SURVEY OF UNFINISHED HOUSING DEVELOPMENTS

Size: px
Start display at page:

Download "SURVEY OF UNFINISHED HOUSING DEVELOPMENTS"

Transcription

1 SURVEY OF UNFINISHED HOUSING DEVELOPMENTS GUIDE FOR HOUSING INSPECTOR SURVEYORS 1 BACKGROUND 2 2 DEFINITIONS 3 3 ROLES AND RESPONSIBILITIES 4 4 THE INFORMATION TO BE COLLECTED 6 ANNEX (A) SURVEY SPREADSHEET TO BE COMPLETED 1

2 1 BACKGROUND The recent economic downturn has created a situation where many developers have been unable or unwilling to complete housing developments (estates and apartments). This has led to undesirable situations where for example some residents are living in partially developed housing developments with little immediate prospect of their development being completed in the near future. Also, in some cases significant health and safety issues may exist on inactive developments. The Department is preparing a policy document that is intended to assist local authorities and other bodies in dealing with the problems associated with vacant and uncompleted housing, and incomplete infrastructure in housing developments that are under construction or where construction has stopped. One of the current substantial difficulties in developing policy is that there is no definitive information about the scale, nature and location of the vacant/unfinished housing problem that has national coverage. Estimates of the number of vacant dwellings 1 in Ireland range from over in aggregate in both urban and rural areas, to around 35,000 in housing developments in mainly urban areas. This survey will enable the Department to get an accurate estimate of the numbers involved in unfinished housing developments and provide information about the location and nature of the problem, all of which will be important inputs into the policy currently being developed. The data from the survey will also be inputted into a planning Geographical Information System (GIS). A pilot study was undertaken in County Laois to test an approach (methodology) to collecting relevant information about vacant/incomplete housing and services in unfinished developments. The pilot study has been completed and the lessons learned have formed the basis for a national roll out of the survey and for the contents of this document. The Department s Housing Inspectors regularly visit housing developments under construction in Ireland where one or more dwellings/apartments (hereafter referred to as dwellings) are offered for sale and where an application for a Floor Area Compliance Certificate (FACC) has been made. In order to obtain a FACC the dwelling(s) must be new, have a floor between 38m² and 125m², and 1 In housing developments which are unfinished (under construction or where construction has halted) as well as in fully completed developments. 2

3 be built in accordance with the standards set out. In practice this means that the Inspectors visit the large majority of housing developments. However in order to get a comprehensive overall picture of the vacant/unfinished housing situation it would be necessary to obtain information about not only the FACC developments but also about those developments where no application for a FACC has been made (non-facc developments) 2, e.g. where all dwelling exceed 125m² or dwellings are built to let only. This document provides guidance for the Housing Inspectors who will visit both FACC and non- FACC housing developments to undertake the survey. 2 DEFINITIONS The survey is focussed on housing matters and thus in the comments below, the status of other development types such as shops, crèches, office or other non-residential uses are not being expressly included in the survey, although the presence of other non-residential elements of mixed use schemes can be noted by comments on the survey spreadsheet. A housing development would comprise two or more dwellings set out in free standing, semidetached, terraced, duplex and/or apartment formats. An unfinished housing development is one where the approved dwellings and their associated services and amenities have not been completed and occupied. In order to create clarity it is necessary to elaborate on the two key underlined words. Completed in this context does not necessarily mean that all the works required in terms of building regulations and/or the planning permission have been completed. 3 Minor outstanding works, such as individual house electricity connections, entrance gates, decoration etc. would not be regarded as significant. A development will be regarded as finished if an Inspector considers, on the basis of a normal visual on-site inspection, that the following have been substantially completed: dwellings, roads and footpaths, lighting, water supply, waste water infrastructure, open spaces, as defined for the purposes of this survey. 2 It is estimated that FACC developments comprise about 90% of all the housing developments currently under construction or which are unfinished but on which no construction activity is taking place. 3 Planning applications may well have many conditions attached ( are not uncommon) many of which relate to different physical aspects of a project. It would be unrealistic and unnecessary to expect that as part of this survey the Inspectors become familiar with every relevant condition and then attempts to see if the conditions have been fully or partially met. 3

4 In cases where one or more phases of a development have been completed but no work has commenced on subsequent phases, then the development would be regarded as being unfinished. Housing developments that may be referred to as recently completed housing developments (three years or less), with unoccupied dwellings, will be included in the survey. Developments regarded as finished for more than three years, but where a small number of the dwellings (less than10%) have never been occupied, will not be included. Such developments with more than 10% unoccupied will be included. Determination by an Inspector of the state of completion of dwellings or any other aspect of a development will not imply any particular level of compliance with building regulations or planning permissions. Guidance on occupied is given in below 3 ROLES AND RESPONSIBILITIES The main tasks to be undertaken by the key participants in the survey are set out below. Project Steering Committee A Project Steering Committee has been established to monitor progress and to provide overall guidance to the project. The Committee comprises representatives from the Housing and Planning Inspectorates, local authorities and the National Building Agency. The Housing Inspectors The Inspector s main task is to complete a Excel spreadsheet relating to each housing development (see Annex (A)). This will involve the following tasks. Identify all the uncompleted or recently completed housing developments (see definitions above) in the areas assigned to be surveyed. Undertake the field surveys in an efficient and cost effective manner. In cases where the Inspector knows or suspects that an uncompleted housing development comprises holiday homes (after making reasonable enquiries) the Inspector should survey the development and indicate in the comments space provided in the spreadsheet that it would appear to be a holiday home. 4

5 Visit and survey the identified developments and fill in the standard Excel spreadsheet (one for each housing development). Obtain the Local Authority Planning Department reference number for the development. Obtain a copy of the overall approved development layout plan(s) 4 in digital form in order to identify the total number of approved dwellings and the number of approved open spaces. The digital copy of the layout plan should if possible be included into the spreadsheet or a hyperlink to the local authority web site that contains an image of the layout plan should be indicated. Let their manager know if they encounter any difficulties or need clarification on any issue as soon as practical. Record any queries or comments into the appropriate parts of the spreadsheet Send their spreadsheets with weekly reports to their Manager. Respond to queries as they may arise from time to time. Finalise spreadsheets and submit to their Manager as soon as possible. Housing Inspectorate Managers (Regional Engineering Inspectors) The Manager s tasks are: To agree work programmes relevant to survey with the Inspectors in their area; To provide the Inspectors with contact details of persons in the planning or other sections of the local authorities for which the Inspectors have responsibility; To provide such guidance and advice to the Inspectors as may be necessary; To obtain clarifications from members of the Steering Committee if necessary; To review the completed survey spreadsheets and if necessary obtain clarifications from the Inspectors; To send by the completed reviewed spreadsheets to Bruce McCormack, Colum O Ruanaidh and Gabriel Moloney; Provide a brief report indicating any problems, difficulties or concerns they may have regarding the coverage, quality of responses or any other relevant matter. When completed the reports should be sent by to Bruce, Colum and Gabriel; To respond to queries as they may arise from time to time. Planning Inspectorate (Custom House) The Planners are responsible for: Notifying local authorities of the survey and obtaining contact names and details of persons in the planning or other sections with whom the Inspectors can make contact. Receiving the spreadsheets and ensuring that they are adequately incorporated into a GIS system and other appropriate database; 4 Only approved layouts are of relevance. Layouts linked to outline planning permissions are not of any relevance in this context. 5

