see comment #xx Geotechnical Study / Preliminary Soils report Collateral Letter of Intent Electronic files for set of plans being submitted to LandUseSubmittals@arapahoegov.com and cc to sliu@arapahoegov.com County Redlines for: FP, SDP, Phase II Drainage Study, TIS SEMSWA Redlines for: Phase III Drainage Study, GESC, O&M Manual, CDs Letter of point-by-point response to this comment letter and SEMSWA s comments Fees Due: Digit al x x x x x x x x x n/a Case No. P P Case Engineer: Sue Liu In order to expedite this case in an efficient manner, please provide all the items above to the Engineering Services Division counter at 6924 S Lima Street or all files to LandUseSubmittals@arapahoegov.com and cc to sliu@arapahoegov.com Incomplete resubmittal packages will not be forwarded to the case engineer for review until all of the information requested on this form has been provided. This sheet must be attached to your resubmittal with the revised documents in the quantities listed above

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

Board Summary Report

Board Summary Report Board of County Commissioners: Public Hearing Agenda, August 7, 2018 Agenda Item: # Date: July 25, 2018 To: Through: From: Subject: Board of County Commissioners Jan Yeckes, Planning Division Manager Bill

More information

DRAFT Development Application Manual

DRAFT Development Application Manual Arapahoe County Public Works and Development DRAFT Development Application Manual Common Requirements and Procedures for All Development Applications Submittal Requirements by Type of Development Application

More information

CASE # P DOVE VALLEY V, FILING #13 (REPLAT OF BLOCK 12, LOTS 1 16 AND TRACTS A, B, D) BILL SKINNER, SENIOR PLANNER JUNE 14, 2016

CASE # P DOVE VALLEY V, FILING #13 (REPLAT OF BLOCK 12, LOTS 1 16 AND TRACTS A, B, D) BILL SKINNER, SENIOR PLANNER JUNE 14, 2016 ARAPAHOE COUNTY BOARD OF COUNTY COMMISSIONERS PUBLIC HEARING June 28, 2016 9:30 A.M. CASE # P15-010 DOVE VALLEY V, FILING #13 (REPLAT OF BLOCK 12, LOTS 1 16 AND TRACTS A, B, D) BILL SKINNER, SENIOR PLANNER

More information

Southeast Metro Stormwater Authority Fee Schedule

Southeast Metro Stormwater Authority Fee Schedule Southeast Metro Stormwater Authority Fee Schedule Section I. Annual Stormwater Fees Fee Type Fee or Rate SFR Tier 1 $57.80 SFR Tier 2 $77.48 SFR Tier 3 $100.82 SFR Tier 4 $135.26 SFR Tier 5 $293.86 NSFR

More information

Residential Major Subdivision Review Checklist

Residential Major Subdivision Review Checklist Residential Major Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

Guide to Minor Developments

Guide to Minor Developments Guide to Minor Developments Introduction The Douglas County (DCD) is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in

More information

Guide to Combined Preliminary and Final Plats

Guide to Combined Preliminary and Final Plats Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested

More information

Residential Minor Subdivision Review Checklist

Residential Minor Subdivision Review Checklist Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

NEW SINGLE FAMILY RESIDENTIAL

NEW SINGLE FAMILY RESIDENTIAL Community Development Building & Permitting Development 38 Hill Street, Suite G-30 Roswell, GA 30075 770-641-3780 www.roswellgov.com NEW SINGLE FAMILY RESIDENTIAL BUILDING PERMIT APPLICATION This packet

More information

SUBDIVISION REGULATIONS

SUBDIVISION REGULATIONS CHAPTER 14 SUBDIVISION REGULATIONS 14-100 Provisions 14-200 Preliminary Plat 14-300 Final Plat 14-400 Replat 14-500 Minor Subdivision 14-600 Administrative Replat 14-700 Vacation of Roadways, Public Easements,

