1 BWA - Works Boundary Plan BWA-M2G-SY-PLN-001 April 2010

2 Certificate of approval for issue of documents Document number BWA-M2G-SY-PLN-001 DM5 number Title BWA - Works Boundary Plan Revision 0 Document status Final Date of issue May 2010 Position Name Signature Date Prepared by Project Engineer Linda Garlick Original signed 18/5/2010 Reviewed by Construction Manager Jason Julius Original signed 18/5/2010 Approved by Project Manager Michael Mackintosh Original signed 19/5/2010 Document revision control Version Author Date Description Approval A Linda Garlick 22 April 2010 Issued for Review 0 Linda Garlick 18 May 2010 Issued for Approval ACTEW Corporation Ltd This publication is copyright and contains information that is the property of ACTEW Corporation Ltd. It may be reproduced for the purposes of use while engaged on ACTEW commissioned projects, but is not to be communicated in whole or in part to any third party without prior written consent. Disclaimer This document has been prepared for ACTEW and is to be used for internal purposes. No warranty is given as to its suitability for any other purpose.

3 Contents 1 PURPOSE Reference Documents 1 2 MURRUMBIDGEE TO GOOGONG PROJECT Scope of Works 2 3 PHYSICAL BOUNDARIES Pipeline Easements Electrical Line Easement Low Lift Pump Station (Areas 1 and 2) High Lift Pump Station (Area 3) Angle Crossing Road Pipe Storage Area (Area 4) Main Site Office Building Layout (Area 5) Pipe Storage Area (Area 6) Borrow Pit Pipe Storage Area (Area 7) Mini Hydro Area (Area 8) Discharge Structure Area (Area 9) High Lift Pump Station Roadworks Upgrade Monaro Highway and Angles Crossing Intersection Upgrade 12 4 FENCING Temporary Fencing Chainwire Fencing Stock Fencing 13 Appendix A Drawings 14

4

5 1 PURPOSE The purpose of this plan is to outline the mitigation measures required when setting out the Murrumbidgee to Googong (M2G) project in accordance with the planning approvals. In accordance with the PAA Clause 16.5 the Works Boundary Plan The Alliance must develop and maintain at all times a Works Boundary Plan which specifies the boundaries of the Active Work Site for each Project at any time during the Program from the purpose of clause 10, this clause 16 and clause 28. The plan and all updates to the plan must be submitted to the APMT for agreement in accordance with clause Reference Documents This Document shall be read in conjunction with the Program Works Boundary Plan (BWA-PRW-SY-PLN- 005). BWA - WORKS BOUNDARY PLAN BWA-M2G-SY-PLN-001 1

6 2 Murrumbidgee to Googong Project 2.1 Scope of Works The Murrumbidgee to Googong Water Transfer encompasses the construction and operation of pumping and pipeline infrastructure to transfer up to 100 ML/day of water approximately 12 km from the Murrumbidgee River at Angle Crossing (ACT), to the Googong Reservoir via run-of-river flow in Burra Creek (NSW). The project incorporates a: One metre diameter underground pipeline from the Murrumbidgee River over Gibraltar Pass to Burra Creek at Williamsdale Rd, a combined intake and low lift pump station at Murrumbidgee River, a high lift pump station, an 11 kv power supply, an outlet structure (within Burra Creek), and a mini-hydro power generator located near the outlet structure. The mini-hydro power generator will recover and reuse 25-30% of the pumping energy required to lift the water over the Gibraltar Range. The power generated will be transferred back to the high lift pump station through an underground cable in the same trench as the transfer pipeline. The project crosses the ACT / NSW Boarder just east of the Monaro Highway. 2 BULK WATER ALLIANCE APR L 2010

7 3 PHYSICAL BOUNDARIES The Physical Boundaries of each area vary dependant on the phase of the project. The table below shows the areas required in the final configuration and during the construction phase. These figures are taken from the EIS document (where detailed). Table 3.1 Area of Works Area of Works Jurisdiction Final Construction Permanent Structures Low Lift Pump Station (Area 1) Area 1A: Area 1B: Area 1C: ACT 750 m 2 40 m m m m m 2 High Lift Pump Station (Area 3) ACT 4200 m m 2 Discharge Structure ( Area 9) NSW 1200 m m 2 Mini hydro (Area 8) NSW 250 m m 2 HLPS Roadwork Upgrade (Angle Crossing Road) Angle Crossing Road and Monaro Highway Intersection Upgrade ACT NA 2050 m 2 ACT NA 1100 m 2 Pipework Easements Chainage 0-94 ACT Easement 40m width Chainage ACT Easement 35m width Chainage ACT Easement 35m width Chainage ACT Easement 40m width Chainage ACT Easement 15m width Chainage ACT Easement 35m width Chainage ACT Easement 20m width Chainage ACT Easement 35m width Chainage ACT Easement 20m width Chainage ACT Easement 35m width Chainage ACT Easement 25m width Chainage ACT Easement 40m width Chainage ACT Easement 20m width Chainage ACT Easement 40m width BWA - WORKS BOUNDARY PLAN BWA-M2G-SY-PLN-001 3

8 Area of Works Jurisdiction Final Construction Chainage ACT Easement 20m width Chainage NSW Easement 15m width Chainage NSW Easement 25m width Chainage NSW Easement 35m width Chainage NSW Easement 25m width Chainage NSW Easement 15m width Chainage NSW Easement 30m width Chainage NSW Easement 40m width Chainage NSW Easement 15m width Chainage NSW Easement 40m width Chainage NSW Easement 35m width Chainage NSW Easement 20m width Chainage NSW Easement 30m width Chainage NSW Easement 40m width Chainage NSW Easement 25m width Chainage NSW Easement 20m width Chainage NSW Easement 40m width Electrical Easement Chainage ACT Easement 20m width Temporary Areas Pipe Laydown Area 2 (Angle Crossing) Pipe Laydown Area 4 (Angle Crossing Cattle Grid) Incl PS site office Main Site Office (Area 5) Incl Storage Facility and Pipe storage area Pipe Laydown Area 6 (DP Property) ACT Temp Only 2300 m 2 ACT Temp Only 4200 m 2 ACT Temp Only 9500 m 2 NSW Temp Only m 2 Pipe Laydown Area 7 (Borrow Pit) NSW Temp Only 5000 m 2 4 BULK WATER ALLIANCE APR L 2010

