1 SETX Environmental, Inc. Environmental Consulting & Testing Asbestos - Mold Lead ESA s Mr. Jack Haralson October 15, 2018 Director of Facilities & Planning ASE Project No Texas City ISD th Avenue North P.O. Box 1150 Texas City, TX Re: Asbestos Survey La Marque Elementary School Site: 1217 Vauthier Street, La Marque, TX SETX Environmental, Inc. (ASE), Texas Department of State Health Services (TDSHS) Licensed Consultant Agency (Lic. # ), has conducted an asbestos survey at the above referenced site of suspected Asbestos Containing Building Materials (ACBM) to be demolished or involved in renovations. This survey was performed in compliance with The Texas Asbestos Health Protection Rules (TAHPR), and the National Emissions Standards for Hazardous Air pollutants (NESHAP). This survey also satisfies the requirements of Senate Bill 509, which requires Cities to verify an Asbestos Survey has been performed prior to issuing a Permit for Renovation, Demolition, Occupancy, etc. Mr. Justin Sonier, TDSHS Asbestos Inspector License No , and Mr. David Morton, TDSHS Asbestos Inspector License #603600, conducted the survey and they were accompanied by Sam Huff. The survey was initiated on September 25, 2018 and completed on October 3, Two hundred and nine, (209), samples were collected and delivered to APEX Laboratories, TDSHS Lab License # for analysis by Polarized Light Microscopy (PLM). The results of the surveys must be kept on site during renovation or demolition activities. This Survey did not include destructive sampling therefore is limited in scope. All suspect materials may not have been identified or sampled. (Hidden under carpet, in wall cavities, mirror mastic, or moisture barriers, etc.) When renovations or demolition occurs, this survey should be reviewed to determine if additional sampling is required for those materials to be disturbed. With regard to asbestos, a homogeneous area (an area of material that is uniform in color and texture) shall be determined to contain asbestos if the results of at least one sample collected from it indicate that asbestos is present in an amount of or greater than 1% (one percent). Once a material has been found to contain asbestos, all such materials in the Homogeneous Area are considered to contain asbestos. A minimum of 3 samples of each suspect material must be collected and analyzed in order to comply with the requirements of the TAHPR Regulations. Building materials that contain asbestos and are in public buildings, commercial buildings or facilities and which are in a good condition can be managed under a Management Plan and an Operations and Maintenance (O&M) program. An O&M spells out the procedures and practices that must be applied to building cleaning, maintenance, renovation, and general operation to maintain the building as free of asbestos contamination as possible. The O&M would remain in effect until all ACM have been removed from the property for which it was prepared. Prior to beginning asbestos abatement activities, notification must be sent to the TDSHS at least ten working days prior to the starting the work. A TDSHS licensed to prepare the specifications and conduct the project management and air monitoring activities during the abatement project and for final clearance Taft Avenue, Groves, TX Office: Fax:

2 Asbestos Survey La Marque Elementary School Page 2 of 7 Based on the Laboratory Analysis, Asbestos has been identified in a portion of the bulk samples below (See BOLDED entries). Sample Analysis Summary Sample No. Material & Location Asbestos Content Sheetrock/Joint Compound Walls Doorway Room 113 None Detected Sheetrock/Joint Compound Walls Back Wall Room 112 None Detected Sheetrock/Joint Compound Walls Behind Ceramic Tile Boy s None Detected Restroom Near Room Sheetrock/Joint Compound Walls Outside Room 116 None Detected Sheetrock/Joint Compound Walls Back Wall Room 101 None Detected Sheetrock/Joint Compound Walls Gym 115 Exterior Wall None Detected Sheetrock/Joint Compound Walls Hallway Outside Main Office None Detected Sheetrock/Joint Compound Walls Room 207 None Detected Sheetrock/Joint Compound Walls Hallway at Library None Detected Sheetrock/Joint Compound Walls Boy s Restroom Next to None Detected Storage Sheetrock/Joint Compound Walls Cafeteria at Room 602 None Detected Sheetrock/Joint Compound Walls Cafeteria Serving Area None Detected Sheetrock/Joint Compound Walls Kitchen Dry Storage None Detected Sheetrock/Joint Compound Walls Hallway Across from Room None Detected Sheetrock/Joint Compound Walls Room 203 None Detected Sheetrock/Joint Compound Walls Room 501 Back Storage None Detected Sheetrock/Joint Compound Walls Room 315 None Detected Sheetrock/Joint Compound Walls Hall Across from Life Skills None Detected Room Sheetrock/Joint Compound Walls Room 302 Work Room None Detected Sheetrock/Joint Compound Walls Women s Restroom by 301B None Detected Sheetrock/Joint Compound Walls 301B Restroom None Detected Unfinished Sheetrock Wall Library West Corner None Detected Unfinished Sheetrock Wall Library East Corner at Room 402 None Detected Unfinished Sheetrock Wall Faculty Workroom 510 None Detected Unfinished Sheetrock Wall Hallway at Room 507 None Detected Unfinished Sheetrock Wall Principal s Office 505 None Detected Unfinished Sheetrock Wall Office 502 None Detected Unfinished Sheetrock Wall Conference Room 512 None Detected Sheetrock/Joint Compound Fur Down Room 306 None Detected Sheetrock/Joint Compound Fur Down Room 307 None Detected Sheetrock/Joint Compound Fur Down Room 107 None Detected Sheetrock/Joint Compound Fur Down Room 103 None Detected Sheetrock/Joint Compound Fur Down Room 106 None Detected Sheetrock/Joint Compound Fur Down Room 112 None Detected Sheetrock/Joint Compound Fur Down Room 113 None Detected Sheetrock/Joint Compound Ceilings Girl s Restroom by Room None Detected 301B Sheetrock/Joint Compound Ceilings Girl s Restroom by Rooms None Detected Sheetrock/Joint Compound Ceilings Gym Office 115A None Detected Sheetrock/Joint Compound Ceilings Electrical Room 317 None Detected