More information

SKY RANCH, FILING NO. 1 PRELIMINARY PLAT

SKY RANCH, FILING NO. 1 PRELIMINARY PLAT Appr. FH 1 No. Revisions Address county comments Init. FH MONTCLAIR GARDENS 2ND FILING AND VACATED RIGHTS-OF-AY TONSHIP 4 SOUTH, RANGE 65 EST OF THE 6TH P.M. ATKINS CO, 80137 A PARCEL OF LAND BEING LOTS

More information

City Of Attleboro Conservation Commission

City Of Attleboro Conservation Commission City Of Attleboro Conservation Commission GOVERNMENT CENTER, 77 PARK STREET ATTLEBORO, MASSACHUSETTS 02703 (508) 223 2222 FAX 222 3046 GENERAL INSTRUCTIONS AND CHECKLIST FOR COMPLETING STORMWATER MANAGEMENT

More information

DAUPHIN CREEK ESTATES SUBDIVISION

DAUPHIN CREEK ESTATES SUBDIVISION # 12 SUB-000076-2017 DAUPHIN CREEK ESTATES SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer):

More information

SECTION 4: PRELIMINARY PLAT

SECTION 4: PRELIMINARY PLAT SECTION 4: PRELIMINARY PLAT After the completion of the sketch plan process, if submitted, the owner or developer shall file with the City an application for preliminary plat. The preliminary plat stage

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review PUBLIC WORKS - COMMUNITY DEVELOPMENT 333 Broadalbin Street SW, PO Box 490, Albany, Oregon 97321-0144 BUILDING 541-917-7553 PLANNING 541-917-7550 Floodplain Development Land Use Review Application Information

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2016

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2016 # 10 SUB2016-00089 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2016 NAME SUBDIVISION NAME LOCATION Lot 12 Laughlin Industrial Park Subdivision Lot 12 Laughlin Industrial Park

More information

WESTMINSTER PARK PLACE SUBDIVISION

WESTMINSTER PARK PLACE SUBDIVISION WESTMINSTER PARK PLACE SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer): A. Provide all of

More information

City of Prior Lake APPLICATION FOR PRELIMINARY PLAT

City of Prior Lake APPLICATION FOR PRELIMINARY PLAT City of Prior Lake APPLICATION FOR PRELIMINARY PLAT Requested Action Brief description of proposed project (Please describe the proposed amendment, project, or variance request. Attach additional sheets

More information

Guide to Preliminary Plans

Guide to Preliminary Plans Guide to Preliminary Plans Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures

More information

SUBJECT PARCEL(S) Property Owner(s) TMS Number Approximate Acreage Carolina Park Development, LLC

SUBJECT PARCEL(S) Property Owner(s) TMS Number Approximate Acreage Carolina Park Development, LLC Staff Report Special Planning Commission Meeting November 19, 2014 For reference, the Zoning Code and Land Development Regulations are available online. AGENDA ITEM 5c. SKETCH PLAN APPROVAL REQUEST: Request

More information

géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585)

géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585) géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY 14424 Phone: (585) 394-1120 / Fax: (585) 394-9476 NOTICE TO ALL PLANNING BOARD APPLICANTS FOR PRELIMINARY SUBDIVISION PHASED PROJECTS The applicant

More information

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT Case File No. Property Identification No. City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT Requested Action Brief description of proposed project (Please describe the proposed amendment,

More information

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST Community Development 110 South Main Street Springville, UT 84663 COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST 801.491.7861 www.springville.org Prior to the issuance of a building

More information

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record. 200 W. Oak Street, 3rd Floor Fort Collins, CO 80521 (970) 498-7683 / larimer.org/planning SITE PLAN REVIEW ADMINISTRATIVE REVIEW The submittal requirements listed in this packet are intended to collect

More information

Chapter IX Site Grading/Construction

Chapter IX Site Grading/Construction Chapter IX Site Grading/Construction Once an area has received the required zoning and site planning approvals, then the site may be eligible to begin construction of the necessary improvements. Construction

