1 Title: Road Asset Valuation 2016/17 Section: Prepared by: Tairāwhiti Roads Susan Rebano-Edwards (Asset Planning Manager) Meeting Date: 30 November 2017 Legal Financial Significance = Medium Report to ASSETS & INFRASTRUCTURE Committee for information SUMMARY The purpose of this report is to inform the Assets & Infrastructure Committee of the results of the Road Asset Valuation 2016/17, undertaken by Stantec (formerly MWH Consultants NZ Ltd). A copy of the report is attached as Appendix 1. The valuation report prepared by Stantec shows a comparison between the 30 June 2016 and 30 June 2017 valuations with a summary and individual comparison of each asset type as well as an explanation of the differences. It also shows valuation results summarised by rating area DRA1, DRA1a, DRA2, DRA3, DRA4 and DRA5. The final annual depreciation figure in 2015/16 was $10,332,501 and in 2016/17 it was $10,800,479. The increase in total annual depreciated replacement cost in 2016/17 was $467,978. The valuations are based on accurate and substantially complete asset registers and appropriate replacement costs and effective lives. RECOMMENDATIONS That the Assets & Infrastructure Committee: 1. Notes the contents of this report. Authorised by: Dave Hadfield General Manager - Tairāwhiti Roads David Wilson Director Lifelines Keywords: land transport, road assets, valuation Page 1 of 13

2 BACKGROUND 1. Stantec (formerly MWH Consultants NZ Ltd) was commissioned by Tairāwhiti Roads to value its roading infrastructure assets as at 30 June The valuations used data on all Council-owned road assets held in the Road Asset Management and Maintenance (RAMM) database as well as data provided by Tairāwhiti Roads. It was based on accurate and substantially complete asset registers and appropriate replacement costs and effective asset lives. The basis of the data inputs used is described in detail in the report. a) The asset lives are generally based upon New Zealand Infrastructure Asset Valuation and Depreciation Guidelines Version 2.0. In specific cases these have been modified where, in the opinion of MWH and Council, a different life is appropriate. The changes are justified in the valuation report. b) The component level of the data used for the valuation is sufficient to calculate depreciation separately for those assets that have different useful lives. REPORT HIGHLIGHTS 3. Stantec reported on the total valuation results of all road assets as well as by Differential Rating Area (DRA) broken down by asset type. The report included the asset replacement cost, total accumulated depreciation, depreciated replacement cost and annual depreciation of all road assets broken down by asset type. Road Assets that were Valued 4. The general categories under which the road components were valued are outlined below: Component RAMM Table Data Source Land Treatment Length RAMM Formation Treatment Length RAMM Pavements Sealed Pavement Structure Treatment Length RAMM Unsealed Pavement Structure Treatment Length RAMM Sealed Surfaces Treatment Length RAMM Drainage Drainage RAMM Surface Water Channels Surface Water Channel RAMM Footpaths Footpath RAMM Traffic Facilities Retaining Walls Retaining Walls RAMM Other Structures Traffic Facilities RAMM Parking Meters Traffic Facilities RAMM Traffic Signals Traffic Signals RAMM Raised Pavement Markers Markings RAMM Page 2 of 13

3 Component RAMM Table Data Source Fords Minor Structure RAMM Markings NA Council supplied data Signs Signs RAMM Railings Railings RAMM Streetlights Streetlight RAMM Bridges and Bridge Culverts Bridge RAMM Car Parks Treatment Length RAMM Valuation Comparison 30 June 2016 and 30 June Last year, the change in unit rates was due to the Transport Agency s cost adjustment factors, resulting in a drop in replacement, depreciated replacement and annual depreciated replacement costs unit rates across all assets (except land). 6. This year changes are mainly due to an increase in the Transport Agency s cost adjustment factors and to the quantity of assets. This has resulted in an increase in replacement, depreciated replacement and annual depreciated replacement costs. 7. The changes in the 2017 road valuation were due to the following: a) Increase in Unit Rates Unit replacement rates have increased, hence (RC) and (DRC) of roading assets valued have increased for: Sealed pavement layers Unsealed pavement layers Drainage Surface water channels Bridges Footpaths Traffic Facilities (but offset by decrease in quantity of retaining walls, refer to explanation of decreases below) Minor structures Signs Railings Carparks Streetlights Bridges and bridge culverts Page 3 of 13

4 The cost adjustment factors provided by the Transport Agency which have increased since the 2016 valuation are: Item 2015/ /17 % change Maintenance % Bridges % Reseals % Construction % b) Increase in land under roads In the 2016/17 period, the median property price for the Gisborne region increased by 2%. c) Increase in quantities The quantities of some assets have also increased: Sealed pavement layers Unsealed pavement layers Drainage Surface water channels Footpaths Signs Railings increase is significant due to the capture of 1,435 railings/sight rails in 2016/17 Bridges and bridge culverts increase due to data capture of 15 footbridges d) Decrease in quantities Traffic facilities Retaining walls In 2016/17, 311 retaining walls were captured and entered into RAMM. While there was an increase in numbers of retaining walls from 2015/16, there was a reduction in the lengths, hence, decrease in the quantity. Streetlights In 2016/17, the upgrade of streetlights to LED has resulted in the decrease in quantity of streetlights and their components. 8. In summary, the 2017 RAMM valuation aligns well with the 2016 RAMM valuation: Valuation Annual Depreciation 30 June 2016 $1,652,801,441 $1,417,224,892 $10,332, June 2017 $1,699,053,956 $1,450,908,338 $10,800,479 % Change 2.80% 2.38% 4.53% Page 4 of 13

5 Summary of Asset Valuation Results 9. The 2016/17 annual depreciation cost of all road assets was $10,800,479 broken down as follows: Asset Description Total Accumulated Depreciation Annual Depreciation Land $745,709,300 $0 $745,709,300 $0 Formation $400,188,338 $0 $400,188,338 $0 Sealed Pavement Surface $42,644,828 $25,009,090 $17,635,738 $2,789,836 Sealed Pavement Layers $180,507,218 $56,133,543 $124,373,675 $2,800,592 Unsealed Pavement Layers $37,591,086 $8,548,322 $29,042,764 $650,966 Drainage $50,021,554 $24,163,438 $25,858,116 $716,919 Surface Water Channels $41,163,812 $18,307,941 $22,855,871 $548,851 Footpath $43,958,809 $17,624,550 $26,334,259 $609,906 Traffic Facilities $14,158,529 $7,241,971 $6,916,558 $240,258 Minor Structures $173,258 $86,629 $86,629 $2,166 Signs $1,494,281 $1,001,934 $492,348 $122,974 Railings $6,531,039 $4,973,186 $1,557,853 $264,309 Streetlights $5,528,181 $2,481,199 $3,046,982 $300,891 Car Parks $1,774,870 $887,435 $887,435 $43,935 Bridges and Major Culverts $127,608,855 $81,686,383 $45,922,472 $1,710,040 Total $1,699,053,956 $248,145,619 $1,450,908,338 $10,800, Valuation Results by Rating Area 10. The valuations were split into rating areas (refer to maps in Appendix 2). The rating area with the highest annual depreciated replacement cost was DRA 1 at $3,466,310. Below are the valuation summary tables for all rating areas broken down by asset type: Page 5 of 13