3 Asbestos Survey La Marque Elementary School Page 3 of Sheetrock/Joint Compound Ceilings Boy s Restroom at Storage None Detected Sheetrock/Joint Compound Ceilings Cafeteria Serving Area None Detected Sheetrock/Joint Compound Ceilings Kitchen Near Freezer None Detected White 12 X 12 Floor Tile/Mastic Cafeteria Storage None Detected White 12 X 12 Floor Tile/Mastic Storage Room 601A Behind None Detected Stage White 12 X 12 Floor Tile/Mastic Ramp Behind Stage None Detected Dark Brown Mastic Glue Pods Room 108 None Detected Dark Brown Mastic Glue Pods Room 106 None Detected Dark Brown Mastic Glue Pods Room 106 None Detected Plaster Walls Between Rooms 103 and 105 None Detected Plaster Walls Hallway Across from Gym None Detected Plaster Walls Hall at Room 308 None Detected Plaster Walls Hall at Room 305 None Detected Plaster Walls Hall at Workroom 302 None Detected Plaster Walls Hall at Room 110 None Detected Plaster Walls Hall at Room 113 None Detected Peanut Butter Mastic Glue Pods Room 108 None Detected Peanut Butter Mastic Glue Pods Room 202 None Detected Peanut Butter Mastic Glue Pods Room 108 None Detected X 2 Ceiling Tile Hallway at Room 108 None Detected X 2 Ceiling Tile Hallway Across from Counselor 511 None Detected X 2 Ceiling Tile Workroom 302 None Detected Residual Black Mastic on Terrazzo Floor Hall Across from Room None Detected Residual Black Mastic on Terrazzo Floor Doorway to Room Chrysotile 2% Residual Black Mastic on Terrazzo Floor Hall at Gym Positive Stop Glue Pods Behind Fiber Chalk Boards Room 105 None Detected Glue Pods Behind Fiber Chalk Boards Room 101 None Detected Glue Pods Behind Fiber Chalk Boards Room 101 None Detected Black Glue Pods Behind Chalk Boards 300 Wing Room 307 None Detected Black Glue Pods Behind Chalk Boards 300 Wing Room 304 None Detected Black Glue Pods Behind Chalk Boards 300 Wing Room 303 None Detected Residual Black Mastic on Concrete Floor Room 206 None Detected Residual Black Mastic on Concrete Floor Cafeteria Floor None Detected Residual Black Mastic on Concrete Floor Book Storage 501 None Detected Residual Cove Base Mastic Room 315 None Detected Residual Cove Base Mastic Room 315 None Detected Residual Cove Base Mastic Room 315 None Detected Fiberglass Insulation with Black Paper Backing Principal s Office None Detected Fiberglass Insulation with Black Paper Backing Gym Exterior None Detected Wall Fiberglass Insulation with Black Paper Backing Hall by Room None Detected Tan Baseboard Stage Storage None Detected Tan Baseboard Stage Storage None Detected Tan Baseboard Stage Storage None Detected Residual Cove Base Mastic - Stage None Detected Residual Cove Base Mastic - Stage None Detected

4 Asbestos Survey La Marque Elementary School Page 4 of Residual Cove Base Mastic Stage None Detected Exterior Sheetrock with Black Paper Principal s Office 505 None Detected Exterior Sheetrock with Black Paper Gym Interior Wall None Detected Exterior Sheetrock with Black Paper Room 102 None Detected Black Vapor Barrier on Floor Gym Floor None Detected Black Vapor Barrier on Floor Gym Floor None Detected Black Vapor Barrier on Floor Gym Floor None Detected Brown 9 X 9 Floor Tile Under Lockers and Mud Plates Room 105 T = Chrysotile 2% M = Chrysotile 5% Brown 9 X 9 Floor Tile Under Lockers and Mud Plates Positive Stop Room Brown 9 X 9 Floor Tile Under Lockers and Mud Plates Positive Stop Room Troweled-on Vapor Barrier Room 315 Between Brick and Chrysotile 15% Cinderblock Troweled-on Vapor Barrier Room 315 Between Brick and Positive Stop Cinderblock Troweled-on Vapor Barrier Room 315 Between Brick and Positive Stop Cinderblock Gypsum Firewall Around Electrical Rooms Electrical Room 507 None Detected Gypsum Firewall Around Electrical Rooms Electrical Room 507 None Detected Gypsum Firewall Around Electrical Rooms Electrical Room 317 None Detected Green Fiberboard Chalk Boards Room 105 None Detected Green Fiberboard Chalk Boards Room 101 None Detected Green Fiberboard Chalk Boards Room 113 None Detected White Mastic on Ductwork Cafeteria Mechanical Room None Detected White Mastic on Ductwork 300 Wing Riser Room None Detected White Mastic on Ductwork Cafeteria Above Ceiling None Detected White Mastic on Silver Fiberglass Insulation Cafeteria None Detected Mechanical Room White Mastic on Silver Fiberglass Insulation Office Mechanical None Detected Room White Mastic on Silver Fiberglass Insulation 300 Wing Riser None Detected Room Vibration Dampener Cafeteria Mechanical Room None Detected Vibration Dampener Office Mechanical Room None Detected Vibration Dampener 300 Wing Riser Room None Detected Fiberglass TSI Straight Line Cafeteria Mechanical Room None Detected Fiberglass TSI Straight Line Office Mechanical Room None Detected Fiberglass TSI Straight Line Hall by 300 Wing Riser Room None Detected Fiberglass TSI Fittings Cafeteria Mechanical Room None Detected Fiberglass TSI Fittings Office Mechanical Room None Detected Fiberglass TSI Fittings Hall by 300 Wing Riser Room None Detected Fiberglass TSI Straight Line Cafeteria Mechanical Room None Detected Fiberglass TSI Straight Line Office Mechanical Room None Detected Fiberglass TSI Straight Line 300 Wing Riser Room None Detected Fiberglass TSI Fittings Cafeteria Mechanical Room None Detected Fiberglass TSI Fittings Office Mechanical Room None Detected Fiberglass TSI Fittings 300 Wing Riser Room None Detected Fiberglass TSI Straight Line Stage None Detected Fiberglass TSI Straight Line Hall Between Library and None Detected Entrance Fiberglass TSI Straight Line 300 Wing Riser Room None Detected