9 3.2 Pipeline Easements The diagram show indicated typical layouts across each easement width. Please note these are only typical layouts and each area will be subject to unique site changes. Appendix A gives the pipeline plans showing the designated easement widths in each area. BWA - WORKS BOUNDARY PLAN BWA-M2G-SY-PLN-001 5

10 3.3 Electrical Line Easement The electrical line between the Mini Hydro Station and the High Lift Pump Station will run in the one easement. However between the Low Lift Pump Station and the High lift Pump Station the electrical easement will be separate to the pipeline easement. This is due to constraints in the length of the electrical cable requirements, and as such the location of the electrical panel to be above regular flood levels. During construction the easement will be 20m wide. 3.4 Low Lift Pump Station (Areas 1 and 2) There are two areas within the lower Angle Crossing area. Area 1 is for the construction of the new Low Lift Pump Station, including associated equipment (Area 1A), and eductor pipework (Area 1B), electrical bunker (Area 1C) and Area 2 is the laydown area for this works. The laydown area will be used for the fabrication of formwork shutters, storage of pipework and mechanical equipment. Please note this diagram does not include the pipework or electrical easement sections. 6 BULK WATER ALLIANCE APR L 2010

11 Block 1572 Block 1611 Murrumbidgee River The figure below shows Area 1A proposed layout as a concept diagram. BWA - WORKS BOUNDARY PLAN BWA-M2G-SY-PLN-001 7

12 3.5 High Lift Pump Station (Area 3) The High Lift pump station is located on the right side of Angles Crossing Road before the decent to the Murrumbidgee River Crossing. The figure below shows the final easement area and the construction easement. Not including the road works in Angles Crossing road required. 3.6 Angle Crossing Road Pipe Storage Area (Area 4) Located on the property (Block 1002A Tuggeranong) to the north west of the pipeline / road crossing area. This storage area will be located on property DP 1002A. Will be used to store pipes and fittings prior to installation or stringing along the route of the pipe. This area will also have a portable toilet facilities and crib rooms, with generator power supply. 8 BULK WATER ALLIANCE APR L 2010

13 Block 1636 Block 1572 Block Main Site Office Building Layout (Area 5) Total area is 9,500m2, located on Block 1471 Tuggeranong. The layout below is an indication of the usage of this area, final layout might be different. BWA - WORKS BOUNDARY PLAN BWA-M2G-SY-PLN-001 9

14 3.8 Pipe Storage Area (Area 6) Located on private property (DP number ). Will be used to store pipes and fittings prior to installation or stringing along the route of the pipe. This area will also have a portable toilet facilities and crib rooms, with generator power supply or permanent power supply. Exact location and layout of area to be confirmed with the landowner prior to establishment. Area x 100m 3.9 Borrow Pit Pipe Storage Area (Area 7) Located on the road reserve at Borrow Pit (Williamsdale Road). Will be used to store pipes and fittings prior to installation or stringing along the route of the pipe and additional materials for the mini hydro and discharge structure (as required). This area will also have a portable toilet facilities and crib rooms, with generator power supply or permanent power supply. 10 BULK WATER ALLIANCE APR L 2010

15 3.10 Mini Hydro Area (Area 8) The mini hydro is located between the new Williamsdale Road and the old section. This area will be utilised during construction for the storage of all the mechanical equipment associated with the Mini Hydro Plant prior to installation. This area will also have a portable toilet facilities and crib rooms, with generator power supply or permanent power supply. The final easement includes an access track to the station, from Williamsdale Road Discharge Structure Area (Area 9) This discharge structure is located in Burra Creek. This area will be used to store materials required during the construction of the discharge structure. The final layout of the access road to the discharge structure will be from Williamsdale Road. BWA - WORKS BOUNDARY PLAN BWA-M2G-SY-PLN

16 3.12 High Lift Pump Station Roadworks Upgrade The entrance to the high lift pump station on Angles Crossing Road is required to be upgraded. A traffic management plan for this area will be developed to ensure the road remains open to traffic during the upgrade works Monaro Highway and Angles Crossing Intersection Upgrade Prior to construction works beginning the intersection at Monaro Highway and Angles Crossing is to be upgraded. The design of this intersection upgrade has been reviewed and approved by the National Capital Authority. 12 BULK WATER ALLIANCE APR L 2010

17 4 Fencing Each area of work will be isolated from the surrounding area utilising boundary fences. A combination of these 3 types of fencing will be used in each area. 4.1 Temporary Fencing Temporary fencing shall be utilised extensively throughout this project. It will be used around all Pipe storage areas and at the Low Lift Pump Station area. 4.2 Chainwire Fencing This type of fence, although permanent can be removed with ease at the completion of the project. This type of fence will only be used around the Main Office complex. 4.3 Stock Fencing To be used along each side of the construction corridor. In conjunction with this temporary and permanent gates will be installed. BWA - WORKS BOUNDARY PLAN BWA-M2G-SY-PLN

18 Appendix A Drawings 14 BULK WATER ALLIANCE APR L 2010

19 Area 1 Area 1 Area 2 Area 2 Electrical Chamber Area 4 Area 3 Electrical Line Easement Monaro Highway Intersection Area 5 Area 3 Road upgrade area Area 6 Area 8 Area 9 Area 7 Area 8 Area 9

