SIAR Assessment Guidance v5.0.doc Page 1 of 65

Size: px
Start display at page:

Download "SIAR Assessment Guidance v5.0.doc Page 1 of 65"

Transcription

1 UNFCCC ITL Administrator Standard Independent Assessment Report Assessment Guidance Part 1 - Completeness Part 2 - Substance Reference IAR Procedure Security classification: RSA Forum Version number: V5.0 State: Final Prepared by: Neil Peerman, Carla Valle, Date: 02/11/2012 Jean-Francois Halleux; UNFCCC Bryan Eckstein, Chris Collins, John Bedard, Heidi McKenna; SIAR Consultants Reviewed by: Jean-Francois Halleux Date: 7/11/2012 Markwin Pieters Approved by: Markwin Pieters Date: 16/11/2012 Circulation list Name/Role Organization Info/Action RSA Forum Registry System Administrators Information UNFCCC.int Public Information Document change record Version Date Description Affected sections v2.3 04/11/2008 Feedback from third SIAR WG meeting and All review comments included; fixed headers and footers and appendices. Formatted. v2.4 07/11/2008 Added paragraph Summary of findings v2.5 13/11/2008 Approved All v2.6 01/12/2008 Final All v2.7 04/03/2009 Final - layout and spelling corrections All v2.8 17/03/2009 Added explanation v2.9 20/04/2009 Improved question to become clearer v /04/2009 Improved explanations All v3.2 11/05/2009 Improved explanations All v3.3 14/05/2009 Improved explanations Section 4, items x and x v3.4 01/07/2009 Incorporation of FAQ document and post All 2009 assessment feedback v3.5 22/07/2009 Incorporation of internal feedback All v4.0 24/09/2009 Streamlining content and format. Updated recommendation language. All v4.1 12/11/2009 Incorporating feedback from SIAR Working Group. P1.2.2, P1.2.3, P1.2.6, P1.2.8, P1.3.7 SIAR Assessment Guidance v5.0.doc Page 1 of 65

2 v4.2 02/12/2009 Incorporating feedback from 6 th meeting of the SIAR Working Group v4.3 15/01/2010 Incorporating feedback from the 7 th meeting of the SIAR Working Group v4.4 30/09/2010 Initial revisions following 2010 SIAR process to improve clarity. Clarified instructions on assessing public information in cases of confidentiality and non-occurrence. Section 2.1, Section P Section 2.3 P P1.0.4, Section 2.4, Comment on P2.1.2, P2.1.5, 4.2 (just formatting), 4.3, P2.2.7, P2.2.10, P , Section 2.5 v4.5 07/12/2010 Incorporated grammatical improvements P and P suggested by JP after CAB 16 v4.6 25/03/2011 Clarified SoF format, clarified guidance on Section 4.1, 4.4, 2.6 response codes, Updated URLs v4.7 23/11/2011 Clarified proper use of SoF; updated JI Section 2.5 (1.4.2) project citation requirements v4.8 02/11/2012 Updated header. Updated for version All consistency. v5.0 12/11/2012 Version increment to 5.0 None SIAR Assessment Guidance v5.0.doc Page 2 of 65

3 Table of Contents 1.0 Introduction Referenced Documents SIAR Part 1 Assessment Guidance Summary Overall Assessment Accounting of Kyoto Protocol Units National Registry Change Public Information Previous Expert Review Team Recommendations SIAR Part 2 Assessment Guidance Summary Overall assessment Summary of Findings Summary of Findings Outline Overall Assessment Result Observations and Recommendations Standard electronic format and reports from the national registry National registry Calculation of commitment period reserve Publically available information Additional Recommendations Identification of Problems Assessor Guidance on Recommendations Identification of Significant Changes Highlighted Readiness Documentation Recommendations Previous Expert Review Team Recommendations Recommendations to Address Identified Problems Common Discrepancies Common Response Codes Out-of-Sequence Message Handling SIAR Assessment Guidance v5.0.doc Page 3 of 65

4 1.0 Introduction This document provides guidance to external assessors, the ITL team and the R&A team of the UNFCCC secretariat on how to assess the completeness ( Part 1 ) and substance ( Part 2 ) of the Standard Independent Assessment Report (SIAR) with regard to a national registry and the relevant information provided as part of its annual report. 2.0 Referenced Documents [RRITL] SIAR Reporting Requirements for ITL [RRREG] SIAR Reporting Requirements and Guidance for Registries [PUBLICINFO] SIAR Publicly Available Information Guidance 2.1 SIAR Part 1 Assessment Guidance As a general guidance for assessor, if an annual submission item is not reported, mark the submission item as incomplete and the overall submission as incomplete. Guidance for Assessors regarding communication with ITL If at any point in time you have questions, please contact the ITL Administrator for clarifications. Specifically on the item Accounting of Information, if the information provided by the ITL Administrator is not the same as provided by the Party, you should request both sides (i.e. the ITL Administrator and the respective Party) to clarify and/or confirm their respective data provided. Guidance for Assessors regarding communication with RSA With regard to requesting further information from the RSA, the SIAR is based on an agreed process with opportunities for feedback on the assessment. Clarifications can be sort within the bounds of this process. The process does preclude one-to-one interaction between the assessors and the RSA. Assessment Templates Assessors are provided with templates for both the completeness ( Part 1 ) and substance ( Part 2 ) assessment. This guidance document and the assessment templates use common reference numbers to refer to information being reviewed. The assessment templates provide default content for common assessment results. This default content appears in red text. For each item, the assessor must determine whether the default comment applies or whether the comment must be revised to accurately reflect the situation for the Party currently being assessed. Upon assessment of each item, change the red text back to the standard black font colour if the default text is consistent with the assessment or, if not, replace the red text with new, black text appropriate for the assessment. 2.2 Summary Ref Nr Description Assessor Guidance P1.0.1 Party name Indicate the name of the Party as recorded in Annex B of the Kyoto Protocol and its amendment(s). P1.0.2 P1.0.3 Reporting period Submission under review Indicate the year for which the Party reported the information, typically the year prior to the assessment. The reporting period for the SIAR is aligned on a calendar year (i.e. from 01/01 to 31/12), covering the year preceding the submission year. Indicate the name of all files of the submission and the date of the submission. Expected files appear in the assessment template by default. Where possible a short name should be assigned to each filename that is SIAR Assessment Guidance v5.0.doc Page 4 of 65

5 Ref Nr Description Assessor Guidance used to allow for easier cross referencing to the documents submitted. The Parties submitted documents should be put in one cell of the table and the ITL documents that are used as supporting documents should be put in the Comments cell of the table. P1.0.4 Previous annual review report reference Indicate the reference to the previous annual review report, including the date of the report. The previous annual review report must have a published date of before the 15 th April for the year in which the Party s annual submission is due. If the published date is after 15 th April then the previous year s annual review report must be used (in no case should the Part 1 or Part 2 report from a previous year s SIAR process be used). The previous annual review recommendations can be found at the following UNFCCC web site location: Home > National Reports > GHG Inventories (Annex I) > Inventory Review Reports reports/items/5687.php Overall Assessment Ref Nr Requirement Assessor Guidance P1.1.1 Submission complete? Yes if: And The assessments P1.2.2, P1.2.4, P1.2.6, P1.2.8, P1.2.10, P1.2.12, P1.2.13, P report the submission is complete (value = Yes); The assessments P1.3.1 to P report the submission is complete. P1.1.2 P1.1.3 Public Information Provided? An explanation to each previous annual review recommendati on was provided? No otherwise Yes if: The assessments P1.4.1 to P1.4.4 report that either the information is confidential or has been provided. No otherwise Yes, if all recommendations from the previous annual review report have been addressed in the Party annual report. No, if at least one recommendation from the previous annual review report has not been addressed. NA, if there were no recommendations. Note that whether the recommendation has been appropriately addressed or not is subject to substantive assessment in Part 2. SIAR Assessment Guidance v5.0.doc Page 5 of 65

6 2.3 Accounting of Kyoto Protocol Units Ref Nr Annual Submission Item Assessor Guidance P /CMP.1 annex I. paragraph 3 Check whether there has been any trading so far by looking at the SEF comparison report, referred to in report R-1 of the SIAR Reporting requirements for ITL [RRITL]. If trading has been reported by the ITL, indicate Yes for this item; Otherwise indicate No. If the Registry is not in full operational live mode with the ITL then mark as No and apply a comment to indicate this. The assessor should note that Parties that have not transferred or acquired any Kyoto Protocol units since they entered into live operation with the international transaction log (ITL) need not to provide the following sections in their submission: 2.4 Accounting of the Kyoto Protocol Units: a. 15/CMP.1 annex I.E paragraph 11:Standard electronic format (SEF); b. 15/CMP.1 annex I.E paragraph 12: List of discrepant transactions; c. 15/CMP.1 annex I.E paragraph 13 & 14: List of CDM notifications; d. 15/CMP.1 annex I.E paragraph 15: List of non-replacements; e. 15/CMP.1 annex I.E paragraph 16: List of invalid units; f. 15/CMP.1 annex I.E paragraph 17: Actions and changes to address discrepancies. SIAR Assessment Guidance v5.0.doc Page 6 of 65

