1 Campus Master Plan Board of Trustees Meeting December 10, 2004

2 Master Plan: Schedule 2004 Observations / Concept Development December 8-9 January and January 21 March 2 3 Focus Groups Space Needs Assessment Additional Focus Groups Summary of Observations / Concept Plan Precinct Studies March April May 10 Precinct 1 Workshop Precinct 2 Workshop BOT Buildings & Grounds Committee June - August July 2004 Development of Plan/Guidelines Baltimore Workshop Final Plan/ Design Guidelines September October 1 November December 10 Draft Plan Open Forums BOT Presentation Final Draft Plan Buildings and Grounds / Open Forums BOT Presentation

3 Arcadia Key Issues 1. How do we meet our immediate need for student housing and faculty offices? 2. How do we accommodate our enrollment growth? a. Housing b. Academic and support space c. Parking 3. How can we maintain our close-knit campus culture?

4 Arcadia Key Issues 1. How do we meet our immediate need for student housing and faculty offices? 2. How do we accommodate our enrollment growth? a. Housing b. Academic and support space c. Parking 3. How can we maintain our close-knit campus culture? What is the responsible capacity of the campus? How can we be a good institutional citizen? How do we address our future needs?

5 Program Needs Existing 04 Proposed 2013 Dance Enrollment 3,423 4,500 Faculty & Staff 527Music 664 Space Needs 600,000 GSF 960,000 GSF Housing 1,090Art Beds Gallery 1,450 Beds On Campus 746 up to 1,185 Parking 1,227 Spaces 1,580 Spaces First Floor Second Floor

6 PRIORITIES Housing New Parking Classroom & faculty office space (which should address deficits) Space for visual and professional arts (may be solved by new classroom space) One stop student services / student life New Dining Auditorium / gathering space 500* Athletics & Rec Physical plant & storage * may be solved by new elevator in Stiteler

7 OBSERVATIONS ~ Summary of Observations Tight-knit campus community Off-campus housing loses close-knit family feeling Need to develop Compact and Coherent Campus Facilities are inadequate to meet growing needs Campus topography and landscape constrain expansion Community questions about Arcadia s expansion

8 OBSERVATIONS ~ Draft Guiding Principles For Master Plan Enhance and preserve the intimacy of the Campus and its surrounding Community by: Connecting Arcadia's Vision and Mission with the Physical Plan Representing the Campus as a Comprehensive University Maximizing Efficiency and Aesthetic Quality of Campus Facilities Protecting, Enhancing, and Expanding the Campus Natural Beauty Clarifying the Campus Edges Allowing for Growth in an elegant and efficient way

9 Campus Plan ~ Existing

10 Arcadia University ~ Proposed Plan Existing Buildings New Buildings Parking Structures

11 Arcadia University Existing Aerial Looking North

12 Arcadia University Proposed Aerial Looking North

13 Arcadia University Existing West Quad viewed from the Kuch Recreation Center

14 Arcadia University Proposed West Quad viewed from the Kuch Recreation Center addition

15 Arcadia University Murphy Hall Improvements and Brubaker Addition

16 Arcadia University Murphy Hall Improvements and Brubaker Addition

17 Arcadia University Residence Hall Renovations

18 Arcadia University Residence Hall Renovations

19 Arcadia University Residence Hall Renovations

20 Arcadia University Residence Hall Renovations

21 Arcadia University ~ Proposed Plan Existing Buildings New Buildings Parking Structures

22 Arcadia University ~ New Opportunity Existing Buildings New Buildings Parking Structures

23 Kaname Property Acquisition of land Approx. $ K 150 Parking spaces and Lit Trail to campus Approx. $750 K Total: $ M 5 Minute Walk

24 Kaname Property Acquisition of land Approx. $ K 150 Parking spaces and Lit Trail to campus Approx. $750 K Total: $ M 5 Minute Walk Gains 2.8 Contiguous Acres Maintains Arcadia s Borders Savings of $2.8M in Phase I Allows for Future Development

25 Pathway Design Good lines of sight Well Lit Defined walk way

26 Kaname Property ~ Long-term Upper division /graduate /faculty /specialty apartments Approx. $6-7.5 M 40 Parking spaces Approx. $120 K Total $ M

27 Arcadia University ~ Proposed Plan Existing Buildings New Buildings Parking Structures

28 Proposed Plan Phase 1 $21 M Oak Summit Purchase and limited renovation $4.5 M North Parking Structure Spaces $1.1 M Landscaping -$1.8 M Divest 1600 Church Road $1.0 M Acquire 309 Properties $25.8 M TOTAL Phase 2 $16.7 M New 60,000 SF Academic and Student Life Center $6.2 M West Quad and Stream Restoration and North Parking Structure Spaces $3.0 M Selected Renovations $4.3 M South Parking Structure Spaces $30.2 M TOTAL

29 Arcadia University ~ Option A Revised Existing Buildings New Buildings Parking Structures

30 Proposed Plan A (Revised) Phase 1 $21 M Oak Summit Purchase and Limited Renovation $1.5 M Purchase/Develop Kaname Property as Surface Parking for 150 Cars $1.3 M Landscaping -$1.8 M Divest 1600 Church Road $1.0 M Acquire 309 Properties $23.0 M TOTAL Savings of $2.8 M compared to original plan Phase 2 $16.7 M New 60,000 SF Academic and Student Life Center $6.2 M West Quad and Stream Restoration and North Parking Structure Spaces $3.0 M Selected Renovations $4.3 M South Parking Structure Spaces $30.2 M TOTAL

31 Option A (R): Phase 1 Years Total Net Gain 1 Building Area 879,295 GSF 280,300 GSF Academic 291,515 GSF 12,000 GSF Auxiliary 97,604 GSF 8,500 GSF Housing 490,176 GSF 271,800 GSF 4 Number of Beds On-Campus Off-Campus 1,267 beds 736 beds 531 beds 200 beds 0 beds 200 beds 5 Parking Spaces 1, ) Purchase of Oak Summit Limited Renovation for program space 2) Acquisition of Kaname Property 3) Land Acquisition 4) Landscape Improvement Boyer Hall Quad 5) Divestiture of 1600 Church Rd. Units 6) Terminate Master Lease for Trilogy Apartments Begin Programming for Phase 2 Academic and Student Life Facilities 6 Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

32 Option A (R): Phase 2 Years 3-5 Total Net Gain Building Area Academic Auxiliary 939,295 GSF 331,515 GSF 117,604 GSF 60,000 GSF 40,000 GSF 20,000 GSF 2 1 Housing 490,176 GSF 0 GSF 5 3 Number of Beds 1,367 beds 100 beds On-Campus Off-Campus 736 beds 631 beds 0 beds 100 beds Parking Spaces 1, ) North Parking Structure Phase 2 2) New Student Union / Academic 3) New West Quadrangle 4) South Parking Structure Phase 1 5) Stream Restoration Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

33 Option A (R): Phase 3 Years 6-10 Total Net Gain Building Area 981,295 GSF 42,000 GSF Academic 349,515 GSF 18,000 GSF 2 Auxiliary Housing 141,604 GSF 490,176 GSF 24,000 GSF 0 GSF 4 Number of Beds On-Campus Off-Campus 1,450 beds 736 beds 714 beds 83 beds 0 beds 83 beds Parking Spaces 1, ) 309 Athletic Field Development 2) Taylor Renovation and Addition 3) Renovation of Boyer, Spruance Fine Arts Center, Grey Castle, Thomas, Kistler, Heinz, and Dilworth Halls 4) Kuch Partial Renovation and Addition 5) Murphy Renovation 6) Landscape Improvements Pedestrianize and landscape entrance from Grey Castle, north to Church Rd entrance. Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