6 DRA 1 (Inner Zone) Gisborne City Asset Type Annual Bridge Culvert $180,651 $90,325 $3,613 Bridges $10,552,452 $2,488,389 $141,628 Drainage $150,444 $101,097 $2,149 First Coat Seals $8,073,964 $4,466,336 $201,849 Footpath $38,923,448 $23,108,919 $537,276 Formation $21,114,189 $21,114,189 $0 Land $491,861,245 $491,861,245 $0 Railings $443,430 $113,420 $20,961 Retaining Walls $230,126 $166,408 $2,877 Sealed Pavement Basecourse $16,408,037 $9,133,099 $410,201 Sealed Pavement Subbase $21,889,343 $17,500,442 $119,380 Signs $762,829 $157,075 $63,122 Streetlights - brackets $1,036,941 $561,095 $69,130 Streetlights - lights $1,410,216 $793,703 $94,005 Streetlights - poles $2,305,160 $1,179,600 $92,882 Surface Water Channels $33,383,256 $17,528,081 $445,110 Surfacing $20,998,456 $10,525,890 $1,231,139 Traffic Facilities $650,639 $64,407 $30,989 Grand Total $670,374,827 $600,953,720 $3,466,310 Page 6 of 13

7 DRA 1A (Inner Zone) - The semi urban/buffer zone around Gisborne City including Wainui and Makaraka. Asset Type Annual Bridge Culvert $168,996 $34,188 $4,273 Bridges $422,525 $191,274 $7,333 Drainage $826,741 $417,708 $11,811 First Coat Seals $1,108,607 $620,473 $27,715 Footpath $1,409,078 $1,049,601 $18,848 Formation $6,290,715 $6,290,715 $0 Land $124,190,350 $124,190,350 $0 Railings $37,840 $10,576 $2,276 Retaining Walls $107,770 $55,010 $1,347 Sealed Pavement Basecourse $2,291,241 $1,280,324 $57,281 Sealed Pavement Subbase $3,275,151 $2,716,818 $17,380 Signs $47,905 $11,346 $3,964 Streetlights - brackets $67,891 $37,076 $4,526 Streetlights - lights $141,537 $93,450 $9,436 Streetlights - poles $149,087 $75,824 $5,999 Surface Water Channels $1,926,872 $1,272,295 $25,692 Surfacing $1,568,697 $629,118 $104,019 Unsealed Pavement Subbase $106,112 $79,582 $531 Unsealed Pavement Wearing Course $9,867 $5,921 $1,974 Grand Total $144,146,984 $139,061,651 $304,404 Page 7 of 13

8 DRA 2 (Inner Zone) - Poverty Bay Flats including immediate fringe hill properties, Muriwai, Manutuke, Patutahi, Makauri, Ormond, part of Waimata, Makorori and Tatapouri. Asset Type Annual Bridge Culvert $703,956 $317,119 $18,118 Bridges $6,118,122 $2,534,620 $77,263 Drainage $4,954,617 $2,484,464 $70,780 First Coat Seals $4,968,089 $2,863,684 $124,202 Footpath $728,658 $411,315 $9,770 Formation $35,430,025 $35,430,025 $0 Land $91,831,446 $91,831,446 $0 Railings $374,802 $82,739 $17,521 Retaining Walls $100,478 $70,586 $1,256 Sealed Pavement Basecourse $10,471,686 $6,053,991 $261,792 Sealed Pavement Subbase $14,982,124 $12,364,349 $80,440 Signs $180,055 $61,158 $14,763 Streetlights - brackets $12,810 $7,094 $830 Streetlights lights $55,135 $46,253 $3,668 Streetlights - poles $27,770 $14,577 $1,144 Surface Water Channels $3,682,808 $2,856,071 $49,104 Surfacing $5,091,705 $1,922,261 $396,354 Traffic Facilities $909,692 $468,514 $20,904 Unsealed Pavement Subbase $760,979 $612,010 $3,805 Unsealed Pavement Wearing Course $70,760 $29,355 $10,185 Grand Total $181,455,719 $160,461,629 $1,161,901 Page 8 of 13

9 DRA 3 (Outer Zone) Whangara, part of Waerenga-o-Kuri, Ngatapa, Whatatutu and Te Karaka. Asset Type Annual Bridge Culvert $676,567 $288,286 $13,795 Bridges $25,573,720 $9,565,698 $319,647 Drainage $8,366,528 $4,273,195 $119,704 First Coat Seals $5,149,478 $2,952,978 $128,737 Footpath $675,902 $407,959 $12,156 Formation $67,084,358 $67,084,358 $0 Land $16,892,020 $16,892,020 $0 Railings $1,430,250 $396,502 $57,091 Retaining Walls $721,981 $394,236 $9,025 Sealed Pavement Basecourse $11,246,868 $6,468,155 $281,172 Sealed Pavement Subbase $15,456,547 $12,923,598 $86,378 Signs $154,947 $79,345 $12,682 Streetlights - brackets $7,686 $3,977 $512 Streetlights - lights $40,125 $33,421 $2,675 Streetlights - poles $16,636 $8,224 $691 Surface Water Channels $963,355 $541,407 $12,845 Surfacing $4,547,273 $1,543,162 $334,352 Traffic Facilities $240,237 $123,728 $9,374 Unsealed Pavement Subbase $5,004,352 $3,924,922 $25,022 Unsealed Pavement Wearing Course $465,333 $235,220 $80,332 Grand Total $164,714,161 $128,140,390 $1,506,190 Page 9 of 13

10 DRA 4 (Outer Zone) Rural hinterland including Tiniroto, Otoko, Matawai, Motu and Tolaga Bay. Asset Type Annual Bridge Culvert $2,220,258 $1,132,390 $65,267 Bridges $45,349,330 $18,419,252 $578,024 Drainage $23,155,259 $12,052,647 $332,160 First Coat Seals $7,058,303 $3,829,559 $176,458 Footpath $156,535 $71,750 $2,334 Formation $169,210,537 $169,210,537 $0 Land $16,621,386 $16,621,386 $0 Minor Structures $127,056 $63,528 $1,588 Railings $2,550,116 $683,510 $105,695 Retaining Walls $1,294,865 $744,905 $16,186 Sealed Pavement Basecourse $15,628,426 $8,485,464 $390,711 Sealed Pavement Subbase $21,246,703 $17,506,591 $120,356 Signs $242,150 $124,963 $19,615 Streetlights - brackets $5,764 $3,122 $384 Streetlights - lights $43,897 $39,907 $2,926 Streetlights - poles $13,821 $7,778 $604 Surface Water Channels $347,945 $200,592 $4,639 Surfacing $6,698,855 $2,070,361 $476,007 Traffic Facilities $1,881,726 $969,136 $40,094 Unsealed Pavement Subbase $17,773,212 $14,520,752 $88,866 Unsealed Pavement Wearing Course $1,652,654 $644,604 $227,300 Grand Total $333,278,798 $267,402,732 $2,649,216 Page 10 of 13