7 Ref Nr P1.2.2 Annual Submission Item 15/CMP.1 annex I.E paragraph 11 Standard electronic format (SEF) Assessor Guidance If the assessment to P1.2.1 is Yes (trading occurred): Check that there has been a SEF submission by assessing SEF application completeness and consistency check results. If there has been a SEF submission and it is complete and consistent, indicate Yes. Otherwise indicate No and add a comment (SEF submission missing, completeness check failed, consistency checks failed ). If the information was provided, but in a different format, then it should be assessed in the usual fashion and a recommendation should be made to use the agreed format for subsequent submissions. If the information was not provided at all, then the overall assessment in P1.1.1 will be No, and the detail sections will highlight to the Party the missing information. The draft SIAR Part 1 will be sent to the Party for comment and they will have an opportunity to resubmit R1 with the missing information included. If the assessment to P1.2.1 is No (trading did not occur): Indicate Yes in any case P /CMP.1 annex I.E paragraph 12 Discrepant transactions (ITL part) Add a comment if the SEF that the Party is not required to submit a SEF as they have not yet transferred or acquired any units. If there are any discrepant transactions, i.e. with response code and explicitly marked as discrepancies identified in [RRITL], report R-2 then Yes, otherwise No. If the ITL report R-2 indicates the occurrence of a 7XXX response code is beyond control limits, they should not be investigated as these relate solely to the EU-ETS and are outside the scope of this review. If the ITL report R-2 indicates the occurrence of a 59xx response code is beyond control limits, they should not be investigated. These are given by the acquiring registry and they represent the reasons for an acquiring registry to reject a transaction. Rejection is a valid action by the acquiring registry, and the reasons for it are outside the scope of this assessment For clarification, if the ITL report R-2 displays transactions for which the transaction type is not identified, it is because the transaction proposal elicited an ITL Checked Discrepancy response with a response code below The transaction type is not available for such transactions during the preparation of reports. This is because these transactions do not form part of the formal transaction log, and hence are only recorded in audit and message logs which have limited information available for such reports. SIAR Assessment Guidance v5.0.doc Page 7 of 65

8 Ref Nr P1.2.4 P1.2.5 P1.2.6 P1.2.7 Annual Submission Item 15/CMP.1 annex I.E paragraph 12 Discrepant transactions (National Registry part) 15/CMP.1 annex I.E paragraph 13 & 14 List of CDM notifications (ITL part) 15/CMP.1 annex I.E paragraph 13 & 14 List of CDM notifications (National Registry Part) 15/CMP.1 annex I.E paragraph 13 & 14 List of CDM notifications (ITL part) Assessor Guidance If the Party has reported a list of discrepant transactions as described in [RRREG] (including an empty list), and this list (in registry report R- 2) matches the list of discrepancies identified in [RRITL] then tick Yes. If the Party has made a statement of nothing to report pursuant to the relevant decision and the ITL has not identified any discrepancy, then tick Yes. In all other cases, tick No and make a comment to that effect taking into consideration the response to P1.2.3 (Party did not state whether discrepancies occurred or not, Party did not report on one or more discrepancies ) For clarification, a discrepancy is defined as a fault in a proposed transaction sent to the international transaction log (ITL) for verification as requested by COP/MOP decisions. The detailed technical specification of the interface between registry systems details all the verification that the ITL performs. The ITL uses a common method for technical verification of transaction proposals sent by the national registries and also the verification required by decisions. The Standard Independent Assessment Report Reporting Requirements and Guidance for Registries has a list titled Applicable DES response codes that lists the specific DES response codes that are discrepancies. Check ITL list of notifications as described in [RRITL], report R-3 for Reversal of Storage and if there are any, respond Yes, otherwise response No. Check Party s list of CDM notifications described in [RRREG] report R-3 for type 4 notifications. If it matches the ITL list of type 4 notifications, respond Yes. If there is a Party statement of nothing to report pursuant to the relevant decision and the ITL list of type 4 notifications is empty, respond Yes. In all other cases, tick No and make a comment to that effect taking into consideration the response to P1.2.5 (Party did not state whether type 4 notifications occurred or not, Party did not report on one or more type 4 notification ). Check ITL list of notifications as described in [RRITL], report R-3 for Non-Submission of Certification Report and if there are any respond Yes, otherwise respond No. SIAR Assessment Guidance v5.0.doc Page 8 of 65

9 Ref Nr P1.2.8 P1.2.9 P P P P Annual Submission Item 15/CMP.1 annex I.E paragraph 13 & 14 List of CDM notifications (National Registry part) 15/CMP.1 annex I.E paragraph 15 List of nonreplacements (ITL part) 15/CMP.1 annex I.E paragraph 15 List of nonreplacements (National Registry Part) 15/CMP.1 annex I.E paragraph 16 List of invalid units (ITL part) 15/CMP.1 annex I.E paragraph 16 List of invalid units (National Registry Part) 15/CMP.1 annex I.E paragraph 17 Actions and changes to address discrepancies Assessor Guidance Check Party s list of CDM notifications described in [RRREG], report R-3 for type 5 notifications. If it matches the ITL list of type 5 notifications, respond Yes. If there is a Party statement of nothing to report pursuant to the relevant decision and the ITL list of type 5 notifications is empty, respond Yes. In all other cases, tick No and make a comment to that effect taking into consideration the response to P1.2.7 (Party did not state whether type 5 notifications occurred or not, Party did not report on one or more type 4 notification ). Check ITL list of notifications as described in [RRITL], report R-3 for lines named Reversal of Storage, Non-Submission of Certification Report and Impending Expiry and column Number Of Units outstanding to fulfil the notification at target date and if there are any entries respond Yes to the assessment question, otherwise respond No. Check Party s list of non-replacements described in [RRREG], report R-4 or the Party statement of nothing to report pursuant to the relevant decision. If there are no non-replacements (either an empty list or a clear statement that there are no non-replacements) reported and the ITL has not identified non-replacements, tick Yes. If there are non-replacements and the list of non-replacements reported matches the ITL list of non-replacements, tick Yes. In all other cases (no list and no statement provided, not all nonreplacements reported, tick No and add a comment taking into account the answer to P1.2.9 above). Check ITL list of discrepant transactions as described in [RRITL], report R-2. If there are any with value in column Final State of Completed then respond Yes to the assessment question, otherwise respond No. Please note that in practice, there should never be a case where a discrepant transaction should have a status of Completed at the ITL as the ITL should prevent a transaction with a discrepancy. This item is included for completeness, and consistency with preceding items in which both ITL data and Registry data are reviewed. If Party has provided a list of invalid units, as described in [RRREG] report R-5, then respond Yes to the assessment question. If the Party has made a statement of nothing to report pursuant to the relevant decision, then respond Yes to the assessment question. If there is no list and no statement then tick No and make a comment to that effect. Check that submission contains actions taken to correct any problem that caused a discrepancy to occur and any changes to the national registry to prevent a discrepancy from recurring. SIAR Assessment Guidance v5.0.doc Page 9 of 65

10 Ref Nr P Annual Submission Item 15/CMP.1 annex I.E paragraph 18: CPR Calculation Assessor Guidance Check if the calculation of Party s commitment period reserve (CPR) is available in the submission. SIAR Assessment Guidance v5.0.doc Page 10 of 65

11 2.4 National Registry Change General comments regarding this section on National registry change; The Assessor should be aware that the SIAR Part 1 assessment does not assess whether all changes have been reported. The Party is provided guidance on what is considered as a significant change in Section 3.2 of the document: SIAR Reporting Requirements and Guidance for Registries. Only changes reported by the Party, or changes for which the assessor has evidence, should be assessed. If the Party does not provide information on an item of section 3, National Registry Change, please leave the column Change Reported? blank and fill in the column Submission Complete? with a No for each specific item. Additionally, include a comment for each item missing. Ref-Nr P1.3.1 Annual Submission Item 15/CMP.1 annex II.E paragraph 32.(a) Change of name or contact Submission complete: Assessor Guidance Tick Yes if a change is reported or it is clearly stated that no change occurred. In the comments column cross reference the location in the submission document (section/paragraph or page number) where the Party states the change or confirms that no change has occurred. Tick No otherwise. Item changed during the reporting period: Tick Yes if a change is reported Tick No if it is clearly stated that no change occurred Leave empty if it is neither stated that no change occurred nor is a change reported add a comment to that effect. SIAR Assessment Guidance v5.0.doc Page 11 of 65