20

RULE C2 ZONE STANDARDS - SUBDIVISION

RULE C2 ZONE STANDARDS - SUBDIVISION RULE C SUBDIVISION 1 RULE C2 ZONE STANDARDS - SUBDIVISION NB Words outlined in bold type below have a specific definition contained in Chapter 2 (Definitions). 2.1 STANDARDS RESIDENTIAL ZONE (Refer Part

More information

City of Grande Prairie Development Services Department

City of Grande Prairie Development Services Department City of Grande Prairie Development Services Department COUNTRYSIDE SOUTH OUTLINE PLAN Prepared by: GPEC Consulting Ltd. #202, 10712-100th Street Grande Prairie, AB Council Resolution of August 20, 2001

More information

From: Gerard Reiter, EGM/Asset Management Date: 14 April 2015 Peter McIntyre, Managing Director

From: Gerard Reiter, EGM/Asset Management Date: 14 April 2015 Peter McIntyre, Managing Director TO THE BOARD Item: 6 From: Gerard Reiter, EGM/Asset Management Date: 14 April 2015 Peter McIntyre, Managing Director Category: FOR APPROVAL SECOND SUPPLY TO THE ACT STOCKDILL DRIVE 330kV SWITCHING STATION

More information

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services. Conditions Relating to Draft Plan of Subdivision Approval East Fonthill 26T 01014 (Draft Plan dated December 1, 2013, and revised August 28, 2014), the Town of Pelham 1. This approval applies to the Draft

More information

The Drainage Control Regulations

The Drainage Control Regulations 1 The Drainage Control Regulations Repealed by Saskatchewan Regulations 89/2015 (effective October 16, 2015) Formerly Chapter D-33.1 Reg 1 (effective August 18, 1981) as amended by Saskatchewan Regulations

More information

Beltrami County Natural Resource Management Policy: Easements and Access Across County Lands

Beltrami County Natural Resource Management Policy: Easements and Access Across County Lands Page 1 Purpose Beltrami County Natural Resource Management Policy: Easements and Access Across County Lands The procedure and requirements for private, government, commercial, and utility entities to cross

More information

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

Preliminary Subdivision Application (Minor) (Three (3) lots or less) Gunnison City Offices www.gunnisoncity.org 38 West Center Gunnison, Utah 84634 (435) 528 7969 Date of Application: Preliminary Subdivision Application (Minor) (Three (3) lots or less) APPLICANT INFORMATION

More information

Administration and Calculation of Servicing Agreement Fees and Development Levies

Administration and Calculation of Servicing Agreement Fees and Development Levies Administration and Calculation of Servicing Agreement Fees and Development Levies Policy Title: Applies to: Reference # Administration and Calculation of Servicing Agreement Fees and City of Regina ###-XXX-##

More information

PLEASE COMPLETE ALL SECTIONS USING BLOCK CAPITALS AND BLACK INK

PLEASE COMPLETE ALL SECTIONS USING BLOCK CAPITALS AND BLACK INK Application for adoption of new sewers Section 104 WIA t a~united ~ ~ Utilities ~~tng life f\ow smoothly This form should be used to offer proposed drainage systems for adoption by United Utilities under

More information

Preliminary Subdivision Application (Major) (Four (4) lots or more)

Preliminary Subdivision Application (Major) (Four (4) lots or more) Gunnison City Offices www.gunnisoncity.org 38 West Center Gunnison, Utah 84634 (435) 528 7969 Date of Application: Preliminary Subdivision Application (Major) (Four (4) lots or more) APPLICANT INFORMATION

More information

Once your eligibility has been approved, you will need to provide a strategy containing the specific details of the proposed tankering arrangements.

Once your eligibility has been approved, you will need to provide a strategy containing the specific details of the proposed tankering arrangements. What is tankering? Tankering is the removal of wastewater by carting. Tankering may be negotiated to allow a subdivision to proceed in situations where the commissioning of wastewater infrastructure such

More information

Appendix 4 Agency Approval Letters

Appendix 4 Agency Approval Letters Appendix 4 Agency Approval Letters 55 Appendix4.a. Appendix 4.b. Appendix 4.c. Appendix 4.d. 3/10/2016 Clarksburg Mews, LLC c/o Michael Fisher 4938 Hampden Lane Bethesda, MD 20814 Re: Phase

More information

Utility Corridors on Public Land PL DEFINITIONS. In this policy,

Utility Corridors on Public Land PL DEFINITIONS. In this policy, Ontario Ministry of Natural Resources Subject Utility Corridors on Public Land Compiled by - Branch Lands and Waters Replaces Directive Title Utility Corridor Management Section Land Management Policy

More information

BYLAW 5781 ****************

BYLAW 5781 **************** BYLAW 5781 **************** A BYLAW OF THE CITY OF LETHBRIDGE PROVIDING FOR THE IMPOSITION OF AN OFF-SITE LEVY IN RESPECT OF LAND TO BE DEVELOPED OR SUBDIVIDED FOR THE YEARS 2013, 2014, 2015 and 2016 ************************************************************

More information

SECTION SITE SURVEYS

SECTION SITE SURVEYS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 02 21 00 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //---// if not applicable to project. Also delete any other item or paragraph

More information

619. Planned Development District (PD)

619. Planned Development District (PD) 619. Planned Development District (PD) Intent. The purpose of the Planned Development District (sometimes hereinafter referred to as PD) is to provide opportunities to create more desirable environments

More information

The Subdivision Regulations, 2014

The Subdivision Regulations, 2014 SUBDIVISION REGULATIONS, 2014 P-13.2 REG 2 1 The Subdivision Regulations, 2014 being Chapter P-13.2 Reg 2 (effective July 18, 2014). NOTE: This consolidation is not official. Amendments have been incorporated

More information

Explanation The policies ensure that land is suitable for subdivision and will not increase risks to people, the environment and property.