11 DRA 5 (Outer Zone) The East Cape north of Mangatuna (Hicks Bay, Te Araroa, Tikitiki Ruatoria, Waipiro Bay, Te Puia Springs, Tokomaru Bay). Asset Type Annual Bridge Culvert $705,121 $358,621 $20,163 Bridges $34,937,155 $10,502,309 $459,752 Drainage $12,567,964 $6,529,005 $180,317 First Coat Seals $3,530,727 $1,996,076 $88,268 Footpath $2,065,188 $1,284,715 $29,521 Formation $101,058,514 $101,058,514 $0 Land $4,312,852 $4,312,852 $0 Minor Structures $46,202 $23,101 $578 Railings $1,694,602 $271,107 $60,765 Retaining Walls $1,029,896 $370,210 $12,871 Sealed Pavement Basecourse $6,983,584 $3,950,269 $174,590 Sealed Pavement Subbase $10,738,340 $9,261,470 $53,682 Signs $106,396 $58,462 $8,828 Streetlights - brackets $29,462 $17,405 $1,964 Streetlights - lights $100,129 $86,463 $6,675 Streetlights - poles $64,114 $38,015 $2,838 Surface Water Channels $859,575 $457,425 $11,461 Surfacing $3,739,841 $944,946 $247,965 Traffic Facilities $6,735,577 $3,468,991 $85,121 Unsealed Pavement Subbase $10,748,372 $8,527,429 $53,742 Unsealed Pavement Wearing Course $999,444 $462,969 $159,210 Grand Total $203,053,057 $153,980,353 $1,658,310 Page 11 of 13

12 IMPROVEMENTS TO VALUATION RESULTS 11. Tairāwhiti Roads has undertaken a major data collection and validation exercise on the retaining walls assets, which are now stored and valued in the Retaining Walls table. Previously these assets were stored in the Traffic Facilities table with limited information attached. This investment helps to better manage the network, through a stronger understanding of the assets Council is responsible for. It is important in accurately monitoring changes, as they have a significant impact on the value of assets. 12. Additionally, Traffic Signal assets have been moved from the Traffic Facilities table into the Traffic Signal table prior to this valuation and are now valued correctly. 13. The report provided the following recommendations to improve the accuracy of future valuations by reducing the number of assumptions required, and by ensuring those assumptions that are used best represent the conditions in the District. Item Sealed Surfacing Methodology Unsealed Pavement Layer Methodology Retaining Walls Car Park Assets Railings Recommended Actions for Tairāwhiti Roads from 2017 valuation results Research is required to find the appropriate total useful life breakdown for these assets to be used in the next valuation. Incorporate the results of dtims 2, TSA 3, condition assessments, and other decision-making tools into the calculation of total useful lives. Research is required to find the appropriate total useful life breakdown for these assets to be used in the next valuation. Incorporate the results of dtims, TSA, condition assessments, and other decision-making tools into the calculation of total useful lives. Now that there is more complete construction, dimension and material type data attached to these assets, it is recommended that the way these assets are valued should be reviewed and that the new dataset is cross-compared with the old dataset in order to ensure that all retaining walls data is complete and accurate. Currently only surface and pavement data exists for Council car parks. Further auditing needs to be undertaken to capture such assets as, lighting, parking meters, kerb and channel, that may exist. Investigate total useful life for bridge railings. These assets are usually designed to last the life of the bridge they are attached to. Currently assigned a total useful life of 15 years. Priority Links to OAG 1 Assessment Criteria for Asset Management 1 Life cycle optimised decision making 1 Life cycle optimised decision making 1 Description of assets 2 Description of assets 1 Description of assets 1 Office of the Auditor General 2 Deighton Total Infrastructure Management System 3 Treatment Selection Algorithm Page 12 of 13

13 Item Fords Recommended Actions for Tairāwhiti Roads from 2017 valuation results Gather further information to value more accurately and determine whether they require inspection with the current bridge stock. Priority Links to OAG 1 Assessment Criteria for Asset Management 1 Description of assets 14. The following recommendations have been undertaken by Tairāwhiti Roads during the year to improve the RAMM 4 database. These were recommendations made in the 2016 valuation. Item Construction Dates Missing Data Recommended Actions for Tairāwhiti Roads from 2016 valuation results Drainage, streetlights and surface water channels are missing almost all of their construction dates. Bridges and signs have large percentage of assets missing construction dates. Investigate other sources of construction date data. Ensure construction date data is recorded for all assets in the future. Collect and record in RAMM all missing asset data including, but not exclusive to, railings, footbridges, large cantilever signs, retaining walls and stock underpasses. Actions completed to date Ongoing updating is occurring through inspections as part of maintenance contracts. Ongoing data collection is taking place with new assets being added to RAMM when identified through field visits APPENDICES Appendix Road Asset Valuation Appendix 2 - Maps of Differential Rating Zones 4 Road Asset Maintenance Management Page 13 of 13

Report to INFRASTRUCTURE SERVICES COMMITTEE for noting

Report to INFRASTRUCTURE SERVICES COMMITTEE for noting 16 420 Title: Section: Prepared by: Road Asset Valuation Tairawhiti Roads Susan Rebano-Edwards (Asset Planning Manager) Meeting Date: 8 September 2016 Legal Financial Significance Report to INFRASTRUCTURE

More information

2017 ROAD ASSET VALUATION

2017 ROAD ASSET VALUATION Appendix 1 2017 ROAD ASSET VALUATION Prepared for Gisborne District Council July 2017 This document has been prepared for the benefit of Gisborne District Council. No liability is accepted by this company

More information

New Plymouth District Council 1 of 23

New Plymouth District Council 1 of 23 New Plymouth District Council 1 of 23 Contents Executive Summary... 4 Introduction... 4 Purpose of this Quarterly Report... 4 First Quarterly Report... 5 New Plymouth District... 5 New Plymouth District

More information

National Policy Statement on Urban Development Capacity Price efficiency indicators technical report: Price-cost ratios

National Policy Statement on Urban Development Capacity Price efficiency indicators technical report: Price-cost ratios National Policy Statement on Urban Development Capacity Price efficiency indicators technical report: Price-cost ratios Acknowledgements: SensePartners is acknowledged for the development of this technical

More information

Fiscal Impact Analysis Evergreen Community

Fiscal Impact Analysis Evergreen Community Evergreen Community July 16, 2015 Evergreen Community Prepared for: Evergreen Community (Burlington) Ltd. Prepared by: 33 Yonge Street Toronto Ontario M5E 1G4 Phone: (416) 641-9500 Fax: (416) 641-9501

More information

Ludgvan Parish HOUSING NEED SURVEY. Report Date: 21 st January Version: 1.2 Document Status: Final Report

Ludgvan Parish HOUSING NEED SURVEY. Report Date: 21 st January Version: 1.2 Document Status: Final Report Ludgvan Parish HOUSING NEED SURVEY Report Date: 21 st January 2019 Version: 1.2 Document Status: Author: Final Report Andrew Prendergast Rural Housing Enabler Affordable Housing Team, Cornwall Council

