ASSET MANAGEMENT PLAN FOR THE CORPORATION OF THE TOWNSHIP OF PUSLINCH

Size: px
Start display at page:

Download "ASSET MANAGEMENT PLAN FOR THE CORPORATION OF THE TOWNSHIP OF PUSLINCH"

Transcription

1 FOR THE CORPORATION OF THE GAMSBY AND MANNEROW LIMITED CONSULTING PROFESSIONAL ENGINEERS GUELPH OWEN SOUND LISTOWEL KITCHENER EXETER December 2013 Our File:

2 File No Page i TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY INTRODUCTION AND METHODOLOGY IMPORTANCE OF INFRASTRUCTURE MUNICIPAL GOALS RELATIONSHIP OF THE PURPOSE OF THE SCOPE OF RESOURCES USED IN DEVELOPMENT OF THE REVIEW AND UPDATE OF CURRENT STATE OF LOCAL INFRASTRUCTURE OBJECTIVE OVERVIEW BRIDGES CULVERTS ROADS TOWNSHIP FACILITIES STORMWATER MANAGEMENT FACILITIES FIRE RESERVOIRS STREETLIGHTS SIDEWALKS TRAFFIC SIGNS DATA VERIFICATION AND CONDITION ASSESSMENT POLICY Bridges and Culverts Roads Township Facilities Stormwater Management Facilities Fire Reservoirs Sidewalks, Streetlights and Traffic Signs DESIRED LEVELS OF SERVICE BRIDGES/CULVERTS ROADS TOWNSHIP FACILITIES STORMWATER MANAGEMENT FACILITIES FIRE RESERVOIRS STREETLIGHTS, SIDEWALKS AND TRAFFIC SIGNS CURRENT PERFORMANCE OF ASSETS ASSET MANAGEMENT STRATEGY OBJECTIVES AND SCOPE NON-INFRASTRUCTURE SOLUTIONS BRIDGES AND CULVERTS PUSLINCH TOWNSHIP, ONTARIO

3 File No Page ii 5.4 ROADS Hardtop Roads Gravel Surfaced Roads STORMWATER MANAGEMENT FACILITIES TOWNSHIP FACILITIES STREETLIGHTS, SIDEWALKS AND TRAFFIC SIGNS FIRE RESERVOIRS PROCUREMENT RISK OVERVIEW FINANCING STRATEGY YEARLY EXPENDITURE FORECASTS ACTUAL EXPENDITURES FOR PREVIOUS YEARS YEARLY REVENUES FUNDING SHORTFALL CONCLUSIONS AND RECOMMENDATIONS...27 LIST OF TABLES Table 1: Overview of Current Performance of Assets... 1 Table 2: Current State of Bridges Table 3: Current State of Culverts Table 4: Current State of Roads Table 5: Current State of Stormwater Management Facilities Table 6: Current State of Streetlights Table 7: Current State of Traffic Signs Table 8: Current Performance of Assets Table 9: Yearly Expenditure Forecasts Table 10: 2011/2012 Yearly Infrastructure Expenditures Table 11: Summary of Revenues LIST OF FIGURES Figure 1: Asset Management Plan Methodology... 6 Figure 2: Township of Puslinch Assets Net Book Value... 8 Figure 3: Township of Puslinch Assets Replacement Values... 8 Figure 4: Expected Remaining Service Life of Township Assets... 9 Figure 5: Condition of Township Assets (2013) Figure 6: Current Condition of Bridges Figure 7: Condition of Culverts Figure 8: Condition of Hardtop Road Sections Figure 9: Condition of Township Facilities Figure 10: Condition of Sidewalks Figure 11: Comparison of Capital Costs vs. Available Funding... 26

4 File No Page iii LIST OF APPENDICES Appendix A Appendix B Asset Information and Condition Tables Detailed Breakdown of Yearly Expenditures

5 1.0 EXECUTIVE SUMMARY THE CORPORATION OF THE December 13, 2013 Our File: The Township is responsible for the care and maintenance of Township owned infrastructure assets, including the road network, bridges and culverts, Township owned facilities, stormwater drainage areas, fire reservoirs, sidewalks, streetlights and street signs. The total net 2012 book value of these assets is $18,522,176 and the total calculated replacement cost is approximately $121,412,680. This Asset Management Plan was developed to assist the Township with planning and financial management of their capital assets, ensuring that Township (public) owned assets are maintained to provide satisfactory levels of service and lifecycle costs at the lowest level of risk. The plan will also serve to satisfy the provincial requirement that each Municipality prepare an Asset Management Plan in order to be eligible for future grants and funding. Of the Township assets included in the plan, 68.8% are considered in good condition, 16.9% are considered as being in fair condition and 14.3% are considered to be in poor (or fair poor) condition. Service targets were defined for each asset type based on legislative requirements and industry best practices. Current asset condition was compared to required service targets in order to assess maintenance, rehabilitation or replacement requirements for each asset. Overall, 78% of Township assets meet their service targets. Current performance of each asset type with respect to targets is summarized as follows. Table 1: Overview of Current Performance of Assets Asset Type Percentage of Assets Meeting Service Target Bridges 71% Culverts 94% Hardtop Roads 59% Non Paved Roads 100% Stormwater Facilities 100% Township Facilities 87% Streetlights 100% Sidewalks 86% Traffic Signs 100% Fire Reservoirs 100%

6 File No Page 2 A ten year forecast of asset maintenance, rehabilitation and replacement expenditures necessary to uphold Township assets was developed and assessed against the available financial resources of the Township. Consistent with the trend being experienced by most other municipalities in the province, funding shortfalls in the Township of Puslinch are anticipated. The average annual expenditure over the ten year timeframe of the plan is $2,259,260. Average estimated available revenues are $1,678,401 corresponding to an estimated funding shortfall of approximately $5,808,593, or $580,859 per year, over the plan duration.

7 File No Page INTRODUCTION AND METHODOLOGY Gamsby and Mannerow Limited (G&M) were retained by the Township of Puslinch (Township) to complete a comprehensive Asset Management Plan. This report summarizes the work that G&M has completed and documents key findings. The Township of Puslinch is part of Wellington County and is located directly south of the City of Guelph and east of the City of Cambridge with Highway 401 running through the centre of the Township from east to west. The Township was incorporated on January 1, Villages in Puslinch include Aberfoyle, Aikensville, Arkell, Badenoch, Crieff, Glen Christie, Killean, Paddock s Corners, Morriston, Corwhin, Downey, Puslinch and Puslinch Lake. According to a Statistics Canada 2011 report, the population of the Township of Puslinch is 7,029 with 2,619 private dwellings. The Township is responsible for the care and maintenance of Township owned assets, including the road network, bridges and culverts, Township owned facilities, stormwater drainage areas, fire reservoirs, sidewalks, streetlights and street signs. 2.1 IMPORTANCE OF INFRASTRUCTURE The performance of a community s infrastructure provides the foundation of economic development, competitiveness, prosperity, image, and overall quality of life for that community. The reliability and availability of infrastructure assets are essential for the delivery of necessary services that the Municipality provides. The Township is experiencing ongoing development, as the Cities of Cambridge and Guelph expand, and Puslinch continues to be a desirable location to reside and work. As such, increased reliance on existing infrastructure and increased need for new infrastructure will be an ongoing condition of Municipal Asset Management going forward. 2.2 MUNICIPAL GOALS Major objectives of the County of Wellington Official Plan include sustainable development, land stewardship and healthy communities. The County aims to work with local municipal governments to ensure wise management of resources and the betterment of communities. The following are specific goals of the Official Plan, which apply to rural Townships: Direct growth to urban areas and in particular to those with municipal sewer and water services; Provide opportunities for jobs, commerce and services that are based on population growth; Provide opportunities for housing which accommodate a wide range of need and affordability; Ensure that County residents have convenient access to commercial uses and services; Maintain strong main streets in towns and villages as a focus for commerce and services; Develop communities, which are efficient and livable; Ensure cost effective development and land use patterns; Maintain the small town and rural character of the County; Protect the agricultural land base for farming; Ensure that farmers, following normal farming practices, are not hindered by conflicting development; Require development to pay its fair share of growth related costs and to demonstrate its compliance with the County s planning policies; Provide the infrastructure required to accommodate growth in an environmentally and fiscally responsible manner;

8 File No Page 4 Maintain clean water, clean air and healthy plant, fish and wildlife; Protect and where reasonable enhance features and functions within natural heritage areas such as wetlands, environmentally sensitive areas, streams and valley lands, woodlands, areas of natural and scientific interest, discharge and recharge areas and other open space areas; Support the creation of partnerships among landowners, community groups and government which promote or undertake land stewardship activities; Protect people and property from natural hazards; Protect County resources such as farmland, minerals, mineral aggregates and forests, and provide for wise management practices; Ensure that County residents continue to have convenient access to health care, education and cultural facilities; Develop a safe and efficient transportation system for people, goods and services; Broaden recreational and leisure opportunities; Promote energy efficient land use and servicing decisions; Ensure responsible waste management practices, which emphasize waste reduction, reuse and recycling; Ensure the quality and quantity of groundwater and surface water are protected as an essential resource for urban and rural water supplies, agricultural production, the maintenance of the Greenland system, and future growth; The County recognizes the need for increased energy supply to be promoted by providing opportunities for energy generation facilities, and supports the use of renewable energy systems and alternative energy systems, where feasible and appropriate. The County of Wellington Official Plan projects that the population of Puslinch will increase to 9,920 by the year During this time total employment is projected to increase from 4,510 to 5,760. The Villages of Aberfoyle and Morriston are considered to be urban centres for the purpose of the Official Plan. Many of the County s goals are dependent on infrastructure, specifically the intention to provide the infrastructure required to accommodate growth in an environmentally and fiscally responsible manner. With the population of the Township of Puslinch projected to increase by over 30%, and employment projected to increase by almost the same percentage over the next 20 years, management of infrastructure and other resources is important to ensure responsible growth and development. 2.3 RELATIONSHIP OF THE The Asset Management Plan (AMP) is a document that will be used in conjunction with other municipal planning and financial documents. In particular, the AMP will assist the Township in guiding annual budgets, development charges and ongoing long-term planning for capital works projects. The AMP will both utilize and influence financial forecasts within long term financial planning. The plan will be subject to regulations, standards and policies from municipal, provincial and federal government levels. Previously the Township completed an Asset Valuation Report in 2008 which included an inventory and valuation, including life cycle expectations and costs, of all tangible capital assets for reporting in financial statements, as required by the Public Sector Accounting Board (PSAB) Existing efforts were built upon to develop this AMP.

9 File No Page PURPOSE OF THE A comprehensive AMP will assist the Township with planning and financial management of their capital assets, ensuring that Township (public) owned assets are maintained to provide satisfactory levels of service and lifecycle costs at the lowest level of risk. The management strategy identified in the AMP aims to streamline inspections, maintenance and renewal and rehabilitation of Township owned assets and enable efficient prioritization of investments to ensure the best overall health and performance of municipal assets. The AMP strategy utilizes a life-cycle based approach to asset management, which incorporates use of regularly planned strategic maintenance to extend the life of an individual asset at less capital expense than if the asset were allowed to deteriorate with no maintenance and replaced at the end of its useful life, which is known as reactive run-to-failure asset management. Further, the Provincial funding authority has indicated that any municipality requesting future provincial funding assistance for capital works projects must complete an AMP and demonstrate how a proposed project fits within it. 2.5 SCOPE OF The Township s AMP has been completed in accordance with the Ministry of Infrastructure- Ontario (MOI) document Building Together: Guide for Municipal Asset Management Plans. The AMP includes all key elements required by the guide including: report of the current state of infrastructure, desired levels of service for the infrastructure, proposed strategy to retain or meet those levels going forward and forecast of available financial resources compared to anticipated expenditures. The plan focuses on infrastructure assets including bridges, culverts, roads, drainage, Township buildings and recreational facilities and other assets including streetlights, fire reservoirs, traffic signs and sidewalks. The AMP forecasts asset expenditures over a ten year timeframe in accordance with MOI requirements, and includes a strategy for ongoing evaluation and verification. Figure 1 illustrates the methodology utilized in preparing the AMP. Going forward the process will be iterative, with asset condition and desired levels of service re-assessed regularly to ensure they continue to meet Township goals and requirements. Based on the existing and desired levels of service identified through discussions with Township staff and the current assessment of state of Township assets and infrastructure, the asset management and financial strategies can easily be updated as required.