Explanation The policies ensure that land is suitable for subdivision and will not increase risks to people, the environment and property. 23 Subdivision 23.1 Purpose a) Subdivision is essentially the process of dividing a parcel of land or a building into one or more further parcels, or changing an existing boundary location. Subdivision

More information

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS 2.1 Required Plan Sheets 2.2 Drawing Requirements 2.3 Graphic Standards 2.4 Easements 2.5 Utility Locations 2.6 Private Facility Locations

More information

Policy and Standards for Public Local Residential Streets And Private Streets

Policy and Standards for Public Local Residential Streets And Private Streets Appendix A City of Toronto Development Infrastructure Policy & Standards Policy and Standards for Public Local Residential Streets And Private Streets November 2005 Policy and Standards For Public Local

More information

ATTACHMENT 2: CONSULTATION UPDATE NO. 3 PART 3 LANDOWNER ENGAGEMENT

ATTACHMENT 2: CONSULTATION UPDATE NO. 3 PART 3 LANDOWNER ENGAGEMENT ATTACHMENT 2: CONSULTATION UPDATE NO. 3 PART 3 LANDOWNER ENGAGEMENT TABLE OF CONTENTS 1.0 INTRODUCTION... 1 Page 1.1 Purpose of Update... 1 1.2 Program Scope (May 1 to December 31, 2014)... 1 2.0 COMPONENTS

More information

ARTICLE 3 DEFINITIONS

ARTICLE 3 DEFINITIONS Sections: 3-1 Rules of Construction 3-2 Definitions ARTICLE 3 DEFINITIONS SECTION 3-1 RULES OF CONSTRUCTION 3-101. a. The language set forth in these regulations shall be interpreted in accordance with

More information

Condominium Unit Requirements.

Condominium Unit Requirements. ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

TS 102 EASEMENT STANDARD

TS 102 EASEMENT STANDARD TS 102: Easement Standard for Distribution Networks TS 102 EASEMENT STANDARD FOR DISTRIBUTION NETWORKS TECHNICAL STANDARD Published: 07 April 2014 SA Power Networks www.sapowernetworks.com.au SA Power

More information

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name:

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name: TOWNSHIP OF UPPER ST. CLAIR FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST Date Filed Plan Name PLC Applicant's Name: Phone Filing Date for Final Application Final Plat 114.22. FINAL APPLICATION

More information

MAPLETON CITY CORPORATION. Step 7: Upon final approval and prior to plat recording the applicant shall provide the following:

MAPLETON CITY CORPORATION. Step 7: Upon final approval and prior to plat recording the applicant shall provide the following: MAPLETON CITY CORPORATION Subdivision Process The City s subdivision requirements are designed to facilitate orderly, safe and efficient development and to implement the adopted General Plan. Below is

More information

Requirements for accepted development and assessment benchmarks for assessable development

Requirements for accepted development and assessment benchmarks for assessable development 9.3.10 Small Lot Housing Design Code 9.3.10.1 Application (1) This code applies to development identified as requiring assessment against the Small Lot Housing Design Code by the categories of development

More information

REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS

REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS October 1, 2018 Northern Wasco County People s Utility District ( NWCPUD )

More information

Servicing Dual Occupancy and Other Two-Dwelling Developments

Servicing Dual Occupancy and Other Two-Dwelling Developments 1. Background Sydney Water has three documents that set out the rules for applicants who want to connect to Sydney Water s sewer or water systems. However, because dual occupancy developments are often

More information

Volume Three Appendix 7. Scheme Plan and other subdivision requirements

Volume Three Appendix 7. Scheme Plan and other subdivision requirements Volume Three Appendix 7 Appendix 7 Scheme Plan and other subdivision requirements Any application for subdivision consent must be accompanied by a Scheme Plan that contains the information set out in this

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario EB-2013-0040 EB-2013-0041 IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B); AND IN THE MATTER OF an application

More information

Section 3 Right-of-Way

Section 3 Right-of-Way Section 3 Right-of-Way 3.1 General For the purposes of this section, Right-of-Way (ROW) is considered fee-owned land and/or easement. CVWD owns approximately 7,000 acres of land and has approximately 3,240

More information

Ownership and maintenance of lines on private land

Ownership and maintenance of lines on private land Electricity Commission RMAG: 17 January 20088 Ownership and maintenance of lines on private land Prepared by: Ron Beatty Senior Adviser Retail Discussion and approval Electricity Commission Board meeting:

More information

Site Plan Application

Site Plan Application Site Plan Application City of St. Pete Beach Community Development Department 155 Corey Avenue St. Pete Beach, Florida 33706 (727) 367-2735 www.stpetebeach.org Case Number: PROPERTY OWNER: Name: Address:

More information

7. EASEMENTS Label Established Lines Affecting Tract and/or Mentioned in its Legal Description:

7. EASEMENTS Label Established Lines Affecting Tract and/or Mentioned in its Legal Description: 7. EASEMENTS 7.010 General All sewers shall be constructed in easements with working room. Existing easements without working room may only be used if revised to include working room. All public sewers,

More information

Land Development Manual March Land Development Manual. March newater.com.au

Land Development Manual March Land Development Manual. March newater.com.au Land Development Manual March 2017 newater.com.au CONTENTS LIST OF FIGURES... 5 1. KEY TERMS AND ABBREVIATIONS... 6 2. ABOUT THIS MANUAL... 9 2.1 PURPOSE... 9 2.2 SCOPE... 9 2.3 INTRODUCTION... 9 3. DEVELOPMENT

More information

Answers to Chatham Residents Questions about the Western Wake Partners

Answers to Chatham Residents Questions about the Western Wake Partners Answers to Chatham Residents Questions about the Western Wake Partners We want the residents of Chatham County to fully understand the purpose and impact of the Western Wake Partners (WWP) request for