5 Asbestos Survey La Marque Elementary School Page 5 of Fiberglass TSI Fittings Stage None Detected Fiberglass TSI Fittings Hall Between Library and Entrance None Detected Fiberglass TSI Fittings 300 Wing Riser Room None Detected Vinyl Roof System Above 300 Hall None Detected Vinyl Roof System Western Corner None Detected Vinyl Roof System Above Gym Hallway None Detected Vinyl Roof System 100 Hall South None Detected Vinyl Roof System 100 Hall North None Detected Asphalt/Tar Roof Above Cafeteria None Detected Asphalt/Tar Roof Above 200 Hallway None Detected Asphalt/Tar Roof Hallway Above Office None Detected Asphalt/Tar Roof Above Room 315 None Detected Asphalt/Tar Roof South Panel None Detected Flashing Mastic Above Kitchen None Detected Flashing Mastic Above Room 315 None Detected Flashing Mastic Above Front Entrance None Detected Older TSI Straight Line Custodial Closet in 100 Wing Chrysotile 3% Restrooms Older TSI Straight Line Pipe Chase 100 Wing Restrooms Positive Stop Older TSI Straight Line Hallway at Room 104 Positive Stop Older TSI Fittings Custodial Closet in 100 Wing Chrysotile 5% Restrooms Older TSI Fittings Pipe Chase 100 Wing Restrooms Positive Stop Older TSI Fittings Hallway at Room 102 Positive Stop Older TSI Straight Line Custodial Closet Between 100 Chrysotile 5% Wing Restrooms Older TSI Straight Line Pipe Chase 100 Wing Restrooms Positive Stop Older TSI Straight Line Hallway at Room 104 Positive Stop Older TSI Fittings with Black Mastic Custodial Closet in Chrysotile 5% 100 Wing Restrooms Older TSI Fittings with Black Mastic Pipe Chase 100 Wing Positive Stop Restrooms Older TSI Fittings with Black Mastic Hallway at Room 106 Positive Stop Sheetrock/Joint Compound Firewall Above Ceiling Hallway at None Detected Room Sheetrock/Joint Compound Firewall Above Ceiling Hallway at None Detected Gym Sheetrock/Joint Compound Firewall Above Ceiling Hallway at None Detected Room Cold Water TSI on AC Unit Room 101 None Detected Cold Water TSI on AC Unit Room 108 None Detected Cold Water TSI on AC Unit Room 111 None Detected Hot Water TSI on AC Unit Room 101 None Detected Hot Water TSI on AC Unit Room 108 None Detected Hot Water TSI on AC Unit Room 111 None Detected Plaster Ceiling Hallway at Corner Near Room 308 None Detected Plaster Ceiling Hallway at Corner Near Room 308 None Detected Plaster Ceiling Hallway at Corner Near Room 308 None Detected Roofing Material in Hall Penetration Hall Next to Room 115 None Detected Roofing Material in Hall Penetration Hall Next to Room 115 None Detected Roofing Material in Hall Penetration Hall Next to Room 115 None Detected Ceramic Fire Brick Wall Room 106 None Detected Ceramic Fire Brick Wall Girl s Restroom in 100 Hall None Detected

6 Asbestos Survey La Marque Elementary School Page 6 of Ceramic Fire Brick Wall Hallway at Gym None Detected Exterior Plaster Ceiling Main Entrance Portico None Detected Exterior Plaster Ceiling Door #5 to Cafeteria None Detected Exterior Plaster Ceiling Overhang Near Entrance #2 None Detected Exterior Green Stucco Wall Exterior on Vertical Overhang None Detected Exterior Green Stucco Wall By Exterior HVAC Area None Detected Exterior Green Stucco Wall at Cafeteria Door to Exterior None Detected Transite Board at Portico Above Entrance #9 Near Portables Chrysotile 30% Transite Board at Portico Above Entrance #9 Near Portables Positive Stop Transite Board at Portico Above Entrance #9 Near Portables Positive Stop Door Frame Caulk Door #7 at NE Corner None Detected Door Frame Caulk Door #6 Cafeteria to Exterior None Detected Door Frame Caulk Door at Front Entrance None Detected Building Caulk Door #6 Cafeteria to Exterior None Detected Building Caulk Door #3 Exterior Wall None Detected Building Caulk SW Building Corner None Detected Fiberboard in Portico Ceiling Above Entrance #3 None Detected Fiberboard in Portico Ceiling Above Entrance #3 None Detected Fiberboard in Portico Ceiling Above Entrance #3 None Detected Large Jacketed TSI Straight Line Exterior HVAC Area None Detected Large Jacketed TSI Straight Line Exterior HVAC Area None Detected Large Jacketed TSI Straight Line Exterior HVAC Area None Detected Large Jacketed TSI Fittings Exterior HVAC Area None Detected Large Jacketed TSI Fittings Exterior HVAC Area None Detected Large Jacketed TSI Fittings Exterior HVAC Area None Detected Small Jacketed TSI Straight Line Exterior HVAC Area None Detected Small Jacketed TSI Straight Line Exterior HVAC Area None Detected Small Jacketed TSI Straight Line Exterior HVAC Area None Detected Small Jacketed TSI Fittings Exterior HVAC Area None Detected Small Jacketed TSI Fittings Exterior HVAC Area None Detected Small Jacketed TSI Fittings Exterior HVAC Area None Detected Mastic on Jacketed TSI Exterior HVAC Area None Detected Mastic on Jacketed TSI Exterior HVAC Area None Detected Mastic on Jacketed TSI Exterior HVAC Area None Detected Black Tar Sheet Vapor Barrier Behind Exterior Brick South Wall None Detected Black Tar Sheet Vapor Barrier Behind Exterior Brick West Wall None Detected Black Tar Sheet Vapor Barrier Behind Exterior Brick West Wall None Detected Positive Stop- Considered asbestos containing based on previous sample result. The conclusions in an environmental consulting report are based on the findings of the investigation described in an industry accepted or specified scope. An assessment cannot absolutely conclude that a site does not contain hazardous materials inside structures or on its surface or subsurface or any such materials have not impacted the condition of the site. As long as the assessment is conducted properly and within standards and/or regulations, and all due considerations are made, a degree of assurance can be achieved. The degree of assurance is determined by the amount of available information, scope of the assessment and complexity of analyses performed. An absolute warranty cannot be expressed or implied that no environmental liabilities exist on the site.