12 Ref-Nr P1.3.2 Annual Submission Item 15/CMP.1 annex II.E paragraph 32.(b) Change of cooperation arrangement Submission complete: Assessor Guidance Tick Yes if it is clearly stated that no change occurred. In the comments column cross reference the location in the submission document (section/paragraph or page number) where the Party confirms that no change has occurred. Tick Yes if a change is reported and the revised readiness documentation that demonstrates the correct functioning of the registry after the change is available. In the comments column cross reference the location in the submission document (section/paragraph or page number) where the Party states the change details. Tick No in other cases, and add a comment to that effect. Item changed during the reporting period: Tick Yes if a change is reported Tick No if it is clearly stated that no change occurred. In the comments column cross reference the location in the submission document (section/paragraph or page number) where the Party confirms that no change has occurred. Leave empty if it is neither stated that no change occurred nor is a change reported add a comment to that effect. SIAR Assessment Guidance v5.0.doc Page 12 of 65

13 Ref-Nr P1.3.3 Annual Submission Item 15/CMP.1 annex II.E paragraph 32.(c) Change to database or the capacity of National Registry Submission complete: Assessor Guidance Tick Yes if it is clearly stated that no change occurred. In the comments column cross reference the location in the submission document (section/paragraph or page number) where the Party confirms that no change has occurred. Tick Yes if a change is reported, the submission contains a high-level description of change and the reasons for the change. If the change is deemed significant, check if there are attached test plans, test reports and procedures which were impacted by the change(s). Is the change significant? For a change to the database to be classified as a significant change the structure of the database must have been affected by the change. For example, if the Party has added more hard disk space to the database to provide increased capacity, this would not affect the structure of the database and as such would not be considered a significant change. It would still need some form of small change record, test plan and reports. However if the database has had structural changes that could affect the operation of the Registry software then this should have a full description of the change and the full life cycle of testing, release, operational testing and rollback plans etc. In the comments column cross reference the location in the submission document where the details of the change are defined. Tick No in other cases, and add a comment to that effect. Item changed during the reporting period: Tick Yes if a change is reported Tick No if it is clearly stated that no change occurred Leave empty if it is neither stated that no change occurred nor is a change reported add a comment to that effect. SIAR Assessment Guidance v5.0.doc Page 13 of 65

14 Ref-Nr P1.3.4 Annual Submission Item 15/CMP.1 annex II.E paragraph 32.(d) Change of conformance to technical standards Submission complete: Assessor Guidance Tick Yes if it is clearly stated that no change occurred. A comment containing the cross reference to the statement from the Party should be added to the comments column; Tick Yes if a change is reported, the submission contains a high level description for each change, and reasons for the change. If the change is deemed significant, check if there are attached test plans and test reports where were impacted by the change(s). Is the change significant? For a change to be significant the Registry will have had to change its software, partially or completely and the new software must demonstrate that it still complies with the DES. Most changes to Registry software or other aspects of the operation that might affect the conformance to the technical standards are minor at this stage of operational use with the ITL. For minor changes to software or environment it is still important for the Registry to follow best practices and have appropriate test plans, test reports, back-out plans etc. These can be submitted as evidence of effective release and change management. The test plans should have a specific section that verifies that the change has not negatively affected the conformance to the technical standards. The important criterion for this point is that the Registry must explain exactly what changes have been made during the course of the reporting period. Then an assessment can be made. Tick No in other cases, and add a comment to that effect. Item changed during the reporting period: Tick Yes if a change is reported; Tick No if it is clearly stated that no change occurred; Leave empty if it is neither stated that no change occurred nor is a change reported add a comment to that effect. SIAR Assessment Guidance v5.0.doc Page 14 of 65

15 Ref-Nr P1.3.5 Annual Submission Item 15/CMP.1 annex II.E paragraph 32.(e) Change of discrepancies procedures Submission complete: Assessor Guidance Tick Yes if it is clearly stated that no change occurred (include cross reference to location of statement in the comments column); Tick Yes if a change is reported and the submission contains a high level description for each change to remove discrepancies and reasons for the change. If the change is deemed significant, check if there are revised or new procedures attached relevant to the change(s). (include cross reference to location of statement in the comments column); Tick No in other cases, and add a comment to that effect. Item changed during the reporting period: Tick Yes if a change is reported; Tick No if it is clearly stated that no change occurred; P /CMP.1 annex II.E paragraph 32.(f) Change of security Leave empty if it is neither stated that no change occurred nor is a change reported add a comment to that effect. Submission complete: Tick Yes if it is clearly stated that no change occurred (include cross reference to location of statement in the comments column); Tick Yes if a change is reported and the submission contains a high level description for each change to prevent unauthorized manipulations at the system level and at the user level, and a reason for the change. If the change is deemed significant, check if there are procedures, test plans and test results available (include cross reference to location of statement in the comments column). For the user-authentication mechanism section of the security plan, check that the Party reported on one of the recommended methods (see reporting guidance) and optionally on additional improvements or provided a complete description of an alternative user-authentication method. Tick No in other cases, and add a comment to that effect. Item changed during the reporting period: Tick Yes if a change is reported; Tick No if it is clearly stated that no change occurred; Leave empty if it is neither stated that no change occurred nor is a change reported add a comment to that effect. SIAR Assessment Guidance v5.0.doc Page 15 of 65

16 Ref-Nr P1.3.7 Annual Submission Item 15/CMP.1 annex II.E paragraph 32.(g) Change of list of publicly available information Submission complete: Assessor Guidance a) Check if submission contains the list of changes on previously public information that has become confidential or previously confidential information that has become public pursuant to part E of the annex to 13/CMP.1, paragraphs 44 to 48 inclusive. b) Check if the submission say that part of the information became confidential and ensure that the Party has clearly identified which elements are confidential and which are public c) Check if the submission clearly states that no change occurred to the information regarded as confidential; d) Tick Yes if the assessment under a), b), or c) above is positive and the public information reported per decision 13/CMP.1, paragraphs 44 to 48 is complete (include cross reference to location of statement in comments column). Tick No in other cases, and add a comment to that effect. Item changed during the reporting period: Tick Yes if a change is reported; Tick No if it is clearly stated that no change occurred; P /CMP.1 annex II.E paragraph 32.(h) Change of Internet address Leave empty if it is neither stated that no change occurred nor is a change reported add a comment to that effect. Submission complete: Tick Yes if Party reported a change to the Internet address of its registry (include a cross reference to the location of statement in the comments column) Tick Yes if Party clearly stated no change occurred with regard to the Internet address of its registry (include cross reference to location of statement in the comments column). Tick No in other cases, and add a comment to that effect. Item changed during the reporting period: Tick Yes if a change is reported; Tick No if it is clearly stated that no change occurred; Leave empty if it is neither stated that no change occurred nor is a change reported add a comment to that effect. SIAR Assessment Guidance v5.0.doc Page 16 of 65

17 Ref-Nr P1.3.9 Annual Submission Item 15/CMP.1 annex II.E paragraph 32.(i) Change of data integrity measures Submission complete: Assessor Guidance Tick Yes if submission contains a high level description for each change, the reason for the change and, if considered a significant change, attached procedures and evidence of its successful application are available (include cross reference to location of statement in the comments column). Tick Yes if Party clearly stated no change occurred with regard to its data integrity measures (include cross reference to location of statement in comments column). Tick No in other cases, and add a comment to that effect. Item changed during the reporting period: Tick Yes if a change is reported; Tick No if it is clearly stated that no change occurred; P /CMP.1 annex II.E paragraph 32.(j) Change of test results Leave empty if it is neither stated that no change occurred nor is a change reported add a comment to that effect. Submission complete: Tick Yes if any additional test results are provided regarding the changes, including a high level description of the change and if the reasons for the change are supplied (include cross reference to location of statement in the comments column). Tick Yes if Party clearly stated no change occurred with regard to its test results (include cross reference to location of statement in the comments column). Tick No in other cases, and add a comment to that effect. Item changed during the reporting period: Tick Yes if a change is reported; Tick No if it is clearly stated that no change occurred; Leave empty if it is neither stated that no change occurred nor is a change reported add a comment to that effect. SIAR Assessment Guidance v5.0.doc Page 17 of 65

18 2.5 Public Information Ref-Nr P1.4.1 Annual Submission Item 13/CMP.1 Annex II paragraph 45 Account information provided? Is Submission complete? Assessor Guidance Tick Yes if Party provided a public URL to access account information and if this information can be viewed. Tick No otherwise. If the Party has provided a public URL but the specific information required by paragraph 45 is not available, or the assessor could not find the information, then tick No. Insert a comment stating that the information was not accessible at the time of the assessment and ask the Party to provide more information. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are public Tick Partial if Party has stated some of the elements are confidential P /CMP.1 Annex paragraph 45 (a) Account name: the holder of the account Tick No otherwise Is Submission complete? Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential, ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise SIAR Assessment Guidance v5.0.doc Page 18 of 65

