1 Cost Ashton Elementary School 2 2 Replace HVAC $ 375, Recoat & Resurface Exterior Paved Play Area $ 135, Various Technological Improvements $ 191, Replace Plumbing Fixtures $ 150, Replace Asphalt Pavement $ 29, Upgrade Room Lighting $ 82, Corridor Exhaust and Ventilation $ 150, Replace Air Handlers at Gym & Café $ 285, Identify Exterior Doors (Security) $ 10, Open Cubbies $ 57, Renovate ADA Pre-K Restroom $ 50, Drop Off Area Roof Repairs $ 5, New Parking $ 500, Egress Lighting $ 10, Replace Asphalt Shingles at Roof $ 463, Repaint Various Surfaces $ 115, ADA Classroom Sinks $ 20, ADA Faculty Restrooms $ 100, New Curb $ 19, New Driveway $ 12, New ADA Kindergarten Restrooms $ 560, Playground Repairs $ 8, New Playground Fence $ 6, Emergency Generator $ 63, Renovations - Kindergarten $ 270, Renovations - Regular $ 195, Renovations - Educational Master Plan $ 480, Upgrade Security & ADA $ 100, New Wing - Ed. Program to be 3-Track $ 2,500, Ashton ES Total Cost $ 6,944, Cost 1... $ 3,760, $ 1,894, $ 477, $ - 5 $ 812,814.10
2 Cost B.F. Norton Elementary School 1 1 Masonry Repair $ 11, Replace Exterior Metal Door $ 5, Replace SAT at Various Locations $ 196, Replace Concrete Walk $ 40, Replace Carpet $ 15, Various Technological Improvements $ 324, Replace Metal Roof at Entrance $ 55, Replace Asphalt Pavement $ 272, Upgrade Acoustics at Gym $ 71, Upgrade Sound Isolation between Rooms $ 10, Replace HVAC Circulation Pump $ 17, Plumbing Fixtures at Classroom Lavs $ 7, Replace Aluminum Windows $ 304, Identify Exterior Doors (Security) $ 3, Provide Area of Rescue Assistance $ 7, Replace Unit Ventilators $ 815, Replace All Plumbing Fixtures $ 150, Repaint Corridors $ 39, Replace Rubber Tile at Stairs $ 4, Renovate New Art Room $ 180, New Parking $ 300, Replace Roof System (replace EPDM w/ PVC) $ 290, Repaint Brick Walls at Gym $ 7, Repaint Ceiling at Gym $ 6, Repair Ceramic Tile at Toilet A-1 $ 2, Replace VCT Flooring at Corridors $ 28, Renovate Clinic $ 10, New Kindergarten ADA Restrooms $ 80, Playground Repairs $ 20, Renovations - Kindergarten $ 267, Renovations - Educational Master Plan $ 792, Upgrade Security & ADA $ 894, B.F. Norton ES Total Cost $ 5,229, Cost 1... $ 2,165, $ 1,702, $ 343, $ 372, $ 645,977.60
3 Cost Community Elementary School 2 2 Replace Metal Exterior Doors $ 83, Replace Mechanical / HVAC Piping $ 832, Replace Carpet $ 25, Replace Plumbing Fixtures $ 250, Replace Acoustical Ceiling Tile $ 87, Replace Unit Ventilators $ 1,750, Replace Sanitary Sewer Piping $ 105, Various Technological Improvements $ 532, Lighting $ 123, Replace Ceiling Grid $ 600, Abate Deteriorating Caulking (Asbestos) $ 6, Abate Deteriorating Glazing Putty (Asbestos) $ 9, Abate Damaged Paint (Pre-1978) (Lead) $ 35, Replace Asphalt Paving $ 200, Repaint Interior Walls $ 175, Plumbing Fixtures at Classroom Lavs $ 12, Open Cubbies $ 84, Identify Exterior Doors (Security) $ 13, Chair Lift $ 155, Egress Windows $ 40, ADA Doors & Openers $ 67, Renovate ADA Restrooms $ 400, Area of Rescue Assistance $ 7, Repair Concrete Window Lintels $ 50, Repair Cracks in South Wing (CMU) $ 30, Repair Cracks in West Wing (Brick) $ 30, Emergency Generator $ 63, Replace Asphalt Shingles at Roof $ 466, Replace Aluminum Windows $ 112, New Parking $ 305, Fire Alarm $ 300, Replace Caulking at Exterior Wall $ 20, New Music Room $ 180, Playground Relocation $ 40, Egress Windows $ 28, Renovations - Kindergarten $ 231, New Addition - Cafeteria & Kitchen $ 1,702, Renovations - Educational Master Plan $ 738, Upgrade Security & ADA $ 500, Community ES Total Cost $ 10,390, Cost 1... $ 3,735, $ 5,680, $ 170, $ 123, $ 680,931.50
4 Cost Garvin Elementary School 2 3 Replace Acoustical Ceiling Tiles $ 266, Various Technological Improvements $ 300, Replace Ceiling Grid $ 315, Abate Deteriorating Caulking (Asbestos) $ 5, Abate Deteriorating Glazing Putty (Asbestos) $ 2, Abate Damaged Paint (pre-1978) (Lead) $ 41, Upgrade Room Lighting $ 46, Plumbing Fixtures at Classroom Lavs $ 6, Replace Aluminum Windows $ 67, Open Cubbies at Classrooms $ 27, Area of Rescue Assistance $ 7, Identify Exterior Doors (Security) $ 8, Emergency Egress Windows $ 38, Replace Sealant at CMU Walls at Gym $ 80, New Emergency Generator $ 60, Replace Unit Ventilators $ 750, Replace Plumbing Fixtures $ 100, Replace Asphalt Shingles at Roof $ 373, Replace PVC Flat Roof $ 15, Replace Aluminum Additions $ 257, Renovate ADA Full Restrooms $ 200, New Art Room $ 180, New Music Room $ 180, New Kindergarten ADA Restrooms $ 80, New Parking & Paving $ 400, New Driveway $ 62, Replace/Repair/Repaint Various $ 75, Renovations - Kindergarten $ 355, New Addition - Cafeteria $ 660, Renovations - Educational Master Plan $ 447, Upgrade Security & ADA $ 200, Garvin ES Total Cost $ 5,609, Cost 1... $ 2,178, $ 1,627, $ 1,265, $ 462, $ 75,000.00