10 File No Page 6 Figure 1: Asset Management Plan Methodology Current State of Infrastructure Accumulation and review of most recently available condition assessment and financial information for all assets Evaluation of information, including estimation of depreciation of assets since the last asset assessment in order to determine its current condition Assessment of current needs and requirements Desired Levels of Service Determination of key performance indicators and measures Identification of gaps in current condition assessment practices Asset Management Strategy Identification of actions and policies to help achieve the targeted levels of service at the lowest lifecycle costs (e.g. demand management, maintenance activities, renewal activities) Development of an asset management strategy identifying and prioritizing capital projects necessary to achieve the service targets Financial Strategy Forecast of yearly expenditures (10-yr timeframe) Comparison with forecasted yearly revenues, reserves, gas tax transfers, borrowing limits, funding opportunities, etc. Evaluation of forecasts and recommendations to ensure funding is available for capital projects

11 File No Page RESOURCES USED IN DEVELOPMENT OF THE The following is a list of references and resources used in the development of the AMP: 1. Building Together: Guide for Municipal Asset Management Plans, Ministry of Infrastructure-Ontario Asset Valuation Report, Gamsby and Mannerow Limited, August Road and Bridge Inventory, Report A, Road Sections, Gamsby and Mannerow Limited, January Hardtop Road Evaluation, Township of Puslinch, Township of Puslinch Detailed Bridge and Culvert Inspections Summary Report, Gamsby and Mannerow Limited, November Keystone Fixed Asset Report, Township of Puslinch, December 31, Township of Puslinch Bylaw 30/13, Approved 2013 Budget, April Township of Puslinch Fixed Asset Acquisition Listings for 2011 and REVIEW AND UPDATE OF The AMP should be considered as a living document and be reviewed and updated with regular frequency to ensure the plan reflects current conditions as they evolve in order to improve upon the information and recommendations contained herein. Asset information and condition data needs be reviewed and updated at regular intervals as per the Data Verification and Condition Assessment Policy outlined in Section 3.12 below. Desired levels of service, asset management strategies and expenditure and revenue forecasts should be updated within the plan calculations when new or additional information is recorded as it becomes available during routine updates of asset information. A detailed review and update of the AMP should be conducted at a minimum frequency of every five years. 3.0 CURRENT STATE OF LOCAL INFRASTRUCTURE 3.1 OBJECTIVE The objective of this section of the plan is to document the current condition of municipal assets, using the best available information regarding physical condition, age and financial value. Where current condition information was not available, the most recent available condition information was adjusted to reflect current conditions based on documented use assumptions to determine deterioration rates. Replacement values were assigned to each asset based on historical unit pricing generated from a review of recent construction projects of a similar nature. Information sources, assumptions and asset specific information are discussed in subsequent sections, with an overview provided in the section below. 3.2 OVERVIEW The Township of Puslinch is responsible for the care and maintenance of Township owned infrastructure assets with a net 2012 book value of $18,522,176. These assets include the road network, bridges and culverts, Township facilities, stormwater drainage areas, sidewalks, streetlights, and fire reservoirs. The total calculated replacement cost of the assets is approximately $121,412,680. Figure 2 shows the breakdown of the 2012 net book value of each of these asset types. Figure 3 shows the breakdown of replacement values excluding Township Facilities for which replacement values are not currently available.

12 File No Page 8 Figure 2: Township of Puslinch Assets Net Book Value Figure 3: Township of Puslinch Assets Replacement Values

13 File No Page 9 The date of installation of assets within the Township ranges from 1920 to 2013 with an average age of approximately twenty-five years for listed assets. Of the listed assets, approximately 15% have less than 25% of their expected remaining service years. 26% of all assets have between 25 and 50% of their expected remaining service years remaining. The remaining 59% have greater than 50% of the expected service life remaining in This breakdown is illustrated in Figure 4 below. Figure 4: Expected Remaining Service Life of Township Assets Of assets included in the plan, 68.8% are considered in good condition, 16.9% are considered as being in fair condition and 14.3% are considered to be in poor (or fair poor) condition. The asset condition breakdown is illustrated in Figure 5 below.

14 File No Page 10 Figure 5: Condition of Township Assets (2013) Detailed information regarding the condition of each of the Township s assets can be found in the tables provided in Appendix A. The current state of individual asset groups is summarized in the following sections. 3.3 BRIDGES The Township of Puslinch owns a total of seven bridges with a net value of $180,238 and an approximate replacement value of $3,441,620. Table 2 provides a summary of information available regarding bridge assets. Table 2: Current State of Bridges Bridge Construction Number of Structures Span Length (m) Asset Value (2012) Replacement Value I-Beam $88,835 $892,190 Rigid Frame $12,781 $899,340 Girder $76,760 $495,040 Rectangular Culvert $1,862 $1,155,050 Total: 7 -- $180,238 $3,441,620 Bridge condition data was obtained from the Township of Puslinch Detailed Bridge and Culvert Inspections Summary Report (September 2013). Of the seven bridges owned by the Township four (57%) are considered to be in good condition, one (14%) bridge is in fair condition and two (29%) bridges are in fair to poor condition (French s Bridge and Little s Bridge). One bridge (Cook s Mill Bridge) was not assessed at the time of the 2013 inspections, as it was scheduled to undertake major rehabilitation work in less than one week. Cook s Mill Bridge will be inspected next in It is assumed that post-rehabilitation the Cook s Mill Bridge will be in good condition. Figure 6 illustrates the number of bridges assessed to be in each condition (fair to poor, fair and good).

15 File No Page 11 Figure 6: Current Condition of Bridges 3.4 CULVERTS The Township of Puslinch owns a total of sixteen culverts with a net value of $117,058 and an approximate replacement value of $3,955,397. Table 3 summarizes available data for the culverts. Table 3: Current State of Culverts Culvert Type Number of Span Length Asset Value Replacement Structures (m) (2012) Value Ellipse CSP $526,181 Box Culvert $236,115 Rectangular $117,058 $2,930,013 Rigid Frame $263,088 Total: $117,058 $3,955,397 Culvert condition data was obtained from the Township of Puslinch Detailed Bridge and Culvert Inspections Summary Report (September 2013). Of the sixteen culverts owned by the Township ten (63%) are considered to be in good condition, five culverts (31%) are in fair condition and one (6%) culvert (Gore Road Culvert) is in poor condition. One culvert was not inspected (Culvert of Cook s Mill Race); as it was due to undergo rehabilitation work in less than a week. This culvert is now assumed to be in good condition. Figure 7 illustrates the number of culverts that were assessed to be in each condition.

16 File No Page 12 Figure 7: Condition of Culverts 3.5 ROADS The Township of Puslinch has a total of 130 hardtop road sections totalling approximately 136 kilometres of roadways. Hardtop road sections have a net value of $11,270,065 and an approximate replacement value of $101,967,900. The Township also owns 48 gravel road sections totalling approximately 53 kilometres of road. Gravel road sections have a net value of $263,736 and an approximate replacement value of $6,848,260. Table 4 summarizes the available information regarding road assets. Table 4: Current State of Roads Road Construction Number of Total Length Asset Value Replacement Road Segments (km) (2012) Value Hardtop $11,270,065 $101,967,900 Granular $263,736 $6,848,260 Total: $11,533,801 $108,816,160 The most recent road condition data (Pavement Condition Index - PCI) were obtained from the 2007 Road and Bridge Inventory, Report A, Road Sections (January 2008). PCI values were reduced by two points per year to reflect condition deterioration since The 2013 estimated PCI values were effectively compared to condition data available from the Hardtop Road Evaluation completed by Township staff in 2011, validating the assumed depreciation of two points per year. The Hardtop Roads Evaluation provided an assessment of the road conditions (good, fair or poor) and a timeline to expected replacement of the asphalt surfacing. The 2013 estimated PCI values were manipulated for several road sections, based on updated reconstruction/rehabilitation information provided by Township staff. For this assessment, hardtop roads with a PCI of less than 55 are considered to be in poor condition, roads with a PCI of are considered to be in fair condition and roads with a PCI of greater than 70 are considered in good condition. Based on this, of the 130 hardtop road sections, 24% were found to be in poor condition, 26% in fair condition and 50% were found to be in good condition. Figure 8 illustrates the breakdown of condition of hardtop road sections. The categorization of road condition based on PCI values should be updated as required in the

17 File No Page 13 future in order to meet the Township s goals and requirements. Figure 8: Condition of Hardtop Road Sections Due to their nature, gravel roads require regular routine maintenance in the form of grading and gravel addition in order to maintain suitable road profile and driving surface. If properly maintained, gravel roads are considered to have nearly unlimited service life. Although maintenance requirements can be considered onerous, the result is that a properly maintained gravel road is consistently maintained in good to fair condition. All Township owned gravel roads are regularly maintained and are considered to be in good to fair condition. 3.6 TOWNSHIP FACILITIES The Township of Puslinch has a total of 31 facilities with net value of $3,228,144. There are no current condition reports or replacement value data available for the Township owned facilities, however the Township has allocated funding to undertake a structural condition assessment audit in For this assessment, condition was determined based on the age and life expectancy. Best available data on sidewalks was taken from the 2008 Asset Valuation Report. Good condition was defined as greater than ten years useful service life remaining, fair condition was defined as between five and ten years useful service life remaining, and poor condition was defined as less than five years useful service life remaining. The life expectancy of Township facilities is estimated at 40 years. Based solely on age, 26 facilities (84%) are considered to be in good condition, one facility (3%) is considered to be in fair condition, and four facilities (13%) are considered to be in poor condition. The condition of Township Facilities is illustrated in Figure 9.

18 File No Page 14 Figure 9: Condition of Township Facilities 3.7 STORMWATER MANAGEMENT FACILITIES The Township of Puslinch has a total of 35 drainage assets with a net book value of $3,220,338 and a total replacement cost of approximately $4,217,359. Of these assets, ten are stormwater management ponds, and the remaining 25 assets are pipes. Table 5 summarizes known information about the stormwater management assets. Table 5: Current State of Stormwater Management Facilities Total Number Known Length SWM Facility of Assets Pond Areas (m) (m 2 ) Asset Value (2012) Replacement Value Ponds 10 16,029 - $2,860,851 $3,533,849 Pipes 25 - Unknown $359,487 $683,510 Total: 35 16, $3,220,338 $4,217,359 For this assessment, condition was determined based on the age and life expectancy of the facility. Best available data on drainage facilities was taken from the 2008 Asset Valuation Report. Good condition was defined as greater than ten years useful service life remaining, fair condition was defined as between five and ten years useful service life remaining, and poor condition was defined as less than five years useful service life remaining. The life expectancy of drainage facilities is estimated at 50 years and all facilities are considered to have significant useful life remaining and to be in good condition. 3.8 FIRE RESERVOIRS The Township of Puslinch owns five fire reservoirs. The current asset value of the fire reservoirs totals $66,426, while the replacement value is calculated as $112,145. For this assessment, condition was determined based on the age and life expectancy. Best

19 File No Page 15 available data on fire reservoirs was taken from the 2008 Asset Valuation Report. Good condition was defined as greater than ten years useful service life remaining, fair condition was defined as between five and ten years useful service life remaining, and poor condition was defined as less than five years useful service life remaining. The life expectancy of fire reservoirs is estimated at 50 years and all reservoirs are considered to have significant useful life remaining and to be in good condition. 3.9 STREETLIGHTS The Township of Puslinch owns several types of streetlights, including standard, decorative and floodlight towers. The net value of these assets is $115,704 and the total replacement value is $622,200. Table 6 summarizes available information regarding streetlights. Table 6: Current State of Streetlights Streetlight Type Quantity Asset Value (2012) Replacement Value Standard Unknown $40,392 $217,508 Decorative Unknown $59,322 $318,587 Floodlight Tower Unknown $15,990 $86,105 Total: -- $115,704 $622,200 For this assessment, streetlights were considered as an asset pool and condition was determined based on the age and life expectancy. Best available data on streetlights was taken from the 2008 Asset Valuation Report. Good condition was defined as greater than ten years useful service life remaining, fair condition was defined as between five and ten years useful service life remaining, and poor condition was defined as less than five years useful service life remaining. The life expectancy of streetlights is estimated at 20 years and the asset pool is considered to have 25% of the estimated expected service life remaining and be in fair condition SIDEWALKS The Township owns seven sections of sidewalk, with a total current value of $14,446 and an estimated replacement value of $52,767. For this assessment, condition was determined based on observations by the Township during annual inspections. Best available data on sidewalks was taken from the 2008 Asset Valuation Report. Good condition was defined as greater than ten years useful service life remaining, fair condition was defined as between five and ten years useful service life remaining, and poor condition was defined as less than five years useful service life remaining. The life expectancy of sidewalks is estimated at 20 years. Based solely on age, one section (14%) of sidewalk is considered to be in good condition, five sections (71%) are considered to be in fair condition and one section (14%) is considered to have exceeded its expected service life and be in poor condition. The condition of sidewalks is illustrated in Figure 10.