7 Asbestos Survey La Marque Elementary School Page 7 of 7 Please contact me if you have any questions or if we can be of further assistance regarding this survey or other environmental issues. Respectfully: Respectfully: Jerry G. Sonier Justin Sonier President Asbestos Inspector TSDHS License No TDSHS License No Respectfully: David Morton Asbestos Inspector TDSHS License No Attached: Laboratory Analysis Sample Locations (C.O.C. s) CC: Job File

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-0044

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. December 30, 2008 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Eastern Heights Elementary Asbestos Inspection Project #0824003 Dear Ted: Enclosed please find the inspection

More information

Millcreek Garden Apartments 395 East 3045 South South Salt Lake, Utah. April 29, Prepared for:

Millcreek Garden Apartments 395 East 3045 South South Salt Lake, Utah. April 29, Prepared for: PRE-DEMOLITION INSPECTION FOR ASBESTOS AND UNIVERSAL, HAZARDOUS, AND TOXIC WASTES Millcreek Garden Apartments 395 East 3045 South South Salt Lake, Utah April 29, 204 Prepared for: Mr. Kyle Kershaw, Director

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-0050

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Conwell Annex ULCS# 5231 Building # B523101-1 3072 Emerald

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 215-216 and ASBESTOS MANAGEMENT PLAN for the New Abraham Lincoln High School ULCS# 81 Building # B811-1

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2320

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

MES Project Number: Asbestos Six-Month Periodic Survey October 2010 Washington Elementary School Lyndhurst, NJ Prepared For: Lyndhurst Board

MES Project Number: Asbestos Six-Month Periodic Survey October 2010 Washington Elementary School Lyndhurst, NJ Prepared For: Lyndhurst Board MES Project Number: 10-01737 Asbestos Six-Month Periodic Survey October 2010 Washington Elementary School Lyndhurst, NJ Prepared For: Lyndhurst Board of Education 420 Fern Avenue Lyndhurst, New Jersey

More information

MATERIAL MATRIX REPORT Pier 70 - Bldg. 101 Page 7 of 12 Room ID------- Material ID Components Positive? Yes, No, Trace, Assumed ASBESTOS WLCT-1,2,3* Tan paint on exterior Yes 2% CH SF 20000 CLOTH-15* Insulation

More information

ASBESTOS PERIODIC SURVEILLANCE CHECK LIST

ASBESTOS PERIODIC SURVEILLANCE CHECK LIST DATE OF SCHOOL: Effingham County Board Office SURVEILLANCE 1. SURFACING: 2010 Plaster in hallway NO This building has been completely renovated for the board office. The plaster has been covered with paneling

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Mastery Charter School Thomas Campus ULCS# 2150 Building

More information

Renovation Progress. July 21 Aug 3, Week 42 & 43

Renovation Progress. July 21 Aug 3, Week 42 & 43 Renovation Progress July 21 Aug 3, 2012 Week 42 & 43 Jul 21 Saturday work: hardwood sanding on 2nd Ottilia and masonry outside BSRC dining room Jul 23 Carpet removal outside of chapel Jul 23 2 nd Ottilia

More information

TITLE 318 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

TITLE 318 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT TITLE 318 ARTICLE 1. INSPECTION AND CLEANUP OF PROPERTY CONTAMINATED WITH CHEMICALS USED IN THE ILLEGAL MANUFACTURE OF A CONTROLLED SUBSTANCE Rule 1. General 318 IAC 1-1-1 Applicability Authority: IC 4-22-2;

More information

ARTICLE 38. INSPECTION AND CLEANUP OF PROPERTY CONTAMINATED WITH CHEMICALS USED IN THE ILLEGAL MANUFACTURE OF A CONTROLLED SUBSTANCE

ARTICLE 38. INSPECTION AND CLEANUP OF PROPERTY CONTAMINATED WITH CHEMICALS USED IN THE ILLEGAL MANUFACTURE OF A CONTROLLED SUBSTANCE ARTICLE 38. INSPECTION AND CLEANUP OF PROPERTY CONTAMINATED WITH CHEMICALS USED IN THE ILLEGAL MANUFACTURE OF A CONTROLLED SUBSTANCE Rule 1. General 410 IAC 38-1-1 Applicability Authority: IC 4-22-2; IC

More information

Analysis Report prepared for County City Property Management

Analysis Report prepared for County City Property Management Analysis Report prepared for County City Property Management Report Date: 1/24/2019 Project #: 521 SanAir ID#: 19003161 Page 1 of 6 Name: County City Property Management Address: 920 O Street Room 203

More information

CUMBERLAND SCHOOLS WORK PROPOSED 2018

CUMBERLAND SCHOOLS WORK PROPOSED 2018 Cost Ashton Elementary School 2 2 Replace HVAC $ 375,000.00 5 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 2 3 Various Technological Improvements $ 191,258.00 2 4 Replace Plumbing Fixtures

More information

ASBESTOS/HAZARDOUS MATERIALS SURVEY AGREEMENT

ASBESTOS/HAZARDOUS MATERIALS SURVEY AGREEMENT Form XIII-15 ASBESTOS/HAZARDOUS MATERIALS SURVEY AGREEMENT THIS AGREEMENT ( Agreement ) is dated 20 by and between ( Contractor ), with a mailing address of, OH 44, and County Land Reutilization Corporation

More information

Application of the TAHPR and NESHAP to the Demolition of a Public Building

Application of the TAHPR and NESHAP to the Demolition of a Public Building Subject: BACKGROUND Application of the TAHPR and NESHAP to the Demolition of a Public Building The Texas Asbestos Health Protection Rules (TAHPR) and the National Emission Standards for Hazardous Air Pollutants

More information

Renovation Progress. June 2-15, Weeks 35 & 36

Renovation Progress. June 2-15, Weeks 35 & 36 Renovation Progress June 2-15, 2012 Weeks 35 & 36 Jun 2 Sisters investigate the progress and ponder the finished arrangement of the reception area (right) and the residence area on 2 nd Ottilia (below)

More information

Lead Safe Renovation Specifications Chase Street Cincinnati, Ohio Year of Construction: 1900

Lead Safe Renovation Specifications Chase Street Cincinnati, Ohio Year of Construction: 1900 Lead Safe Renovation Specifications Cincinnati 3959 Fulton Grove Rd Cincinnati, Ohio 45245 (513) 752-9111 (513) 752-7973 (Fax) 1500 Chase Street Cincinnati, Ohio 45223 Year of Construction: 1900 Cleveland

More information

TOWN CENTER Property Description 2000 Tower Town Center 2000 Tower Overview Completed in 1986, the 2000 Tower at Town Center has one of its most striking entry lobbies. The polished granite lobby is two

More information

U.S. Environmental Protection Agency Applicability Determination Index

U.S. Environmental Protection Agency Applicability Determination Index U.S. Environmental Protection Agency Applicability Determination Index Control Number: A020001 Category: EPA Office: Date: Title: Recipient: Author: Asbestos Region 5 08/30/2002 Moving Structures Robert

More information

Environmental Liabilities Associated Real Estate Transitions LIFE SCIENCES

Environmental Liabilities Associated Real Estate Transitions LIFE SCIENCES Environmental Liabilities Associated Real Estate Transitions Agenda Presentations on Limiting Liability When Engaged in Property Transactions Focus on Lab Decommissioning Panel Discussion Panel Members

More information

DUE DILIGENCE. Presented at. Lydia Work, Senior Chemist Licensed Remediation Specialist Triad Engineering, Inc.

