VISUAL PERFORMANCE (NATURAL & ARTIFICIAL LIGHTING)
|
|
- Ann Anderson
- 5 years ago
- Views:
Transcription
1 VISUAL PERFORMANCE (NATURAL & ARTIFICIAL LIGHTING) Archt.!Moediar)anto,"MSc,!IAI! " " Faculty"of"Architecture"&"Design" "
2 Introduction"
3 Building Performance" Definition" the"series"of"mandates" occupancy"" requirements"and"the" elemental"parameters"of"" comfort comfort dependent"on" physiological,! psychological,!! sociological,! economic!values.!!! Source:(Feriadi,(2003)""
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19 Visual Performance" Fundamental" "wave"length"380nm"j"800"nm","known"as"visible!light! "indicated"by"violet"to"red!
20 Visual Performance" Impacts of Lighting " FISIOLOGIS PSIKOLOGIS
21 Daylight"architecture"
22 Visual Performance" Impacts of Lighting " Daylight"architecture"! """""globe.""! """""dimensional.""an"excellent"" """""means"for"controlling"our" """""level."
23 Visual Performance" Main"parameters"in"daylight"availability" Daylighting" Climate!and!weather! Sun!course!(la)tude,!)me/date)!
24 Design Method" Daylighting" DF"="SC"+"ERC"+"IRC" Split flux method( Sky!Component!(SC)!J"Directly"from"the"sky,"through"an"opening" such"as"a"window."" Externally!Reflected!Component!(ERC)!H!Reflected"off"the"ground," trees"or"other"buildings."" 2"of"surfaces"within"the"room.""
25 Design Method" Daylighting" BRS DAYLIGHT FACTOR PROTRACTOR NO. 2
26 Exercise"
27 Design Method" Daylighting" P" From"the"outer"scale:" 2.5" "0.1"="2.4%! R" Ini7al,Sky,Component,(ISC), From"the"inner"scale:" (25"+"5)/2"="15! Average,angle,of,eleva7on,,
28 Design Method" Daylighting" Average,angle,of,eleva7on, 15,, M" Draw"an"arch"of"the" N" Following"the"drop"lines," from"the"inner"scale:" 0.25"+"0.05"="0.3( Correc+on(Factor( Sky,component:, 0.3,x,2.4%,=,0.6%,
29 Design Method" Daylighting" Total(wall(surface(area:( 2"(4.5"x"2.75"m)"+"2"(5.5"x"2.75"m)"+"2"(0.5"x"2.75"m)"=""57.75!m 2! Total(ceiling(&(floor(surface(area:( 2"(4.5"x"5.5"m)" "2"(0.5"x"2"m)"="47.50!m 2! Total,surface,area:,, !m 2! Window,area:( 2"x"1.25"=""2.50!m 2! Ra7o,window,area,to,total,surface,area:( 2.50"m 2 /105.25"m 2 ""=""0.023!! Nomogram!A!
30 Design Method" Daylighting" Ra7o,wall,surface,area,to,total,surface,area:( 57.75"m 2 /105.25"m 2 ""=""0.548!! White/"light"colors" Interpola7on( (56J54)/(0.6J0.5)*(0.548J0.5)"="0.096!! Wall,Reflectance( 54"+"0.096"="54.096!! Nomogram!scale!B!
31 Design Method" Daylighting" Daylight"Factor"(DF)"=" SC"+"IRC"+"ERC" 0.6"+"0.85"+"0"="1.45%! 1.45"%"x"10.000"lux"="145!lux!
32 Design Method" Standard" Problem:! at"a"distance"of"2.5!)mes"of"height"of"the"top"of"window."" Good" Bad"
33
34 Do"you"have"any"idea"in"terms"of" architectural"design"+"technology"" to"solve"these"problems?""
35 Design Principles" Technology" 3" 1. External"and"internal" light"shelves" 2. heliostat"and"light" pipes." 3. Anidolic "ceiling" 1" 2"
36 Design Principles" Technology" 1"
37 Design Principles" Technology" 1"
38 Design Principles" Technology" 1"
39 Design Principles" Technology" 1"
40 Visual Performance" Technology" Shading!systems!primary"using"diffuse"skylight"
41 Visual Performance" Technology" Shading!systems!primary"using"direct"sunlight"
42 Visual Performance" Technology"
43 Visual Performance" Technology" Shading!systems!primary"using"diffuse"skylight"
44 Visual Performance" Technology" Shading!systems!primary"using"diffuse"skylight"
45 Visual Performance" Technology" Direct!light!guiding!systems"
46 Visual Performance" Daylighting" Moediar)anto,"2008,"A,Study,of,Dayligh7ng,Systems,in,Residen7al,Building,under,Tropical,Climates,"" Journal"Architecture"TESA,"Vol."6"Number"1,"ISSN"1410"J"6094"
47
48
49 Challenge"
50 architecture"
51 Visual Performance" Impacts of Lighting " ""Confined"by"the"inadequate"luminous"power" """"provided"by"the"light"sources"available.""! ""Give"impacts"to"environment"directly"!