More information

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

BRIDGETON SUBDIVISION APPLICATION CHECKLIST APPLICATION NAME AND # CHECKLIST COMPLETED BY: DATE: Signature and printed name BRIDGETON SUBDIVISION APPLICATION CHECKLIST TO SUBDIVISION APPLICANTS: The attached checklist is to assist you in the submission

More information

City of Fort Lupton Amended Plat Process

City of Fort Lupton Amended Plat Process City of Fort Lupton Amended Plat Process Purpose The Amended Plat process is an administrative process to amend a recorded Plat. An Amended Subdivision is an administrative revision to a recorded Subdivision

More information

CHECKLIST FOR DEVELOPMENT REVIEW

CHECKLIST FOR DEVELOPMENT REVIEW CHECKLIST FOR DEVELOPMENT REVIEW Petitions and related documents and plans for land development or other proposals regulated by Title 16 of the Municipal Code (Development Ordinance) and Title 17 of the

More information

Planning Commission Land Disturbance Permit Application

Planning Commission Land Disturbance Permit Application Planning Commission Land Disturbance Permit Application Refer to Meeting and Submittal Dates Calendar for Application Deadlines of Subdivision/Site Plan: Zoned: Location: Owner of Record: Owner Address:

More information

Preliminary Plat Application & Submittal Checklist

Preliminary Plat Application & Submittal Checklist Planning & Community Development Department 550 Landa Street New Braunfels, Texas 78130 (830) 221-4050 www.nbtexas.org Preliminary Plat Application & Submittal Checklist Applicant Name: *Signature. * By

More information

Township of Little Egg Harbor Planning Board 665 Radio Road Little Egg Harbor, New Jersey Phone: ext. 221 Fax:

Township of Little Egg Harbor Planning Board 665 Radio Road Little Egg Harbor, New Jersey Phone: ext. 221 Fax: BLOCK(S) LOT(S) Township of Little Egg Harbor Planning Board 665 Radio Road Little Egg Harbor, New Jersey 08087 Phone: 609-296-7241 ext. 221 Fax: 609-294-3040 Development Application Amended Development

More information

APPENDIX B TOWN OF LITTLE COMPTON, RHODE ISLAND INSTRUCTIONS AND CHECKLIST FOR MINOR SUBDIVISION

APPENDIX B TOWN OF LITTLE COMPTON, RHODE ISLAND INSTRUCTIONS AND CHECKLIST FOR MINOR SUBDIVISION APPENDIX B TOWN OF LITTLE COMPTON, RHODE ISLAND INSTRUCTIONS AND CHECKLIST FOR MINOR SUBDIVISION These Instructions and Checklist apply to Minor Subdivisions a residential subdivision resulting in five

More information

TOWN OF ROXBURY PLANNING BOARD

TOWN OF ROXBURY PLANNING BOARD UPDATED: APRIL 2011 TOWN OF ROXBURY PLANNING BOARD Applicant s Guide for Subdivision Review The Town Planning Board administers the subdivision review process. This guide has been prepared in order to

More information

géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585)

géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585) géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY 14424 Phone: (585) 394-1120 / Fax: (585) 394-9476 APPLICATION FOR LOT-LINE ADJUSTMENT The applicant is responsible for the completeness of all

More information

Planning Commission Preliminary Plan LRC Subdivision Montville Township

Planning Commission Preliminary Plan LRC Subdivision Montville Township Planning Commission Preliminary Plan LRC Subdivision Montville Township Meeting: February 1, 2017 App. No.: 002-2017-PP Owner: Faith & Hope Land Dev. Co. Applicant: Montville Investors LLC Engineer: Weber

More information

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1 Proposed Name of Subdivision: City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1 FOR PRELIMINARY SUBDIVISION APPROVAL This application must be filled out legibly, in

More information

City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY

City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY Case File No. Property Identification No. City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY Requested Action Brief description of proposed project (Please describe the proposed amendment, project,

More information

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT) 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT) *** IMPORTANT INFORMATION ~ Please