6 Undertaking such analyses of the survey data as may be necessary and appropriate. Local Authorities Local authorities will be responsible for: Sharing their data as regards unfinished housing developments; Where requested, to assist in identifying the operative planning permission for unfinished housing developments, the approved layout and approved scale of development (housing units); Where requested, to assist in site identification and access. 4 THE INFORMATION TO BE COLLECTED An example of the information to be collected about each unfinished housing development is set out in tabular form in Annex (A). All Inspectors will be provided with this template in Excel spreadsheet form and would need to fill their responses into the spreadsheet. For consistency and quality control, certain cells in the spreadsheet have been locked. The spreadsheet has four columns. Column 1 the question/issue number; Column 2 the question or issue. Definitions of terms and other issues are dealt with in the text below; Column 3 the area into which the Inspector needs to fill in the survey findings; Column 4 an area into which the Inspector can make comments in relation to each question/issue. There is however no necessity to provide comments. An Inspector may feel the need to provide relevant comments if they would like to provide some degree of clarity regarding the responses in Column 3, or if the Inspector has queries that relate to the question/issue they would like to highlight. The spreadsheet also contains areas for inserting where possible an image(s) of the overall approved layout plan(s) or providing a hyper link to the relevant local authority planning web site which shows the layout plan(s). In any survey it is important that the surveyors adopt a standardised approach in order to ensure comparability of the results. One of the important ways in which to obtain such an approach is to define terms and, where appropriate, to set out what has to be done to complete the various questions in the survey. 6

7 The guidance set out below follows the numbered points in the spreadsheet set out in Annex (A). Department Housing Project Number (No. 1 in the table in Annex (A)) This is the number(s) allocated to the project in the Housing Inspector s filing system. Name of Development (No 2) The name should be as provided in the planning application. Geographic Location (No 3) This information is needed so that the information collected about developments can be incorporated into a planning Geographical Information System (GIS) database. Street Address/Townland (No 3.1) Ideally a street number and name should be recorded. In some cases no street number may exist in which case just the street name only would be recorded. In the case of larger developments in particular there may be more than one named street within the incomplete development. It would be necessary to indicate only one street name. If it is not possible to identify a street number or name then if possible the townland name should be identified and inserted into the spreadsheet. Town, Village, Suburb Name (No 3.2) In the overwhelming majority of cases there should be no difficulty in recording this information. Coordinates (No 3.3) Coordinates provide information about exact locations (i.e. position on the earth surface) and are necessary to locate developments in the Department s GIS system. Coordinates can be obtained using the Ordnance Survey Ireland web site. The steps to follow are set out below. Step 1 Open the OSi home page by typing osi.ie into Google Step 2 Double click on the Map of Ireland text which is displayed. A map of the whole of the island of Ireland will open. 7

8 Step 3 Using the Zoom In button (circle with a +) 5 and the pan button (indicated by a +) 6 in the Menu locate the suburb, town or village in which the development is located. This can be easily done based on the maps which are displayed. As one keeps zooming in the map will be replaced by aerial photography and using the photo images the exact position of a development can be located. Step 4 At the bottom left corner of the screen will be a box titled Status. Within this box there are the XY coordinates that reflect the position of the cross hairs, which will be positioned over the housing development. The two six figure numbers (separated by a comma) should be typed into the Excel spreadsheet. If any Inspector has a difficulty identifying the coordinates for a development he/she can contact Bruce McCormack ( , bruce.mccormack@environ.ie) or Colum O Ruanaidh ( , colum.oruanaidh@environ.ie). Planning File Reference (No 4) Number (No 4.1) The reference number of the planning permission enabling the development of each site must be obtained. Every effort should be made to obtain the reference number of the master permission, with if possible the numbers of any other permission that gives approval to a change in the number of dwellings or open spaces in the development. The reference number may be available on the FACC files or can be obtained from the local authority planning website. If clarification or assistance is required then the designated contact person in the Local Authority may be contacted. Date of Approval (No 4.2) In most cases there will be only one original or master planning approval given and this will relate to the overall project where a single overall layout plan is involved. The date of the original/master planning application would need to be inserted into the spreadsheet in the form day, month, year (eg 24 March 2006). Housing Development Form/Type (No 5) 5 Zooming in (ie showing maps which indicate more and more detail) is achieved by holding down the left side button on a mouse and dragging to create a rectangle (highlighted in red in the OSi system). After releasing the mouse button the next map image which will be displayed will cover just the area within the rectangle. 6 Holding down the left button on a mouse and moving the mouse will result in the whole map moving in the direction of movement of the mouse. Panning will stop when the left button is released. 8

9 Five types of dwelling are identified, namely, single freestanding, semi-detached, terrace, duplex and apartment. The number of dwellings in each category should be obtained by counting the number of proposed dwellings on the main/master approved layout plan(s). In the case of many local authorities the layout plans can be viewed in the planning section of their web site. In the case of those local authorities where it is not possible to obtain the layout plan(s) from the web sites it will be necessary to make contact with the designated contact person in the local authority and ask to see the relevant plan(s). Wherever possible a copy of the approved layout plan(s) can be downloaded from the web site and included into the spreadsheet, or the relevant hyper link to the part of the local authority s web site which shows the layout plan(s) could be inserted into the spreadsheet. Dwelling Completion Status (No 6) In the case of each dwelling 7 a number of levels of completion are to be recorded. Complete and Occupied (6.1.1) Refer to the discussion regarding what is a complete dwelling as set out in section 2 above. In the case of each completed dwelling it is necessary to record whether or not the dwelling is occupied. A dwelling may be regarded as being occupied if it shows signs of habitation such as having furniture, curtains, car in driveway, washing hanging out to dry, a dog in the garden, lights on etc. If the Inspector is in any doubt regarding occupation it would be appropriate to ask locally about the status of the dwelling. Complete and Vacant (No 6.1.2) A vacant dwelling is one that although apparently habitable does not display all or most of the signs of occupation as indicated above. Near Complete (Roofed and Weathertight to Habitable) (No 6.2) In this case the dwelling is weathertight but is not yet complete. In the case of each dwelling at this stage it is necessary to indicate whether or not there is any building activity taking place on this dwelling (Nos and 6.2.2). Wall Plate (Wallplate to Roofed and Weathertight) (No 6.3) 7 The term dwelling is used for this section in parenthesis because the survey will record the situation in relation to dwellings which may be in various stages of completion, from pre-dpc level only to fully habitable. Thus the term as used here may refer to virtual dwellings. 9