19 Ref-Nr P Annual Submission Item 13/CMP.1 Annex paragraph 45 (b) Account type: the type of account (holding, cancellation or retirement) Is Submission complete? Assessor Guidance Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise P /CMP.1 Annex paragraph 45 (c) Commitment period: the commitment period with which a cancellation or retirement account is associated Is Submission complete? Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise SIAR Assessment Guidance v5.0.doc Page 19 of 65

20 Ref-Nr P Annual Submission Item 13/CMP.1 Annex paragraph 45 (d) Representative identifier: the representative of the account holder, using the Party identifier (the two-letter country code defined by ISO 3166) and a number unique to that representative within the Party s registry Is Submission complete? Assessor Guidance Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise P /CMP.1 Annex paragraph 45 (e) Representative name and contact information; the full name, mailing address, telephone number, facsimile number and address of the representative of the account holder Is Submission complete? Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise SIAR Assessment Guidance v5.0.doc Page 20 of 65

21 Ref-Nr P1.4.2 Annual Submission Item 13/CMP.1 Annex II paragraph 46 Article 6 project information provided? Is Submission complete? Assessor Guidance Tick Yes if Party provided a public URL to access Article 6 project information and if this information can be viewed. Tick No otherwise. If the Party has provided a public URL but the specific information required by paragraph 46 is not available, or the assessor could not find the information, then tick No and insert a comment stating that the information was not accessible at the time of the assessment and ask the Party to provide more information. It is permissible for the party to provide links on their public website to project information maintained by the UNFCCC at ji.unfccc.int Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential Tick No otherwise P /CMP.1 Annex paragraph 46 (a) Project name: a unique name for the project Is Submission complete? Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise SIAR Assessment Guidance v5.0.doc Page 21 of 65

22 Ref-Nr P Annual Submission Item 13/CMP.1 Annex paragraph 46 (b) Project location; the Party and town or region in which the project is located Is Submission complete? Assessor Guidance Tick Yes if Party provided a public URL to access required information and if this information can be viewed. It is permissible for the party to provide links on their public website to project information maintained by the UNFCCC at ji.unfccc.int. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential P /CMP.1 Annex paragraph 46 (c) Years of ERU issuance; the years in which ERU s have been issued as a result of the Article 6 project Tick No otherwise Is Submission complete? Tick Yes if Party provided a public URL to access required information and if this information can be viewed. It is permissible for the party to provide links on their public website to project information maintained by the UNFCCC at ji.unfccc.int. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise SIAR Assessment Guidance v5.0.doc Page 22 of 65

23 Ref-Nr P Annual Submission Item 13/CMP.1 Annex paragraph 46 (d) Reports; downloadable electronic version of all publicly available documentation relating to the project, including proposals, monitoring, verification and issuance of ERU s, where relevant, subject to the confidentiality provisions in decision 9/CMP.1 Is Submission complete? Assessor Guidance Tick Yes if Party provided a public URL to access required information and if this information can be viewed. It is permissible for the party to provide links on their public website to project information maintained by the UNFCCC at ji.unfccc.int. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential P /CMP.1 Annex II paragraph 47 Holding and transaction information provided? Tick No otherwise Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential Tick No otherwise Is public information provided? Tick Yes if Party provided public URL to access holding and transaction information and if this information can be viewed. Tick No otherwise. If the Party has provided a public URL but the specific information required by paragraph 47 is not available, or the assessor could not find the information, then tick No and insert a comment stating that the information was not accessible at the time of the assessment and ask the Party to provide more information. SIAR Assessment Guidance v5.0.doc Page 23 of 65

24 Ref-Nr P Annual Submission Item 13/CMP.1 Annex paragraph 47 (a) The total quantity of ERUs, CERs, AAUs and RMUs in each account at the beginning of the year Is Submission complete? Assessor Guidance Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise P /CMP.1 Annex paragraph 47 (b) The total quantity of AAUs issued on the basis of the assigned amount pursuant to Article 3, paragraphs 7 and 8 Is Submission complete? Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise SIAR Assessment Guidance v5.0.doc Page 24 of 65

25 Ref-Nr P Annual Submission Item 13/CMP.1 Annex paragraph 47 (c) The total quantity of ERUs issued on the basis of Article 6 projects Is Submission complete? Assessor Guidance Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise P /CMP.1 Annex paragraph 47 (d) The total quantity of ERUs, CERs, AAUs and RMUs acquired from other registries and the identity of the transferring accounts and registries Is Submission complete? Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise SIAR Assessment Guidance v5.0.doc Page 25 of 65

26 Ref-Nr P Annual Submission Item 13/CMP.1 Annex paragraph 47 (e) The total quantity of RMUs issued on the basis of each activity under Article 3, paragraphs 3 and 4 Is Submission complete? Assessor Guidance Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise P /CMP.1 Annex paragraph 47 (f) The total quantity of ERUs, CERs, AAUs and RMUs transferred to other registries and the identity of the acquiring accounts and registries Is Submission complete? Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise SIAR Assessment Guidance v5.0.doc Page 26 of 65

27 Ref-Nr P Annual Submission Item 13/CMP.1 Annex paragraph 47 (g) The total quantity of ERUs, CERs, AAUs and RMUs cancelled on the basis of activities under Article 3, paragraphs 3 and 4 Is Submission complete? Assessor Guidance Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise P /CMP.1 Annex paragraph 47 (h) The total quantity of ERUs, CERs, AAUs and RMUs cancelled following determination by the Compliance Committee that the Party is not in compliance with its commitment under Article 3, paragraph 1 Is Submission complete? Tick Yes if Party provided a public URL to access required information and if this information can be viewed. If the Party clearly and explicitly states on the publicly accessible website that this specific information is confidential, or not shown due to non-occurrence, tick Yes. Tick No otherwise. Has Party identified this type of information confidential? Tick Yes if Party stated that this information is confidential If part of the information is declared as confidential then ensure that the Party has clearly identified which elements are confidential and which are publicly available. Tick Partial if Party has stated some of the elements are confidential, or if the Party has stated that data outside of a date range is confidential Tick No otherwise SIAR Assessment Guidance v5.0.doc Page 27 of 65

Circulation list Name/Role Organization Info/Action. Protection Authority

Circulation list Name/Role Organization Info/Action. Protection Authority UNFCCC ITL Administrator Standard Independent Assessment Report Assessment Report Part 2 - Substance Reference: IAR/2014/NOR/2/2 Version number: 2.0 State: Final Prepared by: Tom Barker / RSA New Zealand

More information

INTERNATIONAL SERVICES CONTRACT TEMPLATE INTERNATIONAL SERVICES CONTRACT

INTERNATIONAL SERVICES CONTRACT TEMPLATE INTERNATIONAL SERVICES CONTRACT INTERNATIONAL SERVICES CONTRACT TEMPLATE The International Services Contract defines the relationship between the company providing a service and the company receiving that services, when these two companies

More information

INTERNATIONAL SALE CONTRACT MODEL INTERNATION SALE CONTRACT

INTERNATIONAL SALE CONTRACT MODEL INTERNATION SALE CONTRACT INTERNATIONAL SALE CONTRACT MODEL This model of International Sale Contract is designed for the international sale of different types of products: raw materials, manufacturing parts, consumer goods, equipment/machinery,

More information

INTERNATIONAL SUPPLY CONTRACT

INTERNATIONAL SUPPLY CONTRACT INTERNATIONAL SUPPLY CONTRACT Download International Supply Contract sample in Word format. Fill in the blanks and choose the terms of this international agreement that best suit your needs. This Contract

More information

First Exposure Draft of proposed changes for the edition of the Uniform Standards of Professional Appraisal Practice

First Exposure Draft of proposed changes for the edition of the Uniform Standards of Professional Appraisal Practice TO: FROM: RE: All Interested Parties Sandra Guilfoil, Chair Appraisal Standards Board First Exposure Draft of proposed changes for the 2012-13 edition of the Uniform Standards of Professional Appraisal

More information

INTERNATIONAL FRANCHISE CONTRACT TEMPLATE INTERNATIONAL FRANCHISE CONTRACT

INTERNATIONAL FRANCHISE CONTRACT TEMPLATE INTERNATIONAL FRANCHISE CONTRACT INTERNATIONAL FRANCHISE CONTRACT TEMPLATE Download International Franchise Contract sample in Word format. Fill in the blanks and choose the terms of this international agreement that best suit your needs.

