1 Land Development Manual March 2017 newater.com.au

2 CONTENTS LIST OF FIGURES KEY TERMS AND ABBREVIATIONS ABOUT THIS MANUAL PURPOSE SCOPE INTRODUCTION DEVELOPMENT AND PLANNING APPROVAL PROCESS WITHIN DECLARED DISTRICTS INTRODUCTION WHAT IS A DEVELOPMENT FIRE FLOWS NORTH EAST WATER S ROLE IN THE PLANNING PROCESS PLANNING AND ENVIRONMENT ACT SUBDIVISION ACT WATER ACT APPROVAL PROCESS FOR DEVELOPER WORKS DEVELOPER WORKS AGREEMENT DESIGN PLANS FOR COMMENT APPROVAL AND ACCEPTANCE REQUIREMENTS BEFORE CONSTRUCTION CAN COMMENCE CONSTRUCTION CONNECTION AND COMPLETION SUBDIVISIONS AND NON-SUBDIVISIONS WHAT IS A SUBDIVISION COMMON PROPERTY AND OWNERS CORPORATION TWO (2) LOT SUBDIVISIONS MORE THAN TWO (2) LOT SUBDIVISIONS LOT EXCISION newater.com.au 3 of 22

3 4.6 NON-REFERRAL OF A SUBDIVISION REQUIREMENTS UNDER SUBDIVISIONS ACT MAIN EXTENSIONS TAPPING INTO TRUNK MAINS CONSIDERATIONS FOR CONNECTIONS GUIDING PRINCIPLES OTHER TYPES OF CONNECTION ARRANGMENTS OUT OF DISTRICT TRADE WASTE RECLAIMED WATER SUPPLY AND USE WHAT IS RECLAIMED WATER ENVIRONMENTAL IMPROVEMENT PLANS NORTH EAST WATER ASSET PROTECTION WHAT ARE NORTH EAST WATER ASSETS STATUTORY PROTECTION EASEMENTS RESERVES AND BUILD OVER EASEMENTS BUILD OVER APPROVAL ROAD RESERVES OTHER RESERVES PRESSURE MAINS ON PRIVATE LAND REFENCE MATERIAL AND LINKS NORTH EAST WATER ADOPTED STANDARDS NORTH EAST WATER ADDITIONAL STANDARDS REFERENCES AND WEBSITES NORTH EAST WATER EXAMPLE CHECKLISTS FOR DESIGN PLANS LAND DEVELOPMENT MANUAL REVIEW PROCESS newater.com.au 4 of 22

4 LIST OF FIGURES Figure 1 Planning Referral Flow Chart Figure 2 Standard two lot Owners Corporation Figure 3 Typical 2 lot Subdivision Figure 4 Typical 2 + lots Subdivision Figure 5 Subdivision (Excision) of existing building/dwelling newater.com.au 5 of 22

5 1. KEY TERMS AND ABBREVIATIONS Applicant Person(s) applying to Council for a Planning Permit or person(s) applying to register a plan Accredited Contractor Agreement As Constructed Plans A contractor, approved by North East Water as having the skills and experience necessary to carry out connection works to North East Water assets. All approved accredited contractors have submitted extensive documentation to North East Water evidencing their experience, licencing, insurance and OH&S policies An agreement with North East Water to develop a subdivision, extend a water/sewer main or to service a property Plans showing as constructed details of any works carried out as part of a development Certification Common Property Connection Points Consolidation Consultant Design Plans Developer Easement Consent to certification of a plan of subdivision referred to North East Water by the Responsible Authority Property owned by the owners corporation electively on behalf of the lot owners in a plan of subdivision Pipe connecting the household sanitary drainage to North East Water s sewer main The consolidation of existing lots into a reduced number of lots A suitable qualified engineer, recognised by North East Water as experienced in water/sewer design and project management Sewer and Water design plans submitted to North East Water for approval The person responsible for the single connection, private works or developer works including the landowner Portion of land set aside for the benefit of a specified party and use, as indicated in the easement schedule newater.com.au 6 of 22

6 Endorsed Plan Final Release Kick-off Meeting Landowner Lot New Customer Contributions Owners Corporation Planning Schemes Plan endorsed by Responsible Authority in accordance with the approved planning permit under the Planning and Environment Act 1987 End of maintenance period specified in the agreement. If no further works are required, the owner/developer is released of any obligations towards the development The site meeting held prior to civil works commencing. The meeting purpose is to discuss construction methods, testing program and establish site protocols. Person/entity that is the registered or entitled to be registered as the proprietor of the land A part of any land (except a road, reserve or common property) shown on a plan which can be disposed of separately and includes a lot or accessory lot on a registered plan of strata subdivision and a lot or accessory lot on a registered cluster plan A one-off upfront charge levied by North East Water when a new connection is made to its reticulated water, sewerage or recycled water network. A statutory corporation created by registration of a plan of subdivision or a plan of strata or cluster subdivision (formerly known as a body corporate) Planning schemes set out policies and provisions for the use, development and protection of land. Each local government area in Victoria is covered by a planning scheme and some special planning areas are also covered Plan Subdivision of A plan showing the subdivision of land submitted by a licensed surveyor Planning Permit A permit under the Planning and Environment Act 1987 showing intention to the development of the land Practical Completion Construction works are completed to the satisfaction of North East Water as being operational Pressure Main Can include: Water main, sewer main, recycled water main or re-use main newater.com.au 7 of 22

7 Proposed Plan Referral Authority Responsible Authority Proposed Plan of Subdivision with a valid PS number, that will be used later as the actual Plan of Subdivision A statutory authority as specified in the local planning scheme, pursuant to the Planning and Environment Act 1987 that planning applications and subdivision plans are referred to for comments/conditions A Responsible Authority under the Planning and Environment Act 1897 Schedule Section 12(2) Subdivision Act Services Refers to the easement or Owners Corporation schedule noted on the plan of subdivision As part of the subdivision process a plan may create restrictions, owner s corporations and any easements (including implied easements under section 12(2) of the Subdivision Act 1988) necessary to make a development functional Existing water/sewer infrastructure Statement Compliance of A notice given by North East Water to the appropriate Responsible Authority that it consents to issuing of a Statement of Compliance under Section 21 of the Subdivision Act 1988 Subdivision The division of land into two or more parts which can be disposed of separately Tappings The tapping into the water main to service a property The Corporation North East Water Trade Waste Generally, trade waste is all liquid waste other than toilet waste and household waste from kitchens, showers and laundries Works Construction of water and sewer infrastructure WSAA Water Services Association of Australia WSAA Codes The design and construction standards and specifications outlined by WSAA newater.com.au 8 of 22

8 2. ABOUT THIS MANUAL 2.1 PURPOSE The purpose of this manual is to provide guidance on land development management at North East Water. 2.2 SCOPE The information outlined in this manual refer to standard developments and subdivisions only and will be applicable to the majority of development proposals. In instances where these instructions are not applicable, developments will be assessed on a case by case basis. This manual is applicable to all North East Water employees, Directors, contractors and sub-contractors. 2.3 INTRODUCTION The Land Development Manual reflects the legislative, social, financial and operational realities of North East Water. The Land Development Manual formally documents: The commitment of the Board, of North East Water, to Asset Management and the Land Development policies adopted by the Corporation. The Land Development Manual has been established to ensure the following elements:- 1. Currency: that Land Development Management at North East Water is sound, fit for purpose and consistent with Victorian Government and/or Federal legislation, practice and policies, and principles of good governance. 2. Competency: building a culture that embraces Land Development Management as an essential part of our business and a useful tool to achieve individual and organisational objectives ensuring necessary principles, information, accountability and behaviours are communicated across the Corporation. 3. Compliance: ensuring that Land Development Management at North East Water is adequately documented, supported and understood, and effectively and consistently implemented. North East Water is responsible for supplying water and sewerage services to the following Local Government Areas: Wodonga, Wangaratta, Alpine, Indigo, Towong, part Moira and Benalla. 3. DEVELOPMENT AND PLANNING APPROVAL PROCESS WITHIN DECLARED DISTRICTS 3.1 INTRODUCTION Typically, where North East Water infrastructure, assets or supply catchments will be affected by a development, the Responsible Authority will refer the application to North East Water for comment and/or conditions under Section 52 or 55 (respectively) of the Planning and Environment Act North East Water is required to respond to the Responsible Authority within a set timeframe. newater.com.au 9 of 22