More information

2018 EASEMENT DEDICATION PACKET

2018 EASEMENT DEDICATION PACKET 2018 EASEMENT DEDICATION PACKET (INCLUDES PARCELS OF LAND, EASEMENTS, AND RIGHTS-OF-WAY FOR PUBLIC USE) Information Packet There are various situations in which easements, rights-of-way, and parcels of

More information

FINAL PLAT SUBMITTAL CHECKLIST

FINAL PLAT SUBMITTAL CHECKLIST FINAL PLAT SUBMITTAL CHECKLIST The submission requirements for a Final Plat Review are found beginning in Section 24-4-40 of the Weld County Code. The Weld County Code is available on line at www.co.weld.co.us

More information

Project File #: SF Project Name: Jackson Ranch Filing No. 4 Parcel Nos.: , and

Project File #: SF Project Name: Jackson Ranch Filing No. 4 Parcel Nos.: , and COMMISSIONERS: DARRYL GLENN (PRESIDENT) MARK WALLER (PRESIDENT PRO TEMPORE) STAN VANDERWERF LONGINOS GONZALEZ PEGGY LITTLETON PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CRAIG DOSSEY, EXECUTIVE DIRECTOR

More information

these areas are compatible with such conditions. [Section (6) (c) C. R. S.]

these areas are compatible with such conditions. [Section (6) (c) C. R. S.] SECTION 14-200 PRELIMINARY PLAT 14-201 INTENT A Preliminary Plat is one of the first documents utilized when owners of a property wish to subdivide their property in accordance with State Statutes and

More information

PRELIMINARY PLAN CHECKLIST Major Land Development Projects. To initiate the application, the applicant shall submit to the Administrative Officer:

PRELIMINARY PLAN CHECKLIST Major Land Development Projects. To initiate the application, the applicant shall submit to the Administrative Officer: PRELIMINARY PLAN CHECKLIST Major Land Development Projects To initiate the application, the applicant shall submit to the Administrative Officer: 1. The application review fee, as established by the South

More information

SEE PAGE 4 FOR 2018 CALENDAR OF MEETINGS CITY OF BROOKFIELD PLAN COMMISSION AND PLAN REVIEW BOARD PROCEDURES AND APPLICATION CHECKLIST

SEE PAGE 4 FOR 2018 CALENDAR OF MEETINGS CITY OF BROOKFIELD PLAN COMMISSION AND PLAN REVIEW BOARD PROCEDURES AND APPLICATION CHECKLIST SEE PAGE 4 FOR 2018 CALENDAR OF MEETINGS CITY OF BROOKFIELD PLAN COMMISSION AND PLAN REVIEW BOARD PROCEDURES AND APPLICATION CHECKLIST Procedures Form PLN-60; Rev. 2-6-18 All individuals requesting to

More information

Township of Collier 2418 Hilltop Road Presto, PA 15142

Township of Collier 2418 Hilltop Road Presto, PA 15142 Township of Collier 2418 Hilltop Road Presto, PA 15142 Fees: Major: 2 checks $600 + $50 per lot & $1700 Escrow) APPLICATION FOR SUBDIVISION major FINAL only Plans must be folded Rolled plans will not be

More information

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST TOWNSHIP OF EGG HARBOR PLANNING BOARD/ZONING BOARD OF ADJUSTMENT 3515 BARGAINTOWN ROAD EGG HARBOR TOWNSHIP, NJ 08234 MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST The following checklist is designed to

More information

Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585)

Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585) Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY 14424 Phone: (585) 394-1120 / Fax: (585) 394-9476 NOTICE TO ALL PLANNING BOARD APPLICANTS FOR SINGLE STAGE PRELIMINARY/FINAL SUBDIVISION PLAT

More information

To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal agreements.