20 File No Page 16 Figure 10: Condition of Sidewalks 3.11 TRAFFIC SIGNS The net value of the Townships traffic signs is $46,022 and the replacement value is estimated at $195,034. Table 7 summarizes available information regarding traffic signs, the majority of which was taken from the 2008 Township Asset Inventory. Table 7: Current State of Traffic Signs Traffic Sign Status Quantity Asset Value (2012) Replacement Value In-Use Unknown $33,812 $182,076 Stored Unknown $12,210 $12,957 Total: -- $46,022 $195,034 Traffic signs were considered as an asset pool for the purpose of the 2008 Asset Valuation Report. The life expectancy of installed traffic signs is estimated at 20 years and the asset pool is considered to have 25% of the estimated expected service life remaining and be in fair condition. All stored signs are assumed to be in good condition DATA VERIFICATION AND CONDITION ASSESSMENT POLICY The Township utilizes the Fixed Asset module of the Keystone system as an inventory database of infrastructure assets covered by the AMP. This database includes basic asset information such as the asset type, class, physical description, location, expected useful life, etc. The Township s AMP includes information that requires regular updates such as replacement costs, conditions, etc. The following describes the Township s policy regarding how asset information will be verified and when and how assets will be assessed to document current condition.

21 File No Page Bridges and Culverts Inspections are completed every second calendar year on bridges and culverts owned by the Township as mandated by Ontario Regulation Standards for Bridges. Information is gathered visually on an element-by-element inspection for each structure in order to assess any material defects, performance deficiencies or maintenance needs. Quantities for each element are categorized by four condition states (poor, fair, good and excellent), which are utilized in the calculation of the Bridge Condition Index (BCI). The BCI can be utilized to describe the overall condition of a structure in a single value. Essentially, the BCI is a weighted average of the condition of all elements of a structure. The BCI for a structure starts at a value of 100 when the structure is newly constructed, and over time theoretically becomes zero as all elements deteriorate to a poor condition state. In actuality, the BCI for a structure should never reach zero, as rehabilitation works will be performed before all elements reach a poor condition state. Asset information and condition will be reviewed for accuracy and updated in the plan as this information becomes available through regular assessments Roads Condition of Township roads is assessed in terms of Pavement Condition Index (PCI) values. PCI values are numerical indicators between 0 and 100 which are generated based on manual assessment of pavement ride quality and distress manifestations in accordance with the Ministry of Transportation Manual for Condition Rating of Flexible Pavements (1989). PCI values start at 100 for a newly constructed road, and over time theoretically becomes zero as the asset deteriorates. In actuality, the PCI for a structure should never reach zero, as rehabilitation works will be performed prior to this. For the purposes of this plan, PCI values generated during preparation of the Township s 2007 Roads Needs Study were used and depreciated by an accepted annual value of two PCI points per year to establish current condition ratings. The Township will endeavour to undertake a detailed assessment of the current condition of Township Roads, including update of PCI values, in 2015 and at a recurring frequency of every five years. Asset information and condition will be reviewed for accuracy and updated in the plan as this information becomes available through regular assessments. It is noted that Township roads are also routinely patrolled in accordance with Ontario Regulation 239/02 Minimum Maintenance Standards for Municipal Highways. These patrols will not include assessment of PCI values; however will serve to identify condition issues which may arise in between detailed assessments Township Facilities Information regarding current condition of Township facilities was not available at the time the plan was prepared. The Township has budgeted to retain the services of an outside consultant to undertake a structural condition assessment audit of Township buildings and recreational facilities in 2014 and will endeavour to update condition assessments at a regular frequency of every five years. Asset information and condition will be reviewed for accuracy and updated in the plan as this information becomes available through regular assessments Stormwater Management Facilities Typically, new stormwater management facilities have an Inspection and Maintenance plan, which can usually be found in the Professional Consulting Engineer s Stormwater Management Report. If such a plan is available for a facility, the facility should be inspected as outlined in the

22 File No Page 18 plan. In the absence of such a plan, the facility should be inspected in accordance with the MOE Stormwater Management Planning and Design Manual (2003). The MOE manual recommends that stormwater management facilities are inspected annually to ensure inlets and outlets are free from obstructing debris and assess maintenance requirements. Asset information and condition will be reviewed for accuracy and updated in the plan as this information becomes available through annual inspections Fire Reservoirs National Fire Protection Association (NFPA) Publication 25 - Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems recommends that concrete fire water reservoirs are inspected at a minimum frequency of every five years. Asset information and condition will be reviewed for accuracy and updated in the plan as this information becomes available through completed inspections Sidewalks, Streetlights and Traffic Signs Sidewalks, streetlights and traffic signs are inspected by the Township at a minimum frequency of once per calendar year as required by Ontario Regulation 239/02 Minimum Maintenance Standards for Municipal Highways. Asset information and condition will be reviewed for accuracy and updated in the plan as this information becomes available through mandated inspections. 4.0 DESIRED LEVELS OF SERVICE Desired levels of service are high level indicators that establish defined quality thresholds at which municipal services should be offered. They support the Township s strategic goals and are based on customer expectations, statutory requirements, standards, and the financial capacity of the Township to deliver those levels of service. The following factors typically influence desired levels of service: Municipal goals Legislative requirements and standards for best management practice Expected asset performance Public expectations Availability of finances Through clearly defining desired levels of service required to meet the Township s goals, a plan can be formulated to ensure that infrastructure is managed adequately to meet these targets. Desired levels of service are outlined in the sections below. In some instances, these performance indicators are not currently measured, and part of the AMP includes measuring these parameters going forward. It should be noted that desired levels of service will evolve over time, both as the Township s goals change and based on external influences such as new legislation and standards. 4.1 BRIDGES/CULVERTS The primary goal with regards to bridge and culvert structures is to span physical barriers or obstacles in a safe and efficient manner. Examples of physical barriers or obstacles include waterways, roadways, pedestrian paths, railways and valleys. It is also important to minimize maintenance and rehabilitation costs as much as possible through strategic planning and efficient scheduling. Legislative requirements are also a key consideration for this asset group.

23 File No Page 19 The Township will strive to maintain all structures with a good to fair condition rating to extend the service life of individual assets. This approximately corresponds to a BCI rating of 65 or greater. 4.2 ROADS The primary goals with regards to roads are to maintain required access, optimize public safety and meet or exceed all legislative requirements. Road maintenance and rehabilitation is a major expense for the Township, with the road network constituting the Township s most valuable asset. Is also therefore important to minimize maintenance and rehabilitation costs as much as possible through strategic planning and efficient scheduling. Maintenance of roads is governed under Ontario Regulation 239/02 Minimum Maintenance Standards for Municipal Highways. At a minimum, all roads and associated infrastructure (ditches, sidewalks, signage, lighting, etc.) within the Township are patrolled and maintained in accordance with this standard. The Township will further strive to maintain all hardtop and non-paved roads in a good to fair condition. For hardtop roads this will approximately correspond to a PCI value of 65 or greater. 4.3 TOWNSHIP FACILITIES The category of Township Facilities includes a broad range of assets, each with different uses. As a result the desired levels of service for each facility differ. From an overall perspective however, key considerations include meeting public expectations, ensuring adequate accessibility, ensuring optimal public safety, meeting legislative requirements and minimizing maintenance and rehabilitation costs. The Township will strive to maintain all Township facilities in good to fair condition. Good to fair condition is defined as functioning as designed or for its intended use with minimal maintenance required for at least five years. In general, this will entail maintenance and improvements to prevent accelerated deterioration of interior building systems/components, allow facilities to be used for their intended function and meet current building, fire and accessibility codes and standards. 4.4 STORMWATER MANAGEMENT FACILITIES Stormwater management facilities are in place to manage stormwater runoff from developed roads and lands to reduce impacts to property, infrastructure and the public as a result of storm events. Often these facilities serve to control the rate at which runoff from developed lands is released to preserve the natural water balance. They may also provide quality control to prevent release of sediment or other contaminants to the receiving water body. The Township will strive to maintain stormwater facilities in good to fair operating condition. Good to fair condition is defined as functioning as designed or for its intended use with minimal maintenance required for at least five years. Typically, new stormwater management facilities have an Inspection and Maintenance plan, which can usually be found in the Professional Consulting Engineer s Stormwater Management Report. If such a plan is available for a facility, the facility will be maintained to the levels outlined in the plan. In the absence of such a plan, a facility will be maintained in accordance with the MOE Stormwater Management Planning and Design Manual (2003).

24 File No Page FIRE RESERVOIRS Fire reservoirs are in place to meet fire-fighting demands for subdivisions and industrial developments. Primary goals therefore involve ensuring water supply is available when required for fire-fighting purposes. Fire reservoirs should be maintained in good to fair condition. Good to fair condition is defined as functioning as designed or for its intended use with minimal maintenance required for at least five years. Recommended maintenance practices for fire water storage tanks are included under NFPA Publication 25 - Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. 4.6 STREETLIGHTS, SIDEWALKS AND TRAFFIC SIGNS Key considerations for streetlights, sidewalk and traffic signs primarily involve public safety and legislative requirements. Maintenance of these assets is governed under Ontario Regulation 239/02 Minimum Maintenance Standards for Municipal Highways. Assets will be maintained in good to fair condition according to this standard. 4.7 CURRENT PERFORMANCE OF ASSETS Table 8 summarizes current performance of assets, based on best available condition data, relative to the defined service targets. Table 8: Current Performance of Assets Asset Type Number of Assets Service Target Number of Assets Meeting Target Percentage of Assets Meeting Target Bridges 7 -good to fair condition -BCI ~> % Culverts 16 -good to fair condition -BCI ~> % Hardtop Roads 130 -good to fair condition -PCI ~> % Non Paved Roads 48 -good to fair condition % Stormwater Facilities 35 -good to fair condition % Township Facilities 31 -good to fair condition 27 87% Streetlights pool -good to fair condition pool 100% Sidewalks 7 -good to fair condition 6 86% Traffic Signs pool -good to fair condition pool 100% Fire Reservoirs 5 -good to fair condition 5 100% 5.0 ASSET MANAGEMENT STRATEGY 5.1 OBJECTIVES AND SCOPE The ultimate goal of the Asset Management Strategy is to maintain Township assets that currently meet their desired level of service and to improve those assets that do not currently meet their desired level of service, as defined in Section 4.0. The asset management strategy strives to minimize maintenance and rehabilitation costs, while managing risk without diminishing function, through strategic planning and efficient scheduling.