52 Artificial lighting" Principal Lighting Criteria " "Freedom"from"Disturbing"Glare" "Light"Color"and"Color"Rendering" "
53 1 Artificial lighting"
54 Artificial lighting" 1 Luminous"Flux" Luminance" Luminous"Intensity" Illuminance" Photometric"Quan@@es"
55 Requirements! Illuminance!(lx)! Examples! Low" 20"J"70" Artificial lighting" 1 Moderate" 120"J"185" Entrance,"restaurant" Medium" 250"J"375" General"task" High" 500"J"750" Reading,"wri@ng" Very"high" >"1000" Precision"task"
56 Exercise"
57 Artificial lighting" 1."Room"Index" T="2"m" 0.75"m" P" 10"x"4" K =" =" 1.43" 2"(10+4)" L"
58 Artificial lighting" MASTER!LED!18H100W!2700K!PAR38!25D!Dim!"
59 2."Design"Factor" Artificial lighting" UF"=" "="0.57! MF"="0.8! DF"="0.57"x"0.8"="0.456! x 0.18 = 0.022
60 Moediartianto, ST, M.Sc 2010
61 Artificial lighting" 2 PERCEPTION (Lighting Distribution)
62 Artificial lighting" 2
63 Artificial lighting" 2
64 Artificial lighting" 2
65 Artificial lighting" 2
66 Artificial lighting" Visual Quality 3 No direct glare Glare"is"caused"by"brightness"of"any"objects"within"the"visual" field"which"is"brighter"than"the"adapta@on"level"of"eye" It"can"lead"to"discomfort":"Discomfort"Glare"
67 Artificial lighting" 4
68 Artificial lighting" 4
69 Artificial lighting" Color!Rendering!! 5 CRI (Ra) describes lighting quality using scale (0 100) Ra < 20 Ra > 80
70 Artificial lighting" 5
71 Artificial lighting" 5
72
73 Exercise"
74
75
76 Artificial lighting"
77
78 Artificial lighting"
79 Artificial lighting"
80 Artificial lighting"
81 Artificial lighting"
82 Artificial lighting"
83 Artificial lighting"
84 Artificial lighting"
85 What"should"we"do"" to"implement" green!concept" under"the"tropical"climates?"
86 Challenge"
87 Challenge"
88 Challenge"
89 Challenge" Occupancy"Sensor"" Daylight"Sensor" Bad"Design """":"25" "40"W/m2" Excellent"Design:"4.8"W/m2"""
90 Maraming Salamat! Magandang linggo sa iyo! Moediar)anto,"" Faculty"of"Architecture"&"Design"
2009 Rensselaer Polytechnic Institute. All rights reserved. 2. Regional Workshop on Energy Efficient Lighting (RCEEL)
UNDERSTANDING LIGHTING Russell Leslie, FIES AIA LC Professor and Associate Director, Lighting g Research Center Rensselaer Polytechnic Institute April 29, 2009 Increasing interest in Safety Health Security
More informationDAYLIGHTING DESIGN. Strategies for Achieving Quality Daylighting. Spring 2014 College of Architecture, Texas Tech University 1
DAYLIGHTING DESIGN Strategies for Achieving Quality Daylighting Spring 2014 College of Architecture, Texas Tech University 1 DAYLIGHTING DESIGN TOPLIGHTING Criteria & Preliminary Sizing Based on The Architect
More informationUnparalleled Universal Living Washington, DC
Unparalleled Universal Living Washington, DC Project Name / Location Justice Park Apartments / Washington, DC Project Category Residential Architecture Program 26,615 sf, 28-unit workforce housing development
More informationMANDATORY MEASURES DAYLIGHTING. Reference: Sub-Chapter 4, Section 130.1(d)
MANDATORY MEASURES DAYLIGHTING Reference: Sub-Chapter 4, Section 130.1(d) MINIMUM DAYLIGHTING FOR LARGE SPACES Large enclosed spaces, such as large open offices, are required to have a minimum amount of
More informationTopic Source Proposed Revision Hearing authority for Churches. Planning Commission Staff
REVISION SHEET Recommended Changes to the August 2014 Second Public Review Draft of the Zoning Code September 22, 2014 Page 1 of 10 Zoning Code Section Table 3.1 Public, Civic and Institutional Uses A.
