1 Planning and Design Commission Report 915 I Street, 1 st Floor Sacramento, CA File ID: March 22, 2018 Public Hearing Item 08 CADA Site 21 (New Mixed-Use Building) File ID: Location: Southwest Corner of 14 th and N Street, APNs: through -007, District 4 Recommendation: Staff recommends the Planning and Design Commission review and comment on the proposed construction of a new mixed-use building with ground floor commercial and office spaces and 93 residential dwelling units on a 0.44-acres in the High Rise Residential (R-5) zone Contact: Angel Anguiano, Junior Planner, , aanguiano@cityofsacramento.org; Evan Compton, Principal Planner, , Ecompton@cityofsacramento.org Presenter: Angel Anguiano, Junior Planner, , aanguiano@cityofsacramento.org Applicant: Deana Ellis, Cresleigh Homes, 3001 Douglas Boulevard, Roseville, CA Property Owner: Tom Kigar, Capital Area Development Authority (CADA), th Street, Sacramento, CA Attachments: 1-Description/Analysis 2-Background 3-Advisory Conditions 4-Plans 5-Public Comment Letters City of Sacramento March 22, 2018 powered by Legistar Page 1 of 61
2 File ID: Public Hearing Item 08 Description/Analysis Issue Detail: The development consists of a nine-story mixed-use building on 0.44-acres in the High Rise Residential (R-5) zone at the southwest corner of 14 th and N Streets. This project includes demolishing an existing building and parking lot. The proposal includes 93 residential units and approximately 2,600 square feet of ground floor retail and office space. Prior to consideration by the CADA Board of Directors, CADA is required to obtain advisory input from the City Planning and Design Commission. Pursuant to the Joint Powers Agreement (City and State), CADA projects are not required to obtain planning entitlements from the City of Sacramento. Were this other than a CADA project, necessary entitlements would include a Tentative Map to subdivide the parcel for condominium purposes, Site Plan and Design Review for the new mixed-use building construction with deviations for setbacks and lot coverage, and Tree Permits for removal and pruning. Policy Considerations: The 2035 General Plan Update was adopted by City Council on March 3, The 2035 General Plan s goals, policies, and implementation programs define a roadmap to achieving Sacramento s vision to be the most livable city in America. The 2035 General Plan designation of the subject site is Central Business District. This designation provides for high density housing and neighborhood-supporting uses. Some of the goals and policies supported by this project are as follows: City of Sacramento March 22, 2018 powered by Legistar Page 2 of 61
3 File ID: Public Hearing Item 08 LU Distinctive Urban Skyline. The City shall encourage the development of a distinctive urban skyline that reflects the vision of Sacramento with a prominent central core that contains the city s tallest buildings, complemented by smaller urban centers with lower-scale mid-and high-rise development. LU2.6.6 Heat Island Effect. The City shall reduce the heat island effect by promoting and requiring, where appropriate, such features as reflective roofing, green roofs, lightcolored pavement, and urban shade trees and by reducing the unshaded extent of parking lots. LU Transitions in Scale. The City shall require that the scale and massing of new development in higher-density centers and corridors provide appropriate transitions in building height and bulk that are sensitive to the physical and visual character of adjoining neighborhoods that have lower development intensities and building heights. LU Buildings that Engage the Street. The City shall require buildings to be oriented to and actively engage and complete the public realm through such features as building orientation, build-to and setback lines, façade articulation, ground-floor transparency, and location of parking. LU Mixed-Use Downtown Development. The City shall support a mixed use, vibrant Central Business District by encouraging innovative mixed-use development resulting in development consistent with Sacramento s commitment to environmental sustainability Environmental Considerations: The proposed project includes the construction of a nine-story.44-acre parcel at the corner of 14 th and N Street. The site has an existing parking lot and apartment complex that will be removed to make way for the new building. Review and Comment is not a project under the California Environmental Quality Act (CEQA), Guidelines section The City does not have permitting authority over this project and is not making an approval decision within the meaning of Guidelines section No CEQA review is required. Demolition of Existing Apartment Building: The western portion of the project site includes an apartment building which is over 50 years of age and would be demolished as part of the project scope. The Preservation Director reviewed the building and has made a preliminary determination that the building would not be eligible for historic resource consideration as an individual resource. City of Sacramento March 22, 2018 powered by Legistar Page 3 of 61
4 File ID: Public Hearing Item 08 Public/Neighborhood Outreach and Comments: The project was routed to several community groups including Sacramento Area Bicycle Advocates (SABA), Walk Sacramento, Preservation Sacramento, and the Capital Area R Street Association (CARSA). The site has been posted and all the property owners within a 300-foot radius of the subject site were notified of the hearing. At the time of writing this report, staff has not received any phone calls, letters, or s in opposition to the project proposal. Staff received a letter of support including some suggested project revisions from Walk Sacramento and SABA. (See Attachment 5) Rationale for Recommendation: Staff recommends that the Planning and Design Commission provide the attached advisory conditions of approval for consideration by the CADA Board and the developer because the project: a) is consistent with the Central Business District designation in the General Plan and the Central City Community Plan; b) is consistent with the High Rise Residential (R-5) zone; c) provides strong street walls and pedestrian amenities to engage the public streets along the project frontage; d) integrates structured vehicle parking within the building and accessed by the public alley; and e) increases the housing stock within the Central City. City of Sacramento March 22, 2018 powered by Legistar Page 4 of 61
5 Summary: The project site is located on the southwest corner of 14 th and N Streets and within the Central Business District (CBD). On the north side of N Street is the California State Capitol. The immediate surroundings include a mixture of multi-unit dwellings and commercial uses. The Westminster Presbyterian Church is located two parcels to the west. As the most intensely developed area of Sacramento, the area has a variety of architectural styles, heights, and uses. Figure 1: Project Site Aerial The Capital Area Development Authority (CADA) is exempt from Planning and Design Review entitlements from the City of Sacramento, and instead requests review and comment in the form of Advisory Conditions of Approval. Table 1: Project Information General Plan Designation: Central Business District (CBD) (F.A.R ) Existing Zoning of Site: High Rise Residential (R-5) Parking District: Central Business District (CBD) Design Review Area: Central Core Community Plan Area: Central City Property Area: ±0.44 acre / ±19,334 square-feet Gross Square Footage: 161,024-square feet (Residential/Amenity Space: 120,197-square feet, Office/retail: 1,283-square feet, Retail: 1,359-square feet and Parking Area: 23,578-square feet) Proposed Height: 96-0 (roof), (overall) Floors: 11 levels (8 residential, 1 retail and parking, 1 parking, 1 mechanical penthouse) Proposed Floor Area Ratio 6.95 (F.A.R.): Parking Spaces Vehicles 67 spaces Parking Spaces Bicycles 60 spaces (long-term) 30 spaces (short-term) Page 5 of 61
6 Site Plan and Design Review Site Layout: The applicant is proposing to construct a nine-story mixed-use building on 0.44± acres in the R- 5 zone. The building will include 93 for-sale residential units and approximately 1,359 square feet of retail space and 1,283-square feet of office/retail on the ground floor. Outdoor terraces will be provided on the second and eighth floors. These spaces provide a continuity of the pedestrian realm while also activating the street and alley. The main entrance to the building will be located on N Street and an additional entrance along 14 th Street. There will be two levels of parking integrated into the building for a total of 67 vehicle parking stalls. Access for vehicles will be along Neighbors Alley. As part of the first floor, two rooms will be provided for 60 long-term bicycle parking spots. Access the bike storage rooms will be along 14 th Street to provide an efficient pedestrian flow and prevent conflicts along the main lobby entrance. The project will also include sustainability components to meet a minimum LEED Gold rating standard. The project has been designed to provide a strong street wall along the alley and lots of windows for transparency along 14 th and N Streets. Figure 2: Overall Site View Development Standards The project site is within the High Rise Residential (R-5) zone and Central Core Design Review Area. As shown in the plans, the site will include lot coverage and setback deviations, described in the table below. Although deviations from the code are shown, the project s urban form Page 6 of 61
7 remains consistent with the policies and intent of the Central Business District General Plan designation and Central Core design guidelines. Table 2: Proposed High Rise Residential (R-5) Development Standards (17.208) Development Standards Required Proposed Dimensions Deviation? Height (plate height)* 96 feet 96 feet No Height (overall)** 115 feet 111 feet No Lot Coverage 80% 94% Yes Floor Area Ratio No Front and Street Side- 5 feet 2 feet Yes Yard Setback (minimum) Rear Setback (minimum) 5 feet 0 feet Yes Interior Side Setback 0 feet 6 No (minimum) *Consistent with the Capitol View Protection Area standards, the building steps down to a plate height of 80 feet on the west portion of the project site. **The Planning and Development Code (Section ) allows a building to have parapets, penthouses, a pitched roof, and other mechanical appurtenances exceeding the maximum height of the zone by 20% by right. Figure 3 Building Section Page 7 of 61