More information

Report to COUNCIL for decision

Report to COUNCIL for decision 17 229 Title: Section: Prepared by: Kaiti Beach Road Strategic Planning Carrie White & Te Rina Whaanga (Senior Policy Advisor & Policy Advisor) Meeting Date: 18 May 2017 Legal Financial Significance =

More information

Appendix 1: Gisborne District Quarterly Market Indicators Report April National Policy Statement on Urban Development Capacity

Appendix 1: Gisborne District Quarterly Market Indicators Report April National Policy Statement on Urban Development Capacity Appendix 1: Gisborne District Quarterly Market Indicators Report April 2018 National Policy Statement on Urban Development Capacity Quarterly Market Indicators Report April 2018 1 Executive Summary This

More information

Hinchinbrook Shire Adopted Infrastructure Charges Resolution CR1-2018

Hinchinbrook Shire Adopted Infrastructure Charges Resolution CR1-2018 Hinchinbrook Shire Adopted Infrastructure Charges Resolution CR1-2018 Part 4 ge 23 Hinchinbrook Shire COUNCIL CHARGES RESOLUTION No. 1-2018 Table of Contents 1.0 Introduction 3 1.1 Planning Act 2016 (PAct)

More information

Town of Lincoln Development Charges Background Study

Town of Lincoln Development Charges Background Study Town of Lincoln Development Charges Background Study May 17, 2018 Contents Page Executive Summary... i 1. Introduction... 1-1 1.1 Purpose of this Document... 1-1 1.2 Summary of the Process... 1-1 1.3

More information

Vested Assets Deep Dive Report

Vested Assets Deep Dive Report Vested Assets Deep Dive Report Recommendation That the Board: i. Receive the report. Executive summary AT receives vested assets from developers and the NZ Transport Agency, with more than half a billion

More information

Earls Barton. Rural Housing Survey. Authors: A Miles & S Butterworth Date: October 2012

Earls Barton. Rural Housing Survey. Authors: A Miles & S Butterworth Date: October 2012 Earls Barton Rural Housing Survey Authors: A Miles & S Butterworth Date: October 2012 Swanspool House, Doddington Road, Wellingborough, Northamptonshire, NN8 1BP Tel: 01933 229777 DX 12865 www.wellingborough.gov.uk

More information

Profiting from Building Permit Fees March 20, 2001

Profiting from Building Permit Fees March 20, 2001 ing from Building Permit Fees March 20, 2001 Summary In response to a complaint from a Marin County resident, the Grand Jury investigated whether excessive building permit fees are being charged by Marin

More information

METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO. Valuation Date: January 1, 2016

METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO. Valuation Date: January 1, 2016 METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO Valuation Date: January 1, 2016 August 2017 August 22, 2017 The Municipal Property Assessment Corporation (MPAC) is responsible for accurately assessing

More information

Project Appraisal Guidelines for National Roads Unit Project Appraisal Plan

Project Appraisal Guidelines for National Roads Unit Project Appraisal Plan Project Appraisal Guidelines for National Roads Unit 2.1 - Project Appraisal Plan October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible

More information

PIP practice note 1 planning assumptions. How to use this practice note. Planning assumptions. What are planning assumptions? Type.

PIP practice note 1 planning assumptions. How to use this practice note. Planning assumptions. What are planning assumptions? Type. PIP PRACTICE NOTE 1 How to use this practice note This practice note has been prepared to support in the preparation or amending of planning assumptions within a priority infrastructure plan (PIP). It

More information

Vote Lands. APPROPRIATION ADMINISTRATOR: Land Information New Zealand

Vote Lands. APPROPRIATION ADMINISTRATOR: Land Information New Zealand Vote Lands APPROPRIATION MINISTER(S): Minister for Land Information (M44), Minister for Treaty of Waitangi Negotiations (M74), Minister supporting Greater Christchurch Regeneration (M85) APPROPRIATION

More information

Town of Niagara-on-the-Lake Development Charges Background Study

Town of Niagara-on-the-Lake Development Charges Background Study Town of Niagara-on-the-Lake Development Charges Background Study May 17, 2018 Contents Page Executive Summary... i 1. Introduction... 1-1 1.1 Purpose of this Document... 1-1 1.2 Summary of the Process...

More information

Board of Appeal and Equalization Handbook

Board of Appeal and Equalization Handbook Board of Appeal and Equalization Handbook This handbook was created to satisfy the training requirements of Minnesota Statutes, sections 274.014 and 274.135 Updated January 2018 Table of Contents Introduction...

More information

LGFP CONFERENCE Appreciating Depreciation. QAO Perspective. Patrick Flemming Brendan Macrae. 25 November 2014

LGFP CONFERENCE Appreciating Depreciation. QAO Perspective. Patrick Flemming Brendan Macrae. 25 November 2014 LGFP CONFERENCE Appreciating Depreciation QAO Perspective Patrick Flemming Brendan Macrae 25 November 2014 Outline What are financial reporting risks impacting on assets? How do we audit: Ø financial sustainability

More information

LLANO CENTRAL APPRAISAL DISTRICT REAPPRAISAL PLAN FOR TAX YEARS 2017 & 2018 AS ADOPTED BY THE BOARD OF DIRECTORS

LLANO CENTRAL APPRAISAL DISTRICT REAPPRAISAL PLAN FOR TAX YEARS 2017 & 2018 AS ADOPTED BY THE BOARD OF DIRECTORS LLANO CENTRAL APPRAISAL DISTRICT REAPPRAISAL PLAN FOR TAX YEARS 2017 & 2018 AS ADOPTED BY THE BOARD OF DIRECTORS TABLE OF CONTENTS ITEM PAGE Executive Summary 5 Revaluation Decision (Statutory or Administrative)

More information

Rating Valuations Rules 2008

Rating Valuations Rules 2008 Rating Valuations Rules 2008 LINZS30300 Version date: 1 October 2010 www.linz.govt.nz Under section 5 of the Rating Valuations Act 1998 I hereby make the Rating Valuations Rules 2008. Unless otherwise

More information

Housing Need in South Worcestershire. Malvern Hills District Council, Wychavon District Council and Worcester City Council. Final Report.