More informationDaylight availability in courtyards of urban dwellings in Athens
Eco-Architecture II 305 Daylight availability in courtyards of urban dwellings in Athens E. Tsianaka RMJM London Ltd., Cambridge, UK Abstract The aim of this paper is to explore the role of courtyards
More informationUPDATED REVISION SHEET October 7, 2014
UPDATED REVISION SHEET October 7, 2014 Recommended Changes to the: August 2014 Second Public Review Draft of the Zoning Code September 17, 2014, Draft Design Guidelines Includes recommendations from September
More informationMANDATORY MEASURES DAYLIGHTING. Reference: Sub-Chapter 4, Section 130.1(d)
MANDATORY MEASURES Reference: Sub-Chapter 4, Section 130.1(d) Daylighting Controls General lighting in the areas under skylights and directly adjacent to windows must have daylighting controls. Lighting
More informationProponent s Guide to the NCC s Federal Land Use, Design and Transaction Approvals Process
Proponent s Guide to the NCC s Federal Land Use, Design and Transaction Approvals Process September 2018 Table of Contents 1. INTRODUCTION 3 2. WHAT IS THE NATIONAL CAPITAL REGION? 4 3. WHEN IS APPROVAL
More informationTable of Contents E.3 Light and Glare - Glare
Table of Contents E.3 Light and Glare - Glare 1. INTRODUCTION... 1279 2. ENVIRONMENTAL SETTING... 1280 a. Glare-Sensitive Receptors... 1280 b. Existing Daytime Glare Generated at Project Site... 1282 c.
More informationRURAL SETTLEMENT ZONE - RULES
Chapter 38 RURAL SETTLEMENT ZONE - RULES INTRODUCTION This Chapter contains rules managing land uses in the. The boundaries of this zone are shown on the planning maps. There is limited opportunity for
More informationDepartment of Architecture. Faculty of Engineering & Technology The University of Jordan. B.Sc. Curriculum
Department of Architecture Faculty of Engineering & Technology The University of Jordan B.Sc. Curriculum 2005-2006 1 Department of Architecture B.Sc. Curriculum a. Introduction: The student is required
More informationOrdinance # ARTICLE 1
Ordinance # 2012-02 AN ORDINANCE OF THE TOWNSHIP OF ATHENS, BRADFORD COUNTY, PENNSYLVANIA, AMENDING THE TOWNSHIP ZONING ORDINANCE, ENACTED SEPTEMBER 20, 2001 BE IT ENACTED AND ORDAINED by the Township
More informationD-A-CH common training system for assessors Round table meeting of Accreditation Bodies of South East Europe 9th -10th of June 2010 Tirana, Albania
D-A-CH common training system for assessors Round table meeting of Accreditation Bodies of South East Europe 9th -10th of June 2010 Tirana, Albania BAM - Federal Institute for Materials Research and Testing
More informationMULTIFAMILY PERFORMANCE PROGRAM Technical Topic New Buildings Savings Opportunity - Stairwell Lighting
Summary Stairwell lighting offers opportunities for significant energy savings. Many stairwells are designed with more illumination than is required for safety. Furthermore, many light fixtures that are
More informationD8.9 Educational Material for University Studies
D8.9 Educational Material for University Studies Weitlaner Robert - Aldrans, Austria The research leading to these results has received funding from the European Community s Seventh Framework Programme
More informationThe effect of atrium façade design on daylighting in atrium and its adjoining spaces
Design and Nature V 9 The effect of atrium façade design on daylighting in atrium and its adjoining spaces S. Samant Department of the Built Environment, University of Nottingham, UK Abstract Atrium buildings
More informationARC3101 Technologies and environments 3 (Caulfield)
ARC3101 Technologies and environments 3 (Caulfield) View Online Mr hn Sadar : Department of Architecture, Faculty of Art and Design : hn.sadar@monash.edu - List maintained by Monash University Library
More informationNew Accounting Rules for Revenue and Leases
New Accounting Rules for Revenue and Leases CFMA Education Summit March 22, 2017 Presented by: Carole McNees, CPA, Partner, Plante & Moran, PLLC Recently released standards New guidance from the Financial
More informationPD No. 15 Authorized Hearing Steering Committee Meeting #2
PD No. 15 Authorized Hearing Steering Committee Meeting #2 July 11, 2018 Andrew Ruegg, Senior Planner Sustainable Development and Construction City of Dallas Authorized Hearing Process Community meeting
More information3rd Year. 2nd Year. DFN 2004: Desgin Studio IV. DFN 2242: Design Communication II. ARCH 3211: Arch. Structures II: Steel + Wood
2008-14 NAAB Performance Criteria Course Type L: Lecture LS: Lecture/Seminar LP: Lecture & Practicum S: Studio Foundation + Pro: [2] + [3] NAAB Performance Level A: Ability U: Understanding Year of Study
More informationLIFEMARK TM ACCREDITED PLANS
LIFEMARK TM ACCREDITED PLANS Lockwood Homes is proud to be a Lifemark tm Accredited partner. With Lockwood s low maintenance, highly durable consutrction, adaptable, healthy living spaces and sustainable
More informationArchitectural Technology III 1. ARCH 523 Environmental Controls
Architectural Technology III 1 ARCH 523 Environmental Controls Architectural Technology III 2 Architectural Technology III 3 Jeremy Kargon, Registered Architect Born: Champagne-Urbana, Illinois Raised:
More informationThe Carpenter Center for Visual Arts, Harvard University Analysis 4 th and 5 th Floor Studio Spaces
Homework #6 4.492 Daylighting November 5, 2004 Ed Rice The Carpenter Center for Visual Arts, Harvard University Analysis 4 th and 5 th Floor Studio Spaces The Carpenter center for Visual Arts was completed
More informationMarch Breakfast. Presenters: Chong Shin Carson Design Associates. David Sullivan CodeNEXT Advisory Group. Marjorie Burciaga Independence Title Company
March Breakfast March Breakfast Presenters: Marjorie Burciaga Independence Title Company David Sullivan CodeNEXT Advisory Group Chong Shin Carson Design Associates Eric Van Hyfte BOKA Powell Austin s Growth
More informationWashington State Energy Code TABLE C (2) INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
Washington State Energy Code TABLE C405.4.2(2) COMMON SPACE-BY-SPACE TYPES a LPD (w/ft 2 ) Atrium - First 40 feet in height Atrium - Above 40 feet in height Audience/seating area - Permanent 0.03 per ft.