More information

CORPORATE STANDARD FUNDING AND DELIVERY OF GROWTH INFRASTRUCTURE VERSION: 1.0

CORPORATE STANDARD FUNDING AND DELIVERY OF GROWTH INFRASTRUCTURE VERSION: 1.0 CORPORATE STANDARD FUNDING AND DELIVERY OF GROWTH INFRASTRUCTURE VERSION: 1.0 Contents 1. Purpose... 3 2. Scope... 3 3. Definitions... 3 4. Growth Plan... 4 5. Funding and delivery categories... 4 5.1

More information

PORT PHILLIP PLANNING SCHEME. Condition

PORT PHILLIP PLANNING SCHEME. Condition SCHEDULE 1 TO THE CAPITAL CITY ZONE Shown on the planning scheme map as CCZ1. FISHERMANS BEND URBAN RENEWAL AREA Purpose To use and develop the Fishermans Bend Urban Renewal Area generally in accordance

More information

Patrick L. Reznik

Patrick L. Reznik Patrick L. Reznik 512-894-5426 preznik@braungresham.com www.braungresham.com 1 LCRA/CTEC Blumenthal Substation Saturday, September 6, 2014 Hill Country Alliance, Fredericksburg, TX 2 Big Picture Phase

More information

Property Development Connection Requirements (Sewer)

Property Development Connection Requirements (Sewer) 1. Purpose These guidelines apply to developed property and outline: (c) (d) what is a satisfactory point of connection; what works must be provided or funded by applicants; what different development

More information

Licence to Take and Use Surface Water and Operate Works (Unregulated)

Licence to Take and Use Surface Water and Operate Works (Unregulated) APPLICATION FORM 71 Licence to Take and Use Surface Water and Operate Works (Unregulated) What is this application form for? Use this form to make application for a Licence to Take and use Surface water

More information

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit. To Whom It May Concern: Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit. The fee for the permit application is $75.00, which shall be made payable to

More information

ARTICLE 13 CONDOMINIUM REGULATIONS

ARTICLE 13 CONDOMINIUM REGULATIONS ARTICLE 13 CONDOMINIUM REGULATIONS Section 13.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

Policy: Distribution Subdivision

Policy: Distribution Subdivision Policy: Distribution Subdivision Standard Number: HPC-11AH-07-0002-2015 Author Name: Adrian Barnes Document Control Document Owner (May also be the Process Owner) Position: Name: Position: Standards Engineer

More information

PRESSURE SEWER SYSTEM GUIDELINES

PRESSURE SEWER SYSTEM GUIDELINES PRESSURE SEWER SYSTEM GUIDELINES Amendment, Distribution & Authorisation Record Amendment Record Revision Description / Details Date A Draft Document 29/02/2016 B Updated Draft Document 18/05/16 Approval

More information

Contract for the sale and purchase of land edition TERM MEANING OF TERM NSW Duty: vendor s agent Celestino Realty Pty Limited ACN

Contract for the sale and purchase of land edition TERM MEANING OF TERM NSW Duty: vendor s agent Celestino Realty Pty Limited ACN 2017 The Law Society of New South Wales ACN 000 000 699 and The Real Estate Institute of New South Wales ACN 000 012 457. You can prepare your own version of pages 1 and 2 of this contract. Except as permitted

More information

GO Rail Network Electrification Transit Project Assessment Process

GO Rail Network Electrification Transit Project Assessment Process GO Rail Network Electrification Transit Project Assessment Process Study Summary: Land Use & Socio-Economic Assessment (Appendix E) Land Use Scope of the Study The scope of the GO Rail Network Electrification

More information

Date Received: Application Complete? YES / NO

Date Received: Application Complete? YES / NO OFFICE USE ONLY Section 22 (Official Plan Amendment) Section 34 (Zoning Amendment), Section 36 (Holding Zone Removal), Section 41 (Site Plan Approval) and Section 45 (Minor Variance) of the Planning Act

More information

Rule 21 STANDARDS OF PRACTICE FOR SURVEYING

Rule 21 STANDARDS OF PRACTICE FOR SURVEYING Rule 21 STANDARDS OF PRACTICE FOR SURVEYING 21.1 Whenever a survey is performed, it shall comply with Section 73-13-71 (4) and Section 73-13- 73 and the Standards of Practice for Surveying in Mississippi

More information

MUNICIPALITY OF THE COUNTY OF PICTOU SUBDIVISION BY-LAW. Act means the Municipal Government Act, Stats. N.S., 1998, c. 18 and amendments thereto;

MUNICIPALITY OF THE COUNTY OF PICTOU SUBDIVISION BY-LAW. Act means the Municipal Government Act, Stats. N.S., 1998, c. 18 and amendments thereto; MUNICIPALITY OF THE COUNTY OF PICTOU SUBDIVISION BY-LAW SHORT TITLE 1. This by-law may be cited as the Pictou County Subdivision By-Law and shall apply to all lands within the Municipality of the County

More information

Use permitted by: Right Special Exemption

Use permitted by: Right Special Exemption CENTER TOWNSHIP 150 Henricks Road Butler, PA 16001-8472 Phone (724) 282-7805 Fax (724) 282-6550 Application Number: FEE COLLECTED: Application for: Preliminary Final Land Development Location: Map and

More information

ARTICLE 23 CONDOMINIUM STANDARDS

ARTICLE 23 CONDOMINIUM STANDARDS ARTICLE 23 CONDOMINIUM STANDARDS Section 23.01 Intent. The intent of this Article is to provide regulatory standards for condominiums and site condominiums similar to those required for projects developed