25 File No Page 21 This will serve to maximize the useful life of each asset before replacement is ultimately required. Legislative requirements or opportunities may also influence maintenance, rehabilitation and replacement alternatives for bridges and culverts. Through regularly planned strategic maintenance and rehabilitation, the individual asset life can be extended and for less capital expense than if the asset were allowed to deteriorate with no maintenance and replaced at the end of its useful life. In general, maintenance activities ensure continued performance of an asset and prevent premature deterioration; rehabilitation extends the life of an asset for a period of time; and replacement renews the life of an asset. In some circumstances, it may be more efficient and cost effective for the Township to accelerate or delay identified capital improvement needs to a time when maintenance/rehabilitation/replacement of similar adjacent or related infrastructure is required. By documenting asset maintenance/rehabilitation/replacement needs into the AMP the Township will be better positioned to allocate appropriate levels of capital expenditures in annual budgets. 5.2 NON-INFRASTRUCTURE SOLUTIONS Non-infrastructure solutions are items such as studies, policies and consultation exercises which could potentially extend the life of assets or lower total asset program costs in the future. The Township intends to undertake a review of the Township s Development Charges By-Law in the near future which will serve to ensure that appropriate proportions of costs associated with growth are funded, at least in part, by development. Additionally, Township staff will strive to remain up-to-date with current management technologies and trends through interaction with other Municipal staff and officials, attendance at select industry events and review of industry publications. 5.3 BRIDGES AND CULVERTS Maintenance requirements for bridges and culverts are specific to each structure and are determined on a case-by-case basis considering a number of factors including type, use and nature of wear or failure observed. The overall condition of each bridge and culvert structure is described in terms of a BCI value, generated during biennial inspections. For purposes of maintenance/rehabilitation/replacement needs, comparing BCI values between structures may be useful; however, they should be considered along with a number of other factors when determining prioritization of capital work projects. Such factors can include Average Annual Daily Traffic (AADT) values, posted speed limits, economic impacts of structure and barrier/obstacle necessitating structure. Where feasible, consideration will be given to coinciding asset maintenance/rehabilitation with adjacent road maintenance to capitalize on efficiencies gained through economies of scale. In general, bridges and culverts are replaced when at such a time that proposed maintenance costs near proposed replacement costs. Based on the 2013 OSIM reports, two bridges (French s Bridge and Little s Bridge) are considered to be in fair to poor condition and do not meet current service targets defined in this plan. One bridge (Galt Creek Bridge Gore Road Lot 2) is considered to be in fair condition and requires attention in the near future to maintain condition such that it continues to meet its service target. All three bridges are recommended for maintenance and rehabilitation work within the next 1-5 years. French s Bridge is considered the highest priority for rehabilitation work as it is considered to present the greatest liability to the Township due to higher AADT and

26 File No Page 22 higher posted speed limits. One culvert (Gore Road Culvert) is considered to be in poor condition and does not meet current service targets defined in this plan. Eight additional culverts are considered to be in fair to good condition, but require attention in the near future to maintain condition such that the assets continue to meet their service targets. Of these, one culvert is recommended for maintenance and rehabilitation work within one year, five culverts are recommended for maintenance and rehabilitation work within a 1-5 year timeframe and two culverts are recommended for maintenance and rehabilitation work within a 6-10 year timeframe. 5.4 ROADS Road maintenance and rehabilitation is a major expense for the Township, with the road network constituting the Township s most valuable asset. It is therefore important to ensure that systems are in place to maximize useful life and minimize risk and road-related expenditures, where opportunity permits. The asset management strategies for hardtop and non-paved roads are described below. The proposed strategies aim to minimize life cycle costs while minimizing risk and ensuring that PCI values remain within the tolerance of the desired level of service Hardtop Roads The Township is responsible for a total of 136 km of hardtop roads. Of these, approximately 18 km are finished with two lifts of asphalt while the remaining 118 km are finished with a single lift of asphalt. In general, roads which experience high traffic volumes and/or heavy truck traffic as well as newer roads in residential subdivision developments are completed with two lifts. Separate maintenance strategies are proposed for hardtop roads with single and double lift asphalt surfaces. The general maintenance strategy for hardtop roads finished with two lifts of asphalt is to complete crack sealing after approximately five years (roughly corresponding to a PCI value of 85) and to complete resurfacing of one lift of asphalt after approximately years (roughly corresponding to a PCI of 65). Crack sealing will serve to protect the base and preserve the condition of the road preventing further deterioration and holding the PCI value for a period of two years. Resurfacing will serve to restore the condition of the road to near new condition, increasing the PCI value for the road to 95. The general maintenance strategy for hardtop roads finished with a single lift of asphalt is to complete resurfacing of one lift of asphalt after approximately years (roughly corresponding to a PCI of 65). A detailed summary of proposed maintenance and rehabilitation projects is provided in Appendix B. The forecasts represent requirements for maintenance or rehabilitation work based solely on the numerical PCI value with respect to the service targets defined. It is recognized that it is not practical for the Township to undertake all of this work in one year and in reality the work will be prioritized and completed based on the criticality of the risk/need and available funding Gravel Surfaced Roads The gravel road network is 52 km in length and comprises approximately 27% of the total road

27 File No Page 23 network within the Township. Gravel roads require regular routine maintenance in the form of grading and gravel addition in order to maintain suitable road profile and driving surface. However, if properly maintained gravel roads are considered to have nearly unlimited service life. The current practice for maintaining the gravel road system is that one-half of the gravel road system (divided by Brock Road) receives a fresh application of gravel each year with grading being conducted on the other half of the gravel roads within the Township that year. Dust control is completed on an as needed basis. 5.5 STORMWATER MANAGEMENT FACILITIES The Township s stormwater drainage network consists of several stormwater retention and infiltration ponds with a limited amount of Township roads containing storm sewer infrastructure. Routine maintenance of stormwater facilities includes removal of blockages and debris and occasional removal of accumulated sediment. The frequency at which maintenance is required is typically site specific. Typically, new stormwater management facilities have an Inspection and Maintenance plan, which can usually be found in the Professional Consulting Engineer s Stormwater Management Report. If such a plan is available for a facility, the facility will be maintained to the levels outlined in the plan. In the absence of such a plan, a facility should be maintained in accordance with the MOE Stormwater Management Planning and Design Manual (2003). The MOE manual recommends that stormwater facilitates are maintained to ensure no greater than 5% reduction in total suspended solids removal efficiency due to sediment accumulation. The sediment depth and frequency at which this will occur will vary depending on the size/type of facility and type of development and may be determined according to the methods outlined in the manual. All stormwater facilities are currently believed to be in good condition at this time. Minor rehabilitation work is required to repair the outlet structure for Aberfoyle Business Park SWM Block 3 in TOWNSHIP FACILITIES Township facilities are maintained, repaired and upgraded on an as needed basis as issues are identified by staff. Current documentation regarding condition data of Township facilities was not available at the time this report was prepared. The Township will be undertaking a building structural condition assessment audit in 2014 to assist with forecasting future maintenance, rehabilitation and replacement requirements. Maintenance, rehabilitation and replacement work for facilities over the timeframe of this plan were obtained from recreation budget forecasts provided by the Township. Forecasts will be updated and a more detailed maintenance strategy will be documented following completion of the condition audit. 5.7 STREETLIGHTS, SIDEWALKS AND TRAFFIC SIGNS Streetlights, sidewalks and traffic signs are routinely inspected by the Township as required under Ontario Regulation 239/02 Minimum Maintenance Standards for Municipal Highways. These assets are maintained and repaired on an as needed basis according to this standard. 5.8 FIRE RESERVOIRS Fire reservoirs are maintained and repaired on an as needed basis as problems are identified through routine use or inspection. Based on best available current condition data, no major

28 File No Page 24 maintenance or rehabilitation work is predicted for the timeframe of this plan. 5.9 PROCUREMENT The Township has a procurement By-law to guide staff and Council in the most efficient, effective, fair and publicly transparent way to obtain goods and services. While Township forces are used to the maximum extent to reduce or minimize externally-sourced capital projects (such as, for example replacing culverts or reconstructing gravel roads), larger or more complex projects beyond the Township s in-house capacity (such as bridge rehabilitations or asphalt paving) are typically awarded through a public tendering process. It is the Township s general goal to adhere to these policies and continue to look for opportunities to improve procurement methods accordingly to ensure not just low prices but also the best value in all the goods and services received. For the assets included in this plan, the Townships typical procurement process follows a design, tender, build approach which has proven to be effective locally as well as throughout the province. Considering the nature, relatively limited scope, available contracting industry basis and flexible schedule associated with the proposed 10-yr planned capital projects, an alternative design-build or private-public partnership approach does not appear to be feasible, appropriate or beneficial, however future consideration will be given if the circumstances arise RISK OVERVIEW There are risks associated with the implementation of the AMP. For a relatively small municipality such as the Township of Puslinch, most risks are associated with lack of resources. Time and financial resources should be carefully budgeted to not only undertake required inspections, evaluation and maintenance of infrastructure, as required by the AMP, but also to record this information and ensure that the asset management inventory is updated. In addition, it will be necessary to budget time and financial resources to evaluate and update the AMP itself on a regular basis, to ensure that desired levels of service and the strategy to meet those levels is up to date and relevant. If the AMP and associated inventory are not updated over time, their usefulness will decrease with time. 6.0 FINANCING STRATEGY Having a strong financial plan in place is critical for putting an AMP into action. It also allows for the plan to be integrated into the Township s financial planning and budgeting, ensuring that the planning tool is utilized as fully as possible. 6.1 YEARLY EXPENDITURE FORECASTS Yearly expenditure forecasts for each asset type over the ten year timeframe of the AMP are summarized in Table 9. A detailed breakdown of expenditures is provided in Appendix B.

29 File No Page 25 Asset Type Table 9: Yearly Expenditure Forecasts Year Bridges $129,000 $0 $195,000 $177,500 $0 $0 $0 $0 $0 $0 Culverts $132,000 $237,500 $15,000 $15,000 $191,000 $145,000 $80,000 $15,000 $15,000 $15,000 Hardtop Roads $11,589,118 $709,375 $520,275 $228,200 $1,041,775 $1,587,385 $1,506,540 $257,775 $209,300 $719,083 Gravel Roads $100,046 $134,309 $100,046 $134,309 $100,046 $134,309 $100,046 $134,309 $100,046 $134,309 Township Facilities $45,000 $445,000 $0 $0 $230,000 $0 $0 $0 $0 $0 Stormwater Facilities $130,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fire Reservoirs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Street lighting $45,000 $45,000 $45,000 $45,000 $145,000 $45,000 $45,000 $45,000 $45,000 $45,000 Sidewalks $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 Traffic Signs $14,000 $14,000 $14,000 $14,000 $14,000 $14,000 $14,000 $14,000 $14,000 $14,000 Total $12,199,163 $1,600,184 $904,321 $629,009 $1,736,821 $1,940,694 $1,760,586 $481,084 $398,346 $942, ACTUAL EXPENDITURES FOR PREVIOUS YEARS A summary of yearly expenditures on infrastructure assets for the years 2011 and 2012 was developed based on the Fixed Asset Acquisitions Listings provided by the Township. Table 10 shows the annual infrastructure expenditures for each asset type for 2011 and Table 10: 2011/2012 Yearly Infrastructure Expenditures Asset Type 2011 Expenditures 2012 Expenditures Bridges - $77, Culverts - $6, Roads $244, $509, Drainage $8, Township Facilities $11, $50, Other - Sidewalk - $8, Total: $263, $652, YEARLY REVENUES The 2014 budget was not available at the time of completion of this report; therefore the 2013 approved budget has been utilized for discussion of annual revenues. The total estimated revenue for capital expenditures on infrastructure assets in the 2013 approved budget was $1,678, Table 11 outlines sources of revenue in the 2013 budget.

30 File No Page 26 Table 11: Summary of Revenues Revenue Source 2012 (Actual) 2013 (Budgeted) Transfers to Capital - Admin $12, Roads $506, $667, Recreation $38, $365, Fire - $45, Roads Maintenance Allowance $180, $215, Gas Tax $205, $205, Aggregate Levy $189, $180, Total $1,132, $1,678, FUNDING SHORTFALL Figure 11 illustrates estimated annual capital project costs in comparison to anticipated funding sources. The chart illustrates that, as is being experienced by most other municipalities in the province, funding shortfalls are anticipated. The average annual expenditure over the ten year timeframe of the plan is $2,259,260. Average estimated available revenues are $1,678,401 corresponding to an estimated funding shortfall of approximately $5,808,593, or $580,859 per year, over the plan duration. Figure 11: Comparison of Capital Costs vs. Available Funding In an effort to address the potential funding shortfall, the Township is endeavoring to establish and utilize working reserves for funding these infrastructure projects. The Township will aim to contribute to these working reserves at budget time in order to spread the costs of significant infrastructure projects over the longer term. The Township will also be undertaking a review of

31 File No Page 27 its development charges commencing in Therefore, the Township will aim to utilize these funds for future infrastructure projects. 7.0 CONCLUSIONS AND RECOMMENDATIONS The AMP as presented in this report is a systematic process that allows for the maintenance, upgrading and the operating of the Township s physical assets in a cost effective manner. The implementation of this AMP provides the Township with a decision making tool to analyze demands and deliver fiscally responsible options in a sustainable framework. Through the financial planning presented in this document, it is important to recognize that the amount of funds currently projected to be available through traditional sources over the next 10 years for capital works projects may not be sufficient to sustain the current desired or expected levels of service. Staff and Council are therefore encouraged to take advantage of any applicable grant funding programs that may be available. All of which is respectfully submitted. GAMSBY AND MANNEROW LIMITED Per: Amanda Pepping, P.Eng. Steve Conway, C.E.T.