More informationLED Bulb QP Features. Electrical Specification. Applications.
LED Bulb QP08-012 Features Good heat dissipation with professional designed aluminum,alloy housing; Anti-glare, giving visual comfort; Isolating circuit design, safety and reliability; Solid-state, no
More informationq/., S Lt _ _.._--.
~'ii..,... """:." LONDON BOROUGH OF LEWISHAM PLANNING SERVICE LIFETIME HOMES STATEMEf\ t:b~ DEVELOPMENT OF Land to the RIO 13 Calmant Road BR14BY q/., S Lt-7- ----------------.._---- ---_.._--. CASE No
More informationChapter 02 Consolidation of Financial Information Answer Key Multiple Choice Questions
TEST BANK FOR FUNDAMENTALS OF ADVANCED ACCOUNTING 6TH EDITION BY HOYLE Link download full: https://digitalcontentmarket.org/download/test-bank-forfundamentals-of-advanced-accounting-6th-edition-by-hoyle
More informationNAAB Appendix B FACULTY TEACHING MATRIX
o501 W. Cesar E. Chavez Blvd. San Antonio, TX 78207 T: 210.458.3010 NAAB Appendix B FACULTY TEACHING MATRIX Faculty Matrix Template - Fall 2014 Faculty Summary of expertise Course # Course # Course # Alexander
More informationBRIDGES RETREAT CENTRE
P.O. Box 288 Franschhoek, 7690 Phone: 021-867-0267 Fax: 021-867-0907 Email: RetreatCentre@bridgessa.org BRIDGES RETREAT CENTRE Bridges Retreat Centre is a Christian Centre used primarily for ministry.
More informationRenewable Energy Development on Contaminated Properties. Liability Concerns
Renewable Energy Development on Contaminated Properties Addressing Potential Liability Concerns Suzanne Armor Associate Regional Counsel Office of CERCLA Legal Support U.S. Environmental Protection Agency
More informationAtrium in residential buildings a design to enhance social interaction in urban areas in Nordic climates
Atrium in residential buildings a design to enhance social interaction in urban areas in Nordic climates Itai Danielski, Malin Krook 2, and Kerstin Veimer 3,2,3 Mid-Sweden University, Östersund, 8363 Sweden
More informationPrivate Housing Finance Law
Private Housing Finance Law 11-244 11-244 Tax exemption and abatement for rehabilitated buildings. a. As used in this section, the following terms shall have the following meanings: 1. "Eligible real property"
More informationBRIDGES RETREAT CENTRE
P.O. Box 288 Franschhoek, 7690 Phone: 021-867-0267 Fax: 021-867-0907 Email: RetreatCentre@bridgessa.org BRIDGES RETREAT CENTRE Bridges Retreat Centre is a Christian Centre used primarily for ministry.
More informationCountry Club Village Restoration Project
Country Club Village Restoration Project CHARLES PUTMAN & ASSOCIATES, INC. Land Planning Services PLANNING - ZONING - PERMITTING SLATTERY & ASSOCIATES ARCHITECTS / PLANNERS COUNTRY CLUB VILLAGE SITE SITE
More informationSTYLISH & ELEGANT JAKES PLACE
STYLISH & ELEGANT Contents Location Contemporary design ittings and fixtures loor plans Contact us Le Geyt St Location - CARTWRIGHT Rosemount Tce Lutwyche Rd A Grantson St Lyons Tce JAKES PLACE Algar St
More informationINDOOR ENVIRONMENT IN MULTI-STOREY RESIDENTIAL BUILDINGS Thermal and Visual Comfort Using IV20 MASTER THESIS
INDOOR ENVIRONMENT IN MULTI-STOREY RESIDENTIAL BUILDINGS Thermal and Visual Comfort Using IV20 MASTER THESIS 4th Semester MSc. Building Energy Design SYNOPSIS TITLE: INDOOR ENVIRONMENT IN MULTI- STOREY
More informationA Bill Regular Session, 2019 SENATE BILL 170
Stricken language would be deleted from and underlined language would be added to present law. 0 0 0 State of Arkansas nd General Assembly As Engrossed: H// A Bill Regular Session, 0 SENATE BILL 0 By:
More informationon qualifications and experience.