8 Open Space A combination of private and common open space will be provided for the new multi-unit dwelling units at a ratio of 100 square feet per dwelling unit. The proposed project exceeds the minimum required open space as shown in Table 3. Table 3: Open Space ( ) Number of Open Space Open Space Provided Deviation? Dwelling Units Required 93 9,300 square feet 9,561 square feet No Open space is provided through a roof and external terrace balconies on the second and eighth floors. Private open space is provided through private balconies on floors two through nine, which aggregate for a total of 347 square feet per floor. The common outdoor gardens are proposed as shared open space for residents. The project meets the residential open space requirement. Access, Circulation, and Parking The project site fronts on two public streets including N Street and 14 th Street. A 20-foot wide public alley (Neighbors Alley) runs along the south of the project site and provides access to the structured parking garage, building services, and trash room. The site has pedestrian access from all sides and provides sidewalks and planters along the public streets. The Central Business District requires no minimum vehicle parking spaces and the project provides a total of 67 vehicle parking spaces on two levels and therefore complies with the code. Figure 4 First Floor Parking and Layout Figure 5 Below Grade Parking Page 8 of 61
9 Table 4 below also shows the minimum bicycle requirements for new projects in the Central Business District. Per B, the project would exceed the minimum bicycle requirements which requires 49 long-term facilities and 11 short-term facilities. The applicant is proposing 60 indoor bike parking spaces (long-term) within two rooms on the ground floor, and 30 outdoor bike parking spaces (short-term) on the north side of the building. Table 4: Parking and Bicycle Facilities Type Required Proposed Deviation? Vehicle Residential 0 Basement Level: 43 No Vehicle Retail Vehicle - Office 0 0 First Floor: 24 Total: 67 Bicycles Residential Bicycle Commercial Long Term: 47 Short Term: 9 Long Term: 2 Short Term: 2 Long Term: 60 Short Term: 30 Total: 90 No Tree Removal The project proposes to remove seven, onsite private trees and prune six city street trees. Urban Forestry staff has included advisory conditions including items such as no decomposed granite be used within the city street tree planter and adequate Tree Protection Zones be provided per city standards to protect city street trees during construction. Page 9 of 61
10 Attachment 3 City Planning and Design Commission Proposed Advisory Conditions of Approval CADA - Site 21 Southwest Corner of 14 th and N Streets At the regular meeting of March 22, 2018, the City Planning and Design Commission heard and considered evidence in the above titled manner. Based on verbal and documentary evidence at the hearing, the Planning and Design Commission took the following action for the location listed above: Provided Review and Comment on a Capitol Area Development Authority (CADA) project, for the construction of a new mixed-use building with ground floor commercial and 93 dwelling units on a 0.44± acre site in the High Rise Residential (R-5) zone and forwarded to the CADA Board the following Advisory Conditions of Approval: Planning and Design Review Site Design 1) Secure building permits prior to construction. 2) Obtain a parcel merger or record a condo map to consolidate the parcels. 3) The building entrances for pedestrians and vehicles shall be sited as shown on the exhibits. 4) The project shall have a landscape design as shown on the exhibits. 5) The project shall provide vehicle and bicycle parking as indicated on the plans. The design and location of the bicycle parking facilities for long-term and short-term parking shall be provided as shown on the plans. 6) The trash enclosures shall be located on the interior of the building as shown on the plans. Building Design 7) Building facades shall vary in material application and color as shown on the plans. 8) Each building elevation shall have a consistency of detail, material quality, and articulation as indicated on the plans. 9) The final building height and massing shall be consistent as shown on the attached exhibits. General: 10) The applicant shall obtain all necessary building, sign, and/or encroachment permits prior to construction. Page 10 of 61
11 Attachment 3 Department of Public Works: 11) Construct standard public improvements as noted in these conditions pursuant to Title 17 of the City Code. Improvements shall be designed to City Standards and assured as set forth in Section of the City Code. All improvements shall be designed and constructed to the satisfaction of the Department of Public Works. Any public improvement not specifically noted in these conditions shall be designed and constructed to City Standards. This shall include the repair or replacement/reconstruction of any existing deteriorated curb, gutter and sidewalk adjacent to the subject property along N and 14 th Streets per City standards and to the satisfaction of the Department of Public Works. 12) The applicant shall repair or replace/reconstruct (in concrete) any deteriorated portion of the existing alley adjacent to the subject property per City standards and to the satisfaction of the Department of Public Works. The limit of work along the alley shall be from the parcel s western boundary to 14 th Street including the alley entrance from 14 th Street. 13) A revocable encroachment permit will be needed to allow for any awnings, signage, bike racks and any proposed café seating to encroach onto the public right of way and are subject to the requirements of such permit. Any permanent encroachment by the building will not be allowed. 14) The applicant shall attach mirrors at the entrance to the parking areas along the alley to improve sight distance for vehicles exiting the building to the satisfaction of the Department of Public Works. 15) With the anticipated increase of pedestrian activity at N Street and 14 th Street intersection due to the construction of the project, the project applicant shall enhance the existing pedestrian crossing with any needed signage, markings of the existing crosswalk, and ADA ramp improvements. 16) Bulb outs/curb extensions are required where there is on-street parking in the central City area or as directed by the Department of Public Works. Locations of bulb outs must be reviewed and approved by the City Traffic Engineer. The applicant may be required to construct bulb-outs/ curb extension at the following locations to the satisfaction of Public Works: a. South-West Corner of 14 th and N Street intersection. 17) The South-West corner of 14 th and N Street intersection has an existing red curb on N Street and existing angled parking along the 14 th Street frontage. A design of the proposed bulb-out must be submitted to the City for review taking into consideration the existing conditions. 18) The site plan shall conform to A.D.A. requirements in all respects. This shall include the replacement of any curb ramp that does not meet current A.D.A. standards at the South-West corner of the intersection of 14 th and N streets. 19) The design of walls fences and signage near intersections and driveways shall allow stopping Page 11 of 61
12 Attachment 3 sight distance per Caltrans standards and comply with City Code Section (25' sight triangle). Walls shall be set back 3' behind the sight line needed for stopping sight distance to allow sufficient room for pilasters. Landscaping in the area required for adequate stopping sight distance shall be limited 3.5' in height at maturity. The area of exclusion shall be determined by the Department of Public Works. Urban Forestry: 12) In addition to any other required permits, a tree permit from Urban Forestry is required to perform regulated work on city trees such as pruning or excavation within the dripline of a city tree. Urban Forestry does not support non-standard pruning that substantially alters the natural shape of a city tree or extensive excavation or paving within the dripline of city trees. Several design features shown in the current plans may not be able to be constructed as designed. Given the nature of the site it is entirely possible to modify the onsite plans to avoid unnecessary conflicts with city trees. 13) The applicant shall be financially responsible for any damage to the city trees associated with the project. Accidental or negligent actions that damage city trees may result in a penalty. The monetary value of any such damages will by appraised by the City Urban Forester or his authorized representative and shall be expressed as the monetary equivalent of all labor and materials required to bring the tree in question to a state of comparable utility with regards to its condition and function prior to the beginning of the project. 14) All offsite plans within the public right of way or revisions to onsite plans that have the potential to impact city trees will need to be reviewed by Urban Forestry. Utilities: 15) Per City Code Section, , multiple water service to a single lot or parcel may be allowed if approved by DOU Development Review and Operations and Maintenance staff. Any new water services (other than fire) shall be metered. Excess services shall be abandoned to the satisfaction of the DOU. 16) Prior to or concurrent with the submittal of improvement plans, prepare a project specific water study for review and approval by the DOU. The water distribution system shall be designed to satisfy the more critical of the two following conditions: (1) at maximum day peak hour demand, the operating or "residual" pressure at all water service connections shall be at least 30 pounds per square inch, (2) at average maximum day demand plus fire flow, the operating or "residual" pressure in the area of the fire shall not be less than 20 pounds per square inch. The water study shall determine if the existing and proposed water distribution system is adequate to supply fire flow demands for the project. A water supply test may be required for this project. The applicant is advised to contact the City of Sacramento Utilities Department Water Planning Section ( ) at the early planning stages to address any water related requirements. Page 12 of 61