34 Option A (R): Phase 4 Years 8-15 Total Net Gain Building Area 1,101,095 GSF 119,800 GSF Academic 469,315 GSF 119,800 GSF 4 Auxiliary 141,604 GSF 0 GSF Housing 490,176 GSF 0 GSF Number of Beds 1,450 beds 0 beds On-Campus Off-Campus 736 beds 714 beds 0 beds 0 beds 1 2 Parking Spaces 1, ) New Academic Building 2) New Academic Buildings 3) South Parking Structure Phase 2 4) Manor Site Redevelopment Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

35 Option A (R): Future Development Total Net Gain 3 Building Area Academic 1,227,795 GSF 501,215 GSF 126,700 GSF 126,700 GSF 4 Auxiliary 141,604 GSF 0 GSF Housing 584,976 GSF 36,000 GSF Number of Beds 1,475 beds 25 beds 1 On-Campus Off-Campus 736 beds 714 beds 25 beds 0 beds 2 Parking Spaces 1, ) New Academic Building 2) New Academic Building 3) New Housing 4) Expanded Parking Structure Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

36 Option A (R): Full Build-Out Building Area Academic Auxiliary Housing Existing 598,995 GSF 291,515 GSF 89,104 GSF 218,376 GSF Proposed 1,227,795 GSF 501,215 GSF 141,604 GSF 584,976 GSF Number of Beds On-Campus Off-Campus 1,067 beds 736 beds 331 beds 1,475 beds 761 beds 714 beds Parking Spaces 1,227 spaces 1,585 spaces Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

37 Arcadia University ~ Existing Plan

38 Arcadia University ~ Proposed Plan Consolidate the Campus Connect the Natural and Built Systems Connect the Campus with the Community Existing Buildings New Buildings Parking Structures

39 Arcadia University ~ Proposed Plan Consolidate the Campus Connect the Natural and Built Systems Connect the Campus with the Community Existing Buildings New Buildings Parking Structures

40 Arcadia University ~ Existing

41 Arcadia University ~ Proposed

42 Arcadia University ~ Future Opportunities Examine how to use additional capacity of the core campus and Kaname property for academic programs and housing Examine potential of commercial space along Easton Road and redevelopment of Oak Summit Existing Buildings New Buildings Parking Structures

43

44 Existing Parking Parking Spaces: 1,227 total on main campus (including CEA, Manor Housing, and Church Rd. Properties)

45 Proposed Parking Parking Spaces: 1,365 total on main campus (including CEA, Manor Housing, and Church Rd. Properties)

46 Proposed Parking Parking Spaces: 1,665 total on main campus with Oak Summit

47 Existing Building Use P Academic Administrative Athletics Housing Library Service Support Non-Univ. Bldg Parking Deck Public Access Venue P P P P Trilogy Apts.

48 Proposed Building Use P Academic Administrative Athletics Housing Library Service Support Non-Univ. Bldg Parking Deck Public Access Venue P P P P Trilogy Apts.

49 Arcadia University ~ Option A Revised Existing Buildings New Buildings Parking Structures

50 Campus Plan ~ Phasing Two Options A: Acquire Oak Summit B: Core Campus

51 Option A : Existing Conditions Total Building Area Academic Auxiliary Housing 598,995 GSF 291,515 GSF 89,104 GSF 218,376 GSF Number of Beds On-Campus Off-Campus 1,067 beds 736 beds 331 beds Parking Spaces 1,227 spaces Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

52 Option A: Phase 1 Years 1-3 Total Net Gain 1 Building Area 879,295 GSF 280,300 GSF Academic 291,515 GSF 12,000 GSF 2 Auxiliary 97,604 GSF 8,500 GSF Housing 490,176 GSF 271,800 GSF 4 Number of Beds On-Campus Off-Campus 1,267 beds 736 beds 531 beds 200 beds 0 beds 200 beds 5 Parking Spaces 1, ) Purchase of Oak Summit Limited Renovation for program space 2) North Parking Structure Phase 1 3) Land Acquisition 4) Landscape Improvement Boyer Hall Quad 5) Divestiture of 1600 Church Rd. Units 6) Terminate Master Lease for Trilogy Apartments Begin Programming for Phase 2 Academic and Student Life Facilities 6 Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

53 Option A: Phase 2 Years 3-5 Total Net Gain Building Area Academic Auxiliary 939,295 GSF 331,515 GSF 117,604 GSF 60,000 GSF 40,000 GSF 20,000 GSF 2 1 Housing 490,176 GSF 0 GSF 5 3 Number of Beds 1,367 beds 100 beds On-Campus Off-Campus 736 beds 631 beds 0 beds 100 beds Parking Spaces 1, ) North Parking Structure Phase 2 2) New Student Union / Academic 3) New West Quadrangle 4) South Parking Structure Phase 1 5) Stream Restoration Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

54 Option A: Phase 3 Years 6-10 Total Net Gain Building Area 981,295 GSF 42,000 GSF Academic 349,515 GSF 18,000 GSF 2 Auxiliary Housing 141,604 GSF 490,176 GSF 24,000 GSF 0 GSF 4 Number of Beds On-Campus Off-Campus 1,450 beds 736 beds 714 beds 83 beds 0 beds 83 beds Parking Spaces 1, ) 309 Athletic Field Development 2) Taylor Renovation and Addition 3) Renovation of Boyer, Spruance Fine Arts Center, Grey Castle, Thomas, Kistler, Heinz, and Dilworth Halls 4) Kuch Partial Renovation and Addition 5) Murphy Renovation 6) Landscape Improvements Pedestrianize and landscape entrance from Grey Castle, north to Church Rd entrance. Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

55 Option A: Phase 4 Years 8-15 Total Net Gain 5 Building Area 1,101,095 GSF 119,800 GSF Academic 469,315 GSF 119,800 GSF 4 Auxiliary 141,604 GSF 0 GSF Housing 490,176 GSF 0 GSF Number of Beds 1,450 beds 0 beds On-Campus Off-Campus 736 beds 714 beds 0 beds 0 beds 1 2 Parking Spaces 1, ) New Academic Building 2) New Academic Buildings 3) South Parking Structure Phase 2 4) Manor Site Redevelopment 5) New Central Receiving Building Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

56 Option A: Future Development Total Net Gain Building Area 1,227,795 GSF 126,700 GSF Academic 501,215 GSF 126,700 GSF Auxiliary 141,604 GSF 0 GSF Housing 584,976 GSF 0 GSF Number of Beds 1,450 beds 0 beds 1 On-Campus Off-Campus 736 beds 714 beds 0 beds 0 beds 2 Parking Spaces 1, ) New Academic Building 2) New Academic Building Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

57 Option A: Full Build-Out Building Area Academic Auxiliary Housing Existing 598,995 GSF 291,515 GSF 89,104 GSF 218,376 GSF Proposed 1,227,795 GSF 501,215 GSF 141,604 GSF 584,976 GSF Number of Beds On-Campus Off-Campus 1,067 beds 736 beds 331 beds 1,450 beds 736 beds 714 beds Parking Spaces 1,227 spaces 1,635 spaces Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