10 If the dwelling is at wall plate stage and beyond but is not yet weathertight (eg no, windows etc) then the dwelling should be recorded as being at the wall plate stage. In the case of each dwelling at this wall plate stage it is necessary to indicate whether or not there is any building activity taking place on this dwelling (Nos and 6.3.2). DPC Complete (DPC Level to Wallplate Level) (No 6.4) If the DPC has been fully laid but the dwelling has not reached the wall plate stage as defined above then the dwelling should be recorded as being at the DPC stage. In the case of each dwelling at this stage it is necessary to record whether or not there is any building activity taking place (Nos and 6.4.2). Foundation to DPC Level (No 6.5) In the case of each dwelling at this stage it is necessary to record whether or not there is any building activity taking place (Nos and 6.5.2). No Construction Commenced (No 6.6) In this case no construction work has commenced. Road, Access and Lighting Status (No 7) This section of the survey records the extent to which the dwellings in the development are served by roads, footpaths and lighting at varying stages of completion. Roads Complete and in Service (No 7.1) In the case of each dwelling, all of the roadways which are required to service that dwelling (ie from the public road to the dwelling ) need to have all courses (ie sub-base, base, final pavement) for the roads serving that dwelling to be classified as being complete. Base/Binder Course Level (No 7.2) If any part of the roadways servicing a dwelling have only base course or a binder course (ie no final surface pavement) the relevant dwelling should be recorded as being served by roads at base/binder course stage only. No Roads or Pre-base Level Course (No 7.3) If any part of the roadways servicing a dwelling have any road works which are below the base/binder course level (ie pre-base course) or have no works undertaken at all then the dwelling should be classified into this category. 10

11 Footpaths (No 7.4) In the case of each dwelling, it is necessary to indicate if all of the footpaths/pedestrian accesses required to service that dwelling are complete (No 7.4.1) or incomplete (No 7.4.2). Lighting (7.5) In the case of each dwelling, it is necessary to indicate if all the public lighting standards are installed to light roadways and footpaths are complete (No 7.5.1) or incomplete (No 7.5.2). Water Services (No 8) Water (No 8.1) Record the number of dwellings (occupied or vacant) that have full water supply. Waste Water (No 8.2) Record the number of dwellings (occupied or vacant) that have full access to a waste water sewer. Storm Water (No 8.3) Provide an indication/estimate of the level of completion of the stormwater infrastructure for the project as a whole; complete (No 8.3.1), substantially complete (ie %) (No 8.3.2) or untouched/substantially untouched (less than 50%) (No 8.3.3). Open Space (No 9) Number (No 9.1) The number of open spaces can be obtained from the overall estate layout plan. Development Status of Open Space Areas (No 9.2) The intention here is to get an idea regarding the level/stage of development of all the open spaces identified in the overall master layout plan(s). Completed (No 9.2.1) A completed open space is an area which has been contoured (levelled) and grassed or seeded, or possibly hardened (fully or partially). Levelled, not seeded or hardened (No 9.2.2) An open space may be levelled but no seeding (or hardening) has been undertaken in which case it is recorded as such. In order to record an open space as being levelled it is necessary that the whole open space has been levelled, possibly apart from some minor edge areas. 11

12 Untouched/substantially untouched (No 9.2.3) An open space which is classified as untouched or substantially untouched is an area in which in all or at least half of the space no attempt has been made to prepare the open space. Inactive or Active Site (No 10) Construction activity taking place on site (yes/no). Inspector s Name (No 11) If more than one Inspector participated in the inspection then all the Inspectors names should be recorded. Date of Survey Completion (No 12) If the site was visited more than once on different days in order to undertake this survey then only the date of the final visit should be recorded. Any Overall Comments (No 13) Space is provided for any general comments that the Inspector may wish to make on any aspect of the survey. If it would appear that the development constitutes holiday homes then this should be recorded here. Digital Copy of Layout Plan(s) (No 14) A hyperlink to the site layout on the local authority planning website can be inserted where available (6/5/10) 12

13 ANNEX (A) SURVEY SPREADSHEET TO BE COMPLETED (Excel version to be provided to Inspectors) Questions / Issues (see the Guide for information about the questions/issues and how to fill in the form) Responses (example) Comments / Remarks 1 Department Housing Project Number Name of Development The Firs 3 Geographic Location 3.1 Street address/townland 23 Fox Road 3.2 Town, village, suburb Athy 3.3 Coordinates using OSi web site (x y coordinates) , Planning File Reference 4.1 Number 1234/ Date(s) of approval 25/06/ /03/2007 Original permission 105 dwellings. Second permission - 30 extra dwellings 5 Housing Development Form/Type 5.1 Single dwellings Semi-detached Terrace Duplex Apartment 0 TOTAL Dwelling' Completions Status Complete & occupied Complete & vacant Near Complete - no building activity Near Complete - building activity taking place Wall Plate - no building activity Wall Plate - building activity taking place DPC complete - no building activity DPC Complete - building activity taking place Foundation to DPC level no building activity taking place Foundation to DPC level building activity taking place No construction commenced 8 13

14 TOTAL 135 Roads, Footpaths & Lighting Status (number of 'dwellings' 7 served) 7.1 Roads - Complete and in service Roads - Base/binder course Roads - No roads or pre-base course 20 TOTAL Footpaths - complete Footpaths - not complete 90 TOTAL Lighting - compete Lighting - not complete 100 TOTAL Water Services Status (number of 'dwellings' served) 8.1 Potable water supply fully operational Waste water system fully operational Stormwater - Complete / OR Stormwater - Substantially complete (50%+) / OR Yes Stormwater - Incomplete (less than 50%) 9 Open Space 9.1 Number of open space areas planned in overall project (identified from layout plan) OS Areas - fully complete OS areas - levelled, not seeded or hardened OS Areas - Untouched / substantially untouched 2 TOTAL 5 10 Active or Inactive Site (Yes /No) Yes 11 Inspector Name 12 Date of Survey Completion 13 Any Overall Comments 14 Digital copy of Layout Plan(s) Image(s) to be inserted into the area below or Hyperlink to layout plan(s) on local authority web site No problems were encountered undertaking the survey. 14

15 15

EPA Guidance for Licensees and Proposed Transferees on Licence Transfer Applications

EPA Guidance for Licensees and Proposed Transferees on Licence Transfer Applications Issue No: 1 Revision No. 6 Date of Issue: 30/03/2017 EPA Guidance for Licensees and Proposed Transferees on Licence Transfer Applications ENVIRONMENTAL PROTECTION AGENCY An Ghníomhaireacht um Chaomhnú

More information

1. *Does the document clearly specify the aims, objectives and scope of the proposed programme of archaeological work?