13 Attachment 3 17) This project is served by the Combined Sewer System (CSS). Therefore, the developer/property owner will be required to pay the Combined Sewer System Development Fee prior to the issuance of building permit. The fee will be used for improvements to the CSS. The applicant is recommended to contact the Department of Utilities Development Services at for a CSS fee estimate. (Note: Payment of CSS fees are made at the time of the onsite building permit.) 18) All increases in sewer flow shall be mitigated. The proposed project is contributing increased sewer flows to the CSS and shall evaluate the available capacity of existing CSS mains from the project s point of service to the nearest 18-inch main. If any portion of the City mains to the nearest 18-inch main is determined to have insufficient capacity to accommodate the increased sewer flow, the development shall be required to improve the undersized mains to the nearest 18-inch main. The applicant is advised to contact the City of Sacramento Utilities Department Sewer Planning Section ( ) at the early planning stages to address any drainage related requirements. 19) If the development of this site increases imperviousness, the site will be required to comply with the current drainage design standards. To meet this requirement 7,600 cubic feet of detention must be provided per each additional acre of impervious area. The maximum discharge rate must be limited to 0.18 cfs/acre. The required detention volume can be partially or fully mitigated by implementing Low Impact Development (LID) features such as Stormwater planters and porous pavement, provided these features conform to the DOU s Hydromodification Management Plan (HMP) requirements. Designer shall utilize the latest edition of the Sacramento Area Hydrology Model (SAHM) when using LID features. The applicant is advised to contact the City of Sacramento Utilities Department Drainage Planning Section ( ) at the early planning stages to address any drainage related requirements. (Note: A maintenance agreement may be required for detention and Low Impact Development (LID) features.) 20) The onsite water, sewer, and storm drain systems shall be private systems maintained by the owner or other approved entity. (Note: Onsite sewer and drainage facilities shall be separated systems.) 21) Finished floor elevations shall be a minimum of 6-inches above the 100-year HGL or 1- foot above the overland flow release elevation, whichever is higher or as approved by the DOU. 22) A grading plan showing existing and proposed elevations is required. Adjacent off-site topography shall also be shown to the extent necessary to determine impacts to existing surface drainage paths. No grading shall occur until the grading plan has been reviewed and approved by the DOU. Page 13 of 61
14 Attachment 3 23) The applicant must comply with the City of Sacramento's Grading, Erosion and Sediment Control Ordinance. This ordinance requires the applicant to show erosion and sediment control methods on the construction drawings. These plans shall also show the methods to control urban runoff pollution from the project site during construction. 24) Foundation or basement dewatering discharges to the CSS will not be allowed. The CSS does not have adequate capacity to allow for dewatering discharges for foundations or basements. Foundations and basements shall be designed without the need for dewatering. 25) The proposed project is located in a Zone X on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps (FIRMs). Accordingly, the project site lies in an area with no requirements to elevate or flood proof. 26) Currently, two types of groundwater discharges are recognized by the DOU; limited term) discharges and long-term discharges. These types of discharges are described as follows: a) "limited discharges" are short groundwater discharges of 30-daysduration or less. Limited discharges must be approved through the DOU by an approval letter. b) "long-term discharges" are groundwater discharges of greater duration than 30- days. Long-term discharge must be approved through the DOU and the City Manager through a Memorandum of Understanding (MOU) process. 27) All groundwater discharges to the Combined or Separated Sewer and/or drainage systems must be regulated and monitored by the DOU (City Council Resolution #92-439). Groundwater discharges to the City's sewer system are defined as follows: a) Construction dewatering discharges b) Treated or untreated contaminated groundwater cleanup discharges c) Uncontaminated groundwater discharges d) Discharges associated with soil remediation projects Police Department 28) Exterior lighting should be white light using LED lamps with full cutoff fixtures to limit glare and light trespass. Color temperature should be between 2700K and 4100K with a color rendering index of 75 or better and a light loss factor of.95 or better. When choosing lamps, the applicant should look for efficiency of 110 lumens per watt or better. 29) Entry drives, drive aisles, parking and bicycle parking should be illuminated to a maintained minimum of 1.5 foot candles per square foot of parking area at a 6:1 average to minimum ratio. Page 14 of 61
15 Attachment 3 30) Walkways, alcoves and passageways should be illuminated to a maintained minimum of 1/3 foot candles per square foot of surface area at a 6:1 average to minimum ratio. 31) Exterior lighting should be shielded or otherwise designed to avoid spill-over illumination to adjacent streets and properties. 32) All mature landscaping should follow the two-foot, six-foot rule. All landscaping should be ground cover, two feet or less and lower tree canopies of mature trees shall be above six feet. This increases natural surveillance and eliminates hiding areas within the landscape. 33) Tree canopies should not interfere with or block lighting. This creates shadows and areas of concealment. The landscaping plan should allow for proper illumination and visibility regarding lighting and surveillance cameras through the maturity of trees and shrubs. 34) Pedestrian paths should be a minimum of 6 wide. 35) Applicant should install a Knox Box for police access to the common areas of the property after hours. 36) Both sets of stairwells should be painted and decorated. Stair 2 should have windows installed to promote natural surveillance. Fire Department 37) Fire Apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. CFC ) Provide the required fire hydrants in accordance with CFC 507 and Appendix C, Section C105. a) Note: Appendix C, Table C105.1 has been amended by the City of Sacramento so that the required number of hydrants is based on the required GPM of Table B105.1 before any allowed fire sprinkler reduction with modified spacing distances between hydrants. 39) Timing and Installation. When fire protection, including fire apparatus access roads and water supplies for fire protection, is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. CFC ) Provide a water flow test. (Make arrangements at the Permit Center walk-in counter: 300 Richards Blvd, Sacramento, CA 95814). CFC Page 15 of 61
16 Attachment 3 41) Provide appropriate Knox access for site. CFC Section ) Locate and identify Fire Department Connections (FDCs) on address side of building no further than 50 feet and no closer than 15 feet from a fire hydrant and not more than 30 feet from a paved roadway. 43) An approved fire control room shall be provided for all buildings protected by an automatic fire extinguishing system. The room shall contain all system control valves, fire alarm control panels and other fire equipment required by the Fire Code Official. Fire Control rooms shall be located within the building at a location approved by the Fire Code Official, and shall be provided with a means to access the room directly from the exterior. Durable signage shall be provided on the exterior side of the access door to identify the fire control room. Fire Control rooms shall not be less than 50 square feet for rooms without a fire pump and 200 square feet when a fire pump is present. CFC Amendments ) Minimum gate width shall provide 20 feet clear access. Gate shall have AC power and be provided with Key override switch (Knox) and Radio operated controller (Click2Enter). For gates that do not fail safe in the open position upon loss of AC power or are provided with battery back-up power, an approved pedestrian gate shall be installed within 10 feet of all vehicle gates. An approved key box (Knox) shall be installed at least 48 inches above grade on the outside of the gate. It shall be provided with a key to open the pedestrian gate. 45) Please review the City of Sacramento s High-Rise Code for requirements that may exceed those of the standard California Building and Fire Codes. Parks 46) Maintenance District: The applicant shall initiate and complete the formation of a parks maintenance district (assessment or Mello-Roos special tax district), or annex the project into an existing parks maintenance district. The applicant shall pay all city fees for formation of or annexation to a parks maintenance district. (Contact Planning Department, Special Districts, Project Manager. In assessment districts, the cost of neighborhood park maintenance is equitably spread on the basis of special benefit. In special tax districts, the cost of neighborhood park maintenance is spread based upon the hearing report, which specifies the tax rate and method of apportionment.) 47) As per City Code, the applicant will be responsible to meet his/her obligations regarding: a) Community Facilities District , Neighborhood Park Maintenance CFD Annexation. Page 16 of 61