LACKAWANNA COUNTY HOUSING AUTHORITY Housing Inspector Vacancy POSTING DATE: CLOSING DATE: August 5, 2016 August 12, 2016 VACANCY: DUTIES: Job Title: Housing Inspector, subject to the collective bargaining
More informationInner yard building occupant s perception versus the computer simulated metrics of daylight, KTH
Acknowledgement The author of this study would like to thank Paul Rogers (Arkitekt M.Arch, BREEAM and Miljöbyggnad certified assessor at BAU architects, SAR/MSA) for his tutorship, encouragements, guidance
More informationBlock Housing Important Information
Block Housing Important Information This binder contains an anticipated listing of available blocks and floor plan for all of the anticipated room blocks. These blocks are subject to change at any time.
More informationROOF LOUNGE FOYER FOYER. Conference room Conference room
function rooms Our conference rooms, bathed in natural light by openable windows, are fully air-conditioned and equipped with the latest conference technology. Seven function rooms between 70 and 280 sqm
More informationWELCOME TIMESCALES. Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. ANTHOLOGY S COMMITMENTS
WELCOME Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. Since the second consultation in October 2018, which asked your views on the preferred approach,
More informationDAYLIGHT SIMULATION FOR CODE COMPLIANCE: CREATING A DECISION TOOL. Krystle Stewart 1 and Michael Donn 1
DAYLIGHT SIMULATION FOR CODE COMPLIANCE: CREATING A DECISION TOOL Krystle Stewart 1 and Michael Donn 1 1 School of Architecture, Victoria University of Wellington, Wellington, New Zealand ABSTRACT The
More informationMEHLIKA INANICI. Ph.D. in Architecture, University of Michigan, Ann Arbor, MI. Major: Environmental Technology, Minor: Computer Graphics
MEHLIKA INANICI University of Washington Department of Architecture Box 355720 Seattle, WA, 98195 206.221.5794 inanici@uw.edu http://faculty.washington.edu/inanici Education: Ph.D. in Architecture, University
More informationAgenda Item. Item: 11a
Agenda Item Item: 11a Issue under Consideration: Ordinance No. 2014-38 - To rezone two parcels located at 3629 and 3641 Melton Avenue approximately 320 feet east of the intersection of Highway 17 Business
More informationPART 9: RURAL AREA ZONING DISTRICTS
9.1. AREA DESCRIPTION PART 9: RURAL AREA ZONING DISTRICTS The Rural Area consists of the areas of the County that are not part of the Urban Service Area. 9.2. A - Airport 9.2.1. Purpose To provide for
More informationSubmission Procedures
Submission Procedures - The term Tenant may also be used to imply Tenant s Consultants, Contractors, or other Tenant representatives. - Store Design Drawings may also be referred to as Design Drawings
More informationHOME FROM HOME SERVICED APARTMENTS ON FLEXIBLE TERMS
SERVICED APARTMENTS & CORPORATE ACCOMMODATION HOME FROM HOME SERVICED APARTMENTS ON FLEXIBLE TERMS SERVICED APARTMENTS. THE WAY FORWARD. High quality, affordable, serviced apartments provide a home away
More information7 Section 1. PURPOSE. The purpose of this Code is to provide minimum
1 BILL NO. 262 A BILL ORDINANCE NO. 2 94-280 3 FOR 4 AN ORDINANCE 5 ADOPTING THE KEIZER HOUSING CODE 6 The City of Keizer ordains as follows: 7 Section 1. PURPOSE. The purpose of this Code is to provide
More informationSouth Stoke Housing Development Open Day Introduction 1
Introduction 1 Summary of previous village meetings on housing development an open meeting was held in the Village Hall on 5 th Feb 2015 to review the Village Plan and decide on what would follow it on
More informationCHAPTER 4 LIGHT, VENTILATION & OCCUPANCY LIMITATIONS
CHAPTER 4 LIGHT, VENTILATION & OCCUPANCY LIMITATIONS Chapter 4 establishes the minimum criteria for light and ventilation and identifies occupancy limitations. * Indicates code is still under review for
More informationPROPOSED TEXT CHANGES TO LAND USE BYLAW - JULY 2016
SECTION # BRIEF SUMMARY OF CHANGE PROPOSED CHANGE CURRENT WORDING AMENDMENTS TO SECTION 2.5 - DEFINITIONS UTILITY SERVES (Both Major and Minor) Remove the word infrastructure from the definition title
More informationGASB 87 10/29/2017 OBJECTIVE OF GASB 87
GASB 87 LEASES OBJECTIVE OF GASB 87 Establishes a single model for lease accounting based on the foundational principle that leases are financings of the right to use an underlying asset. REQUIRMENTS Lessee
More informationENROLL TODAY! Winter 2014 Class Schedule. January 6 to February 9
Winter 2014 Class Schedule January 6 to February 9 1st Day of Priority Registration: October 21, 2013 1st Day of Registration(Continuing Students): October 24, 2013 1st Day of Registration (New Students):
More informationDreaming about excellent office space?