To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal agreements. ARTICLE 5 FINAL PLAT 501 Intent DOUGLAS COUNTY SUBDIVISION RESOLUTION To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal

More information

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10 Guide to Replats Introduction Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures and expectations

More information

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW PRELIMINARY SUBDIVISION PLAT REVIEW Application Number: Date Plat Submitted: Name of Subdivision: Name of Owner: Owner Address: (Street or P.O. Box) Telephone #: (City) (State) (Zip) E-mail: Name of Authorized

More information

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina This document is a public record under the North Carolina Public Records Act and may be published on the Town s website or disclosed

More information

MINOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE

MINOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE MINOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE Clear Creek County Planning Department P.O. Box 2000 Georgetown, Colorado 80444 (303) 679-2436 phone (303) 569-1103 fax 1 PURPOSE To establish criteria and

More information

CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES

CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES The Sufficiency Table is a checklist to help identify the types of information and documentation needed for various types of projects. The

More information

PERMIT AND SUBMITTAL REQUIREMENTS (PR)

PERMIT AND SUBMITTAL REQUIREMENTS (PR) SECTION 2 PERMIT AND SUBMITTAL REQUIREMENTS (PR) 2-1 GENERAL - No work of any type shall be performed within the City right-of-way and easements without approved plans and an encroachment permit. No grading

More information

Section Preliminary Plat Checklist and Application Forms

Section Preliminary Plat Checklist and Application Forms Section 201 - Preliminary Plat Checklist and Application Forms PRELIMINARY SUBDIVISION PLAT REVIEW PROCESS CHART PRELIMINARY SUBDIVISION PLAT APPLICATION PRELIMINARY PLAT REVIEW CHECKLIST CITY OF NAMPA

More information

Subdivision (Plat) Checklist

Subdivision (Plat) Checklist Subdivision (Plat) Checklist This Checklist is intended to assist you in preparing a complete application for submittal. Occasionally, additional items may be required to complete the review. Incomplete

More information

PROCEDURE. Chapter 12: Subdivision Regulations

PROCEDURE. Chapter 12: Subdivision Regulations SECTION 14-600 ADMINISTRATIVE REPLAT PROCEDURE 14-601 INTENT These procedures are to provide an abbreviated process for Replat applications that demonstrate compliance with the criteria contained herein.

More information

WESTMINSTER PARK SUBDIVISION

WESTMINSTER PARK SUBDIVISION WESTMINSTER PARK SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer): A. Provide all of the required

More information

Use permitted by: Right Special Exemption

Use permitted by: Right Special Exemption CENTER TOWNSHIP 150 Henricks Road Butler, PA 16001-8472 Phone (724) 282-7805 Fax (724) 282-6550 Application Number: FEE COLLECTED: Application for: Preliminary Final Land Development Location: Map and

More information

Plat Reviews. Richard Powell, P.L.S.

Plat Reviews. Richard Powell, P.L.S. Plat Reviews Richard Powell, P.L.S. 177.011 Purpose and scope of part I. This part shall be deemed to establish consistent minimum requirements, and to create such additional powers in local governing

More information

REGULAR FINAL PLAT SUBDIVISION APPLICATION

REGULAR FINAL PLAT SUBDIVISION APPLICATION REGULAR FINAL PLAT SUBDIVISION APPLICATION Name of Subdivision (Subdivision Name must be approved by at 856-6216) ( )Cluster Subdivision ( )Lot-by-Lot Subdivision ( )Open Space Subdivision Name of Subdivision

More information

THE CITY OF MOBILE, ALABAMA

THE CITY OF MOBILE, ALABAMA THE CITY OF MOBILE, ALABAMA LE 'I IER OF DECISION Kimberly Clark Mobile Operations 200 Africatown Blvd. Prichard, AL 36610 Re: 100 & 200 Africatown Boulevard (Northeast corner of Bay Bridge Road and Paper

More information

FINAL PLAT CHECKLIST

FINAL PLAT CHECKLIST FINAL PLAT CHECKLIST Project Name: Tax ID #: Project Number: Date: _ Reviewed By: Telephone: Please address all items marked with an "X" Please return redline comments with corrected plan, original mylar,

More information

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT SECTION 501 ONLY FINAL PLAN REQUIRED The classification of a proposed subdivision as a "Minor Subdivision" shall only require the submission, review and approval