58 Option B : Existing Conditions Total Building Area Academic Auxiliary Housing 598,995 GSF 291,515 GSF 89,104 GSF 218,376 GSF Number of Beds On-Campus Off-Campus 1,067 beds 736 beds 331 beds Parking Spaces 1,227 spaces

59 Option B: Phase 1 Years 1-3 Total Net Gain 1 Building Area 671,995 GSF 73,000 GSF 3 Academic Auxiliary 316,515 GSF 89,104 GSF 25,000 GSF 0 GSF 6 Housing 266,376 GSF 48,000 GSF Number of Beds On-Campus Off-Campus 1,315 beds 869 beds 446 beds 248 beds 133 beds 115 beds Parking Spaces 1, ) Oak Summit Expand Master Lease 2) Trilogy Apartments Expand Master Lease 3) North Parking Structure Phase 1 4) Brubaker Addition Academic - 25,000 GSF 5) Acquisition of 309 Properties 6) Landscape Improvement Boyer Hall Quad 7) New Residential Building 8) 1600 Church Rd. Acquire units if available 2 Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

60 Option B: Phase 2 Years 3-5 Total Net Gain Building Area Academic 778,795 GSF 356,515 GSF 106,800 GSF 40,000 GSF 1 Auxiliary Housing 109,104 GSF 313,176 GSF 20,000 GSF 46,800 GSF 4 2 Number of Beds On-Campus Off-Campus 1,402 beds 1,006 beds 396 beds 83 beds 137 beds -50 beds Parking Spaces 1, ) North Parking Structure Phase 2 2) New Student Union / Academic 60,000 GSF 3) New West Quadrangle 4) Stream Restoration 5) New Residential Building 6) 1600 Church Rd. Acquire units as available Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

61 Option B: Phase 3 Years 6-10 Total Net Gain 7 Building Area 829,295 GSF 50,500 GSF Academic 374,515 GSF 18,000 GSF 2 Auxiliary 141,604 GSF 32,500 GSF Housing 313,176 GSF 0 GSF 4 Number of Beds On-Campus Off-Campus 1,402 beds 1,006 beds 396 beds 0 beds 0 beds 0 beds Parking Spaces 1, ) 309 Athletic Field Development 2) Taylor Renovation and Addition 3) Renovation of Boyer, Spruance Fine Arts Center, Grey Castle, Thomas, Kistler, Heinz, and Dilworth Halls 4) Kuch Partial Renovation and Addition 5) Murphy Renovation 6) Landscape Improvements Pedestrianize and landscape entrance from Castle, north to Church Rd entrance 7) New Central Receiving 1 Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

62 Option B: Phase 4 Years 8-15 Total Net Gain Building Area 955,995 GSF 126,700 GSF Academic 420,115 GSF 45,600 GSF Auxiliary 141,604 GSF 0GSF Housing 394,276 GSF 81,100 GSF 4 Number of Beds On-Campus Off-Campus 1,456 beds 1,185 beds 271 beds 54 beds 179 beds -125 beds Parking Spaces 1, ) New Residence Halls 2) New Academic Building 3) New South Parking Structure 4) Manor Site Redevelopment 5) Trilogy Apartments Reduce Master Lease 6) 1600 Church Rd. Consider Divesting 5 Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

63 Option B: Full Build-Out Building Area Academic Auxiliary Housing Existing 598,995 GSF 291,515 GSF 89,104 GSF 218,376 GSF Proposed 955,995 GSF 420,115 GSF 141,604 GSF 394,276 GSF Number of Beds On-Campus Off-Campus 1,067 beds 736 beds 331 beds 1,456 beds 1,185 beds 271 beds Parking Spaces 1,227 spaces 1,476 spaces Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

64 Option A: Full Build-Out Building Area Academic Auxiliary Housing Option A 1,227,795 GSF 501,215 GSF 141,604 GSF 584,976 GSF Option B 955,995 GSF 420,115 GSF 141,604 GSF 394,276 GSF Number of Beds On-Campus Off-Campus 1,450 beds 736 beds 714 beds 1,456 beds 1,185 beds 271 beds Parking Spaces 1,227 spaces 1,635 spaces Campus Bldg Non Campus Bldg Proposed Bldg Proposed Parking Partial Rental University Owned Partial Ownership

North Campus Master Plan

North Campus Master Plan North Campus Master Plan November 29, 2011 Concept Plan Respect the site s natural features Reinforce vibrant campus anchors Connect campus destinations 2 Sketch Plan: core shifts east 3 Sketch Plan: core

More information

A NEW AMERICAN UNIVERSITY. West Campus.

A NEW AMERICAN UNIVERSITY. West Campus. A NEW AMERICAN UNIVERSITY West Campus www.asu.edu/cdp CAMPUS AS CIVIC ART UNIVERSITY WIDE PLANNING PRINCIPLES Renewing Extending Connecting Rejuvenating ASU WEST CAMPUS N POPULATION DISTRIBUTION 2000 one

More information

The University of Texas at Dallas Campus Master Plan Update Town Hall Meetings. September 6-7, 2018

The University of Texas at Dallas Campus Master Plan Update Town Hall Meetings. September 6-7, 2018 he University of exas at Dallas Campus Master Plan Update own Hall Meetings September 6-7, 2018 UDallas has experienced tremendous growth and quickly developed an aspiring and ambitious culture of leadership,

More information

The University of Texas at San Antonio Campus Master Plan. Barnes Gromatzky Kosarek Architects with Michael Dennis & Associates

The University of Texas at San Antonio Campus Master Plan. Barnes Gromatzky Kosarek Architects with Michael Dennis & Associates The University of Texas at San Antonio Campus Master Plan Barnes Gromatzky Kosarek Architects with Michael Dennis & Associates INSTITUTE OF TEXAN CULTURES WHAT WE HEARD YOU SAY: ITC Many school visitors

More information

School Without Walls Partnership District of Columbia Public Schools and The George Washington University

School Without Walls Partnership District of Columbia Public Schools and The George Washington University Without Walls Partnership District of Columbia Public s and The George COMMUNITY PRESENTATION - DMJM CGS Without Walls PartnershipDMJM CGS The History of the Partnership In partnership since 1980 Facilities

More information

UCSF Mission Bay Community Task Force Meeting #1

UCSF Mission Bay Community Task Force Meeting #1 UCSF Mission Bay Community Task Force Meeting #1 Campus Planning 1 UCSF Planning Context Long Range Development Plan (LRDP) Our Institutional Master Plan Approved by The Regents Framework for physical

More information

Long Range Development Plan (LRDP) Mission Bay Community Workshop #2

Long Range Development Plan (LRDP) Mission Bay Community Workshop #2 Long Range Development Plan (LRDP) Mission Bay Community Workshop #2 Campus Planning February 28, 2013 2 Agenda 1. Welcome 2. Agenda Overview 3. Near-Term Mission Bay Space Needs Discussion 4. LRDP Planning

More information

2. Selection of Preliminary Physical Master Plan

2. Selection of Preliminary Physical Master Plan T e c h n i c a l M e m o r a n d u m Date Project Subject From To Architects and Campus Planners Ayers/Saint/Gross 222 Saint Paul Place Baltimore, MD 21202 410/347-8500 Fax 410/347-8519 Architecture and