More information

Well Survey Requirements

Well Survey Requirements Well Survey Requirements Directive PNG003 November 2015 Revision 1.0 Governing Legislation: Act: The Oil and Gas Conservation Act Regulation: The Oil and Gas Conservation Regulations, 2012 Record of Change

More information

LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES. Engineering & Permitting Requirements

LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES. Engineering & Permitting Requirements 3.7 Access Gates 3.7.1 A permit may be issued for an access gate on LWDD right-of-way upon receipt of all requirements contained in this section. The permit shall be temporary and may be revoked by LWDD

More information

Pakenham East Precinct Structure Plan Design Response options for the Transmission Easement

Pakenham East Precinct Structure Plan Design Response options for the Transmission Easement Pakenham East Precinct Structure Plan Design Response options for the Transmission Easement urban design planning engineering surveying landscape architecture project management Quality Assurance Report

More information

Copyright and Disclaimer

Copyright and Disclaimer 13 FEBRUARY 2019 Copyright and Disclaimer Copyright in this material is owned by or licensed to ElectraNet. Permission to publish, modify, commercialise or alter this material must be sought directly from

More information

ORANGE BLOSSOM GARDENS PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC.

ORANGE BLOSSOM GARDENS PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC. ORANGE BLOSSOM GARDENS A PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC. REVISED OCTOBER 19, 1992 BY THE COLLIER COUNTY LONG RANGE PLANNING DEPARTMENT REVISED DECEMBER, 2008

More information

Plan: Full name and address of the owner of the land:

Plan: Full name and address of the owner of the land: Full name and address of the owner of the land: LegPro 54B Pty. Ltd LegPro 54C Pty. Ltd. 601 High Street Suite 2704, Level 27 PENRITH. 2750 19-29 Martin Place SYDNEY NSW 2000 (Sheet 1 of 14 Sheets) Part

More information

HYDRAULIC SERVICES BY - LAW

HYDRAULIC SERVICES BY - LAW Repeal HOBART CITY COUNCIL HYDRAULIC SERVICES BY - LAW BY-LAW 4 OF 2008 BY-LAW MADE UNDER SECTION 145 OF THE LOCAL GOVERNMENT ACT 1993 AND SECTION 67 A OF THE SEWERS AND DRAINS ACT 1954 FOR THE PURPOSE

More information

Land rights requirements relating to assets to be installed or adopted by SEPD or SHEPD for new connections

Land rights requirements relating to assets to be installed or adopted by SEPD or SHEPD for new connections Land rights requirements relating to assets to be installed or adopted by SEPD or SHEPD for new connections Information for SEPD and SHEPD Staff, ICPs, IDNOs and connection customers v1.1 August 2016 Background

More information

GUIDELINES FOR BUILD OVERS

GUIDELINES FOR BUILD OVERS GUIDELINES FOR BUILD OVERS 2018 Table of Contents 1 Introduction... 3 2 Definitions... 4 3 Application Process... 6 3.1 Pre Application... 6 3.2 Assessment (2 weeks)... 6 3.3 Final Approval... 6 3.4 Change

More information

People, Property and Power Lines. Frequently asked questions about power lines on or near your property

People, Property and Power Lines. Frequently asked questions about power lines on or near your property People, Property and Power Lines Frequently asked questions about power lines on or near your property Great River Energy is a not-for-profit wholesale electric power cooperative which provides electricity

More information

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION OF LAND REGULATIONS TITLE 17

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION OF LAND REGULATIONS TITLE 17 ARTICLE VI -- GENERAL REGULATIONS AND PROVISIONS Sec. 17-50. Sec. 17-51 General Plan. Sec. 17-52 Lot and Block Design and Configuration. Sec. 17-53 Lot Access. Sec. 17-54 Private Roads. Sec. 17-55 Water

More information

Developer Services. Sewerage Technical Team: Fees for April 2018

Developer Services. Sewerage Technical Team: Fees for April 2018 Developer Services Sewerage Technical Team: Fees for 2018-2019 April 2018 Fees for 2018-2019 Sewerage Technical Team Fees for 2018-2019 DOCUMENT CONTROL Author Natalie Drake Created Date February 2018

More information

Development assessment and compliance fees 2010/11

Development assessment and compliance fees 2010/11 Development assessment and compliance fees 2010/11 This fact sheet will assist you to determine which Brisbane City Council development assessment and compliance fees are applicable to your development.

More information

Chapter 22 LAND USE* Article III. Subdivisions

Chapter 22 LAND USE* Article III. Subdivisions Chapter 22 LAND USE* Article III. Subdivisions Sec. 22-256. Authority to Regulate. Sec. 22-257. Scope; plat required. Sec. 22-258. Definitions. Sec. 22-259. Interpretations and Meanings. Sec. 22-260. Procedure

More information

PROVINCIAL SUBDIVISION REGULATIONS. Municipal Government Act

PROVINCIAL SUBDIVISION REGULATIONS. Municipal Government Act PROVINCIAL SUBDIVISION REGULATIONS Made under Section 270 of the Municipal Government Act Chapter 18 of the Statutes of Nova Scotia, 1998 Service Nova Scotia and Municipal Relations April 1, 1999 (with

More information

Objectives The objectives are as listed in the relevant underlying zones and Auckland wide provisions, except as specified below:

Objectives The objectives are as listed in the relevant underlying zones and Auckland wide provisions, except as specified below: 6.35 Drury 1 Precinct description The precinct has an area of 84.62 ha and is bordered by Drury Creek in the north, southern motorway to the east SH22(Karaka road) to the south and Jesmond road to the

More information

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT 700. 701.A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT SECTION 700 PURPOSE The purpose of this Article is to set forth a streamlined set of Plan Requirements for minor

More information

ROAD APPROACH ORDINANCE #44 TILLAMOOK COUNTY OREGON. ADOPTED September 18, UPDATED June 23, UPDATED June 28, UPDATED July 24, 1996