Housing Need in South Worcestershire. Malvern Hills District Council, Wychavon District Council and Worcester City Council. Final Report. Housing Need in South Worcestershire Malvern Hills District Council, Wychavon District Council and Worcester City Council Final Report Main Contact: Michael Bullock Email: michael.bullock@arc4.co.uk Telephone:

More information

Ontario Rental Market Study:

Ontario Rental Market Study: Ontario Rental Market Study: Renovation Investment and the Role of Vacancy Decontrol October 2017 Prepared for the Federation of Rental-housing Providers of Ontario by URBANATION Inc. Page 1 of 11 TABLE

More information

Town of Grimsby Development Charge Background Study

Town of Grimsby Development Charge Background Study Town of Grimsby Development Charge Background Study September 1, 2016 Contents Page Executive Summary... i 1. Introduction... 1-1 1.1 Purpose of this Document... 1-1 1.2 Summary of the Process... 1-1 1.3

More information

Badby Parish. Housing Needs Survey Report

Badby Parish. Housing Needs Survey Report Badby Parish Housing Needs Survey Report February 2013 Contents Introduction Page 3 Methodology Page 4 About Badby Page 5 Survey Results Page 6 Local Housing Market & Affordability Page 11 Section B Analysis

More information

Rent Calculation Policy

Rent Calculation Policy Rent Calculation Policy PURPOSE: To outline how rent will be calculated for tenants allocated to Haven; Home, Safe (HHS) Affordable Housing Association (AHA) properties. BACKGROUND INFORMATION: HHS has

More information

REPORT ON: VALUATION APPROACH AND METHODOLOGY FOR SPECIALISED AIRFIELD ASSETS (RUNWAY, TAXIWAYS AND APRONS) BY PROFESSOR TERRY BOYD 3 AUGUST 2001

REPORT ON: VALUATION APPROACH AND METHODOLOGY FOR SPECIALISED AIRFIELD ASSETS (RUNWAY, TAXIWAYS AND APRONS) BY PROFESSOR TERRY BOYD 3 AUGUST 2001 REPORT ON: VALUATION APPROACH AND METHODOLOGY FOR SPECIALISED AIRFIELD ASSETS (RUNWAY, TAXIWAYS AND APRONS) WITH REFERENCE TO THE COMMERCE COMMISSION DRAFT REPORT ON PRICE CONTROL STUDY OF AIRFIELD ACTIVITIES.

More information

Chapter 8 VALUATION OF AND INFORMATION ON PROPERTIES. Definitions

Chapter 8 VALUATION OF AND INFORMATION ON PROPERTIES. Definitions Chapter 8 VALUATION OF AND INFORMATION ON PROPERTIES Definitions 8.01 In this Chapter:- (1) carrying amount means, for an applicant, the amount at which an asset is recognised in the most recent audited

More information

(ii) Particulars of land sales used: Date of sale Sale price** Address of property Land sales not used in analysis with reason code** (iii) (iv)

(ii) Particulars of land sales used: Date of sale Sale price** Address of property Land sales not used in analysis with reason code** (iii) (iv) Issue by Methodology Documents, Studies or Information Subject to Disclosure Party Responsible and Timing of Disclosure 1 COST APPROACH (a) Land Value Particulars relating to land value by market area

More information

Table of Contents. Appendix...22

Table of Contents. Appendix...22 Table Contents 1. Background 3 1.1 Purpose.3 1.2 Data Sources 3 1.3 Data Aggregation...4 1.4 Principles Methodology.. 5 2. Existing Population, Dwelling Units and Employment 6 2.1 Population.6 2.1.1 Distribution

More information

TOWN OF PELHAM DEVELOPMENT CHARGE BACKGROUND STUDY OFFICE CONSOLIDATION NOVEMBER 4, (As Amended March 5 th and April 28 th, 2014)

TOWN OF PELHAM DEVELOPMENT CHARGE BACKGROUND STUDY OFFICE CONSOLIDATION NOVEMBER 4, (As Amended March 5 th and April 28 th, 2014) TOWN OF PELHAM DEVELOPMENT CHARGE BACKGROUND STUDY OFFICE CONSOLIDATION NOVEMBER 4, 2013 (As Amended March 5 th and April 28 th, 2014) CONTENTS EXECUTIVE SUMMARY Page (i) 1. INTRODUCTION 1.1 Purpose of

More information

FOCUS FRS 116 GETTING READY FOR FRS 116 (LEASES) ARE COMPANIES PREPARED FOR THE NEW STANDARD?

FOCUS FRS 116 GETTING READY FOR FRS 116 (LEASES) ARE COMPANIES PREPARED FOR THE NEW STANDARD? FOCUS FRS 116 GETTING READY FOR FRS 116 (LEASES) BY RESEARCH DEPARTMENT, ISCA ARE COMPANIES PREPARED FOR THE NEW STANDARD? Ahead of the new Singapore leases standard FRS 116: Leases, which comes into effect

More information

Orange Water and Sewer Authority Water and Sewer System Development Fee Study

Orange Water and Sewer Authority Water and Sewer System Development Fee Study Orange Water and Sewer Authority Water and Sewer System Development Fee Study March 6, 2018 March 6, 2018 Mr. Stephen Winters Director of Finance and Customer Service 400 Jones Ferry Road Carrboro, NC

More information

ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM

ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM Davina McNickel 1, Helen Davies 2, Vincent Salomon 2 1 Environment Canterbury, PO Box 345, Christchurch. Telephone: 03 365

More information

4. Parks and Recreation Fee Facility Needs and Cost Estimates Fee Calculation Nexus Findings 24

4. Parks and Recreation Fee Facility Needs and Cost Estimates Fee Calculation Nexus Findings 24 TABLE OF CONTENTS CHAPTER PAGE 1. Introduction and Summary of Calculated Fees 1 1.1 Background and Study Objectives 1 1.2 Organization of the Report 2 1.3 Calculated Development Impact Fees 2 2. Fee Methodology

More information

An Investigation into the Potential Relationship between Property Values and High Voltage Overhead Transmission Lines in Ireland

An Investigation into the Potential Relationship between Property Values and High Voltage Overhead Transmission Lines in Ireland An Investigation into the Potential Relationship between Property Values and High Voltage Overhead Transmission Lines in An independent report prepared for EirGrid Plc The Oval, 160 Shelbourne Road Ballsbridge,

More information

REAL PROPERTY VALUATION METHODS

REAL PROPERTY VALUATION METHODS REAL PROPERTY VALUATION METHODS Introduction Valuation of a property may be prepared by different methods. The appropriate application of a method of valuation depends on the nature of the property as

More information

Administration and Calculation of Servicing Agreement Fees and Development Levies

Administration and Calculation of Servicing Agreement Fees and Development Levies Administration and Calculation of Servicing Agreement Fees and Development Levies Policy Title: Applies to: Reference # Administration and Calculation of Servicing Agreement Fees and City of Regina ###-XXX-##

More information

COUNTY OF BRANT DEVELOPMENT CHARGE BACKGROUND STUDY AND PROPOSED BY-LAW

COUNTY OF BRANT DEVELOPMENT CHARGE BACKGROUND STUDY AND PROPOSED BY-LAW COUNTY OF BRANT DEVELOPMENT CHARGE BACKGROUND STUDY AND PROPOSED BY-LAW JULY 7, 2014 CONTENTS Page EXECUTIVE SUMMARY (i) 1. INTRODUCTION 1.1 Purpose of this Document 1-1 1.2 Summary of the Process 1-1

More information

PURPOSE This paper is to update the Audit and Risk Committee on a number of accounting issues that will impact the finalisation of the Annual Report

PURPOSE This paper is to update the Audit and Risk Committee on a number of accounting issues that will impact the finalisation of the Annual Report 6.3 ANNUAL REPORT 2018 Author: Authoriser: Lorraine Walmsley, Manager Finance Systems Kaiwhakahaere Pūnaha Pūtea Roy Baker, General Manager Corporate Services and Chief Financial Officer Kaiārahi Pūtea