9 Figure 1 Planning Referral Flow Chart Referral Responsible Authority refers planning application to North East Water for comments/conditions Response North East Water responds to planning application with applicable comments / conditions within set time-frame Certification Responsible Authority refers new plan of subdivision to North East Water for Certification and Statement of Compliance consent Response to Certification North East Water responds with either consent to Certification or consent to both Certification and Statement of Compliance or requests more information to support the referral before consent can be given Developer Works Agreement Owner / developer enters into an agreement with North East Water. This agreement is to ensure all North East Water requirements are met before Statement of Compliance is issued Design Plans checked and approved Payment of applicable new customer contributions Confirmation all lots are serviced with water and sewer as required As constructed plans checked and approved Once all North East Water conditions are met, consent is given to the Responsible Authority to issue Statement of Compliance newater.com.au 10 of 22

10 3.2 WHAT IS A DEVELOPMENT North East Water terms a development to include all aspects of any land or building development that relates to water supply services including: drinking and recycled water and sewerage services. This relates to any residential (including subdivisions), industrial and commercial developments and also individual customers seeking connection to water or sewerage services. The requirements of North East Water for different developments may vary with respect to the size, location and complexity of individual developments and will be assessed on a case by case basis. 3.3 FIRE FLOWS Please note that North East Water is not required to provide the necessary fire-flows from its reticulated water mains. Some mains do have the fire-flow capacity whilst others do not. It is the Developer s responsibility to verify whether the mains have the capacity or not. If the main does not have the fire flow capacity the developer may install the necessary private assets such as breakwater tanks and fire flow boosting pumps etc. to upgrade the available fire-flow. Any works to install these private assets will be at the cost to the developer, not North East Water. On request, North East Water will provide pressure-flow information of water mains for a fee. This information may be used by the developers to verify whether the mains have the capacity to provide the necessary fire-flows and to design the fire protection systems as part of building requirements. Pressure-flow tests will be carried out on the authority owned firehydrants located close to the property identified. 3.4 NORTH EAST WATER S ROLE IN THE PLANNING PROCESS PLANNING AND ENVIRONMENT ACT 1987 The Planning and Environment Act 1987 provides the legal framework for the operation of Victoria's planning system. North East Water has obligations as a Referral Authority under the Planning and Environment Act 1987, to asses all planning applications that will/may have an impact on any declared Special water supply districts, or which may be required to connected to North East Water infrastructure. As a referral authority, North East Water has the responsibility to assess all planning applications in line with the provisions of the Planning and Environment Act SUBDIVISION ACT 1988 The Subdivision Act 1988 provides the legal framework for the subdivision and consolidation of land, the creation, variation and removal of easements, the management of common property and the creation of Owners Corporations. newater.com.au 11 of 22

11 The purpose of the Act is to: set out the procedure for the subdivision and consolidation of land, including buildings and airspace, and for the creation, variation or removal of easements or restrictions regulate the management of and dealings with common property and the constitution and operation of bodies corporate (Owners Corporation) Referral authorities may be referred a plan of subdivision by a council. A referral authority must inform the council that it: consents to the plan; requires specified alterations; or refuses consent. Section 12(2) Section 12(2) Subdivisions refer to existing developments and can include ground level and multi-storey units. The owners-in-common are responsible for the maintenance, operation and replacement of internal services Section 12 (2) easements can only be utilised for 2 lot subdivisions that won t be further subdivided and apply where one lot does not abut an asset (cannot achieve separate service(s)). If a 12 (2) easement is detailed on a Plan of Subdivision, allotments may have a shared private service for which they are responsible. Section 12 (2) easements only apply to developments where connection(s) to North East Water s assets has been completed or permission for connection is not required. Further subdivisions of 2 lot residential developments will require work(s) I.e. Separate property connection point(s) and/or extension of reticulation service(s) WATER ACT 1989 The Water Act 1989 is the legislation that governs water entitlements and establishes the mechanisms for managing Victoria s water resources. Victoria's state-owned water sector is made up of 19 water corporations constituted under the Water Act The water corporations provide a range of water services to customers within their service areas comprising water supply, sewage and trade waste disposal and treatment, water delivery for irrigation and domestic and stock purposes, drainage, and salinity mitigation services. Under Section 4l of the Water Industry Act 1994, the Minister for Environment, Climate Change and Water may make and issue statements of obligations to water corporations. These statements specify the obligations of Victoria's water corporations in relation to the performance of their functions and the exercise of their powers. Statement of Obligations can be found at: newater.com.au 12 of 22

12 3.5 APPROVAL PROCESS FOR DEVELOPER WORKS DEVELOPER WORKS Developer works includes the construction of water and sewer infrastructure on behalf of the developer. After the maintenance period the infrastructure is transferred to North East Water s ownership following a satisfactory final release inspection AGREEMENT The owner/developer is required to enter into a Developer Agreement or a Developer Works Deed with a consultant and North East Water to arrange for the design and installation of all works that are required to satisfy the planning permit conditions. The consultant must be recognised by North East Water as experienced in water/sewer design and project management. An original copy of the Developer Agreement or Developer Works Deed signed by the owner/developer and the consultant must be submitted to North East Water. If a plan of subdivision is available, subject to planning permit conditions it must also be submitted at this stage DESIGN PLANS FOR COMMENT APPROVAL AND ACCEPTANCE It is the responsibility of the person(s) or company submitting the documents, to ensure the designs and specifications are technically correct and comply with: Relevant WSAA codes; North East Water s Engineering guidelines for subdivisions and Development Standards ; Relevant Australian Standards; Relevant Local, State and Federal Government Legislation; and Council s development consent for the subdivision. The consultant must submit an electronic copy of the design plan in PDF for comment. If North East Water accepts the design plans, a stamped copy will be returned to the consultant. The acceptance is then current for two years from the date of approval. If the plan is rejected because it does not comply with required standards and/or contradicts the purpose of North East Water engineering guidelines it will be returned marked not accepted REQUIREMENTS BEFORE CONSTRUCTION CAN COMMENCE Before beginning construction the consultant must advise North East Water in writing a minimum of 7 days (5 business days) prior to the intended date for commencement of work. Such written advice is to include the following: newater.com.au 13 of 22

13 Name of contractor and contact details of their on-site representatives; and The name of supervising engineer and contact details of their on-site representatives; and Any pre-established hold point (s) that have been identified at the kick-off meeting. The Consultant (or person nominated by the consultant) shall notify North East Water 48 hours (2 business days) prior to any works that include the following: Opening of trenches ready for pipe laying Placing of pipes in trenches prior to backfilling Placing and pouring concrete; or Testing of water and sewer mains. Auditing of works will be at the discretion of North East Water. The Developer may be required by North East Water to submit evidence from the supplier verifying the quality of the materials supplied. newater.com.au 14 of 22

14 3.5.5 CONSTRUCTION CONNECTION AND COMPLETION The consultant is responsible for the following during the construction period: Project management of all works Ensuring the set out of water mains and/or sewer mains is as per the approved design Ensuring works are constructed as per endorsed design plans, specifications and standard drawings If required, arrange trench compaction testing to North East Water and WSAA requirements and standards Arranging joint audits with North East Water Providing copies of entries in their quality management systems when requested by North East Water at any time during construction Ensuring all water and/or sewer mains are tested after installation to North East Water requirements and WSAA standards Request in writing, allowing seven days notice, approval to connect to North East Water s live assets Ensuring connection of works to North East Water s assets is performed to North East Water standards; and Water and sewer pressure test reports. The owner/developer is responsible for ensuring only North East Water approved accredited contractors experienced in water and / or sewer construction are engaged to complete the works. At the completion of construction the consultant must submit to North East Water: Copies of their quality management systems covering these works, when requested As constructed plans to North East Water s requirements Supply cost of construction, separating water and sewer A request in writing for an invoice covering administration and auditing charges, maintenance deposit, connection costs and North East Water customer contributions applicable to the project Certification that works have been constructed in accordance with the approved design plans and specifications; and If required, supply trench compaction test results by a certified NATA tester. The consultant must indemnify North East Water against any claims or costs arising from design faults or inaccuracy of As constructed details, supplied to North East Water for a period of five years after North East Water accepts practical completion and/or statement of compliance of the works. newater.com.au 15 of 22