5 Cost McLaughlin Cumberland Hill Elementary School 3 2 Replace EPDM Roofing / Repair Asphalt Shingles $ 59, Replace Unit Ventilators $ 1,000, Replace Mechanical Ductwork $ 52, Replace Steam Hot Water Unit Heaters $ 27, Replace Steam Hot Water Radiant Heaters $ 864, Replace Electrical Switchgear $ 69, Replace Electrical Panelboard $ 24, Replace Gutters $ 17, Replace SAT at Various Locations $ 79, Replace Asphalt Walks $ 76, Various Technological Improvements $ 300, Replace Ceiling Grid $ 152, Replace Plumbing Fixtures $ 190, Replace Asphalt Pavement $ 301, Replace HVAC Circulation Pump $ 17, Abate Damaged Paint (pre-1978) (Lead) $ 29, Upgrade Room Lighting $ 281, Replace Gyp. Board Ceilings $ 25, Plumbing Fixtures at Classroom Lavatories $ 12, Identify Exterior Doors (Security) $ 6, ADA Classroom Sinks $ 50, Renovate Clinic Restroom to be ADA Compliant $ 200, Renovate Clinic $ 60, Replace Emergency Generator $ 60, Upgrade Parking/Pathway Lighting $ 20, Replace Caulking at Brick at Exterior Wall $ 20, Replace Caulking at CMU at Exterior Wall $ 20, Aluminum Egress Windows $ 36, New Music Room $ 180, New Art Room $ 180, Replace/Repair/Repaint Various $ 75, Renovations - Kindergarten $ 348, Renovations - Educational Master Plan $ 246, Upgrade Security & ADA $ 220, McLaughlin ES Total Cost $ 5,304, Cost 1... $ 2,199, $ 1,134, $ 1,524, $ - 5 $ 446,263.00
6 Cost McCourt Middle School 2 1 Plumbing Shutoffs $ 38, Replace HVAC Air Handlers $ 425, Replace Steam Hot Water Radiant Heaters $ 115, Plumbing Fixture Replacement $ 225, Replace Concrete Walks $ 5, Replace Parking / Roadway Curbs $ 25, Replace Air Compressor $ 11, Various Technological Improvements $ 300, Upgrade Room Lighting $ 14, Plumbing Fixtures at Classroom Lavs $ 21, ADA Single Faculty & Student Restrooms $ 78, Replace Aluminum Windows $ 59, Replace SAT at Locker Rooms $ 11, Repaint Gym Ceiling $ 13, Replace SAT at Gym Showers $ 1, Replace SAT at Toilets A-M $ 6, Identify Exterior Doors (Security) $ 3, Cross Corridor Doors $ 16, Door Pullside ADA Clearance at Library / Admin. $ 4, ADA Restrooms $ 400, ADA Door Pullside Clearances $ 6, Replace Sealant at Precast Walls $ 40, Health / Safety Items in Courtyards $ 4, Repair Ceramic Tile Flooring at Toilets A-M $ 5, Cafeteria Folding Partitions $ 270, Science Lab Renovations $ 220, Science Classroom Renovation $ 50, Replace Caulking at Brick Walls $ 40, Replace SAT at Classrooms $ 113, Replace SAT at Library $ 5, Replace SAT at Offices $ 14, Replace SAT at Teachers Lounge $ 2, Repaint Wood / CMU Walls at Lobby $ 4, Renovations - Educational Master Plan $ 1,127, Upgrade Security & ADA $ 100, McCourt MS Total Cost $ 3,778, Cost 1... $ 1,529, $ 2,097, $ 51, $ 14, $ 86,254.80
7 Cost North Cumberland Middle School 2 1 Plumbing Shutoffs $ 49, Replace HVAC Air Handler $ 558, Replace Steam / Hot Water Unit Heaters $ 40, Replace Steam / Hot Water Radiant Heaters $ 239, Replace Emergency Generator $ 103, Replace Electrical Switchgear $ 68, Replace Electrical Panelboards $ 89, Replace Backflow Preventer $ 7, Replace Acoustical Ceiling Tiles $ 101, Replace Ceiling Grid $ 725, Replace Plumbing Fixtures $ 310, Repair Built-Up Roofing $ 18, Replace Parking / Roadway Curbs $ 38, Replace Sanitary Sewer Piping $ 115, Various Technological Improvements $ 300, Replace Air Compressor $ 6, Replace Asphalt Pavement $ 301, Plumbing Fixtures at Classroom Lavatories $ 32, Stair Guardrails Extension $ 16, Identify Exterior Doors (Security) $ 3, ADA Single Restrooms at Clinic $ 100, Area of Rescue Assistance $ 7, Replace Aluminum Windows $ 179, Repaint Ceramic Tile / Metal Walls at Gym Showers $ 1, Repair Ceramic Tile Flooring at Toilets A-M $ 10, Replace Rubber Tile at Stairs $ 6, New Elevator $ 250, ADA Single Restrooms $ 100, Science Labs $ 220, Science Classrooms $ 50, New Parking $ 400, Replace Caulking at Brick at Walls $ 40, Replace PVC Roofing at Addition $ 102, Replace Aluminum Windows $ 57, Repair Ceramic Tile Flooring at Locker Rooms $ 7, Replace Gyp. Board Ceiling at Locker Rooms $ 12, Repair Ceramic Tile Flooring at Gym Showers $ 1, Replace Gyp. Board Ceiling at Gym Showers $ 2, Renovations - Educational Master Plan $ 1,455, Upgrade Security & ADA $ 556, N. Cumb. MS Total Cost $ 6,685, Cost 1... $ 2,803, $ 2,865, $ 155, $ - 5 $ 859,818.40