More information

GASB 34 Compliance. Retrospective Valuation of ODOT Infrastructure. A Proposed Approach

GASB 34 Compliance. Retrospective Valuation of ODOT Infrastructure. A Proposed Approach GASB 34 Compliance Retrospective Valuation of ODOT Infrastructure A Proposed Approach ODOT s GASB 34 compliance effort consists of primarily two processes: 1. Retrospective reporting and 2. Prospective

More information

TOWN OF GAWLER POLICY

TOWN OF GAWLER POLICY TOWN OF GAWLER POLICY Policy Section: Policy Name: Classification: 6. Finance & Corporate Services Asset Capitalisation Policy Public Council Policy Adopted: 28 February 2017 Frequency of Review: Triennial

More information

Real estate industry sees highest annual volume increase in 23 months

Real estate industry sees highest annual volume increase in 23 months 11 May 2018 For immediate release Real estate industry sees highest annual volume increase in 23 months The number of properties sold in April 2018 across New Zealand increased by 6.6% compared to the

More information

002 - Assessor GENERAL GOVERNMENT SERVICES ASSESSOR Assessor. At a Glance:

002 - Assessor GENERAL GOVERNMENT SERVICES ASSESSOR Assessor. At a Glance: GENERAL GOVERNMENT SERVICES 002 - ASSESSOR Operational Summary Mission: To serve the citizens of Orange County by valuing all legally assessable property with uniformity and impartiality, producing property

More information

PROPERTY DEVELOPMENT REPORT

PROPERTY DEVELOPMENT REPORT THE CITY OF CAMPBELLTOWN PROPERTY DEVELOPMENT REPORT Location: 123 Sample Street, Campbelltown Parcel ID: Report Processed: 28/04/2016 Max Volume: 4 ipdata Pty Ltd Disclaimer Whilst all reasonable effort

More information

Project Appraisal Guidelines for National Roads Unit Introduction

Project Appraisal Guidelines for National Roads Unit Introduction Project Appraisal Guidelines for National Roads Unit 1.0 - Introduction October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible

More information

Chapter 8 Transportation

Chapter 8 Transportation Chapter 8 Transportation Introduction 1. Chapter 8 of the PDP contains provisions concerning the development, maintenance and use of the transport network and associated activities. It recognises that

More information

TOWN OF LINCOLN COUNCIL POLICY

TOWN OF LINCOLN COUNCIL POLICY Page 1 of 10 PURPOSE The purpose of this policy is to prescribe the accounting treatment for tangible capital assets so that users of the financial report can discern information about the investment in

More information

ASSET MANAGEMENT PLAN FOR THE CORPORATION OF THE TOWNSHIP OF PUSLINCH

ASSET MANAGEMENT PLAN FOR THE CORPORATION OF THE TOWNSHIP OF PUSLINCH FOR THE CORPORATION OF THE GAMSBY AND MANNEROW LIMITED CONSULTING PROFESSIONAL ENGINEERS GUELPH OWEN SOUND LISTOWEL KITCHENER EXETER December 2013 Our File: 113006-2 File No. 113006-2 Page i TABLE OF CONTENTS

More information

Gisborne District Council

Gisborne District Council 12.0 SUBDIVISION... 1 12.1 INTRODUCTION... 1 12.2 ISSUE... 1 12.3 OBJECTIVE (SUBDIVISION)... 1 12.4 POLICIES (SUBDIVISION)... 2 12.5 METHODS OF IMPLEMENTATION... 4 12.5.1 REGULATION... 4 12.6 RULES FOR

More information

3rd Meeting of the Housing Task Force

3rd Meeting of the Housing Task Force 3rd Meeting of the Housing Task Force September 26, 2018 World Bank, 1818 H St. NW, Washington, DC MC 10-100 Linking Housing Comparisons Across Countries and Regions 1 Linking Housing Comparisons Across

More information

Trip Rate and Parking Databases in New Zealand and Australia

Trip Rate and Parking Databases in New Zealand and Australia Trip Rate and Parking Databases in New Zealand and Australia IAN CLARK Director Flow Transportation Specialists Ltd ian@flownz.com KEYWORDS: Trip rates, databases, New Zealand developments, common practices

More information

1.0 INTRODUCTION PURPOSE OF THE CIP VISION LEGISLATIVE AUTHORITY Municipal Act Planning Act...

1.0 INTRODUCTION PURPOSE OF THE CIP VISION LEGISLATIVE AUTHORITY Municipal Act Planning Act... April 2017 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PURPOSE OF THE CIP... 1 3.0 VISION... 1 4.0 COMMUNITY IMPROVEMENT PROJECT AREA..3 5.0 LEGISLATIVE AUTHORITY... 3 5.1 Municipal Act... 3 5.2 Planning

More information

Municipality of Bluewater Development Charge Background Study

Municipality of Bluewater Development Charge Background Study Municipality of Bluewater Development Charge Background Study December 19, 2016 Contents Page Executive Summary... i 1. Introduction... 1-1 1.1 Purpose of this Document... 1-1 1.2 Summary of the Process...

More information

Administration s Finance Office Approval Date: 4/10/12 Effective Date: 4/10/12 Capital Assets and Property Review Date:

Administration s Finance Office Approval Date: 4/10/12 Effective Date: 4/10/12 Capital Assets and Property Review Date: County of Butte Administration s Finance Office Approval Date: 4/10/12 Effective Date: 4/10/12 Capital Assets and Property Review Date: Control County Wide Version: One Last Revision Date: 4/10/12 PURPOSE

More information

Appraisal Review Reminders

Appraisal Review Reminders Use the following list of reminders as a tool when underwriting the appraisal report. For complete information on appraisal requirements, refer to the Freddie Mac Seller/Servicer Guide (Guide) Chapter

More information

BUSI 398 Residential Property Guided Case Study

BUSI 398 Residential Property Guided Case Study BUSI 398 Residential Property Guided Case Study PURPOSE AND SCOPE The Residential Property Guided Case Study course BUSI 398 is intended to give the real estate appraisal student a working knowledge of

More information

Should Residential Tenancy Inspection Reports be supplemented by Visual Aids?