15 The owner/developer must: Pay all fees and charges applicable to the development; and Pay a maintenance deposit or bank guarantee as determined by North East Water to guarantee indemnity against any claims or costs including all costs of rectification of faults arising from the works. For works less than $10,000 in value the maintenance deposit is not required. The owner/developer must indemnify North East Water against any claims or costs, including all costs of rectification of faults arising from defects or failure of the works for a period of 24 months after North East Water accepts practical completion of the works. 24 months after practical completion, a joint inspection of the works with the consultant, contractor and North East Water will be arranged by the consultant. Any outstanding defects noted at this inspection will be rectified at no cost to North East Water. After all outstanding works have been completed to the satisfaction of North East Water a final release report will be sent to the consultant covering the construction works. Any maintenance deposits or bank guarantees held by the corporation will be returned to the owner/developer. 4. SUBDIVISIONS AND NON-SUBDIVISIONS 4.1 WHAT IS A SUBDIVISION A subdivision is the division of land into two or more parcels that can be disposed of separately. New parcels of land that can be created by a subdivision are lots, road reserves or common property. During the subdivision process a plan may create restrictions, an Owners Corporation and/or easements (including implied easements) to make a particular development functional. A new plan of subdivision can also remove or vary any restrictions and easements created in an earlier plan of subdivision, under Section 23 of the Subdivision Act COMMON PROPERTY AND OWNERS CORPORATION Generally, owners of flats, units or apartments are members of an Owners Corporation. When parcels of land are subdivided it is sometimes needed to provide for shared ownership of driveways, walls, services or common property. This is where an Owners Corporation comes into effect. The Owners Corporation manages all shared assets in residential, commercial, retail or mixed use developments. Common property refers to any part of the land, buildings and airspace that are not lots, roads or reserves on the plan of subdivision. This can include; gardens, passages, walls, pathways, staircases, lifts, foyers and fences. The common property is owned by the lot owner. newater.com.au 16 of 22

16 Figure 2 Standard two (2) lot Owners Corporation with single water tapping with two (2) meters on a manifold North East Water Sewer Main North East Water Water Main 1 2 Sewerage easement in favour of North East Water 4.3 TWO (2) LOT SUBDIVISIONS A typical 2 lot subdivision is the division of one parcel of land into two separate parcels each with their own titles that can be disposed of separately. Under the Planning and Environment Act 1987 Responsible Authorities are not required to refer 2 lot subdivisions to North East Water at the planning permit stage, however all plans of subdivision will be referred before the Responsible Authority offers consent to certification. Figure 3 Typical 2 lot Subdivision North East Water Sewer Main 1 2 Sewer easement in favour of North East Water North East Water Water Main Main Road newater.com.au 17 of 22

17 4.4 MORE THAN TWO (2) LOT SUBDIVISIONS The creation of more than two lots within a North East Water service area may require that each individual lot to be separately serviced with sewer and water or have the ability to be connected to North East Water water and sewer infrastructure. Figure 4 Typical 2 + lots Subdivision North East Water Water Main North East Water Sewer Main Sewer easement in favour of North East Water 4.5 LOT EXCISION If a subdivision is to provide for the excision of an existing building the new lot created must be connected to North East Water, water and sewer infrastructure. or the formation of an Owners Corporation (See example Owners Corporation) is required. (Not applicable in areas outside of North East Water s service area in accordance with Responsible Authority Policies) Figure 5 Subdivision (Excision) of existing building/dwelling New Tapping 2 New Lot Road North East Water Sewer main and existing connection point 1 Existing House North East Water - Water main and existing tapping newater.com.au 18 of 22

18 4.6 NON-REFERRAL OF A SUBDIVISION Under the provisions of the Planning and Environment Act 1987 two (2) lot subdivisions are not required to be referred to North East Water at the planning permit stage of the development process. All subdivision applications will be referred at the Certification stage. 4.7 REQUIREMENTS UNDER SUBDIVISIONS ACT 1988 North East Water must inform the Responsible Authority within statutory time frames, that it: Consents to the plan Requires specified alterations or requests further information, or Refuses consent North East Water must give written explanations to the Responsible Authority and the applicant if it requires alterations to a plan. If North East Water fails to respond to the Responsible Authority within the given timeframe or fails to give written reasons for a request for further information, the Responsible Authority can automatically determine North East Water consents to the plan. 4.8 MAIN EXTENSIONS Water mains can be extended to service either residential or commercial properties within a defined water district. They can be extended to service existing residential/commercial properties that are already developed or in the process of being developed with written approval from North East Water, subject to the following conditions: The extension is technically possible The property is not subject to a current subdivision plan or planning condition that would prevent its construction approval A design plan must be submitted and approved prior to works commencing Application forms and applicable fees for water main extensions can be found on the North East Water website. 4.9 TAPPING INTO TRUNK MAINS A trunk main is typically a large diameter water main that transports potable water from a treatment plant to a townships water reticulation system or water storage tank. A reticulated water main is a smaller diameter main that provides water from the storage tank to individual households and businesses Considerations for Connections 1. Quality 2. Flow 3. Pressure 4. Future planning 5. Criticality newater.com.au 19 of 22

19 6. Access; 7. Type of use (residential / commercial) 8. Distance Guiding Principles North East Water is required to comply with all applicable requirements of health and environmental regulations, such as the Environment Protection Act 1970 and the Safe Drinking Water Act 2003 Whenever possible, water tappings are not to be connected to potable and non-potable supply trunk mains. The decision to allow a water connection to a water trunk main is at the sole discretion of North East Water. North East Water may consent to water connection to a trunk main, if the following guiding principles can be satisfied: The trunk main is fronting the property and no distribution main is available The connection will not compromise the primary function of the pipeline Potable water Compliance must be achievable at the customers tap in accordance with Drinking Water Quality guidelines. It may be possible to provide Non- Potable water. However, its agreed use is subject to conditions listed in the formal licence agreement between the property owner and North East Water. The connection point /water meter location must be easily accessible by road The proposed connection must not to traverse another title property The use is for Residential / Rural purposes 5. OTHER TYPES OF CONNECTION ARRANGEMENTS 5.1 OUT OF DISTRICT For development proposals outside of North East Water s water and/or sewerage districts or proposed districts, it may not a North East Water requirement to connect to water and/or sewer services. However, it may be a requirement of the Responsible Authority or other State regulatory bodies for the developer to provide a potable water supply or sewerage service to a development. In this instance, consent may be given by North East Water for the developer to extend the water and/or sewer services outside of our supply districts to the new development. The costs and construction associated with these extensions (if approved) will remain the responsibility of the developer of the land. newater.com.au 20 of 22

20 5.2 TRADE WASTE Trade waste is generally all liquid wastes other than: Toilet waste, and Household waste from kitchens, showers and laundries. There are two categories of trade waste; minor trade waste and major trade waste. Minor trade waste comprises discharges from food preparation premises, mechanical workshops or other premises of minor nature. The vast majority of small businesses fall into this category. Typically waste generated is usually oil and grease which are common discharges from takeaway food shops, service stations and restaurants. These discharges do not have a large impact on the sewage treatment process but they are significant enough to require the installation of a pre-treatment device such as a grease trap or petrol/oil separator. Major Trade wastes have the capacity to damage the infrastructure of the sewer system and/or have a large impact on the treatment process. Large businesses and industries may be in this category, depending on the quantity and quality of their discharge. These wastes are measured by volume and strength/load and they are billed accordingly. For more information on trade wastes refer to Tradewaste section of North East Water website, under Water and Sewerage. 6. RECLAIMED WATER SUPPLY AND USE 6.1 WHAT IS RECLAIMED WATER Reclaimed water is waste water that has been treated to a level that is deemed appropriate for use for various purposes including, lawn irrigation for schools, parks, gardens, sporting facilities and golf courses and irrigated cropping and industry wash down. Some of the customers currently connected to a reclaimed water reuse scheme include Victory Primary School, Latrobe University and various cropping and irrigation systems in Benalla, Wangaratta, Corryong and Yarrawonga. North East Water has developed reclaimed water reuse schemes across the region in line with the requirements of the State Environmental Protection Policy - Waters of Victoria and currently supplies over 2830ML of reclaimed water to 22 different schemes. 6.2 ENVIRONMENTAL IMPROVEMENT PLANS The majority of North East Water s reclaimed water reuse schemes have an Environmental Improvement Plan (EIP) which has been submitted to the Environmental Protection Authority for approval, with the remaining schemes EIP s being developed. The main objective of these EIP s is to maximise the sustainable application of reclaimed water on the land and minimise risk associated with its use. Each EIP contains the following information: How the reuse scheme complies with Legislation Roles, responsibilities and risk management newater.com.au 21 of 22