More information

AFFORDABLE HOUSING CONNECTIONS NOTES FOR CHART REPORTING (FOLLOW THESE INSTRUCTIONS TO AVOID FINDINGS)

AFFORDABLE HOUSING CONNECTIONS NOTES FOR CHART REPORTING (FOLLOW THESE INSTRUCTIONS TO AVOID FINDINGS) AFFORDABLE HOUSING CONNECTIONS NOTES FOR HTC-12 PREPARATION AND REPORTING: PROGRAM YEAR 2015, DUE MARCH 15, 2016 (FOLLOW THESE INSTRUCTIONS TO AVOID FINDINGS) i. The HTC 12 requires the signature of the

More information

Union procedure on the preparation, conduct and reporting of EU pharmacovigilance inspections

Union procedure on the preparation, conduct and reporting of EU pharmacovigilance inspections 21 March 2014 EMA/INS/PhV/192230/2014 Union procedure on the preparation, conduct and reporting of EU pharmacovigilance Adopted by Pharmacovigilance Inspectors Working Group 21 March 2014 Date for coming

More information

ASA MTS CANDIDATE REPORT REVIEW CHECKLIST INSTRUCTIONS (Effective as of January 01, 2018) Basic Report Requirements and General Report Quality

ASA MTS CANDIDATE REPORT REVIEW CHECKLIST INSTRUCTIONS (Effective as of January 01, 2018) Basic Report Requirements and General Report Quality ASA MTS CANDIDATE REPORT REVIEW CHECKLIST INSTRUCTIONS (Effective as of January 01, 2018) Basic Report Requirements and General Report Quality This checklist was designed to be a useful resource tool by

More information

RICS property measurement 2nd edition: Basis for conclusions. Purpose

RICS property measurement 2nd edition: Basis for conclusions. Purpose RICS property measurement 2nd edition: Basis for conclusions Purpose This document has been prepared to accompany publication of the RICS property measurement 2nd edition in order to explain the rationale

More information

BUILDING CONTRACT AGREEMENT TEMPLATE BUILDING CONTRACT FOR HOME OWNER

BUILDING CONTRACT AGREEMENT TEMPLATE BUILDING CONTRACT FOR HOME OWNER BUILDING CONTRACT AGREEMENT TEMPLATE Building Contract Agreement template for a home owner or developer appointing a contractor to build a new house or extension or carry out other construction or renovation

More information

INTERNATIONAL SALES COMMISSION AGREEMENT

INTERNATIONAL SALES COMMISSION AGREEMENT INTERNATIONAL SALES COMMISSION AGREEMENT Download International Sales Commission Agreement sample in Word format. Fill in the blanks and choose the terms of this international agreement that best suit

More information

QUESTIONNAIRE. 1. Authorizing statute(s) citation West Virginia Code and 11-1C-4(d)

QUESTIONNAIRE. 1. Authorizing statute(s) citation West Virginia Code and 11-1C-4(d) QUESTIONNAIRE (Please include a copy of this form with each filing of your rule: Notice of Public Hearing or Comment Period; Proposed Rule, and if needed, Emergency and Modified Rule.) DATE: 6/8/15 TO:

More information

VIRGINIA CENTRAL REGION ITS ARCHITECTURE MAINTENANCE PLAN

VIRGINIA CENTRAL REGION ITS ARCHITECTURE MAINTENANCE PLAN VIRGINIA CENTRAL REGION ITS ARCHITECTURE MAINTENANCE PLAN Prepared for: Prepared by: June 30, 2009 Table of Contents 1 INTRODUCTION... 1 2 ARCHITECTURE MAINTENANCE DECISIONS... 1 2.1 Architecture Maintainer...

More information

Change of Control Guide

Change of Control Guide Change of Control Guide How to Submit a Request for a Change of Control Assignment Version 1.1 August 2017 Contents INTRODUCTION 3 INSTRUCTIONS 4 STEP 1 DETERMINE THE ASSIGNMENT TYPE 4 STEP 2 PREPARE YOUR

More information

IDX Paperwork Cover Sheet

IDX Paperwork Cover Sheet IDX Paperwork Cover Sheet IMPORTANT This cover sheet MUST be filled out and returned via Email or Fax with your IDX paperwork. If this cover sheet is not included your IDX may not be approved and set-up

More information

Guidelines for PERC Odorized Propane Assessments

Guidelines for PERC Odorized Propane Assessments For More Information: Gregg Walker Propane Education & Research Council 202-452-8975 gregg.walker@propanecouncil.org Guidelines for PERC Odorized Propane Assessments The Propane Education & Research Council

More information

IMPORTANT NOTICE. Credit Derivatives Product Management Simon Todd

IMPORTANT NOTICE. Credit Derivatives Product Management Simon Todd IMPORTANT NOTICE #: MS#78 ; TIW#104 Date: January 28, 2011 To: Distribution From: Legal Department Subject: Revisions to the MarkitSERV Operating Procedures and the Warehouse Trust Operating Procedures

More information

The ecrv Submit application opens with the following important warning message on privacy:

The ecrv Submit application opens with the following important warning message on privacy: Submit Form Tabs Buyers and Sellers Property Sales Agreement Supplementary Submitter The ecrv form is a single Web-page form with entry fields, choices and selections in multiple tabs for submitting a

More information

FOR INFORMATION PURPOSES ONLY. Request for Proposals for the Purchase of a Site for the New Acute Care Hospital with Schedules

FOR INFORMATION PURPOSES ONLY. Request for Proposals for the Purchase of a Site for the New Acute Care Hospital with Schedules FOR INFORMATION PURPOSES ONLY Request for Proposals for the Purchase of a Site for the New Acute Care Hospital with Schedules Request for Proposals for the Purchase of a Site for the New Acute Care Hospital

More information

GENERAL CONDITIONS OF PURCHASE

GENERAL CONDITIONS OF PURCHASE 1. DEFINITIONS 1.1 Seller shall mean the company selling the Product to the Buyer. 1.2 Buyer shall mean KAEFER Energy AS, reg. no. 910 608 193. 1.3 Contract shall mean the Purchase Order together with

More information

NROSH+ Statistical Data Return 2017/18. Large Provider Guidance Notes

NROSH+ Statistical Data Return 2017/18. Large Provider Guidance Notes NROSH+ Statistical Data Return 2017/18 Large Provider Guidance Notes Version 1.3 (May 2018) Survey Deadline: 31 May 2018 Contents Statistical Data Return Guidance 2 Introduction 3 Completing the Statistical

More information

SOUTH BROWARD BOARD OF REALTORS IDX Vendor License Agreement

SOUTH BROWARD BOARD OF REALTORS IDX Vendor License Agreement SOUTH BROWARD BOARD OF REALTORS IDX Vendor License Agreement This form must be completed and signed by each broker, licensee (if applicable) and vendor operating the IDX website stated within this agreement

More information

ISDA 2016 VARIATION MARGIN PROTOCOL QUESTIONNAIRE

ISDA 2016 VARIATION MARGIN PROTOCOL QUESTIONNAIRE International Swaps and Derivatives Association, Inc. ISDA 2016 VARIATION MARGIN PROTOCOL QUESTIONNAIRE published on August 16, 2016, by the International Swaps and Derivatives Association, Inc. Annotated

More information

REQUEST FOR PROPOSAL (RFP) RFP AS. Appraisal Services Valuation of DBHA Properties

REQUEST FOR PROPOSAL (RFP) RFP AS. Appraisal Services Valuation of DBHA Properties REQUEST FOR PROPOSAL (RFP) RFP 2019-01AS Appraisal Services Valuation of DBHA Properties Daytona Beach Housing Authority (DBHA) 211 N Ridgewood Ave Suite 300 Daytona Beach, FL 32114 (386) 253-5653 Terril

More information

Notes from Guest Contributor Mary Ross

Notes from Guest Contributor Mary Ross IPM-Software November 10, 2009 Notes from Guest Contributor Mary Ross Changes to the 50059 and Voucher Submission Process Are Your Vouchers Really Subject to Adjustment? As HUD continues to refine the

More information

The Consumer Code Scheme

The Consumer Code Scheme The Consumer Code Scheme This document contains The Code Requirements, their Meaning and an Introduction to The Independent Dispute Resolution Scheme FOURTH EDITION / APRIL 2017 Contents Meaning of words...