More information

Funding Capital Projects: CHEFA Financed Bond Sales for Auxiliary Services Facilities FY

Funding Capital Projects: CHEFA Financed Bond Sales for Auxiliary Services Facilities FY Slide # 1 Funding Capital Projects: CHEFA Financed Bond Sales for Auxiliary Services Facilities FY 2012-13 Prepared by: William Bowes, Chief Finance Officer, Board of Regents Elaine Clark, VP for Real

More information

Visit 4 Clarifying Priorities

Visit 4 Clarifying Priorities Visit Clarifying Priorities. Land Use Patterns. Achieving Space Targets Infilling the Core Additional Space Need Belknap,65, gsf Buildings to be Taken Offline Master Plan Need 665,500 gsf,90,9 gsf Clarification

More information

Board of Trustees Meeting

Board of Trustees Meeting Board of Trustees Meeting The University of North Carolina at Greensboro Authorization of Project and Lease Phase II The Project Chancellor informed BOT in September 2014 of project. Project important

More information

The University of Massachusetts Campus Master Plan. Faculty Senate April 21st

The University of Massachusetts Campus Master Plan. Faculty Senate April 21st The University of Massachusetts Campus Master Plan Faculty Senate April 21st Update on process and schedule 2011 Summer 2012 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

More information

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning UNIVERSITY HOUSING DIVISION OF STUDENT AFFAIRS BRIEFING SUMMER 2013 What is RLI? The Residential Life Initiatives (RLI) is a planned approach for the renewal, revitalization, and expansion of University

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM GB5 Office of the President TO MEMBERS OF THE COMMITTEE ON : For Meeting of ACTION ITEM AMENDMENT OF THE BUDGET FOR STATE CAPITAL IMPROVEMENTS AND THE CAPITAL IMPROVEMENT PROGRAM AND APPROVAL OF EXTERNAL

More information

Bike/Pedestrian Connection at Street Level. Project Underway. Illustrative Master Plan: Traditional Downtown VISION DOWNTOWN STATE COLLEGE MASTER PLAN

Bike/Pedestrian Connection at Street Level. Project Underway. Illustrative Master Plan: Traditional Downtown VISION DOWNTOWN STATE COLLEGE MASTER PLAN Significant Redevelopment Opportunities 16 West Campus Square Academic, Residential and Commercial 3 Atherton East 4 Atherton West Retail, Student Housing Residential, Commercial and Other 5 Beaver Ave.

More information

10. BUILDINGS. PREDICTED TOTAL AREA (THECB), 2006 e&g sf 810,794. ACTUAL (THECB), 2006 e&g sf 551,516. DEFICIT (THECB), 2006 e&g sf [259,278]

10. BUILDINGS. PREDICTED TOTAL AREA (THECB), 2006 e&g sf 810,794. ACTUAL (THECB), 2006 e&g sf 551,516. DEFICIT (THECB), 2006 e&g sf [259,278] 10. BUILDINGS The history of the University s dramatic growth is illustrated by the buildings on its campus. resently, there are 43 buildings totaling some 1,178,626 gross square feet. This considerable

More information

UW Bothell + Cascadia College Campus Master Plan Update

UW Bothell + Cascadia College Campus Master Plan Update STANDING COMMITTEES F 8 Finance and Asset Management Committee UW Bothell + Cascadia College Campus Master Plan Update INFORMATION ITEM This item is for information only. BACKGROUND In June of 2016, the

More information

Trends in Student Housing: Product and Process

Trends in Student Housing: Product and Process Trends in Student Housing: Product and Process Rena Cheskis-Gold, Demographic Perspectives, LLC Merle Bicknell, Harvard University Susan Keller, Harvard University Housing 1 Today s Outline Introduction

More information

Pocatello High School New Building Addition Board Interview

Pocatello High School New Building Addition Board Interview Pocatello High School New Building Addition Board Interview 9.6.2018 Agenda Introduction The Team Project Team Expectations Related Experience The Scope Building Site(s) The Site The Building / Site The

More information

UPDATE Board of Selectmen June 20, 2017

UPDATE Board of Selectmen June 20, 2017 MAPLE STREET I-1 AREA DRAFT ZONING BYLAW & DEVELOPMENT STANDARDS Town of Danvers, MA UPDATE Board of Selectmen June 20, 2017 The Danvers Team: Brovitz Community Planning & Design Dodson & Flinker Danvers

More information

Richardson s TOD Experience From ULI Panel Report to Breaking Ground. September 8, 2011

Richardson s TOD Experience From ULI Panel Report to Breaking Ground. September 8, 2011 Richardson s TOD Experience From ULI Panel Report to Breaking Ground Presented to ULI Minnesota District Council Presented By: Gary Slagel President and CEO CapitalSoft Former Mayor, City of Richardson,

More information

Innovative features such as bridges (3 total on this site), leak detection for the gas main crossing, acoustic berm/barrier adjacent to the railway,

Innovative features such as bridges (3 total on this site), leak detection for the gas main crossing, acoustic berm/barrier adjacent to the railway, Innovative features such as bridges (3 total on this site), leak detection for the gas main crossing, acoustic berm/barrier adjacent to the railway, and creative site layout and planning all came together

More information

Campus Master Plan Part 2. Prepared for Yavapai College District Governing Board December, 2013

Campus Master Plan Part 2. Prepared for Yavapai College District Governing Board December, 2013 Campus Master Plan Part 2 Prepared for Yavapai College District Governing Board December, 2013 Trends in Higher Education Limited Funding - Increase efficiency Increased Accountability: - Retention, Completion,

More information

Alternative Project Delivery Strategies for Expansion and Renovation

Alternative Project Delivery Strategies for Expansion and Renovation Alternative Project Delivery Strategies for Expansion and Renovation UNIVERSITY OF CALIFORNIA, SAN FRANCISCO PUBLIC PRIVATE DEVELOPMENT 2015 Urban Land Institute: Private Public Product Council ESTHER

More information

ORANGE COAST COLLEGE APRIL 26, 2016 DEVELOPMENT SERVICES FOR STUDENT HOUSING AND JOINT OCCUPANCY LEASE MEETING AGENDA APRIL 26, 2015 College & District Introductions Vision for Student Housing Process

More information

PEDESTRIAN OVERLAY DISTRICT. November 6, 2013 Charlotte-Mecklenburg Planning Department

PEDESTRIAN OVERLAY DISTRICT. November 6, 2013 Charlotte-Mecklenburg Planning Department Midtown Morehead Cherry PEDESTRIAN OVERLAY DISTRICT November 6, 2013 Charlotte-Mecklenburg Planning Department Meeting Purpose To provide a background on the Pedestrian Overlay District Zoning text amendment

More information

EAST CAMPUS DEVELOPMENT UPDATE Board of Trustees January 20, 2011

EAST CAMPUS DEVELOPMENT UPDATE Board of Trustees January 20, 2011 EAST CAMPUS DEVELOPMENT UPDATE Board of Trustees January 20, 2011 Introduction I. Long Range Development Plan (LRDP), East Campus II. Proposed University Student Apartments III. Parking/Transit 2 2 LRDP