More information

Major Subdivision Application Packet. Revised June 2018

Major Subdivision Application Packet. Revised June 2018 Major Subdivision Application Packet Revised June 2018 Caroline County Department of Planning and Community Development 233 West Broaddus Avenue Bowling Green, VA 22427 www.co.caroline.va.us Phone: 804-633-4303

More information

City of Duluth Development Regulations

City of Duluth Development Regulations ARTICLE 10 PLAN AND PLAT SPECIFICATIONS 10.1 CONCEPT PLAN SPECIFICATIONS The following paragraphs outline the required elements of both the required and optional plans and plats mentioned throughout these

More information

APPENDIX B. SUBMISSION REQUIREMENTS

APPENDIX B. SUBMISSION REQUIREMENTS Master Major Site Minor Site Landscape Section B.1 Table of /Plat Requirements Proposed or approved name of development, project, subdivision, and/or phase. Location, including township, county, and state.

More information

SUBDIVISION & PLANNING APPROVAL STAFF REPORT Date: December 1, 2016

SUBDIVISION & PLANNING APPROVAL STAFF REPORT Date: December 1, 2016 SUBDIVISION & PLANNING APPROVAL STAFF REPORT Date: December 1, 2016 APPLICANT NAME SUBDIVISION NAME DEVELOPMENT NAME LOCATION Board of Water and Sewer Commissioners of the City of Mobile Halls Mill Road

More information

DINKINS ESTATE FAMILY SUBDIVISION

DINKINS ESTATE FAMILY SUBDIVISION # 9 SUB2015-00122 DINKINS ESTATE FAMILY SUBDIVISION Engineering Comments: The following comments should be addressed prior to submitting the FINAL PLAT for acceptance and signature by the City Engineer:

More information

MAJOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE

MAJOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE MAJOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE Clear Creek County Planning Department P.O. Box 2000 Georgetown, Colorado 80444 (303) 679-2436 - phone (303) 569-1103 - fax PURPOSE To establish criteria and

More information

MINOR PLAT. The following documents are provided as required by the City of Conroe for use in the above titled platting submittals:

MINOR PLAT. The following documents are provided as required by the City of Conroe for use in the above titled platting submittals: Public Works - Engineering Division CITY OF CONROE MINOR PLAT The following documents are provided as required by the City of Conroe for use in the above titled platting submittals: Submittal Questionnaire

More information

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST This CHECKLIST has been adopted in accordance with Section 25:807 of the Land Development Ordinance of the Township of Bordentown and will

More information

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina This document is a public record under the North Carolina Public Records Act and may be published to the Town s website or disclosed

More information

Commercial Site Plan Process and Submittal Requirements (For Commercial, Civic, and Institutional Building Permitting) Revised 12/10/15

Commercial Site Plan Process and Submittal Requirements (For Commercial, Civic, and Institutional Building Permitting) Revised 12/10/15 (For Commercial, Civic, and Institutional Building Permitting) Revised 12/10/15 Step 1 Mandatory Pre-submittal Conference with Town Staff Determination of Adequacy (Adequate Public Facilities Ordinance)

More information

City of Suwanee Development Regulations ARTICLE 10 PLAN AND PLAT SPECIFICATIONS

City of Suwanee Development Regulations ARTICLE 10 PLAN AND PLAT SPECIFICATIONS ARTICLE 10 PLAN AND PLAT SPECIFICATIONS 10.1 CONCEPT PLAN SPECIFICATIONS The following paragraphs outline the required elements of both the required and optional plans and plats mentioned throughout these

More information

PRELIMINARY PLAT Application Packet

PRELIMINARY PLAT Application Packet PRELIMINARY PLAT Application Packet Community Development Department 1020 East Pioneer Road, Draper, UT 84020 (801) 576-6539 Fax (801) 576-6526 Dear Applicant, This application packet has been developed

More information

THE CITY OF MOBILE, ALABAMA

THE CITY OF MOBILE, ALABAMA THE CITY OF MOBILE, ALABAMA LETTER OF DECISION Dewberry I Preble-Rish 9949 Bellaton Avenue Daphne, AL 36526 Re: 6050 & 6086 Whitebark Drive (North side of Girby Road, 125'± East of Bristlecone Drive, extending