Should Residential Tenancy Inspection Reports be supplemented by Visual Aids? Should Residential Tenancy Inspection Reports be supplemented by Visual Aids? HERA ANTONIADES University of Technology, Sydney 2007 ABSTRACT In NSW, landlords and tenants have rights and responsibilities

More information

City of Barrie Development Charge Background Study

City of Barrie Development Charge Background Study City of Barrie Development Charge Background Study Whiskey Creek Stormwater Management Works and Downstream Conveyance Works Area-Specific Development Charges Background Study April 13, 2016 List of Acronyms

More information

AAT Professional Diploma in Accounting

AAT Professional Diploma in Accounting Qualification Number: R486 04 Qualification Technical Information Version 1.1 published 13 June 2016 AAT Professional Diploma in Accounting Qualification Technical Information Units in this qualification

More information

Lanteglos by Fowey HOUSING NEED SURVEY. Report Date: 1 st March Version: 1.1 Document Status: Final Report

Lanteglos by Fowey HOUSING NEED SURVEY. Report Date: 1 st March Version: 1.1 Document Status: Final Report Lanteglos by Fowey HOUSING NEED SURVEY Report Date: Version: 1.1 Document Status: Author: Final Report Victoria Regan Senior Development Officer Affordable Housing Team, Cornwall Council 1. Introduction

More information

Description of the RICS Building Survey Service

Description of the RICS Building Survey Service Description of the RICS Building Survey Service 1 The service The RICS Service includes: a thorough inspection of the property (see The inspection ); and a detailed report based on the inspection (see

More information

Appraisal Review Reminders

Appraisal Review Reminders Use the following list of reminders as a tool when underwriting the appraisal report. For complete information on appraisal requirements, refer to the Freddie Mac Seller/Servicer Guide (Guide) Chapter

More information

Is there a conspicuous consumption effect in Bucharest housing market?

Is there a conspicuous consumption effect in Bucharest housing market? Is there a conspicuous consumption effect in Bucharest housing market? Costin CIORA * Abstract: Real estate market could have significant difference between the behavior of buyers and sellers. The recent

More information

Consulted With Individual/Body Date Head of Finance Financial

Consulted With Individual/Body Date Head of Finance Financial Equipment Disposal Policy Developed in response to: Policy Register No: 12037 Status: Public Internal Audit Report for Fixed Assets Contributes to CQC Regulation 17 Consulted With Individual/Body Date

More information

Sales of real estate units and loans

Sales of real estate units and loans 5 June 2018 Sales of real estate units and loans IV quarter 2017 Notarial deeds Transfers of properties of real estate units In the fourth quarter of 2017, seasonally adjusted sales or any other kind of

More information

Report to COUNCIL for decision

Report to COUNCIL for decision 16 368 Title: Section: Prepared by: Waipaoa Flood Control Scheme Resilience Project Update Environmental & Regulatory Services Neil Daykin (Rivers, Drainage and Coastal Manager) Meeting Date: 1 December

More information

REPUBLIC OF SOUTH AFRICA

REPUBLIC OF SOUTH AFRICA Please note that most Acts are published in English and another South African official language. Currently we only have capacity to publish the English versions. This means that this document will only

More information

Sales of real estate units and loans

Sales of real estate units and loans 22 March 2018 Sales of real estate units and loans III quarter 2017 Notarial deeds Transfers of properties of real estate units In the third quarter of 2017, seasonally adjusted sales or any other kind

More information

Town of Limon Comprehensive Plan CHAPTER 4 HOUSING. Limon Housing Authority Affordable Housing

Town of Limon Comprehensive Plan CHAPTER 4 HOUSING. Limon Housing Authority Affordable Housing CHAPTER 4 HOUSING Limon Housing Authority Affordable Housing 40 VISION Throughout the process to create this comprehensive plan, the community consistently voiced the need for more options in for-sale

More information

Depreciation A QUICK REFERENCE GUIDE FOR ELECTED OFFICIALS AND STAFF

Depreciation A QUICK REFERENCE GUIDE FOR ELECTED OFFICIALS AND STAFF Depreciation A QUICK REFERENCE GUIDE FOR ELECTED OFFICIALS AND STAFF This booklet is a quick reference guide to help you to: understand the purpose and function of accounting for and reporting on the depreciation

More information

Real Estate Acquisitions Audit (Green Line LRT Stage 1)

Real Estate Acquisitions Audit (Green Line LRT Stage 1) Real Estate Acquisitions Audit (Green Line LRT Stage 1) October 10, 2018 ISC: Unrestricted THIS PAGE LEFT INTENTIONALLY BLANK ISC: Unrestricted Table of Contents Executive Summary... 5 1.0 Background...

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 17, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 17, 2017 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 17, 2017 DATE: June 9, 2017 SUBJECT: Request to authorize advertisement of public hearings by the Planning Commission and County Board

More information

Before the Minnesota Public Utilities Commission State of Minnesota. Docket No. E002/GR Exhibit (LMC-1) Property Taxes

Before the Minnesota Public Utilities Commission State of Minnesota. Docket No. E002/GR Exhibit (LMC-1) Property Taxes Direct Testimony and Schedules Leanna M. Chapman Before the Minnesota Public Utilities Commission State of Minnesota In the Matter of the Application of Northern States Power Company for Authority to Increase

More information

Participants of the Ministerial Meeting on Housing and Land Management on 8 October 2013 in Geneva

Participants of the Ministerial Meeting on Housing and Land Management on 8 October 2013 in Geneva Summary At its meeting on 2 April 2012, the Bureau of the Committee on Housing and Land Management of the United Nations Economic Commission for Europe agreed on the need for a Strategy for Sustainable

More information

Real Property Assets Policy and Procedures

Real Property Assets Policy and Procedures Real Property Assets Policy and Procedures Summary: Due Diligence process Prior to the execution of a binding contract to purchase a property by a DomaCom sub-fund, a review of the Real Property Asset

More information

A. K. Alexandridis University of Kent. D. Karlis Athens University of Economics and Business. D. Papastamos Eurobank Property Services S.A.

A. K. Alexandridis University of Kent. D. Karlis Athens University of Economics and Business. D. Papastamos Eurobank Property Services S.A. Real Estate Valuation And Forecasting In Nonhomogeneous Markets: A Case Study In Greece During The Financial Crisis A. K. Alexandridis University of Kent D. Karlis Athens University of Economics and Business.

More information

Rent Setting Policy

Rent Setting Policy Rent Setting Policy 2016-2017 Contents 1. Scope 2. Policy statement 3. Monitoring and evaluation 4. Conditions and exceptions to policy 5. Policy equality and diversity statement 6. Resident/Tenant involvement

More information

Tangible Capital Assets Implementation of Section 3150 New Brunswick Local Governments. October 2010

Tangible Capital Assets Implementation of Section 3150 New Brunswick Local Governments. October 2010 Tangible Capital Assets Implementation of Section 3150 New Brunswick Local Governments October 2010 Agenda Review of the Inventory template Review of the Guide Identification of assets Costing of assets

More information

How many homes did housing associations build in 2016/17?

How many homes did housing associations build in 2016/17? May 2017 How many homes did housing associations build in 2016/17? Summary of key points: Housing associations started 47,709 homes in 2016/17, a 13% increase to last year Housing associations completed

More information

Office of the City Auditor. Audit Report

Office of the City Auditor. Audit Report CITY OF DALLAS Dallas City Council Mayor Laura Miller Office of the City Auditor Audit Report Mayor Pro Tem Donald W. Hill Deputy Mayor Pro Tem Dr. Elba Garcia Audit of the Dallas Central Appraisal District

More information

Highlights Highlights of a review of Newfoundland and Labrador Housing Corporation s Rental Housing Program from January 2007 to December 2007.