DUE DILIGENCE. Presented at. Lydia Work, Senior Chemist Licensed Remediation Specialist Triad Engineering, Inc. DUE DILIGENCE Presented at Lydia Work, Senior Chemist Licensed Remediation Specialist Triad Engineering, Inc. due dil i gence appropriate carefulness: the degree of care that a prudent person would exercise,

More information

ACCESSORY DWELLING UNITS

ACCESSORY DWELLING UNITS ACCESSORY DWELLING UNITS Category: Residential Construction Revised: [Paul L. Scarlett], Director Responsible Bureau Sections: Development Services Center 1900 SW Fourth Avenue Portland, OR 97201 503-823-7310

More information

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS Facility Assessment Report Co-locating on this campus are MARIE MILITAR HS and PHOEIX MILITAR HS This report contains the detailed findings of a facility assessment completed on the date noted in the document

More information

17 N Centre Ave Leesport, PA 19533

17 N Centre Ave Leesport, PA 19533 17,400± SF Special Purpose/Religious Facility 17 N Centre Ave Property Highlights Stained Glass Windows Two Wood Staircases Parking in Rear 2 lots Social Hall with Stage Kitchen Sanctuary w/ Pew Seating

More information

Charles Kozminski Elementary Community Academy

Charles Kozminski Elementary Community Academy Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Renovation Progress. Sep , Week 51

Renovation Progress. Sep , Week 51 Renovation Progress Sep. 22-28, 2012 Week 51 Sep 22 A Saturday morning walk shows the canopy progress on the south end of Ottilia Hall Sep 24 Touch-up painting in the Infirmary Sep 24 Wooden forms removed

More information

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161 1 School Name Year Built/Renovation Classroom quantity, size, type, usage Glover School Construction 2012-14 Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor

More information

ACCESSORY DWELLING UNITS

ACCESSORY DWELLING UNITS ACCESSORY DWELLING UNITS Category: Residential Construction Revised: [Paul L. Scarlett], Director Responsible Bureau Sections: Development Services Center 1900 SW Fourth Avenue Portland, OR 97201 503-823-7310

More information

1976 Fargo, ND City Directory - R.L. Polk & Co.

1976 Fargo, ND City Directory - R.L. Polk & Co. 1986 Fargo, ND City Directory - R.L. Polk & Co. 1981 Fargo, ND City Directory - R.L. Polk & Co. 1976 Fargo, ND City Directory - R.L. Polk & Co. 1971 Fargo, ND Directory - R.L. Polk & Co. 1971 Fargo, ND

More information

Emil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619

Emil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

General Statement Regarding Assessment Analysis Recommendations

General Statement Regarding Assessment Analysis Recommendations Summary For Berkley Court Apartments VA018182000 General Statement Regarding Assessment Analysis Recommendations Pursuant to the Franklin Redevelopment and Housing Authority, VA agreement with The Nelrod

More information

Renovation Progress. May 5 11, Week 31

Renovation Progress. May 5 11, Week 31 Renovation Progress May 5 11, 2012 Week 31 May 5 A Saturday work day for these men tying rebar and building wood framing for the north porch slab May 5 New Infirmary hallway on 1 st Ottilia with most of

More information

Renovations Information

Renovations Information Renovations Information Renovations to a Lot When proposing to undertake renovations to a lot, the lot owners should review this factsheet and we suggest you complete an application form and checklist.

More information

PROGRAM AREAS - MIDDLE SCHOOL

PROGRAM AREAS - MIDDLE SCHOOL CAPACITY Enrollment 4.0 10.00 3.81 Building Size 4.0 10.00 3.81 ACCESSIBILITY Site Access 4.0 3.00 1.14 Building Access 2.0 3.00 0.57 Disabled Access 1.0 3.00 0.29 Some site and building areas not ADA

More information

1 B Swanson Road Auburn, MA (508)

1 B Swanson Road Auburn, MA (508) 2016 COMMUNITY FEATURES: Mature Natural Settings Scenic Roads Lighted Sidewalk Areas Professionally Landscaped ARCHITECTURAL DESIGN: 4 Elegant Designs Covered Front Entry First Floor Master Suite Master

More information

FICO Realty Group Presents 485 Washington Street Woburn MA 01801

FICO Realty Group Presents 485 Washington Street Woburn MA 01801 FICO Realty Group Presents 485 Washington Street Woburn MA 01801 TO BE BUILT! 485 Washington St. Woburn MA 01801 is a beautiful 8 Room, 4 Bedroom, 2 1/2 Bath, Colonial. Very close to the Reading line.

More information

FEMA National Floodplain Insurance Program (NFIP) Substantial Improvement/Substantial Damage Determination

FEMA National Floodplain Insurance Program (NFIP) Substantial Improvement/Substantial Damage Determination Determining Structure/Market Value FEMA National Floodplain Insurance Program (NFIP) For additional clarification of requirements, please refer to FEMA Publication P-758, Substantial Improvement and Substantial

More information

VALUATION ANALYSIS PROPERTY. Single Family Residence 12 Palomino Way Anytown, Massachusetts DATE OF VALUATION. January 1, 2008 PREPARED FOR

VALUATION ANALYSIS PROPERTY. Single Family Residence 12 Palomino Way Anytown, Massachusetts DATE OF VALUATION. January 1, 2008 PREPARED FOR VALUATION ANALYSIS PROPERTY Single Family Residence 12 Palomino Way Anytown, Massachusetts DATE OF VALUATION January 1, 2008 PREPARED FOR Board of Assessors Town of Anytown One Main Street Anytown, MA

More information

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

4401 WILSHIRE BLVD LOS ANGELES, CA

4401 WILSHIRE BLVD LOS ANGELES, CA SALES BROCHURE 4401 WILSHIRE BLVD LOS ANGELES, CA JOEL FRANK Senior Vice President Lic. 0967530 +1 310 550 2513 Joel.Frank@cbre.com BLAKE FOL Associate Lic. 02013968 +1 310 550 2683 blake.fol@cbre.com

More information

Update on Building Conditions at Hilton Anchorage: August 2018

Update on Building Conditions at Hilton Anchorage: August 2018 Update on Building Conditions at Hilton Anchorage: August 2018 In September 2016, UNITE HERE published Behind the Wallpaper: an update on mold and water intrusion at the Hilton Anchorage. In November 2017,