More information

El Paso County Development Review System Adopted Fee Schedule (2005)

El Paso County Development Review System Adopted Fee Schedule (2005) Special Districts Special District 5 (multiple districts for the same project is one fee) D $6,300 Special District Amendment 5 D $3,950 Master Plans Master Plan, Master Plan Amendment D $11,900 Land Use

More information

City of Roswell - Fee Schedule

City of Roswell - Fee Schedule City of Roswell - Fee Schedule On October 27, 2012 Mayor and City Council approved a new fee schedule in relation to clarifying fees for zoning, engineering, building and GIS permitting. These fees do

More information

CONDITIONAL USE PERMIT (CUP)

CONDITIONAL USE PERMIT (CUP) CONDITIONAL USE PERMIT (CUP) LAND DEVELOPMENT APPLICATION FORM DEPARTMENT OF PLANNING 300 East Main Street, Sun Prairie, WI 53590-2227 (608)825-1107 FAX (608)825-1194 Applications will not be processed

More information

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina This document is a public record under the North Carolina Public Records Act and may be published on the Town s website or disclosed to third

More information

SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION. Number of Lots (Units) Address. Address.

SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION. Number of Lots (Units)  Address.  Address. Case No. SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION Name of Subdivision Tax Parcel Number(s) Subdivision Location Total Acreage Number of Lots (Units) Average Lot Size Current

More information

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST Completed DRC Application for Review Required for Application Process DRC Processing Fee 1 Commercial $2,500.00 Fire Department Review Fee 150.00 Total $2,650.00

More information

THE SUBDIVISION AND LAND DEVELOPMENT REVIEW PROCESS

THE SUBDIVISION AND LAND DEVELOPMENT REVIEW PROCESS THE SUBDIVISION AND LAND DEVELOPMENT REVIEW PROCESS INTRODUCTION: Howard County Subdivision and Land Development Regulations are intended to promote the health, safety and general welfare of County residents.

More information

APPLICATION PROCEDURE

APPLICATION PROCEDURE ANTRIM PLANNING BOARD P. O. Box 517 Antrim, New Hampshire 03440 Phone: 603-588-6785 FAX: 603-588-2969 APPLICATION FORM AND CHECKLIST FOR MINOR OR MAJOR SITE PLAN REVIEW File Date Received By APPLICATION

More information

City of Forest Hill Minor Plat Application

City of Forest Hill Minor Plat Application City of Forest Hill Minor Plat Application APPLICANT NAME: DATE: SUB-DIVISION NAME: LEGAL DESCRIPTION: ACRES: CURRENT ZONING: PROPOSED ZONING: BEING PLATTED AS: LOTS: BLOCKS: PHASES: OWNER OF RECORD: ADDRESS:

More information

Appendix A: Submittal Checklists

Appendix A: Submittal Checklists Appendix A: Submittal Checklists A.1 Preliminary Plat Checklist A.2 Final Plat Checklist 11 Appendix A.1 DESIGN CHECKLIST FOR PRELIMINARY PLATS AND DEVELOPMENTS Development Name: Location: Date: Reviewed

More information

Project File #: SF Project Name: Meadowbrook Crossing Filing No. 1 Final Plat Parcel No.:

Project File #: SF Project Name: Meadowbrook Crossing Filing No. 1 Final Plat Parcel No.: COMMISSIONERS: DARRYL GLENN (PRESIDENT) MARK WALLER (PRESIDENT PRO TEMPORE) STAN VANDERWERF LONGINOS GONZALEZ PEGGY LITTLETON PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CRAIG DOSSEY, EXECUTIVE DIRECTOR

More information

COUNTY OF ALBEMARLE APPLICATION FOR FAMILY DIVISION. Family Division = $742 (Provide 5 copies of plat)