21 Reclaimed water treatment and quality Treatment and distribution Acceptable uses and site specific controls Site selection, environmental management; and Monitoring and reporting. In addition to the EIP, each reclaimed water reuse site has a Site Management Plan and a Scale of Reclaimed Water Agreement with any third party lessee. 7. NORTH EAST WATER ASSET PROTECTION 7.1 WHAT ARE NORTH EAST WATER ASSETS North East Water assets include, but are not limited to: all water and sewer mains, sewer manholes, pump stations, treatment plants, buildings and land. North East Water is responsible for the maintenance of all assets under their ownership. Any maintenance or repair works to assets located within private property are generally at the cost to North East Water. Where approval has been given to build over an easement, it is the responsibility of the land owner to remove the building and replace it at their own cost. 7.2 STATUTORY PROTECTION Under Section 148 of the Water Act 1989 works above or below, or any works that may impact on the structural integrity of existing water and/or sewer assets are prohibited. It is the responsibility of the developer/contractor/consultant to identify the location of any North East Water assets prior to commencing any works. 7.3 EASEMENTS RESERVES AND BUILD OVER EASEMENTS North East Water protects its water and sewer assets with the use of easements. An easement is shown on the title of a property. Alternatively, an implied easement may be created at North East Water discretion. 7.4 BUILD OVER APPROVAL For more information regarding build over easements or to apply for permission to build over an easement refer to the build over easement section of our website. The prescribed assessment fee must accompany the application for it to be processed. Include as much detail as possible on the location of the structure on the block with distances to boundaries in metres. Also include the materials from which the structure is to be built and details of any footings that are to be used. newater.com.au 22 of 22

22 7.5 ROAD RESERVES It is not a requirement of North East Water for the creation of easements to protect water and/or sewer infrastructure located within road reserves that are owned or managed by the local Responsible Authority or VicRoads. 7.6 OTHER RESERVES For reserves other than road reserves, such as parks, gardens etc. owned by the local Responsible Authority, North East Water will require the creation of easements to protect any water and/or sewer infrastructure. 7.7 PRESSURE MAINS ON PRIVATE LAND Where a pressure main cannot be located in a public road reserve or access way, consideration maybe given to located the pressure main within an appropriately sized and registered easement, subject to the approval of North East Water. 8. REFENCE MATERIAL AND LINKS 8.1 NORTH EAST WATER ADOPTED STANDARDS WSAA Water Supply Code of Australia (Current Version) WSAA Sewerage Code of Australia (Current Version) WSAA Dual Water Supply Systems (Current Version) WSAA Polyethylene Pipeline Code (Current Version) WSAA Sewerage Pumping Station Code of Australia (Current Version) WSAA Conduit Inspection Code of Australia (Current Version) AS/NZ Plumbing and Drainage Standard (Current Version) 8.2 NORTH EAST WATER ADDITIONAL STANDARDS Engineering guidelines for subdivisions and development standards Part REFERENCES AND WEBSITES Planning and Environment Act 1987 Subdivision Act 1988 Water Act 1989 Department of Transport, Planning and Local Infrastructure Department of Environment and Primary Industries 8.4 NORTH EAST WATER EXAMPLE CHECKLISTS FOR DESIGN PLANS For detailed checklists our development supervisors use when checking design plans, please refer to the Land Development > Design Standards section of the North East Water website. newater.com.au 23 of 22

23 9. LAND DEVELOPMENT MANUAL REVIEW PROCESS The Land Development Manual will be reviewed annually. newater.com.au 24 of 22

Land Development Policies and Pricing Manual Applicable to applications received subsequent to 1 July 2014

Land Development Policies and Pricing Manual Applicable to applications received subsequent to 1 July 2014 Land Development Policies and Pricing Manual Applicable to applications received subsequent to 1 July 2014 South East Water Corporation 1 July 2017 Page 1 of 76 2016 South East Water All rights reserved.

More information

Land Development Manual

Land Development Manual Land Development Manual Western Water March 2018 Table of Contents 1. Definitions and Abbreviations... 5 2. General... 9 2.1 Introduction... 9 2.2 Scope... 9 2.3 Intended Audience... 9 2.4 Review Mechanism...

More information

Planning Permit 1146/2017, issued on 30/04/2018 by Sandra Stewart (Port Phillip City Council). SPEAR Ref: S114883H

Planning Permit 1146/2017, issued on 30/04/2018 by Sandra Stewart (Port Phillip City Council). SPEAR Ref: S114883H ADDRESS OF THE LAND PLANNING PERMIT Application Number : 1146/2017 Planning Scheme : Port Phillip Responsible Authority: City of Port Phillip 253-273 Normanby Road, SOUTH MELBOURNE VIC 3205 THE PERMIT

More information

Permit No.: 1234/2014 ADDRESS OF THE LAND: GEELONG ROAD, PORTARLINGTON

Permit No.: 1234/2014 ADDRESS OF THE LAND: GEELONG ROAD, PORTARLINGTON PLANNING PERMIT GRANTED UNDER SECTION 96I OF THE PLANNING AND ENVIRONMENT ACT 1987 Permit No.: 1234/2014 Planning scheme: Greater Geelong Planning Scheme Responsible authority: Greater Geelong City Council

More information

Servicing Dual Occupancy and Other Two-Dwelling Developments

Servicing Dual Occupancy and Other Two-Dwelling Developments 1. Background Sydney Water has three documents that set out the rules for applicants who want to connect to Sydney Water s sewer or water systems. However, because dual occupancy developments are often

More information

Property Development Connection Requirements (Sewer)

Property Development Connection Requirements (Sewer) 1. Purpose These guidelines apply to developed property and outline: (c) (d) what is a satisfactory point of connection; what works must be provided or funded by applicants; what different development

More information

SCHEDULE 12 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ12. Kororoit Precinct Structure Plan

SCHEDULE 12 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ12. Kororoit Precinct Structure Plan SCHEDULE 12 TO THE URBAN GROWTH ZONE Shown on the planning scheme map as UGZ12. Kororoit Precinct Structure Plan 1.0 The plan Map 1 below shows the future urban structure proposed in the Kororoit Precinct

More information

FORM 1 Building Act 1993 Building Regulations 2018 APPLICATION FOR BUILDING PERMIT Regulation 26

FORM 1 Building Act 1993 Building Regulations 2018 APPLICATION FOR BUILDING PERMIT Regulation 26 Attention: The applicant (owner/agent) is required to fill out every part of this form To: JBG Building Surveying Pty Ltd (Relevant Building Surveyor) PART A - APPLICANT DETAILS (OWNER OR AGENT) I AM MAKING

More information

Developer Services. Sewerage Technical Team: Fees for April 2018

Developer Services. Sewerage Technical Team: Fees for April 2018 Developer Services Sewerage Technical Team: Fees for 2018-2019 April 2018 Fees for 2018-2019 Sewerage Technical Team Fees for 2018-2019 DOCUMENT CONTROL Author Natalie Drake Created Date February 2018

More information

Public Facilities and Finance Element

Public Facilities and Finance Element This Element of the General Plan addresses the following public facilities issues: Water Service, including both potable (drinkable) and non-potable water delivery. Sewer Service, and Financing and construction

More information

Subdivisions and Permit Conditions for Electricity Supplies. A guide to our requirements

Subdivisions and Permit Conditions for Electricity Supplies. A guide to our requirements Subdivisions and Permit Conditions for Electricity Supplies A guide to our requirements Subdivisions and Permit Conditions for Electricity Supplies... 1 Definitions... 3 Introduction... 5 Making an Electricity

More information

OP Clearing Blocked Private Sewer Pipes Policy. 1. Policy Statement. 2. Purpose and Objectives. 3. Policy Scope/Coverage

OP Clearing Blocked Private Sewer Pipes Policy. 1. Policy Statement. 2. Purpose and Objectives. 3. Policy Scope/Coverage Policy Owner Policy Author Supporting Legislation & Documents Documents Directly Related Executive Manager Customer Delivery Manager Field Services South-East Queensland Water (Distribution and Retail