More information

What Every Tenant Should Know About LOCAL LAW 1

What Every Tenant Should Know About LOCAL LAW 1 What Every Tenant Should Know About LOCAL LAW 1 PREVENTING CHILDHOOD LEAD POISONING 1. What Tenants Should Know................................... Page 1 What landlords must do Work covered by the law

More information

Financial Statement Instructions 324

Financial Statement Instructions 324 Tab 32 Financial Statements For preservation developments, submit the three most recent years audited financial statements for the subject development. In the event such statements are not available, please

More information

Renovation Progress. Apr , Week 29

Renovation Progress. Apr , Week 29 Renovation Progress Apr. 23 27, 2012 Week 29 Apr. 23 Drilling and making adjustments to steel posts that need to be in place before the upper level is cemented Apr. 23 Masonry on north porch of kitchen

More information

Renovation Progress. July 7-13, Week 40

Renovation Progress. July 7-13, Week 40 Renovation Progress July 7-13, 2012 Week 40 Jul 7 Masonry crew works a half-day on Saturday removing extra boards from tower scaffolding, building BSRC dining area scaffolding, and adding a few more bricks

More information

Kevin J. Maher Homes by Emerson 1B Swanson Road Auburn, MA 01501

Kevin J. Maher Homes by Emerson 1B Swanson Road Auburn, MA 01501 Kevin J. Maher Homes by Emerson 1B Swanson Road Auburn, MA 01501 Cell: 508-450-4219 Fax: 508-832-5890 E-mail: kjmaher2003@yahoo.com www.oakridgeleicester.com Site Plan COMMUNITY FEATURES: Mature Natural

More information

Janet Campbell Howard Hanna Real Estate Services. 85 South Union Street Main Line: (585) Spencerport NY Office Fax: (585)

Janet Campbell Howard Hanna Real Estate Services. 85 South Union Street Main Line: (585) Spencerport NY Office Fax: (585) Quality Built Homes By: Iuppa Homes Inc. Rich Iuppa Builder & Howard Hanna Real Estate Services Spencerport Office Janet Campbell Broker Associate Office: (585)-352-8524 Cell: (585)-739-8065 Subdivision

More information

Young Quinlan Building 9th & Nicollet

Young Quinlan Building 9th & Nicollet Young Quinlan Building 9th & Nicollet Building Information Building Access Transportation Tenant Amenities Location Amenities Address 81 South 9th Street Minneapolis, Minnesota Building Square Feet Approximately

More information

For Additional Information:

For Additional Information: Nestled in the heart of one of Mishawaka s safest and most established family neighborhoods, this next phase will feature 22 single-family villas. With a variety of floor plans to choose from, along with

More information

21-BEDROOM MOTEL INVESTMENT THREE-LEVEL MULTIFAMILY OPPORTUNITY

21-BEDROOM MOTEL INVESTMENT THREE-LEVEL MULTIFAMILY OPPORTUNITY PROPERTY OVERVIEW INVESTMENT SALE: $400,000 FULLY LEASED NNN THROUGH MAY 31, 2020 6,686 SF motel property featuring: 21 bedrooms 8 bathrooms 2 living rooms 1 kitchen 1 office/apartment with separate entry

More information

Jefferson County, Arkansas

Jefferson County, Arkansas offered for sale FARM HEADQUARTERS, EXECUTIVE RESIDENCE & 400,000 BUSHEL GRAIN STORAGE FACILITY A residential and agri-business investment opportunity. Jefferson County, Arkansas offered by Licensed in

More information

St. Charles High School Emergency Plan Instructions. Fire Drill Evacuation Procedures

St. Charles High School Emergency Plan Instructions. Fire Drill Evacuation Procedures Keep the following items in this folder: St. harles High School Emergency Plan Instructions urrent class rosters (student names only, update quarterly) School Emergency Plan for St. harles High School

More information

Residencial Altos del Sabinal - "Viviendas desde *. Plaza y Trastero Incluido"

Residencial Altos del Sabinal - Viviendas desde *. Plaza y Trastero Incluido Make your life a work of art At Inmobiliaria Osuna, there are hundreds of professional estate agents working to make your ideas and dreams come true, because we like work that is done well, we like looking

More information

Perron & Campbell, Inc. COMMERCIAL REAL ESTATE BROKERAGE PHONE: FAX:

Perron & Campbell, Inc. COMMERCIAL REAL ESTATE BROKERAGE PHONE: FAX: FOR LEASE WEST TEN PLACE 5616 IH-10 West San Antonio, Texas 78201 PROPERTY DISCLAIMER As to the subject property, Perron & Campbell., Inc. ("Broker") makes no warranties, representations or guarantees

More information

ANCHOR SPACE FOR LEASE Civic Square Shopping Center W. El Camino Real Sunnyvale, CA 94087

ANCHOR SPACE FOR LEASE Civic Square Shopping Center W. El Camino Real Sunnyvale, CA 94087 ANCHOR SPACE FOR LEASE Civic Square Shopping Center MARK BIAGINI BRE #00847403 PEGGY OWEN BRE#01473666 Biagini Properties, Inc. 333 W. El Camino Real, Suite 240 Sunnyvale, CA 94087 1969 11/1/2017 Property

More information

William Howard Taft High School

William Howard Taft High School Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

PHASE 1 (PRE-POUR) PROPERTY INSPECTION REPORT

PHASE 1 (PRE-POUR) PROPERTY INSPECTION REPORT PHASE 1 (PRE-POUR) PROPERTY INSPECTION REPORT REPORT # SM 1X-0825P1P DATE & TIME OF INSPECTION 08/25/201X (03:00 PM) A SINGLE FAMILY RESIDENCE AT 12861 XYZ DRIVE, PORTER, TX 77000 FOR MR. & MRS. DANIEL

More information

HEALTH AND SAFETY CODE SECTION

HEALTH AND SAFETY CODE SECTION HEALTH AND SAFETY CODE SECTION 25400.10-25400.12 25400.10. (a) The Legislature finds and declares all of the following: (1) Methamphetamine use and production are growing throughout the state. Properties

More information

A FOR SALE OFFERING OF THE DELESSEPS APARTMENTS 1916, 1918 AND 2002 DELESSEPS AVENUE SAVANNAH, CHATHAM COUNTY, GEORGIA 31404

A FOR SALE OFFERING OF THE DELESSEPS APARTMENTS 1916, 1918 AND 2002 DELESSEPS AVENUE SAVANNAH, CHATHAM COUNTY, GEORGIA 31404 A FOR SALE OFFERING OF THE DELESSEPS APARTMENTS 1916, 1918 AND 2002 DELESSEPS AVENUE SAVANNAH, CHATHAM COUNTY, GEORGIA 31404 PRESENTED BY WHITLEY AND ASSOCIATES, INC. 800 COMMERCIAL COURT, SUITE TWO, SAVANNAH,