32 PUSLINCH, ONTARIO APPENDIX A Asset Information and Condition Tables

33 Bridges Asset Number Description Acquisition Date Structure Type Length of Deck (m) Deck Area (sq m) Span Length 1001 Cook's Mill Bridge 1992 I-Beam $38, $587, Good 1003 Little's Bridge 1960 Rigid Frame $0.00 $219, Fair - Poor 1005 Leslie Road West Between Lots 35/ Rectangular Culvert $1, $414, Good 1006 Concession 1, Lots 9/10, West Of SR 10S 1970 Rigid Frame $12, $679, Good 1007 French's Bridge 1984 I-Beam $50, $304, Fair - Poor 1008 Galt Creek Bridge Gore Road Lot Rectangular Culvert $0.00 $741, Fair 1009 Moyer's Bridge 1960 Girder $76, $495, Good Total $180, $3,441, AADT Net Book Value (2012) Replacement Value Condition (2013 OSIM)

34 Culverts Asset Number Description Acquisition Date Type AADT Span Length (m) Deck Area (m2) Net Book Value (2012) Replacement Value 2002 Culvert Of Cook's Mill Race 2013 Elipse CSP $0.00 $160, Good 2004 McFarlane's Culvert 2005 Rectangular $0.00 $222, Good 2006 Victoria Road Culvert Over Galt Creek 1960 Rectangular $0.00 $268, Good 2007 Irish Creek Culvert On Townline Road 1936 Rectangular $0.00 $287, Fair th Concession Culvert 2012 Elipse CSP $0.00 $117, Good 2009 Gilmour Rd Culvert Over Aberfoyle Creek 1930 Rectangular & Elipse CSP $0.00 $162, Fair 2010 Ellis Road Culvert Over Puslinch Lake Irish Creek 1920 Rectangular $0.00 $340, Good 2011 Ellis Road Culvert At Lot 10 Conc Box Culvert $0.00 $236, Good 2012 Concession 2 Bridge/Culvert Over Mill Creek 1994 Rectangular $110, $661, Good 2013 Victoria Road Culvert North Of Leslie 1960 Rectangular $0.00 $313, Fair 2014 Leslie Road Culvert West Of Victoria 1945 Rectangular $0.00 $307, Fair 2015 Culvert Of Flamborough T/L West Of Victoria 2010 Rectangular $0.00 $317, Good 2016 Flamborough T/L Bridge/Culvert East Of Macpherson Ln 2010 Rigid Frame $0.00 $263, Good 2017 Gore Road Culvert 1960 Elipse CSP $0.00 $179, Poor 2018 Gore Road Dual Culvert 1950 Elipse CSP $0.00 $68, Fair th Concession Culvert 2012 Rectangular $6, $48, Good Total $117, $3,955, Condition (2013 OSIM)

35 Hardtop Roads Asset Number Street Name From Street To Street Acquisition Date Net Book Value (2012) Replacement Value Surface Width (m) Single Lift of Asphalt 1 Gore Road Townline Road Sideroad $92, $1,113, Gore Road Sideroad 10 South County Road 52 (Cooper Road) 1996 $50, $1,113, Gore Road County Road 35 Foreman Road 1992 $0.00 $1,474, Gore Road Sideroad 20 South Valens Road 2004 $427, $2,085, Gore Road Valens Road Concession $162, $1,154, Gore Road Concession 7 Lennon Road 2002 $117, $726, Gore Road Maddaugh Road Lennon Road 1999 $29, $1,875, Puslinch-Flamborough Townline Victoria Road South Maddaugh Road 2003 $141, $802, Puslinch-Flamborough Townline 14th Concession East Victoria Road South 2002 $158, $978, Concession 1 transition Townline Road 1999 $37, $285, A Concession 1 transition transition 2007 $280, $2,516, B Concession 1 Sideroad 10 South transition 1999 $24, $247, Concession 1 Sideroad 10 South County Road $180, $1,551, _SURFACE Concession 1 County Road 35 Sideroad 20 South 1996 $172, $1,543, Concession 1 Sideroad 20 South Sideroad 25 South 1999 $146, $1,449, Concession 1 Sideroad 25 South Concession $92, $1,431, Concession 1/Leslie Rd W 1999 $174, $1,757, Concession 1 Leslie Road W Highway $56, $408, Leslie Road W Highway 6 Victoria Road South 1993 $0.00 $1,530, Leslie Road West Victoria Road South Watson Road South 2003 $272, $1,527, Leslie Road West Watson Road South Bridge 5 (Mountsberg) 2003 $72, $406, Leslie Road West Mountsberg Bridge Curve at Hwy $164, $895, Leslie Road West Curve at Highway 401 Puslinch-Flamborough Townline 2004 $157, $757, C Calfass Road Hwy 6 Settlers Court 2011 $30, $44, Main St And Back 2011 $23, $252, Concession 2 Sideroad 10 South County Road $101, $1,577, Concession 2 Sideroad 10 South County Road $76, $1,551, ,35 Concession 2 County Road 35 Sideroad 25 South 2010 $166, $3,069, Concession 2 Sideroad 20 South Sideroad 25 South 1994 $12, $1,554, Concession 2A Concession 2 Concession $0.00 $160, Mason Road Concession 7 dead end 2000 $19, $163, _SURFACE McLean Road East - WRONG SL County Road 46 (Brock Road) Concession $174, $1,428, Ellis Road County Road 32 County Road $149, $1,479, A Ellis Road Sideroad 10 North 6725 Ellis Road 2010 $400, $465, B Ellis Road transition County Road $0.00 $1,352, _ODD Gilmour Road 2007 $72, $1,352, _SURFACE Gilmour Road County Road 46 (Brock Road) subdivision entrance 2007 $38, $179, Smith Road Concession 7 County Road $0.00 $234, Cockburn Street County Road 46 dead end 2004 $3, $15, _SURFACE Cockburn Street Country Road 46 Old Brock Road 2000 $22, $87, _SURFACE Old Brock Road County Road 46 dead end 2000 $62, $247, Maple Leaf Lane County Road 46 dead end 2000 $22, $196, C Roszell Road 2013 Concession 4 Townline Road 2012 $103, $1,008, Concession 4 Forestell Road County Road $78, $922, _SURFACE 2 Concession 4 County Road 32 Sideroad 10 North 2012 $967, $1,526, Concession 4 Sideroad 10 North Sideroad 12 North 2004 $130, $615, Concession 4 Sideroad 12 North County Road $167, $910, Concession 4 County Road 35 Sideroad 20 North 2003 $288, $1,525, A_SURFACE Maltby Road East 2011 $140, $933, C Maltby Road East-Top Coat 2012 $112, $633, Forestell Road County Road 32 Roszell Road 2000 $103, $878, Forestell Road Sideroad 10 North County Road $151, $1,527, Forestell Road Sideroad 12 North Sideroad 10 North 1999 $61, $608, Forestell Road County Road 35 Sideroad 12 North 1999 $91, $909, Hume Road Nassagaweya-Puslinch Townline Watson Road South 1996 $ 441, $1,730, Niska Road Bailey Bridge Whitelaw Road 1994 $7, $ B Niska Road Surface River Whitelaw Road 2012 $57, $470, Section 80 County Road 37 (Arkell Road) end 2004 $2, $30, Cooks Mill Road Bridge County Road $53, $324, Glenholm Drive County Road 41 (Watson Road South) Dead end 2004 $30, $165, Townline Road Roszell Road County Road $0.00 $1,072, Roszell Road Forestell Road Concession $0.00 $755, Sideroad 10 North County Road 34 Ellis Road 2000 $0.00 $573, A SR 10 Whitelaw Road end 2011 $19, $237, SECTION SR $116, $ Sideroad 10 North Forestell Road Laird Road West 1998 $65, $756, A Sideroad 10 North Niska Road transition 2003 $0.00 $134, Sideroad 20 North County Road 34 Concession $308, $1,527, Concession 7 Concession 1 Gore Road 1990 $0.00 $1,297, Concession 7 Concession 2A Concession $0.00 $1,797, Maddaugh Road Highway 6 Gore Road 1997 $0.00 $690, A Maddaugh Road 14th Concession East Highway $64, $300, B Maddaugh Road Puslinch-Flamborough Townline 14th Concession East 2003 $68, $380, Victoria Road South Leslie Road West Flamborough Puslinch Townline 1999 $59, $600, Victoria Road South Leslie Road West County Road $0.00 $1,657, Victoria Road South County Road 36 (Badenoch Street) Gilmour Road 1995 $65, $ B Victoria Road-Skin Pave 2012 $47, $2,070, A Victoria Road South Gilmour Road entrance to Aberfoyle Pit # $64, $525, Length (km) Road Class 2007 Forecast AADT 2007 PCI 2013 PCI (Estimated) 2014 PCI (Estimated) 2015 PCI (Estimated) 2016 PCI (Estimated) 2017 PCI (Estimated) 2018 PCI (Estimated) 2019 PCI (Estimated) 2020 PCI (Estimated) 2021 PCI (Estimated) 2022 PCI (Estimated) 2023 PCI (Estimated)

36 125B Victoria Road South entrance to Aberfoyle Pit #2 County Road $0.00 $369, Victoria Road South County Road 34 Maltby Road East 2013 $55, $1,746, McRae Station Road Watson Road South Concession 14 East 1996 $0.00 $560, Watson Road South Leslie Road West McRae Station Road 1997 $43, $667, Watson Road South bridge Leslie Road West 1996 $32, $663, Watson Road South bridge bridge 1990 $0.00 $240, Watson Road South County Road 36 (Badenoch Street) Bridge 1998 $42, $513, Watson Road South County Road 34 County Road $142, $3,039, Watson Road South Maltby Road East County Road $23, $1,563, Watson Road South Hume Road Maltby Road East 2001 $211, $1,503, Watson Road South County Road 37 (Arkell Road) Hume Road 2001 $168, $1,217, Puslinch-Flamborough Townline Leslie Road West Township Limits 2003 $36, $201, Nassagaweya-Puslinch Townline Leslie Road East Sideroad 10 Nassagaweya 1997 $8, $103, McLean Road East Brock Road South Brock Road South 1996 $25, $493, Concession 4 Sideroad 20 North curve in road 2004 $69, $334, Concession 4 Curve in Road Highway $56, $244, Sideroad 20 North Concession 4 Forestell Road 2003 $148, $817, Currie Drive County Road 36 (Badenoch Street) Highway 6 (Queen Street) 1993 $0.00 $621, Ochs Drive Currie Drive County Road 36 (Badenoch Street) 1998 $35, $416, _SURFACE Boreham Drive County Road 37 (Arkell Road) County Road 41 (Watson Road South) 1999 $59, $322, Lang Court Currie Drive dead end 1995 $2, $82, Subtotal $9,419, $87,859, TWO LIFTS OF ASPHALT 27B Calfass Road Victoria Street Queen Street (Highway 6) 1995 $2, $67, _SURFACE Victoria Street And Church Street Calfass Road Queen Street (Highway 6) 2000 $67, $202, Concession 2/2A Sideroad 25 South Concession $67, $647, _SURFACE Laird Road West County Road 32 Sideroad 10 North 1999 $54, $1,511, _SURFACE Laird Road West Sideroad 10 North Pioneer Trail 1999 $21, $609, _SURFACE Laird Road West Pioneer Trail County Road $32, $901, _SURFACE Nicholas Beaver Road 2007 $227, $1,737, _SURFACE McLean Road/Concession 7 - SURFACE 2004 $129, $807, _SURFACE McLean Road/Concession 7 - SURFACE Sideroad 25 North County Road $97, $621, _SURFACE Bridle Path 1990 $38, $327, Telfer Glen Queen Street (Highway 6) dead end 1996 $24, $510, Settler's Road Calfass Road Telfer Glen 1995 $7, $229, Deer View Ridge Hammersley Drive Fox Run Drive 2004 $106, $495, Fox Run Drive Deer View Ridge Fox Run Drive transition to curb 2004 $181, $849, Kerr Crescent McLean Road West McLean Road West 1995 $207, $607, _SURFACE Carriage Lane Bridle Path dead end 2000 $112, $498, _SURFACE Cassin Court Daymond Drive dead end 2007 $32, $93, _SURFACE Daymond Drive County Road 46 dead end 2007 $94, $277, _SURFACE Bridle Path Bridle Path Bridle Path 1990 $99, $822, _EVEN Fox Run Drive 2000 $3, $129, Fox Run Drive Fox Run Drive transition to curb Fox Run Drive transition to median 2000 $9, $89, Fox Run Drive Fox Run Drive transition to median County Road $17, $96, _EVEN Fox Run Drive 2000 $3, $97, _EVEN Fox Run Drive 2004 $3, $510, Fox Run Drive Fox Run Drive Fox Run Drive 2000 $8, $64, Winer Court Ochs Drive dead end 1998 $4, $57, A Winer Road McLean Road pavement transition 2000 $58, $443, B_SURFACE Winer Road pavement transition dead end 2007 $89, $252, _SURFACE Tawse Place Nicholas Beaver Road Crown Cemetery 1990 $9, $147, _EVEN Beiber Road Nicholas Beaver Road dead end 2004 $7, $275, Beiber Road Nicholas Beaver Road private property 2004 $31, $129, Subtotal $1,850, $14,108, Total $11,270, $101,967,