17 Attachment 3 Regional Sanitation 48) The City of Sacramento (City) is responsible for providing local sewer service to the proposed project site via their local sanitary sewer collection system. Regional San is responsible for the conveyance of wastewater from the City collection system to the Sacramento Regional Wastewater Treatment Plant (SRWTP). 49) Developing this property will require the payment of Regional San sewer impact fees (connection fees). Regional San sewer impact fees shall be paid prior to the issuance of building permits. For questions pertaining to Regional San sewer impact fees, please contact the Sewer Fee Quote Desk at (916) SMAQMD 50) Energy Use- The District applauds the project s sustainability goal of achieving LEED Gold equivalent. The District notes that studies have found that Green buildings can produced 50% less GHGs due to water consumption than baseline buildings, 48% less due to solid waste management, and 5% less due to transportation. 51) Transportation Demand Management (TDM) Incentives for new residents: Travel behavior choices in individuals can be difficult to change once habits and routines set in. Given this projects location in the Central City and proximity to public transit; there is great potential for future residents to minimize the use of personal motor vehicles for many trips. To encourage the use of sustainable transportation, the District recommends new residents receive a TDM welcome package. The package might include a transit pass or Connect card, Bike-Share membership, Car-share membership, or other incentives to encourage the use of sustainable modes of transportation. The package could also include information on available transit service, and information on other transportation resources such regional ride-matching services. 52) Bicycle Parking- The District applauds the inclusion of short-term bicycle parking for visitors and the inclusion of a Bike room to provide secure, long-term Bicycle storage for future residents. This is consistent with the City of Sacramento s 2035 General Plan Policy M : Encourage Bicycle Use. The District encourages the City and CADA to build a facility that can accommodate a variety of bicycle shapes and sizes, and provides electrical service to allow for the charging of e-bicycles. All projects are subject to SMAQMD rules at the time of construction. Specific rules that may relate to construction activities are attached. A complete listing of current rules is available at or by calling Page 17 of 61
18 Attachment 3 SMUD 53) SMUD has existing 21kV overhead facilities along 14th Street and Neighbors Alley. The Applicant shall be responsible for maintaining all CalOSHA and State of California Public Utilities Commission General Order No. 95 safety clearances during construction and upon building completion. If the required clearances cannot be maintained, the Applicant shall be responsible for relocating existing SMUD facilities. 54) In the event the Applicant requires the relocation or removal of existing SMUD facilities on or adjacent to the subject property, the Applicant shall coordinate with SMUD. The Applicant shall be responsible for the cost of relocation or removal. 55) SMUD reserves the right to use any portion of its easements on or adjacent to the subject property that it reasonably needs and shall not be responsible for any damages to the developed property within said easement that unreasonably interferes with those needs. 56) The Applicant shall not place any building foundations within 5-feet of any SMUD trench to maintain adequate trench integrity. The Applicant shall verify specific clearance requirements for other utilities (e.g., Gas, Telephone, etc.). 57) The Applicant shall comply with SMUD siting requirements (e.g., panel size/location, clearances from SMUD equipment, transformer location, service conductors). Information regarding SMUD siting requirements can be found at: Services 58) Any necessary future SMUD facilities located on the Applicant s property shall require a dedicated SMUD easement. This will be determined prior to SMUD performing work on the Applicant s property. 59) Additional transformer space may be required. This additional space will vary and the amount will depend on specific service requirements, including service size, voltage and other requirements. Furthermore, the location of this space will be site-dependent and could include subsurface (vaulted) or in-building space if pad-mounted and/or alcove space is unavailable or insufficient. Please reference Electric Service in Downtown Sacramento, Solutions-and-Rebates/dcs/dcs-Electric-Service-in-Downtown-Sacramento, for additional information on equipment spacing requirements. Page 18 of 61
19 CADA SITE 21 PLANNING REVIEW Page 19 of 61
20 PROJECT TEAM INDEX OF DRAWINGS VICINITY MAP PROJECT DESCRIPTION OWNER ARCHITECT LANDSCAPE CRESLEIGH HOMES CORP Douglas Blvd., Suite 110 Roseville, CA Contact: Rober Walter Senior Vice President P: W: E: HKS ARCHITECTS, INC. 539 Bryant Street, Suite 100 San Francisco, CA Contact: Brendan Dunnigan - Principal in Charge P: W: E: bdunnigan@hksinc.com ATLAS LAB INC st Street, Sacramento, CA Contact: Kimberly Garza Founder / Director P: W: E kimberly@atlaslab.net GENERAL A0.00 COVER SHEET A0.01 PROJECT INFORMATION A0.02 DESIGN NARRATIVE A0.03 SUSTAINABILITY NARRATIVE & AGENDA A0.04 PROJECT TABULATIONS A0.05 PROJECT TABULATION PLANS A0.06 PROJECT TABULATION PLANS A0.07 PROJECT TABULATION PLANS A0.08 ZONING ANALYSIS A0.09 SITE PHOTOS A0.10 SITE PHOTOS A0.11 SITE PHOTOS A0.12 SITE PHOTOS LANDSCAPE L1 EXISTING GROUND PLANE L2 PROPOSED SITE L3 PROPOSED ROOF TERRACE L4 ROOF TERRACE DESIGN ARCHITECTURAL A1.00 EXISTING SITE PLAN A1.01 SITE PLAN A2.01 LEVEL B1 - BASEMENT FLOOR PLAN A2.02 LEVEL 01 - GROUND FLOOR PLAN A2.03 LEVEL 02 - FLOOR PLAN A2.05 LEVELS TYPICAL FLOOR PLAN A2.08 LEVEL 08 - FLOOR PLAN A2.09 LEVEL 09 - FLOOR PLAN A2.10 LEVEL 10 - ROOF PLAN A2.50 TYPICAL 1BR UNIT PLAN A2.60 TYPICAL 2BR UNIT PLAN A2.70 TYPICAL 3BR UNIT PLAN A5.01 SOUTH EXTERIOR ELEVATION A5.02 EAST EXTERIOR ELEVATION A5.03 NORTH EXTERIOR ELEVATION A5.04 WEST EXTERIOR ELEVATION A5.10 STREET-LEVEL PERSPECTIVE A5.15 AERIAL PERSPECTIVE 10TH ST N STREET 11TH ST 12TH ST O STREET P STREET ASSESSOR'S PARCEL MAP CAPITOL PARK 13TH ST SITE 14TH ST L STREET 15TH ST SITE PARCEL AREA = SF CAPITOL AVE 16TH ST THIS MIXED-USE DEVELOPMENT AT 14TH & N STREETS CONSISTS OF A NEW NINE STORY BUILDING CONTAINING APPROXIMATELY 1,500 SQUARE FEET OF RETAIL, 86 UNITS AND 70 PARKING STALLS. THE PROJECT IS LOCATED WITHIN THE CENTRAL CORE DESIGN GUIDELINE AREA BUILDING / PLANNING ZONING: R-5 MULTI-FAMILY RESIDENTIAL ZONE OCCUPANCY: R-2, A-3, S-2, M TYPE OF CONSTRUCTION: 1-A NO. OF STORIES: 9 NO. OF UNITS: 93 NO. OF BEDROOMS: 138 TOTAL FLOOR AREA (GSF): 156,366 FLOOR AREA RATIO: 8.05 SITE DENSITY (DU/ACRE): 210 SITE AREA (SF): 19,334 PROJECT INFORMATION PROJECT NAME: CADA SITE 21 PARCEL NO.: , , , , ADDRESS: OWNER-CONTACT PERSON: ROBERT WALTER - CRESLEIGH HOMES CODES AND STANDARDS A6.01 BUILDING SECTION CALIFORNIA BUILDING CODE (CBC) - TITLE 24 PART CALIFORNIA MECHANICAL CODE - TITLE 24 PART CALIFORNIA PLUMBING CODE - TITLE 24 PART CALIFORNIA ELECTRICAL CODE - TITLE 24 PART CALIFORNIA FIRE CODE - TITLE 24 PART CALIFORNIA ENERGY CODE - TITLE 24 PART CALIFORNIA GREEN BUILDING STANDARDS - TITLE 24 PART SACRAMENTO CITY CODE SACRAMENTO CENTRAL CITY URBAN DESIGN GUIDELINES CAPITOL AREA PLAN PLANNING PRINCIPLES FAIR HOUSING AMENDMENTS ACT FAIR HOUSING ACT DESIGN MANUAL AMERICAN WITH DISABILITIES ACT (ADA) ADA ACCESSIBILITY GUIDELINES (ADAAG) 2/23/2018 3:10:58 PM CADA SITE 21 - PLANNING REVIEW P0.01 PROJECT INFORMATION 02/22/ Page 20 of 61
21 DESIGN NARRATIVE 2/23/2018 9:58:19 AM CADA SITE 21 - PLANNING REVIEW P0.02 DESIGN NARRATIVE 02/22/ Page 21 of 61
22 SUSTAINABILITY AGENDA SUSTAINABILITY NARRATIVE 2/23/2018 9:58:20 AM CADA SITE 21 - PLANNING REVIEW SUSTAINABILITY NARRATIVE & AGENDA P /22/ Page 22 of 61
23 2/23/2018 3:08:08 PM CADA SITE 21 -PLANNING REVIEW P0.04 PROJECT TABULATIONS 02/22/ Page 23 of 61
24 TABULATION PLAN GENERAL NOTES / COLOR LEGEND 1. STANDARD METHODS OF AREA MEASUREMENT ARE PER ANSI/BOMA Z : MULTI-UNIT RESIDENTIAL BUILDINGS STANDARDS UNIT GROSS AREA LIMITED COMMON AREA COMMON AREA CORRIDOR COMMON AREA RETAIL MEP STRUCTURED PARKING COMMON AREA SUPPORT MAJOR VERTICAL PENETRATION STORAGE SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF COMMON AREA CORRIDOR 901 SF COMMON AREA CORRIDOR 229 SF UNIT GROSS AREA 1395 SF UNIT GROSS AREA 1452 SF UNIT GROSS AREA 880 SF UNIT GROSS AREA 865 SF UNIT GROSS AREA 865 SF UNIT GROSS AREA 747 SF UNIT GROSS AREA 743 SF UNIT GROSS AREA 878 SF UNIT GROSS AREA 1781 SF UNIT GROSS AREA 1318 SF UNIT GROSS AREA 861 SF UNIT GROSS AREA 853 SF COMMON AREA SUPPORT 52 SF MAJOR VERTICAL PENETRATION 356 SF MAJOR VERTICAL PENETRATION 487 SF LIMITED COMMON AREA 3160 SF LIMITED COMMON AREA 36 SF LIMITED COMMON AREA 610 SF LIMITED COMMON AREA 52 SF UNIT GROSS AREA 853 SF MEP 185 SF SF 2/23/ :32:10 AM SF SF SF SF SF SF SF SF SF SF SF SF SF CADA SITE 21 -PLANNING REVIEW SF SF SF SF SF SF LEVEL 02 -AREA TABULATION PLAN SF SF SF B SF B SF LEVEL 01 -AREA TABULATION PLAN 02 B SF B SF B SF B SF B SF LEVEL B1 -AREA TABULATION PLAN COMMON AREA 1178 SF COMMON AREA 1344 SF COMMON AREA 351 SF COMMON AREA 228 SF RETAIL 1454 SF STORAGE 1000 SF COMMON AREA SUPPORT 222 SF COMMON AREA CORRIDOR 333 SF MAJOR VERTICAL PENETRATION 239 SF MAJOR VERTICAL PENETRATION 328 SF STRUCTURED PARKING 6912 SF COMMON AREA SUPPORT 2015 SF MEP 120 SF COMMON AREA CORRIDOR 166 SF COMMON AREA SUPPORT 810 SF COMMON AREA SUPPORT 325 SF COMMON AREA CORRIDOR 210 SF COMMON AREA CORRIDOR 340 SF MEP 327 SF SF COMMON AREA SUPPORT 279 SF B1-01 STRUCTURED PARKING SF B1-02 COMMON AREA SUPPORT 932 SF B1-03 COMMON AREA CORRIDOR 333 SF B1-04 MAJOR VERTICAL PENETRATION 328 SF B1-05 MAJOR VERTICAL PENETRATION 365 SF B1-06 MAJOR VERTICAL PENETRATION 239 SF B1-07 COMMON AREA SUPPORT 182 SF SF PROJECT TABULATION PLANS FT P /22/ Page 24 of 61
25 TABULATION PLAN GENERAL NOTES / COLOR LEGEND 1. STANDARD METHODS OF AREA MEASUREMENT ARE PER ANSI/BOMA Z : MULTI-UNIT RESIDENTIAL BUILDINGS STANDARDS UNIT GROSS AREA LIMITED COMMON AREA COMMON AREA CORRIDOR COMMON AREA RETAIL MEP STRUCTURED PARKING COMMON AREA SUPPORT MAJOR VERTICAL PENETRATION STORAGE Calculating SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF GROSS BUILDING AREA - LEVEL 08 NUMBER NAME AREA COMMON AREA CORRIDOR 950 SF COMMON AREA CORRIDOR 333 SF UNIT GROSS AREA 1378 SF UNIT GROSS AREA 1430 SF UNIT GROSS AREA 1338 SF UNIT GROSS AREA 1763 SF UNIT GROSS AREA 1183 SF UNIT GROSS AREA 1284 SF UNIT GROSS AREA 1284 SF COMMON AREA SUPPORT 65 SF MAJOR VERTICAL PENETRATION 347 SF MAJOR VERTICAL PENETRATION 583 SF COMMON AREA 3420 SF COMMON AREA 236 SF LIMITED COMMON AREA 908 SF SF LEVEL 08 -AREA TABULATION PLAN SF GROSS BUILDING AREA - LEVELS /23/2018 9:58:23 AM CADA SITE 21 - PLANNING REVIEW SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF LEVELS AREA TABULATION PLAN 01 NUMBER NAME AREA MEP 142 SF COMMON AREA CORRIDOR 897 SF COMMON AREA CORRIDOR 222 SF UNIT GROSS AREA 1376 SF UNIT GROSS AREA 1468 SF UNIT GROSS AREA 882 SF UNIT GROSS AREA 865 SF UNIT GROSS AREA 866 SF UNIT GROSS AREA 750 SF UNIT GROSS AREA 751 SF UNIT GROSS AREA 878 SF UNIT GROSS AREA 1775 SF UNIT GROSS AREA 1323 SF UNIT GROSS AREA 861 SF UNIT GROSS AREA 854 SF COMMON AREA SUPPORT 52 SF MAJOR VERTICAL PENETRATION 360 SF MAJOR VERTICAL PENETRATION 480 SF LIMITED COMMON AREA 39 SF UNIT GROSS AREA 852 SF SF PROJECT TABULATION PLANS FT P /22/ Page 25 of 61