More information

VILLAGES AT WALNUT CREEK

VILLAGES AT WALNUT CREEK BASE PRICE SHEET The Campbell 3 Beds / 2 Baths Approx. 1,808 Sq. Ft. See Pricing Below Single-level living at its finest can be found in the Campbell, featuring a large kitchen that would pamper any chef

More information

California Selling Package Contents. Document of name Document Version Page # Escrow Information Sheet 2 Escrow File Checklist 3

California Selling Package Contents. Document of name Document Version Page # Escrow Information Sheet 2 Escrow File Checklist 3 California Selling Package Contents Document of name Document Version Page # Escrow Information Sheet 2 Escrow File Checklist 3 Calfornia Residential Purchase Agreement & Joint Escrow Instruction C.A.R.

More information

Grand Clifton Masterpiece Mayfield Building for Sale

Grand Clifton Masterpiece Mayfield Building for Sale Grand Clifton Masterpiece Mayfield Building for Sale 506 Oak Street Cincinnati, OH 45219 Property history Property highlights Historic Hauck Heine House built in 1906 Main House 11,720 total s.f. Home

More information

ROBERT MOON VICE PRESIDENT, BROKERAGE SERVICES

ROBERT MOON VICE PRESIDENT, BROKERAGE SERVICES OFFERING MEMORANDUM MILLENNIUM MEDICAL 28625 NORTHWESTERN HWY SOUTHFIELD, MICHIGAN SEPTEMBER 2013 PREPARED BY: ROBERT MOON VICE PRESIDENT, BROKERAGE SERVICES FRIEDMAN INTEGRATED REAL ESTATE SOLUTIONS 34975

More information

Saint Cloud Business Center

Saint Cloud Business Center Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale or Lease Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception

More information

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT FOLLOW-UP AUDIT OF BUILDING PERMITS

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT FOLLOW-UP AUDIT OF BUILDING PERMITS INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT FOLLOW-UP AUDIT OF BUILDING PERMITS Ken Burke, CPA*

More information

OFFICE BUILDING FOR SALE SINGLE TENANT PROPERTY 208 GRAHAM STREET, BIDDEFORD, MAINE

OFFICE BUILDING FOR SALE SINGLE TENANT PROPERTY 208 GRAHAM STREET, BIDDEFORD, MAINE FOR SALE SINGLE TENANT PROPERTY OFFICE BUILDING This subject single tenant property is located in Biddeford near the intersection of Alfred Road and Elm Streets and behind the Burger King and Rite Aid

More information

Joe Metzler, NMLS

Joe Metzler, NMLS Joe Metzler, NMLS 274132 How do you turn a fixer upper into your dream home? The Solution the FHA 203(k) Loan! The purchase of a house that needs repair is often a catch-22 situation, because the bank

More information

CONSTRUCTION COST ESTIMATE AND ANALYSIS

CONSTRUCTION COST ESTIMATE AND ANALYSIS CONSTRUCTION COST ESTIMATE AND ANALYSIS As can be seen in the exhibits to this analysis, the total construction cost for the Alteration project is $790,324.11. However, under the state statute, section

More information

GCS Giles P O Box Professional Service, Construction Fernandina Beach, FL Professionally Delivered Services, LLC Telephone:

GCS Giles P O Box Professional Service, Construction Fernandina Beach, FL Professionally Delivered Services, LLC Telephone: Home Inspection Agreement THIS AGREEMENT is made by Tony Giles / GCS Construction Services, LLC (hereinafter INSPECTOR ) and the undersigned ( CLIENT ), collectively referred to herein as the parties.

More information

certified and licensed Lead Risk Assessor

certified and licensed Lead Risk Assessor EBLL (ELEVATED BLOOD LEAD LEVEL) A blood lead level (BLL) confirmed by venous sample to be equal to or greater than the lead level defined as elevated by the United States Centers for Disease Control.

More information

NEW HAMPSHIRE HISTORIC PROPERTY DOCUMENTATION DINARDO-DUPUIS HOUSE NH STATE NO Wight Street, Berlin, Coos County, New Hampshire

NEW HAMPSHIRE HISTORIC PROPERTY DOCUMENTATION DINARDO-DUPUIS HOUSE NH STATE NO Wight Street, Berlin, Coos County, New Hampshire NEW HAMPSHIRE HISTORIC PROPERTY DOCUMENTATION DINARDO-DUPUIS HOUSE NH STATE NO. 696 Location:, Berlin, Coos County, New Hampshire USGS Berlin Quadrangle UTM Coordinates: Z19 4926650N 325990E Present Owner:

More information

A Landlord s Guide to the Lead Poisoning Prevention and Lead Hazard Control Law ( 182)

A Landlord s Guide to the Lead Poisoning Prevention and Lead Hazard Control Law ( 182) A Landlord s Guide to the Lead Poisoning Prevention and Lead Hazard Control Law ( 182) Table of Contents 1. The Importance of Preventing Lead Poisoning page 2 2. What Landlords Need to Know page 3 3. Appendix

More information

SALISH AND KOOTENAI HOUSING AUTHORITY Maintenance Policy

SALISH AND KOOTENAI HOUSING AUTHORITY Maintenance Policy SALISH AND KOOTENAI HOUSING AUTHORITY Maintenance Policy Policy Statement The Board of Commissioners of the Salish and Kootenai Housing Authority (Housing Authority) recognizes that one of the most important

More information

Solicitation for Offers: 135 Allen Brook Lane Williston, Vermont

Solicitation for Offers: 135 Allen Brook Lane Williston, Vermont EXCLUSIVELY LISTED FOR SALE Solicitation for Offers: 135 Allen Brook Lane Williston, Vermont Contact: Chris Sherman x11 Tony Blake x13 www.vtcommercial.com Free-standing 8,127 square foot 1 1/2 story office

More information

203k U N D E R S T A N D I N G A G U I D E T O H O M E O W N E R S H I P

203k U N D E R S T A N D I N G A G U I D E T O H O M E O W N E R S H I P 203k U N D E R S T A N D I N G A G U I D E T O H O M E O W N E R S H I P How do you turn a fixer upper into your dream home? T he purchase of a house that needs repairs is often a catch-22 situation, because