More information

Build Over Easement Guidelines

Build Over Easement Guidelines Build Over Easement Guidelines Document Owner Creation Date 13/04/2015 Revision Date 20/04/2015 Manager Engineering Services Engineering Services Please check Council s Intranet to ensure this is the latest

More information

ELECTORAL AREA DIRECTORS REPORT

ELECTORAL AREA DIRECTORS REPORT ELECTORAL AREA DIRECTORS REPORT TO: Chair and Directors File No: BL 641-2 SUBJECT: All Electoral Areas: Subdivision Servicing Amendment (CSRD) Bylaw No. 641-2 DESCRIPTION: Report from Dan Passmore, Senior

More information

Environmental Health Technician: (303) ; Environmental Health Manager: (303) ;

Environmental Health Technician: (303) ; Environmental Health Manager: (303) ; ON-SITE WASTEWATER TREATMENT SYSTEM PERMIT PROCESS FULL SYSTEM, UPGRADES, ALTERATIONS, REPAIRS AND VAULTS Prior to any work on an Onsite Wastewater Treatment System (OWTS), a permit needs to be obtained

More information

Volume Three Appendix 7. Scheme Plan and other subdivision requirements

Volume Three Appendix 7. Scheme Plan and other subdivision requirements Volume Three Appendix 7 Appendix 7 Scheme Plan and other subdivision requirements Any application for subdivision consent must be accompanied by a Scheme Plan that contains the information set out in this

More information

Guide to Private Water Schemes

Guide to Private Water Schemes Guide to Private Water Schemes This guide provides a summary of the background to private water schemes (syndicates), options for legal structures, types of schemes, and an overview about establishing

More information

PRESSURE SEWER SYSTEM GUIDELINES

PRESSURE SEWER SYSTEM GUIDELINES PRESSURE SEWER SYSTEM GUIDELINES Amendment, Distribution & Authorisation Record Amendment Record Revision Description / Details Date A Draft Document 29/02/2016 B Updated Draft Document 18/05/16 Approval

More information

Consulted With Individual/Body Date Head of Finance Financial

Consulted With Individual/Body Date Head of Finance Financial Equipment Disposal Policy Developed in response to: Policy Register No: 12037 Status: Public Internal Audit Report for Fixed Assets Contributes to CQC Regulation 17 Consulted With Individual/Body Date

More information

HYDRAULIC SERVICES BY - LAW

HYDRAULIC SERVICES BY - LAW Repeal HOBART CITY COUNCIL HYDRAULIC SERVICES BY - LAW BY-LAW 4 OF 2008 BY-LAW MADE UNDER SECTION 145 OF THE LOCAL GOVERNMENT ACT 1993 AND SECTION 67 A OF THE SEWERS AND DRAINS ACT 1954 FOR THE PURPOSE

More information

1. MANDATORY SERVICES OF RELEVANT BUILDING SURVEYOR

1. MANDATORY SERVICES OF RELEVANT BUILDING SURVEYOR Appointment of Relevant Building Surveying Terms of Appointment By completing this form, the Owner acknowledges that they have appointed Daville Building Surveying Pty Ltd to provide to the Owner building

More information

PLANNED AND RESPONSIVE MAINTENANCE POLICY

PLANNED AND RESPONSIVE MAINTENANCE POLICY PLANNED AND RESPONSIVE MAINTENANCE POLICY 1. Purpose 3. Policy Statement This Policy explains how Evolve Housing (Evolve) will provide repairs and maintenance services to its Tenants. Evolve believes that

More information

TORONTO MUNICIPAL CODE CHAPTER 849, WATER AND SEWAGE SERVICES AND UTILITY BILL. Chapter 849 WATER AND SEWAGE SERVICES AND UTILITY BILL 1

TORONTO MUNICIPAL CODE CHAPTER 849, WATER AND SEWAGE SERVICES AND UTILITY BILL. Chapter 849 WATER AND SEWAGE SERVICES AND UTILITY BILL 1 849-1. Definitions. 849-2. Application form. Chapter 849 WATER AND SEWAGE SERVICES AND UTILITY BILL 1 ARTICLE I Rebates 849-3. Rebate on portion of surcharge on water rates for sewage service. 849-4. Submission

More information

Leasehold Management Policy

Leasehold Management Policy UNCONTROLLED WHEN PRINTED Policy Contents 1 Aims and Objectives 2 Definitions 3 Legal and regulatory framework 4 Key aspects of service delivery 5 Monitoring 6 Staff Training 7 Review 8 Equality Impact

More information

Concho Wastewater Improvement District ( District ) Customer Rules and Regulations

Concho Wastewater Improvement District ( District ) Customer Rules and Regulations Concho Wastewater Improvement District ( District ) Customer Rules and Regulations Approved 5/27/17 1.0 Establishment of Service 1.1 To receive wastewater service from the District, a landowner must execute

More information

SCHEDULE 3 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ3 QUARRY HILLS PRECINCT STRUCTURE PLAN. 1.0 The Plan

SCHEDULE 3 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ3 QUARRY HILLS PRECINCT STRUCTURE PLAN. 1.0 The Plan SCHEDULE 3 TO THE URBAN GROWTH ZONE 1.0 The Plan Shown on the planning scheme map as UGZ3 QUARRY HILLS PRECINCT STRUCTURE PLAN Map 1 to Schedule 3 to Clause 37.07 shows the Future Urban Structure for Quarry

More information

OIL TECHNICS (HOLDINGS) LTD STANDARD TERMS & CONDITIONS FOR PURCHASE OF GOODS

OIL TECHNICS (HOLDINGS) LTD STANDARD TERMS & CONDITIONS FOR PURCHASE OF GOODS OIL TECHNICS (HOLDINGS) LTD STANDARD TERMS & CONDITIONS FOR PURCHASE OF GOODS 1. INTERPRETATION 1.1 In these Conditions, the following words shall have the following meanings ascribed to them:- Company

More information

Guideline: Distribution Pole to Pillar

Guideline: Distribution Pole to Pillar Guideline: Distribution Pole to Pillar Standard Number: HPC-2AH-07-0001-2014 Document Number: 3173582 Date Printed: 17/10/2017 Document Control Author Name: Anthony Seneviratne Position: Standards Engineer

More information

HOW TO MAKE POSITIVE CHANGE AROUND YOUR APARTMENT BUILDING

HOW TO MAKE POSITIVE CHANGE AROUND YOUR APARTMENT BUILDING HOW TO MAKE POSITIVE CHANGE AROUND YOUR APARTMENT BUILDING YOU HAVE A SAY IN WHAT HAPPENS AROUND YOUR APARTMENT If you own, rent or work within an apartment building you should know that there are things

More information

GUIDELINES FOR BUILD OVERS

GUIDELINES FOR BUILD OVERS GUIDELINES FOR BUILD OVERS 2018 Table of Contents 1 Introduction... 3 2 Definitions... 4 3 Application Process... 6 3.1 Pre Application... 6 3.2 Assessment (2 weeks)... 6 3.3 Final Approval... 6 3.4 Change

More information

RHLF WORKSHOP The National Housing Code

RHLF WORKSHOP The National Housing Code RHLF WORKSHOP The National Housing Code Outline 1. Statutory requirements 2. Background- why a new Code 3. The structure of the new Code 4. National Housing Programmes 5. National Housing Programmes under

More information

Policy Title: Leasing Policy

Policy Title: Leasing Policy Policy Title: Leasing Policy Date approved by Council: 29 July 2008 Date of Next Review: July 2010 Responsible Department: Properties Statement of Intent: To provide guiding principles that will enable

More information

Guide to Subdivision and Land Development

Guide to Subdivision and Land Development Guide to Subdivision and Land Development Fraser Thomas Ltd......is an engineering and surveying consulting firm based in Highbrook which has provided Surveying, Engineering, Planning and Resource Management

More information

Automated Land Development Applications

Automated Land Development Applications Automated Land Development Applications AGENDA Yarra Valley Water Land Development Process GIS Automation Business Rules Engine Automated Spatial Analysis Questions.Encourage GIS community to embrace GIS

More information

Record of Amendments to Water Regulation and Fee Bylaw No. 967 Amending Bylaw No. 984 Section 12, Schedule A September 19, Section 4.