26 TABULATION PLAN GENERAL NOTES / COLOR LEGEND 1. STANDARD METHODS OF AREA MEASUREMENT ARE PER ANSI/BOMA Z : MULTI-UNIT RESIDENTIAL BUILDINGS STANDARDS SF SF UNIT GROSS AREA LIMITED COMMON AREA COMMON AREA CORRIDOR COMMON AREA RETAIL MEP STRUCTURED PARKING COMMON AREA SUPPORT MAJOR VERTICAL PENETRATION STORAGE Calculating... GROSS BUILDING AREA - LEVEL 10 NUMBER NAME AREA COMMON AREA CORRIDOR 203 SF COMMON AREA SUPPORT 1137 SF MAJOR VERTICAL PENETRATION 511 SF 1851 SF LEVEL 10 -AREA TABULATION PLAN SF SF 882 SF 1443 SF SF SF SF SF SF SF SF SF SF SF SF GROSS BUILDING AREA - LEVEL 09 NUMBER NAME AREA MEP 130 SF COMMON AREA CORRIDOR 788 SF COMMON AREA CORRIDOR 284 SF UNIT GROSS AREA 1443 SF UNIT GROSS AREA 882 SF UNIT GROSS AREA 1744 SF UNIT GROSS AREA 1183 SF UNIT GROSS AREA 1284 SF UNIT GROSS AREA 1284 SF UNIT GROSS AREA 1381 SF COMMON AREA SUPPORT 63 SF MAJOR VERTICAL PENETRATION 361 SF MAJOR VERTICAL PENETRATION 504 SF LIMITED COMMON AREA 95 SF UNIT GROSS AREA 879 SF LIMITED COMMON AREA 305 SF SF 2/23/2018 9:58:24 AM CADA SITE 21 - PLANNING REVIEW LEVEL 09 -AREA TABULATION PLAN 01 PROJECT TABULATION PLANS FT P /22/ Page 26 of 61
27 14TH & N STREET ZONING DIAGRAM 14TH & NEIGHBORS ALLEY ZONING DIAGRAM 2/23/2018 9:58:25 AM CADA SITE 21 - PLANNING REVIEW P0.08 ZONING ANALYSIS 02/22/ Page 27 of 61
28 2/23/2018 9:58:26 AM CADA SITE 21 - PLANNING REVIEW P /22/2018 SITE PHOTOS Page 28 of 61
29 2/23/2018 9:58:26 AM CADA SITE 21 - PLANNING REVIEW SITE PHOTOS FT P /22/ Page 29 of 61
30 2/23/2018 9:58:27 AM CADA SITE 21 - PLANNING REVIEW SITE PHOTOS FT P /22/ Page 30 of 61
31 2/23/2018 9:58:28 AM CADA SITE 21 - PLANNING REVIEW SITE PHOTOS FT P /22/ Page 31 of 61
32 N STREET NEIGHBORS ALLEY 14TH STREET - EXISTING CONDITIONS 14TH AND N STREET PEDESTRIAN CROSSING - EXISTING CONDITIONS 14TH STREET ATLAS LAB LANDSCAPE ARCHITECTURE AND PUBLIC ART EXISTING SITE - OVERALL VIEW SCALE: 1 = N STREET - EXISTING CONDITIONS Page 32 of 61
33 ENHANCE STREET CHARACTER THROUGH PAVING + BIKE PARKING N STREET NEIGHBORS ALLEY SPECIALTY PAVING AT BLDG. ENTRY PLANTERS + ON-STREET BIKE PARKING ACTIVATE STREET THROUGH DESIGNATED CAFE/SEATING AREA CURB BULB-OUT TO INCREASE PED. CROSSING + PLANTING AREA NOTE: PROPOSED N STREET IMPROVEMENTS WILL BE CONGRUENT WITH DOWNTOWN SPECIFIC PLAN (GRID 3.0) SEATING AREA FOR POTENTIAL CAFE USE DG AT EXISTING PLANTING AREA SIDEWALK LIGHTING AT BLDG. FACADE 14TH STREET ATLAS LAB LANDSCAPE ARCHITECTURE AND PUBLIC ART PROPOSED SITE - OVERALL VIEW SCALE: 1 = INCREASE PEDESTRIAN SAFETY WITH SIDEWALK BULB OUT Page 33 of 61
34 FIRE PIT AND SEATING AREAS OUTDOOR KITCHEN + COMMUNITY TABLE SHADE STRUCTURE RAILING + COCKTAIL SHELF 2ND FLOOR TERRACE 8TH FLOOR TERRACE CUSTOM PLANTERS W/ DROUGHT TOLERATE PLANTINGS WALL W/ BUILT-IN TV PEDESTAL PAVERS NATIVE PLANTINGS W/ BUILT IN SEATING 1 CUSTOM PLANTERS + SEATING AREAS ATLAS LAB LANDSCAPE ARCHITECTURE AND PUBLIC ART OUTDOOR KITCHEN + SHADE FABRIC SYSTEM PROPOSED ROOF TERRACES [Drawing Title] Scale: 1" = 10 ft LOUNGE AREAS + FIRE PITS DINING AREA SCALE: 1 = Page 34 of 61
35 ROOF TERRACE DESIGN PROPOSED 8TH FLOOR TERRACE - CONCEPT VIEW ATLAS LAB LANDSCAPE ARCHITECTURE AND PUBLIC ART Page 35 of 61
36 PROPERTY LINE N STREET EXISTING CURB LOCATIONS EXISTING BUILDING TO BE REMOVED EXISTING LOT TO BE REMOVED SD/SS 14TH STREET NEIGHBORS ALLEY PROPERTY LINE 2/23/2018 9:58:28 AM CADA SITE 21 - PLANNING REVIEW EXISTING SITE PLAN FT P /22/ Page 36 of 61
37 APPROX. 3' - 0" ADJACENT FRONT SETBACK N STREET 120' - 7" LOT DIMENSION P5.03/01 A5.02/02 LOBBY CANOPY 100' - 0" SEE LANDSCAPE DRAWINGS FOR PROPOSED BUMP-OUT EXISTING RESIDENTIAL BUILDING 210' - 11" 174' - 7" CANOPY 160' - 3 1/2" LOT DIMENSION A5.02/04 P5.04/01 195' - 11" 115' - 7" A5.02/01 P5.02/01 NEIGHBORS ALLEY PROPERTY LINE A5.02/03 P5.01/01 100' - 0" 14TH STREET 2/23/2018 9:58:30 AM CADA SITE 21 - PLANNING REVIEW SITE PLAN FT P /22/ Page 37 of 61
38 01 P6.01 PARKING SCHEDULE - LEVEL B1 159' - 0" OVERALL BUILDING TYPE NUMBER OF SPACES STALL LENGTH STALL WIDTH PROPERTY LINE COMPACT 17 15' -0" 8' -0" EVCS 2 18' -0" 9' -0" EVCS VAN ADA 1 18' - 0" 9' - 0" STANDARD 12 18' -0" 8' -6" TANDEM 10 18' -0" 8' -6" VAN ADA 1 18' - 0" 9' - 0" GRAND TOTAL 43 FIRE PUMP ROOM 241 SF FIRE WATER STORAGE 1998 SF 14% RAMP UP 1BR 2BR 3BR Amenity Lobby Retail Parking MEP BOH Outdoor Garden Calculating... ST SF UP ELEV LOBBY 297 SF ACCESSIBLE PATH ST SF MAIN ELECTRICAL ROOM 845 SF PARKING SF CAR SHARE STALL 119' - 0" OVERALL BUILDING TELE/DATA 144 SF 2/23/2018 9:58:30 AM CADA SITE 21 - PLANNING REVIEW LEVEL B1 -PARKING FLOOR PLAN 01 LEVEL B1 - BASEMENT FLOOR PLAN FT P /22/ Page 38 of 61
39 01 P6.01 TYPE PARKING SCHEDULE - LEVEL 01 NUMBER OF SPACES STALL LENGTH STALL WIDTH ADA 1 18' - 0" 9' - 0" COMPACT 17 15' -0" 8' -0" TANDEM 6 18' -0" 8' -6" GRAND TOTAL 24 NEIGHBORS ALLEY RESIDENTIAL VEHICULAR ENTRY GAS METER ROOM 91 SF PROPERTY LINE FIRE PUMP ROOM HATCH 24' - 0" 156' - 0" OVERALL BUILDING 14% RAMP DN MEP 299 SF P5.04/01 PACKAGE HOLD 216 SF BIKE AND RESIDENT STORAGE 984 SF AMAZON MAIL ROOM 336 SF OFFICE / RETAIL 1283 SF FCC 207 SF 7" SETBACK 1BR 2BR 3BR Amenity Lobby Retail Parking MEP BOH Outdoor Garden Calculating... RESIDENTIAL VEHICULAR ENTRY 24' - 0" TRASH 153 SF ST SF DN UP ELEV LOBBY 165 SF CONCIERGE/ SECURITY RESIDENTIAL LOBBY 1127 SF MAIN RESIDENTIAL LOBBY ENTRY 24' - 4" P5.01/01 ST SF TRANSFORMER VAULT 837 SF BIKE STORAGE 301 SF RETAIL 1359 SF 5' - 4" SETBACK 119' - 0" OVERALL BUILDING N STREET P5.03/01 0" SETBACK RESIDENTIAL CYCLIST ENTRY RETAIL PEDESTRIAN ENTRY 2/23/2018 9:58:31 AM 14TH STREET CADA SITE 21 - PLANNING REVIEW P5.02/01 LEVEL 01 -GROUND LEVEL FLOOR PLAN 01 LEVEL 01 - GROUND FLOOR PLAN FT P /22/ Page 39 of 61
40 01 P6.01 OVERALL BUILDING 172' - 6" P5.04/01 PROPERTY LINE PODIUM TERRACE 3042 SF 1BR-B 737 SF 1BR-A 845 SF 1BR-B 737 SF 1BR-A 839 SF VIEW OF CA STATE CAPITOL BUILDING 1BR 2BR 3BR Amenity Lobby Retail Parking MEP BOH Outdoor Garden Calculating... ST SF UP 2BR-C 1348 SF 1BR-A 805 SF 1BR-A 796 SF ELEV LOBBY 149 SF 3BR-A 1673 SF RESIDENTIAL LOBBY CANOPY P5.01/01 ST SF 2BR-B 1229 SF TRASH 40 SF 1BR-A 779 SF 1BR-A 779 SF CORRIDOR 910 SF 1BR-A 787 SF 2BR-B 1220 SF 118' - 0" OVERALL BUILDING P5.03/01 4' - 0" 2/23/2018 9:58:32 AM CADA SITE 21 - PLANNING REVIEW P5.02/01 LEVEL 02 -FLOOR PLAN 01 LEVEL 02 -FLOOR PLAN FT P /22/ Page 40 of 61
41 01 P6.01 OVERALL BUILDING P5.04/01 PROPERTY LINE UNIT COUNT LEVEL 02-07: LEVEL 08: LEVEL 09: TOTALS 1BR=50 UNITS 2BR=41 UNITS 3BR=2 UNITS 93 UNITS TOTAL 1BR: 8 UNITS 2BR: 5 UNITS 2BR: 6 UNITS 3BR: 1 UNIT 1BR: 2 UNITS 2BR: 5 UNITS 3BR: 1 UNIT 2BR-C 1358 SF PODIUM GARDEN BELOW 1BR-A 818 SF 1BR-A 806 SF 1BR-B 751 SF 1BR-A 845 SF ST SF DN UP ELEV LOBBY 149 SF 1BR-B 753 SF 1BR-A 855 SF 3BR-A 1709 SF VIEW OF CA STATE CAPITOL BUILDING OVERALL BUILDING 1BR 2BR 3BR Amenity Lobby Retail Parking MEP BOH Outdoor Garden Calculating... P5.01/01 ST SF P5.03/01 2BR-B 1299 SF 1BR-A 804 SF 1BR-A 793 SF 1BR-A 802 SF 2BR-B 1231 SF 2/23/2018 9:58:33 AM P5.02/01 LEVELS FLOOR PLAN 01 CADA SITE 21 - PLANNING REVIEW LEVELS TYPICAL FLOOR PLAN FT P /22/ Page 41 of 61
42 01 P ' - 0" OVERALL BUILDING P5.04/01 PROPERTY LINE UNIT COUNT LEVEL 02-07: LEVEL 08: LEVEL 09: TOTALS 1BR=50 UNITS 2BR=41 UNITS 3BR=2 UNITS 93 UNITS TOTAL 1BR: 8 UNITS 2BR: 5 UNITS 2BR: 6 UNITS 3BR: 1 UNIT 1BR: 2 UNITS 2BR: 5 UNITS 3BR: 1 UNIT P5.01/01 2BR-C 1296 SF ST SF TRASH 42 SF 2BR-A 1226 SF M 81 SF STORAGE 47 SF W 62 SF CORRIDOR 924 SF ST SF ROOF GARDEN 3250 SF UP ELEV LOBBY 149 SF 3BR-A 1631 SF 118' - 6" VIEW OF CA STATE CAPITOL BUILDING OVERALL BUILDING P5.03/01 1BR 2BR 3BR Amenity Lobby Retail Parking MEP BOH Outdoor Garden Calculating... 2BR-B 1242 SF 2BR-A 1176 SF 2BR-A 1176 SF 2BR-B 1109 SF 4' - 0" 2/23/2018 9:58:33 AM CADA SITE 21 - PLANNING REVIEW P5.02/01 LEVEL 08 -FLOOR PLAN 01 LEVEL 08 -FLOOR PLAN FT P /22/ Page 42 of 61
43 160' - 0" 01 OVERALL BUILDING P6.01 P5.04/01 PROPERTY LINE UNIT COUNT LEVEL 02-07: LEVEL 08: LEVEL 09: TOTALS 1BR=50 UNITS 2BR=41 UNITS 3BR=2 UNITS 93 UNITS TOTAL 1BR: 8 UNITS 2BR: 5 UNITS 2BR: 6 UNITS 3BR: 1 UNIT 1BR: 2 UNITS 2BR: 5 UNITS 3BR: 1 UNIT ST SF DN UP ROOF GARDEN BELOW VIEW OF CA STATE CAPITOL BUILDING CANOPY ABOVE 1BR 2BR 3BR Amenity Lobby Retail Parking MEP BOH Outdoor Garden Calculating... P5.01/01 2BR-C 1313 SF ST SF TRASH 44 SF 1BR 807 SF 1BR 814 SF ELEV LOBBY 149 SF CORRIDOR 768 SF 3BR-A 1631 SF 76' - 0" OVERALL BUILDING P5.03/01 2BR-B 1243 SF 2BR-A 1192 SF 2BR-A 1192 SF 2BR-B 1075 SF 2' - 0" 2/23/2018 9:58:34 AM CADA SITE 21 - PLANNING REVIEW P5.02/01 LEVEL 09 -FLOOR PLAN 01 LEVEL 09 -FLOOR PLAN FT P /22/ Page 43 of 61
44 01 P ' - 0" OVERALL BUILDING P5.04/01 PROPERTY LINE 1BR 2BR 3BR Amenity Lobby Retail Parking MEP BOH Outdoor Garden Calculating... ST SF DN P5.01/01 HEAT PUMPS ELEV CONTROL ROOM 297 SF BOILER PENTHOUSE 1107 SF 76' - 0" OVERALL BUILDING P5.03/01 2/23/2018 9:58:35 AM CADA SITE 21 - PLANNING REVIEW P5.02/01 LEVEL 10 -ROOF PLAN 01 LEVEL 10 -ROOF PLAN FT P /22/ Page 44 of 61
45 22' - 5 1/2" KITCHEN W/D P BATHROOM DINING 35' - 7" 895 GSF CLOSET LIVING BEDROOM BALCONY 2/23/2018 9:58:35 AM CADA SITE 21 - PLANNING REVIEW P2.50 1BR-A UNIT PLAN /22/ Page 45 of 61
46 2BR-A 1,176 SF 2/23/2018 9:58:36 AM CADA SITE 21 - PLANNING REVIEW P2.60 2BR-A UNIT PLAN /22/ Page 46 of 61
47 47' - 6" MASTER BATH KITCHEN BATHROOM W/D BATHROOM 11' - 8" CLOSET 1,750 GSF DINING CLOSET 9' - 4 1/2" MASTER BEDROOM LIVING 12' - 1" BEDROOM BEDROOM 14' - 6" BALCONY 2/23/2018 9:58:38 AM CADA SITE 21 - PLANNING REVIEW 11' - 0" 13' - 41/2" 10' - 0" 11' - 0" P2.70 3BR-A UNIT PLAN /22/ Page 47 of 61
48 LEVEL ' -11" 05 15' - 0" INSULATED COMPOSITE PANEL 02 GLASS WALL WITH TINT 03 SIERRA WHITE GRANITE EXISTING RESIDENTIAL BUILDING 14TH STREET 15' - 7" 9' - 8" 9' - 8" 9' - 8" 9' - 8" 9' - 8" 10' - 8" 10' - 8" 10' - 8" 110' - 11" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" GLASS GUARDRAIL & JULIETTE BALCONY 06 WOOD / ALUMINUM CANOPY 04 12' - 0" LEVEL ' -0" LEVEL B1 88' -0" GLASS / ALUMINUM OVERHEAD DOOR 2/23/2018 9:58:40 AM CADA SITE 21 - PLANNING REVIEW SOUTH EXTERIOR ELEVATION 01 SOUTH EXTERIOR ELEVATION FT P /22/ Page 48 of 61
49 P LEVEL ' -11" 05 15' - 0" INSULATED COMPOSITE PANEL 02 GLASS WALL WITH TINT 03 SIERRA WHITE GRANITE 04 NEIGHBORS ALLEY N STREET 12' - 0" 15' - 7" 9' - 8" 9' - 8" 9' - 8" 9' - 8" 9' - 8" 10' - 8" 10' - 8" 10' - 8" 110' - 11" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" LEVEL ' -0" LEVEL B1 88' -0" GLASS GUARDRAIL & JULIETTE BALCONY 06 WOOD / ALUMINUM CANOPY 07 TRANSLUCENT GLASS COMPOSITE WOOD PANEL 2/23/2018 9:58:41 AM CADA SITE 21 - PLANNING REVIEW EAST EXTERIOR ELEVATION 01 EAST EXTERIOR ELEVATION FT P /22/ Page 49 of 61