1. *Does the document clearly specify the aims, objectives and scope of the proposed programme of archaeological work? Notes and Guidance This document provides curatorial advisors, archaeological practitioners and other interested parties with additional information and guidance on the standards and expectations for archaeological

More information

NROSH+ Statistical Data Return 2017/18. Large Provider Guidance Notes

NROSH+ Statistical Data Return 2017/18. Large Provider Guidance Notes NROSH+ Statistical Data Return 2017/18 Large Provider Guidance Notes Version 1.3 (May 2018) Survey Deadline: 31 May 2018 Contents Statistical Data Return Guidance 2 Introduction 3 Completing the Statistical

More information

Capital One Escrow Express SM Reference Guide

Capital One Escrow Express SM Reference Guide Capital One Escrow Express SM Reference Guide Table of Contents Overview 2 Accessing Capital One Escrow Express 2 About the Capital One Escrow Express Menu 4 About the Master Account Summary 5 Creating

More information

User Manual. Section 2: Implementation and Industry Translations. Created: October Copyright PropertyBoss Solutions, LLC. All Rights Reserved.

User Manual. Section 2: Implementation and Industry Translations. Created: October Copyright PropertyBoss Solutions, LLC. All Rights Reserved. User Manual Section 2: Implementation and Industry Translations Created: October 2010 Copyright PropertyBoss Solutions, LLC. All Rights Reserved. PropertyBoss Manual Section 2 - Implementation and Industry

More information

Six Steps to a Completed Appraisal Report

Six Steps to a Completed Appraisal Report Six Steps to a Completed Appraisal Report Section 1 DataLog - Comparable Sales Database ClickFORMS - Report Processor Section 2 Addenda Section 3 Mini Sample - Approach Pages 1 Six Steps to a Completed

More information

MARS Doctor User Guide Primary Care

MARS Doctor User Guide Primary Care 1 MARS Doctor User Guide Primary Care https://gp.marswales.org This guide is intended to walk you through the Appraisal Process using the online MARS system. Primarily for primary care doctors practising

More information

CHOICE BASED LETTING (CBL) HOW TO USE THE CBL SYSTEM

CHOICE BASED LETTING (CBL) HOW TO USE THE CBL SYSTEM CHOICE BASED LETTING (CBL) HOW TO USE THE CBL SYSTEM A new system to help people on Cork County Council s Social Housing Support waiting list express interest in Council Accommodation Phoneline: (021)

More information

GeoWarehouse Land Registry. Teranet Enterprises Inc.

GeoWarehouse Land Registry. Teranet Enterprises Inc. GeoWarehouse Land Registry Teranet Enterprises Inc. TABLE OF CONTENTS Neighoubourhood Sales... 1 Overview... 1 Find Neighbourhood Sales... 1 Neighbourhood Sales and Map... 6 Map Neighbourhood Sales...

More information

Unipol Student Homes. Assistant Housing Management Officer. Fixed Term of 2 years

Unipol Student Homes. Assistant Housing Management Officer. Fixed Term of 2 years Unipol Student Homes Assistant Housing Management Officer Fixed Term of 2 years You will assist the Housing Manager working within one of the housing teams in managing a mixed portfolio of Unipol owned,

More information

Here s How to Do a Simple Property Search.

Here s How to Do a Simple Property Search. Here s How to Do a Simple Property Search. Conducting a Search Using the Single Property Search First step to conducting a property search is selecting the state and the county in which to search. Then,

More information

POLICY & PROCEDURE FOR THE TAKING IN CHARGE OF RESIDENTIAL DEVELOPMENTS

POLICY & PROCEDURE FOR THE TAKING IN CHARGE OF RESIDENTIAL DEVELOPMENTS POLICY & PROCEDURE FOR THE TAKING IN CHARGE OF RESIDENTIAL DEVELOPMENTS TABLE OF CONTENTS 1 POLICY OBJECTIVE...1 2 POLICY OVERVIEW... 2 2.1 Legislative framework... 2 2.2 Policy Statement... 2 2.3 Policy

More information

All information and reports concerning properties can be found by clicking on the Properties tab in your black toolbar along the top of your page.

All information and reports concerning properties can be found by clicking on the Properties tab in your black toolbar along the top of your page. support@payprop.co.za 087 820 7368 TRAINING MANUAL: PROPERTIES All information and reports concerning properties can be found by clicking on the Properties tab in your black toolbar along the top of your

More information

Choice-Based Letting Guidance for Local Authorities

Choice-Based Letting Guidance for Local Authorities Choice-Based Letting Guidance for Local Authorities December 2016 Contents Page 1. What is Choice Based Lettings (CBL) 1 2. The Department s approach to CBL 1 3. Statutory Basis for Choice Based Letting

More information

GAUSSCAD A WEBGIS APPLICATION FOR COLLECTING CADASTRAL DATA

GAUSSCAD A WEBGIS APPLICATION FOR COLLECTING CADASTRAL DATA M.M. Moise GaussCAD a WebGIS Application for Collecting Cadastral Data GAUSSCAD A WEBGIS APPLICATION FOR COLLECTING CADASTRAL DATA Mihai-Mircea MOISE, S.C. GAUSS S.R.L., mihai.moise@gauss.ro Abstract:

More information

Listing Load Manual. for. Staff

Listing Load Manual. for. Staff Listing Load Manual for Staff 1 Listing Load Listing Load is the module that allows you to add a new listing, change listing information and make contractual changes such as status or price at any time

More information

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington Issue Date: March 2, 2018 Prepared By: Rural Municipality of Wellington Wellington, PEI

More information

Table of Contents. Page 2 of 11 CRMLS Rules & Regulations Reference Guide Effective

Table of Contents. Page 2 of 11 CRMLS Rules & Regulations Reference Guide Effective Table of Contents I. Rules Enforcement... 3 II. Accuracy of Information... 3 III. Late Entry of Listings... 4 IV. Listing Status Changes... 5 V. Listing Images & Virtual Tour Information... 6 VI. Public

More information

MML Southern Maryland Chapter. September 2015

MML Southern Maryland Chapter. September 2015 MML Southern Maryland Chapter September 2015 As of October 2012, in accordance with Maryland Code, Real Property Article 14.126.1, purchasers of residential properties at foreclosure sales must register