ROAD APPROACH ORDINANCE #44 TILLAMOOK COUNTY OREGON. ADOPTED September 18, UPDATED June 23, UPDATED June 28, UPDATED July 24, 1996 ROAD APPROACH ORDINANCE #44 TILLAMOOK COUNTY OREGON ADOPTED September 18, 1991 UPDATED June 23, 1993 UPDATED June 28, 1995 UPDATED July 24, 1996 UPDATED June 23, 1999 UPDATED January 1, 2009 UPDATED November

More information

Individual Well Individual Septic. Community Well 19. What is the proposed method of sewage disposal? Public. None

Individual Well Individual Septic. Community Well 19. What is the proposed method of sewage disposal? Public. None Please Answer the Following Questions: (attach sheet if needed). What type of facility is being proposed? Campground Recreational Vehicle (RV) Park Both 2. What is the total acreage of the proposed facility?

More information

MUNICIPALITY OF THE DISTRICT OF CLARE SUBDIVISION BY-LAW

MUNICIPALITY OF THE DISTRICT OF CLARE SUBDIVISION BY-LAW MUNICIPALITY OF THE DISTRICT OF CLARE SUBDIVISION BY-LAW 1 Table of Contents PART 1 - TITLE... 4 PART 2 - INTERPRETATION... 4 PART 3 - DEFINITIONS... 4 PART 4 - PROCEDURE FOR APPROVAL OF PLANS OR INSTRUMENTS

More information

Guide to Subdivision and Land Development

Guide to Subdivision and Land Development Guide to Subdivision and Land Development Fraser Thomas Ltd......is an engineering and surveying consulting firm based in Highbrook which has provided Surveying, Engineering, Planning and Resource Management

More information

Full name and address of the owner of the SIDEHILL PTY LIMITED Land: ACN David Street ALBURY NSW 2640.

Full name and address of the owner of the SIDEHILL PTY LIMITED Land: ACN David Street ALBURY NSW 2640. Sheet 1 of 8 Full name and address of the owner of the SIDEHILL PTY LIMITED Land: ACN 098 729 698 680 David Street ALBURY NSW 2640 Part 1 (Creation) Number of Item show in the intention panel on the plan.

More information

Guideline: Distribution Pole to Pillar

Guideline: Distribution Pole to Pillar Guideline: Distribution Pole to Pillar Standard Number: HPC-2AH-07-0001-2014 Document Number: 3173582 Date Printed: 17/10/2017 Document Control Author Name: Anthony Seneviratne Position: Standards Engineer

More information

Application for Outline Plan / Outline Plan Waiver Section 176A, Resource Management Act

Application for Outline Plan / Outline Plan Waiver Section 176A, Resource Management Act Email: applications@waidc.govt.nz www.waikatodistrict.govt.nz Telephone (all hours) 07 824 8633 Call Free 0800 492 452 District Office 15 Galileo Street Private Bag 544 Ngaruawahia 3742 Application for

More information

Build Over Easement Guidelines

Build Over Easement Guidelines Build Over Easement Guidelines Document Owner Creation Date 13/04/2015 Revision Date 20/04/2015 Manager Engineering Services Engineering Services Please check Council s Intranet to ensure this is the latest

More information

Administration and Calculation of Servicing Agreement Fees and Development Levies

Administration and Calculation of Servicing Agreement Fees and Development Levies Administration and Calculation of Servicing Agreement Fees and Development Levies Policy Title: Applies to: Administration and Calculation of Servicing Agreement Fees and City of Regina City Planning and

More information

PROVINCIAL PUBLIC HIGHWAY PERMIT APPLICATION

PROVINCIAL PUBLIC HIGHWAY PERMIT APPLICATION PERMIT APPLICATION District File Number Your File Number The personal information on this form is collected under the authority of the Transportation Act. The information collected will be used to process

More information

R/W PREQUALIFICATION ODOT, 3/14/2018

R/W PREQUALIFICATION ODOT, 3/14/2018 R/W PREQUALIFICATION ODOT, 3/14/2018 BRETT SHEARER, C.O. REAL ESTATE PROPOSED RIGHT OF WAY DESIGN 172 PROPOSED RIGHT OF WAY DESIGN PROPOSED RIGHT OF WAY DESIGN Section 3200 Types of Title 173 PROPOSED

More information

R-11. REPORT ON SUBDIVISION WITHIN THE AGRICULTURAL LANDRESERVE FILE NO. 212/2017 (Simpson) PEACE RIVER REGIONAL DISTRICT DEVELOPMENT SERVICES

R-11. REPORT ON SUBDIVISION WITHIN THE AGRICULTURAL LANDRESERVE FILE NO. 212/2017 (Simpson) PEACE RIVER REGIONAL DISTRICT DEVELOPMENT SERVICES PEACE RIVER REGIONAL DISTRICT DEVELOPMENT SERVICES REPORT ON SUBDIVISION WITHIN THE AGRICULTURAL LANDRESERVE FILE NO. 212/2017 (Simpson) OWNER: David A. Simpson DATE: October 19, 2017 AREA: Electoral Area

More information

Planning Justification Report

Planning Justification Report Planning Justification Report, Township of Puslinch FARHI HOLDINGS CORPORATION Updated January 27, 2017 Zelinka Priamo Ltd. Page i TABLE OF CONTENTS Page No. 1.0 1.1 1.2 1.3 2.0 2.1 2.2 2.3 2.4 2.5 3.0

More information

FACT SHEET: Tenure requirements for Major Customer Connections

FACT SHEET: Tenure requirements for Major Customer Connections FACT SHEET: for Major Customer Connections Purpose February 2014 Version 1.0 This fact sheet describes the types of underlying land tenure required by Ergon Energy in situations where a Major Customer

More information

APPENDIX B. SUBMISSION REQUIREMENTS

APPENDIX B. SUBMISSION REQUIREMENTS Master Major Site Minor Site Landscape Section B.1 Table of /Plat Requirements Proposed or approved name of development, project, subdivision, and/or phase. Location, including township, county, and state.