More information

GENERAL ASSEMBLY OF NORTH CAROLINA Session Legislative Fiscal Note

GENERAL ASSEMBLY OF NORTH CAROLINA Session Legislative Fiscal Note GENERAL ASSEMBLY OF NORTH CAROLINA Session 2013 Legislative Fiscal Note BILL NUMBER: Senate Bill 480 (First Edition) SHORT TITLE: SPONSOR(S): State Impact Special Fund s: Special Fund Expenditures: UNC

More information

BILL & MELINDA GATES CENTER FOR COMPUTER SCIENCE & ENGINEERING UNIVERSITY OF WASHINGTON

BILL & MELINDA GATES CENTER FOR COMPUTER SCIENCE & ENGINEERING UNIVERSITY OF WASHINGTON BILL & MELINDA GATES CENTER FOR COMPUTER SCIENCE & ENGINEERING UNIVERSITY OF WASHINGTON LMN ARCHITECTS COMPLETES THE NEW BILL & MELINDA GATES CENTER FOR COMPUTER SCIENCE & ENGINEERING AT UNIVERSITY OF

More information

ITC, ENSCHEDE, THE NETHERLANDS. Gateway to international knowledge exchange focusing on capacity building and institutional development

ITC, ENSCHEDE, THE NETHERLANDS. Gateway to international knowledge exchange focusing on capacity building and institutional development ITC, ENSCHEDE, THE NETHERLANDS Gateway to international knowledge exchange focusing on capacity building and institutional development FACULTY ITC UNIVERSITY OF TWENTE In 2010 ITC became a faculty of the

More information

Design Matters. A conversation with the Board of Trustees. Title Slide

Design Matters. A conversation with the Board of Trustees. Title Slide Design Matters A conversation with the Board of Trustees Title Slide September 22, 2010 Agenda Design Review Committee Charge Process 2006 Campus Master Plan Polk Place University Day Guiding Principles

More information

Request for Expansion of Target Investment Zone Boundaries in Hagerstown December 7, 2006

Request for Expansion of Target Investment Zone Boundaries in Hagerstown December 7, 2006 Request for Expansion of Target Investment Zone Boundaries in Hagerstown December 7, 2006 1. Hagerstown Target Investment Zone Boundaries: The Target Investment Zone in Downtown Hagerstown, which is outlined

More information

Subtitle Repaint all cross walk sections. Use local business to enhance local economy. Build a parking garage at Pegues & Sessom and an elevated pathway to assist in pedestrian traffic at that intersection.

More information

Minnesota State Colleges and Universities System Procedures Chapter 6 Facilities Management

Minnesota State Colleges and Universities System Procedures Chapter 6 Facilities Management Minnesota State Colleges and Universities System Procedures Chapter 6 Facilities Management Procedures 6.7.2 Use of College and University Facilities (College or University as Lessor). Part 1. Purpose.

More information

PROPOSED ACCOMMODATION DESIGN HALLS DEVELOPMENT BY 2022

PROPOSED ACCOMMODATION DESIGN HALLS DEVELOPMENT BY 2022 HALLS DEVELOPMENT BY 2022 Barnes Car Park Central Campus Horwood A&B Horwood C Lindsay U-X Horwood D-P Keele Hall DEVELOPMENT LOCATIONS Campus Why are we building? Keele is growing and we need more bedrooms

More information

DeKalb County Jail History

DeKalb County Jail History DEKALB COUNTY, IL Jail Expansion Project Schematic Design Report Kimme & Associates, Inc. with PSA-Dewberry & Gilbane Building September 19, 2012 KIMME & Associates, Inc. DeKalb County Jail History The

More information

Design Review Board (DRB) Staff Report. Exterior Building Renovation. 400 Monroe Ave. Memphis, TN Hwy. 64 Memphis, TN 38123

Design Review Board (DRB) Staff Report. Exterior Building Renovation. 400 Monroe Ave. Memphis, TN Hwy. 64 Memphis, TN 38123 Design Review Board (DRB) Staff Report Exterior Building Renovation Case # 18-38: Applicant/Owner: Background: Orion Federal Credit Union 400 Monroe Ave. Memphis, TN 38103 Orion Federal Credit Union 7845

More information

2026 Campus Plan. September 19, 2016

2026 Campus Plan. September 19, 2016 PRINCETON UNIVERSIT Y 2026 Campus Plan September 19, 2016 In association with: Vanasse Hangen Brustlin, Inc. Michael Van Valkenburgh Associates Inc. KPMB Architects BFJ Planning Burns & McDonnell Level

More information

MEMORANDUM. DATE: November 9, 2016 PC Agenda Item 3.B. Planning Commission Chair Thompson and Commissioners

MEMORANDUM. DATE: November 9, 2016 PC Agenda Item 3.B. Planning Commission Chair Thompson and Commissioners MEMORANDUM DATE: November 9, 2016 PC Agenda Item 3.B TO: FROM: SUBJECT: Planning Commission Chair Thompson and Commissioners Matthew Bachler, Senior Planner Planning Case #16-028 Public Hearing Required

More information

Draft University of Kentucky College Town Study Update

Draft University of Kentucky College Town Study Update Draft COLLEGE TOWN STUDY UPDATE July 30th, 2009 Overview of Study Area W 3rd St Newton Pike S Jefferson St W 2nd St W Main St W Vine St W High St S Broadway St S Limestone W Maxwell St E Euclid Ave 0 250

More information

700 Gervais Street Downtown Columbia, South Carolina

700 Gervais Street Downtown Columbia, South Carolina 700 Gervais Street Downtown Columbia, South Carolina For more information: Macon Lovelace, SIOR +1 803 744 9807 mlovelace@naiavant.com Paul Hartley, SIOR +1 803 744 9824 phartley@naiavant.com THE INFORMATION

More information

Ashland City Hall Feasibility Study. Pioneer Hall, 59 Winburn Way Thursday, September 15, :00 6:30 p.m.

Ashland City Hall Feasibility Study. Pioneer Hall, 59 Winburn Way Thursday, September 15, :00 6:30 p.m. Ashland City Hall Feasibility Study Pioneer Hall, 59 Winburn Way Thursday, September 15, 2016 5:00 6:30 p.m. Space Needs: Summary Space Needs: Summary 23,472 SF Option 1: City Hall Expansion: New Construction

More information

City of Coral Gables Planning and Zoning Staff Report

City of Coral Gables Planning and Zoning Staff Report City of Coral Gables Planning and Zoning Staff Report Applicant: Application: Public Hearing: Date & Time: Location: City of Coral Gables Zoning Code Text Amendment Giralda Plaza Overlay District Planning

More information

New Markets Tax Credits: Community Development Entity

New Markets Tax Credits: Community Development Entity New Markets Tax Credits: Community Development Entity PITTSBURGH URBAN INITIATIVES Pittsburgh Qualifying Census Tracts Pittsburgh Urban Initiatives LLC Who we are PUI LLC is a Community Development Entity

More information

Inspira Medical Center Woodbury Development Options Report

Inspira Medical Center Woodbury Development Options Report Development Options Report Prepared for: City of Woodbury, Gloucester County Improvement Authority, Inspira Health Network Prepared by: Urban Partners (Draft Final) October 25, 2018 1. INTRODUCTION Inspira

More information

2026 Campus Plan. April 26, 2017 Alliance for Action Presentation Forsgate Country Club

2026 Campus Plan. April 26, 2017 Alliance for Action Presentation Forsgate Country Club P R I N C E TO N U N I V E R S I T Y 2026 Campus Plan April 26, 2017 Alliance for Action Presentation Forsgate Country Club In association with: Vanasse Hangen Brustlin, Inc. Michael Van Valkenburgh Associates

More information

Guide to the Wayne State University Chatsworth Tower Apartments Tenants Association WSR Table of Contents

Guide to the Wayne State University Chatsworth Tower Apartments Tenants Association WSR Table of Contents Table of Contents Summary Information... 3 History... 4 Scope and Content... 4 Arrangement... 5 Administrative Information... 5 Related Materials... 6 Controlled Access Headings... 6 Other Access Aids...