COUNTY OF ALBEMARLE APPLICATION FOR FAMILY DIVISION. Family Division = $742 (Provide 5 copies of plat) Page 1 APPLICATION FOR FAMILY DIVISION Family Division = $742 (Provide 5 copies of plat) Tier 2 Groundwater Review = $355 (Required for all plats showing lots less than 21 acres) Tier 3 Groundwater Review

More information

Article III. Erosion and Sedimentation Control

Article III. Erosion and Sedimentation Control Article III. Erosion and Sedimentation Control Section 9.6 Erosion and Sedimentation Control Plan Requirements Section 9.6.1 Plan Submission A plan shall be prepared for all land-disturbing activities

More information

THE CITY OF MOBILE, ALABAMA

THE CITY OF MOBILE, ALABAMA THE CITY OF MOBILE, ALABAMA LETTER OF DECISION Dominion Senior Living of West Mobile, LLC 1200 Corporate Dr., St. 225 Birmingham, AL 35242 Re: 6924 Somerbv Lane (North terminus of Somerby Lane). Council

More information

I. Requirements for All Applications. C D W

I. Requirements for All Applications. C D W 108-16.1. Application checklists. Checklist for Required Submissions to the Planning Board or Zoning Board of Adjustment of Monroe Township All required submissions are to be made to the Administrative

More information

BACKGROUND There are 23 flood control structures in the Upper Brushy Creek Water Control and Improvement District (District). See attached map.

BACKGROUND There are 23 flood control structures in the Upper Brushy Creek Water Control and Improvement District (District). See attached map. BACKGROUND There are 23 flood control structures in the Upper Brushy Creek Water Control and Improvement District (District). See attached map. The U.S Department of Agriculture - Natural Resources Conservation

More information

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects COMMUNITY DEVELOPMENT City of South Salt Lake Community Development Department 220 E. Morris Avenue South Salt Lake City, Utah 84115 Phone (801) 483-6011 Fax (801) 483-6060 CONCEPT PLAN APPLICATION Meeting

More information

Final Plats for Major Residential and Commercial Subdivisions Checklist

Final Plats for Major Residential and Commercial Subdivisions Checklist Project Name: : This form is a checklist of Zoning Ordinance requirements for major residential and commercial subdivision plats to assist the applicant in their submittal. It is not intended to be a comprehensive

More information

Open Space Model Ordinance

Open Space Model Ordinance Open Space Model Ordinance Section I. Background Open space development has numerous environmental and community benefits, including: 1) Reduces the impervious cover in a development. Impervious cover

More information

A Final Plat will be reviewed concurrently with any other development review application(s) that is required.

A Final Plat will be reviewed concurrently with any other development review application(s) that is required. RELATED FACTS TO KNOW: Adams County Recording Requirements, Annexation, Common Wall Subdivision, Development Plan (PUD Development Permit), Fees, Helpful Contact Information, Lot Line Adjustment, Neighborhood

More information

Initial Subdivision Applications Shall Include the Following:

Initial Subdivision Applications Shall Include the Following: Initial Subdivision Applications Shall Include the Following: 1) Subdivision Application Form: completely filled out (12 copies) 2) Plat: The Plat must adhere to the requirements set forth in the Town

More information

Lake County Planning, Building and Development Department

Lake County Planning, Building and Development Department SUBMISSION CHECKLIST FOR SUBDIVISION FINAL PLAT Lake County Planning, Building and Development Department 500 W. Winchester Rd. Unit 101 Libertyville, Illinois 60048-1331 Telephone (847) 377-2600 E-mail:

More information

THE CITY OF MOBILE, ALABAMA MOBILE Crry PLANNING COMMISSION

THE CITY OF MOBILE, ALABAMA MOBILE Crry PLANNING COMMISSION THE CITY OF MOBILE, ALABAMA MOBILE Crry PLANNING COMMISSION LETTER OF DECISION MLK Avenue Redevelopment Corp. Attn: Michael Pierce P.O. Box 2204 Mobile, AL 36652 Re: Case #SUB2014-00040 (Subdivision) MLK

More information