8 Cost Cumberland High School 2 1 Plumbing Shutoff Valves $ 159, Replace Mechanical and HVAC Piping $ 1,388, Replace Mechanical and HVAC Piping, BLDG 3 $ 539, Replace Acoustical Ceiling Tiles, BLDG 3 $ 114, Replace Carpet Flooring $ 78, Replace Carpet Flooring, BLDG 3 $ 136, Plumbing Piping Systems Replacement $ 150, Various Technological Improvements $ 750, Repair Interior CMU Walls, BLDG 3 $ 10, Upgrade Controls to Direct Digital Controls (DDC) $ 800, Replace Ceiling Grid, BLDG 3 $ 638, Lighting Upgrades $ 32, Upgrade Room Lighting, BLDG 3 $ 16, Replace HVAC Controls, BLDG 3 $ 472, Private Shower Area $ 27, Replace Caulking at Windows at Original Building $ 40, Replace Aluminum Windows at ALP $ 127, Replace SAT at ALP Classrooms $ 23, Repaint CMU Walls at ALP Corridors $ 5, Replace SAT at ALP Corridors $ 2, Rescue Assistance Areas $ 14, Stair Tower Guardrail & Rail Extentions $ 10, Identify Exterior Doors (Security) $ 21, Replace 30 Zone Pumps $ 150, Replace Classroom Unit Ventilators - High School $ 300, Provide Ventilation System with HVAC - High School Offices $ 150, Provide Ventilation System with HVAC - High School Media Area $ 150, Replace Convectors and Ventilation Systems - High School Corridor $ 600, Recommission Controls, Add Carbon Dioxide (CO2) Control - Wellness Center $ 50, Upgrade Transitional Building Controls to Direct Digital Controls (DDC) $ 400, Replace Classroom Unit Ventilators - Transitional $ 2,000, Provide Vent System with HVAC - Transitional Offices $ 500, Replace Air Handling Unit (AHU) system with New System - Transitional Gym $ 300, Replace AHU system with New System - Transitional Auditorium $ 300, Provide Ventilation System with HVAC - Transitional Media Area $ 150, Replace Convectors and Ventilation Systems - Transitional Corridor $ 300, Domestic Hot Water Heater $ 50, Install Backflow Preventer $ 10, Aisle Lighting - Auditorium $ 27, Replace Roofing System at Pool Roof (replace EPDM with PVC) $ 122, Replace Rubber Tile at Stairs $ 21, Replace High School Heating Boiler System with NE-CHPS Compliant System $ 480, Replace Caulking at Brick at Walls $ 40, Replace Roofing System at Original (replace Built-Up Roof with PVC) $ 2,313, Replace SAT at Offices $ 12, Repaint Wood / Ceramic Tile Flooring at Corridors - Transitional $ 20, Refinish Wood Flooring at Gym - Transitional $ 18, Renovations - Regular $ 3,900, Renovations - Educational Master Plan $ 2,500, Upgrade Security & ADA $ 521, Cumberland HS Total Cost $ 20,943, Cost 1... $ 7,106, $ 10,989, $ 366, $ 45, $ 2,435,608.50
9 PROJECTED COST BY SCHOOL School Cost Ashton ES $ 6,944, B.F. Norton ES $ 5,229, CUMBERLAND SCHOOLS FIVE YEAR COST PROJECTIONS 11/30/2018 PROJECTED COST BY YEAR Community ES $ 10,390, Cost Garvin ES $ 5,609, $ 25,477, McLaughlin ES $ 5,304, $ 27,993, McCourt MS $ 3,778, $ 4,355, North Cumb. MS $ 6,685, $ 1,017, Cumberland HS $ 20,943, $ 6,042, BASE TOTAL $ 64,885, BASE TOTAL $ 64,885, SOFT COSTS Soft Cost Item Cost Arch. / Eng. 7% $ 4,541, Owner's Rep. 4% $ 2,595, FIVE YEAR GRAND TOTAL Comm. Agent 2% $ 1,297, BASE TOTAL $ 64,885, Contingency 5% $ 3,244, SOFT COSTS $ 11,679, TOTAL SOFT COSTS $ 11,679, GRAND TOTAL $ 76,565,091.43
New Hope-Solebury School District Campus Revitalization Plan
Campus Revitalization Plan 20 January 2016 GODSHALL KANE O ROURKE ARCHITECTS, LLC 12 East Butler Avenue, Suite 205, Ambler, PA 19002 T: 215.646.2003 F: 215.646.5707 www.gkoarchitects.com Site Rendering
More informationCharles Kozminski Elementary Community Academy
Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMyra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649
Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation
More informationPhoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS
Facility Assessment Report Co-locating on this campus are MARIE MILITAR HS and PHOEIX MILITAR HS This report contains the detailed findings of a facility assessment completed on the date noted in the document
More informationAlex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628
11411 S Eggleston Ave Chicago, IL 6628 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors
More informationPROGRAM AREAS - MIDDLE SCHOOL
CAPACITY Enrollment 4.0 10.00 3.81 Building Size 4.0 10.00 3.81 ACCESSIBILITY Site Access 4.0 3.00 1.14 Building Access 2.0 3.00 0.57 Disabled Access 1.0 3.00 0.29 Some site and building areas not ADA
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: R. F. WAGNER SEC SCL ARTS & TECH-Q, 47-07 30TH PLACE, New York, 11101 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-16
More informationSalmon P Chase Elementary School 2021 N Point St Chicago, IL 60647
221 Point St Chicago, IL 47 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each
More informationEmil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619
Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation
More informationWilliam Howard Taft High School
Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629
Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation
More informationOBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS
OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS A 2008 City Code amendment requires the owners of all rental dwelling units in the city to have a certificate of occupancy (CO) before
More informationJohn F Kennedy High School 6325 W 56th St Chicago, IL Co-locating on this campus are KENNEDY HS and KINZIE
Facility Assessment Report 6325 W 56th St Chicago, IL 6638 Co-locating on this campus are KEED HS and KIZIE This report contains the detailed findings of a facility assessment completed on the date noted
More informationConstruction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161
1 School Name Year Built/Renovation Classroom quantity, size, type, usage Glover School Construction 2012-14 Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor
More informationTheodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625
Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation
More informationTRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045
TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION 9123 Route 108, Old Annapolis Road Columbia, MD 21045 RETAIL/OFFICE/MEDICAL/EXECUTIVE SUITES OFFERED FOR LEASE PROPERTY IDENTIFICATION: ADDRESS:
More informationShoreview Corporate Center
Table of Contents Section Page # Property Overview Executive Summary 4 Property Description 4 Area Map 5 Aerial Photograph Area 6 Aerial Photograph Property 7 Campus Map 8 1005 Gramsie Building Physical
More informationLiberty-Valley Elementary School
150024 Liberty-Valley Elementary School Site Plan of Liberty-Valley Elementary Floor Plan of Liberty-Valley Elementary 2 150024; Liberty-Valley Elementary School. This school is located at 175 Liberty
More informationRGM Architects. Eduardo Mata Elementary School
Insert Google Map Image Overall Scope ADA Improvements Exterior site upgrades Roof replacement Restroom upgrades Kitchen upgrades Mechanical, electrical, and plumbing upgrades Fire alarm and Life Safety
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: DIV. OF INSTR. & INFO. TECH.-K, 335 ADAMS STREET, New York, 11201 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-17 8:05
More informationCORDOVAN PARK W I-20, Arlington PROPERTY REPOSITIONING Case Study
CORDOVAN PARK 5840-5850 W I-20, Arlington PROPERTY REPOSITIONING Case Study ABOUT CORDOVAN Cordovan Park is a two building complex of low rise garden office style brick buildings located in South Arlington
More informationM001 EAGLECREST LEARNING CENTER CITY & BOROUGH OF JUNEAU. Inc. CBJ CONTRACT No. E SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE
SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE PLUMBING CONNECTION SCHEDULE PUMP SCHEDULE SHEET LIST SYMBOLS & SCHEDULE FILE: 303 M00 FLOWSETTER AND AUTOMATIC VALVE SCHEDULE CODE NOTES:
More informationGym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers
New Bleachers Gym Capacity: 710 Stage Auditeria Capacity: 390 Enlarged plan of new stage configuration showing greater seating capacity of the gym vs. that of the auditeria Proposed 2018 Bond Projects
More informationAshby, Pepperell, Townsend North Middlesex Regional High School. Preferred Schematic Report Update
Ashby, Pepperell, Townsend North Middlesex Regional High School Preferred Schematic Report Update June 3, 2013 AGENDA Preferred Schematic Report (PSR) Options Review Criteria and Goals Project Costs Factors
More informationThe Kaleden. 11 Suite Apartment Building. For Sale. Prime South Granville Location West 13th Avenue, Vancouver, BC
The Kaleden 11 Suite Apartment Building Prime South Granville Location 1015 West 13th Avenue, Vancouver, BC For Sale David Goodman 604 714 4778 david@goodmanreport.com Mark Goodman* 604 714 4790 mark@goodmanreport.com
More information17 N Centre Ave Leesport, PA 19533
17,400± SF Special Purpose/Religious Facility 17 N Centre Ave Property Highlights Stained Glass Windows Two Wood Staircases Parking in Rear 2 lots Social Hall with Stage Kitchen Sanctuary w/ Pew Seating
More informationAttic Floor Bedrooms 1 & 2 Family Dwellings
Habitable Room Definition (2015 MN Residential Code R202) A space in a building for living, sleeping, eating or cooking is considered a habitable space. Bathrooms, toilet rooms, closets, halls, storage
More informationTiny House on Wheels A Tiny House
TINY HOUSES November 2018 The term Tiny House means different things to different people. Some people use the term to refer to a Tiny House on Wheels while others refer to a smaller version of a detached
More informationRIDDLE RIDDLE ASSOCIATES, INC.