More information

TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: DISCUSSION ITEM

TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: DISCUSSION ITEM F13 Office of the President TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES : For Meeting of DISCUSSION ITEM ORCHARD PARK FAMILY HOUSING AND GRADUATE STUDENT HOUSING REDEVELOPMENT PROJECT AND WEST VILLAGE

More information

Hamilton County Regional Planning Commission

Hamilton County Regional Planning Commission Hamilton County Regional Planning Commission March 1, 2012 Colerain Township Staff Report Zone Map Amendment: Case No.: ZA2012-01 Joseph Toyota Prepared By: Amy Bancroft, Land Use Planner ACTION REQUESTED:

More information

Ashland City Hall Feasibility Study City Council Presentation Monday, October 17, 2016

Ashland City Hall Feasibility Study City Council Presentation Monday, October 17, 2016 Ashland City Hall Feasibility Study City Council Presentation Monday, October 17, 2016 Space Needs: Summary Space Needs: Summary 23,472 SF Option 1: City Hall Expansion: New Construction Consolidate functions

More information

FULL CITY BLOCKS FOR SALE 32-ACRE WATERFRONT REAL ESTATE - $1.5B DEVELOPMENT - PLEASE CALL GEORGE DIAMOND AT

FULL CITY BLOCKS FOR SALE 32-ACRE WATERFRONT REAL ESTATE - $1.5B DEVELOPMENT - PLEASE CALL GEORGE DIAMOND AT CONSTRUCTION UPDATE! SEE INSIDE FULL CITY BLOCKS FOR SALE 32-ACRE WATERFRONT REAL ESTATE - $1.5B DEVELOPMENT - PLEASE CALL GEORGE DIAMOND AT 503.222.2178 2839 SW 2nd Avenue, Portland OR, 97201 503.222.1655

More information

Purpose of Workshop. Scope project to be included in a Design Build RFP Review Program Needs Site Analysis Concept Plans

Purpose of Workshop. Scope project to be included in a Design Build RFP Review Program Needs Site Analysis Concept Plans Purpose of Workshop Scope project to be included in a Design Build RFP Review Program Needs Site Analysis Concept Plans Workshop Process Second Workshop Present Preferred Scheme Revisions Solicit Comment

More information

WAYNE STATE UNIVERSITY. Housing Facilities Master Plan

WAYNE STATE UNIVERSITY. Housing Facilities Master Plan WAYNE STATE UNIVERSITY Housing Facilities Master Plan 2016-2026 January 29, 2016 1 Briefly review significant milestones and trends in housing facilities, occupancy, housing system finances, and programming

More information

Rosslyn Plaza PDSP. County Board Public Hearing

Rosslyn Plaza PDSP. County Board Public Hearing Rosslyn Plaza PDSP County Board Public Hearing Aaron Shriber, DCPHD, Planning Division March 12, 2016 Site Location 2 GLUP Designation 3 Zoning Designation 4 Rosslyn Sector Plan 5 Rosslyn Sector Plan Concept

More information

COMMUNITY COLLEGE SYSTEM OF NEW HAMPSHIRE

COMMUNITY COLLEGE SYSTEM OF NEW HAMPSHIRE COMMUNITY COLLEGE SYSTEM OF NEW HAMPSHIRE Section: BOT 500 Facilities and Capital Budget Date Approved: December 20, 2007 Effective Date: January 1, 2008 Amended Date: December 9, 2010 510 Campus Planning

More information

Comprehensive Plan /24/01

Comprehensive Plan /24/01 IV The is a central component of the Comprehensive Plan. It is an extension of the general goals and policies of the community, as well as a reflection of previous development decisions and the physical

More information

ii. Project description

ii. Project description ii. Project description 17 THE OCEAN AVENUE PROJECT Introduction The Ocean Avenue Project was born out of a desire to create something truly special for the City of Santa Monica. Recent adoption of the

More information

DOWNTOWN DANVERS C1-C1A DISTRICTS NEW ZONING BYLAW & DESIGN STANDARDS Town of Danvers, MA

DOWNTOWN DANVERS C1-C1A DISTRICTS NEW ZONING BYLAW & DESIGN STANDARDS Town of Danvers, MA DOWNTOWN DANVERS C1-C1A DISTRICTS NEW ZONING BYLAW & DESIGN STANDARDS Town of Danvers, MA PUBLIC KICK-OFF MEETING & LISTENING SESSION Planning Board May 8, 2018 The Danvers Team: Brovitz Community Planning

More information

Schedule of Insurance in Force as of July 1, 2009

Schedule of Insurance in Force as of July 1, 2009 Schedule of Insurance in Force as of July 1, 2009 Urbana Campus Insurance Valuation FY09 Business Buildings Contents Interruption Total Allen Hall $ 21,668,652 $ 1,377,000 $ ----(1)---- $ 23,045,652 Busey-Evans

More information

New Hope-Solebury School District Campus Revitalization Plan

New Hope-Solebury School District Campus Revitalization Plan Campus Revitalization Plan 20 January 2016 GODSHALL KANE O ROURKE ARCHITECTS, LLC 12 East Butler Avenue, Suite 205, Ambler, PA 19002 T: 215.646.2003 F: 215.646.5707 www.gkoarchitects.com Site Rendering

More information

W i l s o n B o u l e v a r d & K e y B o u l e v a r d

W i l s o n B o u l e v a r d & K e y B o u l e v a r d 14 0 1 W i l s o n B o u l e v a r d & 14 0 0 K e y B o u l e v a r d R o s s l y n, A r l i n g t o n C o u n t y, V i r g i n i a S i t e P l a n R e v i e w C o m m i t t e e M e e t i n g # 1 0 7.