Dreaming about excellent office space? prime location l modern l high quality l advanced technologies l high standard l cutting-edge design l energy saving l environmentally friendly A STRIKING NEW OFFICE
More information1 February FNB House Price Index - Real and Nominal Growth
1 February 2017 MARKET ANALYTICS AND SCENARIO FORECASTING UNIT JOHN LOOS: HOUSEHOLD AND PROPERTY SECTOR STRATEGIST 087-328 0151 john.loos@fnb.co.za THEO SWANEPOEL: PROPERTY MARKET ANALYST 087-328 0157
More informationOBJECTIVE OF GASB 87
LEASES GASB 87 OBJECTIVE OF GASB 87 Establishes a single model for lease accounting based on the foundational principle that leases are financings of the right to use an underlying asset. 1 REQUIRMENTS
More informationReal Estate Modelling This course can also be presented in-house for your company or via live on-line webinar
Real Estate Modelling This course can also be presented in-house for your company or via live on-line webinar The Banking and Corporate Finance Training Specialist Course Overview Course Methodology This
More informationPLANNING REPORT Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 17, Project No. 1507
PLANNING REPORT 1131 Gordon Street City of Guelph Prepared on behalf of 1876698 Ontario Inc. March 17, 2016 Project No. 1507 423 Woolwich Street, Suite 201, Guelph, Ontario, N1H 3X3 Phone (519) 836-7526
More informationFifth 50,500 4,
The WESTWORKS PLAS and Specification Schedule of areas Retail Reception floor office sq FT sq m sq FT sq m Fifth 50,500 4,692 799 74 Fourth 51,935 4,825 680 63 Third 53,750 4,993 Second 53,840 5,002 7,490
More informationDue Diligence and Disclosures. An agent s perception of riches SAMPLE
Due Diligence and Disclosures Chapter 1: An agent s perception of riches 1 Chapter 1 An agent s perception of riches After reading this chapter, you will be able to: estimate the potential income and expenses
More informationTHE AREA PLAN COMMISSION OF ST. JOSEPH COUNTY, IN AGENDA
THE AREA PLAN COMMISSION OF ST. JOSEPH COUNTY, IN AGENDA Tuesday, June 20, 2017 Fourth-Floor Council Chambers 3:30 p.m. County-City Building, South Bend, IN PUBLIC HEARINGS: 1. Rezonings: A. A combined
More informationSection XXIV Signs (including Banners, Flags, and Temporary Signs)
Section XXIV Signs (including Banners, Flags, and Temporary Signs) A. Guiding Principle Allow for adequate information to be conveyed without compromising the rural character of Rochester. B. Specific
More informationSTAFF REPORT PLN September 11, 2017
Page: 1 TO: SUBJECT: GENERAL COMMITTEE APPLICATIONS FOR OFFICIAL PLAN AMENDMENT AND ZONING BY-LAW AMENDMENT 37 JOHNSON STREET WARD: WARD 1 PREPARED BY AND KEY CONTACT: SUBMITTED BY: GENERAL MANAGER APPROVAL:
More informationSimulation at House Type 45 Viewed From Natural Light
Simulation at House Type 45 Viewed From Natural Light Rachmat Kurnia 1, Hartanto Budiyuwono 2 1 Postgraduate Student, Master of Architecture Department, Parahyangan Catholic University, Bandung, Indonesia
More informationRegistration Classroom Rules and Procedures Introduction
Course Schedule SECTION 1. (Day 1 Morning) Introduction Registration Classroom Rules and Procedures Introduction Part 1. The Appraiser and Public Trust Ethical and Competent Practice Exercising Sufficient
More informationInternational competition for daylight-sensitive, architectural designs. Department for Building and Environment / Danube University Krems
International competition for daylight-sensitive, architectural designs Daylight Spaces 2012 Department for Building and Environment / Danube University Krems in cooperation with AIR artists-in-residence
More informationQuality of Life and Environment Committee. June 12, David Cossum, Director Sustainable Development & Construction
Park Land Dedication Overview Quality of Life and Environment Committee June 12, 2017 David Cossum, Director Sustainable Development & Construction Willis Winters, Director Park and Recreation Overview
More informationONEOK Bakken Pipeline (Bear Creek) Staff Report Conditional Use Permit