More information

TOWN OF EASTCHESTER BUILDING AND PLANNING DEPARTMENT PLANNING BOARD APPLICATION PACKAGE SUBDIVISIONS

TOWN OF EASTCHESTER BUILDING AND PLANNING DEPARTMENT PLANNING BOARD APPLICATION PACKAGE SUBDIVISIONS TOWN OF EASTCHESTER BUILDING AND PLANNING DEPARTMENT 40 Mill Road (914) 771-3317 building@eastchester.org Eastchester, NY 10709 (914) 771-3322 Fax www.eastchester.org TABLE OF CONTENTS PLANNING BOARD APPLICATION

More information

Streetscape Character Manual 1

Streetscape Character Manual 1 Streetscape Character Manual A Streetscape Character Analysis is a scoped Neighbourhood Character Statement & Compatibility Report for Low-Rise Residential Infill & Intensification How to use this manual:

More information

P L A N N I N G A P P L I C A T I O N F O R M

P L A N N I N G A P P L I C A T I O N F O R M P L A N N I N G A P P L I C A T I O N F O R M Part 1: Applicant Information Part 2: Application Details Part 3: Supporting Information Requirements Part 4: Fees PART 1: APPLICANT INFORMATION Registered

More information

HOW TO CREATE AN APPRAISAL

HOW TO CREATE AN APPRAISAL Page 1 7/19/2005 IMAGEsoft s Appraise Link Instruction Manual HOW TO CREATE AN APPRAISAL Start at the MAIN MENU. Click on APPRAISALS. The WORK WITH APPRAISALS screen appears. This screen stores your appraisals,

More information

Universal Geo-database Connector Interface Component (UG-CIC) For Virtual Web-base GIS Server Essential For Real Estate Industry Uses

Universal Geo-database Connector Interface Component (UG-CIC) For Virtual Web-base GIS Server Essential For Real Estate Industry Uses Universal Geo-database Connector Interface Component (UG-CIC) For Virtual Web-base GIS Server Essential For Real Estate Industry Uses Jad Jarroush & Dr. Kobi Zaid Zaid Orniv Group L.T.D Israel kobi_z@zaidorniv.co.il

More information

Information contained

Information contained Cadastral Integrity Unit Audit Survey Procedures August 2012 Table of Contents Introduction... 2 2. Objectives... 3 3. Roles, responsibilities and delegations... 4 3.1 Ethical conduct... 4 3.2 Workplace

More information

Introduction to CREST EDG Reports

Introduction to CREST EDG Reports 9 Introduction to CREST EDG Reports Introduction to CREST EDG Reports Overview Action Items Reports Report Formats Types of CREST EDG Reports CREST EDG produces many types of reports that help you to

More information

AFFORDABLE HOUSING CONNECTIONS NOTES FOR CHART REPORTING (FOLLOW THESE INSTRUCTIONS TO AVOID FINDINGS)

AFFORDABLE HOUSING CONNECTIONS NOTES FOR CHART REPORTING (FOLLOW THESE INSTRUCTIONS TO AVOID FINDINGS) AFFORDABLE HOUSING CONNECTIONS NOTES FOR HTC-12 PREPARATION AND REPORTING: PROGRAM YEAR 2015, DUE MARCH 15, 2016 (FOLLOW THESE INSTRUCTIONS TO AVOID FINDINGS) i. The HTC 12 requires the signature of the

More information

DRILLERS GUIDE TO UNDERTAKING PRE-DRILLING ASSESSMENTS FOR THE CRC BORE INSTALLERS PROGRAMME

DRILLERS GUIDE TO UNDERTAKING PRE-DRILLING ASSESSMENTS FOR THE CRC BORE INSTALLERS PROGRAMME DRILLERS GUIDE TO UNDERTAKING PRE-DRILLING ASSESSMENTS FOR THE CRC BORE INSTALLERS PROGRAMME This document is a step-by-step guide on how to undertake pre-drilling assessments to meet the requirements

More information

Abila MIP Fund Accounting TM. Encumbrances STUDENT WORKBOOK ABILA LEARNING SERVICES. Important Notice:

Abila MIP Fund Accounting TM. Encumbrances STUDENT WORKBOOK ABILA LEARNING SERVICES. Important Notice: Abila MIP Fund Accounting TM Encumbrances STUDENT WORKBOOK ABILA LEARNING SERVICES Important Notice: Authentic Abila MIP Fund Accounting TM training guides display a holographic image on the front cover.

More information

WinTen² Section 8 Desktop Inspections

WinTen² Section 8 Desktop Inspections WinTen² Section 8 Desktop Inspections Preliminary User Manual User Manual Edition: 11/15/2004 We are your inside track for making your job easier! Tenmast Software 132 Venture Court, Suite 1 Lexington,

More information

Procedures For Collecting and Monitoring Data

Procedures For Collecting and Monitoring Data DRAFT Kitsap County Buildable Lands Program Procedures For Collecting and Monitoring Data Page 1 12/1/05 Introduction This procedures report is intended to provide guidelines for Kitsap County and its

More information

SIAR Assessment Guidance v5.0.doc Page 1 of 65

SIAR Assessment Guidance v5.0.doc Page 1 of 65 UNFCCC ITL Administrator Standard Independent Assessment Report Assessment Guidance Part 1 - Completeness Part 2 - Substance Reference IAR Procedure Security classification: RSA Forum Version number: V5.0

More information

Keller Williams Listing System (KWLS)

Keller Williams Listing System (KWLS) Keller Williams Listing System (KWLS) NOTES... KWLS AND THE GSO 0707R3 2007 KELLER WILLIAMS REALTY INC. i NOTICES While Keller Williams Realty International (KWRI) has taken due care in the preparation

More information

Landuse Consent Subdivision Consent Certificate of Compliance Variation/Cancellation of Consent Conditions Outline Plan Waiver

Landuse Consent Subdivision Consent Certificate of Compliance Variation/Cancellation of Consent Conditions Outline Plan Waiver Resource Consent Application for resource consent Form 9, Resource Management Act 1991 All sections of this form must be completed before your application can be assessed. Information required to accompany

More information

Independent Connection Providers Legal Process and Statutory Consents

Independent Connection Providers Legal Process and Statutory Consents Independent Connection Providers and Statutory Consents Contents 1. Land and Rights Over Land 1.1. Basic Principles 1.2. Landowner Negotiations / Legal Completion 1.3. No third party landowners 1.4. Third

More information

Project Appraisal Guidelines for National Roads Unit Introduction

Project Appraisal Guidelines for National Roads Unit Introduction Project Appraisal Guidelines for National Roads Unit 1.0 - Introduction October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible

More information

Style/Type of Property and a brief description (e.g. period, detached, date built, private property, commercial property etc):

Style/Type of Property and a brief description (e.g. period, detached, date built, private property, commercial property etc): Property Name & Address (including postcode): Style/Type of Property and a brief description (e.g. period, detached, date built, private property, commercial property etc): Owner(s) Name: Office Telephone:

More information

MARS User Guide Appraisers https://gp.marswales.org https://medical.marswales.org. Guide Index

MARS User Guide Appraisers https://gp.marswales.org https://medical.marswales.org. Guide Index 1 MARS User Guide Appraisers https://gp.marswales.org https://medical.marswales.org This guide is intended to walk you through the Appraisal Process using the online MARS system. Primarily for Appraisers

More information

RICS property measurement 2nd edition: Basis for conclusions. Purpose

RICS property measurement 2nd edition: Basis for conclusions. Purpose RICS property measurement 2nd edition: Basis for conclusions Purpose This document has been prepared to accompany publication of the RICS property measurement 2nd edition in order to explain the rationale

More information

HS2 Phase Two - Land & Property - preparation of Hybrid Bill activities privacy notice

HS2 Phase Two - Land & Property - preparation of Hybrid Bill activities privacy notice HS2 Phase Two - Land & Property - preparation of Hybrid Bill activities privacy notice Your privacy There are rules about what personal information we can record, hold, use and share. You have rights over

More information

South African Council for Town and Regional Planners

South African Council for Town and Regional Planners TARIFF OF FEES South African Council for Town and Regional Planners PLEASE NOTE : THE TARIFF OF FEES WAS APPROVED BY THE COUNCIL CHAPTER 10 : TARIFF OF FEES 10.1 INTRODUCTION 10.1.1 General This tariff

More information

The Digital Cadastral Database and the Role of the Private Licensed Surveyors in Denmark

The Digital Cadastral Database and the Role of the Private Licensed Surveyors in Denmark IRISH INSTITUTE OF SURVEYORS, DUBLIN INSTITUTE OF TECHNOLOGY, 23 NOVEMBER 2005 PUBLISHED IN IIS NEWS, WINTHER 2006. The Digital Cadastral Database and the Role of the Private Licensed Surveyors in Denmark

More information

Internal Audit Report

Internal Audit Report Final Audit Report Report Industrial & Investment Properties Audit Philippa Watts Auditor October 2016 Contents If viewing on-screen, please click on the links below or use the scrolling arrows 1 Introduction...3

More information

Your property and compulsory purchase

Your property and compulsory purchase Your property and compulsory purchase 2 Your property and Compulsory Purchase Content Highways England 4 Introduction 5 Compulsory purchase 6 Compensation for freeholders, leaseholders and tenants (compensatable

More information

ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM

ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM Davina McNickel 1, Helen Davies 2, Vincent Salomon 2 1 Environment Canterbury, PO Box 345, Christchurch. Telephone: 03 365

More information

Griffith's [Tenement] Valuation of 1858/1859 for Co. Londonderry

Griffith's [Tenement] Valuation of 1858/1859 for Co. Londonderry Griffith's [Tenement] Valuation of 1858/1859 for Co. Londonderry Given the absence of Census Enumerators' Returns for the nineteenth century, the Griffith's [Tenement] Valuation is a key source for identifying

More information

Mass CSV file Enrolment Submission Instructions

Mass CSV file Enrolment Submission Instructions Mass CSV file Enrolment Submission Instructions Note: Use this option if you are entering large numbers of enrolments at the same time or for the same project (i.e. condo enrolments) 1. Select Submit Enrolments

More information

Interim Process for Requesting and Undertaking Methamphetamine Testing on Tenanted Properties

Interim Process for Requesting and Undertaking Methamphetamine Testing on Tenanted Properties Interim Process for Requesting and Undertaking Methamphetamine Testing on Tenanted Properties Process Owner: Health, Safety and Security Version 1.0 Published: 19/11/2015 Version release history Document

More information

STAFF REPORT. Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report.

STAFF REPORT. Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report. STAFF REPORT Planning and Development Department Subject: Cottage Country Unsubstantial Amendment to Development Agreement To: CAO for Planning Advisory Committee, December 13, 2016 Date Prepared: December

More information

The application is being presented to the planning committee as Brentwood Borough Council is the applicant.

The application is being presented to the planning committee as Brentwood Borough Council is the applicant. COMMITTEE REPORT ITEM 09 Reference: 17/00682/FUL Ward: Brentwood South Site: Land Adjacent 3 King Edward Road Brentwood Essex Proposal: Construction of two x 2 bedroomed semi-detached dwellings. Plan Number(s):

More information

South Worcestershire Development Plan Examination Representation Form Additional Pages Consultation on Proposed Modifications to SWDP: 6 October 14 November 2014 South Worcestershire Councils Additional

More information

Easement Program Conservation Easement Monitoring Guidelines

Easement Program Conservation Easement Monitoring Guidelines A. Purpose of Monitoring Easement Program Conservation Easement Monitoring Guidelines The following guideline establishes the standards and practices associated with routine monitoring of WAC easements

More information

Guide to Subdivision and Land Development

Guide to Subdivision and Land Development Guide to Subdivision and Land Development Fraser Thomas Ltd......is an engineering and surveying consulting firm based in Highbrook which has provided Surveying, Engineering, Planning and Resource Management

More information

Demonstration Properties for the TAUREAN Residential Valuation System

Demonstration Properties for the TAUREAN Residential Valuation System Demonstration Properties for the TAUREAN Residential Valuation System Taurean has provided a set of four sample subject properties to demonstrate many of the valuation system s features and capabilities.

More information

AIA FORT WORTH HOMES TOUR RULES:

AIA FORT WORTH HOMES TOUR RULES: All submissions are due to September 28 th 2018 at 4:00pm CST to AIAFW12@GMAIL.COM. Thank you for your consideration in submitting your project to AIA Fort Worth Homes Tour. We are very excited to see

More information

Progress Report on Green Paper. Dr. Paddy Prendergast. on behalf of the. IIS Commission on Land Registration

Progress Report on Green Paper. Dr. Paddy Prendergast. on behalf of the. IIS Commission on Land Registration Progress Report on Green Paper By Dr. Paddy Prendergast on behalf of the IIS Commission on Land Registration Paddy Prendergast - Chair Brendan Sweeny - Hempenstall Surveys Paul Corrigan - P Corrigan Associates

More information

ADMINISTRATIVE GUIDANCE

ADMINISTRATIVE GUIDANCE 11 ADMINISTRATIVE GUIDANCE ON CONTAMINATED SITES Effective date: April 1, 2013 Version 1.1 May 2013 Expectations and Requirements for Contaminant Migration Introduction This guidance focusses on the ministry

More information

Brownfield Land Registers Data Standard Vers 2 August Paul Davidson, CIO Sedgemoor District Council Director of Standards for istanduk

Brownfield Land Registers Data Standard Vers 2 August Paul Davidson, CIO Sedgemoor District Council Director of Standards for istanduk Brownfield Land Registers Data Standard Vers 2 August 2017 Paul Davidson, CIO Sedgemoor District Council Director of Standards for istanduk Operating since 2006 Formerly known as LeGSB All personnel are