More information

Truax Park Apartments

Truax Park Apartments Truax Park Apartments Master Planning and Site Development Study Prepared by The Community Development Authority of the City of Madison In association with SMITH & SMITH ASSOCIATES, Inc CONSTRUCTION COST

More information

Clinical Sciences Campus Plan Phase One Development Scenerio 1 Scenerio 2 Scenerio 3 Scenerio 4 Land Acqusition 66,241,914 25,116,579 22,116,579 60,781,064 Relocation of Programs 33,192,880 60,609,937

More information

Comprehensive Housing Master Plan. Original Development by: Hanbury Evans Wright Vlattas and Co. with Anderson Strickler LLC

Comprehensive Housing Master Plan. Original Development by: Hanbury Evans Wright Vlattas and Co. with Anderson Strickler LLC Comprehensive Housing Master Plan Original Development by: Hanbury Evans Wright Vlattas and Co. with Anderson Strickler LLC Updated July 2013 Comprehensive Housing Master Plan In 2001, the Department of

More information

MEMORANDUM. DATE: April 21, 2014 TO: NeighborWorks America FROM: Capitol Hill Housing. REGARDING: Mission Matrix Contest

MEMORANDUM. DATE: April 21, 2014 TO: NeighborWorks America FROM: Capitol Hill Housing. REGARDING: Mission Matrix Contest MEMORANDUM DATE: April 21, 2014 TO: FROM: NeighborWorks America Capitol Hill Housing REGARDING: Mission Matrix Contest Capitol Hill Housing has completed a Portfolio Assessment using the Mission Matrix

More information

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016 Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016 1 Project Team City: David Belmer Planning and Building Director Jonathan Borrego, AICP Planning Services Manager Gustavo

More information

2026 Campus Plan PRINCETON UNIVERSITY. West Windsor Update. June 7, 2017

2026 Campus Plan PRINCETON UNIVERSITY. West Windsor Update. June 7, 2017 PRINCETON UNIVERSITY 2026 Campus Plan June 7, 2017 West Windsor Update In association with: Vanasse Hangen Brustlin, Inc. Michael Van Valkenburgh Associates Inc. KPMB Architects BFJ Planning Burns & McDonnell

More information

Open Space. Introduction. Vision. Defining Open Space. Midway City 2017 General Plan

Open Space. Introduction. Vision. Defining Open Space. Midway City 2017 General Plan Open Space Midway City 2017 General Plan Introduction The importance of preserving open space to meet the goals and objectives of the General Plan cannot be overstated. Indeed, references to preserving

More information

THE ACADEMY LOFTS adair park

THE ACADEMY LOFTS adair park THE ACADEMY LOFTS adair park 1 DEVELOPMENT TEAM JOHN CRANE Building Insights, INC STAN SUGARMAN Stryant Construction, INC ATTICUS LEBLANC Stryant Construction, INC PROGRAMS NEDA ABGHARI The Creatives Project,

More information

Boston East. Fort Point Associates, Inc. Urban Planning Environmental Consulting Project Permitting. May 31, 2013

Boston East. Fort Point Associates, Inc. Urban Planning Environmental Consulting Project Permitting. May 31, 2013 Boston East East Boston, Massachusetts Development Plan for PDA No. 92 May 31, 2013 submitted to Boston Redevelopment Authority submitted by Trinity Border Street, LLC prepared by Fort Point Associates,

More information

Longford House High Road Trimley St Martin IP11 0RJ

Longford House High Road Trimley St Martin IP11 0RJ Longford House High Road Trimley St Martin IP11 0RJ An outstanding Grade II Listed rectory, cleverly converted into a magnificent family home full of history and character, further benefitting from a self-contained

More information

University Village. October 23, 2014

University Village. October 23, 2014 University Village October 23, 2014 Project Overview The Site Project Overview/Approach Market Findings Vision Next Steps Project Overview The Site Project Overview/Approach Market Findings Vision Next

More information

January 16, Ms. Carmen Fariña Chancellor New York City Department of Education 52 Chambers Street New York, NY 10007

January 16, Ms. Carmen Fariña Chancellor New York City Department of Education 52 Chambers Street New York, NY 10007 January 16, 2014 Ms. Carmen Fariña Chancellor New York City Department of Education 52 Chambers Street New York, NY 10007 Re: Management of General School Funds Report 2013-F-33 Dear Chancellor Fariña:

More information

MICHAEL BARDIN ARCHITECT

MICHAEL BARDIN ARCHITECT education Harvard University Graduate School of Design 99 MArch I University of Pittsburgh 95 Masters of Arts in English Literature Swarthmore College 91 Bachelor of Arts with High Honors in English Lit

More information

2026 Campus Plan PRINCETON UNIVERSITY APPENDIX A. CPUC March 2016

2026 Campus Plan PRINCETON UNIVERSITY APPENDIX A. CPUC March 2016 APPENDIX A PRINCETON UNIVERSITY 2026 Campus Plan CPUC March 2016 In association with: Vanasse Hangen Brustlin, Inc. Michael Van Valkenburgh Associates Inc. KPMB Architects BFJ Planning Burns & McDonnell

More information

Overview. Foundation: Physical Design Framework 2011 Phase 2 Study

Overview. Foundation: Physical Design Framework 2011 Phase 2 Study MISSION BAY 2 MISSION BAY: PHYSICAL OPTIONS HOUSING LOCATION OPTIONS BLOCK 23A BLOCK 15 ENTITLEMENT INCREASE OPTIONS OPTION 1 OPTION 2 OPTION 3 3 MISSION BAY: PHYSICAL OPTIONS Overview Foundation: Physical

More information

LINCOLN CORRIDOR REDEVELOPMENT PROJECT UPDATE FOR DOWNTOWN GATEWAY FOCUS AREA

LINCOLN CORRIDOR REDEVELOPMENT PROJECT UPDATE FOR DOWNTOWN GATEWAY FOCUS AREA ITEM: 51 BACKGROUND: Staff Report LINCOLN CORRIDOR REDEVELOPMENT PROJECT UPDATE FOR DOWNTOWN GATEWAY FOCUS AREA March 27, 2018 The City has been working for two years to develop, adopt, and implement the

More information

BOARD OF HIGHER EDUCATION REQUEST FOR COMMITTEE AND BOARD ACTION

BOARD OF HIGHER EDUCATION REQUEST FOR COMMITTEE AND BOARD ACTION BOARD OF HIGHER EDUCATION REQUEST FOR COMMITTEE AND BOARD ACTION COMMITTEE: Fiscal Affairs and Administrative Policy NO.: FAAP 09-13 COMMITTEE DATE: January 30, 2009 BOARD DATE: February 5, 2009 FISCAL

More information

A. Update on Existing and Proposed Developments Sonja Reichertz, City Planner and Assistant Economic Development Director

A. Update on Existing and Proposed Developments Sonja Reichertz, City Planner and Assistant Economic Development Director 1. Call to Order 2. Roll Call AGENDA CITY OF MONONA COMMUNITY DEVELOPMENT AUTHORITY Monona City Hall Large Conference Room 5211 Schluter Hall, Monona, WI. Tuesday, July 28, 2015 6:30 p.m. 3. Approval of

More information

Development Opportunity in Jonesboro, GA Easy Access to I-75 +/- 9.3 Acres

Development Opportunity in Jonesboro, GA Easy Access to I-75 +/- 9.3 Acres in Jonesboro, GA Easy Access to I-75 +/- 9.3 Acres P of 13 Table of Contents For more information, please contact: Perry Hayes Associate Broker Land & Developer Group (404) 876-1640 x 135 PHayes@BullRealty.com

More information

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY Project Name: ZMA 2010-00015, Cedar Hill Planning Commission Worksession: February 15, 2011 Public Hearing: Not scheduled Staff: Judith C. Wiegand, AICP

More information

Residences at Grove Park 425 Hillsborough St. Chapel Hill, NC

Residences at Grove Park 425 Hillsborough St. Chapel Hill, NC 9 ATTACHMENT 1 Residences at Grove Park 425 Hillsborough St. Chapel Hill, NC Zoning Atlas Amendment Application Statement of Justification December 12 th, 2008 Introduction This is a request for a Zoning

More information

ROWAN UNIVERSITY. Housing Master Plan Update INSPIRE. EMPOWER. ADVANCE. APPENDIX: FINAL REPORT FEBRUARY

ROWAN UNIVERSITY. Housing Master Plan Update INSPIRE. EMPOWER. ADVANCE. APPENDIX: FINAL REPORT FEBRUARY ROWAN UNIVERSITY Housing Master Plan Update FEBRUARY 2 0 1 6 APPENDIX: FINAL REPORT INSPIRE. EMPOWER. ADVANCE. This page intentionally blank. APPENDIX 1. STRATEGIC ASSET VALUE This page intentionally blank.