More information

RAQS ENHANCEMENTS. Automated Transfer/Approval of Performance Appraisals and Formal Reviews/Appeals. Instructions to Consultants

RAQS ENHANCEMENTS. Automated Transfer/Approval of Performance Appraisals and Formal Reviews/Appeals. Instructions to Consultants RAQS ENHANCEMENTS Automated Transfer/Approval of Performance Appraisals and Formal Reviews/Appeals Instructions to Consultants Contract Management Office April 2007 Contents 1.0 Approving Performance Appraisal

More information

Online Cadastre and Tantalis GATOR

Online Cadastre and Tantalis GATOR Online Cadastre and Tantalis GATOR Online Cadastre Free, public online access to BC Crown land cadastral information and other geographic data LTSA is responsible for maintenance of and enhancements to

More information

PROCEDURE FOR REPORTING OF PHARMACOVIGILANCE INSPECTIONS REQUESTED BY THE CHMP. GCP Inspectors Working Group

PROCEDURE FOR REPORTING OF PHARMACOVIGILANCE INSPECTIONS REQUESTED BY THE CHMP. GCP Inspectors Working Group The European Medicines Agency Inspections London, 12 November 2007 EMEA/INS/GCP/391114/2005 Procedure no: INS/PhV/3 Superseded by Union Procedures PROCEDURE FOR REPORTING OF PHARMACOVIGILANCE INSPECTIONS

More information

File Reference No Re: Proposed Accounting Standards Update, Leases (Topic 842): Targeted Improvements

File Reference No Re: Proposed Accounting Standards Update, Leases (Topic 842): Targeted Improvements Deloitte & Touche LLP 695 East Main Street Stamford, CT 06901-2141 Tel: + 1 203 708 4000 Fax: + 1 203 708 4797 www.deloitte.com Ms. Susan M. Cosper Technical Director Financial Accounting Standards Board

More information

Tenant Improvement Program (TIP) Design Review

Tenant Improvement Program (TIP) Design Review Tenant Improvement Program (TIP) Design Review Process Guidelines 100% Draft Dated 2.1.2011 Tenant Improvement Program Design Review (TIPDR) - Draft 2.1.2011 Page 1 of 11 INTRODUCTION The success of San

More information

NEW JERSEY. Uniform Construction Code. Municipal Procedures Manual

NEW JERSEY. Uniform Construction Code. Municipal Procedures Manual NEW JERSEY Uniform Construction Code Municipal Procedures Manual Revised January 2009 NEW JERSEY UNIFORM CONSTRUCTION CODE Municipal Procedures Manual State of New Jersey Department of Community Affairs

More information

RE: Proposed Accounting Standards Update, Leases (Topic 842): Targeted Improvements (File Reference No )

RE: Proposed Accounting Standards Update, Leases (Topic 842): Targeted Improvements (File Reference No ) KPMG LLP Telephone +1 212 758 9700 345 Park Avenue Fax +1 212 758 9819 New York, N.Y. 10154-0102 Internet www.us.kpmg.com 401 Merritt 7 PO Box 5116 Norwalk, CT 06856-5116 RE: Proposed Accounting Standards

More information

Rules for assessors. Date of approval by the Accreditation Advisory Board: SD Revision: November 2016.

Rules for assessors. Date of approval by the Accreditation Advisory Board: SD Revision: November 2016. 71 SD 0 008 Revision: 1.3 30. November 2016 Scope: Within the accreditation of conformity assessment bodies, the verification of the technical competence on-site is a decisive aspect. The results of the

More information

APPLICATION FOR FIVE-YEAR AD VALOREM TAX EXEMPTION FOR OKLAHOMA MANUFACTURING OR RESEARCH & DEVELOPMENT FACILITIES

APPLICATION FOR FIVE-YEAR AD VALOREM TAX EXEMPTION FOR OKLAHOMA MANUFACTURING OR RESEARCH & DEVELOPMENT FACILITIES APPLICATION FOR FIVE-YEAR AD VALOREM TAX EXEMPTION FOR OKLAHOMA MANUFACTURING OR RESEARCH & DEVELOPMENT FACILITIES Revised Aug. 2009 OTC FORM 900XM-R0008/09 INCOMPLETE APPLICATIONS WILL BE NULL AND VOID

More information

How to Participate. July 24, 2015

How to Participate. July 24, 2015 How to Participate July 24, 2015 Please read these User Instructions carefully. You are advised to practice using the website with the assistance of the online recorded Demos to acquire personal mastery

More information

REZONING, COMPREHENSIVE PLAN AMENDMENT, & UDO AMENDMENT PACKET

REZONING, COMPREHENSIVE PLAN AMENDMENT, & UDO AMENDMENT PACKET TOWN OF HOLLY SPRINGS REZONING, COMPREHENSIVE PLAN AMENDMENT, & UDO AMENDMENT PACKET General Use Rezoning, Conditional Use Rezoning, Comprehensive Plan Amendment, and Unified Development Ordinance Amendment

More information

Schedule A. Citation 1 These regulations may be cited as the Land Registration Administration Regulations. Definitions 2 (1) In these regulations,

Schedule A. Citation 1 These regulations may be cited as the Land Registration Administration Regulations. Definitions 2 (1) In these regulations, Schedule A Regulations Respecting Administration of the Land Registration Act made by the Minister of Service Nova Scotia and Municipal Relations under Section 94 of Chapter 6 of the Acts of 2001, the

More information

FINAL DOCUMENT. Global Harmonization Task Force. Title: Registration of Manufacturers and other Parties and Listing of Medical Devices

FINAL DOCUMENT. Global Harmonization Task Force. Title: Registration of Manufacturers and other Parties and Listing of Medical Devices FINAL DOCUMENT Global Harmonization Task Force Title: Registration of Manufacturers and other Parties and Listing of Medical Devices Authoring Group: Study Group 1 of the Global Harmonization Task Force

More information

ARCHITECTURAL MODIFICATION GUIDELINES

ARCHITECTURAL MODIFICATION GUIDELINES ARCHITECTURAL MODIFICATION GUIDELINES The following Architectural Modification Guidelines have been adopted by the Board of Directors of the Madison Green Homeowner s Association to be consistent and expand

More information

1 Adopting the Code. The Consumer Code Requirements and good practice Guidance. 1.1 Adopting the Code. 1.2 Making the Code available

1 Adopting the Code. The Consumer Code Requirements and good practice Guidance. 1.1 Adopting the Code. 1.2 Making the Code available The Non-mandatory Good Practice for Home Builders along The Consumer Code s and good practice 1 Adopting the Code 1.1 Adopting the Code Home Builders must comply with the s of the Consumer Code and have

More information

Application Type CHOOSE USER

Application Type CHOOSE USER To apply for a Secure System ID (WASS ID), for the property you work at. See below in Section 3.2 Obtaining a WASS User ID. 1. This link will take you to the registration page. https://hudapps.hud.gov/public/wass/public/participant/partreg_page.jsp

More information

Homeowner s Exemption (HOE)

Homeowner s Exemption (HOE) Homeowner s Exemption (HOE) Table of Contents CHEAT SHEETS... 3 Add HOE to a Parcel...3 Edit HOE Record...3 Remove HOE from a Parcel...3 Find the HOE Amount...3 Who is getting the exemption?...4 New Application

More information

CORPORATE SUPPLY ARRANGEMENT

CORPORATE SUPPLY ARRANGEMENT CORPORATE SUPPLY ARRANGEMENT For Design Services, Playground Equipment, and Installation THIS CORPORATE SUPPLY ARRANGEMENT is made the xx day of Month, 2013 (the Offeror ) Contact: (the Offeror s Representative)

More information

MARS User Guide Appraisers https://gp.marswales.org https://medical.marswales.org. Guide Index

MARS User Guide Appraisers https://gp.marswales.org https://medical.marswales.org. Guide Index 1 MARS User Guide Appraisers https://gp.marswales.org https://medical.marswales.org This guide is intended to walk you through the Appraisal Process using the online MARS system. Primarily for Appraisers

More information

Enter the web address and click on Housing Credit Management System

Enter the web address and click on Housing Credit Management System Registration http://resources.thda.org/ Enter the web address and click on Housing Credit Management System To create an HCMS account click the New User? Register Here. tab next to the username data field.