Record of Amendments to Water Regulation and Fee Bylaw No. 967 Amending Bylaw No. 984 Section 12, Schedule A September 19, Section 4. Record of Amendments to Water Regulation and Fee Bylaw No. 967 Amending Bylaw No. Summary of Amendments Date of Adoption 984 Section 12, Schedule A September 19, 2011 999 Section 4.2, Schedule A April

More information

Strata Handbook. Strata Handbook Page: 1

Strata Handbook. Strata Handbook Page: 1 Strata Handbook Strata Handbook Page: 1 WHAT IS STRATA TITLE AND WHAT DOES IT MEAN? Strata title is actually an Australia property law innovation that has been copied by countries around the globe. Strata

More information

City of Richmond Municipal Code

City of Richmond Municipal Code City of Richmond Municipal Code Sections: 12.17.010 - Definitions. 12.17.020 - Sewer connections required. 12.17.030 - Connections to be made without damage to streets. 12.17.040 - Standards for sewer

More information

ADMINISTRATIVE REPORT. Gallagher Lake Water and Sanitary Sewer Service Areas

ADMINISTRATIVE REPORT. Gallagher Lake Water and Sanitary Sewer Service Areas RDOS Regular Board Meeting Agenda Item 6.1 ADMINISTRATIVE REPORT TO: FROM: Board of Directors B. Newell, Chief Administrative Officer DATE: May 16, 2013 RE: Gallagher Lake Water and Sanitary Sewer Service

More information

SUBDIVISION APPLICATION

SUBDIVISION APPLICATION PLANNING AND DEVELOPMENT SERVICES 38106 Rge Rd 275, Red Deer County, AB T4S-2L9 Phone: (403) 350-2170 Fax: (403) 346-9840 For Office Use Only File # Roll # Fee Submitted Date Deemed Complete Reference

More information

Hinchinbrook Shire Adopted Infrastructure Charges Resolution CR1-2018

Hinchinbrook Shire Adopted Infrastructure Charges Resolution CR1-2018 Hinchinbrook Shire Adopted Infrastructure Charges Resolution CR1-2018 Part 4 ge 23 Hinchinbrook Shire COUNCIL CHARGES RESOLUTION No. 1-2018 Table of Contents 1.0 Introduction 3 1.1 Planning Act 2016 (PAct)

More information

Conditions. For the purpose of licensing conditions attached to a licence:

Conditions. For the purpose of licensing conditions attached to a licence: Conditions For the purpose of licensing conditions attached to a licence: (i) (ii) Liverpool City Council will be referred to as the Authority acting in its capacity as the Local Housing Authority. tenancy

More information

Agreement for Sale of Water

Agreement for Sale of Water Agreement for Sale of Water This Agreement, effective the day of, 20 is entered into between the Scotland Island Residents Association (herein referred to as SIRA), the Seller, and the Buyer, a resident

More information

Strata Handbook. Strata Handbook Page: 1

Strata Handbook. Strata Handbook Page: 1 Strata Handbook Strata Handbook Page: 1 WHAT IS STRATA TITLE AND WHAT DOES IT MEAN? Strata title is actually an Australia property law innovation that has been copied by countries around the globe. Strata

More information

Licence to Take and Use Surface Water and Operate Works (Unregulated)

Licence to Take and Use Surface Water and Operate Works (Unregulated) APPLICATION FORM 71 Licence to Take and Use Surface Water and Operate Works (Unregulated) What is this application form for? Use this form to make application for a Licence to Take and use Surface water

More information

Condition. The gross floor area of all buildings must not exceed 250 square metres.

Condition. The gross floor area of all buildings must not exceed 250 square metres. 32.03 LOW DENSITY RESIDENTIAL ZONE 23/09/2011 Shown on the planning scheme map as LDRZ with a number (if shown). Purpose To implement the State Planning Policy Framework and the Local Planning Policy Framework,

More information

REDAN CAPITAL LTD 13 Ikeja Close, Off oyo St, Area 2, Garki-, Abuja, Nigeria GUIDELINES FOR PREPARING PROJECT PROPOSALS

REDAN CAPITAL LTD 13 Ikeja Close, Off oyo St, Area 2, Garki-, Abuja, Nigeria GUIDELINES FOR PREPARING PROJECT PROPOSALS GUIDELINES FOR PREPARING PROJECT PROPOSALS INTRODUCTION SHELTER-AFRIQUE's major objective is to promote housing in Africa. In order to achieve this objective, the Company cooperates with private sector,

More information

GUIDE TO THE CITY OF ANN ARBOR ANNEXATION PROCESS

GUIDE TO THE CITY OF ANN ARBOR ANNEXATION PROCESS GUIDE TO THE CITY OF ANN ARBOR ANNEXATION PROCESS FOR SINGLE-FAMILY AND TWO-FAMILY PROPERTIES GENERAL INFORMATION Annexation is a process by which a parcel is released from the jurisdiction of Ann Arbor,

More information

GUIDE TO SUBDIVISION & LAND DEVELOPMENT

GUIDE TO SUBDIVISION & LAND DEVELOPMENT GUIDE TO SUBDIVISION & LAND DEVELOPMENT The Fraser Thomas Difference: Fraser Thomas Ltd is an engineering and surveying consulting firm based in Highbrook, and has been providing; Surveying, Engineering,

More information

SECTION B - GUIDELINES

SECTION B - GUIDELINES SECTION B - GUIDELINES APPLICATION KIT FOR SUBDIVISION RESOURCE CONSENT UNDER SECTION 88 OF THE RESOURCE MANAGEMENT ACT 1991 CONTENTS: PLEASE READ AND COMPLETE 1. Making an Application for a Subdivision

More information

Melbourne Market Relocation Project

Melbourne Market Relocation Project Melbourne Market Relocation Project Melbourne Wholesale Fruit & Vegetable Market Tenancy Fit Out Guide COMMERCIAL AND FOOD SERVICE TENANCIES August 2014 Page 2 Contents GLOSSARY OF TERMS... 4 ABOUT THIS

More information

P420 PROCUREMENT, & DISPOSAL OF LAND AND ASSETS

P420 PROCUREMENT, & DISPOSAL OF LAND AND ASSETS 1. INTRODUCTION Section 49 of the Local Government Act 1999 requires Council to prepare and adopt policies on the contracting out of services, competitive tendering and the use of other measures to ensure

More information

A Guide to the Municipal Planning Process in Saskatchewan

A Guide to the Municipal Planning Process in Saskatchewan A Guide to the Municipal Planning Process in Saskatchewan A look at the municipal development permit and the subdivision approval process in Saskatchewan May 2008 Prepared By: Community Planning Branch

More information

PORT PHILLIP PLANNING SCHEME. Condition

PORT PHILLIP PLANNING SCHEME. Condition SCHEDULE 1 TO THE CAPITAL CITY ZONE Shown on the planning scheme map as CCZ1. FISHERMANS BEND URBAN RENEWAL AREA Purpose To use and develop the Fishermans Bend Urban Renewal Area generally in accordance

More information

ANZVGN 7 THE VALUATION OF PARTIAL INTERESTS IN PROPERTY HELD WITHIN CO-OWNERSHIP STRUCTURES

ANZVGN 7 THE VALUATION OF PARTIAL INTERESTS IN PROPERTY HELD WITHIN CO-OWNERSHIP STRUCTURES 8.7 ANZ VALUATION GUIDANCE NOTE 7 ANZVGN 7 THE VALUATION OF PARTIAL INTERESTS IN PROPERTY HELD WITHIN CO-OWNERSHIP STRUCTURES 1.0 Introduction 1.1 Purpose The purpose of this Guidance Note is to provide

More information

Summit Engineering (Birmingham) Ltd. Standard Terms and Conditions for the Purchases of Goods

Summit Engineering (Birmingham) Ltd. Standard Terms and Conditions for the Purchases of Goods Summit Engineering (Birmingham) Ltd Standard Terms and Conditions for the Purchases of Goods Application The Buyer hereby orders and the supplier, by accepting the purchase order, agrees that it will supply

More information

Application for Individual Site Sanitation Facilities Portland Area Indian Health Services

Application for Individual Site Sanitation Facilities Portland Area Indian Health Services Application for Individual Site Sanitation Facilities Portland Area Indian Health Services PART 1 HOMEOWNER 1. Name: 2. Telephone #: 3. Site/House Address: 4. Current Mailing Address: 5. Directions to,