More information

Main Street Parking Area Strategy. Borough of South River Middlesex County, New Jersey

Main Street Parking Area Strategy. Borough of South River Middlesex County, New Jersey Main Street Parking Area Strategy Borough of South River Middlesex County, New Jersey Draft: May 29, 2018 DRAFT 5/29/2018 Page 1 Bignell Planning Consultants, Inc. 424 AMBOY AVENUE SUITE 202 WOODBRIDGE,

More information

REPORT TO THE BOARD OF GOVERNORS

REPORT TO THE BOARD OF GOVERNORS REPORT TO THE BOARD OF GOVERNORS SUBJECT STUDENT HOUSING AT WALTER GAGE INFILL SITE MEETING DATE JUNE 14, 2018 Forwarded to the Board of Governors on the Recommendation of the President APPROVED FOR SUBMISSION

More information

BISCAYNE BAY CAMPUS REPLACEMENT STUDENT HOUSING

BISCAYNE BAY CAMPUS REPLACEMENT STUDENT HOUSING BISCAYNE BAY CAMPUS REPLACEMENT STUDENT HOUSING 1 Why the Need for Replacement Housing? BBC Bay Vista Housing, containing 235 units accommodating 510 students, opened fall 1984 to recruit high-performing

More information

100% LEASED OFFICE BUILDING FOR SALE 450 GRANT STREET AKRON, OHIO ADJACENT TO UNIVERSITY OF AKRON

100% LEASED OFFICE BUILDING FOR SALE 450 GRANT STREET AKRON, OHIO ADJACENT TO UNIVERSITY OF AKRON OFFICE BUILDING FOR SALE 450 GRANT STREET AKRON, OHIO ADJACENT TO UNIVERSITY OF AKRON 100% LEASED Property Highlights 2-Floor Professional Office Building adjacent to University of Akron and downtown Akron.

More information

7.0 HOUSING ELEMENT (1) DATA REQUIREMENTS. a) Inventory of Existing Beds by Type

7.0 HOUSING ELEMENT (1) DATA REQUIREMENTS. a) Inventory of Existing Beds by Type 7.0 HOUSING ELEMENT (1) DATA REQUIREMENTS. a) Inventory of Existing Beds by Type As indicated in Table 7.1, the current total number of bed spaces at Modesto A. Maidique equates to Two thousand seven hundred

More information

246 MCDARIS LOOP Serene, Forested Mountain Home Wolf Laurel

246 MCDARIS LOOP Serene, Forested Mountain Home Wolf Laurel W W W. M Y M O S A I C R E A L T Y. C O M 60 Biltmore Avenue, Asheville, NC 28801 tel : 828.707.9556 246 MCDARIS LOOP Serene, Forested Mountain Home Wolf Laurel 3 Bedrooms, 3 Bathrooms 3,197 SF 1,000+

More information

E. 90TH & CHESTER AVENUE CLEVELAND, OHIO

E. 90TH & CHESTER AVENUE CLEVELAND, OHIO E. 90TH & CHESTER AVENUE CLEVELAND, OHIO Rico A. Pietro, SIOR Principal 216.525.1473 rpietro@crescorealestate.com Eric Schreibman Vice President 216.525.1471 eschreibman@crescorealestate.com BUILD IT...

More information

PLANNING COMMISSION WILLIAMSBURG, VIRGINIA WORK SESSION AGENDA Wednesday, May 23, 2012

PLANNING COMMISSION WILLIAMSBURG, VIRGINIA WORK SESSION AGENDA Wednesday, May 23, 2012 PLANNING COMMISSION WILLIAMSBURG, VIRGINIA WORK SESSION AGENDA Wednesday, May 23, 2012 The meeting will be called to order in the third floor Conference Room (Room 310), Williamsburg Municipal Building,

More information

UCSF Acquisition of Mission Bay Blocks 33-34

UCSF Acquisition of Mission Bay Blocks 33-34 UCSF Acquisition of Mission Bay Blocks 33-34 Lori Yamauchi Associate Vice Chancellor Campus Planning Mission Bay Citizens Advisory Committee March 13, 2014 Background UCSF has a goal of reducing operating

More information

LAMBTON HALL & FAMILY HOUSING RENOVATIONS

LAMBTON HALL & FAMILY HOUSING RENOVATIONS 2012 LAMBTON HALL & FAMILY HOUSING RENOVATIONS Student Housing Services overview to PRPC regarding the proposed renovation to Lambton Hall and 78 College Ave. Introduction In the Fall 2011 semester the

More information

OPTION 1 MAX RENOVATION/ADDITION

OPTION 1 MAX RENOVATION/ADDITION OPTION 1 MAX RENOVATION/ADDITION MASSING TWO STORY NEW ADDITION OUTDOOR CLASSROOM ON ROOF MULTI PURPOSE ROOM ADDITION PARKING PLAY AREA 1886 HISTORIC BUILDING 12TH PLACE NE C ST NE 13TH ST NE CONSTITUTION

More information

FINAL Public Meeting for the Downtown District Vision Plan. Mebane Arts and Community Center Tuesday, July 31, p.m.

FINAL Public Meeting for the Downtown District Vision Plan. Mebane Arts and Community Center Tuesday, July 31, p.m. FINAL Public Meeting for the Downtown District Vision Plan Mebane Arts and Community Center Tuesday, July 31, 2018 6 8 p.m. Mebane Vision Plan Allison Platt & Associates/Rivers & Associates Economic Leadership

More information

SECTION I - INTRODUCTION

SECTION I - INTRODUCTION - INTRODUCTION 1 2 - INTRODUCTIONION THE MASTER PLAN State law requires every community to have a Master Plan establishing an orderly guide to the use of lands in the community to protect public health

More information

The Arts & Adaptive Reuse: Case Studies in Historic School Buildings

The Arts & Adaptive Reuse: Case Studies in Historic School Buildings The Arts & Adaptive Reuse: Case Studies in Historic School Buildings Landmark Society of Western New York State-Wide Preservation Conference Session Block 1 B, April 17, 2015 Presented by: Clinton Brown,

More information

Board Resolution -1- Month, Day, Year M E M O R A N D U M

Board Resolution -1- Month, Day, Year M E M O R A N D U M Board Resolution -1- Month, Day, Year M E M O R A N D U M March 11, 2015 TO: FROM: SUBJECT: Members of the Board of Trustees Nancy L. Zimpher, Chancellor Ground Lease Purchase College Action Requested

More information

The Miramar Santa Monica

The Miramar Santa Monica The Miramar Santa Monica Project Description The Santa Monica Miramar Hotel (the Miramar or the Hotel ) has been an institution in the City of Santa Monica since originally opening on the site in 1920.

More information

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive Master Plan Presentation for: 520 Virginia Drive May 22, 2018 Design Presentation Agenda Master Plan Design for 520 Virginia Drive Existing Conditions & Opportunities Project Goals Site Plan & Floor Plans

More information