RIDDLE ASSOCIATES Inc. ASSOCIATES Inc. Commercial Real Estate PRICE REDUCTION! OFFICE / WAREHOUSE INDUSTRIAL FOR SALE OR FOR LEASE 1716 Lambert Court Chesapeake, Virginia 23320 (Greenbrier off Woodlake
More informationDESIGN PRIORITIES. Avenues for Homeless Youth. Charrette Goals AVENUES FOR HOMELESS YOUTH
DESIGN PRIORITIES Avenues for Homeless Youth Avenues provides shelter, transitional housing, and support services to over 200 homeless youth annually through a variety of programs including Minneapolis
More information518 3 rd Avenue South St. Petersburg, Florida
518 3 rd Avenue South St. Petersburg, Florida 33701 813.895.8591 www.viridianfl.com Project Summary Preservation of Senior Housing Project Name: Viridian Address: 518 3 rd Avenue South St. Petersburg,
More informationFREEHOLD BOROUGH SCHOOL DISTRICT. Proposed Referendum Schematic Designs & Preliminary Costs
FREEHOLD BOROUGH SCHOOL DISTRICT Proposed Referendum Schematic Designs & Preliminary Costs Introduction The foundation of every state is the education of its youth. - Diogenes Laertius Greek Philosopher
More informationCITY OF NORTH MANKATO CAPITAL ASSET POLICY ADOPTED: JANUARY 1, 2003 REVISED EFFECTIVE: _JANUARY 1, 2016
CITY OF NORTH MANKATO CAPITAL ASSET POLICY ADOPTED: JANUARY 1, 2003 REVISED EFFECTIVE: _JANUARY 1, 2016 1 TABLE OF CONTENTS SECTION I Define Capital Assets and Capitalization Thresholds SECTION II Reporting
More informationTechnical Specifications
Technical Specifications Hazmieh Platinum City Plot 799 Developer: Michel Jean Asmar Platinum City Page 1 Contents 1-COMMON AREA... 3 Access Area... 3 Service Area... 3 2- RESIDENTIAL AREA... 3 3- MECHANICAL
More informationGraduate & Family Housing Master Plan
Graduate & Family Housing Master Plan University of Missouri - Columbia Project Number 400951 June 11, 2008 Prepared by Table of Contents 1 Executive Summary Introduction Recommended Plan Report Structure
More informationCorvallis School District 2002 Long Range Facilities Master Plan Projects Update
Corvallis School District 2002 Long Range Facilities Master Plan Projects Update Phase 1 (Each estimate includes contingency, indirect and inflation costs) 1. Replacement School for Existing Corvallis
More informationMil Palmeras BUILDING SPECIFICATIONS. FOUNDATION: Foundation and armed concrete beams.
complex is located a few meters from the beautiful beaches of, in a quiet place, but close to shopping and entertainment centers such as the Pueblo Latino village or the center of. In we can find bungallows
More information2016 Annual Report. Enid Public Schools 2016 Bond. February 2017
2016 Annual Report Enid Public Schools 2016 Bond February 2017 Enid Public Schools Strategic Action Plan The initial goals of the Enid Public Schools Strategic Action Plan have been met, and we are well
More informationRenovation Progress. July 21 Aug 3, Week 42 & 43
Renovation Progress July 21 Aug 3, 2012 Week 42 & 43 Jul 21 Saturday work: hardwood sanding on 2nd Ottilia and masonry outside BSRC dining room Jul 23 Carpet removal outside of chapel Jul 23 2 nd Ottilia
More informationSETX Environmental, Inc. Environmental Consulting & Testing Asbestos - Mold Lead ESA s
SETX Environmental, Inc. Environmental Consulting & Testing Asbestos - Mold Lead ESA s Mr. Jack Haralson October 15, 2018 Director of Facilities & Planning ASE Project No. 18-206 Texas City ISD 1700 9
More informationHOME INVESTMENTS PARTNERSHIP PROGRAM Local Housing Standards Checklist
: Initial Inspection Annual Inspection Re-Inspection Pass Tenant Name: Address: Number of Bedrooms: Build : Housing Type: Single Family Residence Duplex Low Rise(2-4 stories) High Rise(5 or More Stories)
More informationflexible spaces all the right places... fogg.com ...Euclid Corridor Industrial Mall 1100 East 222nd St., Euclid, Ohio I-90 E. 222 St.