More information

SUBDIVISION AND DEVELOPMENT STANDARDS BYLAW. Date: Monday, April 27, Annacis Room. 4:30-4:45 pm

SUBDIVISION AND DEVELOPMENT STANDARDS BYLAW. Date: Monday, April 27, Annacis Room. 4:30-4:45 pm L P SUBDIVISION AND DEVELOPMENT STANDARDS BYLAW Date: Monday, April 27, 2015 I. Location: Time: Annacis Room 4:30-4:45 pm Presentation: Steven Lan, Director of Engineering Background Materials: Memorandum

More information

Development and. Public Rights of Way. Advice note for developers and development management officers

Development and. Public Rights of Way. Advice note for developers and development management officers Development and Public Rights of Way Advice note for developers and development management officers January 2010 Advice note for developers and development management officers Development and Public Rights

More information

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY Adopted January 3, 2012 PURPOSE: The purpose of the policy statement is to clarify the policies and procedures of the City of Fort

More information

File in Triplicate with the City

File in Triplicate with the City Change of Zone/Variance/Special Permit/Site Plan Application City of Dunkirk City Hall 342 Central Avenue Dunkirk, NY 14048 (716)366-9858 FAX: 366-0058 VARIANCE SPECIAL PERMIT SITE PLAN ZONING CHANGE Please

More information

Underground Electric Distribution Systems for Developments DATE CREATED: 10/01/85 REVISED: 10/14/14

Underground Electric Distribution Systems for Developments DATE CREATED: 10/01/85 REVISED: 10/14/14 PROCEDURE: T&D 20422 013 URACD DISTRIBUTION PROCEDURE TITLE: Underground Electric Distribution Systems for Developments DATE CREATED: 10/01/85 REVISED: 10/14/14 OBJECTIVES: - to provide uniform procedures

More information

Information Memorandum

Information Memorandum Information Memorandum Frenchs Forest 67-75 Dareen Street 320-328 Warringah Road Agent - Stuart Bath 0416 207 215 INFORMATION Memorandum Sections 1 Executive Summary 2 About the property 3 Northern Beaches

More information

HOMELEIGH SPETCHLEY WORCESTER WR5 1RU

HOMELEIGH SPETCHLEY WORCESTER WR5 1RU HOMELEIGH SPETCHLEY WORCESTER WR5 1RU Comprising a 3 Bedroom Bungalow with Scope for Improvement and Decent Farm Buildings together with 14.16 ha or 34.95 acres. For Sale as a Whole or in 3 Lots Lot 1:

More information

Tentative Map Application Review Procedures

Tentative Map Application Review Procedures FOR REFERENCE ONLY This page is not part of the application. Tentative Map Application Review Procedures The tentative map process in Churchill County is designed to provide a mechanism in order to divide

More information

EXHIBIT LIST No Exhibit Name Page 1 P7 Compensation Presentation.pdf (P7) 2-47

EXHIBIT LIST No Exhibit Name Page 1 P7 Compensation Presentation.pdf (P7) 2-47 Reference No: HOC/10001 Petitioner: Phase 2a Teach-ins Published to Collaboration Area: Friday 23-Mar-2018 EXHIBIT LIST Page 1 of 47 No Exhibit Name Page 1 P7 Compensation Presentation.pdf (P7) 2-47 HOC/10001/0001

More information

Conceptual Scheme SE W4

Conceptual Scheme SE W4 December 2012 1. PURPOSE 1.1. The purpose of a Conceptual Scheme (CS) is as follows: a) To provide a framework for the subsequent subdivision and/or development of land within the Country Residential Policy

More information

GENERAL PLAN, DEVELOPMENT CODE AND ZONING MAP AMENDMENT APPLICATION INFORMATION SHEET

GENERAL PLAN, DEVELOPMENT CODE AND ZONING MAP AMENDMENT APPLICATION INFORMATION SHEET GENERAL PLAN, DEVELOPMENT CODE AND ZONING MAP AMENDMENT APPLICATION INFORMATION SHEET GENERAL INFORMATION This information sheet explains how an application requesting an amendment to the Truckee General

More information

SCHEDULE OF EASEMENTS

SCHEDULE OF EASEMENTS NOTE: THE SCHEDULE MUST BE SIGNED BY THE OWNERS & MORTGAGEES OF THE LAND AFFECTED. SIGNATURES MUST BE ATTESTED. PAGE 1 OF 6 PAGES EASEMENTS AND PROFITS Each lot on the plan is together with:- (1) such

More information

DRAFT LOCAL VALIDATION CHECKLIST FOR ALL APPLICATIONS

DRAFT LOCAL VALIDATION CHECKLIST FOR ALL APPLICATIONS DRAFT LOCAL VALIDATION CHECKLIST FOR ALL APPLICATIONS For public consultation 9 February to 9 March 2015 February 2015 1 NATIONAL REQUIREMENTS Application Form Design & Access Statement (DAS) If major

More information

CERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS

CERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS ARTICLE 9 FORMS AND CHECK LISTS 9.100 On preliminary layout & final subdivision plat CERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS I hereby certify that the (...type: private or pubic...)

More information

GUIDELINES. RESIDENTIAL ENTRANCES To COUNTY ROADS

GUIDELINES. RESIDENTIAL ENTRANCES To COUNTY ROADS GUIDELINES For RESIDENTIAL ENTRANCES To COUNTY ROADS Dept. of Public Works Roads Division 0 TABLE OF CONTENTS INTRODUCTION 2 REGULATIONS 1.0 General Policy 3 2.0 Procedure For Obtaining An Entrance Permit

More information