More information

Features Guide. Enhancements. Mortgage Calculators VERSION 7. May 2008

Features Guide. Enhancements. Mortgage Calculators VERSION 7. May 2008 Features Guide VERSION 7 May 2008 Copyright 2002-2008 SuperTech Software All rights reserved. Printed in Australia. Enhancements This document describes new features and enhancements in POSH. Mortgage

More information

Release: 1. CPPDSM4011A List property for lease

Release: 1. CPPDSM4011A List property for lease Release: 1 CPPDSM4011A List property for lease CPPDSM4011A List property for lease Modification History Not Applicable Unit Descriptor Unit descriptor This unit of competency specifies the outcomes required

More information

CONSENT TO LET APPLICATION FORM

CONSENT TO LET APPLICATION FORM CONSENT TO LET APPLICATION FORM To allow us to consider your request please send us the fully completed consent to let application form. IMPORTANT INFORMATION If consent is granted you will be charged

More information

Parkland-Spanaway-Midland LUAC - Agenda

Parkland-Spanaway-Midland LUAC - Agenda 1. 6:30 P.M. Parkland-Spanaway-Midland LUAC - Agenda Documents: 8 2 17 PSMAC Agenda.pdf 2. Parkland-Spanaway-Midland LUAC Initial Project Review Documents: Lincoln Court PP IPR PSMAC-RJ.pdf Department

More information

1. Introduction - 2 -

1. Introduction - 2 - PRE-ACTION PROTOCOL FOR CLAIMS FOR DAMAGES IN RELATION TO THE PHYSICAL STATE OF COMMERCIAL PROPERTY AT THE TERMINATION OF A TENANCY (THE DILAPIDATIONS PROTOCOL) - 1 - PRE-ACTION PROTOCOL FOR CLAIMS FOR

More information

Conditions. For the purpose of licensing conditions attached to a licence:

Conditions. For the purpose of licensing conditions attached to a licence: Conditions For the purpose of licensing conditions attached to a licence: (i) (ii) Liverpool City Council will be referred to as the Authority acting in its capacity as the Local Housing Authority. tenancy

More information

academy conversion land guidance

academy conversion land guidance academy conversion land guidance General Report on Title to DfE From the property perspective, each conversion will require a Report on Title to be provided to the Department for Education (DfE) in their

More information

Highlights Highlights of a review of Newfoundland and Labrador Housing Corporation s Rental Housing Program from January 2007 to December 2007.

Highlights Highlights of a review of Newfoundland and Labrador Housing Corporation s Rental Housing Program from January 2007 to December 2007. Office of the Auditor General Newfoundland and Labrador Highlights Highlights of a review of Newfoundland and Labrador Housing Corporation s Rental Housing Program from January 2007 to December 2007. Why

More information

BPO Best Practices Guide

BPO Best Practices Guide BPO Best Practices Guide A Step by Step Guide for Completing BPO Reports Version: 1.0.0 Published: 03/01/2011 Global DMS, 1555 Bustard Road, Suite 300, Lansdale, PA 19446 2014, All Rights Reserved. Table

More information

Pro Series User Guide

Pro Series User Guide Pro Series User Guide Table of Contents Page 2 Getting Started Page 7 Property Search and Reports Page 22 Farm Search and Reports Page 30 Using the Map GETTING STARTED 2 P a g e Property Search select

More information

Impact of welfare reforms on housing associations: Early effects and responses by landlords and tenants

Impact of welfare reforms on housing associations: Early effects and responses by landlords and tenants Impact of welfare reforms on housing associations: Early effects and responses by landlords and tenants For the National Housing Federation February 2014 Legal notice 2014 Ipsos MORI all rights reserved.

More information

Property administration overview and risk warning notice

Property administration overview and risk warning notice Property administration overview and risk warning notice Overview of property administration You have informed us that you wish to purchase a property within your Scheme. Please complete and return to

More information

Minimum Energy Efficiency Standards. Frequently Asked Questions

Minimum Energy Efficiency Standards. Frequently Asked Questions Minimum Energy Efficiency Standards Frequently Asked Questions These Frequently Asked Questions relate to the Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015 and have been

More information

Neighborhood Data Table User Guide

Neighborhood Data Table User Guide Neighborhood Data Table User Guide MyHistoricLA Neighborhood Data Table User Guide Section I Introduction This step-by-step guide explains how to enter data into the Office of Historic Resources (OHR)

More information

Online Bidding Terms & Conditions

Online Bidding Terms & Conditions National Residential Property Auctions Online Bidding Terms & Conditions Last modified: 28/11/2017 Find your perfect property at an amazing price IMPORTANT: These terms and conditions apply to all Online

More information

The IRAM Web app. Description of the internet application of the Integrated Risk Assessment Method (IRAM)

The IRAM Web app. Description of the internet application of the Integrated Risk Assessment Method (IRAM) The IRAM Web app Description of the internet application of the Integrated Risk Assessment Method (IRAM) https://www.fms.nrw.de/lip/authenticate.do The internet application of the Integrated-Risk-Assessment-Method

More information

REZONING APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS

REZONING APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS REZONING APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS The following table lists the information necessary to review a rezoning application. All

More information

No. 39 Researching Crown Granted 2 Post Mineral Claims

No. 39 Researching Crown Granted 2 Post Mineral Claims M i n e r a l T i t l e s Information Update No. 39 Researching Crown Granted 2 Post Mineral Claims Revision Date: July 9, 2018 The purpose of this Information Update is to guide the reader through the

More information

GUIDE TO SUBDIVISION & LAND DEVELOPMENT

GUIDE TO SUBDIVISION & LAND DEVELOPMENT GUIDE TO SUBDIVISION & LAND DEVELOPMENT The Fraser Thomas Difference: Fraser Thomas Ltd is an engineering and surveying consulting firm based in Highbrook, and has been providing; Surveying, Engineering,

More information

WCMS User s Guide. Effective August, 2013

WCMS User s Guide. Effective August, 2013 WCMS User s Guide Effective August, 2013 Your Computer s Settings: WCMS is currently compatible with Internet Explorer only using any other web browser such as Mozilla Firefox, Google Chrome, etc. may

More information

DECANT POLICY AND PROCEDURES

DECANT POLICY AND PROCEDURES DECANT POLICY AND PROCEDURES A. INTRODUCTION A.1 Solon aims to provide good quality accommodation and in providing this, it is sometimes necessary to modernise, re-improve and carry out major repairs to

More information

Earls Barton. Rural Housing Survey. Authors: A Miles & S Butterworth Date: October 2012