flexible spaces all the right places......euclid Corridor Industrial Mall 1100 East 222nd St., Euclid, Ohio I-90 E. 222 St. N Flexible Spaces in All the Right Places is what Fogg had in mind when designing
More informationSHARPSVILLE AREA SCHOOL DISTRICT
No. 622 SHARPSVILLE AREA SCHOOL DISTRICT SECTION: FINANCES TITLE: GASB STATEMENT 34 ADOPTED: January 22, 2008 REVISED: 622. GASB STATEMENT 34 1. Purpose SC 613 The Board recognizes the need to implement
More information190, Rue Jean-Talon, Fleurimont (Sherbrooke)
190, Rue Jean-Talon, Fleurimont (Sherbrooke) MLS / ID #14426462 Additional Information - The electricity amount of $ 1,307 is for 324 days. - Currently the master bedroom measures 23'11 X 11'11 but it
More informationDESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK
DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK I. LANDLORD'S WORK Landlord's Work shall be done in accordance with the specifications set forth below, shall be limited to the work set forth in this Section
More informationGREAT FALLS HIGH SCHOOL MASTER PLAN. GFHS Master Plan Task Force
GREAT FALLS HIGH SCHOOL MASTER PLAN GFHS Master Plan Task Force Serving our community for over 80 years! Overriding premise: Retain GFHS Architectural Integrity Infrastructure Issues 1) Heat, ventilation,
More informationSubject: Class: Number: ( ) Complete Revision Supersedes: Page:
( ) Partial Revision Page 1 of 12 TABLE OF CONTENTS: Purpose Page 1 A. Buildings 2 B. Improvements 3 C. Land 4 D. Construction in Progress 5 E. Personal Property 6 F. Works of Art and Historical Treasures
More informationTHE TEN AT LAKE FORREST. FROM THE $850's
FROM THE $850's THE TEN AT LAKE FORREST Fabulous custom Brownstones by Sheehan Built Homes in Sandy Springs gated community. Elegantly appointed with finest finishes! Gourmet Kitchen with quartz counters,
More informationFORMER EDUCATIONAL FACILITY HOAGLAND RD., HOAGLAND, IN FOR SALE PROPERTY HIGHLIGHTS FOR SALE: $275,000
PROPERTY HIGHLIGHTS This former educational facility is located on the north side of Hoagland, IN on 11.42 acres. The one-story, steel building is 61,266 SF with access off Hoagland Rd. Zoning: RS-1 (Suburban
More informationLocal Ballot Measure: E. Enterprise Elementary School District Bond Measure
E Enterprise Elementary School District Bond Measure Ballot question To improve educational quality; upgrade/renovate/construct classrooms, restrooms and facilities; repair/replace leaky roofs; upgrade
More informationSolicitation for Offers: 135 Allen Brook Lane Williston, Vermont
EXCLUSIVELY LISTED FOR SALE Solicitation for Offers: 135 Allen Brook Lane Williston, Vermont Contact: Chris Sherman x11 Tony Blake x13 www.vtcommercial.com Free-standing 8,127 square foot 1 1/2 story office
More informationExceptional Multi-Tenant
Facts & Features Sale Price: $1,270,000 ($91/SF) 5 Retail Units + 1 Apartment Building Size: 13,924 SF Sale Includes Gas Station & Liquor Store Businesses Marathon Gas Station with Car Wash Built in 1958-1.95
More informationCommercial For Sale Data Input
* = Required Field Commercial For Sale Data Input Listing Contract Information Property Type Industrial Investment Office Residential Income Retail *Parcel ID No: *Listing *Service Type Full Service *Listing
More informationProperty Details 916 Youngs Road
Property Details 916 Youngs Road PRINCIPAL RESIDENCE o 4 bedrooms, 4 bathrooms, plus 2 half baths Master Suite 1100 sq ft master suite Master Closets His & Hers separate walk-in closets with Custom built-ins
More informationResidencial El Prado - "Viviendas desde *. Plaza y Trastero Incluido" Ensanche de Vallecas (caseta nº 1)
A NEW CITY IN MADRID El Prado residential complex is located in Madrid, in a new area that will soon be considered as one of the most important residential areas in the autonomous community, the place
More informationEXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE
EXHIBIT A FULL TEXT OF BOND PROPOSITION 4152-6874-3188.6 HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE This proposition may be known and referred to as the Hilmar
More informationSt. Charles High School Emergency Plan Instructions. Fire Drill Evacuation Procedures
Keep the following items in this folder: St. harles High School Emergency Plan Instructions urrent class rosters (student names only, update quarterly) School Emergency Plan for St. harles High School
More informationRenovation Progress. June 2-15, Weeks 35 & 36
Renovation Progress June 2-15, 2012 Weeks 35 & 36 Jun 2 Sisters investigate the progress and ponder the finished arrangement of the reception area (right) and the residence area on 2 nd Ottilia (below)
More informationSection 3: Primary Function, Employee Work Areas, & Kitchens
Section 3: Primary Function, Employee Work Areas, & Kitchens TEXAS ACCESSIBILITY ACADEMY Architectural Barriers Program 106.5.45 Primary Function A major activity for which the facility is intended Examples:
More informationflexible spaces all the right places... fogg.com Brookpark Rd. Extension North Olmsted, Ohio
flexible spaces all the right places......26700 Brookpark Rd. Extension North Olmsted, Ohio Flexible Spaces in All the Right Places is what Fogg had in mind when designing their large portfolio of office,
More informationFinal RRISD Bond 2018/19 Project List 3 Yr Sale
Capital Renewal Anderson Mill ES ELEC Replace electric panels, Capital Renewal Anderson Mill ES ELEC Replace Main Switch Gear 97,200 Capital Renewal Anderson Mill ES Controller Replacement/Programming
More informationFour Bedroom 2.5 Bath Colonial: The Grand Maple 2,319 sq. ft. Starting at $329,990
3 Car Garages Available Four Bedroom 2.5 Bath Colonial: The Grand Maple 2,319 sq. ft. Starting at $329,990 The Grand Maple features open floor plan (kitchen/dining/great room), large mud room, first floor
More informationMUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK
MUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK For further information or inquiries please write or call your municipality s Small Cities Consultants: Lisa Low & Associates 293 Riggs Street Oxford,
More informationCustom Luxury Attached Townhomes
Custom Luxury Attached Townhomes A great place to live, learn, work and play! Waco s unique location along I-35 combined with its many natural assets that include the Brazos River, Lake Waco and the beautiful
More informationGeneral Statement Regarding Assessment Analysis Recommendations
Summary For Berkley Court Apartments VA018182000 General Statement Regarding Assessment Analysis Recommendations Pursuant to the Franklin Redevelopment and Housing Authority, VA agreement with The Nelrod
More informationFOR SALE OR LEASE. Manufacturing / Distribution Facility 85,262± Square Feet (Divisible) Acres
FOR SALE OR LEASE Manufacturing / Distribution Facility 85,262± Square Feet (Divisible) 15.65 Acres 330 Southwell Boulevard Tifton, Tift County, Georgia 31794 SALES PRICE: $4,000,000 LEASE RATE: $2.00/PSF,
More information1. Project No.: 812 Muslim Commercial Bank, Karachi Mechanical & Electrical System
Scope of Services Provided FND offers a comprehensive range of engineering consultation services in a wide spectrum of electrical & mechanical fields. We serve clients in the commercial, institutional,
More information1513 & 1515 Greenleaf Street Evanston, IL Karla Thomas & Lina Zoraikat
1513 & 1515 Greenleaf Street Evanston, IL 60202 2 New Construction Homes with Live/Work Flexibility Karla Thomas & Lina Zoraikat Cell 773.505.1121 or 312.721.8554 Email karla.thomas@urb2burb.com www.urb2burb.com
More information1185, Rue du Sphinx, Fleurimont (Sherbrooke)
1185, Rue du Sphinx, Fleurimont (Sherbrooke) 534 000 $ MLS / ID #10472140 Additional Information - Electric heating with forced air - 2 zones: 1 zone for the RDC and the basement and 2nd zone for the 2nd
More informationFile: C DP/CK Photographs of Subject Property Page v. Duplex. Single Family Dwelling
File: C-49048-DP/CK Photographs of Subject Property Page v Duplex Single Family Dwelling File: C-49048-DP/CK Photographs of Subject Property Page vi Cabins Subject Property Page 9 Lac La Biche County
More informationThese requirements are listed in detail in the Decree N of August 26 th 1987 (Download).
LEASE CONTRACTS : THE BASIC RIGHTS AND OBLIGATIONS 1 INTRODUCTION Signing a lease impose the tenant to comply with a number of maintenance and repair obligations. These requirements are listed in detail
More informationTENANT DESIGN MANUAL UPDATED JUNE 2015
TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW Hamilton Town Center is located at the intersection of 146th Street (SR 238) and I-69 in Noblesville, IN. It s location in Hamilton County enables
More informationNOTICE OF SALE. Old Mill Townhomes 725 Mill Stream Lane Lynchburg, VA 24502
NOTICE OF SALE Old Mill Townhomes 725 Mill Stream Lane Lynchburg, VA 24502 Site Description The property is located along the eastern side of Old Mill Road and 0.2 mile north of its intersection with Graves
More informationDRAFT CITY OF LONGVIEW PARKS & RECREATION COMPREHENSIVE PLAN Facilities. 62 P age
4.5 Facilities 62 P age ELKS MEMORIAL BUILDING Facility A 2121 KESSLER BOULEVARD This building is located in Lake Sacajawea Park and includes two activity rooms that house a computer lab, game room, as
More informationResidencial Altos del Sabinal - "Viviendas desde *. Plaza y Trastero Incluido"
Make your life a work of art At Inmobiliaria Osuna, there are hundreds of professional estate agents working to make your ideas and dreams come true, because we like work that is done well, we like looking
More informationFOR SALE. 233 Congress Avenue Waterbury, CT MIXED - USE BUILDING AC LOT. 2,542 S/F with 4-1 BR APTS + BAR GAS / HVAC OFF STREET PARKING
FOR SALE 233 Congress Avenue Waterbury, CT 06708 MIXED - USE BUILDING + 0.14 AC LOT 2,542 S/F with 4-1 BR APTS + BAR GAS / HVAC OFF STREET PARKING WELL MAINTAINED LOCAL OWNER SALE: $295,000.00 MATTHEWS
More informationRiddhi Siddhi a project by Durga Associates
Centrally Located 2, 3 BHK Apartments at IT Hub 6km Airport 23km Hospital 1Km CBSE / ICSE School 2Km Engineering & Management College 1Km Pune Railway Station 12Km a project by Durga Associates Pune Mumbai
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-0050
More informationTOWN CENTER Property Description 2000 Tower Town Center 2000 Tower Overview Completed in 1986, the 2000 Tower at Town Center has one of its most striking entry lobbies. The polished granite lobby is two
More informationREGISTRATION NO P AFFORDABLE HOUSING AT DABHA, NAGPUR
REGISTRATION NO P0000 THE PROPOSED SITE PROPOSED SITE M WIDE ROAD AMRAVATI ROAD ORDINANCE FACTORY MIDC WHY DABHA? Dabha is located within the Municipal corporation limit It is being developed with good
More informationAccessible drinking fountain does not have a clear 30 wide floor space centered on the drinking fountain (centerline to the counter edge is 12 ).
ADA STANDARD: PARKS SERVICE CENTER GARAGE 4.15.5(1), Figs. 4(e) and 27(b) Accessible drinking fountain does not have a clear 30 wide floor space centered on the drinking fountain (centerline to the counter
More informationTENANT DESIGN MANUAL UPDATED AUGUST 2015
TENANT DESIGN MANUAL UPDATED AUGUST 2015 PROJECT OVERVIEW JCPenny Nordstrom Macy s Lord & Taylor Sears WOODFIELD MALL 2 PROJECT OVERVIEW The largest shopping center in the state of Illinois and one of
More informationEdificio Brillante C/ Periodista José Mª Carulla (esquina Avda. Andalucía),
A PLACE FOR YOUR SENSES Where your surroundings and quality of life go hand in hand. 2, 3 and 4 BEDROOM FLATS with an excellent layout in a magnificent urbanisation with a swimming pool, gym and sauna.