More information

Void Management Policy

Void Management Policy Void Management Policy SMT Approval Date: 22 November 2018 Board of Management: 3 December 2018 Approval Date: 3 December 2018 Implementation Date: I January 2018 Review Date: 3 December 2021 Version V1

More information

Appendix A The Homes and Communities Agency Grant Funding Conditions under the Affordable Homes Programme

Appendix A The Homes and Communities Agency Grant Funding Conditions under the Affordable Homes Programme Appendix A The Homes and Communities Agency Grant Funding Conditions under the Affordable Homes Programme Funding Conditions Preamble These Funding Conditions apply to both committed programme schemes

More information

LINE EXTENSION APPLICATION AGREEMENT PROJECT: LINK#

LINE EXTENSION APPLICATION AGREEMENT PROJECT: LINK# LINE EXTENSION APPLICATION AGREEMENT PROJECT: LINK# This LINE EXTENSION APPLICATION AGREEMENT (LEAA) is entered into as of, 20, (the "Effective Date"), by and between, hereinafter called "Customer/Developer",

More information

EDITION 1. This is a SPEAR plan. EASEMENT INFORMATION. Origin E-1 DRAINAGE SEE DIAG PS Y/S1 WHITTLESEA CITY COUNCIL

EDITION 1. This is a SPEAR plan. EASEMENT INFORMATION. Origin E-1 DRAINAGE SEE DIAG PS Y/S1 WHITTLESEA CITY COUNCIL PLAN OF SUBDIVISION LOCATION OF LAND PARISH: TOWNSHIP: SECTION: - WOLLERT CROWN ALLOTMENT: - CROWN PORTION: 16 (PART) TITLE REFERENCE: C/T LAST PLAN REFERENCE: POSTAL ADDRESS: (at time of subdivision)

More information

SUBDIVISION AND DEVELOPMENT STANDARDS BYLAW. Date: Monday, April 27, Annacis Room. 4:30-4:45 pm

SUBDIVISION AND DEVELOPMENT STANDARDS BYLAW. Date: Monday, April 27, Annacis Room. 4:30-4:45 pm L P SUBDIVISION AND DEVELOPMENT STANDARDS BYLAW Date: Monday, April 27, 2015 I. Location: Time: Annacis Room 4:30-4:45 pm Presentation: Steven Lan, Director of Engineering Background Materials: Memorandum

More information

TOURIST TRAFFIC ACTS Registration and Renewal of Registration Regulations for Hotels 2016

TOURIST TRAFFIC ACTS Registration and Renewal of Registration Regulations for Hotels 2016 TOURIST TRAFFIC ACTS 1939-2011 Registration and Renewal of Registration Regulations for Hotels 2016 1 FÁILTE IRELAND in accordance with the powers conferred on it by Section 20 of the Tourist Traffic Acts

More information

Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, Adopted by City Council: February 2, 2009

Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, Adopted by City Council: February 2, 2009 POLICY Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, 2009 February 2, 2009 Supersedes: May 2, 2005 Prepared by: PLANNING, BUILDING AND DEVELOPMENT SERVICES STATEMENT

More information

THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT

THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT July 2009 1 CONTENTS CHAPTER 1 PRELIMINARY... 3 Title, extent and commencement...

More information

Title Reference [Title Reference] In this Easement unless the context or subject matter require otherwise:

Title Reference [Title Reference] In this Easement unless the context or subject matter require otherwise: Land Title Act 1994, Land Act 1994 and Water Act 2000 Page 2 of 7 1. DEFINITIONS AND INTERPRETATION 1.1 Definitions In this Easement unless the context or subject matter require otherwise: Easement Land

More information

REGIONAL DISTRICT OF NORTH OKANAGAN SUBDIVISION SERVICING BYLAW NO. 2600, 2013

REGIONAL DISTRICT OF NORTH OKANAGAN SUBDIVISION SERVICING BYLAW NO. 2600, 2013 REGIONAL DISTRICT OF NORTH OKANAGAN SUBDIVISION SERVICING BYLAW NO. 2600, 2013 Page 3 TABLE OF CONTENTS SECTION -100- SCOPE AND APPLICABILTY... 4 101 Title... 4 102 Application... 4 103 Compliance with

More information

Meera Strata Management Statement. Shams Abu Dhabi, Reem Island, Abu Dhabi

Meera Strata Management Statement. Shams Abu Dhabi, Reem Island, Abu Dhabi Meera Strata Management Statement Shams Abu Dhabi, Reem Island, Abu Dhabi Contents 1 Duties and Obligations of the Owners 2 2 Name of Owners Association 3 3 Numbering of Apartments 3 4 Participation Quotas

More information

ii. Minimum Property Requirements and Minimum Property Standards

ii. Minimum Property Requirements and Minimum Property Standards Underwriting the Property The Mortgagee must underwrite the completed appraisal report to determine if the Property provides sufficient collateral for the FHA-insured Mortgage. The appraisal and Property

More information

TECHNICAL INFORMATION PAPER - VALUATIONS OF REAL PROPERTY, PLANT & EQUIPMENT FOR USE IN AUSTRALIAN FINANCIAL REPORTS

TECHNICAL INFORMATION PAPER - VALUATIONS OF REAL PROPERTY, PLANT & EQUIPMENT FOR USE IN AUSTRALIAN FINANCIAL REPORTS TECHNICAL INFORMATION PAPER - VALUATIONS OF REAL PROPERTY, PLANT & EQUIPMENT FOR USE IN AUSTRALIAN FINANCIAL REPORTS Reference ANZVTIP 8 Valuations of Real Property, Plant & Equipment for Use in Australian

More information

GENERAL CONDITIONS OF PURCHASE

GENERAL CONDITIONS OF PURCHASE 1. DEFINITIONS 1.1 Seller shall mean the company selling the Product to the Buyer. 1.2 Buyer shall mean KAEFER Energy AS, reg. no. 910 608 193. 1.3 Contract shall mean the Purchase Order together with

More information

SP Energy Networks Fee Scale

SP Energy Networks Fee Scale SP Energy Networks Fee Scale Introduction SP Energy Networks (the Company), which is formed by the licensed and regulated companies known as SP Distribution Plc, SP Transmission Plc and SP Manweb Plc,

More information

Electrical Safety Policy

Electrical Safety Policy Electrical Safety Policy Reference Compliance/Electrical Version 1 Safety Staff affected All staff Issue date April 2017 Approved by Arches Board Review June 2017 24 April 2017 Date Lead Officer John Hudson

More information

Developer Extension Agreement Application

Developer Extension Agreement Application Applicant shall indicate that the required information has been provided or is not applicable to the project by placing the appropriate mark in the first column of this checklist. Missing or incomplete

More information

Development Control Policy Subdivision of rural land

Development Control Policy Subdivision of rural land Development Control Policy 3.4 - Subdivision of rural land January 2011 Draft for public comment This policy supersedes Development Control Policy 3.4 Subdivision of Rural Land (February 2008). The Western

More information

Community Occupancy Guidelines

Community Occupancy Guidelines Community Occupancy Guidelines Auckland Council July 2012 Find out more: phone 09 301 0101 or visit www.aucklandcouncil.govt.nz Contents Introduction 4 Scope 5 In scope 5 Out of scope 5 Criteria 6 Eligibility

More information

Montebello Land & Water Co.