50 LEVEL ' -11" 05 15' - 0" INSULATED COMPOSITE PANEL 02 GLASS WALL WITH TINT 03 SIERRA WHITE GRANITE 14TH STREET EXISTING RESIDENTIAL BUILDING 9' - 8" 9' - 8" 9' - 8" 9' - 8" 9' - 8" 10' - 8" 10' - 8" 10' - 8" 110' - 11" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" GLASS GUARDRAIL & JULIETTE BALCONY 06 WOOD / ALUMINUM CANOPY 15' - 7" 04 12' - 0" LEVEL ' -0" LEVEL B1 88' -0" COMPOSITE WOOD PANEL 2/23/2018 9:58:42 AM CADA SITE 21 - PLANNING REVIEW NORTH EXTERIOR ELEVATION 01 NORTH EXTERIOR ELEVATION FT P /22/ Page 50 of 61
51 01 01 P LEVEL ' -11" 15' - 0" INSULATED COMPOSITE PANEL 02 GLASS WALL WITH TINT 03 SIERRA WHITE GRANITE N STREET NEIGHBORS ALLEY 15' - 7" 9' - 8" 9' - 8" 9' - 8" 9' - 8" 9' - 8" 10' - 8" 10' - 8" 10' - 8" 110' - 11" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" GLASS GUARDRAIL & JULIETTE BALCONY 04 12' - 0" LEVEL ' -0" LEVEL B1 88' -0" WOOD / ALUMINUM CANOPY 2/23/2018 9:58:44 AM CADA SITE 21 - PLANNING REVIEW WEST EXTERIOR ELEVATION 01 WEST EXTERIOR ELEVATION FT P /22/ Page 51 of 61
52 2/23/2018 9:58:45 AM CADA SITE 21 - PLANNING REVIEW STREET-LEVEL PERSPECTIVE P /22/ Page 52 of 61
53 2/23/2018 9:58:46 AM CADA SITE 21 - PLANNING REVIEW P5.15 AERIAL PERSPECTIVE 02/22/ Page 53 of 61
54 PROPERTY LINE *MAX ALLOWED PER 1992 CAPITOL VIEW PROTECION ACT AS SHOWN IN THE 1997 CAPITOL AREA PLAN AND AS DEFINED IN SACRAMENTO CITY CODE "B" DEFINITIONS IS 96'-0" FOR LOTS 4-7 AND 80'-0" FOR LOT 3 FROM THE AVERAGE FINISH GRADE AT THE BUILDING ENTRANCE TO THE ROOF PLATE LINE LOT 3 LOTS 4-7 PROPERTY LINE LEVEL ' -11" EXISTING RESIDENTIAL BUILDING MECHANICAL PENTHOUSE (20% HEIGHT EXCEPTION PER SACRAMENTO CITY CODE ) STOR ROOF GARDEN PODIUM GARDEN PARKING (ROOF PLATE LINE) 14TH STREET 15' - 7" 9' - 8" 9' - 8" 9' - 8" 9' - 8" 9' - 8" 10' - 8" 10' - 8" 10' - 8" 15' - 0" 18' - 0" 95' - 11" * LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" LEVEL ' -11" LEVEL ' -3" LEVEL ' -7" 1BR 2BR 3BR Amenity Lobby Retail Parking MEP BOH Outdoor Garden Calculating... LEVEL ' -0" MEP PARKING 12' - 0" LEVEL B1 88' -0" 2/23/2018 9:58:46 AM CADA SITE 21 - PLANNING REVIEW BUILDING SECTION 01 BUILDING SECTION FT P /22/ Page 54 of 61
55 11/29/2017 VIA Angel Anguiano City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA RE: CADA Site 21 (DR17-365) Dear Mr. Anguiano: WALKSacramento has reviewed the routing for CADA Site 21 (DR17-365). The project consists of a mixeduse high rise building comprising of nine stories, 1,500 sf ground floor retail, 86 for-sale residential units, 70 tenant parking stalls on two levels accessible from Neighbor s Alley, and 60 long-term bike parking stalls within the High Rise Residential (R-5) zone. The project will require demolition of one existing apartment building. CADA Site 21 is proposed for 1320 N Street at the southwest corner of 14 th and N Streets. The site location is close to many walkable destinations including the 40-acre California State Capital Park and an adjacent church. It is the last undeveloped parcel directly on Capital Mall. WALKSacramento recommends incorporating the following to improve the walking and biking-supportive elements of CADA Site 21: Provide illumination on Neighbor s Alley and N Street for safe nighttime walking. Provide a bike ramp onto the sidewalk and repurpose the parking spot next to the corner curb extension for a more direct route to the Residential Cyclist Entry door. This will improve bicycle access, reduce pedestrian conflicts, and eliminate auto movement next to the proposed outdoor seating. Use extra-wide or double doors at the Residential Cyclist Entry and the garage entrance to the Resident/Bike Storage Room to allow for bikes to more easily access the bike storage room. Widen the alcove at the Residential Cyclist Entry door to improve pedestrian and bicyclist sightlines. New development that facilitates and motivates people to walk and bike, combined with streets that are walkable and bikeable, is needed to improve the health of our residents. Many people don t achieve the recommended minimal amount of daily physical activity, often due to the obstacles to walking and biking created by the built environment in which they live. CADA Site 21 will be in a prime location, but there are a few elements of the site and building design that will not achieve the same level of support for daily physical activity. These elements involve lighting and bicycle parking access th Street, Suite 203 Sacramento, CA Page 55 of 61
REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento
REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento 915 I Street, Sacramento, CA 95814-2671 www.cityofsacramento.org 9 PUBLIC HEARING December 10, 2015 To: Members of the Planning and Design Commission
More informationCITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811
CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811 ACTION OF THE ZONING ADMINISTRATOR On Thursday, September 14, 2017, the Zoning
More informationCADA Board of Directors MAY 18, 2018 Board Meeting AGENDA ITEM 5 SITE 21 DEVELOPMENT PROPOSAL (SW CORNER OF 14 TH AND N STREETS)
May 9, 28 TO: SUBJECT: CONTACT: CADA Board of Directors MAY 18, 28 Board Meeting AGENDA ITEM 5 SITE 21 DEVELOPMENT PROPOSAL (SW CORNER OF 14 TH AND N STREETS) Tom Kigar, Special Projects Director Wendy
More informationCITY OF MERCED SMALL LOT SINGLE-FAMILY HOME DESIGN GUIDELINES
CITY OF MERCED SMALL LOT SINGLE-FAMILY HOME DESIGN GUIDELINES Development Services Department Planning and Permitting Adopted August 15, 2005 SMALL LOT SINGLE FAMILY HOME GUIDELINES A. Purpose and Applicability.
More informationAccessory Dwelling Unit Permit
PLANNING SERVICES DEPARTMENT 411 Main Street (530) 87-6800 P.O. Box 3420 Chico, CA 527 Application No. APPLICATION FOR Accessory Dwelling Unit Permit Applicant Information Applicant Street Address Daytime
More informationCity of Sacramento City Council 915 I Street, Sacramento, CA,
City of Sacramento City Council 915 I Street, Sacramento, CA, 95814 www.cityofsacramento.org 24 Meeting Date: 7/12/2011 Report Type: Public Hearing Title: 500 Eleanor Avenue Two-Unit Development (P10-083)
More informationREPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento
Members of the Planning and Design Commission: REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento 915 I Street, Sacramento, CA 95814-2671 PUBLIC HEARING January 26, 2017 3 Subject: Sutter Park
More informationARTICLE 900 PLAT AND PLAN REQUIREMENTS
ARTICLE 900 PLAT AND PLAN REQUIREMENTS SEC. 900.1 ITEMS TO BE SHOWN ON PLAT OR PLAN General (1) Property lines of all property owners adjacent to the exterior boundaries of the project shall be located
More informationCity of Sacramento Development Services Department. City of Sacramento Development Services Department
Transportation/Circulation: T-1. Prior to the approval of plans or building permits, the project proponent shall pay a fair share for Central City traffic improvements as identified by City of Sacramento
More informationAN ORDINANCE OF THE CITY OF MINNEAPOLIS. By Palmisano
AN ORDINANCE OF THE CITY OF MINNEAPOLIS By Palmisano Amending Title 20, Chapter 520 of the Minneapolis Code of Ordinances relating to Zoning Code: Introductory Provisions. The City Council of the City
More informationMEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR
MEMORANDUM TO: FROM: BY: PLANNING COMMISSION TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR MATTHEW DOWNING, ASSISTANT PLANNER SUBJECT: CONSIDERATION OF TENTATIVE PARCEL MAP CASE NO. 14-002; SUBDIVISION
More informationAppendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017
Appendix1,Page1 Urban Design Guidelines DRAFT September 2017 Back to Back and Stacked Townhouses Appendix1,Page2 Table of Contents 1 Introduction 1 1.1 Purpose 1 1.2 Urban Design Objectives 1 1.3 Building
More informationMay 21, ACHD Board of Commissioners Stacey Yarrington, Planner II DRH /DRH
Development Services Department May 21, 2013 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner II DRH13-00106/DRH13-00108 Executive Summary: This is a design review application
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019
PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019 DEVELOPMENT NAME SUBDIVISION NAME Springhill Village Subdivision Springhill Village Subdivision LOCATION 4350, 4354, 4356, 4358,
More informationCommitted to Service. License Agreement Application Form
Committed to Service License Agreement Application Form PLEASE NOTE: Effective February 16, 2010 - License Agreements within the downtown Boise area for public structures, objects and uses on ACHD sidewalks
More informationAccessory Dwelling Units (ADUs)
Community Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 Accessory Dwelling Units (ADUs) Completed Project Application
More informationCommunity Development Department Council Chambers, 7:30 PM, June 7, 2018
STAFF REPORT 2018-19P: Special Use Permit Community Development Department Council Chambers, 7:30 PM, June 7, 2018 To: From: Re: Paul Luke, Plan Commission Chairperson Carrie Haberstich, AICP, Planner/CDBG
More informationUPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA
UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA JOINDER DEED / LOT CONSOLIDATION TOWNSHIP REVIEW PROCESS When accepting proposed Joinder Deeds / Lot Consolidations, review the Joinder Deed
More informationPLANNING COMMISSION STAFF REPORT. Merrimac PLNSUB Planned Development 38 West Merrimac November 9, Request. Staff Recommendation
PLANNING COMMISSION STAFF REPORT Merrimac PLNSUB2011-00374 Planned Development 38 West Merrimac November 9, 2011 Planning and Zoning Division Department of Community and Economic Development Applicant:
More informationPREPARED FOR THE URBAN DESIGN COMMISSION AND PLAN COMMISSION
PLANNING DIVISION STAFF REPORT PREPARED FOR THE URBAN DESIGN COMMISSION AND PLAN COMMISSION Project Address: Application Type: Prepared By: Demolition Permit and Conditional Use Kevin Firchow, AICP, Planning
More informationPLANNED DEVELOPMENT DISTRICT STANDARDS. Cadence Site
PLANNED DEVELOPMENT DISTRICT STANDARDS Cadence Site A Planned Development District 1. Statement of General Facts, Conditions and Objectives Property Size: Approximately 57.51 Acres York County Tax Map
More informationComposition of traditional residential corridors.