More information

Canlin Energy Corporation Bidding Guidelines Fee Title Assets November 15, 2017

Canlin Energy Corporation Bidding Guidelines Fee Title Assets November 15, 2017 Bidding Guidelines Fee Title Assets November 15, 2017 1. SCOPE Canlin Resources Partnership, by its managing partner, ( CEC ), is making its Saskatchewan fee title petroleum and natural gas rights available

More information

LOCAL AUTHORITY WORKS PART 8 - PROCEDURE

LOCAL AUTHORITY WORKS PART 8 - PROCEDURE LOCAL AUTHORITY WORKS PART 8 - PROCEDURE Planning & Property Development Department December 2017 INDEX Introduction Page 2 Local Authority Works to which Part 8 applies Page 3 Local Authority Works to

More information

Topic 842 Technical Corrections Summary of Comments Received

Topic 842 Technical Corrections Summary of Comments Received Contact(s) David Hoyer Co-Author Ext. 462 Andy Bologna Co-Author Ext. 356 Thomas Faineteau Co-Author Ext. 362 Chris Roberge Co-Author Ext. 274 Amy Park Co-Author Ext. 476 Shayne Kuhaneck Assistant Director

More information

Filing a property assessment complaint and preparing for your hearing. Alberta Municipal Affairs

Filing a property assessment complaint and preparing for your hearing. Alberta Municipal Affairs Filing a property assessment complaint and preparing for your hearing Alberta Municipal Affairs Alberta s Municipal Government Act, the 2018 Matters Relating to Assessment Complaints Regulation, and the

More information

DOCUMENT TRANSFERS Job Aid for Document Custodians

DOCUMENT TRANSFERS Job Aid for Document Custodians DOCUMENT TRANSFERS Job Aid for Document Custodians December 2017 These Job Aids provide additional detailed information regarding what is required for institutions that are providing document certification

More information

NEM GENERATOR TRANSFER GUIDE

NEM GENERATOR TRANSFER GUIDE NEM GENERATOR TRANSFER GUIDE Purpose AEMO has prepared this document to provide information about the process for becoming a registered as a participant in the National Electricity Market, as at the date

More information

IDX Display Checklist

IDX Display Checklist The Voice for Real Estate in Berkshire County 99 West Street, Suite 200, Pittsfield MA 01201 Telephone (413) 442-8049 Fax: (413) 448-2852 Providing members with the resources to practice real estate ethically,

More information

Meaning of words 3. Introduction 5. Further information 6. Scope of the Code 7

Meaning of words 3. Introduction 5. Further information 6. Scope of the Code 7 Contents Meaning of words 3 Introduction 5 Further information 6 Scope of the Code 7 1.0 Adopting the Code 8 1.1 Adopting the Code 8 1.2 Making the Code available 8 1.3 Customer service 8 1.4 Appropriately

More information

Introduction of the Authority Online Housing Credit Management System (HCMS)

Introduction of the Authority Online Housing Credit Management System (HCMS) Ralph M. Perrey, Executive Director Tennessee Housing Development Agency 404 James Robertson Parkway, Suite 1200 Nashville, Tennessee 37243-0900 www.thda.org TO: FROM: SUBJECT: Recipients of Low-Income

More information

Community Development District INFORMATION PACKET

Community Development District INFORMATION PACKET Community Development District INFORMATION PACKET Please call for an appointment to file the application (813) 276-8366 or (813) 272-5600. The Hillsborough County Board of County Commissioners adopted

More information

The following review steps are designed to fulfill the audit objectives.

The following review steps are designed to fulfill the audit objectives. General Review Objectives County Sheriff s Office Name Date Audit Program Page 1 of 17 1. Review property within the scope identified in the risk assessment. 2. Be effective by focusing on high risk areas.

More information

Uniform Collateral Data Portal (UCDP) General User Guide October 2017

Uniform Collateral Data Portal (UCDP) General User Guide October 2017 Uniform Collateral Data Portal (UCDP) General User Guide October 2017 direction of their regulator, the Federal Housing Finance Agency. 1 of 100 direction of their regulator, the Federal Housing Finance

More information

MANAGEMENT OCCUPANCY REVIEW

MANAGEMENT OCCUPANCY REVIEW MANAGEMENT OCCUPANCY REVIEW Presented by: Kristy Yeadon kyeadon@cms-results.com 2017 Contract Management Services Who is CMS? Located in Bremerton, WA,Contract Management Services (CMS) is a division of

More information

Uniform Appraisal Dataset (UAD) Frequently Asked Questions

Uniform Appraisal Dataset (UAD) Frequently Asked Questions Uniform Appraisal Dataset (UAD) Frequently Asked Questions July 13, 2014 Updated for formatting May 15, 2017 The following provides answers to questions frequently asked about Fannie Mae s and Freddie

More information

Miami Association of REALTORS RETS License Agreement

Miami Association of REALTORS RETS License Agreement Miami Association of REALTORS RETS License Agreement This form must be completed and signed by each broker, agent (if applicable) operating the website stated within this agreement and a separate form

More information

The Consumer Code Requirements

The Consumer Code Requirements The Consumer Code Requirements 1 Adopting the Code 1.1 Adopting the Code Home Builders must comply with the Requirements of the Consumer Code and have regard to good practice guidance. 1.2 Making the Code

More information

Redevelopment Authority of Allegheny County

Redevelopment Authority of Allegheny County Request for Proposals Appraisal Services Allegheny County Wide One Chatham Center, Suite 900 112 Washington Place Pittsburgh, PA 15219 OBJECTIVE The ( RAAC ) is issuing a Request for Proposals ( RFP )

More information

etransfer Form User Guide The Property Registry s

etransfer Form User Guide The Property Registry s s etransfer Form User Guide A service provider for the Province of Manitoba Most recent update: 2018-01-08 Version 2.03 Table of Contents Purpose... 4 General Guidelines for Completion... 4 Requirements...

More information

Below Market Rate Program Administrator. Request for Proposals

Below Market Rate Program Administrator. Request for Proposals Below Market Rate Program Administrator Request for Proposals Housing and Community Development 7351 Rosanna Street Gilroy, CA 95020 Page 1 Introduction and Important Dates The City of Gilroy is seeking

More information

HEATING SERVICES PROCEDURES SOLID FUEL SERVICING

HEATING SERVICES PROCEDURES SOLID FUEL SERVICING HEATING SERVICES PROCEDURES SOLID FUEL SERVICING 13 th October, 2016 CUSTOMER CONSULTATION Introduction The consultation processes with regard to the service and safety check of the solid fuel appliances

More information

SAFETY DEPOSIT BOX LEASE AGREEMENT NUMBER: 001/2015

SAFETY DEPOSIT BOX LEASE AGREEMENT NUMBER: 001/2015 SAFETY DEPOSIT BOX LEASE AGREEMENT NUMBER: 001/2015 The Lessor: business name name: anji s.r.o. registered office: Na Poříčí 1071/17, 110 00 Prague 1, Czech Republic represented by: Ing. Petr Thomson,

More information

II. Policies Applicable to Principal Broker Subscribers VOWs.

II. Policies Applicable to Principal Broker Subscribers VOWs. MRIS Policy governing use of MRIS Listing Content in connection with Internet brokerage services offered by MRIS Subscribers operating a VOW (Virtual Office Website) I. Definitions and Scope of Policy.

More information

RMS USER GUIDE. Version 17. Steps for the Doctor being Appraised Page 5 Steps for the Appraiser Page 31 Help Section Page 36

RMS USER GUIDE. Version 17. Steps for the Doctor being Appraised Page 5 Steps for the Appraiser Page 31 Help Section Page 36 RMS USER GUIDE Please use this guide if you are using the Revalidation Management System If you can see the RMS logo and your organisation s logo at the top of your screen you are using the correct user

More information

Features Guide. Enhancements. Mortgage Calculators VERSION 7. May 2008

Features Guide. Enhancements. Mortgage Calculators VERSION 7. May 2008 Features Guide VERSION 7 May 2008 Copyright 2002-2008 SuperTech Software All rights reserved. Printed in Australia. Enhancements This document describes new features and enhancements in POSH. Mortgage

More information

Review Author Approval 2 HERCA Working Group Radiation Passbook & Outside workers

Review Author Approval 2 HERCA Working Group Radiation Passbook & Outside workers Title: HERCA Radiation passbook model (Version 2) Summary: The model of radiation passbook produced by HERCA should be considered as a communication tool to visualize the required data as given in the

More information

RealEC Interface with Closing Market. The Settlement Industry s Digital Marketplace

RealEC Interface with Closing Market. The Settlement Industry s Digital Marketplace RealEC Interface with Closing Market RealEC & Closing Market Through the RealEC integration with Closing Market, the Title Company and Lender can communicate and share data with one another. Using Event

More information

2. Is the information in the contract section complete and accurate? Yes No Not Applicable If Yes, provide a brief summary.

2. Is the information in the contract section complete and accurate? Yes No Not Applicable If Yes, provide a brief summary. The purpose of this appraisal field review report is to provide the lender/client with an opinion on the accuracy of the appraisal report under review. Property Address City State Zip Code Borrower Owner

More information

Request for Proposals For Village Assessment Services

Request for Proposals For Village Assessment Services Request for Proposals For Village Assessment Services INQUIRIES AND PROPOSALS SHOULD BE DIRECTED TO: Jesse Thyes Village Administrator 860 Badger Circle Grafton, WI 53024 Introduction The Village of Grafton

More information

Chapter 5. Competitive Sealed Bidding: Procedure

Chapter 5. Competitive Sealed Bidding: Procedure Chapter 5. Competitive Sealed Bidding: Procedure Summary This chapter provides an overview of the procedure for procuring goods and nonprofessional services using the competitive sealed bidding procedure.