TOWNSHIP OF SOUTHGATE ASSET MANAGEMENT PLAN ROADS, BRIDGES, STORM, FACILITIES, WATER AND WASTEWATER ASSETS. In association with:

TOWNSHIP OF SOUTHGATE ASSET MANAGEMENT PLAN ROADS, BRIDGES, STORM, FACILITIES, WATER AND WASTEWATER ASSETS. In association with: TOWNSHIP OF SOUTHGATE ASSET MANAGEMENT PLAN ROADS, BRIDGES, STORM, FACILITIES, WATER AND WASTEWATER ASSETS In association with: MARCH 13, 2014 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview

More information

Chapter 24 Saskatchewan Housing Corporation Housing Maintenance 1.0 MAIN POINTS

Chapter 24 Saskatchewan Housing Corporation Housing Maintenance 1.0 MAIN POINTS Chapter 24 Chapter 24 Saskatchewan Housing Corporation Housing Maintenance 1.0 MAIN POINTS The Saskatchewan Housing Corporation s maintenance of the 18,300 housing units it owns is essential to preserve

More information

Planning Justification Report

Planning Justification Report Planning Justification Report, Township of Puslinch FARHI HOLDINGS CORPORATION Updated January 27, 2017 Zelinka Priamo Ltd. Page i TABLE OF CONTENTS Page No. 1.0 1.1 1.2 1.3 2.0 2.1 2.2 2.3 2.4 2.5 3.0

More information

INVENTORY POLICY For Real Property

INVENTORY POLICY For Real Property INVENTORY POLICY For Real Property (Broader Public Sector Entities) Page 1-12 CONTENTS 1. TITLE... 3 2. OVERVIEW... 3 3. PURPOSE... 3 4. POLICY STATEMENT... 3 5. APPLICATION... 7 6. EVALUATION AND REVIEW...

More information

TOTTENHAM SECONDARY PLAN

TOTTENHAM SECONDARY PLAN TOTTENHAM SECONDARY PLAN AMENDMENT NO. 11 TO THE OFFICIAL PLAN OF THE TOWN OF NEW TECUMSETH The following text and schedules to the Official Plan of the Town of New Tecumseth constitute Amendment No. 11

More information

INVENTORY POLICY For Real Property

INVENTORY POLICY For Real Property INVENTORY POLICY For Real Property (Consolidated Revenue Fund Entities) Page 1-10 CONTENTS 1. TITLE... 3 2. OVERVIEW... 3 3. PURPOSE... 3 4. POLICY STATEMENT... 3 5. APPLICATION... 7 6. EVALUATION AND

More information

DESCRIPTION OF THE DISTRICT

DESCRIPTION OF THE DISTRICT DESCRIPTION OF THE DISTRICT The project plan for City of Wausau, Tax Increment District #11 has been prepared in compliance with Wisconsin Statutes Chapter 66.1105(4). The plan establishes the need for

More information

DRAFT REPORT. Boudreau Developments Ltd. Hole s Site - The Botanica: Fiscal Impact Analysis. December 18, 2012

DRAFT REPORT. Boudreau Developments Ltd. Hole s Site - The Botanica: Fiscal Impact Analysis. December 18, 2012 Boudreau Developments Ltd. Hole s Site - The Botanica: Fiscal Impact Analysis DRAFT REPORT December 18, 2012 2220 Sun Life Place 10123-99 St. Edmonton, Alberta T5J 3H1 T 780.425.6741 F 780.426.3737 www.think-applications.com

More information

Land Procedure: Allocation Procedures - Major Projects/Sales. Summary of Changes:

Land Procedure: Allocation Procedures - Major Projects/Sales. Summary of Changes: APPROVED AMENDMENTS: Effective Date Briefing Note /Approval Summary of Changes: June 1, 2011 BN 175892 Policy and Procedure update to reflect reorganization of resource ministries April 2011 FILE: 11480-00

More information

TANGIBLE CAPITAL ASSETS

TANGIBLE CAPITAL ASSETS Administrative Procedure 535 Background TANGIBLE CAPITAL ASSETS The Division will follow a prescribed procedure to record and manage the tangible capital assets (TCA) owned by the Division. The treatment

More information

Chapter 14 Technical Safety Authority of Saskatchewan Inspecting Elevating Devices 1.0 MAIN POINTS

Chapter 14 Technical Safety Authority of Saskatchewan Inspecting Elevating Devices 1.0 MAIN POINTS Chapter 14 Technical Safety Authority of Saskatchewan Inspecting Elevating Devices 1.0 MAIN POINTS The Technical Safety Authority of Saskatchewan (TSASK) administers Saskatchewan s safety programs for

More information

Chapter 10: Implementation

Chapter 10: Implementation Chapter 10: Introduction Once the Comprehensive Plan has been adopted by the City of Oakdale, the City can begin to implement the goals and strategies to make this vision a reality. This chapter will set

More information

PURPOSE OF STUDY. physical and social environments, as well as our political and economic institutions. As a commodity,

PURPOSE OF STUDY. physical and social environments, as well as our political and economic institutions. As a commodity, PURPOSE OF STUDY Housing is one of the most important elements in our lives and our communities. Providing shelter and links to neighborhoods and larger communities, housing plays an essential part in

More information

Township of Tay Official Plan

Township of Tay Official Plan Township of Tay Official Plan Draft for Consultation (v.3) March 2016 Contents 1. INTRODUCTION... 1 1.1 Content, Title and Scope... 1 1.2 Basis and Purpose of this Plan... 1 1.3 Plan Structure... 2 2.

More information

REQUEST FOR PROPOSALS Development of an Asset Management Plan

REQUEST FOR PROPOSALS Development of an Asset Management Plan REQUEST FOR PROPOSALS Development of an Asset Management Plan The Township of North Glengarry 90 Main Street South Alexandria, Ontario K0C 1A0 TABLE OF CONTENTS OVERVIEW... 2 Introduction... 2 Background...

More information

TOWNSHIP SERVICES POLICY PREPARED BY: ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER

TOWNSHIP SERVICES POLICY PREPARED BY: ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER TOWNSHIP SERVICES POLICY PREPARED BY: ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER ISSUED JUNE 8, 2011 Summit County Engineer Policy for Township Services The Summit County Engineer endeavors to provide

More information

ASSET MANAGEMENT PLAN CORE SERVICE INFRASTRUCTURE

ASSET MANAGEMENT PLAN CORE SERVICE INFRASTRUCTURE ASSET MANAGEMENT PLAN CORE SERVICE INFRASTRUCTURE TABLE OF CONTENTS Executive Summary... 3 Introduction... 4 What is core service infrastructure?... 4 Two tier municipal structure... 4 Need for a strategy...

More information

NORTHWEST TERRITORIES HOUSING CORPORATION

NORTHWEST TERRITORIES HOUSING CORPORATION NORTHWEST TERRITORIES HOUSING CORPORATION OVERVIEW MISSION The mission of the Northwest Territories Housing Corporation (NWTHC) is to ensure, where appropriate and necessary, that there is a sufficient

More information

Document under Separate Cover Refer to LPS State of Housing

Document under Separate Cover Refer to LPS State of Housing Document under Separate Cover Refer to LPS5-17 216 State of Housing Contents Housing in Halton 1 Overview The Housing Continuum Halton s Housing Model 3 216 Income & Housing Costs 216 Indicator of Housing

More information

STATE OF OHIO FINANCIAL REPORTING APPROACH GASB 34 IMPLEMENTATION ISSUES TRANSPORTATION INFRASTRUCTURE

STATE OF OHIO FINANCIAL REPORTING APPROACH GASB 34 IMPLEMENTATION ISSUES TRANSPORTATION INFRASTRUCTURE TRANSPORTATION INFRASTRUCTURE GASB 34 Reporting Requirements (Paragraphs 19 through 26) Paragraph 19 includes infrastructure assets in the definition of capital assets. Infrastructure assets are defined

More information

City of Brandon Brownfield Strategy

City of Brandon Brownfield Strategy City of Brandon Brownfield Strategy 2017 Executive Summary A brownfield is a property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of a hazardous

More information

EXHIBIT A. City of Corpus Christi Annexation Guidelines

EXHIBIT A. City of Corpus Christi Annexation Guidelines City of Corpus Christi Annexation Guidelines Purpose: The purpose of this document is to describe the City of Corpus Christi s Annexation Guidelines. The Annexation Guidelines provide the guidance and

More information

F.G. Gardiner Expressway Strategic Rehabilitation Plan

F.G. Gardiner Expressway Strategic Rehabilitation Plan F.G. Gardiner Expressway Strategic Rehabilitation Plan F.G. Gardiner Expressway Strategic Rehabilitation Plan Michael D Andrea, P.Eng. Executive Director, Engineering & Construction Services Stephen Buckley

More information

Section: FS Financial Services. Department: Finance. FS-03 Tangible Capital Asset Policy. Policy Statement LEDUC COUNTY MUNICIPAL POLICY

Section: FS Financial Services. Department: Finance. FS-03 Tangible Capital Asset Policy. Policy Statement LEDUC COUNTY MUNICIPAL POLICY FS-03 Tangible Capital Asset Policy Policy Statement Any object purchased for use by the County whose individual cost is less than the threshold and with a life span of less than one year shall not be

More information

A REPORT FROM THE OFFICE OF INTERNAL AUDIT

A REPORT FROM THE OFFICE OF INTERNAL AUDIT A REPORT FROM THE OFFICE OF INTERNAL AUDIT PRESENTED TO THE CITY COUNCIL CITY OF BOISE, IDAHO AUDIT / TASK: AUDIT CLIENT: REPORT DATE: October 14, 2013 AUDIT GRADE: #13-04, Property Rehabilitation / Loan

More information

OFFICIAL PLAN THE CORPORATION OF THE TOWNSHIP OF SEVERN

OFFICIAL PLAN THE CORPORATION OF THE TOWNSHIP OF SEVERN OFFICIAL PLAN THE CORPORATION OF THE TOWNSHIP OF SEVERN CONSOLIDATION SEPTEMBER, 2010 TOWNSHIP OF SEVERN OFFICIAL PLAN OFFICE CONSOLIDATION SEPTEMBER, 2010 This is the Official Plan of the Corporation

More information

Property Asset Management

Property Asset Management Property Asset Management Contributing Departments Planning, Prop. & Devl. 99% Public Works 1% 2007 Budget: $11.3 M Tax Supported Property Asset Mgmt $33.0 M Civic Accommodations Fund $28.7 M Building

More information

CAPITAL IMPROVEMENT PLAN POLICY/PROCEDURE Approved by the Town Council at the Town Council Meeting

CAPITAL IMPROVEMENT PLAN POLICY/PROCEDURE Approved by the Town Council at the Town Council Meeting CAPITAL IMPROVEMENT PLAN POLICY/PROCEDURE Approved by the Town Council at the 10-20-15 Town Council Meeting A Capital Improvement Plan (CIP) is a valuable and critical planning tool that is used to manage

More information

Bridge Asset Valuation and the Role of the Bridge Management System. Dr. Reed M. Ellis, Stantec Consulting Ltd. Paul D. Thompson, Consultant

Bridge Asset Valuation and the Role of the Bridge Management System. Dr. Reed M. Ellis, Stantec Consulting Ltd. Paul D. Thompson, Consultant Bridge Asset Valuation and the Role of the Bridge Management System Dr. Reed M. Ellis, Stantec Consulting Ltd. Paul D. Thompson, Consultant Paper prepared for presentation at the Bridges Economic and Social

More information

Fiscal Impact Analysis Evergreen Community

Fiscal Impact Analysis Evergreen Community Evergreen Community July 16, 2015 Evergreen Community Prepared for: Evergreen Community (Burlington) Ltd. Prepared by: 33 Yonge Street Toronto Ontario M5E 1G4 Phone: (416) 641-9500 Fax: (416) 641-9501

More information

LLANO CENTRAL APPRAISAL DISTRICT REAPPRAISAL PLAN FOR TAX YEARS 2017 & 2018 AS ADOPTED BY THE BOARD OF DIRECTORS

LLANO CENTRAL APPRAISAL DISTRICT REAPPRAISAL PLAN FOR TAX YEARS 2017 & 2018 AS ADOPTED BY THE BOARD OF DIRECTORS LLANO CENTRAL APPRAISAL DISTRICT REAPPRAISAL PLAN FOR TAX YEARS 2017 & 2018 AS ADOPTED BY THE BOARD OF DIRECTORS TABLE OF CONTENTS ITEM PAGE Executive Summary 5 Revaluation Decision (Statutory or Administrative)

More information

Palmerton Area Comprehensive Plan

Palmerton Area Comprehensive Plan DRAFT Palmerton Area Comprehensive Plan Bowmanstown Borough, Lower Towamensing Township, Palmerton Borough and Towamensing Township Carbon County, Pennsylvania Draft - With Minor Revisions - March 2008

More information

Report on FSCO s Compliance Reviews of Mortgage Brokerages

Report on FSCO s Compliance Reviews of Mortgage Brokerages Report on FSCO s Compliance Reviews of Mortgage Brokerages 2010-2014 Financial Services Commission of Ontario Licensing and Market Conduct Division December 2015 Table of Contents Executive Summary...