Page 1 of 7 St. Petersburg, Florida, Code of Ordinances >> PART II - ST. PETERSBURG CITY CODE >> Chapter 16 - LAND DEVELOPMENT REGULATIONS >> SECTION 16.20.060. CORRIDOR RESIDENTIAL TRADITIONAL DISTRICTS
More informationAPPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps
CITY OF EL CERRITO Community Development Department Planning and Building Division 10890 San Pablo Avenue, El Cerrito, CA 94530 (510) 215-4330 FA (510) 233-5401 planning@ci.el-cerrito.ca.us APPLICATION
More information66 Isabella Street Rezoning Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 66 Isabella Street Rezoning Application - Preliminary Report Date: November 15, 2010 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No.: 10 Date: 06-28-18 Park Potomac: Site Plan Amendment No. 82004015N Benjamin Berbert, Planner
More informationSite Plan Application
Site Plan Application City of St. Pete Beach Community Development Department 155 Corey Avenue St. Pete Beach, Florida 33706 (727) 367-2735 www.stpetebeach.org Case Number: PROPERTY OWNER: Name: Address:
More informationBOROUGH OF HOPATCONG ORDINANCE No
BOROUGH OF HOPATCONG ORDINANCE No. 10-2014 AN ORDINANCE OF THE BOROUGH OF HOPATCONG, SUSSEX COUNTY, NEW JERSEY TO ADOPT A FORM BASED CODE AS AN OVERLAY DISTRICT AFFECTING PORTIONS OF THE B-1 AND R-1 ZONING
More informationREPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento
REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento 915 I Street, Sacramento, CA 95814-2671 www. CityofSacramento.org 5 PUBLIC HEARING APRIL 27, 2017 To: Members of the Planning and Design Commission
More informationUrban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London
Urban Design Brief 1635 (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London Site Plan Control Application Holding Provision Application April 1, 2015 Prepared for: Rise Real
More information4 DEVELOPMENT STANDARDS FOR
4 DEVELOPMENT STANDARDS FOR RESIDENTIAL MIXED-USE PROJECTS This chapter presents standards for residential mixed-use projects in the Ashland-Cherryland Business District and the Castro Valley Central Business
More information1. The reason provided for the opposing votes was that the two commissioners wanted something else to be developed on their parcel.
Agenda Item #6.2 SUBJECT: PUBLIC HEARING - APPEAL OF PLANNING COMMISSION DECISION DENYING THE APPROVAL OF THE TENTATIVE PARCEL MAP, CONDITIONAL USE PERMIT, AND SITE AND ARCHITECTURAL REVIEW FOR THE CONSTRUCTION
More informationAPPROVED CITY OF CITRUS HEIGHTS PLANNING COMMISSION MEETING MINUTES OCTOBER 25, 2017
CITY OF CITRUS HEIGHTS PLANNING COMMISSION MEETING MINUTES OCTOBER 25, 2017 1. CALL MEETING TO ORDER Chair Blair called the meeting to order at 7:00 PM. 2. ROLL CALL Commission Present: Blair, Cox, Lagomarsino,
More informationAgenda Item No.: G.1 Date: August 11, 2009
Agenda Item No.: G.1 Date: August 11, 2009 CASE NUMBER: PHG 09-0015 APPLICANT: LOCATION: TYPE OF PROJECT: PROJECT DESCRIPTION: Humberto Martinez On the eastern side of Orange Street, western side of Escondido
More informationCITY OF SIGNAL HILL SUBJECT: PUBLIC HEARING THE COURTYARD RESIDENTIAL DEVELOPMENT OF 10 CONDOMINIUMS AND A NEW SPECIFIC PLAN
CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: HONORABLE CHAIR AND MEMBERS OF THE PLANNING COMMISSION SELENA ALANIS ASSOCIATE PLANNER SUBJECT: PUBLIC HEARING THE
More informationSITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST
SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST Completed DRC Application for Review Required for Application Process DRC Processing Fee 1 Commercial $2,500.00 Fire Department Review Fee 150.00 Total $2,650.00
More informationARTICLE 24 SITE PLAN REVIEW
ARTICLE 24 SITE PLAN REVIEW 24.1 PURPOSE: The intent of these Ordinance provisions is to provide for consultation and cooperation between the land developer and the Township Planning Commission in order
More informationChapter SPECIAL USE ZONING DISTRICTS
Chapter 20.20 Sections: 20.20.010 Urban Transition (U-T) Zoning District 20.20.020 Planned Development (P-D) Zoning Districts 20.20.010 Urban Transition (U-T) Zoning District A. Purpose. The purpose of
More informationPLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT
PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DATE: TO: Hearing Officer SUBJECT: Minor Variance #11876 LOCATION: APPLICANT: ZONING DESIGNATION: GENERAL PLAN DESIGNATION: CASE PLANNER: STAFF
More informationCounty of Sonoma Agenda Item Summary Report
County of Sonoma Agenda Item Summary Report Agenda Item Number: 36 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To: Board of Supervisors
More informationARTICLE IV: DEVELOPMENT STANDARDS
ARTICLE IV: DEVELOPMENT STANDARDS IV-53 409 PRIVATE STREETS A private street means any way that provides ingress to, or egress from, property by means of vehicles or other means, or that provides travel
More informationPLANNING COMMISSION MAY 3, 2018 PUBLIC HEARING
PLANNING COMMISSION MAY 3, 2018 PUBLIC HEARING SUBJECT: REQUEST TO DEMOLISH TWO SINGLE-FAMILY DWELLINGS ON TWO ADJOINING LOTS AND CONSTRUCT TEN RESIDENTIAL CONDOMINIUM UNITS AT 947 GENESEE AVENUE AND 944
More informationPLANNING DIVISION STAFF REPORT December 16, Summary. Background Information PREPARED FOR THE PLAN COMMISSON. Legistar File ID # 32125
PLANNING DIVISION STAFF REPORT Project Address: Application Type: Legistar File ID # 32125 Prepared By: 644 North Frances Street Conditional Use PREPARED FOR THE PLAN COMMISSON Heather Stouder, AICP, Planning
More informationChurch Street and 117 Dundas Street East - Zoning Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 215-229 Church Street and 117 Dundas Street East - Zoning Amendment Application - Preliminary Report Date: February 26, 2015 To: From: Wards: Reference Number: Toronto and
More informationWashington County, Minnesota Ordinances
Washington County, Minnesota Ordinances Ordinance No. 153 Text Amendment to the Washington County Development Code - Chapter One, Section 2 and Chapter Two, Part 1, Part 2, Part 3, of the Development Code
More informationThe demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.
D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t 2072 ADDISON STREET PRELIMINARY DESIGN REVIEW For Committee Discussion/ Majority Recommendation JULY 20, 2017 Design Review #DRCP2016-0002
More informationAppendix J - Planned Unit Development (PUD)
Appendix J - Planned Unit Development (PUD) Intent and Purpose The purpose of the PUD is: 1. To provide development that is consistent with the Comprehensive Land Use Plan and promote the goals and objectives
More informationAirport Rd. Lot 6 Lot 2 Lot 1. 1 Mile: Population: 1,100 Median HH Income: $51, Mile: Population: 16,300 Median HH Income: $53,500
Walmart Outparcels For Sale Godfrey, IL Store #4695 6660 Godfrey Road Airport Rd Lot 4 Lot 6 Lot 2 Lot 1 Godfrey Rd/ Hwy 67 For more information about this site, contact: Jim Rosen Pace Properties (314)
More informationAccessory Coach House
Updated July 2018 Accessory Coach House Development Permit Guidelines 1 Accessory Coach House Development Permit Guidelines Zoning Bylaw, 1995 DIVISION VII C. Contents Part I General Reglations 1 Introduction
More informationATTACHMENT A REQUEST/BACKGROUND INFORMATION VENTURA/TYRONE REDEVELOPMENT PROJECT PROJECT OVERVIEW/REQUEST BACKGROUND Ventura Boulevard
Revised October 28, 2016 ATTACHMENT A REQUEST/BACKGROUND INFORMATION VENTURA/TYRONE REDEVELOPMENT PROJECT Sherman Oaks, CA 91423 PROJECT OVERVIEW/REQUEST The Applicant, 14311 Ventura Development, LLC,
More informationDEVELOPMENT STANDARDS FOR RESIDENTIAL PROJECTS RESIDENTIAL BUILDING TYPES: APPROPRIATE ZONES AND DENSITIES 2-1
2 DEVELOPMENT STANDARDS FOR RESIDENTIAL PROJECTS RESIDENTIAL BUILDING TYPES: APPROPRIATE ZONES AND DENSITIES 2-1 This Chapter presents the development standards for residential projects. Section 2.1 discusses
More informationREPORT TO PLANNING COMMISSION City of Sacramento
REPORT TO PLANNING COMMISSION City of Sacramento 915 I Street, Sacramento, CA 95814-2671 7 PUBLIC HEARING September 13, 2012 To: Members of the Planning Commission Subject: Downtown and Vine (P12-029)
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: November 17, 2016
PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: November 17, 2016 DEVELOPMENT NAME SUBDIVISION NAME LOCATION Autonation Ford of Mobile Autonation Ford of Mobile Subdivision 901, 909, and 925
More informationPLANNED UNIT DEVELOPMENT (East), PLANNED UNIT DEVELOPMENT (West) STAFF REPORT Date: September 18, 2014
PLANNED UNIT DEVELOPMENT (East), PLANNED UNIT DEVELOPMENT (West) STAFF REPORT Date: September 18, 2014 DEVELOPMENT NAME LOCATION McGowin Park, LLC PLANNED UNIT DEVELOPMENT (East) 1401 Satchel Paige Drive
More informationResidential Major Subdivision Review Checklist
Residential Major Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining
More informationIntroduction. General Development Standards
Introduction The development standards will set the zoning regulations for the East Park development. This section will illustrate lot standards, approximate open space locations and road standards. The
More information-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION OF LAND REGULATIONS TITLE 17
ARTICLE VI -- GENERAL REGULATIONS AND PROVISIONS Sec. 17-50. Sec. 17-51 General Plan. Sec. 17-52 Lot and Block Design and Configuration. Sec. 17-53 Lot Access. Sec. 17-54 Private Roads. Sec. 17-55 Water
More informationADMINISTRATIVE HEARING STAFF REPORT
ADMINISTRATIVE HEARING STAFF REPORT Providence Place Apartments Utility Box No. 2 Conditional Use Petition PLNPCM2011-00426 309 East 100 South September 22, 2011 Planning and Zoning Division Department
More informationPlanning & Development. Background. Subject Properties
Planning & Development APPLICATION BRIEFING Prepared For: Planning Advisory Committee Submitted by: Jason Fox, Director of Planning & Development Date: Subject: Application by Meech Holdings Limited to
More informationBox Elder County Land Use Management & Development Code Article 3: Zoning Districts
Chapter 3-6 Mobile Homes, Mobile Home Subdivisions, & Recreational Vehicle Parks Box Elder Zoning Ordinance as Adopted October 2007 Sections. 3-6-010. Purpose and Intent. 3-6-020. Conditional Use Permit
More informationWilson Bridge Corridor Zoning. Department of Planning & Building
Wilson Bridge Corridor Zoning Department of Planning & Building Background: Wilson Bridge Road Corridor Study The City conducted a strategic study of one of the community s primary economic centers, the
More informationARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW
ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW Section 7.0 - Purpose The purpose of this article is to specify the documents and/or drawings required for a Site Plan Review or a Plot Plan
More informationM E M O. September 14, 2017 Agenda Item #4. Planning Commission. David Goodison, Planning Director
September 14, 2017 Agenda Item #4 M E M O To: From: Planning Commission David Goodison, Planning Director Re: Preliminary review of an application for a mixed-use development proposed for 870 Broadway
More informationCITY PLAN COMMISSION STAFF REPORT
CITY PLAN COMMISSION STAFF REPORT SUBJECT: Request for a Change of Zoning and Preliminary Development Plan FROM: Mara Perry, Director of Planning & Development MEETING DATE: November 6, 2017 PETITION:
More informationAdvisory Design Panel Report For the Meeting of February 27, 2019
Advisory Design Panel Report For the Meeting of February 27, 2019 To: Advisory Design Panel Date: February 15, 2019 From: Subject: Moira Wilson, Senior Planner - Urban Design 952 Johnson Street and 1400
More informationCITY OF HOLLYWOOD. Technical Advisory Committee Submittal Checklist. Guide to TAC Submittal Checklist. General Requirements:
CITY OF HOLLYWOOD Technical Advisory Committee Submittal Checklist Guide to TAC Submittal Checklist This document is an outline of site plan review procedures as listed in the Technical Advisory Committee
More informationSection Preliminary Plat Checklist and Application Forms
Section 201 - Preliminary Plat Checklist and Application Forms PRELIMINARY SUBDIVISION PLAT REVIEW PROCESS CHART PRELIMINARY SUBDIVISION PLAT APPLICATION PRELIMINARY PLAT REVIEW CHECKLIST CITY OF NAMPA
More information8.5.1 R1, Single Detached Residential District
8.5.1 R1, Single Detached Residential District The purpose of this district is to provide for residential development in the form of single detached dwellings. Dwelling, Single Detached Home Business,
More information. \. structure. portion of a. yard setback. in height. for that. above 45 ft. structure above. 20-ft. front. 2, additional.