ONEOK Bakken Pipeline (Bear Creek) Staff Report Conditional Use Permit Conditional use permit request for a 37.5 mile natural gas pipeline, known Application: as Bear Creek Pipeline. Hearing Date: October
More informationCustomer Engagement Strategy
Customer Engagement Strategy If you have difficulty with sight or hearing, or if you require a translated copy of this document, we would be pleased to provide this information in a form that suits your
More informationARCH - Architecture. ARCH - Architecture 1
ARCH - Architecture 1 ARCH - Architecture ARCH 121IA. Introduction to Design. 3 Credits. (2 Lec) F,S,Su PREREQUISITE: For majors and non-majors. Introduction to the design and creative process through
More informationThe Architecture of Light Advanced Studio V A4105 Section 14 Fall 2015 GSAPP Jeffrey Inaba, Draft: 1 September 2015
The Architecture of Light Advanced Studio V A4105 Section 14 Fall 2015 GSAPP Jeffrey Inaba, ji2129@columbia.edu Draft: 1 September 2015 Artificial lighting and haze The Weather Project, Olafur Eliasson
More informationCPT Section Fundamentals of Accounting Chapter 2 Unit 8 CA V.K.Jain
CPT Section Fundamentals of Accounting Chapter 2 Unit 8 CA V.K.Jain (a) Error of Commission (b) Error of Omission (c) Compensating error (d) Error of Principal Right Answer: (d) (a) Debit is more by Rs.
More informationPD No. 15 Authorized Hearing Steering Committee Meeting #3
PD No. 15 Authorized Hearing Steering Committee Meeting #3 July 26, 2018 Andrew Ruegg, Senior Planner Sustainable Development and Construction City of Dallas Working PD No. 15 Meeting Topics Uses Accessory
More information8.5.1 R1, Single Detached Residential District
8.5.1 R1, Single Detached Residential District The purpose of this district is to provide for residential development in the form of single detached dwellings. Dwelling, Single Detached Home Business,
More informationI am writing on behalf of leading European retail companies represented in the European Retail Round Table (ERRT).
-.. : European Retail Round Table 2013-270 International Accounting Standards Board (IASB) IFRS Foundation Publications Department 1st Floor, 30 Cannon Street London EC4M 6XH United Kingdom Copy: European
More informationA D A N A H I LTO N S A
A D A N A H I LTO N S A A HOTEL WITH A HISTO RY, THE FIRST INTERNATIONAL 5 STA R H OTEL IN ADA NA Adana HiltonSA offers 15 years tradition and high service quality. A DA NA H ILTO N SA OFFERS, 16 YEARS
More informationORDINANCE NUMBERS 8 -ob
ORDINANCE NUMBERS 8 -ob ORDINANCE AMENDING Ordinance number 45-08, WHICH AMENDS MASON COUNTY CODE AND DEVELOPMENT REGULATIONS TITLE 17, CHAPTERS 17.20 THROUGH 17.35 AND TO INCLUDE REVISIONS TO THE BELFAIR
More informationORDINANCE NO AMENDING CHAPTER 94 OF THE CODE OF ORDINANCES OF THE ORDINANCE, TEXAS), AS HERETOFORE AMENDED, BY AMENDING; RELATING
ORDINANCE NO. 3513 AN OF THE CITY OF FARMERS BRANCH, TEXAS ORDINANCE AMENDING CHAPTER 94 OF THE CODE OF ORDINANCES OF THE CITY OF FARMERS BRANCH ( THE COMPREHENSIVE ZONING ORDINANCE, TEXAS), AS HERETOFORE
More informationFinancial Institutions.. Rating Symbols and Definitions..
Financial Institutions.. Rating Symbols and efinitions.. www.arcratings.com LOAL EXPERTISE, SHARE INSIGHT, ETTER JUGMENT June 18, 2013 Short-Term Issuers A-1 An obligor rated A-1 shows a strong capacity
More informationMidwest City, Oklahoma Zoning Ordinance
2010 Midwest City, Oklahoma Zoning Ordinance 9/2/2010 Table of Contents Section 1. General Provisions... 5 1.1. Citation... 5 1.2. Authority... 5 1.3. Purpose... 5 1.4. Nature and Application... 5 1.5.
More information3804 Wilson Boulevard (Staples Site) Special General Land Use Plan Study
1 3804 Wilson Boulevard (Staples Site) Special General Land Use Plan Study Long Range Committee of the Planning Commission Meeting May 16, 2018 Department of Community Planning, Housing and Development
More informationARCHITECTURE (ARCH) Architecture (ARCH) 1. ARCH Undergraduate Research Credit Hours.