Highlights Highlights of a review of Newfoundland and Labrador Housing Corporation s Rental Housing Program from January 2007 to December 2007. Office of the Auditor General Newfoundland and Labrador Highlights Highlights of a review of Newfoundland and Labrador Housing Corporation s Rental Housing Program from January 2007 to December 2007. Why

More information

Report. Property Leases Audit Report. Internal Audit Report for August 2010

Report. Property Leases Audit Report. Internal Audit Report for August 2010 Report Office of the General Auditor Summary Three reports were issued during the month: Property Leases Audit Report Skinner East Bypass Screening Structure Rehabilitation Audit Report Yuba Accord Dry

More information

Gwydir Shire Council. Integrated Planning and Reporting. Attachment 3 Operational Plan

Gwydir Shire Council. Integrated Planning and Reporting. Attachment 3 Operational Plan Gwydir Shire Council Integrated Planning and Reporting Attachment 3 Operational Plan Statement of Revenue 2017-2018 THIS PAGE HAS BEEN LEFT BLANK 2 Gwydir Shire Council STATEMENT OF REVENUE POLICY _ Rates

More information

Grazing Disposition Royalty Proposal Alberta Environment and Parks

Grazing Disposition Royalty Proposal Alberta Environment and Parks Grazing Disposition Rental Rates and Assignment Fees on Agricultural Public Lands Background In 1960 the province of Alberta created a public land grazing disposition framework based around a three zone

More information

Economic Significance of the Property Industry to the. OTAGO Economy PREPARED FOR PROPERTY COUNCIL NEW ZEALAND BY URBAN ECONOMICS

Economic Significance of the Property Industry to the. OTAGO Economy PREPARED FOR PROPERTY COUNCIL NEW ZEALAND BY URBAN ECONOMICS Economic Significance of the Property Industry to the OTAGO Economy PREPARED FOR PROPERTY COUNCIL NEW ZEALAND BY URBAN ECONOMICS 2016 ABOUT PROPERTY COUNCIL NEW ZEALAND Property Council New Zealand is

More information

City of Norwalk Revaluation Project

City of Norwalk Revaluation Project City of Norwalk 2018 Revaluation Project Presenter: Paul Miller Supervisor: Salim Serdah Appraisers: James Steiner, John Valente, Steve Beccio, Rich Nicolosi, and Gynt Grube. Why Revaluation? It s important

More information

Township of Selwyn 2018 Development Charges Background Study. For Public Circulation and Comment

Township of Selwyn 2018 Development Charges Background Study. For Public Circulation and Comment Township of Selwyn 2018 Development Charges Background Study For Public Circulation and Comment April 26, 2018 Contents Page 1. Introduction... 1-1 1.1 Purpose of this Document... 1-1 1.2 Summary of the

More information

BUILDINGS, LAND AND LAND IMPROVEMENTS

BUILDINGS, LAND AND LAND IMPROVEMENTS Approved: Effective: February 19, 2014 Office: Office of Comptroller, General Accounting Topic No. 350-090-315-g Department of Transportation BUILDINGS, LAND AND LAND IMPROVEMENTS PURPOSE: To define requirements

More information

ASA MTS CANDIDATE REPORT REVIEW CHECKLIST INSTRUCTIONS (Effective as of January 01, 2018) Basic Report Requirements and General Report Quality

ASA MTS CANDIDATE REPORT REVIEW CHECKLIST INSTRUCTIONS (Effective as of January 01, 2018) Basic Report Requirements and General Report Quality ASA MTS CANDIDATE REPORT REVIEW CHECKLIST INSTRUCTIONS (Effective as of January 01, 2018) Basic Report Requirements and General Report Quality This checklist was designed to be a useful resource tool by

More information

An Overview of the eplan Journey with a Focus on the Victorian eplan 2025 Roadmap Dr Hamed Olfat

An Overview of the eplan Journey with a Focus on the Victorian eplan 2025 Roadmap Dr Hamed Olfat An Overview of the eplan Journey with a Focus on the n eplan 2025 Roadmap Dr Hamed Olfat eplan Coordinator Land Use Chairman of Technical Committee ICSM eplan Working Group Outline eplan Overview ICSM

More information

SUBDIVISION APPLICATION

SUBDIVISION APPLICATION SUBDIVISION APPLICATION Preliminary Plat Minor Plat Final Plat Amended Plat Applicant Name: Owner (if different from applicant) Name: Company: Company: Address: Address: City, State, Zip City, State, Zip

More information

Shawnee Landing TIF Project. City of Shawnee, Kansas. Need For Assistance Analysis

Shawnee Landing TIF Project. City of Shawnee, Kansas. Need For Assistance Analysis Shawnee Landing TIF Project City of Shawnee, Kansas Need For Assistance Analysis December 17, 2014 Table of Contents 1 EXECUTIVE SUMMARY... 1 2 PURPOSE... 2 3 THE PROJECT... 3 4 ASSISTANCE REQUEST... 7

More information

Auckland Monthly Housing Update. December 2018

Auckland Monthly Housing Update. December 2018 Auckland Monthly Housing Update December 2018 Table of contents 1. Summary... 3 2. Highlights... 4 3. Dwellings consented... 5 4. Dwellings consented by type... 6 5. Dwellings consented inside 2010 MUL...

More information

Goods and Services Tax and Mortgage Costs of Australian Credit Unions

Goods and Services Tax and Mortgage Costs of Australian Credit Unions Goods and Services Tax and Mortgage Costs of Australian Credit Unions Author Liu, Benjamin, Huang, Allen Published 2012 Journal Title The Empirical Economics Letters Copyright Statement 2012 Rajshahi University.

More information

Board Policy No. 29 Asset Management

Board Policy No. 29 Asset Management Board Policy No. 29 Asset Management Summary This policy establishes the guidelines that the North County Transit District (NCTD) will utilize in distinguishing capital acquisitions from operational expenditures

More information

The cost of increasing social and affordable housing supply in New South Wales

The cost of increasing social and affordable housing supply in New South Wales The cost of increasing social and affordable housing supply in New South Wales Prepared for Shelter NSW Date December 2014 Prepared by Emilio Ferrer 0412 2512 701 eferrer@sphere.com.au 1 Contents 1 Background

More information

STRATEGIC HOUSING INVESTMENT PLAN SUBMISSION. 16 October Report by the Service Director Regulatory Services EXECUTIVE COMMITTEE

STRATEGIC HOUSING INVESTMENT PLAN SUBMISSION. 16 October Report by the Service Director Regulatory Services EXECUTIVE COMMITTEE STRATEGIC HOUSING INVESTMENT PLAN 2019-2024 SUBMISSION Report by the Service Director Regulatory Services EXECUTIVE COMMITTEE 16 October 2018 1 PURPOSE AND SUMMARY 1.1 This report seeks approval of the

More information

DWGM and Victorian Gas FRC Final budget and Fees June Australian Energy Market Operator Limited

DWGM and Victorian Gas FRC Final budget and Fees June Australian Energy Market Operator Limited DWGM and Victorian Gas FRC Final budget and Fees 2018-19 June 2018 Australian Energy Market Operator Limited $/GJ Introduction AEMO operates on a cost recovery basis as a company limited by guarantee under