Z089-254(RB) E-1 REGULATIONS Front Yard YARD, LOT, AND SPACE 00. \.,, Max.-6Oft. Mm. 15 ft. maximum front yard right-of-ways other way is dedicated existing Ft. Worth ft. from Ft. Worth Ave. or rights
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016
PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016 DEVELOPMENT NAME SUBDIVISION NAME Mullinax Ford Subdivision Mullinax Ford Subdivision LOCATION CITY COUNCIL DISTRICT District 6 Southeast
More informationPolicy and Standards for Public Local Residential Streets And Private Streets
Appendix A City of Toronto Development Infrastructure Policy & Standards Policy and Standards for Public Local Residential Streets And Private Streets November 2005 Policy and Standards For Public Local
More informationARTICLE VII. NONCONFORMITIES. Section 700. Purpose.
ARTICLE VII. NONCONFORMITIES. Section 700. Purpose. The purpose of this chapter is to regulate and limit the development and continued existence of legal uses, structures, lots, and signs established either
More information320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525
320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525 July 28, 2015 (a) What are you proposing/use? A 47,00 S.F., 3-story, mixed used project with 30 for-sale condo residential units and 2
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 8, 2006 DATE: June 30, 2006 SUBJECT: U-3156-06-1 USE PERMIT for a, 2 dwelling units located at 4717 24 th Road North (RPC #05-005-092).
More informationAction Recommendation: Budget Impact:
City of Fayetteville Staff Review Form Garner Stoll Submitted By 2018-0144 Legistar File ID 4/17/2018 City Council Meeting Date - Agenda Item Only N/A for Non-Agenda Item 3/22/2018 Submitted Date Action
More informationMedical Marijuana Special Exception Use Information
Medical Marijuana Special Exception Use Information The Special Exception Use information below is a modified version of the Unified Development Code. It clarifies the current section 5:104 Special Exceptions
More informationNew Zoning Ordinance Program
City of Goleta New Zoning Ordinance Program Module 3: Regulations Applying to Multiple Districts General Site Regulations Landscaping Parking and Loading June 09, 2014 New Zoning Ordinance Program By:
More informationCity of Fayetteville, Arkansas Page 1 of 3
City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Legislation Text File #: 2018-0144, Version: 1 ADM 18-6094 (AMEND UDC 164.19/ACCESSORY DWELLING UNITS): AN
More informationARTICLE 900 PLAT AND PLAN REQUIREMENTS
Final SEC. 900.01 ARTICLE 900 PLAT AND PLAN REQUIREMENTS General provisions. (a) Scale. The scale of all plats and plans shall be a minimum of 1 to 100 ft. (b) Size. The minimum page size for all plats
More informationSpecial Land Use. SLU Application & Review Standards
review and approval is needed for certain uses of property that have the potential to impact adjacent properties and the neighborhood. The application and review procedure is intended to ensure that the
More information900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1
50 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca 900 BURRARD STREET
More informationCity of Midland Application for Site Plan Review
City of Midland Application for Site Plan Review Submission Date: Property Owner: Mailing Address: Phone number: ( ) Cell phone: ( ) Email address: Fax: ( ) Owner s Signature: Applicant Name (if not owner):
More informationWalmart Outparcel For Sale
Walmart Outparcel For Sale Texas City, TX Store # 8190 6614 GULF FREEWAY Emmett F Lowry Expy Lot 5 Gulf Fwy/ US I-45 1764 Road For more information about this site, contact: Lot 5: ±0.85 Acres - $500,000
More informationResidential Minor Subdivision Review Checklist
Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining
More informationFENCE BUILDING PERMIT APPLICATION
Village of Glen Ellyn Planning & Development Department 535 Duane Street Glen Ellyn, IL 60137 Phone: 630-547-5250; Fax: 630-547-5370 www.glenellyn.org FENCE BUILDING PERMIT APPLICATION Permit Number Date
More informationUrban Design Brief 6233, 6237, 6241 and 6245 Main Street, Stouffville Pace Savings and Credit Union June 15, 2012
Pace Savings and Credit Union June 15, 2012 1.0 Introduction 3 2.0 The Proposal 4 3.0 Site and Development Context 5 4.0 Planning Background 7 5.0 Design Rationale 8 5.1 Limited Opportunities 5.2 Overall
More informationMay 23, 2017 Staff Report to the Board of Zoning Ad justment. C AS E # VAR I t e m #1. Location Map. Subject
May 23, 2017 Staff Report to the Board of Zoning Ad justment C AS E # VAR 2 0 1 7-00031 I t e m #1 U N I T E D R E N TA L S O R L A N D O Location Map S U M M A R Y Owner Herbert R. Matthews, Jr. Applicant
More informationCharter Township of Garfield Grand Traverse County
Charter Township of Garfield Grand Traverse County 3848 VETERANS DRIVE TRAVERSE CITY, MICHIGAN 49684 PH: (231) 941-1620 FAX: (231) 941-1588 GUIDE FOR THE SUBMISSION OF AN APPLICATION FOR SITE PLAN REVIEW
More informationFigure 5-1, Land Use Plan, establishes the boundaries of each land use districts in the Boronda Community
APPENDIX A DEVELOPMENT STANDARDS This Appendix provides development standards and regulations for the majority of the land use districts within the Community of Boronda. This section describes the allowed
More informationCity of Reno October 30, 2012 Draft Midtown Zoning Text Amendments 1
Section 18.08.405 Regional Center and Transit Corridor Overlay Districts (i) SVTC South Virginia Street Transit Corridor Overlay Zoning District. (1) Applicability. This Section 18.08.405(l)'s standards
More informationArticle 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT
Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT this page left intentionally blank Contents ARTICLE 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT DIVISION 3.1 NEIGHBORHOOD CONTEXT DESCRIPTION...3.1-1 Section 3.1.1
More informationPuyallup Downtown Planned Action & Code Changes. January 10, 2017
Puyallup Downtown Planned Action & Code Changes January 10, 2017 Purpose & Location Purpose Promote economic development and downtown revitalization Tools: Municipal Code amendments Change development
More informationCHAPTER 26 PLANNING AND ZONING ARTICLE VII. MOBILE HOMES AND RECREATIONAL VEHICLE (RV) PARKS. Recreational Vehicle (RV) Park Development Standards
CHAPTER 26 PLANNING AND ZONING ARTICLE VII. MOBILE HOMES AND RECREATIONAL VEHICLE (RV) PARKS. Section 26-VII-1. Section 26-VII-2. Section 26-VII-3. Section 26-VII-4. Section 26-VII-5. Purpose Permitted
More informationChapter DOWNTOWN ZONING DISTRICTS
Chapter 20.14 Sections: 20.14.010 Purpose of the Downtown Zoning Districts 20.14.020 Land Use Regulations for Downtown Zoning Districts 20.14.030 Development Standards for Downtown Zoning Districts 20.14.010
More informationSherwood Forest (Trinity) Housing Corporation. Urban Design Brief
Sherwood Forest (Trinity) Housing Corporation Sherwood Place Affordable Housing Apartments Trinity Presbyterian Church Orchard Park Nursery School 590 Gainsborough Road, London Urban Design Brief REVISED
More informationCITY OF CITRUS HEIGHTS Planning Department 6237 Fountain Square Drive Citrus Heights, CA (916)
CITY OF CITRUS HEIGHTS Planning Department 6237 Fountain Square Drive Citrus Heights, CA 95621 (916) 725-2448 DATE: May 17, 2005 TO: Mike Evans Mike Williams 3111 Sunset Blvd. Suite One Baker-Williams
More informationCITY OF DERBY. MEETING OF THE PLANNING COMMISSION REGULAR MEETING June 19, :30 PM
CITY OF DERBY MEETING OF THE PLANNING COMMISSION REGULAR MEETING June 19, 2014 6:30 PM CALL MEETING TO ORDER ROLL CALL CONSIDERATION OF MINUTES: Planning Commission Meeting of June 5, 2014. PUBLIC FORUM
More informationREFERRAL. COUNTY OF SAN LUIS OBISPO Department of Public Works. Colt Esenwein, Director
COUNTY OF SAN LUIS OBISPO Department of Public Works Colt Esenwein, Director REFERRAL Date: June 5, 2018 To: Terry Wahler, Project Planner From: Glenn Marshall, Development Services Subject: Public Works
More informationWALNUT CREEK DESIGN REVIEW COMMISSION STAFF REPORT. AGENDA: July 6, 2016 ITEM 4b.
WALNUT CREEK DESIGN REVIEW COMMISSION STAFF REPORT Attachment 3 AGENDA: July 6, 2016 ITEM 4b. ORIGINATED BY: COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT PLANNING PROJECT NAME APPLICATION TYPE APPLICATION
More informationM-43 CORRIDOR OVERLAY ZONE
ARTICLE 26.00 M-43 CORRIDOR OVERLAY ZONE Section 26.01 Findings A primary function of the M-43 state highway is to move traffic through the Township and to points beyond. As the primary east-west arterial
More informationDEVELOPMENT POLICY INFRASTRUCTURE GUIDELINES FOR NEW DEVELOPMENT
CITY OF HAYS SUBJECT DEVELOPMENT POLICY INFRASTRUCTURE GUIDELINES FOR NEW DEVELOPMENT ISSUED BY LAST REVISION DATE POLICY MANUAL REVISION DATE City Commission 3-13-08 10-22-09 POLICY STATEMENT: The City
More information