Architecture (ARCH) 1 ARCHITECTURE (ARCH) ARCH 1009. Fundamentals of Architectural Design I. 4 Credit Introduction to creative problem-solving and the design realization cycle through project-based design
More information1 ON ALBERT BRAND NEW DEVELOPMENT HEAD OFFICE CITY OFFICE A visionary company with decades of experience
1 ON ALBERT BRAND NEW DEVELOPMENT HEAD OFFICE 021 433 2580 CITY OFFICE 021 422 2526 d o g o n g r o u p. c o m A visionary company with decades of experience TABLE TABLE BEDROOM 2 11.2m² BEDROOM 1 15.8
More informationDRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes
Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes 1 Local Area Plan - Project Alignment Overview Directions Report, October 2008 (General Summary Of Selected
More informationFor more information please call the events team on or
The Top of the Terrace. The Top of the Terrace is one of our largest function rooms and is situated at the top of the Barclay Stand. The room can comfortably accommodate up to 0 delegates for a conference
More informationLOT, DEPTH- The mean horizontal distance between the front lot line and the rear lot line.
than 135 degrees. LOT, DEPTH- The mean horizontal distance between the front lot line and the rear lot line. LOT, FRONTAGE: The continuous distance measured along the front lot line between the points
More informationAPPLICATION FOR WAIVER OF MINIMUM REQUIRED SETBACKS/SEPARATION
APPLICATION FOR WAIVER OF MINIMUM REQUIRED SETBACKS/SEPARATION This application must be typed or printed in black ink and submitted with four (4) copies, with all required attachments, to: Planning and
More informationTool for Land Consolidation
LandSpaCES * : A Spatial Planning The Empowerment of Local Authorities: Spatial Information and Spatial Planning Tools 25-28 October, Paris, France Tool for Land Consolidation Demetris Demetriou **, John
More informationARCHITECTURE. Curriculum in Architecture. Objectives of the Bachelor of Architecture program: Total B. Arch. Requirement: cr.
Architecture 1 ARCHITECTURE http://www.arch.iastate.edu The undergraduate program in architecture is an accredited five-year curriculum leading to the Bachelor of Architecture degree. The program provides
More informationAn in depth analysis of all aspects of pipe work restoration. Part 2
An in depth analysis of all aspects of pipe work Part 2 Per Ekelund, 2009-04-14 The economy side of pipe work projects The Costs The costs for a pipe work restoration project vary a lot because of several
More informationPlanning Application 16/4008/F Rockwell 771 units off Anchor and Hope Lane SE7
Annex (6 pages) Planning Application 16/4008/F Rockwell 771 units off Anchor and Hope Lane SE7 Evidence from Charlton Riverside Masterplan Summary (NB This is the Short Annex see also Long Annex for more
More informationDAYLIGHTING DESIGN. Strategies for Achieving Quality Daylighting. Spring 2014 College of Architecture, Texas Tech University 1
DAYLIGHTING DESIGN Strategies for Achieving Quality Daylighting Spring 2014 College of Architecture, Texas Tech University 1 DAYLIGHTING DESIGN TOPLIGHTING Criteria & Preliminary Sizing Based on The Architect
More informationFOR SALE OR LEASE. Manufacturing / Distribution Facility 85,262± Square Feet (Divisible) Acres
FOR SALE OR LEASE Manufacturing / Distribution Facility 85,262± Square Feet (Divisible) 15.65 Acres 330 Southwell Boulevard Tifton, Tift County, Georgia 31794 SALES PRICE: $4,000,000 LEASE RATE: $2.00/PSF,
More informationExquisite, turn-key home, with high-end finishes!
4312 PINE MEADOW TRAIL TRAVERSE CITY, MI 49685 Exquisite, turn-key home, with high-end finishes! Features 5 bedroom, 3 bath, Craftsman Ranch home, with 2,520 SQFT Interior features include; cathedral ceilings,
More informationAGENDA REPORT SUMMARY
PUBLIC HEARING Agenda Item # 10 Meeting Date: September 26, 2017 AGENDA REPORT SUMMARY Subject: Prepared by: Approved by: Ordinance No. 2017-436: CT Zone amendments Jon Biggs, Community Development Director
More informationSECTION 828 "R-3" AND "R-3-A" MEDIUM DENSITY MULTIPLE FAMILY RESIDENTIAL DISTRICTS
SECTION 828 "R-3" AND "R-3-A" MEDIUM DENSITY MULTIPLE FAMILY RESIDENTIAL DISTRICTS The "R-3" AND "R-3-A" Districts are intended to provide for the development of medium density multiple family residential
More informationIn the matter of the application of FINDINGS & DECISION Daniel & Charmaine Warmenhoven (PLN020333)
LYNNE MOUNDAY ZONING ADMINISTRATOR STATE OF CALIFORNIA COUNTY OF MONTEREY 020333 RESOLUTION NO. 000 A.P.# 243-031-002- In the matter of the application of FINDINGS & DECISION Daniel & Charmaine Warmenhoven
More information