More information

Administration and Calculation of Servicing Agreement Fees and Development Levies

Administration and Calculation of Servicing Agreement Fees and Development Levies Administration and Calculation of Servicing Agreement Fees and Development Levies Policy Title: Applies to: Administration and Calculation of Servicing Agreement Fees and City of Regina City Planning and

More information

PROJECT NH 0050(99)381 PCN 6926 YANKTON COUNTY. SD HWY 50 (4 th Street) from Broadway Ave to Archery Road in Yankton, SD

PROJECT NH 0050(99)381 PCN 6926 YANKTON COUNTY. SD HWY 50 (4 th Street) from Broadway Ave to Archery Road in Yankton, SD Public Meeting/ Open House April 4, 2013 PROJECT NH 0050(99)381 PCN 6926 YANKTON COUNTY SD HWY 50 (4 th Street) from Broadway Ave to Archery Road in Yankton, SD Grading, PCC Pavement, Asphalt Concrete

More information

Got Gravel? Strategies to Secure Gravel for Rural Municipalities. Part 1 - Summary Report. October 30, 2013

Got Gravel? Strategies to Secure Gravel for Rural Municipalities. Part 1 - Summary Report. October 30, 2013 ALBERTA ASSOCIATION OF MUNICIPAL DISTRICTS AND COUNTIES Got Gravel? Strategies to Secure Gravel for Rural Municipalities Part 1 - Summary Report October 30, 2013 Prepared for the Alberta Association of

More information

Transit-Oriented Development Specialized Real Estate Services

Transit-Oriented Development Specialized Real Estate Services COLLIERS INTERNATIONAL Transit-Oriented Development Specialized Real Estate Services Accelerating success. Colliers International transit-oriented development GROUP P. 1 2 transit-oriented development

More information

STEVEN J. DREW Assessor OFFICE OF THE ASSESSOR Service, Integrity, Fairness, Internationally Recognized for Excellence

STEVEN J. DREW Assessor OFFICE OF THE ASSESSOR Service, Integrity, Fairness, Internationally Recognized for Excellence STEVEN J. DREW Assessor OFFICE OF THE ASSESSOR Service, Integrity, Fairness, Internationally Recognized for Excellence OVERVIEW OF RESIDENTIAL APPRAISAL PROCESS And Cost Valuation Report Introduction The

More information

PLANNED AND RESPONSIVE MAINTENANCE POLICY

PLANNED AND RESPONSIVE MAINTENANCE POLICY PLANNED AND RESPONSIVE MAINTENANCE POLICY 1. Purpose 3. Policy Statement This Policy explains how Evolve Housing (Evolve) will provide repairs and maintenance services to its Tenants. Evolve believes that

More information

Halifax Water Rate Pricing and Stormwater Management Programs. March 4 th, 2013

Halifax Water Rate Pricing and Stormwater Management Programs. March 4 th, 2013 Halifax Water Rate Pricing and Stormwater Management Programs March 4 th, 2013 Real Property Association of Canada One University Avenue, Suite 1410 Toronto, Ontario Canada M5J 2P1 www.realpac.ca T: (416)

More information

ATTACHMENT NO Growth and Staging of Development Report

ATTACHMENT NO Growth and Staging of Development Report ATTACHMENT NO. 1 2016 Growth and Staging of Development Report This page intentionally left blank. Table of Contents Introduction... 2 Section 1: Provincial Policy Statement (2014) and Provincial Growth

More information

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY Adopted January 3, 2012 PURPOSE: The purpose of the policy statement is to clarify the policies and procedures of the City of Fort

More information

STEVEN J. DREW Assessor OFFICE OF THE ASSESSOR Service, Integrity, Fairness, Internationally Recognized for Excellence

STEVEN J. DREW Assessor OFFICE OF THE ASSESSOR Service, Integrity, Fairness, Internationally Recognized for Excellence STEVEN J. DREW Assessor OFFICE OF THE ASSESSOR Service, Integrity, Fairness, Internationally Recognized for Excellence OVERVIEW OF RESIDENTIAL APPRAISAL PROCESS And Cost Valuation Report Introduction The

More information

Comprehensive Plan 2030

Comprehensive Plan 2030 Introduction Land use, both existing and future, is the central element of a Comprehensive Plan. Previous chapters have discussed: Projected population growth. The quality housing available in the Township

More information

EVALUATION AND APPRAISAL REPORT OF THE CITY OF FELLSMERE COMPREHENSIVE PLAN APPENDIX D HOUSING ELEMENT

EVALUATION AND APPRAISAL REPORT OF THE CITY OF FELLSMERE COMPREHENSIVE PLAN APPENDIX D HOUSING ELEMENT OBJECTIVE H-A-1: ALLOW AFFORDABLE HOUSING AND ADEQUATE SITES FOR VERY LOW, LOW, AND MODERATE INCOME HOUSING. The City projects the total need for very low, low, and moderate income-housing units for the

More information

UK Housing Awards 2011

UK Housing Awards 2011 UK Housing Awards 2011 Excellence in Housing Finance and Development: Finalist North Lanarkshire Council: Building For The Future Summary North Lanarkshire Council has been proactive in establishing, developing

More information

CHAPTER V: IMPLEMENTING THE PLAN

CHAPTER V: IMPLEMENTING THE PLAN CHAPTER V: IMPLEMENTING THE PLAN A range of resources is available to fund the improvements included in the Action Plan. These resources include existing commitments of County funding, redevelopment-related

More information

CITY CLERK. Consolidated Clause in Policy and Finance Committee Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005.

CITY CLERK. Consolidated Clause in Policy and Finance Committee Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005. CITY CLERK Consolidated Clause in Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005. 3 Regent Park Revitalization - Financial Strategy (Ward 28) City Council on July 19, 20,

More information

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW MARCH, 2018

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW MARCH, 2018 CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW MARCH, 2018 Fenton Township continues to receive inquiries regarding the relatively high sewer use fees that Township residents have been paying

More information

Building Permits & Inspections

Building Permits & Inspections Contributing Department Planning Prop. & Devl. 100% 2007 Budget: $10.1 million Building Permits & Inspections Includes: Residential Building Permits Non-Residential Building Permits Residential Building

More information

Accounting for Tangible Capital Assets

Accounting for Tangible Capital Assets Accounting for Tangible Capital Assets Date Approved by Board: 2011.11.17 Resolution No.: 11-113 2016.05.19 16-048 Lead Role: CFO Replaces: N/A Last Review Date: N/A Next Review Date: 2019.05.19 Policy

More information

To achieve growth, property development, redevelopment and an improved tax base in the cities and boroughs in the Lehigh Valley.

To achieve growth, property development, redevelopment and an improved tax base in the cities and boroughs in the Lehigh Valley. Most growth in property valuation is in townships. Between 1991 and 2004, the assessed valuation of the townships in the Lehigh Valley increased by more than $2.8 billion, an increase of 41%. At the same

More information

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services. Conditions Relating to Draft Plan of Subdivision Approval East Fonthill 26T 01014 (Draft Plan dated December 1, 2013, and revised August 28, 2014), the Town of Pelham 1. This approval applies to the Draft

More information

Land Use. Existing Land Use

Land Use. Existing Land Use 8 Land Use 8.1 Land Use Chapter Purpose and Contents This element includes a brief summary of existing land use conditions and trends followed by a series of goals, objectives, and recommendations to guide

More information

DOWNTOWN BEAUMONT CENTRE-VILLE: PARKING MANAGEMENT REPORT

DOWNTOWN BEAUMONT CENTRE-VILLE: PARKING MANAGEMENT REPORT DOWNTOWN BEAUMONT CENTRE-VILLE: PARKING MANAGEMENT REPORT Prepared for: Prepared by: Town of Beaumont Planning & Development Services WATT Consulting Group Our File: 3364.T01 Date: October 5, 2016 1.0

More information

NANTUCKET ISLANDS LAND BANK AFFORDABLE HOUSING POLICY Adopted by the vote of the Land Bank Commission on November 10, 2015

NANTUCKET ISLANDS LAND BANK AFFORDABLE HOUSING POLICY Adopted by the vote of the Land Bank Commission on November 10, 2015 NANTUCKET ISLANDS LAND BANK AFFORDABLE HOUSING POLICY Adopted by the vote of the Land Bank Commission on November 10, 2015 In recent history, the island of Nantucket has experienced a shortage of affordable,

More information

Understanding the Cost to Provide Community Services in the Town of Holland, La Crosse County, Wisconsin

Understanding the Cost to Provide Community Services in the Town of Holland, La Crosse County, Wisconsin Understanding the Cost to Provide Community Services in the Town of Holland, La Crosse County, Wisconsin Rebecca Roberts Land Use Specialist Center for Land Use Education and Karl Green Community Development

More information

How to Read a Real Estate Appraisal Report

How to Read a Real Estate Appraisal Report How to Read a Real Estate Appraisal Report Much of the private, corporate and public wealth of the world consists of real estate. The magnitude of this fundamental resource creates a need for informed

More information

County Bridge Inspection. IACC Conference Presented by: Michael L. McCool, PE Bridge Department Manager Beam, Longest and Neff, LLC

County Bridge Inspection. IACC Conference Presented by: Michael L. McCool, PE Bridge Department Manager Beam, Longest and Neff, LLC County Bridge Inspection Road Scholar Core Course # 9: Bridge Basics IACC Conference - 2015 Presented by: Michael L. McCool, PE Bridge Department Manager Beam, Longest and Neff, LLC Topics National Bridge

More information

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 2188

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 2188 CHAPTER 2004-372 Committee Substitute for Committee Substitute for Senate Bill No. 2188 An act relating to land development; amending s. 197.502, F.S.; providing for the issuance of an escheatment tax

More information

A TDR Program for Naples. May 11, 2007

A TDR Program for Naples. May 11, 2007 ATTACHMENT G A TDR Program for Naples May 11, 2007 Introduction This paper is intended to supplement and expand upon the Draft TDR Program Framework authored by Solimar in February 2007. 1 The Framework

More information

GASB 34 Compliance. Retrospective Valuation of ODOT Infrastructure. A Proposed Approach

GASB 34 Compliance. Retrospective Valuation of ODOT Infrastructure. A Proposed Approach GASB 34 Compliance Retrospective Valuation of ODOT Infrastructure A Proposed Approach ODOT s GASB 34 compliance effort consists of primarily two processes: 1. Retrospective reporting and 2. Prospective

More information

Settlement Pattern & Form with service costs analysis Preliminary Report

Settlement Pattern & Form with service costs analysis Preliminary Report Settlement Pattern & Form with service costs analysis Preliminary Report Prepared for Regional Planning Halifax Regional Municipality by Financial Services, HRM May 15, 2004 TABLE OF CONTENTS INTRODUCTION...

More information

Shaping Our Future. Return-on-Investment Study. June 2017

Shaping Our Future. Return-on-Investment Study. June 2017 Shaping Our Future Return-on-Investment Study A June 2017 PURPOSE AND CONTEXT The 10-county Upstate Region is growing, and is projected to welcome more than 300,000 new residents by 2040 to reach a total

More information

MITIGATION POLICY FOR DISTRICT-PROTECTED LANDS

MITIGATION POLICY FOR DISTRICT-PROTECTED LANDS MITIGATION POLICY FOR DISTRICT-PROTECTED LANDS Approved by the District Board of Directors on July 18, 2017 The following Mitigation Policy is intended to inform the evaluation of environmental mitigation-related

More information

Greenfield Development Requirements

Greenfield Development Requirements Greenfield Development Requirements Planning & Engineering Department City of Yorkton Saskatchewan 2014 Summary Greenfield Development refers to the development of raw land to a finished state as residential,

More information

Land Trust of Santa Cruz County. Strategic Plan. July 2012 to June This is a public version of a more detailed internal plan.