More informationPREMIUM SERVICED RESIDENCES
PREMIUM SERVICED RESIDENCES with a sea view Part of South Chennai s largest integrated development MARG JUNCTION MARG Junction mall is MARG s umbrella brand for development of retail, hospitality and leisure
More informationRR Building Area: (sf) 19,800 SF. Cost per Square Foot: $207. Construction Cost $4,100,000. Date of Completion: February 2014
Program Summary: The client, a seminary college, wished to renovate an existing 1960 Mid- Century Modern dormitory structure, converting it to a single room / bath residence hall. Program Statement: The
More informationUpper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive
Master Plan Presentation for: 520 Virginia Drive May 22, 2018 Design Presentation Agenda Master Plan Design for 520 Virginia Drive Existing Conditions & Opportunities Project Goals Site Plan & Floor Plans
More informationINFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS
INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS Prepared by: Community Development Standards Branch Town of Innisfil www.innisfil.ca June 2016 Contents 1. Introduction... 1 2. Ontario Building
More informationREQUEST FOR PROPOSAL ON PURCHASE OF HISTORIC SCHOOL BUILDING
REQUEST FOR PROPOSAL ON PURCHASE OF HISTORIC SCHOOL BUILDING Garfield Elementary School 300 North West 7th Street Abilene, Kansas 67410 Listed on the National Historic Register of Historic Places Site
More informationHome Plan Approx Bed Baths Garage Slab Basement Sq Ftg Base Price Base Price. Willow (Mstr Main) From $369,900 $410,900
Home Plan Approx Bed s Garage Slab Basement Sq Ftg Base Price Base Price Willow (Mstr Main) From 2900 4 3.5 $369,900 $410,900 Jaemore (Ranch) From 3000 4 3.5 $387,900 $442,900 (Includes upstairs bonus
More informationThe residential housing development of GRAND LAND, INC.
The residential housing development of GRAND LAND, INC. Developer s Profile Grand Land is the residential property development arm of the Gaisano Grand Group. It is tasked to develop single detached houses,
More informationWEST END. 855 Jervis Street, Vancouver $8,100, Unit Apartment Building Suite Mix 13 - Bachelor 35-1 Bedroom
WEST END $8,100,000 48 Unit Apartment Building Suite Mix 13 - Bachelor 35-1 Bedroom BUILDING SUMMARY Cresta Apartments is located in the West End of Vancouver, blocks to all amenities including transportation
More informationRENTER'S INSPECTION WORKSHEET Free form provided at
RENTER'S INSPECTION WORKSHEET Free form provided at www.utaheviction.com In anticipation of entering into a lease where ("Landlord(s)"), will rent to, (the "Tenant(s)"), the premises described as: The
More informationFor more information, please call: GINA ALLEN (757)
Built by: For more information, please call: GINA ALLEN (757) 439-3003 ginaallen@williamewood.com Standard Features INTERIOR FEATURES: Hardwood Flooring in Foyer 9 Ceilings First Floor Walls Gas Fireplace
More informationACCESSORY DWELLING UNITS
ACCESSORY DWELLING UNITS Category: Residential Construction Revised: [Paul L. Scarlett], Director Responsible Bureau Sections: Development Services Center 1900 SW Fourth Avenue Portland, OR 97201 503-823-7310
More informationREFLEC TIONS I & II AT CIRCLEPOR T
REFLEC TIONS I & II AT CIRCLEPORT ERLANGER, KENTUCKY CL ASS A OFFICE SPACE AVAIL ABLE REFLECTIONS I & II AT CIRCLEPORT OFFERS MANY ADVANTAGES: State-of-the-art fiber optics cabling designed for New Economy
More informationFICO Realty Group Presents 485 Washington Street Woburn MA 01801
FICO Realty Group Presents 485 Washington Street Woburn MA 01801 TO BE BUILT! 485 Washington St. Woburn MA 01801 is a beautiful 8 Room, 4 Bedroom, 2 1/2 Bath, Colonial. Very close to the Reading line.
More informationCAPITAL ASSETS POLICY FOR THE VILLAGE OF FLOWER HILL. Section I. Capital Asset Definitions and Guidelines. I. (1) Overview
CAPITAL ASSETS POLICY FOR THE VILLAGE OF FLOWER HILL Section I. Capital Asset Definitions and Guidelines I. (1) Overview The Governmental Accounting Standards Board s (GASB) Statement No. 34, Basic Financial
More informationCOLD DARK SHELL LEASE EXHIBIT
COLD DARK SHELL LEASE EXHIBIT COLD DARK SHELL Lease Exhibit 1 EXHIBIT C Leasehold Improvements Work Letter I. ALL WORK TO BE PERFORMED HEREUNDER SHALL CONFORM TO CODE. CODE SHALL BE DEFINED FOR PURPOSES
More informationerie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT
erie street hotel 12-22 WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT PROJECT F.A.R. BASE F.A.R. PROPOSED F.A.R. 13,819 SF 111,933 SF 14 LEVELS+
More informationHarmony Row Dublin 2. Dublin 2
Harmony Row Dublin 2 Dublin 2 A Prime Location Herbert House is situated in a most accessible and well known address within Dublin 2. The building sits on the south side of Lower Grand Canal Street just
More information