Montebello Land & Water Co. Rules & Regulations Montebello Land & Water Co. 344 East Madison Avenue Montebello, California 90640 October 10, 2017 TABLE OF CONTENTS Page SECTION I COMPANY STOCK... 1 1. STOCK REQUIREMENTS... 1 2. TRANSFER

More information

ACCESSORY DWELLING UNITS

ACCESSORY DWELLING UNITS ACCESSORY DWELLING UNITS LAND USE BYLAW C-4841-97 ACCESSORY DWELLING UNIT (ADU): means a subordinate dwelling unit attached to, created within or detached from the principal dwelling, single detached,

More information

Flinders Avenue, Lara Planning Scheme Amendment Combined Application for Rezoning and Multi-Lot Subdivision Reference : Decembe

Flinders Avenue, Lara Planning Scheme Amendment Combined Application for Rezoning and Multi-Lot Subdivision Reference : Decembe 143-179 Flinders Avenue, Lara Planning Scheme Amendment Combined Application for Rezoning and Multi-Lot Subdivision Reference: 14134-03 TGM Group Geelong Melbourne Ballarat 1/27-31 Myers Street (PO Box

More information

CORPORATE STANDARD FUNDING AND DELIVERY OF GROWTH INFRASTRUCTURE VERSION: 1.0

CORPORATE STANDARD FUNDING AND DELIVERY OF GROWTH INFRASTRUCTURE VERSION: 1.0 CORPORATE STANDARD FUNDING AND DELIVERY OF GROWTH INFRASTRUCTURE VERSION: 1.0 Contents 1. Purpose... 3 2. Scope... 3 3. Definitions... 3 4. Growth Plan... 4 5. Funding and delivery categories... 4 5.1

More information

POLICY & PROCEDURE FOR THE TAKING IN CHARGE OF RESIDENTIAL DEVELOPMENTS

POLICY & PROCEDURE FOR THE TAKING IN CHARGE OF RESIDENTIAL DEVELOPMENTS POLICY & PROCEDURE FOR THE TAKING IN CHARGE OF RESIDENTIAL DEVELOPMENTS TABLE OF CONTENTS 1 POLICY OBJECTIVE...1 2 POLICY OVERVIEW... 2 2.1 Legislative framework... 2 2.2 Policy Statement... 2 2.3 Policy

More information

THE CORPORATION OF THE MUNICIPALITY OF KINCARDINE BY-LAW NO

THE CORPORATION OF THE MUNICIPALITY OF KINCARDINE BY-LAW NO THE CORPORATION OF THE MUNICIPALITY OF KINCARDINE BY-LAW NO. 2016-030 BEING A BY-LAW TO AMEND BY-LAW NO. 2004-28 - BEING A BY-LAW TO ENACT RULES AND REGULATIONS FOR THE INSTALLATION, REPAIR, MAINTENANCE,

More information

Section 12A Purpose of Subdivision Provisions

Section 12A Purpose of Subdivision Provisions Section 12A 12A Purpose of Subdivision Provisions Subdivision is primarily about creating land parcels that define and redefine property rights and, in most instances, the creation of new parcels of land

More information

PAPAKAINGA DISTRICT WIDE ACTIVITY

PAPAKAINGA DISTRICT WIDE ACTIVITY SECTION 13.1 PAPAKAINGA DISTRICT WIDE ACTIVITY 13.1.1 INTRODUCTION The Resource Management Act 1991 introduced specific and new obligations for those exercising functions and powers under the Act to provide

More information

Owner Corporation SP88062 By-laws

Owner Corporation SP88062 By-laws Owner Corporation SP88062 By-laws 1 Vehicles An owner or occupier of a lot must not park or stand any motor or other vehicle on common property, or permit a motor vehicle to be parked or stood on common

More information

SEWER RATES AND CHARGES

SEWER RATES AND CHARGES SEWER RATES AND CHARGES Section 39.1 Public Utility Basis; Fiscal Year. The System shall be operated and maintained by the Township on a public utility basis pursuant to state law under the supervision

More information

REVIEWING ELECTRICAL INSPECTION AND TESTING CERTIFICATES FOR NON-ELECTRICAL ENGINEERS

REVIEWING ELECTRICAL INSPECTION AND TESTING CERTIFICATES FOR NON-ELECTRICAL ENGINEERS EDIS USER GUIDE REVIEWING ELECTRICAL INSPECTION AND TESTING CERTIFICATES FOR NON-ELECTRICAL ENGINEERS Purpose of this document is to provide context and suggestions on how electrical installation, inspection

More information

TERMS AND CONDITIONS OF SALE

TERMS AND CONDITIONS OF SALE TERMS AND CONDITIONS OF SALE 1. DEFINITIONS AND INTERPRETATIONS 1.1. In these Conditions: "SSD means ; "Buyer means the person firm or company so described in the Order; "Conditions means the standard

More information

Renovations Information

Renovations Information Renovations Information Renovations to a Lot When proposing to undertake renovations to a lot, the lot owners should review this factsheet and we suggest you complete an application form and checklist.

More information

STANDARD TERMS AND CONDITIONS FOR THE PURCHASE OF GOODS

STANDARD TERMS AND CONDITIONS FOR THE PURCHASE OF GOODS STANDARD TERMS AND CONDITIONS FOR THE PURCHASE OF GOODS 1. Application The Buyer hereby orders and the supplier, by accepting the purchase order, agrees that it will supply the Goods specified overleaf

More information

Development assessment and compliance fees 2010/11

Development assessment and compliance fees 2010/11 Development assessment and compliance fees 2010/11 This fact sheet will assist you to determine which Brisbane City Council development assessment and compliance fees are applicable to your development.

More information

South East Queensland Regional Plan State planning regulatory provisions Current as at May 2014

South East Queensland Regional Plan State planning regulatory provisions Current as at May 2014 South East Queensland Regional Plan 2009 2031 State planning regulatory provisions Current as at May 2014 The Department of State Development, Infrastructure and Planning is responsible for driving the

More information

Minimum Educational Requirements

Minimum Educational Requirements Minimum Educational Requirements (MER) For all persons elected to practice in each Member Association With effect from 1 January 2011 1 Introduction 1.1 The European Group of Valuers Associations (TEGoVA)

More information

Gwydir Shire Council. Integrated Planning and Reporting. Attachment 3 Operational Plan

Gwydir Shire Council. Integrated Planning and Reporting. Attachment 3 Operational Plan Gwydir Shire Council Integrated Planning and Reporting Attachment 3 Operational Plan Statement of Revenue 2017-2018 THIS PAGE HAS BEEN LEFT BLANK 2 Gwydir Shire Council STATEMENT OF REVENUE POLICY _ Rates

More information

THE STATUTES OF THE REPUBLIC OF SINGAPORE LAND TITLES (STRATA) ACT (CHAPTER 158)

THE STATUTES OF THE REPUBLIC OF SINGAPORE LAND TITLES (STRATA) ACT (CHAPTER 158) THE STATUTES OF THE REPUBLIC OF SINGAPORE LAND TITLES (STRATA) ACT (CHAPTER 158) (Original Enactment: Act 41 of 1967) REVISED EDITION 2009 (31st July 2009) Prepared and Published by THE LAW REVISION COMMISSION

More information

LIM Application for 1/ 240 Hurstmere Road Takapuna 0622

LIM Application for 1/ 240 Hurstmere Road Takapuna 0622 21 October 2015 G Bogiatto and B J Malcolm 23B Riverside Road OREWA 0931 LIM Application for 1/ 240 Hurstmere Road Takapuna 0622 This Land Information Memorandum (LIM) details information known to Council

More information

Historic Environment Scotland Àrainneachd Eachdraidheil Alba

Historic Environment Scotland Àrainneachd Eachdraidheil Alba The Schemes of Delegation from Scottish Ministers to Historic Environment Scotland Introduction This document sets out how Historic Environment Scotland shall fulfil the Scheme of Delegation for both properties

More information

Chapter 8 VALUATION OF AND INFORMATION ON PROPERTIES. Definitions

Chapter 8 VALUATION OF AND INFORMATION ON PROPERTIES. Definitions Chapter 8 VALUATION OF AND INFORMATION ON PROPERTIES Definitions 8.01 In this Chapter:- (1) carrying amount means, for an applicant, the amount at which an asset is recognised in the most recent audited

More information

SPORTING AND COMMUNITY LEASING POLICY

SPORTING AND COMMUNITY LEASING POLICY SPORTING AND COMMUNITY LEASING POLICY Classification: Statutory Policy. Trim Container TRIM Container Number Trim Document Number: TRIM Document Number First Issued / Approved: 24 April 2018 Last Reviewed:

More information

Strata Plan Phoenix Gardens Dora Street, Hurstville

Strata Plan Phoenix Gardens Dora Street, Hurstville Annexure A By-Laws Strata Schemes Management Act 1996 Page 1 Strata Plan 64498 Phoenix Gardens 12-22 Dora Street, Hurstville Attention all non-resident owners: Section 46(1) of the Strata Schemes Management

More information

2011 General Conditions JOINT FORM OF GENERAL CONDITIONS FOR THE SALE OF LAND

2011 General Conditions JOINT FORM OF GENERAL CONDITIONS FOR THE SALE OF LAND 2011 General Conditions JOINT FORM OF GENERAL CONDITIONS FOR THE SALE OF LAND CLAUSE PAGE CLAUSE PAGE For defined terms see clause 26 Contents 1 Deposit 4 1.1 Payment... 4 1.2 Deposit Holder - Stakeholder...