Land Trust of Santa Cruz County. Strategic Plan. July 2012 to June This is a public version of a more detailed internal plan. Land Trust of Santa Cruz County Strategic Plan July 2012 to June 2015 This is a public version of a more detailed internal plan. Over the next three years the Land Trust will pursue four critical strategies.

More information

2019 Development Charges By-law Update Project Plan

2019 Development Charges By-law Update Project Plan Staff Report for Committee of the Whole Meeting Department: Division: Subject: Corporate and Financial Services Financial Services 2019 Development Charges By-law Update Project Plan Purpose: This report

More information

1.0 INTRODUCTION PURPOSE OF THE CIP VISION LEGISLATIVE AUTHORITY Municipal Act Planning Act...

1.0 INTRODUCTION PURPOSE OF THE CIP VISION LEGISLATIVE AUTHORITY Municipal Act Planning Act... April 2017 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PURPOSE OF THE CIP... 1 3.0 VISION... 1 4.0 COMMUNITY IMPROVEMENT PROJECT AREA..3 5.0 LEGISLATIVE AUTHORITY... 3 5.1 Municipal Act... 3 5.2 Planning

More information

4.0 Implementation & Phasing Strategies

4.0 Implementation & Phasing Strategies VISION MANDATE: To ensure that the City Centre Area Plan (CCAP) develops in an orderly, sustainable and fi nancially sound manner: Build Community : Ensure that the necessary infrastructure and community

More information

City of Winnipeg Housing Policy Implementation Plan

City of Winnipeg Housing Policy Implementation Plan The City of Winnipeg s updated housing policy is aligned around four major priorities. These priorities are highlighted below: 1. Targeted Development - Encourage new housing development that: a. Creates

More information

Riverton Properties Ltd Proposed Special Housing Area

Riverton Properties Ltd Proposed Special Housing Area Riverton Properties Ltd Proposed Special Housing Area Housing Accords and Special Housing Areas Act 2013 Expression of Interest 1 This Expression of Interest is made on behalf of Riverton Properties Ltd,

More information

A Guide to Establishing Additional Service Areas in Rural Municipalities

A Guide to Establishing Additional Service Areas in Rural Municipalities A Guide to Establishing Additional Service Areas in Rural Municipalities February 2014 Contents Introduction... 3 Purpose of this Guide... 3 Background... 3 What are the benefits to Rural Municipalities

More information

11 Teranet Easement Mapping Data Acquisition

11 Teranet Easement Mapping Data Acquisition Clause 11 in Report No. 18 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on November 19, 2015. 11 Teranet Easement Mapping

More information

Hennepin County Economic Analysis Executive Summary

Hennepin County Economic Analysis Executive Summary Hennepin County Economic Analysis Executive Summary Embrace Open Space commissioned an economic study of home values in Hennepin County to quantify the financial impact of proximity to open spaces on the

More information

Ontario Rental Market Study:

Ontario Rental Market Study: Ontario Rental Market Study: Renovation Investment and the Role of Vacancy Decontrol October 2017 Prepared for the Federation of Rental-housing Providers of Ontario by URBANATION Inc. Page 1 of 11 TABLE

More information

Adopts a revised Real Property Excess, Surplus, and Disposition Policy and supersedes Resolution No. R99-35.

Adopts a revised Real Property Excess, Surplus, and Disposition Policy and supersedes Resolution No. R99-35. RESOLUTION NO. R2013-30 Real Property Excess, Surplus, and Disposition Policy MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Board Board 11/21/13 12/19/13 PROPOSED ACTION Introduction to Board Final

More information

A Class Environmental Assessment for Provincial Parks and Conservation Reserves. Phase III: Submission to Ministry of the Environment

A Class Environmental Assessment for Provincial Parks and Conservation Reserves. Phase III: Submission to Ministry of the Environment A Class Environmental Assessment for Provincial Parks and Conservation Reserves Phase III: Submission to Ministry of the Environment II CLASS EA FOR PROVINCIAL PARKS AND CONSERVATION RESERVES 2001, Queen

More information

DIRECTIVE # This Directive Supersedes Directive # and #92-003

DIRECTIVE # This Directive Supersedes Directive # and #92-003 Division Of Property Valuation Docking State Office Building 915 SW Harrison St., Room 400N Topeka, KS 66612-1588 Nick Jordan, Secretary David N. Harper, Director phone: 785-296-2365 fax: 785-296-2320

More information

Orange Water and Sewer Authority Water and Sewer System Development Fee Study

Orange Water and Sewer Authority Water and Sewer System Development Fee Study Orange Water and Sewer Authority Water and Sewer System Development Fee Study March 6, 2018 March 6, 2018 Mr. Stephen Winters Director of Finance and Customer Service 400 Jones Ferry Road Carrboro, NC

More information

COMPARISON OF THE LONG-TERM COST OF SHELTER ALLOWANCES AND NON-PROFIT HOUSING

COMPARISON OF THE LONG-TERM COST OF SHELTER ALLOWANCES AND NON-PROFIT HOUSING COMPARISON OF THE LONG-TERM COST OF SHELTER ALLOWANCES AND NON-PROFIT HOUSING Prepared for The Fair Rental Policy Organization of Ontario By Clayton Research Associates Limited October, 1993 EXECUTIVE

More information

Public Facilities and Finance Element

Public Facilities and Finance Element This Element of the General Plan addresses the following public facilities issues: Water Service, including both potable (drinkable) and non-potable water delivery. Sewer Service, and Financing and construction

More information

LGFP CONFERENCE Appreciating Depreciation. QAO Perspective. Patrick Flemming Brendan Macrae. 25 November 2014

LGFP CONFERENCE Appreciating Depreciation. QAO Perspective. Patrick Flemming Brendan Macrae. 25 November 2014 LGFP CONFERENCE Appreciating Depreciation QAO Perspective Patrick Flemming Brendan Macrae 25 November 2014 Outline What are financial reporting risks impacting on assets? How do we audit: Ø financial sustainability

More information

METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO. Valuation Date: January 1, 2016

METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO. Valuation Date: January 1, 2016 METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO Valuation Date: January 1, 2016 August 2017 August 22, 2017 The Municipal Property Assessment Corporation (MPAC) is responsible for accurately assessing

More information

Town of Niagara-on-the-Lake Development Charges Background Study

Town of Niagara-on-the-Lake Development Charges Background Study Town of Niagara-on-the-Lake Development Charges Background Study May 17, 2018 Contents Page Executive Summary... i 1. Introduction... 1-1 1.1 Purpose of this Document... 1-1 1.2 Summary of the Process...

More information

RAINS COUNTY APPRAISAL DISTRICT

RAINS COUNTY APPRAISAL DISTRICT RAINS COUNTY APPRAISAL DISTRICT 2017 MASS APPRAISAL SUMMARY REPORT mass appraisal report 2017 uspap_appr_report RAINS COUNTY APPRAISAL DISTRICT 2017 MASS APPRAISAL SUMMARY REPORT Identification of Subject:

More information

Administration and Calculation of Servicing Agreement Fees and Development Levies

Administration and Calculation of Servicing Agreement Fees and Development Levies Administration and Calculation of Servicing Agreement Fees and Development Levies Policy Title: Applies to: Reference # Administration and Calculation of Servicing Agreement Fees and City of Regina ###-XXX-##

More information

3.10. Ontario Realty Corporation Real Estate and Accommodation Services. Chapter 3 Section. Background

3.10. Ontario Realty Corporation Real Estate and Accommodation Services. Chapter 3 Section. Background Chapter 3 Section 3.10 Ontario Realty Corporation Real Estate and Accommodation Services Chapter 3 VFM Section 3.10 Background The Ontario Realty Corporation (Corporation) was established in 1993 as a

More information

Table of Contents. Appendix...22

Table of Contents. Appendix...22 Table Contents 1. Background 3 1.1 Purpose.3 1.2 Data Sources 3 1.3 Data Aggregation...4 1.4 Principles Methodology.. 5 2. Existing Population, Dwelling Units and Employment 6 2.1 Population.6 2.1.1 Distribution

More information

TOWN OF LINCOLN COUNCIL POLICY

TOWN OF LINCOLN COUNCIL POLICY Page 1 of 10 PURPOSE The purpose of this policy is to prescribe the accounting treatment for tangible capital assets so that users of the financial report can discern information about the investment in

More information

PLANNING RATIONALE ONTARIO LTD. APLLICATION FOR PLAN OF SUBDIVISION APPROVAL

PLANNING RATIONALE ONTARIO LTD. APLLICATION FOR PLAN OF SUBDIVISION APPROVAL PLANNING RATIONALE 1384341 ONTARIO LTD. APLLICATION FOR PLAN OF SUBDIVISION APPROVAL PART OF LOTS 18 & 19, CONCESSION 1 GEOGRAPHIC TOWNSHIP OF MARCH NOW IN CITY OF OTTAWA FEBRUARY 2013 1 Planning Rationale

More information

Terms of Reference for Town of Caledon Housing Study

Terms of Reference for Town of Caledon Housing Study 1.0 Introduction Terms of Reference for Town of Caledon Housing Study The Town of Caledon is soliciting proposals for a comprehensive Housing Study. Results of this Housing Study will serve as a guiding

More information

Consulted With Individual/Body Date Head of Finance Financial

Consulted With Individual/Body Date Head of Finance Financial Equipment Disposal Policy Developed in response to: Policy Register No: 12037 Status: Public Internal Audit Report for Fixed Assets Contributes to CQC Regulation 17 Consulted With Individual/Body Date

More information

SERVICE & IMPROVEMENT PLAN AND ASSESSMENT PLAN:

SERVICE & IMPROVEMENT PLAN AND ASSESSMENT PLAN: DOWNTOWN MIDLAND MANAGEMENT DISTRICT SERVICE & IMPROVEMENT PLAN AND ASSESSMENT PLAN: 2010-2019 August 25, 2009 Table of Contents 1. Introduction...1 2. Background: The First Five Years...2 3. Service &

More information

Understanding the Consent Application Process

Understanding the Consent Application Process Understanding the Consent Application Process Your Step-By-Step Guide for Consent-Granting Authorities 1 2 3 4 5 6 7 8 9 10 11 Section 53 of the Planning Act ontario.ca/municipallearning Understanding

More information

CHAPTER 2 VACANT AND REDEVELOPABLE LAND INVENTORY

CHAPTER 2 VACANT AND REDEVELOPABLE LAND INVENTORY CHAPTER 2 VACANT AND REDEVELOPABLE LAND INVENTORY CHAPTER 2: VACANT AND REDEVELOPABLE LAND INVENTORY INTRODUCTION One of the initial tasks of the Regional Land Use Study was to evaluate whether there is

More information

KENT COUNTY STORMWATER MAINTENANCE DISTRICT

KENT COUNTY STORMWATER MAINTENANCE DISTRICT KENT COUNTY STORMWATER MAINTENANCE DISTRICT 2015 VUSP Stormwater Symposium Villanova, Pennsylvania David Athey, PE, CPSWQ, CMS4S AECOM (previously with Duffield Associates) Sarah Keifer, AICP Kent County,

More information

FILLMORE COMMUNITY REINVESTMENT AREA (CRA)

FILLMORE COMMUNITY REINVESTMENT AREA (CRA) DRAFT PROJECT AREA PLAN FILLMORE COMMUNITY REINVESTMENT AREA (CRA) REDEVELOPMENT AGENCY OF FILLMORE CITY, UTAH FEBRUARY 2018 Table of Contents DEFINITIONS... 3 INTRODUCTION... 5 DESCRIPTION OF THE BOUNDARIES

More information

Proposed Strategic Housing and Employment Land Availability Assessment (SHELAA) Methodology 2018

Proposed Strategic Housing and Employment Land Availability Assessment (SHELAA) Methodology 2018 Proposed Strategic Housing and Employment Land Availability Assessment (SHELAA) Methodology 2018 1.1 This section of the report sets out the methodology to be used in preparing the three South Worcestershire

More information

1.3. The Policy is based on the City of London governing principles:

1.3. The Policy is based on the City of London governing principles: Real Property Acquisition Policy Policy Name: Real Property Acquisition Policy Legislative History: Enacted September 19, 2017 (By-law No. CPOL.-188-440); Amended July 24, 2018 (By-law No. CPOL.-188(a)-447)

More information