More information

Residencial Cármenes Balcón de Granada c/ Zahareña (Barranco del Abogado),

Residencial Cármenes Balcón de Granada c/ Zahareña (Barranco del Abogado), Look through your new window Balcón de Granada is a proposal to appreciatte the beauty of one of the most wonderful landscapes of the world. In "Inmobiliaria Osuna" we want to keep the tradition of thhe

More information

Renovation Progress. Nov. 4 9, Week 57

Renovation Progress. Nov. 4 9, Week 57 Renovation Progress Nov. 4 9, 2012 Week 57 Nov 4 For the first time in over a year the Sisters welcome guests for Sunday Mass through the front doors of Ottilia Hall Nov 5 Plumbers have been around adding

More information

Gezandebaan 2 in Someren

Gezandebaan 2 in Someren Gezandebaan 2 in Someren Agricultural business with a spacious detached farmhouse and a large garden. Currently this location is in use as a poultry farm. The entire plot is situated on a unique location

More information

HIGHLANDS AT MADISON PARK

HIGHLANDS AT MADISON PARK BASE PRICE SHEET The Benson 3 Beds / 2.5 Baths Approx. 1,801 Sq. Ft. See Pricing Below An impressive, light-filled entry welcomes you into the Benson and leads to a connected living-dining-kitchen layout

More information

ReNew Jersey Stronger

ReNew Jersey Stronger 1 Insured: PAUL WALDMAN Business: (201) 954-2427 Property: 57 Bridgewaters Dr Apt 19 UNIT 19 Cell: (732) 389-2728 Oceanport, NJ 07757 Home: 57 Bridgewaters Dr Apt 19 UNIT 19 Oceanport, NJ 07757 E-mail:

More information

WESTBROOK III & HIGHLAND III Live Work Town Center Townhomes

WESTBROOK III & HIGHLAND III Live Work Town Center Townhomes WESTBROOK III & HIGHLAND III Live Work Town Center Townhomes Westbrook III Lot 8 Lot 7 Lot 6 Lot 5 Lot 4 Lot 3 Lot 2 Westbrook III Lot 1 The Westbrook III and are unique three-level live work townhomes

More information

EXHIBIT A SCOPE OF SERVICES. Demolition & Removal Services for Crosstown Parkway from Manth Lane to SR-5 / US-1

EXHIBIT A SCOPE OF SERVICES. Demolition & Removal Services for Crosstown Parkway from Manth Lane to SR-5 / US-1 EXHIBIT A SCOPE OF SERVICES Demolition & Removal Services for Crosstown Parkway from Manth Lane to SR-5 / US-1 1.0 The purpose of this agreement is to retain the Vendor for three years to provide demolition,

More information

518 3 rd Avenue South St. Petersburg, Florida

518 3 rd Avenue South St. Petersburg, Florida 518 3 rd Avenue South St. Petersburg, Florida 33701 813.895.8591 www.viridianfl.com Project Summary Preservation of Senior Housing Project Name: Viridian Address: 518 3 rd Avenue South St. Petersburg,

More information

ROGER GRAY BROKER TEL

ROGER GRAY BROKER TEL ROGER GRAY BROKER 210-240-4319 TEL WWW.CAPROP.NET Absolute NNN Trophy Property in the Heart of the South Texas Medical Center Built in 2003, and updated with new AC and flooring in 2016, this is a great

More information

REQUEST FOR PROPOSAL BID Daniell Heights Apartments Winter Cleaning Project

REQUEST FOR PROPOSAL BID Daniell Heights Apartments Winter Cleaning Project REQUEST FOR PROPOSAL BID 17-101 Daniell Heights Apartments Winter Cleaning Project ISSUE DATE November 9, 2017 Invitation to Bid Michigan Technological University invites you to submit bids for work involving

More information

QHOChomes.com. our Standard Features

QHOChomes.com. our Standard Features our Standard Features Excellent Exteriors Low maintenance vinyl siding Exterior cornice wrapped in aluminum with decorative bend Decorative raised panel vinyl shutters on front windows (per plan/elevation)

More information

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628 11411 S Eggleston Ave Chicago, IL 6628 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors

More information

SALISH AND KOOTENAI HOUSING AUTHORITY Maintenance Policy

SALISH AND KOOTENAI HOUSING AUTHORITY Maintenance Policy SALISH AND KOOTENAI HOUSING AUTHORITY Maintenance Policy Policy Statement The Board of Commissioners of the Salish and Kootenai Housing Authority (Housing Authority) recognizes that one of the most important

More information

PROPOSAL JANITORIAL SERVICES LAKELAND ELEMENTARY SCHOOL OAKSEED LN LAKELAND, TN FEBRUARY 11, 2015

PROPOSAL JANITORIAL SERVICES LAKELAND ELEMENTARY SCHOOL OAKSEED LN LAKELAND, TN FEBRUARY 11, 2015 PROPOSAL JANITORIAL SERVICES LAKELAND ELEMENTARY SCHOOL 10050 OAKSEED LN LAKELAND, TN 38002 FEBRUARY 11, 2015 A Service Mark of COMMUNITY REHABILITATION AGENCIES OF TENNESSEE 40 Rutledge Street Nashville,

More information

NOW LEASING RETAIL SPACE OVERBROOK PLAZA SHOPPING CENTER NORTH LITTLE ROCK, ARKANSAS

NOW LEASING RETAIL SPACE OVERBROOK PLAZA SHOPPING CENTER NORTH LITTLE ROCK, ARKANSAS Visit: www.metrorealty.cc for information about our commercial properties. NOW LEASING RETAIL SPACE OVERBROOK PLAZA SHOPPING CENTER NORTH LITTLE ROCK, ARKANSAS LOCATION IN HIGH TRAFFIC CORRIDOR EXCELLENT

More information

15 Tanguay Avenue, Nashua, NH

15 Tanguay Avenue, Nashua, NH 15 Tanguay Avenue, Nashua, NH Berkshire Hathaway Verani Realty Commercial Division is pleased to announce the availability of executive office suites, with individual mailing addresses, at 15 Tanguay Ave.

More information

Stark HS. Housing Solutions. By:

Stark HS. Housing Solutions. By: Stark HS Housing Solutions Stark HS Constructive technology based on a system of precast Models and spaces Stark HS offers a range of models with different construction areas between 47 and 158 m2, in

More information

TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045

TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045 TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION 9123 Route 108, Old Annapolis Road Columbia, MD 21045 RETAIL/OFFICE/MEDICAL/EXECUTIVE SUITES OFFERED FOR LEASE PROPERTY IDENTIFICATION: ADDRESS:

More information