Earls Barton. Rural Housing Survey. Authors: A Miles & S Butterworth Date: October 2012 Earls Barton Rural Housing Survey Authors: A Miles & S Butterworth Date: October 2012 Swanspool House, Doddington Road, Wellingborough, Northamptonshire, NN8 1BP Tel: 01933 229777 DX 12865 www.wellingborough.gov.uk

More information

Your property and land surveys

Your property and land surveys Your property and land surveys 2 Content Highways England 4 Introduction 5 Surveys and compensation 6 Typical compensation levels 6 Compensation for boreholes and trial pits 8 Rent for measuring apparatus

More information

Establishing a Wetland Bank in Minnesota

Establishing a Wetland Bank in Minnesota Establishing a Wetland Bank in Minnesota Updated February 1, 2018 This document provides a general summary of the key steps in establishing an individual wetland bank site within the state wetland banking

More information

The Xafinity SIPP Development & Property Works Guide

The Xafinity SIPP Development & Property Works Guide The Xafinity SIPP Development & Property Works Guide If you require this document in another format for ease of reading, please let us know. 2 Contents Important notes 3 Development / property works: an

More information

Prescribed Information and suggested clauses for tenancy agreements and terms of business

Prescribed Information and suggested clauses for tenancy agreements and terms of business Prescribed Information and suggested clauses for tenancy agreements and terms of business For Letting Agents Updated June 2016 Tel: 0300 037 1000 Email: deposits@tenancydepositscheme.com www.tenancydepositscheme.com

More information

Terms of Reference for Town of Caledon Housing Study

Terms of Reference for Town of Caledon Housing Study 1.0 Introduction Terms of Reference for Town of Caledon Housing Study The Town of Caledon is soliciting proposals for a comprehensive Housing Study. Results of this Housing Study will serve as a guiding

More information

Cadastral and Right of Way Data Sharing

Cadastral and Right of Way Data Sharing Cadastral and Right of Way Data Sharing May 2010 TRS 1006 This Transportation Research Synthesis (TRS) provides summaries of recent research and implementation efforts on a topic of current interest. Online

More information

Waterford City and County Council Vacant Homes Action Plan 2017

Waterford City and County Council Vacant Homes Action Plan 2017 Waterford City and County Council Vacant Homes Action Plan 2017 1. Introduction The high demand for residential properties on the property market, slow rate of new build and deepening housing crisis across

More information

Cressingham Gardens Estate, Brixton. DRAFT Masterplan Objectives for discussion. September 2015

Cressingham Gardens Estate, Brixton. DRAFT Masterplan Objectives for discussion. September 2015 Cressingham Gardens Estate, Brixton DRAFT Masterplan Objectives for discussion September 2015 Contents Introduction 1 Project objectives 2 Masterplan objectives 4 Draft masterplan objectives for the Cressingham

More information

Planning & Zoning FAQ

Planning & Zoning FAQ Planning & Zoning FAQ What is zoning and planning and what does it do? The Zoning and Planning Department is here to help ensure that Boardman Township stays a wonderful place to call home! Planning involves

More information

TOOL FOR COSTING SUSTAINABLE COMMUNITY PLANNING: USER GUIDE

TOOL FOR COSTING SUSTAINABLE COMMUNITY PLANNING: USER GUIDE Canadian Mortgage and Housing Corporation TOOL FOR COSTING SUSTAINABLE COMMUNITY PLANNING: USER GUIDE DRAFT SEPTEMBER 2006 TABLE OF CONTENTS 1. INTRODUTION...1 1.1 What is the Tool for Costing Sustainable

More information

Data Co-op 2.3 Release Notes March The following changes and enhancements have been made to the MLS Data Co-op: Search Tab

Data Co-op 2.3 Release Notes March The following changes and enhancements have been made to the MLS Data Co-op: Search Tab Data Co-op 2.3 Release Notes March 2013 The following changes and enhancements have been made to the MLS Data Co-op: Search Tab The listing number and address search have been combined into one field (they

More information

Prescribed Information and Clauses

Prescribed Information and Clauses Who should read this? How To (Pre-Tenancy) Tenants Agents Landlords Prescribed Information and Clauses Contents What has changed? 03 Guidance on issuing Prescribed Information for ASTs 04 Section A Prescribed

More information

Service Charges Explained

Service Charges Explained Service Charges Explained Contents What is a service charge? How do service charges work? Different Service Charge Elements Understanding your service charge statement Other charges and understanding your

More information

Apostolos Arvanitis, Associate Professor Asterios Asteriadis, Rural - Surveying Engineer Thomai Sotireli, Rural - Surveying Engineer Aristotle University School of Rular and Surveying Engineering Department

More information

Mining Rehabilitation Fund (MRF)

Mining Rehabilitation Fund (MRF) Government of Western Australia Department of Mines and Petroleum Department of Mines and Petroleum Mining Rehabilitation Fund (MRF) Frequently Asked Questions www.dmp.wa.gov.au 1 Contents Mining Rehabilitation

More information

CITY OF NORTH PORT Neighborhood Development Services Planning Division Rezoning Packet

CITY OF NORTH PORT Neighborhood Development Services Planning Division Rezoning Packet CITY OF NORTH PORT Neighborhood Development Services Planning Division Planninginfo@cityofnorthport.com Rezoning Packet The following items are to be included in the submission: Rezoning Application Affidavit(s)

More information

LOCAL AUTHORITY WORKS PART 8 - PROCEDURE

LOCAL AUTHORITY WORKS PART 8 - PROCEDURE LOCAL AUTHORITY WORKS PART 8 - PROCEDURE Planning & Property Development Department December 2017 INDEX Introduction Page 2 Local Authority Works to which Part 8 applies Page 3 Local Authority Works to

More information

Marshall & Swift SwiftEstimator

Marshall & Swift SwiftEstimator Program Reference Marshall & Swift SwiftEstimator Commercial Estimator Program June 2016 June 2016 SwiftEstimator - Commercial Estimator 2 - i 2016 CoreLogic, Inc. All Rights Reserved Worldwide. No part

More information

3. FISCAL IMPACT ANALYSIS FISCAL IMPACT ANALYSIS 29

3. FISCAL IMPACT ANALYSIS FISCAL IMPACT ANALYSIS 29 3. FISCAL IMPACT ANALYSIS FISCAL IMPACT ANALYSIS 29 The purpose of fiscal impact analysis is to estimate the impact of a development or a land use change on the budgets of governmental units serving the

More information

HOME WARRANTY REGISTRATION

HOME WARRANTY REGISTRATION CHAPTER 3 HOME WARRANTY REGISTRATION in ALBERTA Obtaining a Building Permit Applying for Home Warranty Coverage: Single Detached Dwelling Unit Schedule C-1 Duplex or Triplex Schedule C-2 Multi-Unit Building

More information