More information

WebMoney Transfer Passport issuance Regulations

WebMoney Transfer Passport issuance Regulations WebMoney Transfer Passport issuance Regulations These regulations determine order and rules of WebMoney Passport Service (further Service) partnership program participants in the matter of Personal and

More information

Consulted With Individual/Body Date Head of Finance Financial

Consulted With Individual/Body Date Head of Finance Financial Equipment Disposal Policy Developed in response to: Policy Register No: 12037 Status: Public Internal Audit Report for Fixed Assets Contributes to CQC Regulation 17 Consulted With Individual/Body Date

More information

Request for Proposal to Develop a Land Use Master Plan

Request for Proposal to Develop a Land Use Master Plan Request for Proposal to Develop a Land Use Master Plan PO Box 141, 400 Centre Road, Lions Bay, BC V0N 2E0 Phone: 604-921-9333 Fax: 604-921-6643 Email: office@lionsbay.ca Web: www.lionsbay.ca TABLE OF CONTENTS

More information

OFFICIAL GAZETTE OF THE REPUBLIC OF KOSOVA / No. 33 / 23 NOVEMBER 2012, PRISTINA

OFFICIAL GAZETTE OF THE REPUBLIC OF KOSOVA / No. 33 / 23 NOVEMBER 2012, PRISTINA OFFICIAL GAZETTE OF THE REPUBLIC OF KOSOVA / No. 33 / 23 NOVEMBER 2012, PRISTINA LAW No. 04/L-136 ON THE REGISTRATION OF A PLEDGE IN THE REGISTRY OF MOVABLE PROPERTY Assembly of Republic of Kosovo, Based

More information

Request for Proposals WASTE AND ORGANICS COLLECTION SERVICES RFP# ANM

Request for Proposals WASTE AND ORGANICS COLLECTION SERVICES RFP# ANM Village of Anmore Request for Proposals WASTE AND ORGANICS COLLECTION SERVICES RFP# ANM2014-02 Date Issued: March 10, 2014 Closing Date: April 2, 2014 Submission Location: Village of Anmore 2697 Sunnyside

More information

Owner Builder Training Guide for the New Home Buyer Protection Public Registry

Owner Builder Training Guide for the New Home Buyer Protection Public Registry Owner Builder Training Guide for the New Home Buyer Protection Public Registry Prepared by New Home Buyer Protection Office Alberta Municipal Affairs Contents 1 Introduction... 3 2 Using the Owner Builder

More information

Standard Information / Document Request List. Application for the Authority s Consent to the Merger of MPF Schemes

Standard Information / Document Request List. Application for the Authority s Consent to the Merger of MPF Schemes The applicant should note that a person who in any document given to the Authority makes a statement that the person knows to be false or misleading in a material respect, or recklessly makes a statement

More information

TERMS & CONDITIONS OF MEMORY LANE, INC. AUCTION

TERMS & CONDITIONS OF MEMORY LANE, INC. AUCTION TERMS & CONDITIONS OF MEMORY LANE, INC. AUCTION This Auction is being held online by Memory Lane, Inc., 12831 Newport Avenue, Suite 180, Tustin, California 92780, Phone (714) 730-0600, Facsimile (714)

More information

ACCESS AGREEMENT FOR BROKER RECIPROCITY DATA FEED RECITALS DEFINITIONS

ACCESS AGREEMENT FOR BROKER RECIPROCITY DATA FEED RECITALS DEFINITIONS ACCESS AGREEMENT FOR BROKER RECIPROCITY DATA FEED 1. This AGREEMENT is made and entered into by and among Multiple Listing Service of Long Island, Inc. ( MLSLI ), and the real estate firm and the MLSLI

More information

Abila MIP Fund Accounting TM. Encumbrances STUDENT WORKBOOK ABILA LEARNING SERVICES. Important Notice:

Abila MIP Fund Accounting TM. Encumbrances STUDENT WORKBOOK ABILA LEARNING SERVICES. Important Notice: Abila MIP Fund Accounting TM Encumbrances STUDENT WORKBOOK ABILA LEARNING SERVICES Important Notice: Authentic Abila MIP Fund Accounting TM training guides display a holographic image on the front cover.

More information

FINAL APPLICATION. N.J.A.C. 7: (Minor disposals or diversions of parkland)

FINAL APPLICATION. N.J.A.C. 7: (Minor disposals or diversions of parkland) FINAL APPLICATION N.J.A.C. 7:36-26.6 (Minor disposals or diversions of parkland) PRIOR TO SUBMITTING THE FINAL APPLICATION: The pre-application must be reviewed by the and the applicant must be given permission

More information

February 22, RFQ No. 1 California WaterFix Real Estate Services ADDENDUM NO. 2

February 22, RFQ No. 1 California WaterFix Real Estate Services ADDENDUM NO. 2 February 22, 2018 RFQ No. 1 California WaterFix Real Estate Services ADDENDUM NO. 2 This Addendum is meant to address Questions and Answers to the Real Estate Services Request for Qualifications (RFQ)

More information

Electronic Assignment of Lease

Electronic Assignment of Lease This document explains how to create, complete, authenticate and submit for registration an electronic Assignment of Lease for Law Firm users that have signed E-Submission agreements with Service New Brunswick.

More information

Request for Proposals To prepare a Zoning Ordinance and Map Comprehensive Update

Request for Proposals To prepare a Zoning Ordinance and Map Comprehensive Update Request for Proposals To prepare a Zoning Ordinance and Map Comprehensive Update City of Riverbank, California Prepared by: Donna M. Kenney, Planning and Building Manager 6707 Third Street Riverbank, CA

More information

Caliber Aero s Terms and Conditions for Purchase Orders Rev

Caliber Aero s Terms and Conditions for Purchase Orders Rev The following are Caliber Aero's terms and conditions for all purchase orders. This document takes precedence over all other documents, unless specified in writing by Caliber Aero management. By accepting

More information

Appraisal Firewall Guide for Administrators

Appraisal Firewall Guide for Administrators Appraisal Firewall Guide for Administrators Managing Your Branches and Market Areas in Appraisal Firewall The Appraisal Firewall Administrator user was designed to give lenders fast and easy access to

More information

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Law No. 04/L-136 ON THE REGISTRATION OF A PLEDGE IN THE REGISTRY OF MOVABLE PROPERTY Assembly of Republic of Kosovo,

More information

Consumer Code Requirements and Good Practice Guidance for Home Builders

Consumer Code Requirements and Good Practice Guidance for Home Builders Consumer Code s and Good Practice for Home Builders This document contains the Non-mandatory Good Practice for Home Builders along with an Introduction to The Independent Dispute Resolution Scheme FOURTH

More information

Mandatory Requirement for Certification Bodies in Assessing Free, Prior and Informed Consent (FPIC) in New Planting Procedures

Mandatory Requirement for Certification Bodies in Assessing Free, Prior and Informed Consent (FPIC) in New Planting Procedures Mandatory Requirement for Certification Bodies in Assessing Free, Prior and Informed Consent (FPIC) in New Planting Procedures February 2018 Document Name: Mandatory Requirement for Certification Bodies

More information

ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM

ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM Davina McNickel 1, Helen Davies 2, Vincent Salomon 2 1 Environment Canterbury, PO Box 345, Christchurch. Telephone: 03 365

More information

Groupe d Etudes UTILISATEURS WAGONS Studiengruppe WAGENVERWENDER Study Group WAGON USERS

Groupe d Etudes UTILISATEURS WAGONS Studiengruppe WAGENVERWENDER Study Group WAGON USERS Groupe d Etudes UTILISATEURS WAGONS Studiengruppe WAGENVERWENDER Study Group WAGON USERS Amendments and additions to the GCU: Appendix 9, Proposal 1 Title and text: link with UIC 471-2, Technical Transfer

More information

Escrow Basics. Chapter 6. Learning Objectives

Escrow Basics. Chapter 6. Learning Objectives Chapter 6 Escrow Basics Learning Objectives After reading this chapter, you will be able to: explain the basic regional differences of escrow instructions. define the general principles followed by all

More information

Procedure for reporting of GCP inspections requested by the Committee for Medicinal Products for Human Use (CHMP)

Procedure for reporting of GCP inspections requested by the Committee for Medicinal Products for Human Use (CHMP) 28 March 2017 Rev. 1 Good Clinical Practice Inspectors Working Group (GCP IWG) Procedure for reporting of GCP inspections requested by the Committee for Medicinal Products for Human Use (CHMP) GCP Inspectors

More information

ELECTRONIC COMMERCE TRADING PARTNER AGREEMENT (Dated 10 November 2016)

ELECTRONIC COMMERCE TRADING PARTNER AGREEMENT (Dated 10 November 2016) ELECTRONIC COMMERCE TRADING PARTNER AGREEMENT (Dated 10 November 2016) This ELECTRONIC COMMERCE TRADING PARTNER AGREEMENT ( Agreement ) is made between Northrop Grumman Systems Corporation ("Buyer" or

More information